Question # 2
What is Easy Cost Planning?

Answer:LSMW is an encapsulated data transfer tool. It can provide


the same functionality as BDC infact much more but when
coming to techinical perspective most the parameters are
encapulated. To listout some of the differences :
LSMW is basicaly designed for a fuctional consultant who do
not do much coding but need to explore the fuctionality
while BDC is designed for a technical consultant.
LSMW offers different techinque for migrating data: Direct
input ,BAPI,Idoc,Batch input recording. While bdc basically
uses recording.
LSMW mapping is done by SAP while in BDC we have to do it
explicitly .
LSMW is basically for standard SAP application while bdc
basically for customized application.

Question # 3
How LSMW and BAPI works?

.C

Read More Answers.

Answer:It is another function for planning costs at WBS elements


level. It uses the existing Controlling, purchasing or MM
data in the form of costing items. Also you can have
predefined costing models to simplify repeated entries.

lin
de

Answer:Settlement rules are nothing but settling the account for a


cost center.Which WBS are account assigned the cost of
corresponding WBS should be settled to the respective cost
center assigned for that WBS.Settlement rule is assigned in
settlement profile in which you will define (like assect)
the rules of settlement.

ui

lG

Question # 1
What are settlement rules?

Read More Answers.

Question # 4
What do you understand by Project?
Answer:A project is a system which involves 1. project, subproject, activities & tasks.
It will have the good integration with the other modules
like MM, Fi/co, & PM modules.
Read More Answers.

Question # 5
What mean by valuated stock,non valuated stock?
Copyright http://www.GlobalGuideline.COM

Page 2/6

SAP PS Interview Questions And Answers

Which cotagiri you are using in po&pr?

Read More Answers.

ba
lo

Answer:In Valuated stock every material in stock is managed on a


both a quantity basis and a value basis. The monetary value
of each quantity of material is calculated separately. while
non valuated material is maintained as per quantity and not
on the basis of its value.

Question # 6
How to calculate WIP in PS for all wbs pertaining to that particular project? Any specific T code in ECC 6.0?
Answer:KKA2 for calculating result Analysis;
KKAJ - for calculating WIP
Read More Answers.

lG

Question # 7
How can PS be linked to COPA? How will the settlement take place in this case (when PS is linked to Controlling through COPA)?

lin
de

Read More Answers.

ui

Answer:Settlement will take place via profitability segmenet .


Level 1 WBS should have settlement rule define to be
settled to PSG and level 2 WBS should be settled to
superior one WBS element .The main one level 1 WBS/ Project
will be settled to PSG , and variance will be posted to
COPA .

Question # 8
My SAP system will be implemented in May 2008, how do i put past cost/ hours for a project which has started in january?

Read More Answers.

.C

Question # 9
Explain the "Process how do we convert business
into sap"?

Answer:Post the cost incurred from Jan-May via JV (From SAP-FI)


directly on WBS.

Answer:By ASAP Methodology:


It has following 5 phases:
1. As is to be Study Phase: Means study the process of the company which they are using. Or we can say analysis the business process of company.
2. Blueprint phase: In this we have to prepare the flow diagram of the above data which we have collected in first point. Or we can say documentation of the data
which we have collected from to be study phase.
3. Realization Phase: Implementing the collected data in SAP system.
4. Final Preparation Phase: In this phase testing has been done on arbitrary data and on actual data. And there are three type of testing is there:
a. Unit Testing: Individual Module Testing.
b. Integration Testing: Whether every module is communicating with each other or not and finally
c. User Acceptance Test: End User is satisfied by the system or not.
5. Go Live and Post Implementation Support: Live usage of system or in Production.
Read More Answers.

Question # 10
What is Project Management?
Answer:Project Management is nothing but a Organizing and planning
and scheduling software Project
-Delevered on time
-Software needed
Neede for Project Management is,
-Project Planning
-project Scheduling
-Project Costing
-Monitoring Reviews
-Report Writing and Presentation
Manually it is Documented and Automated it is Microsoft
Project Planner(MPP)
Read More Answers.

Question # 11
Copyright http://www.GlobalGuideline.COM

Page 3/6

SAP PS Interview Questions And Answers

Explain What is unit costing?


Answer:Unit costing is a means of recording all the costs - direct
and indirect - associated with the delivery of services.
Total cost of service provision divided by the total amount
of service provided

Read More Answers.

ba
lo

Question # 12
What is Project planning board?

Answer:Project planning board is a tool within PS that allows you


to plan the entire project structure, capacity, resources,
dates.
Read More Answers.

Read More Answers.

Question # 14
What is relationship in SAP PS?

Question # 15
What is milestone triggering?

.C

Read More Answers.

Answer:Relationship basically denotes how activities in a


networkorder are related to each other.They can be
classified into 4 categories - SS (Start-Start), SF(StartFinish), FF (Finish-Finish), FS (Finish - Start).
For 2 activities say A and B
SS -->> Both A and B start together
SF -->> Start of A coincides with finish of B and so on.
We can also specify the time gap between which these
relationships work. Say in an SS relationship, there can be
a 10 minutes gap between start of A and B and so on.

lin
de

Answer:It is a graphical representaion which helps in Scheduling


the Project. It can be referred to as a Dash Board which
gives details of the Project in terms Budgeting, Actual
Costs, Planned Work and Actual Work, Remaining Work, % of
Completion. Project Manager can also use this for
restricting the activities in terms of SS,FS,SF conditions
datewise.

ui

lG

Question # 13
What is Gantt chart?

Answer:Whenever the confimation of activities done and if the


milestne is attached with that particular activity the
milstone trigerrs the milstone as per the configuration
done and it will do the nilling through SD module
Read More Answers.

Copyright http://www.GlobalGuideline.COM

Page 4/6

Management Most Popular Interview Topics.

1 : Human Resource (HR) Frequently Asked Interview Questions and Answers Guide.
2 : Peoplesoft Frequently Asked Interview Questions and Answers Guide.
3 : Project Manager Frequently Asked Interview Questions and Answers Guide.
4 : Hotel Management Frequently Asked Interview Questions and Answers Guide.
5 : Operations Management Frequently Asked Interview Questions and Answers Guide.
6 : SAP Security Frequently Asked Interview Questions and Answers Guide.
7 : SAP ALE IDocs Frequently Asked Interview Questions and Answers Guide.
8 : SAP MM Frequently Asked Interview Questions and Answers Guide.
9 : SAP SD Frequently Asked Interview Questions and Answers Guide.
10 : SAP PP Frequently Asked Interview Questions and Answers Guide.

About Global Guideline.

Global Guideline is a platform to develop your own skills with thousands of job interview questions
and web tutorials for fresher's and experienced candidates. These interview questions and web
tutorials will help you strengthen your technical skills, prepare for the interviews and quickly revise
the concepts. Global Guideline invite you to unlock your potentials with thousands of Interview
Questions with Answers or begin a tutorial right away, such as HTML, XML, XSLT, Cascading
Style Sheet (CSS), Search Engine Optimization (SEO), JavaScript, Structure Query Language (SQL),
Database Articles, Web Hosting Guide and much more. Learn the most common technologies
Interview Questions and Answers. We will help you to explore the resources of the World Wide Web
and develop your own skills from the basics to the advanced. Here you will learn anything quite
easily and you will really enjoy while learning. Global Guideline will help you to become a
professional and Expert, well prepared for the future.
* This PDF was generated from http://www.GlobalGuideline.com at October 14th, 2015
* If any answer or question is incorrect or inappropriate or you have correct answer or you found any
problem in this document then don't hesitate feel free and e-mail us we will fix it.
You can follow us on FaceBook for latest Jobs, Updates and other interviews material.
www.facebook.com/InterviewQuestionsAnswers
Follow us on Twitter for latest Jobs and interview preparation guides
http://twitter.com/InterviewGuide
Best Of Luck.
Global Guideline Team
http://www.globalguideline.com
Support@globalguideline.com

Anda mungkin juga menyukai