Anda di halaman 1dari 29

ALTERNATIVA N 01

COSTOS SISTEMA DE AGUA POTABLE


PARCIAL SIN
IGV
96,089.20
11,825.39
481,769.69
14,839.77
24,056.86
310,559.22
123,572.52
108,852.64
2,308,836.72
665,169.38
18,059.56
51,925.12

PARCIAL
CON IGV
114,346.15
14,072.21
573,305.93
17,659.33
28,627.66
369,565.47
147,051.30
129,534.64
2,747,515.70
791,551.56
21,490.88
61,790.89

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (4.2140115%CD) S/.
UTILIDAD (5%CD) S/.

4,215,556.07
177,644.02
210,777.80

5,016,511.72
211,396.38
250,825.59

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

4,603,977.89
874,755.80

5,478,733.69
0.00

COSTO TOTAL (ST+IGV) S/.

5,478,733.69

5,478,733.69

PARCIAL SIN
IGV
830,803.65
1,812,041.28
606,110.64
181,078.27
74,483.49
4,859,893.17
33,118.16

PARCIAL
CON IGV
988,656.34
2,156,329.12
721,271.66
215,483.14
88,635.35
5,783,272.87
39,410.61

8,397,528.66
177,644.02
419,876.43

9,993,059.11
211,396.38
499,652.96

ITEM

PARTIDAS

UND

01
02
03
04
05
06
07
08
09
10
11
12

Represamiento
Mej. Captacin
Redes de Conduccin
Mej. Desarenador
Mej. Sedimentador
Planta de Tratamiento
Mej. Reservorio
Redes de Aduccin
Redes de Distribucin
Conexiones Domiciliarias
Obras de Arte (Pase Aereo)
Mitigacin de Impacto Ambiental

Und
Und
ml
Und
Und
Und
Und
ml
ml
Und
Und
glb

MET.
1.00
1.00
4,740.00
1.00
1.00
1.00
1.00
878.50
25,884.00
1,925.00
1.00
1.00

P. UNIT
96,089.20
11,825.39
101.64
14,839.77
24,056.86
310,559.22
123,572.52
123.91
89.20
345.54
18,059.56
51,925.12

COSTOS SISTEMA DE ALCANTARILLADO


ITEM

PARTIDAS

UND

01
02
03
04
05
06
07

Conexiones Domiciliarias
Red Colectora
Red Emisora
Sistema de Bombeo
Pases Aereos
Planta de Tratamiento
Mitigacin de Impacto Ambiental

Und
ml
ml
Und
Und
Und
glb

MET.
1,925.00
13,745.00
5,151.95
2.00
3.00
1.00
1.00

P. UNIT
431.59
131.83
117.65
90,539.14
24,827.83
4,859,893.17
33,118.16

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (2.1154321%CD) S/.
UTILIDAD (5%CD) S/.
SUB TOTAL (CD+GG+UT) S/.
IGV (19% ST) S/.

8,995,049.11 10,704,108.44
1,709,059.33
0.00

COSTO TOTAL (ST+IGV) S/.

10,704,108.44 10,704,108.44

RESUMEN DE COSTO CON PROYECTO SISTEMA DE AGUA POTABLE Y


ALCANTARILLADO
ITEM
01
02
03

PARTIDAS
Sistema de Agua Potable
Sistema de Alcantarillado

UND

MET.
1.00
1.00

PARCIAL SIN
IGV
4,215,556.07 4,215,556.07
8,397,528.66 8,397,528.66
P. UNIT

PARCIAL
CON IGV
5,016,511.72
9,993,059.11

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (2.2836077%CD) S/.
UTILIDAD (5%CD) S/.

12,613,084.73 15,009,570.83
288,033.37
342,759.71
630,654.24
750,478.54

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

13,531,772.34 16,102,809.08
2,571,036.74
0.00

COSTO TOTAL (ST+IGV) S/.

16,102,809.08 16,102,809.08

ALTERNATIVA N 02
COSTOS SISTEMA DE AGUA POTABLE
PARCIAL SIN
IGV
107,019.63
0.00
601,231.87
14,839.77
24,056.86
218,471.66
76,461.38
108,852.64
2,311,394.92
665,169.38
18,059.56
51,925.12

PARCIAL
CON IGV
127,353.36
0.00
715,465.93
17,659.33
28,627.66
259,981.28
90,989.04
129,534.64
2,750,559.95
791,551.56
21,490.88
61,790.89

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (4.2321560%CD) S/.
UTILIDAD (5%CD) S/.

4,197,482.79
177,644.02
209,874.14

4,995,004.52
211,396.38
249,750.23

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

4,585,000.95
871,150.18

5,456,151.13
0.00

COSTO TOTAL (ST+IGV) S/.

5,456,151.13

5,456,151.13

PARCIAL SIN
IGV
830,803.65
1,812,041.28
606,110.64
181,078.27
74,483.49
2,152,531.08
33,118.16

PARCIAL
CON IGV
988,656.34
2,156,329.12
721,271.66
215,483.14
88,635.35
2,561,511.99
39,410.61

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (3.1219476%CD) S/.
UTILIDAD (5%CD) S/.

5,690,166.57
177,644.02
284,508.33

6,771,298.22
211,396.38
338,564.91

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

6,152,318.92
1,168,940.59

7,321,259.51
0.00

COSTO TOTAL (ST+IGV) S/.

7,321,259.51

7,321,259.51

ITEM

PARTIDAS

UND

01
02
03
04
05
06
07
08
09
10
11
12

Represamiento
Mej. Captacin
Redes de Conduccin
Mej. Desarenador
Mej. Sedimentador
Planta de Tratamiento
Mej. Y Const. Reservorio
Redes de Aduccin
Redes de Distribucin
Conexiones Domiciliarias
Obras de Arte (Pase Aereo)
Mitigacin de Impacto Ambiental

Und
Und
ml
Und
Und
Und
Und
ml
ml
Und
Und
glb

MET.
1.00
0.00
4,740.00
1.00
1.00
1.00
1.00
878.50
25,884.00
1,925.00
1.00
1.00

P. UNIT
107,019.63
0.00
126.84
14,839.77
24,056.86
218,471.66
76,461.38
123.91
89.30
345.54
18,059.56
51,925.12

COSTOS SISTEMA DE ALCANTARILLADO


ITEM

PARTIDAS

UND

01
02
03
04
05
06
07

Conexiones Domiciliarias
Red Colectora
Red Emisora
Sistema de Bombeo
Pases Aereos
Planta de Tratamiento
Mitigacin de Impacto Ambiental

Und
ml
ml
Und
Und
Und
glb

MET.
1,925.00
13,745.00
5,151.95
2.00
3.00
1.00
1.00

P. UNIT
431.59
131.83
117.65
90,539.14
24,827.83
2,152,531.08
33,118.16

RESUMEN DE COSTO CON PROYECTO SISTEMA DE AGUA POTABLE Y


ALCANTARILLADO
ITEM
01
02
03

PARTIDAS
Sistema de Agua Potable
Sistema de Alcantarillado

UND

MET.
1.00
1.00

PARCIAL SIN
IGV
4,197,482.79 4,197,482.79
5,690,166.57 5,690,166.57
P. UNIT

PARCIAL
CON IGV
4,995,004.52
6,771,298.22

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (2.9130622%CD) S/.
UTILIDAD (5%CD) S/.

9,887,649.36 11,766,302.74
288,033.37
342,759.71
494,382.47
588,315.14

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

10,670,065.20 12,697,377.59
2,027,312.39
0.00

COSTO TOTAL (ST+IGV) S/.

12,697,377.59 12,697,377.59

ALTERNATIVA N 01
COSTOS SISTEMA DE AGUA POTABLE
11.50%

ITEM

COMPONENTE

UND

01
02
03
04
05
06
07
08
09
10
11
12

Represamiento
Mej. Captacin
Redes de Conduccin
Mej. Desarenador
Mej. Sedimentador
Planta de Tratamiento
Mej. Reservorio e inst. valv. R. P
Redes Aduccin (Reubicacion)
Redes Distribucin
Conexiones Domiciliarias
Obras de Arte (Pase Aereo)
Mitigacin de Impacto Ambiental

Und
Und
ml
Und
Und
Und
Und
ml
ml
Und
Und
glb

41.39%

MEJORAMIENTO

REHABILITACIN

SIN IGV
0.00
11,825.39
0.00
14,839.77
24,056.86
310,559.22
123,572.52

CON IGV
0.00
14,072.21
0.00
17,659.33
28,627.66
369,565.47
147,051.30

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

SIN IGV
CON IGV
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
108,852.64 129,534.64
1,444,583.94 1,719,054.89
191,430.56 227,802.37
0.00
0.00
0.00
0.00

43.17%

3.94%

AMPLIACIN
SIN IGV
0.00

INSTALACION/CONST.

CON IGV
0.00
0.00
573,305.93
0.00
0.00
0.00
0.00

SIN IGV
96,089.20
0.00
0.00
0.00
0.00
0.00

CON IGV
114,346.15
0.00
0.00
0.00
0.00
0.00
0.00

864,252.78 1,028,460.81
473,738.82 563,749.19
0.00
0.00
0.00
0.00

0.00
0.00
18,059.56
51,925.12

0.00
0.00
21,490.88
61,790.89

481,769.69
0.00
0.00
0.00
0.00

COSTO DIRECTO PARCIAL S/.


ASTOS GENERALES (4.2140115%CD) S/.
UTILIDAD (5%CD) S/.

484,853.76
20,431.79
24,242.69

576,975.97 1,744,867.14 2,076,391.90 1,819,761.29 2,165,515.93


24,313.83
73,528.90
87,499.39
76,684.95
91,255.09
28,848.80
87,243.36 103,819.60
90,988.06 108,275.80

166,073.88
6,998.37
8,303.69

197,627.92
8,328.06
9,881.40

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

529,528.24
100,610.37

630,138.61 1,905,639.40 2,267,710.89 1,987,434.30 2,365,046.82


0.00 362,071.49
0.00 377,612.52
0.00

181,375.95
34,461.43

215,837.37
0.00

COSTO TOTAL (ST+IGV) S/.

630,138.61

630,138.61 2,267,710.89 2,267,710.89 2,365,046.82 2,365,046.82

215,837.37

215,837.37

COSTOS SISTEMA DE ALCANTARILLADO


0.00%

ITEM

PARTIDAS

UND

01
02
03
04
05
06
07

Conexiones Domiciliarias
Red Colectora
Red Emisora
Sistema de Bombeo
Pases Aereos
Planta de Tratamiento
Mitigacin de Impacto Ambiental

Und
ml
ml
Und
Und
Und
glb

COSTO DIRECTO PARCIAL S/.


ASTOS GENERALES (2.1154321%CD) S/.

34.46%

MEJORAMIENTO
SIN IGV

0.00
0.00

REHABILITACIN

CON IGV
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SIN IGV
515,314.06
624,381.35

45.45%
AMPLIACIN

INSTALACION/CONST.

CON IGV
SIN IGV
CON IGV
SIN IGV
CON IGV
613,223.73
315,489.59 375,432.62
743,013.81 1,187,659.93 1,413,315.31
0.00
0.00
0.00
606,110.64 721,271.66
0.00
0.00
0.00 181,078.27 215,483.14
0.00
0.00
0.00
74,483.49
88,635.35
0.00
0.00
0.00 4,859,893.17 5,783,272.87
0.00
0.00
0.00
33,118.16
39,410.61

0.00 1,139,695.41 1,356,237.54 1,503,149.52 1,788,747.93 5,754,683.73 6,848,073.64


0.00
24,109.48
28,690.28
31,798.11
37,839.75
121,736.43 144,866.35

UTILIDAD (5%CD) S/.

0.00

0.00

56,984.77

67,811.88

75,157.48

89,437.40

287,734.19

342,403.68

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

0.00
0.00

0.00 1,220,789.66 1,452,739.70 1,610,105.11 1,916,025.08 6,164,154.35 7,335,343.67


0.00 231,950.04
0.00 305,919.97
0.00 1,171,189.33
0.00

COSTO TOTAL (ST+IGV) S/.

0.00

0.00 1,452,739.70 1,452,739.70 1,916,025.08 1,916,025.08 7,335,343.67 7,335,343.67

RESUMEN DE COSTO CON PROYECTO SISTEMA DE AGUA POTABLE Y ALCANTARILLADO


ITEM
01
02
03

PARTIDAS

UND

Sistema de Agua Potable


Sistema de Alcantarillado

MEJORAMIENTO
REHABILITACIN
AMPLIACIN
INSTALACION/CONST.
SIN IGV
CON IGV
SIN IGV
CON IGV
SIN IGV
CON IGV
SIN IGV
CON IGV
484,853.76 576,975.97 1,744,867.14 2,076,391.90 1,819,761.29 2,165,515.93
166,073.88 197,627.92
0.00
0.00 1,139,695.41 1,356,237.54 1,503,149.52 1,788,747.93 5,754,683.73 6,848,073.64

COSTO DIRECTO PARCIAL S/.


ASTOS GENERALES (2.2836077%CD) S/.
UTILIDAD (5%CD) S/.

484,853.76
11,072.16
24,242.69

576,975.97 2,884,562.55 3,432,629.44 3,322,910.81 3,954,263.86 5,920,757.61 7,045,701.56


13,175.87
65,872.09
78,387.79
75,882.25
90,299.87
135,206.88 160,896.18
28,848.80
144,228.13 171,631.47
166,145.54 197,713.19
296,037.88 352,285.08

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

520,168.61
98,832.04

619,000.64 3,094,662.77 3,682,648.70 3,564,938.60 4,242,276.93 6,352,002.37 7,558,882.82


0.00 587,985.93
0.00 677,338.33
0.00 1,206,880.45
0.00

COSTO TOTAL (ST+IGV) S/.

619,000.64

619,000.64 3,682,648.70 3,682,648.70 4,242,276.93 4,242,276.93 7,558,882.82 7,558,882.82

ALTERNATIVA N 02
COSTOS SISTEMA DE AGUA POTABLE
6.21%

ITEM

PARTIDAS

UND

01
02
03
04
05
06
07
08
09
10
11
12

Represamiento
Mej. Captacin
Redes de Conduccin
Mej. Desarenador
Mej. Sedimentador
Planta de Tratamiento
Mej. Y Const. Reservorio
Redes de Aduccin
Redes de Distribucin
Conexiones Domiciliarias
Obras de Arte (Pase Aereo)
Mitigacin de Impacto Ambiental

Und
Und
ml
Und
Und
Und
Und
ml
ml
Und
Und
glb

41.61%

MEJORAMIENTO

REHABILITACIN

SIN IGV
0.00
0.00
0.00
14,839.77
24,056.86
218,471.66
3,287.52

CON IGV
0.00
0.00
0.00
17,659.33
28,627.66
259,981.28
3,912.15

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

SIN IGV
CON IGV
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
108,852.64 129,534.64
1,446,184.54 1,720,959.61
191,430.56 227,802.37
0.00
0.00
0.00
0.00

46.22%

5.96%

AMPLIACIN
SIN IGV
0.00

INSTALACION/CONST.

CON IGV
0.00
0.00
715,465.93
0.00
0.00
0.00
0.00

SIN IGV
107,019.63
0.00
0.00
0.00
0.00
0.00
73,173.86

CON IGV
127,353.36
0.00
0.00
0.00
0.00
0.00
87,076.89

865,210.38 1,029,600.35
473,738.82 563,749.19
0.00
0.00
0.00
0.00

0.00
0.00
18,059.56
51,925.12

0.00
0.00
21,490.88
61,790.89

601,231.87
0.00
0.00
0.00
0.00

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (4.2321560%CD) S/.
UTILIDAD (5%CD) S/.

260,655.81
11,031.36
13,032.79

310,180.41 1,746,467.75 2,078,296.62 1,940,181.06 2,308,815.46


13,127.32
73,913.24
87,956.75
82,111.49
97,712.67
15,509.02
87,323.39 103,914.83
97,009.05
115,440.77

250,178.17
10,587.93
12,508.91

297,712.02
12,599.64
14,885.60

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

284,719.96
54,096.79

338,816.75 1,907,704.37 2,270,168.21 2,119,301.60 2,521,968.91


0.00 362,463.83
0.00 402,667.30
0.00

273,275.01
51,922.25

325,197.26
0.00

COSTO TOTAL (ST+IGV) S/.

338,816.75

338,816.75 2,270,168.21 2,270,168.21 2,521,968.91 2,521,968.91

325,197.26

325,197.26

COSTOS SISTEMA DE ALCANTARILLADO


0.00%

ITEM

PARTIDAS

UND

01
02
03
04
05
06
07

Conexiones Domiciliarias
Red Colectora
Red Emisora
Sistema de Bombeo
Pases Aereos
Planta de Tratamiento
Mitigacin de Impacto Ambiental

Und
ml
ml
Und
Und
Und
glb

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (3.1219476%CD) S/.

34.79%

MEJORAMIENTO
SIN IGV

0.00
0.00

REHABILITACIN

CON IGV
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SIN IGV
515,314.06
624,381.35

45.88%
AMPLIACIN

INSTALACION/CONST.

CON IGV
SIN IGV
CON IGV
SIN IGV
CON IGV
613,223.73
315,489.59 375,432.62
743,013.81 1,187,659.93 1,413,315.31
0.00
0.00
0.00
606,110.64 721,271.66
0.00
0.00
0.00 181,078.27 215,483.14
0.00
0.00
0.00
74,483.49
88,635.35
0.00
0.00
0.00 2,152,531.08 2,561,511.99
0.00
0.00
0.00
33,118.16
39,410.61

0.00 1,139,695.41 1,356,237.54 1,503,149.52 1,788,747.93 3,047,321.64 3,626,312.75


0.00
35,580.69
42,341.03
46,927.54
55,843.77
95,135.79
113,211.58

UTILIDAD (5%CD) S/.

0.00

0.00

56,984.77

67,811.88

75,157.48

89,437.40

152,366.08

181,315.64

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

0.00
0.00

0.00 1,232,260.87 1,466,390.44 1,625,234.54 1,934,029.10 3,294,823.51 3,920,839.97


0.00 234,129.57
0.00 308,794.56
0.00 626,016.47
0.00

COSTO TOTAL (ST+IGV) S/.

0.00

0.00 1,466,390.44 1,466,390.44 1,934,029.10 1,934,029.10 3,920,839.97 3,920,839.97

RESUMEN DE COSTO CON PROYECTO SISTEMA DE AGUA POTABLE Y ALCANTARILLADO


ITEM
01
02
03

PARTIDAS

UND

Sistema de Agua Potable


Sistema de Alcantarillado

MEJORAMIENTO
REHABILITACIN
AMPLIACIN
INSTALACION/CONST.
SIN IGV
CON IGV
SIN IGV
CON IGV
SIN IGV
CON IGV
SIN IGV
CON IGV
260,655.81 310,180.41 1,746,467.75 2,078,296.62 1,940,181.06 2,308,815.46
250,178.17 297,712.02
0.00
0.00 1,139,695.41 1,356,237.54 1,503,149.52 1,788,747.93 3,047,321.64 3,626,312.75

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (2.9130622%CD) S/.
UTILIDAD (5%CD) S/.

260,655.81
7,593.07
13,032.79

310,180.41 2,886,163.16 3,434,534.16 3,443,330.58 4,097,563.39 3,297,499.81 3,924,024.77


9,035.75
84,075.73
100,050.11
100,306.36
119,364.57
96,058.22
114,309.28
15,509.02
144,308.16 171,726.71
172,166.53 204,878.17
164,874.99 196,201.24

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

281,281.67
53,443.52

334,725.18 3,114,547.04 3,706,310.98 3,715,803.47 4,421,806.13 3,558,433.02 4,234,535.29


0.00 591,763.94
0.00 706,002.66
0.00 676,102.27
0.00

COSTO TOTAL (ST+IGV) S/.

334,725.18

334,725.18 3,706,310.98 3,706,310.98 4,421,806.13 4,421,806.13 4,234,535.29 4,234,535.29

RESUMEN DE COSTO CON PROYECTO SISTEMA DE AGUA POTABLE


ALTERNATIVA N 01
PARCIAL SIN
IGV
1,231,179.25
476,771.58
1,474,435.43
1,033,169.81

PARCIAL
CON IGV
1,465,103.31
567,358.18
1,754,578.16
1,229,472.07

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (4.2140115%CD) S/.
UTILIDAD (5%CD) S/.

4,215,556.07
177,644.02
210,777.80

5,016,511.72
211,396.38
250,825.59

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

4,603,977.89
874,755.80

5,478,733.69
0.00

COSTO TOTAL (ST+IGV) S/.

5,478,733.69
0.00

5,478,733.69

ITEM

PARTIDAS

UND

01
02
03
04

Mano de Obra No Calificada


Mano de Obra Calificada
Materiales
Equipo

glb
glb
glb
glb

MET.

P. UNIT

1.00 1,231,179.25
1.00 476,771.58
1.00 1,474,435.43
1.00 1,033,169.81

RESUMEN DE COSTO CON PROYECTO SISTEMA DE ALCANTARILLADO


ALTERNATIVA N 01
ITEM

PARTIDAS

UND

01
02
03
04

Mano de Obra No Calificada


Mano de Obra Calificada
Materiales
Equipo

glb
glb
glb
glb

MET.
1.00
1.00
1.00
1.00

P. UNIT
1,435,222.34
1,349,933.76
2,565,917.47
3,046,455.09

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (2.1154321%CD) S/.
UTILIDAD (5%CD) S/.

PARCIAL SIN
IGV
1,435,222.34
1,349,933.76
2,565,917.47
3,046,455.09

PARCIAL
CON IGV
1,707,914.58
1,606,421.17
3,053,441.79
3,625,281.56

8,397,528.66
177,644.02
419,876.43

9,993,059.11
211,396.38
499,652.96

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

8,995,049.11 10,704,108.44
1,709,059.33
0.00

COSTO TOTAL (ST+IGV) S/.

10,704,108.44 10,704,108.44

RESUMEN DE COSTO CON PROYECTO SISTEMA DE AGUA POTABLE Y


ALCANTARILLADO ALTERNATIVA N 01
ITEM

PARTIDAS

UND

01
02
03
04

Mano de Obra No Calificada


Mano de Obra Calificada
Materiales
Equipo

glb
glb
glb
glb

MET.
1.00
1.00
1.00
1.00

P. UNIT
2,666,401.59
1,826,705.34
4,040,352.90
4,079,624.90

PARCIAL SIN
IGV
2,666,401.59
1,826,705.34
4,040,352.90
4,079,624.90

PARCIAL
CON IGV
3,173,017.89
2,173,779.35
4,808,019.95
4,854,753.63

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (2.2836077%CD) S/.
UTILIDAD (5%CD) S/.

12,613,084.73 15,009,570.83
288,033.37
342,759.71
630,654.24
750,478.54

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

13,531,772.34 16,102,809.08
2,571,036.74
0.00

COSTO TOTAL (ST+IGV) S/.

16,102,809.08 16,102,809.08

RESUMEN DE COSTO CON PROYECTO SISTEMA DE AGUA POTABLE


ALTERNATIVA N 02
ITEM
01
02
03
04

PARCIAL SIN
IGV
1,240,888.93
496,006.79
1,453,207.36
1,007,379.71

PARCIAL
CON IGV
1,476,657.83
590,248.08
1,729,316.76
1,198,781.85

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (4.2321560%CD) S/.
UTILIDAD (5%CD) S/.

4,197,482.79
177,644.02
209,874.14

4,995,004.52
211,396.38
249,750.23

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

4,585,000.95
871,150.18

5,456,151.13
0.00

COSTO TOTAL (ST+IGV) S/.

5,456,151.13

5,456,151.13

PARTIDAS
Mano de Obra No Calificada
Mano de Obra Calificada
Materiales
Equipo

UND
glb
glb
glb
glb

MET.

P. UNIT

1.00 1,240,888.93
1.00 496,006.79
1.00 1,453,207.36
1.00 1,007,379.71

RESUMEN DE COSTO CON PROYECTO SISTEMA DE ALCANTARILLADO


ALTERNATIVA N 02
ITEM
01
02
03
04

PARCIAL SIN
IGV
1,032,730.11
869,546.33
2,208,787.48
1,579,102.65

PARCIAL
CON IGV
1,228,948.83
1,034,760.13
2,628,457.10
1,879,132.15

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (3.1219476%CD) S/.
UTILIDAD (5%CD) S/.

5,690,166.57
177,644.02
284,508.33

6,771,298.22
211,396.38
338,564.91

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

6,152,318.92
1,168,940.59

7,321,259.51
0.00

COSTO TOTAL (ST+IGV) S/.

7,321,259.51

7,321,259.51

PARTIDAS
Mano de Obra No Calificada
Mano de Obra Calificada
Materiales
Equipo

UND
glb
glb
glb
glb

MET.

P. UNIT

1.00 1,032,730.11
1.00 869,546.33
1.00 2,208,787.48
1.00 1,579,102.65

RESUMEN DE COSTO CON PROYECTO SISTEMA DE AGUA POTABLE Y


ALCANTARILLADO ALTERNATIVA N 02
ITEM
01
02
03
04

PARTIDAS
Mano de Obra No Calificada
Mano de Obra Calificada
Materiales
Equipo

UND
glb
glb
glb
glb

MET.
1.00
1.00
1.00
1.00

P. UNIT
2,273,619.04
1,365,553.12
3,661,994.84
2,586,482.36

PARCIAL SIN
IGV
2,273,619.04
1,365,553.12
3,661,994.84
2,586,482.36

PARCIAL
CON IGV
2,705,606.66
1,625,008.21
4,357,773.86
3,077,914.01

COSTO DIRECTO PARCIAL S/.


GASTOS GENERALES (2.9130622%CD) S/.
UTILIDAD (5%CD) S/.

9,887,649.36 11,766,302.74
288,033.37
342,759.71
494,382.47
588,315.14

SUB TOTAL (CD+GG+UT) S/.


IGV (19% ST) S/.

10,670,065.20 12,697,377.59
2,027,312.39
0.00

COSTO TOTAL (ST+IGV) S/.

12,697,377.59 12,697,377.59

SITUACION ACTUAL DE LA RED EXISTENTE DE AGUA


Zona

AMBO

Red Existente
Estado Conservacin
Caracteristica
Longitud
Malo
Bueno
Asbesto 6"
4,345
4,345
0
Asbesto 8"
1137
1,137
0
Asbesto 4"
820
820
0

PVC 4"
PVC 2"
Margen Drecha
Asbesto 2"
PVC 4"
PVC 3"
Ayancocha (Ambo)
PVC 2"
Total

Zona
CHUNAPAMPA
AAHHAAC
Ayancocha
Porvenir

700
597
598
224
2612
740
11,773

700
328
598
224
1946
456
10,554

0
269
0
0
666
284
1,219

Red Existente
Estado Conservacion
Caracteristica
Longitud
Malo
Bueno
Tub. PVC 4"
2,166
2,166
PVC 1 1/2"
PVC 1/2"
Asbesto 2"

675
370
2150

675
370
2150

PVC 1"
Total

280
5,641

280
5,641

0
0
0
0
0
0

TOTAL

17,414

16,195

1,219

Necesidad de Red del Proyecto Integral:


Redes no intervenidas
Redes a proyectarse
25,884
Ampliacion
Rehabilitacion
9,689
16,195

27,103
1,219

SITUACION ACTUAL DE LA RED EXISTENTE DE DESAGUE


Red Existente
Caracteristica
Longitud
5,483
Asbesto
Cemento de 8"

Zona

AMBO

Margen Derecha

Estado Conservacin
Malo
Bueno
5,138
345
0
0
0
0

1,648

682

3111

0
261

10,242

6,081

PVC 8" y 6"

Ayancocha (Ambo)

PVC 6" y 8"

Total

Zona
CHUNAPAMPA

Red Existente
Caracteristica
Longitud
1,921
PVC 8" y 6"

AHAAC
Asbesto
Cemento 6"
PVC 6"

Ayancocha
Porvenir
Total

TOTAL

Necesidad de Red del Proyecto Integral:


Redes no intervenidas
Redes a proyectarse
22,390
Ampliacion
Rehabilitacion
14,675
7,715

966
0
0
2850
0
0
4,161

Estado Conservacion
Malo
Bueno
0
1,921

1,250

100

1,150

2372

1452

920

575
6,118

82
1,634

493
4,484

16,360
3,171

7,715

8,645

31,035
8,645

DESAGREGADO DE GASTOS GENERALES


ALTERNATIVA N 01

ITEM
06.05.11.11

DESCRIPCION

COEF

P. UNIT

PERIODO DE EJECUCION (09 MESES)


1er. MES

2do. MES

3er. MES

4to. MES

5to. MES

6to. MES

7to. MES

8to. MES

9no. MES

PARCIAL

OBLIGACIONES DEL EMPLEADOR


ESSALUD (9%)
I.E.S. (2%)

06.05.11.23

06.05.11.27

COMBUSTIBLES Y LUBRICANTES
Petroleo

4100.00

4,100.00

4,100.00

4,100.00

4,100.00

4,100.00

4,100.00

4,100.00

4,100.00

4,100.00

36,900.00

Gasolina

5250.00

5,250.00

5,250.00

5,250.00

5,250.00

5,250.00

5,250.00

5,250.00

5,250.00

5,250.00

47,250.00

Lubricantes

2430.00

2,430.00

2,430.00

2,430.00

2,430.00

2,430.00

2,430.00

2,430.00

2,430.00

2,430.00

21,870.00

Ingeniero Residente Residente de Obra

2,100.00

2,100.00

2,100.00

2,100.00

2,100.00

2,100.00

2,100.00

2,100.00

2,100.00

2,100.00

18,900.00

Asistente Tecnico 01

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

16,200.00

Asistente Tecnico 02

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

16,200.00

Asistente Administrativo

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

13,500.00

Secretaria

800.00

800.00

800.00

800.00

800.00

800.00

800.00

800.00

800.00

800.00

7,200.00

Liquidador Tecnico y financiero

Chofer

1,200.00

1,200.00

1,200.00

1,200.00

1,200.00

1,200.00

1,200.00

1,200.00

Topografo-Dibujante

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

Residente de Obra

525.00

525.00

525.00

525.00

525.00

525.00

Asistente Tecnico 01

360.00

360.00

360.00

360.00

360.00

360.00

Asistente Tecnico 02

360.00

360.00

360.00

360.00

360.00

Chofer

300.00

300.00

300.00

300.00

300.00

SERVICIOS NO PERSONALES

2,000.00

2,000.00

1,200.00

1,200.00

10,800.00

1,500.00

1,500.00

1,500.00

13,500.00

525.00

525.00

525.00

525.00

4,725.00

360.00

360.00

360.00

360.00

3,240.00

360.00

360.00

360.00

360.00

360.00

3,240.00

300.00

300.00

300.00

300.00

300.00

2,700.00

Veaticos

Gratificaciones
Por Fiestas Patrias

10,700.00

10,700.00

Por Navidad

10,866.67

10,866.67

Control de calidad y ensayos


Diseo de Mezcla
Ensayo de materiales
Ensayo de compresin y rotura de probetas
06.05.11.30

900.51
1,500.00

240.00

240.00

240.00

240.00

240.00

240.00

240.00

240.00

240.00

2,160.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

4,374.00

BIENES DE CONSUMO
Materiales de escritorio
Equipamiento de muebles y enseres de oficina

06.05.11.33

900.51
1,500.00

0.00
4,860.00

4,860.00

SERVICIOS DE CONSULTORIA
Supervisor

06.05.11.39

OTROS SERVICIOS DE TERCEROS


Gastos de Licitacin

1,500.00

Rollos y revelados fotograficos

1,500.00

240.80

240.80

240.80

240.80

240.80

240.80

240.80

240.80

240.80

2,167.20

2,100.00

2,100.00

2,100.00

2,100.00

2,100.00

2,100.00

2,100.00

2,100.00

2,100.00

18,900.00

Fotocopias

150.00

150.00

150.00

150.00

150.00

150.00

150.00

150.00

150.00

1,350.00

Alquiler de equipo de computo

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

8,100.00

Pago por serv. telefono, agua, luz

270.00

270.00

270.00

270.00

270.00

270.00

270.00

270.00

270.00

2,430.00

37,172.31

28,411.80

28,411.80

39,111.80

28,411.80

28,411.80

28,411.80

28,411.80

41,278.47

288,033.37

Alquiler de camioneta

PARCIAL
TOTAL GASTOS GENERALES

288,033.37

2.2836077%

COSTO DIRECTO

12,613,084.73

DESAGREGADO DE GASTOS GENERALES DEL SISTEMA DE AGUA POTABLE


ALTERNATIVA N 01
ITEM
06.05.11.11

DESCRIPCION

COEF

P. UNIT

1er. MES

2do. MES

3er. MES

PERIODO DE EJECUCION (09 MESES)


4to. MES
5to. MES
6to. MES

7to. MES

8to. MES

9no. MES

PARCIAL

OBLIGACIONES DEL EMPLEADOR


ESSALUD (9%)
I.E.S. (2%)

06.05.11.23

06.05.11.27

COMBUSTIBLES Y LUBRICANTES
Petroleo

0.5

4100.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

18,450.00

Gasolina

0.5

5250.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

23,625.00

Lubricantes

0.5

2430.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

10,935.00

Ingeniero Residente Residente de Obra

0.5

2,100.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

9,450.00

Asistente Tecnico 01

0.5

1,800.00

900.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

15,300.00

Asistente Tecnico 02

0.5

1,800.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

8,100.00

Asistente Administrativo

0.5

1,500.00

750.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

12,750.00

Secretaria

0.5

800.00

400.00

800.00

800.00

800.00

800.00

800.00

800.00

800.00

800.00

6,800.00

Liquidador Tecnico y financiero

0.5

Chofer

0.5

1,200.00

600.00

1,200.00

1,200.00

1,200.00

1,200.00

1,200.00

1,200.00

Topografo-Dibujante

0.5

1,500.00

750.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

Residente de Obra

0.5

525.00

262.50

262.50

262.50

262.50

262.50

Asistente Tecnico 01

0.5

360.00

180.00

180.00

180.00

180.00

180.00

Asistente Tecnico 02

0.5

360.00

180.00

180.00

180.00

180.00

Chofer

0.5

300.00

150.00

150.00

150.00

150.00

SERVICIOS NO PERSONALES

2,000.00

2,000.00

1,200.00

1,200.00

10,200.00

1,500.00

1,500.00

1,500.00

12,750.00

262.50

262.50

262.50

262.50

2,362.50

180.00

180.00

180.00

180.00

1,620.00

180.00

180.00

180.00

180.00

180.00

1,620.00

150.00

150.00

150.00

150.00

150.00

1,350.00

Veaticos

Gratificaciones
Por Fiestas Patrias

5,350.00

5,350.00

Por Navidad

8,916.67

8,916.67

Control de calidad y ensayos

06.05.11.30

Diseo de Mezcla

0.5

450.25

Ensayo de materiales

0.5

750.00

Ensayo de compresin y rotura de probetas

0.5

120.00

120.00

120.00

120.00

120.00

120.00

120.00

120.00

120.00

1,080.00

0.5

243.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

4,131.00

Equipamiento de muebles y enseres de oficina 0.5

2,430.00

750.00

BIENES DE CONSUMO
Materiales de escritorio

06.05.11.33

450.25

0.00
2,430.00

SERVICIOS DE CONSULTORIA
Supervisor

06.05.11.39

OTROS SERVICIOS DE TERCEROS


Gastos de Licitacin

0.5

750.00

Rollos y revelados fotograficos

0.5

120.40

120.40

120.40

120.40

120.40

120.40

120.40

120.40

120.40

1,083.60

Alquiler de camioneta

0.5

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

9,450.00

Fotocopias

0.5

75.00

75.00

75.00

75.00

75.00

75.00

75.00

75.00

75.00

675.00

Alquiler de equipo de computo

0.5

450.00

450.00

450.00

450.00

450.00

450.00

450.00

450.00

450.00

4,050.00

Pago por serv. telefono, agua, luz

0.5

PARCIAL

750.00

135.00

135.00

135.00

135.00

135.00

135.00

135.00

135.00

135.00

1,215.00

18,586.15

17,848.90

17,848.90

23,198.90

17,848.90

17,848.90

17,848.90

17,848.90

28,765.57

177,644.02

TOTAL GASTOS GENERALES

177,644.02

COSTO DIRECTO

4,215,556.07

4.2140115%

DESAGREGADO DE GASTOS GENERALES DEL SISTEMA DE ALCANTARILLADO


ALTERNATIVA N 01
ITEM
06.05.11.11

DESCRIPCION

COEF

P. UNIT

1er. MES

2do. MES

3er. MES

PERIODO DE EJECUCION (09 MESES)


4to. MES
5to. MES
6to. MES

7to. MES

8to. MES

9no. MES

PARCIAL

OBLIGACIONES DEL EMPLEADOR


ESSALUD (9%)
I.E.S. (2%)

06.05.11.23

06.05.11.27

COMBUSTIBLES Y LUBRICANTES
Petroleo

0.5

4100.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

18,450.00

Gasolina

0.5

5250.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

23,625.00

Lubricantes

0.5

2430.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

10,935.00

Ingeniero Residente Residente de Obra

0.5

2,100.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

9,450.00

Asistente Tecnico 01

0.5

1,800.00

900.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

15,300.00

Asistente Tecnico 02

0.5

1,800.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

8,100.00

Asistente Administrativo

0.5

1,500.00

750.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

12,750.00

Secretaria

0.5

800.00

400.00

800.00

800.00

800.00

800.00

800.00

800.00

800.00

800.00

6,800.00

Liquidador Tecnico y financiero

0.5

Chofer

0.5

1,200.00

600.00

1,200.00

1,200.00

1,200.00

1,200.00

1,200.00

1,200.00

Topografo-Dibujante

0.5

1,500.00

750.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

Residente de Obra

0.5

525.00

262.50

262.50

262.50

262.50

262.50

Asistente Tecnico 01

0.5

360.00

180.00

180.00

180.00

180.00

180.00

Asistente Tecnico 02

0.5

360.00

180.00

180.00

180.00

180.00

Chofer

0.5

300.00

150.00

150.00

150.00

150.00

SERVICIOS NO PERSONALES

2,000.00

2,000.00

1,200.00

1,200.00

10,200.00

1,500.00

1,500.00

1,500.00

12,750.00

262.50

262.50

262.50

262.50

2,362.50

180.00

180.00

180.00

180.00

1,620.00

180.00

180.00

180.00

180.00

180.00

1,620.00

150.00

150.00

150.00

150.00

150.00

1,350.00

Veaticos

Gratificaciones
Por Fiestas Patrias

5,350.00

5,350.00

Por Navidad

8,916.67

8,916.67

Control de calidad y ensayos

06.05.11.30

Diseo de Mezcla

0.5

450.25

Ensayo de materiales

0.5

750.00

Ensayo de compresin y rotura de probetas

0.5

120.00

120.00

120.00

120.00

120.00

120.00

120.00

120.00

120.00

1,080.00

0.5

243.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

4,131.00

Equipamiento de muebles y enseres de oficina 0.5

2,430.00

750.00

BIENES DE CONSUMO
Materiales de escritorio

06.05.11.33

450.25

0.00
2,430.00

SERVICIOS DE CONSULTORIA
Supervisor

06.05.11.39

OTROS SERVICIOS DE TERCEROS


Gastos de Licitacin

0.5

750.00

Rollos y revelados fotograficos

0.5

120.40

120.40

120.40

120.40

120.40

120.40

120.40

120.40

120.40

1,083.60

Alquiler de camioneta

0.5

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

9,450.00

Fotocopias

0.5

75.00

75.00

75.00

75.00

75.00

75.00

75.00

75.00

75.00

675.00

Alquiler de equipo de computo

0.5

450.00

450.00

450.00

450.00

450.00

450.00

450.00

450.00

450.00

4,050.00

Pago por serv. telefono, agua, luz

0.5

PARCIAL

750.00

135.00

135.00

135.00

135.00

135.00

135.00

135.00

135.00

135.00

1,215.00

18,586.15

17,848.90

17,848.90

23,198.90

17,848.90

17,848.90

17,848.90

17,848.90

28,765.57

177,644.02

TOTAL GASTOS GENERALES

177,644.02

COSTO DIRECTO

8,397,528.66

2.1154321%

DESAGREGADO DE GASTOS GENERALES


ALTERNATIVA N 02

ITEM
06.05.11.11

06.05.11.23

06.05.11.27

06.05.11.30

06.05.11.33
06.05.11.39

DESCRIPCION
OBLIGACIONES DEL EMPLEADOR
ESSALUD (9%)
I.E.S. (2%)
COMBUSTIBLES Y LUBRICANTES
Petroleo
Gasolina
Lubricantes
SERVICIOS NO PERSONALES
Ingeniero Residente Residente de Obra
Asistente Tecnico 01
Asistente Tecnico 02
Asistente Administrativo
Secretaria
Liquidador Tecnico y financiero
Chofer
Topografo-Dibujante
Veaticos
Residente de Obra
Asistente Tecnico 01
Asistente Tecnico 02
Chofer
Gratificaciones
Por Fiestas Patrias
Por Navidad
Control de calidad y ensayos
Diseo de Mezcla
Ensayo de materiales
Ensayo de compresin y rotura de probetas
BIENES DE CONSUMO
Materiales de escritorio
Equipamiento de muebles y enseres de oficina
SERVICIOS DE CONSULTORIA
Supervisor
OTROS SERVICIOS DE TERCEROS
Gastos de Licitacin
Rollos y revelados fotograficos
Alquiler de camioneta
Fotocopias
Alquiler de equipo de computo
Pago por serv. telefono, agua, luz
PARCIAL
TOTAL GASTOS GENERALES
COSTO DIRECTO

COEF

P. UNIT

PERIODO DE EJECUCION (09 MESES)


1er. MES

2do. MES

3er. MES

4to. MES

5to. MES

6to. MES

7to. MES

8to. MES

9no. MES

PARCIAL

1
1
1

4100.00
5250.00
2430.00

4,100.00
5,250.00
2,430.00

4,100.00
5,250.00
2,430.00

4,100.00
5,250.00
2,430.00

4,100.00
5,250.00
2,430.00

4,100.00
5,250.00
2,430.00

4,100.00
5,250.00
2,430.00

4,100.00
5,250.00
2,430.00

4,100.00
5,250.00
2,430.00

4,100.00
5,250.00
2,430.00

36,900.00
47,250.00
21,870.00

1
1
1
1
1
1
1
1

2,100.00
1,800.00
1,800.00
1,500.00
800.00

2,100.00
1,800.00
1,800.00
1,500.00
800.00

2,100.00
1,800.00
1,800.00
1,500.00
800.00

2,100.00
1,800.00
1,800.00
1,500.00
800.00

2,100.00
1,800.00
1,800.00
1,500.00
800.00

2,100.00
1,800.00
1,800.00
1,500.00
800.00

2,100.00
1,800.00
1,800.00
1,500.00
800.00

2,100.00
1,800.00
1,800.00
1,500.00
800.00

2,100.00
1,800.00
1,800.00
1,500.00
800.00

1,200.00
1,500.00

1,200.00
1,500.00

1,200.00
1,500.00

1,200.00
1,500.00

1,200.00
1,500.00

1,200.00
1,500.00

1,200.00
1,500.00

1,200.00
1,500.00

1,200.00
1,500.00

2,100.00
1,800.00
1,800.00
1,500.00
800.00
2,000.00
1,200.00
1,500.00

18,900.00
16,200.00
16,200.00
13,500.00
7,200.00
2,000.00
10,800.00
13,500.00

1
1
1
1

525.00
360.00
360.00
300.00

525.00
360.00
360.00
300.00

525.00
360.00
360.00
300.00

525.00
360.00
360.00
300.00

525.00
360.00
360.00
300.00

525.00
360.00
360.00
300.00

525.00
360.00
360.00
300.00

525.00
360.00
360.00
300.00

525.00
360.00
360.00
300.00

525.00
360.00
360.00
300.00

4,725.00
3,240.00
3,240.00
2,700.00

10,866.67

10,700.00
10,866.67

10,700.00

900.51
1,500.00
240.00
486.00
4,860.00

1,500.00
240.80
2,100.00
150.00
900.00
270.00
37,172.31

240.00

240.00

240.00

240.00

240.00

240.00

240.00

240.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

240.80
2,100.00
150.00
900.00
270.00
28,411.80

240.80
2,100.00
150.00
900.00
270.00
28,411.80

240.80
2,100.00
150.00
900.00
270.00
39,111.80

240.80
2,100.00
150.00
900.00
270.00
28,411.80
288,033.37
9,887,649.36

240.80
2,100.00
150.00
900.00
270.00
28,411.80

240.80
2,100.00
150.00
900.00
270.00
28,411.80

240.80
2,100.00
150.00
900.00
270.00
28,411.80

240.80
2,100.00
150.00
900.00
270.00
41,278.47

900.51
1,500.00
2,160.00
0.00
4,374.00
4,860.00

1,500.00
2,167.20
18,900.00
1,350.00
8,100.00
2,430.00
288,033.37
2.9130622%

DESAGREGADO DE GASTOS GENERALES DEL SISTEMA DE AGUA POTABLE


ALTERNATIVA N 02
ITEM
06.05.11.11

DESCRIPCION

COEF

P. UNIT

1er. MES

2do. MES

3er. MES

PERIODO DE EJECUCION (09 MESES)


4to. MES
5to. MES
6to. MES

7to. MES

8to. MES

9no. MES

PARCIAL

OBLIGACIONES DEL EMPLEADOR


ESSALUD (9%)
I.E.S. (2%)

06.05.11.23

06.05.11.27

COMBUSTIBLES Y LUBRICANTES
Petroleo

0.5

4100.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

2,050.00

18,450.00

Gasolina

0.5

5250.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

2,625.00

23,625.00

Lubricantes

0.5

2430.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

1,215.00

10,935.00

Ingeniero Residente Residente de Obra

0.5

2,100.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

9,450.00

Asistente Tecnico 01

0.5

1,800.00

900.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

1,800.00

15,300.00

Asistente Tecnico 02

0.5

1,800.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

8,100.00

Asistente Administrativo

0.5

1,500.00

750.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

12,750.00

Secretaria

0.5

800.00

400.00

800.00

800.00

800.00

800.00

800.00

800.00

800.00

800.00

6,800.00

Liquidador Tecnico y financiero

0.5

Chofer

0.5

1,200.00

600.00

1,200.00

1,200.00

1,200.00

1,200.00

1,200.00

1,200.00

Topografo-Dibujante

0.5

1,500.00

750.00

1,500.00

1,500.00

1,500.00

1,500.00

1,500.00

Residente de Obra

0.5

525.00

262.50

262.50

262.50

262.50

262.50

Asistente Tecnico 01

0.5

360.00

180.00

180.00

180.00

180.00

180.00

Asistente Tecnico 02

0.5

360.00

180.00

180.00

180.00

180.00

Chofer

0.5

300.00

150.00

150.00

150.00

150.00

SERVICIOS NO PERSONALES

2,000.00

2,000.00

1,200.00

1,200.00

10,200.00

1,500.00

1,500.00

1,500.00

12,750.00

262.50

262.50

262.50

262.50

2,362.50

180.00

180.00

180.00

180.00

1,620.00

180.00

180.00

180.00

180.00

180.00

1,620.00

150.00

150.00

150.00

150.00

150.00

1,350.00

Veaticos

Gratificaciones
Por Fiestas Patrias

5,350.00

5,350.00

Por Navidad

8,916.67

8,916.67

Control de calidad y ensayos

06.05.11.30

Diseo de Mezcla

0.5

450.25

Ensayo de materiales

0.5

750.00

Ensayo de compresin y rotura de probetas

0.5

120.00

120.00

120.00

120.00

120.00

120.00

120.00

120.00

120.00

1,080.00

0.5

243.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

4,131.00

Equipamiento de muebles y enseres de oficina 0.5

2,430.00

750.00

BIENES DE CONSUMO
Materiales de escritorio

06.05.11.33

450.25

0.00
2,430.00

SERVICIOS DE CONSULTORIA
Supervisor

06.05.11.39

OTROS SERVICIOS DE TERCEROS


Gastos de Licitacin

0.5

750.00

Rollos y revelados fotograficos

0.5

120.40

120.40

120.40

120.40

120.40

120.40

120.40

120.40

120.40

1,083.60

Alquiler de camioneta

0.5

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00

9,450.00

Fotocopias

0.5

75.00

75.00

75.00

75.00

75.00

75.00

75.00

75.00

75.00

675.00

Alquiler de equipo de computo

0.5

450.00

450.00

450.00

450.00

450.00

450.00

450.00

450.00

450.00

4,050.00

Pago por serv. telefono, agua, luz

0.5

PARCIAL

750.00

135.00

135.00

135.00

135.00

135.00

135.00

135.00

135.00

135.00

1,215.00

18,586.15

17,848.90

17,848.90

23,198.90

17,848.90

17,848.90

17,848.90

17,848.90

28,765.57

177,644.02

TOTAL GASTOS GENERALES

177,644.02

COSTO DIRECTO

4,197,482.79

4.2321560%

DESAGREGADO DE GASTOS GENERALES DEL SISTEMA DE ALCANTARILLADO


ALTERNATIVA N 02
ITEM
06.05.11.11

06.05.11.23

06.05.11.27

06.05.11.30

06.05.11.33
06.05.11.39

DESCRIPCION
OBLIGACIONES DEL EMPLEADOR
ESSALUD (9%)
I.E.S. (2%)
COMBUSTIBLES Y LUBRICANTES
Petroleo
Gasolina
Lubricantes
SERVICIOS NO PERSONALES
Ingeniero Residente Residente de Obra
Asistente Tecnico 01
Asistente Tecnico 02
Asistente Administrativo
Secretaria
Liquidador Tecnico y financiero
Chofer
Topografo-Dibujante
Veaticos
Residente de Obra
Asistente Tecnico 01
Asistente Tecnico 02
Chofer
Gratificaciones
Por Fiestas Patrias
Por Navidad
Control de calidad y ensayos
Diseo de Mezcla
Ensayo de materiales
Ensayo de compresin y rotura de probetas
BIENES DE CONSUMO
Materiales de escritorio
Equipamiento de muebles y enseres de oficina
SERVICIOS DE CONSULTORIA
Supervisor
OTROS SERVICIOS DE TERCEROS
Gastos de Licitacin
Rollos y revelados fotograficos
Alquiler de camioneta
Fotocopias
Alquiler de equipo de computo
Pago por serv. telefono, agua, luz
PARCIAL
TOTAL GASTOS GENERALES
COSTO DIRECTO

COEF

P. UNIT

1er. MES

2do. MES

3er. MES

PERIODO DE EJECUCION (09 MESES)


4to. MES
5to. MES
6to. MES

7to. MES

8to. MES

9no. MES

PARCIAL

0.5
0.5
0.5

4100.00
5250.00
2430.00

2,050.00
2,625.00
1,215.00

2,050.00
2,625.00
1,215.00

2,050.00
2,625.00
1,215.00

2,050.00
2,625.00
1,215.00

2,050.00
2,625.00
1,215.00

2,050.00
2,625.00
1,215.00

2,050.00
2,625.00
1,215.00

2,050.00
2,625.00
1,215.00

2,050.00
2,625.00
1,215.00

18,450.00
23,625.00
10,935.00

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5

2,100.00
1,800.00
1,800.00
1,500.00
800.00

1,050.00
900.00
900.00
750.00
400.00

1,050.00
1,800.00
900.00
1,500.00
800.00

1,050.00
1,800.00
900.00
1,500.00
800.00

1,050.00
1,800.00
900.00
1,500.00
800.00

1,050.00
1,800.00
900.00
1,500.00
800.00

1,050.00
1,800.00
900.00
1,500.00
800.00

1,050.00
1,800.00
900.00
1,500.00
800.00

1,050.00
1,800.00
900.00
1,500.00
800.00

1,200.00
1,500.00

600.00
750.00

1,200.00
1,500.00

1,200.00
1,500.00

1,200.00
1,500.00

1,200.00
1,500.00

1,200.00
1,500.00

1,200.00
1,500.00

1,200.00
1,500.00

1,050.00
1,800.00
900.00
1,500.00
800.00
2,000.00
1,200.00
1,500.00

9,450.00
15,300.00
8,100.00
12,750.00
6,800.00
2,000.00
10,200.00
12,750.00

0.5
0.5
0.5
0.5

525.00
360.00
360.00
300.00

262.50
180.00
180.00
150.00

262.50
180.00
180.00
150.00

262.50
180.00
180.00
150.00

262.50
180.00
180.00
150.00

262.50
180.00
180.00
150.00

262.50
180.00
180.00
150.00

262.50
180.00
180.00
150.00

262.50
180.00
180.00
150.00

262.50
180.00
180.00
150.00

2,362.50
1,620.00
1,620.00
1,350.00

8,916.67

5,350.00
8,916.67

5,350.00

0.5
0.5
0.5

450.25
750.00
120.00

0.5
0.5

243.00
2,430.00

0.5
0.5
0.5
0.5
0.5
0.5

750.00
120.40
1,050.00
75.00
450.00
135.00
18,586.15

120.00

120.00

120.00

120.00

120.00

120.00

120.00

120.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

486.00

120.40
1,050.00
75.00
450.00
135.00
17,848.90

120.40
1,050.00
75.00
450.00
135.00
17,848.90

120.40
1,050.00
75.00
450.00
135.00
23,198.90

120.40
1,050.00
75.00
450.00
135.00
17,848.90
177,644.02
5,690,166.57

120.40
1,050.00
75.00
450.00
135.00
17,848.90

120.40
1,050.00
75.00
450.00
135.00
17,848.90

120.40
1,050.00
75.00
450.00
135.00
17,848.90

120.40
1,050.00
75.00
450.00
135.00
28,765.57

450.25
750.00
1,080.00
0.00
4,131.00
2,430.00

750.00
1,083.60
9,450.00
675.00
4,050.00
1,215.00
177,644.02
3.1219476%

PRESUPUESTO ANALITICO DE COSTO DIRECTO


SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE AMBO
ALTERNATIVA N 01
PRESUPUESTO
PLAZO
DEPARTAMENTO
PROVINCIA
DISTRITO
LUGAR
PARTIDA

06.05.11.10

:
:
:
:
:
:

S/. 12,613,084.73
270 DIAS CALENDARIO
HUANUCO
HUANUCO
AMBO
AMBO
ASIGNACION GENERICA

RETRIBUCIONES Y COMPLEMENTOS
DEL OBRERO EVENTUAL

06.05.11.11

06.05.11.13

06.05.11.37

S/. 350,475.82
S/. 327,547.50

S.CT.R (0.63%)

S/. 22,928.32

GASTOS VARIABLES Y OCASIONALES

S/. 503,214.50
S/. 503,214.50

MATERIALES DE CONSTRUCCION

S/. 4,040,352.90
S/. 4,040,352.90

ALQUILER DE BIENES
ALQUILER DE EQUIPO Y MAQUINARIA

06.05.11.30

S/. 3,639,416.61

ESALUD ( 9 %)

MATERIAL DE CONSTRUCION

S/. 4,079,624.90
S/. 4,079,624.90

BIENES DE CONSUMO
HERRAMIENTAS

TOTAL

S/. 3,639,416.61

OBLIGACIONES DEL EMPLEADOR

OTROS GASTOS EVENTUALES U OCASIONALES


06.05.11.29

PRESUPUESTO

S/. 0.00
S/. 0.00

TOTAL S/.

12,613,084.73

PRESUPUESTO ANALITICO SISTEMA DE AGUA POTABLE


PARTIDA

06.05.11.10

ASIGNACION GENERICA

RETRIBUCIONES Y COMPLEMENTOS
DEL OBRERO EVENTUAL

06.05.11.11

06.05.11.13

06.05.11.37

S/. 133,225.29
S/. 124,509.62

S.CT.R (0.63%)

S/. 8,715.67

GASTOS VARIABLES Y OCASIONALES

S/. 191,285.37
S/. 191,285.37

MATERIALES DE CONSTRUCCION

S/. 1,474,435.43
S/. 1,474,435.43

ALQUILER DE BIENES
ALQUILER DE EQUIPO Y MAQUINARIA

06.05.11.30

S/. 1,383,440.17

ESALUD ( 9 %)

MATERIAL DE CONSTRUCION

S/. 1,033,169.81
S/. 1,033,169.81

BIENES DE CONSUMO
HERRAMIENTAS

TOTAL

S/. 1,383,440.17

OBLIGACIONES DEL EMPLEADOR

OTROS GASTOS EVENTUALES U OCASIONALES


06.05.11.29

PRESUPUESTO

S/. 0.00
S/. 0.00

TOTAL S/.

4,215,556.07

PRESUPUESTO ANALITICO SISTEMA DE ALCANTARILLADO


PARTIDA

06.05.11.10

ASIGNACION GENERICA

RETRIBUCIONES Y COMPLEMENTOS
DEL OBRERO EVENTUAL

06.05.11.11

06.05.11.13

06.05.11.37

S/. 217,250.53
S/. 203,037.88

S.CT.R (0.63%)

S/. 14,212.65

GASTOS VARIABLES Y OCASIONALES

S/. 311,929.13
S/. 311,929.13

MATERIALES DE CONSTRUCCION

S/. 2,565,917.47
S/. 2,565,917.47

ALQUILER DE BIENES
ALQUILER DE EQUIPO Y MAQUINARIA

06.05.11.30

S/. 2,255,976.44

ESALUD ( 9 %)

MATERIAL DE CONSTRUCION

S/. 3,046,455.09
S/. 3,046,455.09

BIENES DE CONSUMO
HERRAMIENTAS

TOTAL

S/. 2,255,976.44

OBLIGACIONES DEL EMPLEADOR

OTROS GASTOS EVENTUALES U OCASIONALES


06.05.11.29

PRESUPUESTO

S/. 0.00
S/. 0.00

TOTAL S/.

8,397,528.66

PRESUPUESTO ANALITICO DE COSTO DIRECTO


SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE AMBO
ALTERNATIVA N 02
PRESUPUESTO
PLAZO
DEPARTAMENTO
PROVINCIA
DISTRITO
LUGAR
PARTIDA

06.05.11.10

:
:
:
:
:
:

S/. 9,887,649.36
270 DIAS CALENDARIO
HUANUCO
HUANUCO
AMBO
AMBO
ASIGNACION GENERICA

RETRIBUCIONES Y COMPLEMENTOS
DEL OBRERO EVENTUAL

06.05.11.11

06.05.11.13

06.05.11.37

S/. 283,866.35
S/. 265,295.65

S.CT.R (0.63%)

S/. 18,570.70

GASTOS VARIABLES Y OCASIONALES

S/. 407,576.36
S/. 407,576.36

MATERIALES DE CONSTRUCCION

S/. 3,661,994.84
S/. 3,661,994.84

ALQUILER DE BIENES
ALQUILER DE EQUIPO Y MAQUINARIA

06.05.11.30

S/. 2,947,729.45

ESALUD ( 9 %)

MATERIAL DE CONSTRUCION

S/. 2,586,482.36
S/. 2,586,482.36

BIENES DE CONSUMO
HERRAMIENTAS

TOTAL

S/. 2,947,729.45

OBLIGACIONES DEL EMPLEADOR

OTROS GASTOS EVENTUALES U OCASIONALES


06.05.11.29

PRESUPUESTO

S/. 0.00
S/. 0.00

TOTAL S/.

9,887,649.36

PRESUPUESTO ANALITICO SISTEMA DE AGUA POTABLE


PARTIDA

06.05.11.10

ASIGNACION GENERICA

RETRIBUCIONES Y COMPLEMENTOS
DEL OBRERO EVENTUAL

06.05.11.11

06.05.11.13

06.05.11.37

S/. 135,483.08
S/. 126,619.70

S.CT.R (0.63%)

S/. 8,863.38

GASTOS VARIABLES Y OCASIONALES

S/. 194,527.11
S/. 194,527.11

MATERIALES DE CONSTRUCCION

S/. 1,453,207.36
S/. 1,453,207.36

ALQUILER DE BIENES
ALQUILER DE EQUIPO Y MAQUINARIA

06.05.11.30

S/. 1,406,885.53

ESALUD ( 9 %)

MATERIAL DE CONSTRUCION

S/. 1,007,379.71
S/. 1,007,379.71

BIENES DE CONSUMO
HERRAMIENTAS

TOTAL

S/. 1,406,885.53

OBLIGACIONES DEL EMPLEADOR

OTROS GASTOS EVENTUALES U OCASIONALES


06.05.11.29

PRESUPUESTO

S/. 0.00
S/. 0.00

TOTAL S/.

4,197,482.79

PRESUPUESTO ANALITICO SISTEMA DE ALCANTARILLADO


PARTIDA

06.05.11.10

ASIGNACION GENERICA

RETRIBUCIONES Y COMPLEMENTOS
DEL OBRERO EVENTUAL

06.05.11.11

06.05.11.13

06.05.11.37

S/. 148,383.27
S/. 138,675.95

S.CT.R (0.63%)

S/. 9,707.32

GASTOS VARIABLES Y OCASIONALES

S/. 213,049.25
S/. 213,049.25

MATERIALES DE CONSTRUCCION

S/. 2,208,787.48
S/. 2,208,787.48

ALQUILER DE BIENES
ALQUILER DE EQUIPO Y MAQUINARIA

06.05.11.30

S/. 1,540,843.92

ESALUD ( 9 %)

MATERIAL DE CONSTRUCION

S/. 1,579,102.65
S/. 1,579,102.65

BIENES DE CONSUMO
HERRAMIENTAS

TOTAL

S/. 1,540,843.92

OBLIGACIONES DEL EMPLEADOR

OTROS GASTOS EVENTUALES U OCASIONALES


06.05.11.29

PRESUPUESTO

S/. 0.00
S/. 0.00

TOTAL S/.

5,690,166.57

BALANCE DE OFERTA Y DEMANDA SIN PROYECTO Y CON PROYECTO DEL SISTEMA DE AGUA
POTABLE

COMPONENTES

UND DE
MEDIDA

Represamiento
Mej. Captacin
Redes de Conduccin
Mej. Desarenador
Mej. Sedimentador
Planta de Tratamiento
Mej. Y Const. Reservorio
Redes de Aduccin
Redes de Distribucin
Conexiones Domiciliarias
Obras de Arte (Pase Aereo)
Mitigacin de Impacto Ambiental

Und
Und
ml
Und
Und
Und
Und
ml
ml
Und
Und
glb

CON
CON
BALANCE
SIN
PROYECTO PROYECTO SIN (-) CON
PROYECTO
ALT 01
ALT 02
PROYECTO
0
1
1
1
1
1
0
-1
5755
10495
10495
4740
1
1
1
0
1
1
1
0
1
1
1
0
719
719
849
130
290
878.5
878.5
588.5
1219
25884
25884
24665
1371
1925
1925
554
0
1
1
1
0
1
1
1

BALANCE DE OFERTA Y DEMANDA SIN PROYECTO Y CON PROYECTO DEL SISTEMA DE


ALCANTARILLADO

COMPONENTES

UND DE
MEDIDA

Conexiones Domiciliarias
Red Colectora
Red Emisora
Sistema de Bombeo
Pases Aereos
Planta de Tratamiento
Mitigacin de Impacto Ambiental

Und
ml
ml
Und
Und
Und
glb

CON
CON
BALANCE
SIN
PROYECTO PROYECTO SIN (-) CON
PROYECTO
ALT 01
ALT 02
PROYECTO
1194
1925
1925
731
8566
22390
22390
13824
0
5152
5152
5152
0
2
2
2
0
3
3
3
0
1
1
1
0
1
1
1

EN LA SITUACION ACTUAL SE REEMPLAZA TODO

ALTERNATIVA N 01
COSTOS DE OPERACIN Y MANTENIMIENTO SISTEMA DE AGUA POTABLE
ITEM
01

PARTIDAS

UND CANT

Produccin (Captacin y Tratamiento)


Ingeniero Sanitario y Quimico
Mano de Obra (Operadores)
Materiales y Herramientas
Redes de Distribucin
Mano de Obra (Operadores)
Materiales y Herramientas
Mantenimiento de Medidores
Mano de Obra (Operadores)
Materiales y Herramientas
Comercial (Retribucin del Servicio Prestado)
Mano de Obra (Personal de cobranza)
Materiales y Herramientas
Mantenimeinto de Equipos
Mano de Obra (personal mecanico)
Materiales y Herramientas
Capacitacin
Al personal administrativo
Al personal obrero y operadores
Indemnizacin

02

03

04

05

06

07

P. UNIT

PARCIAL

glb

SUB TOTAL
13,500.00

2
4
1

2,500.00
1,200.00
3,700.00

5,000.00
4,800.00
3,700.00

3
1

1,200.00
1,600.00

3,600.00
1,600.00

1
1

1,200.00
1,700.00

1,200.00
1,700.00

1
1

1,200.00
800.00

1,200.00
800.00

1
1

1,200.00
3,100.00

1,200.00
3,100.00

0.5
0.5

2,500.00
2,500.00

1,250.00
1,250.00

glb

5,200.00

glb

2,900.00

glb

2,000.00

glb

4,300.00

glb

2,500.00

glb

1,250.00

COSTO DIRECTO PARCIAL S/.

31,650.00

COSTOS DE OPERACIN Y MANTENIMIENTO SISTEMA DE ALCANTARILLADO


ITEM
01

02

03
04

05

06

PARTIDAS

UND CANT

Limpieza de Red Colectora y Emisora


Mano de Obra (Operadores)
Materiales y Herramientas
Descolmatacin de Buzones
Mano de Obra (Operadores)
Materiales y Herramientas
Comercial (Retribucin del servicio)
Mano de Obra (Personal de cobranza)
Limpieza y Mant. Planta de Tratamiento
Mano de Obra (Operadores)
Materiales y Herramientas
Equipos
Mantenimiento de Equipos
Mano de Obra (personal mecanico)
Materiales y Herramientas
Capacitacin
Al personal administrativo
Al personal obrero y operadores

P. UNIT

PARCIAL

glb

SUB TOTAL
3,600.00

2
1

1,200.00
1,200.00

2,400.00
1,200.00

2
1

1,200.00
1,226.00

2,400.00
1,226.00

1,200.00

1,200.00

8
1
1

1,200.00
3,500.00
4,000.00

9,600.00
3,500.00
4,000.00

1
1

1,200.00
500.00

1,200.00
500.00

0.5
0.5

2,500.00
2,500.00

1,250.00
1,250.00

glb

3,626.00

glb

1,200.00

glb

17,100.00

glb

1,700.00

glb

2,500.00

COSTO DIRECTO PARCIAL S/.

29,726.00

RESUMEN DE COSTO DE OPERACIN Y MANTENIMIENTO DEL SISTEMA DE AGUA


POTABLE Y ALCANTARILLADO ALTERNATIVA N 01
ITEM
01
02
03
04

PARTIDAS
Sistema de Agua Potable
Sistema de Alcantarillado

UND CANT
glb
glb

1.00
1.00

P. UNIT

PARCIAL

SUB TOTAL
31,650.00
29,726.00

COSTO DIRECTO PARCIAL S/.

61,376.00

ALTERNATIVA N 02
COSTOS DE OPERACIN Y MANTENIMIENTO SISTEMA DE AGUA POTABLE
ITEM
01

PARTIDAS

UND CANT

Produccin (Captacin y Tratamiento)


Ingeniero Sanitario y Quimico
Mano de Obra (Operadores)
Materiales y Herramientas
Redes de Distribucin
Mano de Obra (Operadores)
Materiales y Herramientas
Mantenimiento de Medidores
Mano de Obra (Operadores)
Materiales y Herramientas
Comercial (Retribucin del Servicio Prestado)
Mano de Obra (Personal de cobranza)
Materiales y Herramientas
Mantenimeinto de Equipos
Mano de Obra (personal mecanico)
Materiales y Herramientas
Capacitacin
Al personal administrativo
Al personal obrero y operadores
Indemnizacin

02

03

04

05

06

07

P. UNIT

PARCIAL

glb

SUB TOTAL
12,608.40

2
4
1

2,500.00
1,200.00
2,808.40

5,000.00
4,800.00
2,808.40

3
1

1,200.00
900.00

3,600.00
900.00

1
1

1,200.00
1,700.00

1,200.00
1,700.00

1
1

1,200.00
800.00

1,200.00
800.00

1
1

1,200.00
550.00

1,200.00
550.00

0.5
0.5

2,500.00
2,500.00

1,250.00
1,250.00

glb

4,500.00

glb

2,900.00

glb

2,000.00

glb

1,750.00

glb

2,500.00

glb

350.00

COSTO DIRECTO PARCIAL S/.

26,608.40

COSTOS DE OPERACIN Y MANTENIMIENTO SISTEMA DE ALCANTARILLADO


ITEM
01

02

03
04

05

06

PARTIDAS

UND CANT

Limpieza de Red Colectora y Emisora


Mano de Obra (Operadores)
Materiales y Herramientas
Descolmatacin de Buzones
Mano de Obra (Operadores)
Materiales y Herramientas
Comercial (Retribucin del servicio)
Mano de Obra (Personal de cobranza)
Limpieza y Mant. Planta de Tratamiento
Mano de Obra (Operadores)
Materiales y Herramientas
Equipos
Mantenimiento de Equipos
Mano de Obra (personal mecanico)
Materiales y Herramientas
Capacitacin
Al personal administrativo
Al personal obrero y operadores

P. UNIT

PARCIAL

glb

SUB TOTAL
3,600.00

2
1

1,200.00
1,200.00

2,400.00
1,200.00

2
1

1,200.00
1,226.00

2,400.00
1,226.00

1,200.00

1,200.00

6
1
1

1,200.00
2,000.00
1,500.00

7,200.00
2,000.00
1,500.00

1
1

1,200.00
500.00

1,200.00
500.00

0.5
0.5

2,500.00
2,500.00

1,250.00
1,250.00

glb

3,626.00

glb

1,200.00

glb

10,700.00

glb

1,700.00

glb

2,500.00

COSTO DIRECTO PARCIAL S/.

23,326.00

RESUMEN DE COSTO DE OPERACIN Y MANTENIMIENTO DEL SISTEMA DE AGUA


POTABLE Y ALCANTARILLADO ALTERNATIVA N 02
ITEM
01
02
03
04

PARTIDAS
Sistema de Agua Potable
Sistema de Alcantarillado

UND CANT
glb
glb

P. UNIT

PARCIAL

SUB TOTAL
26,608.40
23,326.00

COSTO DIRECTO PARCIAL S/.

49,934.40