Detailed Soil Investigation of
Trishuli River Bridge,
Ratmate-08, Khalte
to
Budhasingh-01, Chiplette
Nuwakot
Client:
Department of Roads, Bridge Branch
Babarmahal, Kathmandu
Prepared For:
ANK- Lumbini- Himdung J/V
Prepared By:
Acknowledgement
ACKNOWLEDGEMENT
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page i
Table of Contents
Table of Content
1.
Background .............................................................................................................................. 1
1.2
2.
OBJECTIVES ................................................................................................................................. 2
3.
Scope of Investigation..................................................................................................................... 2
4.
Methodology ................................................................................................................................... 2
4.1
4.2
Sampling................................................................................................................................... 3
4.3
4.4
4.5
Strata Analysis.......................................................................................................................... 4
4.6
4.6.1
4.6.2
4.6.3
4.7
4.7.1
4.8
5.
Liquefaction ........................................................................................................................... 10
5.2
5.2.1
5.2.2
Strength Parameters.................................................................................................... 12
5.3
6.
Settlement ............................................................................................................................... 12
6.2
RECOMMENDATION ................................................................................................................ 20
Annexes:
Bore Hole Logs
Test Result Summary Sheet
Laboratory Test Result
Figures
Photographs
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page ii
Abbreviation
LIST OF ABBREVIATION
SPT
DCPT
ADB
ADT
ARE
ASTM
AWBR
AWGT
BM
BOQ
CAD
CBR
CPM
CV
DCP
DLP
DOR
DTM
EIA
EMAP
EMG
EPA
EPR
ESA
EV
FWET
FWGT
GEU
GON
HRD
ICB
IEE
IOW
IRC
JV
Km
MIS
NCB
NRRL
PAF
PIP
POL
PQ
PWD
QAP
RAP
RMDP
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page iii
GENERAL INTRODUCTION
This report is prepared in accordance with the agreement between Bridge Branch, DoR and
ANK- Lumbini- Himdung J/V and RIDARC Drilling & Geo-Technical Pvt. Ltd., Sainbu,
Lalitpur to determine the bearing capacity and subsurface exploration of bridge site at
Trishuli River at Ratmate-08, Khalte to Budhasingh-01, Chiplette, Nuwakot District.
Site has been proposed to make two bore holes for sub surface exploration, which is located
at Ratmate-08, Khalte to Budhasingh-01, Chiplette, Nuwakot District. The site is nearer to
the vehicular approach of Galchhi to Bidur link road.
1.1
Background
The main objective of this Soil Investigation is to explain geotechnical characteristics of the
sub-soil strata, (i) to express the engineering properties of the sub-soil (ii) to confirm the
value of bearing capacity of the soil.
1.2
Geologically, the lesser Himalaya are covered by glaciers where boulders, sand and stone
brought by glacier are found. Glaciers in the lesser Himalaya are deposited by the rivers
originating and coming from the Himalaya and they make fan shape deposition at the exit
point of the river. It is also observed that the same pattern continued in earlier times for the
deposition of older sediment. From the depositional pattern it is found that boulder and
cobbles are deposited in the form of fan in the mouth of river, whereas fines are deposited
further away.
In lesser Himalaya the parent rocks being the lower and upper formation of metasediments
consisting of sandstones, silt, conglomerates, lime stone, quartzites, schists, etc. The land
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 1
form of lesser Himalaya has been divided as metasediments and crystalline, the
metasediments where both erosion and deposition are not occurring.
Generally, the sandstones, silt, conglomerates, lime stone, quartzites and schists are
compact. Its bearing capacity is high. Locally this unit is not prone to erosion and flooding.
There is no liquefaction.
As a matter of fact, the project site is in a Himalaya area having sandstones, silt,
conglomerates, lime stone, quartzites, schists in their textures without any soft cohesive
traces in the vicinity of the site. The deposits are in loose to medium denseness in state.
So both banks are slightly eroded during rainy season. The river depth is low and flows in
the wider width at the bridge axis.
2.
OBJECTIVES
The main objective of this investigation is to explore geotechnical characteristics of the
subsoil strata, (i) to assess the engineering properties of the sub-soil; (ii) to confirm the
assumed value of bearing capacity of the ground strata during design of foundation, and
(iii) to confirm the design parameters to be used during the detailed design of the foundation
of the proposed site.
3.
SCOPE OF INVESTIGATION
The scope of work includes drilling of two boreholes, each of greater than 19.0 m deep,
along with dynamic cone penetration test, standard penetration test, retrieving samples
from the boreholes and evaluation of allowable bearing capacity of the foundation based
on field and laboratory test.
4.
METHODOLOGY
The following are the methodology adopted to meet the objectives.
4.1
Field Tests
The SPT is done to find the strength of soil in field at every interval of 1.5 m in each BH.
Standard Penetration Tests: It consists of driving a Split Spoon sampler with an outside
dia. of 50 mm into the soil at the base of borehole. Driving is accomplished by a drop of
hammer weighing 63.5 kg falling freely through a height of 750 mm onto the drive head.
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 2
First of all the spoon is driven 150 mm into the soil at the bottom of the borehole. It is then
driven further 300 mm and the number of blows (N values) required to drive this distance
is recorded.
Dynamic Cone Penetration Test (DCPT): It consists of driving a cone by blows of
hammers. The number of blows for driving the cone through a specified distance is a
measure of the dynamic cone resistance.
Dynamic Cone Penetration test are performed by a 50 mm cone. The driving energy is
given by a 63.5 kg falling freely through a height of 750 mm onto the drive head. First of
all the cone is driven 100 mm into the soil at the bottom of the bore hole. It is then driven
further 200 mm and the number of blows (Ncbr values) required to drive this distance is
recorded.
The result i.e., Nc values first corrected to the Standard Penetration Test (SPT) value (N)
and that provides and estimation of degree of compaction of soil strata, values of angles of
internal friction () and allowable bearing capacity. The dynamic cone resistance is
correlated with the SPT (N) as given below.
4.2
Sampling
(i) Disturbed Sample:
Before any sample was taken, the borehole was cleaned up of loose disturbed soil
deposited during boring operation. The samples which were obtained from bailer and in the
SPT tube were preserved as representative disturbed samples for finding out index
properties. The samples thus obtained were placed in airtight double plastic bags, labeled
properly for identification and later transported to the lab for analysis.
Undisturbed Sample was extracted by means of thin wall tube (Shelby tube). The tube was
pushed into the ground and the sample recovered mechanically. The tube was sealed with
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 3
wax and wrapped with airtight polythene sheets and then bound by adhesive tapes and
properly labeled. The tube was properly packed in a wooden box so as to minimize the
disturbances during transportation to the laboratory and avoided the changes of moisture
content of sample. This sample was used for the determination of strength and
consolidation parameters.
But undisturbed samples could not be obtained in this site.
4.3
4.4
Laboratory Tests
Disturbed and Undisturbed samples collected in core boxes, were transported to lab in
Bhainsepati, Lalitpur for the following tests.
Index property Test
a)
Sieve Analysis
b)
c)
d)
Specific Gravity
f)
Atterbergs Limit
4.5
Strata Analysis
The project area lies in the Nuwakot district. The area is found of sand and boulder with
some layers of clay.
4.6
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 4
4.6.3
The Boussinesq's equation can be used to get stress distribution analysis for stress at
depths below the foundation level.
L
6 m,
L/B
6/6
6m
1.0
For square footing the effective pressure below B; (depth equal to width of footing, 6.0 m,
or 12.0 m below GL) below the foundation bed, the remaining pressure is reduce about
1/3rd of total value.
The investigation work is to 16 m. The stress distribution at a depth of 7.0 m below ground
level is only 1/3rd of stress developed at the foundation level and seems very low. So there
will not be any major geotechnical changes in the strata below the depth of investigation.
4.7
Overburden Correction
for overburden, as suggested by Peck et.al. (1974).
corr
Where, v'
ii)
N rec
Dilatancy Correction
Terzaghi and Peak (1976) give correction for water pressure.
If, Nrec 15, then Ncorr= Nrec
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 5
N rec H B S R
60
N60
N60
Nrec
sampler correction
Where,
iv)
3.28B 1
S
11.98N
f d x Rw1
3.28B
25
=
=
=
=
=
qsafe
Where,
N
B
S
fd
Rw1
0.5
Since the soil in the vicinity of the foundation level has been found to be granular or nonplastic, cohesion less sand through-out the site, the allowable bearing capacity has been
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 6
analyzed using the N-values from SPT results. Empirical formula of Teng (1988) applicable
for this type of soils has been used to obtain the allowable bearing pressure with safety
factor equal to 3.
For Open foundation:
qa = 3 NBRw + 5(100+N)DRw
(4.1)
qa = 2 NBRw + 6(100+N)DRw
(4.2)
(4.3)
The maximum allowable settlement for footings in sand is generally 40 mm and format
foundation in sand the allowable settlement is 65 mm (Skempton and MacDonald, 1955).
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 7
The method of Teng (1988) has been employed for the analysis. This method is a
modification of the method of Terzaghi and Peck (1948) such that the allowable bearing
pressure could directly be obtained from the SPT values.
For open and well foundations:
B 1
D
q 720( N 3)
Rw' 1
B
2B
for 25 mm settlement
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 8
4.7.2
In sandy soil the failure is generally shear failure and the bearing capacity is governed by
the shear properties i.e. C and . Direct shear test from disturbed samples shows that the
average value of angle of friction is greater than 280. Then the failure condition of these
strata should be considered as general shear failure. This is the general rule that local
shear cannot occur in dense gravelly strata.
Considering the worst condition of water table at ground, either suitable correction factor
of Rw' (0.5) or submerged unit weight of the strata should be used for getting the ultimate
bearing capacity, assuming that the whole depth is saturated.
qsafe
qult / F.S.
Qa
qult / F.S.
Where,
AS= Shaft Surface area of pile in m2
Ab = Base area of pile in m2
= Adhesion factor
K = earth pressure factor
= angle of internal friction
Cu= Undrained cohesion = undrained shear strength
F.S.
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 9
Q p Qs
F .S .
Where,
Qp
Qs
Qp
Apq Nq
Qs
Qs
Where,
=
Pile perimeter = Dp
Ko tan
Ap
Area of Pile
p
f
Cu
0.8
Nq
50.0
sat
18 KN/m3
Dp
F.S.
Results: The stratigraphy profiles of all boreholes at the proposed depth of pile foundation
level have in same order and (N) value also more or less same. So, a single average value is
taken for all boreholes.
4.8
Liquefaction
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 10
When fine or medium, saturated, loose sand deposit is subjected to a sudden shock
(generated by an earthquake) the mass will temporarily liquefy. This phenomenon is
termed 'Liquefaction'. When liquefaction takes place in a particular soil then the bearing
capacity of the soil disappears and the structure built on it gets tilts or even sinks.
The past big earthquakes, have shown that saturated sandy soils in a loose to medium
dense condition were liquefied during earthquakes varying in magnitude from 5.5 to 8.5
(Richter scale) and epicenter distance from several miles to hundreds of miles.
From the case studies, liquefaction potential characteristics of the soil depend on:
1)
The soil contains less than 10 percent fines (silt and clay sizes)
2)
3)
4)
The blow count per 30 cm standard penetration tests is less than 15.0
Where:
D60
D10
Cu
5.
5.1
5.2
Index Properties
The results of physical and index properties of soil samples collected from various depths
are presented in the attached summary sheet.
The grain size distribution curves of soil sample are classified as USCS Soil Classification
System. As per USCS Soil Classification System most of the soils are in GP group.
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 11
5.2.2
Strength Parameters
Direct Shear Test was conducted on undisturbed and representative disturbed samples.
The cohesion (c) and angle of internal friction () of the soil up to 19 m in BH1 and 25 m in
BH2 is found in the range of 0 to 7 KN/m2 and 230 to 320 respectively. The strength
parameter leads to give medium to high shear strength value.
5.3
Settlement
For heavier and important structure consolidation settlement should be predicted by the
following equation.
= Hi * (Cc/(1+eo) log {(p0 + p)/ p0}
SOc
6.
ANALYSIS OF DATA
6.1
Bearing Capacity
The sample on the right bank (BH-2) consists of soft rock from 3 m depth. The rock samples
obtained were in pulverized or powder form. No RQD values could be obtained. So the soft
rock is treated as soil and the bearing capacity values are obtained as per below. However,
in the next section, the bearing capacity are calculated as per soft rock.
For open foundation, the Bearing Capacity values from field test results are summarized in
tabulated form:
Size of open foundation= 4.5 m X 4.5 m
Bore
Hole
No.
BH-1
Depth
(m)
3
4.5
6
7.5
9
Field
recorded
SPT (N)
Values
75
63
64
54
58
Standardize
N value N60
51.56
43.31
44.00
37.13
39.88
Meyerhofs
(1965) &
Bowles (1977)
(25mm
Settlement)
(T/m2)
42.28
38.72
42.59
38.68
44.49
IS Code
(2950-1956)
(25 mm
settlement)
(T/m2)
42.49
35.27
35.88
29.86
32.27
Lower BC
Values for
25 mm
settlement
(T/m2)
BC values
for 40 mm
settlement
(T/m2)
42.28
35.27
35.88
29.86
32.27
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
67.65
61.95
68.14
61.89
71.19
Page 12
BH-2
3
4.5
6
7.5
9
46
75
75
75
75
31.63
51.56
51.56
51.56
51.56
25.93
46.10
49.91
53.72
57.53
25.05
42.49
42.49
42.49
42.49
25.05
42.49
42.49
42.49
42.49
41.49
73.75
79.85
85.95
92.05
Bore
Hole
No.
BH-1
BH-2
Depth
(m)
3
4.5
6
7.5
9
3
4.5
6
7.5
9
Field
recorded
SPT (N)
Values
75
63
64
54
58
46
75
75
75
75
Standardize
N value N60
Meyerhofs
(1965) &
Bowles (1977)
(25mm
Settlement)
(T/m2)
51.56
43.31
44.00
37.13
39.88
31.63
51.56
51.56
51.56
51.56
41.00
37.28
40.76
36.83
42.18
25.14
44.38
47.77
51.16
54.55
IS Code
(2950-1956)
(25 mm
settlement)
(T/m2)
42.49
35.27
35.88
29.86
32.27
25.05
42.49
42.49
42.49
42.49
Lower BC
Values for
25 mm
settlement
(T/m2)
BC values
for 40 mm
settlement
(T/m2)
41.00
35.27
35.88
29.86
32.27
25.05
42.49
42.49
42.49
42.49
65.59
59.65
65.22
58.93
67.49
40.23
71.01
76.43
81.85
87.27
Bore
Hole
No.
BH-1
BH-2
Depth
(m)
3
4.5
6
7.5
9
3
4.5
6
7.5
9
Field
recorded
SPT (N)
Values
75
63
64
54
58
46
75
75
75
75
Standardize
N value N60
Meyerhofs
(1965) &
Bowles (1977)
(25mm
Settlement)
(T/m2)
51.56
43.31
44.00
37.13
39.88
31.63
51.56
51.56
51.56
51.56
39.11
35.18
38.10
34.14
38.81
23.99
41.88
44.64
47.41
50.18
IS Code
(2950-1956)
(25 mm
settlement)
(T/m2)
42.49
35.27
35.88
29.86
32.27
25.05
42.49
42.49
42.49
42.49
Lower BC
Values for
25 mm
settlement
(T/m2)
BC values
for 40 mm
settlement
(T/m2)
39.11
35.18
35.88
29.86
32.27
23.99
41.88
42.49
42.49
42.49
62.57
56.28
60.95
54.62
62.09
38.38
67.00
71.43
75.86
80.29
BH-1
Depth
(m)
3
4.5
6
7.5
9
Field
recorded
SPT (N)
Values
75
63
64
54
58
Standardize
N value N60
51.56
43.31
44.00
37.13
39.88
Meyerhofs
(1965) &
Bowles (1977)
(25mm
Settlement)
(T/m2)
37.79
33.71
36.24
32.26
36.46
IS Code
(2950-1956)
(25 mm
settlement)
(T/m2)
42.49
35.27
35.88
29.86
32.27
Lower BC
Values for
25 mm
settlement
(T/m2)
BC values
for 40 mm
settlement
(T/m2)
37.79
33.71
35.88
29.86
32.27
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
60.46
53.93
57.98
51.62
58.34
Page 13
BH-2
3
4.5
6
7.5
9
46
75
75
75
75
31.63
51.56
51.56
51.56
51.56
23.18
40.13
42.47
44.81
47.15
25.05
42.49
42.49
42.49
42.49
23.18
40.13
42.47
42.49
42.49
37.08
64.21
67.95
71.70
75.44
Bore
Hole
No.
BH-1
BH-2
Depth
(m)
3
4.5
6
7.5
9
3
4.5
6
7.5
9
Field
recorded
SPT (N)
Values
75
63
64
54
58
46
75
75
75
75
Standardize
N value N60
Meyerhofs
(1965) &
Bowles (1977)
(25mm
Settlement)
(T/m2)
51.56
43.31
44.00
37.13
39.88
31.63
51.56
51.56
51.56
51.56
36.81
32.63
34.87
30.89
34.74
22.58
38.84
40.87
42.90
44.92
IS Code
(2950-1956)
(25 mm
settlement)
(T/m2)
42.49
35.27
35.88
29.86
32.27
25.05
42.49
42.49
42.49
42.49
Lower BC
Values for
25 mm
settlement
(T/m2)
BC values
for 40 mm
settlement
(T/m2)
36.81
32.63
34.87
29.86
32.27
22.58
38.84
40.87
42.49
42.49
58.90
52.20
55.80
49.42
55.58
36.13
62.15
65.39
68.63
71.88
Bore
Hole
No.
BH-1
BH-2
Depth
(m)
3
4.5
6
7.5
9
3
4.5
6
7.5
9
Field
recorded
SPT (N)
Values
75
63
64
54
58
46
75
75
75
75
Standardize
N value N60
51.56
43.31
44.00
37.13
39.88
31.63
51.56
51.56
51.56
51.56
Meyerhofs
(1965) &
Bowles (1977)
(25mm
Settlement)
(T/m2)
36.07
31.80
33.83
29.83
33.42
22.12
37.86
39.64
41.43
43.22
IS Code
(2950-1956)
(25 mm
settlement)
(T/m2)
42.49
35.27
35.88
29.86
32.27
25.05
42.49
42.49
42.49
42.49
Lower BC
Values for
25 mm
settlement
(T/m2)
BC values
for 40 mm
settlement
(T/m2)
36.07
31.80
33.83
29.83
32.27
22.12
37.86
39.64
41.43
42.49
57.71
50.88
54.13
47.73
53.47
35.40
60.57
63.43
66.29
69.15
BH-1
Depth
(m)
3
4.5
6
7.5
9
Field
recorded
SPT (N)
Values
75
63
64
54
58
Standardize
N value N60
51.56
43.31
44.00
37.13
39.88
Meyerhofs
(1965) &
Bowles (1977)
(25mm
Settlement)
(T/m2)
35.48
31.14
33.00
29.00
32.38
IS Code
(2950-1956)
(25 mm
settlement)
(T/m2)
42.49
35.27
35.88
29.86
32.27
Lower BC
Values for
25 mm
settlement
(T/m2)
BC values
for 40 mm
settlement
(T/m2)
35.48
31.14
33.00
29.00
32.27
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
56.76
49.83
52.80
46.39
51.81
Page 14
BH-2
3
4.5
6
7.5
9
46
75
75
75
75
31.63
51.56
51.56
51.56
51.56
21.76
37.08
38.67
40.27
41.87
25.05
42.49
42.49
42.49
42.49
21.76
37.08
38.67
40.27
41.87
34.82
59.32
61.88
64.43
66.99
The right bank (BH-2) consists of soft rock from 3 m depth. On the process of obtaining
samples, no such sample pieces required for obtaining RQD (core pieces greater than 10
cm) were obtained. The samples obtained were in pulverized form.
As per Bowles (1996), the Bearing capacity of rock can be obtained using Terzaghi
equations as,
qu= 1.3cNc + qNq + 0.4BN for square footing
where, the bearing capacity factors are calculated as:
N c = 5 tan 4 (45 + )
2
N q = tan 6 (45 + )
2
N = Nq +1
The bearing capacity equation is for intact rock and does not account for the effect of
discontinuities. In our case, the sample obtained is pulverized, i.e. the sample is quite
discontinuous and the bearing capacity equation is not applicable.
Peck et al. (1974) have related the RQD to the allowable bearing pressure as
RQD
100
90
75
50
25
0
qa (Mpa)
29
19
12
6.25
3
0.96
qa (T/m2)
2900
1900
1200
625
300
96
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 15
For well foundation, the Bearing Capacity values from field test results are summarized in
tabulated form:
Well Foundation For Borehole 1 (Left Bank)
BH
no.
Diameter
(B) (m)
Depth (D)
(m)
5
5
5
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
7
7
7
7
7
7
7
7
7
8
8
8
8
8
8
8
8
8
9
9
9
9
9
9
9
9
9
6
7.5
9
10.5
12
13.5
15
16.5
18
6
7.5
9
10.5
12
13.5
15
16.5
18
6
7.5
9
10.5
12
13.5
15
16.5
18
6
7.5
9
10.5
12
13.5
15
16.5
18
6
7.5
9
10.5
12
13.5
15
16.5
18
N
values
51.56
43.31
44.00
37.13
39.88
35.06
25.44
28.88
35.06
51.56
43.31
44.00
37.13
39.88
35.06
25.44
28.88
35.06
51.56
43.31
44.00
37.13
39.88
35.06
25.44
28.88
35.06
51.56
43.31
44.00
37.13
39.88
35.06
25.44
28.88
35.06
51.56
43.31
44.00
37.13
39.88
35.06
25.44
28.88
35.06
IS 3955 (1967)
(T/m2)
Least Value
(T/m2)
336.62
287.77
345.46
285.56
367.41
320.34
196.77
269.03
416.05
350.98
297.90
355.91
293.00
376.00
326.98
200.26
273.53
422.69
365.33
308.03
366.36
300.45
384.59
333.62
203.76
278.03
429.33
379.69
318.16
376.82
307.89
393.17
340.26
207.25
282.53
435.97
394.05
328.29
387.27
315.33
401.76
346.89
210.74
287.04
442.61
276.92
261.23
297.56
274.20
324.97
307.49
232.63
288.39
382.29
237.96
222.22
251.13
229.92
271.03
255.30
192.40
237.73
314.21
212.03
196.32
220.32
200.57
235.31
220.75
165.79
204.22
269.21
193.61
177.93
198.48
179.78
210.01
196.30
146.96
180.52
237.39
179.86
164.24
182.22
164.31
191.20
178.13
132.96
162.92
213.75
276.92
261.23
297.56
274.20
324.97
307.49
196.77
269.03
382.29
237.96
222.22
251.13
229.92
271.03
255.30
192.40
237.73
314.21
212.03
196.32
220.32
200.57
235.31
220.75
165.79
204.22
269.21
193.61
177.93
198.48
179.78
210.01
196.30
146.96
180.52
237.39
179.86
164.24
182.22
164.31
191.20
178.13
132.96
162.92
213.75
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 16
Diameter
(B) (m)
Depth (D)
(m)
5
5
5
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
7
7
7
7
7
7
7
7
7
8
8
8
8
8
8
8
8
8
9
9
9
9
9
9
9
9
9
6
7.5
9
10.5
12
13.5
15
16.5
18
6
7.5
9
10.5
12
13.5
15
16.5
18
6
7.5
9
10.5
12
13.5
15
16.5
18
6
7.5
9
10.5
12
13.5
15
16.5
18
6
7.5
9
10.5
12
13.5
15
16.5
18
N
values
31.63
51.56
51.56
51.56
51.56
51.56
51.56
51.56
51.56
31.63
51.56
51.56
51.56
51.56
51.56
51.56
51.56
51.56
31.63
51.56
51.56
51.56
51.56
51.56
51.56
51.56
51.56
31.63
51.56
51.56
51.56
51.56
51.56
51.56
51.56
51.56
31.63
51.56
51.56
51.56
51.56
51.56
51.56
51.56
51.56
IS 3955 (1967)
(T/m2)
Least Value
(T/m2)
132.62
402.83
469.04
535.24
601.45
667.66
733.87
800.08
866.29
138.02
417.18
483.39
549.60
615.81
682.02
748.23
814.44
880.64
143.42
431.54
497.75
563.96
630.17
696.38
762.58
828.79
895.00
148.82
445.90
512.11
578.32
644.52
710.73
776.94
843.15
909.36
154.22
460.26
526.46
592.67
658.88
725.09
791.30
857.51
923.72
163.23
314.69
352.45
390.21
427.97
465.73
503.50
541.26
579.02
140.26
267.70
297.45
327.19
356.93
386.68
416.42
446.17
475.91
124.98
236.50
260.96
285.43
309.89
334.36
358.82
383.29
407.76
114.12
214.35
235.09
255.84
276.58
297.32
318.07
338.81
359.55
106.02
197.85
215.83
233.82
251.81
269.79
287.78
305.76
323.75
132.62
314.69
352.45
390.21
427.97
465.73
503.50
541.26
579.02
138.02
267.70
297.45
327.19
356.93
386.68
416.42
446.17
475.91
124.98
236.50
260.96
285.43
309.89
334.36
358.82
383.29
407.76
114.12
214.35
235.09
255.84
276.58
297.32
318.07
338.81
359.55
106.02
197.85
215.83
233.82
251.81
269.79
287.78
305.76
323.75
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 17
Considering Circular pile and pile cap (Mat) at 3.2 m from Surface
For Borehole 1 and 2 the Bearing Capacity values are tabulated as below:
For
Depth
10
12
15
18
20
For
0.5 m
Qs
Qb
184.3
260.4
399.0
566.9
695.1
0.6 m
Qu
399.2
461.3
570.3
624.2
691.0
FOS
Qa( KN)
Qa( T)
583.5
2.5
233.4
23.3
721.7
2.5
288.7
28.9
969.3
2.5
387.7
38.8
1191.1
2.5
476.4
47.6
1386.0
2.5
554.4
55.4
Depth
Qs
Qb
Qu
FOS
Qa( KN)
Qa( T)
10
221.2
312.5
478.8
680.2
834.1
574.8
664.3
821.2
898.8
995.0
796.0
2.5
318.4
31.8
976.8
2.5
390.7
39.1
1300.0
2.5
520.0
52.0
1579.1
2.5
631.6
63.2
1829.0
2.5
731.6
73.2
12
15
18
20
For
0.7 m
Depth
Qs
Qb
Qu
FOS
Qa( KN)
Qa( T)
10
258.0
364.6
558.6
793.6
973.1
782.4
904.2
1117.8
1223.4
1354.3
1040.4
2.5
416.2
41.6
1268.8
2.5
507.5
50.8
1676.4
2.5
670.6
67.1
2017.0
2.5
806.8
80.7
2327.3
2.5
930.9
93.1
12
15
18
20
For
0.8 m
Depth
Qs
Qb
Qu
FOS
Qa( KN)
Qa( T)
10
294.9
416.7
638.4
907.0
1112.1
1021.9
1181.0
1460.0
1597.9
1768.8
1316.8
2.5
526.7
52.7
1597.7
2.5
639.1
63.9
2098.4
2.5
839.3
83.9
2504.9
2.5
1002.0
100.2
2880.9
2.5
1152.4
115.2
12
15
18
20
For
0.9 m
Depth
Qs
Qb
Qu
FOS
Qa( KN)
Qa( T)
10
331.7
468.8
718.2
1020.4
1251.1
1293.3
1494.7
1847.8
2022.4
2238.7
1625.1
2.5
650.0
65.0
1963.4
2.5
785.4
78.5
2566.0
2.5
1026.4
102.6
3042.8
2.5
1217.1
121.7
3489.8
2.5
1395.9
139.6
12
15
18
20
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 18
6.2
D50 Calculations
Bore Hole
BH-1
BH-2
Depth (m)
thickness
0
0 - 0.5
0.5 - 1.0
1.0 - 1.5
1.5 - 3.0
3.0 - 4.5
4.5 - 6.0
6.0 - 7.5
0
0 - 0.5
0.5 - 1.0
1.0 - 1.5
1.5 - 3.0
3.0 - 4.5
4.5 - 6.0
6.0 - 7.5
0.5
0.5
0.5
1.5
1.5
1.5
1.5
0.5
0.5
0.5
1.5
1.5
1.5
1.5
weighted mean
size (mm)
4.94
17.50
16.07
3.39
2.24
25.00
25.00
0.79
1.78
2.32
4.93
2.19
3.05
25.00
25.00
25.00
D50 as per
borehole (mm)
13.73
15.1
16.48
7 DESIGN PARAMETERS
Unit weight of soil = 1.7 t/m2
Angle of internal friction = 300
Ground Water table: At the surface level (Considering Worst Condition)
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 19
8 RECOMMENDATION
The results are shown in safe bearing capacity, it is recommended that:
i
The safe allowable bearing capacity (tons/m2) for 4.5, 5.0, 6.0, 7.0, 8.0, 9.0 and
10.0 m width Open foundation at 3.0, 4.5, 6.0, 7.5 and 9.0 m depths (measured
from existing ground level) of site locations are as given below:
BH1
Size
Depth
4.5 x 4.5
4.5 x 4.5
4.5 x 4.5
4.5 x 4.5
4.5 x 4.5
BH2
3
4.5
6
7.5
9
BC (25 mm
settlement)
42.28
35.27
35.88
29.86
32.27
BC (40 mm
settlement)
67.65
61.95
68.14
61.89
71.19
BC (25 mm
settlement)
25.05
42.49
42.49
42.49
42.49
BC (40 mm
settlement)
41.49
73.75
79.85
85.95
92.05
5.0 x 5.0
5.0 x 5.0
5.0 x 5.0
5.0 x 5.0
5.0 x 5.0
3
4.5
6
7.5
9
41.00
35.27
35.88
29.86
32.27
65.59
59.65
65.22
58.93
67.49
25.05
42.49
42.49
42.49
42.49
40.23
71.01
76.43
81.85
87.27
6.0 x 6.0
6.0 x 6.0
6.0 x 6.0
6.0 x 6.0
6.0 x 6.0
3
4.5
6
7.5
9
39.11
35.18
35.88
29.86
32.27
62.57
56.28
60.95
54.62
62.09
23.99
41.88
42.49
42.49
42.49
38.38
67.00
71.43
75.86
80.29
7.0 x 7.0
7.0 x 7.0
7.0 x 7.0
7.0 x 7.0
4.5
6
7.5
9
33.71
35.88
29.86
32.27
53.93
57.98
51.62
58.34
40.13
42.47
42.49
42.49
64.21
67.95
71.70
75.44
8.0 x 8.0
8.0 x 8.0
8.0 x 8.0
8.0 x 8.0
4.5
6
7.5
9
32.63
34.87
29.86
32.27
52.20
55.80
49.42
55.58
38.84
40.87
42.49
42.49
62.15
65.39
68.63
71.88
9.0 x 9.0
9.0 x 9.0
9.0 x 9.0
9.0 x 9.0
4.5
6
7.5
9
31.80
33.83
29.83
32.27
50.88
54.13
47.73
53.47
37.86
39.64
41.43
42.49
60.57
63.43
66.29
69.15
10.0 x 10.0
10.0 x 10.0
10.0 x 10.0
10.0 x 10.0
4.5
6
7.5
9
31.14
33.00
29.00
32.27
49.83
52.80
46.39
51.81
37.08
38.67
40.27
41.87
59.32
61.88
64.43
66.99
This bearing capacity values are calculated considering the discontinuous pulverized soft rock as
soil mass. However, the allowable bearing capacity values can be considered as 96 ton/m2 for the
soft rock of Borehole 2 from the depth of 3.0 m.
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 20
ii
iii Use an average friction angle of 30 for soil and rock layers below the foundation
depth in both bore holes.
iv The value of D50 of the river bed material is 15.1 mm
v
As the relatively high DCPT values are due to the presence of cobbles and boulders
in borehole location. Which may sometimes does not exactly represent the actual
site conditions and the above recommended bearing capacity may be unsafe. Thus,
it is recommended to check the average percentage of boulders and gravels and
weathered rock fragments including their denseness during the period of excavation
of the foundation. Provision of thicker PCC helps to reduce the weaker soil pockets
zones.
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Page 21
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Figures
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Photographs
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
4.5 m
6.0 m
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
3.0 m
7.5 m
12.0 m
17.5 m
20.0 m
Sample collection at BH-2 (Left Bank)
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com
Sainbu VDC - 2, Bhaisepati, Lalitpur, Contract No: 9851016051, 9741137840, E-mail: ridarcnp@gmail.com