ISLAMABAD: The commission set up by the prime minister to investigate the 10-day oil crisis

which almost paralysed the country this month has blamed almost the entire oil supply chain,
including the ministries of power, petroleum and finance, Oil and Gas Regulatory Authority
(Ogra), the management and board of Pakistan State Oil (PSO), market players and Pakistan
National Shipping Corporation (PNSC) for the acute fuel shortage.
Read: Pakistan's fuel crisis weighing on credit worthiness: Moody's
The two-member commission comprising Zahid Muzaffar and Zafar Masud recommended
structural reforms in the energy sector and maintaining above 300,000 tons of fuel stocks at all
times to cover at least 20 days of consumption.
Members of the commission considered close to Finance Minister Ishaq Dar called for action
against the chairman and member of Ogra, reprimanded the PNSC management and fixed direct
responsibility on eight officers of the petroleum ministry and PSO.
Also reead: Ogra responsible for petrol crisis, PM Nawaz told
The inquiry report available with Dawn also accused what it described as the black sheep in the
oil industry oil marketing companies (OMCs) and dealers of being involved in hoarding and
black marketing of petrol. It suggested diversion of at least 50 per cent power sector bills and
tariff differential subsidy to the PSO to avoid similar crisis in future. It also accused the Oil
Companies Advisory Council (OCAC) of having been negligent.
Also read: Petrol crisis deepens, spills over to Karachi
The report said the crisis had been brewing for quite some time and surely a result of structural
issues and not only an event-driven situation, adding that some issues needed to be fixed
urgently while structural issues could be tackled in medium to long-term.
The issues identified by the report included poor management practices, systems and
management incompetence at the PSO, inability to appreciate the extent of the potential issue by
the petroleum ministry and failure of Ogra to do its job of prudent monitoring of OMCs amid
falling prices.
It said inventory losses resulted in OMCs shying away from holding inventory for a longer
period and lack of crisis management rules of business across the sector. The OMCs failed to
invest in storage facilities and were not maintaining the stocks required for emergency.

Also a sudden surge in demand because of falling patrol prices and the rationing of CNG in the
market contributed to the problem and strong possibilities of hoarding at the distributor and retail
level. The private sector OMCs may also be involved in creating this artificial shortage, it said.
The report also identified chronic capacity and competence issues within the public sector and
ownership issues within bureaucracy and mounting receivables from the water and power
ministry and the delay in payments by the power sector companies due to resurrection of the
circular debt issue.
Commissions findings
One thing is absolutely clear that the crisis has arisen fundamentally due to indifference and
incompetence of the PSO management. In this respect, the then acting managing director, CFO,
GM (retail), senior GM (supply chain) and DMD (operations) are at fault. They surely did not
play the role required to handle the situation.
There are surely room available in PSOs balance sheet to raise more funding from the market
but the necessary efforts were not made. There was an impending dispute on freight charges on
motor gasoline (mogas) between the PSO and PNSC which could have been managed a while
back (the committee within PSO was formed in August last year) which could have at least
reduced the $2 per ton freight loss for the PNSC and led the corporation to charter the ships
quickly/without delay and import mogas in a timely fashion.
No efforts were made to manage the 20-day required stock. This resulted in absolutely minimum
stock maintenance, leading to panic buying which aggravated the situation of mogas in the
market. Lack of strategic planning and ineffectiveness of contingency plan in the PSO was very
evident.
At the Ministry of Petroleum and Natural Resources, the additional secretary (policy), who also
happened to be a member of the PSO board and responsible for monitoring the industrys stock
position, did not act in time to make necessary alternative arrangements. The DG (oil), whos
responsible for monitoring the industry-wide demand and supply position and to ensure stability
in the market, also failed to understand the extent of the potential issue and manage the situation
prudently.
The petroleum secretary, whos the administrative head of the ministry, cannot be absolved of the
responsibility of this fiasco either. Given the technical nature of the sector, the capacity issue
seems more glaring in the petroleum ministry.
Ogras role

The most interesting revelation has been on the role of Ogra. It was very clear that the role and
actions of Ogra have been substandard as a regulator. The enforcement of issues like inspection
at the retail/distribution and OMC level, requirement of building of infrastructure to meet with
minimum storage facilities, monitoring of stock/sale situation industry-wide in the falling oil
prices environment, instituting mandatory contingency planning in OMCs, etc, were almost nonexistent, despite reportedly substantial resources at the disposal of the regulator.
Had Ogar been playing its due role, this situation would have never arisen.
The role of other OMCs, with a collective market share of 54 per cent and storage facilities of
44pc, cannot be ignored either. They were also not maintaining the necessary/minimum
contingency stocks due to the storage constraints. The foul act of some elements at the OMC,
distributor and retail levels cannot be ruled out either.
The Oil Companies Advisory Council also appeared to have failed to identify structural and flow
issues in the industry and did not play the role expected from this expert forum.
The crisis has a lot to do with PSOs receivables outstanding from the public sector entities,
particularly from the power sector Rs171 billion currently. PIA at Rs13bn was another big
defaulter of PSO. But then this is not a unique situation for the PSO.
Recommendations
The responsibility within PSO vests with the acting MD and DMD (finance). The DMD
(operations), senior GM (supply chain), and GM (retail) need to be reprimanded. The
responsibility within the petroleum ministry rests primarily with the secretary, additional
secretary (policy) and DG (oil).
Action needs to be taken against the chairman and relevant member of Ogra and the PNSC
management should also be reprimanded; cash management of white oil and black oil shall
immediately be segregated and maintained independently to avoid such instances in future and
the PSO must secure more banking lines, both funded and unfunded, and explore the possibilities
of raising funding through innovative products, including listed capital market instruments, to
meet its working capital requirements assuming six months of delayed payments from the water
and power ministry.
Additional storage facilities should be built across the country to preserve at least 300,000 tons to
meet the benchmark of a minimum 20-day requirement. The private sector should be invited to
build these facilities and further lease them out on a long-term basis to the local OMCs.
The OCAC should review the product demand and supply situation on a better frequency
intervals weekly basis and make a bouquet of supply arrangements of contracts on spot,

short-term and medium-term bases, ideally through a government-to-government arrangement,


or otherwise on a tendering basis.
There must be a system in place whereby at least 50 per cent collections of Pepco/power ministry
be diverted to the PSO through a banking cash flow mechanism, and a mechanism to ensure that
the TDS payment be diverted directly to the PSO.
Published in Dawn January 27th, 2015