Anda di halaman 1dari 28

Estimation of pkg.

2 PSC girder birdges


Bridge No-1202/2
span

1X 18.3 M

Boq. Item.
No.

Description of items

unit

2006

Providing precast/cast in situ PSC girders


including diaphram and deck slab with
design mix control concrete M/45/M50

Cum

2008

Providing and fixing elastomeric bearings


as per specification provided(as per
drawing0

Ccm

2009

providing and laying 400 mm expansion


joints as per rdso drawing no.- B1757/R

Nos

2010

Conducting static load test of prestressed


concrete deck with static uniformly
distrubuted static load asper clause 10.5 of
Irs bridge code 1

2010c

Nos

18.3 meter Cast in situ I girder


Providing IPN coating (Devloped by CBRI)
on psc girders slabs and other structures as
directed by Engineers

SQM

2061

sypplying- TMt Fe- 500


Reinforcementconfirming to IS:1786 1985
Including decoiling, straightening, cutting,
Bending, Placing in position

MT

8001

supplying of 43/53 grade cement


confirming to revelent is specification

bags

2015

Bridge No-1239/2

span

2X 18.3 M

Boq. Item.
No.

Description of items

unit

2006

Providing precast/cast in situ PSC girders


including diaphram and deck slab with
design mix control concrete M/45/M50

Cum

2008

Providing and fixing elastomeric bearings


as per specification provided(as per
drawing0

Ccm

2009

providing and laying 400 mm expansion


joints as per rdso drawing no.- B1757/R

Nos

2010

Conducting static load test of prestressed


concrete deck with static uniformly
distrubuted static load asper clause 10.5 of
Irs bridge code 1

Nos

2010c

18.3 meter Cast in situ I girder

2015

Providing IPN coating (Devloped by CBRI)


on psc girders slabs and other structures as
directed by Engineers

SQM

2061

supplying- TMt Fe- 500


Reinforcementconfirming to IS:1786 1985
Including decoiling, straightening, cutting,
Bending, Placing in position

MT

8001

supplying of 43/53 grade cement


confirming to revelent is specification

bags

Bridge No- 1252/2


span

Boq. Item.
No.

Description of items

unit

2X 12.2M

2006

Providing precast/cast in situ PSC girders


including diaphram and deck slab with
design mix control concrete M/45/M50

Cum

2008

Providing and fixing elastomeric bearings


as per specification provided(as per
drawing0

Ccm

2009

providing and laying 400 mm expansion


joints as per rdso drawing no.- B1757/R

Nos

2010

Conducting static load test of prestressed


concrete deck with static uniformly
distrubuted static load asper clause 10.5 of
Irs bridge code 1

Nos

2010c

12.2 meter Cast in situ I girder

2015

Providing IPN coating (Devloped by CBRI)


on psc girders slabs and other structures as
directed by Engineers

SQM

2061

sypplying- TMt Fe- 500


Reinforcementconfirming to IS:1786 1985
Including decoiling, straightening, cutting,
Bending, Placing in position

MT

8001

supplying of 43/53 grade cement


confirming to revelent is specification

Bags

Quantity/
span

rate

amount/span

updation of
contrctor's %
Updated cost
% above
above

77.17

10700

825719

6.56%

879886.17

21.2% above

60480

0.7

42336

6.56%

45113.24

21.2% above

11800

23600

6.56%

25148.16

21.2% above

71600

71600

6.56%

76296.96

21.2% above

117.88

381

44912.28

6.56%

47858.53

21.2% above

9.25

56000.00

518000.00

7.64%

557575.20

7.33%

700.00

339.00

237300.00

0.00%

282387.00

19.00%

Total =

Quantity/
span

rate

amount/span

updation of
contrctor's %
Updated cost
% above
above

77.17

10700

825719

6.56%

879886.17

21.2% above

60480

0.7

42336

6.56%

45113.24

21.2% above

11800

23600

6.56%

25148.16

21.2% above

71600

71600

6.56%

76296.96

21.2% above

117.88

381

44912.28

6.56%

47858.53

21.2% above

9.25

56000.00

518000.00

7.64%

557575.20

7.33%

700.00

339.00

237300.00

0.00%

282387.00

19.00%

Total =

Quantity/
Span

rate

amount/span

updation of
contrctor's %
Updated cost
% above
above

46.77

10700.00

500439.00

6.56%

533267.80

21.20%

60480.00

0.70

42336.00

6.56%

45113.24

21.20%

2.00

11800.00

23600.00

6.56%

25148.16

21.20%

1.00

55900.00

55900.00

6.56%

59567.04

21.20%

120.00

381.00

45720.00

6.56%

48719.23

21.20%

5.50

56000.00

308000.00

7.64%

308000.00

7.33%

500.00

339.00

169500.00

0.00%

182449.80

19%

Total =

total amount

1066422.03

54677.25

30479.57

92471.92

58004.53

598445.46

336040.53

2236541.29

total amount

For all spans

1066422.03

2132844.0673536

54677.25

109354.4976384

30479.57

60959.13984

92471.92

184943.83104

58004.53

116009.065976832

598445.46

1196890.92432

336040.53

672081.06

2236541.29 4473082.586

total amount

For all spans

646320.57

1292641.14

54677.25

109354.50

30479.57

60959.14

72195.25

144390.50

59047.71

118095.42

330576.40

661152.80

217115.26

434230.52

1410412.01

2820824.03

Estimation of pkg. 3 PSC girder birdges


Bridge No-1301/2
span

Boq. Item. No.

Description of items

3X18.3

2006

Providing precast/cast in situ PSC girders including


diaphram and deck slab with design mix control concrete
M/45/M50

2008

Providing and fixing elastomeric bearings as per


specification provided(as per drawing0

2009

providing and laying 400 mm expansion joints as per rdso


drawing no.- B1757/R

2010

Conducting static load test of prestressed concrete deck


with static uniformly distrubuted static load asper clause
10.5 of Irs bridge code 1

2010c

18.3 meter Cast in situ I girder

2015

Providing Ipn coating (Devloped by CBRI) on psc girders


slabs and other structures as directed by Engineers

2061

supplying- TMt Fe- 500 Reinforcementconfirming to IS:1786


1985 Including decoiling, straightening, cutting, Bending,
Placing in position

8001

supplying of 43/53 grade cement confirming to revelent IS


specification

Boq. Item. No.

Description of items

span

2X 12.2M

2006

Providing precast/cast in situ PSC girders including


diaphram and deck slab with design mix control concrete
M/45/M50

2008

Providing an dfixing elastomeric bearings as per


specification provided(as per drawing0

2009

providing and laying 400 mm expansion joints as per rdso


drawing no.- B1757/R

2010

Conducting static load test of prestressed concrete deck


with static uniformly distrubuted static load asper clause
10.5 of Irs bridge code 1

2010c

12.2 meter Cast in situ I girder

2015

Providing IPN coating (Devloped by CBRI) on psc girders


slabs and other structures as directed by Engineers

2061

supplying- TMt Fe- 500 Reinforcementconfirming to IS:1786


1985 Including decoiling, straightening, cutting, Bending,
Placing in position

8001

supplying of 43/53 grade cement confirming to revelent is


specification

Bridge No-1325/1
span

3X18.3

Boq. Item. No.

Description of items

2006

Providing precast/cast in situ PSC girders including


diaphram and deck slab with design mix control concrete
M/45/M50

2008

Providing and fixing elastomeric bearings as per


specification provided(as per drawing0

2009

providing and laying 400 mm expansion joints as per rdso


drawing no.- B1757/R

2010

Conducting static load test of prestressed concrete deck


with static uniformly distrubuted static load asper clause
10.5 of Irs bridge code 1

2010c

18.3 meter Cast in situ I girder

2015

Providing Ipn coating (Devloped by CBRI) on psc girders


slabs and other structures as directed by Engineers

2061

sypplying- TMt Fe- 500 Reinforcementconfirming to IS:1786


1985 Including decoiling, straightening, cutting, Bending,
Placing in position

8001

supplying of 43/53 grade cement confirming to revelent is


specification

span

Boq. Item. No.

Description of items

2X 12.2M

2006

Providing precast/cast in situ PSC girders including


diaphram and deck slab with design mix control concrete
M/45/M50

2008

Providing and fixing elastomeric bearings as per


specification provided(as per drawing0

2009

providing and laying 400 mm expansion joints as per rdso


drawing no.- B1757/R

2010

Conducting static load test of prestressed concrete deck


with static uniformly distrubuted static load asper clause
10.5 of Irs bridge code 1

2010c

12.2 meter Cast in situ I girder

2015

Providing IPN coating (Devloped by CBRI) on psc girders


slabs and other structures as directed by Engineers

2061

sypplying- TMt Fe- 500 Reinforcementconfirming to IS:1786


1985 Including decoiling, straightening, cutting, Bending,
Placing in position

8001

supplying of 43/53 grade cement confirming to revelent is


specification

pkg. 3 PSC girder birdges


Span 3 X 18.3M+ 2X 12.2M
Description of items

unit

Quantity/span

Cum

77.17

Providing and fixing elastomeric bearings as per


specification provided(as per drawing0

Ccm

60480

iding and laying 400 mm expansion joints as per rdso


drawing no.- B1757/R

Nos

Nos

SQM

162

MT

9.25

bags

700.00

unit

Quantity/Span

Providing precast/cast in situ PSC girders including


hram and deck slab with design mix control concrete
M/45/M50

nducting static load test of prestressed concrete deck


static uniformly distrubuted static load asper clause
10.5 of Irs bridge code 1

18.3 meter Cast in situ I girder

viding Ipn coating (Devloped by CBRI) on psc girders


labs and other structures as directed by Engineers

lying- TMt Fe- 500 Reinforcementconfirming to IS:1786


5 Including decoiling, straightening, cutting, Bending,
Placing in position

plying of 43/53 grade cement confirming to revelent IS


specification

Description of items

Providing precast/cast in situ PSC girders including


hram and deck slab with design mix control concrete
M/45/M50

Cum

46.77

Providing an dfixing elastomeric bearings as per


specification provided(as per drawing0

Ccm

60480.00

iding and laying 400 mm expansion joints as per rdso


drawing no.- B1757/R

Nos

2.00

Nos

1.00

SQM

120.00

MT

5.50

Bags

500.00

nducting static load test of prestressed concrete deck


static uniformly distrubuted static load asper clause
10.5 of Irs bridge code 1
12.2 meter Cast in situ I girder

viding IPN coating (Devloped by CBRI) on psc girders


labs and other structures as directed by Engineers

lying- TMt Fe- 500 Reinforcementconfirming to IS:1786


5 Including decoiling, straightening, cutting, Bending,
Placing in position

plying of 43/53 grade cement confirming to revelent is


specification

Span 3 X 18.3M+ 2X 12.2M


Description of items

Providing precast/cast in situ PSC girders including


hram and deck slab with design mix control concrete
M/45/M50

unit

Quantity/span

Cum

77.17

Providing and fixing elastomeric bearings as per


specification provided(as per drawing0

Ccm

60480

iding and laying 400 mm expansion joints as per rdso


drawing no.- B1757/R

Nos

Nos

nducting static load test of prestressed concrete deck


static uniformly distrubuted static load asper clause
10.5 of Irs bridge code 1
18.3 meter Cast in situ I girder

viding Ipn coating (Devloped by CBRI) on psc girders


labs and other structures as directed by Engineers

SQM

162

lying- TMt Fe- 500 Reinforcementconfirming to IS:1786


5 Including decoiling, straightening, cutting, Bending,
Placing in position

MT

9.25

plying of 43/53 grade cement confirming to revelent is


specification

bags

700.00

unit

Quantity/Span

Cum

46.77

Providing and fixing elastomeric bearings as per


specification provided(as per drawing0

Ccm

60480.00

iding and laying 400 mm expansion joints as per rdso


drawing no.- B1757/R

Nos

2.00

Nos

1.00

SQM

120.00

Description of items

Providing precast/cast in situ PSC girders including


hram and deck slab with design mix control concrete
M/45/M50

nducting static load test of prestressed concrete deck


static uniformly distrubuted static load asper clause
10.5 of Irs bridge code 1
12.2 meter Cast in situ I girder

viding IPN coating (Devloped by CBRI) on psc girders


labs and other structures as directed by Engineers

lying- TMt Fe- 500 Reinforcementconfirming to IS:1786


5 Including decoiling, straightening, cutting, Bending,
Placing in position

MT

5.50

plying of 43/53 grade cement confirming to revelent is


specification

Bags

500.00

rate

amount/span

updation of %
above

Updated cost

contrctor's %
above

10700

825719

6.23%

877161.29

32% above

0.7

42336

6.23%

44973.53

32% above

11800

23600

6.23%

25070.28

32% above

71600

71600

6.23%

76060.68

32% above

381

61722

6.23%

65567.28

32% above

56000.00

518000.00

7.64%

557575.20

4% above

339.00

237300.00

0.00%

237300.00

19% above

Total =

rate

amount/span

updation of %
above

Updated cost

contrctor's %
above

10700.00

500439.00

6.23%

531616.35

32.00%

0.70

42336.00

6.23%

44973.53

32.00%

11800.00

23600.00

6.23%

25070.28

32.00%

55900.00

55900.00

6.23%

59382.57

32.00%

381.00

45720.00

6.23%

48568.36

32.00%

56000.00

308000.00

7.64%

308000.00

4.00%

339.00

169500.00

0.00%

182449.80

19%

Total =

Total for 1301/1 Bridge =

rate

amount/span

updation of %
above

Updated cost

contrctor's %
above

10700

825719

6.23%

877161.29

32% above

0.7

42336

6.23%

44973.53

32% above

11800

23600

6.23%

25070.28

32% above

71600

71600

6.23%

76060.68

32% above

381

61722

6.23%

65567.28 32% above

56000.00

518000.00

7.64%

557575.20

4% above

339.00

237300.00

0.00%

237300.00

19% above

Total =

rate

amount/span

updation of %
above

Updated cost

contrctor's %
above

10700.00

500439.00

6.23%

531616.35

32.00%

0.70

42336.00

6.23%

44973.53

32.00%

11800.00

23600.00

6.23%

25070.28

32.00%

55900.00

55900.00

6.23%

59382.57

32.00%

381.00

45720.00

6.23%

48568.36

32.00%

56000.00

308000.00

7.64%

308000.00

4.00%

339.00

169500.00

0.00%

182449.80

19%

Total =

Total for 13025/1 Bridge =

total amount

For all spans

1157852.91

3473558.72

59365.06

178095.19

33092.77

99278.31

100400.10

301200.29

86548.81

259646.43

579878.21

1739634.62

282387.00

847161.00

2299524.86

6898574.57

total amount

For all spans

701733.58

1403467.16

59365.06

118730.13

33092.77

66185.54

78384.99

156769.98

64110.23

128220.46

320320.00

640640.00

217115.26

434230.52

1474121.90

2948243.80

9846818.37

total amount

For all spans

1157852.91

3473558.72

59365.06

178095.19

33092.77

99278.31

100400.10

301200.29

86548.81

259646.43

579878.21

1739634.62

282387.00

847161.00

2299524.86

6898574.57

total amount

For all spans

701733.58

1403467.16

59365.06

118730.13

33092.77

66185.54

78384.99

156769.98

64110.23

128220.46

320320.00

640640.00

217115.26

434230.52

1474121.90

2948243.80

9846818.37

Anda mungkin juga menyukai