9500 MPR Quick Start Guide MPT-HC-HQAM / XP-HQAM / MC Overview and ODU-to-IDU Connections

For MPR-e and MPR-1c, if the SW version of the existing network is anterior to R5.0.0, all new or repaired MPT-MC/HC/XP received with a SW Release 5.2.0 must be downgraded to the network SW Release using MCT / TCO R5.0.0.
This MCT must be first downloaded from OLCS server to a laptop, where the downgrade can be performed.

Configuration [1+0]

MPT-HC-HQAM to MSS
Optical

MPT-HC-HQAM to Ethernet
device Optical

Not valid for


MPT-XP-HQAM
Pigtail
RJ45/N
XPIC port

CAT5e cable
data and DC
1AC015760006

CAT5e cable
data and DC
1AC015760006

MPTaccess
or EASv2 board

Maintenance port

MPT-MC specificities :

MSS-4/8

MSS-1/4/8

Optical user port


(SFP to be inserted)

- Only RPS protection without cable


- XPIC feature not supported
- Optical connection not supported

Power feed over Ethernet port

RPS LC-LC optical cord


RPS LC-LC optical cord 3CC52169XXXX

MSS-1c

Power injector plug-in


3CC50120AAXX

MSS-O

[1+1] MPT-HQAM to MSS


Electrical
RPS cord when needed

RPS cord when needed

XPIC cord

XPIC cord

Ortho Mode Transducer OMT


6, 7,8 and 10,5 / 11 GHz

Pigtail
RJ45/N

QMA
connector

Option 1
Fiber

Option 2
To any switch or router

MSS

If Coax port MSS-4/8

MPT Powering devices


MPT to Power Injector Box Electrical

Pigtail RJ45/N

MSS-1/4/8

CAT5e cable
data and DC
1AC015760006

Note: See the applicable MPR user manual


for other supported configurations.

Ortho Mode Transducer OMT


11 to 23 GHz

No MPTaccess board
If PFoE port MSS-1/4/8/1c + Pigtail
MPT
Access board

Coaxial cable to station


battery with low-pass
filter, pigtail, lightning
arrestor

MPT-HC-HQAM with MPT


Power Unit - Optical

Not valid for


MPT-XP-HQAM

With MPT-HC-HQAM / MPT-XP-HQAM in 1+1


configuration,
when channel spacing is 40, 50, 56 or 60 MHz, the
two ODUs must be connected together with an
RPS cord (with different lengths available).
Optionnal optical SFP modules must be previously
inserted.

Pigtail
RJ45/N

Coaxial

[1+1] MPT-HQAM to MSS


Optical

Note :
Coupler 6, 7, 8 and 10,5 / 11 GHz

Fiber

RJ45 cable data

Maintenance port
Power feed over Ethernet port

Coupler 11 to 38 GHz

Configuration [2+0] XPIC

MPT through power injector


plug-in Electrical

Optical RPS port

Coupler
1+1 or 2+0 Copolar

Configuration [1+1]

MPT-MC / MPT-HC-HQAM to
MSS Electrical

MPT-HC-HQAM
MPT-XP-HQAM

MPT-MC

[2+0] XPIC MPT-HQAM to MSS


Electrical
MPT1 pol V
MPT2 pol H

Coaxial
Fiber
MSS-1/4/8
Note: See the applicable MPR user manual
for other supported configurations.

[2+0] XPIC MPT-HQAM to MSS


Optical

CAT5e cable
data and DC
1AC015760006
RJ45 to any switch
or router

Pigtail
RJ45/N
Fiber
Max 4 MPT

Max 2 MPT

N connector

48 V DC

48 V DC

Power injector box 3CC50129XXXX

MPT-HQAM with MPT


Extended Power Unit-Electrical

Power unit 3CC50173XXXX

MPT-HQAM with MPT


Extended Power Unit Optical

MPT1 pol V
MPT2 pol H

Pigtail
RJ45/N

XPIC cord

CAT5e cable
data and DC
1AC015760006

MSS-1/4/8
Note: See the applicable MPR user manual
for other supported configurations.

XPIC cord

Pigtail RJ45/N
Coaxial
Fiber

CAT5e cable
data and DC
1AC015760006

RJ45 to any
switch or router

Coaxial

48 V or
+24 V DC

48 V or
+24 V DC

MSS-1/4/8
Note: See the applicable MPR user manual
for other supported configurations.

Fiber

Max 2 MPT
Extended Power unit 3CC50174XXXX

Max 2 MPT
Extended Power unit 3CC50174XXXX

9500 MPR Quick Start Guide MPT-HC-HQAM / XP-HQAM / MC Installation Steps

1.2 Ground the MSS using the ground screw on


the front panel of the bracket on the right side of
the MSS; use grounding kit 3CC13423AAXX.
1.3 Connect the power supply cable between the
MSS and breakers or power panel:
MSS1 and power injector box: 2x1 mm
1AC007800068
MSS4/8: 2x4 mm 3DB18271AAXX
MSS8 (full config): 2x6 mm 3CC52190AAXX
1.4 Install the integrated DDF; (see the applicable
manual 75 , 120 , RJ45).

2.1 Assemble & install the non-integrated


antenna. (Refer to antenna instructions)
2.2 Verify the polarization on the antenna and
change it if required

Install MPT [1+0] on


integrated antenna

Note: MPT toolbox is mandatory 3CC50098AAXX


3.1 Assemble & Install the Integrated antenna .
(Refer to antenna instructions)
3.2 Verify the polarization on the antenna and
change it if required

Install coupler for


MPT [1+1]

Set MPT polarization

Factory delivery is in V polarization.


To change the polarization, loosen the two
screws and line up the H or V polarization with
the polarization references.

5.1 Set the coupler polarization (antenna side) to


match the antenna polarization (same process as
steps 3.1 to 3.3)
WARNING: Verify that the indication
engraved
on the coupler is directed toward the pole side.

3.3 Put silicon grease only if required in the


installation instructions of the antenna, see below
Reference
polarization

2.3 Assemble & install the pole mounting for


remote ODU
2.4 Put silicon grease on nose o-ring only if
required in the installation instructions.
2.5 Set the appropriate polarization on the MPT
(see step 4); the connectors must face down.

3.4 Set the appropriate polarization on the MPT


(see step 4); the connectors must face down.

2.6 Open the four locking hooks on the MPT and


slide the MPT on the remote nose adapter.

3.5 Open the four locking hooks on the MPT and


slide the MPT on the antenna nose adapter.

2.7 Secure the MPT with the four hooks.

3.6 Secure the MPT with the four hooks.

Connect the MPT grounding connector to the nearest grounding plate, using the ground cable
16mm 3CC08166AAXX. Washer, screw and lug are provided with the MPT.

6.2

6.1

Install MPT [2+0] with OMT

6.1 Follow the same process described in steps 3.1


and 3.3 . Set the OMT then connect to the antenna.
6.2 Set the appropriate polarization on the MPT (see
step 4); the connectors must face down.
6.3 Open the four locking hooks on the MPT and slide
the MPT on the OMT nose adapter.

Example :
11 to 38 GHz
coupler
5.2 Install and set MPT polarization, for high
frequency, turn the MPT polarization disk to be
aligned with the coupler waveguide. The connectors
must face down.

WARNING: To avoid equipment damage, do not


remove the waterproof tape that is glued on the
MPT waveguide.

11.1

5.3 for low frequency, turn the whole MPT


5.4 Secure the module with the four hooks on the
corresponding brackets.

Example MPT-HQAM installation with MSS

Ground the MPT

6.4 Secure the MPT with the four hooks.


H

- ETSI rack (21 in.)


-Standard rack (19 in.)
- wall mount
- Full outdoor, with MSS-O . Refer to dedicated
quick start guide

Install MPT [1+0] on


non integrated antenna

1.1 Install the MSS indoor unit in one of four


supported configurations
(see the applicable user manual):

Install MSS unit

Assemble and connect electrical connectors

For an explanation, see the step


indicated by the numbered circle.

Note: This is a guideline for assembling the R2CT with the RJ45 connector for CAT5e cable. For details
see Best practice and tips MPR R2CT and RJ45 connector and grounding 3FQ 24013 1100 PCZZA.

RPS cord when needed

8.1 Prepare the R2CT connector, insert the CAT5e cable, and insert the RJ45 plug unlocking clip.

Kit for Ethernet cable or coaxial cable ( 6,85) 1AD040130004


Kit for coaxial cable ( 10,3) 1AB128500002

Assembled R2CT
connector

R2CT connector
1AB150990002

11.3

8.2 Mount the RJ45 connector using the RJ45 hirose tool.
RJ45
connector

XPIC cable

RJ45 connector
1AB074610027

RPS cable

For MPT ANSI

For MPT ETSI

Ground the indoor


Outdoor cable

9.1 Put one grounding kit :


- On top, when it comes on the tower
- On bottom, when it leaves the tower
- At the entrance of the building
Maximum distance between 2 Grounding Kits : 50m

10

Connect optical cables

10.1 For MPT optical connection to MSS, used


optical LC-LC preassembled cable
3CC52170XXXX. Different lengths exist.
10.2 Use coaxial cable with N-to-Ethernet pairs
pigtails (plus RJ45 and R2CT connectors) for MPT
power supply.

RJ45 hirose tool 1AD160490001 or


supplier ref: HT601/TM21-88P

8.3 Hoist the cable using the buckle on the R2CT cap.
8.4 Connect the assembled R2CT to the MPT, mount another RJ45 plug indoors, and verify all cables
and connectors using a cable tester (to avoid short circuit and verify continuity).

9
Electrical
CAT5e

11
Pigtail RJ45/N
Fiber + SFP

Perform alignment

11.1 Plug the connector on the maintenance port on


the MPT

10
Coaxial

11.2 Plug the banana plugs into the multi-meter to


align the antenna

Light Service Kit for Alignment 3CC52191AAXX

Refer to the 9500MPR User Manual.

Measurement

1.2
1.1

To access online customer support


(OLCS), go to:
http://alcatel-lucent.com/support/
supportredirect.html
On the OLCS page, select Sign In/Register
(MyAccess) and then log in to OLCS.

Service kit cable VDC: 5 4.71 4.12 3.5 2.9 2.3 1.71 1.11 0.59 0.14
RSL (dBm) :
-10 -20 -30 -40 -50 -60 -70 -80 -90 -100

For technical support contact information:

11.3 Adjust the site & azimuth to the maximum RSL


(lobe number 2 (Main lobe)).

On the right side of the OLCS page under Product


Technical Support, select your country from the
Phone and Email Contact Information drop-down
list.

1.4

All Rights Reserved Alcatel-Lucent 2014

Contact
support
1 Contact
Support

For product documentation:

1.3

Auto-amalgamating tape is recommended.

9.2 Connect the grounding kit to the ground


plate

Cat5e cable
1AB150990002

The contact information is displayed.

Line A-A represents azimutht path of a properly aligned antenna.

REF: 3DB20024CAAATNZZA ICS01