AT PC HOTEL LAHORE
Civil Works
25-Nov-13
Sr.N
o
Description
QTY.
UNIT
Rate
Amount
2-Dec-13
%Age
Actual
Planned
Actual
Planned
A Civil Works
EARTH WORK
1 Excavation in all types of soil, i.e. Sandy, Clayey, Hard,
average Soft, Wet or Dry in foundations of Columns including
their dewatering (in case the water table encountered during
excavation) adequate shoring and lead the excavated
material outside hotel premises at a suitable location as
directed by client representative also or as directed by the
Engineer Incharge. (Consultant)
0 M to 2.6 M
276,202
BACK FILLING
2 Back Filling Material in columns, footing pits, under tie beams,
including water, ramming, compacting (plate compactor to be
used), consolidating to the required density of modified
AASHTO dry density (compacted measurement) as per
drawing and specifications or as directed by the Engineer
Incharge. (Consultant)
35,000
GHASSU FILLING
3 Supplying & Ghassu Sand free from salt & mud in layers not
exceeding 300 mm (average filling) in depth including
watering, ramming, compacting, through Road Roller
consolidating to the required density of modified AASHTO dry
density (compact measurement) in Plinth as per drawing and
specification or as directed by the Engineer Incharge
(Consultant).
112,000
cft
10
2,762,020
1.26
cft
315,000
0.14
cft
25
2,800,000
1.28
Sft
25
1,616,250
0.74
64,650
Page 1 of 24
9-Dec-13
1,420,000
743,621
2,228,000
1,487,242
Actual
25-Nov-13
Sr.N
o
Description
QTY.
UNIT
Rate
Amount
6 STEEL
Providing & laying steel reinforcement as per ASTM 615 yield
strength 420 Map, and Hot Rolled Deformed Steel as
specified in drawings, as per ASTM 615, with a proof strength
420 Map as manufactured from billet of Pakistan Steel by
M/s. Itifaq Steel, Lahore or equivalent, in any position, height,
level or shape, including cutting, bending, placing and binding
wire unspecified overlaps, spacers etc., complete as per
drawings or as directed by the Engineer In charge
(Consultant)
(a) Footing
(b) Plinth Beam
(c) Pedestal Columns up to Plinth
RCC CONCRETE (Foundations of Column)
7 Providing and laying Reinforced Cement Concrete mix not
leaner than 1:1:2 (5000 psi) Cubical Strength (1 Ordinary
Portland Cement, 1 Sand 2 Crushed Stone 20 mm as coarse
aggregate), in Foundation of Columns including vibrating,
curing, mortar tight form work and its removal but excluding
the cost of reinforcement, complete as per drawings and
specifications or as directed by the Engineer In charge.
(Consultant)
21,192
Cft
270 Tons
9 Tons
28 Tons
187
3,962,904
1.81
115000
115000
115000
31,050,000
1,035,000
3,220,000
14.20
0.47
1.47
123,620
cft
331
40,918,220
18.72
5,298
Cft
395
2,092,710
0.96
9-Dec-13
%Age
Actual
2-Dec-13
Planned
528,387
Actual
481,712
Planned
1,453,065
Actual
25-Nov-13
Sr.N
o
Description
QTY.
UNIT
Rate
Amount
3,532
cft
375
1,324,500
0.61
5,300
Cft
210
1,113,000
0.51
1,076
sft
418
449,768
0.21
38,050
38,050
38,050
38,050
38,050
38,050
38,050
Sft
sft
sft
sft
sft
sft
sft
126
126
126
126
126
126
126
4,794,300
4,794,300
4,794,300
4,794,300
4,794,300
4,794,300
4,794,300
2.19
2.19
2.19
2.19
2.19
2.19
2.19
B Super Structure
1 R.C.C (1:2:4) 60 mm thick Screed
Providing and laying of trowel finished 60 mm thick Screed
3000 psi Cylindrical using OPC cement, Chenab sand and
Sargodha crush 13mm down with admixture Sika Bond LA as
per manufacture's recommendation and steel bar dia 3/8''@
8'' c/c both ways single layer over HCS roof as per drawing,
specification and instruction of the engineer.
Ground Floor
First Floor Roof
2nd Floor Roof
3rd Floor Roof
4th Floor Roof
5th Floor Roof
6th Floor Roof
Block Work
Page 3 of 24
9-Dec-13
%Age
Actual
2-Dec-13
Planned
Actual
Planned
Actual
25-Nov-13
Sr.N
o
Description
QTY.
UNIT
Rate
Amount
4'' thick
i Ground Floor
2 Surface Rendering
Cement Plaster1/2'' thick ratio 1:4 on walls fair side complete
in all respect as per drawing and directed by the Engineer-incharge.
Internal
i Ground Floor
ii First Floor to Sixth Floor
External
i Ground Floor
ii First to Sixth Floor
Grand Total
2580 Cft
8560 Cft
200
220
516,000
1,883,200
0.24
0.86
35 Cft
250
8,750
0.00
3950 Sft
12720 Sft
35
40
138,250
508,800
0.06
0.23
3115 Sft
12145 Sft
35
40
109,025
485,800
0.05
0.22
129,869,297
59.41
Page 4 of 24
9-Dec-13
%Age
Actual
i Ground Floor
ii First Floor to Sixth Floor
Providing and laying Custom Hollow Block masonry with
block set in (1:4) cement sand mortar in superstructure
including raking out joints, scaffolding, curing, drilling for wall
ties where block work joins R.C.C columns, walls etc.
Complete in all respects as per drawings and directed by the
Engineer-in-charge:-
2-Dec-13
Planned
Actual
Planned
Actual
9-Dec-13
Planned
16-Dec-13
Actual
Planned
23-Dec-13
Actual
Planned
30-Dec-13
Actual
Planned
6-Jan-14
Actual
Page 5 of 24
Planned
13-Jan-14
Actual
Planned
20-Jan-14
Actual
Planned
27-Jan-14
Actual
Planned
9-Dec-13
Planned
16-Dec-13
Actual
Planned
23-Dec-13
Actual
Planned
30-Dec-13
Actual
Planned
6-Jan-14
Actual
Page 6 of 24
Planned
13-Jan-14
Actual
Planned
20-Jan-14
Actual
Planned
27-Jan-14
Actual
Planned
9-Dec-13
Planned
16-Dec-13
Actual
Planned
23-Dec-13
Actual
Planned
30-Dec-13
Actual
Planned
6-Jan-14
Actual
Page 7 of 24
Planned
13-Jan-14
Actual
Planned
20-Jan-14
Actual
Planned
27-Jan-14
Actual
Planned
9-Dec-13
Planned
16-Dec-13
Actual
Planned
23-Dec-13
Actual
Planned
30-Dec-13
Actual
Planned
6-Jan-14
Actual
Page 8 of 24
Planned
13-Jan-14
Actual
Planned
20-Jan-14
Actual
Planned
27-Jan-14
Actual
Planned
3-Feb-14
Actual
Planned
10-Feb-14
Actual
Planned
17-Feb-14
Actual
Planned
24-Feb-14
Actual
Planned
Page 9 of 24
3-Mar-14
Actual
Planned
10-Mar-14
Actual
Planned
17-Mar-14
Actual
Planned
24-Mar-14
Actual
3-Feb-14
Actual
Planned
10-Feb-14
Actual
Planned
17-Feb-14
Actual
Planned
24-Feb-14
Actual
Planned
Page 10 of 24
3-Mar-14
Actual
Planned
10-Mar-14
Actual
Planned
17-Mar-14
Actual
Planned
24-Mar-14
Actual
3-Feb-14
Actual
Planned
10-Feb-14
Actual
Planned
17-Feb-14
Actual
Planned
24-Feb-14
Actual
Planned
Page 11 of 24
3-Mar-14
Actual
Planned
10-Mar-14
Actual
Planned
17-Mar-14
Actual
Planned
24-Mar-14
Actual
3-Feb-14
Actual
Planned
10-Feb-14
Actual
Planned
17-Feb-14
Actual
Planned
24-Feb-14
Actual
Planned
Page 12 of 24
3-Mar-14
Actual
Planned
10-Mar-14
Actual
Planned
17-Mar-14
Actual
Planned
24-Mar-14
Actual
24-Mar-14
Planned
31-Mar-14
Actual
Planned
7-Apr-14
Actual
Planned
14-Apr-14
Actual
Planned
21-Apr-14
Actual
Page 13 of 24
Planned
28-Apr-14
Actual
Planned
5-May-14
Actual
Planned
12-May-14
Actual
Planned
24-Mar-14
Planned
31-Mar-14
Actual
Planned
7-Apr-14
Actual
Planned
14-Apr-14
Actual
Planned
21-Apr-14
Actual
Page 14 of 24
Planned
28-Apr-14
Actual
Planned
5-May-14
Actual
Planned
12-May-14
Actual
Planned
24-Mar-14
Planned
31-Mar-14
Actual
Planned
7-Apr-14
Actual
Planned
14-Apr-14
Actual
Planned
21-Apr-14
Actual
Page 15 of 24
Planned
28-Apr-14
Actual
Planned
5-May-14
Actual
Planned
12-May-14
Actual
Planned
24-Mar-14
Planned
31-Mar-14
Actual
Planned
7-Apr-14
Actual
Planned
14-Apr-14
Actual
Planned
21-Apr-14
Actual
Page 16 of 24
Planned
28-Apr-14
Actual
Planned
5-May-14
Actual
Planned
12-May-14
Actual
Planned
19-May-14
Actual
Planned
26-May-14
Actual
Planned
2-Jun-14
Actual
Planned
9-Jun-14
Actual
Planned
Page 17 of 24
16-Jun-14
Actual
Planned
23-Jun-14
Actual
Planned
30-Jun-14
Actual
Planned
7-Jul-14
Actual
19-May-14
Actual
Planned
26-May-14
Actual
Planned
2-Jun-14
Actual
Planned
9-Jun-14
Actual
Planned
Page 18 of 24
16-Jun-14
Actual
Planned
23-Jun-14
Actual
Planned
30-Jun-14
Actual
Planned
7-Jul-14
Actual
19-May-14
Actual
Planned
26-May-14
Actual
Planned
2-Jun-14
Actual
Planned
9-Jun-14
Actual
Planned
Page 19 of 24
16-Jun-14
Actual
Planned
23-Jun-14
Actual
Planned
30-Jun-14
Actual
Planned
7-Jul-14
Actual
19-May-14
Actual
Planned
26-May-14
Actual
Planned
2-Jun-14
Actual
Planned
9-Jun-14
Actual
Planned
Page 20 of 24
16-Jun-14
Actual
Planned
23-Jun-14
Actual
Planned
30-Jun-14
Actual
Planned
7-Jul-14
Actual
7-Jul-14
Planned
14-Jul-14
Actual
Planned
21-Jul-14
Actual
Page 21 of 24
Planned
22-Jul-14
Actual
Planned
7-Jul-14
Planned
14-Jul-14
Actual
Planned
21-Jul-14
Actual
Page 22 of 24
Planned
22-Jul-14
Actual
Planned
7-Jul-14
Planned
14-Jul-14
Actual
Planned
21-Jul-14
Actual
Page 23 of 24
Planned
22-Jul-14
Actual
Planned
7-Jul-14
Planned
14-Jul-14
Actual
Planned
21-Jul-14
Actual
Page 24 of 24
Planned
22-Jul-14
Actual
Planned