4. Click the
5. Click the Create Job button to create a new combined footing job.
file:///C:/Users/bipik/AppData/Local/Temp/~hh71.htm
12/6/2015
Page 2 of 5
The new Strip Footing job is added to the Main Navigator pane. The new job name also appears in
the Job selection list in the Standard toolbar.
Additionally, strip footing controls appear in the Job Info form.
6. Select node 2 and 3 in Main View window.
Nodes will be shown as selected as shown below.
7. Click the Create from Selected Node button in the . A tree view showing the support assignment will
appear.
The strip footing is graphically added between the two selected supports.
file:///C:/Users/bipik/AppData/Local/Temp/~hh71.htm
12/6/2015
Page 3 of 5
STAAD.foundation Help
STAAD.foundation Help
file:///C:/Users/bipik/AppData/Local/Temp/~hh71.htm
12/6/2015
Page 4 of 5
or
The Analyze / Design tool in the Standard toolbar.
The progress of the analysis process is displayed in the Status Bar along with the steps being
performed by the program in the Design Progress Report of the Output pane.
Once the analysis process is complete, a results table appears in the Output pane showing the pile cap
dimensions and the bar size and spacing in the longitudinal and transverse directions.
The results are for only one of the six supports in the project because pile arrangements were selected
for only support 1.
The Calculation Sheet opens in the Main View window for reviewing the detailed code checks.
2. Click the Graphs tab in the Main View window to display both Bending Moment and Shear Force
diagrams.