BFG Power Plant Gent SPP5-5000

Noise Acceptance Test

March/April 2010
Version 3 - Definitive report

Principal :
Siemens NV Energy
Demeurslaan 132
B-1654 Huizingen, Belgium

Reportnumber: 10.0102-1-v3

Date : 28 April 2010

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Report executed by
SGS Belgium NV
Haven 407
Polderdijkweg 16
2030 Antwerp
Tel. 03/545.87.50

Co-operators of SGS
Bert De Winter
Acknowledged expert noise and vibration (Flanders environmental legislation)
Projectleader and author

Ing. Dries Van Hooydonk


Acknowledged expert noise and vibration (Flanders environmental legislation)

Jerome Gevaert
Acknowledged expert noise and vibration (Flanders environmental legislation)

Ing. Thomas Redant


Expert noise and vibration

Contact of Siemens
Mr. Marcel Jttner, Noise Expert

This report may only be reproduced in its entirety. Only and only the original signed report is
binding

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

2/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Table of contents
1

INTRODUCTION .................................................................................................. 6

REFERENCE DOCUMENTS................................................................................ 6

MEASUREMENT EQUIPMENT ........................................................................... 8

APPLICABLE LEGISLATION .............................................................................. 9

4.1
Environmental noise in Flanders concerning the far field levels
4.1.1
General
4.1.2
Immission points used to evaluate the specific noise of the BFG Power Plant

9
9
10

4.2
Extract of Legislation in Belgium concerning the near field levels
4.2.1
Exposure limit values and exposure action values
4.2.2
Practical interpretation of exposure action values for BFG Power plant

11
11
11

MEASUREMENTS @ 1 M DISTANCE NEAR FIELD ..................................... 12


5.1

During 100% Steam turbine bypass operation For information

12

5.2
During base load and/or maximum load operation
5.2.1
In the control room building UCA
5.2.2
In the water treatment building UGD
5.2.3
In the steam turbine building UMA
5.2.4
In the cooling tower make up water building UGJ
5.2.5
In Workshop and Storage building UST
5.2.6
In PCC Containers UBA
5.2.7
In boiler building UHA
5.2.8
Around steam turbine building UMA and transformer area UBF
5.2.9
Around PCC containers UBA
5.2.10
Around water treatment area UGD/UGA/UGE
5.2.11
Around gas reduction station area UEN
5.2.12
Around boiler building UHA and auxiliary boiler building UHB
5.2.13
Around Cooling Tower area URA and UGJ

16
16
17
17
20
20
21
22
24
25
25
26
26
28

MEASUREMENTS IN THE FAR FIELD ............................................................. 29


6.1

Regimes of the BFG Power Plant and evaluation points to consider

29

6.2

Specific noise by immission measurements at the evaluation points

29

6.3

Noise emission measurements

30

6.4

The noise calculation model

32

6.5

Comparison specific noise with limit values

33

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

3/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

CONCLUSIONS ................................................................................................. 34

Table 4.1: environmental quality standards from Appendix 2.2.1 of Vlarem II ............................... 10
Table 5.1 : Levels in UMA during steam turbine bypass operation ................................................. 12
Table 5.2 : Levels ground level between UMA and UHA during steam turbine bypass operation13
Table 5.3 : Levels in UHA during steam turbine bypass operation.................................................. 14
Table 5.4: Levels in UCA ...................................................................................................................... 16
Table 5.5: Levels in UGD ...................................................................................................................... 17
Table 5.6: Levels in UMA during steel gas pressure control operation ( 275MWel. output) ....... 17
Table 5.7: Levels in UMA during maximum load ( 325MWel. output) ............................................ 18
Table 5.8: Levels in UGJ....................................................................................................................... 20
Table 5.9: Levels in UST....................................................................................................................... 20
Table 5.10: Levels in UBAs ................................................................................................................. 21
Table 5.11: Levels in UHA during maximum load.............................................................................. 22
Table 5.12: Levels around UMA and UBF during base load ............................................................. 24
Table 5.13: Levels around UBA during base load ............................................................................. 25
Table 5.14: Levels around UGD/UGA/UGE during base load ........................................................... 26
Table 5.15: Levels around UEN during base load ............................................................................. 26
Table 5.16: Levels around UHA and UHB during base load ............................................................. 27
Table 5.17: Levels around URA and UGJ during base load.............................................................. 28
Table 6.1: Measured LA95,5min. levels at evaluation points ............................................................... 30
Table 6.2: LA95,1.5min-levels, measured at the different positions at the plant boundary................. 31
Table 6.3: Sound power levels of relevant noise sources during maximum load ......................... 32
Table 6.4: Sound power levels of relevant noise sources during bypass operation..................... 32
Table 6.5: Comparison calculated specific noise of maximum load to the noise limits ............... 33
Table 6.6: Comparison calculated specific noise of bypass operation to the noise limits........... 33
Figure 7.1: Position evaluation points on land use map (source AGIV GIS Vlaanderen))........... 35
Figure 7.2: Position measuring points on aerial photograph (source Google Earth).................... 36
Figure 7.3: Ref. No. 3B - Measurement positions located inside Steam turbine building UMA
(level 14,5m) ................................................................................................................................... 37
Figure 7.4: Ref. No. 3A - Measurement positions located inside Steam turbine building UMA
(ground level 0m) .......................................................................................................................... 38
Figure 7.5: Ref. No. 8 - Measurement positions located outside Steam turbine building UMA
(1.5m above ground level) ............................................................................................................ 39
Figure 7.6: Ref. No. 12 - Measurement positions located outside Boiler building UHA and UHB
area (1.5m above ground level).................................................................................................... 40
Figure 7.7: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 73.3m)
......................................................................................................................................................... 41
Figure 7.8: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 62.7m)
......................................................................................................................................................... 42
Figure 7.9: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 56.2m)
......................................................................................................................................................... 43
Figure 7.10: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 46.5m)
......................................................................................................................................................... 44
Figure 7.11: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 37.6m)
......................................................................................................................................................... 45

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

4/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.12: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 30.6m)
......................................................................................................................................................... 46
Figure 7.13: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 21.5m)
......................................................................................................................................................... 47
Figure 7.14: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 13.7 +
16m) ................................................................................................................................................ 48
Figure 7.15: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 8 +
11m) ................................................................................................................................................ 49
Figure 7.16: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 5.7m)
......................................................................................................................................................... 50
Figure 7.17: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 0m) . 51
Figure 7.18: Ref. No. 1 - Measurement positions located at work places inside Control building
UCA................................................................................................................................................. 52
Figure 7.19: Ref. No. 2 - Measurement positions located in different rooms of UGD.................... 53
Figure 7.20: Ref. No. 4 - Measurement positions located in UGJ .................................................... 54
Figure 7.21: Ref. No. 5 - Measurement positions located in UST level 0m .................................. 54
Figure 7.22: Ref. No. 5 - Measurement positions located in UST level 3.25m ............................ 55
Figure 7.23: Measurement positions located in 10UBA81 PCC cooling towers.......................... 56
Figure 7.24: Ref. No. 6 - Measurement positions located in UBA .................................................... 56
Figure 7.25: Ref.No9 - Measurement positions located around UBA .............................................. 57
Figure 7.26: Ref.No10 - Measurement positions located around UGD/UGA/UGE .......................... 58
Figure 7.27: Ref.No11 - Measurement positions located around UEN ............................................ 59
Figure 7.28: Ref.No13 - Measurement positions located around UGJ and URA Cooling Tower
area ................................................................................................................................................. 60
Figure 7.29: Position noise sources in acoustical model IMMI........................................................ 61

Annex 1: Figures ................................................................................................................................... 35


Annex 2: Working regimes during measurements ............................................................................ 62
Annex 3: Immission measurements at evaluation points................................................................. 68
Annex 4: Overview Weather conditions during far field measurements......................................... 80
Annex 5: Calculation LwA according ISO 8297 based on LA95-soundpressure levels at plant
boundery ........................................................................................................................................ 83

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

5/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

1 INTRODUCTION
The purpose of this document is to assess the noise emitted by the installations of the BFG Power Plant
of Electrabel at Knippegroen Gent. Two assessments are executed namely:

Sound pressure levels at 1 m distance of the installations (Near Field) in order to check the
noise limits specified in the Siemens Noise Acceptance Test Procedure with ref.
EN32/2009/201 and based on the specification under 6.1.5 in the contract of Electrabel
Engineering with ref. RDH-SID/4C/79888/000/00 page 37 and 38 of 64:
o All equipment designed in order to meet LpA 85 dB(A) at 1 m from equipment
surface or associated enclosures and 1.5m above levels normally accessible to
personnel, under all operation conditions. Except higher levels acceptable by law.
o For safety and by-pass station valves opening; than 125 dB(A) at 1m allowed and
generator circuit breaker opening; than 95 dB(A) at 1m allowed.
o 50 dB(A) in control rooms (Power Control Centers excluded), offices and meeting
rooms (only stable noise from air ventilation and air conditioning considered).
o 70 dB(A) in warehouse and workshop (excluded local machines use).
o 70 dB(A) in relay - and electrical rooms (only stable noise from air ventilation and air
conditioning considered).

Specific noise (Far Field) assessed to 50 dB(A) at 200m of the border of the Plant, 40 dB(A) at
the nearest dwelling outside the industrial area (in direction of R4) and 30 dB(A) at 500m of the
border of the industrial area (in direction of R4).
o Specific noise will be measured in these immission points by measuring the
background, the immission at maximum load and the immission with by-pass
conditions.
o In case theres too many difference between the signal and the background noise:
Additional measurements at 7m height will be performed at the surrounding border
of the site (Strber method, ISO 8297) for calculating the noise emission in the
horizontal plane (and this by Max Load, Bypass operation and Background noise).
The noise emission of the high placed noise sources on the roofs of the highest
building (UHA and UMA) will be measured separately (according to ISO 3746) and
this for Max Load and Bypass operation. The noise immission in the evaluation
points east of the site (MP 200m, MP A and MP B) will be calculated according ISO
9613.

The noise study takes into account measurements executed on site during March and April 2010.

2 REFERENCE DOCUMENTS
Studies:
o E.I.A. report Electrabel Centrale Knippegroen - SGS Belgium: project number 06.0009 - 2006.
o Acoustical study Planned STEG at Sidmar Gent - SGS Belgium: project number 04.0575
December 2004
Specifications
o Siemens Noise Acceptance Test Procedure with ref. EN32/2009/201
SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

6/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Noise Specification Electrabel with ref. RDH-SID/4C/79888/000/00

Legislation
o Vlarem II: Flemish Environmental Legislation
o Belgian Law Koninklijke Besluit betreffende de bescherming van de gezondheid en de
veiligheid van werknemers tegen de risicos van lawaai op het werk (KB van 16 januari 2006,
gepubliceerd in het BS d.d. 15 februari 2006)
o Directive 2003/10/EC of the European Parliament and of the Council of 6 February 2003 on the
minimum health and safety requirements regarding the exposure of workers to the risks arising
from physical agents (noise)
Standards, codes and regulations
o DIN EN 61672-1, Oktober 2003 Elektroakustik, Schallpegelmesser Teil 1: Anforderungen
(Electroacoustics, Sound Level Meters-Part1: Specifications)
o DIN EN 61672-2, August 2004 Elektroakustik, Schallpegelmesser Teil 2: Baumusterprfungen
(Electroacoustics, Sound Level Meters-Part2: Pattern Evaluation Tests)
o DIN EN 61043, May 1994 (IEC 1043:1993) Elektroakustik, Gerte fr die Messung der
Schallintensitt (Electroacoustics, Instruments for the measurement of sound intensity)
o ISO 1996/1, September 1982 Acoustics - Description and measurement of environmental noise
Part 1: Basic quantities and procedures
o ISO 1996/2, April 1987 Acoustics - Description and measurement of environmental noise Part
2: Acquisition of data pertinent to land use
o ISO 1996/3, December 1987 Acoustics - Description and measurement of environmental noise
Part 3: Application to noise limits
o ISO 3744, 1994 Acoustics - Determination of sound power levels of noise sources - Engineering
method in an essentially free field over a reflecting plane
o ISO 3746, 1995 Acoustics - Determination of sound power levels of noise sources using sound
pressure - Survey method using an enveloping measurement surface over a reflecting plane
o ISO 6190, 1988 Acoustics Measurement of sound pressure levels of gas turbine installations for
evaluating environmental noise - Survey method
o ISO 8297, 1994 Acoustics Determination of sound power levels of multisource industrial
plants for evaluation of sound pressure levels in the environment Engineering method
o IEC 1063, 1991 Acoustics - Measurement of airborne noise emitted by steam turbines and
driven machinery
o DIN 45635, part 1, April 1984 Geruschmessung an Maschinen, Luftschallemission,
Hllflchenverfahren (Measurement of airborne noise emitted by machines, enveloping surface
method)
o DIN 45635, part 8, June 1985 Geruschmessung an Maschinen, Krperschallmessung
(Determination of airborne noise emitted by machines by measurement of structure borne
noise)
o DIN 45635, part 15, December 1987 Geruschmessung an Maschinen, Luftschallemission,
Hllflchenverfahren Turbomaschinenstze in Wrmekraftanlagen zur Stromerzeugung
(Measurement of airborne noise emitted by machines, enveloping surface method, turbine sets)
o DIN 45635, part 38, April 1986 Geruschmessung an Maschinen, Luftschallemission,
Hllflchen-, Hallraum- und Kanalverfahren, Ventilatoren (Measurement of airborne noise
emitted by machines, enveloping surface, reverberation and duct method, fans)
o DIN 45635, part 46, June 1985 Geruschmessung an Maschinen, Luftschallemission,
Hllflchenverfahren, Khltrme (Measurement of airborne noise emitted by machines,
enveloping surface method, cooling towers)

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

7/92

Noise acceptance test BFG Power Plant Gent

o
o
o
o

o
o
o
o

Siemens NV Energy

DIN 45635, part 47, June 1985 Geruschmessung an Maschinen, Luftschallemission,


Hllflchenverfahren, Schornsteine (Measurement of airborne noise emitted by machines,
enveloping surface method, chimneys)
DIN 45641, June 1990 Mittelungspegel und Beurteilungspegel zeitlich schwankender
Schallvorgnge (Averaging of time-varying sound levels, rating levels)
ISO 9613-2, December 1996 Acoustics - Attenuation of sound during propagation outdoors Part
2: general method of calculation
ISO 10494, 1993 Gas turbines and gas turbine sets - Measurement of emitted airborne noise Engineering/Survey methods
ISO 11200, 1995; DIN EN ISO 11200, July 1996 Acoustics - Noise emitted by machinery and
equipment - Guidelines for the use of basic standards for the determination of emission sound
pressure levels at a work station and at other specified positions.
ISO 11201, 1995; DIN EN ISO 11201, July 1996 Acoustics - Noise emitted by machinery and
equipment Measurement of emission sound pressure levels at a work station and at other
specified positions. Engineering method in an essentially free field over a reflecting plane
ISO 11202, 1995; DIN EN ISO 11202, July 1996 Acoustics - Noise emitted by machinery and
equipment - Measurement of emission sound pressure levels at a work station and at other
specified positions. Survey method in situ.
ISO 11203, 1995; DIN EN ISO 11203, July 1996 Acoustics - Noise emitted by machinery and
equipment Determination of emission sound pressure levels at a work station and at other
specified positions from the sound power level.
ISO 11204, 1995; DIN EN ISO 11204, July 1996 Acoustics - Noise emitted by machinery and
equipment - Measurement of emission sound pressure levels at a work station and at other
specified positions. Method requiring environmental corrections.
IEC 60076-10, 2001-05 Power transformers- Part 10: Determination of sound levels
IEC 61063, April 1991 Acoustics - Measurement of airborne noise emitted by steam turbines
and driven machinery
Immi 6.3 Noise Prediction / Noise Mapping Software - Wlfel Mesysteme Software
Google Earth

3 MEASUREMENT EQUIPMENT
Sound pressure levels:
Larson-Davis real-time analyzer type 824
GRAS microphone and pre-amp type 26AK
Larson-Davis calibration source type CA250
Larson-Davis software
Distance measurement device:
Bushnell Laser Yardage Pro Tour, range-finder
Leica IR odometer
The sound pressure meter is according to the IEC 651 type 1 standard and the IEC 804 type 1 standard
for integrating soundlevelmeters. The accuracy for the 63 Hz octave is 1.5 dB, for the octave bands
from 125-4000 Hz 1dB and for the 8000 Hz octave +2 till -4 dB.
Before and after each measurement test, the measuring instruments are individually calibrated with a
Larson-Davis calibrator type CA250.

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

8/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

De long distance odometer Bushnell has an accuracy of 1m, the Leica IR odometer an accuracy of
10mm.

4 APPLICABLE LEGISLATION
4.1

Environmental noise in Flanders concerning the far field levels

4.1.1 General
An important distinction that needs to be taken into account in the Flemish environmental law
concerning the noise section of an Environmental Impact Assessment, is the difference between
existing establishments (existing installation) and new establishments (new installations).
Briefly explained, an existing establishment is defined as an establishment that on 1.01.93 (coming into
force of the original Vlarem II) was licensed or for which before 1.09.91 (coming into force of Vlarem I) a
license application had been submitted. New establishments are establishments that on 1.01.1993 were
not yet in operation and with extension establishments that were in operation on this date, but for
which a license was not applied for or notification provided on time.
The type of establishment determines to which standards the measured/calculated values need to be
assayed. Environmental quality standards are standards established by the Flemish Government that
determine which quality requirements the parts of the environment must meet within the periods set by
the government. These standards can be established in the form of limit values and guide values. Limit
values may in principle not be exceeded and are applied to new establishments and thus also to a
planned situation or a reference situation if the industrial site has new installations. Guide values are
comparable with limit values, but their binding nature is less great. These values are applied to existing
establishments and thus to the existing establishments in of a reference situation and never to a
planned situation.
The purpose of the noise measurements in the framework of the Environmental Impact Assessment of
an industrial site executed by SGS is firstly to determine the influence of the site on the acoustical
climate in the near surroundings in the actual situation (= reference situation) and secondly to determine
the influence of an extension of the industrial site on the acoustical climate (= planned situation).
The influence of the industrial site on the acoustical climate in the near surroundings in the reference
situation can be determined in two ways:
Firstly, a long-term measurement is carried out taking into consideration the Vlarem legislation. The
results are assessed to environmental quality standards (guide values) by means of the LA95 parameter,
a good estimator of the particular noise level of a stable source in the presence of perturbing noise. The
guide values depend on the assessment period and the area in which the point lies (see Table below).
Secondly, a three dimensional acoustical model in which the sound power level of the most important
sources on the industrial site, height of buildings, level of the ground differences, are incorporated
calculates the immission level (= specific noise produced by the industrial site) in different assessment
points at 200m (imposed by Vlarem but deviations are possible) of the boundary of the industrial site.
The calculated values are assessed to the guide values (see table below) or limit values depending on
the type of establishment (new or existing). As explained above the limit values are stricter and depend
on the one hand on the area in which the assessment point lies and on the other hand on the LA95 value
of the sound that existed before the new installations were functioning (=original sound in the
surroundings). If the original sound pressure level around the industrial site is not known, the limit value
SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

9/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

for new installations is obtained by reducing the limit values of existing installations (Table 4.1) with 5
dB(A) according to the decision diagram in appendix 4.5.6 of Vlarem II.
Table 4.1: environmental quality standards from Appendix 2.2.1 of Vlarem II

Day
(7 19 h)
1 rural areas and areas for stay recreation
2 areas or parts of areas located at less than 500
meters of industrial areas not mentioned under 3 , or
of areas for community supplies and public utilities
supplies
3 areas or parts of areas located on less than 500
meters of areas for old-fashioned companies and small
and medium ventures, of service areas or of grubbing
areas during grubbing
4 living areas
5 industrial areas, service areas, areas for community
supplies and public utilities supplies and grubbing
areas during grubbing
6 recreation areas, except for areas for stay
recreation
7 all other areas, excluded: buffer areas, military fields
and these for which are laid down specific standards in
particular decisions
8 buffer area
9 areas or parts of areas on less than 500 meters of
for gravel extraction intended grubbing areas during
grubbing

Assessment period
Evening
Night
(19 22 h)
(22 7 h)

40
50

35
45

30
45

50

45

40

45
60

40
55

35
55

50

45

40

45

40

35

55
55

50
50

50
45

Note : if an area falls under two or more points of the table, then in that area the highest standard value
applies

The important area and assessment period for the BFG Power Plant is indicated in grey colour.

4.1.2 Immission points used to evaluate the specific noise of the BFG Power
Plant
The position of the evaluation point on the land use map is shown in Figure 7.1 in Annex 1.

MP 200m is situated in Industrial area so the guide value of 55 dB(A) has to be applied. Cause
no original background measurements are available, the limit value of 50 dB(A) during night
period has to be applied.
MP A: immision point at closest dwellings @ 530m east of the centre of the power plant is
situated in living area but closer than 500m from the industrial area (so area 2 of Table 4.1), the
guide value of 45 dB(A) has to be applied. The specific noise of the new installations has to
fulfils at the limit values. The original stable noise is measured in a nearby very similar position
(MP 2 in the E.I.E.). The original stable noise at night period (mean of 4 lowest LA95,1h-levels
during the night period (22.00 till 07.00 hour) measured during one week) was 46 dB(A). So the
limit value is 41 dB(A). In accordance the Electrabel specifications the most severe limit value of
40 dB(A) shall be taken.
MP B: immision point at the closest dwellings in living area (with rural character) @ > 500m
from the industrial area (so area 4 of Table 4.1), the guide value of 35 dB(A) has to be applied.
SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

10/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

The specific noise of the new installations has to fulfils at the limit values. The original stable
noise is measured in a nearby very similar position (MP 2 in measurement report 04.0575 for
the planned STEG at Sidmar). The original stable noise at night period was 42 dB(A). So the
limit value is 35 dB(A). In accordance the Electrabel specifications the most severe limit value of
30 dB(A) shall be taken.

4.2

Extract of Legislation in Belgium concerning the near field levels

4.2.1 Exposure limit values and exposure action values


For the KB from 16 January 2006 the exposure limit values and exposure action values in respect of the
daily noise exposure levels and peak sound pressure are fixed at:

(a) exposure limit values: LEX,8h = 87 dB(A) and Ppeak = 140 dB(C) in relation to 20 Pa;
(b) upper exposure action values: LEX,8h = 85 dB(A) and Ppeak = 137 dB(C) in relation to 20 Pa;
(c) lower exposure action values: LEX,8h = 80 dB(A) and Ppeak = 135 dB(C) in relation to 20 Pa
When applying the exposure limit values, the determination of the worker's effective exposure shall take
account of the attenuation provided by the individual hearing protectors worn by the worker. The
exposure action values shall not take account of the effect of any such protectors.
the employer shall give particular attention, when carrying out the risk assessment, to the following:
(a) the level, type and duration of exposure, including any exposure to impulsive noise;
(b) the exposure limit values and the exposure action values;
(c) any effects concerning the health and safety of workers belonging to particularly sensitive
risk groups;
(d) as far as technically achievable, any effects on workers health and safety resulting from
interactions between noise and work-related ototoxic substances, and between noise and
vibrations;
(e) any indirect effects on workers' health and safety resulting from interactions between noise
and warning signals or other sounds that need to be observed in order to reduce the risk of
accidents;
(f) information on noise emission provided by manufacturers of work equipment;
(g) the existence of alternative work equipment designed to reduce the noise emission;
(h) the extension of exposure to noise beyond normal working hours under the employer's
responsibility;
(i) appropriate information obtained following health surveillance, including published
information, as far as possible;
(j) the availability of hearing protectors with adequate attenuation characteristics.

4.2.2 Practical interpretation of exposure action values for BFG Power plant
The upper exposure level of 85 dB(A) corresponds with an exposure time of 8 hours.
To show workers noise exposure during a normal working day, for an exposure time of 2 hours
(e.g. inspection time inside buildings) the equivalent sound pressure level of LAeq in dB(A)
corresponds to an exposure level Lex, 2h or exposure level of 85dB(A) - 6 dB
1 hour of exposure at 85 dB(A) corresponds with an Lex, 1h level of 85dB(A) - 9 dB
0.5 hour exposure at 85 dB(A) corresponds with an Lex, 0.5h level of 85dB(A) - 12 dB

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

11/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

For example; if workers are exposed 1 hour at 85 dB(A) and the rest of the day (7 hours) at exposure
levels of 70 dB(A). The daydosis shall be 1/8x85 dB(A) + 7/8x70 dB(A) = 76 dB(A)+ 69.4dB(A) = 76.9
dB(A).

5 MEASUREMENTS @ 1 M DISTANCE NEAR FIELD


The noise level measurements inside/outside rooms or buildings and in the near field of
machines/components were performed at a height of 1.5 m above the ground level and above working
platforms normally accessible to personnel. Measurements in the near field of machines/components
were executed at a horizontal distance of 1 m from the equipment surface and its acoustic attenuation
devices.
The noise levels were measured over a time interval of at least 10 seconds and logarithmic averaged
over the number of measurement locations around the machine/component or within/outside the
room/building.
The spatially averaged sound pressure level will be determined by using the following formula:

LAeq (av) =10 LOG10 [(1/N) (10 (0,1 (LAeq(1)) .... + 10 (0,1 (LAeq(N)) )]

(1)

Legend:
LAeq(av) is the frequency-dependent equivalent continuous sound pressure level, spatially averaged over
all microphone positions, selected for the tested area.
N is the number of the microphone position selected for the tested area.
(1)
(N)
LAeq
to LAeq
are the local frequency-dependent equivalent continuous sound pressure levels,
measured at the microphone positions (1 to N), selected for the tested area.

5.1

During 100% Steam turbine bypass operation For information

For information measurements were executed at 1m off the installations during 100% steam turbine
bypass operation in UMA and UHA (and outside on ground level in the zone between UMA and UHA). In
UMA is measured during night period d.d. 19 March 2010. In UHA and the zone between UMA and UHA
is measured d.d. 08 April 2010. More details about the working regimes during these measurement
periods are graphically given in Annex 2.
The measurement positions are given in the figures in Annex 1.
Table 5.1 : Levels in UMA during steam turbine bypass operation
Location
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m

Position
nr
1
2
3
4
5
6
7
8
9
10

16 Hz
dB
79.3
81.4
81.4
83.4
81.1
78.6
78.9
79.9
80.2
81.1

31 Hz
dB
86.1
87.6
89
89.7
87.8
87.7
88
88.6
89.1
89.5

63 Hz
dB
89.8
89.9
90.3
91
93.3
91.4
88.9
89.5
90.4
90.8

SGS Belgium NV
Reportnumber : 10.0102-1-v3

125 Hz
dB
91.8
91.6
94
94
95
94.7
93.5
94
94.5
94.5

250 Hz
dB
95.1
95.9
97.7
97.8
98.4
97.4
97.2
96.8
97.7
97.8

500 Hz
dB
98.5
99.6
99.5
99.3
99.5
99
98.7
98.9
99.5
99.7

28/04/2010

1 kHz
dB
97.3
100.8
96.8
95.4
94.5
94.3
93.7
93.8
94.7
94.7

2 kHz
dB
97.7
98.5
94.5
92.4
90.6
89.8
88.9
89.4
90.3
90.5

4 kHz
dB
96
97.7
91.8
88.4
85
83.9
82.3
82.6
83.7
84.1

8kHz 16kHz LAeq


dB
dB
dB(A)
90.7
83.1 103.6
93.6
85.9 105.5
86
77.8 101.9
80.7
70.6 100.5
75.5
65.5
99.9
73.9
64.2
99.4
70.3
58.2
98.8
70.6
60.7
99.0
72.8
62.4
99.8
73.7
63.2
99.9

12/92

Noise acceptance test BFG Power Plant Gent

Location
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 14.5m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m

Position
nr
11
12
13
14
15
16
17
18
19
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Average

16 Hz
dB
79.8
79.4
81.4
81.2
80.2
79.2
80.5
79.4
77.7
82.8
82.3
80.5
80.7
80.2
80.1
82.8
83.2
82.9
83.5
82.2
82.3
80.1
78.9
81.5
82.3
82.8
81.1
81.2

Siemens NV Energy

31 Hz
dB
88.6
86.6
85.9
85.3
85
80.7
81.2
78.6
78.5
87.7
86.8
87
83.7
86.2
85.1
86.2
88.1
89.2
89.1
85.6
84.9
88
86.8
87.6
87.4
88.2
88.4
87.1

63 Hz
dB
90.5
91.4
87.3
89.1
88.1
85.5
84.6
82.7
84.5
90.7
90.2
89.5
88.3
87.2
89.5
92.9
94.3
95.1
93.3
92.9
90.3
91
89
92.4
92.9
92.4
91.4
90.8

125 Hz
dB
94.5
94.7
93
92.2
91.6
88.1
86.8
85.2
85.4
94.4
92.9
90.2
90.6
90
89.8
91.6
95.2
97.4
96.2
94.4
92.7
92.8
92.6
93.4
93.8
94.2
94.8
93.3

250 Hz
dB
97.5
96.9
96
95.5
94.8
91.4
89.4
87.2
88.4
96.4
93.5
91.5
91.3
90.9
91.1
94.9
97.8
99.2
98.6
96.9
95.3
96.1
95.7
96
96.4
96.9
97.5
96.1

500 Hz
dB
99.6
99.3
98.2
98
97.6
93.4
91.6
90.1
91.2
97.4
94.9
93.4
93.2
92.7
93.7
96.3
99.2
101.1
99.5
97.4
96.9
97.3
96.4
96.9
97.1
98.2
98.9
97.8

1 kHz
dB
95.2
95.2
94.3
94.5
95.6
92.6
89.6
88.6
90.5
94
92.5
91.6
92.8
94.3
95.9
96.2
96
95.7
93.2
91.4
91.1
91.3
90.9
91
91.9
93.1
94.1
94.4

2 kHz
dB
91.2
91.6
91.4
92.3
94.9
91.6
87.8
87.2
89.4
92.9
91.9
91.5
92.4
95.1
96.9
95.8
94.3
91.8
88.8
86.7
86.4
86.7
86.2
86.7
88.1
90
91.7
92.4

4 kHz
dB
85.6
86.6
86.9
88.3
91.4
87.8
84.3
84
86.6
89.7
88.3
87.7
89
91.7
93.7
93
91.4
87
83
80.4
79.6
79.9
79.6
80.8
83.3
86
87.5
89.2

8kHz 16kHz LAeq


dB
dB
dB(A)
76.1
64.3 100.2
78
66.8 100.2
78.8
66.9
99.4
80.5
68.6
99.7
85.1
76.7 101.1
82.6
72
97.7
78.3
67.7
94.6
79.6
70
93.7
83.2
73.9
95.7
84.2
75.6
99.8
81.9
72.1
98.2
80.5
70.9
97.3
81.5
71.1
98.2
85
75
100.1
87.7
78.1 101.8
88.3
79.6 101.7
88.9
81.7 101.6
82.3
73.2 101.3
76.5
66.4
99.1
72
62
97.2
69
57
96.7
68.2
53.9
97.0
68.2
53.9
96.4
70.8
57.2
96.8
75.3
64.5
97.5
79.2
69.7
98.8
81.2
72.1
99.9
83.8
75.4
99.8

The average level in the steam turbine building during steam turbine bypass operation is 99.8 dB(A).
At 1m of the High pressure bypass valve (10LBF20) the highest level of 107.9 dB(A) is measured.
Table 5.2 : Levels ground level between UMA and UHA during steam turbine bypass operation
Location
Around UHA
Around UHA
Around UHA
Around UHA
Around UMA
Around UMA
Around UMA
Around UMA

Position 16 Hz 31 Hz
nr
dB
dB
9
85.6
83.5
10
85.7
84.3
11
88
83.9
12
101.4
97
22
86.1
84.1
23
89
86.2
24
85.4
83.3
25
82.3
78.6
Average 93.2
89.2

63 Hz
dB
77.5
80
79.5
89.7
79.2
83.1
75.9
75.2
82.8

125 Hz
dB
76.4
75.7
77.5
81.7
75.4
79.8
74.9
74.1
77.7

250 Hz
dB
70.1
74.9
76.6
75.4
72.7
76.6
71.6
68
74.1

500 Hz
dB
70.1
76.5
77.2
76.6
73
76.6
71
68
74.7

1 kHz
dB
70.3
77.5
79.3
80.2
77.3
78.1
70.7
67.9
76.9

2 kHz
dB
68
78.2
80.5
80.1
76.6
80.1
66.5
64.2
77.4

4 kHz
dB
61.6
73
74.9
75
71.2
74.8
60.2
57.5
72.1

8kHz
dB
53
66.7
68.6
68.8
65.6
68.3
51
47.6
65.8

16kHz LAeq
dB
dB(A)
41.7
74.3
59.4
82.9
62
84.8
63.1
84.9
59.5
81.4
62.4
84.3
39.6
74.2
35.9
71.5
59.5
82.0

The average level in the zone between UMA and UHA during steam turbine bypass operation is 82.0
dB(A).

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

13/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Table 5.3 : Levels in UHA during steam turbine bypass operation


Location
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 30.6m
UHA 30.6m
UHA 30.6m
UHA 30.6m

Position
nr
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

16 Hz
dB
95.4
98.3
94.7
95.7
92.9
94
98.4
96.3
96
94.1
91.5
90
86
90.8
91.5
96.7
95.8
93.3
98.1
95
93.6
95.6
95.6
92.9
90.2
93.8
92.9
91.6
91.2
92.2
93.7
93.6
91.5
91.6
87.8
87.9
87.6
90
90.4
87.9
88.2
89.5
90.6
88.3
88.1
87.5
88.4
86.6
88.5
93.2
87.7
87.9
88.1
91.8
87.5
84.8

31 Hz
dB
98.4
97.7
94.3
93.9
94.6
95.3
97.4
99.4
97.4
89.7
87.8
90.9
90.5
87.7
92.1
93.6
96.5
94.5
94.1
95.6
95.6
98.9
94.8
92
85
91.7
90.4
87.2
88
87.2
86.3
89.6
92
92.9
87.2
84.9
84.2
85.5
87.6
87.7
87.2
88.2
87.1
89.7
86.3
86.5
86.9
88.5
91.4
88.3
88.9
89.1
85.5
87.4
86
86.5

63 Hz
dB
95.2
94.7
90.6
89.3
89.4
89.4
94
94.1
91.4
84.3
82.1
82.4
84.3
82.8
85
85
91.9
91.9
94.6
93.9
92.4
93.1
87.1
83.6
81.5
86.5
88.2
85.1
85.5
85
84.7
87.9
90.7
91.7
82.6
84.3
84.2
85.1
86.6
87.7
87.2
88.5
90.3
83.6
83.5
84.1
85
83.7
84.6
85.2
85.6
83.6
81.4
82.5
85.9
84.2

SGS Belgium NV
Reportnumber : 10.0102-1-v3

125 Hz
dB
89.1
85.7
81.9
79.9
81
83
86
88
83.7
78.4
77.3
80.3
78.1
78.8
78.7
82.5
84.9
88.6
87.4
86.5
88.7
87
83.1
77.9
77.9
81.7
82.1
80.6
79.7
80.3
80.3
81.6
84.7
83.3
78
79.3
80.6
80.5
81.1
82.8
83.6
82.4
82.4
75.9
78
80.1
81.3
80
80.3
80.6
79.8
79.6
76.8
76.8
79.7
78

250 Hz
dB
89.8
84.1
81.2
80
81.1
82.7
84.7
88.7
85.5
81.5
81.1
80.2
80
79.3
80.5
84.2
88.3
89.5
91.4
90.6
90.2
88.5
86.1
81
78.9
83.1
82.7
80.4
79
79.9
80.4
83.4
87.1
85.6
79.3
78.6
79.9
81.7
82
84.6
85.2
81.2
79.9
76.5
77.2
80.1
81.5
80.7
81.3
80.1
79.7
79.7
76.8
76.7
76.8
76.2

500 Hz
dB
81.6
79.4
78.2
77.5
78.1
77.8
79
81.9
80
77.1
76.6
76.6
77.1
77.3
79.1
80.5
82
83.9
85.3
84.6
84.3
83.3
80.4
77.8
78.1
78.9
79
78.1
77.9
79.1
80.3
81.4
81.8
80.9
78.5
79
82
82.7
82.3
81.4
80.2
78.6
78.3
77.5
79.9
84
88.6
85.3
82.2
78.5
77.8
79
78.5
77.1
77.1
78.6

28/04/2010

1 kHz
dB
82.2
80.9
80.8
81.7
82.4
82.5
82
84.2
83.4
81.7
81.6
81.7
83.1
84.5
85.5
86.1
86
86.7
87.2
86.3
85.8
83.9
82.6
81.8
82.9
83.5
84.6
83.6
84.5
86.8
89.4
89.7
87.7
85.9
84.6
86.5
90.9
91.5
90.7
89.1
87.5
84.7
84.1
84
87.6
92
96.8
95.4
93
86.9
84.2
84.6
85.4
85.5
83.1
85.4

2 kHz
dB
77.4
75.9
76.2
76.6
77.6
77.8
77.4
79.1
78.8
76.4
76.1
76.6
78.3
79.9
80.8
81.1
81.1
81.3
81.3
80.8
80.3
78.7
77.3
76.4
77.8
78.2
78.7
78.8
80.4
82.6
84.8
84.6
82.4
80.5
78.9
82.2
86.5
87.2
86
84.3
81.7
79
79.1
79.1
84.1
89.6
93.7
90.7
88
81.5
78.9
80
80
79.7
77.7
80.1

4 kHz
dB
72.4
71.9
70.5
69.7
71.1
71.7
72.4
73.5
71.8
69.7
68.8
69.1
71.2
72.7
73.8
73.9
74.1
75.3
73.5
73.2
74.3
72.4
70.7
68.9
71.2
70.7
71.3
72
73.8
76
78.2
77.7
74.7
72.7
72.4
76.1
80.6
81.3
78.9
77.2
74.3
71.7
72.6
73.5
79
84.9
88.7
84.4
81.3
74.9
72.6
74.6
75.3
73.7
73.2
75.7

8kHz
dB
62.7
62.9
60.2
55.6
59.6
61
62.8
63.9
58.4
57.1
54.1
54.2
55.5
57.3
58.6
58.7
59.3
62.8
59.9
59.2
61.9
59.3
57.1
54
57.7
55.7
56
56.8
58.7
61.3
63.7
62.8
59.1
57.2
57.4
62.3
66.9
67
64.3
62.5
59.3
57.1
58.7
61
66.5
73.3
77.3
72.5
69.1
63.7
61.6
63.9
64.8
63.6
65.7
66.1

16kHz
dB
47.2
45.9
41.7
34.5
40.7
43.3
45.5
50.5
39.2
37.2
35.9
35.1
35.2
40.2
39.3
43.3
42.6
50.9
56
44.7
51
45.6
39.8
36.2
41.7
37.3
39.1
37.9
39.6
43.3
46
45
41.4
39.5
38.6
45.3
50.3
50.6
47.3
47.4
42.6
39.4
41.7
43.6
51.8
60.6
64.6
60
56.5
52.2
48.3
48.7
49.5
50.3
53.8
52.1

14/92

LAeq
dB(A)
86.7
84.5
83.8
84.0
84.9
85.1
85.2
87.5
86.3
84.0
83.8
83.9
85.3
86.6
87.6
88.3
88.8
89.7
90.4
89.6
89.3
87.6
85.7
84.1
85.1
85.8
86.6
85.9
86.8
89.0
91.3
91.6
89.9
88.2
86.4
88.7
92.9
93.6
92.6
91.1
89.3
86.6
86.3
86.1
90.2
95.1
99.5
97.3
94.8
88.6
86.2
86.9
87.3
87.1
85.1
87.4

Noise acceptance test BFG Power Plant Gent

Location

Position
nr
UHA 30.6m
57
UHA 30.6m
58
UHA 30.6m
59
UHA 30.6m
60
UHA 30.6m
61
UHA 21.5m
62
UHA 21.5m
63
UHA 21.5m
64
UHA 21.5m
65
UHA 21.5m
66
UHA 21.5m
67
UHA 21.5m
68
UHA 21.5m
69
UHA 13&16m
70
UHA 13&16m
71
UHA 13&16m
72
UHA 13&16m
73
UHA 13&16m
74
UHA 13&16m
75
UHA 8&10m
76
UHA 8&10m
77
UHA 8&10m
78
UHA 8&10m
79
UHA 8&10m
80
UHA 8&10m
81
UHA 8&10m
82
UHA 8&10m
83
UHA 5.7m
84
UHA 5.7m
85
UHA 5.7m
86
UHA 5.7m
87
UHA 0m
88
UHA 0m
89
UHA 0m
90
UHA 0m
91
UHA 0m
92
UHA 0m
93
UHA 0m
94
UHA 0m
95
UHA 0m
96
UHA 0m
97
Average

16 Hz
dB
87.2
87.2
86.4
85.6
86.3
85.7
90.4
88.1
83.2
83.3
86.1
85
84.1
85.6
83.9
84.5
85.9
85.1
83.9
86
85.9
84.8
85.8
90.1
88.8
85
84.6
84.7
83
82.3
85
88.4
86.7
85
86.8
86.3
86.4
87.4
87.3
86
85.4
91.2

Siemens NV Energy

31 Hz
dB
87
89.1
85.9
87.8
87.1
88
89.9
89.6
92.2
91.8
93
93.6
88.6
92.7
89.8
88.7
89
94.3
94
91.9
92.6
88
89.5
91.1
92.8
87.3
86.3
89.4
85.3
90.5
83.7
90.5
91.8
88.8
91.7
91.4
90.6
91
94.6
88.8
91.1
92.0

63 Hz
dB
84.9
83.4
83.9
83.5
83.4
82
87
86.3
85.5
84.3
85.7
85.9
84.1
86.9
87.3
82.4
87.9
84.8
84.5
89.1
89
87.2
83.6
87
87.7
83.1
84.1
90.9
86.5
89.1
83.3
87.1
85.5
89.6
84.9
85.4
83.7
84
86.7
86.8
86.7
88.1

125 Hz
dB
78.2
80
81.7
79.9
79
77.8
78.7
79.9
80.3
78.5
76.3
77.7
77.6
78.5
78.9
78.5
79.8
80.2
78.8
77.8
77.9
81.3
79.3
79.3
79.1
79.9
79.5
77.9
78.1
78.2
78
77.2
76.7
77.8
77.9
76.6
77
76.8
76.1
78.5
78.6
81.6

250 Hz
dB
78.1
81.7
80.3
79.1
78.1
75.7
76.8
81.7
78.9
77.6
76.9
76.7
76.8
76.7
75.8
76.1
77.4
81.7
77.3
75.1
75.6
77.2
75.8
76.4
77.4
81.4
77.9
77.1
76.8
75.6
75.9
75.1
76.1
75.9
74.9
76
78.4
76.4
74.7
74.7
74.7
82.5

500 Hz
dB
81.1
86.3
86.9
85.2
82.5
80.5
81.5
86.6
84.9
81.5
80.2
77.4
77.7
77.4
78.4
80.2
83.2
87.4
81.8
78.9
77.6
81.9
80.3
82.2
82.5
87.5
82.1
81.7
80.2
77.7
79.5
79.2
81.8
79.9
80.4
78.3
78.7
77.7
76.7
77.7
78.1
81.5

1 kHz
dB
88.2
94.4
95.9
95.3
93.8
87.3
90.2
94.2
93.4
91.5
89.8
85.1
83.8
85
83.2
87.1
90.8
94.2
89.8
87.2
85.2
85
84.7
87.8
90.3
94.8
89.3
88.8
87.3
84.3
84.1
86.4
87.9
87
85.6
84.6
84
83
81.8
82.8
83.3
88.7

2 kHz
dB
84.7
92.5
92.8
91.2
88.2
81.4
85.3
89.8
89.3
86.7
84.7
79.3
78.2
79.7
79.1
80.5
86.5
91.5
85.3
83
79.6
81.4
80.5
83.8
86.4
91.4
85.3
84.7
83.7
79.5
79.2
82.1
84.1
83.1
81.6
80.7
79.4
78.6
77.4
78.1
78.8
84.6

4 kHz
dB
80.4
88.5
88.3
85
82
77.3
81.7
86.9
85.5
80.7
78.5
72.9
72.1
73.9
74
77
83
88.6
80.5
77
74.4
78.3
77.1
80.2
82.8
88.1
82
81
80.3
74.2
78.3
77.9
79.8
78.7
76.8
75.2
74.1
72.9
72
74.2
74.7
79.9

8kHz
dB
69.4
80.4
77.7
73.8
70.5
71.6
71.1
76.9
77.1
70.6
68.7
66.2
67.5
68
75.2
73.9
72.5
80.4
77.8
69.4
68.8
81.8
79.2
70.4
72.1
79
81.8
70.3
77.4
68.7
81.7
68.9
70.2
71.8
70.8
67.7
67.9
67.1
69.9
72.9
73.2
72.3

16kHz
dB
55
70.9
69.5
63.7
60.1
61.6
55.4
63.6
66.8
58.9
55.1
53.6
56.2
55.9
69.8
66
57.8
71.3
72.6
56
55.8
77.4
73.7
56.1
57.4
69.1
78.4
55.2
71.8
56.1
76.3
56.7
57.4
62.1
59.9
54.1
55.1
53.5
57.4
63.2
64.7
65.1

LAeq
dB(A)
90.9
97.9
98.6
97.4
95.3
89.1
92.3
96.7
95.8
93.4
91.6
86.8
85.7
86.9
86.1
88.8
93.2
97.6
92.1
89.4
87.0
89.0
87.9
90.5
92.8
97.6
92.2
91.3
90.2
86.5
87.8
88.7
90.5
89.5
88.3
87.0
86.4
85.4
84.3
85.4
85.9
91.2

The average level in the boiler building during steam turbine bypass operation is 91.2 dB(A).
Conclusion: During 100% steam turbine bypass operation the average level in UMA and UHA are higher
than the upper action level of 85dB(A) according the law. During this operational case, it is obligated to
wear ear protection. The near field measurements at bypass operation were just for info. The steam
turbine bypass operation is excluded in the scope of the contract for the near field levels (see chapter
1).

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

15/92

Noise acceptance test BFG Power Plant Gent

5.2

Siemens NV Energy

During base load and/or maximum load operation

In the most relevant buildings UMA and UHA measurements were executed during maximum load
operation at 09 April 2010. The generator output was than between 321.8 and 324.7 MW.
In the other buildings and around the other installations measurements were executed during base load
operation at 07 April 2010. The generator output was than 313 MW.
In UMA extra measurements were executed during steel gas pressure control operation in the afternoon
of 08 April 2010. The generator output was then between 267.9 and 288.5 MW.
More details about the working regimes are given in Annex 2.

5.2.1 In the control room building UCA


Measurements are executed d.d. 08/04/2010 at work places with HVAC installations at maximum level
and with no contribution of noise caused by the mobile inventory in these rooms as well as that caused
by the staff (talking, phone, ).
Table 5.4: Levels in UCA
Location
UCA
UCA
UCA
UCA
UCA
UCA
UCA
UCA
UCA
UCA
UCA
UCA

Position 16 Hz 31 Hz 63 Hz
nr
dB
dB
dB
1
74.1
63
59
2
67.6
71.1
58.8
3
66.2
50.4
52.1
4
63.9
62.3
61.8
5
70
71.9
56.9
6
64
68.5
57.1
7
65.8
67.7
61.9
8
59.3
59.3
51.7
9
59.4
59
51.1
10
57.6
54.8
48.6
11
52
51.7
48.2
12
60.9
56.9
45.8
Average
66.8
66.0
57.2

125 Hz
dB
55.3
54.1
49.3
53.7
55.5
56.5
55
50
51.1
55
50.1
54.4
53.9

250 Hz
dB
46
45.8
44.3
45.8
51.2
47.2
46.2
44.3
44.2
49.3
43.5
42.7
46.6

500 Hz
dB
39.1
38.8
41.2
45.2
44
41.4
41.1
42.2
41
45
37.9
38.5
41.9

1 kHz
dB
33.8
39
37.2
42.4
37.8
36.9
37.1
37.8
40.1
45.6
37.1
36.3
39.7

2 kHz
dB
29.7
32
32.2
34.9
32.5
30.5
31.3
35.7
35.9
43.1
32.2
31
35.5

4 kHz
dB
27.3
29.5
26.4
30.3
27.5
25.2
26.1
31.6
32.4
35.7
27.4
25.9
30.0

8kHz
dB
25.1
28.9
25
27.2
26
24.5
24.9
25.9
26.5
28.4
25.9
25.8
26.4

16kHz
dB
26.7
27.2
26.7
27
26.8
26.6
26.7
27.1
28
27.1
26.7
26.9
27.0

LAeq
dB(A)
43.8
44.9
43.1
47.2
47.0
44.8
44.8
44.3
44.9
50.0
42.6
42.7
45.6

The average level in UCA is with 45.6 dB(A) sufficient below 50 dB(A). In room 01.11 the limit of 50
dB(A) is reached. The noise in this room is from the HVAC system.
The measurement positions are shown in Annex 1.

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

16/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

5.2.2 In the water treatment building UGD


Table 5.5: Levels in UGD
Location
Office 1.06
Office 1.07
Average
Lab 1.05
Lab 1.05
Average
El.Room 1.08
10UGD
10UGD
10UGD
10UGD
10UGD
10UGD
10UGD
10UGD
10UGD
Average

Position
nr
1
2
3
4
5
6
7
8
9
10
11
12
13
14

16 Hz
dB
65.9
69.2
67.9
67.8
67.8
67.8
68.3

31 Hz
dB
67.6
67.4
67.5
72.5
66.1
70.4
63.5

63 Hz
dB
56.9
53.2
55.4
58.1
63.5
61.6
67.5

125 Hz
dB
55.7
54.1
55.0
57.2
58
57.6
55.1

250 Hz
dB
49
49
49.0
53.2
54.1
53.7
53.1

500 Hz
dB
45.1
44.1
44.6
50
51.7
50.9
53

1 kHz
dB
43.9
42.3
43.2
50.2
52.5
51.5
51.2

2 kHz
dB
40.3
39.8
40.1
49.4
51.9
50.8
52.1

4 kHz
dB
34.4
34.2
34.3
43.2
45.7
44.6
47.7

8kHz 16kHz
dB
dB
27.6
26.9
27.6
26.8
27.6
26.9
33.4
27.7
35.5
29
34.6
28.4
37.6
29.5

LAeq
dB(A)
48.9
47.9
48.4
55.3
57.5
56.5
57.5

74.3
76.1
75.4
75
71.5
79.8
75.6
71
74.3
75.5

72.5
71.7
72.4
73.8
71.3
71.6
72.6
73.9
73.8
72.7

65.6
68.2
67.8
67.4
68.4
65.4
66.2
66.8
65.9
67.0

63.6
65.5
65.8
64.9
66.4
65.2
65.6
66.8
64
65.4

71.7
71.9
72.9
74.1
73.2
71.8
72.6
72.3
72.9
72.7

75
75.6
76.4
78.7
77.8
76.5
76.2
76.2
75
76.5

75.5
76.1
77
80.1
78.7
77.4
77.1
76.2
74.5
77.3

76.1
77.1
78.4
81.6
80.8
79
78.6
77
75.3
78.7

73.3
74.5
76.1
79.9
78.4
76.2
75.9
74.5
72.1
76.3

65
66.7
69.1
74.1
72.4
68.9
68.7
66.8
63.1
69.5

81.4
82.3
83.5
86.8
85.7
83.9
83.5
82.3
80.5
83.7

49.8
52.4
57.1
64.3
60.8
54
55.2
51.5
45.8
57.8

The average level in the offices of UGD is with 48.4 dB(A) sufficient below 50 dB(A). In the electrical
room 1.08 the level is below 70 dB(A). The average level in the lab is with 56.5 dB(A) sufficient below
the normal noise levels in lab areas. The average level in the pump area is below the 85 dB(A). The
higher level near point 9 is caused by pump 10GHC12AA003.
The measurement positions are shown in Annex 1.

5.2.3 In the steam turbine building UMA


D.d. 08 April 2010 measurements were executed in the steam turbine building during steel gas pressure
control operation (cfr. base load) and with an electrical output of 275 MW.
Table 5.6: Levels in UMA during steel gas pressure control operation ( 275MWel. output)
Location
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m

Position
nr
1
2
3
4
5
6
7
8
9
10
11
12

16 Hz 31 Hz
dB
dB
79.8
76.7
78.8
77.1
80.1
76.1
78.2
77.1
79.3
77
80.2
76.4
81.6
76.4
81.6
76.6
81.2
76.5
81.8
77.5
79.4
76.5
77.9
75.7

63 Hz
dB
85.5
78.8
78.6
82.8
76
83.1
75.7
88.1
78.5
78.8
92.8
87.9

SGS Belgium NV
Reportnumber : 10.0102-1-v3

125 Hz
dB
78.6
78.3
80.7
82.2
82.4
75.8
80.6
79.8
83.9
83.9
83.8
83.8

250 Hz
dB
78.6
80.4
81.5
79.9
78.3
77.2
76.9
79.8
81.3
82.6
79.5
77.8

500 Hz
dB
80.5
81
81.5
80.1
77.5
74.9
77.1
80.1
80.4
81.1
79.6
77

28/04/2010

1 kHz
dB
78.9
80.4
80.7
78.7
75.3
74.5
76.6
79.9
79.5
79.1
77.8
75.9

2 kHz
dB
80
83
82.1
79.5
75.7
74
75.1
76.6
76
76.6
74.1
72.2

4 kHz
dB
74.1
74.5
72.8
71.5
68.5
66.7
70.1
71.4
70.9
71.6
68.9
66.9

8kHz
dB
67.4
67.9
64.5
61.9
59.2
60
63.5
65.4
63.8
63.9
59.9
57

16kHz
dB
55.5
53.1
51.4
47.4
50.8
49.3
51.9
57.4
55.2
54.4
48.9
43.8

17/92

LAeq
dB(A)
84.8
86.9
86.5
84.4
81.1
79.5
81.3
83.7
83.6
83.9
82.1
80.1

Noise acceptance test BFG Power Plant Gent

Location

Position
nr
UMA 0m
13
UMA 0m
14
UMA 0m
15
UMA 0m
16
UMA 0m
17
UMA 0m
18
Average Floor 0m
UMA 14.5m
1
UMA 14.5m
2
UMA 14.5m
3
UMA 14.5m
4
UMA 14.5m
5
UMA 14.5m
6
UMA 14.5m
7
UMA 14.5m
8
UMA 14.5m
9
UMA 14.5m
10
UMA 14.5m
11
UMA 14.5m
12
UMA 14.5m
13
UMA 14.5m
14
UMA 14.5m
15
UMA 14.5m
16
UMA 14.5m
17
UMA 14.5m
18
UMA 14.5m
19
Average floor 14.5m
Average total UMA

Siemens NV Energy

16 Hz 31 Hz
dB
dB
78
77.5
77
77.6
78
76.4
80.4
76.2
80.1
77.2
79.3
77.2
79.8
76.8
77.4
78.6
79
77.3
79.9
79.6
81.6
82.6
79.7
80.9
77.8
78.5
79
79.7
78.7
79.5
79.1
81.7
79.8
80
77.8
79.3
78
78.6
77.9
77.9
78.3
78
80.3
79.7
78.2
74.5
77
75.6
78
75.1
76.3
74.5
78.8
79.0
79.3
78.1

63 Hz
dB
88.3
85.3
87
89.5
78.5
85.1
86.0
89.5
87.1
82
84.9
86.1
92.4
88.9
83.4
77.5
84.1
90.1
82.9
80.4
85.4
93
81.9
81.5
76.1
79.5
87.0
86.5

125 Hz
dB
82.5
83.1
81.1
88.4
82
78.4
82.6
82.1
82.9
80.2
82.1
83.1
86.1
83.1
87
77.8
86.7
82.1
87.2
77.1
78.9
83.2
79.8
78.4
75
78.9
83.0
82.8

250 Hz
dB
78.7
77.9
78.3
78.9
78.9
77.9
79.4
77.6
76.9
76.1
76.5
79.8
79.4
76.2
76.1
76.2
76.7
76.3
75.8
76.2
78
77.7
77.6
74.6
75.6
76.8
77.0
78.4

500 Hz
dB
78
77.5
76.9
78.5
77.6
79
79.1
74.6
75.9
75.3
75.4
77.9
77.8
77.7
76
77.8
76.8
74.9
74.4
75.6
74.4
75.7
75.3
73.2
75.4
77.4
76.1
77.8

1 kHz
dB
75
75.1
75.3
76.2
75.8
76.1
77.8
72.6
73.1
73.3
73.9
75.3
74
72.8
72.6
73
73.6
74.1
73.1
72.9
73.2
73.3
75
73.2
75.2
76.8
73.9
76.2

2 kHz
dB
72.9
71.8
72.1
73.3
74.1
74.2
77.2
71.2
71.9
72.7
72.7
73.4
72.6
70.9
71
72.2
73.1
72.5
72.8
73
73.3
73.2
78.3
75.4
77.1
80.3
74.4
76.0

4 kHz
dB
68.2
66.3
66.5
67.5
68.5
68.6
70.4
67.4
68.3
70.3
70.1
70
68.5
66.3
66.8
68.7
70
69.4
69.4
68.3
67.8
67.5
70.1
66.6
68.1
69.2
68.7
69.6

8kHz
dB
59.6
56.9
58
60.1
60
59.8
62.9
56.8
57.8
61
60
59.6
57.7
53.3
54.3
58.4
60.4
58.9
58.7
57.6
57.8
57.5
63
60
59.2
61.5
59.1
61.4

16kHz
dB
45.3
41.9
43.3
45.8
45
44.7
51.5
41.1
43.4
51.7
48.1
49.2
46.1
40.1
41.5
47.1
48.6
45.9
44.9
42.8
42.9
40.4
54.1
46.1
46
49.9
47.5
49.9

LAeq
dB(A)
80.4
79.9
79.8
81.1
80.8
81.2
82.9
78.2
78.9
79.2
79.4
80.8
80.1
78.8
78.5
79.4
79.9
79.2
79.2
78.9
79.0
79.3
82.0
79.4
81.1
83.6
80.0
81.6

The measurement positions are given Annex 1.


D.d. 09 April 2010 measurements were executed in the steam turbine building during maximum load,
with an electrical output between 321.8 and 324.7 MW.
Table 5.7: Levels in UMA during maximum load ( 325MWel. output)
Location
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m
UMA 0m

Position
nr
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

16 Hz
dB
79.1
79.3
79.7
79.1
79.4
80.6
81.2
81.3
81.5
81.1
78.6
80.2
77.2
77.4
78.9
80.2
79.7
79.7

31 Hz
dB
77.9
77.5
76.9
77.5
78
76.8
77.2
77.4
76.6
77.8
76.6
76.5
78
78.4
76.7
76.9
77.3
77.2

63 Hz
dB
87
79.1
85.5
83.2
81.8
84.2
77.8
87.8
78.6
83
88.2
89.1
90.7
87.4
83.2
90.2
80.8
88.6

SGS Belgium NV
Reportnumber : 10.0102-1-v3

125 Hz
dB
80
80.9
81.7
80.8
79.8
78.9
80.3
82.8
83.1
82.7
86.1
85.7
82.9
82.2
82.9
87.4
82.6
82.6

250 Hz
dB
80.1
83.4
83.3
83
78.3
81.1
76.7
80.1
80.6
82.4
79.8
78.1
78.2
77.7
77.5
78.5
79.8
78.9

500 Hz
dB
79.8
81.1
80.5
79.8
77.2
75.8
76
78.6
79.3
80.2
78.2
77.3
77.1
76.4
76.5
76.4
77.6
77.2

28/04/2010

1 kHz
dB
78.4
80.6
79.3
78.9
76
74.7
76
78.1
78.2
79.6
77.1
75.4
74.8
74.8
75.2
76.4
76
75.8

2 kHz
dB
80.6
82.6
80.5
79.2
76.2
73.9
74.2
75.6
76.2
76.9
74.9
73.2
73.5
72.4
73.1
73.8
74.7
75.7

4 kHz
dB
73.7
76.3
75.6
73.5
71.4
68.7
69.8
71.5
72.1
73
70.7
68.8
69.4
67.5
68.3
69.1
70
70.6

8kHz 16kHz
dB
dB
67.1
54.4
68.2
55.9
65
51.7
63.5
50.3
60.7
46.8
60.1
47.9
63
50.4
63.4
52.3
63.7
50.5
65.4
53.9
62.1
48.6
59.9
45.8
61.7
46.6
58.3
41.9
60.4
45.3
61.9
47.1
62.2
46.5
62.8
46.3

18/92

LAeq
dB(A)
85.0
87.0
85.6
84.5
81.7
80.2
80.6
82.5
83.0
84.1
81.9
80.5
80.3
79.6
80.0
80.9
81.2
81.5

Noise acceptance test BFG Power Plant Gent

Location

Position
nr

Average Floor 0m
UMA 14.5m
1
UMA 14.5m
2
UMA 14.5m
3
UMA 14.5m
4
UMA 14.5m
5
UMA 14.5m
6
UMA 14.5m
7
UMA 14.5m
8
UMA 14.5m
9
UMA 14.5m
10
UMA 14.5m
11
UMA 14.5m
12
UMA 14.5m
13
UMA 14.5m
14
UMA 14.5m
15
UMA 14.5m
16
UMA 14.5m
17
UMA 14.5m
18
UMA 14.5m
19
Average floor 14.5m
UMA 0m
19
UMA 0m
20
UMA 0m
21
UMA 0m
22
UMA 0m
23
UMA 0m
24
UMA 0m
25
UMA 0m
26
Average Feedwater pumps
Average total UMA

16 Hz
dB
79.8
78.7
79.3
79.7
81.2
78.9
77.1
79.2
78
78.8
78.6
77.7
77.7
78.3
78.8
78.3
79.1
79.2
78.5
76.6
78.7
82.6
83.3
79.8
80.4
78.4
81.1
82.5
83.8
81.8
79.9

Siemens NV Energy

31 Hz
dB
77.3
79.4
77.8
80
82
81.7
79.4
80
79.6
81.6
80.9
79.7
78.6
78.2
77.6
80.1
74.4
75.6
75.8
75.1
79.3
80.7
79.2
80.7
80.2
80.9
76.7
78.1
81.1
79.9
78.8

63 Hz
dB
86.4
88.6
85.7
79.6
82.4
90.1
92.1
87.7
89.1
79.6
84.8
89.4
87.6
84.7
85.9
95.1
83.9
79.9
75.2
84.2
87.9
77.9
82.7
86.6
78.2
88.7
86.5
86.6
80.9
85.0
86.9

125 Hz
dB
83.0
80.1
83
79.9
82.5
83.9
84.1
82.9
81.9
78.3
83
82.3
84.3
77.9
80.1
82.6
80.7
79.4
79.7
77.3
81.7
79
80.5
82.5
81.7
83.2
85.3
88.2
84.3
84.0
82.7

250 Hz
dB
80.4
79.6
77.3
77
77.8
79
79.1
77.1
77.7
78.2
76.8
78.3
78
77.7
78
81.4
77.3
75.8
76.5
77.3
78.1
79.6
81.1
85.3
81.7
82.7
86.7
84.9
82.8
83.7
80.5

500 Hz
dB
78.4
74.6
75.1
76.1
76.3
77.3
78.7
75.5
75.9
75.8
77.1
75.3
74.6
75.9
74.5
76.7
76.1
74.5
75.9
77.3
76.1
80.1
81.7
85
82.6
84.1
85.4
84.6
83.7
83.7
79.4

1 kHz
dB
77.4
72.9
73.2
73
73.3
74.4
74.2
73.1
73
73.2
73.5
73.3
73.1
72.7
72.9
73
75.6
73.3
74.2
76
73.7
79
79.7
82.7
81.4
82.9
84.9
84.9
82.4
82.7
78.1

2 kHz
dB
77.1
72.3
72.3
72.7
73.2
73.5
72.8
71
71.6
72.1
73.3
72.9
72.7
73.1
74
72.9
80.7
76.8
81.3
80.3
75.6
83.1
85
90.9
85.1
86.3
94.2
89.4
86
89.0
82.5

4 kHz
dB
71.9
68.6
68.9
70.3
70.6
70.5
69.4
67.2
67.6
69.4
70.9
70.4
70.6
69.7
69.6
69.1
73.1
71.2
73.4
73.4
70.5
77.9
81.7
82
79.7
81.3
83.8
83.3
80.4
81.6
75.6

8kHz 16kHz
dB
dB
63.5
50.5
59.1
42.7
58.6
44.6
60.4
47.6
60.8
48.7
61.1
49.7
59.3
47
55.3
40.5
56
42
60
47.4
61.9
49.7
60.8
47.8
60.4
46.8
58.8
44.4
59.8
44.9
59
42.3
63.7
56.1
60.5
46.7
60.4
45.7
61.8
50.5
60.3
48.3
64.7
47.6
68.5
53.4
71.6
56.6
66.9
51.7
68.6
53.7
70.5
57.1
71.4
57.6
67.6
52.3
69.3
54.7
64.5
51.0

With the 8 additional measurements on positions around the Feedwater pumps (with 2 of 3 working) the
average level in UMA is 86.1 dB(A). Without the feedwater pump area the average level is 81.9 dB(A),
so 0.3 dB(A) higher than during base load.
The average level on floor 14.5m and floor 0m (without feedwater pump area) in UMA is during
maximum load and base load sufficiently below the contractually agreed near field noise level of 85
dB(A). Therefore according to the law, hearing protectors have to be provided when entering the
building. The average level around the feedwaterpumps is 92.0 dB(A) and as an 8-hour doses above
the upper action level of 85 dB(A) according the law. Entering this area for a longer time, it is obliged to
wear ear protection.
The spatially averaged sound pressure level of 85 dB(A) corresponds to an exposure level of 85dB(A)
with an exposure time of 8 hours. To show workers noise exposure during a normal working day, for an
exposure time of 2 hours (e.g. inspection time inside turbine building) the spatially averaged sound
pressure level of LAeq in dB(A) corresponds to an exposure level Lex, 2h of:
UMA during base load (excl. Feedwater Pump Area): LAeq = 81,6dB(A) Lex, 2h = 75,6dB(A)
UMA during max load (excl. Feedwater Pump Area): LAeq = 81,9dB(A) Lex, 2h = 75,9dB(A)
UMA during max load (incl. Feedwater Pump Area) LAeq = 86,1dB(A) Lex, 2h = 80,1dB(A)
UMA during bypass operation LAeq = 99,8dB(A) Lex, 2h = 93,8dB(A)
Taking into account the measured noise levels inside UMA during several operational cases, exposure
time and personal hearing protection, we can conclude that the contractual obligations are fulfilled.
SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

19/92

LAeq
dB(A)
82.8
78.9
78.9
79.4
79.8
80.4
80.5
78.4
78.7
79.1
80.1
79.5
79.3
79.2
79.5
79.9
84.0
80.9
84.1
83.9
80.7
86.9
89.2
93.5
89.0
90.4
96.4
92.9
89.9
92.0
86.1

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

5.2.4 In the cooling tower make up water building UGJ

Table 5.8: Levels in UGJ


Location
UGJ
UGJ
UGJ
UGJ
UGJ
Average

Position
nr
1
2
3
4
5

16 Hz
dB
84.6
76.1
85.8
86.6
87.4
85.4

31 Hz
dB
74.5
70.9
73.4
73
76.3
74.0

63 Hz
dB
68
67.9
65.3
66.7
62.5
66.5

125 Hz
dB
67.2
65.6
67.7
65.2
66.7
66.6

250 Hz
dB
64
65.1
64.4
65
65
64.7

500 Hz
dB
64
64.6
64.2
66.9
67.5
65.7

1 kHz
dB
69.3
69
69.1
70.8
73.4
70.7

2 kHz
dB
64.8
65
66.1
67.3
70.1
67.1

4 kHz
dB
60.6
61
63.1
64.1
67.8
64.2

8kHz
dB
49.1
50.1
52.3
53.4
58.5
54.1

16kHz
dB
35.2
37.3
40.7
41.9
47.1
42.4

LAeq
dB(A)
71.9
72.0
72.6
74.1
76.8
73.9

The average level in UGJ is with 73.9 dB(A) sufficient below the 85 dB(A).
The measurement positions are shown in Annex 1.

5.2.5 In Workshop and Storage building UST

Table 5.9: Levels in UST


Location
Storage 01.01
Storage 01.01
Storage 01.01
Storage 01.11
Storage 01.11
Storage 01.11
Storage 01.05
Average
Workshop 01.08
Workshop 01.08
Workshop 01.08
Average
room 01.16
office 01.17
office 01.17
hall
office 01.19
office 01.20
office 01.20
office 01.18
Average
TechRoom 01.14

Position
nr
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
19
18

16 Hz
dB
73.1
69.1
70.2
64
59.4
67
49.3
68.3
76.8
74.6
70.1
74.6
57.4
61.7
62.7
58.5
53.8
57.6
59.4
53.2
59.1
69.1

31 Hz
dB
69.4
76.1
69.6
53.3
57.2
57.8
57.3
69.4
72
69.1
67.8
70.0
56.6
59.2
57
48.6
59.3
56.8
58.8
55.2
57.3
71.4

63 Hz
dB
66.8
67.7
70.5
52.6
54.1
52.7
62.9
65.4
68.5
67.2
66.8
67.6
47.1
53.7
54.3
45.5
52.5
50.5
50.5
48.4
51.2
74.4

125 Hz
dB
66.2
66.1
64.7
49.9
48.8
48.8
65.4
63.3
66.1
64.8
66.5
65.9
47.8
49.6
50.1
47.3
50.9
47.6
50.7
47.9
49.2
73.7

250 Hz
dB
58.3
60
58.6
44.7
43.5
43.3
53.5
55.9
58.6
59.3
58.8
58.9
44.4
45.5
44
41.9
45.5
47.7
47.7
43.8
45.5
65.3

500 Hz
dB
53.8
55.3
53.3
42.4
39.9
38.1
44.3
50.9
53.8
54.4
54.6
54.3
42.6
41.3
40.5
42
40.9
44.1
44
40.8
42.2
66.3

1 kHz 2 kHz 4 kHz


dB
dB
dB
47.7
43.5
36.3
48.5
44.6
37.1
46.9
42.1
34.4
42.4
39.3
34.6
37.5
35.2
31.6
35.5
30.7
27.2
40.6
40.9
39.3
44.9
41.2
35.6
49.5
45.6
39.1
49.9
45.6
38.9
50.2
46.8
41.7
49.9
46.0
40.1
38
33.3
30.1
35.3
30.4
25.7
35.9
30.7
27.1
35.1
30.3
27.2
36.9
33.2
27.5
39.4
31.1
25.9
39.1
32.3
26.8
37.8
33.6
28.9
37.5
32.1
27.6
58.3
53.1
47.6

8kHz
dB
29.3
28.1
26.7
30.1
28.5
27.7
38.2
31.9
31.2
31.7
35.7
33.4
29.4
24.6
25.3
26
25.5
24.7
24.8
26.5
26.1
38.6

16kHz
dB
27.1
26.8
26.8
26.9
26.5
26.6
27.5
26.9
27.4
27.5
29.3
28.2
28.5
26.6
27.1
26.9
26.7
26.6
26.9
27
27.1
29.6

The average level in the offices of UST is with 43.8 dB(A) sufficient below the contractually agreed near
field noise level of 50 dB(A). The average level in the storage rooms of UST is with 53.5 dB(A) sufficient
below the contractually agreed near field noise level of 70 dB(A). Also in the workshop the 70 dB(A) is
fully met. The level in the technical room 01.14 (with air handling unit 10SAS30 working) are sufficiently
low.

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

20/92

LAeq
dB(A)
55.9
56.8
55.9
46.9
43.6
41.8
53.2
53.5
56.6
56.7
57.2
56.8
44.0
43.0
42.4
42.5
43.6
45.3
45.4
43.4
43.8
66.1

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

The measurement positions are shown in Annex 1.

5.2.6 In PCC Containers UBA

Table 5.10: Levels in UBAs


Location
10UBA91
10UBA91
Average
10UBA71
10UBA71
10UBA72
10UBA72
Average
10UBA73&74
10UBA73&74
10UBA73&74
10UBA73&74
Average
Bat room 75
Bat room 76
Average
10UBA76
10UBA76
Average
10UBA77&78
10UBA77&78
10UBA77&78
10UBA77&78
10UBA77&78
10UBA77&78
Average
10UBA81
10UBA81
Average

Position
nr
1
2
3
4
5
6
7
8
9
10
11
14
12
13
15
16
17
18
19
20
21
22

16 Hz
dB
75.8
75
75.4
78.9
71
75.9
76.3
76.3
76.5
74.4
73.6
74.6
74.9
77.9
71
75.7
76.1
72.3
74.6
80
72.4
70.4
76
72.2
75.3
75.6
83.5
88.2
86.5

31 Hz
dB
69.7
67.1
68.6
67.4
66.2
70
68.7
68.3
69
65.6
67.4
68.5
67.8
65
64.5
64.8
67.3
66.5
66.9
70.6
67
65.5
68.7
67.6
66
67.9
78.9
86.4
84.1

63 Hz
dB
70.1
70
70.1
70
70.5
68.3
72.1
70.4
76.4
67.6
67.7
70.5
72.2
65.6
59.9
63.6
72.1
70.7
71.5
72
70.5
64.7
72.2
69
62.3
69.7
75
74.8
74.9

125 Hz
dB
76.5
78.4
77.6
74.3
74
72.1
78.2
75.3
75.5
73.9
72.2
76.2
74.7
67.5
69.8
68.8
76.5
75.7
76.1
77.1
75.6
73
78
74.7
69.7
75.4
77.2
69.4
74.9

250 Hz
dB
69.6
70.7
70.2
69
68.9
70.3
73.2
70.7
70.7
71.3
66.5
71.8
70.5
64.2
65
64.6
73
74.4
73.8
72.7
69.2
69.3
73.3
69.3
68.9
70.9
69.9
69.3
69.6

500 Hz
dB
71.2
70.5
70.9
67.7
66.8
66.4
70.9
68.3
69.2
69.6
65.5
70.3
69.0
66.1
60.3
64.1
71
70.8
70.9
69.7
67.4
66.3
71.3
69.4
66.9
68.9
71.3
67.8
69.9

1 kHz
dB
66.8
67
66.9
63.9
62.5
62
67
64.3
65.1
65.8
63
65.9
65.1
58.4
60.7
59.7
69.6
68.2
69.0
66.7
62.9
60.9
67.7
63.6
61.4
64.6
66.8
64.5
65.8

2 kHz
dB
66.2
67.5
66.9
63.6
62.7
62.7
66.3
64.1
65.3
66.4
62.5
65.9
65.3
54.6
53.4
54.0
68.9
67.1
68.1
67.6
64.6
62.8
68.6
65.4
63.6
65.9
66.5
64.1
65.5

4 kHz
dB
64.7
66.7
65.8
61.8
60.9
61.4
64.9
62.6
63.8
65
61.2
65
64.0
49.4
47.2
48.4
67.9
66.2
67.1
66
63.2
61.6
67.4
64.3
62.4
64.6
64.9
61.6
63.6

8kHz 16kHz
dB
dB
56.6
41.5
57.4
44.2
57.0
43.1
53.3
39.1
52.8
37.8
52.8
36.5
56.5
40.7
54.2
38.8
53.8
41
55.7
43.1
50.6
36.2
55.8
43
54.4
41.5
39
29.7
37.9
28.9
38.5
29.3
57.7
58.4
57.1
49.7
57.4
55.9
56.1
44.1
51.3
34.3
49.7
33.1
57.1
43.3
53.1
37.6
50.6
33.1
53.9
40.0
57.9
44.5
54.1
41.1
56.4
43.1

The average levels in the different UBAs are above the contractually agreed near field noise level of 70
dB(A). Most responsible noise sources are the Liebhert Ventilation Systems. In the 2 Battery rooms the
contractually agreed near field noise level of 70 dB(A) is met.
The measurement positions are shown in Annex 1.

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

21/92

LAeq
dB(A)
73.5
74.2
73.9
70.7
69.8
69.8
73.8
71.4
72.3
73.0
69.4
73.1
72.2
65.4
64.1
64.8
75.6
74.6
75.1
74.0
71.0
69.6
75.1
72.0
70.1
72.4
73.7
70.9
72.5

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

5.2.7 In boiler building UHA


D.d. 09 April 2010 measurements were executed in the boiler building during maximum load, with an
electrical output between 321.8 and 324.7 MW. The measurement positions are shown in Annex 1.
Table 5.11: Levels in UHA during maximum load
Location
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
UHA 73.3m
Average Floor 73.3m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
UHA 62.7m
Average Floor 62.7m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
UHA 56.2m
Average Floor 56.2m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 46.5m
UHA 46.5m
Average Floor 46.5m

Pos.
nr
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

16 Hz
dB
95.9
99.2
94.9
93.2
93
93.1
97.6
96
96.6
93.4
95.8
92
90.6
87.5
91.3
92.4
98.1
93.5
95.6
97.2
95.2
93.8
95.9
95.2
92.1
94.4
89.1
94.2
92.8
93.2
92.3
91.2
93.6
93.7
91.5
91.1
92.5
87.6
87.5
87.3
87.8
90.1
88.9
89.6
89.8
92.1
89.2

31 Hz
dB
98.2
96.5
94.2
92.6
92.3
94.5
96.7
99.1
97.9
91.1
96.1
87
88.7
90.3
88
92.9
93.2
96.2
95.2
92.2
95.1
95.5
97.9
92.8
91.2
93.6
84.6
92.7
89.8
85.3
86
85.9
85.2
87.9
91.8
93
89.4
87
84.7
85.5
86.7
87.2
87.1
87.6
88.8
88.2
87.1

63 Hz
dB
95.4
94.1
90.3
86.7
89.3
88.5
92.7
94.7
92.4
84.4
92.0
81.3
80.7
81.2
80.8
84.4
85
95.4
92.1
95
93.8
92.1
94.6
85.5
83.2
90.8
81.7
86.1
87.2
82.4
80.5
81.4
83.3
86.8
90.1
90.7
86.4
79.7
80.9
80.3
81
85.5
87.9
88.1
87.1
85
85.1

SGS Belgium NV
Reportnumber : 10.0102-1-v3

125 Hz
dB
89.3
85.1
81.7
79.4
80.4
82.3
85.5
88.4
83.4
78.6
84.8
77.5
78.9
77.5
78.9
78.4
82.5
87.4
89
87.8
87.3
90.3
84.8
82.4
77.9
85.2
76.6
81.8
81.8
79.5
78
78
79
80.8
85.1
84.3
81.3
77.1
78.1
78.1
77.7
80.5
83.2
84.4
82
79.7
80.8

250 Hz
dB
89.4
85.5
82
80.6
79.5
81.6
83.9
88.2
85.2
80
84.9
79.7
79.1
81.9
78.4
82
86.7
89.8
91.2
93.3
91.4
90.8
88.5
84.2
82.6
88.2
79.3
85.1
83.6
82.9
78.3
78.7
80.9
86.2
88.1
86.8
84.2
79.8
79.9
78.5
80.4
82.9
85.2
86.6
84.6
81.5
83.0

500 Hz
dB
81.5
78.8
77
75.6
75.9
76.4
77.7
80.9
78.8
75.6
78.3
75.7
75.7
75.1
74.8
76.1
79.3
82.9
84.2
85.8
84.7
84.8
81.2
79.5
76.7
81.5
74.9
77.8
77.7
76
74.4
74.4
76
77.5
81
81.2
77.8
75.1
74.9
74.9
75.6
76.9
79.3
79.4
77.6
75.8
77.0

28/04/2010

1 kHz
dB
78.6
74.5
73.7
72.4
72.3
73.5
74.2
77.4
75.7
72.6
75.0
72.5
72.2
71.7
71.4
72.8
76
79.3
80.2
82.5
81.8
79.8
77.6
76
73.3
77.9
72.7
75.3
75.1
73.1
72.2
71.5
73.6
74.6
77.4
77.7
74.8
75.5
73.8
73.3
73.3
74.9
76.6
77.7
75.6
74.5
75.3

2 kHz
dB
75.2
70.6
69.3
67.4
67.6
70.5
70.4
73.3
71.1
67.8
71.0
67.9
66.9
66.6
66.4
68.5
71.8
74.8
75.3
76.6
76.2
75.4
73.4
71.3
68.2
72.9
67.8
70
70.6
68.9
67.7
68.4
72.9
70.5
72.4
72.6
70.6
69.7
70.1
71.2
69.8
70.7
71.9
73.7
70.6
69.8
71.0

4 kHz
dB
70.9
69
67.3
63.9
64.7
68.5
69.1
70.6
67.4
64.5
68.2
64.3
60.6
61.4
61.2
63.8
68
73.5
71.6
70.2
70
70.4
67.8
65.9
62.6
68.3
62.2
63.7
64.5
62.8
62.7
61.6
72.5
64.2
66.3
66
66.1
63.8
64.1
66
63.2
63.5
64.3
66.5
63.2
61.8
64.3

8kHz 16kHz
dB
dB
60.6
46
60.7
43.9
59.6
40.7
53.3
33
54.5
33.9
59.9
42.8
60.6
43.4
60.6
46.9
55.6
39.3
53.9
32.2
58.8
42.6
55.2
43.1
48.1
33
48.7
30.2
48.5
33.7
50.7
32.2
54.9
41.9
61.1
46.4
60.7
49
58.1
46.5
58.1
45.1
60.6
52.9
56.4
44
54.1
38.1
50.2
31.7
56.8
45.3
53.1
40.7
52
35.4
54.3
40.1
52.1
37.4
55.6
44.4
50.6
39.2
66.9
58.5
52.4
38.3
53.4
39.6
53.4
39.5
58.3
49.0
53.4
37
53.9
41.4
58.5
47
51.3
35.9
51.6
35
52.3
35.9
56.3
41.2
51.8
37.9
51.7
38.3
54.2
40.7

22/92

LAeq
dB(A)
85.3
81.7
79.6
78.0
78.0
79.7
80.8
84.3
81.8
78.0
81.5
77.8
77.4
77.8
76.7
78.7
82.4
86.1
87.2
88.9
87.7
87.0
84.2
81.6
79.0
84.3
77.5
80.9
80.6
79.1
77.0
77.0
80.6
81.2
83.9
83.6
80.8
78.9
78.4
78.4
78.4
80.0
82.1
83.2
81.0
79.1
80.3

Noise acceptance test BFG Power Plant Gent

Location

Pos.
nr
44
45
46
47
48
49
50
51
52

UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 37.6m
UHA 37.6m
Average Floor 37.6m
UHA 30.6m
53
UHA 30.6m
54
UHA 30.6m
55
UHA 30.6m
56
UHA 30.6m
57
UHA 30.6m
58
UHA 30.6m
59
UHA 30.6m
60
UHA 30.6m
61
Average Floor 30.6m
UHA 21.5m
62
UHA 21.5m
63
UHA 21.5m
64
UHA 21.5m
65
UHA 21.5m
66
UHA 21.5m
67
UHA 21.5m
68
UHA 21.5m
69
Average Floor 21.5m
UHA 13&16m
70
UHA 13&16m
71
UHA 13&16m
72
UHA 13&16m
73
UHA 13&16m
74
UHA 13&16m
75
Average Floor 13&16m
UHA 8&10m
76
UHA 8&10m
77
UHA 8&10m
78
UHA 8&10m
79
UHA 8&10m
80
UHA 8&10m
81
UHA 8&10m
82
UHA 8&10m
83
Average Floor 8&10m
UHA 5.7m
84
UHA 5.7m
85
UHA 5.7m
86
UHA 5.7m
87
Average Floor 5.7m
UHA 0m
88
UHA 0m
89
UHA 0m
90
UHA 0m
91
UHA 0m
92
UHA 0m
93
UHA 0m
94
UHA 0m
95

16 Hz
dB
89.2
87.6
86.8
88.8
86.4
86.3
90.9
87.5
89.8
88.2
88.7
92.8
88.3
86
86.7
86.7
86.7
85.5
86.8
88.2
87.5
89
88
82.9
84.1
85.5
86.1
83.8
86.3
84
83.7
84.5
86.5
85.6
84.4
84.9
86.3
85.6
84.1
86
90.3
88
85.1
84.3
86.7
86.1
82.5
82.4
85
84.3
87.5
85.8
84.6
87.6
84.7
85.1
87
85.2

Siemens NV Energy

31 Hz
dB
87.3
84.6
84
85.8
85.8
90.1
84.7
85.9
85.5
85.5
84.4
85.2
84.7
86.2
84.4
84.8
85.6
86.1
87
85.5
85.5
86.2
87.7
88.7
88.5
89.2
86.3
87.2
87.6
84.4
87.2
83.7
85.3
87.3
91.3
87.3
87.7
88.5
86.1
86.8
89
87
81.2
84.9
86.9
84.3
83.6
85.7
80.1
83.9
84
88.1
85.5
87.8
87.7
84.1
86.8
88.3

63 Hz
dB
79
80.1
81.2
81.8
82.5
83.6
82.9
83.3
81.2
81.9
78.4
81.4
83.2
83.3
81.5
82.5
81.1
81.4
82.6
81.9
78.1
82.5
83
84.4
81.8
83.6
82.7
83.4
82.7
83.1
82.5
80.4
83.9
82
82.9
82.6
84.6
83.1
83.9
81.9
83.5
82.8
80.1
82.1
82.9
85.2
81.3
82.3
80.5
82.7
82.5
80.6
80.9
80.1
79.7
79
79
80.3

SGS Belgium NV
Reportnumber : 10.0102-1-v3

125 Hz
dB
76.3
77.2
77.3
78
80
79.8
79.5
79.6
78.4
78.1
76.3
76.5
78.1
78.5
76.1
76.4
79.1
80.9
78.3
78.1
77.4
77.7
77.6
79.8
78.6
76.8
78.1
78
78.1
78.3
79.4
77.2
78.4
79.4
79.3
78.7
78
78.8
80.3
80.9
77.8
78
77
78.3
78.8
77.7
77.8
77.6
78.5
77.9
75.7
74.5
77
76.5
77.5
77.3
76
75.3

250 Hz
dB
77.1
76.8
77.6
78.4
79.2
80.8
79.3
78.7
78
76.9
76.5
76.2
76.9
75.4
75
77
77.3
77.5
79.1
76.9
74.8
74.8
76.2
78.5
78.3
78.2
77.5
76.9
77.1
77
77.2
74.7
74.7
78.1
77.3
76.7
76.2
76.7
77
76.6
75.3
74.3
75.4
76.7
76.1
73.7
75.3
76.1
75.8
75.3
74.3
74.4
75.1
75.7
79.7
77.1
75.8
74.4

500 Hz
dB
74
73.6
74
74.2
76.3
76.1
75.7
76.3
75.4
74.6
74
74.1
75.2
75.1
73.6
73.5
74.7
76
75
74.6
77.4
74.6
74.2
77.2
75.9
75.1
75.6
75.9
75.9
76
78.8
77.7
74.9
77.4
76.9
77.1
75.1
75.4
80.7
80.7
75.1
73.9
76
76.3
77.4
74
74.9
75
78.2
75.8
73.7
73.6
74
73.8
76.3
75.2
74.8
74.4

28/04/2010

1 kHz
dB
75.5
74.7
73.7
75.3
76.4
76.7
75.3
75.8
77.4
77.1
77.4
75.2
77.9
79.3
75.2
74.3
76
78.2
77.8
77.1
79.9
75.6
75.1
78.9
77.4
76.4
78.4
78.7
77.8
78.4
81.6
81.3
77.5
78.7
78.5
79.6
77.2
78.2
84.8
85.3
77.3
76.3
78.6
77.5
80.9
75.9
75.6
77
81.5
78.2
76.6
76.2
75.8
74.8
76.1
77.6
77
77.2

2 kHz
dB
70
71.4
73.4
74.4
74.4
73.7
72
70.5
70.3
74.4
70.6
72.4
71.5
72.1
72.6
75.2
76.8
77.5
75.4
74.4
71.8
72.9
74
77.2
75.9
74.9
74.3
73.8
74.6
74.3
77.6
75.2
71.7
78.3
76.6
76.1
74.7
74.8
79.7
79.2
71.6
71.6
78.5
78.2
77.0
71.3
74.8
73.7
77
74.7
71.4
71.7
72.9
72.9
73.9
73.4
73.2
73.4

4 kHz
dB
62.2
63.6
66
68.9
67.6
66.3
63.6
62.9
64
68.4
63.5
65.6
66
67
68.2
68.4
70.9
71.3
69
68.4
66.1
65
66.2
72.7
69.5
68
67.4
67.6
68.5
68.6
72.4
69.5
64.8
74.3
72.6
71.3
69.4
72.1
76.3
74.4
66.4
65.8
71.2
76
72.9
65.6
74.6
69.9
76.9
73.6
66.6
65.9
69.3
69.1
68.8
68.8
68.2
69.2

8kHz 16kHz
dB
dB
55.5
40.6
56.2
48.3
60.1
56.6
61.4
51.2
59.4
44.4
57.4
40.3
54.9
37.4
55.3
38.8
56.7
43
63.5
55.0
60.4
46.7
60.1
44.3
62.8
49.1
63.2
49.2
64.1
49.6
65.1
61.6
65.4
57.6
65.1
56.5
61.7
48
63.5
55.0
66.7
55.6
63
52.1
64.4
60.9
71.5
61.5
67.7
56
64.8
52
64.6
52.8
66.4
55.1
67.0
57.2
67.4
56.9
74.4
67.3
72.6
64.2
64.1
54.3
78.1
72.2
75.5
69.2
74.1
67.5
66.1
52.8
71.4
54.6
80.3
75.3
77.4
68.9
66.4
54.8
64
51.6
73.9
67.5
79.2
73.8
75.7
69.6
64.3
50
76
70.3
66.5
53.4
80.9
75.6
76.3
70.7
65.9
53.7
65.6
53.9
69
58.5
68.9
57.6
65.3
51.2
65.7
54
65.2
51.4
68
54.6

23/92

LAeq
dB(A)
78.3
78.2
78.9
80.1
80.8
80.8
79.5
79.3
79.7
80.6
79.3
78.9
80.2
80.9
79.0
79.9
81.5
82.7
81.4
80.6
81.8
79.2
79.5
83.3
81.7
80.7
81.3
81.3
81.3
81.4
84.7
83.5
79.8
84.6
83.2
83.2
81.0
82.0
87.8
87.4
79.8
79.1
83.5
84.6
84.2
78.8
82.1
80.6
86.0
82.7
79.2
79.1
79.8
79.5
80.8
80.8
80.2
80.4

Noise acceptance test BFG Power Plant Gent

Location

Pos.
nr
96
97

UHA 0m
UHA 0m
Average Floor 0m
Average Total UHA

16 Hz
dB
85.3
86.4
86.1
91.2

Siemens NV Energy

31 Hz
dB
84.1
87
86.6
90.6

63 Hz
dB
81.3
79.7
80.4
87.0

125 Hz
dB
77.8
78.4
76.8
81.5

250 Hz
dB
74.1
74.4
75.9
83.0

500 Hz
dB
75.5
74.7
74.7
77.7

1 kHz
dB
79
78.2
77.0
77.4

2 kHz
dB
73.2
72.6
72.9
73.6

4 kHz
dB
70.6
69.7
68.8
69.1

8kHz 16kHz
dB
dB
71.4
60.8
71.6
62.4
68.3
57.4
69.0
62.4

The average levels at the different levels of UHA and the total average level in UHA, during maximum
load, are under the contractually agreed near field noise level of 85 dB(A).
The spatially averaged sound pressure level of 85 dB(A) corresponds to an exposure level of 85dB(A)
with an exposure time of 8 hours. To show workers noise exposure during a normal working day, for an
exposure time of 2 hours (e.g. inspection time inside boiler building) the spatially averaged sound
pressure level of LAeq in dB(A) corresponds to an exposure level Lex, 2h of:
UHA during max load: LAeq = 82.0dB(A) Lex, 2h = 76dB(A)
UHA during bypass operation LAeq = 91.2dB(A) Lex, 2h = 85.2dB(A)
Taking into account the measured noise levels inside UHA during several operational cases, exposure
time and personal hearing protection (during bypass operation), we can conclude that the contractual
obligations are fulfilled.

5.2.8 Around steam turbine building UMA and transformer area UBF
D.d. 07 April 2010 measurements were executed around the boiler building and transformer area during
base load, with an electrical output of 313 MW. The measurement positions are shown in Annex 1.
Table 5.12: Levels around UMA and UBF during base load
Pos.

16 Hz

31 Hz

63 Hz

125 Hz

250 Hz

500 Hz

1 kHz

2 kHz

4 kHz

8kHz

16kHz

LAeq
dB(A)

nr

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

75.3

70.7

68.3

63.8

62.3

56.3

53.4

54.3

51.5

48.5

36.2

61.0

76.2

70.4

74.3

70.2

65.5

60.8

57.9

55.6

52.4

42

30.9

64.1

75.5

72.4

71.2

72.8

63.6

60

57.1

55.1

51.5

40.6

28.6

63.5

79.5

76.4

77.8

74.4

65.2

63

59.7

56.6

53.5

43.2

29.9

65.8

84

77.5

75.2

72.1

63.4

59.4

56.6

53.6

48.3

42.5

32.9

63.1

82.9

78.8

73.3

73

65

60.7

58.5

54.1

49.6

39

29.5

64.2

79.9

75.5

73.3

73.7

66.7

66

61.2

56.9

50.4

42.1

33.6

67.1

76.9

74.7

72.9

71.3

65.4

64.9

57.5

52.3

46.7

37.9

29.8

64.6

77.3

75.6

73.4

70.5

59

57.2

53.8

49.5

46.2

38.4

28.6

60.1

10

77.5

76

72.9

67.2

61.8

57

54

50.6

47

39

29.4

60.1

11

80.4

78.3

75.8

70

60.4

57.7

53.1

50.2

47.7

39.8

29.1

60.4

12

79.3

78.4

76

72

63.6

61.4

58

53.8

49.9

40.9

30

64.0

13

86.2

80.9

76.2

70.5

60.2

54.3

50.5

47.4

43.9

36.1

27.9

59.2

14

80.2

75.6

77.2

70.2

63.1

57.5

54.6

49.7

44

33.9

27.6

61.2

15

89.3

85.8

81.6

78.7

71.7

70.5

68.5

65.1

63

53.1

41.4

73.8

16

86.4

80.4

77.1

76.2

64

61

60.6

63.7

53.8

45.4

30.8

68.2

17

85.3

82.5

76.3

71

61

59

59.8

63.1

52.6

45.3

29.4

66.7

18

83.1

81.3

79.6

69.6

59.1

56.4

55.1

54.7

53.7

48.8

33.3

62.4

19

87.6

84.4

75.4

71.1

61.6

61

60.3

62.5

58.2

48

33

67.3

20

90.3

84.7

80.7

77.4

69.9

68.4

67.7

64

61.2

52.8

40.3

72.4

21

89.3

83.6

78.8

73.4

63.9

61

58.4

54.6

53

47.6

33.8

65.1

22

85.4

83

79.6

71.9

63.9

60.8

59.5

55.7

53.7

48.3

34.2

65.1

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

24/92

LAeq
dB(A)
81.7
81.0
80.3
82.0

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

23

85.5

82.7

79

72.1

65.4

61.7

59.5

55.8

54.2

47.8

31.6

65.4

24

84.8

82

71.6

68.8

64

57.2

57.2

51.1

50.9

45.6

40.9

62.2

25

80.8

76.1

70.8

65.6

59.4

55.2

52.6

46.8

43.7

33.7

28.2

58.3

84.5

80.6

76.7

72.7

64.8

62.5

60.3

58.2

54.3

46.2

34.3

66.1

Average

Around UMA and UBF the average LAeq-level is sufficiently below the contractually agreed level of 85
dB(A) during base load operation (313 MW electric output).

5.2.9 Around PCC containers UBA


D.d. 07 April 2010 measurements were executed around the PCC containers UBA during base load,
with an electrical output of 313 MW. The measurement positions are shown in Annex 1.
Table 5.13: Levels around UBA during base load
Pos

16 Hz

125 Hz

250 Hz

500 Hz

1 kHz

2 kHz

4 kHz

8kHz

16kHz

LAeq

nr

dB

31 Hz 63 Hz
dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB(A)

79.8

74

74.1

64.5

58.9

53.3

50.6

45.7

42.2

33.5

27.6

56.7

80.3

71.5

72.6

65.1

59

52.3

48.7

41.9

39

31

27.6

55.4

79.6

70.5

68.1

60.9

56.8

50.6

48.5

42.3

37.1

29.6

27.1

53.8

78.1

69.2

67.7

59.2

56

50.9

48.4

43.8

37.9

30

27.1

53.7

76.5

70.1

67.1

62.9

60.4

54.2

46.9

42.3

39.3

32.2

27.5

55.3

79.4

70.6

68.6

62.2

57.8

51.9

47.8

44.1

40.5

30.5

27.1

54.8

77.8

72.4

70.1

65

58.7

52.7

49.1

44.1

40.6

31.3

29.9

55.9

75.7

69.3

71.6

64.3

60.3

55.7

51.2

50.8

49.3

39.3

28.7

58.9
56.6

76.5

71.1

66.1

69.3

58.6

53.1

48.3

45.2

41.9

31.8

27.2

10

76.4

69.3

67.8

62.4

55.8

51.3

46.7

42.6

38.7

30.7

27.4

53.6

11

75.4

68.2

65.3

65.4

65

61

53.3

51.2

47.4

38.5

29.2

61.6

12

75.3

67.7

64.3

65.4

67.1

57.7

50.8

48.5

45.7

37

29.2

60.2

13

74.8

67.4

64.6

67.2

61.6

56.3

49.8

45.9

43

34.5

27.8

57.9

14

73.5

65.8

65.8

66.6

58

54

48.9

45

40

31.3

29.8

55.9

15

75.7

67.3

66.5

64.9

58.2

53.9

51

46.6

40.1

30.7

27

56.6

16

74.1

69.2

70.5

66.6

59.8

55.8

53.7

50.8

46.6

37.6

29.2

59.2

17

74.4

71.7

66.2

65.1

56.6

54.7

50.4

46.8

41.3

32.1

27.2

56.8

18

75.1

71.9

69.1

68.3

60.2

57.7

54.9

52.7

47.8

37.5

28.1

60.8

19

77

71.4

70.3

69.2

64.7

60.2

56.9

55.2

50.7

40.6

30.2

63.3

20

77.2

69

74

71.1

64.5

60.4

55.5

53.6

50.2

40.3

28.7

62.7

21

75.6

70.3

69.6

70.5

62.5

57.7

53.8

51.4

48.4

37.9

28.6

60.8

22
Average

75.3

67.4

72.1

66.7

63.7

58.3

55.6

54.2

50.7

40

28.8

61.9

77.0

70.2

69.7

66.5

61.4

56.3

52.0

49.5

45.8

36.1

28.3

58.9

Around UBA the average LAeq-level is sufficiently below the contractually agreed level of 85 dB(A) during
base load operation (313 MW electric output).

5.2.10 Around water treatment area UGD/UGA/UGE


D.d. 07 April 2010 measurements were executed around water treatment area UGD/UGA/UGE during
base load, with an electrical output of 313 MW. The measurement positions are shown in Annex 1.

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

25/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Table 5.14: Levels around UGD/UGA/UGE during base load


Pos

16 Hz

31 Hz

63 Hz

125 Hz

250 Hz

500 Hz

1 kHz

2 kHz

4 kHz

8kHz

16kHz

LAeq

nr
1

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB(A)

82.1

78

71.8

64.6

58.5

54.9

55.4

51.5

47.4

34.9

27.8

59.7

81.9

78.5

74.2

63.4

66.7

61.8

56.2

53

50.4

42

31

63.9

80.5

81

72.4

64.4

70.8

62.4

54.3

48.8

48.9

35.5

28.3

65.6

80.6

80.9

73.6

62.5

65.2

61.6

60.4

56.3

57.5

41.8

35.7

65.6

77.2

75.9

69.3

61.3

56.2

60.7

59.2

54

55.1

38.4

31.5

63.6

77.2

74.3

69.1

57.6

56.7

59.3

57.5

50.4

48.8

31.2

27.4

61.2

77.6

71.7

66.6

57.8

60.6

58.5

56.9

50.3

46.2

31.8

27.6

60.8

77.2

74.8

65.5

56.5

54.7

53.2

51.6

46.8

44.2

28.7

27.2

56.1

73.7

71.3

63.8

54

52.1

52

50.9

45.1

39.1

30.3

27.8

54.6

10

76.2

67.3

62.1

54.2

51.7

50.7

48.8

43.2

37.8

29.8

28.1

52.9

11

76.2

69.4

65.4

57.5

53.1

53.8

52

44.7

38.4

29.1

27.2

55.6

12

77.8

70.2

69.2

60.6

54.7

52.6

52.3

45.5

36.9

27.3

27

55.8

13

79.1

71.7

69.3

63.9

56.9

52.5

50.1

45.8

42.1

35.4

27.5

55.8

14

79.2

72.5

69.8

64.8

59.6

54.4

54

52.1

46.3

37.8

28.4

59.3

15
Average

80.9

75.3

72.1

65.5

62.2

55.5

53.5

48.4

44.5

40.2

30.4

59.3

79.1

76.0

70.2

62.0

62.5

58.0

55.5

50.7

49.7

36.8

29.7

61.1

Around UGD/UGA/UGE the average LAeq-level is sufficiently below the contractually agreed level of 85
dB(A) during base load operation (313 MW electric output).

5.2.11 Around gas reduction station area UEN


D.d. 07 April 2010 measurements were executed around gas reduction station UEN (outside safety
fence) during base load, with an electrical output of 313 MW.
Table 5.15: Levels around UEN during base load
Pos

16 Hz

31 Hz

63 Hz

125 Hz

250 Hz

500 Hz

1 kHz

2 kHz

4 kHz

8kHz

16kHz

LAeq

nr

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB(A)

81.7

77.3

72.4

64.5

59.7

59.2

57.8

52.9

50.4

37.1

28.9

62.2

82.1

81.3

73.2

64.6

63.1

62.7

61.8

56.7

57.1

40.2

32.4

66.2

77.8

76.4

71.1

64.7

62.1

63.8

64.8

60.5

62

46.5

40.7

69.1

79.3

77

72

67.3

62.7

65.1

63.6

63.9

67.4

52.9

46.8

71.7

79.2

75

72.5

65.6

65.3

64.9

64

63.4

65.2

48.4

40.6

70.8

78.6

76.2

75

70.9

66.1

64.9

63.6

62.4

63.6

44.7

35.2

70.0

78

74.8

71.6

69.5

65

64.2

62.7

61.9

63.6

44.6

35.7

69.4

80.2

75.8

70.8

65.2

65.1

63.6

64.3

63.1

64.5

45.9

36.4

70.3

78.7

78.6

71.2

67.2

63.8

63.2

61.6

62.1

63.8

45.8

37.3

69.2

10

81.8

79.9

71.5

64

59.5

58.9

56.9

54.5

56.9

42.6

32.9

63.3

Average

80.0

77.7

72.3

67.0

63.7

63.5

62.7

61.4

63.3

46.8

39.7

69.1

Around UEN the average LAeq-level is sufficiently below the contractually agreed level of 85 dB(A) during
base load operation (313 MW electric output).

5.2.12 Around boiler building UHA and auxiliary boiler building UHB
D.d. 07 April 2010 measurements were executed UHA and UHB during base load, with an electrical
output of 313 MW. The measurement positions are shown in Annex 1.
SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

26/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Table 5.16: Levels around UHA and UHB during base load
Pos

16 Hz

31 Hz

63 Hz

125 Hz

250 Hz

500 Hz

1 kHz

2 kHz

4 kHz

8kHz

16kHz

LAeq

nr

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB(A)

80

75.2

72.5

67.9

66

65.1

63.6

59.7

60.3

40.4

29.8

68.6

79.6

76.8

71.6

69.6

64.3

63.8

62.7

60.4

61.6

41.8

31.9

68.4

80.4

76.4

71.7

70.8

66.3

66.3

64.6

61.8

62.8

43.1

32.3

70.1

80.3

77

70.8

69.3

66.9

65.6

64.5

62.6

63.2

45.4

34.7

70.2

80.6

80.6

72.7

64.6

68.7

63.3

59

54.8

56.2

43.4

32.5

66.2

80.4

80.7

74

63.9

68.3

57.9

56.7

51.7

54.6

48.1

39

64.3

82.5

81.8

72.6

63.1

57

55.3

55

50.9

52.6

49.9

42.5

60.4

79.6

76.1

69.3

61.6

56.8

54.9

54.2

49

48.7

39

29.4

58.7

85.5

82.1

75.7

73.9

64.6

61

59.1

54.9

47.9

41.4

30

64.6

10

85.2

83.2

79.8

72.1

64.1

60.7

59.5

54.8

51.5

46.8

32.6

64.8

11

86.5

83.1

82.3

70.5

66.9

62.5

62

57.1

54

46.7

31.2

66.5

12

84.4

82.2

79.2

68.5

63.4

59.3

57.7

53.5

51.6

46.9

31.6

63.1

13

86.3

86.8

80.8

65.9

61.1

58.9

60.3

57.7

53.1

50.7

35.1

64.9

14

87.5

84.1

78.7

65

55.5

55.7

55.8

54.5

52.4

50.6

40.2

61.8

15

86.4

84.3

77.6

63.3

55.3

56.5

55.8

50.6

48.5

44.4

32.4

60.4

16

83

79.6

72.4

63.6

60.9

63.1

59.2

52.7

52

37.8

27.9

64.1

17

84.7

80.8

74.9

65.4

61

61.7

61.4

52.4

45.1

35.6

27.5

64.5

18

80

76.5

71.7

62.7

64.2

67.2

65.1

55.2

50.5

32.7

27.6

68.4

19

80.9

78.2

74

67.9

64.7

64.4

63

58.4

59.7

38.6

29

67.8

20
Average

83

76

71.1

67.7

67.1

66

63.4

57.4

58

37.2

28.9

68.2

83.7

81.3

76.4

68.2

64.7

62.9

61.3

57.1

57.2

45.5

34.8

66.4

Around UHA and UHB the average LAeq-level is sufficiently below the contractually agreed level of 85
dB(A) during base load operation (313 MW electric output).
During steam turbine bypass operation LAeq-levels till 84.9 dB(A) can occur in the zone between UHA
and UMA (noise radiation of outdoor steam pipes).

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

27/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

5.2.13 Around Cooling Tower area URA and UGJ


D.d. 07 April 2010 measurements were executed around URA and UGJ during base load, with an
electrical output of 313 MW. The measurement positions are shown in Annex 1.
Table 5.17: Levels around URA and UGJ during base load
Pos

16 Hz

31 Hz

63 Hz

125 Hz

250 Hz

500 Hz

1 kHz

2 kHz

4 kHz

8kHz

16kHz

LAeq
dB(A)

nr

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

90.6

87.4

84.8

73.4

65.7

62

58.2

59.4

60.9

58.8

47.7

67.9

92.4

91.1

80

73.4

61.7

57.5

59.9

62.3

66.6

66.2

58

71.3

90

88.3

80.6

70.2

59.6

56.6

56.6

58.6

60.9

58.8

47.4

66.4

87.6

85

76.5

72

61.7

59.6

58.5

55.7

53.5

47.2

32.3

64.3

86.1

84.4

80.4

69.1

60.7

58.2

57.6

57.6

57.1

53.6

43

65.0

87.7

86.1

80.8

74.9

64.7

61.4

58.4

60.4

62.5

60.6

50.6

68.6

87.6

87.2

79.8

72

60.8

57.1

57.5

59.6

63

61.4

50.3

68.0

85.1

85.8

81

69.4

61.7

57.8

56.7

58.2

60.9

59.9

50.1

66.7

86.5

86.6

81.8

69.1

66.9

62.1

58.3

55.1

54.5

53.7

44.7

65.6

10

91.4

90.4

82.8

75.1

65.8

63.4

63.4

64.6

68.2

67.4

58.6

73.3

11

81.3

75.3

66.1

62.6

51.5

48.6

51.5

44.3

40.5

34.8

28.3

54.4

12

83.1

82.1

68.8

64.6

56.1

55.8

56.8

51.3

50.2

47

37.2

60.3

13

92.1

91.8

83.6

74

62.3

61.1

62.1

65.8

69.1

68.6

61.6

73.9

14

92.3

91.7

83.7

74.1

61.4

59.2

60

62

68.3

69.8

64.6

73.3

15

92.3

93

83.4

73.9

60.5

58.5

59.6

60.6

68.3

69.6

64

73.0

16

94

92.6

82.6

74.1

63.9

63.3

63.3

65.5

69

69.1

63.1

74.1

17

85.7

80.4

69.5

61.1

58.6

59.6

58

50.8

46.8

43.1

36

61.5

18

84.9

80.9

72.5

65

58

54.4

53.2

51.3

50.6

47.9

39.1

59.5

19

92.2

91.4

83.6

73.8

63.4

62.9

61.7

65.4

68.4

67.8

60.4

73.4

20

91.3

92.7

83

74.1

60.5

58.7

57.9

60.9

68.2

69.6

64.1

72.9

21

90.3

90.4

83.2

74.4

62

61.5

60.2

62.4

68.4

69.8

64.2

73.4

22

90.1

90.5

83.1

74.8

65.9

64.9

63

65

67.4

66.3

59.2

72.9

90.0

89.3

81.5

72.5

62.6

60.4

59.6

61.4

65.4

65.5

59.1

70.6

Average

Around URA and UGJ the average LAeq-level is sufficiently below the contractually agreed level of 85
dB(A) during base load operation (313 MW electric output).

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

28/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

6 MEASUREMENTS IN THE FAR FIELD


6.1

Regimes of the BFG Power Plant and evaluation points to consider

The specific noise of following conditions has to be considered:


normal operating conditions from minimum to maximum load,
included start up operation, shut down operation and steam turbine bypass operation.
The specific noise of following conditions (abnormal transients) has not to be considered:
safety valve operation,
commissioning phase and temporary test operating conditions,
emergency conditions (e.g. diesel generator operation)
noise generated by sources supplied by others.
More details about the working regimes during the far field measurements are given in Annex 2.
The specific noise (Far Field Level) will be evaluated at:
MP200m: At 200m of the border of the Plant in the direction of the nearest dwelling (direction
east from the Plant). The specific noise is contractually agreed to be equal or lower than 50
dB(A).
MPA: at the nearest dwelling outside the industrial area (east from the Plant in the direction of
R4). The specific noise is contractually agreed to be equal or lower than 40 dB(A).
MPB: at 500m of the border of the industrial area (direction east from the Plant). The specific
noise is contractually agreed to be equal or lower than 30 dB(A).
MPC: at 700m of the center of the Plant in the north-east direction (down wind condition during
measurements at maximum load and bypass operation). No noise limit applicable, so for
information only.
The position of the evaluation points is shown in Figure 7.1 and Figure 7.2 of Annex 1.
Because the power plant can work during the night period, immission measurements and evaluation will
be executed at 4 m height (average height of sleeping rooms).

6.2

Specific noise by immission measurements at the evaluation points

To avoid noise disturbance off the traffic all far field measurements were executed during the night
period.
The background measurements were executed d.d. 17 March 2010 from 2.30 till 3.30 hour, with
wind from SSW and with average speed between 0 to 4 km/h.
The measurements with maximum load operation were executed d.d. 18 March 2010 from 1.10
till 2.00 hour and with wind from S with average speed between 0 to 5 km/h.
The measurements with steam turbine bypass operation were executed d.d. 20 March 2010
from 2.00 till 2.45 hour, with wind from various direction between SE and SW and with average
speed between 8 to 16 km/h.
More details about the weather conditions during the immission measurements are given in Annex 4.
SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

29/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

All details about the measuring results at evaluation points are given in Annex 3.
Because the noise off a Power Plant is a very stable noise the LA95,5min.-level can be used to characterize
the specific noise of the BFG plant. In the table underneath a summary of the LA95,5min-levels.
Table 6.1: Measured LA95,5min. levels at evaluation points
MP

MP200m
MPA
MPB
MPC

Background
dB(A)
47.5
49.6
46.6
52.3

Condition
Max load
dB(A)
46.8
48.8
47.3
49.7

Bypass
dB(A)
46.3
46.4
40.8
48.3

LAsp (Signal Background)


Max load
Bypass
dB(A)
dB(A)
/*
/*
/*
/*
39 **
/*
/*
/*

* Because backgroundlevels were higher than the signal levels, the specific noise could not be
calculated with immission measurements at the evaluation points. The background noise is probably to
much influenced by the changing stable noise sources from the neighbouring factories and/or the
slightly different wind direction during the background measurements (17 March 2010) with regard to the
measurements with maximum load (18 March 2010) and with bypass operation (20 March 2010). The
noise contribution of the Power Plant has no specific influence at the evaluation points, therefore it can
be stated, that the specific noise of the power plant is more than 10dB below the background noise in
the evaluation points
** In MPB during maximum load was a higher signal level than the background level. But the signal to
noise ratio was lower than 3 dB, so the calculated specific noise of 39 dB(A) is an estimation.
The specific noise at the evaluation points shall be calculated by noise emission measurements
(according ISO 3746 and ISO 8297) and sound propagation calculations (according ISO 9613).

6.3

Noise emission measurements

For measuring the sound power level of the noise sources at ground level and the sound radiation from
faades (relevant noise sources in the horizontal plane) the Strber method (according ISO 8297) was
used. Therefore measurements at 7 m height at the plant boundary were executed during standstill
(background measurements), during maximum load and during steam turbine bypass operation.
Because the noise off a Power Plant is a very stable noise the LA95,1.5min.-levels were used to
characterize the specific noise of the BFG plant at the plant boundary. In the table underneath, a
summary of the LA95,1.5min-levels measured at the plant boundary. Locations of these measuring points
are given in Figure 7.2.

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

30/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Table 6.2: LA95,1.5min-levels, measured at the different positions at the plant boundary
MP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Standstill (17/3/2010)
49.2
50.1
50.1
53
51.5
53.6
52.1
52.1
50.2
50.5
53.2
58.7
55.1
54.2
55.3
55.2

LA95-level in dB(A)
Max Load (18/3/2010)
55
51.6
53
54.1
51.7
54.1
54.2
53.3
50.7
56
69
66.1
54.2
55.1
62.1
65.2

Bypass (20/3/2010)
54.7
54.2
56.1
55.6
52.4
56.5
56.1
55.3
53.2
69.2
69.1
66.6
56.5
58.7
61.9
65.2

Based on the 1/3-octave L95,1.5min.-sound pressure levels at the plant boundary, a calculation of the
sound powerlevel (LwA according to ISO 8297) has been done. The detailed calculations are inserted in
Annex 5.
Remarks:
At position 12 and position 15 were some power plant sources audible during the background
measurements. Respectively the recirculation pumps of the cooling water at position 12
(recirculation to avoid freezing/ bacteriological growth) and the auxiliary boiler at position 15 (for
heating the buildings). The background levels in these positions are the mean levels of the two
neighbouring positions during background measurements. This to avoid underestimation of the
specific level during maximum load or bypass conditions.
At maximum load the difference between the highest level (68.4 dB(A) in position 11) and the
lowest level (42 dB(A) in position 9) is > 10 dB(A). With bypass operation the difference
between the highest level (68.9 dB(A) in position 10) and the lowest level (45.4 dB(A) in position
5) is > 10 dB(A). The power plant has a northern directivity because of the mayor influence of
the suction side of the cooling towers (northern suction side and reflection of southern suction
side against UMA and UHA). Because of this directivity a combined method will be applied. The
LwA calculated with the uncorrected Strber levels (normally correction in step 2+3) will be
adjusted with the measured directivity (sound radiation in each separate direction).
All calculation were performed with 1/3-octave L95,1.5min.-levels. Because of the changing
influence of the stable noise sources of the neighbouring factory, some spectral signal levels
(max. load or bypass) were lower than the corresponding background levels. For these 1/3octaves a level of the signal level minus 10 dB is assumed.
With the Strber method the noise emission in the horizontal plane is covered. We can assume that the
sound power level of the noise sources at the roofs of the highest buildings (UHA and UMA) were not
included in the calculated LwA with the Stber method. Therefore additional soundpower measurements
according ISO 3746 at following sources were performed:
Stack of UHA
Natural Ventilation Openings on roof of UHA
SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

31/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Exhaust pipe on the roof of UMA with eastern directivity (wrazendampf steam condensate
exhaust pipe)

Table 6.3: Sound power levels of relevant noise sources during maximum load
IMMI name/nr.

Description

LwA North Max Load


LwA West Max Load
LwA East Max Load
LwA South Max Load
UMA exhaust pipe

Northern horizontal emission during max. load


Western horizontal emission during max. load
Eastern horizontal emission during max. load
Southern horizontal emission during max. load
Exhaust pipe on the roof of UMA with eastern directivity
(wrazendampf steam condensate exhaust pipe)
Stack of UHA
Natural Ventilation Openings on roof of UHA - south
Natural Ventilation Openings on roof of UHA - north

S-UHAroof-1
S-UHAroof-2
S-UHAroof-3
Sum

LwA
dB(A)
106.2
102.3
89.8
91.2
88.7
93.1
77.6
77.0
108.1

Table 6.4: Sound power levels of relevant noise sources during bypass operation
IMMI name/nr.

Description

LwA North Bypass


LwA West Bypass
LwA East Bypass
LwA South Bypass
S-UHAroof-1
S-UHAroof-2
S-UHAroof-3
Sum

Northern horizontal emission during bypass operation


Western horizontal emission during bypass operation
Eastern horizontal emission during bypass operation
Southern horizontal emission during bypass operation
Stack of UHA
Natural Ventilation Openings on roof of UHA - south
Natural Ventilation Openings on roof of UHA - north

6.4

LwA
dB(A)
108.7
102.4
94.5
94.6
93.1
77.6
77.0
110

The noise calculation model

The specific noise of the power plant is calculated with a three-dimensional acoustical model program
IMMI 2009 The program Immi is efficient for acoustical modeling in open air. All calculations were
executed according to ISO 9613.
The model contains following parameters:

Information about the terrain such as height, distances,


All geometric elements with there own acoustical parameters. A brick wall has another reflection
coefficient than for instance a dike of soil.
Each source has its own sound power level (spectrum in 1/3-octaves) and directivity. Each type
of source has a typical emission pattern (the eastern exhaust on UMA has another sound
radiation pattern than the ventilation on top of UHA).
The number of reflections is adjusted to 2.

Furthermore according to ISO 9613 the Immi noise calculation model pays attention to:
SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

32/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Geometric extension, reduces in function of the distance;


Atmospheric reduction in function of the air temperature (10C) and air humidity (relative
humidity 70%);
Reflection of an acoustical wave on a reflecting surface. The reflection depends on the wave
length and the dimensions of the reflecting surface.
Between each source and evaluation point the ground effect will be calculated in 1/3-octave
bands;
The absorption of acoustical energy by a soft surface (depends on the frequency)
A slight wind (direction source receiver) of 2 m/s is assumed.

The immission height is 4m. The source positions are shown in Figure 7.29 in Annex 1.

6.5

Comparison specific noise with limit values

Table 6.5: Comparison calculated specific noise of maximum load to the noise limits
Evaluation
point
MP200m
MPA
MPB

LAsp cal.
dB(A)
38.3
34.6
28.8

Noise limit
dB(A)
50
40
30

Comparison
dB(A)
-11.7
-5.4
-1.2

At maximum load there are no overcrossings of the noise limits (contractually agreed levels).
Table 6.6: Comparison calculated specific noise of bypass operation to the noise limits
Evaluation
point
MP200m
MPA
MPB

LAsp cal.
dB(A)
40.7
36.6
30.5

Noise limit
dB(A)
50
40
30

Comparison
dB(A)
-9.3
-3.4
0.5

With bypass operation there is a slight overcrossing of the most severe noise limit at MPB (contractually
agreed level of 30 dB(A)). This slight overcrossing is neglectable because:
The neglectable impact of the specific noise during bypass on the original environment noise in
MPB (LAeq during background measurements in was MPB 48.1 dB(A)). 30.5 dB(A) + 48.1 dB(A)
= 48.2 dB(A). A rise of 0.1 dB(A) is not audible.
30 dB(A) is the most severe noise limit. According to Vlarem II the original background noise
must be considered to fix the noise limit. Because of the high original stable noise (42 dB(A) cfr.
heading 4.1.2), the noise limit of 35 dB(A) can be used.

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

33/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

7 CONCLUSIONS
SGS Belgium and Siemens carried out Noise Acceptance Tests on site when the BFG Gent SPP5-5000
was in continuous operation (Plant Base Load/ Plant Maximum Load) and bypass operation for the far
field noise measurements.
The objective of the Noise Acceptance Test was to check whether the required noise levels are met.
The Near Field Noise Acceptance Tests were performed on April 7th to 9th 2010 by Mr. De Winter
SGS Belgium Department Noise and Vibrations) and by Mr. Jttner (Siemens AG Energy- EN32
Acoustics).
The Far Field Noise Acceptance Tests were performed on March 16th to 19th 2010 by Mr. De Winter
SGS Belgium Department Noise and Vibrations) and by Mr. Jttner (Siemens AG Energy- EN32
Acoustics).
The Noise Acceptance Tests shows the following essential results:
The agreed near field noise levels are met outside all buildings and installations.
The agreed near field noise levels are exceeded inside Power Control Centers
In the area around the Feedwater pumps on ground level in the steam turbine building the
upper action level of 85 dB(A) can be overcrossed when working in this area for longer than 2
hours. Taking into account the measured noise levels inside UMA during several operational
cases, exposure time and personal hearing protection, we can conclude that the contractual
obligations are fulfilled.
The wearing of Ear protection is obliged when working around the Feedwater pumps for longer
than 2 hours and during bypass operation in UMA and UHA.
The agreed near field noise levels are met inside all other buildings.
The agreed far field noise levels are met during maximum load and bypass operation

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

34/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Annex 1: Figures
Figure 7.1: Position evaluation points on land use map (source AGIV GIS Vlaanderen))

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

35/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.2: Position measuring points on aerial photograph (source Google Earth)

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

36/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.3: Ref. No. 3B - Measurement positions located inside Steam turbine building UMA
(level 14,5m)

MP19
MP16
MP1

MP15

MP18

MP5

SGS Belgium NV
Reportnumber : 10.0102-1-v3

MP10

28/04/2010

37/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.4: Ref. No. 3A - Measurement positions located inside Steam turbine building UMA
(ground level 0m)

MP26

MP25

MP5
MP23
MP24

MP22
MP21
MP1
MP20
MP19
MP18

MP10

MP15

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

38/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.5: Ref. No. 8 - Measurement positions located outside Steam turbine building UMA
(1.5m above ground level)

MP25

MP22

MP1

MP20

MP5

MP14

MP16

MP15

MP10

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

39/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.6: Ref. No. 12 - Measurement positions located outside Boiler building UHA and UHB
area (1.5m above ground level)

MP1
MP19

MP5

MP14

MP9

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

40/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.7: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 73.3m)

MP1

MP8

MP9

MP3

MP6

MP10

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

41/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.8: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 62.7m)

MP18
MP21

MP17
MP20

MP23

MP12

MP15

MP11

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

42/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.9: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 56.2m)

MP34

MP26

MP27
MP32

MP29

MP25

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

43/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.10: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 46.5m)

MP41

MP39
MP43

MP35

MP36

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

44/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.11: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 37.6m)

MP49

MP52

MP46

MP44

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

45/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.12: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 30.6m)

MP54

MP60

MP56

MP58
MP53

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

46/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.13: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 21.5m)

MP69

MP66

MP62
MP64

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

47/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.14: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 13.7 +
16m)

MP70

MP72

SGS Belgium NV
Reportnumber : 10.0102-1-v3

MP74

28/04/2010

48/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.15: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 8 +
11m)

MP76

MP78

MP80
MP82

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

49/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.16: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 5.7m)

MP87

MP85

MP84

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

50/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.17: Ref. No. 7 - Measurement positions located inside Boiler building UHA (level 0m)

MP95

MP92

MP93

MP97
MP90

MP88

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

51/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.18: Ref. No. 1 - Measurement positions located at work places inside Control building
UCA
MP2

MP1

MP3

MP4

MP5
MP12

MP9
MP11

MP8

MP6

MP7

MP10

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

52/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.19: Ref. No. 2 - Measurement positions located in different rooms of UGD

MP1

MP2

MP3

MP4
MP5

MP6

MP14

MP7

MP8
MP13

MP9
MP12

MP11

MP10

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

53/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.20: Ref. No. 4 - Measurement positions located in UGJ

MP5

MP4
MP2

MP3

MP1

Figure 7.21: Ref. No. 5 - Measurement positions located in UST level 0m


MP2

MP7

MP8

MP3

MP9

MP4

MP1

MP10

MP5

SGS Belgium NV
Reportnumber : 10.0102-1-v3

MP6

28/04/2010

54/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.22: Ref. No. 5 - Measurement positions located in UST level 3.25m
MP18
MP11
MP14
MP12

MP17

MP16

MP13

MP19

SGS Belgium NV
Reportnumber : 10.0102-1-v3

MP15

28/04/2010

55/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.23: Measurement positions located in 10UBA81 PCC cooling towers

Figure 7.24: Ref. No. 6 - Measurement positions located in UBA

MP1

MP2

MP3

MP4

MP5

MP6
MP8

MP7
MP9

MP10

MP11

MP12

MP13

MP14
MP16
MP15

MP17

MP18

MP20
MP19
SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

56/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.25: Ref.No9 - Measurement positions located around UBA

MP3

MP1

MP7

MP5
MP10
MP8

MP22

MP12

MP17

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

57/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.26: Ref.No10 - Measurement positions located around UGD/UGA/UGE


MP5

MP10

MP1

MP10

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

58/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.27: Ref.No11 - Measurement positions located around UEN


MP5

MP1

SGS Belgium NV
Reportnumber : 10.0102-1-v3

MP10

28/04/2010

59/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.28: Ref.No13 - Measurement positions located around UGJ and URA Cooling Tower
area

MP18

MP1

MP2
MP4

MP20
MP15
MP7

MP5

MP8
MP22

MP9

MP10

MP12

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

60/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Figure 7.29: Position noise sources in acoustical model IMMI

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

61/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Annex 2: Working regimes during measurements

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

62/92

Noise acceptance test BFG Power Plant Gent

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Siemens NV Energy

28/04/2010

63/92

Noise acceptance test BFG Power Plant Gent

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Siemens NV Energy

28/04/2010

64/92

Noise acceptance test BFG Power Plant Gent

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Siemens NV Energy

28/04/2010

65/92

Noise acceptance test BFG Power Plant Gent

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Siemens NV Energy

28/04/2010

66/92

Noise acceptance test BFG Power Plant Gent

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Siemens NV Energy

28/04/2010

67/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Annex 3: Immission measurements at evaluation points


Background measurement at MP 200m
17 March 2010
Filename :
Instrument :
Duration :
Calibration :

General
Info

LD8_017.slmdl Intv T.H.


Larson-Davis 824
322.6 seconds

A-Weighted

C-Weighted

Leq (A): 53.1 dBA


SEL (A): 78.2 dBA
Peak (A): 79.4 dBA

Leq (C): 64.3 dBC


SEL (C): 89.4 dBC
Peak (C): 84.8 dBC

Linear
Leq (Lin): 68.6 dB
SEL (Lin): 93.7 dB
Peak (Lin): 86.2 dB

Global
Analyse

Lmin (dB)

Lmax (dB)

17Mar2010 02:32:48

17Mar2010 02:32:47

17Mar2010 02:31:21

Statistical
Analyse

47.5

65.0

61.7

70.8

17Mar2010 02:32:36

17Mar2010 02:32:12

17Mar2010 02:32:36

75.3

47.0

66.8

59.9

73.6

17Mar2010 02:32:35

17Mar2010 02:31:33

17Mar2010 02:32:36

17Mar2010 02:34:34

17Mar2010 02:32:36

76.7

47.2

67.5

62.3

75.1

17Mar2010 02:32:35

17Mar2010 02:31:21

17Mar2010 02:32:36

17Mar2010 02:31:21

17Mar2010 02:32:35

L1 : 61.3 dB(A)

L5 : 58.0 dB(A)

L10 : 56.6 dB(A)

L50 : 49.3 dB(A)

L95 : 47.5 dB(A)

L99 : 47.3 dB(A)

70
dB
60

L95,T
Third Octave Bands

50
L95,T

Lmax (dB(C))

17Mar2010 02:32:04

65.9

Impulse

Lmin (dB(C))

73.2

62.5

Fast

Lmax (dB(A))

17Mar2010 02:32:36

65.0

Slow

Lmin (dB(A))

40
30
20
10
20

Hz

50

70

100

200

500

1K

2K

Car passage Knippegroen

dBA

5K

10K(L)*

2:33:19
Leq
1= 51.5 dBA 51.5 dBA

Truck passages R4

Truck passages R4

LAeq,1s

60
Car passages R4

50

40
2:31:20

2:33:20

2:35:20

Test report number : 10.0102-1-v1

Acoustical testing laboratory name : SGS Belgium NV

Date:17/03/2010

Operator name : Bert De Winter

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

Hz
12.5 Hz
16 Hz
20 Hz
25 Hz
31.5 Hz
40 Hz
50 Hz
63 Hz
80 Hz
100 Hz
125 Hz
160 Hz
200 Hz
250 Hz
315 Hz
400 Hz
500 Hz
630 Hz
800 Hz
1000 Hz
1250 Hz
1600 Hz
2000 Hz
2500 Hz
3150 Hz
4000 Hz
5000 Hz
6300 Hz
8000 Hz
10000 Hz
12500 Hz
16000 Hz
20000 Hz

dB
61.5
54.5
48.5
49.0
50.0
52.0
54.0
45.0
43.0
43.5
42.0
43.0
42.5
43.0
42.5
42.0
41.0
40.5
38.0
36.0
35.0
30.5
26.5
23.5
19.5
19.0
19.0
19.5
20.5
21.5
21.0
23.0
24.0

2:37:20

68/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Background measurement at MP A
17 March 2010
Filename :
Instrument :
Duration :
Calibration :

General
Info

LD8_018.slmdl Intv T.H.


Larson-Davis 824
333.1 seconds

A-Weighted

C-Weighted

Leq (A): 59.6 dBA


SEL (A): 84.8 dBA
Peak (A): 85.4 dBA

Leq (C): 66.1 dBC


SEL (C): 91.3 dBC
Peak (C): 88.3 dBC

Linear
Leq (Lin): 69.2 dB
SEL (Lin): 94.4 dB
Peak (Lin): 88.7 dB

Global
Analyse

Lmin (dB)

Lmax (dB)

17Mar2010 02:48:20

17Mar2010 02:48:32

17Mar2010 02:48:20

Statistical
Analyse

49.3

72.4

62.0

75.9

17Mar2010 02:45:39

17Mar2010 02:48:20

17Mar2010 02:45:39

77.6

49.0

73.6

59.7

76.9

17Mar2010 02:45:39

17Mar2010 02:49:00

17Mar2010 02:45:39

17Mar2010 02:48:32

17Mar2010 02:45:39

78.4

49.3

74.3

62.4

77.8

17Mar2010 02:45:39

17Mar2010 02:48:58

17Mar2010 02:45:39

17Mar2010 02:48:20

17Mar2010 02:45:38

L1 : 71.9 dB(A)

L5 : 65.8 dB(A)

L10 : 62.9 dB(A)

L50 : 51.7 dB(A)

L95 : 49.6 dB(A)

L99 : 49.3 dB(A)

70
dB
60

L95,T
Third Octave Bands

L95,T

50
40
30
20
10
20

Hz

50

100

80

200

500

1K

2K

5K

10K(L)*
2:47:27
1= 67.0 dBA

Truck passage R4

dBA
Truck passage R4

70
LAeq,1s

Lmax (dB(C))

17Mar2010 02:48:58

66.1

Impulse

Lmin (dB(C))

76.5

62.4

Fast

Lmax (dB(A))

17Mar2010 02:45:39

65.0

Slow

Lmin (dB(A))

60

50

40
2:43:46

2:45:46

2:47:46

Test report number : 10.0102-1-v1

Acoustical testing laboratory name : SGS Belgium NV

Date:17/03/2010

Operator name : Bert De Winter

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

Hz
12.5 Hz
16 Hz
20 Hz
25 Hz
31.5 Hz
40 Hz
50 Hz
63 Hz
80 Hz
100 Hz
125 Hz
160 Hz
200 Hz
250 Hz
315 Hz
400 Hz
500 Hz
630 Hz
800 Hz
1000 Hz
1250 Hz
1600 Hz
2000 Hz
2500 Hz
3150 Hz
4000 Hz
5000 Hz
6300 Hz
8000 Hz
10000 Hz
12500 Hz
16000 Hz
20000 Hz

dB
62.0
53.0
49.0
48.5
51.5
50.0
51.5
46.5
47.0
48.5
46.5
47.5
46.0
45.5
44.5
43.0
43.0
42.0
40.0
38.5
36.5
32.5
27.5
22.5
19.0
19.0
19.5
19.5
21.0
21.5
21.5
23.0
24.5

2:49:46

69/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Background measurement at MP B
17 March 2010
Filename :
Instrument :
Duration :
Calibration :

General
Info

LD8_019.slmdl Intv T.H.


Larson-Davis 824
320.3 seconds

A-Weighted

C-Weighted

Leq (A): 48.1 dBA


SEL (A): 73.2 dBA
Peak (A): 66.0 dBA

Leq (C): 60.1 dBC


SEL (C): 85.1 dBC
Peak (C): 74.3 dBC

Linear
Leq (Lin): 64.3 dB
SEL (Lin): 89.3 dB
Peak (Lin): 77.6 dB

Global
Analyse

Lmin (dB)

Lmax (dB)

17Mar2010 03:00:14

17Mar2010 03:01:06

17Mar2010 03:00:14

Statistical
Analyse

46.4

52.0

58.7

61.8

17Mar2010 03:03:18

17Mar2010 03:04:17

17Mar2010 03:03:19

70.4

45.9

52.8

57.2

64.0

17Mar2010 03:03:51

17Mar2010 03:00:39

17Mar2010 03:02:56

17Mar2010 03:02:42

17Mar2010 03:03:51

72.3

46.2

53.5

58.8

66.0

17Mar2010 03:03:51

17Mar2010 03:00:41

17Mar2010 03:03:19

17Mar2010 03:00:13

17Mar2010 03:05:10

L1 : 51.8 dB(A)

L5 : 50.1 dB(A)

L10 : 49.4 dB(A)

L50 : 47.6 dB(A)

L95 : 46.6 dB(A)

L99 : 46.2 dB(A)

60
dB
50

L95,T
Third Octave Bands

L95,T

40
30
20
10
20

Hz

50

100

200

500

1K

2K

5K

55

10K(L)*
3:03:19
1= 51.5 dBA

Truck passage R4

dBA
LAeq,1s

Lmax (dB(C))

17Mar2010 03:00:39

61.3

Impulse

Lmin (dB(C))

67.2

59.2

Fast

Lmax (dB(A))

17Mar2010 03:02:48

61.4

Slow

Lmin (dB(A))

50

45
3:00:13

3:02:13

3:04:13

Test report number : 10.0102-1-v1

Acoustical testing laboratory name : SGS Belgium NV

Date:17/03/2010

Operator name : Bert De Winter

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

Hz
12.5 Hz
16 Hz
20 Hz
25 Hz
31.5 Hz
40 Hz
50 Hz
63 Hz
80 Hz
100 Hz
125 Hz
160 Hz
200 Hz
250 Hz
315 Hz
400 Hz
500 Hz
630 Hz
800 Hz
1000 Hz
1250 Hz
1600 Hz
2000 Hz
2500 Hz
3150 Hz
4000 Hz
5000 Hz
6300 Hz
8000 Hz
10000 Hz
12500 Hz
16000 Hz
20000 Hz

dB
57.0
51.0
45.5
45.5
45.0
44.5
46.0
43.5
43.0
45.5
43.0
44.0
43.5
43.0
42.5
40.5
40.0
38.5
37.0
35.0
32.5
27.0
22.0
19.0
18.5
18.5
19.0
19.5
21.0
21.5
21.5
23.0
24.5

3:06:13

70/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Background measurement at MP C
17 March 2010
Filename :
Instrument :
Duration :
Calibration :

General
Info

LD8_020.slmdl Intv T.H.


313.6 seconds

A-Weighted

C-Weighted

Leq (A): 59.2 dBA


SEL (A): 84.1 dBA
Peak (A): 83.6 dBA

Leq (C): 67.1 dBC


SEL (C): 92.0 dBC
Peak (C): 86.6 dBC

Linear
Leq (Lin): 70.9 dB
SEL (Lin): 95.9 dB
Peak (Lin): 87.5 dB

Global
Analyse

Lmin (dB)

Lmax (dB)

17Mar2010 03:23:42

17Mar2010 03:27:13

17Mar2010 03:23:42

Statistical
Analyse

51.7

69.2

63.4

76.2

17Mar2010 03:26:42

17Mar2010 03:23:42

17Mar2010 03:24:57

79.2

51.0

70.5

62.4

77.9

17Mar2010 03:24:57

17Mar2010 03:28:28

17Mar2010 03:26:41

17Mar2010 03:27:57

17Mar2010 03:24:57

79.8

51.9

71.1

63.4

78.4

17Mar2010 03:24:57

17Mar2010 03:28:31

17Mar2010 03:26:41

17Mar2010 03:23:42

17Mar2010 03:24:57

L1 : 68.2 dB(A)

L5 : 65.0 dB(A)

L10 : 63.3 dB(A)

L50 : 55.7 dB(A)

L95 : 52.3 dB(A)

L99 : 51.7 dB(A)

70
dB
60

L95,T
Third Octave Bands
Sources Arcelor

L\95,T

50
40
30
20
10
20

Hz

50

100

200

500

1K

2K

5K

70
Truck passage R4

Truck passage R4

10K(L)*
3:26:41
1= 69.6 dBA

dBA
LAeq,1s

Lmax (dB(C))

17Mar2010 03:28:29

67.4

Impulse

Lmin (dB(C))

77.3

65.0

Fast

Lmax (dB(A))

17Mar2010 03:24:57

66.2

Slow

Lmin (dB(A))

60

50
3:23:41

3:25:41

3:27:41

Test report number : 10.0102-1-v1

Acoustical testing laboratory name : SGS Belgium NV

Date:17/03/2010

Operator name : Bert De Winter

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

Hz
12.5 Hz
16 Hz
20 Hz
25 Hz
31.5 Hz
40 Hz
50 Hz
63 Hz
80 Hz
100 Hz
125 Hz
160 Hz
200 Hz
250 Hz
315 Hz
400 Hz
500 Hz
630 Hz
800 Hz
1000 Hz
1250 Hz
1600 Hz
2000 Hz
2500 Hz
3150 Hz
4000 Hz
5000 Hz
6300 Hz
8000 Hz
10000 Hz
12500 Hz
16000 Hz
20000 Hz

dB
64.0
57.5
50.5
52.0
51.0
51.5
52.5
47.5
47.0
44.5
42.5
47.5
48.5
49.5
49.5
46.5
46.0
44.0
43.5
41.5
39.5
34.5
29.0
23.5
19.0
18.5
19.0
19.5
20.5
21.0
21.0
22.5
24.0

3:29:41

71/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Measurements at maximum load at MP 200m


17 to 18 March 2010
Filename :
Instrument :
Duration :
Calibration :

General
Info

LD8_017.slmdl Intv T.H.


Larson-Davis 824
301.8 seconds

A-Weighted

C-Weighted

Leq (A): 49.9 dBA


SEL (A): 74.7 dBA
Peak (A): 72.4 dBA

Leq (C): 67.4 dBC


SEL (C): 92.2 dBC
Peak (C): 81.2 dBC

Linear
Leq (Lin): 71.5 dB
SEL (Lin): 96.3 dB
Peak (Lin): 85.0 dB

Global
Analyse

Lmax (dB)

Lmin (dB)
18Mar2010 01:12:16

18Mar2010 01:14:59

18Mar2010 01:12:16

Statistical
Analyse

46.6

56.3

63.1

69.4

18Mar2010 01:13:10

18Mar2010 01:12:16

18Mar2010 01:16:22

77.3

46.1

58.5

62.7

72.0

18Mar2010 01:13:10

18Mar2010 01:14:27

18Mar2010 01:13:10

18Mar2010 01:12:16

18Mar2010 01:13:10

79.9

46.6

59.2

62.7

74.3

18Mar2010 01:13:10

18Mar2010 01:14:27

18Mar2010 01:13:10

18Mar2010 01:12:16

18Mar2010 01:12:26

L1 : 55.7 dB(A)

L5 : 53.7 dB(A)

L10 : 52.7 dB(A)

L50 : 48.1 dB(A)

L95 : 46.8 dB(A)

L99 : 46.5 dB(A)

70
dB
60

L95,T
Third Octave Bands

L95,T

50
40
30
20
10
20

Hz

50

100

200

500

1K

2K

5K

60

10K(L)*
1:15:43
1= 49.4 dBA

dBA
LAeq,1s

Lmax (dB(C))

18Mar2010 01:14:33

68.3

Impulse

Lmin (dB(C))

74.0

65.9

Fast

Lmax (dB(A))

18Mar2010 01:13:10

68.7

Slow

Lmin (dB(A))

50

40
1:12:16

1:14:16

1:16:16

Acoustical testing laboratory name : SGS Belgium NV

Date:17/03/2010

Operator name : Bert De Winter

28/04/2010

dB
61.0
60.0
61.5
59.5
53.5
54.5
56.0
46.0
44.5
44.5
41.0
43.5
43.5
42.5
42.0
41.0
40.0
39.0
37.0
35.0
32.5
29.5
25.5
21.5
19.5
19.0
19.0
19.5
20.5
21.0
21.0
22.5
24.0

1:18:16

Test report number : 10.0102-1-v1

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Hz
12.5 Hz
16 Hz
20 Hz
25 Hz
31.5 Hz
40 Hz
50 Hz
63 Hz
80 Hz
100 Hz
125 Hz
160 Hz
200 Hz
250 Hz
315 Hz
400 Hz
500 Hz
630 Hz
800 Hz
1000 Hz
1250 Hz
1600 Hz
2000 Hz
2500 Hz
3150 Hz
4000 Hz
5000 Hz
6300 Hz
8000 Hz
10000 Hz
12500 Hz
16000 Hz
20000 Hz

72/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Measurements at maximum load at MP A


17 to 18 March 2010
Filename :
Instrument :
Duration :
Calibration :

General
Info

LD8_018.slmdl Intv T.H.


Larson-Davis 824
313.3 seconds

A-Weighted

C-Weighted

Leq (A): 59.9 dBA


SEL (A): 84.9 dBA
Peak (A): 85.0 dBA

Leq (C): 69.8 dBC


SEL (C): 94.8 dBC
Peak (C): 92.2 dBC

Linear
Leq (Lin): 72.3 dB
SEL (Lin): 97.3 dB
Peak (Lin): 93.0 dB

Global
Analyse

Lmin (dB)

Lmax (dB)

18Mar2010 01:25:06

18Mar2010 01:26:39

18Mar2010 01:25:06

Statistical
Analyse

48.4

72.0

64.2

82.7

18Mar2010 01:28:10

18Mar2010 01:25:05

18Mar2010 01:30:19

86.7

47.9

72.9

62.5

84.7

18Mar2010 01:30:19

18Mar2010 01:29:39

18Mar2010 01:28:09

18Mar2010 01:26:39

18Mar2010 01:30:19

87.9

48.5

73.2

64.4

85.8

18Mar2010 01:30:19

18Mar2010 01:25:51

18Mar2010 01:28:09

18Mar2010 01:25:05

18Mar2010 01:30:19

L1 : 70.3 dB(A)

L5 : 67.0 dB(A)

L10 : 64.8 dB(A)

L50 : 51.8 dB(A)

L95 : 48.8 dB(A)

L99 : 48.4 dB(A)

L95,T

60
dB
50

L95,T
Third Octave Bands

40
30
20
10
20

Hz

50

100

200

500

1K

2K

5K

80

10K(L)*
1:28:32
1= 66.9 dBA

dBA
70
LAeq,1s

Lmax (dB(C))

18Mar2010 01:29:40

67.8

Impulse

Lmin (dB(C))

85.0

65.2

Fast

Lmax (dB(A))

18Mar2010 01:30:19

67.3

Slow

Lmin (dB(A))

60

50

40
1:25:05

1:27:05

1:29:05

Acoustical testing laboratory name : SGS Belgium NV

Date:17/03/2010

Operator name : Bert De Winter

28/04/2010

dB
59.5
58.5
56.5
53.0
53.5
54.5
58.0
47.0
47.5
47.0
45.5
47.0
46.0
44.5
44.0
42.0
41.5
40.5
39.5
37.0
35.5
30.0
25.5
21.0
19.0
19.0
19.5
19.5
20.5
21.0
21.0
22.5
24.0

1:31:05

Test report number : 10.0102-1-v1

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Hz
12.5 Hz
16 Hz
20 Hz
25 Hz
31.5 Hz
40 Hz
50 Hz
63 Hz
80 Hz
100 Hz
125 Hz
160 Hz
200 Hz
250 Hz
315 Hz
400 Hz
500 Hz
630 Hz
800 Hz
1000 Hz
1250 Hz
1600 Hz
2000 Hz
2500 Hz
3150 Hz
4000 Hz
5000 Hz
6300 Hz
8000 Hz
10000 Hz
12500 Hz
16000 Hz
20000 Hz

73/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Measurements at maximum load at MP B


17 to 18 March 2010
Filename :
Instrument :
Duration :
Calibration :

General
Info

LD8_019.slmdl Intv T.H.


Larson-Davis 824
303.6 seconds

A-Weighted

C-Weighted

Leq (A): 48.2 dBA


SEL (A): 73.0 dBA
Peak (A): 64.3 dBA

Leq (C): 63.2 dBC


SEL (C): 88.0 dBC
Peak (C): 76.7 dBC

Linear
Leq (Lin): 67.2 dB
SEL (Lin): 92.1 dB
Peak (Lin): 80.0 dB

Global
Analyse

Lmin (dB)

Lmax (dB)

18Mar2010 01:39:31

18Mar2010 01:41:27

18Mar2010 01:37:01

Statistical
Analyse

47.4

50.2

61.3

65.0

18Mar2010 01:37:06

18Mar2010 01:41:29

18Mar2010 01:40:13

71.9

46.8

51.6

59.8

66.8

18Mar2010 01:41:03

18Mar2010 01:40:37

18Mar2010 01:37:05

18Mar2010 01:39:31

18Mar2010 01:40:39

74.1

47.4

52.8

62.0

69.0

18Mar2010 01:41:03

18Mar2010 01:40:49

18Mar2010 01:37:05

18Mar2010 01:39:31

18Mar2010 01:40:39

L1 : 49.8 dB(A)

L5 : 49.0 dB(A)

L10 : 48.7 dB(A)

L50 : 48.0 dB(A)

L95 : 47.3 dB(A)

L99 : 47.1 dB(A)

L95,T

60
dB
50

L95,T
Third Octave Bands

40
30
20
10
20

Hz

50

100

200

500

1K

2K

5K

55

10K(L)*
1:40:28
1= 48.0 dBA

dBA
LAeq,1s

Lmax (dB(C))

18Mar2010 01:40:11

65.4

Impulse

Lmin (dB(C))

69.6

62.2

Fast

Lmax (dB(A))

18Mar2010 01:40:52

64.9

Slow

Lmin (dB(A))

50

45
1:37:01

1:39:01

1:41:01

Acoustical testing laboratory name : SGS Belgium NV

Date:17/03/2010

Operator name : Bert De Winter

28/04/2010

dB
55.5
54.5
50.0
56.5
46.0
47.5
47.0
47.5
45.5
46.5
46.0
46.0
45.0
44.0
43.0
41.5
40.5
39.0
37.5
35.0
32.0
26.5
21.0
18.5
18.0
18.5
19.0
19.5
20.5
21.0
21.0
22.5
24.0

1:43:01

Test report number : 10.0102-1-v1

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Hz
12.5 Hz
16 Hz
20 Hz
25 Hz
31.5 Hz
40 Hz
50 Hz
63 Hz
80 Hz
100 Hz
125 Hz
160 Hz
200 Hz
250 Hz
315 Hz
400 Hz
500 Hz
630 Hz
800 Hz
1000 Hz
1250 Hz
1600 Hz
2000 Hz
2500 Hz
3150 Hz
4000 Hz
5000 Hz
6300 Hz
8000 Hz
10000 Hz
12500 Hz
16000 Hz
20000 Hz

74/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Measurements at maximum load at MP C


17 to 18 March 2010
Filename :
Instrument :
Duration :
Calibration :

General
Info

LD8_020.slmdl Intv T.H.


Larson-Davis 824
323.6 seconds

A-Weighted

C-Weighted

Leq (A): 56.3 dBA


SEL (A): 81.5 dBA
Peak (A): 84.0 dBA

Leq (C): 66.0 dBC


SEL (C): 91.1 dBC
Peak (C): 83.9 dBC

Linear
Leq (Lin): 70.8 dB
SEL (Lin): 95.9 dB
Peak (Lin): 86.0 dB

Global
Analyse

Slow

Lmin (dB)

Lmax (dB)

Lmin (dB(A))

Lmax (dB(A))

Lmin (dB(C))

Lmax (dB(C))

67.3

79.5

49.4

67.8

63.2

73.6

18Mar2010 01:59:01

18Mar2010 01:54:58

64.0

Fast

18Mar2010 01:59:52

69.0

Impulse
Statistical
Analyse

18Mar2010 01:59:52

69.7

64.3

75.1

18Mar2010 01:57:26 18Mar2010 01:56:11 18Mar2010 01:55:08

18Mar2010 01:55:31

L1 : 66.6 dB(A)

L5 : 63.4 dB(A)

L10 : 59.5 dB(A)

L50 : 51.5 dB(A)

L95 : 49.7 dB(A)

L99 : 49.3 dB(A)

70
dB
60

L95,T
Third Octave Bands

50
L95,T

73.4

61.3

18Mar2010 01:55:05 18Mar2010 01:56:12 18Mar2010 01:57:49 18Mar2010 01:59:41

49.4

80.3

18Mar2010 01:56:32

69.0

48.6

78.7

18Mar2010 01:55:45

18Mar2010 01:57:26 18Mar2010 01:56:12 18Mar2010 01:55:08 18Mar2010 01:54:58

40
30
20
10
20

Hz

50

100

200

500

1K

2K

5K

70

10K(L)*
1:58:25
1= 51.2 dBA

dBA

LAeq,1s

60

50

40
1:54:58

1:56:58

1:58:58

Acoustical testing laboratory name : SGS Belgium NV

Date:17/03/2010

Operator name : Bert De Winter

28/04/2010

dB
62.5
59.0
54.5
54.0
51.5
50.5
50.5
46.0
44.0
42.5
41.5
46.0
46.5
46.5
46.5
44.0
43.0
40.5
40.5
38.0
35.5
30.5
25.5
21.0
18.5
18.5
19.0
19.5
20.5
21.0
21.0
22.5
24.0

2:00:58

Test report number : 10.0102-1-v1

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Hz
12.5 Hz
16 Hz
20 Hz
25 Hz
31.5 Hz
40 Hz
50 Hz
63 Hz
80 Hz
100 Hz
125 Hz
160 Hz
200 Hz
250 Hz
315 Hz
400 Hz
500 Hz
630 Hz
800 Hz
1000 Hz
1250 Hz
1600 Hz
2000 Hz
2500 Hz
3150 Hz
4000 Hz
5000 Hz
6300 Hz
8000 Hz
10000 Hz
12500 Hz
16000 Hz
20000 Hz

75/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Measurements with By Pass Conditions at MP 200m


19 to 20 March 2010
Filename :
Instrument :
Duration :
Calibration :

General
Info

LD8_066.slmdl Intv T.H.


Larson-Davis 824
302.1 seconds

A-Weighted

C-Weighted

Leq (A): 52.5 dBA


SEL (A): 77.3 dBA
Peak (A): 76.7 dBA

Leq (C): 68.6 dBC


SEL (C): 93.4 dBC
Peak (C): 91.5 dBC

Linear
Leq (Lin): 73.4 dB
SEL (Lin): 98.3 dB
Peak (Lin): 94.8 dB

Global
Analyse

Slow

Lmin (dB)

Lmax (dB)

Lmin (dB(A))

Lmax (dB(A))

Lmin (dB(C))

Lmax (dB(C))

68.7

82.0

45.7

58.2

64.4

77.0

20Mar2010 02:05:45

20Mar2010 02:06:13

64.8

Fast

20Mar2010 02:06:12

70.7

Impulse
Statistical
Analyse

20Mar2010 02:06:12

63.5

65.9

L95,T

85.8

20Mar2010 02:04:29 20Mar2010 02:02:22 20Mar2010 02:05:42

20Mar2010 02:06:12

L1 : 58.1 dB(A)

L5 : 57.0 dB(A)

L10 : 56.2 dB(A)

L50 : 50.5 dB(A)

L95 : 46.3 dB(A)

L99 : 45.7 dB(A)

70
dB
60

L95,T
Third Octave Bands

50
40
30
20
20

Hz

50

100

200

500

1K

2K

5K

60

10K(L)*
2:05:05
1= 57.0 dBA

dBA
LAeq,1s

82.5

61.7

20Mar2010 02:04:31 20Mar2010 02:02:22 20Mar2010 02:02:55 20Mar2010 02:06:12

45.7

90.8

20Mar2010 02:04:22

59.3

45.3

87.8

20Mar2010 02:02:55

20Mar2010 02:04:31 20Mar2010 02:06:11 20Mar2010 02:05:45 20Mar2010 02:06:13

50

40
2:01:38

2:03:38

2:05:38

Acoustical testing laboratory name : SGS Belgium NV

Date:20/03/2010

Operator name : Bert De Winter

28/04/2010

dB
61.0
61.5
59.5
56.5
54.5
53.5
52.0
47.5
46.0
42.0
40.5
41.5
41.5
40.0
39.5
39.0
38.0
37.5
37.5
36.5
35.0
32.0
29.0
26.5
25.0
21.5
21.5
21.5
22.0
22.5
22.0
23.0
24.5

2:07:38

Test report number : 10.0102-1-v1

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Hz
12.5 Hz
16 Hz
20 Hz
25 Hz
31.5 Hz
40 Hz
50 Hz
63 Hz
80 Hz
100 Hz
125 Hz
160 Hz
200 Hz
250 Hz
315 Hz
400 Hz
500 Hz
630 Hz
800 Hz
1000 Hz
1250 Hz
1600 Hz
2000 Hz
2500 Hz
3150 Hz
4000 Hz
5000 Hz
6300 Hz
8000 Hz
10000 Hz
12500 Hz
16000 Hz
20000 Hz

76/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Measurements with By Pass Conditions at MP A


19 to 20 March 2010
Filename :
Instrument :
Duration :
Calibration :

General
Info

LD8_067.slmdl Intv T.H.


Larson-Davis 824
374.3 seconds

A-Weighted

C-Weighted

Leq (A): 62.0 dBA


SEL (A): 87.7 dBA
Peak (A): 86.5 dBA

Leq (C): 69.7 dBC


SEL (C): 95.4 dBC
Peak (C): 93.9 dBC

Linear
Leq (Lin): 73.6 dB
SEL (Lin): 99.4 dB
Peak (Lin): 98.5 dB

Global
Analyse

Lmin (dB)

Lmax (dB)

20Mar2010 02:15:57

20Mar2010 02:13:10

20Mar2010 02:15:57

Statistical
Analyse

45.7

74.2

62.6

78.8

20Mar2010 02:12:40

20Mar2010 02:15:57

20Mar2010 02:13:37

91.4

44.9

75.1

60.1

83.5

20Mar2010 02:13:51

20Mar2010 02:16:06

20Mar2010 02:12:39

20Mar2010 02:16:14

20Mar2010 02:13:51

94.9

45.7

76.1

63.7

86.4

20Mar2010 02:13:51

20Mar2010 02:15:54

20Mar2010 02:12:39

20Mar2010 02:16:04

20Mar2010 02:13:36

L1 : 72.7 dB(A)

L5 : 69.2 dB(A)

L10 : 65.6 dB(A)

L50 : 55.6 dB(A)

L95 : 46.4 dB(A)

L99 : 45.8 dB(A)

60

L95,T
Third Octave Bands

dB

L95,T

50

40

30

20
20

Hz

50

100

200

500

1K

2K

5K

80

10K(L)*
2:15:39
1= 48.2 dBA

dBA
70
LAeq,1s

Lmax (dB(C))

20Mar2010 02:16:06

68.0

Impulse

Lmin (dB(C))

85.8

63.5

Fast

Lmax (dB(A))

20Mar2010 02:13:37

66.2

Slow

Lmin (dB(A))

60

50

40
2:12:12

2:14:12

2:16:12

2:18:12

Acoustical testing laboratory name : SGS Belgium NV

Date:20/03/2010

Operator name : Bert De Winter

28/04/2010

dB
59.5
59.5
56.5
52.5
52.5
51.0
51.5
47.5
49.0
47.0
43.5
44.5
42.5
42.0
40.5
39.0
37.5
37.0
37.0
35.0
35.0
31.5
29.5
27.5
25.5
22.5
21.0
21.0
21.5
22.0
22.0
23.5
24.5

2:20:12

Test report number : 10.0102-1-v1

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Hz
12.5 Hz
16 Hz
20 Hz
25 Hz
31.5 Hz
40 Hz
50 Hz
63 Hz
80 Hz
100 Hz
125 Hz
160 Hz
200 Hz
250 Hz
315 Hz
400 Hz
500 Hz
630 Hz
800 Hz
1000 Hz
1250 Hz
1600 Hz
2000 Hz
2500 Hz
3150 Hz
4000 Hz
5000 Hz
6300 Hz
8000 Hz
10000 Hz
12500 Hz
16000 Hz
20000 Hz

77/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Measurements with By Pass Conditions at MP B


19 to 20 March 2010
Filename :
Instrument :
Duration :
Calibration :

General
Info

LD8_068.slmdl Intv T.H.


Larson-Davis 824
304.3 seconds

A-Weighted

C-Weighted

Leq (A): 43.1 dBA


SEL (A): 68.0 dBA
Peak (A): 72.0 dBA

Leq (C): 58.8 dBC


SEL (C): 83.7 dBC
Peak (C): 81.9 dBC

Linear
Leq (Lin): 64.1 dB
SEL (Lin): 88.9 dB
Peak (Lin): 83.1 dB

Global
Analyse

Lmax (dB)

Lmin (dB)
20Mar2010 02:24:17

20Mar2010 02:25:56

20Mar2010 02:24:16

Statistical
Analyse

40.4

47.3

55.0

65.6

20Mar2010 02:28:25

20Mar2010 02:26:49

20Mar2010 02:24:40

75.5

40.1

53.6

53.4

69.8

20Mar2010 02:24:48

20Mar2010 02:26:35

20Mar2010 02:29:02

20Mar2010 02:25:56

20Mar2010 02:24:47

77.9

40.4

57.8

55.6

73.1

20Mar2010 02:24:48

20Mar2010 02:26:35

20Mar2010 02:29:02

20Mar2010 02:24:17

20Mar2010 02:24:47

L1 : 47.0 dB(A)

L5 : 45.4 dB(A)

L10 : 44.8 dB(A)

L50 : 42.5 dB(A)

L95 : 40.8 dB(A)

L99 : 40.4 dB(A)

60
dB
50

L95,T

Lmax (dB(C))

20Mar2010 02:26:42

57.7

Impulse

Lmin (dB(C))

72.0

56.1

Fast

Lmax (dB(A))

20Mar2010 02:24:41

58.1

Slow

Lmin (dB(A))

L95,T
Third Octave Bands

40
30
20
10
20

Hz

50

100

200

500

1K

2K

5K

47.6
dBA
46.2

10K(L)*
2:27:43
1= 44.6 dBA

LAeq,1s

44.8
43.4
42
40.6
39.2
2:24:16

2:26:16

2:28:16

Acoustical testing laboratory name : SGS Belgium NV

Date:20/03/2010

Operator name : Bert De Winter

28/04/2010

dB
52.0
50.5
46.5
43.5
40.0
41.5
42.5
41.0
42.0
42.0
39.5
39.5
38.0
37.0
35.5
34.0
32.5
31.0
29.5
28.0
27.0
24.0
22.0
20.0
19.5
19.5
20.0
20.0
21.5
22.0
22.0
23.5
25.0

2:30:16

Test report number : 10.0102-1-v1

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Hz
12.5 Hz
16 Hz
20 Hz
25 Hz
31.5 Hz
40 Hz
50 Hz
63 Hz
80 Hz
100 Hz
125 Hz
160 Hz
200 Hz
250 Hz
315 Hz
400 Hz
500 Hz
630 Hz
800 Hz
1000 Hz
1250 Hz
1600 Hz
2000 Hz
2500 Hz
3150 Hz
4000 Hz
5000 Hz
6300 Hz
8000 Hz
10000 Hz
12500 Hz
16000 Hz
20000 Hz

78/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Measurements with By Pass Conditions at MP C


19 to 20 March 2010
Filename :
Instrument :
Duration :
Calibration :

General
Info

LD8_069.slmdl Intv T.H.


Larson-Davis 824
301.3 seconds

A-Weighted

C-Weighted

Leq (A): 61.9 dBA


SEL (A): 86.7 dBA
Peak (A): 87.3 dBA

Leq (C): 70.0 dBC


SEL (C): 94.8 dBC
Peak (C): 92.8 dBC

Linear
Leq (Lin): 75.0 dB
SEL (Lin): 99.8 dB
Peak (Lin): 98.5 dB

Global
Analyse

Lmin (dB)

Lmax (dB)

20Mar2010 02:42:30

20Mar2010 02:42:30

20Mar2010 02:43:15

Statistical
Analyse

47.8

73.5

62.9

79.3

20Mar2010 02:40:37

20Mar2010 02:43:15

20Mar2010 02:39:24

90.5

47.3

74.7

60.9

84.9

20Mar2010 02:44:06

20Mar2010 02:40:23

20Mar2010 02:40:36

20Mar2010 02:42:30

20Mar2010 02:39:23

94.3

47.9

75.1

64.4

87.2

20Mar2010 02:44:06

20Mar2010 02:40:16

20Mar2010 02:40:36

20Mar2010 02:42:05

20Mar2010 02:39:23

L1 : 73.5 dB(A)

L5 : 69.8 dB(A)

L10 : 64.1 dB(A)

L50 : 53.3 dB(A)

L95 : 48.3 dB(A)

L99 : 47.7 dB(A)

80
dB
70

L95,T
Third Octave Bands
Sources Arcelor

L95,T

60
50
40
30
20
20

Hz

50

100

200

500

1K

2K

5K

80

10K(L)*
2:42:48
1= 49.4 dBA

dBA
70
LAeq,1s

Lmax (dB(C))

20Mar2010 02:40:17

69.4

Impulse

Lmin (dB(C))

85.6

64.3

Fast

Lmax (dB(A))

20Mar2010 02:39:24

67.1

Slow

Lmin (dB(A))

60

50

40
2:39:21

2:41:21

2:43:21

Test report number : 10.0102-1-v1

Acoustical testing laboratory name : SGS Belgium NV

Date:20/03/2010

Operator name : Bert De Winter

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

Hz
12.5 Hz
16 Hz
20 Hz
25 Hz
31.5 Hz
40 Hz
50 Hz
63 Hz
80 Hz
100 Hz
125 Hz
160 Hz
200 Hz
250 Hz
315 Hz
400 Hz
500 Hz
630 Hz
800 Hz
1000 Hz
1250 Hz
1600 Hz
2000 Hz
2500 Hz
3150 Hz
4000 Hz
5000 Hz
6300 Hz
8000 Hz
10000 Hz
12500 Hz
16000 Hz
20000 Hz

dB
77.5
73.5
71.5
69.5
68.0
65.0
63.0
61.5
60.0
55.5
55.0
55.0
55.5
54.0
55.5
55.5
56.5
61.5
63.0
61.5
60.0
58.5
58.0
56.0
54.5
53.5
51.5
50.5
48.5
45.0
39.5
34.0
27.5

2:45:21

79/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Annex 4: Overview Weather conditions during far field measurements

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

80/92

Noise acceptance test BFG Power Plant Gent

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Siemens NV Energy

28/04/2010

81/92

Noise acceptance test BFG Power Plant Gent

SGS Belgium NV
Reportnumber : 10.0102-1-v3

Siemens NV Energy

28/04/2010

82/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Annex 5: Calculation LwA according ISO 8297 based on LA95-soundpressure levels at plant boundery
Maximum load
f(Hz)

12

16

20

25

31

40

50

63

80

100

125

160

200

250

315

400

500

630

800

1k

1.25 k

1. 6 k

2k

2.5 k

3.15 k

4k

5k

6.3 k

8k

10 k

12.5 k

16 k

20 k

LAeq

Pos.

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB(A)

Max L oad L95 levels 17 to 18 March 2010


1

63.4

60.4

54.9

56.9

60.9

60.4

56.9

53.4

49.9

49.4

48.9

48.4

47.4

47.9

47.4

45.9

45.4

44.9

44.4

43.4

42.9

41.9

41.4

39.4

44.4

32.9

30.4

25.9

23.4

22.4

21.4

22.9

24.4

55.8

61.9

59.4

54.9

53.9

57.4

57.9

53.4

50.9

49.4

52.9

48.9

47.9

47.9

46.4

45.4

44.4

43.9

45.4

41.9

39.9

38.9

35.9

33.4

32.9

32.9

25.4

22.4

21.4

21.9

21.4

21.4

22.9

23.9

52.9

59.4

59.4

55.9

54.9

57.4

55.4

53.4

49.9

49.4

52.4

49.9

47.9

53.9

48.4

48.9

46.4

44.4

44.4

42.4

40.9

38.9

35.9

32.9

31.4

31.4

24.9

22.4

21.4

21.4

21.4

20.9

22.4

24.4

53.6

58.9

59.4

60.4

58.4

57.4

56.9

55.9

51.9

51.4

56.9

51.9

49.4

49.9

47.4

50.9

46.9

47.9

44.4

43.4

42.9

40.4

38.4

36.4

34.4

32.9

29.9

27.4

24.9

22.9

21.9

20.9

22.4

23.9

54.9

57.4

59.9

60.9

59.9

57.4

55.4

55.9

52.9

50.9

52.4

54.9

48.4

45.4

43.9

44.4

42.4

43.4

44.9

41.4

39.9

38.9

36.9

37.9

37.4

34.9

32.4

28.4

25.9

23.9

22.9

21.4

22.4

23.9

53.0

62.5

65.0

64.0

61.0

59.0

61.5

60.0

56.5

55.0

57.0

57.0

50.0

47.5

46.5

50.0

46.5

46.0

45.0

43.0

42.0

41.0

40.0

39.5

38.5

37.5

35.5

33.0

29.5

26.5

23.0

21.5

22.5

24.0

55.1

64.5

65.0

65.5

65.0

63.0

60.0

60.0

57.0

56.0

56.0

53.0

50.0

47.5

47.5

49.0

48.5

48.5

44.5

43.0

42.0

40.5

40.0

39.5

39.5

38.0

36.5

34.0

32.5

29.5

25.5

22.5

23.0

24.0

55.1

66.5

64.0

64.0

63.5

60.0

60.5

59.0

55.0

54.5

55.0

51.0

49.0

48.5

46.5

46.0

45.5

45.5

43.0

42.5

42.0

40.5

40.0

38.5

38.5

38.5

37.0

34.0

33.0

31.0

28.0

24.0

23.0

24.0

54.1

67.0

65.5

64.0

62.0

59.5

59.0

58.0

53.5

50.5

49.5

47.5

46.5

44.5

44.0

45.0

43.5

43.0

41.0

42.0

39.5

38.0

35.0

33.5

32.0

30.5

29.5

28.0

26.0

25.0

22.5

21.5

22.5

24.0

52.3

10

67.0

67.0

67.0

67.0

67.5

66.0

64.0

60.5

58.0

56.5

52.5

49.5

46.5

45.0

45.5

45.0

44.0

44.0

44.0

43.5

42.5

41.5

42.0

43.0

43.5

43.0

42.5

42.0

42.0

39.5

35.0

29.0

25.0

56.5

11

71.5

70.5

75.5

75.5

73.5

72.5

69.0

67.5

66.0

64.0

60.0

56.0

52.5

49.5

49.0

49.0

49.0

50.0

50.5

51.5

51.0

51.5

53.5

55.5

58.0

59.0

59.5

60.0

61.5

60.5

57.0

52.0

42.5

69.6

12

68.5

69.5

70.0

71.0

72.0

68.0

64.5

62.5

62.0

61.0

57.0

54.5

52.0

49.5

50.5

52.5

52.0

51.5

51.5

50.5

50.5

50.0

51.5

53.0

54.5

55.5

56.0

57.0

58.0

57.0

54.0

48.5

39.5

66.8

13

66.0

67.5

67.5

64.5

61.5

61.5

58.5

55.0

53.0

52.0

50.0

49.5

48.0

47.5

47.0

48.0

46.0

45.0

46.5

44.0

43.0

40.0

37.5

36.5

35.0

31.0

28.5

27.0

25.0

23.0

21.5

22.5

24.0

55.4

14

68.0

68.0

66.0

65.5

64.5

61.0

59.5

58.0

52.5

53.0

51.5

49.5

48.5

48.0

48.0

47.5

47.0

46.0

45.5

44.0

43.5

42.0

40.0

39.0

41.0

33.0

30.0

26.5

24.0

22.0

21.5

22.5

24.0

55.9

15

67.5

67.0

67.0

66.5

64.5

61.0

64.0

60.5

57.0

54.0

54.0

53.5

53.5

54.0

54.0

52.5

53.5

54.0

51.5

51.0

50.5

49.0

48.0

47.5

53.0

41.0

38.5

34.0

30.5

28.5

26.5

23.5

24.0

63.1

16

63.5

61.5

63.0

63.0

66.0

61.5

62.5

61.0

55.0

53.5

52.5

51.5

51.0

55.5

54.5

50.5

51.0

51.0

51.5

50.5

51.0

52.5

53.0

53.5

60.5

48.0

46.0

42.5

41.5

41.5

38.0

32.0

26.5

66.5

Backgro und L 95 levels 16 to 17 March 2010. (corr ected levels for po si tion 12 (r ecir cul ation pump cooling water) and p ositio n 15 (auxi liary b oiler ))
1

62.0

59.5

51.0

49.5

47.0

48.5

51.0

47.0

48.5

47.0

48.0

47.0

45.5

45.0

44.0

42.0

41.5

41.0

40.0

39.0

36.5

34.5

32.0

31.5

25.5

21.5

20.0

19.5

20.5

21.0

21.0

22.5

24.0

49.2

59.5

57.0

50.5

49.0

49.0

48.0

51.5

47.0

48.5

48.5

47.0

47.0

46.5

47.0

45.0

44.5

42.5

41.5

40.5

39.5

37.5

35.0

32.5

31.0

26.5

23.0

20.5

20.0

20.5

21.0

21.0

22.5

24.0

50.1

59.5

56.5

52.5

49.0

49.5

48.5

51.0

48.0

48.5

51.5

49.5

46.5

52.5

44.5

45.5

45.0

42.0

40.0

39.0

37.0

35.5

32.5

29.5

28.0

24.5

22.0

20.5

20.0

20.5

21.0

21.0

22.5

24.0

50.1

58.5

56.0

53.5

50.0

50.5

50.5

51.5

49.0

50.0

54.0

51.5

48.0

47.0

47.5

46.5

48.0

47.0

44.5

43.0

42.0

40.0

38.0

35.5

33.0

29.5

26.5

24.0

22.5

22.0

21.5

21.0

22.5

24.0

53.0

55.0

53.5

48.0

48.5

49.0

53.5

58.0

50.0

51.0

53.0

53.0

45.5

45.0

43.5

43.0

43.5

42.0

46.0

41.5

39.5

39.0

37.0

39.0

38.0

35.0

32.0

27.5

25.5

25.0

24.0

21.5

22.5

24.0

51.5

59.5

53.5

48.0

50.0

50.5

53.5

51.0

50.5

49.5

52.0

55.5

48.5

47.5

47.0

52.0

48.5

47.0

44.5

42.5

41.5

40.0

38.0

37.0

36.0

32.0

29.0

25.5

23.5

22.5

21.5

21.0

22.5

24.0

53.6

57.5

56.5

51.5

50.5

51.0

49.5

49.5

48.5

52.0

50.0

49.5

47.0

49.0

47.5

48.5

45.5

45.0

43.0

41.5

40.5

39.0

37.5

35.5

34.0

31.0

29.0

25.5

22.5

21.5

21.0

21.0

22.5

23.5

52.1

63.5

59.5

50.5

50.0

48.0

52.0

49.5

47.0

51.5

49.0

49.0

48.5

48.5

48.0

47.0

45.5

45.0

43.5

42.0

41.0

40.0

38.5

36.5

35.0

31.5

29.5

25.5

23.0

22.0

21.5

21.0

22.5

24.0

52.1

67.5

59.5

50.0

50.0

48.0

49.0

51.0

45.0

47.0

46.5

46.5

46.5

46.0

45.5

46.0

44.5

43.0

42.0

42.0

39.5

37.5

34.5

31.0

27.5

24.0

21.5

20.5

20.0

21.0

21.0

21.0

22.5

24.0

50.2

10

67.0

57.5

51.5

50.5

49.0

50.5

51.0

46.0

47.5

47.0

46.5

47.0

45.5

45.5

46.0

44.0

43.5

42.0

42.0

40.0

39.0

36.0

32.5

28.5

25.0

23.0

22.0

21.5

22.0

22.0

21.5

22.5

24.0

50.5

11

67.0

60.5

51.5

51.5

50.5

51.0

51.5

50.0

47.5

47.5

48.0

48.5

48.0

47.0

46.5

46.0

46.0

45.0

45.0

44.0

43.0

40.0

36.0

32.5

29.0

25.0

23.0

22.0

22.0

22.0

21.5

22.5

24.0

53.2

12

66.1

59.8

51.8

52.0

51.0

49.9

51.0

48.8

49.6

50.3

49.1

49.9

48.8

47.8

47.6

47.1

47.1

45.3

45.3

44.3

43.8

40.3

36.8

34.9

29.8

25.3

22.5

21.5

21.5

21.5

21.3

22.5

24.0

54.3

13

65.0

59.0

52.0

52.5

51.5

48.5

50.5

47.0

51.0

52.0

50.0

51.0

49.5

48.5

48.5

48.0

48.0

45.5

45.5

44.5

44.5

40.5

37.5

36.5

30.5

25.5

22.0

21.0

21.0

21.0

21.0

22.5

24.0

55.1

14

65.5

60.0

54.5

55.0

54.0

51.5

52.5

50.5

52.0

51.0

51.5

51.5

49.0

48.5

48.0

47.5

47.0

46.0

45.0

44.0

42.5

40.0

38.0

37.0

34.5

30.0

25.5

25.5

24.0

22.0

21.0

22.5

24.0

54.2

15

65.0

58.8

53.8

54.8

54.0

53.6

53.3

50.8

51.5

51.0

51.0

52.3

50.1

50.6

49.1

47.8

47.5

46.5

45.3

44.3

42.8

40.0

38.3

37.3

33.8

29.5

25.3

24.4

23.3

22.0

21.3

22.5

24.0

54.7

16

64.5

57.0

53.0

54.5

54.0

55.0

54.0

51.0

51.0

51.0

50.5

53.0

51.0

52.0

50.0

48.0

48.0

47.0

45.5

44.5

43.0

40.0

38.5

37.5

33.0

29.0

25.0

23.0

22.5

22.0

21.5

22.5

24.0

55.2

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

83/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

f(Hz)

12

16

20

25

31

40

50

63

80

100

125

160

200

250

315

400

500

630

800

1k

1.25 k

1.6 k

2k

2. 5 k

3.15 k

4k

5k

6.3 k

8k

10 k

12. 5 k

16 k

20 k

LAeq

Pos.

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB(A)

44.8

44.7

13.8

Max L oad m inus Background


1

57.8

53.1

52.6

56. 0

60. 7

60. 1

55. 6

52.3

44. 3

45. 7

41.6

42. 8

42.9

43.6

43.1

42.6

42.4

41.4

41.8

41.0

40. 9

38. 6

44.3

32. 6

30. 0

24.8

20. 3

16. 8

10.8

12.3

58.2

55.7

52.9

52. 2

56. 7

57. 4

48. 9

48.6

42. 1

50. 9

44.4

40. 6

42.3 #####

34.8 #####

38.3

43.1

36.3

29.3

33.3

28.6

26. 1

28. 4

31.8

21. 7

17. 9

15.8

16. 3

10. 8

10.8

12.3 #####

#####

56.3

53.2

53. 6

56. 6

54. 4

49. 7

45.4

42. 1

45. 1

39.3

42. 3

48.3

46.2

40.7

42.4

39.7

38.6

36.2

33.2

30. 2

28. 7

30.4

21. 8

17. 9

15.8

14. 1

10. 8 ##### #####

48.3

56.7

59.4

57. 7

56. 4

55. 8

53. 9

48.8

45. 8

53. 8

41.3

43. 8

46.8 #####

48.9 #####

40.6 #####

32.8

35.6

29.8

27.8

29. 1

28. 8

30.2

27. 2

24. 7

21.2

15. 6

11. 3 ##### ##### #####

53.7

58.8

60.7

59. 6

56. 7

50. 9 #####

49.8 ##### #####

50.4

45. 3

34.8

38.8 #####

37.8 ##### #####

29.3 ##### ##### ##### ##### #####

21. 8

21. 1

15.3 ##### ##### ##### ##### #####

59.5

64.7

63.9

60. 6

58. 3

60. 8

59. 4

55.2

53. 6

55. 3

51.7

44. 7 #NUM! ##### ##### ##### #####

35.4

33.4

32.4

34.1

35.7

35. 9

34. 9

36.1

34. 4

32. 1

28.2

24. 3

17. 7

63.5

64.3

65.3

64. 8

62. 7

59. 6

59. 6

56.3

53. 8

54. 7

50.4

47. 0 #NUM! #####

39.2

37.7

36.7

35.2

36.4

37. 3

38. 1

37.0

35. 6

33. 3

32.0

28. 8

23. 6

17.2

13.4

63.5

62.1

63.8

63. 3

59. 7

59. 8

58. 5

54.3

51. 5

53. 7

46.7

39. 4 #NUM! ##### ##### #####

35.9 #####

32.9

35.1

30.9

34.7

34. 2

35. 9

37.5

36. 1

33. 3

32.5

30. 4

26. 9

21.0

13.4 #####

46.1

33.3

39.4

40.8

45.5

45.9

#NUM! ##### ##### ##### ##### ##### ##### #####

13.8

11.9 ##### #####


14.4

#####

64.2

63.8

61. 7

59. 2

58. 5

57. 0

52.8

47. 9

46. 5

40.6 #####

28.4

25.4

29. 9

30. 1

29.4

28. 8

27. 1

24.7

22. 8

17. 2

11.9 ##### #####

10

#####

66.5

66.9

66. 9

67. 4

65. 9

63. 8

60.3

57. 6

56. 0

51.2

45. 9

39.6 ##### #####

38.1

34.4

39.7

39.7

40.9

39.9

40.1

41. 5

42. 8

43.4

43. 0

42. 5

42.0

42. 0

39. 4

34.8

27.9

18.1

11

69.6

70.0

75.5

75. 5

73. 5

72. 5

68. 9

67.4

65. 9

63. 9

59.7

55. 1

50.6

45.9

45.4

46.0

46.0

48.3

49.1

50.6

50.3

51.2

53. 4

55. 5

58.0

59. 0

59. 5

60.0

61. 5

60. 5

57.0

52.0

42.4

12

64.8

69.0

69.9

70. 9

72. 0

67. 9

64. 3

62.3

61. 7

60. 6

56.2

52. 6

49.2

44.6

47.4

51.0

50.3

50.3

50.3

49.3

49.5

49.5

51. 3

52. 9

54.5

55. 5

56. 0

57.0

58. 0

57. 0

54.0

48.5

39.4

13

59.1

66.8

67.4

64. 2

61. 0

61. 3

57. 8

54.3

48. 7 ##### ##### #####

#NUM! ##### ##### ##### ##### #####

39.6 ##### ##### ##### ##### #####

33.1

29. 6

27. 4

25.7

22. 8

18. 7

11.9 ##### #####

14

64.4

67.3

65.7

65. 1

64. 1

60. 5

58. 5

57.1

42. 9

48. 7 ##### #####

#NUM! ##### ##### ##### ##### #####

35.9 #####

36.6

37.7

35. 7

34. 7

39.9

30. 0

28. 1

19.6 ##### #####

11.9 ##### #####

15

63.9

66.3

66.8

66. 2

64. 1

60. 1

63. 6

60.0

55. 6

51. 0

51.0

47. 3

50.8

51.4

52.3

50.7

52.2

53.1

50.3

50.0

49.7

48.4

47. 5

47. 1

52.9

40. 7

38. 3

33.5

29. 6

27. 4

25.0

16.6 #####

16

#####

59.6

62.5

62. 3

65. 7

60. 4

61. 8

60.5

52. 8

49. 9

48.2 #####

#NUM!

52.9

52.6

46.9

48.0

48.8

50.2

49.2

50.3

52.2

52. 8

53. 4

60.5

47. 9

46. 0

42.5

41. 4

41. 5

37.9

31.5

22.9

For those levels where the b ackgro und l evel was hig her than sig nal l evel (l evel w ith max lo ad ) a level of the signal level minus 10 dB is assum ed
1

57.8

53.1

52.6

56. 0

60. 7

60. 1

55. 6

52.3

44. 3

45. 7

41.6

42. 8

42.9

44.8

44.7

43.6

43.1

42.6

42.4

41.4

41.8

41.0

40. 9

38. 6

44.3

32. 6

30. 0

24.8

20. 3

16. 8

10.8

12.3

13.8

58.2

55.7

52.9

52. 2

56. 7

57. 4

48. 9

48.6

42. 1

50. 9

44.4

40. 6

42.3

36.4

34.8

34.4

38.3

43.1

36.3

29.3

33.3

28.6

26. 1

28. 4

31.8

21. 7

17. 9

15.8

16. 3

10. 8

10.8

12.3

13.9

49.4

56.3

53.2

53. 6

56. 6

54. 4

49. 7

45.4

42. 1

45. 1

39.3

42. 3

48.3

46.1

46.2

40.8

40.7

42.4

39.7

38.6

36.2

33.2

30. 2

28. 7

30.4

21. 8

17. 9

15.8

14. 1

10. 8

10.9

12.4

13.8

48.3

56.7

59.4

57. 7

56. 4

55. 8

53. 9

48.8

45. 8

53. 8

41.3

43. 8

46.8

37.4

48.9

36.9

40.6

34.4

32.8

35.6

29.8

27.8

29. 1

28. 8

30.2

27. 2

24. 7

21.2

15. 6

11. 3

10.9

12.4

13.9

53.7

58.8

60.7

59. 6

56. 7

50. 9

45. 9

49.8

40. 9

42. 4

50.4

45. 3

34.8

33.3

38.8

32.4

37.8

34.9

31.4

29.3

28.9

26.9

27. 9

27. 4

24.9

21. 8

21. 1

15.3

13. 9

12. 9

11.4

12.4

13.9

59.5

64.7

63.9

60. 6

58. 3

60. 8

59. 4

55.2

53. 6

55. 3

51.7

44. 7

37.5

36.5

40.0

36.5

36.0

35.4

33.4

32.4

34.1

35.7

35. 9

34. 9

36.1

34. 4

32. 1

28.2

24. 3

17. 7

11.9

12.5

14.0

63.5

64.3

65.3

64. 8

62. 7

59. 6

59. 6

56.3

53. 8

54. 7

50.4

47. 0

37.5

37.5

39.4

45.5

45.9

39.2

37.7

36.7

35.2

36.4

37. 3

38. 1

37.0

35. 6

33. 3

32.0

28. 8

23. 6

17.2

13.4

14.4

63.5

62.1

63.8

63. 3

59. 7

59. 8

58. 5

54.3

51. 5

53. 7

46.7

39. 4

38.5

36.5

36.0

35.5

35.9

33.0

32.9

35.1

30.9

34.7

34. 2

35. 9

37.5

36. 1

33. 3

32.5

30. 4

26. 9

21.0

13.4

14.0

57.0

64.2

63.8

61. 7

59. 2

58. 5

57. 0

52.8

47. 9

46. 5

40.6

36. 5

34.5

34.0

35.0

33.5

33.0

31.0

32.0

29.5

28.4

25.4

29. 9

30. 1

29.4

28. 8

27. 1

24.7

22. 8

17. 2

11.9

12.5

14.0

10

57.0

66.5

66.9

66. 9

67. 4

65. 9

63. 8

60.3

57. 6

56. 0

51.2

45. 9

39.6

35.0

35.5

38.1

34.4

39.7

39.7

40.9

39.9

40.1

41. 5

42. 8

43.4

43. 0

42. 5

42.0

42. 0

39. 4

34.8

27.9

18.1

11

69.6

70.0

75.5

75. 5

73. 5

72. 5

68. 9

67.4

65. 9

63. 9

59.7

55. 1

50.6

45.9

45.4

46.0

46.0

48.3

49.1

50.6

50.3

51.2

53. 4

55. 5

58.0

59. 0

59. 5

60.0

61. 5

60. 5

57.0

52.0

42.4

12

64.8

69.0

69.9

70. 9

72. 0

67. 9

64. 3

62.3

61. 7

60. 6

56.2

52. 6

49.2

44.6

47.4

51.0

50.3

50.3

50.3

49.3

49.5

49.5

51. 3

52. 9

54.5

55. 5

56. 0

57.0

58. 0

57. 0

54.0

48.5

39.4

13

59.1

66.8

67.4

64. 2

61. 0

61. 3

57. 8

54.3

48. 7

42. 0

40.0

39. 5

38.0

37.5

37.0

38.0

36.0

35.0

39.6

34.0

33.0

30.0

27. 5

26. 5

33.1

29. 6

27. 4

25.7

22. 8

18. 7

11.9

12.5

14.0

14

64.4

67.3

65.7

65. 1

64. 1

60. 5

58. 5

57.1

42. 9

48. 7

41.5

39. 5

38.5

38.0

38.0

37.5

37.0

36.0

35.9

34.0

36.6

37.7

35. 7

34. 7

39.9

30. 0

28. 1

19.6

14. 0

12. 0

11.9

12.5

14.0

15

63.9

66.3

66.8

66. 2

64. 1

60. 1

63. 6

60.0

55. 6

51. 0

51.0

47. 3

50.8

51.4

52.3

50.7

52.2

53.1

50.3

50.0

49.7

48.4

47. 5

47. 1

52.9

40. 7

38. 3

33.5

29. 6

27. 4

25.0

16.6

14.0

16

53.5

59.6

62.5

62. 3

65. 7

60. 4

61. 8

60.5

52. 8

49. 9

48.2

41. 5

41.0

52.9

52.6

46.9

48.0

48.8

50.2

49.2

50.3

52.2

52. 8

53. 4

60.5

47. 9

46. 0

42.5

41. 4

41. 5

37.9

31.5

22.9

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

84/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Copy val ues

LpA

57.8

53.1

52.6

56. 0

60. 7

60. 1

55. 6

52.3

44. 3

45. 7

41.6

42. 8

42.9

44.8

44.7

43.6

43.1

42.6

42.4

41.4

41.8

41.0

40. 9

38. 6

44.3

32. 6

30. 0

24.8

20. 3

16. 8

10.8

12.3

13.8

52. 4

58.2

55.7

52.9

52. 2

56. 7

57. 4

48. 9

48.6

42. 1

50. 9

44.4

40. 6

42.3

36.4

34.8

34.4

38.3

43.1

36.3

29.3

33.3

28.6

26. 1

28. 4

31.8

21. 7

17. 9

15.8

16. 3

10. 8

10.8

12.3

13.9

45. 4

49.4

56.3

53.2

53. 6

56. 6

54. 4

49. 7

45.4

42. 1

45. 1

39.3

42. 3

48.3

46.1

46.2

40.8

40.7

42.4

39.7

38.6

36.2

33.2

30. 2

28. 7

30.4

21. 8

17. 9

15.8

14. 1

10. 8

10.9

12.4

13.8

48. 4

48.3

56.7

59.4

57. 7

56. 4

55. 8

53. 9

48.8

45. 8

53. 8

41.3

43. 8

46.8

37.4

48.9

36.9

40.6

34.4

32.8

35.6

29.8

27.8

29. 1

28. 8

30.2

27. 2

24. 7

21.2

15. 6

11. 3

10.9

12.4

13.9

46. 8

53.7

58.8

60.7

59. 6

56. 7

50. 9

45. 9

49.8

40. 9

42. 4

50.4

45. 3

34.8

33.3

38.8

32.4

37.8

34.9

31.4

29.3

28.9

26.9

27. 9

27. 4

24.9

21. 8

21. 1

15.3

13. 9

12. 9

11.4

12.4

13.9

42. 7

59.5

64.7

63.9

60. 6

58. 3

60. 8

59. 4

55.2

53. 6

55. 3

51.7

44. 7

37.5

36.5

40.0

36.5

36.0

35.4

33.4

32.4

34.1

35.7

35. 9

34. 9

36.1

34. 4

32. 1

28.2

24. 3

17. 7

11.9

12.5

14.0

47. 3

63.5

64.3

65.3

64. 8

62. 7

59. 6

59. 6

56.3

53. 8

54. 7

50.4

47. 0

37.5

37.5

39.4

45.5

45.9

39.2

37.7

36.7

35.2

36.4

37. 3

38. 1

37.0

35. 6

33. 3

32.0

28. 8

23. 6

17.2

13.4

14.4

50. 1

63.5

62.1

63.8

63. 3

59. 7

59. 8

58. 5

54.3

51. 5

53. 7

46.7

39. 4

38.5

36.5

36.0

35.5

35.9

33.0

32.9

35.1

30.9

34.7

34. 2

35. 9

37.5

36. 1

33. 3

32.5

30. 4

26. 9

21.0

13.4

14.0

47. 0

57.0

64.2

63.8

61. 7

59. 2

58. 5

57. 0

52.8

47. 9

46. 5

40.6

36. 5

34.5

34.0

35.0

33.5

33.0

31.0

32.0

29.5

28.4

25.4

29. 9

30. 1

29.4

28. 8

27. 1

24.7

22. 8

17. 2

11.9

12.5

14.0

42. 0

10

57.0

66.5

66.9

66. 9

67. 4

65. 9

63. 8

60.3

57. 6

56. 0

51.2

45. 9

39.6

35.0

35.5

38.1

34.4

39.7

39.7

40.9

39.9

40.1

41. 5

42. 8

43.4

43. 0

42. 5

42.0

42. 0

39. 4

34.8

27.9

18.1

53. 6

11

69.6

70.0

75.5

75. 5

73. 5

72. 5

68. 9

67.4

65. 9

63. 9

59.7

55. 1

50.6

45.9

45.4

46.0

46.0

48.3

49.1

50.6

50.3

51.2

53. 4

55. 5

58.0

59. 0

59. 5

60.0

61. 5

60. 5

57.0

52.0

42.4

68. 4

12

64.8

69.0

69.9

70. 9

72. 0

67. 9

64. 3

62.3

61. 7

60. 6

56.2

52. 6

49.2

44.6

47.4

51.0

50.3

50.3

50.3

49.3

49.5

49.5

51. 3

52. 9

54.5

55. 5

56. 0

57.0

58. 0

57. 0

54.0

48.5

39.4

65. 6

13

59.1

66.8

67.4

64. 2

61. 0

61. 3

57. 8

54.3

48. 7

42. 0

40.0

39. 5

38.0

37.5

37.0

38.0

36.0

35.0

39.6

34.0

33.0

30.0

27. 5

26. 5

33.1

29. 6

27. 4

25.7

22. 8

18. 7

11.9

12.5

14.0

45. 0

14

64.4

67.3

65.7

65. 1

64. 1

60. 5

58. 5

57.1

42. 9

48. 7

41.5

39. 5

38.5

38.0

38.0

37.5

37.0

36.0

35.9

34.0

36.6

37.7

35. 7

34. 7

39.9

30. 0

28. 1

19.6

14. 0

12. 0

11.9

12.5

14.0

47. 5

15

63.9

66.3

66.8

66. 2

64. 1

60. 1

63. 6

60.0

55. 6

51. 0

51.0

47. 3

50.8

51.4

52.3

50.7

52.2

53.1

50.3

50.0

49.7

48.4

47. 5

47. 1

52.9

40. 7

38. 3

33.5

29. 6

27. 4

25.0

16.6

14.0

60. 6

16

53.5

59.6

62.5

62. 3

65. 7

60. 4

61. 8

60.5

52. 8

49. 9

48.2

41. 5

41.0

52.9

52.6

46.9

48.0

48.8

50.2

49.2

50.3

52.2

52. 8

53. 4

60.5

47. 9

46. 0

42.5

41. 4

41. 5

37.9

31.5

22.9

64. 6

63. 8

61. 3

59.1

56. 7

55. 5

51.4

47. 2

45.2

45.1

46.0

44.4

44.9

45.4

44.7

44.4

44.4

45.0

46. 1

47. 3

51.6

49. 0

49. 3

49.8

51. 1

50. 1

46.8

41.6

32.2

59. 9

Step 1: Lp = mean level on measurement line


62.2

64.9

66.9

66. 7

65. 8

Step 2+3: differance between highest level in position 11 (68.4 dB(A)) and lowest level in position 9 (42 dB(A)) is > 10 dB(A)
The power plant has a northern directiv ity because of the may or inf luence of the suction side of the c ooling towers (northern s uc tion side and ref lec tion of s outhern suct ion s ide
against UMA and UHA) Bec ause of this direct ivity a combined method will be applied (LwA det ermend wit h unc orrigated St ruber level (normally step 2+3) will be adjust ed wit h
measured direc tivy )
Step 4: calculation surface f ac tor Ls = 10xLO G ((2x Sm + h. l)/So)
wit h

Sm = measuring s urf ac e = 200x191 =


h = meausuring hight =
l = lenght off measuring line = 2x200+2x191 =
So = reference surface =

38200 m

Ls =

49.1

LF =

-1. 206585

7 m
782 m
1 m

Step 5: calculation near f iel d factor LF = LOG ((d/ (4x?Sp))


wit h

d = mean meas urement distance between Sm and Sp

30.7 m

Sp = s ource s urf ac e = ground surface of cooli ng t owers+UMA+UHA+U EN+UHB+UGD +U BA+UAA+surface area bet ween UMA and cooling t owers
15252 m

Step 6: calculation microphone factor LM = 0


LM = 0 because of the use of a omnidirect ional microphone

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

85/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Step 7: calculation air abs orption f ac tor L = 0.5 x alu x ?Sm


wit h

S m = measuring s urf ac e = 200x191 =

38200 m

alu = air absorption according t o ISO 9613-1 51993) at 70% relativ e humidity and 10C ac cording t o guide line Emola B egis LNE (Flanders environmental legislation)
40

50

63

80

100

125

160

200

dB /km

0.079 0.079 0.079 0.079 0.079

12

16

20

25

31

0.079

0.079

0. 122

0. 186

0. 280

0.411

0. 584

0. 797

1.040 1.310 1.600 1.930 2.330 2.870 3.660 4.860 6.730

250

315

400

500

630

800

1k

1.25 k

1.6 k

2k

2. 5 k

3.15 k

4k

5k

9.66

14. 30

21. 50

32.80

50. 20

76. 90 117.00 175.00 175. 00 175. 00 175.00

dB /m

0.000 0.000 0.000 0.000 0.000

0.000

0.000

0. 000

0. 000

0. 000

0.000

0. 001

0. 001

6.3 k

8k

10 k

12. 5 k

16 k

20 k

0.001 0.001 0.002 0.002 0.002 0.003 0.004 0.005 0.007 0.010 0.014

0.022

0.033

0. 050

0.077

0. 117

0. 175

0.175

0. 175 0. 175

Step 8: calculation LwA = Lp + Ls + LF + LM + L

LwA

12

16

20

25

31

40

50

63

80

100

125

160

200

250

315

400

500

630

800

1k

1.25 k

1.6 k

2k

2. 5 k

3.15 k

4k

5k

6.3 k

8k

10 k

12. 5 k

16 k

20 k

LwA

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB(A)

99.3

95. 1

93.0

94.0

92.3

92.8

93.3

92.6

92.3

92.3

92.9

94. 0

95. 3

99.5

96. 9

97. 3

97.8

99. 2

98. 2

94.9

89.7

80.3

107.8

110.1 112.9 114.9 114. 6 113. 7 111. 7 109. 3 107.0 104. 6 103. 4

93.1

Cal cu lation directivity

Lw A

South surface (s urf ace is 2 x 7 x 191m =

2674 m

10LO G S=

34.27 dB

57.8

53.1

52.6

56. 0

60. 7

60. 1

55. 6

52.3

44. 3

45. 7

41.6

42. 8

42.9

44.8

44.7

43.6

43.1

42.6

42.4

41.4

41.8

41.0

40. 9

38. 6

44.3

32. 6

30. 0

24.8

20. 3

16. 8

10.8

12.3

13.8

58.2

55.7

52.9

52. 2

56. 7

57. 4

48. 9

48.6

42. 1

50. 9

44.4

40. 6

42.3

36.4

34.8

34.4

38.3

43.1

36.3

29.3

33.3

28.6

26. 1

28. 4

31.8

21. 7

17. 9

15.8

16. 3

10. 8

10.8

12.3

13.9

49.4

56.3

53.2

53. 6

56. 6

54. 4

49. 7

45.4

42. 1

45. 1

39.3

42. 3

48.3

46.1

46.2

40.8

40.7

42.4

39.7

38.6

36.2

33.2

30. 2

28. 7

30.4

21. 8

17. 9

15.8

14. 1

10. 8

10.9

12.4

13.8

48.3

56.7

59.4

57. 7

56. 4

55. 8

53. 9

48.8

45. 8

53. 8

41.3

43. 8

46.8

37.4

48.9

36.9

40.6

34.4

32.8

35.6

29.8

27.8

29. 1

28. 8

30.2

27. 2

24. 7

21.2

15. 6

11. 3

10.9

12.4

13.9

53.7

58.8

60.7

59. 6

56. 7

50. 9

45. 9

49.8

40. 9

42. 4

50.4

45. 3

34.8

33.3

38.8

32.4

37.8

34.9

31.4

29.3

28.9

26.9

27. 9

27. 4

24.9

21. 8

21. 1

15.3

13. 9

12. 9

11.4

12.4

13.9

Lp

55.2

56.5

57.2

56. 6

57. 8

56. 7

52. 2

49.5

43. 4

49. 5

45.4

43. 2

44.9

42.2

45.1

39.5

40.5

41.0

38.4

37.3

36.7

35.2

34. 8

33. 0

37.9

27. 5

24. 9

20.3

16. 7

13. 2

11.0

12.4

13.9

91.5

90. 9

92. 1

91. 0

86. 4

83.8

77. 7

83. 8

79.7

77. 5

79.2

76.5

79.3

73.8

74.8

75.2

72.7

71.5

70.9

69.5

69. 1

67. 3

72.2

61. 7

59. 2

54.6

51. 0

47. 5

45.3

46.6

48.1

82. 6

LwA = Lp + 10xLOG S
89.5

90.8

East surface (surface is 2 x 7 x 200m =

2800 m

10LO G S=

34.47 dB

53.7

58.8

60.7

59. 6

56. 7

50. 9

45. 9

49.8

40. 9

42. 4

50.4

45. 3

34.8

33.3

38.8

32.4

37.8

34.9

31.4

29.3

28.9

26.9

27. 9

27. 4

24.9

21. 8

21. 1

15.3

13. 9

12. 9

11.4

12.4

13.9

0.0

59.5

64.7

63.9

60. 6

58. 3

60. 8

59. 4

55.2

53. 6

55. 3

51.7

44. 7

37.5

36.5

40.0

36.5

36.0

35.4

33.4

32.4

34.1

35.7

35. 9

34. 9

36.1

34. 4

32. 1

28.2

24. 3

17. 7

11.9

12.5

14.0

0.0

63.5

64.3

65.3

64. 8

62. 7

59. 6

59. 6

56.3

53. 8

54. 7

50.4

47. 0

37.5

37.5

39.4

45.5

45.9

39.2

37.7

36.7

35.2

36.4

37. 3

38. 1

37.0

35. 6

33. 3

32.0

28. 8

23. 6

17.2

13.4

14.4

0.0

63.5

62.1

63.8

63. 3

59. 7

59. 8

58. 5

54.3

51. 5

53. 7

46.7

39. 4

38.5

36.5

36.0

35.5

35.9

33.0

32.9

35.1

30.9

34.7

34. 2

35. 9

37.5

36. 1

33. 3

32.5

30. 4

26. 9

21.0

13.4

14.0

0.0

57.0

64.2

63.8

61. 7

59. 2

58. 5

57. 0

52.8

47. 9

46. 5

40.6

36. 5

34.5

34.0

35.0

33.5

33.0

31.0

32.0

29.5

28.4

25.4

29. 9

30. 1

29.4

28. 8

27. 1

24.7

22. 8

17. 2

11.9

12.5

14.0

0.0

Lp

60.9

63.3

63.7

62. 4

59. 8

58. 9

57. 8

54.2

51. 3

52. 7

49.3

44. 0

36.8

35.8

38.2

39.8

40.4

35.6

34.1

33.6

32.3

33.7

34. 3

34. 8

35.0

33. 6

31. 2

29.4

26. 7

22. 3

16.5

12.8

14.1

98.2

96. 9

94. 3

93. 4

92. 3

88.7

85. 8

87. 2

83.8

78. 5

71.3

70.3

72.7

74.2

74.9

70.0

68.6

68.0

66.8

68.2

68. 8

69. 2

69.5

68. 1

65. 7

63.9

61. 2

56. 8

50.9

47.3

48.5

LwA = Lp + 10xLOG S
95.3

97.8

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

86/92

81. 3

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

North surface (surface is 2 x 7 x 191m =

2674 m

10LO G S=

34.27 dB

57.0

64.2

63.8

61. 7

59. 2

58. 5

57. 0

52.8

47. 9

46. 5

40.6

36. 5

34.5

34.0

35.0

33.5

33.0

31.0

32.0

29.5

28.4

25.4

29. 9

30. 1

29.4

28. 8

27. 1

24.7

22. 8

17. 2

11.9

12.5

14.0

0.0

10

57.0

66.5

66.9

66. 9

67. 4

65. 9

63. 8

60.3

57. 6

56. 0

51.2

45. 9

39.6

35.0

35.5

38.1

34.4

39.7

39.7

40.9

39.9

40.1

41. 5

42. 8

43.4

43. 0

42. 5

42.0

42. 0

39. 4

34.8

27.9

18.1

0.0

11

69.6

70.0

75.5

75. 5

73. 5

72. 5

68. 9

67.4

65. 9

63. 9

59.7

55. 1

50.6

45.9

45.4

46.0

46.0

48.3

49.1

50.6

50.3

51.2

53. 4

55. 5

58.0

59. 0

59. 5

60.0

61. 5

60. 5

57.0

52.0

42.4

0.0

12

64.8

69.0

69.9

70. 9

72. 0

67. 9

64. 3

62.3

61. 7

60. 6

56.2

52. 6

49.2

44.6

47.4

51.0

50.3

50.3

50.3

49.3

49.5

49.5

51. 3

52. 9

54.5

55. 5

56. 0

57.0

58. 0

57. 0

54.0

48.5

39.4

0.0

13

59.1

66.8

67.4

64. 2

61. 0

61. 3

57. 8

54.3

48. 7

42. 0

40.0

39. 5

38.0

37.5

37.0

38.0

36.0

35.0

39.6

34.0

33.0

30.0

27. 5

26. 5

33.1

29. 6

27. 4

25.7

22. 8

18. 7

11.9

12.5

14.0

0.0

Lp

64.4

67.8

70.6

70. 6

69. 6

67. 8

64. 5

62.4

60. 9

59. 1

54.8

50. 5

46.3

42.0

43.1

45.6

44.9

45.8

46.2

46.4

46.2

46.7

48. 7

50. 6

52.7

53. 7

54. 2

54.8

56. 1

55. 1

51.8

46.6

37.2

98.7 102.1 104.9 104. 8 103. 9 102. 0

98. 7

96.7

95. 2

93. 4

89.1

84. 8

80.6

76.3

77.3

79.9

79.2

80.1

80.5

80.7

80.4

80.9

83. 0

84. 8

87.0

88. 0

88. 4

89.1

90. 4

89. 4

86.1

80.9

71.5

97. 6

LwA = Lp + 10xLOG S

West surface (surface is 2 x 7 x 200m =

2800 m

10LO G S=

34.47 dB

13

59.1

66.8

67.4

64. 2

61. 0

61. 3

57. 8

54.3

48. 7

42. 0

40.0

39. 5

38.0

37.5

37.0

38.0

36.0

35.0

39.6

34.0

33.0

30.0

27. 5

26. 5

33.1

29. 6

27. 4

25.7

22. 8

18. 7

11.9

12.5

14.0

0.0

14

64.4

67.3

65.7

65. 1

64. 1

60. 5

58. 5

57.1

42. 9

48. 7

41.5

39. 5

38.5

38.0

38.0

37.5

37.0

36.0

35.9

34.0

36.6

37.7

35. 7

34. 7

39.9

30. 0

28. 1

19.6

14. 0

12. 0

11.9

12.5

14.0

0.0

15

63.9

66.3

66.8

66. 2

64. 1

60. 1

63. 6

60.0

55. 6

51. 0

51.0

47. 3

50.8

51.4

52.3

50.7

52.2

53.1

50.3

50.0

49.7

48.4

47. 5

47. 1

52.9

40. 7

38. 3

33.5

29. 6

27. 4

25.0

16.6

14.0

0.0

16

53.5

59.6

62.5

62. 3

65. 7

60. 4

61. 8

60.5

52. 8

49. 9

48.2

41. 5

41.0

52.9

52.6

46.9

48.0

48.8

50.2

49.2

50.3

52.2

52. 8

53. 4

60.5

47. 9

46. 0

42.5

41. 4

41. 5

37.9

31.5

22.9

0.0

57.8

53.1

52.6

56. 0

60. 7

60. 1

55. 6

52.3

44. 3

45. 7

41.6

42. 8

42.9

44.8

44.7

43.6

43.1

42.6

42.4

41.4

41.8

41.0

40. 9

38. 6

44.3

32. 6

30. 0

24.8

20. 3

16. 8

10.8

12.3

13.8

Lp

61.4

64.9

65.0

63. 9

63. 5

60. 5

60. 4

57.9

51. 3

48. 4

46.6

43. 2

45.2

48.7

49.0

46.1

47.2

47.9

46.9

46.1

46.5

47.1

47. 2

47. 5

54.3

41. 9

39. 9

36.1

34. 8

34. 7

31.2

24.8

17.7

99.5

98. 3

98. 0

95. 0

94. 9

92.4

85. 7

82. 9

81.1

77. 7

79.7

83.2

83.4

80.5

81.6

82.4

81.4

80.5

80.9

81.6

81. 7

82. 0

88.8

76. 4

74. 3

70.6

69. 3

69. 1

65.6

59.3

52.2

101.9 105.0 106.8 106. 4 105. 4 103. 5 101. 0

98.7

96. 1

95. 0

91.0

86. 9

84.8

84.9

85.8

84.2

84.6

85.0

84.4

84.0

84.0

84.5

85. 6

86. 8

91.1

88. 3

88. 6

89.2

90. 5

89. 5

86.1

80.9

71.6

99.3

110.1 112.9 114.9 114. 6 113. 7 111. 7 109. 3 107.0 104. 6 103. 4

99.3

95. 1

93.1

93.0

94.0

92.3

92.8

93.3

92.6

92.3

92.3

92.9

94. 0

95. 3

99.5

96. 9

97. 3

97.8

99. 2

98. 2

94.9

89.7

80.3

107.8

8.3

8.2

8.1

8.2

8.2

8.2

8.3

8.2

8.3

8. 3

8. 4

8.4

8. 5

8. 4

8. 6

8. 6

8. 7

8. 7

8.8

8.8

8.8

8.8

8.5

LwA = Lp + 10xLOG S
95.8

99.4

93. 8

LwA t ot al surface Sout h + Eas t + Nort h + West

LwA strber

dif ferance between LwA struber and sum area sources of 14m heigt
8.2

7. 8

8.1

8. 2

8. 3

8.2

8. 2

8. 3

8.5

8. 5

8.3

The total LwA of 107.8 dB(A) will be modelled in f our lines with LwA per line at 7m heigt at s ide S, E , N and W wit h LwA
LwA line Sout h (length 191m)
97.6

98.6

99.5

99.1

100.4

99.2

94.7

92.1

86.2

92.3

87. 9

85. 7

87. 5

84. 6

87.5

81.9

83.0

83.5

80.9

79.9

79.2

77.9

77.5

75.8

80.7

70.3

67.8

63.3

59.7

56.3

54. 0

55. 4

56.9

91. 2

103.5 105. 6 106. 3 105.1 102.6

101.6

100.5

97.0

94.3

95.7

92. 0

86. 7

79. 6

78. 5

80.9

82.4

83.1

78.3

76.8

76.4

75.1

76.6

77.2

77.7

78.0

76.7

74.3

72.6

69.9

65.5

59. 7

56. 1

57.3

89. 8

110.2

107.0

105.0

103.6

101.8

97. 3

93. 0

88. 9

84. 4

85.5

88.0

87.4

88.4

88.7

89.0

88.8

89.3

91.4

93.3

95.4

96.6

97.1

97.8

99.1

98.2

94. 8

89. 7

80.2

106.2

104.0 107. 2 107. 6 106.6 106.3

103.2

103.1

100.7

94.2

91.4

89. 3

85. 9

88. 0

91. 4

91.6

88.7

89.8

90.7

89.6

88.9

89.3

90.0

90.2

90.5

97.3

85.0

83.0

79.3

78.0

77.9

74. 4

68. 0

60.9

102.3

110.1 112. 9 114. 9 114.6 113.7

111.7

109.3

107.0

104.6

103.4

99. 3

95. 1

93. 1

93. 0

94.0

92.3

92.8

93.3

92.6

92.3

92.3

92.9

94.0

95.3

99.5

96.9

97.3

97.8

99.2

98.2

94. 9

89. 7

80.3

107.8

LwA line Eas t (length 200m)

LwA line North (length 191m)


106.9 109. 9 113. 0 113.1 112.2
LwA line W es t (lengt h 200m)

sum

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

87/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Steam turbine Bypass operation


f(Hz)

12

16

20

25

31

40

50

63

80

100

125

160

200

250

315

400

500

630

800

1k

1.25 k

1.6 k

2k

2.5 k

3. 15 k

4k

5k

6.3 k

8k

10 k

12. 5 k

16 k

20 k

LAeq

Pos.

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB(A)

By Pass L95 level s 19 to 20 March 2010


1

61.5

59.5

57.0

56.5

59.0

59. 0

55. 5

52.5

51.0

50. 0

51. 0

48. 5

47.5

47. 0

46.5

45.0

45. 5

44. 0

45. 0

43. 0

42.5

41.5

41. 0

40. 5

45. 5

35. 5

32.5

29.5

27.5

26.5

24.5

24.0

24.5

54.7

61.5

59.5

57.0

55.5

57.0

58. 5

56. 5

54.0

52.0

53. 5

54. 5

50. 5

49.5

48. 0

48.0

46.5

46. 0

45. 5

46. 0

44. 0

42.5

40.5

39. 0

38. 5

36. 0

31. 0

28.5

26.5

25.5

25.0

23.5

23.5

24.5

54.2

60.0

58.5

57.5

55.5

59.0

58. 0

58. 0

57.0

55.0

56. 5

56. 0

52. 0

53.5

50. 5

50.0

49.0

48. 5

46. 5

46. 0

45. 0

44.0

42.0

41. 0

41. 5

37. 5

32. 5

30.5

27.5

26.0

25.0

23.5

23.0

24.5

56.1

63.5

63.0

62.5

61.5

60.5

60. 5

59. 5

57.0

56.0

56. 0

56. 5

54. 5

53.0

50. 0

49.5

49.0

48. 5

47. 0

45. 5

44. 5

42.5

40.5

39. 0

38. 5

36. 5

33. 5

31.0

29.5

27.5

24.5

22.5

23.0

24.5

55.6

62.0

61.5

62.0

61.5

61.0

58. 5

57. 0

55.5

53.5

53. 5

58. 5

50. 0

47.5

44. 5

43.5

43.5

43. 0

44. 5

42. 0

41. 0

39.5

37.5

37. 5

37. 0

34. 5

31. 5

29.5

27.0

26.0

23.5

22.0

23.0

24.5

52.4

67.0

67.5

66.5

64.0

62.0

63. 0

62. 0

60.5

57.5

56. 0

57. 5

53. 0

51.5

50. 0

49.5

49.5

49. 0

47. 0

46. 0

45. 0

44.0

43.0

42. 5

42. 0

40. 5

38. 5

36.5

35.0

33.0

28.5

24.0

23.0

24.5

56.5

67.0

68.0

69.0

68.0

66.0

63. 0

62. 0

59.5

58.0

56. 0

55. 0

52. 5

50.5

49. 5

49.0

49.0

48. 0

46. 5

45. 5

44. 5

44.0

43.0

42. 5

42. 5

41. 0

39. 0

37.5

36.5

35.0

31.0

26.5

23.5

24.5

56.1

68.0

66.5

70.0

67.5

62.0

62. 0

61. 0

58.5

56.0

54. 5

53. 0

51. 0

49.0

48. 0

47.5

46.5

45. 5

45. 0

46. 0

44. 0

43.0

42.0

41. 5

41. 5

41. 0

39. 5

37.5

37.0

36.0

34.0

30.0

25.0

24.5

55.3

70.0

66.5

69.0

67.0

63.5

62. 0

61. 0

58.5

55.0

53. 5

51. 0

48. 0

46.0

44. 0

45.5

45.0

43. 0

42. 0

44. 0

41. 5

40.0

38.5

38. 0

38. 5

38. 0

37. 5

37.0

37.5

37.5

35.5

31.5

26.0

24.5

53.2

10

65.0

70.0

74.5

73.5

70.5

69. 5

67. 5

66.5

65.5

64. 0

60. 0

56. 5

52.0

48. 5

47.0

46.5

47. 0

48. 0

50. 0

50. 5

50.5

51.0

53. 0

55. 5

57. 5

58. 5

60.0

61.5

62.5

62.0

59.5

55.0

45.5

69.2

11

70.0

71.0

73.0

74.0

76.0

72. 5

69. 0

67.5

66.5

64. 5

60. 5

56. 0

52.0

48. 5

48.0

47.5

47. 5

49. 0

50. 0

50. 5

50.0

51.0

53. 0

55. 5

57. 5

58. 5

59.5

61.5

62.0

62.5

59.5

55.0

46.0

69.1

12

69.5

70.5

71.5

72.0

70.5

68. 5

65. 5

64.0

63.0

61. 5

57. 5

54. 5

51.5

49. 0

48.0

48.5

49. 0

48. 5

49. 5

49. 0

49.0

49.0

50. 5

52. 5

54. 5

55. 5

57.0

57.5

59.5

59.5

56.5

52.0

42.5

66.6

13

67.5

68.5

68.0

65.0

63.0

61. 5

60. 0

57.5

56.0

54. 0

51. 5

50. 5

49.0

47. 5

47.5

47.0

46. 0

46. 5

47. 0

46. 5

46.0

45.0

44. 0

44. 5

41. 5

37. 5

36.0

33.5

31.5

28.5

24.5

23.0

24.5

56.5

14

67.5

70.5

70.0

66.5

66.0

62. 5

61. 5

60.0

55.5

54. 5

53. 5

50. 5

49.5

48. 5

48.5

47.5

48. 0

49. 0

50. 0

48. 0

47.5

47.0

47. 0

47. 0

45. 0

40. 0

38.0

36.0

33.5

29.5

25.5

23.0

24.5

58.7

15

69.5

69.0

70.5

67.5

66.5

62. 5

64. 5

61.0

57.0

55. 0

54. 5

52. 0

52.0

53. 5

52.5

51.0

52. 0

52. 0

52. 0

50. 5

49.5

49.0

48. 5

49. 0

52. 5

43. 0

40.0

37.0

35.0

31.5

27.5

24.5

24.5

61.9

16

65.0

63.5

64.0

64.0

67.0

62. 0

61. 0

60.5

55.5

53. 5

53. 0

51. 5

51.5

55. 0

53.5

50.5

51. 0

50. 5

52. 0

50. 0

50.0

52.0

52. 5

53. 5

60. 0

48. 0

46.0

43.0

41.5

41.5

38.5

33.0

27.0

65.2

Backgro und L 95 levels 16 to 17 March 2010. (co rrected level s for position 12 (recircul ati on p ump cool ing water) and positi on 15 (auxiliary boiler))
1

62.0

59.5

51.0

49.5

47.0

48. 5

51. 0

47.0

48.5

47. 0

48. 0

47. 0

45.5

45. 0

44.0

42.0

41. 5

41. 0

40. 0

39. 0

36.5

34.5

32. 0

31. 5

25. 5

21. 5

20.0

19.5

20.5

21.0

21.0

22.5

24.0

49.2

59.5

57.0

50.5

49.0

49.0

48. 0

51. 5

47.0

48.5

48. 5

47. 0

47. 0

46.5

47. 0

45.0

44.5

42. 5

41. 5

40. 5

39. 5

37.5

35.0

32. 5

31. 0

26. 5

23. 0

20.5

20.0

20.5

21.0

21.0

22.5

24.0

50.1

59.5

56.5

52.5

49.0

49.5

48. 5

51. 0

48.0

48.5

51. 5

49. 5

46. 5

52.5

44. 5

45.5

45.0

42. 0

40. 0

39. 0

37. 0

35.5

32.5

29. 5

28. 0

24. 5

22. 0

20.5

20.0

20.5

21.0

21.0

22.5

24.0

50.1

58.5

56.0

53.5

50.0

50.5

50. 5

51. 5

49.0

50.0

54. 0

51. 5

48. 0

47.0

47. 5

46.5

48.0

47. 0

44. 5

43. 0

42. 0

40.0

38.0

35. 5

33. 0

29. 5

26. 5

24.0

22.5

22.0

21.5

21.0

22.5

24.0

53.0

55.0

53.5

48.0

48.5

49.0

53. 5

58. 0

50.0

51.0

53. 0

53. 0

45. 5

45.0

43. 5

43.0

43.5

42. 0

46. 0

41. 5

39. 5

39.0

37.0

39. 0

38. 0

35. 0

32. 0

27.5

25.5

25.0

24.0

21.5

22.5

24.0

51.5

59.5

53.5

48.0

50.0

50.5

53. 5

51. 0

50.5

49.5

52. 0

55. 5

48. 5

47.5

47. 0

52.0

48.5

47. 0

44. 5

42. 5

41. 5

40.0

38.0

37. 0

36. 0

32. 0

29. 0

25.5

23.5

22.5

21.5

21.0

22.5

24.0

53.6

57.5

56.5

51.5

50.5

51.0

49. 5

49. 5

48.5

52.0

50. 0

49. 5

47. 0

49.0

47. 5

48.5

45.5

45. 0

43. 0

41. 5

40. 5

39.0

37.5

35. 5

34. 0

31. 0

29. 0

25.5

22.5

21.5

21.0

21.0

22.5

23.5

52.1

63.5

59.5

50.5

50.0

48.0

52. 0

49. 5

47.0

51.5

49. 0

49. 0

48. 5

48.5

48. 0

47.0

45.5

45. 0

43. 5

42. 0

41. 0

40.0

38.5

36. 5

35. 0

31. 5

29. 5

25.5

23.0

22.0

21.5

21.0

22.5

24.0

52.1

67.5

59.5

50.0

50.0

48.0

49. 0

51. 0

45.0

47.0

46. 5

46. 5

46. 5

46.0

45. 5

46.0

44.5

43. 0

42. 0

42. 0

39. 5

37.5

34.5

31. 0

27. 5

24. 0

21. 5

20.5

20.0

21.0

21.0

21.0

22.5

24.0

50.2

10

67.0

57.5

51.5

50.5

49.0

50. 5

51. 0

46.0

47.5

47. 0

46. 5

47. 0

45.5

45. 5

46.0

44.0

43. 5

42. 0

42. 0

40. 0

39.0

36.0

32. 5

28. 5

25. 0

23. 0

22.0

21.5

22.0

22.0

21.5

22.5

24.0

50.5

11

67.0

60.5

51.5

51.5

50.5

51. 0

51. 5

50.0

47.5

47. 5

48. 0

48. 5

48.0

47. 0

46.5

46.0

46. 0

45. 0

45. 0

44. 0

43.0

40.0

36. 0

32. 5

29. 0

25. 0

23.0

22.0

22.0

22.0

21.5

22.5

24.0

53.2

12

66.1

59.8

51.8

52.0

51.0

49. 9

51. 0

48.8

49.6

50. 3

49. 1

49. 9

48.8

47. 8

47.6

47.1

47. 1

45. 3

45. 3

44. 3

43.8

40.3

36. 8

34. 9

29. 8

25. 3

22.5

21.5

21.5

21.5

21.3

22.5

24.0

54.3

13

65.0

59.0

52.0

52.5

51.5

48. 5

50. 5

47.0

51.0

52. 0

50. 0

51. 0

49.5

48. 5

48.5

48.0

48. 0

45. 5

45. 5

44. 5

44.5

40.5

37. 5

36. 5

30. 5

25. 5

22.0

21.0

21.0

21.0

21.0

22.5

24.0

55.1

14

65.5

60.0

54.5

55.0

54.0

51. 5

52. 5

50.5

52.0

51. 0

51. 5

51. 5

49.0

48. 5

48.0

47.5

47. 0

46. 0

45. 0

44. 0

42.5

40.0

38. 0

37. 0

34. 5

30. 0

25.5

25.5

24.0

22.0

21.0

22.5

24.0

54.2

15

65.0

58.8

53.8

54.8

54.0

53. 6

53. 3

50.8

51.5

51. 0

51. 0

52. 3

50.1

50. 6

49.1

47.8

47. 5

46. 5

45. 3

44. 3

42.8

40.0

38. 3

37. 3

33. 8

29. 5

25.3

24.4

23.3

22.0

21.3

22.5

24.0

54.7

16

64.5

57.0

53.0

54.5

54.0

55. 0

54. 0

51.0

51.0

51. 0

50. 5

53. 0

51.0

52. 0

50.0

48.0

48. 0

47. 0

45. 5

44. 5

43.0

40.0

38. 5

37. 5

33. 0

29. 0

25.0

23.0

22.5

22.0

21.5

22.5

24.0

55.2

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

88/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

f(Hz)

12

16

20

25

31

40

50

63

80

100

125

160

200

250

315

400

500

630

800

1k

1.25 k

1.6 k

2k

2.5 k

3. 15 k

4k

5k

6.3 k

8k

10 k

12. 5 k

16 k

20 k

LAeq

Pos.

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB(A)

By Pass mi nus Backg round


1

55.7

55.5

58.7

58.6

53.6

51.1

47.4

47.0

48.0

43.2

43.2

42.7

42.9

42.0

43.3

41.0

43.3

40.8

41.2

40.5

40. 4

39.9

45.5

35. 3

32. 2

29. 0

26. 5

25.1

21.9

18. 7

14. 9

##### #####
57.2

55.9

55.9

54.4

56.3

58.1

54.8

53.0

49.4

51.8

53.6

47.9

46.5

41.1

45.0

42.2

43.4

43.3

44.6

42.1

40.8

39.1

37. 9

37.6

35.5

30. 3

27. 8

25. 4

23. 8

22.8

19.9

16. 6

14. 9

50.4

54.2

55.8

54.4

58.5

57.5

57.0

56.4

53.9

54.8

54.9

50.6

46.6

49.2

48.1

46.8

47.4

45.4

45.0

44.3

43.3

41.5

40. 7

41.3

37.3

32. 1

30. 0

26. 6

24. 6

22.8

19.9

13. 4

14. 9

61.8

62.0

61.9

61.2

60.0

60.0

58.8

56.3

54.7

51.7

54.8

53.4

51.7

46.4

46.5

42.1

43.2

43.4

41.9

40.9

38.9

36.9

36. 4

37.1

35.5

32. 5

30. 0

28. 5

26. 1

21.5

17.2

13. 4

14. 9

61.0

60.8

61.8

61.3

60.7

56.8 #####

54.1

49.9

43.9

57.1

48.1

43.9

37.6

33.9 #####

36.1 #####

32.4

35.7

29.9

27.9 ##### ##### ##### #####

25. 2

21. 7

19. 1 #####

12.4

13. 4

14. 9

66.1

67.3

66.4

63.8

61.7

62.5

61.6

60.0

56.8

53.8

53.2

51.1

49.3

47.0 #####

44.7

43.4

42.4

41.8

41.3

66.5

67.7

68.9

67.9

65.9

62.8

61.7

59.1

56.7

54.7

53.6

51.1

45.2

45.2

39.4

46.4

45.0

43.9

43.3

42.3

42.3

41.6

41. 5

66.1

65.5

70.0

67.4

61.8

61.5

60.7

58.2

54.1

53.1

50.8

47.4

39.4 #####

37.9

39.6

35.9

39.7

43.8

41.0

40.0

39.4

39. 8

66.4

65.5

68.9

66.9

63.4

61.8

60.5

58.3

54.3

52.5

49.1

42.7

35.4 ##### #####

39.7

37.2

36.4

36.3

37. 0

38.1

10

#####

69.7

74.5

73.5

70.5

69.4

67.4

66.5

65.4

63.9

59.8

56.0

50.9

45.5

40.1

42.9

44.4

46.7

49.3

50.1

50.2

50.9

53. 0

11

67.0

70.6

73.0

74.0

76.0

72.5

68.9

67.4

66.4

64.4

60.2

55.1

49.8

43.2

42.7

42.2

42.2

46.8

48.3

49.4

49.0

50.6

52. 9

12

66.8

70.1

71.5

72.0

70.5

68.4

65.3

63.9

62.8

61.2

56.8

52.6

48.1

42.8

37.3

42.9

44.5

45.7

47.4

47.2

47.4

48.4

50. 3

13

63.9

68.0

67.9

64.7

62.7

61.3

59.5

57.1

54.3

49.7

46.2 #####

#NUM! ##### ##### ##### #####

39.6

41.7

42.2

40.7

43.1

14

63.2

70.1

69.9

66.2

65.7

62.1

60.9

59.5

52.9

51.9

49.2 #####

39.9 #####

38.9 #####

41.1

46.0

48.3

45.8

45.8

15

67.6

68.6

70.4

67.3

66.2

61.9

64.2

60.6

55.6

52.8

51.9 #####

47.5

50.4

49.8

48.2

50.1

50.6

51.0

49.3

48.5

16

55.4

62.4

63.6

63.5

66.8

61.0

60.0

60.0

53.6

49.9

49.4 #####

41.9

52.0

50.9

46.9

48.0

47.9

50.9

48.6

#NUM! ##### #####

42.6

43.4

41. 1

40.7

39.8

38. 0

36. 1

34. 7

32. 6

27.5

21.0

13. 4

14. 9

41.8

40.5

38. 5

37. 2

36. 3

34. 8

30.5

25.1

16. 6

17. 6

40.4

40.5

39. 0

37. 2

36. 8

35. 8

33.7

29.4

21. 4

14. 9

37.8

37. 4

36. 9

37. 4

37. 4

35.3

31.1

23. 4

14. 9

55.5

57.5

58. 5

60. 0

61. 5

62. 5

62.0

59.5

55. 0

45. 5

55.5

57.5

58. 5

59. 5

61. 5

62. 0

62.5

59.5

55. 0

46. 0

52.4

54.5

55. 5

57. 0

57. 5

59. 5

59.5

56.5

52. 0

42. 4

42. 9

43.8

41.1

37. 2

35. 8

33. 2

31. 1

27.6

21.9

13. 4

14. 9

46.0

46. 4

46.5

44.6

39. 5

37. 7

35. 6

33. 0

28.6

23.6

13. 4

14. 9

48.4

48. 1

48.7

52.4

42. 8

39. 9

36. 8

34. 7

31.0

26.3

20. 2

14. 9

49.0

51.7

52. 3

53.4

60.0

47. 9

46. 0

43. 0

41. 4

41.5

38.4

32. 6

24. 0

For those level s where th e backgr ound level is higher than signal level (level with by pass) a level of the si gnal level minus 10 dB is assum ed
1

51.5

49.5

55.7

55.5

58.7

58.6

53.6

51.1

47.4

47.0

48.0

43.2

43.2

42.7

42.9

42.0

43.3

41.0

43.3

40.8

41.2

40.5

40. 4

39.9

45.5

35. 3

32. 2

29. 0

26. 5

25.1

21.9

18. 7

14. 9

57.2

55.9

55.9

54.4

56.3

58.1

54.8

53.0

49.4

51.8

53.6

47.9

46.5

41.1

45.0

42.2

43.4

43.3

44.6

42.1

40.8

39.1

37. 9

37.6

35.5

30. 3

27. 8

25. 4

23. 8

22.8

19.9

16. 6

14. 9

50.4

54.2

55.8

54.4

58.5

57.5

57.0

56.4

53.9

54.8

54.9

50.6

46.6

49.2

48.1

46.8

47.4

45.4

45.0

44.3

43.3

41.5

40. 7

41.3

37.3

32. 1

30. 0

26. 6

24. 6

22.8

19.9

13. 4

14. 9

61.8

62.0

61.9

61.2

60.0

60.0

58.8

56.3

54.7

51.7

54.8

53.4

51.7

46.4

46.5

42.1

43.2

43.4

41.9

40.9

38.9

36.9

36. 4

37.1

35.5

32. 5

30. 0

28. 5

26. 1

21.5

17.2

13. 4

14. 9

61.0

60.8

61.8

61.3

60.7

56.8

47.0

54.1

49.9

43.9

57.1

48.1

43.9

37.6

33.9

33.5

36.1

34.5

32.4

35.7

29.9

27.9

27. 5

27.0

24.5

21. 5

25. 2

21. 7

19. 1

13.5

12.4

13. 4

14. 9

66.1

67.3

66.4

63.8

61.7

62.5

61.6

60.0

56.8

53.8

53.2

51.1

49.3

47.0

39.5

42.6

44.7

43.4

43.4

42.4

41.8

41.3

41. 1

40.7

39.8

38. 0

36. 1

34. 7

32. 6

27.5

21.0

13. 4

14. 9

66.5

67.7

68.9

67.9

65.9

62.8

61.7

59.1

56.7

54.7

53.6

51.1

45.2

45.2

39.4

46.4

45.0

43.9

43.3

42.3

42.3

41.6

41. 5

41.8

40.5

38. 5

37. 2

36. 3

34. 8

30.5

25.1

16. 6

17. 6

66.1

65.5

70.0

67.4

61.8

61.5

60.7

58.2

54.1

53.1

50.8

47.4

39.4

38.0

37.9

39.6

35.9

39.7

43.8

41.0

40.0

39.4

39. 8

40.4

40.5

39. 0

37. 2

36. 8

35. 8

33.7

29.4

21. 4

14. 9

66.4

65.5

68.9

66.9

63.4

61.8

60.5

58.3

54.3

52.5

49.1

42.7

36.0

34.0

35.5

35.4

33.0

32.0

39.7

37.2

36.4

36.3

37. 0

38.1

37.8

37. 4

36. 9

37. 4

37. 4

35.3

31.1

23. 4

14. 9

10

55.0

69.7

74.5

73.5

70.5

69.4

67.4

66.5

65.4

63.9

59.8

56.0

50.9

45.5

40.1

42.9

44.4

46.7

49.3

50.1

50.2

50.9

53. 0

55.5

57.5

58. 5

60. 0

61. 5

62. 5

62.0

59.5

55. 0

45. 5

11

67.0

70.6

73.0

74.0

76.0

72.5

68.9

67.4

66.4

64.4

60.2

55.1

49.8

43.2

42.7

42.2

42.2

46.8

48.3

49.4

49.0

50.6

52. 9

55.5

57.5

58. 5

59. 5

61. 5

62. 0

62.5

59.5

55. 0

46. 0

12

66.8

70.1

71.5

72.0

70.5

68.4

65.3

63.9

62.8

61.2

56.8

52.6

48.1

42.8

37.3

42.9

44.5

45.7

47.4

47.2

47.4

48.4

50. 3

52.4

54.5

55. 5

57. 0

57. 5

59. 5

59.5

56.5

52. 0

42. 4

13

63.9

68.0

67.9

64.7

62.7

61.3

59.5

57.1

54.3

49.7

46.2

40.5

39.0

37.5

37.5

37.0

36.0

39.6

41.7

42.2

40.7

43.1

42. 9

43.8

41.1

37. 2

35. 8

33. 2

31. 1

27.6

21.9

13. 4

14. 9

14

63.2

70.1

69.9

66.2

65.7

62.1

60.9

59.5

52.9

51.9

49.2

40.5

39.9

38.5

38.9

37.5

41.1

46.0

48.3

45.8

45.8

46.0

46. 4

46.5

44.6

39. 5

37. 7

35. 6

33. 0

28.6

23.6

13. 4

14. 9

15

67.6

68.6

70.4

67.3

66.2

61.9

64.2

60.6

55.6

52.8

51.9

42.0

47.5

50.4

49.8

48.2

50.1

50.6

51.0

49.3

48.5

48.4

48. 1

48.7

52.4

42. 8

39. 9

36. 8

34. 7

31.0

26.3

20. 2

14. 9

16

55.4

62.4

63.6

63.5

66.8

61.0

60.0

60.0

53.6

49.9

49.4

41.5

41.9

52.0

50.9

46.9

48.0

47.9

50.9

48.6

49.0

51.7

52. 3

53.4

60.0

47. 9

46. 0

43. 0

41. 4

41.5

38.4

32. 6

24. 0

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

89/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Copy val ues

Lp A

51.5

49.5

55.7

55.5

58.7

58.6

53.6

51.1

47.4

47.0

48.0

43.2

43.2

42.7

42.9

42.0

43.3

41.0

43.3

40.8

41.2

40.5

40. 4

39.9

45.5

35. 3

32. 2

29. 0

26. 5

25.1

21.9

18. 7

14. 9

52.5

57.2

55.9

55.9

54.4

56.3

58.1

54.8

53.0

49.4

51.8

53.6

47.9

46.5

41.1

45.0

42.2

43.4

43.3

44.6

42.1

40.8

39.1

37. 9

37.6

35.5

30. 3

27. 8

25. 4

23. 8

22.8

19.9

16. 6

14. 9

51.5

50.4

54.2

55.8

54.4

58.5

57.5

57.0

56.4

53.9

54.8

54.9

50.6

46.6

49.2

48.1

46.8

47.4

45.4

45.0

44.3

43.3

41.5

40. 7

41.3

37.3

32. 1

30. 0

26. 6

24. 6

22.8

19.9

13. 4

14. 9

54.0

61.8

62.0

61.9

61.2

60.0

60.0

58.8

56.3

54.7

51.7

54.8

53.4

51.7

46.4

46.5

42.1

43.2

43.4

41.9

40.9

38.9

36.9

36. 4

37.1

35.5

32. 5

30. 0

28. 5

26. 1

21.5

17.2

13. 4

14. 9

51.5

61.0

60.8

61.8

61.3

60.7

56.8

47.0

54.1

49.9

43.9

57.1

48.1

43.9

37.6

33.9

33.5

36.1

34.5

32.4

35.7

29.9

27.9

27. 5

27.0

24.5

21. 5

25. 2

21. 7

19. 1

13.5

12.4

13. 4

14. 9

45.4

66.1

67.3

66.4

63.8

61.7

62.5

61.6

60.0

56.8

53.8

53.2

51.1

49.3

47.0

39.5

42.6

44.7

43.4

43.4

42.4

41.8

41.3

41. 1

40.7

39.8

38. 0

36. 1

34. 7

32. 6

27.5

21.0

13. 4

14. 9

53.1

66.5

67.7

68.9

67.9

65.9

62.8

61.7

59.1

56.7

54.7

53.6

51.1

45.2

45.2

39.4

46.4

45.0

43.9

43.3

42.3

42.3

41.6

41. 5

41.8

40.5

38. 5

37. 2

36. 3

34. 8

30.5

25.1

16. 6

17. 6

53.5

66.1

65.5

70.0

67.4

61.8

61.5

60.7

58.2

54.1

53.1

50.8

47.4

39.4

38.0

37.9

39.6

35.9

39.7

43.8

41.0

40.0

39.4

39. 8

40.4

40.5

39. 0

37. 2

36. 8

35. 8

33.7

29.4

21. 4

14. 9

51.7

66.4

65.5

68.9

66.9

63.4

61.8

60.5

58.3

54.3

52.5

49.1

42.7

36.0

34.0

35.5

35.4

33.0

32.0

39.7

37.2

36.4

36.3

37. 0

38.1

37.8

37. 4

36. 9

37. 4

37. 4

35.3

31.1

23. 4

14. 9

49.3

10

55.0

69.7

74.5

73.5

70.5

69.4

67.4

66.5

65.4

63.9

59.8

56.0

50.9

45.5

40.1

42.9

44.4

46.7

49.3

50.1

50.2

50.9

53. 0

55.5

57.5

58. 5

60. 0

61. 5

62. 5

62.0

59.5

55. 0

45. 5

68.9

11

67.0

70.6

73.0

74.0

76.0

72.5

68.9

67.4

66.4

64.4

60.2

55.1

49.8

43.2

42.7

42.2

42.2

46.8

48.3

49.4

49.0

50.6

52. 9

55.5

57.5

58. 5

59. 5

61. 5

62. 0

62.5

59.5

55. 0

46. 0

68.8

12

66.8

70.1

71.5

72.0

70.5

68.4

65.3

63.9

62.8

61.2

56.8

52.6

48.1

42.8

37.3

42.9

44.5

45.7

47.4

47.2

47.4

48.4

50. 3

52.4

54.5

55. 5

57. 0

57. 5

59. 5

59.5

56.5

52. 0

42. 4

65.9

13

63.9

68.0

67.9

64.7

62.7

61.3

59.5

57.1

54.3

49.7

46.2

40.5

39.0

37.5

37.5

37.0

36.0

39.6

41.7

42.2

40.7

43.1

42. 9

43.8

41.1

37. 2

35. 8

33. 2

31. 1

27.6

21.9

13. 4

14. 9

52.5

14

63.2

70.1

69.9

66.2

65.7

62.1

60.9

59.5

52.9

51.9

49.2

40.5

39.9

38.5

38.9

37.5

41.1

46.0

48.3

45.8

45.8

46.0

46. 4

46.5

44.6

39. 5

37. 7

35. 6

33. 0

28.6

23.6

13. 4

14. 9

56.2

15

67.6

68.6

70.4

67.3

66.2

61.9

64.2

60.6

55.6

52.8

51.9

42.0

47.5

50.4

49.8

48.2

50.1

50.6

51.0

49.3

48.5

48.4

48. 1

48.7

52.4

42. 8

39. 9

36. 8

34. 7

31.0

26.3

20. 2

14. 9

60.1

16

55.4

62.4

63.6

63.5

66.8

61.0

60.0

60.0

53.6

49.9

49.4

41.5

41.9

52.0

50.9

46.9

48.0

47.9

50.9

48.6

49.0

51.7

52. 3

53.4

60.0

47. 9

46. 0

43. 0

41. 4

41.5

38.4

32. 6

24. 0

64.1

64.9

62.7

61.1

59.1

57.3

54.9

50.4

46.9

45.8

44.6

43.5

44.4

45.0

46.5

45.6

45.3

46.2

47. 4

49.2

52.3

50. 7

51. 9

53. 3

54. 3

54.3

51.5

47. 0

37. 6

61.9

St ep 1: Lp = mean lev el on measurement line


64.1

66.9

68.9

68.0

67.5

St ep 2+3: differanc e bet ween highest level in posit ion 10 (68.9 dB(A)) and lowes t l ev el in pos ition 5 (45. 4 dB(A))is > 10 dB(A)
The power plant has a northern di rectivity becaus e of the mayor infl uence of the suct ion s ide of the c ooling towers (northern suction side and reflection of southern s uc tion side
against UMA and UHA) Becaus e of t hi s directivit y a combined method will be applied (LwA determend with unc orrigated Struber level (normally st ep 2+3) will be adjusted with
measured direc tivy )
St ep 4: calculation surface factor Ls = 10xLOG ((2xSm + h.l)/So)
with

Sm = measuring surface = 200x191 =


h = meausuring hight =
l = lenght off meas uring line = 2x200+2x191 =
So = ref erence surface =

38200 m

Ls=

49. 1

LF=

-1.206585

7 m
782 m
1 m

St ep 5: calculation near field fact or LF = LOG ((d/(4x?Sp))


with

d = mean measurement dist anc e between Sm and Sp

30.7 m

Sp = sourc e surface = ground s urfac e of cooling towers+UMA+U HA+UEN+UHB+UGD+U BA+UAA+surface area bet ween UMA and cooling towers
15252 m

St ep 6: calculation microphone factor LM = 0


LM = 0 because of the use of a omnidirectional microphone

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

90/92

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

St ep 7: calculation air absorption factor L = 0.5 x alu x ?Sm


with

Sm = measuring surface = 200x191 =

38200 m

alu = air abs orption acc ording to ISO 9613-1 51993) at 70% relative humidity and 10C ac cording t o guide line Emola Begi s LNE (Flanders environment al legis lat ion)
2k

2.5 k

3. 15 k

4k

5k

dB/k m 0.079 0.079 0.079 0.079 0.079 0.079 0.079 0.122 0.186 0.280 0. 411 0. 584

12

16

20

25

31

40

50

63

80

100

125

160

0.797

1.040 1.310 1.600 1.930 2. 330 2. 870 3.660 4. 860 6. 730

9.66

14.30

21.50

32.80

50. 20

76.90 117.00 175.00 175.00 175.00 175.00

dB/m

0.001

0.001 0.001 0.002 0.002 0. 002 0. 003 0.004 0. 005 0. 007

0. 010

0. 014

0. 022

0.033

0. 050

0. 077

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0. 000 0. 001

200

250

315

400

500

630

800

1k

1.25 k

1.6 k

6.3 k

8k

10 k

12. 5 k

16 k

20 k

0. 117

0. 175

0.175

0.175

0.175

St ep 8: calculation LwA = Lp + Ls + LF + LM + L

LwA

12

16

20

25

31

40

50

63

80

100

125

160

200

250

315

400

500

630

800

1k

1.25 k

1.6 k

2k

2.5 k

3. 15 k

4k

5k

6.3 k

8k

10 k

12. 5 k

16 k

20 k

LwA

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB

dB(A)

112.0

114.8

116.9

115.9

115.4

112.8

110.6

109.0

107.1

105.3

102.8

93.7

92.5

91.4

92.4

92.9

94.4

93.5

93.2

94.1

95. 3

97.1 100.2

98. 7

99. 9 101. 3 102. 3 102.4

99.6

95. 1

85. 7

109.9

98.4

94.9

Calculation directivity

LwA

South surface (s urf ac e is 2 x 7 x 191m =

2674 m

10LOG S=

34. 27 dB

51.5

49.5

55.7

55.5

58.7

58.6

53.6

51.1

47.4

47.0

48.0

43.2

43.2

42.7

42.9

42.0

43.3

41.0

43.3

40.8

41.2

40.5

40. 4

39.9

45.5

35. 3

32. 2

29. 0

26. 5

25.1

21.9

18. 7

14. 9

57.2

55.9

55.9

54.4

56.3

58.1

54.8

53.0

49.4

51.8

53.6

47.9

46.5

41.1

45.0

42.2

43.4

43.3

44.6

42.1

40.8

39.1

37. 9

37.6

35.5

30. 3

27. 8

25. 4

23. 8

22.8

19.9

16. 6

14. 9

50.4

54.2

55.8

54.4

58.5

57.5

57.0

56.4

53.9

54.8

54.9

50.6

46.6

49.2

48.1

46.8

47.4

45.4

45.0

44.3

43.3

41.5

40. 7

41.3

37.3

32. 1

30. 0

26. 6

24. 6

22.8

19.9

13. 4

14. 9

61.8

62.0

61.9

61.2

60.0

60.0

58.8

56.3

54.7

51.7

54.8

53.4

51.7

46.4

46.5

42.1

43.2

43.4

41.9

40.9

38.9

36.9

36. 4

37.1

35.5

32. 5

30. 0

28. 5

26. 1

21.5

17.2

13. 4

14. 9

61.0

60.8

61.8

61.3

60.7

56.8

47.0

54.1

49.9

43.9

57.1

48.1

43.9

37.6

33.9

33.5

36.1

34.5

32.4

35.7

29.9

27.9

27. 5

27.0

24.5

21. 5

25. 2

21. 7

19. 1

13.5

12.4

13. 4

14. 9

Lp

58.5

58.5

59.3

58.5

59.1

58.4

55.7

54.6

52.0

51.3

54.5

49.8

47.6

45.2

45.1

43.0

43.9

42.7

43.0

41.5

40.5

38.9

38. 3

38.4

39.8

32. 1

29. 7

26. 9

24. 7

22.4

19.3

15. 7

14. 9

93.5

92.8

93.4

92.6

89.9

88.9

86.2

85.6

88.8

84.1

81.8

79.5

79.4

77.2

78.2

77.0

77.3

75.8

74.7

73.2

72. 6

72.7

74.1

66. 3

63. 9

61. 2

58. 9

56.6

53.5

49. 9

49. 1

LwA = Lp + 10xLOGS
92.8

92.8

East surface (surface is 2 x 7 x 200m =

2800 m

10LOG S=

86.0

34. 47 dB

61.0

60.8

61.8

61.3

60.7

56.8

47.0

54.1

49.9

43.9

57.1

48.1

43.9

37.6

33.9

33.5

36.1

34.5

32.4

35.7

29.9

27.9

27. 5

27.0

24.5

21. 5

25. 2

21. 7

19. 1

13.5

12.4

13. 4

14. 9

66.1

67.3

66.4

63.8

61.7

62.5

61.6

60.0

56.8

53.8

53.2

51.1

49.3

47.0

39.5

42.6

44.7

43.4

43.4

42.4

41.8

41.3

41. 1

40.7

39.8

38. 0

36. 1

34. 7

32. 6

27.5

21.0

13. 4

14. 9

66.5

67.7

68.9

67.9

65.9

62.8

61.7

59.1

56.7

54.7

53.6

51.1

45.2

45.2

39.4

46.4

45.0

43.9

43.3

42.3

42.3

41.6

41. 5

41.8

40.5

38. 5

37. 2

36. 3

34. 8

30.5

25.1

16. 6

17. 6

66.1

65.5

70.0

67.4

61.8

61.5

60.7

58.2

54.1

53.1

50.8

47.4

39.4

38.0

37.9

39.6

35.9

39.7

43.8

41.0

40.0

39.4

39. 8

40.4

40.5

39. 0

37. 2

36. 8

35. 8

33.7

29.4

21. 4

14. 9

66.4

65.5

68.9

66.9

63.4

61.8

60.5

58.3

54.3

52.5

49.1

42.7

36.0

34.0

35.5

35.4

33.0

32.0

39.7

37.2

36.4

36.3

37. 0

38.1

37.8

37. 4

36. 9

37. 4

37. 4

35.3

31.1

23. 4

14. 9

Lp

65.6

65.9

68.0

66.1

63.1

61.5

60.3

58.3

55.0

52.8

53.6

49.0

44.9

42.9

37.7

41.9

41.5

40.8

42.0

40.5

39.8

39.2

39. 3

39.6

38.9

37. 3

36. 0

35. 5

34. 5

31.8

27.2

19. 5

15. 6

102.5

100.6

97.6

96.0

94.7

92.8

89.4

87.2

88.1

83.4

79.4

77.4

72.2

76.4

76.0

75.3

76.4

75.0

74.3

73.7

73. 7

74.0

73.3

71. 8

70. 5

70. 0

69. 0

66.2

61.7

54. 0

50. 0

LwA = Lp + 10xLOGS
100.1

100.4

SGS Belgium NV
Reportnumber : 10.0102-1-v3

28/04/2010

91/92

85.9

Noise acceptance test BFG Power Plant Gent

Siemens NV Energy

Nort h surface (surface is 2 x 7 x 191m =

2674 m

10LOG S=

34. 27 dB

66.4

65.5

68.9

66.9

63.4

61.8

60.5

58.3

54.3

52.5

49.1

42.7

36.0

34.0

35.5

35.4

33.0

32.0

39.7

37.2

36.4

36.3

37. 0

38.1

37.8

37. 4

36. 9

37. 4

37. 4

35.3

31.1

23. 4

14. 9

10

55.0

69.7

74.5

73.5

70.5

69.4

67.4

66.5

65.4

63.9

59.8

56.0

50.9

45.5

40.1

42.9

44.4

46.7

49.3

50.1

50.2

50.9

53. 0

55.5

57.5

58. 5

60. 0

61. 5

62. 5

62.0

59.5

55. 0

45. 5

11

67.0

70.6

73.0

74.0

76.0

72.5

68.9

67.4

66.4

64.4

60.2

55.1

49.8

43.2

42.7

42.2

42.2

46.8

48.3

49.4

49.0

50.6

52. 9

55.5

57.5

58. 5

59. 5

61. 5

62. 0

62.5

59.5

55. 0

46. 0

12

66.8

70.1

71.5

72.0

70.5

68.4

65.3

63.9

62.8

61.2

56.8

52.6

48.1

42.8

37.3

42.9

44.5

45.7

47.4

47.2

47.4

48.4

50. 3

52.4

54.5

55. 5

57. 0

57. 5

59. 5

59.5

56.5

52. 0

42. 4

13

63.9

68.0

67.9

64.7

62.7

61.3

59.5

57.1

54.3

49.7

46.2

40.5

39.0

37.5

37.5

37.0

36.0

39.6

41.7

42.2

40.7

43.1

42. 9

43.8

41.1

37. 2

35. 8

33. 2

31. 1

27.6

21.9

13. 4

14. 9

Lp

65.3

69.1

71.8

71.5

71.2

68.6

65.7

64.3

63.2

61.3

57.2

52.7

47.7

42.2

39.4

41.1

41.9

44.6

46.7

47.2

47.1

48.2

50. 2

52.6

54.5

55. 5

56. 8

58. 3

59. 3

59.3

56.5

52. 0

42. 7

106.1

105.8

105.5

102.9

100.0

98.6

97.4

95.6

91.5

87.0

82.0

76.5

73.6

75.3

76.2

78.8

80.9

81.5

81.4

82.5

84. 5

86.9

88.8

89. 8

91. 1

92. 6

93. 6

93.6

90.8

86. 3

76. 9

LwA = Lp + 10xLOGS
99.6

103.4

West surface (surface is 2 x 7 x 200m =

2800 m

10LOG S=

100.2

34. 47 dB

13

63.9

68.0

67.9

64.7

62.7

61.3

59.5

57.1

54.3

49.7

46.2

40.5

39.0

37.5

37.5

37.0

36.0

39.6

41.7

42.2

40.7

43.1

42. 9

43.8

41.1

37. 2

35. 8

33. 2

31. 1

27.6

21.9

13. 4

14. 9

14

63.2

70.1

69.9

66.2

65.7

62.1

60.9

59.5

52.9

51.9

49.2

40.5

39.9

38.5

38.9

37.5

41.1

46.0

48.3

45.8

45.8

46.0

46. 4

46.5

44.6

39. 5

37. 7

35. 6

33. 0

28.6

23.6

13. 4

14. 9

15

67.6

68.6

70.4

67.3

66.2

61.9

64.2

60.6

55.6

52.8

51.9

42.0

47.5

50.4

49.8

48.2

50.1

50.6

51.0

49.3

48.5

48.4

48. 1

48.7

52.4

42. 8

39. 9

36. 8

34. 7

31.0

26.3

20. 2

14. 9

16

55.4

62.4

63.6

63.5

66.8

61.0

60.0

60.0

53.6

49.9

49.4

41.5

41.9

52.0

50.9

46.9

48.0

47.9

50.9

48.6

49.0

51.7

52. 3

53.4

60.0

47. 9

46. 0

43. 0

41. 4

41.5

38.4

32. 6

24. 0

51.5

49.5

55.7

55.5

58.7

58.6

53.6

51.1

47.4

47.0

48.0

43.2

43.2

42.7

42.9

42.0

43.3

41.0

43.3

40.8

41.2

40.5

40. 4

39.9

45.5

35. 3

32. 2

29. 0

26. 5

25.1

21.9

18. 7

14. 9

Lp

63.3

67.1

67.7

64.8

64.9

61.2

60.8

58.6

53.5

50.7

49.3

41.6

43.4

47.8

47.0

44.5

46.1

46.8

48.5

46.5

46.3

47.6

47. 9

48.7

54.0

43. 0

40. 8

37. 9

36. 2

35.3

32.0

26. 1

18. 7

102.2

99.3

99.3

95.6

95.2

93.1

87.9

85.2

83.8

76.1

77.9

82.2

81.5

79.0

80.6

81.2

83.0

81.0

80.8

82.1

82. 4

83.2

88.5

77. 4

75. 3

72. 4

70. 6

69.7

66.5

60. 6

53. 2

92. 7

93. 6

LwA = Lp + 10xLOGS
97.8

101.6

93.9

LwA tot al surface South + East + North + W est


104.4

106.9

108.9

107.8

107.1

104.6

102.4

100.8

98.7

96.9

94.8

90.1

86.6

85.5

84.3

83.2

84.2

84.7

86.2

85.3

85.0

85.8

87. 0

88.7

91.8

90. 1

91. 2

93.6

90.8

86. 3

77. 0

101. 3

114.8

116.9

115.9

115.4

112.8

110.6

109.0

107.1

105.3

102.8

98.4

94.9

93.7

92.5

91.4

92.4

92.9

94.4

93.5

93.2

94.1

95. 3

97.1 100.2

98. 7

99. 9 101. 3 102. 3 102.4

99.6

95. 1

85. 7

109. 9

8.3

8.4

8.0

8.3

8.2

8.2

8.2

8.3

8.2

8.2

8.3

8.3

8.4

8.4

8.4

8.6

8. 6

8.7

8.7

8. 8

8. 8

8. 8

8. 8

8.5

LwA st rber
112.0

dif ferance between LwA struber and s um area sources of 14m heigt
7.7

7.9

8.0

8.1

8.3

8.2

8.2

8.2

8.3

8.2

The total LwA of 109.9 dB(A) will be modelled in four lines with LwA per line at 7m heigt at side S, E , N and W wit h LwA
LwA line Sout h (length 191m)
100.5 100.7 101. 5 100. 9 101. 6 100.8

98. 1

97.1

94.6

94. 0

96. 8

92. 4

90.1

87. 7

87.6

85.4

86. 4

85. 3

85. 5

84. 0

83.0

81.5

80. 9

81. 1

82. 5

74. 9

72.6

69.9

67.6

65.4

62.3

58.7

57.9

94.6

107.8 108.3 110. 5 108. 7 105. 8 104.2 102.9 101.0

97.8

95. 6

96. 0

91. 7

87.6

85. 6

80.4

84.5

84. 2

83. 6

84. 6

83. 2

82.5

82.0

82. 1

82. 4

81. 8

80. 4

79.1

78.6

77.7

75.0

70.4

62.8

58.8

94.5

107.3 111.3 114. 1 113. 9 113. 7 111.1 108.2 106.8 105.8 104.0

99. 4

95. 3

90.2

84. 7

81.8

83.5

84. 4

87. 1

89. 1

89. 7

89.6

90.8

92. 8

95. 3

97. 3

98. 4

99.7

101.3

102.3

102.3

99.5

95.0

85.7

108.7

LwA line East (length 200m)

LwA line North (length 191m)

LwA line W es t (length 200m)


105.5 109.5 110. 2 107. 4 107. 6 103.8 103.4 101.3
sum

91. 8

84. 4

86.1

90. 5

89.7

87.2

88. 7

89. 5

91. 2

89. 2

89.1

90.4

90. 7

91. 6

96. 9

86. 0

83.9

81.1

79.3

78.5

75.2

69.3

62.0

102.4

112.0 114.8 116. 9 115. 9 115. 4 112.8 110.6 109.0 107.1 105.3 102.8

98. 4

94.9

93. 7

92.5

91.4

92. 4

92. 9

94. 4

93. 5

93.2

94.1

95. 3

97. 1

100.2

98. 7

99.9

101.3

102.3

102.4

99.6

95.1

85.7

109.9

SGS Belgium NV
Reportnumber : 10.0102-1-v3

96.3

93. 6

28/04/2010

92/92