S A U D I O G E R P R O D U C T I V I T Y R AT E

TRADE

ACTIVITY DESCRIPTION

005

EARTHWORKS Bed manual Final Grading in Normal soil


EARTHWORKS Bed manual Final Grading in Rock
FOUNDATIONS
REINFORCED CONCRETE STRUCTURE
GROUND SLAB/CRAWL SPACE
VERTICAL STRUCTURE
HORIZONTAL STRUCTURE
MASONRY WORKS
BLOCKS (0.10; 0.15; 0.20)
REINFORCEMENT
REINFORCEMENT AND BLOCKS
PLASTERS
SCREEDS
BLOCKS FOR CLOSING SHAFTS
WATERPROOFING
INSULATING
WATERPROOF 2 LAYERS
DRAINING
PROTECTION WITH SCREED
PROTECTION WITH GRAVEL
MULTI-LAYERS WATERPROOF
INTERIOR (DAMP ROOM)
TECHNICAL ROOM (SURFACE<50 m)
TECHNICAL ROOM (SURFACE>50 m)
SWIMMING POOL AND FOUNTAIN
ROOF-COVERING TILES
TILES
DOMES
INSULATING LINING
DRY ROOM (CD1 panels 3.00 x 1.20)
DAMP ROOM (CD10 Siporex)
Ceiling CD30 (fibralith)
DRY AREA PARTITION
DRY ROOM WITH INSULATION (HT < 3m)
DRY ROOM WITH INSULATION (HT > 3m)
MOVABLE PARTITION
RAIL
PANELS
FALSE CEILING
MINERAL FIBER
METAL
FIBROUS PLASTER-GYPSUM
SIMPLE STAFF (Flat,no cornice with bank moulding)
MEDIUM STAFF (Cornice, rosace, frise)
COMPLEX STAFF (Cornice with fillet,rosace,luminous ramp)
EXTERIOR WOOD JOINERY
WINDOW (FRAME)
WINDOW (LEAF)
WINDOW (GLAZING)
WINDOW: ALL (Frame,window leaf, glazing)
DOOR (FRAME)
DOOR (LEAF)
ALL (Door frame & leaf)
DOOR NOBLE (VIP)
DOOR STAFF
EXTERIOR ALUMINUM JOINERY

010
020

030

080

090

100

110

120

130

131

150

151
160

Estimated
Unit
Quantity

500
500

Prepared by: Russel Carandang, RCE

Days

Gv. Qty

Gv. Days

m
m
m
m
m
m
m

0
0
0
0
0
0
0

70
18
5
5
5
3
5

1.0
1.0
1.0
1.0
1.0
1.0
1.0

m
ML
m
m
m
m

0
0
0
42
0
42

5
10
3
3
70
3

1.0
1.0
1.0
1.0
1.0
1.0

m
m
m
m
m
m
m
m
m
m

0
0
0
0
0
0
0
0
0
0

175
150
150
70
125
30
10
25
100
400

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

m
m

0
0

2
5

1.0
1.0

m
m
m

0
0
0

25
17
30

1.0
1.0
1.0

m
m

0
0

7
4

1.0
1.0

m
m

0
0

10
20

1.0
1.0

m
m

0
0

20
15

1.0
1.0

m
m
m

0
0
0

3
2
2

1.0
1.0
1.0

u
u
u
u
u
u
u
u
u

0
0
0
0
0
0
0
0
0

4
4
6
1
10
2
1
1
3

1.0
1.0
1.0
1.0
1.0
1.0
0.6
1.0
1.0

Page 1

190

191

200
210
211
220

230
240

250

260

261

270

300

320

WINDOW (Frame)
WINDOW (Leaf)
WINDOW (Glazing)
WINDOW (Bulletproof glazing)
WINDOW ALL STANDARD
ROOLING SHUTTER FOR STANDARD WINDOW
DOOR (Frame)
DOOR (Leaf)
DOOR (Block)
ROOLING SHUTTER FOR STANDARD DOOR
METAL WORKS
METAL GATE
METAL DOOR
SUPPORT CHANDELIER
SUPPORT CHANDELIER TEST
SUPPORT MARBLE (VANITY)
BATHROOM ACCESSTRAP
DECORATIVE METAL WORKS
RAILING
STAIR HANDRAIL
MIRRORS
GLUED CARPET
VINYL TILE
PLAIN CARPET
DESIGN CARPET
TILING WORKS
GLUED WALL TILLING
GLUED FLOOR TILLING
STRETCHED WALL FABRICS
INTERNAL MARBLE
MATCHED
GLUED
FAADE SURFACE FINISHING
MANUAL SANDTEX
MECHANICAL SANDTEX
CLOSE SURFACE
OPEN SURFACE
INTERIOR PAINTING
WALL (MAKING GOOD)
WALL (MECHANICAL SANDTEX)
ROLLER PAINTING
SPRAY GUN PAINTING
CEILING (PLASTER)
CEILING (SANDPAPER)
CEILING (SPRAYGUN PAINTING)
CEILING (COLOR FILLET)
BONDED COVERING WALL FABRICS
MAKING GOOD
MECHANICAL SANDPAPER
1 LAYER FIXING
LAYING
EXTERNAL MARBLE
NORMAL ELEVATION
DIFFICULT ELEVATION
CURTAINS
RAIL
FABRICATION
LAYING
LIGHTING FIXTURES AND CHANDELIERS
CHANDELIER
WALL LIGHT
Prepared by: Russel Carandang, RCE

u
u
u
u
u
u
u
u
u
u

0
0
0
0
0
0
0
0
0
0

10
10
5
5
1
1
1
1
1
1

1.0
1.0
1.0
1.0
0.4
0.4
0.4
0.4
0.5
0.4

u
u
u
u
u
u

0
0
0
0
0
0

1
3
4
4
3
4

1.0
1.0
1.0
2.0
1.0
1.0

u
u
u
m
m
m
m

0
0
0
0
0
0
0

1
1
1
200
100
30
20

1.0
1.0
1.0
1.0
1.0
1.0
1.0

m
m
m

0
0
0

6
8
100

1.0
1.0
2.0

m
m

0
0

2
5

1.0
1.0

m
m
m
m

0
0
0
0

20
150
250
115

1.0
1.0
1.0
1.0

m
m
m
m
m
m
m
m

0
0
0
0
0
0
0
0

250
450
150
600
25
50
80
2

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

m
m
m
m

0
0
0
0

250
450
200
60

1.0
1.0
1.0
1.0

m
m

0
0

4
2

1.0
1.0

ML
pair
u

0
0
0

20
1
1

1.0
1.0
0.3

u
u

0
0

1
10

1.0
1.0
Page 2

330

WOOD FITTINGS
WOOD WALL FITTING
WOOD CORNICE
WOOD SKIRTING
WOOD MOULDING
STAFF VERTICAL
CUPBOARD
CURTAIN BOX
400 HVAC GLOBAL PER m
DUCTING AND PIPPING
EQUIPMENT
FINISHING
TESTING
410 PLUMBING GLOBAL PER m
PIPES AND NETWORKS
EQUIPMENT
FINISHING AND TESTING
420/430 INDUSTRIAL KITCHEN/PANTRIES
ELECTRIC EUROPEAN (VIP-ROYALE)
ELECTRIC STAFF
GAZ EUROPEAN (VIP-ROYALE)
GAZ STAFF
450/460 HIGH CURRENT / LOW CURRENT GLOBAL PER m
INCORPORATIONS
CABLE TRAY
PIPPING AND WIRING
FINISHING AND TESTING
790 LANDSCAPING
800 SIGN POST INTERIOR
SIGN POST EXTERIOR
900 EXTERNAL PAVING
910 EXTERNAL FOUNTAIN MARBLE
EXTERNAL FOUNTAIN MOSAIC
1000 FINAL CLEANING

Prepared by: Russel Carandang, RCE

m
m
ML
ML
ML
m
u
m
m
m
m
m
m
m
m
m
m

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1
2
2
20
25
2
1
1
1
1
1
1
1
1
1
1
1

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.1
0.3
0.4
0.3
0.1
0.5
0.1
0.3
0.0

u
u
u
u
m
m
m
m
m
m
u
u
m
m
m
m

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1
1
1
1
1
1
1
1
1
1
10
5
8
1
3
300

15.0
10.0
21.0
16.0
0.7
0.1
0.2
0.3
0.0
0.2
1.0
1.0
1.0
1.0
1.0
1.0

Page 3

Gv.men

Min.Req'd
No.of men

Hrs/unit

1
1
1
1
1
1
1

1
1
1
1
1
1
1

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1
1
1
1
6
1

1
1
1
4
6
4

0.00
0.00
0.00
138.89
0.00
138.89

3
1
1
6
6
1
1
1
1
3

3
1
1
6
6
1
1
1
1
3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1
1

1
1

0.00
0.00

2
3
4

2
3
4

0.00
0.00
0.00

2
2

2
2

0.00
0.00

2
2

2
2

0.00
0.00

2
2

2
2

0.00
0.00

1
1
1

1
1
1

0.00
0.00
0.00

2
4
2
2
2
2
2
1
1

2
4
2
2
2
2
2
1
1

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Prepared by: Russel Carandang, RCE

Page 4

2
2
2
8
2
2
2
2
2
2

2
2
2
8
2
2
2
2
2
2

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4
3
2
1
2
2

4
3
2
1
2
2

0.00
0.00
0.00
0.00
0.00
0.00

4
4
1
2
3
2
2

4
4
1
2
3
2
2

0.00
0.00
0.00
0.00
0.00
0.00
0.00

2
2
4

2
2
4

0.00
0.00
0.00

1
1

1
1

0.00
0.00

2
2
12
12

2
2
12
12

0.00
0.00
0.00
0.00

3
4
2
2
2
4
2
1

3
4
2
2
2
4
2
1

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3
4
2
2

3
4
2
2

0.00
0.00
0.00
0.00

1
1

1
1

0.00
0.00

1
1
1

1
1
1

0.00
0.00
0.00

1
1

1
1

0.00
0.00

Prepared by: Russel Carandang, RCE

Page 5

1
1
1
1
1
1
1
0
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6
6
6
6
1
1
1
1
1
1
1
1
1
1
1
8

6
6
6
6
1
1
1
1
1
1
1
1
1
1
1
8

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Prepared by: Russel Carandang, RCE