AWARDED SOLAR PROJECTS as of October 31, 2015

ISLAND /
GRID
LUZON

REGION

PROVINCE

Ilocos Norte

CITY /
MUNICIPALITY

PROJECT NAME

STATUS

POTENTIAL
CAPACITY
(MW)

Currimao

Currimao Solar Power


Project

Mirae Asia Energy


Corporation

Under Development Stage (FIT System). For


issuance of show-cause letter due to non-posting
of Performance Bond.

20.00

Pasuquin, Burgos

Pasuquin East Solar


Power Project

Energy Logics Philippines,


Inc.

Motion for reconsideration and DOC (FIT System)


is under evaluation. For issuance of reminder
letter due to non compliance with RESHERR.

50.00

Burgos

Burgos Solar Power


Project Phase I

Energy Development
Corporation

Under Commercial Stage (FIT System). Compliant


with all work and financial obligations.

Burgos Solar Power


Project Phase 2

Energy Development
Corporation

DOC for Additional Investment (FIT System) is on


process.

Ilocos Norte Phase I


Solar Power Project

Del Sol Energy Primera, Inc.

Paoay

Ilocos Norte Phase II


Solar Power Project
Paoay II Solar Power
Project
Paoay III Solar Power
Project

II

COMPANY NAME

For issuance of Termination Letter due to noncompliance with Milestone Approach and
RESHERR.
For issuance of Termination Letter due to nonDel Sol Energy Primera, Inc. compliance with Milestone Approach and
RESHERR.
For issuance of Termination Letter due to nonDel Sol Energy Segunda, Inc. compliance with Milestone Approach and
RESHERR.
For issuance of Termination Letter due to nonDel Sol Energy Tercera, Inc. compliance with Milestone Approach and
RESHERR.

Pangasinan

Manaoag

Pugaro Solar Power


Project

AVGarcia Power Systems


Corp.

Cagayan

Aparri

Aparri Solar Power


Project

GreEnergy Power Systems


Philippines, Inc.

Isabela

Ilagan

Isabela Solar Power


Project

Living Projects 4 People


Philippines Inc.

For issuance of Termination Letter due to nonposting of Performance Bond and non-compliance
with Milestone Approach and RESHERR.
For issuance of Termination Letter due to
expiration of the SESC and non compliance with
the Performance Bond, DOC, and RESHERR.
Compliance with Milestone Approach is on-going.
For issuance of reminder letter due to non
compliance with RESHERR.

INSTALLED
CAPACITY
(MW)

4.10

2.66

40.00

40.00

40.00

40.00

2.00

105.00

100.00

AWARDED SOLAR PROJECTS as of October 31, 2015


ISLAND /
GRID
LUZON

REGION

III

PROVINCE

Pampanga

CITY /
MUNICIPALITY
Mexico

PROJECT NAME

COMPANY NAME

Pampanga Solar Power


RASLAG Corp.
Project
Pampanga Solar Power
RASLAG Corp.
Project Phase II

Bataan

Bulacan

Mabalacat

Clark Solar Power


Project

Enfinity Philippines
Renewable Resources Inc.

Hermosa

Hermosa Solar Power


Project

YH Green Energy
Incorporated

Morong

Morong Solar Power


Project

SPARC Solar Powered AgriRural Communities


Corporation

Mariveles

Bataan Solar Power


Project

Next Generation Power


Technology Corp.

Bataan I Solar Power


Project

nv vogt Philippines Solar


Energy Four, Inc.

Orani

Bataan Solar Power


Project

BWST, Inc.

San Rafael

San Rafael Solar Power


Project

SPARC Solar Powered AgriRural Communities


Corporation

San Ildefonso

Bulacan 3 Solar Power


Project

Cleantech Global
Renewables, Inc.

STATUS
Under Commercial Stage (FIT System). For
issuance of reminder letter due to noncompliance with RESHERR.
Confirmed DOC (FIT System). For issuance of
reminder letter relative to its compliance with
RESHERR.
Under Development Stage (FIT System).
Amendment of DOC (FIT System) was approved.
For issuance of show-cause letter due to delayed
implementation of 5-Year Work Plan, and noncompliance with RESHERR.
DOC (FIT System) is under evaluation. For issuance
of reminder letter due to non compliance with
RESHERR.
DOC (FIT System) is under evaluation. For issuance
of reminder letter due to non compliance with
RESHERR.
Compliant with Milestone Approach. For issuance
of reminder letter due to non compliance with
RESHERR.
Compliance with Milestone Approach is on-going.
For issuance of reminder letter due to non
compliance with RESHERR.
Compliant with Milestone Approach. For issuance
of show-cause letter due to delayed
implementation of its Work Program and noncompliance with RESHERR.
DOC (FIT System) is under evaluation. For issuance
of reminder letter due to non compliance with
RESHERR.
DOC (FIT System) and assignment to Bulacan Solar
Energy Corp. are under evaluation. For issuance of
reminder letter due to non compliance with
RESHERR.

POTENTIAL
CAPACITY
(MW)

INSTALLED
CAPACITY
(MW)
10.00

13.14

24.55

14.50

5.00

20.00

55.00

150.00

5.00

45.00

AWARDED SOLAR PROJECTS as of October 31, 2015


ISLAND /
GRID
LUZON

REGION

III

PROVINCE

Zambales

Nueva Ecija

Bataan

Tarlac

CITY /
MUNICIPALITY

PROJECT NAME

COMPANY NAME

Cavite

POTENTIAL
CAPACITY
(MW)

Palauig

Palauig Solar Power


Project

SPARC Solar Powered AgriRural Communities


Corporation

DOC (FIT System) is under evaluation. For issuance


of reminder letter due to non compliance with
RESHERR.

5.00

Botolan

Botolan Solar Power


Project

Solar Power Utilities


Generator Corporation

DOC under evaluation. Compliance with Milestone


Approach is on-going. For issuance of reminder
letter due to non compliance with RESHERR.

40.00

Under Development Stage (FIT System). For


Cabanatuan Solar Power First Cabanatuan Renewable
Cabanatuan City
issuance of reminder letter due to non compliance
Project
Ventures, Inc.
with RESHERR.
Confirmed DOC (FIT System). For issuance of
Sta. Rita Solar Power
Morong -Hermosa
Jobin-Sqm Inc.
reminder letter due to non compliance with
Project
RESHERR.
Under Development Stage (FIT System). For
Concepcion Solar Power Enfinity Philippines
Concepcion
issuance of reminder letter due to non compliance
Project
Renewable Resources Inc.
with RESHERR.
Compliance with Milestone Approach is on-going.
Tarlac Solar Power
nv vogt Philippines Solar
Tarlac City
For issuance of reminder letter due to non
Project
Energy Three, Inc.
compliance with RESHERR.
PetroSolar Corporation

IV-A

STATUS

Rosario and
General Trias

Cavite Economic Zone


Solar Power Project

Majestics Energy
Corporation

Naic

Sabang Solar Power


Project

G.A. Philkor Multi Energy


Corp.

Noveleta, Rosario, Cavite Solar Power


Gen. Trias, Tanza Project

Enfinity Philippines
Renewable Resources Inc.

Under Development Stage (FIT System). For


issuance of reminder letter due to non compliance
with RESHERR.
Under Commercial Stage (FIT System). For
issuance of reminder letter due to non compliance
with RESHERR.
Effectivity of the SESC was reinstated and shall be
valid until 05 December 2015. For issuance of
reminder letter due to non compliance with
RESHERR.
Under Development Stage (FIT System). For
issuance of show-cause letter due to delayed
implementation of 5-Year Work Plan and noncompliance with RESHERR.

INSTALLED
CAPACITY
(MW)

10.06

100.44

50.55

55.00

50.00

41.30

50.00

3.00

AWARDED SOLAR PROJECTS as of October 31, 2015


ISLAND /
GRID

LUZON

REGION

IV-A

PROVINCE

CITY /
MUNICIPALITY

PROJECT NAME

COMPANY NAME

STATUS

Dasmarias

For issuance of Termination Letter due to nonDasmarias Solar Power Solar Philippines Commercial
posting of Performance Bond and non-compliance
Project
Rooftop Projects, Inc.
with Milestone Approach and RESHERR.

Rizal

Rodriguez

Macabud Solar Power


Project

Laguna

Calamba

Cavite

Binan

Under Development Stage (FIT System). For


ATN Philippines Solar Energy issuance of show-cause letter due to non-posting
Group, Inc.
of Performance Bond and non-compliance with
RESHERR.
For issuance of Termination Letter due to denied
Canlubang Solar Power Transnational Renewable
Motion for Reconsideration and non-compliance
Project
Energy Corporation
with RESHERR.
Under Development Stage (PSA with Central Mall
Central Mall Bian Solar Solar Philippines Commercial Binan). For issuance of show-cause letter due to
Power Project
Rooftop Projects, Inc.
non-posting of Performance Bond and noncompliance with RESHERR.

Cabuyao

Cabuyao Solar Power


Project

Luisiana

Luisiana Solar Power


Project

Batangas

Sto. Tomas

Quezon

Candelaria

Batangas

Calatagan

Lian

For issuance of Termination Letter due to nonSolar Philippines Commercial


posting of Performance Bond and non-compliance
Rooftop Projects, Inc.
with Milestone Approach and RESHERR.

Compliance with Milestone Approach is on-going.


For issuance of reminder letter due to non
compliance with RESHERR.
For issuance of show-cause letter due non-posting
FPIP Batangas Solar
First Gen Visayas Energy Inc. of Performance Bond and non-compliance with
Power Project
RESHERR.
Compliance with Milestone Approach is on-going.
Candelaria Solar Power Solar Power Utilities
For issuance of reminder letter due to non
Project
Generator Corporation
compliance with RESHERR.
Under Development Stage (FIT System). For
Calatagan Solar Power Solar Philippines Calatagan
issuance of reminder letter due to non compliance
Project Phase I
Corporation
with RESHERR.
DOC (FIT System) is under evaluation. For issuance
Lian Solar Power Project Absolut Distillers, Inc.
of reminder letter due to non compliance with
RESHERR.
Solar Power Utilities
Generator Corporation

POTENTIAL
CAPACITY
(MW)
0.80

30.00

0.206

0.700

16.00

30.00

50.00

12.91

2.00

INSTALLED
CAPACITY
(MW)

AWARDED SOLAR PROJECTS as of October 31, 2015


ISLAND /
GRID
LUZON

REGION

PROVINCE

PROJECT NAME

COMPANY NAME

STATUS

IV-A

Batangas

Balayan

Batangas Solar Power


Project

EarthEnergy Corp.

For issuance of reminder letter due to noncompliance with RESHERR.

IV-B

Palawan

Puerto Princesa

Palawan Solar Power


Project

Sabang Renewable Energy


Corp.

For issuance of Termination Letter due to nonposting of Performance Bond and non-compliance
with Milestone Approach and RESHERR.

Phil. Solar Farm-Palawan,


Inc.

For issuance of Termination Letter due to nonposting of Performance Bond and non-compliance
with Milestone Approach and RESHERR.

NCR

Metro Manila

Metro Manila

El Nido Island

El Nido Solar Power


Project

Quezon City

SM North Solar Power


Project

Quezon City

Quezon City 1 Solar


Power Project

Pasay City

Pasay City Solar Power


Project

Camarines Sur Pili

Catanduanes
LUZON Sum

CITY /
MUNICIPALITY

Caramoran

Request for suspension of its obligation is under


evaluation. For issuance of showcause Letter due
to non-posting of Performance Bond and noncompliance with RESHERR.
Under Commercial Stage (FIT System). For
Solar Philippines Commercial
issuance of reminder letter due to non compliance
Rooftop Projects, Inc.
with RESHERR.
SolarPacific Energy
Corporation

For issuance of Termination Letter due to nonSolar Philippines Commercial payment of Signature Bonus, non-posting of
Rooftop Projects, Inc.
Performance Bond, and non-compliance with
Milestone Approach and RESHERR.

Compliance with Milestone Approach is on-going.


Solar Philippines Commercial
For issuance of reminder letter due to non
Rooftop Projects, Inc.
compliance with RESHERR.
For issuance of Termination Letter due to nonPili Solar Power Project Emerging Power Inc.
compliance with Milestone Approach and
RESHERR.
DOC (PPA with FICELCO) is under evaluation. For
Catanduanes Solar
Local Government Unit of
issuance of reminder letter due to non compliance
Power Project
Caramoran
with RESHERR.

POTENTIAL
CAPACITY
(MW)

INSTALLED
CAPACITY
(MW)

30.00

10.00

3.00

1.50

1.20

3.20

12.00

1.00
1,338.92

56.90

AWARDED SOLAR PROJECTS as of October 31, 2015


ISLAND /
GRID
VISAYAS

REGION

VI

PROVINCE
Negros
Occidental

CITY /
MUNICIPALITY
Cadiz City

San Carlos City

La Carlota City

Bago

Manapla and
Cadiz
Bais City

Murcia

Victorias City

La Carlota City

Silay City

PROJECT NAME
Cadiz Solar Power
Project

COMPANY NAME
Helios Solar Energy Corp.
(formerly Phil-Power Solar
Energy Corp.)

STATUS
Under Development Stage (FIT System). Compliant
with all work and financial obligations.

Under Commercial Stage (FIT System). For


issuance of reminder letter due to non compliance
with RESHERR.
Under Commercial Stage (FIT System). For
issuance of reminder letter due to non compliance
with RESHERR.
Under Development Stage (FIT System). For
La Carlota Solar Power
San Carlos Solar Energy Inc. issuance of reminder letter due to non compliance
Project (SACASOL II-A)
with RESHERR.
For issuance of Termination letter due to nonBago Solar Power
Energy Development
submission of additional requirements relative to
Project
Corporation
its DOC and non compliance with Milestone
Approach and RESHERR.
DOC (FIT System) is under evaluation. For issuance
Manapla Solar Power
Negros Island Solar Power
of reminder letter due to non compliance with
Project (SACASOL III)
Inc.
RESHERR.
DOC (FIT System) is under evaluation. For issuance
Bais City Solar Power
Monte Solar Energy Inc.
of reminder letter due to non compliance with
Project (SACASOL IV)
RESHERR.
Compliance with Milestone Approach is on-going.
Murcia Solar Power
Energy Development
For issuance of reminder letter due to non
Project
Corporation
compliance with RESHERR.
DOC (FIT System) and Assignment to VictoriaSolar
Negros Occidental Solar
Energy Corp. are under evaluation. For issuance of
SunAsia Energy Inc.
Power Project
reminder letter due to non compliance with
RESHERR.
DOC (FIT System) is under evaluation. For issuance
SACASOL II-B Solar
Negros Island Solar Power
of reminder letter due to non compliance with
Power Project
Inc.
RESHERR.
Request for Assignment/transfer to Silay Solar
Power, Inc. is under evaluation. Compliance with
Silay City Solar Power
Megawatt Clean Energy, Inc. Milestone Approach is on-going. For issuance of
Project
reminder letter due to non compliance with
RESHERR.

POTENTIAL
CAPACITY
(MW)

INSTALLED
CAPACITY
(MW)

132.50

San Carlos Solar Power


Project Phase I-A and I-B San Carlos Solar Energy Inc.
(SACASOL I-A&I-B)
San Carlos Solar Power
Project Phase I-C and I- San Carlos Solar Energy Inc.
D (SACASOL I-C&I-D)

22.00

23.00

18.00

48.00

25.00

60.00

14.00

33.00

AWARDED SOLAR PROJECTS as of October 31, 2015


ISLAND /
GRID
VISAYAS

REGION
VI

PROVINCE
Negros
Occidental

CITY /
MUNICIPALITY
San Carlos City
Bacolod City

VII

Iloilo

Miag-ao

Iloilo

Tigbauan

Capiz

Roxas City

Cebu

DaanBantayan

Toledo

Bogo
VIII

Leyte

Ormoc

Tacloban, Santa
Fe and Palo

Biliran
VISAYAS Sum

Biliran

PROJECT NAME
SACASUN Solar Power
Project

COMPANY NAME

STATUS

DOC is under evaluation. For issuance of reminder


letter due to non compliance with RESHERR.
Compliance with Milestone Approach is on-going.
Bacolod City Solar
Negros PH Solar Inc.
For issuance of reminder letter due nonPower Project II
compliance with RESHERR.
Under Development Stage (FIT System). For
Miag-ao Solar Power
Cosmo Solar Energy, Inc.
schedule of on-site validation of Electromechanical
Project
Completion.
DOC (FIT System) is under evaluation. For issuance
Tigbauan Solar Power
Solexar Energy International,
of reminder letter due to non compliance with
Project
Inc.
RESHERR.
Compliance with Milestone Approach is on-going.
Roxas City Solar Power Solar Philippines Commercial
For issuance of reminder letter due to non
Project
Rooftop Projects, Inc.
compliance with RESHERR.
Compliance with Milestone Approach is on-going.
Daanbantayan Solar
Ceko Solar Farm Systems
For issuance of reminder letter due to non
Power Project
Corporation
compliance with RESHERR.
Assignment to First Toledo Solar Energy Corp. is
on process while awaiting submission of lacking
Toledo Solar Power
SunAsia Energy Inc.
documents relative to its DOC (FIT System). For
Project
issuance of reminder letter due to non compliance
with RESHERR.
Compliance with Milestone Approach is on-going.
Bogo Solar Power
Energy Development
For issuance of reminder letter due to non
Project
Corporation
compliance with RESHERR.
Leyte Solar Power
Request for reconsideration of its compliance
Phil. Solar Farm-Leyte, Inc.
Project II
under milestone approach is under evaluation.
Ormoc Solar Power
Under Commercial Stage (FIT System). Compliant
Phil. Solar Farm-Leyte, Inc.
Project
with all work and financial obligations.
Request for Contract Area Amendment is on
Sulu Electric Power and Light process. DOC (FIT System) is under evaluation. For
Palo Solar Power Project
(Phils.), Inc.
issuance of reminder letter due to non compliance
with RESHERR.
Under Development Stage (FIT System). For
Biliran Solar Power
E & P Green Energy, Inc.
issuance of reminder letter due to non compliance
Project
with RESHERR.
San Carlos Sun Power Inc.

POTENTIAL
CAPACITY
(MW)

INSTALLED
CAPACITY
(MW)

50.00
200.00

5.67

30.20

0.70

25.00

60.00

30.00
30.00

50.00

25.00
807.07

75.00

AWARDED SOLAR PROJECTS as of October 31, 2015


ISLAND /
GRID

REGION

MINDANAO IX

PROVINCE

PROJECT NAME

COMPANY NAME

Zamboanga del La Libertad and


Norte
Dapitan

Zamboanga del Norte


Solar Power Project

Astronergy Development
Dipolog Inc.

Misamis
Oriental

Villanueva

Kirahon Solar Power


Project

Kirahon Solar Energy


Corporation

Bukidnon

Kibawe

Kibawe Solar Power


Project

Asian Greenenergy Corp.

Sumilao

Bukidnon Solar Power


Project

SunAsia Energy Inc.

Laguindingan

Laguindingan Solar
Power Project

Liberty Solar Energy


Corporation (formerly
Cagayan Electric Power &

Claveria

Claveria Solar Power


Project

The Ark Green Dynamic


Resources Corp.

Balingasag

Misamis Oriental Solar


Power Project

Astronergy Development
Mindanao, Inc.

Sta. Cruz

Darong Solar Power


Project

PhilNewEnergy, Inc.

Davao Oriental Mati City

Davao Oriental Solar


Power Project

Sun Option for Livelihood


Alternative Resources Inc.

Davao del Sur

Digos Solar Power


Project Phase I

Enfinity Philippines
Renewable Resources
Fourth, Inc.

Misamis
Oriental

XI

CITY /
MUNICIPALITY

Davao del Sur

Digos City

STATUS
DOE requested for additional requirement for its
compliance with Milestone Approach. For issuance
of reminder letter due to non compliance with
RESHERR.
Under Development Stage (PSA with CEPALCO ERC approved Php8.75). Partial assignment to its
Kirahon Two Energy Corp. is under evaluation. For
issuance of reminder letter due to non compliance
with RESHERR.
Under Development Stage (FIT System). For
issuance of reminder letter due to non compliance
with RESHERR.
For issuance of Termination Letter due to nonposting of Performance Bond and non-compliance
with Milestone Approach and RESHERR.
On going pre-development activities. For issuance
of reminder letter due to non compliance with
RESHERR.
DOC (FIT System) is under evaluation. For issuance
of reminder letter due to non compliance with
RESHERR.
DOE requested for additional requirement for its
compliance with Milestone Approach. For issuance
of reminder letter due to non compliance with
RESHERR.
Expired SESC. For issuance of reminder letter to
settle all its Financial Obligations (i.e. Training
Assistance and Development Assistance).
On-going pre-development activities. For issuance
of reminder letter due to non- compliance with
RESHERR.
Under Development Stage (FIT System). For
issuance of show-cause letter due to delayed
implementation of its 5-Year Work Plan and noncompliance with RESHERR.

POTENTIAL
CAPACITY
(MW)

12.50

10.49

2.00

20.00

60.00

35.00

10.00

INSTALLED
CAPACITY
(MW)

AWARDED SOLAR PROJECTS as of October 31, 2015


ISLAND /
GRID

REGION

MINDANAO XI

XII

PROVINCE

CITY /
MUNICIPALITY

PROJECT NAME

COMPANY NAME

Davao del Sur

Digos City

Digos Solar Power


Project Phase II

Enfinity Philippines
Renewable Resources
Fourth, Inc.

North
Cotabato

Midsayap

Midsayap Solar Power


Project

SunAsia Energy Inc.

South
Cotabato

Under Development Stage (FIT System). For


issuance of reminder letter due to non compliance
with RESHERR.
For issuance of Termination Letter due to nonpayment of Signature Bonus, non-posting of
Performance Bond, and non-compliance with
Milestone Approach and RESHERR.

Surallah

Centrala Solar Power


Project

nv vogt Philippines Solar


Energy One, Inc.

Under Development Stage (PPA w/ SOCOTECO IERC Approved Php7.95). DOC(FIT System) is under
evaluation. For issuance of show-cause letter due
to non-posting of Performance Bond, delayed
implementation of its 5-Year Work Plan, & noncompliance with RESHERR.

General Santos
City

General Santos City 1


Solar Power Project

Enfinity Philippines
Renewable Resources Inc.

For issuance of Termination Letter due to nonposting of Performance Bond and non-compliance
with Milestone Approach and RESHERR.

Astronergy Development
GenSan Inc.

DOE requested for additional requirements for its


request for partial assignment to Astronergy
Development F1 Inc. and Astronergy Development
F2 Inc.. For issuance of reminder letter due to noncompliance with RESHERR.

South Cotabato Solar


Power Project

Sarangani

STATUS

Alabel

GenSan Solar Power


Project Phase I

Del Sol Energy CGS, Inc.

GenSan Solar Power


Project Phase II

Del Sol Energy CGS, Inc.

Alabel Solar Power


Project

SolarPacific Energy
Corporation

Request for Contract Area Amendment is on


process. Under Development Stage (FIT System).
For issuance of reminder letter due to non
compliance with RESHERR.
Under Development Stage (FIT System). For
issuance of reminder letter due to non compliance
with RESHERR.
Request for suspension of its obligation is under
evaluation. For issuance of showcause Letter due
to non-posting of Performance Bond and noncompliance with RESHERR.

POTENTIAL
CAPACITY
(MW)
19.58

2.50

6.25

10.00

48.00

48.00

15.00

INSTALLED
CAPACITY
(MW)

AWARDED SOLAR PROJECTS as of October 31, 2015


ISLAND /
GRID

REGION

PROJECT NAME

COMPANY NAME

President Roxas Solar


Power Project

Energy Development
Corporation

Matalam

Kilada-Matalam Solar
Power Project

Energy Development
Corporation

Kabacan

Kabacan Solar Power


Project

Solarus Partners Inc.

Sarangani

Alabel

Alabel Solar Power


Project

El Elyon Power Plant Phils.


Inc.

XIII

Agusan del
Norte

Butuan City

Butuan City 1 Solar


Power Project

Enfinity Philippines
Renewable Resources Inc.

ARMM

Lanao del Sur

Tagoloan II,
Saguiaran &
Marawi City

ICOM Solar Power


Project

Local Government Unit of


the Islamic City of Marawi

MINDANAO Sum

North
Cotabato

CITY /
MUNICIPALITY
President Roxas
and Magpet

MINDANAO XII

Grand Total

PROVINCE

STATUS
Compliance with Milestone Approach is on-going.
For issuance of reminder letter due to non
compliance with RESHERR.
On-going pre-development activities. With
correction of the location as per SESC. For issuance
of reminder letter due to non compliance with
RESHERR.
For issuance of Termination Letter due to nonpayment of Signature Bonus, non-posting of
Performance Bond, and non-compliance with
Milestone Approach
Compliance with Milestone Approach is on-going.
For issuance of reminder letter due to noncompliance with RESHERR.
For issuance of Termination Letter due to noncompliance with Milestone Approach and
RESHERR.
DOC (FIT System) is under evaluation. For issuance
of show-cause letter due to non-posting of
Performance Bond and non-compliance with
RESHERR.

POTENTIAL
CAPACITY
(MW)

INSTALLED
CAPACITY
(MW)

14.50

40.00

10.00

35.00
398.82
2,544.81

131.90