Introduction
Legacy Protocols
Modbus
DNP3
5
7
9
11
13
15
16
18
Future Trends
IEC 61850 beyond Substations
IEC 61850 for Peer-to-Peer Communications
19
21
Concluding Remarks
22
Introduction
Communication Protocols and Standards
ABB Group
March 3, 2011 | Slide 3
Main objectives:
Open access
Interoperability
Flexibility
Upgradability
Future proof
Introduction
Current Status
ABB Group
March 3, 2011 | Slide 4
Legacy Protocols
Modbus
Query/response
Broadcast/no response
1 Byte
Address Field
ABB Group
March 3, 2011 | Slide 5
Data Field
2 Bytes
Error Checking
Field
Legacy Protocols
Modbus
ABB Group
March 3, 2011 | Slide 6
Legacy Protocols
DNP3
ABB Group
March 3, 2011 | Slide 7
Communication media:
Legacy Protocols
DNP3
ABB Group
March 3, 2011 | Slide 8
ABB Group
March 3, 2011 | Slide 9
ABB Group
March 3, 2011 | Slide 10
ABB Group
March 3, 2011 | Slide 12
Client/Server
Peer-to-Peer Services
GOOSE: multicast
transmission of high priority
information like trip
commands or interlocking
information
ABB Group
March 3, 2011 | Slide 13
ABB Group
March 3, 2011 | Slide 14
Enhances communication
capabilities between the IEDs
ABB Group
March 3, 2011 | Slide 15
ABB Group
March 3, 2011 | Slide 16
Inter-Control Center
Communication Protocol (ICCP),
also known as TASE.2 is used for
communications between control
centers.
Client/server model
Types of requests:
Single requests
ABB Group
March 3, 2011 | Slide 17
ABB Group
March 3, 2011 | Slide 18
Implementation on TCP/IP
allows for transferring the data
over WAN
Future Trends
IEC 61850 Beyond Substations
Feeder Automation
ABB Group
March 3, 2011 | Slide 19
Future Trends
IEC 61850 Beyond Substations
Communication with Control Centers
ABB Group
March 3, 2011 | Slide 20
Future Trends
IEC 61850 for Peer-to-Peer Communications
ABB Group
March 3, 2011 | Slide 21
Concluding Remarks
ABB Group
March 3, 2011 | Slide 22
Possible future trends for extending the scope of the standard and
using its capabilities for other applications within the distribution
system were also discussed.
ABB Group
March 3, 2011 | Slide 23