CHAPTER NO.

BRICK WORK
DESCRIPTION OF ITEM:
Item No. 1
(i)

Pucca brick work in mud mortar in building.


In foundation and plinth.

Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1 Bricks 9\" x 4\" x 3\"
1350.00 Nos.
2 Good earth or stiff clay for m35.00 Cft
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
1.50 Nos.
2
Coolies unskilled
2.00 Nos.
3
Bahishti
0.13 No
For Mud Mortar
1
Cooly unskilled
2
Bahishty

0.67 No.
0.33 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 1

d mortar in building.

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 1
(ii)

Pucca brick work in mud mortar in building.


In ground floor.
Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1 Bricks 9\" x 4\" x 3\"
1350.00 Nos.
2 Good earth or stiff clay for m35.00 Cft
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2.00 Nos.
2
Coolies unskilled
3.00 Nos.
3
Bahishti
0.13 No.
For Mud Mortar
1
2

Cooly unskilled
0.67 No.
Bahishty
0.33 No
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Page 2

d mortar in building.

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 2

Add extra labour in item No.1 for brick work in

Detail

Unit Rate (British System) per 100 Cft


Qty

LABOUR for 125 Cft


First Floor
1
Mason
0.25 No.
2
Cooly unskilled
1.00 No.
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
LABOUR for 125 Cft
Second Floor
1
Masons
0.75 No.
2
Coolies unskilled
2.00 Nos.
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Page 3

em No.1 for brick work in

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

per day
per day

Say
Say

Detail

Unit Rate (British System) per 100 Cft


Qty

LABOUR for 125 Cft


Third Floor
1
Masons
1.25 Nos.
2
Coolies unskilled
3.00 Nos.
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
LABOUR for 125 Cft
4th & Subsequent Floor
1
Masons
2.25 Nos.
2
Coolies unskilled
4.50 Nos.
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per cum

Rs.
Rs.

Page 4

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 3
(i)

Pucca brick work in mud mortar other than buildi


Upto 20 ft. (6 metre) high.

Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1 Bricks 9\" x 4\" x 3\"
1350.00 Nos.
2 Good earth or stiff clay
35.00 Cft
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
For Mud Mortar
1
2

2.00 Nos.
3.00 Nos.

Cooly unskilled
1.00 No.
Bahishty
0.33 No
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Page 5

d mortar other than building.

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 3
(ii)

Pucca brick work in mud morter other than buildi

Extra labour for every 5.0' (1.5 metre) addition


thereof.
Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.25 No.
1.00 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

ITEM RATES

Page 6

d morter other than building:


5.0' (1.5 metre) additional height

nit Rate (British System) per 100 Cft


Rate
Per Unit
Amount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:2).
Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


1350.00 Nos.
Cement
8.00 bags
Sand
20.00 Cft
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
2
3
LABOUR for
For Cement
1
2

Mason
Coolies unskilled
Bahishti
125 Cft
Mortar
Cooly unskilled
Bahishty

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 7

undation & plinth in

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in:


Cement sand mortar Ratio (1:3).

Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


1350.00 Nos.
Cement
6.00 bags
Sand
22.50 Cft
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
2
3
LABOUR for
For Cement
1
2

Mason
Coolies unskilled
Bahishti
125 Cft
Mortar
Cooly unskilled
Bahishty

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 8

undation & plinth in:

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bags
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in:


Cement sand mortar Ratio (1:4).

Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


1350.00 Nos.
Cement
4.80 bags
Sand
24.00 Cft
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
Cooly unskilled
2
Bahishty

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 9

undation & plinth in:

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in:


Cement sand mortar Ratio (1:5).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
4.00 bags
25.00 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.00 Nos.
2.50 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 10

undation & plinth in:

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:6).
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total

1350.00 No
3.40 bags
25.70 Cft

LABOUR for 125 Cft


For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
LABOUR for 125 Cft
For Cement Mortar

2.00 Nos.
2.50 Nos.
0.25 No.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 11

undation & plinth in

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:7).
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total

1350.00 No
3.00 bags
26.50 Cft

LABOUR for 125 Cft


For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
LABOUR for 125 Cft
For Cement Mortar

2.00 Nos.
2.50 Nos.
0.25 No.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 12

undation & plinth in

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
2.66 bags
26.67 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.00 Nos.
2.50 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 13

undation & plinth in

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:6).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Cement
Slaked lime
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
3.20 bags
59.72 kg
24.00 Cft

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 14

undation & plinth in


r Ratio (1:1:6).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
per kg
% Cft

per day
per day
per day

per day
per day

Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in:


Lime cement sand mortar Ratio (1:1:7).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Cement
Slaked lime
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar

1350.00 No
2.85 bags
53.00 kg
24.78 Cft

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

2.00 Nos.
2.50 Nos.
0.25 No.

ITEM RATES

Page 15

undation & plinth in:


r Ratio (1:1:7).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
per kg
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Cement
Slaked lime
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
2.56 bags
47.78 kg
25.60 Cft

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 16

undation & plinth in


r Ratio (1:1:8).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
per kg
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:9).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Cement
Slaked lime
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
2.32 bags
43.30 kg
26.20 Cft

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 17

undation & plinth in


r Ratio (1:1:9).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
per kg
% Cft

per day
per day
per day

per day
per day

Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:10).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Cement
Slaked lime
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
2.14 bags
39.94 kg
26.66 Cft

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 18

undation & plinth in


r Ratio (1:1:10).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
per kg
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (iii)

Lime, sand mortar Ratio (1:2).

Detail

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Lime Slaked
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

Unit Rate (British System)


Qty

1350.00 No
174.30 Kg.
23.33 Cft

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 19

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
Per Kg.
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1:2).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
8.00 bags
20.00 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 20

ound floor (including striking of jo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1:3).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
6.00 bags
22.50 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 21

ound floor (including striking of jo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1:4).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
4.80 bags
24.00 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 22

ound floor (including striking of jo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1:5).
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
4.00 bags
25.00 Cft

1
2
3
For Cement

Mason
Coolies unskilled
Bahishti
Mortar

2.50 Nos.
4.00 Nos.
0.25 No.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 23

ound floor (including striking of jo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1:6).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
3.40 bags
25.70 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 24

ound floor (including striking of jo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1:7).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
3.00 bags
26.50 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 25

ound floor (including striking of jo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1 : 8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
2.66 bags
26.57 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 26

ound floor (including striking of jo


io (1 : 8).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio (1:1:6).

Detail

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total

LABOUR for 125 Cft


For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
2

Unit Rate (British System)


Qty

1350.00 No
59.72 kg
3.20 bags
24.00 Cft

2.50 Nos.
4.00 Nos.
0.25 No.

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 27

r Ratio (1:1:6).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio (1 : 1 : 7).


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
53.37 kg
2.85 bags
24.78 Cft

1
2
3
For Cement

Mason
Coolies unskilled
Bahishti
Mortar

2.50 Nos.
4.00 Nos.
0.25 No.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 28

r Ratio (1 : 1 : 7).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio (1:1:8).


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
47.78 kg
2.56 bags
25.60 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 29

r Ratio (1:1:8).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio ( 1 : 1 : 9 ).


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
43.30 kg
2.32 bags
26.20 Cft

1
2
3
For Cement

Mason
Coolies unskilled
Bahishti
Mortar

2.50 Nos.
4.00 Nos.
0.25 No.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 30

r Ratio ( 1 : 1 : 9 ).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio ( 1 : 1 : 10 ).

Detail

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total

LABOUR for 125 Cft


For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
2

Unit Rate (British System)


Qty

1350.00 No
40.00 kg
2.14 bags
26.66 Cft

2.50 Nos.
4.00 Nos.
0.25 No.

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 31

r Ratio ( 1 : 1 : 10 ).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (iii)

Lime sand mortar Ratio (1:2).

Detail

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Lime
Sand

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
2

Unit Rate (British System)


Qty

1350.00 No
174.30 kg
23.33 Cft

2.50 Nos.
4.00 Nos.
0.25 No.

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 32

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 6

Add extra labour in item No.5 for brick work in:

Detail

LABOUR for 125 Cft


First Floor
1
Mason
2
Cooly unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
LABOUR for 125 Cft
Second Floor
1
Masons
2
Coolies unskilled

Unit Rate (British System)


Qty

0.25 No.
1.00 No.

Rs.
Rs.

0.75 No.
2.00 Nos.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft

Rs.

Labour rate per Cum

Rs.

Page 33

em No.5 for brick work in:-

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

per day
per day

Say
Say

Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


Third Floor
1
Masons
2
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft

1.25 Nos.
3.00 Nos.

Labour rate per Cum


LABOUR for 125 Cft
4th & Subsequent Floor
1
Masons
2
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per cum

2.25 Nos.
4.50 Nos.

Rs.
Rs.

Page 34

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1:2).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
8.00 bags
20.00 Cft

1
Mason
2
Coolies unskilled
For Cement Mortar

2.50 Nos.
3.00 Nos.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 35

than building including striking of

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

Item No. 7

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1:3).
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total

LABOUR for 125 Cft


For Masonry Work
1
Mason
2
Coolies unskilled
For Cement Mortar
1
2

1350.00 No
6.00 bags
22.50 Cft

2.50 Nos.
3.00 Nos.

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 36

than building including striking of

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 4).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
4.80 bags
24.00 Cft

1
Mason
2
Coolies unskilled
For Cement Mortar

2.50 Nos.
3.00 Nos.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 37

than building including striking of

io (1 : 4).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 5).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
4.00 bags
25.00 Cft

1
Mason
2
Coolies unskilled
For Cement Mortar

2.50 Nos.
3.00 Nos.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 38

than building including striking of

io (1 : 5).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 6).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
3.40 bags
25.70 Cft

1
Mason
2
Coolies unskilled
For Cement Mortar

2.50 Nos.
3.00 Nos.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 39

than building including striking of

io (1 : 6).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 7).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
3.00 bags
26.50 Cft

1
Mason
2
Coolies unskilled
For Cement Mortar

2.50 Nos.
3.00 Nos.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 40

than building including striking of

io (1 : 7).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
2.66 bags
26.67 Cft

1
Mason
2
Coolies unskilled
For Cement Mortar

2.50 Nos.
3.00 Nos.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 41

than building including striking of

io (1 : 8).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 6).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
59.72 kg
3.20 bags
24.00 Cft

2.50 Nos.
3.00 Nos.

1.00 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 42

than building including striking of

tar Ratio (1 : 1 : 6).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 7).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
53.00 kg
2.85 bags
24.78 Cft

2.50 Nos.
3.00 Nos.

1.00 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 43

than building including striking of

tar Ratio (1 : 1 : 7).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
47.78 kg
2.56 bags
25.60 Cft

2.50 Nos.
3.00 Nos.

1.00 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 44

than building including striking of

tar Ratio (1 : 1 : 8).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 9).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
43.29 kg
2.32 bags
26.20 Cft

2.50 Nos.
3.00 Nos.

1.00 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 45

than building including striking of

tar Ratio (1 : 1 : 9).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 10).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
39.94 kg
2.14 bags
26.66 Cft

2.50 Nos.
3.00 Nos.

1.00 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 46

than building including striking of

tar Ratio (1 : 1 : 10).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (iii)

Lime, sand, mortar ratio (1 : 2)

Detail

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Sand

Unit Rate (British System)


Qty

1350.00 No
174.30 kg
23.33 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled

2.50 Nos.
3.00 Nos.

For Cement Mortar


1
Cooly unskilled
2
Bahishty

1.00 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 47

io (1 : 2)

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 8

Additional extra labour in item No.7 for every 1


additional height.

Detail

LABOUR for 125 Cft


1
Masons
2
Cooly

Unit Rate (British System)


Qty

0.25 No.
1.00 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Page 48

r in item No.7 for every 10 ft. (3 m

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 9

Extra labour for arch work in brick masonry incl


centering and de-centering.
Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


1
2

Masons
Cooly
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.50 No.
0.50 No.

Labour rate Per 100 Cft.


Labour Rate Per Cum.

Rs.
Rs.

ITEM RATES

Page 49

work in brick masonry including labo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Extra for Pacca brick work in steining of wells


circular masonry.

Detail

MATERIAL
1

Pacca bricks

Unit Rate (British System)


Qty

82.00 No.

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
1

Mason
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 No.

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 50

work in steining of wells or any oth

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

% Cft

per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 11

Extra labour for profile and flared walls.

Detail

LABOUR for 125 Cft


1
Mason

Unit Rate (British System)


Qty

0.43 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum

Rs.
Rs.

Page 51

le and flared walls.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 12
(i)

Extra labour for Pacca brick work in piers and a

From 10 ft. (3 metre) to 20 ft. (6 metre) height


Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.12 No.
0.50 No.

Labour rate per 100 Cft


Composit rate per Cum

Rs.
Rs.

ITEM RATES

Page 52

brick work in piers and abutment.

to 20 ft. (6 metre) height.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 12
(ii)

Extra labour for Pacca brick work in piers and a


Above 20 ft. (6 metre) height.

Detail

LABOUR for 125 Cft


1
Mason
2
Cooly unskilled

Unit Rate (British System)


Qty

0.25 No.
1.00 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum

Rs.
Rs.

Page 53

brick work in piers and abutment.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Extra for face work (half brick thick) using spe


of Ist class bricks.

Detail

MATERIAL
1
2

Special moulded Stretcher


courses bricks
Header courses
Total
Add 5% wastage
Total
Difference in cost of special
moulded and ordinary Ist class
bricks
Extra cost = 0
-=
Contractor's Profit &20 Percent
Total
Labour rate for 100 Cft
Composit rate per Cum

270
513
783
39.15
822.15

Page 54

alf brick thick) using special brick

Unit Rate (British System) per 100 Cft


Qty
Rate Per UnitAmount (Rs.)

Nos.

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 14

Reinforced brick work in lintels of opening, lai


sand mortar including, all labour material forms
and shuttering etc., but excluding cost and labo
reinforcement which shall be paid for separately
Detail

MATERIAL
1
2
3
4

Pacca bricks
Cement
Sand
Kikar wood for centring & shuttering
(10 x 1.60 x 0.2) Can be use 20 times

Unit Rate (British System)


Qty

10.00 No.
0.11 bag
0.41 Cft
0.002 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
1
2
3

Mason
Cooly unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.067 No.
0.11 No.
0.023 No.

Labour rate per Cft


Labour rate per Cum
Composite rate per Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 55

in lintels of opening, laid in (1:3)


all labour material forms, moulds,
ut excluding cost and labour of stee
all be paid for separately.

nit Rate (British System) per Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 15 (a)

Extra for dressing or chamfering of bricks (spec


architectaral shape).
Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

3.00 No.
0.34 No.

Labour rate per 100 No.

Rs.

ITEM RATES

Page 56

chamfering of bricks (special or

nit Rate (British System) per 100 No.


Rate Per UnitAmount (Rs.)

per day
per day

Say

DESCRIPTION OF ITEM:
Item No. 15 (b)

All other purposes.

Detail

LABOUR for 125 Cft


1
Mason
2
Cooly unskilled

Unit Rate (British System)


Qty

1.50 No.
0.17 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 No.

Rs.

Page 57

nit Rate (British System) per 100 No.


Rate Per UnitAmount (Rs.)

per day
per day

Say

DESCRIPTION OF ITEM:
Item No. 16
(i)

Peforated Pacca brick walling 114 mm (4\") thic


floor in
Mud mortar.

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Pacca bricks 9\" x 4\" x 3\"


Good earth
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
8.75 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
1.83 Nos.
0.23 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 58

walling 114 mm (4\") thick in ground

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1 : 2).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
2.00 bags
5.00 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 59

io (1 : 2).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:3).

Detail

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total

LABOUR for 125 Sft


1
Mason
2
Coolies unskilled
3
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

Unit Rate (British System)


Qty

338.00 No.
1.50 bags
5.60 Cft

1.25 Nos.
2.42 Nos.
0.38 No.

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 60

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:4).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
1.20 bags
6.00 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 61

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:5).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
1.00 bags
6.25 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 62

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:6).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
0.86 bags
6.40 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 63

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:7).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
0.75 bags
6.58 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 64

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
0.67 bags
6.67 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 65

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 6).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
14.93 kg
0.80 bags
6.00 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 66

r Ratio (1 : 1 : 6).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 7).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
13.44 kg
0.71 bags
6.13 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 67

r Ratio (1 : 1 : 7).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
12.32 kg
0.64 bags
6.40 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 68

r Ratio (1 : 1 : 8).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 9).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
10.82 kg
0.58 bags
6.50 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 69

r Ratio (1 : 1 : 9).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 10).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
10.08 kg
0.54 bags
6.70 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 70

r Ratio (1 : 1 : 10).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (iv)

Lime cement sand mortar Ratio (1 : 2).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 Nos
43.67 kg
5.58 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 71

r Ratio (1 : 2).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 17

Add. extra labour on item No.15 for pacca brick

Detail

LABOUR for 125 Sft


First Floor
1
Mason
2
Cooly unskilled

Unit Rate (British System)


Qty

0.13 No.
0.50 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate for 100 Sft

Rs.

Labour rate per Sqm

Rs.

LABOUR for 125 Sft


Second Floor
1
Masons
2
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate for 100 Sft
Labour rate per Sqm
LABOUR for 125 Cft
Third Floor
1
Masons
2
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate for 100 Sft

0.37 No.
1.00 No.

Rs.
Rs.

0.63 No.
1.50 Nos.

Labour rate per Sqm


Page 72

tem No.15 for pacca brick work.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

per day
per day

Say
Say

per day
per day

Say

Say

LABOUR for 125 Sft


4th & Subsequent Floor
1
Masons
2
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.12 Nos.
2.12 Nos.

ITEM RATES
Labour rate for 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 73

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (i)

Perforated pacca brick walling 9\" thick in grou


Mud Mortar

Detail

Unit Rate (British System)


Qty

MUD MORTAR
1
Pacca bricks 9\" x 4\" x 3\"
2
Good earth

675.00 Nos
17.50 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
Mason
2
Coolies unskilled
3
Bahishti

1.25 Nos.
2.75 Nos.
0.35 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 74

walling 9\" thick in ground floor in

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 2)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

675.00 Nos
4.00 bags
10.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 75

io (1 : 2)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
bags
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 3)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

675.00 Nos
3.00 bags
11.25 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 76

io (1 : 3)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
bags
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 4)

Detail

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

Unit Rate (British System)


Qty

675.00 Nos
2.40 bags
12.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 77

io (1 : 4)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 5)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

675.00 Nos
2.00 bags
12.50 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 78

io (1 : 5)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 6)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

675.00 Nos
1.72 bags
12.80 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 79

io (1 : 6)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 7)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

675.00 Nos
1.50 bags
13.13 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 80

io (1 : 7)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 8)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

675.00 Nos
1.33 bags
13.34 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 81

io (1 : 8)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 6)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand

675.00 Nos
29.86 kg
1.60 bags
12.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 82

r Ratio (1 : 1 : 6)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 7)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
Mason
2
Coolies unskilled
3
Bahishti

675.00 Nos
26.50 kg
1.42 bags
12.39 Cft

1.90 Nos.
3.63 Nos.
0.55 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 83

r Ratio (1 : 1 : 7)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 8)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand

675.00 Nos
23.90 kg
1.28 bags
12.80 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 84

r Ratio (1 : 1 : 8)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 9)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
Mason
2
Coolies unskilled
3
Bahishti

675.00 Nos
21.65 kg
1.16 bags
13.10 Cft

1.90 Nos.
3.63 Nos.
0.55 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 85

r Ratio (1 : 1 : 9)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 10)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
Mason
2
Coolies unskilled
3
Bahishti

675.00 Nos
20.16 kg
1.07 bags
13.33 Cft

1.90 Nos.
3.63 Nos.
0.55 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 86

r Ratio (1 : 1 : 10)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per kg
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (iv)

Lime sand mortar Ratio (1 : 2)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Sand

675.00 Nos
86.97 kg
11.67 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 87

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 19

Extra labour in item No.18 for per perforated pa


work in
Detail

Unit Rate (British System)


Qty

LABOUR
First Floor

Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

LABOUR
Second Floor
Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

LABOUR
Third Floor
Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

LABOUR
Fourth & Subsequent Floor
Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

Page 88

o.18 for per perforated pacca brick

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Say
Say

Say
Say

Say
Say

Say
Say

DESCRIPTION OF ITEM:
Item No. 20
(i)

Fire brick masonary in fire clay mortar.


Upto 20 ft. (6 metre) height including all char

Detail

Unit Rate (British System)


Qty

Per 100 Cft


MATERIAL
1
2
3

Fire clay bricks 9\" x 4\" x 3\"


Fire resistant Cement
Brick grinded sand

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
for masonary work
1
Mason
2
Coolies
3
Bahishti
for mortar
1
2

1350.00 No
8.80 bags
22.00 Cft

3.00 Nos.
3.00 Nos.
0.25 No.

Cooly
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.25 No

Labour rate per Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 89

fire clay mortar.


height including all charges.

nit Rate (British System) per Cft


Rate Per UnitAmount (Rs.)

Each
per bag
per Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 20
(ii)

Fire brick masonary in fire clay mortar.


Extra for every 1.5 metre additional height.

Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.25 No.
1.00 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

ITEM RATES

Page 90

fire clay mortar.

tre additional height.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 21
(i)

First class brick walling laid in (1 : 3) cement


reinforced with (1\") 25 mm wide 18 gauge hoop i
4\" (114 mm) thick walling with hoop iron boudi
(150 mm) apart.

Detail

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Hoop iron

Unit Rate (British System)


Qty

525.00 Nos
2.40 bags
9.00 Cft
45.00 lbs
20.41 Kg.

Total
Contractor's Profit &20 Percent
Total
LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00
1.25
0.25
0.15

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

No.
Nos.
No.
No.

Page 91

ing laid in (1 : 3) cement sand mort


25 mm wide 18 gauge hoop iron.
lling with hoop iron bouding 6\"

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Per Kg.

per
per
per
per

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 21
(ii)

First class brick walling laid in (1 : 3) cement


reinforced with 1\" (25 mm) wide 18 gauge hoop i
4\" (114 mm) thick walling with hoop iron boudi
12\" (300 mm) apart.

Detail

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Hoop iron

Unit Rate (British System)


Qty

525.00 Nos
2.40 bags
9.00 Cft
22.50 lbs
10.20 kg.

Total
Contractor's Profit &20 Percent
Total
LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00
1.00
0.25
0.10

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

No.
No.
No.
No.

Page 92

ing laid in (1 : 3) cement sand mort


5 mm) wide 18 gauge hoop iron.
lling with hoop iron bouding

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Per Kg.

per
per
per
per

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 21
(iii)

First class brick walling laid in (1 : 3) cement


reinforced with 1\" (25 mm) wide 18 gauge hoop i
3\" (75 mm) thick walling with hoop iron bouding
(150 mm) apart.

Detail

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Hoop iron

Unit Rate (British System)


Qty

350.00 Nos
1.80 bags
6.50 Cft
45.00 lbs
20.41 Kg.

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.75
1.00
0.20
0.15

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

No.
No.
No.
No.

Page 93

ing laid in (1 : 3) cement sand mort


5 mm) wide 18 gauge hoop iron.
ing with hoop iron bouding 6\"

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Per Kg.

per
per
per
per

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 21
(iv)

First class brick walling laid in (1 : 3) cement


reinforced with 1\" (25 mm) wide 18 gauge hoop i
3\" (75 mm) thick walling with hoop iron bouding
(300 mm) apart.

Detail

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Hoop iron

Unit Rate (British System)


Qty

350.00 Nos
1.80 bags
6.50 Cft
20.00 lbs
9.070 Kg.

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.75
1.00
0.20
0.15

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

No.
No.
No.
No.

Page 94

ing laid in (1 : 3) cement sand mort


5 mm) wide 18 gauge hoop iron.
ing with hoop iron bouding 12\"

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Per Kg.

per
per
per
per

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 22

Ghilafi work (1 brick thick wall).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

B.B in mud ( of item No.1)


Sundried bricks ( of item No.24)

x
x

Total
LABOUR for 125 Cft
1
Mason
2
Coolies unskilled
3
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

2.00 Nos.
3.67 Nos.
0.50 No.

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 95

thick wall).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 23

Dry brick pitching.

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Ist class burnt brick

1350.00 No

Total
Contractor's Profit &20 Percent
Total
LABOUR
1
2

Mason
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
2.00 Nos.

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 96

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 24

Sun dried bricks in Mud mortar.

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Sun dried bricks


Siff clay

1350.00 No
35.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.50 Nos.
3.50 Nos.
0.25 No.

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 97

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 25

Pise wall (mud walling).

Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


1
2
3

Coolies skilled
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
1.50 Nos.
0.50 No.

Labour rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 98

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 26
(i)

Providing Eave brick moulded weathered and throa


brick or drip course cornice in (1 : 3) cement m
3\" (76 mm) thick drip course.

Detail

MATERIAL (FOR 100 RFT.)


1
Moulded brick
2
Cement for laying and plastering
3
Sand
Deduct cost of ordinary bricks
Total
Contractor's Profit &20 Percent
Total

Unit Rate (British System)


Qty

280.00 Nos
1.50 bag
5.00 Cft
140 Nos.

LABOUR (FOR 125 RFT.)


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.75 Nos.
1.75 Nos.
0.25 No.

Labour rate per Rft


Labour rate per R.M
Composite rate per Rft
Composite rate per R.M

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 99

oulded weathered and throated with b


ornice in (1 : 3) cement mortar.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Nos.

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 26
(ii)

Providing Eave brick moulded weathered and throa


brick or drip cornice in (1 : 3) cement mortars.
4\" (114 mm) thick drip course cornice.

Detail

MATERIAL (FOR 100 RFT.)


1
Brick moulded I/C wastage
2
Cement for laying and plastering
3
Sand
Deduct cost of ordinary bricks
Total
Contractor's Profit &20 Percent
Total

Unit Rate (British System)


Qty

420.00 Nos
1.75 bag
6.00 Cft
210.00 Nos

LABOUR (FOR 125 RFT)


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

2.00 Nos.
2.00 Nos.
0.25 No.

Labour rate per Rft


Labour rate per R.M
Composite rate per 100 Rft
Composite rate per R.M

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 100

oulded weathered and throated with b


in (1 : 3) cement mortars.
ip course cornice.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Nos.

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 26
(iii)

Providing Eave brick moulded weathered and throa


brick or drip cornice in (1 : 3) cement mortar.
4\" (114 mm) thick eave brick with back brick.

Detail

MATERIAL (FOR 100 RFT)


1
Brick moulded (including wastage)
2
Back bricks ordinary
3
Cement
4
Sand

Unit Rate (British System)


Qty

465.00 Nos
465.00 Nos
1.20 bag
5.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR (FOR 125 RFT.)
1
2

Mason for laying


Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
2.00 Nos.

Labour rate per Rft


Labour rate per R.M
Composite rate per Rft
Composite rate per R.M

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 101

oulded weathered and throated with b


in (1 : 3) cement mortar.
ve brick with back brick.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
Nos.
per bag
% Cft

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 27
(i)

Providing & laying dressed or moulded brick corn


cement mortar, plastering or pointing complete.
One brick.

Detail

Unit Rate (British System)


Qty

MATERIAL (FOR 100 RFT.)


1

2
3

Pacca bricks I/C 10% wastage


As the rate is only for the projected protion
to the brick required
60.00 Nos.
Cement for laying & plastering or pointi 1.60 bag
Sand for laying & plastering or plasteri 6.00 Cft
Total
Contractor's Profit &20 Percent
Total

LABOUR for 125 Rft


1
Mason
2
Coolies unskilled
3
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

2.00 Nos.
2.00 Nos.
0.25 No.

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Page 102

ssed or moulded brick cornice in ( 1


ing or pointing complete.

nit Rate (British System) per

Rft

Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 27
(ii)

Providing & laying dressed or moulded brick corn


cement mortar, plastering or pointing complete.
Two brick.

Detail

MATERIAL (FOR 100 RFT.)


1
Pacca bricks
2
Cement for laying & plastering
3
Sand for laying & plastering

Unit Rate (British System)


Qty

175.00 Nos
5.00 bags
18.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Rft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

3.00 Nos.
3.00 Nos.
0.25 No.

Labour rate per Rft


Labour rate per R.M
Composite rate per Rft
Composite rate per R.M

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 103

ssed or moulded brick cornice in ( 1


ing or pointing complete.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 27

(iii)

Providing & laying dressed or moulded brick corn


cement mortar, plastering or pointing complete.
Three bricks.

Detail

Unit Rate (British System)


Qty

MATERIAL (FOR 100 RFT.)


1
2
3

Pacca bricks
Cement for laying & plastering
Sand for laying & plastering

270.00 Nos
8.00 bags
60.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Rft
1
Mason
2
Coolies unskilled
3
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

4.00 Nos.
4.00 Nos.
0.34 No.

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Page 104

ssed or moulded brick cornice in ( 1


ing or pointing complete.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 27
(iv)

Providing & laying dressed or moulded brick corn


cement mortar, plastering or pointing complete.
Four brick.

Detail

MATERIAL FOR 100 RFT.)


1
Pacca bricks
2
Cement for laying & plastering
3
Sand for laying & plastering

Unit Rate (British System)


Qty

580.00 Nos
10.00 bags
37.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Rft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

5.00 Nos.
5.00 Nos.
0.50 No.

Labour rate per Rft


Labour rate per R.M
Composite rate per Rft
Composite rate per R.M

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 105

ssed or moulded brick cornice in ( 1


ing or pointing complete.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 28

Cleaning brick dismentled from kacha pacca mason

Detail

LABOUR for 1250 Nos.


1
Cooly unskilled

Unit Rate (British System)


Qty

1.75 Nos.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rat per 1000 No.

Rs.

DESCRIPTION OF ITEM:
Item No. 29

Scraping bricks dismantled from pacca masonary.

Detail

LABOUR for 1250 Nos.


1
Cooly unskilled

Unit Rate (British System)


Qty

3.30 Nos.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rat per 1000 No.

Rs.

Page 106

led from kacha pacca masonry.

nit Rate (British System) per 1000 No.


Rate Per UnitAmount (Rs.)

per day

Say

tled from pacca masonary.

nit Rate (British System) per 1000 No.


Rate Per UnitAmount (Rs.)

per day

Say

DESCRIPTION OF ITEM:
Item No. 30

Supplying and filling sand under floors or plugg

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Sand

100.00 Nos

Total
Contractor's Profit &20 Percent
Total
LABOUR for 150 Cft
1

Cooly unskilled

0.50 Nos.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft.
Labour rate per Cum
Composite rate per 100 Cft.
Composite rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 107

sand under floors or plugging in wel

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

% Nos.

per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 31

Providing and laying 2\" (50 mm) thick projected


(1: 2) cement sand mortar with hoop iron 1\" (25
SWG flat iron sheet 9\" (225 mm) apart.
Detail

Unit Rate (British System)

Qty
Rate Analysis for 8 Rft
MATERIAL
1
2
3
4

Title 225 x 114 x 40 mm title


Cement
Sand
Cost of hoop iron
Total
Contractor's Profit &20 Percent
Total

43.00 Nos.
0.09 bag
0.20 Cft
3.00 Kg.

Mason
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.50 No.
0.50 No.

Labour rate per Rft


Labour rate per R.M

Rs.
Rs.

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

LABOUR
1
2

ITEM RATES

Page 108

\" (50 mm) thick projected tile bank


tar with hoop iron 1\" (25 mm) wide 1
" (225 mm) apart.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Per Kg.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 32

(i)

Ist class brick tiles (9\" 4\" x 1\") 225 x 11


76 mm thick laid in cement sand mortar recifered
strips placed at 2 ft. (600 mm) apart vertically
Ratio (1 : 3).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Brick tiles 9\" x 4\" x 1\"


Cement
Sand
Hoop iron

810.00 No.
2.40 bags
9.00 Cft
4.54 Kg.

Total
Contractor's Profit &20 Percent
Total
LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00
1.00
0.25
0.10

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composite rate per 100 Sft.


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

No.
No.
No.
No.

Page 109

(9\" 4\" x 1\") 225 x 114 x 40 mm cla


ment sand mortar recifered with hoop
(600 mm) apart vertically.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
per Kg.

per
per
per
per

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 32

(ii)

Ist class brick tiles (9\" 4\" x 1\") 225 x 11


76 mm thick laid in cement sand mortar recifered
strips placed at 2 ft. (600 mm) apart vertically
Ratio (1 : 4).

Detail

MATERIAL
1
2
3
4

Brick tiles 9\" x 4\" x 1\"


Cement
Sand
Hoop iron

Unit Rate (British System)


Qty

810.00 No.
1.92 bags
9.60 Cft
4.54 Kg.

Total
Contractor's Profit &20 Percent
Total
LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00
1.00
0.25
0.10

Labour rate per 100 Sft.


Labour rate per Sqm
Composite rate per 100 Sft.
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

No.
No.
No.
No.

Page 110

(9\" 4\" x 1\") 225 x 114 x 40 mm cla


ment sand mortar recifered with hoop
(600 mm) apart vertically.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
per Kg.

per
per
per
per

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 33

Chamfering sides of head regulators and masonry


increase width.
Detail

Unit Rate (British System)


Qty

LABOUR (FOR 30 SFT)


1
2

Mason
Cooly unskilled

1.00 No.
1.00 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
Labour rate per Sft
Labour rate per Sqm

Rs.
Rs.

Page 111

ad regulators and masonry wall to

nit Rate (British System) per Sft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 34

Replacing kallar eaten bricks.

Detail

Unit Rate (British System)


Qty

Assume 60 Bricks
MATERIAL
1
2
3

Bricks
Cement
Sand
Total
Contractor's Profit &20 Percent
Total

50.00 Nos.
0.005 Bag
0.026 Cft

Mason
Cooly

2.00 No.
1.00 No.

LABOUR
1
2

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per Brick
Composit rate per Brick

Rs.
Rs.

Page 112

nit Rate (British System) per Bricks


Rate Per UnitAmount (Rs.)

Nos.
Bag
% Cft.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 35

Repairing corner's of bridges and other hydrauli


masoney works.
Detail

Unit Rate (British System) per No. / A


Qty

MATERIAL
1
2
3

Brick tiles 9\" x 4\" x 1\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total

10.00 No.
0.08 bags
0.25 Cft

LABOUR for 1.5 No.


1
2

Mason
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.25 No.
0.25 No.

Labour rate per Each No.


Composite rate per Each No.

Rs.
Rs.

ITEM RATES

Page 113

bridges and other hydraulic

British System) per No. / Assumed for 1


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 36

Extra labour for drains of bath roons etc.

Detail

Unit Rate (British System)


Qty

Assumed for 40 Lft


LABOUR
1

Mason

1.00 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
Labour rate per Lft
Labour rate per Meter

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 37

Maroo corners.
Detail

Unit Rate (British System)


Qty

LABOUR for 1.25 No.


1

Mason

0.20 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
Labour rate per Each No.

Rs.

Page 114

s of bath roons etc.

nit Rate (British System) per Lft


Rate Per UnitAmount (Rs.)

per day

Say
Say

nit Rate (British System) per No.


Rate Per UnitAmount (Rs.)

per day

Say

CHAPTER NO. 11

SURFACE RENDERING
DESCRIPTION OF ITEM:
Item No. 1
(a)

Mud plaster on walls (excluding Gobri


\" (12 mm) thick.

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Clay
Bhoosa
Total
Contractor's Profit & Ove 20.00
Total

LABOUR (For 125 Sft)


1
Mason
2
Cooly un-skilled
3
Bahisthi
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

6.00 Cft
7.50 kg
Percent

0.17 No.
0.50 No.
0.05 No.
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 1

RENDERING
on walls (excluding Gobri leeping) upto 20' (6.10 metre) height.

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.00per 100 Cft


0.0 kg

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 1

Mud plaster on walls (excluding Gobiry


(6.10 metre).
(b)

1\" (25 mm) thick.


Detail

MATERIAL
1
2

Clay
Bhoosa
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Unit Rate (British System)


Qty

12.00 Cft
15.00 kg
Percent

0.20 No.
0.75 No.
0.07 No.
Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Page 2

on walls (excluding Gobiry leaping) upto 20' height

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.00per 100 Cft


0.0 kg

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 2

Mud plaster on floor or roof (excludin


(a)

\" (12 mm) thick.


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Clay
Bhoosa
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

6.00 Cft
7.50 kg
Percent

0.15 No.
0.45 No.
0.05 No.
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 3

on floor or roof (excluding Gobri Leaping).

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.00per 100 Cft


0.0 kg

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 2

Mud plaster on floor or roof (excludin


(b)

1\" (25 mm) thick.


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Clay
Bhoosa
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft) (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

12.00 Cft
15.00 kg
Percent

0.15 No.
0.45 No.
0.05 No.
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 4

on floor or roof (excluding Gobri Leaping).

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.00per 100 Cft


0.0 kg

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 3

Cement lime plaster 1 : 7 : 12 (cemnt


(6.10 metre) height.
(a)

\" thick (6 mm).


Detail

MATERIAL
1
2
3

Cement
Lime Slaked (ground)
Sand
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Unit Rate (British System)


Qty

0.10 bag
12.70 kg
1.40 Cft
Percent

0.75 No.
1.00 No.
0.25 No.
Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 5

plaster 1 : 7 : 12 (cemnt

lime and sand) up to 20 ft.

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 kg
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

-.01
0.0
-.01
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 3
(b)

Cement lime plaster 1 : 7 : 12 (cemnt


(6.10 metre) height.
\" thick (12 mm).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Cement
Lime Slaked (ground)
Sand
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

0.20 bag
25.38 kg
2.80 Cft
Percent

0.75 No.
1.00 No.
0.25 No.
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 6

plaster 1 : 7 : 12 (cemnt

lime and sand) up to 20 ft.

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 kg
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
.01
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4

Cement neru plaster 1 : 2 (cement and


(a)

\" thick (6 mm) thick.


Detail

MATERIAL
1
2
3

Cement
Sand
Chopped jute
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Unit Rate (British System)


Qty

0.60 bag
1.54 Cft
1.41 kg
Percent

0.75 No.
1.00 No.
0.25 No.
Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 7

plaster 1 : 2 (cement and sand) upto 20 ft. (6.10 metre).

6 mm) thick.

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft
0.0 kg

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4

Cement neru plaster 1 : 2 (cement and


(b)

\" (12 mm) thick.


Detail

MATERIAL
1
2
3

Cement
Sand
Chopped jute
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Unit Rate (British System)


Qty

0.92 bag
3.08 Cft
2.72 kg
Percent

0.75 No.
1.00 No.
0.25 No.
Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 8

plaster 1 : 2 (cement and sand) upto 20 ft. (6.10 metre).

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft
0.0 kg

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5

Stucco cement plaster 2\" (50 mm) thick 1 : 2 :


upto 20 ft (6.0 m) height.
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

MATERIAL
1
2
3

Shingle
Sand
Cement
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

15.00 Cft
7.40 Cft
3.70 bags

-200
0.0
0.0

1.00 No.
4.00 Nos.
0.30 No.

0.0
0.0
0.0

Rs.
Rs.

0.0
0.0

Rs.
Rs.

0.0
0.0

Page 9

2\" (50 mm) thick 1 : 2 : 4 (cement sand and shingle,

British System) per 100 Sft

ate Per Unit

Amount (Rs.)

% Cft
Cft
bags

per day
per day
per day

Say
Say

Say
Say

DESCRIPTION OF ITEM:
Item No. 6

(i)

Providing and laying machine sprayed p


cement and chips zero gauge over the e
surface, upto 20 ft height (6 metre).
Ratio 1 : 1.
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Cement
Chips

Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
4
Spray machine
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

1.80 bag
2.30 Cft
157.00 kg
Percent

1.00 No.
0.50 Nos.
0.13 No.
L.S
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 10

nd laying machine sprayed plaster \" (12 mm) thick, using


chips zero gauge over the existing plastered and roughened
to 20 ft height (6 metre).

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 kg

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 6

(ii)

Providing and laying machine sprayed p


and chips zero gauge over the existing
upto 20 ft height.
Ratio 1 : 1.
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Cement
Chips

Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
4
Spray machine
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

1.45 bag
2.75 Cft
187.00 kg
Percent

1.00 No.
0.50 Nos.
0.13 No.
L.S
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 11

nd laying machine sprayed plaster \"12 mm thick, using cement


ero gauge over the existing plastered and roughened surface,

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 kg

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 6

(iii)

Providing and laying machine sprayed p


and chips zero gauge over the existing
upto 20 ft height.
Ratio 1 : 2.

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Cement
Chips

Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
4
Spray machine
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

1.25 bag
3.00 Cft
204.00 kg
Percent

1.00 No.
0.50 Nos.
0.13 No.
L.S
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 12

nd laying machine sprayed plaster \"12 mm thick, using cement


ero gauge over the existing plastered and roughened surface,

nit Rate (British System) per 100 Sft


Rate Per Unit

0.0 bags
0.0 kg

Amount (Rs.)

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7

Cement plaster (1 : 2) upto 20 ft heig


(i)

3/8\" (10 mm) thick.


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

0.96 bag
2.50 Cft
Percent

0.75 No.
1.00 Nos.
0.25 No.
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 13

ter (1 : 2) upto 20 ft height (6.10) metre.

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
.01
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7

Cement plaster (1 : 2) upto 20 ft heig


(ii)

\" (12 mm) thick.


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

1.25 bag
3.00 Cft
Percent

0.75 No.
1.00 Nos.
0.25 No.
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 14

ter (1 : 2) upto 20 ft height (6.10) metre.

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7

Cement plaster (1 : 2) upto 20 ft heig


(iii)

\" (19 mm) thick.


Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Unit Rate (British System)


Qty

1.92 bag
5.00 Cft
Percent

1.00 No.
1.25 Nos.
0.25 No.
Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Page 15

ter (1 : 2) upto 20 ft height (6.10) metre.

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 8

Cement plaster (1 : 3) cement and sand


(a)

3/8\" (10 mm) thick.


Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Unit Rate (British System)


Qty

0.66 bag
2.55 Cft
Percent

0.75 No.
1.00 Nos.
0.25 No.
Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Page 16

ter (1 : 3) cement and sand upto 20 ft height (6.10 metre).

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 8

Cement plaster (1 : 3) cement and sand


(b)

\" (12 mm) thick.


Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Unit Rate (British System)


Qty

0.88 bag
3.40 Cft
Percent

0.75 No.
1.00 Nos.
0.25 No.
Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Page 17

ter (1 : 3) cement and sand upto 20 ft height (6.10 metre).

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

-.01
0.0

Say
Say

-.01
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 8

Cement plaster (1 : 3) cement and sand


(c)

\" (19 mm) thick.


Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Unit Rate (British System)


Qty

1.32 bag
5.10 Cft
Percent

1.00 No.
1.25 Nos.
0.25 No.
Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Page 18

ter (1 : 3) cement and sand upto 20 ft height (6.10 metre).

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 9

Cement plaster (1 : 4) upto 20 ft. (6.


(a)

3/8\" (10 mm) thick.


Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Unit Rate (British System)


Qty

0.57 bag
3.00 Cft
Percent

0.75 No.
1.00 Nos.
0.25 No.
Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Page 19

ter (1 : 4) upto 20 ft. (6.10 metre) height.

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 9

Cement plaster (1 : 4) upto 20 ft. (6.


(b)

\" (12 mm) thick.


Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Unit Rate (British System)


Qty

0.73 bag
3.60 Cft
Percent

0.75 No.
1.00 Nos.
0.25 No.
Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Page 20

ter (1 : 4) upto 20 ft. (6.10 metre) height.

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 9

Cement plaster (1 : 4) upto 20 ft. (6.


(c)

\" (19 mm) thick.


Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
LABOUR (For 125 Sft)
1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Unit Rate (British System)


Qty

1.14 bag
5.50 Cft
Percent

1.00 No.
1.25 Nos.
0.25 No.
Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Page 21

ter (1 : 4) upto 20 ft. (6.10 metre) height.

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 10
(a)

Cement plaster 3/8\" (10 mm) thick under soffit


20 ft. (6.10 meter) height.
Ratio ( 1 : 2 ).

Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1

Cement for floating coat (0.20 bag)


Cemtnt (0.96 bag)
1.16
2
Sand
2.55
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Mason
1.00
2
Cooly un-skilled
1.00
3
Bahishti
0.25
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

bag
Cft

No.
Nos.
No.

Page 22

10 mm) thick under soffit of R.C.C. roof slab only, upto

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10
(b)

Cement plaster 3/8\" (10 mm) thick under soffit


20 ft. (6.10 meter) height.
Ratio ( 1 : 3 ).

Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1

Cement for floating coat (0.20 bag)


Cement (0.66 bag)
0.86
2
Sand
2.55
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Mason
1.00
2
Cooly un-skilled
1.00
3
Bahishti
0.25
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

bag
Cft

No.
Nos.
No.

Page 23

10 mm) thick under soffit of R.C.C. roof slab only, upto

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10
(c)

Cement plaster 3/8\" (10 mm) thick under soffit


20 ft. (6.10 meter) height.
Ratio ( 1 : 4 ).

Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1

Cement for floating coat (0.20 bag)


Cement (0.57 bag)
0.77
2
Sand
3.00
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Mason
1.00
2
Cooly un-skilled
1.00
3
Bahishti
0.25
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

bag
Cft

No.
Nos.
No.

Page 24

10 mm) thick under soffit of R.C.C. roof slab only, upto

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 11
(a)

Cement plaster (1 : 5) upto 20 ft. (6.10 metre)


3/8\" (10 mm) thick.
Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.50 bag
3.00 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.75 No.
1.00 Nos.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 25

upto 20 ft. (6.10 metre) height.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 11
(b)

Cement plaster (1 : 5) upto 20 ft. (6.10 metre)


\" (12 mm) thick.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

0.60 bag
4.00 Cft

0.75 No.
1.00 Nos.
0.25 No.

Rs.
Rs.
Rs.
Rs.

Page 26

upto 20 ft. (6.10 metre) height.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 11
(c)

Cement plaster (1 : 5) upto 20 ft. (6.10 metre)


\" (19 mm) thick.
Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

1.00 bag
6.00 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

1.00 No.
1.25 Nos.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 27

upto 20 ft. (6.10 metre) height.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 12
(a)

Cement plaster (1 : 6) upto 20 ft. (6.10 metre)


3/8\" (10 mm) thick.
Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.40 bag
3.00 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.75 No.
1.00 Nos.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 28

upto 20 ft. (6.10 metre) height.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 12
(b)

Cement plaster (1 : 6) upto 20 ft. (6.10 metre)


\" (12 mm) thick.
Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.53 bag
4.00 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.75 No.
1.00 Nos.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 29

upto 20 ft. (6.10 metre) height.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 12
(c)

Cement plaster (1 : 6) upto 20 ft. (6.10 metre)


\" (19 mm) thick.
Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.80 bag
6.00 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

1.00 No.
1.25 Nos.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 30

upto 20 ft. (6.10 metre) height.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Applying floating coat of cement 1/32\" (0.75 mm


Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

MATERIAL
1

Cement
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.40 bag

0.0

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.75 No.
0.25 Nos.
0.10 No.

0.0
0.0
0.0

Labour rate per 100 Sft


Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

0.0
0.0
0.0
0.0

ITEM RATES

Page 31

of cement 1/32\" (0.75 mm) thick.

British System) per 100 Sft

ate Per Unit

Amount (Rs.)

bags

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 14

Lime pointing flush upto 20 ft (6.10 mm) height


Ratio (1 : 2) lime sand mortar.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

Lime slaked (ground)


Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

13.44 kg
1.80 Cft

0.50 No.
0.75 Nos.
0.25 No.

Rs.
Rs.
Rs.
Rs.

Page 32

to 20 ft (6.10 mm) height including raking joints.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 kg
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 15

Lime pointing struck joints on walls, upto 20 ft


including raking joints Ratio (1 : 2) lime sand
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

Lime slaked (ground)


Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

13.44 kg
1.80 Cft

1.00 No.
1.00 Nos.
0.25 No.

Rs.
Rs.
Rs.
Rs.

Page 33

oints on walls, upto 20 ft. (6.10 metre) height


s Ratio (1 : 2) lime sand mortar.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 kg
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16
(a)

Cement pointing Flush upto 20 ft. (6.10 metre) h


1 : 2 (cement and sand)
Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.72 bag
1.80 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.75 No.
1.00 Nos.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 34

upto 20 ft. (6.10 metre) height.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 16
(b)

Cement pointing Flush upto 20 ft. (6.10 metre) h


1 : 3 (cement and sand)
Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.54 bag
2.00 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.75 No.
1.00 Nos.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 35

upto 20 ft. (6.10 metre) height.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 17

Cement pointing (1 : 2) flush on floor.


Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

0.72 bag
1.80 Cft

0.50 No.
0.75 Nos.
0.25 No.

Rs.
Rs.
Rs.
Rs.

Page 36

) flush on floor.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18
(a)

Cement pointing struck joints on walls upto 20 f


Ratio 1 : 2 (cement & sand).
Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.72 bag
1.80 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

1.00 No.
1.00 Nos.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 37

joints on walls upto 20 ft. (6.10 metre) height.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 18
(b)

Cement pointing struck joints on walls.


Ratio 1 : 3 (cement & sand).
Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.54 bag
2.00 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

1.00 No.
1.00 Nos.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 38

joints on walls.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 19
(a)

Pointing flush on stone work raised.


In Lime Mortar Ratio 1 : 2 (Limet & Sand).
Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Lime slaked (ground)


Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

18.66 kg
2.00 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

1.00 No.
0.50 Nos.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 39

e work raised.
: 2 (Limet & Sand).

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 kg
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 19
(b)

Pointing flush on stone work raised.


In Cement Mortar Ratio 1 : 3 (Cement & Sand).
Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.54 bag
2.00 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

1.00 No.
0.50 Nos.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 40

e work raised.
1 : 3 (Cement & Sand).

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 19
(c)

(i)

Pointing flush on stone work raised.


In Lime Mortar Ratio 1 : 2 (Lime & Sand).
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

Slaked lime
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

0.54 bag
18.66 kg
2.00 Cft

2.00 No.
1.00 Nos.
0.25 No.

Rs.
Rs.
Rs.
Rs.

Page 41

e work raised.
: 2 (Lime & Sand).

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 kg
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 19
(c)

(ii)

Pointing flush on stone work raised.


In Cement Mortar Ratio 1 : 3 (Cement & Sand).
Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.54 bag
2.00 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

2.00 No.
1.00 Nos.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 42

e work raised.
1 : 3 (Cement & Sand).

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

Raking and washing joints of stone masonry (old


Detail

Unit Rate (British System) per 100 Sft


Qty

LABOUR (For 125 Sft)


1

Cooly (Skilled)
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

1.00 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

ITEM RATES

DESCRIPTION OF ITEM:
Item No. 21

Raking and washing joints of brick masonary (old


Detail

LABOUR (For 125 Sft)


1
Cooly (Skilled)

Unit Rate (British System) per 100 Sft


Qty

0.50 No.

Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 43

nts of stone masonry (old work).

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per day

0.0 Say
0.0 Say

nts of brick masonary (old work).

British System) per 100 Sft


Rate Per Unit

0.0 per day

Amount (Rs.)

0.0 Say
0.0 Say

DESCRIPTION OF ITEM:
Item No. 22

Priming coat of chalk under distemper.


Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1

Chalk
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.91 kg

1
2

Mason
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.10 No.
0.10 Nos.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 44

under distemper.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 kg

0.0 per day


0.0 per day

0.0 Say
0.0 Say

.01 Say
0.0 Say

DESCRIPTION OF ITEM:
Item No. 23
(a)
(i)

Distempering.
New surface.
One coat.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2
3

Distemper
Burshes (Large)
Sand Paper
Total
Contractor's Profit & Percent
Total
LABOUR (For 150 Sft)
1
Painter
2
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

0.15 gln
1.50 lbs
0.04 No.
0.014 No.

0.17 No.
0.08 Nos.

Rs.
Rs.
Rs.
Rs.

Page 45

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per gln


0.0 Each
0.0 Doz

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 23
(a)
(ii)

Distempering.
New surface.
Two coats.

Detail

Unit Rate (British System) per 100 Sft


Qty
Rate Per Unit

MATERIAL
1
2
3

Distemper
Burshes (Large)
Sand Paper
Total
Contractor's Profit & Percent
Total
LABOUR (For 150 Sft)
1
Painter
2
Cooly un-skilled

0.20 gln
2.00 lbs
0.04 No.
0.014 No.

0.0
0.0
0.0

0.25 No.
0.12 Nos.

0.0
0.0

Rs.
Rs.
Rs.
Rs.

0.0
0.0
0.0
0.0

Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Page 46

British System) per 100 Sft


ate Per Unit

Amount (Rs.)

per gln
Each
Doz

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 23
(a)
(iii)

Distempering.
New surface.
Three coats.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2
3

Distemper
Burshes (Large)
Sand Paper
Total
Contractor's Profit & Percent
Total
LABOUR (For 150 Sft)
1
Painter
2
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

0.25 gln
2.50 lbs
0.04 No.
0.014 No.

0.33 No.
0.16 Nos.

Rs.
Rs.
Rs.
Rs.

Page 47

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per gln


0.0 Each
0.0 Doz

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 23
(b)
(i)

Distempering.
Old surface.
One coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2
3

Distemper
Burshes (Large)
Sand Paper
Total
Contractor's Profit & Percent
Total
LABOUR (For 150 Sft)
1
Painter
2
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

0.10 gln
1.00 lbs
0.04 No.
0.014 No.

0.15 No.
0.08 Nos.

Rs.
Rs.
Rs.
Rs.

Page 48

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per gln


0.0 Each
0.0 Doz

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 23
(b)
(ii)

Distempering.
Old surface.
Two coats.

Detail

Unit Rate (British System) per 100 Sft


Qty
Rate Per Unit

MATERIAL
1
2
3

Distemper
Burshes (Large)
Sand Paper
Total
Contractor's Profit & Percent
Total
LABOUR (For 150 Sft)
1
Painter
2
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

0.10 gln
1.00 lbs
0.04 No.
0.014 No.

0.0
0.0
0.0

0.25 No.
0.12 Nos.

0.0
0.0

Rs.
Rs.
Rs.
Rs.

0.0
0.0
0.0
0.0

Page 49

British System) per 100 Sft


ate Per Unit

Amount (Rs.)

per gln
Each
Doz

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 24
(a)
(i)

Colour washing.
New surface.
One coat.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2
3

White lime
Rice
Colouring material

Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Colly skilled
2
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

1.87 kg
0.117 kg
0.17 lbs
0.077 kg

0.12 No.
0.06 Nos.

Rs.
Rs.
Rs.
Rs.

Page 50

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per kg
0.0 per kg
0.0 per kg

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 24
(a)
(ii)

Colour washing.
New surface.
Two coat.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2
3

White lime
Rice
Colouring material

Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Colly skilled
2
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

2.80 kg
0.175 kg
0.22 lbs
0.10 kg

0.18 No.
0.09 Nos.

Rs.
Rs.
Rs.
Rs.

Page 51

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per kg
0.0 per kg
0.0 per kg

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 24
(b)
(i)

Colour washing.
Old surface.
One coat.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2
3

White lime
Rice
Colouring material

Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Colly skilled
2
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

1.40 kg
0.044 kg
0.10 lbs
0.045 kg

0.12 No.
0.06 Nos.

Rs.
Rs.
Rs.
Rs.

Page 52

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per kg
0.0 per kg
0.0 per kg

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 24
(b)
(ii)

Colour washing.
Old surface.
Two coats.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2
3

White lime
Rice
Colouring material

Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Colly skilled
2
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

2.33 kg
0.073 kg
0.15 lbs
0.068 kg

0.18 No.
0.09 Nos.

Rs.
Rs.
Rs.
Rs.

Page 53

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per kg
0.0 per kg
0.0 per kg

6.99
6.99
1.4
8.39

0.0 per day


0.0 per day

0.0
0.0
8.39
.9

Say
Say
Say
Say

8.4
.9

DESCRIPTION OF ITEM:
Item No. 25
(a)
(i)

White washing.
New surface.
One coat.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

White lime
Rice
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Colly skilled
2
Cooly un-skilled

1.87 kg
0.117 kg

0.12 No.
0.06 Nos.

Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 54

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per kg
0.0 per kg

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 25
(a)
(ii)

White washing.
New surface.
Two coats.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

White lime
Rice
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Colly skilled
2
Cooly un-skilled

2.80 kg
0.175 kg

0.18 No.
0.09 Nos.

Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 55

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per kg
0.0 per kg

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 25
(a)
(iii)

White washing.
New surface.
Three coats.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

White lime
Rice
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Colly skilled
2
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

3.73 kg
0.233 kg

0.23 No.
0.12 Nos.

Rs.
Rs.
Rs.
Rs.

Page 56

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per kg
0.0 per kg

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 25
(b)
(i)

White washing.
Old surface.
One coat.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

White lime
Rice
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Colly skilled
2
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

1.40 kg
0.088 kg

0.12 No.
0.06 Nos.

Rs.
Rs.
Rs.
Rs.

Page 57

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per kg
0.0 per kg

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 25
(b)
(ii)

White washing.
Old surface.
Two coats.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

White lime
Rice
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Colly skilled
2
Cooly un-skilled

2.33 kg
0.146 kg

0.18 No.
0.09 Nos.

Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 58

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per kg
0.0 per kg

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 26 (a)

Gobri leeping on wall.


Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

Mud (good earth)


Cowdung
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Mason
2
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

0.25 Cft
4.00 kg

0.15 No.
0.06 Nos.

Rs.
Rs.
Rs.
Rs.

Page 59

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per kg
0.0 per kg

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 26 (b)

Gobri leeping over roofs.


Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

Mud (good earth)


Cowdung
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Mason
2
Bahishti

0.25 Cft
4.00 kg

0.12 No.
0.06 Nos.

Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 60

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per kg
0.0 per kg

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 27

Striking joints of burnt bricks in lime or cemen


Detail

Unit Rate (British System) per 100 Sft


Rate
Qty
Per Unit

LABOUR (For 125 Sft)


1

Mason
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.25 No.

0.0

Rs.
Rs.

0.0
0.0

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
DESCRIPTION OF ITEM:
Item No. 28

Extra for lime Mud or cement plaster and pointin


each Addl: 10' height).
Detail

LABOUR (For 125 Sft)


1
Mason
2
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Unit Rate (British System) per 100 Sft


Rate
Qty
Per Unit
0.12 No.
0.25 No.

0.0
0.0

Rs.
Rs.

0.0
0.0

Page 61

nt bricks in lime or cement mortar.

British System) per 100 Sft


Amount (Rs.)

per day

Say
Say

cement plaster and pointing from 20' and above (for

British System) per 100 Sft


Amount (Rs.)
per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 29

Caulking joint of sleeper wall with sand and coa


Detail

MATERIAL
1
2
3

Unit Rate (British System) per 100 Sft


Qty
Rate Per Unit

Coaltar (Bitumen)
Sand
Fuel
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

4.00 kg
4.00 Cft
2.18 Kg.

0.0
0.0
0.0

1
2

Cooly skilled
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.50 No.
0.50 Nos.

0.0
0.0

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

0.0
0.0

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.0
0.0

ITEM RATES

Page 62

per wall with sand and coaltar.

British System) per 100 Sft


ate Per Unit

Amount (Rs.)

per kg
per Cft
per kg.

per day
per day

Say
Say

Say
Say

DESCRIPTION OF ITEM:
Item No. 30

Caulking joint of sleepers with mud and chopped


Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

Mud
Chopped Straw
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Cooly skilled
2
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

4.00 Cft
1.50 kg

0.50 No.
0.50 Nos.

Rs.
Rs.
Rs.
Rs.

Page 63

pers with mud and chopped straw.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.00per 100 Cft


0.0 per kg

0.0 per day


0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 31

Extra cost of labour and material for red oxide


to match with the colour of bricks.
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1

Red oxide pigment

2.50 lbs
0.25 gln

Total
Contractor's Profit & Percent
Total
LABOUR
1

for mixing red oxide in mortar


Cooly skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.25 Nos.

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 64

nd material for red oxide pigment in cement pointing


ur of bricks.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.00 per gln.

0.0 per day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 32 (i)

Providing grooved cement plaster 3/8\" (10 mm) t


existing plastered and rough surface upto 20' he
Detail

Unit Rate (British System) per 100 Sft


Qty

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composit rate per 100 Sft
Composite rate per Sqm

0.66 bag
2.55 Cft

1.00 No.
1.00 No.
0.25 No.

Rs.
Rs.
Rs.
Rs.

Page 65

nt plaster 3/8\" (10 mm) thick ratio (1 : 3) over


rough surface upto 20' height.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 bags
0.0 Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0
.01
0.0

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 32 (ii)

\" (12 mm) thick


Detail

MATERIAL
1
2

Unit Rate (British System) per 100 Sft


Qty

Cement
Sand
Total
Contractor's Profit & Percent
Total
LABOUR (For 125 Sft)

0.88 bag
3.40 Cft

1
2
3

Mason
Cooly un-skilled
Bahishti
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

1.00 No.
1.00 No.
0.25 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 66

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 per bag


0.0 per Cft

0.0 per day


0.0 per day
0.0 per day

0.0
0.0

Say
Say

0.0
0.0

Say
Say

DESCRIPTION OF ITEM:
Item No. 33

Providing & fitting expanded metal edge bead for


both sides of edges.
Detail

Unit Rate (British System) per Rft


Qty
Rate Per Unit

MATERIAL
1

Edge bead (5\" wide mesh 3/8\" x1.00 Rft. 0.00 Per Rft.
2\" wide on each side of siled
strip 1\" wide T 1 No.11)
2
Nails
0.012 Kg.
0.0
Total
Contractor's Profit & Percent
Total
LABOUR (For 84 Rft)
1

Skilled Cooly
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total rate for 84 Rft

1.00 No.

0.0

Labour rate per Rft


Labour rate per R.M
Composit rate per Rft
Composite rate per R.M

Rs.
Rs.
Rs.
Rs.

0.0
0.0
0.0
0.0

ITEM RATES

Page 67

panded metal edge bead for corner's with nail on

British System) per Rft


ate Per Unit
Amount (Rs.)

.00 Per Rft.

Per Kg.

per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 34
(i)

Petty repair's to fire place.


Single
Detail

Unit Rate (British System) per each


Qty
Rate Per Unit

MATERIAL
1

LABOUR
1
2

Cement 0.076 Bag


Sand
Total
Contractor's Profit & Percent
Total

0.38 Cft.

0.0
0.0

Mason
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.14 No.
0.14 No.

0.0
0.0

Labour rate for each


Composit rate for each

Rs.
Rs.

0.0

ITEM RATES

Page 68

British System) per each


ate Per Unit
Amount (Rs.)

Bag
% Cft.

.01

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 34
(ii)

Petty repairs to fire place.


Double
Detail

MATERIAL
Cost of cement and sand

Unit Rate (British System) per each


Qty
Rate Per Unit

As per item 34 (i)= R

LABOUR
As per ite -

ITEM RATES
Labour rate for each
Composit rate for each

Rs.
Rs.

0
0

Page 69

British System) per each


ate Per Unit
Amount (Rs.)

Say
Say

DESCRIPTION OF ITEM:
Item No. 35

Petty repair's to main room

Detail

MATERIAL
1
2

Cement 0.200 Bag


Sand
Total
Contractor's Profit & Percent
Total

Unit Rate (British System) for Each


Qty

1.15 Cft.

LABOUR
1
2

Mason
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.25 No.
0.34 No.

Labour rate for Each


Composit rate for Each

Rs.
Rs.

ITEM RATES

Page 70

British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 Bag
0.0 % Cft.

0.0 per day


0.0 per day

0.0 Say
0.0 Say

DESCRIPTION OF ITEM:
Item No. 36

Petty repair's to small rooms.

Detail

MATERIAL
1
2

Cement 0.100 Bag


Sand
Total
Contractor's Profit & Percent
Total

Unit Rate (British System) for Each


Qty

0.57 Cft.

LABOUR
1
2

Mason
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.125 No.
0.17 No.

Labour rate for Each


Composit rate for Each

Rs.
Rs.

ITEM RATES

Page 71

British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 Bag
0.0 % Cft.

0.0 per day


0.0 per day

0.0 Say
0.0 Say

DESCRIPTION OF ITEM:
Item No. 37

Petty repair's to verandah.

Detail

Unit Rate (British System) for Each


Qty

MATERIAL
1
2

LABOUR
1
2

Cement 0.16 Bag


Sand
Total
Contractor's Profit & Percent
Total

0.91 Cft.

Mason
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.25 No.
0.34 No.

Labour rate for Each


Composit rate for Each

Rs.
Rs.

ITEM RATES

Page 72

British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 Bag
0.0 % Cft.

0.0 per day


0.0 per day

0.0 Say
0.0 Say

DESCRIPTION OF ITEM:
Item No. 38

Extra labour for white washing colour washing, p


distempering etc from 20 ft. (6 metre) height an
scaffolding for every additional 10 ft. (3 metre
Detail

Unit Rate (British System) per 100 Sft


Qty

LABOUR (For 125 Sft)


1
2

Cooly skilled
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total

0.02 No.
0.01 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

ITEM RATES

Page 73

washing colour washing, priming coat and


20 ft. (6 metre) height and above, requiring
additional 10 ft. (3 metre) height, or part thereof.

British System) per 100 Sft (per coat)


Rate Per Unit
Amount (Rs.)

0.0 per day


0.0 per day

0.0 Say
0.0 Say

CHAPTER NO. 7

BRICK WORK
DESCRIPTION OF ITEM:
Item No. 1
(i)

Pucca brick work in mud mortar in building.


In foundation and plinth.

Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1 Bricks 9\" x 4\" x 3\"
1350.00 Nos.
2 Good earth or stiff clay for m35.00 Cft
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
1.50 Nos.
2
Coolies unskilled
2.00 Nos.
3
Bahishti
0.13 No
For Mud Mortar
1
Cooly unskilled
2
Bahishty

0.67 No.
0.33 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 1

d mortar in building.

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 1
(ii)

Pucca brick work in mud mortar in building.


In ground floor.
Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1 Bricks 9\" x 4\" x 3\"
1350.00 Nos.
2 Good earth or stiff clay for m35.00 Cft
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2.00 Nos.
2
Coolies unskilled
3.00 Nos.
3
Bahishti
0.13 No.
For Mud Mortar
1
2

Cooly unskilled
0.67 No.
Bahishty
0.33 No
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Page 2

d mortar in building.

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 2

Add extra labour in item No.1 for brick work in

Detail

Unit Rate (British System) per 100 Cft


Qty

LABOUR for 125 Cft


First Floor
1
Mason
0.25 No.
2
Cooly unskilled
1.00 No.
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
LABOUR for 125 Cft
Second Floor
1
Masons
0.75 No.
2
Coolies unskilled
2.00 Nos.
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Page 3

em No.1 for brick work in

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

per day
per day

Say
Say

Detail

Unit Rate (British System) per 100 Cft


Qty

LABOUR for 125 Cft


Third Floor
1
Masons
1.25 Nos.
2
Coolies unskilled
3.00 Nos.
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
LABOUR for 125 Cft
4th & Subsequent Floor
1
Masons
2.25 Nos.
2
Coolies unskilled
4.50 Nos.
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per cum

Rs.
Rs.

Page 4

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 3
(i)

Pucca brick work in mud mortar other than buildi


Upto 20 ft. (6 metre) high.

Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1 Bricks 9\" x 4\" x 3\"
1350.00 Nos.
2 Good earth or stiff clay
35.00 Cft
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
For Mud Mortar
1
2

2.00 Nos.
3.00 Nos.

Cooly unskilled
1.00 No.
Bahishty
0.33 No
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Page 5

d mortar other than building.

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 3
(ii)

Pucca brick work in mud morter other than buildi

Extra labour for every 5.0' (1.5 metre) addition


thereof.
Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.25 No.
1.00 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

ITEM RATES

Page 6

d morter other than building:


5.0' (1.5 metre) additional height

nit Rate (British System) per 100 Cft


Rate
Per Unit
Amount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:2).
Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


1350.00 Nos.
Cement
8.00 bags
Sand
20.00 Cft
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
2
3
LABOUR for
For Cement
1
2

Mason
Coolies unskilled
Bahishti
125 Cft
Mortar
Cooly unskilled
Bahishty

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 7

undation & plinth in

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in:


Cement sand mortar Ratio (1:3).

Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


1350.00 Nos.
Cement
6.00 bags
Sand
22.50 Cft
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
2
3
LABOUR for
For Cement
1
2

Mason
Coolies unskilled
Bahishti
125 Cft
Mortar
Cooly unskilled
Bahishty

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 8

undation & plinth in:

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bags
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in:


Cement sand mortar Ratio (1:4).

Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


1350.00 Nos.
Cement
4.80 bags
Sand
24.00 Cft
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
Cooly unskilled
2
Bahishty

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 9

undation & plinth in:

British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in:


Cement sand mortar Ratio (1:5).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
4.00 bags
25.00 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.00 Nos.
2.50 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 10

undation & plinth in:

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:6).
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total

1350.00 No
3.40 bags
25.70 Cft

LABOUR for 125 Cft


For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
LABOUR for 125 Cft
For Cement Mortar

2.00 Nos.
2.50 Nos.
0.25 No.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 11

undation & plinth in

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:7).
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total

1350.00 No
3.00 bags
26.50 Cft

LABOUR for 125 Cft


For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
LABOUR for 125 Cft
For Cement Mortar

2.00 Nos.
2.50 Nos.
0.25 No.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 12

undation & plinth in

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
2.66 bags
26.67 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.00 Nos.
2.50 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 13

undation & plinth in

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:6).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Cement
Slaked lime
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
3.20 bags
59.72 kg
24.00 Cft

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 14

undation & plinth in


r Ratio (1:1:6).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
per kg
% Cft

per day
per day
per day

per day
per day

Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in:


Lime cement sand mortar Ratio (1:1:7).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Cement
Slaked lime
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar

1350.00 No
2.85 bags
53.00 kg
24.78 Cft

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

2.00 Nos.
2.50 Nos.
0.25 No.

ITEM RATES

Page 15

undation & plinth in:


r Ratio (1:1:7).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
per kg
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Cement
Slaked lime
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
2.56 bags
47.78 kg
25.60 Cft

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 16

undation & plinth in


r Ratio (1:1:8).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
per kg
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:9).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Cement
Slaked lime
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
2.32 bags
43.30 kg
26.20 Cft

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 17

undation & plinth in


r Ratio (1:1:9).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
per kg
% Cft

per day
per day
per day

per day
per day

Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:10).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Cement
Slaked lime
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
2.14 bags
39.94 kg
26.66 Cft

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 18

undation & plinth in


r Ratio (1:1:10).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
per kg
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (iii)

Lime, sand mortar Ratio (1:2).

Detail

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Lime Slaked
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

Unit Rate (British System)


Qty

1350.00 No
174.30 Kg.
23.33 Cft

2.00 Nos.
2.50 Nos.
0.25 No.

0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 19

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
Per Kg.
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1:2).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
8.00 bags
20.00 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 20

ound floor (including striking of jo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1:3).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
6.00 bags
22.50 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 21

ound floor (including striking of jo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1:4).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
4.80 bags
24.00 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 22

ound floor (including striking of jo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1:5).
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
4.00 bags
25.00 Cft

1
2
3
For Cement

Mason
Coolies unskilled
Bahishti
Mortar

2.50 Nos.
4.00 Nos.
0.25 No.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 23

ound floor (including striking of jo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1:6).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
3.40 bags
25.70 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 24

ound floor (including striking of jo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1:7).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
3.00 bags
26.50 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 25

ound floor (including striking of jo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including stri


Cement sand mortar Ratio (1 : 8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
2.66 bags
26.57 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 26

ound floor (including striking of jo


io (1 : 8).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio (1:1:6).

Detail

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total

LABOUR for 125 Cft


For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
2

Unit Rate (British System)


Qty

1350.00 No
59.72 kg
3.20 bags
24.00 Cft

2.50 Nos.
4.00 Nos.
0.25 No.

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 27

r Ratio (1:1:6).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio (1 : 1 : 7).


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
53.37 kg
2.85 bags
24.78 Cft

1
2
3
For Cement

Mason
Coolies unskilled
Bahishti
Mortar

2.50 Nos.
4.00 Nos.
0.25 No.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 28

r Ratio (1 : 1 : 7).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio (1:1:8).


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
47.78 kg
2.56 bags
25.60 Cft

1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
Cooly unskilled
2
Bahishty

2.50 Nos.
4.00 Nos.
0.25 No.
0.83 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 29

r Ratio (1:1:8).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio ( 1 : 1 : 9 ).


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
43.30 kg
2.32 bags
26.20 Cft

1
2
3
For Cement

Mason
Coolies unskilled
Bahishti
Mortar

2.50 Nos.
4.00 Nos.
0.25 No.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 30

r Ratio ( 1 : 1 : 9 ).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio ( 1 : 1 : 10 ).

Detail

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total

LABOUR for 125 Cft


For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
2

Unit Rate (British System)


Qty

1350.00 No
40.00 kg
2.14 bags
26.66 Cft

2.50 Nos.
4.00 Nos.
0.25 No.

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 31

r Ratio ( 1 : 1 : 10 ).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (iii)

Lime sand mortar Ratio (1:2).

Detail

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Lime
Sand

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
3
Bahishti
For Cement Mortar
1
2

Unit Rate (British System)


Qty

1350.00 No
174.30 kg
23.33 Cft

2.50 Nos.
4.00 Nos.
0.25 No.

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.83 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 32

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
% Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 6

Add extra labour in item No.5 for brick work in:

Detail

LABOUR for 125 Cft


First Floor
1
Mason
2
Cooly unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
LABOUR for 125 Cft
Second Floor
1
Masons
2
Coolies unskilled

Unit Rate (British System)


Qty

0.25 No.
1.00 No.

Rs.
Rs.

0.75 No.
2.00 Nos.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft

Rs.

Labour rate per Cum

Rs.

Page 33

em No.5 for brick work in:-

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

per day
per day

Say
Say

Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


Third Floor
1
Masons
2
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft

1.25 Nos.
3.00 Nos.

Labour rate per Cum


LABOUR for 125 Cft
4th & Subsequent Floor
1
Masons
2
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per cum

2.25 Nos.
4.50 Nos.

Rs.
Rs.

Page 34

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1:2).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
8.00 bags
20.00 Cft

1
Mason
2
Coolies unskilled
For Cement Mortar

2.50 Nos.
3.00 Nos.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 35

than building including striking of

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

Item No. 7

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1:3).
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total

LABOUR for 125 Cft


For Masonry Work
1
Mason
2
Coolies unskilled
For Cement Mortar
1
2

1350.00 No
6.00 bags
22.50 Cft

2.50 Nos.
3.00 Nos.

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 36

than building including striking of

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 4).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
4.80 bags
24.00 Cft

1
Mason
2
Coolies unskilled
For Cement Mortar

2.50 Nos.
3.00 Nos.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 37

than building including striking of

io (1 : 4).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 5).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
4.00 bags
25.00 Cft

1
Mason
2
Coolies unskilled
For Cement Mortar

2.50 Nos.
3.00 Nos.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 38

than building including striking of

io (1 : 5).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 6).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
3.40 bags
25.70 Cft

1
Mason
2
Coolies unskilled
For Cement Mortar

2.50 Nos.
3.00 Nos.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 39

than building including striking of

io (1 : 6).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 7).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
3.00 bags
26.50 Cft

1
Mason
2
Coolies unskilled
For Cement Mortar

2.50 Nos.
3.00 Nos.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 40

than building including striking of

io (1 : 7).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work

1350.00 No
2.66 bags
26.67 Cft

1
Mason
2
Coolies unskilled
For Cement Mortar

2.50 Nos.
3.00 Nos.

1
2

Cooly unskilled
Bahishty
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.50 No

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 41

than building including striking of

io (1 : 8).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 6).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
59.72 kg
3.20 bags
24.00 Cft

2.50 Nos.
3.00 Nos.

1.00 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 42

than building including striking of

tar Ratio (1 : 1 : 6).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 7).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
53.00 kg
2.85 bags
24.78 Cft

2.50 Nos.
3.00 Nos.

1.00 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 43

than building including striking of

tar Ratio (1 : 1 : 7).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
47.78 kg
2.56 bags
25.60 Cft

2.50 Nos.
3.00 Nos.

1.00 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 44

than building including striking of

tar Ratio (1 : 1 : 8).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 9).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
43.29 kg
2.32 bags
26.20 Cft

2.50 Nos.
3.00 Nos.

1.00 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 45

than building including striking of

tar Ratio (1 : 1 : 9).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including s


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 10).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled
For Cement Mortar
1
Cooly unskilled
2
Bahishty

1350.00 No
39.94 kg
2.14 bags
26.66 Cft

2.50 Nos.
3.00 Nos.

1.00 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 46

than building including striking of

tar Ratio (1 : 1 : 10).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (iii)

Lime, sand, mortar ratio (1 : 2)

Detail

MATERIAL
1
2
3

Pacca brick 9\" x 4\" x 3\"


Slaked lime
Sand

Unit Rate (British System)


Qty

1350.00 No
174.30 kg
23.33 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
For Masonry Work
1
Mason
2
Coolies unskilled

2.50 Nos.
3.00 Nos.

For Cement Mortar


1
Cooly unskilled
2
Bahishty

1.00 No.
0.50 No

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 47

io (1 : 2)

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
per kg
% Cft

per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 8

Additional extra labour in item No.7 for every 1


additional height.

Detail

LABOUR for 125 Cft


1
Masons
2
Cooly

Unit Rate (British System)


Qty

0.25 No.
1.00 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Page 48

r in item No.7 for every 10 ft. (3 m

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 9

Extra labour for arch work in brick masonry incl


centering and de-centering.
Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


1
2

Masons
Cooly
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.50 No.
0.50 No.

Labour rate Per 100 Cft.


Labour Rate Per Cum.

Rs.
Rs.

ITEM RATES

Page 49

work in brick masonry including labo

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Extra for Pacca brick work in steining of wells


circular masonry.

Detail

MATERIAL
1

Pacca bricks

Unit Rate (British System)


Qty

82.00 No.

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
1

Mason
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 No.

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 50

work in steining of wells or any oth

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

% Cft

per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 11

Extra labour for profile and flared walls.

Detail

LABOUR for 125 Cft


1
Mason

Unit Rate (British System)


Qty

0.43 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum

Rs.
Rs.

Page 51

le and flared walls.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 12
(i)

Extra labour for Pacca brick work in piers and a

From 10 ft. (3 metre) to 20 ft. (6 metre) height


Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.12 No.
0.50 No.

Labour rate per 100 Cft


Composit rate per Cum

Rs.
Rs.

ITEM RATES

Page 52

brick work in piers and abutment.

to 20 ft. (6 metre) height.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 12
(ii)

Extra labour for Pacca brick work in piers and a


Above 20 ft. (6 metre) height.

Detail

LABOUR for 125 Cft


1
Mason
2
Cooly unskilled

Unit Rate (British System)


Qty

0.25 No.
1.00 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum

Rs.
Rs.

Page 53

brick work in piers and abutment.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Extra for face work (half brick thick) using spe


of Ist class bricks.

Detail

MATERIAL
1
2

Special moulded Stretcher


courses bricks
Header courses
Total
Add 5% wastage
Total
Difference in cost of special
moulded and ordinary Ist class
bricks
Extra cost = 0
-=
Contractor's Profit &20 Percent
Total
Labour rate for 100 Cft
Composit rate per Cum

270
513
783
39.15
822.15

Page 54

alf brick thick) using special brick

Unit Rate (British System) per 100 Cft


Qty
Rate Per UnitAmount (Rs.)

Nos.

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 14

Reinforced brick work in lintels of opening, lai


sand mortar including, all labour material forms
and shuttering etc., but excluding cost and labo
reinforcement which shall be paid for separately
Detail

MATERIAL
1
2
3
4

Pacca bricks
Cement
Sand
Kikar wood for centring & shuttering
(10 x 1.60 x 0.2) Can be use 20 times

Unit Rate (British System)


Qty

10.00 No.
0.11 bag
0.41 Cft
0.002 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
1
2
3

Mason
Cooly unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.067 No.
0.11 No.
0.023 No.

Labour rate per Cft


Labour rate per Cum
Composite rate per Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 55

in lintels of opening, laid in (1:3)


all labour material forms, moulds,
ut excluding cost and labour of stee
all be paid for separately.

nit Rate (British System) per Cft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 15 (a)

Extra for dressing or chamfering of bricks (spec


architectaral shape).
Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

3.00 No.
0.34 No.

Labour rate per 100 No.

Rs.

ITEM RATES

Page 56

chamfering of bricks (special or

nit Rate (British System) per 100 No.


Rate Per UnitAmount (Rs.)

per day
per day

Say

DESCRIPTION OF ITEM:
Item No. 15 (b)

All other purposes.

Detail

LABOUR for 125 Cft


1
Mason
2
Cooly unskilled

Unit Rate (British System)


Qty

1.50 No.
0.17 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 No.

Rs.

Page 57

nit Rate (British System) per 100 No.


Rate Per UnitAmount (Rs.)

per day
per day

Say

DESCRIPTION OF ITEM:
Item No. 16
(i)

Peforated Pacca brick walling 114 mm (4\") thic


floor in
Mud mortar.

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Pacca bricks 9\" x 4\" x 3\"


Good earth
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
8.75 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
1.83 Nos.
0.23 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 58

walling 114 mm (4\") thick in ground

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1 : 2).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
2.00 bags
5.00 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 59

io (1 : 2).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:3).

Detail

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total

LABOUR for 125 Sft


1
Mason
2
Coolies unskilled
3
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

Unit Rate (British System)


Qty

338.00 No.
1.50 bags
5.60 Cft

1.25 Nos.
2.42 Nos.
0.38 No.

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 60

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:4).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
1.20 bags
6.00 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 61

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:5).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
1.00 bags
6.25 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 62

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:6).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
0.86 bags
6.40 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 63

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:7).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
0.75 bags
6.58 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 64

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
0.67 bags
6.67 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 65

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 6).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
14.93 kg
0.80 bags
6.00 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 66

r Ratio (1 : 1 : 6).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 7).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
13.44 kg
0.71 bags
6.13 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 67

r Ratio (1 : 1 : 7).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 8).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
12.32 kg
0.64 bags
6.40 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 68

r Ratio (1 : 1 : 8).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 9).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
10.82 kg
0.58 bags
6.50 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 69

r Ratio (1 : 1 : 9).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 10).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 No.
10.08 kg
0.54 bags
6.70 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 70

r Ratio (1 : 1 : 10).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 16 (iv)

Lime cement sand mortar Ratio (1 : 2).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Sand
Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft

338.00 Nos
43.67 kg
5.58 Cft

1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.25 Nos.
2.42 Nos.
0.38 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 71

r Ratio (1 : 2).

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 17

Add. extra labour on item No.15 for pacca brick

Detail

LABOUR for 125 Sft


First Floor
1
Mason
2
Cooly unskilled

Unit Rate (British System)


Qty

0.13 No.
0.50 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate for 100 Sft

Rs.

Labour rate per Sqm

Rs.

LABOUR for 125 Sft


Second Floor
1
Masons
2
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate for 100 Sft
Labour rate per Sqm
LABOUR for 125 Cft
Third Floor
1
Masons
2
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate for 100 Sft

0.37 No.
1.00 No.

Rs.
Rs.

0.63 No.
1.50 Nos.

Labour rate per Sqm


Page 72

tem No.15 for pacca brick work.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

per day
per day

Say
Say

per day
per day

Say

Say

LABOUR for 125 Sft


4th & Subsequent Floor
1
Masons
2
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.12 Nos.
2.12 Nos.

ITEM RATES
Labour rate for 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 73

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (i)

Perforated pacca brick walling 9\" thick in grou


Mud Mortar

Detail

Unit Rate (British System)


Qty

MUD MORTAR
1
Pacca bricks 9\" x 4\" x 3\"
2
Good earth

675.00 Nos
17.50 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
Mason
2
Coolies unskilled
3
Bahishti

1.25 Nos.
2.75 Nos.
0.35 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 74

walling 9\" thick in ground floor in

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 2)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

675.00 Nos
4.00 bags
10.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 75

io (1 : 2)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
bags
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 3)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

675.00 Nos
3.00 bags
11.25 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 76

io (1 : 3)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
bags
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 4)

Detail

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

Unit Rate (British System)


Qty

675.00 Nos
2.40 bags
12.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

Page 77

io (1 : 4)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 5)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

675.00 Nos
2.00 bags
12.50 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 78

io (1 : 5)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 6)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

675.00 Nos
1.72 bags
12.80 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 79

io (1 : 6)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 7)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

675.00 Nos
1.50 bags
13.13 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 80

io (1 : 7)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 8)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand

675.00 Nos
1.33 bags
13.34 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 81

io (1 : 8)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 6)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand

675.00 Nos
29.86 kg
1.60 bags
12.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 82

r Ratio (1 : 1 : 6)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 7)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
Mason
2
Coolies unskilled
3
Bahishti

675.00 Nos
26.50 kg
1.42 bags
12.39 Cft

1.90 Nos.
3.63 Nos.
0.55 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 83

r Ratio (1 : 1 : 7)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 8)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand

675.00 Nos
23.90 kg
1.28 bags
12.80 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 84

r Ratio (1 : 1 : 8)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 9)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
Mason
2
Coolies unskilled
3
Bahishti

675.00 Nos
21.65 kg
1.16 bags
13.10 Cft

1.90 Nos.
3.63 Nos.
0.55 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 85

r Ratio (1 : 1 : 9)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 10)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Cement
Sand

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
Mason
2
Coolies unskilled
3
Bahishti

675.00 Nos
20.16 kg
1.07 bags
13.33 Cft

1.90 Nos.
3.63 Nos.
0.55 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

Page 86

r Ratio (1 : 1 : 10)

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
per kg
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (iv)

Lime sand mortar Ratio (1 : 2)

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

Pacca bricks 9\" x 4\" x 3\"


Slaked lime
Sand

675.00 Nos
86.97 kg
11.67 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Sft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.90 Nos.
3.63 Nos.
0.55 No.

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 87

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per kg
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 19

Extra labour in item No.18 for per perforated pa


work in
Detail

Unit Rate (British System)


Qty

LABOUR
First Floor

Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

LABOUR
Second Floor
Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

LABOUR
Third Floor
Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

LABOUR
Fourth & Subsequent Floor
Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

Page 88

o.18 for per perforated pacca brick

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Say
Say

Say
Say

Say
Say

Say
Say

DESCRIPTION OF ITEM:
Item No. 20
(i)

Fire brick masonary in fire clay mortar.


Upto 20 ft. (6 metre) height including all char

Detail

Unit Rate (British System)


Qty

Per 100 Cft


MATERIAL
1
2
3

Fire clay bricks 9\" x 4\" x 3\"


Fire resistant Cement
Brick grinded sand

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
for masonary work
1
Mason
2
Coolies
3
Bahishti
for mortar
1
2

1350.00 No
8.80 bags
22.00 Cft

3.00 Nos.
3.00 Nos.
0.25 No.

Cooly
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
0.25 No

Labour rate per Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 89

fire clay mortar.


height including all charges.

nit Rate (British System) per Cft


Rate Per UnitAmount (Rs.)

Each
per bag
per Cft

per day
per day
per day

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 20
(ii)

Fire brick masonary in fire clay mortar.


Extra for every 1.5 metre additional height.

Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.25 No.
1.00 No

Labour rate per 100 Cft


Labour rate per Cum

Rs.
Rs.

ITEM RATES

Page 90

fire clay mortar.

tre additional height.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 21
(i)

First class brick walling laid in (1 : 3) cement


reinforced with (1\") 25 mm wide 18 gauge hoop i
4\" (114 mm) thick walling with hoop iron boudi
(150 mm) apart.

Detail

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Hoop iron

Unit Rate (British System)


Qty

525.00 Nos
2.40 bags
9.00 Cft
45.00 lbs
20.41 Kg.

Total
Contractor's Profit &20 Percent
Total
LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00
1.25
0.25
0.15

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

No.
Nos.
No.
No.

Page 91

ing laid in (1 : 3) cement sand mort


25 mm wide 18 gauge hoop iron.
lling with hoop iron bouding 6\"

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Per Kg.

per
per
per
per

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 21
(ii)

First class brick walling laid in (1 : 3) cement


reinforced with 1\" (25 mm) wide 18 gauge hoop i
4\" (114 mm) thick walling with hoop iron boudi
12\" (300 mm) apart.

Detail

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Hoop iron

Unit Rate (British System)


Qty

525.00 Nos
2.40 bags
9.00 Cft
22.50 lbs
10.20 kg.

Total
Contractor's Profit &20 Percent
Total
LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00
1.00
0.25
0.10

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

No.
No.
No.
No.

Page 92

ing laid in (1 : 3) cement sand mort


5 mm) wide 18 gauge hoop iron.
lling with hoop iron bouding

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Per Kg.

per
per
per
per

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 21
(iii)

First class brick walling laid in (1 : 3) cement


reinforced with 1\" (25 mm) wide 18 gauge hoop i
3\" (75 mm) thick walling with hoop iron bouding
(150 mm) apart.

Detail

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Hoop iron

Unit Rate (British System)


Qty

350.00 Nos
1.80 bags
6.50 Cft
45.00 lbs
20.41 Kg.

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.75
1.00
0.20
0.15

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

No.
No.
No.
No.

Page 93

ing laid in (1 : 3) cement sand mort


5 mm) wide 18 gauge hoop iron.
ing with hoop iron bouding 6\"

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Per Kg.

per
per
per
per

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 21
(iv)

First class brick walling laid in (1 : 3) cement


reinforced with 1\" (25 mm) wide 18 gauge hoop i
3\" (75 mm) thick walling with hoop iron bouding
(300 mm) apart.

Detail

MATERIAL
1
2
3
4

Pacca bricks 9\" x 4\" x 3\"


Cement
Sand
Hoop iron

Unit Rate (British System)


Qty

350.00 Nos
1.80 bags
6.50 Cft
20.00 lbs
9.070 Kg.

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.75
1.00
0.20
0.15

Labour rate per 100 Sft


Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

No.
No.
No.
No.

Page 94

ing laid in (1 : 3) cement sand mort


5 mm) wide 18 gauge hoop iron.
ing with hoop iron bouding 12\"

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Per Kg.

per
per
per
per

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 22

Ghilafi work (1 brick thick wall).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

B.B in mud ( of item No.1)


Sundried bricks ( of item No.24)

x
x

Total
LABOUR for 125 Cft
1
Mason
2
Coolies unskilled
3
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

2.00 Nos.
3.67 Nos.
0.50 No.

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 95

thick wall).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 23

Dry brick pitching.

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Ist class burnt brick

1350.00 No

Total
Contractor's Profit &20 Percent
Total
LABOUR
1
2

Mason
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
2.00 Nos.

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 96

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 24

Sun dried bricks in Mud mortar.

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Sun dried bricks


Siff clay

1350.00 No
35.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Cft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.50 Nos.
3.50 Nos.
0.25 No.

Labour rate per 100 Cft


Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 97

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

Nos.
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 25

Pise wall (mud walling).

Detail

Unit Rate (British System)


Qty

LABOUR for 125 Cft


1
2
3

Coolies skilled
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
1.50 Nos.
0.50 No.

Labour rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

ITEM RATES

Page 98

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

per day
per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 26
(i)

Providing Eave brick moulded weathered and throa


brick or drip course cornice in (1 : 3) cement m
3\" (76 mm) thick drip course.

Detail

MATERIAL (FOR 100 RFT.)


1
Moulded brick
2
Cement for laying and plastering
3
Sand
Deduct cost of ordinary bricks
Total
Contractor's Profit &20 Percent
Total

Unit Rate (British System)


Qty

280.00 Nos
1.50 bag
5.00 Cft
140 Nos.

LABOUR (FOR 125 RFT.)


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.75 Nos.
1.75 Nos.
0.25 No.

Labour rate per Rft


Labour rate per R.M
Composite rate per Rft
Composite rate per R.M

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 99

oulded weathered and throated with b


ornice in (1 : 3) cement mortar.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Nos.

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 26
(ii)

Providing Eave brick moulded weathered and throa


brick or drip cornice in (1 : 3) cement mortars.
4\" (114 mm) thick drip course cornice.

Detail

MATERIAL (FOR 100 RFT.)


1
Brick moulded I/C wastage
2
Cement for laying and plastering
3
Sand
Deduct cost of ordinary bricks
Total
Contractor's Profit &20 Percent
Total

Unit Rate (British System)


Qty

420.00 Nos
1.75 bag
6.00 Cft
210.00 Nos

LABOUR (FOR 125 RFT)


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

2.00 Nos.
2.00 Nos.
0.25 No.

Labour rate per Rft


Labour rate per R.M
Composite rate per 100 Rft
Composite rate per R.M

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 100

oulded weathered and throated with b


in (1 : 3) cement mortars.
ip course cornice.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Nos.

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 26
(iii)

Providing Eave brick moulded weathered and throa


brick or drip cornice in (1 : 3) cement mortar.
4\" (114 mm) thick eave brick with back brick.

Detail

MATERIAL (FOR 100 RFT)


1
Brick moulded (including wastage)
2
Back bricks ordinary
3
Cement
4
Sand

Unit Rate (British System)


Qty

465.00 Nos
465.00 Nos
1.20 bag
5.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR (FOR 125 RFT.)
1
2

Mason for laying


Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00 No.
2.00 Nos.

Labour rate per Rft


Labour rate per R.M
Composite rate per Rft
Composite rate per R.M

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 101

oulded weathered and throated with b


in (1 : 3) cement mortar.
ve brick with back brick.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
Nos.
per bag
% Cft

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 27
(i)

Providing & laying dressed or moulded brick corn


cement mortar, plastering or pointing complete.
One brick.

Detail

Unit Rate (British System)


Qty

MATERIAL (FOR 100 RFT.)


1

2
3

Pacca bricks I/C 10% wastage


As the rate is only for the projected protion
to the brick required
60.00 Nos.
Cement for laying & plastering or pointi 1.60 bag
Sand for laying & plastering or plasteri 6.00 Cft
Total
Contractor's Profit &20 Percent
Total

LABOUR for 125 Rft


1
Mason
2
Coolies unskilled
3
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

2.00 Nos.
2.00 Nos.
0.25 No.

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Page 102

ssed or moulded brick cornice in ( 1


ing or pointing complete.

nit Rate (British System) per

Rft

Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 27
(ii)

Providing & laying dressed or moulded brick corn


cement mortar, plastering or pointing complete.
Two brick.

Detail

MATERIAL (FOR 100 RFT.)


1
Pacca bricks
2
Cement for laying & plastering
3
Sand for laying & plastering

Unit Rate (British System)


Qty

175.00 Nos
5.00 bags
18.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Rft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

3.00 Nos.
3.00 Nos.
0.25 No.

Labour rate per Rft


Labour rate per R.M
Composite rate per Rft
Composite rate per R.M

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 103

ssed or moulded brick cornice in ( 1


ing or pointing complete.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 27

(iii)

Providing & laying dressed or moulded brick corn


cement mortar, plastering or pointing complete.
Three bricks.

Detail

Unit Rate (British System)


Qty

MATERIAL (FOR 100 RFT.)


1
2
3

Pacca bricks
Cement for laying & plastering
Sand for laying & plastering

270.00 Nos
8.00 bags
60.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Rft
1
Mason
2
Coolies unskilled
3
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

4.00 Nos.
4.00 Nos.
0.34 No.

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Page 104

ssed or moulded brick cornice in ( 1


ing or pointing complete.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 27
(iv)

Providing & laying dressed or moulded brick corn


cement mortar, plastering or pointing complete.
Four brick.

Detail

MATERIAL FOR 100 RFT.)


1
Pacca bricks
2
Cement for laying & plastering
3
Sand for laying & plastering

Unit Rate (British System)


Qty

580.00 Nos
10.00 bags
37.00 Cft

Total
Contractor's Profit &20 Percent
Total
LABOUR for 125 Rft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

5.00 Nos.
5.00 Nos.
0.50 No.

Labour rate per Rft


Labour rate per R.M
Composite rate per Rft
Composite rate per R.M

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 105

ssed or moulded brick cornice in ( 1


ing or pointing complete.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 28

Cleaning brick dismentled from kacha pacca mason

Detail

LABOUR for 1250 Nos.


1
Cooly unskilled

Unit Rate (British System)


Qty

1.75 Nos.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rat per 1000 No.

Rs.

DESCRIPTION OF ITEM:
Item No. 29

Scraping bricks dismantled from pacca masonary.

Detail

LABOUR for 1250 Nos.


1
Cooly unskilled

Unit Rate (British System)


Qty

3.30 Nos.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rat per 1000 No.

Rs.

Page 106

led from kacha pacca masonry.

nit Rate (British System) per 1000 No.


Rate Per UnitAmount (Rs.)

per day

Say

tled from pacca masonary.

nit Rate (British System) per 1000 No.


Rate Per UnitAmount (Rs.)

per day

Say

DESCRIPTION OF ITEM:
Item No. 30

Supplying and filling sand under floors or plugg

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Sand

100.00 Nos

Total
Contractor's Profit &20 Percent
Total
LABOUR for 150 Cft
1

Cooly unskilled

0.50 Nos.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per 100 Cft.
Labour rate per Cum
Composite rate per 100 Cft.
Composite rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 107

sand under floors or plugging in wel

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

% Nos.

per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 31

Providing and laying 2\" (50 mm) thick projected


(1: 2) cement sand mortar with hoop iron 1\" (25
SWG flat iron sheet 9\" (225 mm) apart.
Detail

Unit Rate (British System)

Qty
Rate Analysis for 8 Rft
MATERIAL
1
2
3
4

Title 225 x 114 x 40 mm title


Cement
Sand
Cost of hoop iron
Total
Contractor's Profit &20 Percent
Total

43.00 Nos.
0.09 bag
0.20 Cft
3.00 Kg.

Mason
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.50 No.
0.50 No.

Labour rate per Rft


Labour rate per R.M

Rs.
Rs.

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

LABOUR
1
2

ITEM RATES

Page 108

\" (50 mm) thick projected tile bank


tar with hoop iron 1\" (25 mm) wide 1
" (225 mm) apart.

nit Rate (British System) per Rft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
Per Kg.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 32

(i)

Ist class brick tiles (9\" 4\" x 1\") 225 x 11


76 mm thick laid in cement sand mortar recifered
strips placed at 2 ft. (600 mm) apart vertically
Ratio (1 : 3).

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

Brick tiles 9\" x 4\" x 1\"


Cement
Sand
Hoop iron

810.00 No.
2.40 bags
9.00 Cft
4.54 Kg.

Total
Contractor's Profit &20 Percent
Total
LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00
1.00
0.25
0.10

Labour rate per 100 Sft


Labour rate per Sqm

Rs.
Rs.

Composite rate per 100 Sft.


Composite rate per Sqm

Rs.
Rs.

ITEM RATES

No.
No.
No.
No.

Page 109

(9\" 4\" x 1\") 225 x 114 x 40 mm cla


ment sand mortar recifered with hoop
(600 mm) apart vertically.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
per Kg.

per
per
per
per

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 32

(ii)

Ist class brick tiles (9\" 4\" x 1\") 225 x 11


76 mm thick laid in cement sand mortar recifered
strips placed at 2 ft. (600 mm) apart vertically
Ratio (1 : 4).

Detail

MATERIAL
1
2
3
4

Brick tiles 9\" x 4\" x 1\"


Cement
Sand
Hoop iron

Unit Rate (British System)


Qty

810.00 No.
1.92 bags
9.60 Cft
4.54 Kg.

Total
Contractor's Profit &20 Percent
Total
LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

1.00
1.00
0.25
0.10

Labour rate per 100 Sft.


Labour rate per Sqm
Composite rate per 100 Sft.
Composite rate per Sqm

Rs.
Rs.
Rs.
Rs.

ITEM RATES

No.
No.
No.
No.

Page 110

(9\" 4\" x 1\") 225 x 114 x 40 mm cla


ment sand mortar recifered with hoop
(600 mm) apart vertically.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft
per Kg.

per
per
per
per

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 33

Chamfering sides of head regulators and masonry


increase width.
Detail

Unit Rate (British System)


Qty

LABOUR (FOR 30 SFT)


1
2

Mason
Cooly unskilled

1.00 No.
1.00 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
Labour rate per Sft
Labour rate per Sqm

Rs.
Rs.

Page 111

ad regulators and masonry wall to

nit Rate (British System) per Sft


Rate Per UnitAmount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 34

Replacing kallar eaten bricks.

Detail

Unit Rate (British System)


Qty

Assume 60 Bricks
MATERIAL
1
2
3

Bricks
Cement
Sand
Total
Contractor's Profit &20 Percent
Total

50.00 Nos.
0.005 Bag
0.026 Cft

Mason
Cooly

2.00 No.
1.00 No.

LABOUR
1
2

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
ITEM RATES
Labour rate per Brick
Composit rate per Brick

Rs.
Rs.

Page 112

nit Rate (British System) per Bricks


Rate Per UnitAmount (Rs.)

Nos.
Bag
% Cft.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 35

Repairing corner's of bridges and other hydrauli


masoney works.
Detail

Unit Rate (British System) per No. / A


Qty

MATERIAL
1
2
3

Brick tiles 9\" x 4\" x 1\"


Cement
Sand
Total
Contractor's Profit &20 Percent
Total

10.00 No.
0.08 bags
0.25 Cft

LABOUR for 1.5 No.


1
2

Mason
Coolies unskilled
Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total

0.25 No.
0.25 No.

Labour rate per Each No.


Composite rate per Each No.

Rs.
Rs.

ITEM RATES

Page 113

bridges and other hydraulic

British System) per No. / Assumed for 1


Rate Per UnitAmount (Rs.)

Nos.
per bag
% Cft

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 36

Extra labour for drains of bath roons etc.

Detail

Unit Rate (British System)


Qty

Assumed for 40 Lft


LABOUR
1

Mason

1.00 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
Labour rate per Lft
Labour rate per Meter

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 37

Maroo corners.
Detail

Unit Rate (British System)


Qty

LABOUR for 1.25 No.


1

Mason

0.20 No.

Total
Sundries 10 Percent
Total
Contractor's Profit &20 Percent
Total
Labour rate per Each No.

Rs.

Page 114

s of bath roons etc.

nit Rate (British System) per Lft


Rate Per UnitAmount (Rs.)

per day

Say
Say

nit Rate (British System) per No.


Rate Per UnitAmount (Rs.)

per day

Say

CHAPTER NO. 6

CONCRETE
DESCRIPTION OF ITEM:
Item No. 1

Mud concrete in foundation including w


or stone ballast 1\" (40 mm) gauge.
Detail

MATERIAL
1
2

Brick/Stone Ballast
Earth
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

10 Percent
20 Percent

Page 1

e in foundation including watering and ramming using bri


llast 1\" (40 mm) gauge.
Unit Rate (British System) per 100 Cft
Qty

Rate

Per Unit

100.00 Cft 50.00 Cft -

% Cft
% Cft

0.13 No.
4.00 Nos. 0.25 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Dry Ramming brick or stone ballast 1\

Detail

MATERIAL
1

Brick/Stone Ballast

Total
Contractor's Profit & Overhea
Total
LABOUR
1

20 Percent

Coolies un-skilled
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 2

brick or stone ballast 1\" to 2 (40 mm to 50 mm) gauge.

Unit Rate (British System) per 100 Cft


Qty
Rate Per Unit
Amount (Rs.)

110.00 Cft -

% Cft

3.00 Nos. -

per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 3
(a)

Cement concrete brick or stone ballast


foundation and plinth.
Ratio (1 : 3 : 6)
Detail

MATERIAL
1
2
3

Cement
Sand
Brick/Stone ballast
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 3

rete brick or stone ballast 1\" to 2\" (40 to 50 mm) gaug


and plinth.

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

13.00 Bags 46.00 Cft 92.00 Cft -

per bag
% Cft
% Cft

0.25 No.
5.00 Nos. 0.50 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3
(b)

Cement concrete brick or stone ballast


foundation and plinth.
Ratio (1 : 4 : 8)
Detail

MATERIAL
1
2
3

Cement
Sand
Brick/Stone ballast
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 4

rete brick or stone ballast 1\" to 2\" (40 to 50 mm) gaug


and plinth.

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

9.60 bags 48.00 Cft 96.00 Cft -

per bag
% Cft
% Cft

0.25 No.
5.00 Nos. 0.50 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3
(c)

Cement concrete brick or stone ballast


foundation and plinth.
Ratio (1 : 5 : 10)
Detail

MATERIAL
1
2
3

Cement
Sand
Bricks/stone ballast
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 5

rete brick or stone ballast 1\" to 2\" (40 to 50 mm) gaug


and plinth.

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

7.80 bags 49.00 Cft 98.00 Cft -

per bag
% Cft
% Cft

0.25 No.
5.00 Nos. 0.50 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3
(d)

Cement concrete brick or stone ballast


foundation and plinth.
Ratio (1 : 6 : 12)
Detail

MATERIAL
1
2
3

Cement
Sand
Bricks/stone ballast
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 6

rete brick or stone ballast 1\" to 2\" (40 to 50 mm) gaug


and plinth.

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

6.50 bags 49.00 Cft 98.00 Cft -

per bag
% Cft
% Cft

0.25 No.
5.00 Nos. 0.50 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3
(e)

Cement concrete brick or stone ballast


foundation and plinth.
Ratio (1 : 6 : 18)
Detail

MATERIAL
1
2
3

Cement
Sand
Bricks/stone ballast
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composit rate per 100 Cft
Composite rate per Cum

20 Percent

Page 7

rete brick or stone ballast 1\" to 2\" (40 to 50 mm) gaug


and plinth.

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

5.00 bags 37.00 Cft 112.00 Cft -

per bag
% Cft
% Cft

0.25 No.
5.00 Nos. 0.50 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3
(f)

Cement concrete brick or stone ballast


foundation and plinth.
Ratio (1 : 7 : 20)
Detail

MATERIAL
1
2
3

Cement
Sand
Bricks/stone ballast
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composit rate per 100 Cft
Composite rate per Cum

20 Percent

Page 8

rete brick or stone ballast 1\" to 2\" (40 to 50 mm) gaug


and plinth.

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

4.40 bags 38.50 Cft 110.00 Cft -

per bag
% Cft
% Cft

0.25 No.
5.00 Nos. 0.50 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 4
(a)

Extra on item No.3 above for Sedimenta


Health Engineering Works.
in bed.

Detail

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

20 Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 4

(b)

Extra on item No.3 above for Sedimenta


Health Engineering Works.
on slope.
Detail

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

20 Percent

Page 9

em No.3 above for Sedimentation tank or filter beds of P


neering Works.

Unit Rate (British System) per 100 Cft


Qty
Rate Per Unit

0.60 No.
1.00 Nos. 0.10 No.
-

Rs.
Rs.

Amount (Rs.)

per day
per day
per day

Say
Say

em No.3 above for Sedimentation tank or filter beds of P


neering Works.

Unit Rate (British System) per 100 Cft


Qty

Rate

1.00 No.
1.40 Nos. 0.10 No.
-

Rs.
Rs.

Per Unit

Amount (Rs.)

per day
per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 5
(a)

Cement concrete plain including, placi


complete (including screening and wash
Ratio (1 : 1 : 2)
Detail

MATERIAL
1
2
3

Cement
Sand
Aggregate (Stone)
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 10

rete plain including, placing, compacting, finishing and


ncluding screening and washing of stone aggregate).

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

31.50 bags 39.00 Cft 78.00 Cft -

per bag
% Cft
% Cft

1.00 No.
6.00 Nos. 0.60 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5
(b)

Cement concrete plain including, placi


complete (including screening and wash
Ratio (1 : 1 : 1)
Detail

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 11

rete plain including, placing, compacting, finishing and


ncluding screening and washing of stone aggregate).

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

31.50 bags 58.00 Cft 58.00 Cft -

per bag
% Cft
% Cft

1.00 No.
6.00 Nos. 0.60 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5
(c)

Cement concrete plain including, placi


complete (including screening and wash
Ratio (1 : 1 : 3)
Detail

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 12

rete plain including, placing, compacting, finishing and


ncluding screening and washing of stone aggregate).

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

22.50 bags 42.00 Cft 84.00 Cft -

per bag
% Cft
% Cft

1.00 No.
6.00 Nos. 0.60 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5
(d)

Cement concrete plain including, placi


complete (including screening and wash
Ratio (1 : 2 : 3)
Detail

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 13

rete plain including, placing, compacting, finishing and


ncluding screening and washing of stone aggregate).

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

21.00 bags 52.00 Cft 78.00 Cft -

per bag
% Cft
% Cft

1.00 No.
6.00 Nos. 0.60 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 5
(e)

Cement concrete plain including, placi


complete (including screening and wash
Ratio (1 : 3 : 3)
Detail

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 14

rete plain including, placing, compacting, finishing and


ncluding screening and washing of stone aggregate).

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

17.60 bags 66.00 Cft 66.00 Cft -

per bag
% Cft
% Cft

1.00 No.
6.00 Nos. 0.60 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5
(f)

Cement concrete plain including, placi


complete (including screening and wash
Ratio (1 : 2 : 4)
Detail

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 15

rete plain including, placing, compacting, finishing and


ncluding screening and washing of stone aggregate).

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

17.60 bags 44.00 Cft 88.00 Cft -

per bag
% Cft
% Cft

1.00 No.
6.00 Nos. 0.60 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5
(g)

Cement concrete plain including, placi


complete (including screening and wash
Ratio (1 : 2 : 6)
Detail

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composit rate per 100 Cft
Composite rate per Cum

20 Percent

Page 16

rete plain including, placing, compacting, finishing and


ncluding screening and washing of stone aggregate).

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

13.70 bags 34.00 Cft 102.00 Cft -

per bag
% Cft
% Cft

1.00 No.
6.00 Nos. 0.60 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5
(h)

Cement concrete plain including, placi


complete (including screening and wash
Ratio (1 : 3 : 6)
Detail

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 17

rete plain including, placing, compacting, finishing and


ncluding screening and washing of stone aggregate).

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

13.00 bags 46.00 Cft 92.00 Cft -

per bag
% Cft
% Cft

1.00 No.
6.00 Nos. 0.60 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5
(i)

Cement concrete plain including, placi


complete (including screening and wash
Ratio (1 : 4 : 8)
Detail

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

20 Percent

Page 18

rete plain including, placing, compacting, finishing and


ncluding screening and washing of stone aggregate).

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

9.60 bags 48.00 Cft 96.00 Cft -

per bag
% Cft
% Cft

1.00 No.
6.00 Nos. 0.60 No.
-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

(a) (i)

1-

Providing and laying reinfo


concrete), using coarse san
aggregate, in required shap
shuttering, lifting, compac
surface, complete (but excl
fabrication and placing in
Reinforced cement concrete
and other structural member
stressed members cast in si
Type 'A' (Nominal mix 1 : 1
Detail

Analysis for 100 Cft


MATERIAL
1
2
3
4

Cement
Sand (Harro)
Bajri
Shuttering
Assumed size for concrete slab
14' x 20' x 5\"
=
1\" thick plank seperate slab 280x1/12 =
Joint (studs) for supporting planks
5 x 0.3' x 0.3' x 14' =
Props Mix. 20 x 3\" x 3\" x 14' =
Total
For 100 Cft 45.5 x 100 117 =
This material can be uses 24 times
For one operation 38.89 24 =
1.62 Cft @ 350.0 Cft (kail wood)
Bolts and nuts, nails
Greasing and oiling for surfacing
and shuttering
Total
Contractor's Profit & Overhea
20 Percent
Total

LABOUR
1
2
3
4
5
6

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total for 100 Cft
Rate/Cft

20 Percent

ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per Cft
Composite rate per Cum
Page 19

roviding and laying reinforced cement concrete (including pre-stre


oncrete), using coarse sand and screened graded and washed
ggregate, in required shape and design, including forms, moulds,
huttering, lifting, compacting, curing, rendering and finishing ex
urface, complete (but excluding the cost of steel reinforcement, i
abrication and placing in position etc).
einforced cement concrete in roof slab, beams, columns, lintels, g
nd other structural members laid in situ or pre cast laid in posit
tressed members cast in situ complete in all respect.
ype 'A' (Nominal mix 1 : 1: 2)
Unit Rate (British System) per Cft
Qty

Rate

Per Unit

Amount (Rs.)

nalysis for 100 Cft


31.50 bags 39.00 Cft 78.00 Cft -

per bag
% Cft
% Cft

1.62 Cft
3.5 Kg.

per Cft
Per Kg.

2.67 Kg.

Per Kg.

1.00 Nos.
1.50 Nos.
10.00 No.
2.00 No.
1.00 Nos.
2.00 Nos.

per
per
per
per
per
per

117 Cft
23.34 Cft
4.38 Cft
17.50 Cft
0.28 Cft
45.5 Cft
38.89
1.62 Cft

0 Percent

0 Percent

day
day
day
day
day
day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 6

(a) (i)

2-

Providing and laying reinforced cement


concrete), using coarse sand and scree
aggregate, in required shape and desig
shuttering, lifting, compacting, curin
surface, complete (but excluding the c
fabrication and placing in position et
Reinforced cement concrete in roof sla
and other structural members laid in s
stressed members cast in situ complete
Type 'B' (Nominal mix 1 : 1: 3).
Detail

Analysis for 100 Cft


MATERIAL
1
2
3
4

Cement
Sand (Harro)
Bajri
Shuttering
Wood for shuttering detail as per
item 5-(a) (i)-1
Bolts and nuts, nails
Greasing and oiling for surfacing
and shuttering
Total
Contractor's Profit & Overhea
20 Percent
Total

LABOUR
1
2
3
4
5
6

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total for 100 Cft
Rate per Cft

ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per Cft
Composite rate per Cum

20 Percent

Page 20

nd laying reinforced cement concrete (including pre-stre


using coarse sand and screened graded and washed
in required shape and design, including forms, moulds,
lifting, compacting, curing, rendering and finishing ex
mplete (but excluding the cost of steel reinforcement, i
and placing in position etc).
cement concrete in roof slab, beams, columns, lintels, g
tructural members laid in situ or pre cast laid in posit
mbers cast in situ complete in all respect.
ominal mix 1 : 1: 3).
Unit Rate (British System) per Cft
Qty
Rate Per Unit
Amount (Rs.)

22.50 bags 42.00 Cft 84.00 Cft -

per bag
% Cft
% Cft

1.62 Cft
3.5 Kg.

per Cft
Per Kg.

2.432 Kg. -

Per Kg.

1.00 Nos.
1.50 Nos.
10.00 No.
2.00 No.
1.00 Nos.
2.00 Nos.

per
per
per
per
per
per

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

day
day
day
day
day
day

DESCRIPTION OF ITEM:
Item No. 6

(a) (i)

3-

Providing and laying reinforced cement


concrete), using coarse sand and scree
aggregate, in required shape and desig
shuttering, lifting, compacting, curin
surface, complete (but excluding the c
fabrication and placing in position et
Reinforced cement concrete in roof sla
and other structural members laid in s
stressed members cast in situ complete
Type 'C' (Nominal mix 1 : 2: 4).
Detail

Analysis for 100 Cft


MATERIAL
1
2
3
4

LABOUR
1
2
3
4
5
6

Cement
Sand (Harro)
Bajri
Shuttering
Kail Wood for shuttering detail as per
item 5-(a) (i)-1
Bolts and nuts, nails
Greasing and oiling for surfacing
and shuttering
Total
Contractor's Profit & Overhea
20 Percent
Total
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total for 100 Cft
Rate per Cft

ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per Cft
Composite rate per Cum

20 Percent

Page 21

nd laying reinforced cement concrete (including pre-stre


using coarse sand and screened graded and washed
in required shape and design, including forms, moulds,
lifting, compacting, curing, rendering and finishing ex
mplete (but excluding the cost of steel reinforcement, i
and placing in position etc).
cement concrete in roof slab, beams, columns, lintels, g
tructural members laid in situ or pre cast laid in posit
mbers cast in situ complete in all respect.
ominal mix 1 : 2: 4).
Unit Rate (British System) per Cft
Qty
Rate Per Unit
Amount (Rs.)

17.60 bags 44.00 Cft 88.00 Cft -

bags
% Cft
% Cft

1.62 Cft
3.5 Kg.

per Cft
Per Kg.

2.272 Kg. -

Per Kg.

1.00 Nos.
1.50 Nos.
10.00 No.
2.00 No.
1.00 Nos.
2.00 Nos.

per
per
per
per
per
per

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

day
day
day
day
day
day

DESCRIPTION OF ITEM:
Item No. 6

(a) (ii)

1-

Providing and laying reinforced cement


concrete), using coarse sand and scree
aggregate, in required shape and desig
shuttering, lifting, compacting, curin
surface, complete (but excluding the c
fabrication and placing in position et
Reinforcement cement concrete in slab
slab of column and retaining walls; et
other than those mentioned in 6(a) (i)
complete in all respects.
Type 'A' (Nominal mix 1 : 1 : 2).
Detail

Analysis for 100 Cft


MATERIAL
1
2
3
4
5
6

LABOUR
1
2
3
4
5
6

Cement
Sand (Harro)
Bajri
Kail Wood for shuttering
Bolts, nuts & nails
Oiling, greasing, surface of shuttering
Total
Contractor's Profit & Overhea
20 Percent
Total
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total for 100 Cft
Rate per Cft

ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per Cft
Composite rate per Cum

20 Percent

Page 22

nd laying reinforced cement concrete (including pre-stre


using coarse sand and screened graded and washed
in required shape and design, including forms, moulds,
lifting, compacting, curing, rendering and finishing ex
mplete (but excluding the cost of steel reinforcement, i
and placing in position etc).
nt cement concrete in slab of roofs/strip foundation; ba
umn and retaining walls; etc., and other structural memb
those mentioned in 6(a) (i) above not requiring form wor
all respects.
ominal mix 1 : 1 : 2).
Unit Rate (British System) per Cft
Qty
Rate Per Unit
Amount (Rs.)

31.50 bags
39.00 Cft
78.00 Cft
0.19 Cft.
3.5 Kg.
0.480 Kg.

per bag
% Cft
% Cft
P. Cft
Per Kg.
Per Kg.

1.00
1.00
5.00
1.00
1.00
1.00

per
per
per
per
per
per

Say
Say
Say
Say

Rs.
Rs.
Rs.
Rs.

Nos.
Nos.
No.
No.
Nos.
Nos.

day
day
day
day
day
day

DESCRIPTION OF ITEM:
Item No. 6

(a) (ii)

2-

Providing and laying reinforced cement


concrete), using coarse sand and scree
aggregate, in required shape and desig
shuttering, lifting, compacting, curin
surface, complete (but excluding the c
fabrication and placing in position et
Reinforcement cement concrete in slab
slab of column and retaining walls; et
other than those mentioned in 6(a) (i)
complete in all respects.
Type 'B' (Nominal mix 1 : 1 : 3).
Detail

Analysis for 100 Cft


MATERIAL
1
2
3
4
5
6

LABOUR
1
2
3
4
5
6

Cement
Sand (Harro)
Bajri
Kail Wood for shuttering
Bolts, nuts & nails
Oiling, greasing, surface of shuttering
Total
Contractor's Profit & Overhea
20 Percent
Total
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft

ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per Cft
Composite rate per Cum

20 Percent

Page 23

nd laying reinforced cement concrete (including pre-stre


using coarse sand and screened graded and washed
in required shape and design, including forms, moulds,
lifting, compacting, curing, rendering and finishing ex
mplete (but excluding the cost of steel reinforcement, i
and placing in position etc).
nt cement concrete in slab of roofs/strip foundation; ba
umn and retaining walls; etc., and other structural memb
those mentioned in 6(a) (i) above not requiring form wor
all respects.
ominal mix 1 : 1 : 3).
Unit Rate (British System) per Cft
Qty
Rate Per Unit
Amount (Rs.)

22.50 bags
42.00 Cft
84.00 Cft
0.17 Cft.
0.5 Kg.
0.560 Kg.

per bag
% Cft
% Cft
P. Cft
Per Kg.
Per Kg.

1.00
1.00
5.00
1.00
1.00
1.00

per
per
per
per
per
per

Say
Say
Say
Say

Rs.
Rs.
Rs.
Rs.

Nos.
Nos.
No.
No.
Nos.
Nos.

day
day
day
day
day
day

DESCRIPTION OF ITEM:
Item No. 6

(a) (ii)

3-

Providing and laying reinforced cement


concrete), using coarse sand and scree
aggregate, in required shape and desig
shuttering, lifting, compacting, curin
surface, complete (but excluding the c
fabrication and placing in position et
Reinforcement cement concrete in slab
slab of column and retaining walls; et
other than those mentioned in 6(a) (i)
complete in all respects.
Type 'C' (Nominal mix 1 : 2 : 4).
Detail

Analysis for 100 Cft


MATERIAL
1
2
3
4
5
6

LABOUR
1
2
3
4
5
6

Cement
Sand (Harro)
Bajri
Kail Wood for shuttering
Bolts, nuts & nails
Oiling, greasing, surface of shuttering
Total
Contractor's Profit & Overhea
20 Percent
Total
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft

ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per Cft
Composite rate per Cum

20 Percent

Page 24

nd laying reinforced cement concrete (including pre-stre


using coarse sand and screened graded and washed
in required shape and design, including forms, moulds,
lifting, compacting, curing, rendering and finishing ex
mplete (but excluding the cost of steel reinforcement, i
and placing in position etc).
nt cement concrete in slab of roofs/strip foundation; ba
umn and retaining walls; etc., and other structural memb
those mentioned in 6(a) (i) above not requiring form wor
all respects.
ominal mix 1 : 2 : 4).
Unit Rate (British System) per Cft
Qty
Rate Per Unit
Amount (Rs.)

17.60 bags
44.00 Cft
88.00 Cft
0.16 Cft.
0.5 Kg.
0.560 Kg.

per bag
% Cft
% Cft
P. Cft
Per Kg.
Per Kg.

1.00
1.00
5.00
1.00
1.00
1.00

per
per
per
per
per
per

Say
Say
Say
Say

Rs.
Rs.
Rs.
Rs.

Nos.
Nos.
No.
No.
Nos.
Nos.

day
day
day
day
day
day

DESCRIPTION OF ITEM:
Item No. 6

(b)

1-

MATERIAL
1
2
3
4

LABOUR
1
2
3
4
5

Cement
Sand (Harro)
Bajri
Shuttering
Assume beam of 12' x 12\" x 6\" =
Wood
Planks = 2 x 12 1/6 x 13/12 x 2 1/12 =
1 x 12 1/6 x 1/12 x =
2 x 1/12 x 12/12 x 6/12 =
Studs = 2 x 5 x 1/6 x 1/12 =
Total
For 100 Cft 2.93 6 x 100 =
Can be used in 40 operation
One operation 48.73 40.0Cft
=
Nails, nuts & bolts etc.
Greasing and oiling for shuttering surface
Total
Contractor's Profit & Overhe
Total
Mason
Carpanter
Coolies skilled
Bahisthi
Coolies un-skilled
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Composite rate per Cft


Composite rate per Cum

Providing and laying reinforced cement concrete (including pre-stre


concrete), using coarse sand and screened graded and washed
aggregate, in required shape and design, including forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing ex
surface, complete (but excluding the cost of steel reinforcement, i
fabrication and placing in position etc).
Precast reinforced cement concrete and prestresed reinforced cement
concrete in columns, beams, lintels, stair cases, shelves etc.
Type 'A' (Nominal mix 1 : 1 : 2).
Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 100 Cft


31.50 bags 39.00 Cft 78.00 Cft -

per bag
% Cft
% Cft

1.22 Cft
4.00 No.
2.11 Kg.

Per Cft
Each
Per Kg.

1.00
1.00
2.00
1.00
8.00

per
per
per
per
per

Say
Say

6 Cft
2.2 Cft
0.51 Cft
0.08 Cft
0.04 Cft
2.93 Cft
48.73 Cft
1.22 Cf

ng surface
20 Percent

Nos.
Nos.
No.
No.
Nos.

20 Percent

Rs.
Rs.

day
day
day
day
day

Rs.
Rs.
Page 25

Say
Say

DESCRIPTION OF ITEM:
Item No. 6

(b)
2-

Providing and laying reinforced cement


concrete), using coarse sand and scree
aggregate, in required shape and desig
shuttering, lifting, compacting, curin
surface, complete (but excluding the c
fabrication and placing in position et
Precast reinforced cement concrete and
concrete in columns, beams, lintels, s
Type 'B' (Nominal mix 1 : 1 : 3).
Detail

Analysis for 100 Cft


MATERIAL
1
2
3
4

LABOUR
1
2
3
4
5

Cement
Sand (Harro)
Bajri
Shuttering
Kail Woood for shuttering as per item 5 (b) (1)
Nails, nuts & bolts etc.
Greasing and oiling etc.
Total
Contractor's Profit & Overhea
20 Percent
Total

Mason
Carpanter
Coolies skilled
Bahisthi
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft

ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per Cft
Composite rate per Cum

10 Percent
20 Percent

Page 26

nd laying reinforced cement concrete (including pre-stre


using coarse sand and screened graded and washed
in required shape and design, including forms, moulds,
lifting, compacting, curing, rendering and finishing ex
mplete (but excluding the cost of steel reinforcement, i
and placing in position etc).
nforced cement concrete and prestresed reinforced cement
columns, beams, lintels, stair cases, shelves etc.
ominal mix 1 : 1 : 3).
Unit Rate (British System) per Cft
Qty

Rate

Per Unit

Amount (Rs.)

22.40 bags 42.00 Cft 84.00 Cft -

per bag
% Cft
% Cft

1.22 Cft
4.00 No.
2.11 Kg.

Cft
Each
Per Kg.

1.00
1.00
2.00
1.00
8.00

per
per
per
per
per

Say
Say
Say
Say

Rs.
Rs.
Rs.
Rs.

Nos.
Nos.
No.
No.
Nos.

day
day
day
day
day

DESCRIPTION OF ITEM:
Item No. 6

(b) (i)
3-

Providing and laying reinforced cement


concrete), using coarse sand and scree
aggregate, in required shape and desig
shuttering, lifting, compacting, curin
surface, complete (but excluding the c
fabrication and placing in position et
Precast reinforced cement concrete and
concrete in columns, beams, lintels, s
Type 'C' (Nominal mix 1 : 2 : 4).
Detail

Analysis for 100 Cft


MATERIAL
1
2
3
4

Cement
Sand (Harro)
Bajri
Shuttering
Kail Woood for shuttering as per item 5 (b) (1)
Nails, nuts & bolts etc.
Greasing and oiling etc.
Total
Contractor's Profit & Overhea
20 Percent
Total

LABOUR
1
2
3
4
5

Mason
Carpanter
Coolies skilled
Bahisthi
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft

ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per Cft
Composite rate per Cum

10 Percent
20 Percent

Page 27

nd laying reinforced cement concrete (including pre-stre


using coarse sand and screened graded and washed
in required shape and design, including forms, moulds,
lifting, compacting, curing, rendering and finishing ex
mplete (but excluding the cost of steel reinforcement, i
and placing in position etc).
nforced cement concrete and prestresed reinforced cement
columns, beams, lintels, stair cases, shelves etc.
ominal mix 1 : 2 : 4).
Unit Rate (British System) per Cft
Qty
Rate Per Unit
Amount (Rs.)

17.60 bags 44.00 Cft 88.00 Cft -

per bag
% Cft
% Cft

1.22 Cft
4.00 No.
1.71 Kg.

Cft
Each
Per Kg.

1.00
1.00
2.00
1.00
8.00

per
per
per
per
per

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Nos.
Nos.
No.
No.
Nos.

day
day
day
day
day

DESCRIPTION OF ITEM:
Item No. 6

(c)

Providing and laying reinforced cement


concrete), using coarse sand and scree
aggregate, in required shape and desig
shuttering, lifting, compacting, curin
surface, complete (but excluding the c
fabrication and placing in position et
Erecting and fixing in position, preca
roofs or lintels, etc., lift upto 20 f
Detail

Rate Analysis for 100 Cft


MATERIAL
1
2

Sand
Bitumen
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2

Mason
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft

ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

10 Percent
20 Percent

Page 28

nd laying reinforced cement concrete (including pre-stre


using coarse sand and screened graded and washed
in required shape and design, including forms, moulds,
lifting, compacting, curing, rendering and finishing ex
mplete (but excluding the cost of steel reinforcement, i
and placing in position etc).
d fixing in position, precast cement concrete or stone s
ntels, etc., lift upto 20 ft. (6.0 metre) including all
Unit Rate (British System) per Cft
Qty
Rate Per Unit
Amount (Rs.)

is for 100 Cft


1.00 Cft
12.73 kg
0.25 Cwt

% Cft
kg

1.00 Nos. 5.00 Nos. -

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 6

(d)

Providing and laying reinfo


concrete), using coarse san
aggregated, in required sha
shuttering, lifting, compac
surface, complete (but excl
fabrication and placing in
Add extra labour for R.C. c
Detail

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total
ITEM RATES
Labour rate per Cft
Labour rate per Cum

10 Percent
20 Percent

Page 29

roviding and laying reinforced cement concrete (including pre-stre


oncrete), using coarse sand and screened graded and washed
ggregated, in required shape and design, including forms, moulds,
huttering, lifting, compacting, curing, rendering and finishing ex
urface, complete (but excluding the cost of steel reinforcement, i
abrication and placing in position etc).
dd extra labour for R.C. concrete in 2nd and subsequent stories.
Unit Rate (British System) per Cft
Qty
Rate Per Unit
Amount (Rs.)

0.03 Nos. -

per day

0 Percent

0 Percent

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 7

Providing and casting in si


concrete (Nominal mix 1 : 2
course sand including all l
reinforcement and its labou
will be paid separately, in
curing.
18\" dia (450 mm) pile.

(i)

Detail

MATERIAL
1

Analysis for 100 Rft


Concrete

x 100
22

2
3
4
5
6

LABOUR
1
2
3
4
5
6
7
8
9

Cement
Sand (Harro)
Bajri
Extra cement (10%)
Cost of casing pipe
100' @
Can be used 100 times
0 100
=
Total
Contractor's Profit & Overhea
Total

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Fitter
Total
Boring hole 18\" dia (24\" dia)
Working of rig during casting
Construction of Temporary Island
Carriage of material to site of work
(Boring Material)
Total
Sundries 10 Percent o 0.00
Total
Contractor's Profit & Overhea
on Rs. 4725.45 + 472.55
=
Total for 100 Rft

ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M

= 176.78 Cft

roviding and casting in situ bored reinforced concrete pile with t


oncrete (Nominal mix 1 : 2: 4), using 10% extra cement in dry mix,
ourse sand including all labour and material (except the cost of s
einforcement and its labour for bending and laying in position etc
ill be paid separately, including screening and washing of shingle

8\" dia (450 mm) pile.


Unit Rate (British System) per Rft
Qty
Rate Per Unit
Amount (Rs.)

x 100

= 176.78 Cft
12 x 4
31.10 bags
77.76 Cft
155.52 Cft
3.11 bags

per bag
% Cft
% Cft
per bag

5.10 Nos.
5.30 Nos.
22.00 Nos.
1.00 Nos.
2.00 Nos.

per
per
per
per
per

Rs. 0.00
Rs. 0.00
20 Percent

100.00 Rft 2.50 hrs. L.S

per foot
per hour

L.S

20 Percent

Rs.
Rs.
Rs.
Rs.

day
day
day
day
day

Say
Say
Say
Say

Page 30

DESCRIPTION OF ITEM:
Item No. 7

Providing and casting in si


concrete (Nominal mix 1 : 2
course sand including all l
reinforcement and its labou
will be paid separately, in
curing.
20\" dia (500 mm) pile.

(ii)

Detail

Analysis for 100 Rft


MATERIAL
1
2
3
4
5
6

LABOUR
1
2
3
4
5
6
7
8
9

Concrete

22
7

Cement
Sand (Harro)
Bajri
Extra cement (10%)
Cost of casing pipe
100 @
Can be used 100 times
0 100
=
Total
Contractor's Profit & Overhea
Total
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Fitter
Total
Boring hole 20\" dia (500 mm) dia
Working of rig during casting
Constructin of Temparary Island
Carriage of material at site of work
(Boring Material)
Total
Sundries 10 Percent o
Total
Contractor's Profit & Overhea
on Rs.
0.0
Total for 100 Rft

ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M

x 100
12x4

= 218.17 Cft

roviding and casting in situ bored reinforced concrete pile with t


oncrete (Nominal mix 1 : 2: 4), using 10% extra cement in dry mix,
ourse sand including all labour and material (except the cost of s
einforcement and its labour for bending and laying in position etc
ill be paid separately, including screening and washing of shingle

0\" dia (500 mm) pile.


Unit Rate (British System) per Rft
Qty
Rate Per Unit
Amount (Rs.)

nalysis for 100 Rft


x 100
12x4

= 218.17 Cft
38.40 bags
96.00 Cft
192.00 Cft
3.84 bags

per bag
% Cft
% Cft
per bag

7.00 Nos.
7.00 Nos.
35.00 No.
1.00 No.
3.00 Nos.

per
per
per
per
per

Rs. 0.00
Rs. 0.00
20 Percent

100.00 Rft 2.50 hrs. L.S

per foot
per hour

L.S
0.0
20 Percent
=

0.0

Rs.
Rs.
Rs.
Rs.

day
day
day
day
day

Say
Say
Say
Say

Page 31

mount (Rs.)

DESCRIPTION OF ITEM:
Item No. 7

Providing and casting in si


concrete (Nominal mix 1 : 2
course sand including all l
reinforcement and its labou
will be paid separately, in
curing.
22\" dia (550 mm) pile.

(iii)

Detail

Analysis for 100 Rft


MATERIAL
1
2
3
4
5

LABOUR
1
2
3
4
5
6
7
8
9

Concrete

22
7

Cement
Sand (Harro)
Bajri
Extra cement (10%)
Cost of casing pipe
100'.0 @
Can be used 100 times
0 100
=
Total
Contractor's Profit & Overhea
Total

x 100
12x4

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Fitter
Total
Boring hole 22\" dia (550 mm) dia
Working of rig during casting
Constructin of Tempary Island
Carriage of material as site of work
(Boring Material)
Total
Sundries 10 Percent
Total
Contractor's Profit & Overhea
on Rs. 11245.00 + 1124.50 =
Total for 100 Rft

ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M

20 Percent

20 Percent

= 264.98 Cft

Page 32

roviding and casting in situ bored reinforced concrete pile with t


oncrete (Nominal mix 1 : 2: 4), using 10% extra cement in dry mix,
ourse sand including all labour and material (except the cost of s
einforcement and its labour for bending and laying in position etc
ill be paid separately, including screening and washing of shingle

2\" dia (550 mm) pile.


Unit Rate (British System) per Rft
Qty
Rate Per Unit
Amount (Rs.)

nalysis for 100 Rft


x 100
12x4

= 264.98 Cft
46.46 bags
116.15 Cft
192.00 Cft
4.60 bags

per bag
% Cft
% Cft
per bag

7.00 Nos.
7.00 Nos.
70.00 Nos.
1.00 Nos.
3.75 Nos.

per
per
per
per
per

Rs. 0.00
Rs. 0.00

0 Percent

100.00 Rft 2.50 hrs. L.S

per foot
per hour

L.S

0 Percent

Rs.
Rs.
Rs.
Rs.

day
day
day
day
day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 7

Providing and casting in si


concrete (Nominal mix 1 : 2
course sand including all l
reinforcement and its labou
will be paid separately, in
curing.
24\" dia (600 mm) pile.

(iv)

Detail

MATERIAL

Analysis for 100 Rft


22
7

Concrete

2
3
4
5

Cement
Sand (Harro)
Bajri
Extra cement (10%)
Cost of casing pipe
100'.0 @
Can be used 100 times
0 100
=
Total
Contractor's Profit & Overhea
Total

LABOUR
1
2
3
4
5
6
7
8
9

x 100
12x4

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Fitter
Total
Boring hole 24\" dia (550 mm) dia
Working of rig during casting
Constructin of Temparary Island
Carriage of material to site of work
(Boaring Material)
Total
Sundries 10 Percent o
Total
Contractor's Profit & Overhea
on Rs. 13528.75 + 1352.88 =
Rs.
Total for 100 Rft

ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M

20 Percent

20 Percent

= 314.16 Cft

Page 33

roviding and casting in situ bored reinforced concrete pile with t


oncrete (Nominal mix 1 : 2: 4), using 10% extra cement in dry mix,
ourse sand including all labour and material (except the cost of s
einforcement and its labour for bending and laying in position etc
ill be paid separately, including screening and washing of shingle

4\" dia (600 mm) pile.


Unit Rate (British System) per Rft
Qty
Rate Per Unit
Amount (Rs.)

nalysis for 100 Rft


x 100
12x4

= 314.16 Cft
55.29 bags
138.23 Cft
276.46 Cft
5.53 bags

per bag
% Cft
% Cft
per bag

8.00 Nos.
8.00 Nos.
95.00 No.
1.00 No.
4.75 Nos.

per
per
per
per
per

Rs. 0.00
Rs. 0.00

0 Percent

100.00 Rft 2.50 hrs. L.S

per foot
per hour

L.S
0.0

0 Percent
0.0

Rs.
Rs.
Rs.
Rs.

day
day
day
day
day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 8

(a)

Fabrication of mild steel reinforcemen


including cutting bending, laying in p
including cost of binding wire and lab
reinforcement (also includes removal o
Plain bars.
Detail

Analysis for 48 Cwt


MATERIAL
1
2
3
4

Fabrication of steel
Welding electrode
Hire charges of plant
Working of rig during lowering of cage
Total
Contractor's Profit & Overhea
20 Percent
Total
Material cost per Cwt
LABOUR for 2 Cwt
1
Welder
2
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
ITEM RATES
Labour rate per Cwt
Labour rate per 100 Kg
Composite rate per Cwt
Composite rate per 100 Kg

10 Percent
20 Percent

Page 34

of mild steel reinforcement bar cage for R.C.C bored pi


utting bending, laying in position, welding and fastenin
ost of binding wire and labour charges for binding of st
nt (also includes removal of rust from the bars).

Unit Rate (British System) per Cwt


Qty

Rate

2.443 Ton
(48.00 Cwt 1.00 bundl L.S
3.00 hrs. -

Per Unit

per ton
er bundle
per hour

1.00 Nos. 3.00 Nos. -

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 8

(b)

Fabrication of mild steel reinforcemen


including cutting bending, laying in p
including cost of binding wire and lab
reinforcement (also includes removal o
Deformed bars.
Detail

Analysis for 48 Cwt


MATERIAL
1
2
3
4

Fabrication of steel
Welding electrode
Hire charges of plant
Working of rig during lowering of cage
Total
Contractor's Profit & Overhea
20 Percent
Total
Material cost per Cwt
LABOUR for 2 Cwt
1
Welder
2
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
ITEM RATES
Labour rate per Cwt
Labour rate per 100 Kg
Composite rate per Cwt
Composite rate per 100 Kg

10 Percent
20 Percent

Page 35

of mild steel reinforcement bar cage for R.C.C bored pi


utting bending, laying in position, welding and fastenin
ost of binding wire and labour charges for binding of st
nt (also includes removal of rust from the bars).

Unit Rate (British System) per Cwt


Qty

Rate

2.443 Ton
(48.00 Cwt 1.00 bundl L.S
3.00 hrs. -

Per Unit

per ton
er bundle
per hour

1.00 Nos. 3.00 Nos. -

per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 9

(a)

Fabrication of mild steel reinforcemen


cutting, bending, laying in position,
cost of binding wire and labour charge
(also includes the removal of rust fro
Plain bars.
Detail

Analysis for One Cwt


MATERIAL
1
2

M.S. bars including wastage


Binding wire
Total
Contractor's Profit & Overhea
Total

LABOUR
1
2

20 Percent

Black Smith
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per Cwt
Labour rate per 100 Kg
Composite rate per Cwt
Composite rate per 100 Kg

10 Percent
20 Percent

Page 36

of mild steel reinforcement for cement concrete, includ


nding, laying in position, making joints and fastenings,
ding wire and labour charges for binding of steel reinfo
des the removal of rust from bars).

Unit Rate (British System) per

Cwt

Qty

Amount (Rs.)

Rate

Per Unit

55 kg
(1.08 Cwt) (0.25 lbs) 0.114 kg

per tonne
kg

0.25 Nos. 0.25 Nos. -

per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 9

(b)

Fabrication of mild steel reinforcemen


cutting, bending, laying in position,
cost of binding wire and labour charge
(also includes the removal of rust fro
Deformed bars.
Detail

Analysis for One Cwt


MATERIAL
1
2

M.S. bars including Wastage


Binding wire
Total
Contractor's Profit & Overhea
Total

LABOUR
1
2

20 Percent

Black Smith
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per Cwt
Labour rate per 100 Kg
Composite rate per Cwt
Composite rate per 100 Kg

10 Percent
20 Percent

Page 37

of mild steel reinforcement for cement concrete, includ


nding, laying in position, making joints and fastenings,
ding wire and labour charges for binding of steel reinfo
des the removal of rust from bars).

Unit Rate (British System) per Cwt


Qty

55.00
(1.08
(0.25
0.114

Rate

kg
Cwt) lbs) kg

Per Unit

per tonne
per kg

0.25 Nos. 0.25 Nos. -

per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 10

Pre cast cement concrete solid or face


templates.

Detail

Analysis for 100 Cft


MATERIAL
1
2
3
4

Cement
Sand
Shingle
Kail Woden planks or steel plates for moulds
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3
4

Mason
Collies unskilled
Carpenter
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 100 Cft

ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per Cft
Composite rate per Cum

10 Percent
20 Percent

Page 38

ment concrete solid or face blocks (1 : 2 : 4) including

Unit Rate (British System) per Cft


Qty
Rate Per Unit
Amount (Rs.)

17.60 bags
44.00 Cft
88.00 Cft
0.40 Cft

per bag
% Cft
% Cft
P. Cft.

2.00
3.00
0.50
1.00

per
per
per
per

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Nos.
Nos.
No.
No.

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 11

Pre cast cement concrete hollow block


and constructing walls thereof.

Detail

Analysis for 100 Cft


MATERIAL
1
2
3
4

Cement
Sand
Shingle
Kail Wood for templates
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2
3
4

Mason
Collies unskilled
Bahishti
Carpenter for template
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per Cft
Composite rate per Cum

10 Percent
20 Percent

Page 39

ment concrete hollow block (1 : 2 : 4) including cost of


cting walls thereof.

Unit Rate (British System) per Cft


Qty
Rate Per Unit
Amount (Rs.)

11.20 bags
28.00 Cft
56.00 Cft
0.40 Cft

per bag
% Cft
% Cft
P. Cft.

4.50
8.00
1.50
0.50

per
per
per
per

Nos.
Nos.
No.
No.

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 12

Providing and fixing ornamental concre


(1 : 2 : 4) without steel.

Detail

Analysis for 10 Sft


MATERIAL
1
2
3
4

Cement
Sand
Shingle
Form work (Kail Wood)
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2

Mason
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per Sft
Labour rate per Sqm
Composit rate per Sft
Composite rate per Sqm

10 Percent
20 Percent

Page 40

nd fixing ornamental concrete cement Jali 2\" (50 mm) thi


without steel.

Unit Rate (British System) per Sft


Qty
Rate Per Unit
Amount (Rs.)

0.30
0.75
1.00
0.01

bags
Cft
Cft
Cft

per bag
% Cft
% Cft
P. Cft.

0.20 No.
0.20 No.

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13
(a)

Extra labour for laying concrete plain


Above 20' upto 40' (6 metre to 12 metr

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Collies unskilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate for 100 Cft

4.00 Nos.

10 Percent
20 Percent
363.00 x 1
125

0.0

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 13
(b)

Extra labour for laying concrete plain

For every additional 10' (3 metre) hei


Detail

Unit Rate (British System)

Qty
Analysis for 125 Cft
LABOUR
1

Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate for 100 Cft

2.50 Nos.

10 Percent
20 Percent
226.88 x 1
125

0.0

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 41

r for laying concrete plain or reinforced.


pto 40' (6 metre to 12 metre) height.

nit Rate (British System) per 100 Cft


Rate Per Unit
Amount (Rs.)

per day

Say
Say

r for laying concrete plain or reinforced.

dditional 10' (3 metre) height.

nit Rate (British System) per 100 Cft


Rate

Per Unit

per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 14

Extra labour work of weir, rail or roa


super-structure.
Detail

Unit Rate (British System)

Qty
Analysis for 125 Cft
LABOUR
1

Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate for 100 Cft

1.00 Nos.
10 Percent
20 Percent
0.0
125

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 15

Rs.
Rs.

Making reinforced cement concrete spou


(2' x 6\" x 5\").
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5

LABOUR
1
2

Cement
Sand
Bajri
Steel
Wood (Kail Wood)
Total
Contractor's Profit & Overhea
Total

0.09 Bag
0.22 Cft
0.88 Cft
0.70 Kg.
0.007 Cft
20 Percent

Mason
Collies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.25 No.
0.25 No.

10 Percent
20 Percent

ITEM RATES
Labour rate per Spout
Composit rate per Spout

Rs.
Rs.

Page 42

r work of weir, rail or road bridges syphons and concret

nit Rate (British System) per 100 Cft


Rate

Per Unit

Amount (Rs.)

per day

Say
Say

forced cement concrete spout, including fixing in positi

nit Rate (British System) for Each


Rate

Per Unit

P. Bag
% Cft.
% Cft.
P. Kg.
P. Cft

per day
per day

Amount (Rs.)

Say
Say

DESCRIPTION OF ITEM:
Item No. 16

Making hole upto 3\" (75 mm) dia 18\"


stone masonry walls and repairing.

Detail

LABOUR
1
2

Mason
Collies unskilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

Unit Rate (British System)


Qty

0.60 No.
0.60 No.

10 Percent
20 Percent

ITEM RATES
Labour rate per hole

DESCRIPTION OF ITEM:
Item No. 17

Rs.

Extra labour for skipping concrete in

Detail

Unit Rate (British System)


Qty

Analysis for 150 Cft


LABOUR
1
2

Well sinker/diver
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Cft

1.00 No.
6.00 Nos.
10 Percent
20 Percent
750.20 x 1
150

0.0

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 43

upto 3\" (75 mm) dia 18\" (450 mm) deep in cement concret
ry walls and repairing.

nit Rate (British System) per Hole


Rate Per Unit

Amount (Rs.)

per day
per day

Say

r for skipping concrete in wells.

nit Rate (British System) per 100 Cft


Rate

Per Unit

Amount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 18
(a)

Nicking concrete surface.


Cement concrete surface.

Detail

Analysis for 125 Sft


LABOUR
1

Mason

Total
Sundries
10 Percent
Total
Contractor's Profit &20 Percent
Total
Rate per 100 Sft
125

x 100

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
DESCRIPTION OF ITEM:
Item No. 18
(b)

Nicking concrete surface.


Lime concrete surface.
Detail

Analysis for 125 Sft


LABOUR
1

Mason
Total
Sundries
10 Percent
Total
Contractor's Profit &20 Percent
Total
Rate per 100 Sft
125

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

x 100

Page 44

Unit Rate (British System) per 100 Sft


Qty
Rate Per Unit

0.50 No.

Rs.
Rs.

Amount (Rs.)

per day

Say
Say

Unit Rate (British System) per 100 Sft


Qty

Rate

0.165 No. -

Rs.
Rs.

Per Unit

Amount (Rs.)

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 19
(a)

Preparing, watering and ramming surfac


works only).
Horizontal floor.

Detail

Analysis for 125 Sft


LABOUR
1
2

Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft

10 Percent
20 Percent
x 100
125

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
DESCRIPTION OF ITEM:
Item No. 19

(b)

Preparing, watering and ramming surfac


works only).
Glacis and crest.
Detail

Analysis for 125 Sft


LABOUR
1
2

Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft

10 Percent
20 Percent
x 100
125

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Page 45

watering and ramming surface for laying concrete (for he

Unit Rate (British System) per 100 Sft


Qty
Rate Per Unit

0.28 No.
0.25 No.

Rs.
Rs.

Amount (Rs.)

per day
per day

Say
Say

watering and ramming surface for laying concrete (for he

Unit Rate (British System) per 100 Sft


Qty

Rate

0.50 No.
0.25 No.

Rs.
Rs.

Per Unit

Amount (Rs.)

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 19
(c)

Preparing, watering and ramming surfac


works only).
Inverted filters.

Detail

Analysis for 125 Sft


LABOUR
1
2

Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft

10 Percent
20 Percent
x 100
125

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Page 46

watering and ramming surface for laying concrete (for he

Unit Rate (British System) per 100 Sft


Qty
Rate Per Unit
Amount (Rs.)

0.125 No. 0.125 No. -

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

Fabrication of high tensile steel pres


(post tensioned) concrete, including a
through metal spacer plate, inserting
sheathing in longitudinally welded met
anchorage with male and female set of
transverse cable, stressing cables wit
schedule, maintaining stressing record
approved proforma to the Engineering-i
including all materials required for i
cutting projected ends and making good
respects.

Detail

MATERIAL
(a)

(b)
(c)

Cable having 12 Nos. wire


12 x 209.86 x 75
1000
Wastage 8%
=
Anchorage cone, set of one male and
female for 12/0.276\" (7 mm dia cable)
Self coupling longitudinally welded
carrogated sheath of 1-9/16\" i/d for
12/0.276\" (7 mm) cable

(d)

Helical core (compressed for 10 tons)


extension for 12/0.276 (7 mm) cable
stretch length 75'/10 =

(e)

Making good recessed with type 'A'


nominal mix 1:1:2: concrete
including curing
Cement
Sand (Harrow)
Bajri
Injecting cable 12/0.276 (7 mm)
with cement grout
i) Cement for injecting cable =
making good recess
=

(f)

ii) Sand 39 x 0.25 100


=
iii) Bajri 78 x 0.25 100
=
Total
Contractor's Profit & Overhea
20 Percent
Total
Rate for 100 Kg
0.0 x

85.65

Page 47

of high tensile steel prestressing cables for prestress


oned) concrete, including assembling by drawing the H.T.
al spacer plate, inserting in helix core and taping or t
n longitudinally welded metal corrugated sheath, positio
ith male and female set of anchorage cone, forming ducts
cable, stressing cables with jack at both ends as per st
aintaining stressing record and supply the same in the
oforma to the Engineering-in-charge, making loop at blin
ll materials required for it, grouting the cable ducts w
jected ends and making good recesses, etc., complete in

Unit Rate (British System) 100 Kg


Qty
Rate Per Unit
Amount (Rs.)

188.87 lbs
15.11
203.98 92.54 kg

7.5 ft.

per ton

2.00 sets -

per set

75.00 ft
22.86 metre

per metre

7.50 ft
2.29 metre

per metre

0.27 Bag
0.34 Cft. 0.68 Cft. -

P. Bag
% Cft.
% Cft.

0.38 bags
0.07 bags
0.45 ba
0.45 bag
0.97 Cf
0.97 Cft
0.194 C
0.194 Cft -

100

per bag
% Cft
% Cft

LABOUR for 4 Nos.


1
2
3
4
5

Foreman/Supervisor
Black Smith
Coolies skilled
Coolies un-skilled
Total
Hire charges of assembling bunch
cable wire cutter stressing, jack
Hydraulic pump, conce, fixer grout
injecting pump reliveable observation
and supply of recorded data of
stresses.
Total
Sundries 10 Percent o
Total
Contractor's Profit & Overhea
Total for 4 Nos.
Rate for one cable (85.65 Kg)
Rate for 100 Kg

ITEM RATES
Labour rate per 100 Kg
Composite rate per 100 Kg

0.0
20 Percent
0

Page 48

2.00
6.00
4.00
8.00

No.
Nos.
Nos.
Nos.

per
per
per
per

day
day
day
day

L.S

100

85.65

Rs.
Rs.
Say

DESCRIPTION OF ITEM:
Item No. 21

MATERIAL
1
(a)

(b)

Cable having 5 mm dia


5 x 500 x 102.5
1000
Cable having 4 mm dia
3 x 500 x 66.6
1000

Fabrication of High Tensile


(pretensioned) concrete wor
M.S. shear bars, spacers an
down, struts, stressing cab
same in approved proforma t
projecting ends and making
Detail

356.15 lbs or 161.55 kg


Wastage 8%
=

4
5

LABOUR
1
2
3
4
5

Anchorage cone set one male and


one female for using
i) 5 mm dia = 4x2 = 8 sets @ = 2000 =
ii) 4 mm dia = 3x2 = 6 sets @ = 2500 =
Using 4 times
=
Making good recesses with type 'A'
nominal mix 1:1:2 concrete
including curing 500 15 = 33+1
= 34 x 2 =
Repair of plate for the down struts
spacers
M.S bar used for spacer reinforcement
161.55 x 20 100
=
Wastage 1%
Binding wire lbs
Total
Contractor's Profit & Overhea
Total
Material cost for 100 Kg
0.00 x 100
161.55
Foreman
Black Smith
Coolies skilled
Coolies un-skilled
Total
Hire charges of wire cutter

20 Percent

stressing, Jack, Hydraulic pump


relievable cone, observation and
supply of recorded data of stress.
Total
Sundries (10on labour
Total
Contractor's Profit & Overhea
Total
ITEM RATES
Labour rate per 100 Kg
Composite rate per 100 Kg

20 Percent

abrication of High Tensile steel reinforcement for prestressed


pretensioned) concrete work, including inserting wire in moulds, p
.S. shear bars, spacers and lift hook, male and female anchorage,
own, struts, stressing cables, maintaining stress record and suppl
ame in approved proforma to the Engineer-in-charge, cutting wires
rojecting ends and making good recesses, etc., complet in all resp
Unit Rate (British System) per 100 Kg
Qty

Rate

Per Unit

5 Nos.
256.25 lbs
3 Nos.

=
99.900 lbs
356.15 lbs
161.55 kg
12.92 kg
174.47 174.47 kg

Rs.
Rs.
Rs. 0.00
= 0 Rs.

68 ends

per ton

0.0
0.0

68.00 ends -

each end

L.S
32.31 kg
0.32 kg
32.63 k

32.63 kg
0.114 kg

per ton

per
per
per
per

0 Percent

0.0

0.25
1.00
1.00
1.00

No.
Nos.
Nos.
Nos.

day
day
day
day

L.S

0 Percent

Rs.
Rs.
Page 49

tem) per 100 Kg


Amount (Rs.)

kg

DESCRIPTION OF ITEM:
Item No. 22

(i)

Lifting, transporting and placing prec


Girder and other members (excluding ba
bridge to correct alignment and level,
Beam upto 50 ft. (15.0 metre) length.
Detail

Assumed for 375 Cft


EQUIPMENT
1
2
3
4
5
6

(a)

LABOUR
1
2
3
4

Cost of lifting machinery including carriage


Cost of trollies
Cost of steel rope 1\"
U Clamp i/c 5/8\" bolts & nuts
Steel rope \" (3 x 20)
Railway track 200 ft. including sleepers bolts
& nuts complete 200' x 2 = 400 Rft @
235/-P-Rft
Crow bar
Total
Assume life of machinery = 5 years
depreciation for one year
0 5 =
Contractor's Profit & Overhea
Total
Beam 50'.0 in length 50x2x3.75 =
The above equipment used to lift/
transport and fixing in postion
during one year
=
Cft = 200 x 375
Amount per beam
x
75000
For 100 Cft
x
375
Working team for two beams of 375 Cft
Supervisor/foreman
Colies skilled
Crane operator
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 2 beams of 375 Cft each
Rate for 100 Cft
-

ITEM RATES
Labour rate per 100 Cft

Labour rater per Cum


Composite rate per 100 Cft
Composite rate per Cum

ansporting and placing precast prestressed concrete Beam


other members (excluding battens) etc., in position on
orrect alignment and level, etc., complete.
0 ft. (15.0 metre) length.
Unit Rate (British System) per 100 Cft
Qty

Rate

Per Amount (Rs.)

1.00 No.
3.00 Nos.
450.00 Rft
3.00 Nos.
60.00 Rft

each
each
Rft
each
Rft

400.00 Rft
6.00 Nos. -

Rft
each

1.00
3.00
1.00
8.00

per
per
per
per

Say

0.0
20 Percent
375 Cft

200 beams
75000 Cft
375

0.0

100

0.0

No.
Nos.
No.
Nos.

10 Percent
20 Percent
x
1 0.00
2 x 375
Rs.

day
day
day
day

Rs.
Rs.
Rs.
Page 50

Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 22

(ii)

Lifting, transporting and p


Girder and other members (e
bridge to correct alignment
Beam above 50 ft. upto 75 f
Detail

EQUIPMENT
As per item 22(i)
(a)

Beam 75 x 2 x 3.75 =
The equipment used to lift/
transport and fixing in postion
during one year
=
Cft = 80 x 562.5 =
Amount per beam
-

LABOUR
Full shift of Labour is required for
one day as per item 22(i)
Total
ITEM RATES
Machinary + Labour required to operate the
machinary
Rate per 100 Cft
Rate per Cum

ifting, transporting and placing precast prestressed concrete Beam


irder and other members (excluding battens) etc., in position on
ridge to correct alignment and level, etc., complete.
eam above 50 ft. upto 75 ft (15 metre to 23 metre) length.
Unit Rate (British System) per 100 Cft
Qty

Rate

Rs.
Rs.

Per Unit

Amount (Rs.)

562.5 Cft

80 beams
45000 Cft
x
562
45000

x
562.5

Rs.

100

Page 51

DESCRIPTION OF ITEM:
Item No. 22

(iii)

Lifting, transporting and p


Girder and other members (e
bridge to correct alignment
Beam above 75 ft. upto 100
Detail

EQUIPMENT
As per item 22(i)
(a)

Beam = 100 x 2 x 3.75 =


The equipment used to lift/
transport and fixing in postion
during one year
=
Cft = 60 x 750.0 =
Amount per beam
-

LABOUR
Full shift of Labour is required for
two days as per item 22(i)
Total
ITEM RATES
Machinary + Labour required to operate the
machinary
Rate per 100 Cft
Rate per Cum

ifting, transporting and placing precast prestressed concrete Beam


irder and other members (excluding battens) etc., in position on
ridge to correct alignment and level, etc., complete.
eam above 75 ft. upto 100 ft (23 metre to 30 metre) length.
Unit Rate (British System) per 100 Cft
Qty

Rate

Per Amount (Rs.)

750 Cft

60 beams
45000 Cft
x
750
45000

2 -

Rs.
Rs.
Rs.

x
750 Say

100

Page 52

DESCRIPTION OF ITEM:
Item No. 22

(iv)

Lifting, transporting and p


Girder and other members (e
bridge to correct alignment
Beam above 100 ft. upto 150
Detail

EQUIPMENT
As per item 22(i)
(a)

Beam = 150 x 2 x 3.75


The equipment used to lift/
transport and fixing in postion
during one year
=
Cft = 34 x 1125 =
Amount per beam 34 x 1125 =
-

LABOUR
Full shift of Labour is required for
four days as per item 22(i)
Total
ITEM RATES
Machinary + Labour required to operate the
machinary
Rate per 100 Cft
Rater per Cum

ifting, transporting and placing precast prestressed concrete Beam


irder and other members (excluding battens) etc., in position on
ridge to correct alignment and level, etc., complete.
eam above 100 ft. upto 150 ft (23 metre to 30 metre) length.
Unit Rate (British System) per 100 Cft
Qty

Rate

Per Unit

1125 Cft

34 beams
38250 Cft
x
1125
38250

Rs.
Rs.
Rs.

0.0
Say

1,125

100

Page 53

Amount (Rs.)

Say

DESCRIPTION OF ITEM:
Item No. 22

(v)

Lifting, transporting and p


Girder and other members (e
bridge to correct alignment
Beam above 150 ft. upto 175
Detail

EQUIPMENT
As per item 22(i)
(a)

Beam = 175 x 2 x 3.75


The equipment used to lift/
transport and fixing in postion
during one year
=
Cft = 28 x 1312.5 =
Amount per beam
-

LABOUR
Full shift of Labour is required for
six days as per item 22(i)
Total
ITEM RATES
Machinary + Labour required to operate the
machinary Rs.
Rate per 100 Cft
Rater per Cum

ifting, transporting and placing precast prestressed concrete Beam


irder and other members (excluding battens) etc., in position on
ridge to correct alignment and level, etc., complete.
eam above 150 ft. upto 175 ft (46 metre to 53 metre) length.
Unit Rate (British System) per 100 Cft
Qty

Rate

Per Amount (Rs.)

1312.5 Cft

28 beams
36750 Cft
x
1312
36750

6 -

Rs.
Say
Rs.
Say

Page 54

DESCRIPTION OF ITEM:
Item No. 23

Providing and laying foam concrete 3\"


the ratio of 1 : 2 and aluminum powder
mix.
Detail

Analysis for 20 Sft


MATERIAL
1
2
3

Cement
Sand
Aluminum powder 0.2% od cement sand
mix
Total
Contractor's Profit & Overhea
20 Percent
Total

LABOUR
1
2
3

Mason
Collies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per Sft
Labour rate per Sqm
Composite rate per Sft
Composite rate per Sqm

10 Percent
20 Percent

Page 55

nd laying foam concrete 3\" (75 mm) thick, using cement s


f 1 : 2 and aluminum powder at the rate of 0.2% of the c

Unit Rate (British System) per Sft


Qty
Rate Per Unit
Amount (Rs.)

1.00
2.50
0.66
0.30

bag
Cft
lbs
kg

per bag
% Cft
per kg

0.20 Nos. 0.50 Nos. 0.10 No.


-

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 24

(i)

Providing and fixing 6\" (150 mm) wide


on face of the construction joint with
construction joints vertically.
Aluminum sheet 1/16\" (1.6 mm) thick.
Detail

Analysis for 12 Rft


MATERIAL
1

2
3

Aluminum sheet 1/16\" (1.6 mm) thick 6\" (150 mm)


wide 12' (3.6 metre) long = 12' x 6\" = 6 Sft
6 Sft @ 0.39 kg per Sft
=
2.34 Kg
Gutties 1.5' (450 mm) c/c
Screws 1\" (40 mm)
Total
Contractor's Profit & Overhea
20 Percent
Total

LABOUR
Mason
For making special slope
Total
Sundries
Total
Contractor's Profit & Overhea
Total
ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M

10 Percent
20 Percent

Page 56

nd fixing 6\" (150 mm) wide curved sheet of required shap


the construction joint with G.I. Screw, 1.5\" (40 mm) lon
n joints vertically.
eet 1/16\" (1.6 mm) thick.
Unit Rate (British System) per Rft
Qty

Rate

Per Unit

2.34 kg
16.00 Nos. 17.00 Nos. -

per kg
each
Doz

0.125 No. 0.094 No. -

per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 24

(ii)

Providing and fixing 6\" (150 mm) wide


on face of the construction joint with
construction joints vertically.
G.I. sheet, 18 SWG.
Detail

Analysis for 12 Rft


MATERIAL
1
2

G.I. Sheet 12' x 6\" (3.60 x 0.150 metre)


Special shape i.e V shaped 2' (600 mm)
Interval

Total
Contractor's Profit & Overhea
20 Percent
Total
LABOUR for 15 Rft
1
Cutting of G.I Sheet in required pieces
2
Fixing special required Nos.
3
Mason
Total
Sundries
Total
Contractor's Profit & Overhea
Total
ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M

10 Percent
20 Percent

6 Sft

Page 57

nd fixing 6\" (150 mm) wide curved sheet of required shap


the construction joint with G.I. Screw, 1.5\" (40 mm) lon
n joints vertically.

Unit Rate (British System) per Rft


Qty

Rate

5.77 kg

Per Unit

per kg

6.00 Nos. -

each

6.00 Sft
6.00 Nos. 0.13 No.
-

Sft
each
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 25

(a)

Providing and fixing 1/8\" (3 mm) thic


horizontal and vertical expansion join
etc., including cost of clips/screws
On interior surface (without mastic st
Detail

Analysis for 12 Rft


MATERIAL
1
2
3

Aluminum sheet 1/8 (3 mm) thic 3\" (75 mm)


wide and 12' (3.6 metre) long = 12 Rft = 3 Sft
Gutties 1.5 c/c
Screws
Total
Contractor's Profit & Overhea
20 Percent
Total

LABOUR for 15 Rft


1
Mason
2
Moulder/Fitter
Total
Sundries
Total
Contractor's Profit & Overhea
Total
ITEM RATES
Labour rate per Rft
Labour rate per L.M.
Composite rate per Rft
Composite rate per L.M

10 Percent
20 Percent

Page 58

nd fixing 1/8\" (3 mm) thick 3\" (75 mm) wide aluminum str
and vertical expansion joints in walls, columns, ceiling
uding cost of clips/screws etc., complete in all respect
surface (without mastic strip).
Unit Rate (British System) per Rft
Qty

Rate

2.34 kg
16.00 Nos. 17.00 Nos. -

Per Unit

per kg
each
Dozen

0.13 Nos. 0.13 Nos. -

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 25

(b)

Providing and fixing 1/8\" (3 mm) thic


horizontal and vertical expansion join
etc., including cost of clips/screws
On exterior surface (with mastic strip
Detail

Analysis for 12 Rft


MATERIAL
1

Aluminum sheet 1/8 (3 mm) thick 3\" (75 mm)


wide & 12' (3.6 metre) long 3.6 metre long (3.00 Sf
2
Gutties 1.5'(450 mm) c/c
3
Screws
4
12 Rft (3.6 metre) mastic strip
Total
Contractor's Profit & Overhea
20 Percent
Total
Cost of Material/Rft
LABOUR for 15 Rft
1
2

Mason
Moulder/Fitter
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per Rft
Labour rate per L.M.
Composite rate per Rft
Composite rate per L.M

10 Percent
20 Percent

Page 59

nd fixing 1/8\" (3 mm) thick 3\" (75 mm) wide aluminum str
and vertical expansion joints in walls, columns, ceiling
uding cost of clips/screws etc., complete in all respect
surface (with mastic strip).
Unit Rate (British System) per Rft
Qty

Rate

2.34 kg
16.00 Nos.
17.00 Nos.
12.00 Rft

Per Unit

per kg
each
P. Dozen
per Rft

0.13 Nos. 0.13 Nos. -

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 26

Providing and fixing 1/16\" (1.6 mm) t


complete in all respects.

Detail

Analysis for 100 Sft


MATERIAL
1
2

Coper flashing 100 Sft (9.35 metre)


with 5% wastage (105.00 Sft)
Nail & screws etc.
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2

Carpenter/Black Smith
Helper
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per Sft
Labour rate per Sqm
Composite rate per Sft
Composite rate per Sqm

10 Percent
20 Percent

Page 60

nd fixing 1/16\" (1.6 mm) thick copper flashing on expans


all respects.

Unit Rate (British System) per Sft


Qty
Rate Per Unit
Amount (Rs.)

105.00 Sft 0.50 Kg.


-

Per Sft
Per Kg.

1.00 Nos. 1.00 Nos.

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 27

Providing and fixing 6\" (150 mm) wide


joint.
Detail

Analysis for 10 Rft


MATERIAL
1

G.I. Sheet 18 SWG (10' x 6\") (5.00 Sft)

Total
Contractor's Profit & Overhea
Total
LABOUR
1
2

20 Percent

Cuting of G.I sheet to required length


placing G.I sheet joint at required height
Mason
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M

10 Percent
20 Percent

Page 61

nd fixing 6\" (150 mm) wide G.I. sheet 18 SWG stopper to

Unit Rate (British System) per Rft


Qty
Rate Per Unit
Amount (Rs.)

4.83 kg

per kg

0.012 Nos. 0.05 Nos. -

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 28

Providing and embedding 10\" (250 mm)


water stopper in expansion joints of R
Detail

Analysis for 10 Rft


MATERIAL
1

Rubber water stopped 10 Rft (3.6 metre)

Total
Contractor's Profit & Overhea
Total
LABOUR
1

20 Percent

Mason (for couting and embedding)

Total
Sundries
Total
Contractor's Profit & Overhea
Total
ITEM RATES
Labour rate per Rft
Labour rate per metre
Composite rate per Rft
Composite rate per metre

10 Percent
20 Percent

Page 62

nd embedding 10\" (250 mm) wide 1/4\" thick (6 mm) thick r


er in expansion joints of R.C.C roof slab complete in al
Unit Rate (British System) per Rft
Qty
Rate Per Unit
Amount (Rs.)

10.00 Rft -

Rft

0.25 No.

per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 29

Filling expansion joints with bitumen

Detail

Analysis for 100 Rft length 2\" width x 4\" deep


MATERIAL
1

2
3
4

LABOUR
1

Contents = 100' x 1/6' x 1/3'


=
Bitumen 5.5 5
=
65 lbs/Cft @ 71.5 lbs or
32.39 kg

5.5 Cft
1.1 Cft

Sand
5.5 x 2 5 =
Sawdust
5.5 x 2 5 =
Wood for heating 4 seers
=
Total
Contractor's Profit & Overhea
Total

2.2 Cft
2.2 Cft
1.82 kg
20 Percent

Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10 Percent
20 Percent

ITEM RATES
Labour rate per inch/per foot
Labour rate per 25 mm/per metre
Composite rate per inch/per foot
Composite rate per 25 mm/per metre

Page 63

ansion joints with bitumen sand and sawdust in ratio (1


Unit Rate (British System)
(Per Rft length per inch width)
Qty
Rate Per Unit
Amount (Rs.)

32.39 kg
2.20 Cft
2.20 Cft
1.82 kg

per kg
% Cft
per Cft
per kg

1.00 No.

per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 30

Filling expansion joints with bitumen.

Detail

Analysis for 10 Rft


LABOUR
1

Coolies skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10 Percent
20 Percent

ITEM RATES
Labour rate per Rft
Labour rater per metre

DESCRIPTION OF ITEM:
Item No. 31

Laying asphaltic mixture in expansion

Detail

Analysis for 10 Rft


LABOUR
1

Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per Rft
Labour rater per metre

10 Percent
20 Percent

Page 64

ansion joints with bitumen.

Unit Rate (British System) per Rft


Qty
Rate Per Unit

0.65 No.

Rs.
Rs.

per day

Amount (Rs.)

0.0

Say
Say

altic mixture in expansion joints.

Unit Rate (British System) per Rft


Qty

Rate

0.70 No.

Rs.
Rs.

Per Unit

Amount (Rs.)

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 32
(a)

Providing and fixing thermopore (foame


vertical expansion joints.
1\" (25 mm) thick thermopore sheet.

Detail

Analysis for 100 Sft


MATERIAL
1

Thermopore sheet 1\" (25 mm) thick wastage 5%


(105 Sft
=
9.76 Sqm)
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2

Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per Sft
Labour rate per Sqm
Composite rate per Sft
Composite rate per Sqm

10 Percent
20 Percent

Page 65

nd fixing thermopore (foamed polythene) sheet in horizon


pansion joints.
thick thermopore sheet.

Unit Rate (British System) per Sft


Qty
Rate Per Unit
Amount (Rs.)

9.76 Sqm

0.40 No.
0.40 No.

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 32
(b)

Providing and fixing thermopore (foame


vertical expansion joints.
1\" (40 mm) thick thermopore sheet.

Detail

Analysis for 100 Sft


MATERIAL
1

Thermopore sheet 1\" (40 mm) thick wastage 5%


(105 Sft
=
9.76 Sqm)
Total
Contractor's Profit & Overhea
Total

20 Percent

LABOUR
1
2

Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per Sft
Labour rate per Sqm
Composite rate per Sft
Composite rate per Sqm

10 Percent
20 Percent

Page 66

nd fixing thermopore (foamed polythene) sheet in horizon


pansion joints.
) thick thermopore sheet.

Unit Rate (British System) per Sft


Qty
Rate Per Unit
Amount (Rs.)

9.76 Sqm

0.40 No.
0.40 No.

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 33
(a)

Providing and laying damp proof course


cement sand and shingle) including bit
With one coat of bitumen and one coat

(i)

1\" (40 mm) thick.


Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel 5.82 Kg.
Brush

7
8

Bitumen
Polythine 105 Sft @ 1.13 kg % Sft
Total
Contractor's Profit & Overhea
20 Percent
Total
LABOUR for 150 Sft
1
Carpenter
2
Mason
3
Coolies un-skilled
4
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

10 Percent
20 Percent

Page 67

nd laying damp proof course of cement concrete 1 2 : 4 (


and shingle) including bitumen coating.
at of bitumen and one coat polythene sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

2.25 bags
5.50 Cft
11.00 Cft
0.103 Cft

Per Unit

Amount (Rs.)

0.20 No.
(20.00 lbs)
8.88 kg
1.18 kg
-

per bag
% Cft
% Cft
Per Cft
Per Cft
Each

0.15
0.50
2.00
0.25

per
per
per
per

Say
Say
Say
Say

Rs.
Rs.
Rs.
Rs.

No.
No.
Nos.
No.

per kg
per kg

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 33
(a)

Providing and laying damp proof course


cement sand and shingle) including bit
With one coat of bitumen and one coat

(ii)

2\" (50 mm) thick.


Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel 5.82 Kg.
Brush

7
8

Bitumen
Polythine with 5% wastage
Total
Contractor's Profit & Overhea
Total
LABOUR for 150 Sft
1
Carpenter
2
Mason
3
Coolies un-skilled
4
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent

10 Percent
20 Percent

Page 68

nd laying damp proof course of cement concrete 1 2 : 4 (


and shingle) including bitumen coating.
at of bitumen and one coat polythene sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

2.93 bags
7.50 Cft
15.00 Cft
0.103 Cft

Per Unit

Amount (Rs.)

0.20 No.
(20.00 lbs)
8.88 kg
1.18 kg
-

per bag
% Cft
% Cft
Per Cft
Per Cft
Each

0.15
0.50
2.00
0.25

per
per
per
per

Say
Say
Say
Say

Rs.
Rs.
Rs.
Rs.

No.
No.
Nos.
No.

per kg
per kg

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 33
(a)

Providing and laying damp proof course


cement sand and shingle) including bit
With one coat of bitumen and one coat

(iii)

3\" (75 mm) thick.


Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel 5.82 Kg.
Brush

7
8

Bitumen
Polythine with 5% wastage
Total
Contractor's Profit & Overhea
Total
LABOUR for 150 Sft
1
Carpenter
2
Mason
3
Coolies un-skilled
4
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent

10 Percent
20 Percent

Page 69

nd laying damp proof course of cement concrete 1 2 : 4 (


and shingle) including bitumen coating.
at of bitumen and one coat polythene sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

4.50 bags
11.00 Cft
22.00 Cft
0.103 Cft

Per Unit

Amount (Rs.)

0.20 No.
(20.00 lbs)
8.88 kg
1.18 kg
-

per bag
% Cft
% Cft
Per Cft
Per Cft
Each

0.25
0.50
2.00
0.25

per
per
per
per

Say
Say
Say
Say

Rs.
Rs.
Rs.
Rs.

No.
No.
Nos.
No.

per kg
per kg

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 33
(b)

Providing and laying damp proof course


cement sand and shingle) including bit
With 2 coats of bitumen.

(i)

1\" (40 mm) thick.


Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel 5.82 Kg.
Brush

Bitumen 34 lbs/100 Sft (15.34 Kg/100 Sft)


Total
Contractor's Profit & Overhea
20 Percent
Total
LABOUR for 150 Sft
1
Carpenter
2
Mason
3
Coolies un-skilled
4
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

10 Percent
20 Percent

Page 70

nd laying damp proof course of cement concrete 1 2 : 4 (


and shingle) including bitumen coating.
s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

2.25 bags
5.50 Cft
11.00 Cft
0.103 Cft

Per Unit

Amount (Rs.)

0.20 No.
(34.00 lbs)
15.08 kg
-

per bag
% Cft
% Cft
Per Cft
Per Cft
Each

0.15
0.50
2.00
0.25

per
per
per
per

Say
Say
Say
Say

Rs.
Rs.
Rs.
Rs.

No.
No.
Nos.
No.

per kg

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 33
(b)

Providing and laying damp proof course


cement sand and shingle) including bit
With 2 coats of bitumen.

(ii)

2\" (50 mm) thick.


Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel 5.82 Kg.
Brush

Bitumen 34 lbs/100 Sft (15.34 Kg/100 Sft)


Total
Contractor's Profit & Overhea
20 Percent
Total
LABOUR for 150 Sft
1
Carpenter
2
Mason
3
Coolies un-skilled
4
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

10 Percent
20 Percent

Page 71

nd laying damp proof course of cement concrete 1 2 : 4 (


and shingle) including bitumen coating.
s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

2.93 bags
7.50 Cft
15.00 Cft
0.103 Cft

Per Unit

Amount (Rs.)

0.20 No.
(34.00 lbs)
15.08 kg
-

per bag
% Cft
% Cft
Per Cft
Per Cft
Each

0.15
0.50
2.00
0.25

per
per
per
per

Say
Say
Say
Say

Rs.
Rs.
Rs.
Rs.

No.
No.
Nos.
No.

per kg

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 33
(b)

Providing and laying damp proof course


cement sand and shingle) including bit
With 2 coats of bitumen.

(iii)

3\" (76 mm) thick.


Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel 5.82 Kg.
Brush

Bitumen 34 lbs/100 Sft (15.34 Kg/100 Sft)


Total
Contractor's Profit & Overhea
20 Percent
Total
LABOUR for 150 Sft
1
Mason
2
Coolies un-skilled
3
Carpenter
4
Bahishti
Total
Sundries
10 Percent
Total
Contractor's Profit & Overhea
20 Percent
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Page 72

nd laying damp proof course of cement concrete 1 2 : 4 (


and shingle) including bitumen coating.
s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

4.50 bags
11.00 Cft
22.00 Cft
0.103 Cft

Per Unit

Amount (Rs.)

0.20 No.
(34.00 lbs)
15.08 kg
-

per bag
% Cft
% Cft
Per Cft
Per Cft
Each

0.50
2.00
0.25
0.25

per
per
per
per

Say
Say
Say
Say

Rs.
Rs.
Rs.
Rs.

No.
Nos.
No.
No.

per kg

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 34
(a)
(i)
(a)

Provding and laying damp proof course


coating.
With one coat of bitumen and one coat
Ratio 1 : 4.
\" (12 mm) thick.
Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel 5.82 Kg.
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
Total
LABOUR for 150 Sft
1
Mason
2
Coolies un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent

10 Percent
20 Percent

Page 73

d laying damp proof course with cement sand plaster and

at of bitumen and one coat polythen sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

0.73 bags 3.60 Cft


0.20 No.
8.86 kg
1.18 kg
-

per bag
% Cft
Per Cft
Each
per kg
per kg

0.50 No.
2.00 Nos. 0.25 No.
-

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34
(a)
(i)
(b)

Provding and laying damp proof course


coating.
With one coat of bitumen and one coat
Ratio 1 : 4.
\" (20 mm) thick.
Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel 5.82 Kg.
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent

10 Percent
20 Percent

Page 74

d laying damp proof course with cement sand plaster and

at of bitumen and one coat polythen sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

1.14 bags 5.50 Cft


0.20 No.
8.86 kg
1.18 kg
-

per bag
% Cft
Per Cft
Each
kg
kg

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34
(a)
(ii)
(a)

Provding and laying damp proof course


coating.
With one coat of bitumen and one coat
Ratio 1 : 3.
\" (12 mm) thick.
Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel 5.82 Kg.
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate fore 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent

10 Percent
20 Percent

Page 75

d laying damp proof course with cement sand plaster and

at of bitumen and one coat polythen sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

0.88 bags 3.40 Cft


0.20 No.
8.86 kg
1.18 kg
-

per bag
% Cft
Per Cft
Each
kg
per kg

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34
(a)
(ii)
(b)

Provding and laying damp proof course


coating.
With one coat of bitumen and one coat
Ratio 1 : 3.
\" (20 mm) thick.
Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel 5.82 Kg.
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent

10 Percent
20 Percent

Page 76

d laying damp proof course with cement sand plaster and

at of bitumen and one coat polythen sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

1.32 bags 5.10 Cft


0.20 No.
8.86 kg
1.18 kg
-

per bag
% Cft
Per Cft
Each
kg
per kg

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34
(a)
(iii)
(a)

Provding and laying damp proof course


coating.
With one coat of bitumen and one coat
Ratio 1 : 2.
\" (12 mm) thick.
Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
i.e. on Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Coolies un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent
-

10 Percent
20 Percent

on items 1, 2, 3,4 & 6

Page 77

d laying damp proof course with cement sand plaster and

at of bitumen and one coat polythen sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.25 bags 3.00 Cft


0.20 No.
9.72 kg
1.18 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg
per kg

on items 1, 2, 3,4 & 6

0.50 No.
2.00 Nos. 0.250 No. -

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34
(a)
(iii)
(b)

Provding and laying damp proof course


coating.
With one coat of bitumen and one coat
Ratio 1 : 2.
\" (20 mm) thick.
Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
i.e. on Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Coolies un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent on item 1, 2, 3, 4 & 6


-

10 Percent
20 Percent

Page 78

d laying damp proof course with cement sand plaster and

at of bitumen and one coat polythen sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.92 bags 3.00 Cft


0.20 No.
9.72 kg
1.18 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg
per kg

on item 1, 2, 3, 4 & 6

0.50 No.
2.00 Nos. 0.250 No. -

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34
(b)
(i)
(a)

Provding and laying damp proof course


coating.
With 2 coats of bitumen.
Ratio 1 : 4.
\" (12 mm) thick.
Detail

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel 3.65 Kg.
Brush
Bitumen
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent on item 1, 2, 3 & 4


-

10 Percent
20 Percent

Page 79

d laying damp proof course with cement sand plaster and

s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

0.73 bags 3.60 Cft


0.20 No.
16.50 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg

on item 1, 2, 3 & 4

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34
(b)
(i)
(b)

Provding and laying damp proof course


coating.
With 2 coats of bitumen.
Ratio 1 : 4.
\" (20 mm) thick.
Detail

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Total
Contractor's Profit & Overhea
i.e. on Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent
-

10 Percent
20 Percent

on item 1, 2, 3 & 4

Page 80

d laying damp proof course with cement sand plaster and

s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.14 bags 5.50 Cft


0.20 No.
16.50 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg

on item 1, 2, 3 & 4

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34
(b)
(ii)
(a)

Provding and laying damp proof course


coating.
With 2 coats of bitumen.
Ratio 1 : 3.
\" (12 mm) thick.
Detail

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel 3.73 Kg.
Brush
Bitumen
Total
Contractor's Profit & Overhea
i.e. on
Rs
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent in item 1, 2, 3 & 4


-

10 Percent
20 Percent

Page 81

d laying damp proof course with cement sand plaster and

s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

0.88 bags 3.40 Cft


0.20 No.
16.50 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg

in item 1, 2, 3 & 4

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34
(b)
(ii)
(b)

Provding and laying damp proof course


coating.
With 2 coats of bitumen.
Ratio 1 : 3.
\" (20 mm) thick.
Detail

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel 3.73 Kg.
Brush
Bitumen
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent in item 1, 2, 3 & 4


-

10 Percent
20 Percent

Page 82

d laying damp proof course with cement sand plaster and

s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.32 bags 5.10 Cft


0.20 No.
16.50 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg

in item 1, 2, 3 & 4

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34
(b)
(iii)
(a)

Provding and laying damp proof course


coating.
With 2 coats of bitumen.
Ratio 1 : 2.
\" (12 mm) thick.
Detail

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel 3.73 Kg.
Brush
Bitumen
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent in item 1, 2, 3 & 4


-

10 Percent
20 Percent

Page 83

d laying damp proof course with cement sand plaster and

s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.25 bags 3.00 Cft


0.20 No.
16.50 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg

in item 1, 2, 3 & 4

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34
(b)
(iii)
(b)

Provding and laying damp proof course


coating.
With 2 coats of bitumen.
Ratio 1 : 2.
\" (20 mm) thick.
Detail

MATERIAL
1
2
4
5
5

Cement
Sand
Fuel 3.73 Kg.
Brush
Bitumen
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent in item 1, 2, 3 & 4


-

10 Percent
20 Percent

Page 84

d laying damp proof course with cement sand plaster and

s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.92 bags 5.00 Cft


0.20 No.
16.50 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg

in item 1, 2, 3 & 4

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35
(a)
(i)
(a)

Providing and laying vertical damp pro


bitumen coating.
With one coat of bitumen & one layer o
Ratio 1 : 4.
\" (12 mm) thick.
Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel 3.62 Kg.
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent on item 1, 2, 3, 4 & 6


-

10 Percent
20 Percent

Page 85

nd laying vertical damp proof course with cement sand pl

at of bitumen & one layer of polythene sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

0.73 bags 3.60 Cft


0.20 No.
9.72 kg
1.18 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg
per kg

on item 1, 2, 3, 4 & 6

0.50 No.
2.00 No.
0.250 No. -

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35
(a)
(i)
(b)

Providing and laying vertical damp pro


bitumen coating.
With one coat of bitumen & one layer o
Ratio 1 : 4.
\" (20 mm) thick.
Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent on item 1, 2, 3, 4 & 6


-

10 Percent
20 Percent

Page 86

nd laying vertical damp proof course with cement sand pl

at of bitumen & one layer of polythene sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.14 bags 5.50 Cft


0.20 No.
9.72 kg
1.18 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg
per kg

on item 1, 2, 3, 4 & 6

0.50 No.
2.00 No.
0.250 No. -

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35
(a)
(ii)
(a)

Providing and laying vertical damp pro


bitumen coating.
With one coat of bitumen & one layer o
Ratio 1 : 3.
\" (12 mm) thick.
Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent on item 1, 2, 3, 4 & 6


-

10 Percent
20 Percent

Page 87

nd laying vertical damp proof course with cement sand pl

at of bitumen & one layer of polythene sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

0.88 bags 3.40 Cft


0.20 No.
9.72 kg
1.18 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg
per kg

on item 1, 2, 3, 4 & 6

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35
(a)
(ii)
(b)

Providing and laying vertical damp pro


bitumen coating.
With one coat of bitumen & one layer o
Ratio 1 : 3.
\" (20 mm) thick.
Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Bitumen
Polythene with 5% wastage
Fuel 3.63 Kg.
Brush
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent on item 1, 2,
-

10 Percent
20 Percent

4, 5 & 6

Page 88

nd laying vertical damp proof course with cement sand pl

at of bitumen & one layer of polythene sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

1.32
5.10
9.72
1.18

Rate

bags
Cft
kg
kg

0.20 No.

on item 1, 2,

Per Unit

per bag
% Cft
per kg
per kg
Per Cft
Each

4, 5 & 6

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35
(a)
(iii)
(a)

Providing and laying vertical damp pro


bitumen coating.
With one coat of bitumen & one layer o
Ratio 1 : 2.
\" (12 mm) thick.
Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent
-

10 Percent
20 Percent

on item 1, 2, 3, 4 & 6

Page 89

nd laying vertical damp proof course with cement sand pl

at of bitumen & one layer of polythene sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.25 bags 3.00 Cft


0.20 No.
9.72 kg
1.18 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg
per kg

on item 1, 2, 3, 4 & 6

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35
(a)
(iii)
(b)

Providing and laying vertical damp pro


bitumen coating.
With one coat of bitumen & one layer o
Ratio 1 : 2.
\" (20 mm) thick.
Detail

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent
-

10 Percent
20 Percent

on item 1, 2, 3, 4 & 6

Page 90

nd laying vertical damp proof course with cement sand pl

at of bitumen & one layer of polythene sheet 500 gauge.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.92 bags 5.00 Cft


0.20 No.
9.72 kg
1.18 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg
per kg

on item 1, 2, 3, 4 & 6

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35
(b)
(i)
(a)

Providing and laying vertical damp pro


bitumen coating.
With 2 coats of bitumen.
Ratio 1 : 4.
\" (12 mm) thick.
Detail

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent
-

10 Percent
20 Percent

on item 1, 2, 3 & 4

Page 91

nd laying vertical damp proof course with cement sand pl

s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

0.73 bags 3.60 Cft


0.20 No.
16.50 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg

on item 1, 2, 3 & 4

0.50 No.
2.00 No.
0.250 No. -

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35
(b)
(i)
(b)

Providing and laying vertical damp pro


bitumen coating.
With 2 coats of bitumen.
Ratio 1 : 4.
\" (20 mm) thick.
Detail

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent on item 1, 2, 3 & 4


-

10 Percent
20 Percent

Page 92

nd laying vertical damp proof course with cement sand pl

s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.14 bags 5.50 Cft


0.20 No.
16.50 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg

on item 1, 2, 3 & 4

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35
(b)
(ii)
(a)

Providing and laying vertical damp pro


bitumen coating.
With 2 coats of bitumen.
Ratio 1 : 3.
\" (12 mm) thick.
Detail

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent on item 1, 2, 3 & 4


-

10 Percent
20 Percent

Page 93

nd laying vertical damp proof course with cement sand pl

s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

0.88 bags 3.40 Cft


0.20 No.
16.50 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg

on item 1, 2, 3 & 4

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35
(b)
(ii)
(b)

Providing and laying vertical damp pro


bitumen coating.
With 2 coats of bitumen.
Ratio 1 : 3.
\" (20 mm) thick.
Detail

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent on item 1, 2, 3 & 4


-

10 Percent
20 Percent

Page 94

nd laying vertical damp proof course with cement sand pl

s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.32 bags 5.10 Cft


0.20 No.
16.50 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg

on item 1, 2, 3 & 4

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35
(b)
(iii)
(a)

Providing and laying vertical damp pro


bitumen coating.
With 2 coats of bitumen.
Ratio 1 : 2.
\" (12 mm) thick.
Detail

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR for 150 Sft
1
2
3

20 Percent on item 1, 2, 3 & 4


-

Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

10 Percent
20 Percent

Page 95

nd laying vertical damp proof course with cement sand pl

s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.25 bags 3.02 Cft


0.20 No.
16.50 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg

on item 1, 2, 3 & 4

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35
(b)
(iii)
(b)

Providing and laying vertical damp pro


bitumen coating.
With 2 coats of bitumen.
Ratio 1 : 2.
\" (20 mm) thick.
Detail

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel 3.63 Kg.
Brush
Bitumen
Total
Contractor's Profit & Overhea
i.e. on
Rs.
Total
LABOUR 150 Sft
1
Mason
2
Cooly un-skilled
3
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

20 Percent on item 1, 2, 3 & 4


-

10 Percent
20 Percent

Page 96

nd laying vertical damp proof course with cement sand pl

s of bitumen.

Unit Rate (British System) per 100 Sft


Qty

Rate

1.92 bags 5.00 Cft


0.20 No.
16.50 kg
-

Per Unit

per bag
% Cft
Per Cft
Each
per kg

on item 1, 2, 3 & 4

0.50 No.
2.00 No.
0.25 No.

per day
per day
per day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 36

Grouting concrete between the grooves

Detail

LABOUR
1
2
3
4

Mason
Carpenter
Coolies un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10 Percent
20 Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 37

Chiesel dressing concrete surface on s

Detail

LABOUR
1

Mason

Total
Sundries
Total
Contractor's Profit & Overhea
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

10 Percent
20 Percent

Page 97

ncrete between the grooves of gates including shuttering

Unit Rate (British System) per 100 Cft


Qty
Rate Per Unit

2.00
0.50
5.00
1.00

Rs.
Rs.

Nos.
No.
Nos.
No.

per
per
per
per

Amount (Rs.)

day
day
day
day

Say
Say

ssing concrete surface on sides of grooves.

Unit Rate (British System) per 100 Sft


Qty
Rate Per Unit

0.22 Nos. -

Rs.
Rs.

per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 38

Laying and ramming dry ballast or kank

Detail

LABOUR
1

Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10 Percent
20 Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 39

Hoisting and placing in position R.C.C

Detail

LABOUR for 32 Nos.


1
Mason
2
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
ITEM RATES
Labour rate per No.

10 Percent
20 Percent

Page 98

ramming dry ballast or kankar.

Unit Rate (British System) per 100 Cft


Qty

Rate

3.25 Nos. -

Rs.
Rs.

Per Unit

Amount (Rs.)

per day

Say
Say

d placing in position R.C.C shelves.

Unit Rate (British System) for Each


Qty
Rate Per Unit

1.00 No.
2.00 Nos. -

Rs.

per day
per day

Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 40
(a)

Breaking brick ballast, screaning and


2\" (50 mm) ring.

Detail

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10 Percent
20 Percent

ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum

DESCRIPTION OF ITEM:
Item No. 40
(b)

Breaking brick ballast, screaning and


1\" (40 mm) ring.
Detail

LABOUR
1

Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum

10 Percent
20 Percent

Page 99

ick ballast, screaning and stacking.

Unit Rate (British System) per 100 Cft


Qty
Rate Per Unit

2.50 Nos. -

Rs.
Rs.

Amount (Rs.)

per day

Say
Say

ick ballast, screaning and stacking.

Unit Rate (British System) per 100 Cft


Qty

Rate

2.80 Nos. -

Rs.
Rs.

Per Unit

Amount (Rs.)

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 40
(c)

Breaking brick ballast, screaning and


1\" (25 mm) ring.

Detail

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10 Percent
20 Percent

ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum
DESCRIPTION OF ITEM:
Item No. 40
(d)

Breaking brick ballast, screening and


Jhama ballast \" (20 mm) ring.
Detail

LABOUR
1

Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

10 Percent
20 Percent

Page 100

ick ballast, screaning and stacking.

Unit Rate (British System) per 100 Cft


Qty
Rate Per Unit

3.25 Nos. -

Rs.
Rs.

Amount (Rs.)

per day

Say
Say

ick ballast, screening and stacking.

st \" (20 mm) ring.


Unit Rate (British System) per 100 Cft
Qty

Rate

3.75 Nos. -

Rs.
Rs.

Per Unit

Amount (Rs.)

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 41

Supplying and fixing broken glasses on


cement concrete coping.
Detail

Unit Rate (British System)

Qty
Assumed for 100 Rft
MATERIAL (for 100 Rft)
For Coping
Assume base 13\" and height 4\" (114 mm)
for segment angle subtended at the centre
150' (45.75 metre) = 0.43 x 100' =
43.00 Cft
Add 25%
0.107 Cft
53.7 Cft
1
Cement
4.40 bags
2
Sand
16.00 Cft
3
Stone agregate
32.00 Cft
4
Broken glass
2.00 mds
74.39 kg
Total
Contractor's Profit & Overhea
20 Percent
Total
LABOUR
1
Mason
0.50 No.
2
Coolies un-skilled
2.00 Nos.
3
Bahishti for fixing glass
0.15 No.
4
Coolies un-skilled
5.00 Nos.
Total
Sundries
10 Percent
Total
Contractor's Profit & Overhea
20 Percent
Total
ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Page 101

nd fixing broken glasses on courtyard walls, including 1


rete coping.

nit Rate (British System) per Rft


Rate

Per Unit

Amount (Rs.)

per bag
% Cft
per Cft
% kg

per
per
per
per

Say
Say

Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 42

Crushing stone ballast by machine.

Detail

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10 Percent
20 Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 43
(a)

Breaking stone ballast screened and st


2\" (50 mm) ring.
Detail

LABOUR
1

Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

10 Percent
20 Percent

Page 102

one ballast by machine.

Unit Rate (British System) per 100 Cft


Qty
Rate Per Unit

2.50 Nos. -

Rs.
Rs.

Amount (Rs.)

per day

Say
Say

one ballast screened and stacked.

Unit Rate (British System) per 100 Cft


Qty

Rate

2.80 Nos. -

Rs.
Rs.

Per Unit

Amount (Rs.)

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 43
(b)

Beaking stone ballast screened and sta


1\" (40 mm) ring.

Detail

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10 Percent
20 Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 43
(c)

Beaking stone ballast screened and sta


1\" (25 mm) ring.
Detail

LABOUR
1

Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

10 Percent
20 Percent

Page 103

ne ballast screened and stacked.

Unit Rate (British System) per 100 Cft


Qty
Rate Per Unit

3.25 Nos. -

Rs.
Rs.

Amount (Rs.)

per day

Say
Say

ne ballast screened and stacked.

Unit Rate (British System) per 100 Cft


Qty

Rate

3.75 Nos. -

Rs.
Rs.

Per Unit

Amount (Rs.)

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 43
(d)

Beaking stone ballast screened and sta


\" (12 mm) ring.

Detail

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10 Percent
20 Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 43
(e)

Beaking stone ballast screened and sta


1/8\" (3 mm) to \" (6 mm) ring.
Detail

LABOUR
1

Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

10 Percent
20 Percent

Page 104

ne ballast screened and stacked.

Unit Rate (British System) per 100 Cft


Qty
Rate Per Unit

5.00 Nos. -

Rs.
Rs.

Amount (Rs.)

per day

Say
Say

ne ballast screened and stacked.

) to \" (6 mm) ring.


Unit Rate (British System) per 100 Cft
Qty

Rate

8.50 Nos. -

Rs.
Rs.

Per Unit

Amount (Rs.)

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 44

Screening and stacking stone ballast s

Detail

LABOUR
1

Cooly un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10 Percent
20 Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 45

Washing ballast, bajri or shingle.

Detail

LABOUR
1

Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

10 Percent
20 Percent

Page 105

nd stacking stone ballast shingle or bajri etc.

Unit Rate (British System) per 100 Cft


Qty
Rate Per Unit

0.80 No.

Rs.
Rs.

Amount (Rs.)

per day

Say
Say

last, bajri or shingle.

Unit Rate (British System) per 100 Cft


Qty

Rate

0.80 No.

Rs.
Rs.

Per Unit

Amount (Rs.)

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 46

Erecting and carting sun shades of pre


(1.50 x 0.760 metre).
Detail

Assume 5 Nos.
LABOUR
1
2

Mason
Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total
ITEM RATES
Labour rate per No.

10 Percent
20 Percent

Page 106

d carting sun shades of precast R.C concrete upto 5' x 2


60 metre).
Unit Rate (British System) per Each
Qty
Rate Per Amount (Rs.)

0.50 No.
1.60 Nos. -

per day
per day

Rs.

Say

CHAPTER NO.4

DISMANTLING
DESCRIPTION OF ITEM:
Item No. 1

Dismantling dry stone masonry.

Detail

Unit Rate (British System)

Analysis for 125 Cft


LABOUR
1

Cooly un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

10

Page 1

nit Rate (British System) per 100 Cft


Qty
Rate Per UnitAmount (Rs.)

0.85 No.

0.00per day

0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 2

Dismantling stone masonry in mud

Detail

mortar.

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Cooly un-skilled

1.25 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 3

Rs.
Rs.

Dismantling stone masonry in lime or cement mort

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Cooly un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

3.00 Nos.
10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 2

nry in mud

mortar.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

nry in lime or cement mortar.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 4 (a)

Dismantling dry stone or spawl pitching.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

1.50 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 4 (b)

Dismantling stone or spawl pitching (mud grouted

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

1.90 Nos.
10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 3

or spawl pitching.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

pawl pitching (mud grouted).

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 5

Dismantling stone or spawl pitching and apron in

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

2.50 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 6

Dismantling stone pitching cement or lime groute

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

4.00 Nos.
10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 4

pawl pitching and apron in silted c

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

hing cement or lime grouted.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 7
(a)

Dismantling stone in crates.


Wooden Crates

Detail

Unit Rate (British System)


Qty

LABOUR
1

Analysis for 125 Cft


Coolies un-skilled

2.00 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 7
(b)

Dismantling stone in crates.


Wire crates

Detail

Unit Rate (British System)


Qty

LABOUR
1

Analysis for 125 Cft


Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

2.50 Nos.
10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 5

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 8

Dismantling stone ware drain including base conc

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

1.40 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 9

Rs.
Rs.

Dismantling mud/pise walling.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Cooly un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

0.50 No.
10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 6

drain including base concrete.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 10

Dismantling sundried brick masonry.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

1.25 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 11

Dismantling dry brick masonry.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

0.85 No.
10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 7

rick masonry.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 12

Dismantling brick work in mud mortar.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

1.75 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 13

Rs.
Rs.

Dismantling brick work in lime or cement mortar.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

4.25 Nos.
10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 8

in mud mortar.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

Say
0 Say

0
0

in lime or cement mortar.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 14

Dismantling cement block masonry.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

3.75 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 15

Dismantling Dhajji walling.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

1.00 No.
10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 9

ck masonry.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 16

Dismantling mud concrete.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

2.00 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 17

Rs.
Rs.

Dismantling lime concrete.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

2.75 Nos.
10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 10

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 18

Dismantling lime or cement concrete under water.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

10.50 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 19 (a)

Rs.
Rs.

Dismantling cement concrete plain 1 : 4 : 8.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

5.50 Nos.
10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 11

ment concrete under water.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

crete plain 1 : 4 : 8.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 19 (b)

Dismantling cement concrete plain 1 : 3 : 6.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

9.00 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 19 (c)

Rs.
Rs.

Dismantling cement concrete plain 1 : 2 : 4.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

11.00 Nos.
10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 12

crete plain 1 : 3 : 6.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

crete plain 1 : 2 : 4.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 19 (d)

Dismantling cement concrete with brick aggregate

Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

3.00 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 19 (e)

Rs.
Rs.

Dismantling D.P.C of cement concrete 1\" thick

Detail

Unit Rate (British System)


Qty

LABOUR
1

Analysis for 125 Cft


Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

1.50 Nos.
10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 13

crete with brick aggregate.

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

ement concrete 1\" thick and cleari

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 20

Dismantling cement concrete reinforced, separati


concrete and straightening the same.

Detail

Unit Rate (British System)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 21

Dismantling sirki sarkanda or thatched roofing s


battens.

Detail

Unit Rate (British System)

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

10

Page 14

crete reinforced, separating reinfo


ning the same.

nit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

18.00 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

anda or thatched roofing supported

nit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

0.60 No.

0.00per day

0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 22 (a)

Dismantling Ist class tile roofing.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled

1.50 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

DESCRIPTION OF ITEM:
Item No. 22 (b)

Rs.
Rs.

Dismantling 2nd class tile roofing.

Detail

Unit Rate (British System)


Qty

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

1.25 Nos.
10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 15

tile roofing.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

tile roofing.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 23

Dismantling from any height asbestos sheet and r


Detail

Unit Rate (British System)


Qty

LABOUR
1
2

Analysis for 125 Sft


Fitter
Coolies un-skilled

0.25 No.
0.50 No.

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 24 (a)

Dismantling roof of wooden planks and battens up


Detail

Unit Rate (British System)


Qty

Analysis for 125 Sft


LABOUR
1
2

Carpenter
Cooly un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

0.20 No.
0.40 No.

10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 16

eight asbestos sheet and ridge copi

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day
0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

oden planks and battens upto any he

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day
0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 24 (b)

Dismantling wooden ceiling above 6 m (20' height


including lifting with care and special scaffold
and with machines underneath.
Detail

Unit Rate (British System)


Qty

LABOUR
1
2

Analysis for 125 Sft


Carpenter
Cooly un-skilled

0.60 No.
1.80 Nos.

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

DESCRIPTION OF ITEM:
Item No. 25

Rs.
Rs.

Dismantling Jack arch roofing including removal

Detail

Unit Rate (British System)


Qty

LABOUR
1

Analysis for 125 Sft


Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

2.00 Nos.
10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 17

ling above 6 m (20' height) in diff


care and special scaffolding along

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day
0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

roofing including removal of joists

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 26

Dismantling R.B. roof complete with mud and mud


separating reinforcement, cleaning and straighte
Detail

Unit Rate (British System)


Qty

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled

2.50 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 27 (a)

Stripping and stackings slates or tiles from the

Detail

Unit Rate (British System)


Qty

LABOUR
1

Analysis for 125 Sft


Coolies unskilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

1.25 Nos.
10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 18

complete with mud and mud plaster i


nt, cleaning and straightening the

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

s slates or tiles from the truss ro

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 27 (b)

Stripping and stacking G.I. sheet roof.


Detail

Unit Rate (British System)


Qty

LABOUR
1
2

Analysis for 125 Sft


Fitter
Cooly unskilled

0.12 No.
1.00 No.

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 27 (c)

Extra for dismantling G.I. sheet roof above 6 m


position including lifting with special scaffold
wires with machines under-neath.
Detail

Unit Rate (British System)


Qty

LABOUR
1
2

Analysis for 125 Sft


Blacksmith
Cooly unskilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

1.00 No.
0.25 No.

10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 19

G.I. sheet roof.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day
0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

G.I. sheet roof above 6 m (20') in


ting with special scaffolding alone
der-neath.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day
0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 28

Dismantling slates or tiles including battens pu


Detail

Unit Rate (British System)


Qty

LABOUR
1

Analysis for 125 Sft


Coolies un-skilled

2.00 Nos.

Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 29

Dismantling brick or flagged flooring without co

Detail

Unit Rate (British System)


Qty

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

0.85 No.
10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 20

tiles including battens purlines &

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

lagged flooring without concrete fo

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 30

Dismantling plank or wooden block flooring etc.


Detail

Unit Rate (British System)

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

10

Page 21

ooden block flooring etc.

nit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

1.25 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 31
(a)

Dis-jointing R.C.C. pipe inside the tr


the pipes from the trench and stacking
6\" to 12\" dia-metre.

Detail

Analysis for 125 Rft


LABOUR

1
2

i) For dis-jointing the pipe inside


the trench one mason will take
hour for disjointing each joint.
Day's out put is 16 joints
i.e. 100 Rft.
Mason
Cooly un-skilled
ii) For dismantling the pipe line and
removal of the pipe from trench
and stacking out-side.
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Ove 20.00
Total

Percent

10

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M
NOTE:

1)

Bends, elbows, sluice valves etc shoul


of pipe line that is being dismantled.

2)

The rate does not include the cost of

g R.C.C. pipe inside the trench and dismentlin


rom the trench and stacking them out side.
dia-metre.

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

1.00 No.
1.00 No.

0.00per day
0.00per day

0.0
0.0

1.00 No.

0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

ws, sluice valves etc should not be paid for e


e that is being dismantled.

es not include the cost of excavation and refi

0.0
0.0

Page 22

DESCRIPTION OF ITEM:
Item No. 31

(b)

Above 12

inches

to 24 inches Dia-metre.

Detail

Analysis for 125 Rft


LABOUR

1
2

i) For dis-jointing the pipe inside


the trench one mason will take
hour for disjointing each joint.
Day's out put is 16 joints
i.e. 100 Rft.
Mason
Cooly un-skilled
ii) For dismantling the pipe line and
removal of the pipe from trench
and stacking out-side.
Cooly un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATES
Labour rate per Rft
Labour rate per R.M

10

Page 23

4 inches Dia-metre.

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

1.00 No.
1.00 No.

0.00per day
0.00per day

0.0
0.0

3.00 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 31 (c)

Above 24

inches

to 36 inches Dia-metre.

Detail

Analysis for 150 Rft


LABOUR

1
2

i) For dis-jointing the pipe inside


the trench one mason will take
hour for disjointing each joint.
Day's out put is 16 joints
i.e. 100 Rft.
Mason
Cooly un-skilled
ii) For dismantling the pipe line and
removal of the pipe from trench
and stacking out-side.
Cooly un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATES
Labour rate per Rft
Labour rate per R.M

10

Page 24

6 inches Dia-metre.

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

1.50 Nos. 0.00per day


1.50 Nos. 0.00per day

0.0
0.0

4.00 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 31 (d)

Above 36

inches

Dia-metre.

Detail

Analysis for 150 Rft


LABOUR

1
2

i) For dis-jointing the pipe inside


the trench one mason will take
one hour for disjointing each joint.
Day's out put is 8 joints or 50 Rft
Mason
Cooly un-skilled
ii) For dismantling the pipe line and
removal of the pipe from trench
and stacking out-side.
Cooly un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATES
Labour rate per Rft
Labour rate per R.M

10

Page 25

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

2.00 Nos. 0.00per day


2.00 Nos. 0.00per day

0.0
0.0

6.00 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
Say

0.0

DESCRIPTION OF ITEM:
Item No. 32 (a)

Removing door with chowkat.


Detail

LABOUR
1
2
3

Cooly un-skilled
Mason
Carpenter
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATE
Labour rate per No.

DESCRIPTION OF ITEM:
Item No. 32 (b)

Removing window and sky lights with chowkat.


Detail

LABOUR
1
2
3

Cooly un-skilled
Mason
Carpenter
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATE
Labour rate per No.

10

Page 26

Unit Rate (British System) per No.


Qty

Rate Per UnitAmount (Rs.)

0.15 No.
0.10 No.
0.05 No.

0.00per day
0.00per day
0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

0.0 Say

0.0

y lights with chowkat.


Unit Rate (British System) per No.
Qty

Rate Per UnitAmount (Rs.)

0.10 No.
0.08 No.
0.05 No.

0.00per day
0.00per day
0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

0.0 Say

DESCRIPTION OF ITEM:
Item No. 33

Removing ventilators and wooden sunshades etc.

Detail

LABOUR
1
2
3

Cooly un-skilled
Mason
Carpenter
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATE
Labour rate per No.

DESCRIPTION OF ITEM:
Item No. 34 (a)

Dismantling wooden beams upto 4 m (12') in lengt

Detail

LABOUR
1

Cooly un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATE
Labour rate per No.

10

Page 27

nd wooden sunshades etc.

Unit Rate (British System) per No.


Qty

Rate Per UnitAmount (Rs.)

0.05 No.
0.05 No.
0.02 No.

0.00per day
0.00per day
0.00per day

Rs.

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0 Say

ms upto 4 m (12') in length.

Unit Rate (British System) per No.


Qty

Rate Per UnitAmount (Rs.)

0.25 No.

0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

Rs.

0.0 Say

0.0

DESCRIPTION OF ITEM:
Item No. 34 (b)

Dismantling wooden beams above 4 m to 7 m in len


Detail

LABOUR
1

Cooly un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATE
Labour rate per No.
DESCRIPTION OF ITEM:
Item No. 35 (a)

Dismantling wooden partition Jaffary work etc.

Detail

Unit Rate (British System)

Rate analysis for 700 Sft


LABOUR
1
2

Carpenter
Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

10

Page 28

ms above 4 m to 7 m in length.
Unit Rate (British System) per No.
Qty

Rate Per UnitAmount (Rs.)

0.40 No.

0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

Rs.

0.0 Say

0.0

tition Jaffary work etc.

nit Rate (British System) per 100 Sft


Qty
Rate Per UnitAmount (Rs.)

1.00 No.
0.00per day
2.00 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 35 (b)

Dismantling wooden trusses.


Detail

Rate analysis for 6 Cwt


LABOUR
1
2

Carpenter
Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
Labour rate per Cwt

10

ITEM RATES
Labour rate 100 Kg
DESCRIPTION OF ITEM:
Item No. 36

Dismantling wooden

pelisade fencing.

Detail

Rate Analysis for 60 Rft


LABOUR
1
2

Carpenter
Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATES
Labour rate per Rft
Labour rate per Metre

10

Page 29

Unit Rate (British System) per 100 Kg


Qty

Rate Per UnitAmount (Rs.)

0.25 No.
0.00per day
4.00 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

lisade fencing.
Unit Rate (British System) per Rft
Qty

Rate Per UnitAmount (Rs.)

1.00 No.
1.00 No.

0.00per day
0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 37

Dismantling iron work of trusses, sheds, water t


cutting of rivets.
Detail

Rate Analysis for 6 Cwt


LABOUR
1
2

Carpenter
Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
Labour rate per Cwt

10

ITEM RATES
Labour rate per 100 Kg
DESCRIPTION OF ITEM:
Item No. 38

Dismantling rolled steel beame or iron rails etc


Detail

Rate Analysis for 15 Cwt (762.0 Kg)


LABOUR
1

Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
Labour rate per Cwt

ITEM RATES
Labour rate per 100 kg

10

Page 30

of trusses, sheds, water tanks etc.

Unit Rate (British System) per 100 Kg


Qty

Rate Per UnitAmount (Rs.)

1.00 No.
0.00per day
3.00 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

el beame or iron rails etc.


Unit Rate (British System) per 100 Kg
Qty

Rate Per UnitAmount (Rs.)

5.00 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

0.0 Say

0.0

DESCRIPTION OF ITEM:
Item No. 39

Dismantling iron latrine.


Detail

LABOUR
1
2

Unit Rate (British System)

Fitters
Cooly un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATE
Labour rate per unit of two seats
DESCRIPTION OF ITEM:
Item No. 40

Dismantling tees, bends or sluice valves upto 12

Detail

Unit Rate (British System)

Rate Analysis for 6 Nos. 12\" bore


LABOUR
1
2

Fitters
Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
Labour rate for 1 No. 12\" bore

10

ITEM RATES
Labour rate for each per 1\" (25mm) bore
Labour rate for each per cm bore

Page 31

nit Rate (British System) per Unit of 2 S


Qty

Rate Per UnitAmount (Rs.)

0.40 No.
1.00 No.

0.00per day
0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

0.0 Say

0.0

s or sluice valves upto 12\" bore.

nit Rate (British System) for each per inch


Qty
Rate Per UnitAmount (Rs.)

1.00 No.
1.00 No.

0.00per day
0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 41 (a)

Dismantling B.G. water column.


Detail

LABOUR
1
2
3

Mason
Black-smith
Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate for Each
DESCRIPTION OF ITEM:
Item No. 41 (b)

Dismantling M.G. or N.G water column.


Detail

LABOUR
1
2
3

Mason
Black-smith
Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATES
Labour rate for Each

10

Page 32

Unit Rate (British System) per Each


Qty

Rate Per UnitAmount (Rs.)

0.75 No.
0.00per day
0.75 No.
0.00per day
8.00 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

0.0 Say

0.0

G water column.
Unit Rate (British System) per Each
Qty

Rate Per UnitAmount (Rs.)

0.50 No.
0.00per day
0.75 No.
0.00per day
5.00 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

DESCRIPTION OF ITEM:
Item No. 42

Dismantling all types of wire fencing including


bundles and collecting material.
Detail

Unit Rate (British System)

Rate Analysis for 250 Rft


LABOUR
1

Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Rft
Labour rate per R.M
DESCRIPTION OF ITEM:
Item No. 43

Dismantling wire netting of tennis court and fra


Detail

Unit Rate (British System)

Analysis for 125 SFt


LABOUR
1

Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

10

Page 33

of wire fencing including rolling t


material.

nit Rate (British System) per 100 Rft


Qty

Rate Per UnitAmount (Rs.)

1.70 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
Say

0.0

ng of tennis court and frame work.

nit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

0.40 No.

0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 44

Dismantling cloth ceiling and supporting timber.


Detail

Unit Rate (British System)

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
DESCRIPTION OF ITEM:
Item No. 45

Dismantling and removing road metalling.


Detail

Unit Rate (British System)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

10

Page 34

ing and supporting timber.

nit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

0.75 No.

0.00per day

0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

Say
Say

ng road metalling.

nit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

2.00 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 46

Dismantling and removing road pavement, etc., in


and staking of by products upto one chain lead.
Detail

Unit Rate (British System)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

10

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 47

Removing mud Plaster from walls.


Detail

Unit Rate (British System)

Analysis for 600 Sft


LABOUR
1

Cooly un-skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

10

Page 35

ng road pavement, etc., including s


ucts upto one chain lead.

nit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

2.67 Nos. 0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

rom walls.

nit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

1.00 No.

0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 48

Removing cement or lime plaster.


Detail

Unit Rate (British System)


Qty

Rate Analysis for 300 Sft


LABOUR
1

Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

1.00 No.

Percent

10

Percent

20

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 49 (a)

Scrapping of white wash or colour wash.


Detail

Unit Rate (British System)


Qty

LABOUR
1

Coolies un-skilled
Total
Sundries
Total
Contractor Profit
Total

0.20 No.

Percent

10

Percent

20

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 36

e plaster.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

h or colour wash.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 49 (b)

Scrapping ordinary distemper, oil bound distempe


Detail

Unit Rate (British System)


Qty

Analysis for 125 Sft


LABOUR
1

Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

0.75 No.

Percent

10

Percent

20

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 50

Dismantling glazed or encaustic tiles etc.


Detail

Unit Rate (British System)


Qty

LABOUR
1
2

Analysis for 125 Sft


Mason
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

1.00 No.
1.00 No.

Percent

10

Percent

20

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 37

temper, oil bound distemper or pain

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

encaustic tiles etc.

nit Rate (British System) per 100 Sft


Rate Per UnitAmount (Rs.)

0.00per day
0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 51

Scraping boulders.
Detail

Unit Rate (British System)


Qty

Analysis for 125 Cft


LABOUR
1

Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

3.50 Nos.

Percent

10

Percent

20

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 52

Cleaning lime or cement mortar of old stones to


Detail

Unit Rate (British System)


Qty

LABOUR
1

Analysis for 125 Cft


Coolies un-skilled
Total
Sundries
Total
Contractor Profit
Total

1.75 Nos.

Percent

10

Percent

20

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 38

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

t mortar of old stones to be re-use

nit Rate (British System) per 100 Cft


Rate Per UnitAmount (Rs.)

0.00per day

0.0
0.0
0.0
0.0
0.0
0.0

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 53

Dismantling of light, fans & call bell point inc


open type & making good damaged surface (buildin
Detail

Rate Analysis for 30 Points


MATERIAL
1
2

Cement 0.02 Bag


Sand
Total
Contractor Profit
Total

Percent

20

Percent

10

Percent

20

LABOUR
1
2

Electrician
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

ITEM RATES
Labour rate per point
Composite rate for each point

Page 39

fans & call bell point including ca


d damaged surface (building portion
Unit Rate (British System) per point
Qty

Rate Per UnitAmount (Rs.)

0.11 Cft

1.00 No.
0.50 No.

0.00per day
0.00per day

Rs.
Rs.

Each B
% Cft,

0.0 Say
0.0 Say

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 54

Dismantling plug point and making good damaged s


portion).

Detail

Rate Analysis for 35 Points


MATERIAL
1
2

LABOUR
1
2

Cement 0.02 Bag


Sand
Total
Contractor Profit
Total

Percent

20

Percent

10

Percent

20

Electrician
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

ITEM RATES
Labour rate for each point
Composite rate for each point

Page 40

and making good damaged surface (b

Unit Rate (British System) per point


Qty
Rate Per UnitAmount (Rs.)

0.11 Cft

Each B
% Cft,

1.00 No.
0.50 No.

0.00per day
0.00per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 55

Dismantling G.I conduit/M.S conduit/G.I Flexible


wiring etc of all sizes including making good da
portion).
(i)

On surface.
Detail

Rate Analysis for 50 Metre


MATERIAL
1
2

Cement 0.02 Bag


Sand
Total
Contractor Profit
Total

Percent

20

Percent

10

Percent

20

LABOUR
1
2

Electrician
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

ITEM RATES
Labour rate per Foot
Composite rate per Foot
Labour rate per R.M
Composite rate per R.M

Page 41

t/M.S conduit/G.I Flexible/PVC Pipe


s including making good damaged sur

Unit Rate (British System) per foot


Qty

Rate Per UnitAmount (Rs.)

0.11 Cft

1.00 No.
0.50 No.

0.00per day
0.00per day

Each B
% Cft,

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

Rs.
Rs.

0.0 Say
Say

0.0

DESCRIPTION OF ITEM:
Item No. 55

(ii)

Dismantling G.I conduit/M.S conduit/G.I Flexible


wiring etc of all sizes including making good da
portion).
Recessed in wall.
Detail

Rate analysis for 30 Metre


MATERIAL
1
2

LABOUR
1
2

Cement 0.02 Bag


Sand
Total
Contractor Profit
Total

Percent

20

Percent

10

Percent

20

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

ITEM RATES
Labour rate per Foot
Composite rate per Foot
Labour rate per R.M
Composite rate per R.M

Page 42

t/M.S conduit/G.I Flexible/PVC Pipe


s including making good damaged sur

Unit Rate (British System) per foot


Qty

Rate Per UnitAmount (Rs.)

0.11 Cft

1.00 No.
1.00 No.

0.00per day
0.00per day

Each B
% Cft,

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

CHAPTER NO.3

EARTH WORK
(EXCAVATION & EMBANKMENT)
DESCRIPTION OF ITEM:
Item No. 1
a)

Earth work excavation undressed lead upto a sing


Phaorah or shovel.
In ashes, sand, soft soil or silt clearance.

Detail

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled for digging


(including dagbelling for borrow pits)
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 1

KMENT)

undressed lead upto a single throw of kassi,

oil or silt clearance.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

3.75 No.

per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 1
b)

Earth work excavation undressed lead upto a sing


Phaorah or shovel.
In ordinary soil.

Detail

Rate Analysis for 1250 Cft


LABOUR
1

Coolies unskilled for digging


(including dagbelling for borrow pits)
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 2

Earthwork excavation in ashes, sand and soft soi


undressed lead upto 50 ft (15 metre).
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Coolies un-skilled for digging, filling, lifting (including


dab belling for borrow pits
Coolies unskilled for carrying
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Page 2

undressed lead upto a single throw of kassi,

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

4.50 No.

per day

Rs.
Rs.

Say
Say

n ashes, sand and soft soil or silt clearance,


ft (15 metre).
Unit Rate (British System) per 1000 Cft
Qty
Rate Per U Amount (Rs.)

fting (including
2.5 Nos.
per day
3.00 Nos. per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 3

a)

Bed clearance and dressing slopes of drains to r


including the removal of weeds, roots, etc, disp
materials within 50 ft (15 metre) lead.
Excavated material undressed.
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Coolies unskilled for digging


Coolies unskilled for carrying
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES

Labour rate per 1000 Cft


Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 3
Bed clearance and dressing slopes of drains to r
including the removal of weeds, roots, etc., dis
materials within 50 ft (15 metre) lead.
b)

Excavated material dressed in the specified mann


Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging


Coolies unskilled for carrying
Dresser
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 3

sing slopes of drains to required sections


of weeds, roots, etc, disposal of excavated
(15 metre) lead.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

4.00 Nos. per day


3.00 Nos. per day

Rs.
Rs.

Say
Say

sing slopes of drains to required sections


of weeds, roots, etc., disposal of excavated
(15 metre) lead.

ssed in the specified manner.


Unit Rate (British System) per 1000 Cft
Qty
Rate Per U Amount (Rs.)

4.00 Nos. per day


3.00 Nos. per day
0.55 No.
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 4
a)

Borrowpit excavation undressed lead upto 100 ft.


Ordinary Soil.

Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Coolies unskilled for digging and filling


Coolies unskilled for carrying
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 4
b)

Borrowpit excavation undressed lead upto 100 ft.


Hard Soil.

Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Coolies unskilled for digging and filling


Coolies unskilled for carrying
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Page 4

ndressed lead upto 100 ft. (30 metre)

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

4.00 Nos. per day


3.00 Nos. per day

Rs.
Rs.

Say
Say

ndressed lead upto 100 ft. (30 metre).

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

5.60 Nos. per day


3.00 Nos. per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 5

(i)

Earthwork in ordinary soil for embankments lead


including ploughing and mixing with blade grade
other suitable equipment and compaction by mecha
optimum moisture content and dressing to designe
in all respects:
95% to 100% maximum modified AASHTO dry-density
Mixing, Moisterning earth to optimum moisture co
complete with tractor complete with rotorator bl
Detail

Rate Analysis for 1250 Cft (65 m)


LABOUR
1
2
3
4

Coolies unskilled for digging


Coolies unskilled for carrying
Dresser cooly skilled
Cooly unskilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft
MACHINERY (For 1000 Cft Compacted)
1
Tractor with rotarator blade
2
Vibratory Road Roller
Total
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Percent
Percent

Page 5

soil for embankments lead upto 100 ft. (30 metre)


d mixing with blade grade or disc harrow or
nt and compaction by mechanical means at
nt and dressing to designed section, complete

dified AASHTO dry-density with vibratory roller.


rth to optimum moisture contant in layer etc.
complete with rotorator blade.
Unit Rate (British System) per 1000 Cft
Qty
Cft (65 m)

Rate Per U Amount (Rs.)

4.00 Nos.
3.00 Nos.
0.125 No.
0.142 No.

per
per
per
per

day
day
day
day

0.25 HR
0.25 HR

per hrs.
per hrs.

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5

(ii)

Earthwork in ordinary soil for embankments lead


including ploughing and mixing with blade grade
other suitable equipment and compaction by mecha
optimum moisture content and dressing to designe
in all respects:
90% maximum modified AASHTO dry density.
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3
4

Coolies unskilled for digging


Coolies unskilled for carrying
Dresser cooly skilled
Cooly Unskilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft
MACHINERY (For 1000 Cft Compacted)
1
Tractor with rotarator blade
2
Vibratory Road Roller
Total
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Percent
Percent

Page 6

soil for embankments lead upto 100 ft. (30 metre)


d mixing with blade grade or disc harrow or
nt and compaction by mechanical means at
nt and dressing to designed section, complete

ASHTO dry density.


Unit Rate (British System) per 1000 Cft
Qty
Rate Per U Amount (Rs.)

4.00 Nos.
3.00 Nos.
0.125 No.
0.142 No.

per
per
per
per

day
day
day
day

0.25 HR
0.20 HR

per hrs.
per hrs.

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5

(iii)

Earthwork in ordinary soil for embankments lead


including ploughing and mixing with blade grade
other suitable equipment and compaction by mecha
optimum moisture content and dressing to designe
in all respects:
85% maximum modified AASHTO dry density.
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3
4

Coolies unskilled for digging


Coolies unskilled for carrying
Dresser cooly skilled
Cooly Unskilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft
MACHINERY (For 1000 Cft Compacted)
1
Tractor with rotarator blade
2
Vibratory Road Roller
Total
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Percent
Percent

Page 7

soil for embankments lead upto 100 ft. (30 metre)


d mixing with blade grade or disc harrow or
nt and compaction by mechanical means at
nt and dressing to designed section, complete

ASHTO dry density.


Unit Rate (British System) per 1000 Cft
Qty
Rate Per U Amount (Rs.)

4.00 Nos.
3.00 Nos.
0.125 No.
0.142 No.

per
per
per
per

day
day
day
day

0.25 HR
0.15 HR

per hrs.
per hrs.

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 6

Regular excavation dressed.

Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging carrying


and dagbelling.
Dresser
Cooly skilled for dressing
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Page 8

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

4.50 Nos. per day


0.50 No.
per day
0.12 No.
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 7

i)

Earthwork excavation in open cutting upto 5 ft (


water channels, drains, sullage drains in open a
including under pinning of walls and shoring to
shuttering and timbering the trenches, dressed t
dimensions, trimming, removal of suface water fr
surplus excavated material disposed of and dress
lead.
Ordinary
Detail

Rate Analysis for 1250 Cft


MATERIAL
1

LABOUR
1
2
3
4
5
6
7

Kail Wood for shuttering


Total
Contractor's Profit &#####
Total

Percent

Coolies unskilled for digging, filling & dagbelling


Coolies unskilled for carrying
Coolies unskilled for temporary diviation
Coolies unskilled for removal of surplus water
Cooly un-skilled
Dresser
Skilled cooly for fixing and timbering
under pinning
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 9

n open cutting upto 5 ft (1500 mm) depth for storm


, sullage drains in open areas, roads, streets, lane
g of walls and shoring to protect existing works,
ng the trenches, dressed to designed level and
removal of suface water from trenches, back filling
rial disposed of and dressed within 50 ft (15 metre)

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

0.046 Cft. P. Cft.

4.00
1.50
0.50
0.50
1.00
1.00

day
day
day
day
day
day

0.20 No.

per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Nos.
Nos.
No.
No.
No.
No.

per
per
per
per
per
per

DESCRIPTION OF ITEM:
Item No. 7

ii)

Earthwork excavation in open cutting upto 5 ft (


water channels, drains, sullage drains in open a
including under pinning of walls and shoring to
shuttering and timbering the trenches, dressed t
dimensions, trimming, removal of suface water fr
surplus excavated material disposed of and dress
lead.
Hard
Detail

Rate Analysis for 1250 Cft


MATERIAL
1

LABOUR
1
2
3
4
5
6
7

Kail Wood for shuttering


Total
Contractor's Profit &#####
Total

Percent

Coolies unskilled for digging, filling & dagbelling


Coolies unskilled for carrying
Coolies unskilled for temporary diviation
Coolies unskilled for removal of surplus water
Cooly un-skilled
Dresser
Skilled cooly for fixing and timbering
under pinning
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 10

n open cutting upto 5 ft (1500 mm) depth for storm


, sullage drains in open areas, roads, streets, lane
g of walls and shoring to protect existing works,
ng the trenches, dressed to designed level and
removal of suface water from trenches, back filling
rial disposed of and dressed within 50 ft (15 metre)

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

0.046 Cft. P. Cft.

5.60
1.50
0.50
0.50
1.00
1.00

day
day
day
day
day
day

0.20 No.

per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Nos.
Nos.
No.
No.
No.
No.

per
per
per
per
per
per

DESCRIPTION OF ITEM:
Item No. 7

iii)

Earthwork excavation in open cutting upto 5 ft (


water channels, drains, sullage drains in open a
including under pinning of walls and shoring to
shuttering and timbering the trenches, dressed t
dimensions, trimming, removal of suface water fr
surplus excavated material disposed of and dress
lead.
Very Hard
Detail

Rate Analysis for 1250 Cft


MATERIAL
1

LABOUR
1
2
3
4
5
6
7

Kail Wood for shuttering


Total
Contractor's Profit &#####
Total

Percent

Coolies unskilled for digging, filling & dagbelling


Coolies unskilled for carrying
Coolies unskilled for temporary diviation
Coolies unskilled for removal of surplus water
Cooly un-skilled
Dresser
Skilled cooly for fixing and timbering
under pinning
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 11

n open cutting upto 5 ft (1500 mm) depth for storm


, sullage drains in open areas, roads, streets, lane
g of walls and shoring to protect existing works,
ng the trenches, dressed to designed level and
removal of suface water from trenches, back filling
rial disposed of and dressed within 50 ft (15 metre)

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

0.046 Cft.

Amount (Rs.)

0.0 P. Cft.

per
per
per
per
per
per

day
day
day
day
day
day

0.20 No.

per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

7.30
1.50
0.50
0.50
1.00
1.00

Nos.
Nos.
No.
No.
No.
No.

DESCRIPTION OF ITEM:
Item No. 7

iv)

Earthwork excavation in open cutting upto 5 ft (


water channels, drains, sullage drains in open a
including under pinning of walls and shoring to
shuttering and timbering the trenches, dressed t
dimensions, trimming, removal of suface water fr
surplus excavated material disposed of and dress
lead.
Gravel and Shingle.
Detail

Rate Analysis for 1250 Cft


MATERIAL
1

LABOUR
1
2
3
4
5
6
7

Kail Wood for shuttering


As per item No.7 - (i)
=
Total
Contractor's Profit &#####
Total

Percent

Coolies unskilled for digging, filling & dagbelling


Coolies unskilled for carrying
Coolies unskilled for temporary diviation
Coolies unskilled for removal of surplus water
Cooly un-skilled
Dresser
Skilled cooly for fixing and timbering
under pinning
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 12

n open cutting upto 5 ft (1500 mm) depth for storm


, sullage drains in open areas, roads, streets, lane
g of walls and shoring to protect existing works,
ng the trenches, dressed to designed level and
removal of suface water from trenches, back filling
rial disposed of and dressed within 50 ft (15 metre)

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

0.046 Cft. P. Cft.

10.00 Nos.
4.50 No.
2.00 No.
1.00 No.
0.50 No.
2.00 No.

per
per
per
per
per
per

day
day
day
day
day
day

0.20 No.

per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 8

i)

Earth work excavation in open cutting 5.01 ft.(1


depth for storm water channels, drains sullage d
streets, lanes including under pinning of walls
existing works, shuttering and timbering the tre
level and dimensions, trimming, removal of surfa
back filling and surplus excavated material disp
100 ft. (30 metre) lead.
Ordinary soil
Detail
Unit Rate (British System) per 1000 Cf
Rate
Qty
Rate Per Unit
Rate Analysis for 1250 Cft

MATERIAL
1

LABOUR
1
2
3
4

Wood for shuttering


Total
Contractor's Profit &#####
Total

0.092 Cft.
Percent

Coolies unskilled for digging an4.00 Nos.


Coolies unskilled for carrying 4.00 Nos.
Coolies unskilled for removing s0.50 No.
Dresser for dressing, fixing shuttering
removing and temporary shutterin1.00 No.
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 13

in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm


channels, drains sullage drains in open areas, roads
ng under pinning of walls and shoring to protect
ring and timbering the trenches, dressed to disigned
trimming, removal of surface water from trenches,
us excavated material disposal of and dressed within

British System) per 1000 Cft

ate Per Unit

Amount (Rs.)

P. Cft.

per day
per day
per day

per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 8

ii)

Earth work excavation in open cutting 5.01 ft.(1


depth for storm water channels, drains sullage d
streets, lanes including under pinning of walls
existing works, shuttering and timbering the tre
level and dimensions, trimming, removal of surfa
back filling and surplus excavated material disp
100 ft. (30 metre) lead.
Hard Soil
Detail
Unit Rate (British System) per 1000 Cf
Qty
Rate Per Unit
Rate Analysis for 1250 Cft

MATERIAL
1

LABOUR
1
2
3
4

Wood for shuttering


Total
Contractor's Profit &#####
Total

0.092 Cft.
Percent

Coolies unskilled for digging an5.60 Nos.


Coolies unskilled for carrying 4.00 Nos.
Coolies unskilled for removing s0.50 No.
Dresser for dressing, fixing shuttering
removing and temporary shutterin1.00 No.
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 14

in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm


channels, drains sullage drains in open areas, roads
ng under pinning of walls and shoring to protect
ring and timbering the trenches, dressed to disigned
trimming, removal of surface water from trenches,
us excavated material disposal of and dressed within

British System) per 1000 Cft

ate Per Unit

Amount (Rs.)

P. Cft.

per day
per day
per day

per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 8

iii)

Earth work excavation in open cutting 5.01 ft.(1


depth for storm water channels, drains sullage d
streets, lanes including under pinning of walls
existing works, shuttering and timbering the tre
level and dimensions, trimming, removal of surfa
back filling and surplus excavated material disp
100 ft. (30 metre) lead.
Very Hard
Detail
Unit Rate (British System) per 1000 Cf
Qty
Rate Per Unit
Rate Analysis for 1250 Cft

MATERIAL
1

LABOUR
1
2
3
4

Wood for shuttering

0.092 Cft.

Total
Contractor's Profit &#####
Total

Percent

Coolies unskilled for digging an7.30 Nos.


Coolies unskilled for carrying 4.00 Nos.
Coolies unskilled for removing s0.50 No.
Dresser for dressing, fixing shuttering
removing and temporary shutterin1.00 No.
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Page 15

in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm


channels, drains sullage drains in open areas, roads
ng under pinning of walls and shoring to protect
ring and timbering the trenches, dressed to disigned
trimming, removal of surface water from trenches,
us excavated material disposal of and dressed within

British System) per 1000 Cft

ate Per Unit

Amount (Rs.)

P. Cft.

per day
per day
per day

per day

Say
Say

Say
Say

DESCRIPTION OF ITEM:
Item No. 8

iv)

Earth work excavation in open cutting 5.01 ft.(1


depth for storm water channels, drains sullage d
streets, lanes including under pinning of walls
existing works, shuttering and timbering the tre
level and dimensions, trimming, removal of surfa
back filling and surplus excavated material disp
100 ft. (30 metre) lead.
Gravel and Shingle
Detail
Unit Rate (British System) per 1000 Cf
Qty
Rate Per Unit
Rate Analysis for 1250 Cft

MATERIAL
1

LABOUR
1
2
3
4
5

Wood for shuttering

0.092 Cft.

Total
Contractor's Profit &#####
Total

Percent

Coolies unskilled for digging


Coolies unskilled for carrying
Coolies unskilled for filling
Removing surface water
Dresser
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

9.00
6.00
4.00
1.00
2.00

Labour rate per 1000 Cft


Labour rate per Cum

Rs.
Rs.

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Nos.
Nos.
Nos.
No.
Nos.

Percent
Percent

ITEM RATES

Page 16

in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm


channels, drains sullage drains in open areas, roads
ng under pinning of walls and shoring to protect
ring and timbering the trenches, dressed to disigned
trimming, removal of surface water from trenches,
us excavated material disposal of and dressed within

British System) per 1000 Cft

ate Per Unit

Amount (Rs.)

P. Cft.

per
per
per
per
per

day
day
day
day
day

Say
Say

Say
Say

DESCRIPTION OF ITEM:
Item No. 9
i)

Excavation in shingle or gravel formation and ro


blasting, undressed lead upto 100 ft. (30 metre)
Dry

Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging


Coolies unskilled for filling
Coolies unskilled for carrying
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 9
ii)

Excavation in shingle or gravel formation and ro


blasting, undressed lead upto 100 ft. (30 metre)
Wet
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging


Coolies unskilled for filling
Coolies unskilled for carrying
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 17

or gravel formation and rock, not, requiring


ad upto 100 ft. (30 metre).

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

9.00 Nos. per day


4.00 Nos. per day
6.00 Nos. per day

Rs.
Rs.

Say
Say

or gravel formation and rock, not, requiring


ad upto 100 ft. (30 metre).

Unit Rate (British System) per 1000 Cft


Rate
Qty
Per Unit
Amount (Rs.)

10.00 Nos. per day


5.00 Nos. per day
7.00 Nos. per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 9
iii)

Excavation in shingle or gravel formation and ro


blasting, undressed lead upto 100 ft. (30 metre)
In flowing water
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging


Coolies unskilled for filling
Coolies unskilled for carrying
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 10

i)

Earth work excavation in irrigation channels, dr


section, grades and profiles excavated material
with in 50 ft (15 metre) lead.
Ordinary soil
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging, filling


filling & dag belling
Coolies unskilled for carrying
Dresser (for slopes and bed)
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Page 18

or gravel formation and rock, not, requiring


ad upto 100 ft. (30 metre).

Unit Rate (British System) per 1000 Cft


Rate
Qty
Per Unit
Amount (Rs.)

14.00 Nos. per day


6.50 Nos. per day
7.50 Nos. per day

Rs.
Rs.

Say
Say

in irrigation channels, drains, etc., to designed


ofiles excavated material disposed off and dressed

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

4.00 Nos. per day


3.00 Nos. per day
1.00 No.
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 10

ii)

Earth work excavation in irrigation channels, dr


section, grades and profiles excavated material
with in 50 ft (15 metre) lead.
Hard soil
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging,


filling & dag belling
Coolies unskilled for carrying
Dresser (for slopes and bed)
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 10

iii)

Earth work excavation in irrigation channels, dr


designed section, grades and profiles excavated
off and dressed with in 50 ft (15 metre) lead.
Very hard soil
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging,


filling & dag belling
Coolies unskilled for carrying
Dresser (for slopes and bed)
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 19

in irrigation channels, drains, etc., to designed


ofiles excavated material disposed off and dressed

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

5.60 Nos. per day


3.00 Nos. per day
1.00 No.
per day

Rs.
Rs.

Say
Say

in irrigation channels, drains, etc., to


es and profiles excavated material disposed
n 50 ft (15 metre) lead.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

7.30 Nos. per day


3.00 Nos. per day
1.00 No.
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 10

iv)

Earth work excavation in irrigation channels, dr


designed section, grades and profiles excavated
off and dressed with in 50 ft (15 metre) lead.
Shingle and gravel
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3
4

Coolies unskilled for digging,


filling & dag belling
Coolies unskilled for filling
Coolies unskilled for carrying
Dresser (for slopes and bed)
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES

Labour rate per 1000 Cft


Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 11
Excavation in rock dressed to designed section,
excavated material disposed off within 100 ft. (
(1.5 metre).
a)
Soft rock, Slate, Shale, Schist or laterite work
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging & carrying


Dresser
Bahishti
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Page 20

in irrigation channels, drains, etc., to


es and profiles excavated material disposed
n 50 ft (15 metre) lead.

Unit Rate (British System) per 1000 Cft


Qty

8.00
4.00
6.00
2.00

Rs.
Rs.

Rate Per U Amount (Rs.)

Nos.
Nos.
Nos.
Nos.

per
per
per
per

day
day
day
day

Say
Say

ssed to designed section, grades and profiles,


posed off within 100 ft. (30 metre) and lift upto 5

e, Schist or laterite works, with pick & crowbar.


Unit Rate (British System) per 1000 Cft
Qty
Rate Per U Amount (Rs.)

14.00 Nos. per day


4.00 Nos. per day
1.00 No.
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 11

b)

Excavation in rock dressed to designed section,


profiles, excavated material disposed off within
lift upto 5 ft. (1.5 metre).
Medium hard rocks requiring occasional blasting.
Detail

Rate Analysis for 1250 Cft


MATERIAL
1

Cost of gun powder and fuse


(1 lbs and 1 fuse)
0.453 kg @ 14.00/kg
=
1 fuse (1 metre) @ 14/Contractor's Profit &#####
Total

LABOUR
1
2
3
4
5
6
7
8
9

6.34
14
20.34
Percent

Coolies skilled for boring holes with steel jumper


Coolies skilled for tempering & fixing charges
Blowman
Coolies unskilled for digging
Breaking coolies un-skilled stone and removing the sp
Mate (skilled cooly)
Dresser
Hammerman
Blacksmith for repairing tools etc.
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 21

ssed to designed section, grades and


terial disposed off within 100 ft. (30 metre) and

iring occasional blasting.


Unit Rate (British System) per 1000 Cft
Qty

Rate Per U Amount (Rs.)

3.00 Nos. each

3.00 Nos.
0.13 No.
1.00 No.
12.00 Nos.
9.00 Nos.
0.50 No.
2.00 Nos.
1.00 No.
1.00 No

per
per
per
per
per
per
per
per
per

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

day
day
day
day
day
day
day
day
day

DESCRIPTION OF ITEM:
Item No. 12 (a)

i)

Excavation in hard rock requiring blasting, and


material (blasted material) upto 50 ft. (15 metr
and levelling to designed section etc. complete.
Grade-I
Detail

Rate Analysis for 1250 Cft


MATERIAL
1

LABOUR
1
2
3
4
5
6
7

(Powder and fuse) for blasting


(1 lbs and one fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/Total
Contractor's Profit &#####
Percent
Total
Quarrymen for boring hole and fixing
etc. (skilled cooly)
Quarrymen for digging and breaking
large stone into small ones
Chiselar for dressing
Bahishti
Coolies unskilled for remaining spoil
upto 50 ft. 15 metre lead
Blacksmith
Smithy cooly
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 22

k requiring blasting, and disposal of excavated


rial) upto 50 ft. (15 metre) lead (including dressing
ned section etc. complete.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

3.00 No.

each

3.00 Nos. per day

7.00 Nos. per day


1.00 No.
per day
0.50 No.
per day

6.00 Nos. per day


0.25 No.
per day
0.25 No.
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12 (a)

ii)

Excavation in hard rock requiring blasting, and


material (blasted material) upto 50 ft. (15 metr
and levelling to designed section etc. complete.
Grade-II
Detail

Rate Analysis for 1250 Cft


MATERIAL
1

LABOUR
1
2
3
4
5
6
7

(Powder and fuse) for blasting


(1 lbs and one fus)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/Total
Contractor's Profit &#####
Percent
Total
Quarrymen for boring hole and fixing etc.
Digging and breaking
large stone into small one
Chiselar for dressing
Bahishti
Black-smith for repairing tools etc.
Smithy cooly
Coolies unskilled for remaining spoil
upto 50 ft. (15 metre) lead
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 23

k requiring blasting, and disposal of excavated


rial) upto 50 ft. (15 metre) lead (including dressing
ned section etc. complete.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

5.00 No.

each

4.00 Nos. per day

7.00
1.00
0.50
0.50
0.50

day
day
day
day
day

6.00 No.

per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Nos.
No.
No.
Nos.
No.

per
per
per
per
per

DESCRIPTION OF ITEM:
Item No. 12 (a)

iii)

Excavation in hard rock requiring blasting, and


material (blasted material) upto 50 ft. (15 metr
and levelling to designed section etc. complete.
Grade-III
Detail

Rate Analysis for 1250 Cft


MATERIAL
1

(Powder and fuse) for blasting


(1 lbs and 1 fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/Total
Contractor's Profit &#####
Percent
Total

LABOUR
1
2
3
4
5
6
7

Quarrymen for boring hole and fixing etc.


Digging and breaking large stones
into small one.
Chiselar for dressing
Bahishti
Blacksmith for repairing tools
Smithy cooly
Coolies un-skilled for removing spoil upto 50 ft.
(15 metre)
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 24

k requiring blasting, and disposal of excavated


rial) upto 50 ft. (15 metre) lead (including dressing
ned section etc. complete.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

6.00 No.

each

5.00 Nos. per day

8.50
1.50
0.75
0.75
0.75

day
day
day
day
day

6.00 Nos. per day

Rs.
Rs.
Rs.
Rs.

Nos.
No
No.
No.
No.

per
per
per
per
per

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 11 (a)

iv)

Excavation in hard rock requiring blasting, and


material (blasted material) upto 50 ft. (15 metr
and levelling to designed section etc. complete.
Grade-IV
Detail

Rate Analysis for 1250 Cft


MATERIAL
1

(Powder and fuse) for blasting


(1 lbs and 1 fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/Total
Contractor's Profit &#####
Percent
Total

LABOUR
1
2
3
4
5
6
7

Quarrymen for boring hole and fixing etc.


Digging and breaking large stones
into small one.
Chiselar for dressing
Bahishti
Blacksmith for repairing tools
Smithy cooly
Coolies un-skilled for removing spoil upto 50 ft.
(15 metre)
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 25

k requiring blasting, and disposal of excavated


rial) upto 50 ft. (15 metre) lead (including dressing
ned section etc. complete.

Unit Rate (British System) per 1000 Cft


Rate
Qty
Per Unit
Amount (Rs.)

7.00 No.

each

6.00 Nos. per day

9.00
2.00
0.75
1.00
1.00

day
day
day
day
day

6.00 Nos. per day

Rs.
Rs.
Rs.
Rs.

Nos.
No
No.
No.
No.

per
per
per
per
per

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12

v)

Excavation in hard rock requiring blasting, and


material (blasted material) upto 50 ft. (15 metr
and levelling to designed section etc., complete
Grade-V
Detail

Rate Analysis for 1250 Cft


MATERIAL
1

(Powder and fuse) for blasting


(1 lbs and 1 fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/Total
Contractor's Profit &#####
Percent
Total

LABOUR
1
2
3
4
5
6
7

Quarrymen for boring hole and fixing etc.


Digging and breaking large stones
into small one.
Chiselar for dressing
Bahishti
Blacksmith for repairing tools
Smithy cooly
Coolies un-skilled for removing spoil upto 50 ft.
(15 metre)
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 26

k requiring blasting, and disposal of excavated


rial) upto 50 ft. (15 metre) lead (including dressing
ned section etc., complete.

Unit Rate (British System) per 1000 Cft


Rate
Qty
Per Unit
Amount (Rs.)

8.00 No.

each

7.00 Nos. per day

10.00 Nos.
2.50 No
1.00 No.
1.00 No.
1.00 No.

day
day
day
day
day

6.00 Nos. per day

Rs.
Rs.
Rs.
Rs.

per
per
per
per
per

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12

vi)

Excavation in hard rock requiring blasting, and


material (blasted material) upto 50 ft. (15 metr
and levelling to designed section etc., complete
Grade-VI
Detail

Rate Analysis for 1250 Cft


MATERIAL
1

(Powder and fuse) for blasting


(1 lbs and 1 fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.
Total
Contractor's Profit &#####
Percent
Total

LABOUR
1
2
3
4
5
6
7

Quarrymen for boring hole and fixing etc.


Digging and breaking large stones
into small one.
Chiselar for dressing
Bahishti
Blacksmith for repairing tools
Smithy cooly
Coolies un-skilled for removing spoil upto 50 ft.
(15 metre)
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 27

k requiring blasting, and disposal of excavated


rial) upto 50 ft. (15 metre) lead (including dressing
ned section etc., complete.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

9.00 No.

each

8.00 Nos. per day

10.00 Nos.
3.00 No
1.00 No.
1.25 No.
1.25 No.

day
day
day
day
day

6.00 Nos. per day

Rs.
Rs.
Rs.
Rs.

per
per
per
per
per

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12 (b)
Excavation in hard rock requiring blasting, but blasting pr
disposal of excavated material within 50 ft. (15 metre) lea
dressing and levelling to designed section etc., complete.
i)
Grade-I
Detail

Rate Analysis for 1250 Cft


MATERIAL
Add 100% to the rate on item No. 12 (a) (i)
LABOUR
Add 100% to the rate on item No. 12 (a) (i)
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum
DESCRIPTION OF ITEM:
Item No. 12 (b)

ii)

Excavation in hard rock requiring blasting, but blasting pr


disposal of excavated material within 50 ft. (15 metre) lea
dressing and levelling to designed section etc., complete).
Grade-II
Detail

Rate Analysis for 1250 Cft


MATERIAL
Add 100% to the rate on item No. 12 (a) (ii)
LABOUR
Add 100% to the rate on item No. 12 (a) (ii)
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 28

g blasting, but blasting prohibited, and


ithin 50 ft. (15 metre) lead (including
ed section etc., complete.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rs.
Rs.
Rs.
Rs.

0.01

Say
Say
Say
Say

g blasting, but blasting prohibited, and


ithin 50 ft. (15 metre) lead (including
ed section etc., complete).

Unit Rate (British System) per 1000 Cft


Qty
Rate Per Unit
Amount (Rs.)

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12 (b)
Excavation in hard rock requiring blasting, but blasting pr
disposal of excavated material within 50 ft. (15 metre) lea
dressing and levelling to designed section etc., complete.
iii)
Grade-III
Detail

Rate Analysis for 1250 Cft


MATERIAL
Add 100% to the rate on item No. 12 (a) (iii)
LABOUR
Add 100% to the rate on item No. 12 (a) (iii)
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

DESCRIPTION OF ITEM:
Item No. 12 (b)
Excavation in hard rock requiring blasting, but blasting pr
disposal of excavated material within 50 ft. (15 metre) lea
dressing and levelling to designed section etc., complete.
iv)
Grade-IV
Detail

Rate Analysis for 1250 Cft


MATERIAL
Add 100% to the rate on item No. 12 (a) (iv)
LABOUR
Add 100% to the rate on item No. 12 (a) (iv)
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 29

g blasting, but blasting prohibited, and


ithin 50 ft. (15 metre) lead (including
ed section etc., complete.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

g blasting, but blasting prohibited, and


ithin 50 ft. (15 metre) lead (including
ed section etc., complete.

Unit Rate (British System) per 1000 Cft


Qty

Rs.
Rs.
Rs.
Rs.

Rate Per Unit

Amount (Rs.)

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12 (b)
Excavation in hard rock requiring blasting, but blasting pr
disposal of excavated material within 50 ft. (15 metre) lea
dressing and levelling to designed section etc., complete.
v)
Grade-V
Detail

Rate Analysis for 1250 Cft


MATERIAL
Add 100% to the rate on item No. 12 (a) (v)
LABOUR
Add 100% to the rate on item No. 12 (a) (v)
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

DESCRIPTION OF ITEM:
Item No. 12 (b)
Excavation in hard rock requiring blasting, but blasting pr
disposal of excavated material within 50 ft. (15 metre) lea
dressing and levelling to designed section etc., complete.
vi)
Grade-VI
Detail

Rate Analysis for 1250 Cft


MATERIAL
Add 100% to the rate on item No. 12 (a) (vi)
LABOUR
Add 100% to the rate on item No. 12 (a) (iv)
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 30

g blasting, but blasting prohibited, and


ithin 50 ft. (15 metre) lead (including
ed section etc., complete.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

g blasting, but blasting prohibited, and


ithin 50 ft. (15 metre) lead (including
ed section etc., complete.

Unit Rate (British System) per 1000 Cft


Qty

Rs.
Rs.
Rs.
Rs.

Rate Per Unit

Amount (Rs.)

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Rehandling of Earth Work


a)

Lead upto a single throw of Kassi, Phaorah or Sh

Detail

Rate Analysis for 1250 Cft


LABOUR
1
Sundries

Coolies un-skilled
Total
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 13
b)

Rehandling of Earth Work


Upto a lead of 50 ft. (15 metre)

Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Cooly un-skilled for filling


Coolies un-skilled for carrying
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Page 31

ow of Kassi, Phaorah or Shovel.

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

2.50 No.

per day

Rs.
Rs.

Say
Say

(15 metre)

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

1.50 No.
2.00 No.

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 14

Rehandling of gravel work or excavated rock, lea


Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Cooly un-skilled for filling


Coolies un-skilled for carrying
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 15
i)

Filling watering and ramming earth under floors.


With surplus earth from foundation etc.

Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3
4

Coolies un-skilled for ramming


Coolies un-skilled for carrying
Dresser earth work
Bahishti
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Page 32

ork or excavated rock, lead upto 50 ft. (15 metre).


Unit Rate (British System) per 1000 Cft
Qty

Rate Per U Amount (Rs.)

4.00 Nos. per day


6.00 Nos. per day

Rs.
Rs.

Say
Say

amming earth under floors.

m foundation etc.

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

1.50
2.00
1.00
0.50

Rs.
Rs.

Nos.
Nos.
No.
No.

per
per
per
per

Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 15
ii)

Filling, watering and ramming earth under floors

With new earth excavated from outside, lead upto

Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3
4
5

Diggers
Carrier
Dresser
Rammer Cooly un-skilled
Bahishti
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 33

ramming earth under floors.

ed from outside, lead upto one chain (30 metre).

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

4.00
2.58
1.00
1.50
0.50

Rs.
Rs.

Nos.
Nos.
No.
Nos.
No.

per
per
per
per
per

Say
Say

day
day
day
day
day

DESCRIPTION OF ITEM:
Item No. 16

Extra for every 50 ft. (15 metre) addi

i)
For earth work soft, ordinary, hard an
I) Earth work excavation in ashes sand soft soil
By means of donkey labour.
Detail

Actual expenses of 4 No. belchas


LABOUR on monthly basis (for 30 days)
(a)

(b)
(c)
i)

28 men detailed as below Kharkar (owner)


Belcha men for excavation
Gantiman (with pick axes)
Topalies (men with donkeys for carrying earth)
Langri (Cooks)
Chowkidars
Dobashi (man for supervision)
Total
Exenditure per day
0
30
Jamadari commission for supplying labour on Rs.
0.00 @ 6%
Food etc as under
One seer Atta per man daily for 28 men

ii)

Kitchen expenses (tea meat, milk,


fuel, fat & aplienees)
iii) Lantern, Patromax lamp depreciation
and K. oil consumption
iv)
Kitchen Utensil, cost of repair and
replacement etc.
Total: = a + b + c =
II - i)Donkeys
28 Nos. Donkeys worker 500 ft. lead in belcha
7 No. Donkey in each belcha
Average working life of one donkey
6 years
Average cost price of one donkey
=
After depriceation cost of one donkey =
Amount per day
28 x 0
=
6 x 365
Say
ii)
Food etc as under for 28 donkeys
Phak, 5 seers (4.67 kg) per day per donkey
= 28 x 5
=
40
Grams, 2 seers (0.933 x 2) = 1.866 kg per donkey
Per day
28 x 2
40

Total-II
iii) Material
The following articles are required:
a) 4 No. pick axes and 8 Nos. belchas
cost of repairs and replacement
b) Sharpening expenses for pick axes
and belchas 12 No.
c) Palana with namda complete for one donckey
Rs.300 average life 4 months. Hence cost per
day
28 x 0
=
4 x 30
d) 2 sacks daily consumption repairs and
Page 34

very 50 ft. (15 metre) additional lead or part thereof.

ork soft, ordinary, hard and very hard.


on in ashes sand soft soil or silt lead 500 ft. (150 me
donkey labour.
Unit Rate (British System) per 1000 Cft
Qty

Rate Per U Amount (Rs.)

1.00 No.
8.00 Nos.
4.00 Nos.
10.00 Nos.
2.00 Nos.
2.00 Nos.
1.00 No.

per
per
per
per
per
per
per

month
month
month
month
month
month
month

28.00 seer per kg


26.12 kg

L.S.

L.S.

L.S.

0.0

0.0
0.0
0.0
-

3.50 mds

3.50 mds

per Md

1.40 mds

1.40 mds

per Md

0.00 per day


12.00 No. each

0.0

iv)

(v)

replacement etc.
e) Sutli consumption
Total - III
Comp. Equipment
a) 4 No. tents are used for labour of
4 belchas, cost of one tent Rs.
Average life 12 month
Hence cost per day
4
x 0
365
b) Dondky hut expenditure = 2500/Average lift of hut = 6 months
Cost per day
0
6x3 0
Total - IV
Medical Expenditure
For 28 men and 28 donkey
Grand Total I + II + III + IV + V
Contractor's Profit &#####
Percent
Total
Hence cost per belcha

0
4

i) Progress per belcha in ashes sand, soft soil or


silt = 1650 Cft and lead 500 ft.
Rate for 1000 Cft
0.00 x 1000
1650
Rate for 1000 Cft lead 50 ft. (as per item No.2)
of this Chapter
Difference for 450 = 0.00 - 0.00
Rate for 50 ft. lead
0.0
9
ii) Progress per belcha in ordinary soil =
Rate for 1000 Cft lead 500 ft.
0.00 x 1000
1260
Rate for 1000 Cft lead 50' as per item No. (10-i) SR
of this Chapter
Difference for lead 40.00 - 0.00
Rate for 50 ft. lead
0.0
9
Rate for every 50 ft. add lead or a part thereof
iii) Progress per belcha in hard soil 1150 Cft
Rate for 1000 Cft lead 500 ft.
0.00 x 1000
=
1150
Rate for 1000 Cft lead 50 ft.
(as per item No.10-ii of the Chapter
Difference for lead 40.00 - 0.00
=
Rate for 50 ft. lead
0.0
=
9

Rate for every 50 ft. Addl. lead or thereof


iv) Progress per belcha in very hard soil 990 Cft
Rate for 1000 Cft lead 500 ft.
0.00 x 1000
=
990
Rate for 1000 Cft lead 50 ft.
(as per item No.10-iii) of this Chapter
Difference for lead0.00 - 0.00
=
Rate for 50 ft. lead
0.0
Page 35

2.00 Nos.
0.6 Kg.
-

0.0

each
P. Kg.

per day

Total - V

0.0
0.0
1260 Cft
0.0

0.0
0.0
0.0

0.0

0.0
0.0

0.0

0.0
0.0

9
Rate for eveyr 50 ft. Add. lead or part thereof
i)
For earth work. Soft, ordifnary, hard and very hard
Extra lead for every 50 ft. or part thereof
(as per detail above i - iv)
Total
Average rate
Vi + Vii + Viii + Viv 0.00
Labour rate per 1000 Cft
= 0.00
(i) (iFor gravel, shingle or rock extra labour required
for 1000 Cft. The carriage of spoil from these
formalities over and above that required for soil
is 20%

Stat

0.00 x 20
100
0.00 + 0.0

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

0.0
0.0

Page 36

This rate shall apply to


lead upto mile when
the lead is more than
mile lead shall be
paid as carriage of
material by
mechanical mean.
-

Rs.
Rs.

0.0 -

DESCRIPTION OF ITEM:
Item No. 17
Transportation of earth all types when the total distance,
covered in the item of work, is more than 1000 ft.
(a)
Upto mile

Detail

Based on item No.1 of Chapter Carriage


Rate of Ist chain of 100 ft.
=
Rate of 2nd chain of 100 ft.
=
Rate of 3rd chain to 10th chain
@ Rs.
per Chain for 8 chains
=
Rate of 1000 to 1320 ft. ( mile)
@ Rs.26.30 per 1000 ft. (26.30 1000 x 400)
Total rate for mile
Deduct rate of Ist chain already included
in the item of earth work
=
Rate of mile for 100 Cft
Rate of mile for 1000 Cft = (36.77 x 10)
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 17 (b)
For every 330 ft. additional lead or part-thereof, beyond

Detail

Rate of Ist mile of 100 Cft


Rate of Ist mile of 1000 Cft (129.55 x 10) =
Deduct rate of mile as per item 17(a)
=
Net rate for mile upto one mile
=
Rate for 330 ft.:
5280 - 1320
= 12
330
12
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Page 37

s when the total distance, including the l


more than 1000 ft.

Unit Rate (British System) per 1000 Cft


Qty
Rate Per Unit
Amount (Rs.)

Rs.
Rs.

Say
0 Say

d or part-thereof, beyond mile upto one m

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)
-

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 17 (c)

For every mile additional lead or part thereof

Detail

Rate of 2nd mile


as per item 1 of
Rate of 2nd mile
Rate for every
ITEM RATES

for 100 Cft


chapter Carriage
per 1000 Cft =
(25.75 x 10) =
mile (257.50 4)

=
=
=

Labour rate per 1000 Cft


Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 17 (d)

For every mile additional lead or part thereof

Detail

mile rate upto 5th mile beyond


one mile for 1000 Cft as per item 17(c)
=
Rate reduced as per percentage
=
calculated between the rates
of item 17(c) and 17(d) of CSR-1979
15 - 10.25 =
75 x 100 =
15
Reduction in rate = 64.40 x 31.67% =
Thus rate for every mile additional lead
beyond 5 miles
(64.40 - 20.40) =
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Page 38

ional lead or part thereof, beyond one mile upto 5 m

Unit Rate (British System) per 1000 Cft


Qty
Rate Per Unit
Amount (Rs.)

Rs.
Rs.

Say
Say

ional lead or part thereof, beyond 5 miles.

Unit Rate (British System) per 1000 Cft


Qty
Rate Per Unit
Amount (Rs.)

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 18
a)

Dressing and levelling of earth work to designed


Ashes, Sand, Silt or Soft Soil.

Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Dresser
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 18
b)

Dressing and levelling of earth work to designed


Ordinary or hard soil.

Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Dresser
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 39

of earth work to designed section etc., complete:

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

0.20 No.
0.12 No.

per day
per day

Rs.
Rs.

Say
Say

of earth work to designed section etc., complete:

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

0.50 No.
0.12 No.

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 18
c)

Dressing and levelling of earth work to designed

Gravel work or soft rock not requiring blasting.


Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Quarryman for dressing


Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 19

Dowel dressing.

Detail

Rate Analysis for 150 Rft


LABOUR
1
2

Dresser
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 150 Rft
Rate per 100 Rft

ITEM RATES
Labour rate per Chain
Labour rate per R.M

Percent
Percent

Page 40

of earth work to designed section etc., complete:

ck not requiring blasting.


Unit Rate (British System) per 1000 Cft
Qty
Rate Per U Amount (Rs.)

1.00 No.
0.50 No.

per day
per day

Rs.
Rs.

Say
Say

Unit Rate (British System) per Chain


Qty
Rate Per U Amount (Rs.)

0.25 No.
0.10 No.

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 20 (a)

Dressing Slopes of banks or ground surface.


Detail

Rate Analysis for 1250 Sft


LABOUR
1
2

Dresser
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Sft

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
DESCRIPTION OF ITEM:
Item No. 20 (b)

Dressing of earth work (done by Machinery or oth


to designed section.

Detail

Rate Analysis for 1600 Sft


LABOUR
1
2

Dresser
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1600 Sft

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Percent
Percent

Page 41

ks or ground surface.
Unit Rate (British System) per 1000 Sft
Qty

Rate Per U Amount (Rs.)

1.00 No.
0.30 No.

per day
per day

Rs.
Rs.

Say
Say

(done by Machinery or otherwise and left undressed)

Unit Rate (British System) per 100 Sft


Qty
Rate Per U Amount (Rs.)

1.00 No.
per day
2.00 Nos. per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 21

a)

Excavation in foundation of building, bridges an


including dag belling, dressing refilling around
earth, watering and ramming, lead upto one chain
5 ft. (1.5 metre).
In sand, ashes or loose soil.
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies un-skilled for digging & refilling


Coolies un-skilled for carrying earth
Dresser
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 21

b)

Excavation in foundation of building, bridges an


including dag belling, dressing refilling around
earth, watering and ramming, lead upto one chain
5 ft. (1.5 metre).
In ordinary soil.
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies un-skilled for digging & refilling


Coolies un-skilled for carrying earth
Dresser
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Page 42

on of building, bridges and other structures,


dressing refilling around structure with excavated
mming, lead upto one chain (30 metre) and lift upto

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

5.00 Nos. per day


3.00 Nos. per day
1.00 No.
per day

Rs.
Rs.

Say
Say

on of building, bridges and other structures,


dressing refilling around structure with excavated
mming, lead upto one chain (30 metre) and lift upto

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

6.00 Nos. per day


3.00 Nos. per day
1.50 No.
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 21

c)

Excavation in foundation of building, bridges an


including dag belling, dressing refilling around
earth, watering and ramming, lead upto one chain
5 ft. (1.5 metre).
In hard soil or soft murum.

Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies un-skilled for digging & refilling


Coolies un-skilled for carrying earth
Dresser
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 43

on of building, bridges and other structures,


dressing refilling around structure with excavated
mming, lead upto one chain (30 metre) and lift upto

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

7.00 Nos. per day


3.00 Nos. per day
1.75 No.
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 22

Cutting hard rock such as granite, ballast hard


with chisels and lammers for small foundations.
Detail

Rate Analysis for 1250 Cft


MATERIAL
1

Steel

Charcoal
Total
Contractor's Profit &#####
Total

Percent

LABOUR
1
2
3
4

Hammerman 4 No. for 7 days


Skilled Coolies 4 No. for 7 days
Black smith 1 No. for 7 days
Cooly un-skilled for carrying 1 No. for 7 days
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 44

as granite, ballast hard line, stone or sand stone


rs for small foundations.
Unit Rate (British System) per 1000 Cft
Rate
Qty
Rate Per U Amount (Rs.)

50 Lbs
22.69 kg
500 Lbs
##### kg

kg

kg

28.00 No.
28.00 No.
7.00 No.
7.00 No.

per
per
per
per

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 23

Extra for excavation requiring shoring.


Detail

Rate Analysis for 1250 Cft


METERIAL
1

LABOUR
1
2

Kail Wood for shoring


Total
Contractor's Profit &#####
Total
Cooly un-skilled
Carpenter
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

54
Percent

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum
DESCRIPTION OF ITEM:
Item No. 24
a)

Compaction of earth work (soft, ordinary or hard


Mixing, moistering earth to optimum moister cont
compaction etc. complete.
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Cooly un-skilled
Bahishti
Dresser earth
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 45

equiring shoring.
Unit Rate (British System) per 1000 Cft
Qty

Rate Per Unit

Amount (Rs.)

0.154 Cft. -

P. Cft.

1.00 No.
0.25 No.

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

rk (soft, ordinary or hard soil)


th to optimum moister content in layer for

Unit Rate (British System) per 1000 Cft


Qty
Rate Per Unit

0.12 No.
0.30 No.
0.75 No.

Rs.
Rs.

per day
per day
per day

Amount (Rs.)

Say
Say

DESCRIPTION OF ITEM:
Item No. 24
b)

Compaction of earth work (soft, ordinary or hard

Compaction by rolling with animal driven roller/


i) Soft or sandy soil
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Bullockman
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 24
b)

Compaction of earth work (soft, ordinary or hard


Compaction by rolling with animal driven roller/
ii) Ordinary soil.
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Bullockman
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 46

rk (soft, ordinary or hard soil)

with animal driven roller/hand rammed.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

1.00 No.
0.50 No.

per day
per day

Rs.
Rs.

Say
Say

rk (soft, ordinary or hard soil)


with animal driven roller/hand rammed.

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

1.25 No.
0.50 No.

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 24
b)

Compaction of earth work (soft, ordinary or hard


Compaction by rolling with animal driven roller/
iii) Hard soil.
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Bullockman
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 24
b)

Compaction of earth work (soft, ordinary or hard

Compaction by rolling with animal driven roller/


iv) Admixture of shingle.
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Bullockman
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 47

rk (soft, ordinary or hard soil)


with animal driven roller/hand rammed.

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

1.25 No.
0.75 No.

per day
per day

Rs.
Rs.

Say
Say

rk (soft, ordinary or hard soil)

with animal driven roller/hand rammed.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

1.50 No.
0.75 No.

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 24
c)

Compection of earth work (soft, ordinary or hard


Ramming earthwork (all type of soil)
Detail

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 24
d)

Compaction of earth work (soft, ordinary or hard


Ramming earthwork behind retaining walls.

Detail

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled for watering & ramming


Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Page 48

rk (soft, ordinary or hard soil)


type of soil)
Unit Rate (British System) per 1000 Cft
Qty
Rate Per U Amount (Rs.)

1.50 No.

per day

Rs.
Rs.

Say
Say

rk (soft, ordinary or hard soil)


nd retaining walls.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

2.00 No.

per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 25

i)

Compaction of earthwork with power road roller,


mixing, moistening earth to optimum moisture con
complete.
95% to 100% maximum modified AASHTO dry density.
Detail

Rate Analysis for 1000 Cft


LABOUR
As per item No. 5 (i) of this chapter for machi

Total Rate for 1000 Cft


ITEM RATES
Composite rate per 1000 Cft
Composite rate per Cum

DESCRIPTION OF ITEM:
Item No. 25

ii)

Compaction of earthwork with power road roller,


mixing, moistening earth to optimum moisture con
complete.
90% maximum modified AASHTO dry density.
Detail

Rate Analysis for 1000 Cft


LABOUR
As per item No. 5 (ii) of this chapter for mach
Total Rate for 1000 Cft
ITEM RATES
Composite rate per 1000 Cft
Composite rate per Cum

Page 49

k with power road roller, including ploughing,


th to optimum moisture content in layers etc.

dified AASHTO dry density.


Unit Rate (British System) per 1000 Cft
Qty

Rate Per U Amount (Rs.)

1000 Cft

Cft

Rs.
Rs.

k with power road roller, including ploughing,


th to optimum moisture content in layers etc.

ASHTO dry density.


Unit Rate (British System) per 1000 Cft
Qty
Rate Per U Amount (Rs.)

1000 Cft

Cft

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 25

iii)

Compaction of earthwork with power road roller,


mixing, moistening earth to optimum moisture con
complete.
85% maximum modified AASHTO dry density.
Detail

Rate Analysis for 1000 Cft


LABOUR
As per item No. 5 (iii) of this chapter fo
Total Rate for 1000 Cft
ITEM RATES
Composite rate per 1000 Cft
Composite rate per Cum
DESCRIPTION OF ITEM:
Item No. 26

Extra for wet earth work.


Detail

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled for digging, filling & lifting


Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 50

k with power road roller, including ploughing,


th to optimum moisture content in layers etc.

ASHTO dry density.


Unit Rate (British System) per 1000 Cft
Qty

Rate Per Unit

Amount (Rs.)

1000 Cft

Cft

Rs.
Rs.

Unit Rate (British System) per 1000 Cft


Qty
Rate Per Unit
Amount (Rs.)

3.50 No.

per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 27

Extra for slush or daldal including dewatering.

Detail

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled for digging, filling & lifting


and dewatering
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 28

Extra for puddling.

Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Bahishti
Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 51

dal including dewatering.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

8.00 No.

per day

Rs.
Rs.

Say
Say

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

1.5 per day


4.75 No.
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 29

Earthwork on small rain water drains along canal


plantion drains dressed etc., complete.

Detail

Rate Analysis for 125 Rft


LABOUR
1

Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate fore 125 Rft

Percent
Percent

ITEM RATES
Labour rate per 100 Rft
Labour rate per metre
DESCRIPTION OF ITEM:
Item No. 30

Filling and compacting soil earth and boulders b


(including excavation of soil and lead upto 50 f
Detail

Rate Analysis for 1250 Cft


LABOUR
1
2

Excavation, carriage & filling


Watering and compaction
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 52

n water drains along canal banks roads and


d etc., complete.

Unit Rate (British System) per 100 Rft


Qty
Rate Per Unit
Amount (Rs.)

0.95 No.

per day

Rs.
Rs.

Say
Say

soil earth and boulders behind retaining walls


of soil and lead upto 50 ft. (15 metre).
Unit Rate (British System) per 1000 Cft
Qty

Rate Per Unit

7.00 Nos. per day


2.00 Nos. per day

Amount (Rs.)

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 31

Dag belling 3\" (75 mm) deep.

Detail

Assume 2500 Rft


LABOUR
1

Dresser
Total
Sundries
#####
Total
Contractor's Profit &#####
Total

Percent
Percent

ITEM RATES
Labour rate for 1 Mile
Labour rate for 1 Kilometre
DESCRIPTION OF ITEM:
Item No. 32

Turfing slopes of banks or lawns with grass sods


laying settling and watering (Turf got from with
(8 kilometre) and maintenance for 15 days).

Detail

Rate Analysis for 300 Sft


LABOUR
1
2
3
4

Coolies un-skilled for digging sods


Coolies un-skilled for carrying load 8 km
Laying setting and watering
Watering for 15 days
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 300 Sft

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Page 53

Unit Rate (British System) per Mile


Qty

Rate Per Unit

1.40 Nos. per day

Amount (Rs.)

Rs.
Rs.

Say
Say

s or lawns with grass sods including ploughing


tering (Turf got from within a distance of 5 miles
tenance for 15 days).

Unit Rate (British System) per 100 Sft


Qty
Rate Per Unit
Amount (Rs.)

0.50
1.00
1.00
1.50

Rs.
Rs.

No.
No.
No.
No.

per
per
per
per

day
day
day
day

Say
Say

DESCRIPTION OF ITEM:
Item No. 33
a)

Berm cutting

Lead upto a single throw of Kassi, phaora or sho

Detail

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled for digging including


dag-belling for barrow pits
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 33
b)

Berm cutting

Upto 50 ft. (15 metre) lead (including dressing)

Detail

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies un-skilled for digging filling, dag-belling


Carrying
Dresser (for slopes and load)
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1250 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Page 54

ow of Kassi, phaora or shovel (without dressing).

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

4.50 No.

per day

Rs.
Rs.

Say
Say

lead (including dressing).

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

4.00 Nos. per day


3.00 Nos. per day
1.00 No.
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 34
a)

Berm trimming both sides of channels


Upto 3 ft (1 metre) depth.
Detail

Rate Analysis for 1.5 Miles


LABOUR
1
2

Dresser's earthwork (for dag-belling & dressing)


Coolies un-skilled coolies (for trimming etc.)
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1.5 miles

ITEM RATES
Labour rate for 1 Mile
Labour rate for 1 Kilometre
DESCRIPTION OF ITEM:
Item No. 34
b)

Berm trimming both sides of channels


Exceeding 3 ft. (1 metre) to 5 ft (1.5 metre) d

Detail

Rate Analysis for 1.5 Miles


LABOUR
1
2
3

Dresser's earthwork (for dag-belling & dressing)


Coolies un-skilled
Mate earthwork for supervision
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1.5 Miles

ITEM RATES
Labour rate for 1 Mile
Labour rate for 1 Kilometre

Page 55

es of channels

Unit Rate (British System) per one Mile


Qty
Rate Per Unit
Amount (Rs.)

2.00 Nos. per day


12.00 Nos. per day

Rs.
Rs.

Say
Say

es of channels
tre) to 5 ft (1.5 metre) depth.

Unit Rate (British System) per one Mile


Qty

Rate Per Unit

3.00 Nos. per day


15.50 Nos. per day
1.00 No.
per day

Rs.
Rs.

Amount (Rs.)

Say
Say

DESCRIPTION OF ITEM:
Item No. 34
c)

Berm trimming both sides of channels


Exceeding 5 ft. (1.5 metre) to 8 ft (2.4 metre)
Detail

Rate Analysis for 1.5 Miles


LABOUR
1
2
3

Dresser's earthwork (for dag-belling & dressing)


Coolies un-skilled
Mate earthwork for supervision
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total Rate for 1.5 Miles

ITEM RATES
Labour rate for 1 Mile
Labour rate for 1 Kilometre
DESCRIPTION OF ITEM:
Item No. 35
i)

Ploughing and leveling borrow pits.


Upto 3 ft. (914 mm) depth.
Detail

LABOUR
1
2

Bullockman with pair of bullocks


Coolies un-skilled for leveling
Total
Sundries
#####
Total
Contractor's Profit &#####
Total

ITEM RATES
Labour rate per Acre
Labour rate per Hectare

Percent
Percent

60

Page 56

es of channels

etre) to 8 ft (2.4 metre) depth.


Unit Rate (British System) per one Mile
Qty
Rate Per U Amount (Rs.)

4.00 Nos. per day


25.50 Nos. per day
1.00 No.
per day

Rs.
Rs.

Say
Say

borrow pits.

Unit Rate (British System) per Acre


Qty

Rate Per U Amount (Rs.)

1.00 No.
1.00 No.

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 35
ii)

Ploughing and leveling borrow pits.


Above 3 ft (914 mm) depth.
Detail

LABOUR
1

Double of item No. 35 (i)

0.00

508.2

ITEM RATES
Labour rate per Acre
Labour rate per Hectare

DESCRIPTION OF ITEM:
Item No. 36
(i)

Making boundry or service roads including dag-be


In unploughed land.

a) From 10 ft (3 metre) to 20 ft (6 metre) wide.

Detail

Rate Analysis for 1.5 Chain


LABOUR
1
2

Earth work dresser


Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1.5 Chain

ITEM RATES
Labour rate per Chain
Labour rate per Running Metre

Percent
Percent

Page 57

borrow pits.

Unit Rate (British System) per Acre


Qty
Rate Per Unit
Amount (Rs.)

Acre

Rs.
Rs.

Say
Say

ice roads including dag-belling, levelling & dressing

) to 20 ft (6 metre) wide.

Unit Rate (British System) per Chain


Qty
Rate Per Unit
Amount (Rs.)

0.50 No.
per day
1.00 Nos. per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 36
(i)

Making boundry or service roads including dag-be

In unploughed land.
b) From 20 ft (6 metre) to 40 ft (12 metre) wide
Detail

Unit Rate (British System)

Qty
Rate Analysis for 1.5 Chain
LABOUR
1
2

Earth work dresser


Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1.5 Chains

1.00 No.
1.00 Nos.
Percent
Percent

ITEM RATES
Labour rate per Chain
Labour rate per Running Metre
DESCRIPTION OF ITEM:
Item No. 36
(ii)

Making boundry or service roads including dag-be

In ploughed land.
a) From 10 ft. (3 metre) to 20 ft. (6 metre) wid

Detail

LABOUR
1
2

Rs.
Rs.

Unit Rate (British System)


Qty

as per item No.36 (i)0.00 1.5


Ploughing charges
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total

0.0
0.032 Acre

Labour rate per Chain


Labour rate per Running Metre

Rs.
Rs.

ITEM RATES

Page 58

ice roads including dag-belling, levelling & dressing

) to 40 ft (12 metre) wide.

nit Rate (British System) per Chain


Rate Per U Amount (Rs.)

per day
per day

Say
Say

ice roads including dag-belling, levelling & dressing

e) to 20 ft. (6 metre) wide.

nit Rate (British System) per Chain


Rate Per U Amount (Rs.)

.032 Acre

P.Acre

Say
Say

DESCRIPTION OF ITEM:
Item No. 36
(ii)

Making boundry or service roads including dag-be

In unploughed land.
b) From 20.1 ft. (6.1 metre) to 40 ft. (12 metre
Detail

Unit Rate (British System)


Qty

LABOUR
1
2

as per item No.36 (i)0.00 1.5


Ploughing charges
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total

0.0

ITEM RATES
Labour rate per Chain
Labour rate per Running Metre
DESCRIPTION OF ITEM:
Item No. 37
i)

Rs.
Rs.

Earthwork by boats including hire of boats.

Digging and loading into boats upto 50 ft. (15 m


Detail

Unit Rate (British System)

Qty
Rate Analysis for 1250 Cft
LABOUR
1
2

Coolies un-skilled for digging,


and lifting
Coolies un-skilled for carrying
boats
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

filling in baskets
4.00 No.
and loading in
3.50 No.
Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 59

ice roads including dag-belling, levelling & dressing

metre) to 40 ft. (12 metre) wide.

nit Rate (British System) per Chain


Rate Per Unit

Amount (Rs.)

L.S
-

Say
Say

luding hire of boats.

to boats upto 50 ft. (15 metre) lead.

nit Rate (British System) per 1000 Cft


Rate Per Unit

Amount (Rs.)

per day

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 37
ii)

Earthwork by boats including hire of boats.


Carriage by boat upto 10 chains (300 metres).

Detail
(Capacity of boat 200 Cft 5.66 m)
LABOUR
1
2

15 trips in a day/rate for one trip boatman with


large boats per trip 15 trips in a day
8 No. extra boatmen (0.53 No. per trip)
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total rate for 1 trip (200 Cft
Rate for 5 trips (100 Cft)
58.27 x 5

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 37
iii)

Earthwork by boats including hire of boats.


Extra for every additional one chain (30 metre)
10 chain (300 metre).
Detail

Analysis for 1250 Cft


LABOUR
1
lead.

Extra boatman required for one chain (30 metre)

Total
Sundries
#####
Total
Contractor's Profit &#####
Total rate per 1250 Cft
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 60

luding hire of boats.


10 chains (300 metres).

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)
Cft 5.66 m)

0.07 No.
0.53 No.

per day
per day

Rs.
Rs.

Say
Say

luding hire of boats.


onal one chain (30 metre) or part thereof beyond

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

0.20 No.

per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 37
iv)

Earthwork by boats including hire of boats inclu


Unloading earth from Boats.

Detail

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

DESCRIPTION OF ITEM:
Item No. 38

Unloading earth from B.G. Tracks and clearing 5

Detail

Rate Analysis for 1250 Cft


LABOUR
1

Cooly un-skilled for


(1.5 metre)

unloading and clear 5 ft.

Total
Sundries
#####
Total
Contractor's Profit &#####
Total Rate for 1250 Cft
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 61

luding hire of boats including hire of boats.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

3.50 No.

per day

Rs.
Rs.

Say
Say

.G. Tracks and clearing 5 ft. (1.5 metre) from rail.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

3.00 No.

per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 39

Earthwork by train way, digging and loading in t


lead.
Detail

Analysis for 1250 Cft


LABOUR
1

Cooly un-skilled for digging and loading

Total
Sundries
#####
Total
Contractor's Profit &#####
Total rate for 1250 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 40

Unloading earth from B.G. trucks and spreading u


rail.
Detail

LABOUR
1
2

Cooly un-skilled for unloading


Coolies un-skilled for spreading
Total
Sundries
#####
Total
Contractor's Profit &#####
Total

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Percent
Percent

Page 62

, digging and loading in truck, upto 50 ft. (15 metr

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

7.00 No.

per day

Rs.
Rs.

Say
Say

.G. trucks and spreading upto 15 ft. (4.5 metre) from

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

2.50 Nos. per day


2.00 Nos. per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 41

Supplying clean and screened river or pit sand w

Detail

MATERIAL
1

Royalty
Contractor's Profit &#####
Total

Percent

LABOUR
1

Coolies (for excavation of sand, and


removal of pit earth loading and
screening etc.)
Sundries
#####
Total
Contractor's Profit &#####
Total
TOTAL

Percent
Percent

CARRIAGE
Ist
2nd
3rd
4th

Chain
Chain
Chain
Chain

=
=
=
=

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Page 63

reened river or pit sand within 5 chain (150 metre).

Unit Rate (British System) per 100 Cft


Qty

Rate Per Unit

Amount (Rs.)

100 Cft.

% Cft.

0.424 No. per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 42

(i)

Earth work excavation inopen cutting for sewers


drawing including shuttering and timbering, dres
dimension according to templates and levels and
all types of soil except, shingle gravel and roc
0 ft. to 7.0 ft.
Detail

MATERIAL (For Shutterng 1750 Cft)


1
Vertical planks 26 x 4' x 10\" x 1\"
Can be used 80 times
Per time 10.83 80
=
STRUTS
Wood 26 x 4.75' x 6\" x 3\"
Can be used 100 times
for one time 15.44 100
=
Total
Wastage 5%

(b)
1

(c)
1

0.14 Cft

Ist class sawing charges 0.31 x 10


Nail bolts & nuts

1
2

= 10.83 Cft

15.44 Cft

0.154 Cft
0.294 Cft
0.0147 Cft
0.31 Cft
3.10 Sft

Total
Contractor's Profit &#####
Percent except sawing charges
i.e on Rs.
0.0
Total rate for 1750 Cft
Total rate for 1000 Cft
For excavation coolies un-skilled for 1250 Cft
Dresser
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total rate for 1250 Cft
Labour rate for 1000 Cft
LABOUR for removing surface water 1250 Cft
Cooly un-skilled
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total rate per 1250 Cft
Labour rate per 1000 Cft
LABOUR for shutterng for 1750 Cft
Carpenter

Cooly un-skilled
Page 64

inopen cutting for sewers and manholes as shown in


tering and timbering, dressing to correct section an
templates and levels and removing surface water, in
pt, shingle gravel and rock.

Unit Rate (British System) per 1000 Cft


Qty

Rate Per U Amount (Rs.)

.0147 Cft
0.31 Cft
Cft
3.1 Sft
Sft
0.083 Kg. Per Kg.

ept sawing charges


6.50 Nos. per day
1.00 No.
per day

0.25 Nos. per day

0.10 No.

per day

0.40 No.

per day

Total
Sundries
Total
Contractor's Profit & Ove
Total rate for 1750 Cft
Total rate for 1000 Cft
ITEM RATES
Labour rate for 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

#####

Percent

#####

Percent

Page 65

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 42

(ii)

Earth work excavation in open cutting for sewers


drawing including shuttering and timbering, dres
dimension according to templates and levels and
all types of soil except shingle, gravel and roc
7.01 to 15 ft. (2.1 metre to 4.5 metre).
Detail

Analysis for rate for 2000 Cft


MATERIAL for Shuttering
1
Vertical planks
26 Nos. Ist class kail wood
26 x 8' x 10\" x 1\"
=
21.67 Cft
Can be use 80 times
21.67 80
=
0.27 Cft
2
STRUTS 39 Nos.
Kail wood 39 x 4.75 x 6\" x 3\" =
23.16 Cft
Can be used 100 times
Wood for one time 23.16 100
=
0.23 Cft
Total 1 + 2 = 0.27 + 0.23
=
0.50 Cft
Wastage 5% =
0.03 Cft
0.53 Cft
Sawing charges = 0.53 x 10
=
5.3 Sft
Bolts, nuts & nails
Total
Contractor's Profit &#####
Percent
0.0
(except on sawing charges)
Total
Cost per 1000 Cft 212.69 2
=
0.0
Analysis for 2000 Cft
(a)
LABOUR for Shutterng
1
Carpenter
2
Cooly un-skilled
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total rate for 2000 Cft
Total rate for 1000 Cft

Page 66

in open cutting for sewers and manholes as shown in


tering and timbering, dressing to correct section an
templates and levels and removing surface water, in
pt shingle, gravel and rock.
tre to 4.5 metre).
Unit Rate (British System) per 1000 Cft
Qty
Rate Per U Amount (Rs.)

0.53 Cft
Cft
5.30 Sft
Sft
0.083 Kg. Per Kg.

0.20 No.
0.80 No.

per day
per day

(b)
1
2

(c)

For Excavation 1250 Cft


Coolies un-skilled
Dresser
Total
Sundries
#####
Total
Contractor's Profit &#####
Total rate for 1250 Cft
Total rate for 1000 Cft
Labour For Dewatering
Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Percent
Percent

Percent
Percent

Page 67

12.00 Nos. per day


1.00 No.
per day

0.12 No.

per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 42

(iii)

Earth work excavation in open cutting for sewers


drawing including shuttering and timbering, dres
dimension according to templates and levels and
all types of soil except shingle gravel and rock
Above 15 ft. (4.5 metre) depth.

Detail

Analysis for rate for 2000 Cft


MATERIAL (For Shuttering)
1

STRUTS
2

(a)
1
2

Kail wood vertical plants


26 Nos.
26 x 8' x 10\" x 1\"
=
21.67 Cft
Can be used 80 times
Wood for one time 21.67 80
=
0.27 Cft
39 Nos.
Kail wood 39 x 4.75 x 6\" x 3\" =
23.16 Cft
Can be used 100 times
Kail wood for one time 23.16 100 =
0.23 Cft
Total ( 1 + 2 ) = 0.27 + 0.23 =
0.50 Cft
Wastage (5%)
0.03 Cft
Total
0.53 Cft
Sawing charges 0.53 x 10
=
5.30 Sft
Bolt, nuts & nails
Total
Contractor's Profit &#####
Percent on 189.50 (Except sawing charg
Total rate for 2000 Cft
Cost per 1000 Cft 212.69 2
=
0.0
Analysis for Rate for 2000 Cft
LABOUR (For Shutterng)
Carpenter
Cooly
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total rate for 2000 Cft
Total rate for 1000 Cft

Page 68

in open cutting for sewers and manholes as shown in


tering and timbering, dressing to correct section an
templates and levels and removing surface water, in
pt shingle gravel and rock.
re) depth.

Unit Rate (British System) per 1000 Cft


Qty
Rate Per U Amount (Rs.)

0.53 Cft
Cft
5.30 Sft
Sft
0.083 Kg. Per Kg.

189.50 (Except sawing charges) -

0.20 No.
0.80 No.

per day
per day

(b)
1
2

(c)
1

For Excavation 1250 Cft


Coolies un-skilled
Dresser
Total
Sundries
#####
Total
Contractor's Profit &#####
Total rate for 1250 Cft
Total rate for 1000 Cft
Labour for Dewatering
Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total per 1000 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Percent
Percent

Percent
Percent

Page 69

16.00 No.
1.00 No.

0.12 No.

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 43

(i)

Earth work excavation of trenches in open cuttin


chambers etc. below sub soil water level to corr
according to templates and levels, including sho
shuttering of M.S. Sheets on both sides of the t
0 ft. (0 metre) to 4 ft. (1.2 metre) depth below
Detail

MATERIAL
(i)

M.S. sheet 8' x 4' x \" ft.


For
Excavation
Platform

10 Nos.
2 Nos.
12 Nos.
384 Sft @ 5 lbs1920 lbs

12 x 8' x 4' =
Life = 200 times
For one operation 1920 200
=9.60 lbs
(ii) R.S Joist 4 No. 12' long
4 x 12 = 48 Rft @ 20 lbs/Rft 960 lbs
Life 1500 times
For one operation 960 1500
=0.64 lbs
Total 9.6 + 0.64 =
10.24 lbs 10.24 lbs
(iii) Jhambs
2.00 Nos.
life = 100 time
One opertion = 2 100 =
0.02 No.
(iv) Charakharies complete
(v)
Kail wood first class planks
=10 Nos.
10 x 10' x 10\" x 1\" =
10.41 Cft
Life 20 times
One operation 10.41 20
=
0.520 Cft
(vi) Ballies
16.00 Nos.
16 x 10 x 8\" x 4\"
=
35.55 Cft
Life 200 time
One operation = 35.55 200
= 0.18 Cft
(vii) Struts =
16.00 Nos.
16 x 6.25' x 8\" x 4\" =
22.22 Cft
Life = 100 times
One operation = 22.22 100 = 0.22 Cft
Kail wood first class total 0.52 + 0.18 + 0.22 0.92 Cft
Wastage (5%) = 0.92 + 0.05 0.97 Cft
Sawing charges 0.97 Cft x 10 9.7 Sft
Bolts and nuts
(viii)Manila Rope 1\" 100' long
Life 25 times
One operation = 100 25
= 4.00 Rft

Total
Contractor's Profit &##### % Ex
Total

0
Page 70

of trenches in open cutting for Sewers and manhole


b soil water level to correct section and dimension
and levels, including shoring, timbering and
ets on both sides of the trenches.
t. (1.2 metre) depth below S.S.W.L.
Unit Rate (British System) per 1000 Cft
Qty

Rate Per Unit

Amount (Rs.)

kg

each
each

Cft
Sft
Per Kg.

Rft

4.64 kg

0.02 No.
2.00 Nos.

.22 0.92 Cft


0.97 Cft
9.70 Sft
0.083 Kg. -

4.00 Rft

LABOUR for 1500 Cft


1
Diver sinker
2
Charakhar-man
3
Cooly for pully out
4
Coolies for removing earth
5
Skilled coolies for hammering M.S sheet to
drive and takout
6
Cooly for making platform
7
Carpenter for making shuttering and removing
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total rate per 1500 Cft
Total rate per 1000 Cft
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 71

2.00
4.00
2.00
2.00
2.00

No.
No.
No.
No.
No.

per
per
per
per
per

day
day
day
day
day

0.50 No.
0.25 No.

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 43

(ii)

Earth work excavation of trenches in open cuttin


chambers etc. below sub soil water level to corr
according to templates and levels, including sho
shuttering of M.S. Sheets on both sides of the t
4 ft. to 8 ft. (1.2 metre to 2.4 metre) depth be
Detail

MATERIAL
(I)

M.S. sheet (8' x 4' x \" ft.)


For
Excavation
Plate form

24 x 8' x 4' = 768 Sft @ 5 lbs/Sft


Life = 200 times
One operation 3840 200 =
(ii) R.S. Joist = 4 Nos. 12' long
4 x 12 = 48 Rft @ 20 lbs/Rft
=
Life 1500 times
One operation 960 1500
=
Total

20 Nos.
4 Nos.
24 Nos.
3840 lbs
19.20 lbs
960 lbs
0.64 lbs
19.84 lbs 19.84 lbs

(iii) Jhambs
=
2.00 Nos.
Life = 100 times
One operation 2 100 =
0.02 No.
(iv) Charakharies complete =
2.00 Nos.
(v)
Wooden planks =
10.00 Nos.
Kail wood first class 10 x 10' x 10\" x 1 10.41 Cft
Life 20 times
One operation = 10.41 20
=
0.52 Cft
(vi) Ballies
=
16.00 Nos.
16 x 10' x 8\" x 4\" =
35.55 Cft
Life 200 time
One operation
35.55 200
=
0.18 Cft
(vii) Struts
16.00 Nos.
16 x 6.25' x 8\" x 4\" =
22.22 Cft
Life = 100 times
One operation 22.22 100
=
0.22 Cft
Kail wood Ist class total 0.52 + 0.18 + 0.22 =0.92 Cft
Add 5% wastage
0.05 Cft
0.97 Sft
Sawing charges 0.97 x 10
=
9.7 Sft
Bolts and nuts
(viii)Manila Rope 1\" x 100' long
Life 25 times

One operation 100 25


Total
Contractor's Profit &#####
Total

4.00 Rft
Percent
Page 72

of trenches in open cutting for Sewers and manhole


b soil water level to correct section and dimension
and levels, including shoring, timbering and
ets on both sides of the trenches.
tre to 2.4 metre) depth below SSWL
Unit Rate (British System) per 1000 Cft
Qty

Rate Per Unit

9.84 lbs 19.84 lbs

Amount (Rs.)

kg

0.02 No.
2.00 Nos.

each
each

0.97 Cft

Cft

9.70 Sft
0.083 Kg. -

Sft
Per Kg.

9.00 kg

0.00 Nos.

6.00 Nos.

6.00 Nos.

=0.92 Cft

4.00 Rft

Rft

LABOUR for 1500 Cft


1
2
3
4
5
6
7

Diver sinker
Charakhar-man
Cooly un-skilled for pully out
Coolies un-skilled ramming
Skilled coolies for hammering M.S sheet to
drive and takout
Cooly for making platform
Carpenter for making shuttering and removing
Total
Sundries
#####
Percent
Total
Contractor's Profit &#####
Percent
Total rate per 1500 Cft
Total rate per 1000 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Composite rate per 1000 Cft
Composite rate per Cum

Page 73

2.50
5.00
2.50
2.50
2.50

No.
No.
No.
No.
No.

per
per
per
per
per

day
day
day
day
day

0.63 No.
0.31 No.

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 43

(iii)

Earth work excavation of trenches in o


chambers etc. below sub soil water lev
according to templates and levels, inc
shuttering of M.S. Sheets on both side
Exceeding 2.40 metre depth below SSWL.
Detail

MATERIAL
(i)

M.S. sheet (8' x 4' x \" ft.)


For
Excavation
Plate form

30 x 8' x 4' = 960 Sft @ 5 lbs/Sft =


One sheet for making jaharies
8 x 4 = 32 Sft @ 5lbs/Sft =
Life = 200 times
for one operation 4960 200 =
(ii) For R.S. Joist 4 No.
4 x 12 = 48 Rft @ 20 lbs/foot =
Life = 1500 time
One operation = 960 1500 =
Total (I + II)
24.80 + 0.64 =
(iii) Thambs
=
Life = 100 times
One operation 2 100 =
(iv) Charakharies complete
=
(v)
Wooden planks
=
Kail wood Ist class 10 x 10 x 10\" x 5\"
Life 20 times
One operation 10.41 20
=
(vi) Ballies
=
16 x 10' x 8\" x 4\" =
Life 200 time
One operation 35.55 200
=
(vii) Struts
=
16 x 6.25 x 8\" x 4\" =
Life = 100 times
One operation = 22.22 100
=
0.52 + 0.18 + 0.22
=
Wastage (5%)
Total
Sawing charges 0.97 x 10 =
Bolts and nuts
(viii)Manila Rope 1\" x 100' long

(vi) Cost

of rope
Life 25 times
One operation 100 25
Total
Contractor's Profit &#####
Total Material cost

=
Percent

excavation of trenches in open cutting for Sewers and manhole


c. below sub soil water level to correct section and dimension
o templates and levels, including shoring, timbering and
of M.S. Sheets on both sides of the trenches.
.40 metre depth below SSWL.
Unit Rate (British System) per 1000 Cft
Qty

Rate Per U Amount (Rs.)

26 Nos.
4 Nos.
30 Nos.
4800 lbs
160 lbs
24.80 lbs
960 lbs
0.64 lbs
25.44 lbs 11.54 kg
2.00 Nos.

25.44 lbs

0.02 No.
2.00 Nos.
10.00 Nos.
10.41 Cft

0.02 No.
each
2.00 Nos. each

0.97 Cft
Cft
9.70 Sft
Sft
0.083 Kg. Per Kg.

kg

0.52 Cft
16.00 Nos.
35.55 Cft
0.18 Cft
16.00 Nos.
22.22 Cft
0.22
0.92
0.05
0.97
9.70

Cft
Cft
Cft
Cft
Sft

4.00 Rft

Page 74

4.00 Rft

Per Rft.

LABOUR for 1500 Cft


1.5 times of item No. (43-ii)
Total rate per 1500 Cft
Total rate per 1000 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Page 75

Say
Say

Say
Say

DESCRIPTION OF ITEM:
Item No. 44

Excavation of trenches in all kind of soil excep


pipe lines upto to 5 ft. (1.5 metre) depth from
dressing sides, leveling the beds of trenches to
pits for joints etc. complete in all respects.
Detail

Analysis for 1250 Cft


LABOUR
1
2
3

Coolies for dressing earth


Dewatering the rain
Dresser
Total
Sundries
#####
Total
Contractor's Profit &#####
Total rate per 1250 Cft
Total rate per 1000 Cft

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
DESCRIPTION OF ITEM:
Item No. 45
a)

Cutting and removing trees within a distance of


Upto 2.5 ft. (0.75 metre) girth.
Detail

LABOUR
1
2

Carpenter
Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total

ITEM RATES
Labour rate for each

Percent
Percent

Page 76

in all kind of soil except cutting rock, for water


t. (1.5 metre) depth from ground level including trim
ng the beds of trenches to correct grade and cutting
omplete in all respects.
Unit Rate (British System) per 1000 Cft
Qty
Rate Per U Amount (Rs.)

6.50 No.
0.50 No.
0.50 No.

per day
per day
per day

Rs.
Rs.

Say
Say

rees within a distance of 100 ft. (30 metre).

re) girth.
Unit Rate (British System) for Each
Qty

Rate Per U Amount (Rs.)

0.15 No.
1.00 No.

per day
per day

Rs.

Say

DESCRIPTION OF ITEM:
Item No. 45
(b)

Cutting and removing trees within a distance of


Above 2.5 ft. (0.75 metre) to 6 ft. (1.8 metre)

Detail

LABOUR
1
2

Coolies un-skilled
Carpenter
Total
Sundries
#####
Total
Contractor's Profit &#####
Total

Percent
Percent

ITEM RATES
Labour rate for each
DESCRIPTION OF ITEM:
Item No. 46

Uprooting stump and removing with in 100 ft. (30


(0.61 metre to 1.83 metre) grith.
Detail

LABOUR
1

Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total

ITEM RATES
Labour rate for each

Percent
Percent

Page 77

rees within a distance of 100 ft. (30 metre).

tre) to 6 ft. (1.8 metre) grith.

Unit Rate (British System) for Each


Qty
Rate Per U Amount (Rs.)

2.00 Nos. per day


0.25 No.
per day

Rs.

Say

moving with in 100 ft. (30 metre) from 2\" to 6 ft.


tre) grith.
Unit Rate (British System) for Each
Qty

Rate Per U Amount (Rs.)

1.50 Nos. per day

Rs.

Say

DESCRIPTION OF ITEM:
Item No. 47
(a)

Jungle clearance and removing within 100 ft. (30


Light

Detail

Analysis for 1250 Sft


LABOUR
1

Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total for 1250 Sft

Percent
Percent

ITEM RATES
Labour rate per 1000 Sft
Labour rate per Sqm

DESCRIPTION OF ITEM:
Item No. 47
(b)

Jungle clearance and removing within 100 ft. (30


Thick

Detail

Analysis for 1250 Sft


LABOUR
1

Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total for 1250 Sft

ITEM RATES
Labour rate per 1000 Sft
Labour rate per Sqm

Percent
Percent

Page 78

emoving within 100 ft. (30 metre).

Unit Rate (British System) per 1000 Sft


Qty

Rate Per U Amount (Rs.)

0.25 No.

per day

Rs.
Rs.

Say
Say

emoving within 100 ft. (30 metre).

Unit Rate (British System) per 1000 Sft


Qty
Rate Per U Amount (Rs.)

0.50 No.

per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 48

Up rooting sarkanda growth and disposal within 1

Detail

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled

Total
Sundries
#####
Total
Contractor's Profit &#####
Total for 125 Sft

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
DESCRIPTION OF ITEM:
Item No. 49

Ploughing 3 times

Detail

Assumed for 4.0 Acres


LABOUR
1

Bullock-man
Total
Sundries
#####
Total
Contractor's Profit &#####
Total

ITEM RATES
Labour rate per Acre
Labour rate per Hectar

Percent
Percent

Page 79

owth and disposal within 100 ft. (30 metre).

Unit Rate (British System) per 100 Sft


Qty

Rate Per U Amount (Rs.)

0.12 No.

per day

Rs.
Rs.

Say
Say

Unit Rate (British System) per Acre


Qty
Rate Per U Amount (Rs.)

3.25 Nos. per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 50

Levelling, dressing and making lawns

Detail

Analysis for 150 Sft


LABOUR
1

Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit &#####
Total for 150 Sft

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
DESCRIPTION OF ITEM:
Item No. 51

Turfing lawns (excluding cost of turf).


Detail

Analysis for 150 Sft


LABOUR
1

Mali
Total
Sundries
#####
Total
Contractor's Profit &#####
Total for 150 Sft

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Percent
Percent

Page 80

d making lawns

Unit Rate (British System) per 100 Sft


Qty
Rate Per Unit
Amount (Rs.)

0.60 No.

per day

Rs.
Rs.

Say
Say

ng cost of turf).
Unit Rate (British System) per 100 Sft
Qty
Rate Per Unit
Amount (Rs.)

0.50 No.

per day

Rs.
Rs.

Say
Say

CHAPTER NO. 24

ELECTRIC INSTALLATION
DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for w


boxes, inspection boxes, bends, tees,
(a)

On surface including clamps etc.

(i)

\" dia (15 mm i/d).

Detail

MATERIAL (For 7 Metre)


1 G.I. pipe \" dia (15 mm i/d)
2 Clamp \" dia (15 mm i/d)
3 G.I bend \" dia (15 mm i/d)
4 Gutties
5 Screw 1\" to \" (25 to 20 mm)
6 Inspection box \" dia (15 mm)
7 Cement 0.021 Cft.
8 Sand
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 25 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

## Percent
479.84 7

## Percent
## Percent

Page 1

CHAPTER NO. 24

IC INSTALLATION

erection of G.I pipes for wiring purposes including pul


ection boxes, bends, tees, etc., complete with all spec

including clamps etc.

Unit Rate (Metric System) per Metre


Qty
Rate Per Unit

7.00 metre
10.00 Nos.
1.00 No.
20.00 Nos.
1.50 Dozen
1.00 No.
0.08 Cft.

per mtr.
each
each
dozen
dozen
each
P.
Bag
Per % Cft.

1.00 No.
1.00 No.

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
(a)

On surface including clamps etc.

(ii)

\" dia (20 mm i/d).


Detail

Unit Rate (Metric System) per Metre


Qty

MATERIAL (For 7 Metre)


1 G.I. pipe \" dia (20 mm i/d)
2 G.I bend \" dia (20 mm i/d)
3 Clamp \" dia (20 mm i/d)
4 Gutties
5 Screw 1\" to \" (25 to 20 mm)
6 Inspection box \" dia (20 mm)
7 Cement 0.021 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
626.14 7
LABOUR (For 25 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
10.00 Nos.
20.00 Nos.
1.50 Dozen
1.00 No.
0.08 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 2

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.

lamps etc.

Metric System) per Metre


Rate

Per Unit

per mtr.
each
each
dozen
dozen
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
(a)
(iii)

On surface including clamps etc.


1\" dia (25 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

MATERIAL (For 7 Metre)


1 G.I. pipe 1\" dia (25 mm i/d)
2 G.I bend 1\" dia (25 mm i/d)
3 Clamp 1\" dia (25 mm i/d)
4 Gutties
5 Screw \" to 1\" (25 to 20 mm)
6 Inspection box 1\" dia (25 mm)
7 Cement 0.021 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
897.63 7
LABOUR (For 25 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
10.00 Nos.
20.00 Nos.
1.50 Dozen
1.00 No.
0.08 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 3

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.

lamps etc.

Metric System) per Metre


Rate

Per Unit

per mtr.
each
each
dozen
dozen
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
(a)
(iv)

On surface including clamps etc.


1\" dia (32 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

MATERIAL (For 7 Metre)


1 G.I. pipe 1\" dia (32 mm i/d)
2 Clamp 1\" dia (32 mm i/d)
3 G.I bend 1\" dia (32 mm i/d)
4 M.S. Inspection box 1\" dia (32 mm)
5 Gutties
6 Screw \" to 1\" (25 to 20 mm)
7 Cement 0.021 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
1126.33
LABOUR (For 50 Metre)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
10.00 Nos.
1.00 No.
1.00 No.
20.00 Nos.
1.50 Dozen
0.08 Cft.

2.00 Nos.
3.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 4

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.

lamps etc.

Metric System) per Metre


Rate

Per Unit

per mtr.
each
each
each
dozen
dozen
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 1
(a)

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
On surface including clamps etc.

(v)

1\" dia (40 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

MATERIAL (For 7 Metre)


1 G.I. pipe 1\" dia (40 mm i/d)
2 G.I bend 1\" dia (40 mm i/d)
3 M.S. Inspection box 1\" dia (40 mm)
4 G.I. Clamp 1\" dia (40 mm i/d)
5 Gutties
6 Screw 1 to \" (25 to 20 mm)
7 Cement 0.021 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
1330.43
LABOUR (For 50 Metre)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 Nos.
1.00 No.
10.00 Nos.
20.00 Nos.
1.50 Dozen
0.08 Cft.

0
2.00 No.
3.00 Nos.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 5

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.
lamps etc.

Metric System) per Metre


Rate

Per Unit

per mtr.
each
each
each
dozen
dozen
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
(a)
(vi)

On surface including clamps etc.


2\" dia (50 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

MATERIAL (For 7 Metre)


1 G.I. pipe 2\" dia (50 mm i/d)
2 G.I bend 2\" dia (50 mm i/d)
3 M.S. Inspection box 2\" dia (50 mm)
4 G.I. Clamp 2\" dia (50 mm i/d)
5 Gutties
6 Screw 1 to \" (25 to 20 mm)
7 Cement 0.021 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
1758.85
LABOUR (For 42 Metre)

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
20.00 Nos.
1.50 Dozen

1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

2.00 No.
3.00 Nos.

0.08 Cft.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 6

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.

lamps etc.

Metric System) per Metre


Rate

Per Unit

per mtr.
each
each
each
dozen
dozen
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
(a)
(vii)

On surface including clamps etc.


3\" dia (80 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

MATERIAL (For 7 Metre)


1 G.I. pipe 3\" dia (80 mm i/d)
2 G.I. Clamp 3\" dia (80 mm i/d)
3 M.S. Inspection box 3\" dia (80 mm)
4 G.I bend 3\" dia (80 mm i/d)
5 Gutties
6 Screw 1 to \" (25 to 20 mm)
7 Cement 0.021 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
2949.77
LABOUR (For 33 Metre)

7.00 metre
10.00 Nos.
1.00 No.
1.00 No.
20.00 Nos.
1.50 Dozen

1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

2.00 No.
3.00 Nos.

0.08 Cft.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 7

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.

lamps etc.

Metric System) per Metre


Rate

Per Unit

per mtr.
each
each
each
dozen
dozen
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
(b)
(i)

Recessed in walls, including hooks, cutting, jha


\" dia (15 mm i/d).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 G.I. Pipe \" dia (15 mm i/d)
2 G.I. Bend \" dia (15 mm i/d)
3 Hooks
4 M.S. Inspection box \" dia (15 mm)
5 Cement 0.021 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
442.55 7
LABOUR (For 25 Metre)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00
1.00
8.00
1.00

0.08 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

metre
Nos.
No.
Nos.

Rs.
Rs.
Rs.
Rs.

Page 8

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.

luding hooks, cutting, jharries and repairin

nit Rate (Metric System) per Metre


Rate

Per Unit

Amount (Rs.)

per mtr.
each
each
each
P.

Bag

Per % Cft.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
(b)
(ii)

Recessed in walls, including hooks, cutting, jha


\" dia (20 mm i/d).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 G.I. Pipe \" dia (20 mm i/d)
2 G.I. Bend \" dia (20 mm i/d)
3 Hooks
4 M.S. Inspection box \" dia (20 mm)
5 Cement 0.021 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
564.44 7
LABOUR (For 25 Metre)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00
1.00
7.00
1.00

0.18 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

metre
Nos.
No.
Nos.

Rs.
Rs.
Rs.
Rs.

Page 9

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.

luding hooks, cutting, jharries and repairin

nit Rate (Metric System) per Metre

.00 metre

Rate

Per Unit

per mtr.
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
(b)
(iii)

Recessed in walls, including hooks, cutting, jha


1\" dia (25 mm i/d).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 G.I. Pipe 1\" dia (25 mm i/d)
2 G.I. Bend 1\" dia (25 mm i/d)
3 Hooks
4 M.S. Inspection box 1\" dia (25 mm)
5 Cement 0.052 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
820.19 7
LABOUR (For 24 Metre)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES

7.00
1.00
8.00
1.00

metre
Nos.
No.
Nos.

0.18 Cft.

0
1.00 No.
2.00 Nos.

## Percent
## Percent

Labour rate per Metre


Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 10

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.

luding hooks, cutting, jharries and repairin

nit Rate (Metric System) per Metre

.00 metre

Rate

Per Unit

per mtr.
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
(b)
(iv)

Recessed in walls, including hooks, cutting, jha


1\" dia (32 mm i/d).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 G.I. Pipe 1\" dia (32 mm i/d)
2 G.I. Bend 1\" dia (32 mm i/d)
3 Hooks
4 M.S. Inspection box 1\" dia (32 mm)
5 Cement 0.063 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
1046.69
LABOUR (For 24 Metre)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES

7.00
1.00
8.00
1.00

metre
Nos.
No.
Nos.

0.18 Cft.

0
1.00 No.
2.00 Nos.

## Percent
## Percent

Labour rate per Metre


Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 11

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.

luding hooks, cutting, jharries and repairin

nit Rate (Metric System) per Metre

.00 metre

Rate

Per Unit

per mtr.
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
(b)
(v)

Recessed in walls, including hooks, cutting, jha


1\" dia (40 mm i/d).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 G.I. Pipe 1\" dia (40 mm i/d)
2 G.I. Bend 1\" dia (40 mm i/d)
3 M.S. Inspection box 1\" dia (40 mm i/d)
4 Hooks
5 Cement 0.074 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
1252.99
LABOUR (For 22 Metre)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00
1.00
1.00
8.00

0.20 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

metre
Nos.
No.
Nos.

Rs.
Rs.
Rs.
Rs.

Page 12

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.

luding hooks, cutting, jharries and repairin

nit Rate (Metric System) per Metre

.00 metre

Rate

Per Unit

per mtr.
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
(b)
(vi)

Recessed in walls, including hooks, cutting, jha


2\" dia (50 mm i/d).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 G.I. Pipe 2\" dia (50 mm i/d)
2 G.I. Bend 2\" dia (50 mm i/d)
3 M.S. Inspection box 2\" dia (50 mm i/d)
4 Hooks
5 Cement 0.084 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
1679.21
LABOUR (For 16 Metre)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00
1.00
1.00
8.00

0.24 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

metre
Nos.
No.
Nos.

Rs.
Rs.
Rs.
Rs.

Page 13

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.

luding hooks, cutting, jharries and repairin

nit Rate (Metric System) per Metre

.00 metre

Rate

Per Unit

per mtr.
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 1

Supply and erection of G.I pipes for wiring purp


inspection boxes, bends, tees, etc., complete wi
(b)
(vii)

Recessed in walls, including hooks, cutting, jha


3\" dia (80 mm i/d).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 G.I. Pipe 3\" dia (80 mm i/d)
2 G.I. Bend 3\" dia (80 mm i/d)
3 M.S. Inspection box 3\" dia (80 mm)
4 Hooks
5 G.I. Socket 3\" dia (80 mm)
6 Cement 0.08 Cft.
7 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
2871.23
LABOUR (For 10 Metre)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00
1.00
1.00
8.00
1.00

0.24 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

metre
No.
No.
Nos.
No.

Rs.
Rs.
Rs.
Rs.

Page 14

G.I pipes for wiring purposes including pul


s, tees, etc., complete with all specials.

luding hooks, cutting, jharries and repairin

nit Rate (Metric System) per Metre

.00 metre

Rate

Per Unit

per mtr.
each
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Supply and erection of M.S conduit pipes for wir


boxes, pull boxes, bends, tees, etc., complete
(a)
(i)

On surface, including clamps.


\" dia (16 mm dia).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 M.S. Conduit pipe \" dia (16 mm)
2 M.S. Bend \" dia (16 mm)
3 M.S. Inspection box \" dia (16 mm)
4 Clamps \" dia (16 mm)
5 Screw
6 Gutties
Total
Contractor's Profit & O
## Percent
Total
Material per metre
251.69 7
LABOUR (For 36 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
1.20 Dozen
1.00 Dozen

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 15

M.S conduit pipes for wiring, including ins


ds, tees, etc., complete with all specials.

nit Rate (Metric System) per Metre

.00 metre

0.00 Nos.
.20 Dozen
.00 Dozen

Rate

Per Amount (Rs.)

per mtr.
each
dozen
each
dozen
dozen

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 2

Supply and erection of M.S conduit pipes for wir


boxes, pull boxes, bends, tees, etc., complete
(a)
(ii)

On surface, including clamps.


\" dia (20 mm dia).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 M.S. Conduit pipe \" dia (20 mm)
2 M.S. Bend \" dia (20 mm)
3 M.S. Inspection box \" dia (20 mm)
4 M.S. Clamps \" dia (20 mm)
5 Screw
6 Gutties
7 Cement 0.02 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
325.92 7
LABOUR (For 36 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
1.20 Dozen
1.00 Dozen
0.06 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 16

M.S conduit pipes for wiring, including ins


ds, tees, etc., complete with all specials.

nit Rate (Metric System) per Metre

.00 metre

0.00 Nos.
.20 Dozen
.00 Dozen

Rate

Per Unit

per mtr.
each
per doz.
each
dozen
dozen
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Supply and erection of M.S conduit pipes for wir


boxes, pull boxes, bends, tees, etc., complete
(a)
(iii)

On surface, including clamps.


1\" dia (25 mm dia).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 M.S. Conduit pipe 1\" dia (25 mm)
2 M.S. Bend 1\" dia (25 mm)
3 M.S. Inspection box 1\" dia (25 mm)
4 M.S. Clamps 1\" dia (25 mm)
5 Screw
6 Gutties
7 Cement 0.042 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
334.40 7
LABOUR (For 36 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
1.20 Dozen
1.00 Dozen
0.12 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 17

M.S conduit pipes for wiring, including ins


ds, tees, etc., complete with all specials.

nit Rate (Metric System) per Metre

.00 metre

0.00 Nos.
.20 Dozen
.00 Dozen

Rate

Per Unit

per mtr.
each
per doz.
each
dozen
dozen
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Supply and erection of M.S conduit pipes for wir


boxes, pull boxes, bends, tees, etc., complete
(a)
(iv)

On surface, including clamps.


1\" dia (32 mm dia).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 M.S. Conduit pipe 1\" dia (32 mm)
2 M.S. Conduit Bend 1\" dia (32 mm)
3 M.S. Inspection box 1\" dia (32 mm)
4 M.S. Clamps 1\" dia (32 mm)
5 Screw
6 Gutties
7 Cement 0.042 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
572.62 7
LABOUR (For 36 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
1.20 Dozen
1.00 Dozen
0.12 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 18

M.S conduit pipes for wiring, including ins


ds, tees, etc., complete with all specials.

nit Rate (Metric System) per Metre

.00 metre

0.00 Nos.
.20 Dozen
.00 Dozen

Rate

Per Unit

per mtr.
each
per doz.
each
dozen
dozen
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Supply and erection of M.S conduit pipes for wir


boxes, pull boxes, bends, tees, etc., complete
(a)
(v)

On surface, including clamps.


1\" dia (40 mm dia).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 M.S. Conduit pipe 1\" dia (40 mm)
2 M.S. Bend 1\" dia (40 mm)
3 M.S. Inspection box 1\" dia (40 mm)
4 M.S. Clamps 1\" dia (40 mm)
5 Screw
6 Gutties
7 Cement 0.042 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
652.76 7
LABOUR (For 32 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
1.20 Dozen
1.00 Dozen
0.12 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 19

M.S conduit pipes for wiring, including ins


ds, tees, etc., complete with all specials.

nit Rate (Metric System) per Metre

.00 metre

0.00 Nos.
.20 Dozen
.00 Dozen

Rate

Per Unit

per mtr.
each
per doz.
each
dozen
dozen
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Supply and erection of M.S conduit pipes for wir


boxes, pull boxes, bends, tees, etc., complete
(a)
(vi)

On surface, including clamps.


2\" dia (50 mm dia).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 M.S. Conduit pipe 2\" dia (50 mm)
2 M.S. Conduit Bend 2\" dia (50 mm)
3 M.S. Inspection box 2\" dia (50 mm)
4 M.S. Clamps 2\" dia (50 mm)
5 Screw
6 Gutties
7 Cement 0.042 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
822.43 7
LABOUR (For 26 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
1.20 Dozen
1.00 Dozen
0.12 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 20

M.S conduit pipes for wiring, including ins


ds, tees, etc., complete with all specials.

nit Rate (Metric System) per Metre

.00 metre

0.00 Nos.
.20 Dozen
.00 Dozen

Rate

Per Unit

per mtr.
each
per doz.
each
dozen
dozen
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Supply and erection of M.S conduit pipes for wir


boxes, pull boxes, bends, tees, etc., complete
(b)
(i)

Recessed in walls including cutting, jharries, c


surface etc.
\" dia (16 mm dia).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 M.S. Conduit pipe \" dia (16 mm)
2 M.S. Bend \" dia (16 mm)
3 M.S. Inspection box \" dia (16 mm)
4 M.S. Hooks
5 Cement 0.021 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
247.29 7
LABOUR (For 28 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
0.08 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 21

M.S conduit pipes for wiring, including ins


ds, tees, etc., complete with all specials.

uding cutting, jharries, cost of hooks and r

nit Rate (Metric System) per Metre

.00 metre

0.00 Nos.

Rate

Per Unit

per mtr.
each
per doz.
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Supply and erection of M.S conduit pipes for wir


boxes, pull boxes, bends, tees, etc., complete
(b)
(ii)

Recessed in walls including cutting, jharries, c


surface etc.
\" dia (20 mm dia).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 M.S. Condict pipe \" dia (20 mm)
2 M.S. Bend \" dia (20 mm)
3 M.S. Inspection box \" dia (20 mm)
4 M.S. Hooks
5 Cement 0.042 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
310.12 7
LABOUR (For 28 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
0.12 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 22

M.S conduit pipes for wiring, including ins


ds, tees, etc., complete with all specials.

uding cutting, jharries, cost of hooks and r

nit Rate (Metric System) per Metre

.00 metre

0.00 Nos.

Rate

Per Unit

per mtr.
each
per doz.
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Supply and erection of M.S conduit pipes for wir


boxes, pull boxes, bends, tees, etc., complete
(b)
(iii)

Recessed in walls including cutting, jharries, c


surface etc.
1\" dia (25 mm dia).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 M.S. Conduit pipe 1\" dia (25 mm)
2 M.S. Bend 1\" dia (25 mm)
3 M.S. Inspection box 1\" dia (25 mm)
4 Hooks
5 Cement 0.052 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
385.81 7
LABOUR (For 25 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
0.18 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 23

M.S conduit pipes for wiring, including ins


ds, tees, etc., complete with all specials.

uding cutting, jharries, cost of hooks and r

nit Rate (Metric System) per Metre

.00 metre

0.00 Nos.

Rate

Per Unit

per mtr.
each
per doz.
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Supply and erection of M.S conduit pipes for wir


boxes, pull boxes, bends, tees, etc., complete
(b)
(iv)

Recessed in walls including cutting, jharries, c


surface etc.
1\" dia (32 mm dia).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 M.S. Conduit pipe 1\" dia (32 mm)
2 M.S. Conduit Bend 1\" dia (32 mm)
3 M.S. Inspection box 1\" dia (32 mm)
4 M.S. Hooks
5 Cement 0.063 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
524.22 7
LABOUR (For 24 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
0.18 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 24

M.S conduit pipes for wiring, including ins


ds, tees, etc., complete with all specials.

uding cutting, jharries, cost of hooks and r

nit Rate (Metric System) per Metre

.00 metre

0.00 Nos.

Rate

Per Unit

per mtr.
each
per doz.
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Supply and erection of M.S conduit pipes for wir


boxes, pull boxes, bends, tees, etc., complete
(b)
(v)

Recessed in walls including cutting, jharries, c


surface etc.
1\" dia (40 mm dia).

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 M.S. Conduit pipe 1\" dia (40 mm)
2 M.S. Conduit Bend 1\" dia (40 mm)
3 M.S. Inspection box 1\" dia (40 mm)
4 M.S. Hooks
5 Cement 0.074 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
606.56 7
LABOUR (For 23 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
0.20 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 25

M.S conduit pipes for wiring, including ins


ds, tees, etc., complete with all specials.

uding cutting, jharries, cost of hooks and r

nit Rate (Metric System) per Metre

.00 metre

0.00 Nos.

Rate

Per Unit

per mtr.
each
per doz.
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Supply and erection of M.S conduit pipes for wir


boxes, pull boxes, bends, tees, etc., complete
(b)

Recessed in walls including cutting, jharries, c


surface etc.

(vi)

2\" dia (50 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 M.S. Conduit pipe 2\" dia (50 mm)
2 M.S. Conduit Bend 2\" dia (50 mm)
3 M.S. Inspection box 2\" dia (50 mm)
4 Hooks
5 Cement 0.084 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
778.43 7
LABOUR (For 22 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

7.00 metre
1.00 No.
1.00 No.
10.00 Nos.
0.24 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 26

M.S conduit pipes for wiring, including ins


ds, tees, etc., complete with all specials.

uding cutting, jharries, cost of hooks and r

nit Rate (Metric System) per Metre

.00 metre

0.00 Nos.

Rate

Per Unit

per mtr.
each
per doz.
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3

Supply and erection of P.V.C pipe for wiring pur


including inspection boxes, pull boxes, hooks, c
repairing surface etc., complete with all specia
(i)

\" dia (12 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC pipe \" dia (12 mm)
2 PVC Bend \" dia (12 mm)
3 M.S. Hook
4 PVC Inspection box \" (12 mm)
5 Cement 0.042 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
129.43 1
LABOUR (For 31 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 No.
10.00 No.
2.00 Nos.
0.12 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 27

P.V.C pipe for wiring purposes recessed in


oxes, pull boxes, hooks, cutting, jharriers
, complete with all specials.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Unit

per mtr.
each
each
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3

Supply and erection of P.V.C pipe for wiring pur


including inspection boxes, pull boxes, hooks, c
repairing surface etc., complete with all specia
(ii)

\" dia (20 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC pipe \" dia (20 mm)
2 PVC Bend \" dia (20 mm)
3 M.S. Hook
4 PVC Inspection box \" dia (20 mm)
5 Cement 0.052 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
163.53 1
LABOUR (For 30 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 No.
10.00 No.
2.00 Nos.
0.18 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 28

P.V.C pipe for wiring purposes recessed in


oxes, pull boxes, hooks, cutting, jharriers
, complete with all specials.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Unit

per mtr.
each
each
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3

Supply and erection of P.V.C pipe for wiring pur


including inspection boxes, pull boxes, hooks, c
repairing surface etc., complete with all specia
(iii)

1\" dia (25 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC pipe 1\" dia (25 mm)
2 PVC Bend 1\" dia (25 mm)
3 M.S. Hook
4 PVC Inspection box 1\" dia (25 mm)
5 Cement 0.063 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
235.03 1
LABOUR (For 27 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 No.
10.00 No.
2.00 Nos.
0.18 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 29

P.V.C pipe for wiring purposes recessed in


oxes, pull boxes, hooks, cutting, jharriers
, complete with all specials.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Unit

per mtr.
each
each
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3

Supply and erection of P.V.C pipe for wiring pur


including inspection boxes, pull boxes, hooks, c
repairing surface etc., complete with all specia
(iv)

1\" dia (30 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC pipe 1\" dia (30 mm)
2 PVC Bend 1\" dia (30 mm)
3 M.S. Hook
4 PVC Inspection box 1\" dia (30 mm)
5 Cement 0.065 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
228.053 1
LABOUR (For 25 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 No.
10.00 No.
2.00 Nos.
0.37 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 30

P.V.C pipe for wiring purposes recessed in


oxes, pull boxes, hooks, cutting, jharriers
, complete with all specials.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Unit

per mtr.
each
each
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3

Supply and erection of P.V.C pipe for wiring pur


including inspection boxes, pull boxes, hooks, c
repairing surface etc., complete with all specia
(v)

1\" dia (40 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC pipe 1\" dia (40 mm)
2 PVC Bend 1\" dia (40 mm)
3 M.S. Hook
4 PVC Inspection box 1\" dia (40 mm)
5 Cement 0.070 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
454.67 1
LABOUR (For 24 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 No.
10.00 No.
2.00 Nos.
0.40 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 31

P.V.C pipe for wiring purposes recessed in


oxes, pull boxes, hooks, cutting, jharriers
, complete with all specials.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Unit

per mtr.
each
each
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3

Supply and erection of P.V.C pipe for wiring pur


including inspection boxes, pull boxes, hooks, c
repairing surface etc., complete with all specia
(vi)

2\" dia (50 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC pipe 2\" dia (50 mm)
2 PVC Bend 2\" dia (50 mm)
3 M.S. Hook
4 Cement 0.084 Cft.
5 Sand
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 23 Metre)

10.00 metre
2.00 No.
10.00 No.
0.24 Cft.
## Percent
625.35 1

1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES

1.00 No.
2.00 Nos.

## Percent
## Percent

Labour rate per Metre


Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 32

P.V.C pipe for wiring purposes recessed in


oxes, pull boxes, hooks, cutting, jharriers
, complete with all specials.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Unit

per mtr.
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 4

Supply and erection of P.V.C pipe for wiring on


inspection boxes, pull boxes bends, tees repairi
with all specials.
(i)

\" dia (12 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC pipe \" dia (12 mm)
2 PVC Bend \" dia (12 mm)
3 M.S. Clamp/saddle
4 Gutties
5 Screws for \" dia clamp
6 PVC Inspection Box \" dia (12 mm)
7 Cement 0.021 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
176.37 1
LABOUR (For 80 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 Nos.
20.00 Nos.
20.00 Nos.
20.00 Nos.
2.00 Nos.
0.06 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 33

P.V.C pipe for wiring on surface including


boxes bends, tees repairing surface etc.,

nit Rate (Metric System) per Metre

0.00 metre

0.00 Nos.
0.00 Nos.
0.00 Nos.

Rate

Per Unit

per mtr.
each
each
each
per doz.
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 4

Supply and erection of P.V.C pipe for wiring on


inspection boxes, pull boxes bends, tees repairi
with all specials.
(ii)

\" dia (20 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC pipe \" dia (20 mm)
2 PVC Bend \" dia (20 mm)
3 M.S. Clamp \" dia (20 mm)
4 Screws for \" dia clamp
5 PVC Inspection Box \" dia (20 mm)
6 Cement 0.021 Cft.
7 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
186.27 1
LABOUR (For 80 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 Nos.
10.00 Nos.
20.00 Nos.
2.00 Nos.
0.06 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 34

P.V.C pipe for wiring on surface including


boxes bends, tees repairing surface etc.,

nit Rate (Metric System) per Metre

0.00 metre

0.00 Nos.
0.00 Nos.

Rate

Per Unit

per mtr.
each
each
per doz.
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 4

Supply and erection of P.V.C pipe for wiring on


inspection boxes, pull boxes bends, tees repairi
with all specials.
(iii)

1\" dia (25 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC pipe 1\" dia (25 mm)
2 PVC Bend 1\" dia (25 mm)
3 M.S. Clamp/saddle 1 dia (25 mm)
4 Screws for 1\" dia clamp
5 Gutties
6 PVC Inspection Box 1\" dia (25 mm)
7 Cement 0.021 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
347.23 1
LABOUR (For 80 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 Nos.
20.00 Nos.
20.00 Nos.
20.00 Nos.
2.00 Nos.
0.06 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 35

P.V.C pipe for wiring on surface including


boxes bends, tees repairing surface etc.,

nit Rate (Metric System) per Metre

0.00 metre

0.00 Nos.
0.00 Nos.
0.00 Nos.

Rate

Per Unit

per mtr.
each
each
per doz.
per doz.
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 4

Supply and erection of P.V.C pipe for wiring on


inspection boxes, pull boxes bends, tees repairi
with all specials.
(iv)

1\" dia (30 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC pipe 1\" dia (30 mm)
2 PVC Bend 1\" dia (30 mm)
3 M.S. Clamp/saddle 1\" dia (30 mm)
4 Gutties
5 Screws for 1\" dia clamp
6 PVC Inspection Box 1\" dia (30 mm)
Total
Contractor's Profit & O
## Percent
Total
Material per metre
484.73 1
LABOUR (For 70 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 Nos.
20.00 Nos.
20.00 Nos.
20.00 Nos.
2.00 Nos.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 36

P.V.C pipe for wiring on surface including


boxes bends, tees repairing surface etc.,

nit Rate (Metric System) per Metre

0.00 metre

0.00 Nos.
0.00 Nos.
0.00 Nos.

Rate

Per Amount (Rs.)

per mtr.
each
each
per doz.
per doz.
per doz.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 4

Supply and erection of P.V.C pipe for wiring on


inspection boxes, pull boxes bends, tees repairi
with all specials.
(v)

1\" dia (40 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC pipe 1\" dia (40 mm)
2 PVC Bend 1\" dia (40 mm)
3 M.S. Clamp/saddle 1\" dia (40 mm)
4 Gutties
5 Screws for 1\" dia clamp
6 PVC Inspection Box 1\" dia (40 mm)
7 Cement 0.021 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
619.67 1
LABOUR (For 70 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 Nos.
20.00 Nos.
20.00 Nos.
20.00 Nos.
2.00 Nos.
0.06 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 37

P.V.C pipe for wiring on surface including


boxes bends, tees repairing surface etc.,

nit Rate (Metric System) per Metre

0.00 metre

0.00 Nos.
0.00 Nos.
0.00 Nos.

Rate

Per Unit

per mtr.
each
each
per doz.
per doz.
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 4

Supply and erection of P.V.C pipe for wiring on


inspection boxes, pull boxes bends, tees repairi
with all specials.
(vi)

2\" dia (50 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC pipe 2\" dia (50 mm)
2 PVC Bend 2\" dia (50 mm)
3 M.S. Clamp/saddle 2\" dia (50 mm)
4 Gutties
5 Screws for 2\" dia clamp
6 PVC Inspection Box 2\" dia (50 mm)
7 Cement 0.021 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
860.02 1
LABOUR (For 58 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 Nos.
20.00 Nos.
20.00 Nos.
20.00 Nos.
2.00 Nos.
0.06 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 38

P.V.C pipe for wiring on surface including


boxes bends, tees repairing surface etc.,

nit Rate (Metric System) per Metre

0.00 metre

0.00 Nos.
0.00 Nos.
0.00 Nos.

Rate

Per Unit

per mtr.
each
each
per doz.
per doz.
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5

Supply and erection of G.I Flexible pipe for wir


sockets, nipples and check nuts etc complete.
(i)

\" dia (12 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL
1 G.I. Flexible Pipe \" dia (12 mm)
2 Socket \" dia (12 mm)
3 Nipple \" dia (12 mm)
4 Check Nuts \" dia (12 mm)
5 Soldering etc.
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 32 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

1.00 No.
1.00 No.
2.00 joint

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 39

G.I Flexible pipe for wiring including weld


heck nuts etc complete.

nit Rate (Metric System) per Metre


Rate

Per Unit

Amount (Rs.)

per mtr.
each
each
each

per day
per day
per joints

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5

Supply and erection of G.I Flexible pipe for wir


sockets, nipples and check nuts etc complete.
(ii)

\" dia (20 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL
1 G.I. Flexible Pipe \" dia (20 mm)
2 G.I. Socket \" dia (20 mm)
3 G.I. Nipple \" dia (20 mm)
4 Check Nuts \" dia (20 mm)
5 Solder joint
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 30 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

1.00 No.
1.00 No.
2.00 joints

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 40

G.I Flexible pipe for wiring including weld


heck nuts etc complete.

nit Rate (Metric System) per Metre

.00 metre

.00 joints

Rate

Per Amount (Rs.)

per mtr.
each
each
each

per day
per day
per joint

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5

Supply and erection of G.I Flexible pipe for wir


sockets, nipples and check nuts etc complete.
(iii)

1\" dia (25 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL
1 G.I. Flexible Pipe 1\" dia (25 mm)
2 G.I. Socket 1\" dia (25 mm)
3 G.I. Nipple 1\" dia (25 mm)
4 Check Nuts 1\" dia (25 mm)
5 Solder
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 29 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

1.00 No.
1.00 No.
2.00 joints

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 41

G.I Flexible pipe for wiring including weld


heck nuts etc complete.

nit Rate (Metric System) per Metre

.00 metre

.00 joints

Rate

Per Amount (Rs.)

per mtr.
each
each
each

per day
per day
per joints

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5

Supply and erection of G.I Flexible pipe for wir


sockets, nipples and check nuts etc complete.
(iv)

1\" dia (32 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL
1 G.I. Flexible Pipe 1\" dia (32 mm)
2 G.I. Socket 1\" dia (32 mm)
3 G.I. Nipple 1\" dia (32 mm)
4 Check Nuts 1\" dia (32 mm)
5 Solder
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 24 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

1.00 No.
1.00 No.
2.00 joints

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 42

G.I Flexible pipe for wiring including weld


heck nuts etc complete.

nit Rate (Metric System) per Metre

.00 metre

.00 joints

Rate

Per Amount (Rs.)

per mtr.
each
each
each

per day
per day
per joints

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5

Supply and erection of G.I Flexible pipe for wir


sockets, nipples and check nuts etc complete.
(v)

1\" dia (40 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL
1 G.I. Flexible Pipe 1\" dia (40 mm)
2 G.I. Socket 1\" dia (40 mm)
3 G.I. Nipple 1\" dia (40 mm)
4 Check Nuts 1\" dia (40 mm)
5 Solder
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 22 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

1.00 No.
1.00 No.
2.00 joints

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 43

G.I Flexible pipe for wiring including weld


heck nuts etc complete.

nit Rate (Metric System) per Metre

.00 metre

.00 joints

Rate

Per Amount (Rs.)

per mtr.
each
each
each

per day
per day
per joints

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5

Supply and erection of G.I Flexible pipe for wir


sockets, nipples and check nuts etc complete.
(vi)

2\" dia (50 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL
1 G.I. Flexible Pipe 2\" dia (50 mm)
2 G.I. Socket 2\" dia (50 mm)
3 G.I. Nipple 2\" dia (50 mm)
4 Check Nuts 2\" dia (50 mm)
5 Solder
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 20 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

1.00 No.
1.00 No.
2.00 joints

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 44

G.I Flexible pipe for wiring including weld


heck nuts etc complete.

nit Rate (Metric System) per Metre

.00 metre

.00 joints

Rate

Per Amount (Rs.)

per mtr.
each
each
each

per day
per day
per joints

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 5

Supply and erection of G.I Flexible pipe for wir


sockets, nipples and check nuts etc complete.
(vii)

3\" dia (80 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL
1 G.I. Flexible Pipe 3\" dia (80 mm)
2 G.I. Socket 3\" dia (80 mm)
3 G.I. Nipple 3\" dia (80 mm)
4 Check Nuts 3\" dia (80 mm)
5 Solder
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 15 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

1.00 No.
1.00 No.
2.00 joints

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 45

G.I Flexible pipe for wiring including weld


heck nuts etc complete.

nit Rate (Metric System) per Metre

.00 metre

.00 joints

Rate

Per Amount (Rs.)

per mtr.
each
each
each

per day
per day
per joints

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 6

Supply and erection of PVC pipe for recessed wir


purposes including bends special etc., in floor
(i)

2\" dia (50 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC Pipe 2\" dia (50 mm)
2 PVC Bend 2\" dia (50 mm)
3 M.S Hooks
4 PVC Inspection box
5 Cement 0.084 Cft.
6 Sand
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 23 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 Nos.
10.00 Nos.
2.00 Nos.
0.24 Cft.
## Percent
631.22

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 46

PVC pipe for recessed wiring (main and subds special etc., in floor, wall or trenches

nit Rate (Metric System) per Metre

0.00 metre

0.00 Nos.

Rate

Per Unit

per mtr.
each
each
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

Supply and erection of PVC pipe for recessed wir


purposes including bends special etc., in floor
(ii)

3\" dia (80 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC Pipe 3\" dia (75 mm)
2 PVC Bend 3\" dia (75 mm)
3 PVC Inspection box
4 Cement 0.106 Cft.
5 Sand
Total
Contractor's Profit & O
Total
Material per metre

10.00 metre
2.00 Nos.
2.00 Nos.
0.25 Cft.
## Percent
818.58

LABOUR (For 20 Metre)


1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 47

PVC pipe for recessed wiring (main and subds special etc., in floor, wall or trenches

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Unit

per mtr.
each
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

Supply and erection of PVC pipe for recessed wir


purposes including bends special etc., in floor
(iii)

4\" dia (100 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC Pipe 4\" dia (100 mm)
2 PVC Bend 4\" dia (100 mm)
3 PVC Inspection box
4 Cement 0.106 Cft.
5 Sand
Total
Contractor's Profit & O
Total
Material per metre

10.00 metre
2.00 Nos.
2.00 Nos.
0.25 Cft.
## Percent
1141.80

LABOUR (For 20 Metre)


1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 48

PVC pipe for recessed wiring (main and subds special etc., in floor, wall or trenches

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Unit

per mtr.
each
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 7

Supply and erection of PVC pipe for on surface w


including clamps bends etc., complete with all
(i)

2\" dia (50 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC Pipe 2\" dia (50 mm)
2 PVC Bend 2\" dia (50 mm)
3 M.S Clamp
4 PVC Inspection boxes
5 Gutties
6 Cement 0.021 Cft.
7 Sand
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 58 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metr
2.00 Nos.
20.00 Nos.
2.00 Nos.
20.00 Nos.
0.06 Cft.
## Percent
802.27 1

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 49

PVC pipe for on surface wiring (main and su


etc., complete with all specials.

nit Rate (Metric System) per Metre


Rate

Per Unit

per mtr.
each
each
per doz.
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 7

Supply and erection of PVC pipe for on surface w


including clamps bends etc., complete with all
(ii)

3\" dia (80mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC Pipe 3\" dia (75 mm)
2 PVC Bend 3\" dia (75 mm)
3 M.S Clamp
4 PVC Inspection boxes
5 Screws for 3\" dia clamp
6 Gutties
7 Cement 0.042 Cft.
8 Sand
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 40 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 Nos.
20.00 Nos.
2.00 Nos.
40.00 Nos.
40.00 Nos.
0.12 Cft.
## Percent
1155.92

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 50

PVC pipe for on surface wiring (main and su


etc., complete with all specials.

nit Rate (Metric System) per Metre

0.00 metre

0.00 Nos.

0.00 Nos.
0.00 Nos.

Rate

Per Unit

per mtr.
each
each
per doz.
per doz.
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 7

Supply and erection of PVC pipe for on surface w


including clamps bends etc., complete with all
(iii)

4\" dia (100 mm dia).


Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 PVC Pipe 4\" dia (100 mm)
2 PVC Bend 4\" dia (100 mm)
3 M.S Clamp
4 Gutties
5 Screws for 4\" dia clamp
6 PVC Inspection boxes
7 Cement 0.084 Cft.
8 Sand
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 35 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
2.00 Nos.
20.00 Nos.
40.00 Nos.
40.00 Nos.
2.00 Nos.
0.24 Cft.
## Percent
1533.77

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 51

PVC pipe for on surface wiring (main and su


etc., complete with all specials.

nit Rate (Metric System) per Metre

0.00 metre

0.00 Nos.
0.00 Nos.
0.00 Nos.

Rate

Per Unit

per mtr.
each
each
per doz.
per doz.
per doz.
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 8

Supply and erection of wooden strip batten for w


insulation cleats etc.

Detail

Unit Rate (Metric System) per Metre


Qty

MATERIAL (For 100 Metre)


1 Strip casing
2 Gutties
3 Clamp & nails
4 Screw
5 Insulated cleats
Total
Contractor's Profit & O
Total
Material per metre

100.00 metre
10.00 Nos.
300.00 Nos.
7.25 Dozen
100.00 Nos.
## Percent
491.70 1

LABOUR (For 200 Metre)


1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 52

wooden strip batten for wiring purposes inc

Metric System) per Metre


Rate

Per Amount (Rs.)

% per mtr.
per doz.
% No.
Dozen
each

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 9

Supply and erection of sahl wood casing and capp


including insulation cleats, screws etc., compl

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 100 Metre)


1 Casing Sahlwood
2 Screw
3 Gutties
4 Insulated cleats
5 Screw for cover
Total
Contractor's Profit & O
Total
Material per metre

100.00 metre
20.00 Nos.
20.00 Nos.
20.00 Nos.
0.60 Dozen
## Percent
2662.00

LABOUR (For 200 Metre)


1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 53

sahl wood casing and capping for wiring pur


leats, screws etc., complete.

nit Rate (Metric System) per Metre

0.00 Nos.
0.00 Nos.
0.00 Nos.
.60 Dozen

Rate

Per Amount (Rs.)

per mtr.
P. Doz.
per doz.
each
Dozen

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(a)
(i)

250/440 Volts PVC insulated.


3/0.74 mm (3/0.029\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 3/0.029\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 100 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
439.49 9

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 54

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(a)
(ii)

250/440 Volts PVC insulated.


3/0.91 mm (3.036\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 3/0.036\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 100 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
636.29 9

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 55

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(a)
(iii)

250/440 Volts PVC insulated.


7/0.74 mm (7/0.029\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.029\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 100 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
908.55 9

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 56

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(a)
(iv)

250/440 Volts PVC insulated.


7/0.91 mm (7/0.036\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.036\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
1150.22

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 57

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(a)
(v)

250/440 Volts PVC insulated.


7/1.12 mm (7/0.044\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.044\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 80 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
1640.70

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 58

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(a)
(vi)

250/440 Volts PVC insulated.


7/1.63 mm (7/0.064\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 65 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
4371.45

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 59

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(a)
(vii)

250/440 Volts PVC insulated.


19/1.32 mm (19/0.052\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 19/0.052\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 70 Metre)
1 Electrician
2 Cooly skilled

Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
5759.90

0
2.00 Nos.
3.00 Nos.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 60

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(a)
(viii)

250/440 Volts PVC insulated.


19/1.63 mm (19/0.064\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 19/0.064\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 60 Metre)
1 Electrician
2 Cooly skilled

Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
13464.0

0
2.00 Nos.
3.00 Nos.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 61

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per 90 mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(b)
(i)

250/440 volts. PVC insulated cotton braided and


3/0.74 mm (3/0.029\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 3/0.029\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
509.85 9

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 62

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

ulated cotton braided and compounded cables.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(b)
(ii)

250/440 volts. PVC insulated cotton braided and


3/0.91 mm (3/0.036\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 3/0.036\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
611.82 9

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 63

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

ulated cotton braided and compounded cables.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(b)
(iii)

250/440 volts. PVC insulated cotton braided and


7/0.74 mm (7/0.029\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.029\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
815.76 9

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 64

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

ulated cotton braided and compounded cables.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(b)
(iv)

250/440 volts. PVC insulated cotton braided and


7/0.91 mm (7/0.036\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.036\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
968.72 9

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 65

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

ulated cotton braided and compounded cables.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(b)
(v)

250/440 volts. PVC insulated cotton braided and


7/1.12 mm (7/0.044\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.044\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
1529.55

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 66

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

ulated cotton braided and compounded cables.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Supply and erection of single core PVC insulated


in prelaid PVC pipe M.S conduit/G.I pipe/wooden
casing and capping/G.I wire/trenches (rate for c

(b)
(vi)

250/440 volts. PVC insulated cotton braided and


7/1.63 mm (7/0.064\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 66 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
4078.80

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 67

single core PVC insulated copper conductor


S conduit/G.I pipe/wooden strip batten/woode
wire/trenches (rate for cable only).

ulated cotton braided and compounded cables.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 11

(i)

Supply and erection at single core PVC insulated


conductor, 250/440 volts grade cable. (BSS-2004)
conduit/G.I pipe/wooden strip batten/wooden casi
capping/trenches etc., (rate for cable only).
3/0.74 mm (3/0.029\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 3/0.029\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 100 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
505.77 9

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 68

single core PVC insulated PVC sheathed copp


ts grade cable. (BSS-2004) in prelaid PVC pi
n strip batten/wooden casing and
(rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 11

(ii)

Supply and erection at single core PVC insulated


conductor, 250/440 volts grade cable. (BSS-2004)
conduit/G.I pipe/wooden strip batten/wooden casi
capping/trenches etc., (rate for cable only).
3/0.91 mm (3/0.036\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 3/0.036\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 100 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
740.30 9

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 69

single core PVC insulated PVC sheathed copp


ts grade cable. (BSS-2004) in prelaid PVC pi
n strip batten/wooden casing and
(rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 11

(iii)

Supply and erection at single core PVC insulated


conductor, 250/440 volts grade cable. (BSS-2004)
conduit/G.I pipe/wooden strip batten/wooden casi
capping/trenches etc., (rate for cable only).
7/0.74 mm (7/0.029\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.074\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 100 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
1008.48

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 70

single core PVC insulated PVC sheathed copp


ts grade cable. (BSS-2004) in prelaid PVC pi
n strip batten/wooden casing and
(rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 11

(iv)

Supply and erection at single core PVC insulated


conductor, 250/440 volts grade cable. (BSS-2004)
conduit/G.I pipe/wooden strip batten/wooden casi
capping/trenches etc., (rate for cable only).
7/0.91 mm (7/0.036\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.036\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
1517.31

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 71

single core PVC insulated PVC sheathed copp


ts grade cable. (BSS-2004) in prelaid PVC pi
n strip batten/wooden casing and
(rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 11

(v)

Supply and erection at single core PVC insulated


conductor, 250/440 volts grade cable. (BSS-2004)
conduit/G.I pipe/wooden strip batten/wooden casi
capping/trenches etc., (rate for cable only).
7/1.12 mm (7/0.044\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.044\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 80 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
2143.41

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 72

single core PVC insulated PVC sheathed copp


ts grade cable. (BSS-2004) in prelaid PVC pi
n strip batten/wooden casing and
(rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 11

(vi)

Supply and erection at single core PVC insulated


conductor, 250/440 volts grade cable. (BSS-2004)
conduit/G.I pipe/wooden strip batten/wooden casi
capping/trenches etc., (rate for cable only).
7/1.63 mm (7/0.064\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 65 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
4443.85

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 73

single core PVC insulated PVC sheathed copp


ts grade cable. (BSS-2004) in prelaid PVC pi
n strip batten/wooden casing and
(rate for cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12

Supply and erection of single core PVC insulated


conductor, 660/1100 volts grade cable, in prelai
pipe/G.I wire/trenches etc., (rate per cable onl
(i)

7/1.63 mm (7/0.064\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064\"
Wastage (2%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 66 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
4329.01

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 74

single core PVC insulated, PVC sheathed cop


lts grade cable, in prelaid G.I pipe/M.S con
etc., (rate per cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12

Supply and erection of single core PVC insulated


conductor, 660/1100 volts grade cable, in prelai
pipe/G.I wire/trenches etc., (rate per cable onl
(ii)

19/0.32 mm (19/0.052\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 19/0.052\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 60 Metre)

1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
5759.90

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 75

single core PVC insulated, PVC sheathed cop


lts grade cable, in prelaid G.I pipe/M.S con
etc., (rate per cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12

Supply and erection of single core PVC insulated


conductor, 660/1100 volts grade cable, in prelai
pipe/G.I wire/trenches etc., (rate per cable onl
(iii)

19/0.63 mm (19/0.064\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 19/0.064\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 55 Metre)

1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
7847.16

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 76

single core PVC insulated, PVC sheathed cop


lts grade cable, in prelaid G.I pipe/M.S con
etc., (rate per cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12

Supply and erection of single core PVC insulated


conductor, 660/1100 volts grade cable, in prelai
pipe/G.I wire/trenches etc., (rate per cable onl
(iv)

19/2.11 mm (19/0.083\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 19/0.083\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 50 Metre)

1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
12207.59

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 77

single core PVC insulated, PVC sheathed cop


lts grade cable, in prelaid G.I pipe/M.S con
etc., (rate per cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12

Supply and erection of single core PVC insulated


conductor, 660/1100 volts grade cable, in prelai
pipe/G.I wire/trenches etc., (rate per cable onl
(v)

37/1.83 mm (37/0.072\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 37/0.072\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 29 Metre)

1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
21264.40

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 78

single core PVC insulated, PVC sheathed cop


lts grade cable, in prelaid G.I pipe/M.S con
etc., (rate per cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12

Supply and erection of single core PVC insulated


conductor, 660/1100 volts grade cable, in prelai
pipe/G.I wire/trenches etc., (rate per cable onl
(vi)

37/2.11 mm (37/0.083\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 37/0.083\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 24 Metre)

1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
26390.11

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 79

single core PVC insulated, PVC sheathed cop


lts grade cable, in prelaid G.I pipe/M.S con
etc., (rate per cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 12

Supply and erection of single core PVC insulated


conductor, 660/1100 volts grade cable, in prelai
pipe/G.I wire/trenches etc., (rate per cable onl
(vii)

37/2.62 mm (37/0.103\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 37/0.103\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 17 Metre)

1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
40719.18

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 80

single core PVC insulated, PVC sheathed cop


lts grade cable, in prelaid G.I pipe/M.S con
etc., (rate per cable only).

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(a)
(i)

PVC insulated, PVC sheathed twin core, 250/440 v


3/0.74 mm (3/0.029\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 3/0.029\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 81

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed twin core, 250/440 volts.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(a)
(ii)

PVC insulated, PVC sheathed twin core, 250/440 v


3/0.91 mm (3/0.036\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 3/0.036\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 82

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed twin core, 250/440 volts.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(a)
(iii)

PVC insulated, PVC sheathed twin core, 250/440 v


7/0.74 mm (7/0.029\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.029\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 83

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed twin core, 250/440 volts.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(a)
(iv)

PVC insulated, PVC sheathed twin core, 250/440 v


7/0.91 mm (7/0.036\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.036\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 84

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed twin core, 250/440 volts.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(a)
(v)

PVC insulated, PVC sheathed twin core, 250/440 v


7/1.12 mm (7/0.044\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.044\"
Wastage (3%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 85

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed twin core, 250/440 volts.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(a)
(vi)

PVC insulated, PVC sheathed twin core, 250/440 v


7/1.63 mm (7/0.064\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064\"
Wastage (2%)

Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 66 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 86

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed twin core, 250/440 volts.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

(b)
(i)

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

PVC insulated, PVC sheathed 3 core, 660/1100 vol


3/0.74 mm (3/0.029\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 3 core
Wastage (3%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 87

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 3 core, 660/1100 volt cable.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

(b)
(ii)

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

PVC insulated, PVC sheathed 3 core, 660/1100 vol


3/0.91 mm (3/0.036\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 3 core
Wastage (3%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 88

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 3 core, 660/1100 volt cable.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(b)
(iii)

PVC insulated, PVC sheathed 3 core, 660/1100 vol


3/0.74 mm (7/0.029\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.029\"
Wastage (3%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 89

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 3 core, 660/1100 volt cable.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(b)
(iv)

PVC insulated, PVC sheathed 3 core, 660/1100 vol


7/0.91 mm (7/0.036\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.036\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 90

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 3 core, 660/1100 volt cable.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(b)
(v)

PVC insulated, PVC sheathed 3 core, 660/1100 vol


7/1.12 mm (7/0.044\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.044\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 72 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 91

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 3 core, 660/1100 volt cable.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(b)
(vi)

PVC insulated, PVC sheathed 3 core, 660/1100 vol


7/1.13 mm (7/0.064\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 63 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 92

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 3 core, 660/1100 volt cable.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(c)
(i)

PVC insulated, PVC sheathed 4 core, 660/1100 vol


3/70.74 m,m (3/0.29\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 3/0.029\"
Wastage (3%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 80 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 93

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 4 core, 660/1100 volt non-armored cabl

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(c)
(ii)

PVC insulated, PVC sheathed 4 core, 660/1100 vol


3/0.91 mm (3/0.036\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 3/0.036\"
Wastage (3%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 80 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 94

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 4 core, 660/1100 volt non-armored cabl

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(c)
(iii)

PVC insulated, PVC sheathed 4 core, 660/1100 vol


7/0.74 mm (7/0.029\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.029\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 95

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 4 core, 660/1100 volt non-armored cabl

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(c)
(iv)

PVC insulated, PVC sheathed 4 core, 660/1100 vol


7/0.91 mm (7/0.036\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.036\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 96

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 4 core, 660/1100 volt non-armored cabl

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(c)
(v)

PVC insulated, PVC sheathed 4 core, 660/1100 vol


7/1.12 mm (7/0.044\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.044\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 72 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 97

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 4 core, 660/1100 volt non-armored cabl

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(c)
(vi)

PVC insulated, PVC sheathed 4 core, 660/1100 vol


7/1.63 mm (7/0.064\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 63 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 98

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 4 core, 660/1100 volt non-armored cabl

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(c)
(vii)

PVC insulated, PVC sheathed 4 core, 660/1100 vol


19/1.32 mm (19/0.052\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 19/0.052\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 45 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 99

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed 4 core, 660/1100 volt non-armored cabl

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(d)

PVC insulated, PVC sheathed, 660/1100 volts grad


wire 16 SWG.

(i)

19/1.32 mm (19/0.052\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 19/0.052\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 45 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
11164.35

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 100

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed, 660/1100 volts grade cable, armoured

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(d)

PVC insulated, PVC sheathed, 660/1100 volts grad


wire 16 SWG.

(ii)

19/1.63 mm (19/0.064\")

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 19/0.064\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 42 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 101

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed, 660/1100 volts grade cable, armoured

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(d)

PVC insulated, PVC sheathed, 660/1100 volts grad


G.I wire 16 SWG.
19/1.83 mm (19/0.072\")

(iii)

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 19/0.072\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 40 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent
21288.60

0
1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 102

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed, 660/1100 volts grade cable, armoured

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(d)

PVC insulated, PVC sheathed, 660/1100 volts grad


G.I wire 16 SWG.
19/2.11 mm (19/0.083\")

(iv)

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 19/0.083\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 37 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 103

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed, 660/1100 volts grade cable, armoured

nit Rate (Metric System) per Metre


Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(d)

PVC insulated, PVC sheathed, 660/1100 volts grad


wire 16 SWG.
37/1.83 mm (37/0.072\")

(v)

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 37/0.072\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 36 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 104

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed, 660/1100 volts grade cable, armoured

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(d)

PVC insulated, PVC sheathed, 660/1100 volts grad


wire 16 SWG.
37/2.11 mm (37/0.083\")

(vi)

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 37/0.083\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 30 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 105

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed, 660/1100 volts grade cable, armoured

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(d)

PVC insulated, PVC sheathed, 660/1100 volts grad


wire 16 SWG.
37/2.36 mm (37/0.093\")

(vii)

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 37/0.093\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 25 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 106

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed, 660/1100 volts grade cable, armoured

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Supply and erection of copper conductor cables f


prelaid pipe/G.I wire/trenches, etc., (rate for

(d)

PVC insulated, PVC sheathed, 660/1100 volts grad


wire 16 SWG.
37/2.62 mm (37/0.103\")

(viii)

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 90 Metre)


1 PVC cable 37/0.103\"
Wastage (2%)
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 20 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1 coil

90.00 metre

## Percent

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 107

copper conductor cables for service connect


trenches, etc., (rate for cable only).

athed, 660/1100 volts grade cable, armoured

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Amount (Rs.)

per mtr.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 14

(i)

Supply and erection of M.S sheet box of 16 SWG,


4.75 mm thick 3/16\" (6 mm) bakelite sheet top,
making holes for regulators, switches, plugs, et
10 x 10 cm (4\" x 4\") (100 x 100 mm)

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 M.S Box 4\" x 4\" (100 x 100 mm)
2 Cement 0.021 Cft.
3 Sand
Total
Contractor's Profit & O
Total
LABOUR (For 20 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
0.08 Cft.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 108

M.S sheet box of 16 SWG, 10 cm 4\" (100 mm)


6 mm) bakelite sheet top, for recessed wiring
ators, switches, plugs, etc.
(100 x 100 mm)

nit Rate (Metric System) for Each


Rate

Per Unit

each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 14

(ii)

Supply and erection of M.S sheet box of 16 SWG,


4.75 mm thick 3/16\" (6 mm) bakelite sheet top,
making holes for regulators, switches, plugs, et
17.5 x 10 cm

Detail

(7\" x

4\") (175 x 100 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 M.S Box 7\" x 4\" (175 x 100 mm)
2 Cement 0.026 Cft.
3 Sand
Total
Contractor's Profit & O
Total
LABOUR (For 16 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
0.09 Cft.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 109

M.S sheet box of 16 SWG, 10 cm 4\" (100 mm)


6 mm) bakelite sheet top, for recessed wiring
ators, switches, plugs, etc.

4\") (175 x 100 mm)

nit Rate (Metric System) for Each


Rate

Per Unit

each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 14

(iii)

Supply and erection of M.S sheet box of 16 SWG,


4.75 mm thick 3/16\" (6 mm) bakelite sheet top,
making holes for regulators, switches, plugs, et
22.5 x 10 cm

Detail

(9\" x 4\") (225 x 100 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 M.S Box 9\" x 4\" (225 x 100 mm)
2 Cement 0.032 Cft.
3 Sand
Total
Contractor's Profit & O
Total
LABOUR (For 12 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
0.08 Cft.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 110

M.S sheet box of 16 SWG, 10 cm 4\" (100 mm)


6 mm) bakelite sheet top, for recessed wiring
ators, switches, plugs, etc.

\") (225 x 100 mm)

nit Rate (Metric System) for Each


Rate

Per Unit

each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 14

(iv)

Supply and erection of M.S sheet box of 16 SWG,


4.75 mm thick 3/16\" (6 mm) bakelite sheet top,
making holes for regulators, switches, plugs, et
20 x 25 cm

Detail

(8\" x 10\")

(200 x 250 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 M.S Box 8\" x 10\" (200 x 250 mm)
2 Cement 0.036 Cft.
3 Sand
Total
Contractor's Profit & O
Total
LABOUR (For 10 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES

1.00 No.
0.150 Cft.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

Page 111

M.S sheet box of 16 SWG, 10 cm 4\" (100 mm)


6 mm) bakelite sheet top, for recessed wiring
ators, switches, plugs, etc.

")

(200 x 250 mm)

nit Rate (Metric System) for Each

.150 Cft.

Rate

Per Unit

each
P.
Bag
Per % Cft.

per day
per day

Amount (Rs.)

Labour rate for Each


Composite rate for Each

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 14

(v)

Supply and erection of M.S sheet box of 16 SWG,


4.75 mm thick 3/16\" (6 mm) bakelite sheet top,
making holes for regulators, switches, plugs, et
25 x 30 cm

Detail

(10\" x 12\") (250 x 300 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 M.S Box 10\" x 12\" (250 x 300 mm)
2 Cement 0.047 Cft.
3 Sand
Total
Contractor's Profit & O
Total
LABOUR (For 8 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
0.155 Cft.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 112

Say
Say

M.S sheet box of 16 SWG, 10 cm 4\" (100 mm)


6 mm) bakelite sheet top, for recessed wiring
ators, switches, plugs, etc.

\") (250 x 300 mm)

nit Rate (Metric System) for Each

.155 Cft.

Rate

Per Unit

each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 14

(vi)

Supply and erection of M.S sheet box of 16 SWG,


4.75 mm thick 3/16\" (6 mm) bakelite sheet top,
making holes for regulators, switches, plugs, et
30 x 35 cm

Detail

(12\" x 14\")

(300 x 350 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 M.S Box 12\" x 14\" (300 x 350 mm)
2 Cement 0.052 Cft.
3 Sand
Total
Contractor's Profit & O
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
0.180 Cft.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 113

M.S sheet box of 16 SWG, 10 cm 4\" (100 mm)


6 mm) bakelite sheet top, for recessed wiring
ators, switches, plugs, etc.

\")

(300 x 350 mm)

nit Rate (Metric System) for Each

.180 Cft.

Rate

Per Unit

each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 15

Supply and erectionof round block of Sahl wood,


(100 x 40 mm).

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Round block
2 W. Gutti 1\" x 1\" (40 x 25 mm)
3 Screw
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 70 Nos.)

0.544 No.
1.00 No.
1.00 Dozen

1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 114

round block of Sahl wood, 10 x 4 cm 4\" x 1\"

nit Rate (Metric System) for Each

.00 Dozen

Rate

Per Amount (Rs.)

each
per doz.
per doz.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 16
(i)

Supply and erection of teak wood board, 4.5 cm 1


17.5 x 10 cm
Detail

(7\" x 4\")

(175 x 100 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 Teak Wood Board 7\" x 4\" (175 x 100 mm)
2 W. Gutti
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.
2.00 Nos.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 115

teak wood board, 4.5 cm 1\" (45 mm) thick.

\")

(175 x 100 mm)

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
per dozen
per dozen

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 16
(ii)

Supply and erection of teak wood board, 4.5 cm 1


22.5 x 10 cm
Detail

(9\" x 4\")

(225 x 100 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 Teak Wood Board 9\" x 4\" (225 x 100 mm)
2 W. Gutti
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.
2.00 Nos.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 116

teak wood board, 4.5 cm 1\" (45 mm) thick.

\")

(225 x 100 mm)

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
per dozen
per dozen

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 16
(iii)

Supply and erection of teak wood board, 4.5 cm 1


20 x 25 cm
Detail

(8\" x 10\") (200 x 250 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 Teak Wood Board 8\" x 10\" (200 x 250 mm)
2 W. Gutti
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 45 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.
2.00 Nos.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 117

teak wood board, 4.5 cm 1\" (45 mm) thick.

") (200 x 250 mm)

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
per dozen
per dozen

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 16
(iv)

Supply and erection of teak wood board, 4.5 cm 1


25 x 30 cm

(10\" x 12\")

Detail

(250 x 300 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 Teak Wood Wooden Board 10\" x 12\" (250 x 300 mm)
2 W. Gutti
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 40 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
4.00 Nos.
4.00 Nos.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 118

teak wood board, 4.5 cm 1\" (45 mm) thick.

\")

(250 x 300 mm)

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
per dozen
per dozen

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 16
(v)

Supply and erection of teak wood board, 4.5 cm 1


30 x 35 cm

(12\" x 14\") (300 x 350 mm)

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Teak Wood Board 12\" x 14\" (300 x 350 mm)
2 W. Gutti
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 35 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
4.00 Nos.
4.00 Nos.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 119

teak wood board, 4.5 cm 1\" (45 mm) thick.

\") (300 x 350 mm)

nit Rate (Metric System) for Each


Rate

Per Unit

Amount (Rs.)

each
per dozen
per dozen

per day
per day

0 Say
0 Say

0
0

DESCRIPTION OF ITEM:
Item No. 17
(i)

Supply and erection of Sahl wood board 4.5 cm 1


17.5 x 10 cm
Detail

(7\" x 4\")

(175 x 100 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 Sahl Wood Board 7\" x 4\" (175 x 100 mm)
2 W. Gutti
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.
2.00 Nos.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 120

Sahl wood board 4.5 cm 1\" (45 mm) thick.

\")

(175 x 100 mm)

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
per dozen
per dozen

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 17
(ii)

Supply and erection of Sahl wood board 4.5 cm 1


22.5 x 10 cm
Detail

(9\" x 4\")

(225 x 100 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 Sahl Wood Board 9\" x 4\" (225 x 100 mm)
2 W. Gutti
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.
2.00 Nos.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 121

Sahl wood board 4.5 cm 1\" (45 mm) thick.

\")

(225 x 100 mm)

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
per dozen
per dozen

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 17
(iii)

Supply and erection of Sahl wood board 4.5 cm 1


20 x 25 cm
Detail

(8\" x 10\")

(200 x 250 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 Sahl Wood Board 8\" x 10\" (200 x 250 mm)
2 W. Gutti
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 45 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.
2.00 Nos.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 122

Sahl wood board 4.5 cm 1\" (45 mm) thick.

")

(200 x 250 mm)

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
per dozen
per dozen

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 17
(iv)

Supply and erection of Sahl wood board 4.5 cm 1


25 x 30 cm

(10\" x 12\")

Detail

(250 x 300 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 Sahl Wood Board 10\" x 12\" (250 x 300 mm)
2 W. Gutti
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 40 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.
2.00 Nos.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 123

Sahl wood board 4.5 cm 1\" (45 mm) thick.

\")

(250 x 300 mm)

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
per dozen
per dozen

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 17
(v)

Supply and erection of Sahl wood board 4.5 cm 1


30 x 35 cm

(12\" x 14\")

Detail

(300 x 350 mm)

Unit Rate (Metric System) f


Qty

MATERIAL
1 Sahl Wood Board 12\" x 14\" (300 x 350 mm)
2 W. Gutti
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 35 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.
2.00 Nos.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 124

Sahl wood board 4.5 cm 1\" (45 mm) thick.

\")

(300 x 350 mm)

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
per dozen
per dozen

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 18

(a)
(i)

Supply and erection of iron/aluminium clad 500 v


fuses, on angle iron board with 3 mm (1/8\") thi
bonding to earth with necessary flexible pipe an
Double pole:
Main Switch 15/20 Amp.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main switch 15/20 Amp. 500 volts
2 G.I Flexible pipe 1\" dia (25 mm)
3 Angle iron board including paints (9\"x9\"x1\")
4 Reg bolts 9\" x 5/8\" (225 x 16 mm)
5 Nipple 1\" dia (25 mm)
6 Socket 1\" dia (25 mm)
7 Check nut 1\" dia (25 mm)
8 Thimble
9 Cement 0.032 Cft.
10 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00
0.50
1.00
4.00
2.00
3.00
1.00
8.00

No.
metre
No.
Nos.
Nos.
Nos.
No.
Nos.

0.08 Cft.

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 125

iron/aluminium clad 500 volts main switches


oard with 3 mm (1/8\") thick M.S. sheet cover
necessary flexible pipe and thimbles, etc.

nit Rate (Metric System) for Each

.50 metre

Rate

Per Unit

each
per mtr.
each
% No.
each
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 18

Supply and erection of iron/aluminium clad 500 v


fuses, on angle iron board with 3 mm (1/8\") thi
bonding to earth with necessary flexible pipe an

(a)

Double pole:

(ii)

Main switch 30/35 Amp.


Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 30/35 Amp. 500 volts
2 G.I Flexible pipe 1\" dia (25 mm)
3 L-Iron board including paint (9\"x12\"x1\")
4 Reg bolts 9\" x 5/8\" (225 x 16 mm)
5 Nipple 1\" dia (25 mm)
6 Socket 1\" dia (25 mm)
7 Check nut 1\" dia (25 mm)
8 Thimble
9 Cement 0.032 Cft.
10 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00
0.50
1.00
4.00
2.00
3.00
1.00
8.00

No.
metre
No.
Nos.
Nos.
Nos.
No.
Nos.

0.08 Cft.

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 126

iron/aluminium clad 500 volts main switches


oard with 3 mm (1/8\") thick M.S. sheet cover
necessary flexible pipe and thimbles, etc.

nit Rate (Metric System) for Each

.50 metre

Rate

Per Unit

each
per mtr.
each
% No.
each
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 18

Supply and erection of iron/aluminium clad 500 v


fuses, on angle iron board with 3 mm (1/8\") thi
bonding to earth with necessary flexible pipe an

(a)

Double pole:

(iii)

Main switch 60/65 Amp.


Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 60/65 Amp. 500 volts
2 G.I Flexible pipe 1\" dia (38 mm)
3 L-Iron board including paint (10\"x12\"x1\")
4 Nipple 1\" dia (38 mm)
5 Socket 1\" dia (38 mm)
6 Check nut 1\" dia (38 mm)
7 Reg bolts 9\" x 5/8\" (225 x 16 mm)
8 Cement 0.032 Cft.
9 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
0.50
1.00
2.00
2.00
2.00
4.00

0.08 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
metre
No.
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 127

iron/aluminium clad 500 volts main switches


oard with 3 mm (1/8\") thick M.S. sheet cover
necessary flexible pipe and thimbles, etc.

nit Rate (Metric System) for Each

.50 metre

Rate

Per Unit

each
per mtr.
each
each
each
each
% No.
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 18

Supply and erection of iron/aluminium clad 500 v


fuses, on angle iron board with 3 mm (1/8\") thi
bonding to earth with necessary flexible pipe an

(a)

Double pole:

(iv)

Main switch 100 Amp.


Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 100 Amp. 500 volts
2 G.I Flexible pipe 1\" dia (38 mm)
3 L-Iron board including paint (10\"x12\"x1\")
4 Nipple 1\" dia (38 mm)
5 Socket 1\" dia (38 mm)
6 Check nut 1\" dia (38 mm)
7 Reg bolts 9\" x 5/8\" (225 x 16 mm)
8 Cement 0.032 Cft.
9 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
0.50
1.00
2.00
2.00
2.00
4.00

0.08 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
metre
No.
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 128

iron/aluminium clad 500 volts main switches


oard with 3 mm (1/8\") thick M.S. sheet cover
necessary flexible pipe and thimbles, etc.

nit Rate (Metric System) for Each

.50 metre

Rate

Per Unit

each
per mtr.
each
each
each
each
% No.
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 18

(b)
(i)

Supply and erection of iron/aluminium clad 500 v


fuses, on angle iron board with 3 mm (1/8\") thi
bonding to earth with necessary flexible pipe an
Triple pole:
Main switch 15/20 Amp (500 Volts).

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 15/20 Amp. 500 volts
2 G.I Flexible pipe 1\" dia (25 mm)
3 L-Iron board including paint (9\"x12\"x1\")
4 Nipple 1\" dia (25 mm)
5 Socket 1\" dia (25 mm)
6 Check nut 1\" dia (25 mm)
7 Reg bolts 9\" x 5/8\" (225 x 16 mm)
8 Cement 0.032 Cft.
9 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00
0.50
1.00
2.00
2.00
2.00
4.00

No.
metre
No.
Nos.
Nos.
Nos.
Nos.

0.08 Cft.

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 129

iron/aluminium clad 500 volts main switches


oard with 3 mm (1/8\") thick M.S. sheet cover
necessary flexible pipe and thimbles, etc.

(500 Volts).

nit Rate (Metric System) for Each

.50 metre

Rate

Per Unit

each
per mtr.
each
each
each
each
% No.
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 18

(b)
(ii)

Supply and erection of iron/aluminium clad 500 v


fuses, on angle iron board with 3 mm (1/8\") thi
bonding to earth with necessary flexible pipe an
Triple pole:
Main switch 30/35 Amp (500 Volts).

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 30/35 Amp. 500 volts
2 L-Iron board including paint (10\"x12\"x1\")
3 G.I Flexible pipe 1\" dia (25 mm)
4 Reg bolts 9\" x 5/8\" (225 x 16 mm)
5 Nipple 1\" dia (25 mm)
6 Socket 1\" dia (25 mm)
7 Check nut 1\" dia (25 mm)
8 Thimble
9 Cement 0.032 Cft.
10 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00
1.00
0.50
4.00
2.00
2.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.

0.08 Cft.

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 130

iron/aluminium clad 500 volts main switches


oard with 3 mm (1/8\") thick M.S. sheet cover
necessary flexible pipe and thimbles, etc.

(500 Volts).

nit Rate (Metric System) for Each

.50 metre

Rate

Per Unit

each
each
per mtr.
% No.
each
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 18

(c)
(i)

Supply and erection of iron/aluminium clad 500 v


fuses, on angle iron board with 3 mm (1/8\") thi
bonding to earth with necessary flexible pipe an
Triple pole, with neutral link:
Main switch 30/35 Amp.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 30/35 Amp. 500 volts
2 L-Iron board including paint (10\"x12\"x1\")
3 G.I Flexible pipe 1\" dia (25 mm)
4 Reg bolts 9\" x 5/8\" (225 x 16 mm)
5 Nipple 1\" dia (25 mm)
6 Socket 1\" dia (25 mm)
7 Check nut 1\" dia (25 mm)
8 Thimble
9 Cement 0.032 Cft.
10 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00
1.00
0.50
4.00
2.00
2.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.

0.08 Cft.

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 131

iron/aluminium clad 500 volts main switches


oard with 3 mm (1/8\") thick M.S. sheet cover
necessary flexible pipe and thimbles, etc.

nit Rate (Metric System) for Each

.50 metre

Rate

Per Unit

each
each
per mtr.
% No.
each
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 18

(c)
(ii)

Supply and erection of iron/aluminium clad 500 v


fuses, on angle iron board with 3 mm (1/8\") thi
bonding to earth with necessary flexible pipe an
Triple pole, with neutral link:
Main switch 60/65 Amp.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 60/65 Amp. 500 volts
2 L-Iron board including paint (12\"x15\"x1\")
3 G.I Flexible pipe 1\" dia (32 mm)
4 Reg bolts 9\" x 5/8\" (225 x 16 mm)
5 Nipple 1\" dia (40 mm)
6 Socket 1\" dia (32 mm)
7 Check nut 1\" dia (32 mm)
8 Cement 0.052 Cft.
9 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00
1.00
0.50
4.00
2.00
2.00
2.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

0.18 Cft.

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 132

iron/aluminium clad 500 volts main switches


oard with 3 mm (1/8\") thick M.S. sheet cover
necessary flexible pipe and thimbles, etc.

nit Rate (Metric System) for Each

.50 metre

Rate

Per Unit

each
each
per mtr.
% No.
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 18

(c)
(iii)

Supply and erection of iron/aluminium clad 500 v


fuses, on angle iron board with 3 mm (1/8\") thi
bonding to earth with necessary flexible pipe an
Triple pole, with neutral link:
Main switch 100 Amp.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 100 Amp. 500 volts
2 L-Iron board including paint (12\"x18\"x1\")
3 G.I Flexible pipe 1\" dia (40 mm)
4 Brass Nipple 1\" dia (40 mm)
5 Socket 1\" dia (40 mm)
7 Reg bolts 9\" x 5/8\" (225 x 16 mm)
8 Cement 0.052 Cft.
9 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)

1.00
1.00
0.50
2.00
2.00
4.00

1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.62 No.

0.18 Cft.

## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.

Rs.
Rs.

Page 133

iron/aluminium clad 500 volts main switches


oard with 3 mm (1/8\") thick M.S. sheet cover
necessary flexible pipe and thimbles, etc.

nit Rate (Metric System) for Each

.50 metre

Rate

Per Unit

each
each
per mtr.
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 19

(i)

Supply and erection of iron/aluminium clad, 500


pole and neutral link and HRC fuses, on angle ir
thick M.S sheet covering, including bonding to e
pipe and thimbles.
60/65 Amp.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch with triple pole and
2 Flexible pipe 1\" (40 mm)
3 L-Iron board including paint (10\"x15\"x1\")
4 Brass Nipple 1\" dia (40 mm)
5 Brass check nut 1\" (40 mm)
6 Reg bolts 9\" x 5/8\" (225 x 16 mm)
7 Brass Socket 1\" dia (40 mm)
8 Thimble 60/65 Amp
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)

1.00
0.50
1.00
2.00
2.00
4.00
2.00
4.00

1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Nos.

Page 134

iron/aluminium clad, 500 volts main switche


and HRC fuses, on angle iron board with 3 mm
ng, including bonding to earth with necessar

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
per mtr.
each
each
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 19

(ii)

Supply and erection of iron/aluminium clad, 500


pole and neutral link and HRC fuses, on angle ir
thick M.S sheet covering, including bonding to e
pipe and thimbles.
100 Amp.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 100 Amp. 500 volts
2 Flexible pipe 1\" (40 mm)
3 L-Iron board including paint (12\"x18\"x1\")
4 Brass Nipple 1\" dia (32 mm)
5 Brass check nut 1\" (32 mm)
6 Reg bolts 9\" x 5/8\" (225 x 16 mm)
7 Brass Socket 1\" dia (40 mm)
8 Thimble 100 Amp.
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)

1.00
0.50
1.00
2.00
2.00
4.00
2.00
4.00

1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.62 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Nos.

Page 135

iron/aluminium clad, 500 volts main switche


and HRC fuses, on angle iron board with 3 mm
ng, including bonding to earth with necessar

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
per mtr.
each
each
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 19

(iii)

Supply and erection of iron/aluminium clad, 500


pole and neutral link and HRC fuses, on angle ir
thick M.S sheet covering, including bonding to e
pipe and thimbles.
150 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 150 Amp. 500 volts
2 L-Iron board including paint (15\"x18\"x1\")
3 Flexible pipe 1\" (40 mm)
4 Brass Nipple 1\" dia (32 mm)
5 Brass Socket 1\" dia (40 mm)
6 Thimble 150 Amp.
7 Reg bolts 9\" x 5/8\" (225 x 16 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00
1.00
0.50
2.00
2.00
4.00
4.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

1.00 No.
1.62 No.

## Percent
## Percent

Rs.
Rs.

Page 136

iron/aluminium clad, 500 volts main switche


and HRC fuses, on angle iron board with 3 mm
ng, including bonding to earth with necessar

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 19

(iv)

Supply and erection of iron/aluminium clad, 500


pole and neutral link and HRC fuses, on angle ir
thick M.S sheet covering, including bonding to e
pipe and thimbles.
200 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 200 Amp. 500 volts
2 L-Iron board including paint (15\"x18\"x1\")
3 Flexible pipe 1\" (40 mm)
4 Brass Nipple 1\" dia (32 mm)
5 Brass Socket 1\" dia (40 mm)
6 Brass check nut 1\" (32 mm)
7 Reg bolts 9\" x 5/8\" (225 x 16 mm)
8 Copper Thimble 200 Amp.
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 1 No.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
2.00
2.00
2.00
4.00
4.00

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 137

iron/aluminium clad, 500 volts main switche


and HRC fuses, on angle iron board with 3 mm
ng, including bonding to earth with necessar

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 19

(v)

Supply and erection of iron/aluminium clad, 500


pole and neutral link and HRC fuses, on angle ir
thick M.S sheet covering, including bonding to e
pipe and thimbles.
300 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 300 Amp. 500 volts
2 Flexible pipe 1\" (40 mm)
3 L-Iron board including paint (15\"x18\"x1\")
4 Brass Nipple 1\" dia (32 mm)
5 Brass Socket 1\" dia (40 mm)
6 Brass check nut 1\" (32 mm)
7 Reg bolts 9\" x 5/8\" (225 x 16 mm)
8 Copper Thimble 300 Amp.
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 1 No.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
0.50
1.00
2.00
2.00
2.00
4.00
4.00

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 138

iron/aluminium clad, 500 volts main switche


and HRC fuses, on angle iron board with 3 mm
ng, including bonding to earth with necessar

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
per mtr.
each
each
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 19

(vi)

Supply and erection of iron/aluminium clad, 500


pole and neutral link and HRC fuses, on angle ir
thick M.S sheet covering, including bonding to e
pipe and thimbles.
400 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 400 Amp. 500 volts
2 L-Iron board including paint (15\"x18\"x1\")
3 Flexible pipe 2\" (50 mm)
4 Brass Nipple 2 dia (50 mm)
5 Brass Socket 2\" dia (50 mm)
6 Brass check nut 2\" (50 mm)
7 Reg bolts 9\" x 5/8\" (225 x 16 mm)
8 Copper Thimble 400 Amp.
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 1 No.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
2.00
2.00
2.00
4.00
4.00

1.25 No.
3.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 139

iron/aluminium clad, 500 volts main switche


and HRC fuses, on angle iron board with 3 mm
ng, including bonding to earth with necessar

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 19

(vii)

Supply and erection of iron/aluminium clad, 500


pole and neutral link and HRC fuses, on angle ir
thick M.S sheet covering, including bonding to e
pipe and thimbles.
500 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Main Switch 500 Amp. 500 volts
2 L-Iron board including paint (15\"x18\"x1\")
3 Flexible pipe 4\" (100 mm)
4 Brass Nipple 4\" dia (100 mm)
5 Brass Socket 4\" dia (100 mm)
6 Brass check nut 4\" (100 mm)
7 Reg bolts 12\" x 5/8\" (300 x 16 mm)
8 Copper Thimble 500 Amp.
8 Cement 0.203 Cft.
9 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 1 No.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
2.00
2.00
2.00
4.00
4.00

0.99 Cft.

1.50 Nos.
3.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 140

iron/aluminium clad, 500 volts main switche


and HRC fuses, on angle iron board with 3 mm
ng, including bonding to earth with necessar

nit Rate (Metric System) for Each

.50 metre

Rate

Per Unit

each
each
per mtr.
each
each
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 20

(i)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
2 way, 15 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/aluminium clad 2 way15 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 141

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(ii)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
3 way, 15 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/aluminium clad 3 way15 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 142

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(iii)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
4 way, 15 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 4 way15 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 143

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(iv)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
5 way, 15 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 5 way15 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 144

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(v)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
6 way, 15 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 6 way15 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 145

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(vi)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
7 way, 15 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 7 way15 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 146

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(vii)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
8 way, 15 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 8 way15 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 147

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(viii)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
9 way, 15 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 9 way15 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 148

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(ix)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
10 way, 15 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 10 way15 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 149

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(x)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
11 way, 15 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 11 way15 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 150

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(xi)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
12 way, 15 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 12 way15 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 151

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(xii)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
2 way, 30 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 2 way 30 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 152

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(xiii)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
3 way, 30 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 3 way 30 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 153

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(xiv)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
4 way, 30 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 4 way 30 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 154

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(xv)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
5 way, 30 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 5 way 30 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 155

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(xvi)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
6 way, 30 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 6 way 30 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 156

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(xvii)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
7 way, 30 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 7 way 30 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 157

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(xviii)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
8 way, 30 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 8 way 30 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 158

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(xix)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
9 way, 30 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 9 way 30 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 159

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 20

(xx)

Supply and erection of iron/aluminium clad, bran


on angle iron frame of suitable size with 3 mm (
10 way, 30 Amp. per way.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Iron/Aluminium clad 10 way 30 Amp. per way
2 L-Iron board (9\"x 9\"x1\") (225 x 225 x 40 mm)
3 PVC Flexible pipe \" dia (12 mm)
4 PVC Socket \" dia (12 mm)
5 PVC Nipple \" dia (12 mm)
6 PVC Check nut \" dia (12 mm)
7 PVC bushes \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
0.50
4.00
4.00
2.00
8.00

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

Rs.
Rs.

Page 160

iron/aluminium clad, branch distribution bo


suitable size with 3 mm (1/8\") M.S sheet co

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.
each
each
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 21

(i)

Supply and erection of bus bars, for 500 volts 3


copper bars, including glazed porcelain bridges,
with rag bolts and M.S sheet box 1.5 mm thick, e

60 Amp. with 4 copper bars size 1\" x 1/8\" (40


Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Porcelain (Imported)
8.00
2 Copper strip 1\" x 1/8\" x 14\" (40 x 3 x 350 mm) 4.00
3 Box 1.5 mm thick
1.00
4 L-Iron board 18\" x 12\" x 1\" (450 x 300 x 40 mm)1.00
5 Reg bolts 9 x 5/8 (225 x 16 mm)
4.00
6 Cement 0.063 Cft.
7 Sand
0.18
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

Cft.

1.50 Nos.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Nos.
Nos.
No.
No.
Nos.

Rs.
Rs.

Page 161

bus bars, for 500 volts 3 phase A.C supply


glazed porcelain bridges, on angle iron boa
sheet box 1.5 mm thick, etc., complete:

bars size 1\" x 1/8\" (40 x 3 mm)

nit Rate (Metric System) for Each


Rate

Per Unit

each
each
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 21

(ii)

Supply and erection of bus bars, for 500 volts 3


copper bars, including glazed porcelain bridges,
with rag bolts and M.S sheet box 1.5 mm thick, e

100 Amp. with 4 copper bars size 1\" x 1/8\" (4


Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Porcelain (Imported)
8.00
2 Copper strip 14\" x 1\" x 1/8\" (350 x 40 x 3 mm) 4.00
3 Box 1.5 mm thick
1.00
4 L-Iron board 18\" x 12\" x 1\" (450 x 300 x 40 mm)1.00
5 Reg bolts 9\" x 5/8\" (225 x 16 mm)
4.00
6 Cement 0.063 Cft.
7 Sand
0.18
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

Cft.

1.50 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Nos.
Nos.
No.
No.
Nos.

Rs.
Rs.

Page 162

bus bars, for 500 volts 3 phase A.C supply


glazed porcelain bridges, on angle iron boa
sheet box 1.5 mm thick, etc., complete:
bars size 1\" x 1/8\" (40 x 3 mm)

nit Rate (Metric System) for Each


Rate

Per Unit

each
each
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 21

(iii)

Supply and erection of bus bars, for 500 volts 3


copper bars, including glazed porcelain bridges,
with rag bolts and M.S sheet box 1.5 mm thick, e

200 Amp. with 4 copper bars size 2\" x 1/8\" (50


Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Porcelain (Imported)
8.00
2 Copper strip 14\" x 2\" x 1/8\" (350 x 50 x 3 mm) 4.00
3 Box 1/16 (2 mm) thick
1.00
4 L-Iron board 18\" x 12\" x 1\" (450 x 300 x 40 mm)1.00
5 Reg bolts 9\" x 5/8\" (225 x 16 mm)
4.00
6 Cement 0.063 Cft.
7 Sand
0.18
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Coolies (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

Cft.

2.00 Nos.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Nos.
Nos.
No.
No.
Nos.

Rs.
Rs.

Page 163

bus bars, for 500 volts 3 phase A.C supply


glazed porcelain bridges, on angle iron boa
sheet box 1.5 mm thick, etc., complete:
bars size 2\" x 1/8\" (50 x 3 mm)

nit Rate (Metric System) for Each


Rate

Per Unit

each
each
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 21

(iv)

Supply and erection of bus bars, for 500 volts 3


copper bars, including glazed porcelain bridges,
with rag bolts and M.S sheet box 1.5 mm thick, e

300 Amp. with 4 copper bars size 2\" x 3/16\" (5


Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Porcelain (Imported)
8.00
2 Copper strip 2\" x 3/16\" x 14\" (50 x 4 x 350 mm) 4.00
3 Box 1/16\" (2 mm) thick
1.00
4 L-Iron board 18\" x 12\" x 1\" (450 x 300 x 40 mm)1.00
5 Reg bolts 2 \"x 5/8\" (50 x 16 mm)
4.00
6 Cement 0.063 Cft.
7 Sand
0.18
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Coolies skilled
Total
Sundries
Total
Contractor's Profit & O
Total

Cft.

2.50 Nos.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Nos.
Nos.
No.
No.
Nos.

Rs.
Rs.

Page 164

bus bars, for 500 volts 3 phase A.C supply


glazed porcelain bridges, on angle iron boa
sheet box 1.5 mm thick, etc., complete:
bars size 2\" x 3/16\" (50 x 4 mm)

nit Rate (Metric System) for Each


Rate

Per Unit

each
each
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 21

(v)

Supply and erection of bus bars, for 500 volts 3


copper bars, including glazed porcelain bridges,
with rag bolts and M.S sheet box 1.5 mm thick, e

500 Amp. with 4 copper bars size 2\" x \" (50 x


Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Porcelain (Imported)
8.00 Nos.
2 Copper strip 14\" x 2\" x \" (350 x 50 x 6 mm)
4.00 Nos.
3 Box 1/16\" (2 mm) thick
1.00 No.
4 L-Iron board 18\" x 12\" x 1\" (450 x 300 x 40 mm)1.00 No.
5 Reg bolts 9\" x 5/8\" (225 x 16 mm)
4.00 Nos.
6 Cement 0.084 Cft.
7 Sand
0.24 Cft.
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

2.00 Nos.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 165

bus bars, for 500 volts 3 phase A.C supply


glazed porcelain bridges, on angle iron boa
sheet box 1.5 mm thick, etc., complete:
bars size 2\" x \" (50 x 6 mm)

nit Rate (Metric System) for Each


Rate

Per Unit

each
each
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 22 (i)

Supply and erection of plain pendent lamp holder


holder and flexible twin wire 23/0.0076\" upto 2
shade).

Detail
Qty
MATERIAL
1 Pendent lamp holder bakelite
2 Flexible twin wire 23/0.0076 (23/0.195 mm)
Total
Contractor's Profit & O
Total
LABOUR (For 24 Nos.)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.
2.00 metre

0.50 No.

## Percent
## Percent

Rs.
Rs.

Page 166

plain pendent lamp holder, complete, with b


in wire 23/0.0076\" upto 2 metre length (with

.00 metre

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
per mtr.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 22 (ii)

Extra for additional length of flexible wire, be

Detail

Unit Rate (Metric System) p


Qty

MATERIAL
2 Flexible twin wire 23/0.0076 (23/0.195 mm)
Total
Contractor's Profit & O
Total

1.00 metre

## Percent

ITEM RATE
Composite rate per Metre
Composite rate per ft.

Rs.
Rs.

Page 167

ength of flexible wire, beyond 2 metres.

nit Rate (Metric System) per Metre

.00 metre

Rate

Per Amount (Rs.)

per mtr.

Say
Say

DESCRIPTION OF ITEM:
Item No. 23

Supply and erection of counter weight pendent wi


and fitting on bakelite lamp holder, with flexib
(without bulb & shade).

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Flexible twin wire 23/0.0076 (23/0.195 mm)
2 Bakelite lamp holder
3 Counter weight with accessories
Total
Contractor's Profit & O
Total
LABOUR (For 12 Nos.)
1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total

3.00 metre
1.00 No.
1.00 No.

## Percent

0.50 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 168

counter weight pendent with porcelain count


e lamp holder, with flexible twin wire 23/0.

nit Rate (Metric System) for Each

.00 metre

Rate

Per Amount (Rs.)

per mtr.
each
each

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 24

Supply and erection of stiff pendent with brass/


15 mm (\") dia brass oxidised or painted along
3/0.74 mm (3/0.029\").
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Brass pipe \" dia (12 mm)
2 Canopy nipple & hook
3 Brass lamp holder
4 VIR/PVC cable 3/0.29
Total
Contractor's Profit & O
Total
LABOUR (For 30 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

2.00
1.00
1.00
2.00

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

metre
job
No.
metre

Rs.
Rs.

Page 169

stiff pendent with brass/metal pipe 6.3 cm


oxidised or painted along lamp holder with VI

nit Rate (Metric System) for Each

.00 metre

.00 metre

Rate

Per Amount (Rs.)

per mtr.
per job
each
per mtr.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 25

Supply and erection of 22.5 cm (9\") long swan n


oxidised bracket lamp holder, complete.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Brass bracket
2 Brass lamp holder
3 VIR/PVC Cable 3/0.029
Total
Contractor's Profit & O
Total
LABOUR (For 29 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No.
0.50 metre

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 170

22.5 cm (9\") long swan neck plain brass/ste


holder, complete.

nit Rate (Metric System) for Each

.50 metre

Rate

Per Amount (Rs.)

each
each
per mtr.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 26

Supply and erection of wall type/pole type brack


tight reflector, flexible wire and brass holder.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 G.I. Pipe \" dia (20 mm)
2 Brass nipple
3 Brass lamp holder
4 Double cone reflector
5 Flexible wire
Total
Contractor's Profit & O
Total

1.00
1.00
1.00
1.00
1.00
## Percent

LABOUR (For 21 Nos.)


1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

metre
No.
No.
No.
metre

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 171

wall type/pole type bracket, with double co


ble wire and brass holder.

nit Rate (Metric System) for Each

.00 metre

.00 metre

Rate

Per Amount (Rs.)

per mtr.
each
each
each
per mtr.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 27

Supply and erection of bakelite button holder sh

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Button Switch holder
2 Bakelite screwed cover
Total
Contractor's Profit & O
Total
LABOUR (For 100 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.84 Dozen

## Percent

1.00 No.
0.50 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 172

bakelite button holder shade, large size.

nit Rate (Metric System) for Each

.84 Dozen

Rate

Per Amount (Rs.)

each
P. Doz

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 28

Supply and erection of call bell 220/250 volts,


17.5 x 10 cm (7\" x 4\").
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Call bell
2 Board 7\" x 4\" (175 x 100 mm)
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 30 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No.
1.85 Dozen

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 173

call bell 220/250 volts, fixed on teak wood

nit Rate (Metric System) for Each

.85 Dozen

Rate

Per Amount (Rs.)

each
each
P. Doz

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 29

Supply and erection of bell push or bed switch,


wire 23/0.0076\"
Detail
Qty

MATERIAL
1 Bed switch/bell push
2 Flexible wire 23/0.0076\" (23/0.195 mm)
Total
Contractor's Profit & O
Total
LABOUR (For 80 Nos.)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.
5.00 metre

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 174

bell push or bed switch, with 5 metre twin

.00 metre

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
per mtr.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 30

Supply and erection of celling rose, bakelite.

Detail
Qty
MATERIAL
1 Ceiling rose
2 Iron screw
Total
Contractor's Profit & O
Total
LABOUR (For 48 Nos.)

1.00 No.
1.50 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 175

celling rose, bakelite.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 31
(i)

Supply and erection of switches 5 Amp.


Open type.
Detail
Qty

MATERIAL
1 Switch 5 Amp
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)

1.00 No.
1.50 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 176

switches 5 Amp.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 31
(ii)

Supply and erection of switches 5 Amp.


Piano type.
Detail
Qty

MATERIAL
1 Switch 5 Amp piano type
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)

1.00 No.
1.50 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 177

switches 5 Amp.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 31
(iii)

Supply and erection of switches 5 Amp.


Switch ring type, recessed.
Detail
Qty

MATERIAL
1 Switch ring type
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)

1.00 No.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 178

switches 5 Amp.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 31
(iv)

Supply and erection of switches 5 Amp.


Switch plate type recessed.
Detail
Qty

MATERIAL
1 Switch plate type
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)

1.00 No.
1.50 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 179

switches 5 Amp.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 31
(v)

Supply and erection of switches 5 Amp.


Double control, open type.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Double control switch
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 44 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.

## Percent

1.00 No.
0.25 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 180

switches 5 Amp.

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 31
(vi)

Supply and erection of switches 5 Amp.


Double control, ring type recessed.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Double control switch recessed type
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 44 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.

## Percent

1.00 No.
0.25 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 181

switches 5 Amp.

ype recessed.

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 31
(vii)

Supply and erection of switches 5 Amp.


Double control, piano type.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Double control piano type
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 44 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.

## Percent

1.00 No.
0.25 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 182

switches 5 Amp.

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 32
(i)

Supply and erection of switches 10/15 Amp.


Open type.
Detail
Qty

MATERIAL
1 Switch 10/15 Amp
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)

1.00 No.
2.00 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 183

switches 10/15 Amp.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 32
(ii)

Supply and erection of switches 10/15 Amp.


Recessed type switch 10/15 Amp.
Detail
Qty

MATERIAL
1 Switch 10/15 Amp. recessed
2 Mechine Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)

1.00 No.
2.00 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 184

switches 10/15 Amp.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 33

Supply and erection of wall socket with 3 pin 5

Detail
Qty
MATERIAL
1 3 pin 5 Amp wall socket
2 Shoe
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No.
2.00 Nos.

## Percent

1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 185

wall socket with 3 pin 5 Amp. shoe.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 34

Supply and erection of 3 pin 5 Amp. wall socket.

Detail
Qty
MATERIAL
1 Wall socket 3 pin 5 Amp.
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)

1.00 No.
2.00 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 186

3 pin 5 Amp. wall socket.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 35
(i)

Supply and erection of 3 pin 10/15 Amp. wall soc


Open type.
Detail
Qty

MATERIAL
1 Wall socket 10/15 Amp.
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)

1.00 No.
2.00 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 187

3 pin 10/15 Amp. wall socket.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 35
(ii)

Supply and erection of 3 pin 10/15 Amp. wall soc


Wall socket 10/15 Amp. recessed.
Detail
Qty

MATERIAL
1 Wall socket 10/15 Amp. recessed
2 Machine Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.
2.00 Nos.

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 188

3 pin 10/15 Amp. wall socket.


recessed.
Unit Rate (Metric System) for Each
Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 36
(i)

Supply and erection of 3 pin switch and plug com


5 Amp.
Detail
Qty

MATERIAL
1 Plugs 3 pin and switch (combine) 5 Amp.
2 Machine Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.
4.00 Nos.

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 189

3 pin switch and plug combined, recessed ty

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 36
(ii)

Supply and erection of 3 pin switch and plug com


10/15 Amp.
Detail
Qty

MATERIAL
1 Plugs 3 pin and switch (combine) 10/15 Amp.
2 Machine Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.
5.00 Nos.

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 190

3 pin switch and plug combined, recessed ty

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 37

Supply and erection of 3 pin 10/15 Amp. wall soc

Detail
Qty
MATERIAL
1 Wall socket 3 pin 10/15 Amp.
2 Shoe 3 pin
3 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No.
2.00 Nos.

## Percent

1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 191

3 pin 10/15 Amp. wall socket with shoe open

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 38
(i)

Supply and erection of cut out, bakelite:


Open type.
Detail
Qty

MATERIAL
1 Cut out bakelite
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 90 Nos.)

1.00 No.
2.00 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 192

cut out, bakelite:

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 38
(ii)

Supply and erection of cut out, bakelite:


Recessed type cut out.
Detail
Qty

MATERIAL
1 Cut out
2 Machine Screw
Total
Contractor's Profit & O
Total
LABOUR (For 90 Nos.)

1.00 No.
2.00 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 193

cut out, bakelite:

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 39
(i)

Supply and erection of button holder:


Bakelite large size.
Detail
Qty

MATERIAL
1 Button holder large
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 80 Nos.)

1.00 No.
2.00 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 194

button holder:

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 39
(ii)

Supply and erection of button holder:


Button holder Brass.
Detail
Qty

MATERIAL
1 Button holder
2 Screws
Total
Contractor's Profit & O
Total
LABOUR (For 80 Nos.)

1.00 No.
2.00 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 195

button holder:

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 40

Supply and erection of brass bracket with holder

Detail
Qty
MATERIAL
1 Brass bracket with holder
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 60 Nos.)

1.00 No.
2.00 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 196

brass bracket with holder.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 41

Supply and erection of bell push, open/recessed

Detail
Qty
MATERIAL
1 Bell push
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 90 Nos.)

1.00 No.
2.00 Nos.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 197

bell push, open/recessed type (without flex

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 42
(i)

Supply and erection of kit kat, 500 volt:


15/20 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Kit kat 15/20 Amp.
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 60 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 Nos.

## Percent

1.00 No.
0.25 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 198

kit kat, 500 volt:

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 42
(ii)

Supply and erection of kit kat, 500 volt:


30/35 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Kit kat 30/35 Amp.
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 55 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 Nos.

## Percent

1.00 No.
0.25 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 199

kit kat, 500 volt:

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 42
(iii)

Supply and erection of kit kat, 500 volt:


60/65 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Kit kat 60/65 Amp.
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 36 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 Nos.

## Percent

1.00 No.
0.25 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 200

kit kat, 500 volt:

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 42
(iv)

Supply and erection of kit kat, 500 volt:


100 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Kit kat 100 Amp.
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 32 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 Nos.

## Percent

1.00 No.
0.25 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 201

kit kat, 500 volt:

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 42
(v)

Supply and erection of kit kat, 500 volt:


200 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Kit kat 200 Amp.
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 28 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 Nos.

## Percent

1.00 No.
0.25 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 202

kit kat, 500 volt:

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 42
(vi)

Supply and erection of kit kat, 500 volt:


300 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Kit kat 300 Amp.
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 28 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 Nos.

## Percent

1.00 No.
0.25 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 203

kit kat, 500 volt:

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 42
(vii)

Supply and erection of kit kat, 500 volt:


400 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Kit kat 400 Amp.
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 25 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 Nos.

## Percent

1.00 No.
0.50 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 204

kit kat, 500 volt:

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
P. Doz.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 42
(viii)

Supply and erection of kit kat, 500 volt:


500 Amp.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Kit kat 500 Amp.
2 Screw
Total
Contractor's Profit & O
Total
LABOUR (For 25 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 No.

## Percent

1.00 No.
0.50 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 205

kit kat, 500 volt:

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 43

(i)

Supply and erection of tube light, including rod


flexible wire, including connection from ceiling

Double rod (80 watts) with two chokes and 2 star


Detail

Unit Rate (Metric System) per Set


Qty

MATERIAL
1 Tube rod
2 Chokes
3 Starters
4 Frame with holder
5 Flexible wire
Hooks, Chain
Total
Contractor's Profit & O
Total

2.00
2.00
2.00
1.00
2.00
L.S

ITEM RATES
Labour rate for each Set
Composite rate for each Set

Nos.
Nos.
Nos.
job
metre

## Percent

LABOUR (For 4 Sets)


1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

Rate

1.00 No.
0.50 No.

## Percent
## Percent

Rs.
Rs.

Per Unit

Page 206

tube light, including rod, choke, starter w


ng connection from ceiling rose, etc., compl

with two chokes and 2 starters.

Metric System) per Set

ate

Per Unit

Amount (Rs.)

each
each
each
per job
per mtr.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 43

(ii)

Supply and erection of tube light, including rod


flexible wire, including connection from ceiling

Single rod (40 watts) with one choke and one sta
Detail

Unit Rate (Metric System) per Set


Qty

MATERIAL
1 Tube rod
2 Choke
3 Starter
4 Frame set
5 Flexible wire
Hooks, Chain
Total
Contractor's Profit & O
Total

1.00
1.00
1.00
1.00
2.00
L.S

ITEM RATES
Labour rate for each Set
Composite rate for each Set

No.
No.
No.
No.
metre

## Percent

LABOUR (For 5 Sets)


1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

Rate

1.00 No.
0.50 No.

## Percent
## Percent

Rs.
Rs.

Per Unit

Page 207

tube light, including rod, choke, starter w


ng connection from ceiling rose, etc., compl

with one choke and one starter.

Metric System) per Set

ate

Per Unit

Amount (Rs.)

each
each
each
each
per mtr.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 43

(iii)

Supply and erection of tube light, including rod


flexible wire, including connection from ceiling
Single round tube, 32 watts, with one choke and
Detail

Unit Rate (Metric System) for Each


Qty

MATERIAL
1 Round tube 32 watts
2 Starter
3 Choke
4 Holder
5 Base
6 Flexeble wire
7 Hooks
Total
Contractor's Profit & O
Total
LABOUR (For 5 Sets)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
1.00
2.00
1.00
2.00
1.00

No.
No.
No.
Nos.
No.
metre
No.

## Percent

1.00 No.
0.50 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rate

Rs.
Rs.

Per Unit

Page 208

tube light, including rod, choke, starter w


ng connection from ceiling rose, etc., compl

watts, with one choke and one starter, witho

Metric System) for Each

ate

Per Unit

Amount (Rs.)

each
each
each
each
each
per mtr.
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 43

(iv)

Supply and erection of tube light, including rod


flexible wire, including connection from ceiling

Round tube, 32 watts, with one choke and one sta


Detail

Unit Rate (Metric System) for Each


Qty

MATERIAL
1 Round tube 32 watts
2 Starter
3 Choke
4 Holder
5 Base
6 Plastic cover
7 Flexeble wire
8 Hooks
Total
Contractor's Profit & O
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
1.00
2.00
1.00
1.00
2.00
1.00

No.
No.
No.
Nos.
No.
No.
metre
No.

## Percent

1.00 No.
0.50 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rate

Rs.
Rs.

Per Unit

Page 209

tube light, including rod, choke, starter w


ng connection from ceiling rose, etc., compl

with one choke and one starter, with cover.

Metric System) for Each

ate

Per Unit

Amount (Rs.)

each
each
each
each
each
each
per mtr.
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 44

Providing and fixing M.S iron box for housing ma


(1/16\") thick M.S sheet, with locking arrangeme
(i)

60 x 35 x 15 cm (24\" x 14\" x 6\")


Detail

MATERIAL
1 M.S sheet 1.5 mm thick
Base side 1 x 24/12 x 14/12 (1 x 600 x 350 mm)
Long side 2 x 24/12 x 7 12 (2x600x190mm)
Short side 2 x 14/12 x 7 12 (2x350x190mm)
Top 1 x 24 x 12 x 14 (600 x 350 x 150 mm)
1.04 Sqm @ 12.20 Kg/Sqm
2 Angle Iron 25 x 25 x 3 mm/Sqm
2 x 24\" =
48\" (2 x 600 mm)
2 x 14\" =
28\" (2 x 350 mm)
4 x 7.12 =
30\" (4 x 190 mm)
=
0.82 Sqm @ 6.08 Kg/Sqm
3 Handle chromium plated
4 Painting
5 Hinges
6 Locking arrangement
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 4 Nos.)
1 Black Smith
2 Cooly (helper)
3 Painter
4 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O
## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.70 kg

Page 210

.S iron box for housing main switches, made


et, with locking arrangement, including paint

x 14\" x 6\")
Unit Rate (Metric System) for Each
Qty

Rate

Per Amount (Rs.)

12.68 kg

per kg

1.70 kg
1.00 No.
0.178 Gallon
3.00 Nos.
L.S

each
each
Gallon
each

1.00 No.
1.00 No.
0.125 No.
1.00 No.

per
per
per
per

Rs.
Rs.

Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 44

Providing and fixing M.S iron box for


(1/16\") thick M.S sheet, with locking
(ii)

95 x 40 x 20 cm (38\" x 16\" x 8\")


Detail

MATERIAL
1 M.S sheet 38\"x16\"x 8\" thick (1965x406x200mm)
Base side 1x38/12x16/12 (965x406mm) =
Long side 2x38/12x8/12 (2x965x200mm)
=
Short side 2x16/12x8/12 (2x406x200mm)
Top 1x38/12x16/12 (1x965x406mm)
=

0.39
0.39
0.17
0.39
1.34

1.34 Sqm @ 12.45 Kg/Sqm


2 Angle Iron 1\" x 1\" x 1/8\" (25 x 25 x 3mm)
2 x 965 mm = 1.93 R/m
2 x 406 mm = 0.82 R/m
4 x 200 mm = 0.80 R/m
3.55 R/m
3.55 R/m @ 0.632 Kg/R/m
3 Handle chromium plated
4 Paint
5 Hinges
6 Locking arrangement
Total
Contractor's Profit & O
Total
LABOUR (For 3 Nos.)
1 Black Smith
2 Cooly (helper)
3 Painter
4 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

## Percent

## Percent
## Percent

Sqm
Sqm
Sqm
Sqm
Sqm

Page 211

nd fixing M.S iron box for housing main switches, made


ick M.S sheet, with locking arrangement, including paint

0 cm (38\" x 16\" x 8\")


Unit Rate (Metric System) for Each
Qty

Rate

Per Amount (Rs.)

16.70 kg

per kg

2.25 kg
1.00 No.
0.045 Gallon
3.00 Nos.
L.S

per kg
each
Gallon
each

1.25 Nos.
1.00 No.
0.125 No.
1.00 No.

per
per
per
per

Rs.
Rs.

Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 44

Providing and fixing M.S iron box for


(1/16\") thick M.S sheet, with locking
(iii)

105 x 52.5 x 22.5 cm (42\" x 21\" x 9\


Detail

MATERIAL
1 M.S sheet 42\" x 21\" x 9\" thick (1067 x 534 x 225mm)
Base side 1 x 42/12 x 21/12 (1076x534mm)
Long side 2 x 42/12 x 9/12
(2x1067x225mm)
Short side 2 x 21/12 x 9/12
(2x534x225mm)
Top
1 x
42 (1x1067x534mm)
12
12 1.872 Sqm
1872 Sqm @ 27.44 Per Sqm
(51.36 lbs
2 Angle Iron 1\" x 1\" x 1/8 (25x25x3mm)
2 x 42\" =
84\" (2x1076)
2 x 21\" =
42\" (2x534)
4 x 9\"
=
36\" (4x225mm)
162\" or 13.5 ft. (4.12 R/m)
412 ft. 1.394 lbs/PRM
5.74 lbs
3 P/F chromium plated
4 P/F Hinges
Paint
Locking arrangement
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Black Smith
2 Colly (helper)
3 Painter
4 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O
## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

Page 212

nd fixing M.S iron box for housing main switches, made


ick M.S sheet, with locking arrangement, including paint

x 22.5 cm (42\" x 21\" x 9\")


Unit Rate (Metric System) for Each
Qty

Rate

23.30 kg

per kg

.5 ft. (4.12 R/m)


2.60 kg
1.00 No.
3.00 Nos.
0.054 Gallon
L.S

1.25
1.00
0.17
1.00

Rs.
Rs.

Nos.
No.
No.
No.

Per Amount (Rs.)

per kg
each
each
Gallon

per
per
per
per

Say
Say

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 44

Providing and fixing M.S iron box for


(1/16\") thick M.S sheet, with locking
(iv)

135 x 70 x 27.5 cm (54\" x 28\" x 11\"


Detail

MATERIAL
1 M.S sheet (54\" x 28\" 11\") thick (1372x710x280mm)
Base side 1 x 54/12 x 28/12 (1372x710mm)
Long side 2 x 54/12 x 11/12
(2x1372x280mm)
Short side 2 x 28/12 x 11/12
(2x710x280mm)
Top 1 x 54/12 x 28/12
(1x1372x710mm)
3.12 Sqm
3.12 Sqm @ 27.44 lbs/Per Sqm
(85.50 lbs
2 Angle Iron 1\" x 1\" x 1/8\" (25x25x3mm)
1x2 x 54\"=
108\" (2x1372mm)
2 x 28\" =
56\" (2x710mm)
4 x 11\" =
44(4x280mm)
5.28 R/M
5.28 R/M @ 1.39 lbs/Per R/M
7.36 lbs
(7.36 lbs)
3 Handle chromium plated
4 Hinges with screws
5 Locking arrangement
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Black Smith
2 Cooly (helper)
3 Painter
4 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O
## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

Page 213

nd fixing M.S iron box for housing main switches, made


ick M.S sheet, with locking arrangement, including paint

27.5 cm (54\" x 28\" x 11\")


Unit Rate (Metric System) for Each
Qty

Rate

38.78 kg

per kg

3.34 kg
1.00 No.
4.00 Nos.
L.S

per kg
each
each

1.50
1.00
0.25
1.00

per
per
per
per

Rs.
Rs.

No.
No.
No.
No.

Say
Say

Per Amount (Rs.)

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 45

Supply and erection of girder clamp hook, 16 mm


with bolts and nuts for hanging ceiling fans.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Girder clamp hock 5/8\" (16 mm) with
M.S plate 1\" x \" (25 x 6 mm)
2 Nut & bolts \" (12 mm) 1\" (40 mm) long
Total
Contractor's Profit & O
Total
LABOUR (For 30 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
2.00 Nos.

## Percent

1.00 No.
0.50 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 214

girder clamp hook, 16 mm (5/8\") with M.S pl


r hanging ceiling fans.

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 46

Supply and erection of girder strut, of M.S tee


1\" x \") complete with clamp, bolts and nuts,
cement concrete 1 : 3 : 6.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 T - Iron \" x 1\" x 1\" x 5\"
Clamps
2 Nut & Bolts 1\" (25 mm)
3 Manufacturing
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 30 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

5.00
(11.00 lbs)
1.00
3.00
1.00

kg
kg
No.
No.

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 215

girder strut, of M.S tee section 40 x 40 x


ith clamp, bolts and nuts, etc., including fix

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

per kg
each
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 47

Supply and erection of roof suspension hook,16mm


(3 x 1\" x 1/8\") M.S Steel Channel, with clamp
with cement concrete 1:3:6.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Steel channel 75 x 40 x 3 mm
1.5 R/m @ 6.90 Kg/R/m
10.35 kg
2 Hook 5/8\" (16 mm) with nut & bolts
3 Clamp
4 Cement 0.042 Cft.
5 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 28 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

10.35 kg
1.00 No.
1.00 No.
0.12 Cft.

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 216

roof suspension hook,16mm (5/8\" dia) rod wi


Steel Channel, with clamp, bolts & nuts etc.,

nit Rate (Metric System) for Each


Rate

Per Unit

per kg
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 48

Supply and erection of roof suspension hook, of


(3 x 1\" x \") with 16 mm (5/8\") hook, comple
with cement concrete 1 : 3 : 6.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1

Iron plate 3\"x1\"x\" (0.862x46.96 lbs


3.16 kg
2 Hook 5/8\" with bolts & nut
3 Cement 0.063 Cft.
4 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 21 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

3.16 kg
1.00 No.
0.18 Cft.

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 217

roof suspension hook, of M.S plate 75 x 40


16 mm (5/8\") hook, complete with bolts and nut

nit Rate (Metric System) for Each


Rate

Per Unit

per kg
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 49

Supply and erection of 3/8\" (10 mm) dia M.S bar


casting of slab.

Detail
Qty
MATERIAL
1 M.S bar hook 3/8\" (!0 mm) dia
Total
Contractor's Profit & O
Total
LABOUR (For 39 Nos.)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 218

3/8\" (10 mm) dia M.S bar fan hook placed at

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 50

Erection of circular L.T pole in cement concrete


ground level (excluding the cost of pole), inclu
(1 : 2 : 4) excavation of foundation and finishi

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Cement concrete 1:3:6 (1.22x.300x1.0)
Total
Contractor's Profit & O
Total
LABOUR (For 4 Nos.)
1 Cement concrete 1 : 3 : 6
2 Excavation of foundatin
3 Erection of pole in position
Plumber
Helper
4 Extra labour for shuttering
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

0.3714 Cum 0.3714 Cum

## Percent

0.3714 Cum
0.3714 Cum
0.50 No.
2.00 Nos.
L.S
## Percent
## Percent

Rs.
Rs.

Page 219

.T pole in cement concrete 1 : 3 : 6, one me


g the cost of pole), including cement concre
of foundation and finishing surface.

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

.3714 Cum

Per Cum

.3714 Cum
.3714 Cum

Cum
Cum
per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 51

Supply and erection of bracket of M.S


section:
(i)

0.60 metre (2') long for 2 lines.


Detail

MATERIAL
1 Steel channel (25 x 13 x 6 mm)
0.600 @ 5.22 Kg
Steel plate (75 x 20 x 20 mm)

3.18 Kg
0.79 Kg
3.97 Kg

Bolts and nuts 5/8\" dia (16 mm)


Total
Contractor's Profit & O
Total

## Percent

LABOUR (For 7 Nos.)


1 Black Smith
2 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

## Percent
## Percent

Page 220

erection of bracket of M.S channel 75 x 40 x 6 mm (3\"x1

(2') long for 2 lines.


Unit Rate (Metric System) for Each
Qty

Rate

Per Amount (Rs.)

3.97 Kg
2.00 Nos.

per kg
each

1.00 No.
0.25 No.

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 51

Supply and erection of bracket of M.S


section:
(ii)

1.20 metre (4') long, for 4 lines.


Detail

MATERIAL
1 Steel channel 75 x 13 x 6 mm
1.322 m @ 5.22 Kg/Rm
Iron plate 75 x 20 x 6 mm
Bolts and nuts 5/8\" dia (16 mm)
Manufacturing charges
Total
Contractor's Profit & O
Total

6.35 Kg
0.80 Kg
7.15 Kg

## Percent

LABOUR (For 6 Nos.)


1 Black Smith
2 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

## Percent
## Percent

Page 221

erection of bracket of M.S channel 75 x 40 x 6 mm (3\"x1

(4') long, for 4 lines.


Unit Rate (Metric System) for Each
Qty

Rate

Per Amount (Rs.)

7.15 Kg
2.00 Nos.
1 job

per kg
each
per job

1.00 No.
0.25 No.

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 52

Supply and erection of anchor rod Henley type fo


clamps and 7/12\" stay wire, straining screws, e
1 : 3 : 6 and collar of cement concrete.

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 10 Metre)


1 Stay wire 7/12\"
2 Double clamp
3 Steining Screw
4 Eye bolts
5 Cement 0.064 Cft.
6 Sand
7 Bajri
Total
Contractor's Profit & O
Total
Material per metre
LABOUR (For 70 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metre
1.00 No.
1.00 No.
1.00 No.
0.16 Cft.
0.322
## Percent
235.40 1 0

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

Rs.
Rs.
Rs.
Rs.

Page 222

anchor rod Henley type for pole, including


wire, straining screws, etc., erected in cem
f cement concrete.

nit Rate (Metric System) per Metre

0.00 metre

Rate

Per Unit

per mtr.
each
each
each
P.
Bag
Per % Cft.
P. Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 53

Supply and erection of stay for house service pi


screws and 7/14\" stay wire, complete.

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 5 Metre)


1 Stay wire 7/14\"
2 Double clamp 9\" dia (225 mm)
3 Stearining Screw
4 Hook size
5 Eye bolts
6 Cement 0.064 Cft.
7 Sand
8 Bajri
Total
Contractor's Profit & O
## Percent
Total
Material per metre
129.80 5 0
LABOUR (For 35 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

5.00
1.00
1.00
1.00
1.00

0.16 Cft.
0.322

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

metre
No.
No.
No.
No.

Rs.
Rs.
Rs.
Rs.

Page 223

stay for house service pipe, erected with s


wire, complete.

nit Rate (Metric System) per Metre

.00 metre

Rate

Per Unit

per mtr.
each
each
each
each
P.
Bag
Per % Cft.
P. Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 54

Supply and erection of house service pipe Henley


pole, type, 50 mm (2\" dia) erected to install i
shackle insulator for holding insulated wire and
wire and other accessories, etc., complete.

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 4 Metre)


1 G.I. pipe 2\" dia (50 mm)
2 Shakle insulator
3 Clamp double
4 Clamp 2\" dia (50 mm)
5 Rag bolts 5/8\" 9\" (16 x 225 mm)
6 G.I bend 2\" (50 mm) cap
7 G.I Reducing socket 2 x \" dia (50 x 20 mm)
8 M.S bolts for suport
9 Cement 0.064 Cft.
10 Sand
11 Bajri
Total
Contractor's Profit & O
## Percent
Total
Material per metre
1090.45
LABOUR (For 12 Metre)
1 Electrician
2 Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES

4.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00

metre
No.
No.
No.
No.
Nos.
No.
No.

0.16 Cft.
0.322

0
1.00 No.
2.00 Nos.

## Percent
## Percent

Labour rate per Metre


Labour rate per Ft.

Rs.
Rs.

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Page 224

house service pipe Henley (G.I pipe water q


dia) erected to install insulated overhead l
holding insulated wire and straining devices
ries, etc., complete.

nit Rate (Metric System) per Metre

.00 metre

Rate

Per Unit

per mtr.
each
each
each
each
each
each
each
P.
Bag
Per % Cft.
P. Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 55

Supply and erection of house service pipe 50 mm


pole type, for bare copper wire overhead line, i
straining devices and other accessories, etc.

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 4 Metre)


1 G.I. pipe (water quality)
2 Shakle insulator
3 Clamp double
4 Clamp 2\" dia (50 mm)
5 Rag bolts 5/8\" 9\" (16 x 225 mm)
6 G.I bend 2\" (50 mm) cap
7 G.I Reducing socket 2 x \" dia (50 x 20 mm)
8 M.S bar suport
9 Cement 0.042 Cft.
10 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per metre
1081.65
LABOUR (For 12 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

4.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00

metre
No.
No.
No.
No.
Nos.
No.
No.

0.12 Cft.

0
1.00 No.
2.00 Nos.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Page 225

house service pipe 50 mm (2\" dia) G.I pipe


pper wire overhead line, including shackle i
other accessories, etc.

nit Rate (Metric System) per Metre

.00 metre

Rate

Per Unit

per mtr.
each
each
each
each
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 56

Supply and erection of lightening arrestor horn

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Lightening arrestor
Total
Contractor's Profit & O
Total

1.00 No.
## Percent

LABOUR (For 5 Nos.)


1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 226

lightening arrestor horn type, complete.

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 57

Supply and erection of shackle insulator, medium

Detail
Qty
MATERIAL
1 Shackle insulator (medium size)
Total
Contractor's Profit & O
Total
LABOUR (For 7 Nos.)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

0.33 No.

## Percent
## Percent

Rs.
Rs.

Page 227

shackle insulator, medium size.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 58

Supply and erection of pin insulator, green medi

Detail
Qty
MATERIAL
1 Pin insulator green (medium size)
Total
Contractor's Profit & O
Total
LABOUR (For 7 Nos.)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

0.33 No.

## Percent
## Percent

Rs.
Rs.

Page 228

pin insulator, green medium size.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 59

Supply and erection of bare copper conductor wir


including binding wire No.16 SWG.
Detail
Qty

MATERIAL
13.61 kg
(30.00 lbs)
1.00 lbs
0.454 kg

1 Copper wire No.2 to 10


2 Binding wire No.16
Total
Contractor's Profit & O
Total
Per Kg
LABOUR (For 90 Lbs) 40.82 Kg
1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total

## Percent
1211.65

1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Kg
Composite rate per Kg

Rs.
Rs.

Page 229

bare copper conductor wire, No.2 to No.10 S


No.16 SWG.
Unit Rate (Metric System) per Kg
Rate

Per Amount (Rs.)

per kg
per kg

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 60

Supply and erection of G.I wire of all sizes, in


for support of rubber wire or earthing wire, pol
Detail
Qty

MATERIAL
13.61 kg
(30.00 lbs)
(1.00 lbs)
0.454 kg

1 G.I wire (all size)


2 Binding wire No.16
Total
Contractor's Profit & O
Total
Material cost per Kg
LABOUR (For 90 Lbs) 40.83 Kg
1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total

## Percent
418.20 1

1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate per Kg
Composite rate per Kg

Rs.
Rs.

Page 230

G.I wire of all sizes, including binding wi


wire or earthing wire, pole to pole, etc.

1.00 lbs)

Unit Rate (Metric System) per Kg


Rate

Per Amount (Rs.)

per kg
per kg

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 61

Wiring overhead line in 2 single core,


No.8 SWG bearer wire and in house serv
through joint box:
(i)

3/0.74 mm (3/0.029\")
Detail

MATERIAL (For 47 Metre)


1 PVC/weather proof cable 3/0.029\" (3/0.74 mm)
Single core
2 Leather or wooden cleats
3 G.I wire No.8 SWG
4 Eye - bolts
Total
Contractor's Profit & O
Total
Material cost per metre
LABOUR (For 90 Metre)

## Percent

1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

573.62 4

## Percent

Page 231

head line in 2 single core, PVC/weather proof cable, on


arer wire and in house service pipe, including connecti

3/0.029\")
Unit Rate (Metric System) per Metre
Qty

Rate

Per Amount (Rs.)

47.00 metre
25.00 Nos.
1.81 kg
(4.00 lbs)
2.00 Nos.

per mtr.
each

1.00 No.
1.00 No.

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

kg
each

DESCRIPTION OF ITEM:
Item No. 61

Wiring overhead line in 2 single core,


No.8 SWG bearer wire and in house serv
through joint box:
(ii)

7/0.74 mm (7/0.029\")
Detail

MATERIAL (For 47 Metre)


1 PVC/weather proof cable /0.029\" (7/0.74 mm)
Single core
2 G.I wire No.8 SWG
3 Eye - bolts
4 Cut out
5 T. Wooden board 7\" x 4\" (175 x 100 mm)
6 Wooden & leather cleats
Total
Contractor's Profit & O
## Percent
Total
Material cost per metre
880.13 4
LABOUR (For 90 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

## Percent
## Percent

Page 232

head line in 2 single core, PVC/weather proof cable, on


arer wire and in house service pipe, including connecti

7/0.029\")
Unit Rate (Metric System) per Metre
Qty

Rate

Per Amount (Rs.)

47.00 metre
1.81 kg
(4.00 lbs)
2.00 Nos.
2.00 Nos.
1.00 No.
25.00 Nos.

per mtr.

1.00 No.
1.00 No.

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

kg
each
each
each
each

DESCRIPTION OF ITEM:
Item No. 61

Wiring overhead line in 2 single core,


No.8 SWG bearer wire and in house serv
through joint box:
(iii)

7/0.91 mm (7/0.036\")
Detail

MATERIAL (For 47 Metre)


1 PVC/weather proof cable /0.036\" (7/0.91 mm)
Single core
2 G.I wire No.8 SWG
3 Eye - bolts
4 Cut out
5 T. Wooden board 7\" x 4\" (175 x 100 mm)
6 Wooden & leather cleats
Total
Contractor's Profit & O
## Percent
Total
Material cost per metre
1230.76
LABOUR (For 90 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

## Percent
## Percent

Page 233

head line in 2 single core, PVC/weather proof cable, on


arer wire and in house service pipe, including connecti

7/0.036\")
Unit Rate (Metric System) per Metre
Qty

Rate

Per Amount (Rs.)

47.00 metre
1.81 kg
(4.00 lbs)
2.00 Nos.
2.00 Nos.
1.00 No.
25.00 Nos.

per mtr.

1.00 No.
1.00 No.

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

kg
each
each
each
each

DESCRIPTION OF ITEM:
Item No. 61

Wiring overhead line in 2 single core,


No.8 SWG bearer wire and in house serv
through joint box:
(iv)

7/1.12 mm (7/0.044\")
Detail

MATERIAL (For 47 Metre)


1 PVC/weather proof cable /0.044\" (7/1.12 mm)
Single core
2 G.I wire No.8 SWG
3 Eye - bolts
4 Cut out
5 T. Wooden board 7\" x 4\" (175 x 100 mm)
6 Wooden & leather cleats
Total
Contractor's Profit & O
## Percent
Total
Material cost per metre
1437.56
LABOUR (For 80 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

## Percent
## Percent

Page 234

head line in 2 single core, PVC/weather proof cable, on


arer wire and in house service pipe, including connecti

7/0.044\")
Unit Rate (Metric System) per Metre
Qty

Rate

Per Amount (Rs.)

47.00 metre
1.81 kg
(4.00 lbs)
2.00 Nos.
2.00 Nos.
1.00 No.
25.00 Nos.

per mtr.

1.00 No.
1.00 No.

per day
per day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

kg
each
each
each
each

DESCRIPTION OF ITEM:
Item No. 62

Supply and erection of all aluminium stranded ha


size 7/3.099 mm (7/0.122\").

Detail

Unit Rate (Metric System) p


Qty

MATERIAL
1 Aluminium stranded hard drawn bare
conductor 7/3.099 mm (7/0.122\")
Total
Contractor's Profit & O
Total
LABOUR (For 26 Metre)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES

1.00 No.

1.00 No.

## Percent
## Percent

Labour rate per Metre


Labour rate per Ft.

Rs.
Rs.

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Page 235

all aluminium stranded hard drawn bare cond

nit Rate (Metric System) per Metre


Rate

Per Unit

each

per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 63

Supply and erection of street light pole bracket


long, complete with 2 No. pole clamp.

Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 G.I. Pipe 1\" dia (32 mm) 7 ft. (2.13 metre)
2 Cost of clamp
Total
Contractor's Profit & O
Total
LABOUR (For 6 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

2.13 metre
2.00 Nos.

## Percent

1.00 No.
1.00 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 236

street light pole bracket 30 mm (1\") G.I p


No. pole clamp.

nit Rate (Metric System) for Each

.13 metre

Rate

Per Amount (Rs.)

per mtr.
each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 64

Supply and erection of pole mounted st


etc., for fitting 125/250 watts mercur
(i)

G.E.C design
Detail

MATERIAL
1 Pole street with holder shade and glass
for mercury vapour lamp 125/250 complete
2 Bracket
3 Clamps with bolts & nuts etc.
Total
Contractor's Profit & O
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

## Percent

## Percent
## Percent

Page 237

erection of pole mounted street light, holders, shade a


itting 125/250 watts mercury vapour lamp (excluding cos

Unit Rate (Metric System) for Each


Qty

Rate

Per Amount (Rs.)

1.00 No.
1.00 No.
2.00 Nos.

each
each
each

1.00 No.
1.00 No.

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 64

Supply and erection of pole mounted st


etc., for fitting 125/250 watts mercur
(ii)

Phillips design
Detail

MATERIAL
1 Cost of fitting complete with holder
shade and glass
2 Cost of bracket 1\" (32 mm) G.I pipe
7 ft. long half round
3 Cost of pole clamp with bolt & nuts
Total
Contractor's Profit & O
Total

## Percent

LABOUR (For 3 Nos.)


1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

## Percent
## Percent

Page 238

erection of pole mounted street light, holders, shade a


itting 125/250 watts mercury vapour lamp (excluding cos

Unit Rate (Metric System) for Each


Qty

Rate

Per Amount (Rs.)

1.00 No.

each

1.00 No.
2.00 Nos.

each
each

1.00 No.
1.00 No.

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 65

Supply and fitting of mercury vapour l


(i)

125 watt lamp


Detail

MATERIAL
1 Vapour mercury lamp 125 watt
with choke set 649 + 330
=
Total
Contractor's Profit & O
Total
LABOUR (For 6 Nos.)

979

## Percent

1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

## Percent
## Percent

Page 239

fitting of mercury vapour lamp, complete with choke set

Unit Rate (Metric System) for Each


Qty

Rate

Per Amount (Rs.)

1.00 Nos.

each

1.00 No.
0.50 No.

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 65

Supply and fitting of mercury vapour l


(ii)

250 watt lamp


Detail

MATERIAL
1 Vapour mercury lamp 250 watt
with choke set 2558 + 100 =
Total
Contractor's Profit & O
Total
LABOUR (For 5 Nos.)

3658

## Percent

1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

## Percent
## Percent

Page 240

fitting of mercury vapour lamp, complete with choke set

Unit Rate (Metric System) for Each


Qty

Rate

Per Amount (Rs.)

1.00 Nos.

each

1.00 No.
0.50 No.

per day
per day

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 66

Manufacture and erection of angle iron lattice s


long (9348 mm ground level) 355 mm square at bas
electric distribution line, using 1\"x1\"x3/16
angle iron bracings 420 mm long fixed between le
diagonal position, and 1\" x 1\" x 3/16\" angl
flat iron 2\" x \", 305 mm centre to centre, as
silverpainting of pole 3 coats, excavation and r
concrete 1 : 2 : 4, 1807 x 500 x 500 mm for foun
respects.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1

6
7

Angle iron 1\"x1\"x3/16\" (32x32x4 mm)


Legs 4x10923 mm = 43692mm = 143.35 ft.
143.35 ft. @ 1.47 lbs/ft.
=
210.72 lbs
Angle Iron \"x\"x1/8 (20x20x3 mm)
Bracing 18x4x420mm = 30240mm or 99.21 ft.
99.21 ft. @ 0.58 lbs/ft. =
57.54 lbs
Angle Iron 1\"x1\"1/8 (25x25x3 mm)
Bracing 3x4x385mm = 4620 mm or 15.16 ft.
15.16 ft. @ 0.80 lbs/ft.
12.13 lbs
280.39 lbs
M.S. flat 2x\" (50 x 6 mm)
4x4x204 mm = 3264 mm = 10.71 ft.
10.71 ft. @ 1.70 lbs/ft. =
18.21 lbs
Angle Iron 1\"x1\"x3/16\" (44x44x4 mm)
4x4x204 mm = 3264mm = 10.71 ft.
10.71 ft. @ 2.11 lbs/ft. =
22.60 lbs
Silver paint 0.25 gallon @ 550 per gallon
Cement concrete 1 : 2 :4
foundation 500x500x1728 mm = 0.43 m
15.06 Cft
Pre cast cement concrete 1 : 2 : 4
2x100x100x100 = 2000000 mm or 0.07 Cft
0.07 Cft
Total
Contractor's Profit &## Percent
Total

127.22 kg

8.26 kg

10.25 kg
0.25 gallon

15.06 Cft.

0.07 Cft.

Page 241

on of angle iron lattice steel structure pol


evel) 355 mm square at base & 204 mm square
line, using 1\"x1\"x3/16\" angle iron legs an
0 mm long fixed between legs on all the four
1\" x 1\" x 3/16\" angle iron on top and 4 b
05 mm centre to centre, as per standard drawin
3 coats, excavation and refilling of founda
07 x 500 x 500 mm for foundation, etc., comp

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

per kg

per kg

.25 gallon

per kg
per gln.

5.06 Cft.

per Cft

per Cft

Detail

Unit Rate (Metric System) f


Qty

LABOUR
1 Black Smith
1.50 Nos.
Cooly (helper)
3.00 Nos.
2 Welding charges
No. of weld 2(72+12+16) = 200 Nos.
200.00 Nos.
3 Drilling hole
20.00 Nos.
Painter
0.25 No.
4 Excavation 500x500x1576 mm = 394000000
or 13.91 Cft (Item 4b Chap. 3)
13.91 Cum
5 Concrete 1:2:4
Foundation 500x500x1728 mm = 432000000
15.06 Cft (Item 5f Chap. 6)
15.06 Cum
6 Pre cast cement concrete 1:2:4
2x100x100x100 = 2000000 mm or 0.07 Cft
0.07 Cum
(Item 10 Chap. 6)
Total
Sundries
## Percent
Total
Contractor's Profit & O
## Percent
Total
ITEM RATES
Labour rate for Each
Rs.
Composite rate for Each
Rs.

Page 242

nit Rate (Metric System) for Each


Rate Per Amount (Rs.)

0.00 Nos.

per day
per day
each
each
per day
per Cft

per Cft
per Cft

Say
Say

DESCRIPTION OF ITEM:
Item No. 67

Manufacture and erection of galvanized angle iro


pole 11.30 metre long (9.85 metre above ground l
base, 350mm square at top, for electric distribu
high tensile steel angle iron legs, and 310x310x
fixed between legs on all the four sides in diag
drawing including silver painting of pole, excav
foundation, one ft. thick cement concrete 1:3:6
2.44x1.067x1.067 metre complete in all respects.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Angle iron 50x50x4mm (lattice steel)
Legs 4x30 ft.
=
120 ft.
Studs 4x7 = 28 = 148 ft. 1.96 lbs/Rft290.08 lbs
131.62 kg
2 Angle Iron 1 3/8 x 1 3/8 3 x 1/8
Braces 4x16x2.75 = 176 ft.
@ 1.55 lbs/ft. = 272.8 lbs =
123.77 kg
3 M.S plate 5/32\" thick
13\"x13\"x5/32\"
= 0.017 Cft
@ 493 lbs/Cft = 8.38 lbs
3.80 kg
4 Silver paint 0.25 gallon
5 Cement concrete 1:3:6
(3.5 x 3.5 x 0.5)
=
6.13 Cft
(1 x 3.5 x 6.5)
=
22.75 Cft
(1 x 1.5 x 6.5)
=
9.75 Cft
38.63 Cft
Total
Contractor's Profit & O
## Percent
Total

131.62 kg

123.77 kg

3.80 kg
0.25 gallon

38.63 Cum

Page 243

on of galvanized angle iron lattice steel st


(9.85 metre above ground level), 875mm squar
top, for electric distribution line, using 5
le iron legs, and 310x310x3mm M.S angle iro
all the four sides in diagonal position, as
er painting of pole, excavation and refilli
ick cement concrete 1:3:6 foundation of oute
complete in all respects.

nit Rate (Metric System) for Each

.25 gallon

Rate

Per Amount (Rs.)

per kg

per kg

per kg
per gln.

per Cum

Detail

Unit Rate (Metric System) f


Qty

LABOUR
1 Black Smith
2 Cooly (helper)
3 Welding charges (No. of weld)
Bacing 64 x 2 =
T/plate 1 x 4
=

1.50 Nos.
3.00 Nos.
128 Nos.
4 Nos.
132 Nos.

132 Nos. weld


4 Drilling hole
5 Painter
6 Excavation of foundation
(3.5 x 3.5 x 7.5) (Item 4b Chap. 3) 91.88 Cft
7 Cement Concrete 1:3:6 (Item 3a Chap. 6)
8 Earth filling(1.5x.5 x 6.5) (Item 15(14.63 Cft
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

132.00 Nos.
8.00 Nos.
0.25 No.
91.88 Cft
38.630 Cft
14.630 Cft

## Percent
## Percent

Rs.
Rs.

Page 244

nit Rate (Metric System) for Each


Rate Per Amount (Rs.)

32.00 Nos.

8.630 Cft
4.630 Cft

per day
per day

per weld
per hole
per day
per Cft
per Cft
per Cft

Say
Say

DESCRIPTION OF ITEM:
Item No. 68

Earthing of iron clad/aluminium switches, etc.,


pipe 15 mm (\" dia) recessed or on surface of w
1.5 metre long G.I pipe, 50 mm (2\" dia) with re
below ground level, and 2 metre away from buildi
Detail

Unit Rate (Metric System) p


Qty

MATERIAL
1 Boring
2 G.I pipe \" (12 mm) ( medium quality)
3 G.I wire No.8 SWG @ (2 lbs)
4 G.I pipe 2\" (50 mm) ( medium quality)
5 G.I reducing socket size 2 x \" (50 x 13 mm)
6 G.I bend \" (13 mm)
7 Cement 0.063 Cft.
8 Sand
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 metr
8.00 metre
0.907 kg
(2.00 lbs)
1.50 metre
1.00 No.
4.00 No.
0.18 Cft.

1.00 No.
2.00 Nos.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 245

aluminium switches, etc., with G.I wire No.8


ecessed or on surface of wall and floor, comp
e, 50 mm (2\" dia) with reducing socket 4 to
d 2 metre away from building plinth.

nit Rate (Metric System) per Job

2.00 lbs)

Rate

Per Unit

per mtr.
per mtr.
kg
per mtr.
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 69

(i)

Earthing of Metallic cases, etc., with G.I wire


pipe, best quality:
On surface, including clamps, etc.
Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 G.I pipe \" dia (12 mm)
2 G.I wire No.8 SWG
3 G.I clamp \" dia (12 mm)
4 G.I bolts 2\" x \" dia (50 x 6 mm)
5 Gutties
6 Screw \" (20 mm)
7 G.I bend \" dia (12 mm)
Total
Contractor's Profit & O
## Percent
Total
Material per Metre
145.48
LABOUR (For 40 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

7.00 metre
0.454 kg
(1.00 lbs)
6.00 Nos.
1.00 No.
10.00 Nos.
10.00 Nos.
1.00 No.

1.00 No.
1.00 No.
## Percent
## Percent

Rs.
Rs.
Rs.
Rs.

Page 246

ases, etc., with G.I wire No.8 SWG, in 15 mm

clamps, etc.

nit Rate (Metric System) per Metre


Rate

Per Unit

.00 metre

per mtr.

1.00 lbs)

per kg
each
each
per doz.
each
each

0.00 Nos.
0.00 Nos.

0.00 per day


0.00 per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 69

(ii)

Earthing of Metallic cases, etc., with G.I wire


pipe, best quality:
Recessed in wall, including hooks, jharries and
Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 G.I pipe \" dia (12 mm)
2 G.I wire No.8 SWG
3 G.I bolts 2\" x \" dia (50 x 6 mm)
4 Hooks
5 G.I bend \" dia (12 mm)
6 Cement 0.063 Cft.
7 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per Metre
470.64
LABOUR (For 25 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O
## Percent
Total
ITEM RATES

7.00 metre
0.454 kg
(1.00 lbs)
1.00 No.
6.00 Nos.
1.00 Nos.
0.18 Cft.

0
1.00 No.
2.00 No.

Labour rate per Metre


Labour rate per Ft.

Rs.
Rs.

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Page 247

ases, etc., with G.I wire No.8 SWG, in 15 mm

uding hooks, jharries and making good surfac

nit Rate (Metric System) per Metre


Rate

Per Unit

.00 metre

per mtr.

1.00 lbs)

kg
each
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 70

Bonding to earth with wire on surface, including


clamps, thimbles, etc.

(a)

G.I wire:

(i)

8 SWG
Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 G.I wire No.8 SWG
2 Copper themble
3 G.I Nuts & Bolts 2\" long \" ( 50 mm x 13 mm)
4 G.I clamp
5 Cement 0.042 Cft.
6 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per Metre
51.00
LABOUR (For 50 Metre)
1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total

0.68 kg
(1.50 lbs)
1.00 No.
1.00 No.
1.00 No.
0.12 Cft.

0
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Page 248

wire on surface, including cost of wire,

nit Rate (Metric System) per Metre


Rate

Per Unit

1.50 lbs)

Amount (Rs.)

per kg
each
each
each
P.

Bag

Per % Cft.

per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 70

(a)
(ii)

Bonding to earth with wire on surface, including


clamps, thimbles, etc.
G.I wire:
16 SWG

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 G.I wire No.16 SWG
2 Copper themble
3 G.I Nuts & Bolts 1\" x \" long (40 x 6 mm)
4 Cement 0.011 Cft.
5 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per Metre
LABOUR (For 50 Metre)
1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total

0.112 kg
1.00 No.
1.00 No.
0.03 Cft.

1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Page 249

wire on surface, including cost of wire,

nit Rate (Metric System) per Metre


Rate

Per Unit

per kg
each
each
P.
Bag
Per % Cft.

per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 70

(b)
(i)

Bonding to earth with wire on surface, including


clamps, thimbles, etc.
Copper wire:
16 SWG

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 Copper wire No.16 SWG
2 Copper themble
3 G.I Nuts & Bolts 1\" x \" long (40 x 6 mm)
4 Cement 0.011 Cft.
5 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per Metre
28.56
LABOUR (For 50 Metre)
1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total

0.133 kg
1.00 No.
1.00 No.
0.03 Cft.

1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Page 250

wire on surface, including cost of wire,

nit Rate (Metric System) per Metre


Rate

Per Unit

per kg
each
each
P.
Bag
Per % Cft.

per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 70

(b)
(ii)

Bonding to earth with wire on surface, including


clamps, thimbles, etc.
Copper wire:
20 SWG

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 Copper wire No.20 SWG
2 Copper themble
3 G.I Nuts & Bolts 1\" x \" long
4 Cement 0.011 Cft.
5 Sand
Total
Contractor's Profit & O
## Percent
Total
Material per Metre
15.04
LABOUR (For 50 Metre)
1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total

0.035 kg
1.00 Nos.
1.00 Nos.
0.03 Cft.

1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Page 251

wire on surface, including cost of wire,

nit Rate (Metric System) per Metre


Rate

Per Unit

per kg
each
each
P.
Bag
Per % Cft.

per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 71

Erection only, of lightening conductor of copper


cement, sand mortar.

Detail

Unit Rate (Metric System) p


Qty

MATERIAL (For 7 Metre)


1 Gutties
2 Copper nail
3 Copper stapple
4 Cement 0.021 Cft.
5 Sand
Total
Contractor's Profit & O
Total
Material per Metre

8.00 Nos.
8.00 Nos.
4.00 Nos.
0.06 Cft.
## Percent
44.00

LABOUR (For 25 Metre)


1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Page 252

tening conductor of copper staple, and coppe

nit Rate (Metric System) per Metre


Rate

Per Unit

per doz.
each
each
P.
Bag
Per % Cft.

per day
per day

Say
Say
Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 72

Supply and erection of 600 x 600x3mm (2'x2x1/8\"


riveting to copper tape and placing in mixture o

Detail

Unit Rate (Metric System) per Each


Qty

MATERIAL
9.98 kg
Copper plate 600x600x3mm=0.00133(22.00 lbs)
@ 550 lbs/cft 22 lbs
36.30 kg
2 Char coal
(80.00 lbs)
18.15 kg
3 Salt
(40.00 lbs)
Total
Contractor's Profit &## Percent
Total
LABOUR (For 3 Metre)
1

1 Electrician
1.00 No.
2 Cooly (helper)
2.00 Nos.
Total
Sundries
## Percent
Total
Contractor's Profit &## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 253

600 x 600x3mm (2'x2x1/8\") copper plate, inc


e and placing in mixture of salt & charcoal,

Metric System) per Each


Rate

Per Amount (Rs.)

per kg
per kg
per kg

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 73

(i)

Supply and erection of copper tape, including co


cement, sand, etc.
Tape 40 x 3 mm (1\" x 1/8\")
Detail

Unit Rate (Metric System) p


Qty

MATERIAL
1 Copper tap 1\"x1/8\"
= 1 metre
1 metre = 0.004 Cft @ 550 lbs/Cft 2.2 lbs
2 Gutties
3 Copper nail
4 Copper staple
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 25 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 kg
(2.20 lbs)
1.00 No.
1.00 No.
1.00 No.

1.00 No.
2.00 Nos.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 254

copper tape, including copper staple copper

nit Rate (Metric System) per Metre

2.20 lbs)

Rate

Per Amount (Rs.)

per kg
per doz.
each
each

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 73

(ii)

Supply and erection of copper tape, including co


cement, sand, etc.
Tape 50 x 3 mm (2\" x 1/8\")
Detail

Unit Rate (Metric System) p


Qty

MATERIAL
1 Copper tap 2\"x1/8\"
= 1 metre
1 metre = 0.005 Cft @ 550 lbs/Cft 2.7 lbs
2 Copper nail
3 Copper staple
4 Gutties
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 25 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.22 kg
(2.27 lbs)
1.00 No.
1.00 No.
1.00 No.

1.00 No.
2.00 Nos.

## Percent
## Percent

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Page 255

copper tape, including copper staple copper

nit Rate (Metric System) per Metre


Rate

Per Unit

2.27 lbs)

Amount (Rs.)

per kg
each
each
per doz.

per day
per day

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 74

Supply and erection of 25 mm (1\"/dia) and one m


copper rod with 5 spikes on ball and base, etc.,

Detail

Unit Rate (Metric System) p


Qty

MATERIAL
Copper rod 1\" dia (25 mm)
=
with 5 spikes on ball and base
1 Weight of rod
2 weight of ball
3 weight of base and spikes

Total
Contractor's Profit & O
Total

1 metre
9.9 lbs
3.00 lbs
1.00 lbs
13.90 lbs (13.90 lbs)
6.30 kg
## Percent

LABOUR (For 3 Nos.)


1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each Job
Composite rate for Each Job

1.00 No.
1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 256

25 mm (1\"/dia) and one metre long lightning


es on ball and base, etc., complete.

nit Rate (Metric System) per Job

13.90 lbs)

Rate

Per Amount (Rs.)

per kg

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 75

Supply and erection of electric energy metre, in

(a)

Single phase:

(i)

1 x 10 Amp 250 volts


Detail
Qty

MATERIAL
1 Energy metre 10 Amp. Single phase 250 Volts
2 Testing Fee
Total
Contractor's Profit & O
Total
LABOUR (For 4 Nos.)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.
L.S

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 257

electric energy metre, including metre test

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 75

Supply and erection of electric energy metre, in

(a)

Single phase:

(ii)

1 x 30 Amp 250 volts


Detail
Qty

MATERIAL
1 Energy metre 30 Amp. Single phase 250 Volts
2 Testing Fee
Total
Contractor's Profit & O
Total
LABOUR (For 4 Nos.)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.
L.S

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 258

electric energy metre, including metre test

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 75

Supply and erection of electric energy metre, in

(b)

Three phase, 4 wires

(i)

3 x 15 Amp. 400 volts


Detail
Qty

MATERIAL
1 Energy metre 3 x 15 Amp. Three phase 400 Volts
2 Testing Fee
Total
Contractor's Profit & O
Total
LABOUR (For 2 Nos.)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.
L.S

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 259

electric energy metre, including metre test

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 75

Supply and erection of electric energy metre, in

(b)

Three phase, 4 wires

(ii)

3 x 50 Amp. 400 volts


Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Energy metre 3 x 50 Amp. Three phase 400 Volts
2 Testing Fee
Total
Contractor's Profit & O
Total
LABOUR (For 2 Nos.)

## Percent

1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.
L.S

1.00 No.
0.50 No.

## Percent
## Percent

Rs.
Rs.

Page 260

electric energy metre, including metre test

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 75

Supply and erection of electric energy metre, in

(b)

Three phase, 4 wires

(iii)

3 x 80 Amp. 400 volts


Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 Energy metre 3 x 80 Amp. Three phase 400 Volts
2 Testing Fee
Total
Contractor's Profit & O
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
L.S

## Percent

1.00 No.
0.50 No.
## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 261

electric energy metre, including metre test

nit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 76

(i)

Rewinding of A.C ceiling fan, capacitor type, in


paper cotton tape, soldering, etc.
1200 mm (48\") sweep, 275 - 300 RPM
Detail

MATERIAL
1 Leatheride paper
2 Copper wire No.32 SWG - 26 SWG
3 Soldring and vanishing hoop wire No.3
4 Deduction cost of 2 lbs (1.02 kg) copper wire ol
Total
Contractor's Profit & O
Total

## Percent

LABOUR (For 4 Nos.)


1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

L.S
1.02 kg
(2.25 lbs)
Job
2.25 lbs
1.02 kg

1.50 No.
0.50 No.

## Percent
## Percent

Rs.
Rs.

Page 262

ng fan, capacitor type, including cost of wi


dering, etc.

275 - 300 RPM

2.25 lbs)

Unit Rate (Metric System) for Each


Qty

Rate

Per Amount (Rs.)

per kg
per kg

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 76

(ii)

Rewinding of A.C ceiling fan, capacitor type, in


wire, leatheride paper cotton tape, soldering, e
1400 mm (56\") sweep, 250 - 275 RPM
Detail
Qty

MATERIAL
1 Leatheride paper and cotten tape
2
3
4
5

Enemal wire No.26 SWG to 32 SWG


Soldering and varnishing
Loop wire 4 loop 3/0.029 (3/0.74 mm)
Deduction cost of old material

Total
Contractor's Profit & O
Total
LABOUR (For 4 Nos.)

## Percent

1 Electrician
2 Cooly (helper)
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

Job
1.13 kg
(2.50 lbs)
1.00 No.
4.00 ft.
2.50 lbs
1.13 kg

1.50 No.
0.75 No.

## Percent
## Percent

Rs.
Rs.

Page 263

ng fan, capacitor type, including cost of


cotton tape, soldering, etc.

250 - 275 RPM

2.50 lbs)

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

per kg
each
per Rft
per kg

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 77

(i)

Rewinding of A.C exhaust fan, including cost of


leatheride paper, cotton tape, soldering, etc.
375 mm (15\") sweep, and 1300 - 1500 RPM
Detail
Qty

MATERIAL
1 Leatheride paper and cotten tape
2 Enamel wire No.26 SWG to 32 SWG
3 Varnishing and soldering
4 Deduction cost of old material
Total
Contractor's Profit & O
Total

## Percent

LABOUR (For 3 Nos.)


1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

Job
0.68 kg
(1.50 lbs)
Job
1.50 lbs
0.68 kg

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 264

st fan, including cost of wire,


on tape, soldering, etc.

nd 1300 - 1500 RPM

1.50 lbs)

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

per kg
per kg

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 77

(ii)

Rewinding of A.C exhaust fan, including cost of


leatheride paper, cotton tape, soldering, etc.
450 mm (18\") sweep, and 1300 - 1500 RPM
Detail
Qty

MATERIAL
1 Leatheride paper and cotten tape
2
3
4
5

Enamel wire No.26 SWG to 32 SWG


Varnishing and soldering
Loop wire 3/0.029\" (3/0.74 mm)
Deduction cost of old material

Total
Contractor's Profit & O
Total
LABOUR (For 3 Nos.)

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

Job
0.79 kg
(1.75 lbs)
Job
4.00 ft.
1.75 lbs
0.79 kg

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 265

st fan, including cost of wire,


on tape, soldering, etc.

nd 1300 - 1500 RPM

1.75 lbs)

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

per kg
per ft.
per kg

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 78

Rewinding of pedestal fan 600 mm (24\") sweep, a


RPM, including wire, leatheride paper, cotton, t

Detail
Qty
MATERIAL
1 Leatheride paper and cotten tape
2 Enamel wire No.26 SWG to 32 SWG
3 Varnishing and soldering
4 Deduction cost of old material
Total
Contractor's Profit & O
Total

## Percent

LABOUR (For 5 Nos.)


1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total

Job
0.91 kg
(2.00 lbs)
Job
(2.00 lbs)
0.91 kg

2.00 No.

## Percent
## Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 266

fan 600 mm (24\") sweep, and 900 - 950


eatheride paper, cotton, tape, etc.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

2.00 lbs)

per kg

2.00 lbs)

per lbs

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 79

Supply and fitting of regulator nob with shaft a


electric fan regulator.
Detail
Qty

MATERIAL
1 Knob with shaff and plate
Total
Contractor's Profit & O
Total
LABOUR (For 16 Nos.)

1.00 No.

## Percent

1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 267

regulator nob with shaft and plate of

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 80

Supply and fitting of capacitor 2.2 uf, for ceil

Detail
Qty
MATERIAL
1 Capacitor 2.2 uf
Total
Contractor's Profit & O
Total

1.00 No.
## Percent

LABOUR (For 20 Nos.)


1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 268

capacitor 2.2 uf, for ceiling fans.

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 81

Supply and fitting of ball bearing of size 6201,

Detail
Qty
MATERIAL
1 Ball bearing size (6201, 6202 or 6203)
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 16 Nos.)
1 Electrician
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

1.00 No.

1.00 No.

## Percent
## Percent

Rs.
Rs.

Page 269

ball bearing of size 6201, 6202 or 6203, for

Unit Rate (Metric System) for Each


Rate

Per Amount (Rs.)

each

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 82

Rewinding regulator of ceiling fan (1200/1400 mm


3/4 speeds.
Detail

Unit Rate (Metric System) for Each


Qty

MATERIAL
0.18 kg
1 Enamel copper wire No.26 SWG to 32 SWG (0.403 lbs)
2 Leathoride paper, cotten tape and vinish L.S
3 Deduct cost of old material
(0.403 lbs)
0.18 kg
Total
Contractor's Profit & O
## Percent
Total
LABOUR (For 8 Nos.)
1 Electrician
1.00 No.
Total
Sundries
Total
Contractor's Profit & O
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

## Percent
## Percent

Rs.
Rs.

Page 270

ceiling fan (1200/1400 mm) sweep, to contro

Metric System) for Each


Rate

Per Unit

kg
per kg

per day

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 83

Erection of ceiling fan alongwith regulator (all


from local Railway Station/Store to site of work
suspension rod and board connection, and cutting
where necessary.
Detail

Unit Rate (Metric System) f


Qty

MATERIAL
1 PVC wire 3/0.029\"
Total
Contractor's Profit & O
Total
LABOUR (For 10 Nos.)

2.00 metre

## Percent

1 Carriage from stone to site


2 Cutting & threading G.I pipe (22mm) dia
3 Electrician
4 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O
## Percent
Total

L.S
8.00 Nos.
1.00 No.
1.00 No.

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 271

n alongwith regulator (all sizes), including


tion/Store to site of work, electric wire/ca
rd connection, and cutting threading on the

nit Rate (Metric System) for Each

.00 metre

Rate

Per Amount (Rs.)

per mtr.

each
per day
per day

Say
Say

LIST EQUIPMENT
S. No.
EQ-01
EQ-02
EQ-03
EQ-04
EQ-05
EQ-06
EQ-07
EQ-08
EQ-09
EQ-10
EQ-11
EQ-12
EQ-13
EQ-14
EQ-15
EQ-16
EQ-17
EQ-18
EQ-19
EQ-20
EQ-21
EQ-22
EQ-23
EQ-24
EQ-25
EQ-26
EQ-27
EQ-28
EQ-29
EQ-30
EQ-31
EQ-32
EQ-33
EQ-34
EQ-35
EQ-36
EQ-37
EQ-38
EQ-39
EQ-40
EQ-41
EQ-42
EQ-43
EQ-44
EQ-45
EQ-46
EQ-47

NAME OF MACHINERY
Bull Dozer D-6 (16 Ton)
Motor Grader
Wheel Loader (15 Ton)
Rental Charges of equipment for desilting
3 Wheel Roller (10-15 Ton)
Pneumatic Tyre Roller (8-13 Ton)
Tandum/Road Roller (8-12 Ton)
Vibratory Roller (8 Ton)
Asphalt Plant (45-46 Ton)
Asphalt Finishers (Paver)
Electric Power Plant (Generator) (100 KW)
Truck 2-Axle (Local) (10 Ton)
Truck 3-Axle (Local) (15 Ton)
Truck 3-Axle (Imported) (15-18 Ton)
Dumper Truck (Imported) (15 Ton)
Water Lorry (Local)
Donkey
Wheel Tractor with Plough
Wheel Tractor with Trolley
Wheel Tractor with Sheep foot Roller
Wheel Tractor with Water Tank
Wheel Tractor with Blade
Concrete Mixer
Concrete Mixer
Concrete Vibrator
Plate Compactor
Tar Boiler
Cost of lifting machinery including carriage
Cost of trollies
Road Roller
Hire charges for a cart having a capacity of about 20 Cft/one t
Hire charges of Rig
Hire charges of truck (5 ton - 10 tons) excluding POL but inclu
Hire Charges of testing apparatus
Reg Pump
Cost of pump set 6\"x5\" with 15 HP Diesel Engine
Generator set light
Pumping for out water 0-1' to 0-8'
Pumping for out water 0-9' to 0-12'
Pumping Machinery Boring 0-1' to 0-8'
Pumping Machinery Boring 0-9' to 0-12'
Pump charges for pumping out water from 0-1' to 0-8' depth
Pump charages for pumping out water from 0-9' to 0-12' depth
Hire Charges of Assembling Machine for A.C. Pipe 3\" to 6\"
Hire Charges of Assembling Machine for A.C. Pipe 8\" to 10\"
Hire Charges of Assembling Machine for A.C. Pipe 12\" to 18\"
Hire Charges of Assembling Machine for A.C. Pipe 20\" to 24\"

EQ-48
EQ-49
EQ-50
EQ-51
EQ-52
EQ-53
EQ-54

Disposal of Pumped Out


Disposal of Pumped Out
Disposal of Pumped Out
Disposal of Pumped Out
Disposal of Pumped Out
Cost of Bulldozer-D6
Cost of Motor Grader

Water
Water
Water
Water
Water

upto
upto
upto
upto
upto

Page 1

100'
100'
100'
100'
100'

distance
distance
distance
distance
distance

for 1' depth


upto 3' dept
upto 5' dept
upto 6' dept
upto 7' to 12

CAPACITY
Per Hour
Per Hour
Per Hour
Per Day
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Each
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
2 Bag
1 Bag
Per Hour
Per Hour
Per Hour
Each
Each
Per Day
Per Day
Per Hour
Per Day
Per Day
Per Hour
Each
Per Hour
Per Hour
Per Hour
Per Day
Per Day
Per Hour
Per Hour
-----

COST

-----140 HP
135 HP

LIST EQUIPMENT
S. No.
EQ-55
EQ-56
EQ-57
EQ-58
EQ-59
EQ-60
EQ-61
EQ-62
EQ-63
EQ-64
EQ-65
EQ-66
EQ-67
EQ-68
EQ-69
EQ-70
EQ-71
EQ-72
EQ-73
EQ-74
EQ-75
EQ-76
EQ-77

Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost

NAME OF MACHINERY
Wheel Loader
of 3 wheel-Static Roller (local)
of Pneumatic Roller
of Tandem Roller
of Vibratory Roller
of Asphalt Plant
of Asphalt Paver
of Electric power Generator
of Truck-2axle (local)
of Truck-3axle (local)
of Truck-3axle (imported)
of Dump truck
of Water lorry (local)
of Wheel Tractor with Plough
of Wheel Tractor with Trolley
of Wheel Tractor with Sheep foot roller
of Wheel Tractor with Water Tank
of Wheel Tractor with Blade
of Concrete Mixer
of Concrete Mixer
of Concrete vibrator
of Plate Compactor
of Tar Boiler

Page 2

CAPACITY
100 HP
10-12 Ton
8-13 Ton
8-12 Ton
8-Ton
45-46 Ton.
145 HP
100 KW
10 Ton
15-18 Ton
18 Ton
18.0 Ton
------2 bags
1 bag
--1000Ltr.

COST

CHAPTER NO. 10

FLOORING
i)

Rates for all finished works include the removal of surplus


material and by products.

ii)

For handling of all types of material for short lead includ


3 chains (90m) nothing is to be paid as extra. Where hand
involves an extra lead beyond 3 chains, (90m) carriage for
should be paid

DESCRIPTION OF ITEM
Laying Muram flooring consisting of 1\" (25m) layer of fine
laid over 6\" (150mm) good hard layer of Muram spreaded ove
comprising of hand packed rubble or broken bricks properly
over well rammed earth

Detail
Qty
MATERIAL
1
2
3

9\" thick rubble or broken hard


6\" Hard Muram
1\" Fine Powdery Muram
Total
Contractor's Profit & Ove ## Percent
Total

80
55
9

Mason

.5
3
.5

LABOUR

Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 1

lude the removal of surplus debris, unused

erial for short lead including carriage upto


paid as extra. Where handling and carriage
chains, (90m) carriage for whole of the distance

of 1\" (25m) layer of fine powdery or flakey variety of M


layer of Muram spreaded over 9\" (225mm) thick sub base
or broken bricks properly watered and rammed provided

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Cft
Cft
Cft.

Amount (Rs.)

0.00Per 100 Cft


0.00Per 100 Cft
0.00Per 100 Cft

No.
Nos.
No.

0.0
0.0
0.0

per day
per
Per day

day

0.0
-

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
2

Earth flooring consisting of 6\" thick consolidated layer o


earth including ramming

Detail
Qty
MATERIAL
Earth (Loose measured)
Contractor's Profit & Ove ## Percent
Total

50

LABOUR
Mason
Coolly
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

.125
1
.25

Page 2

thick consolidated layer of moistured

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Cft

Amount (Rs.)

0.00Per 100 Cft

No.
No.
No.

0.0
0.0
0.0

Per
Per day
Pay day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
3

Providing, laying, watering and ramming brick ballast 1\"


25% sand, for floor foundation, complete in all respects.

Detail
Qty
MATERIAL
1
2

Brick Ballast
Sand
Total
Contractor's Profit & Ove ## Percent
Total

100
25

LABOUR
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

3.1
.1

Page 3

ramming brick ballast 1\" - 2\" gauge mixed with


complete in all respects.

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.)

Amount (Rs.)

Cft
0.00Per 100 Cft
Cft 0.00Per 100 Cft

No.
No.

0.0
0.0

per
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

Mud Flooring
DESCRIPTION OF ITEM
Mud flooring consisting of 6\" thick consolidated layer of
finished off with 1\" mud plaster and gobri leeping.

Detail
Qty
MATERIAL
1
2
3
4
5

Earth for filling


50
Earth for Mud Plaster
10
Bhoosa
34 lbs (15.44 Kg.
Fine Clay for Gobri L
.75
Cow Dung
0.75 Cft. (5.44 Kg
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Coolies

.25
2
.25

Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 SRs.
Labour Rate Per Sqm. Rs.
Composite Rate per 10Rs.
Composite Rate per SqRs.

Page 4

hick consolidated layer of moistured earth and


r and gobri leeping.

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Cft
Cft
Cft.

0.00Per 100
0.00Per 100
0.0
0.00Per 100
0.00Per 100

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Cft
Cft

Kg.
Cft
Kg.

Per day
Per
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

Brick Flooring
DESCRIPTION OF ITEM

Dry brick paving laid flat, sand grouted including preparat


bringing the same to proper camber by \" mud plaster

Detail
Qty
MATERIAL
1
2
3

Brick 9\"
350
Sand
5
\" Mud Plaster (Good earth)
6
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR FOR 125 SFT.


Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

.5
1
.05

Page 5

grouted including preparation of bed by watering, rammin


er by \" mud plaster

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Nos.
Cft.
Cft.

0.00 Per 1000 No


0.00Per 100 Cft
0.00Per 100 Cft

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Per day
Per
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
6

Dry brick on edge paving sand grouted including preparation


ramming and bringing the same to proper camber by thick m

Detail
Qty
MATERIAL
1
2
2

Brick 9\" (including wastage)


525
\" thick mud plaster (good eart6
Sand
6
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

.67
1.5
.08

Page 6

outed including preparation of bed by watering,


proper camber by thick mud plaster

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Nos.
Cft.
Cft.

Amount (Rs.)

0.00er 1000 Nos


0.00Per 100 Cft
0.00Per 100 Cft

No.
No.
No.

0.0
0.0
0.0

Per day
Per
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
7

Grouting 4\"

dry brick work with cement mortar ratio 1:5

Detail
Qty
MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

.7
4.5

LABOUR FOR 125 SFT


Mason
Coolies (Unskilled)
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

.5
.5
.5

Page 7

th cement mortar ratio 1:5

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bag
Cft.

0.0
0.00Per 100 Cft

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Per Bag

Per day
Per day
Per day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM

Flat brick flooring laid in 1:6 cement mortar over a


Detail
Qty

MATERIAL
1
2
3
4
5

Bricks 9\" size


350
Cement (for laying)
Cement (for bedding mortar)
Sand for laying
Sand for bedding mortar
Total
Contractor's Profit & Ove ## Percent
Total

.5
.8
4
6

LABOUR FOR 125 SFT.


Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

.75
1.5
.5

Page 8

3
cement mortar over a 4
Unit Rate Per 100 Sft.
Rate
Per Unit (Rs.)

Nos.
Bag
Bag
Cft.
Cft.

0.00 Per 1000 No


0.0
0.0
0.00Per 100 Cft
0.00Per 100 Cft

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Per Bag
Per Bag

Per day
Per
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
9

Brick on edge flooring laid in 1:6 cement mortar over a bed

Detail
Qty
MATERIAL
1
2
3
4
5

Bricks 9\" size


525
Cement for laying
Cement for bedding mortar
Sand for laying
Sand for bedding mortar
Total
Contractor's Profit & Ove ## Percent
Total

.85
.88
7
6

LABOUR FOR 125 Sft.


Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
2
.5

Page 9

:6 cement mortar over a bed of 3/4\" thick cement mortar (

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Nos.
Bag
Bag
Cft.
Cft.

0.00 Per 1000 No


0.0
0.0
0.00Per 100 Cft
0.00Per 100 Cft

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Per Bag
Per Bag

Per day
Per
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
10

Brick tiles (12\"x6\"x2\") laid in (1:6) cement mortar, ove

Detail
Qty
MATERIAL
1
2
4

Tiles 12\"x6\"x2\"
210
Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

1.1
8

LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

.75
1.5
.5

Page 10

in (1:6) cement mortar, over a bed of 3/4\" thick cement mort

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Nos.
Bag
Cft.

0.00 Per 1000 No


0.0
0.00Per 100 Cft

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Bag

Per day
Per
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
11

Brick tiles (9\" x 4\" x 1\") laid flat in 1:3 cement mor

Detail
Qty
MATERIAL
1
2
4

Tiles 9\"x4\"x1\"
350
Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

1.4
12

LABOUR
Mason
Coolies (Unskilled)
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
1.5
.5

Page 11

laid flat in 1:3 cement mortar over a bed of 3/4\" thick ceme

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Nos.
Bag
Cft.

0.00 Per 1000 No


0.0
0.00Per 100 Cft

No.
No.
No.

0.0
0.0
0.0

Bag

Per day
Per day
Per day

Amount (Rs.)

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
12

Cement tiles (8\"x8\"x\") laid fiat in 1:2 cement mortar o

Detail
Qty
MATERIAL
1
2
4

Cement tiles (8\"x8\"x3/4\")


240
Cement
1.87
Sand
4.7
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR FOR 200 SFT.


Mason
1.25
Coolies (Unskilled)
2
Bahishti
.34
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 12

fiat in 1:2 cement mortar over 3/4\" thick bed of cement mort

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Nos.
Bags
Cft.

0.0
0.0
0.00Per 100 Cft

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Per No.
Per Bag

Per day
Per day
Per day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
13

Cement concrete tiles laid in 1:2 cement mortar over 3/4\"


a)

12\" x 12\" x 1\"

Detail
Qty
MATERIAL
1
2
4

Cement concrete tiles (1\" thick105


Cement for bedding and laying of
1.85
Sand
4.67
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR FOR 200 SFT


Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1.25
2
.34

Page 13

2 cement mortar over 3/4\" thick bed of cement mortar 1:2

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Nos
Bags
Cft.

0.0
0.0
0.00Per 100 Cft

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Each
Per Bag

Per day
Per
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

b)

9\" x 9\" x 3/4\"

Detail
Qty
MATERIAL
1
2
4

Cement concrete tiles


186
Cement for bedding and laying of
1.86
Sand
4.67
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 200 SFT.
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1.25
2
.34

Page 14

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Nos
Bags
Cft.

0.0
0.0
0.00Per 100 Cft

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Each
Per Bag

Per day
Per
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

c)

6\" x 6\" x 3/4\"

Detail
Qty
MATERIAL
1
2
4

Cement concrete tiles


420
Cement for bedding and laying of
1.9
Sand
4.74
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 200 SFT.
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1.25
2
.34

Page 15

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Nos
Bags
Cft.

0.0
0.0
0.00Per 100 Cft

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Each
Per Bag

Per day
Per
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
14

Coloured cement tiles (8\"x8\"3/4\") of approved dark shade


mortar over 3/4\" bedding mortar of 1:2

Detail
Qty
MATERIAL
1
2
3
4

Tiles
240
Cement
1.87
Sand
4.7
Pigment
0.67 Lbs (0.30 Kg
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR FOR 200 SFT.


Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1.25
2
.34

Page 16

4\") of approved dark shade laid flat in 1:2 cement

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Each
Bag
Cft.
.67 Lbs (0.30 Kg

0.0
0.0
0.00Per 100 Cft
0.0

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Each
Per Bag

Per Kg.

Per day
Per
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
15

Providing and laying topping of cement concrete (1:2:4) inc


surface finishing and dividing into panels.
a)

1\" (25mm) Thick

Detail
Qty
MATERIAL
1
2
3
4

Cement
1.5
Sand
3.7
Shingle
7.4
Form Work (Kail Wood)
.034
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Coolies
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
.5
.1
.25

Page 17

cement concrete (1:2:4) including


nto panels.

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bags
Cft.
Cft.
Cft.

0.0
0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Amount (Rs.)

Per Bag

Per day
Per
Per day
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

b)

1\" (30mm) Thick

Detail
Qty
MATERIAL
1
2
3
4

Cement
1.85
Sand
4.6
Shingle
9.2
Form Work (Kail Wood)
.034
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Coolies
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
.5
.1
.25

Page 18

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bags
Cft.
Cft.
Cft.

0.0
0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Amount (Rs.)

Per Bag

Per day
Per
Per day
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

c)

1\" (40mm) Thick

Detail
Qty
MATERIAL
1
2
3
4

Cement
2.2
Sand
5.5
Shingle
11
Form Work (Kail Wood)
.034
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Cooly (Unskilled)
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
1
.15
.25

Page 19

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bags
Cft.
Cft.
Cft.

0.0
0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Amount (Rs.)

Per Bag

Per
Per
Per
Per

day
day
day
day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

d)

3
1

/ \" (4 4

Detail

MATERIAL
1
2
3
4

Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Page 20

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Qty

2.55
6.5
12.8
.04

Bags
Cft.
Cft.
Cft.

1
1
.15
.25

No.
No.
No.
No.

0.0
0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

0.0
0.0
0.0
0.0

Amount (Rs.)

Per Bag

Per day
Per
Per day
Per day

day

0.0
0.0

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.0
0.0
0.0
0.0

mount (Rs.)

e)

2\" (50mm) Thick

Detail
Qty
MATERIAL
1
2
3
4

Cement
3
Sand
7.4
Shingle
14.7
Form Work (Kail Wood)
.04
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
1.5
.2
.25

Page 21

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bags
Cft.
Cft.
Cft.

0.0
0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Amount (Rs.)

Per Bag

Per day
Per
Per day
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

f)

2\" (55mm) Thick

Detail
Qty
MATERIAL
1
2
3
4

Cement
3.3
Sand
8.4
Shingle
16.5
Form Work (Kail Wood)
.046
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
1.6
.2
.25

Page 22

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bags
Cft.
Cft.
Cft.

0.0
0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Amount (Rs.)

Per Bag

Per day
Per
Per day
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

g)

2\" (60mm) Thick

Detail
Qty
MATERIAL
1
2
3
4

Cement
3.65
Sand
2.2
Shingle
18.35
Form Work (Kail Wood)
.051
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
2
.25
.25

Page 23

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bags
Cft.
Cft.
Cft.

0.0
0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Amount (Rs.)

Per Bag

Per day
Per
Per day
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

h)

2 3/4\" (70mm) Thick

Detail
Qty
MATERIAL
1
2
3
4

Cement
4
Sand
10
Shingle
20.2
Form Work (Kail Wood)
.051
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
2
.25
.25

Page 24

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bags
Cft.
Cft.
Cft.

0.0
0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Amount (Rs.)

Per Bag

Per day
Per
Per day
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

i)

3\" (75mm) Thick

Detail
Qty
MATERIAL
1
2
3
4

Cement
4.4
Sand
11
Shingle
22
Form Work (Kail Wood)
.057
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
2
.25
.25

Page 25

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bags
Cft.
Cft.
Cft.

0.0
0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Amount (Rs.)

Per Bag

Per day
Per
Per day
Per day

day

0.0
-

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
16

Providing and laying conglomerate flooring (two coat work)


wearing surface, consisting of one part of cement and two p
3/16\" sieave, over bottom layer of cement concrete 1:3:6 i
dividing in panels:a)
1\" (40mm) Thick

Detail
Qty
MATERIAL
i)
1
2

\" Thick Topping


Cement
Sand

1.25
3

ii) 1\" Thick Bedding 1:3:6


Cement
1.08
Sand
3.83
Shingle
7.67
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR
i)

\" Thick Topping


Mason
Cooly
Bahishti
.05
Carpenter

ii) 1\" Thick Bedding 1:3:6


Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Rs.
Labour Rate Per Sqm.
Rs.
Composite Rate per 100 Sft.
Rs.
Composite Rate per Sqm.
Rs.

.5
.25
.25

.8
.5
.15
.25

Page 26

e flooring (two coat work) with top layer of \" thick


ne part of cement and two parts of stone chips passing
of cement concrete 1:3:6 including surface finishing and

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Amount (Rs.)

Bags
Cft.

0.0
0.00Per 100 Cft

Per Bag

Bags
Cft.
Cft.

0.0
0.00Per 100 Cft
0.00Per 100 Cft

Per Bag

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Per day
Per day
Per Per day

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Per day
Per
Per day
Per day

day
-

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

b)

1 3/4\" (45mm) Thick

Detail
Qty
MATERIAL
i)
1
2

\" Thick Topping


Cement
Sand

1.25
3

ii) 1\" Thick Bedding 1:3:6


Cement
1.35
Sand
4.06
Shingle
8.12
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR
i)

\" Thick Topping


Mason
Cooly
Bahishti
Carpenter

.5
.25
.05
.25

ii) 1\" Thick Bedding 1:3:6


Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

.8
.5
.15
.25

Page 27

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Amount (Rs.)

Bags
Cft.

0.0
0.00Per 100 Cft

Per Bag

Bags
Cft.
Cft.

0.0
0.00Per 100 Cft
0.00Per 100 Cft

Per Bag

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Per day
Per day
Per Per day

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Per day
Per
Per day
Per day

day
-

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

c)

2\" (50mm) Thick

Detail
Qty
MATERIAL
i)

\" Thick Topping

1
Cement
2
Sand
ii) 1\" Thick Bedding 1:3:6

1.25
3

Cement
1.63
Sand
5.75
Shingle
11.5
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR
i)

\" Thick Topping 1:2


Mason
Cooly
Bahishti
Carpenter

.5
.25
.05
.25

ii) 1\" Thick Bedding 1:3:6


Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
1
.2
.3

Page 28

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Amount (Rs.)

Bags
Cft.

0.0
0.00Per 100 Cft

Per Bag

Bags
Cft.
Cft.

0.0
0.00Per 100 Cft
0.00Per 100 Cft

Per Bag

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Per day
Per day
Per Per day

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Per day
Per
Per day
Per day

day
-

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
17

Add extra in cement concrete floor topping, if f

Detail

MATERIAL
1
2
3

Grey Cement for Finishing 1/16\"


Pigment
Polish
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR FOR 150 SFT.


Mason
Cooly (Skilled)
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Page 29

ncrete floor topping, if finished with pigment and polishing

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Qty

.4 Bags
4.5 Lbs (2.04 Kg
0.5 Lbs (0.23 Kg.

Amount (Rs.)

0.0
0.0
0.0

Per Bag
Per Kg.
Per Kg.

0.0
0.0

Per day
Per day

Ove ## Percent

.5 No.
.5 No.

0.0

Ove ## Percent

0.0

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.0
0.0
0.0
0.0

mount (Rs.)

18

DESCRIPTION OF ITEM
Extra labour for each storey above ground floor for moasic,
stone and wooden floor
Detail

LABOUR FOR 125 SFT.


Cooly for carriage of material
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate per 100 Sft.
Labour Rate per Sqm.

19

DESCRIPTION OF ITEM
Flag stone flooring laid in lime mortar 1:2 over 3/4\" bedd
and floors etc.
a)
2\" (50mm) Thick

Detail

MATERIAL
1
2
3
4
5

Dressed Stone 2'x2'x2\"


Lime
Sand
Steel 0.76
Charcoal
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Coolies
Bahishti
Blacksmith
Bollow Man
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.

Composite Rate per Sqm.

Page 30

ve ground floor for moasic, conglomerate, tiles

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Qty
.75 No.

0.0

Amount (Rs.)

Per day

# Percent

Rs.
Rs.

0.0

Say
Say

0.0
0.0

mortar 1:2 over 3/4\" bedding mortar in plat forms

\" (50mm) Thick

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Qty
25 Nos.
(48.5 Kg
5 Cft.
Kg.
1.75 Kg.

1.3 Mds

2.5
3
.12
.1
.1

0.0
0.0
0.00Per 100 Cft
0.0
0.0

No.
No.
No.
No.
No.

0.0
0.0
0.0
0.0
0.0

Amount (Rs.)
Each

Per Kg.
Per
Per Kg.

Per
Per
Per
Per
Per

Kg.

day
day
day
day
day

# Percent

0.0
0.0

Rs.
Rs.
Rs.

Say
Say
Say

0.0
0.0
0.0

Rs.

Say

0.0

mount (Rs.)

mount (Rs.)

b)

3\" (75mm) Thick

Detail
Qty
MATERIAL
1
2
3
4
5

Dressed Stone 2'x2'x3\"


25
Lime
1.42 Mds (53 Kg.)
Surkhi
5
Steel 0.75
Charcoal
1.81
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Cooly
Bahishti
Blacksmith
Bollow Man
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

2.5
3
.12
.1
.1

Page 31

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Nos.
.42 Mds (53 Kg.)
Cft.
Kg.
Kg.

0.0
0.0
0.00Per 100 Cft
0.0
0.0

No.
No.
No.
No.
No.

0.0
0.0
0.0
0.0
0.0

Amount (Rs.)

Each
Per Kg.
Per
Per Kg.

Per
Per
Per
Per
Per

Kg.

day
day
day
day
day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
20

Asphalt flooring including preparation of proper base, reme


finishing complete
a)

1\" Thick Topping

Detail
Qty
MATERIAL
1
2
3
4

Asphalt
2.36 Cwt (119.90 Kg
Steam Coal
0.5 Md (18.66 Kg.
Fine Aggregate
9
Form Work (Kail Wood)
.034
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason for Setting out and laying
Coolies
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

.25
2
.25

Page 32

ration of proper base, remelting, setting out and

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

.36 Cwt (119.90 Kg


.5 Md (18.66 Kg.
Cft.
Cft.

0.0
0.0
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Per Kg.
Per Kg.

Per day
Per
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

b)

\" Thick Topping

Detail
Qty
MATERIAL
1
2
3
4

Asphalt
1.20
Steam Coal
0.25
Fine Aggregate
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total

Cwt (60.960 Kg
Md (9.33 Kg.
4.51
.034

LABOUR
Mason 0.20
Coolies
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1.5
.25

Page 33

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

.20 Cwt (60.960 Kg


.25 Md (9.33 Kg.
Cft.
Cft.

0.0
0.0
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Per Kg.
Per Kg.

Per
Per
Per day

day
day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

c)

\" Thick Topping

Detail
Qty
MATERIAL
1
2
3
4

Asphalt
0.60
Steam Coal
0.25
Fine Grit
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total

Cwt (30.48 Kg
Md (8.58 Kg.
2.51
.034

LABOUR
Mason 0.17
Cooly
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
.25

Page 34

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

.60 Cwt (30.48 Kg


.25 Md (8.58 Kg.
Cft.
Cft.

0.0
0.0
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Per Kg.
Per Kg.

Per
Per
Per day

day
day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

21

DESCRIPTION OF ITEM
1 3/8\" thick mosaic flooring consisting of 3/8\" mosaic to
cement and marble powder in the ratio 3:1 and two parts of
over 1\" thick flooring of 1:2:4 cement concrete including
complete.
a)
Using Grey Cement
Detail

MATERIAL
1
2
3
4
5
6
7

MATERIAL
1
2
3
4

LABOUR
Coolies

LABOUR

Qty
for mosaic topping, rubbing & polishing
Cement For 3/8\" topping
.94
Marble Chips
3.00 Cwt (152.40 Kg
Corborandom Stone
3
Wax Polish
0.5 Lbs (0.23 Kg.
Linen and Cotton
.4
Marble Powder
0.31 Cwt (15.75 Kg
Tatric Acid
0.34 Lbs (0.15 Kg
Total
Contractor's Profit & Ove ## Percent
Total
for 1\" thick 1:2:4 concrete
Cement
1.5
Sand
3.7
Shingle
7.4
Form Work
.034
Total
Contractor's Profit & Ove ## Percent
Total
Total Material
for mosaic topping
Mason for Laying
1.5
1.25
Coolies (skilled for rubbing)
5
Bahishti
.75
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
for 1\" Thick 1:2:4 Concrete
As per Item 15(a)
Total Labour

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 35

nsisting of 3/8\" mosaic topping of one part of


ratio 3:1 and two parts of marble chips laid
cement concrete including rubbing and polishing

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

bbing & polishing


Bag

.00 Cwt (152.40 Kg


Nos.

.5 Lbs (0.23 Kg.


Kg.

.31 Cwt (15.75 Kg


.34 Lbs (0.15 Kg

Bags
Cft.
Cft.
Cft.

0.0
0.0
0.0
0.00 Pack. of 3
0.0
0.00Per 100 Kg.
0.0

Per Bag
Per Kg.
Each

0.0
0.00Per 100 Cft
0.00Per 100 Cft
0.0

Per Bag

No.
No.
Nos.
No.

0.0
0.0
0.0
0.0

P. Kg.
Per Kg.

P. Cft.

Per day
Per
Per day
Per day

day

Say
Say
Say
Say

Amount (Rs.)

0.0
0.0
0.0
0.0
0.0
0.0

b)

Using White Cement

Detail
Qty
MATERIAL
1
2
3
4
5
6
7

for 3/8\"
Cement (White)
Marble Poweder
0.31
Marble Chips
3.00
Carborandom Stone
Wax Polish
0.50
Linen Cotton etc.
Tar Taric Acid
0.34
Total
Contractor's Profit & Ove ## Percent
Total
Add for cement concrete 1\" thick
As per Item 15(a) Material
Total Material

.94
Cwt (15.75 Kg
Cwt (152.40 Kg
3
Lbs (0.23 Kg
.4
Lbs (0.15 Kg

LABOUR
Mason

for Laying

Coolies
Coolies (skilled for rubbing)
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.5
1.25
5
.75

Add Labour for 1\" thick C.C. topping 1:2:4


As per item No. 15(a)
Total Labour
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 36

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bag
.31 Cwt (15.75 Kg
.00 Cwt (152.40 Kg
Nos.
.50 Lbs (0.23 Kg
Kg.
.34 Lbs (0.15 Kg

0.0
0.00Per 100 Kg.
0.0
0.0
0.00Packet 3 Kg
0.0
0.0

Amount (Rs.)

Per Bag

Per Kg.
Each
P. Kg.
Per Kg.

.01

No.
No.
Nos.
No.

0.0
0.0
0.0
0.0

Per day
Per
Per day
Per day

day

0.0
0.0

pping 1:2:4
-

Say
Say
Say
Say

0.0
0.0
0.0
0.0

mount (Rs.)

DESCRIPTION OF ITEM
22

1\" thick mosaic flooring consisting of \" mosaic topping


cement and marble powder in the ratio of 3:1 and two parts
over 1\" thick flooring of 1:2:4 cement concrete including
complete.
a)
Using Grey Cement

Detail

MATERIAL
1
2
3
4
5
6
7

Grey Cement for \" Topping


Marble Chips
Carborandom Stone
Wax Polish
Linen Cotton etc.
Tar Taric Acid
Marble Poweder
Total
Contractor's Profit & Ove ## Percent
Total
Add Material for 1\" thick cement concrete
Topping as per Item 15(a)
Total Material
LABOUR FOR 125 SFT.
Mason

for Laying

Coolies
Coolies (skilled for rubbing and Polish
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Add Labour for 1\" thick cement concrete
Topping as per Item 15(a)
Total Labour
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Page 37

sting of \" mosaic topping of one part of


ratio of 3:1 and two parts of marble chips laid
cement concrete including rubbing and polishing

sing Grey Cement

Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

1.27 Bag
3.00 Cwt (152.40 Kg
2 Nos.
0.50 Lbs (0.23 Kg
.72 Kg.
0.34 Lbs / (0.15 Kg
0.42 Cwt (21.34 Kg

0.0
0.0
0.0
0.00Packet 3 Kg
0.0
0.0
0.00Per 100 Kg.

Per Bag
Per Kg.
Each
P. Kg.
Per Kg.

t concrete

1.5
1.25
5
.75

No.
No.
Nos.
No.

0.0
0.0
0.0
0.0

Per day
Per
Per day
Per day

day

# Percent

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount (Rs.)

0.0
0.0
-

0.0
0.0
0.0
0.0

b)

Using White Cement

Detail
Qty
MATERIAL
1
2
3
4
5
6
7

Cement White
Marble Powder
0.42
Marble Chips
4.16
Carborandom Stone
Wax Polish
0.50
Linen Cotton etc.
Tar Taric Acid
0.34
Total
Contractor's Profit & Ove ## Percent
Total
Add for material of 1\" thick cement
Topping as per Item No. 15(a)
Total Material

1.27
Cwt (21.34 Kg
Cwt (211.33 Kg
3
Lbs (0.23 Kg
.72
Lbs (0.15 Kg

concrete

LABOUR FOR 125 SFT.


Mason for Laying
1.5
Coolies
1.25
Coolies (skilled for rubbing and
5
Bahishti
.75
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Add labour for 1\" thick cement concrete
Topping as per Item No. 15(a)
Total Labour
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 38

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bag
.42 Cwt (21.34 Kg
.16 Cwt (211.33 Kg
Nos.
.50 Lbs (0.23 Kg
Kg.
.34 Lbs (0.15 Kg

0.0
0.00Per 100 Kg.
0.0
0.0
0.00Packet 3 Kg
0.0
0.0

Amount (Rs.)

Per Bag

Per Kg.
Each
P. Kg.
Per Kg.

ment concrete
-

No.
No.
Nos.
No.

0.0
0.0
0.0
0.0

Per day
Per
Per day
Per day

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

mount (Rs.)

DESCRIPTION OF ITEM
23

Providing and laying floor of mosaic marble chips tiles 1\"


laid in white cement and pigment over 3/4\" bedding of ceme
finishing and polishing complete.

Detail
Qty
MATERIAL
1
2
3
4
5

Mosaic marble tiles 12\"x12\"x1105


Cement Grey
1.69
Sand
4
Pigment
1.00 Lbs (0.45 Kg
White Cement
.08
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1.84
2.8
.34

Page 39

saic marble chips tiles 1\" thick of approved quality and


over 3/4\" bedding of cement sand mortar 1:2, incluidng

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Nos.
Bags
Cft.
.00 Lbs (0.45 Kg
Bag

0.0
0.0
0.00 Per 100 Cft
0.0
0.0

Each
Per Bag

0.0
0.0
0.0

Per day
Per
Per day

No.
No.
Nos.

Amount (Rs.)

Per Kg.
Per Bag

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
24

Laying floor of approved white glazed tile 1/4\" thick in w


3/4\" thick cement mortar 1:2 complete.

Detail
Qty
MATERIAL
1
2
3
4

Tile (Glazed) 6\"x6\"x\" includ420


White Cement for laying
.1
Grey Cement for Bed
2.16
Sand
5.2
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

2
4
.5

Page 40

lazed tile 1/4\" thick in white cement 1:2 over

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

No.
Bag
Bag
Cft.

0.0
0.0
0.0
0.00 Per 100 Cft

Each
Per Bag
Per Bag

No.
No.
No.

0.0
0.0
0.0

Per day
Per
Per day

Amount (Rs.)

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
25

Laying floors of a approved coloured glazed tiles 1/4\" thi


cement and pigment on a bed of 3/4\" thick cement mortar 1:

Detail
Qty
MATERIAL
1
2
3
4
5

Coloured glazed tiles 6\"x6\" in420


White Cement
.1
Grey Cement
2.16
Pigment
1.00 Lb/0.45 Kg.
Sand
5.2
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

2
4
.5

Page 41

ured glazed tiles 1/4\" thick laid in white


/4\" thick cement mortar 1:2

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

No.
Bag
Bag
.00 Lb/0.45 Kg.
Cft

0.0
0.0
0.0
0.0
0.00 Per 100 Cft

Each
Per Bag
Per Bag
Per Kg.

0.0
0.0
0.0

Per day
Per
Per day

No.
No.
No.

Amount (Rs.)

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
26

Rubbing and polishing old grit/mosaic floor including repai


surface complete in all respects.

Detail
Qty
MATERIAL
1
2
3
4

Carborandum Stone
.5
Wax Polish
0.50 Lb (0.23 Kg.
Tartric Acid
0.34 Lb (0.162 Kg
Cotton waste cloth etc.
.72
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR FOR 125 SFT.


Skilled Cooly for rubbing and po
Cooly
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
1
.25

Page 42

osaic floor including repairing voids, un-even

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

No.
.50 Lb (0.23 Kg.
.34 Lb (0.162 Kg
Kg.

0.0
0.00cket of 3 K
0.0
0.0

No.
No.
No.

0.0
0.0
0.0

Amount (Rs.)

Each

Per Kg.
P. Kg.

Per day
Per
Per day

day

0.0
-

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
27

Rubbing and Polishing grit floor, including repairing voids


complete in all respects.

Detail
Qty
MATERIAL
1
2
4

Carborandum Stone
1.5
Wax Polish
0.5 Lb (0.23 Kg.)
Cotton waste cloth etc.
.08
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR FOR 125 SFT.


Cooly
Cooly Skilled
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

1
1
.4

Page 43

, including repairing voids, uneven surface

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

No.
.5 Lb (0.23 Kg.)
Kg.

0.0
0.00cket of 3 K
0.0

No.

0.0
0.0
0.0

No.

Amount (Rs.)

Each

P. Kg.

Per

day

Per day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
28

Cleaning and washing mosaic or marble floor with caustic so

Detail
Qty
MATERIAL
1
2

Caustic Soda
1 Lb (0.45 Kg.)
Hassein Cloth
0.5 Yard (0.46 m)
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR FOR 150 SFT.


Mason
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

.25
.12

Page 44

arble floor with caustic soda mixture

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Lb (0.45 Kg.)
.5 Yard (0.46 m)

Amount (Rs.)

0.0 Per Kg.


0.00 Per Metre

0.0 Per day


0.0 Per day

No.
No.

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
29

Shisham wood boarding or strips flooring 3/4\" thick (sawn


tongued and grooved or splayed rebated fixed with brass scr
battens 1\"x2\" placed at 12\" centre to centre including
hot on the base.
Detail

MATERIAL
Shisham Wood
3
1
100 / ' x x
4
Add 5% rebate
Total
Add 60% Wastage
Total
Deodar Wood Battens

12

11 x 10' x 1/8' x 1/6'


Add 50% Wastage
Total
Bitumen
Fire Wood
Brass Screws 2\"
Sand Paper Sheet
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 300 SFT.
Carpenters
Coolies
Total
Sundries
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

flooring 3/4\" thick (sawn to required sizes)


ebated fixed with brass screws on deedar wood
centre to centre including two coats of bitumen laid

Qty

6.25
.31
6.56
3.94
10.5

Cft.
Cft.
Cft.
Cft.
Cft.

2.29 Cft.
1.15 Cft.
3.44 Cft.
35 Lbs (15.89 Kg.
0.125 Lbs (4.67 Kg
7 Dozen
1.5 Dozen

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Per Cft.

0.00 Per Cft.


0.0 Per Kg.
0.0 Per Kg.
0.00 Per Dozen
0.00 Per Dozen

0.0 Per day


0.0 Per day

10 No.
5 No.
## Percent

0.0
0.0

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.0
0.0
0.0
0.0

Page 45

mount (Rs.)

DESCRIPTION OF ITEM
30

Decdar wood boarding or strips flooring 3/4\" thick (sawn t


sizes)tongued and grooved or splayed rebated fixed with bra
deodar wood battens 1\"x2\" placed at 12\" c/c including t
laid hot on the base.

Detail
Qty
MATERIAL
Deodar wood planks 10
Add 5% for rebate
Total
Deodar wood batten 11
Total
Add 50% Wastage
Total

6.25
.31
6.56
2.29
8.85
4.43
13.28

Bitumen
34 Lbs (15.44 Kg.
Fire Wood
0.125 Mds (4.67 Kg
Brass Screws 2\" long
7
Sand Paper
1
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 200 SFT.
Carpenters
6
Coolies
6
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 SRs.
Labour Rate Per Sqm. Rs.
Composite Rate per 10Rs.
Composite Rate per SqRs.

Page 46

looring 3/4\" thick (sawn to required


ayed rebated fixed with brass screws on
ced at 12\" c/c including two coats of bitumens

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Amount (Rs.)

Cft.
Cft.
Cft.
Cft.
Cft.
Cft.
Cft.

0.00 Per Cft.

Dozen
Dogen

0.0
0.0
0.00 Per Dozen
0.00 Per Dozen

No.
No.

0.0
0.0

Per Kg.
Per Kg.

Per day
Per day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
31

Teakwook boarding or strips flooring \" thick (Sawn to req


tongued and grooved screwed on deodar wood battens 1\" x 2
centre to centre including 2 coats of bitumen laid hot on t

Detail
Qty
MATERIAL
1
Teak Wood 12
Add 5% for rebate
Total
Add 20% Wastage
Total
Deodar wood 11x10' x
Add. 50% Wastage
Total

4.2
.2
4.4
.88
5.28
2.29
1.15
3.44

Bitumen
34 Lbs (15.44 Kg.
Sand Paper
2
Fuel Wood
0.125 Mds (4.67 Kg
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 300 SFT.
Carpenters
10
Coolies
5
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 SRs.
Labour Rate Per Sqm. Rs.
Composite Rate per 10Rs.
Composite Rate per SqRs.

Page 47

ring \" thick (Sawn to required sized)


eodar wood battens 1\" x 2\" size, placed at 12\"
ts of bitumen laid hot on the base.

Cft.
Cft.
Cft.
Cft
Cft.
Cft.

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Per Cft.

Cft.

Dozen

0.0
0.0
0.00 Per Dozen
0.0

No.
No.

0.0
0.0

Cft.

Per Kg.

Per Kg.

Per day
Per day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
32

Shisham wood block flooring 1\" thick cut to required size,


asphalt bitumen laid on base

Detail
Qty
MATERIAL
Shisham Wood of best quality
100 x 1/12' sawan to required size
Add 100 % Wastage
Total

8.33
8.33
16.66

Bitumen for laying and dipping blocks 80 Lbs (36.32 K


Primer
5.00 Lbs (2.27 Kg
Fire Wood
0.25 Md (9.33 Kg.
Sand Paper
2
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 200 SFT.
Carpenters
Coolies
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

6
5

Page 48

thick cut to required size, fixed on a layer of

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Per Cft.

Cft.
Cft.
Cft.

locks 80 Lbs (36.32 K


0.0
.00 Lbs (2.27 Kg
0.0
.25 Md (9.33 Kg.
0.0
Dozen
0.00 Per Dozen

No.
No.

0.0
0.0

Per Kg.
Per Kg.
Per Kg.

Per day
Per day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
33

Teak wood block 1\" thick cut to required size fixed on a l

Detail
Qty
MATERIAL
Teak wood for blocks
8.33
thick sawn to size 100 x1/12'
Add 40% Wastage
3.33
Total
11.66
Bitumen
80 Lbs (36.32 Kg.
Primer
5.00 Lbs (2.27 Kg
Fuel Wood
0.125 Lbs (4.67 Kg
Sand Paper
2
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 300 SFT.
Carpenters
10
Coolies
5
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 SRs.
Labour Rate Per Sqm. Rs.
Composite Rate per 10Rs.
Composite Rate per SqRs.

Page 49

required size fixed on a layer of asphalt bitumen laid on

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Amount (Rs.)

Cft.
Cft.

0.00 Per Cft.

Dozen

0.0
0.0
0.0
0.00 Per Dozen

Cft.

No.
No.

0.0
0.0

Per Kg.
Per Kg.
Per Kg.

Per day
Per day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
34

Laying wooden paving of hard wood on edge in coal tar and a


a)

Shisham Wood

Detail

MATERIAL
Shisham Wood Sawn into
1\" thick or any required
Add 30% Wastage
Total

size

Bitumen
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 150 SFT.
Carpenters
Coolies
Mason
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Page 50

d on edge in coal tar and asphalt

Unit Rate Per 100 Sft. (Per Inch Thickness)


Rate
Qty
Per Unit (Rs.)
Amount (Rs.)

8.33 Cft.
2.5 Cft.
10.83 Cft.

0.00 Per Cft.

34 Lbs / 15.44 Kg

1 No.
3 No.
1 No.

0.0 Per Kg.

0.0 Per day


0.0 Per day
0.0 Per day

0.0
0.0

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.0
0.0
0.0
0.0

b)

Kikar Wood

Detail

Unit Rate Per 100 Sft. (Per


Qty

MATERIAL
Kikar Wood

100
12

Wastage 30%
Total
Bitumen
Total
Contractor's Profit & Ove ## Percent
Total

8.33
2.5
10.83
34 Lbs (15.44 Kg.

LABOUR FOR 150 SFT.


Carpenter
Coolies
Mason
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

1
3
1

Rs.
Rs.
Rs.
Rs.

Page 51

nit Rate Per 100 Sft. (Per Inch Thickness)


Rate
Per Unit (Rs.)
Amount (Rs.)

Cft.

Cft.
Cft.
4 Lbs (15.44 Kg.

0.00 Per Cft.


0.0 Per Kg.

0.0 Per day


0.0 Per day
0.0 Per day

No.
No.
No.

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
35

Tile skirting laid in 1:2 cement mortar over 3/4\" thick ce


cement washing and filling joints complete.
a)

Cement Tiles

Detail
Qty
MATERIAL
Cement tiles 8\"x8\" 240
and Wastage
Cement for laying an
2.45
Sand
6
Pigment
1 Lb (0.45 Kg.)
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 150 SFT.
Masons
1.56
Coolies
2.5
Bahishti
.34
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 SRs.
Labour Rate Per Sqm. Rs.
Composite Rate per 10Rs.
Composite Rate per SqRs.

Page 52

mortar over 3/4\" thick cement mortar 1:2 including


s complete.

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

No.

0.0

Bags
Cft.

Amount (Rs.)

Each

0.0
0.00 Per 100 Cft
0.0

Per Bag

0.0
0.0
0.0

Per day
Per day
Per day

No.
No.
No.

Per Kg.

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

b)

Mosaic Tiles

Detail
Qty
MATERIAL
Tiles
6\"x6\"x3/4\"
Cement
2.54
Sand
Pigment
White Cement
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR

420
6
1 Lbs (0.45 Kg.)
.08

Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

2
2.5
.25

Rs.
Rs.
Rs.
Rs.

Page 53

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

No.
Bag
Cft
Lbs (0.45 Kg.)
Bag

0.0
0.0
0.00 Per 100 Cft
0.0
0.0

No.
No.
No.

0.0
0.0
0.0

Each
Per

Amount (Rs.)

Bag

Per Kg.
Per Bag

Per day
Per day
Per day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
36

Providing grey cement skirting or dado 3/8\" thick includin


straightening of top edge and finishing to smooth surface a
a)

1:2 Cement Sand Mortar

Detail

MATERIAL
Cement
Sand
2.5
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 125 SFT.
Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Page 54

r dado 3/8\" thick including rounding of corner and


nishing to smooth surface after plastering

Sand Mortar

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Qty

.96 Bag
Cft.

0.0
0.00 Per 100 Cft

2.5 No.
1.5 No.
.34 No.

0.0
0.0
0.0

Per

Amount (Rs.)

Bag

Per day
Per day
Per day

0.0
0.0

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.0
0.0
0.0
0.0

mount (Rs.)

b)

1:3 Cement Sand Mortar

Detail
Qty
MATERIAL
Cement
Sand
2.55
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 125 SFT.

0.66

Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE

2.5
1.5
0.34

Labour Rate Per 100 Sft.


Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 55

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bag
Bag

0
0.00 Per 100 Cft

No.
No.
No.

0
0
0

Per

Amount (Rs.)

Bag

Per day
Per day
Per day

0
0

Say
Say
Say
Say

0
0
0
0

c)

Extra if skirting or dado is finished with pigme

Detail
Qty
MATERIAL
Pigment
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 200 SFT.

6 Lbs (2.72 Kg.)

Cooly for mixing


Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

0.5

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 56

ado is finished with pigment of any colour

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Lbs (2.72 Kg.)

No.

Amount (Rs.)

0 Per Kg.

0 Per day

0
-

Say
Say
Say
Say

0
0
0
0

DESCRIPTION OF ITEM
37

White glazed tiles \" thick dado jointed in white cement a


sand mortar 3/4\" thick including finishing complete

Detail

MATERIAL
Tiles

6\"x6\"x\"
White Cement
Grey Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Page 57

o jointed in white cement and laid over 1:2 cement


g finishing complete

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Qty

420

No.
.1 Bag
2.16 Bag
5.2 Cft.

0.0
0.00 Per Bag
0.00 Per Bag
0.00 Per 100 Cft

2.5 No.
5 No.
.5 No.

Amount (Rs.)

Each

0.0 Per day


0.0 Per day
0.0 Per day

0.0
0.0

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.0
0.0
0.0
0.0

mount (Rs.)

DESCRIPTION OF ITEM

38

Glazed tile dado \" thick dado laid in pigment over 1:2 ce
including finishing
Detail

MATERIAL
Tiles

6\"x6\"x\"
White Cement
Grey Cement
Pigment
Sand
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Page 58

laid in pigment over 1:2 cement sand mortar

/ \" thick

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Qty

420

No.
.1 Bag
2.16 Bag
0.67 Lb (0.30 Kg.
5 Cft.

3
4

Amount (Rs.)

0.0
0.0
0.0
0.0
0.00 Per 100 Cft

Each
Per Bag
Per Bag
Per Kg.

0.0
0.0
0.0

Per day
Per day
Per day

2.5 No.
5 No.
.5 No.

0.0
0.0

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
39

Masaic dado or skirting with one part of cement and marble


3:! and two parts of marble chips, laid over \" thick ceme
rubbing and polishing complete with finishing:
a - i)

Using Grey Cement 3/8\" Thick

Detail
Qty
MATERIAL
Grey

Cement
.94
Marble Powder
0.31 Cwt. (15.75 Kg
Marble Chips
3.00 Cwt.(152.40 Kg
Carbordum Stone
3
Wax Polish
0.5 Lbs (0.23 Kg.
Tartric Acid
0.34 Lbs (0.15 Kg
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
Mason
Coolies
Skilled Cooly
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

2
2
5
1

Page 59

part of cement and marble powder in the ratio of


s, laid over \" thick cement plaster 1:3 including
ith finishing:

Cement 3/8\" Thick

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Bags

.31 Cwt. (15.75 Kg


.00 Cwt.(152.40 Kg
No.

.5 Lbs (0.23 Kg.


.34 Lbs (0.15 Kg

0.0
0.00Per 100 Kg.
0.0
0.0
0.00 Packet 3 Kg
0.0

Bag

0.0
0.0
0.0
0.0

Per
Per
Per
Per

No.
No.
No.
No.

Amount (Rs.)

Per Kg.
Per Kg.
Per Kg.

day
day
day
day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

mount (Rs.)

a-ii)

Using Grey Cement \" Thick

Detail
Qty
MATERIAL
Cement
Marble Powder
Marble Chips
Carboradom Stone
Wax Polish
Linion Cloth
Tartric Acid
\"cement plaster under neath

1.27
0.42 Cwt. (21.34 Kg
3 Cwt. (152.40 Kg
3
0.5 Lbs (0.23 Kg.
.72
0.34 Lbs (0.15 Kg

Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR

.88
3.4

Mason
Cooly
Skilled Cooly
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

2
2
5
1

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 60

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Amount (Rs.)

0
0.00Per 100 Kg.
0
0.0
0.00 Packet 3 Kg
0.0
0.0

Bag

Bag
Cft.

0.0
0.00 Per 100 Cft

Bag

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Per
Per
Per
Per

Bags

No.
Kg.

Per Kg.
Each
P. Kg.
Per Kg.

day
day
day
day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

b-i)

Using White Cement

3/8\" thick

Detail
Qty

MATERIAL
i)
White

3/8\" Thick
Cement
Marble Powder
Marble Chips
Carboradom Stone
Wax Polish
Linion Cloth
Tartric Acid

0.94
0.31 Cwt. (15.75 Kg
3 Cwt. (152.40 Kg
3
0.5 Lbs (0.23 Kg.
.72
0.34 Lbs (0.15 Kg

ii) \"cement plaster under neath


Grey Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

.88
3.4

Mason for Laying


Coolies for rubbing and polishin
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

2
5
2
1

LABOUR

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 61

Cement

3/8\" thick

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Amount (Rs.)

0
0.00Per 100 Kg.
0
0.0
0.00 Packet 3 Kg
0.0
0.0

Bag

Bag
Cft.

0.0
0.00 Per 100 Cft

Bag

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Per
Per
Per
Per

Bags

.31 Cwt. (15.75 Kg


Cwt. (152.40 Kg
No.

.5 Lbs (0.23 Kg.


Kg.

.34 Lbs (0.15 Kg

Per Kg.
Each
P. Kg.
Per Kg.

day
day
day
day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

b-ii)

Using White Cement

(\" thick)

Detail
Qty

MATERIAL
i)
White

Thick
Cement
Marble Powder
Marble Chips
Carboradom Stone
Wax Polish
Linion Cloth
Tartric Acid

1.27
0.42 Cwt. (21.34 Kg
3 Cwt. (152.40 Kg
3
0.5 Lbs (0.23 Kg.
.72
0.34 Lbs / 0.15 Kg

ii) \"cement plaster 1:3 under neath


Grey Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

.88
3.4

Mason
Skilled Cooly
Coolies
Bahishti 1.00
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

2
5
2

LABOUR

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 62

Cement

(\" thick)

Bags

.42 Cwt. (21.34 Kg


Cwt. (152.40 Kg
No.

.5 Lbs (0.23 Kg.


Kg.

.34 Lbs / 0.15 Kg

Bag
Cft.

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)

Amount (Rs.)

0
0.00Per 100 Kg.
0
0.0
0.00 Packet 3 Kg
0.0
0.0

Bag

0.0
0.00 Per 100 Cft

Bag

Per Kg.
Each
P. Kg.
Per Kg.

No.
No.
No.
No.

0.0
0.0
0.0
0.0

Per day
Per day
Per day
Per

day

0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

mount (Rs.)

DESCRIPTION ITEM
40

Rubber Flooring, consisting of 12\"x12\"x1/8\" rubber tiles

Detail

(Assume for 100 Sft.)


MATERIAL
Rubber tiles (12\"x12\"x1/8\")
including 5% wastage
Adhesive mixutre (10 Lbs) (4.56 Kg.)
Brushes etc.
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR
Mason
Coolies
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per Sft.
Labour Rate Per Sqm.
Composite Rate per Sft.
Composite Rate per Sqm.

Page 63

2\"x12\"x1/8\" rubber tiles laid on firm foundation

Unit Rate Per Sft.


Rate
Per Unit (Rs.)

Qty

105

Nos.

Amount (Rs.)

0.0

Each

4.56 Kg.
.04 No.

0.0
0.0

Kg.
Each

1 No.
1.5 No.

0.0
0.0

Per day
Per day

0.0
0.0

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
41

Providing and Fixing Glass Strip 5mm thick and 1\" wide
for dividing mosaic flooring into panels.

Detail

(Assume for 100 Rft.)


MATERIAL

5mm

Glass Strips 1\" wide


Thick
Wastage 10%
Total
Contractor's Profit & Ove ## Percent
Total

ITEM RATE
Composite Rate per Rft.
Composite Rate per R.M.

Note :Labour for fixing already included in item 15 & 22 of this chap

Page 64

5mm thick and 1\" wide

Unit Rate Per Rft.


Rate
Per Unit (Rs.)

Qty

100 Rft.
10 Rft.
110 Rft.

0.00Per 100 Rft

Amount (Rs.)

Rs.

Say

0.0

Rs.

Say

0.0

item 15 & 22 of this chapter

DESCRIPTION OF ITEM
42

Providing and fixing marble strip of any shade for dividing


a)

Size 1\" x 3/8\"

Detail

(Assume for 100 Rft.)


MATERIAL
Marble Strip 1\" x 3/8\"
Wastage 10%
Total
Contractor's Profit & Ove ## Percent
Total

ITEM RATE
Composite Rate per Rft.
Composite Rate per R/M

Note

Labour already included in item 15, 16 and 22 of this chapter.

Page 65

p of any shade for dividing the mosaic flooring into pann

Unit Rate Per Rft.


Rate
Per Unit (Rs.)

Qty

100 Rft.
10 Rft.
110 Rft.

0.00 Per Rft.

Amount (Rs.)

Rs.

Say

0.0

Rs.

Say

0.0

6 and 22 of this chapter.

b)

Size 1\" x \"

Detail
Qty
(Assume for 100 Rft.)
MATERIAL
Marble Strips 1\" x \"
Wastage 10%
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE

100
10
110

Composite Rate per Rft.

Rs.

Composite Rate per R/M

Rs.

Note

Labour already included in item 15, 16 and 22 of this chapter.

Page 66

Unit Rate Per Rft.


Rate
Per Unit (Rs.)

Rft.
Rft.
Rft.

0.00 Per Rft.

Amount (Rs.)

Say

Say

6 and 22 of this chapter.

CHAPTER NO. 25

IRON WORK
DESCRIPTION OF ITEM:
1

Laying, Linking & Packing


Tram way line.

Detail
Qty
Rate Analysis for 350 Rft
LABOUR
1
2
3

Jamadar (Mate)
Keyman (Skilled Cooly)
Coolies (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate Per R M

1
1
7

Page 1

Unit of Rate 100 Rft.


Rate
Per Unit
Amount

No.
No.
Nos.

0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

Say
Say

0.0
0.0

2 Dismantling Tramway track.

Detail
Qty
Rate Analysis for 1400 Rft.
LABOUR
1
2
3

Jamadar (Mate)
Skilled Cooly
Coolies (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate per RM

1
1
10

Page 2

Unit of Rate 100 Rft.


Rate
Per Unit
Amount

No.
No.
Nos.

Rs.
Rs.

0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Say
Say

0.0
0.0

3 Laying, Linking of B.G Track including packing, straightening and lev

Detail
Qty
Rate Analysis per 120 Rft.
LABOUR
1
2
3

Jamadar (Mate)
Keyman (Skilled Cooly)
Coolies (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate per RM

1
1
6

Page 3

ing, straightening and levelling.

Unit = 100 Rft


Rate
Per Unit

No.
No.
Nos.

Amount

0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

Rs.

Say

0.0

4 Linking points and crossings complete with fastenings.

Detail
Qty
LABOUR
1
2
3

Jamadar (Mate)
Keyman (Skilled Cooly)
Coolies (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate Per Each

.5
.5
5.5

Page 4

fastenings.

Unit = Each
Rate
Per Unit

No.
No.
Nos.

Rs.

Amount

0.0
0.0
0.0

Say

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Say

0.0

5 Bending or straightening B.G.

rail with Jim crow

Detail
Qty
LABOUR
1
2

Black Smith
Coolies (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate Per Each Point

.2
.5

Page 5

Unit Rate Per Each Point


Rate
Per Unit

No.
No.

Rs.

0.0 per day


0.0 per day

Amount

Say

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Say

0.0

Fixing street lamp post.

Detail
Qty
LABOUR
1

Coolies (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor 20.00 Percent
Total

.85 No.

ITEM RATE
Labour Rate Per/Each

Rs.

Page 6

Unit Rate Per Each


Rate
Per Unit

0.0

Amount

per day

0.0
0.0
0.0
0.0
0.0
0.0

Say

0.0

7 Binding ends of sleepers and timbers of all sizes and kinds including
restacking.

Detail
Qty
LABOUR
1
2
3

Fitter
Mate
Coolies (unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate Per 100 Nos.

1.5
.5
5.75

Page 7

sizes and kinds including spreading and

Unit Rate Per


Rate
Per Unit

No.
No.
No.

0.0
0.0
0.0

100 Nos.
Amount

per day
per day
per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Say

Rs.

Say

0.0

8 Opening stacks of sleepers and Timbers of all kinds and sizes includi
inspection and restacking within chain lead.

Detail
Qty
Rate Analysis for 1500 Nos.
LABOUR
1
2

Mate
Coolies (unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate Per 100 Nos.

1
14

Page 8

ll kinds and sizes including spreading for

Unit Rate Per 100 Nos.


Rate
Per Unit

No.
Nos.

Rs.

0.0
0.0

Amount

per day
per day

0.0
0.0

Say

0.0
0.0
0.0
0.0
0.0
0.0

Say

0.0

9 Small Iron work such as gusset plates, knees, bends, strips, straps,
cutting, drilling, revitting, bending assembling & fixing but excludi

Detail
Qty
Rate Analysis for 1 Cwt.
MATERIAL
1

2
3

Iron
wastage 10%

= 1.0 Cw
55.9
0.1 Cwt.
1.10 Cwt. or 55.

Char Coal
Steel Revits

8.4
.68

Total
Contractor's Profit &20.00 Percent
Total
LABOUR
Black Smith
Coolies (Unskilled)

1.5
2.5

Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total
ITEM RATE
Labour Rate for 1 Cwt.
Composite Rate for 1 Rs.
Labour Rate/100 Kgs.
Composite Rate/100 Kg Rs.

Page 9

s, bends, strips, straps, rings etc. including


bling & fixing but excluding erection in position.

Unit = 1 Cwt.
Rate
Per Unit

Amount

Kg

0.0

per Kg

Kg
Kg

0.0
0.0

per Kg
per Kg

Nos.
Nos.

per day
per day

Say
Rs.

Say
Say

Rs.

Say
Say

10 Fabrication of heavy steel work, with angle, tees, flat iron, round i
making trusses, girders, tanks etc. including cutting, drilling, revi
assembling and fixing but excluding erection in position.

Detail
Qty
Rate Analysis for 1 Cwt.
MATERIAL
1

2
3

Iron
wastage 5%

= 1.00 Cwt
= 0.05 Cwt
53.36
1.05 Cwt.o (53.36 Kg.)

Char Coal
Steel Revits

7.46
.45

Total
Contractor's Profit &20.00 Percent
Total
LABOUR
1
2

Black Smith
Hammer man
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate/Cwt
Composite Rate/One Cwt.
Labour Rate/100 Kg.
Composite Rate/100 Kg

.5
.9

Page 10

, tees, flat iron, round iron and sheet iron for


ng cutting, drilling, revitting handling,
n in position.

Unit = 1 Cwt.
Rate
Per Unit

Amount

Kg

0.0

Per Kg.

0.0

Kg
Kg

0.0
0.0

Per Kg.
Per Kg.

0.0
0.0
0.0
0.0
0.0

No.
No.

0.0
0.0

per day
per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

0.0

Say

0.0

Rs.

0.0

Say

0.0

Rs.

0.0

Say

0.0

Rs.

0.0

Say

0.0

11 Erection and fitting in position of iron trusses, staging of water ta

Detail
Qty
Rate Analysis for 9.00 Cwt.
LABOUR
1
2

Fitter
Coolies (unskilled)

2
2

Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total
Rate/Cwt

0.0 = Rs. 65.88


9

ITEM RATE
Labour Rate / Cwt.
Labour Rate 100 Kg

Page 11

usses, staging of water tanks.

Unit = 100 Kg
Rate
Per Unit

No.
No.

0.0
0.0

Amount

per day
per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0

Say

0.0

Say

0.0

12 Fixing corrugated iron sheet including revitting.

Detail
Qty
Rate Analysis for 125 Sft.
LABOUR
1
2

Black smith
Coolies (unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate 100 Sft.
Labour Rate/Sq.m

1
1

Page 12

Unit Rate Per 100 Sft.


Rate
Per Unit

No.
No.

0.0
0.0

Per day
Per day

Amount

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

Rs.

Say

0.0

13 Erecting corrugated iron sheet tanks upto 20 ft. height.

Detail

Rate Analysis for 14.25 Cwt.


LABOUR
1
2

Black smith
Coolies (unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

Rate / Cwt.
ITEM RATE
Labour Rate/ One Cwt
Labour Rate / 100 Kg.

0.0 =
14.25

Rs.

0.0

Page 13

0 ft. height.

Unit = 100 Kg
Rate
Per Unit

Qty

2 Nos.
9.5 Nos.

0.0
0.0

Amount

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0

Say

0.0

Say

0.0

14 Erecting rolled steel beams on old rails in roofs etc., erection and

Detail
Qty
Rate Analysis for 30 Cwt.
LABOUR
1
2

Black smith
Coolies (unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate /Cwt.
Labour Rate / 100 Kg.

.5
14.5

Page 14

roofs etc., erection and fixing in position.

Unit 100 Kg.


Rate
Per Unit

No.
Nos.

0.0
0.0

Amount

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0

Say

0.0

Say

0.0

15 Erecting rolled steel beams or rails, erection for posts etc. (other

Detail

Rate Analysis for 30 Cwt.


LABOUR
1
2

Black smith
Coolies (unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

Rate/Cwt.

.01 =
30

ITEM RATE
Labour Rate /Cwt.
Labour Rate / 100 Kg.

Rs.

0.0

Page 15

ion for posts etc. (other than in roofs).

Unit 100 Kg.


Rate
Per Unit

Qty

.5 No.
6.75 Nos.

Rs.
Rs.

Amount

0.0
0.0

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0

Say
Say

0.0
0.0

16 Making bolts and nuts of iron rods.

Detail
Qty
Rate Analysis for 1 Cwt.
MATERIAL
1

Mild Steel
wastage 10%

2
3

Steel chisel
Coal
Total
Contractor's Profit &20.00 Percent
Total

LABOUR
1
2
3

1 .0 Cwt.
55.9
0.1 Cwt
1.1 Cwt. o (55.90 Kg)
.68
46.51

Black Smith
Hammer man
Cooly (Unskilled)

1.5
.75
.75

Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total
ITEM RATE
Labour Rate/ Cwt.
Composite Rate/Cwt
Labour Rate/100 Kg.
Composite Rate/100 Kg.

Page 16

Unit 100 Kg.


Rate
Per Unit

Amount

Kg

0.0

Per Kg.

0.0

Kg
Kg

0.0
0.0

Per Kg.
Per Kg.

0.0
0.0
0.0
0.0
0.0

Nos.
No.
No.

0.0
0.0
0.0

Per day
Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0
0.0

Say
Say

0.0
0.0

Rs.

0.0

Say

0.0

Rs.

0.0

Say

0.0

17 Cutting rails, rolled steel joists and beams with hack saw:a) upto 6\" size.

Detail
Qty
Rate Analysis for 1 Cut.
LABOUR
1
2

Fitter
Coolies (unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Cut

.15
.15

Page 17

s with hack saw:-

Unit per cut


Rate
Per Unit

No.
No.

0.0
0.0

Amount

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

17 b) Above 6\" size.

Detail
Qty
Rate Analysis for 5 Cuts.
LABOUR
1
2

Fitter
Coolies (unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Cut.

1.2
1

Page 18

Unit per Cut


Rate
Per Unit

Nos.
No.

Rs.

0.0
0.0

Amount

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Say

0.0

18 Cutting rails or rolled steel beams of size below 6\" with Jim.

Detail
Qty
Rate Analysis for 14 Cuts
LABOUR
1
2

Fitter
Coolies (unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Cut.

1
1

Page 19

below 6\" with Jim.

Unit per Cut


Rate
Per Unit

No.
No.

Rs.

0.0
0.0

Amount

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Say

0.0

19 Bending rolled steel beams on rails.

Detail
Qty
Rate Analysis for 10 Bends
MATERIAL
1

Steam coal

139.95

Total
Contractor's Profit &20.00 Percent
Total
LABOUR
1
2

Black Smith
Hammer man
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate Per Bend
Composite Rate/Bend

.75
.75

Page 20

Unit / Bend
Rate
Per Unit

Kg

0.0

Amount

Per Kg

0.0

0.0
0.0
0.0

No.
No.

0.0
0.0

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

Rs.

Say

0.0

20 Drilling holes in plates upto 1/2\" thick per inch dia or part thereo

Detail
Qty
Rate Analysis for 40 holes
LABOUR
1
2

Fitter (Grade I)
Coolies (unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per hole

.5
2

Page 21

er inch dia or part thereof.

Unit Rate per Hole


Rate
Per Unit

No.
No.

0.0
0.0

Amount

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

21 Extra for drilling holes in plates over each 1/2\" thick per inch dia

Detail
Qty
Rate Analysis for 120 holes
LABOUR
1
2

Fitter (Grade I)
Coolies (unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per hole

.25
4

Page 22

h 1/2\" thick per inch dia or part thereof.

Unit Rate Per Hole


Rate
Per Unit

No.
Nos.

0.0
0.0

Amount

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

22 Riveting 1/8\" dia

Detail
Qty
Rate Analysis for 120 Nos.
LABOUR
1
2

Riveted
Coolies (unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate for 100 Nos.

.5
.5

Page 23

Unit Rate Per 100 Nos.


Rate
Per Unit

No.
No.

0.0
0.0

Per day
Per day

Amount

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

23 Cutting out rivets, all sizes.

Detail
Qty
Rate Analysis for 160 Nos.
LABOUR
1
2

Fitter (Grade II)


Hammer man
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate for 100 Nos.

2
2

Page 24

Unit 100 Nos.


Rate
Per Unit

Nos.
Nos.

0.0
0.0

Amount

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

24 Fitting and erection

of gutters of sheet iron.

Detail
Qty
Rate Analysis for 115 Feet
LABOUR
1
2
3

Fitter (Grade II)


Mason
Coolies (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate Per Lft.
Labour Rate per RM

1
1
10

Page 25

Unit / Lft.
Rate
Per Unit

No.
No.
Nos.

0.0
0.0
0.0

Amount

Per day
Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

Rs.

Say

0.0

25 Cutting and fixing iron bars for barred windows

Detail
Qty
Rate Analysis for 35 Bars
LABOUR
1
2
3

Fitter (Grade III)


Carpenter
Coolies (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate Per Bar

.5
.5
1

Page 26

Unit / Bar
Rate
Per Unit

No.
No.
No.

0.0
0.0
0.0

Amount

Per day
Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

Say

0.0

26 Cutting GI sheets.

Detail
Qty
Rate Analysis for 65 Cuts
LABOUR
1
2

Fitter (Grade II)


Hammer man
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per cut

1
1

Page 27

Unit Rate Per Cut


Rate
Per Unit

No.
No.

Rs.

0.0
0.0

Amount

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Say

0.0

27 Notching web or foot of rail posts for housing rail beams.

Detail
Qty
Rate Analysis for 3 Notches
MATERIAL
1

Steam Coal

28

Total
Contractor's Profit &20.00 Percent
Total
LABOUR
1
2

Black Smith
Hammer man
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate/Notch
Composite Rate/Notch

1
1

Page 28

ing rail beams.

Unit Rate Per Notch


Rate
Per Unit

Kg

0.0

Amount

Per Kg

0.0

0.0
0.0
0.0

Nos.
Nos.

0.0
0.0

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.

0.0

Say

0.0

Say

0.0

Rs.

28 Hoop Iron netted trellis work fixed with nails.

Detail
Qty
Rate Analysis for 50 Sft.
LABOUR
1
2

Fitter (Grade - II)


Coolies (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Sft.
Labour Rate per Sq.m

1
1

Page 29

Unit Rate Per Sft.


Rate
Per Unit

No.
No.

0.0
0.0

Amount

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0
-

Say

0.0

Say

0.0

29 Fixing zinc Iron or GI Sheets on table tops.

Detail
Qty
Rate Analysis for 85 Sft.
LABOUR
1
2

Carpenter
Coolies (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Sft.
Labour Rate per Sq.m

1
1

Page 30

Unit Rate Per Sft.


Rate
Per Unit

No.
No.

0.0
0.0

Amount

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0
-

Say

0.0

Say

0.0

30

Making and fixing steel grated doors, complete with lockin


3/4\" square bars 4\" center to center

Detail

Rate Analysis for 7' x 4'

= 28.00

Sft.

MATERIAL
a)
1

2
3

b
c
d
e
f

Angle Iron frame 2\"x2\"x3/8\"


vertical 4x7
Top rail 2 x 4'-0\"
Bottom & central rail

28 Rft
8 Rft
8 Rft.
44 Rft.
Grating(\"x\")
= 9x7'-0\" = 63 Rft.
Gusset Plate (\" thick)
8x6\"x3\"
1.0 0 Sft.
4x8\"x3\"
0.67 Sft.
1.67 Sf
Total
Wastage
Total
Hold fast with pivot and fixed
Locking arrangement with sliding bolt 1 long
and 1\" dia
Coal
Rivets and bolts
Steel
Total
Contractor's Profit &20.00 Percent
Total

LABOUR
1
2
3

Black Smith
Hammer man
Blowman
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Sft.
Composite Rate per Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

Page 31

doors, complete with locking arrangement, angle iron frame 2\"x2\"x3

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

90.44 Kg.
53.74 Kg.

.0 0 Sft.
.67 Sft.
7.58 Kg.
151.76
7.59
159.35 Kg.
6 Nos.

0.0
0.0

Per Kg.
Each

0.0
0.0

No.
Kg.
Kg.
Kg.

0.0
0.0
0.0
0.0

Each
Per Kg.
Per Kg.
Per Kg.

0.0
0.0
0.0
0.0
0.0
0.0
0.0

2 Nos.
3 Nos.
2 Nos.

0.0
0.0
0.0

Per day
Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0
0.0

Say
Say

0.0
0.0

Rs.
Rs.

0.0
0.0

Say
Say

0.0
0.0

bolt 1 long
1
15
2.27
1.13

31 Making and fixing steel grated door with 1/16\" thick sheeting includ
2\"x2\"x3/8\" and 3/4\" square bars 4\" center to center with locking

Detail

Rate Analysis for 7'x4'

28 Sft.

MATERIAL
1
2

As per Item No. 30 (a) to (f)


M.S. sheet 1/16\" , 7x4=
Wastage @ 5%
@

28 Sft.
1.4 Sft
29.40 S
lb/Sft.

Total
Contractor's Profit &20.00 Percent
Total
LABOUR
1
2
3

Black Smith
Hammer man
Blowman
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate/Sft.
Composite Rate per Sft.
Labour Rate Per Sq.m
Composite Rate per Sq.m

33.35

Page 32

16\" thick sheeting including angle iron frame


ter to center with locking arrangement.

Unit Rate Per Sft.


Rate
Per Unit

Qty

Kg.

2.25 Nos.
3 Nos.
2 Nos.

Amount

Per Kg.

Per day
Per day
Per day

Say

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

32 Making and fixing grating in opening, including fixing at site with f


square bars at 4\" cetnre to center.

Detail
Qty
Rate Analysis for 5'x8'
MATERIAL
1
a
b

40

Sft.

Steel
Frame 2\" x 3/8\"
3 x 6' = 18 Rft. @ 2.51 lb/Rft. = 45 lb
20.5
Grating 3/4\"x3/4\" 14x 8' = 112 Rft. @ 1.88 lb/ft.
= 210.5
95.54
Total
116.04
Wastage @ 5%
5.8
Total
121.84
Coal
Total
Contractor's Profit &20.00 Percent
Total

1.4

LABOUR
1
2
3

Black Smith
Hammer man
Blowman
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate/Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

1.25
1.25
1.5

Page 33

ding fixing at site with flat iron 2\"x3/8\" and 3/4\"

Unit Rate Per Sft.


Rate
Per Unit

Amount

Kg.
1.88 lb/ft.
Kg.
Kg.
Kg.

0.0

Per Kg.

0.0

Kg.

0.0

Per Kg.

0.0
0.0
0.0
0.0

Nos.
Nos.
Nos.

0.0
0.0
0.0

Per day
Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0
0.0

Say
Say

0.0
0.0

Rs.
Rs.

0.0
0.0

Say
Say

0.0
0.0

33 Providing and fixing stair railing (all types and designs) of hard wo
and corners, screwed to 5/8\"x5/8\" M.S. square bars 2.75 ft. high, a
center, fixed in steps of stairs, M.S. flat 1\"x1/8\" welded to bars,
etc. complete.

Detail
Qty
Rate Analysis for 10 Rft.
MATERIAL
1
2
3
4

Wooden railing
10
M.S. flat 1\"x1/8\" 10 Rft. @ 0.42 LB/ft.
1.91
= 4.2 lbs/ft.
M.S. square bars (5/8\"x5/8\") 11x2 = 22 Nos x 3
=66 ft. @
39.83
Painting
0.045 Gallon
Total
Contractor's Profit &20.00 Percent
Total

LABOUR
1
2
3
4
5
6

Cutting 5/8\" square bars.


Cutting flat iron 2 Nos. cuts
Welding bar with M.S. flat 22 Nos.
Drilling holes in stone or masonry
Mason
Cooly (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate/Rft.
Composite Rate/Rft.
Labour Rate per Rm
Composite Rate per Rm

22
2
22
22
.75
1

Page 34

es and designs) of hard wood, including bends


uare bars 2.75 ft. high, at 5.5 inch center to
1\"x1/8\" welded to bars, painting/polishing 3 coats,

Unit Rate Per Rft.


Rate
Per Unit

Rft.
Kg.

0.00 Per Rft.


0.0

Kg.

0.0
0.0

Amount

Per Kg.

0.0
0.0

Per Kg.
Gallon

0.0
0.0
0.0
0.0
0.0

cuts
cuts
Nos
Nos
No.
No.

0.0
0.0
0.0
0.00 per hole
0.0
0.0

Rs.
Rs.

Rs.
Rs.

per cut
Per cut
per No.
per day
per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0

Say
Say

0.0
0.0

0.0
0.0

Say
Say

0.0
0.0

34 Providing/fixing stair railing consisting of M.S. Box section size 1welded with M.S. flat 1\"x1/8\" continuously and welded over M.S. squ
punched in M.S. flat 2 ' high @ 5\" c/c fixed in steps of stair I/C
complete.
Detail
Qty
MATERIAL
1

LABOUR
1

2
3

Rate of stair railing with hard wood hand railing


(Item No. 33)
Rate/ft.
#####
Less: rate of shisham wood raili#####
(No. 31 (a) wood work
#####
Providing fixing M.S. Box section of 16 SWG
1\"x3\" for hand rail
1
Add 5% wastage
.05
1.05
Painting 3 coats (Item 5d i & ii Painting)
.62
including Contractor Profit
54.73+72.6
100
Contractor's Profit &20.00 Perc
0.0

Stair railing
Rs. 83.95
Less shisham wood rail
Rs. 40.70
(Ref. 28 (a) (wood)
Rs. 43.
Labour for painting (Ref. as above)
Making/fixing M.S. box section to required
shape i/c bends/corners welding i/c cost o
welding rod.
Total
Sundries
10.00 Perc
0.0
Contractor's Profit &20.00 Percent
at Rs. (6.40+0.64)
0.0
Total

ITEM RATE
Labour Rate/Rft.
Composite Rate/Rft.
Labour Rate/ RM
Composite Rate/RM

1
.62
1

Page 35

f M.S. Box section size 1-1/2\"x3\" of 16 SWG


y and welded over M.S. square bars 5/8\"x5/8\"
ixed in steps of stair I/C painting 3 coats

Unit Rate Per Rft.


Rate
Per Unit

Per Rft.
Rft.
Rft.
Sft.

0.00 Per Rft.


0.00 Per Sft.
Say 1.3

Total

Rft.
Sft.

Per Rft.
Per Sft.

Rft.

Per Rft.

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Amount

35 Providing and fixing terrace railing of 2\" i/d conduit pipe 16 SWG w
square bars 2.75 ft. high fixed at 5\" center to center in reinforced
with suitable arrangement, complete in all respects as per design and

Detail
Qty
Rate Analysis for 10 Rft.
MATERIAL
1
2
3

LABOUR
1
2
3

Conduit pipe including specials


10
M.S. square bars 5/8\"x5/8\" @5\" c/c =22
@ 1.33 lb/ft. = 87.78 lbs (39.83 Kg)
M.S. flat iron 1\"x1/8\"=10 ft. @ 0.42 LB/
(1.91 Kg.)
Total
Contractor's Profit &20.00 Percent
Total

Cutting 5/8\" square bars


Welding square bar with conduit pipe
Drilling hole 22x3 = 66 Nos.
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate Rft.
Composite Rate/Rft.
Labour Rate per RM
Composite Rate per RM

22
22
66

39.83
1.91

Page 36

i/d conduit pipe 16 SWG welded with 5/8\"x5/8\"


er to center in reinforced cement concrete slab
respects as per design and drawing.

Unit Rate Per Rft.


Rate
Per Unit

Amount

Rft.
Kg.

0.0
0.0

Per ft.
Per Kg.

0.0
0.0

Kg.

0.0

Per Kg.

0.0
0.0
0.0
0.0

Nos.
Nos.
Nos.

0.0
0.0
0.00 per hole

Rs.
Rs.

Rs.
Rs.

per cut
per No.

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0

Say
Say

0.0
0.0

0.0
0.0

Say
Say

0.0
0.0

36 Providing and fixing collapsible gate made of 2\"x2\"x1/4\" tee iron


channel iron vertical 3/4\"x1/4\"x1/4\"x1/8\" at 3\" to 5\" center to
iron crosses 3\"x3/16\" and best quality rollers at bottom of 3\" dia
handles 12\" long of 3/4\"x1/4\"x1/4\"x 1/8\" channel iron, locking a
side, painting 3 coats of black Japan enameled, complete in working o

Detail
Qty
Rate Analysis for 7'x10'
MATERIAL
i)
ii)

iii)

iv)
v)
vi)
vii)
viii)
ix)
x)

xi)

75

Sft.

Top and bottom tee 2\"x2\"x1/4\", 2x8'=16 Rft


@ 3.2 Lbs/ft. = 51.20 lbs or 23.23 Kg.
23.23
Vertical channels 3\"x1/4\"x1/4\"x1/8\"
24x2x10' =
480 Rft.
Wastage @ 5%
24
Rft.
Total
504 Rf
128.06
@ 0.56 lb per ft. = 282.24 lbs
Flat iron 3/4\"x3/16 crosses
12\" long 4x4x1'
= 16 Rft.
24\" long 46x4x2' = 368 Rft.
384 Rft.
wastage @ 5%
19.20 Rft.
91.47
403.20 Rft. @ 0.50 lb/ft.=201.60 lbs
Total
242.76
3\" diameter rollers
6
Rivets with heads 2\" long 11x24= 264 No.
264
Rivets 1\" long 4x2x24 = 192 Nos
192
Handles 12\" long 3/4\"x1/4\" channels inside
and outside
2
Locking arrangement in & outside
2
Holdfast 8.00
Cement 0.480
Sand
1.3
Bajri
2.45
Painting 3 coats Qty. gallon
0.5
Total
Contractor's Profit &20.00 Percent
Total

Page 37

of 2\"x2\"x1/4\" tee iron at top and bottom,


\" at 3\" to 5\" center to center (Approximately) and flat
llers at bottom of 3\" dia meter including holdfast,
\" channel iron, locking arrangement inside and out
led, complete in working order.

82.24

Unit Rate Per Sft.


Rate
Per Unit

Amount

Kg.

Kg.
lbs

Kg.
ft.=201.60 lbs
Kg.
Nos.

Nos.
Nos.
Nos.
Cft.
Cft.
Cft.
gln.

0
0
0
0
0
0
0
0
0.00 Per % Cft.
0

Per Kg.
Nos.
Each
Each

0
0
0
0

Each
Each
Each
P.

0
0
0
0
0
0
0
0
0
0

Per % Cft.
gln

Bag

Detail
Qty

LABOUR
1
2
3
4
5
6

Black Smith
Coolies (Skilled)
Coolies (Unskilled)
Mason
Coolies
Painter
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate/ Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

6
12
6
.5
1.5
.33

Page 38

Unit Rate Per Sft.


Rate
Per Unit

Amount

Nos
Nos
Nos
No.
No.
No.

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0
0.0

Say
Say

0.0
0.0

Rs.
Rs.

0.0
0.0

Say
Say

0.0
0.0

37

Providing and fixing 24 SWG GI sheet rolling shutter, consi


channel 2\"x1\"x1/8\", angle iron 1\"x1\"x1/8\", M.S. pl
2' center to center, rollers, 24 SWG, GI covering 1'x1', ha
coats, complete in all respects.

Detail

Rate Analysis shutter size 8'x9' = 72' Sft.


MATERIAL
1
M.S. channels 2\"x1\"x1/8\"
Frame sides 2 Nos x 9'
wastage @ 5%

M.S. plate 1'x1'x1/8\"


2 Nos x 1 x 1
wastage @ 5%

Angle Iron 1\"x1\"x1/8\"


Bottom side 7'-10\"
wastage @ 5%

GI sheet 24 SWG
i) For shutter 1x7.83x9 =
ii) For box 1x8x3.25 =
iii) For covering plate =
Over lap 10%
Wastage 5%

5
6
7

GI bracket
GI Holdfast
GI Pipe 1\" dia:Pipe
wastage 5%

Handle 2 Nos

GI spring

10

Rolling gear 3 Nos.

11

Making (holes/khuda)

18.00
Rft.
0.9 Rft.
18.9 Rf
lbs/ft.
2.00 Sft
0.10 Sft
2.10 S
@ 5.10 lbs/Sft.
7.83 Rft.
0.39 Rft.
8.22 R
@ 1.23 lbs/ft.
70.47 Rft.
26.00 Rft.
2.00 Sft.
98.47 Sft.
9.85 Rft..
108.32 Sft.
5.41 Sft.
113.73 Sft.
@ 1.112

8.00
0.40
8.40

Rft.
Rft.
R

12
13

Rivets
Greasing 0.80

14

Cement 0.212 Cft.

Page 39

heet rolling shutter, consisting of steel frame of M.S.


on 1\"x1\"x1/8\", M.S. plat 1'x1'x1/8\", GI pipe 1\" dia, spring
SWG, GI covering 1'x1', handles, holdfast & painting three

Unit Rate Per Sft.


Rate
Per Unit

Qty

8.00

Amount

Rft.
19.21 Kg.

0.0

Per Kg.

0.0

4.86 Kg.

0.0

Per Kg.

0.0

4.59 Kg.

0.0

Per Kg.

0.0

57.38 Kg.
2 Nos.
6 Nos.

0.0
0.0
0.0

Per Kg.
Each
Each

0.0
0.0
0.0

Each

0.0
0.0

5.10 lbs/Sft.

.83
.39

Rft.
Rft.

1.23 lbs/ft.

0.47 Rft.
6.00 Rft.
2.00 Sft.
8.47 Sft.
9.85 Rft..
08.32 Sft.
.41 Sft.
13.73 Sft.

.00
.40

Rft.
Rft.
8.4 Rft.
2 Nos.

0.00 Per Rft.


0.0

2 Nos.

0.0

Each

0.0

3 Nos.

0.0

Each

0.0

2 Nos.

0.0

Each

0.0

.86 Kg.
Kg.

0.0
0.0

P. Kg.
P.

Kg.

0.0
0.0

0.0

P.

Bag

0.0

15

Sand

0.50 Cft.

Total
Contractor's Profit &20.00 Percent
Total
LABOUR
1
2
3
4

Black Smith
Coolies (Skilled)
Coolies (Unskilled)
Mason
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATES
Labour Rate/ Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

2.5
1.5
1
.5

Page 40

0.00 Per % Cft.

0.0
0.0
0.0
0.0

Nos
Nos
Nos
No.

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

38 Providing and fixing M.S. angle iron 1\"x1\"x\" edge protector no


having holdfast of 3/8\" dia M.S. bars 8\" long welded at 2' center t
in cement concrete on steps complete in all respects.

Detail
Qty
Rate Analysis for one step
MATERIAL
1

Angle Iron 1\"x1\"x\"


wastage 5%
@ 2.32 lb/ft.

Holdfast 3/8\" dia

4 ft. long
4.00
0.20
4.20

Rft.
Rft.
R
9.74 Lbs or
4.42
3

Total
Contractor 20.00 Percent
Total
LABOUR
1
2

Welding charges of angle iron


Fixing charge
Total
Sundries
10.00 Percent
Total
Contractor 20.00 Percent
Total

ITEM RATE
Labour Rate per foot
Composite Rate / Foot.
Labour Rate per RM
Composite Rate per RM

4.00 No.weld

Page 41

\"x\" edge protector nozing of steps of stairs,


long welded at 2' center to center and embedded
respects.

Unit Rate Per Rft.


Rate
Per Unit

.74 Lbs or
Kg.
Nos.

Amount

0.0

Per Kg.

0.0

0.0

Each

0.0
0.0
0.0
0.0

.00 No.weld

0.00 Each weld


0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.
Rs.
Rs.

0.0

Say
Say

0.0
0.0

0.0
0.0

Say
Say

0.0
0.0

39 Providing and fixing stair railing of 2' i/d GI pipe, welded with 5/
bars 2'-9\" high, fixed in each step, complete in all respects, inclu
three coats.

Detail
Qty
Rate Analysis for 10 Rft.
MATERIAL
1

GI pipe 2\" dia


wastage 5%

1.00
0.50

Rft.
Rft.
10.5
10.5
(Medium Quanlity)
M.S. flat 2\"x1/8\"
10.00 Rft.
wastage 5%
0.50 Rft.
10.5
3.9
@ 0.82 lbs/ft.
M.S. square bars 5/8\"x5/8\"
1x13x2.75
35.75 Rft.
wastage 5%
3.58 Rft.
39.33 Rft.
@ 1.33
23.73
Paint for 3 coats
0.089 Gallon
Total
Contractor's Profit &20.00 Percent
Total

LABOUR
1
2
3
4
5

Black smith
Mason
Coolies (Unskilled)
Welding GI pipe with M.S. flat 2\"x1/8\",
Welding M.S. square bars with M.S. flat
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Rft
Composite Rate per Rft.
Labour Rate per RM
Composite Rate per RM

.5
.5
.75
10
13

Page 42

/d GI pipe, welded with 5/8\"x5/8\" square M.S.


ete in all respects, including painting, polishing

Unit Rate Per Rft.


Rate
Per Unit

Rft.

Amount

0.0

ft.

0.0

Kg.

0.0

Per Kg.

0.0

Kg.
.089 Gallon

0.0
0.0

Per Kg.
Gallon

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

Per day
Per day
Per day
Each
Each

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0

Say
Say

0.0
0.0

0.0
0.0

Say
Say

0.0
0.0

No.
No.
No.
Long
Nos.

Rs.
Rs.
Rs.
Rs.

40 Providing and fixing galvanized wire gauze 24 SWG 144 mesh per square
steel window, complete in all respects.

Detail
Qty
Rate Analysis for 3'x5'

15

Sft

MATERIAL
1

G. I. wire gauge
wastage 5% over lap

M.S. flat \"x1/16\"


4 x 3'
4 No x 5

15.00 Sft.
0.75 Sft.
15.75

15.75

12.00 Rft.
20.00 Rft.
32.00 Rft.
wastage 5%
1.60 Rft.
33.6
1.61
per foot = 3.56 lbs/ (1.61 Kg)
Machine screws 1/8\"x1/2\"
5.7
Total
Contractor's Profit &20.00 Percent
Total

LABOUR
1

Carpenter /Blacksmith
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

.5

Page 43

24 SWG 144 mesh per square inch fixed to

Unit Rate Per Sft.


Rate
Per Unit

Sft.

Amount

0.00 Per Sft.

0.0

Kg.

0.0

Per Kg.

0.0

Dozen

0.0

Dozen

0.0
0.0
0.0
0.0

No.

0.0

per day

0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0
0.0

Say
Say

0.0
0.0

Rs.
Rs.

0.0
0.0

Say
Say

0.0
0.0

41 Providing and fixing steel windows with openable glazed panels, using
frame 1\"1x5/8\"x1/8\" Z section for beams 3/4\"x1\"x3/4\"x1/8\", T
glass panes, wooden screeds for glazing, embedded over a thin layer o
screwed with beams, brass fittings, holdfast, duly painted, complete
including all costs of material and labour, etc., as per approved des
a)

Without Wire Gauze

Detail

MATERIAL
1

4
5
6
7

8
9

Qty
Rate Analysis for 6' x 4' = 24 Sft.
(without glass panes)
Beam section 1\"x1\"x5/8\"x1/8\"
Horizontal 2x6' =
12.00 Rft.
vertical 5x4' =
20.00 Rft.
32.00 Rft.
wastage 5%
1.60 Rft
33.6
18.6
@ 1.22 lb/ft
Z-section \"x1\"x\"x1/8\"
Horizontal 8x1'-5\" = 11.67 Rft.
vertical 8x3'-11\" = 31'-8\" 43.33 Rft
Add wastage 5%
2.16 Rft.
45.49
19.81
@ 0.96 lb/ft.
T-section 1\"x1\"x1/8\"
Horizontal 8x 1-5\"
11.66 Rft.
Add wastage 5%
0.59 Rft.
12.25
4.44
@ 0.798 lb/ft.
Iron holdfast
6
Window hinges 1/4\" thick with 5/16 dia p
8
Brass casement handle 6\" with screwing flat and
catching hook
4
Mild steel casement stay 15\" long with gap flats
and catching pins
4
Wooden strips for fixing glass pans
68
96 Nos steel glazing clips for fixing glass panes in
position before applying putty
96

Page 44

nable glazed panels, using beam section for


3/4\"x1\"x3/4\"x1/8\", T section sashes 1\"x1\"x1/8\"
bedded over a thin layer of putty duly
t, duly painted, complete in all respects,
etc., as per approved design and as directed by the En

Unit Rate Per Sft.


Rate
Per Unit

Amount

Kg.

0.0

Per Kg.

0.0

Kg.

0.0

Per Kg.

0.0

Kg.

0.0

Per Kg.

0.0

Nos.
Nos

0.0
0.0

Each
Each

0.0
0.0

Nos.

0.0

Each

0.0

Nos.

0.0

Each

0.0

Rft.
Nos.

0.00 Per Rft.


0.0

0.0
Each
Total Rs.

0.0
0.0

41 a (i)

Using Glass Pans 2 mm thick


Material as per item No. 41 (a) above
Cost of glass 2 mm thick
24
Total
Contractor's Profit &20.00 Percent
Total

LABOUR
1

Labour for 24 Sft. for fabrication, welding and


fixing fixtures 42 welds includi
42
smoothern the surface.
Labour for 24 Sft. for fixing 12
24
position by fixing 96 Nos. glazing clips in
position and then applying wooden strips

One job labour for fixing in position

Painting 24 Sft.

Carriage to site of work


L.S.
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

24

Page 45

Sft.

Sft.

0.00 Per Sft.

0.00 per weld

0.0

0.00 Per Sft.

0.0

0.0
Sft.

1333.9
0
1333.9
266.78
1600.68

0.0

0.00 Per Sft.

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.
Rs.
Rs.

0.0
66.7
-.05
717.64

Say
Say
Say
Say

0.0
66.7
0.0
717.65

41 a (ii Using 2.5 mm thick glass of Panes

Detail
Qty
Rate Analysis for 24

Sft.

MATERIAL
1
2

Same as per item No: 41 (a)


Cost of 2.5 mm glass panes

24 Sft.

Total
Contractor's Profit &20.00 Percent
Total
LABOUR
1

Same as per item No. 41 a (i)


Total

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

Rs.
Rs.
Rs.
Rs.

Page 46

Unit Rate Per Sft.


Rate
Per Unit

Amount

0.0
0.0

0.00 Per Sft.

0.0
0.0
0.0

0.0
0.0

0.0
0.0

Say
Say

0.0
0.0

-.05
0.0

Say
Say

0.0
0.0

41

a (i Using

3 mm thick glass panes

Detail
Qty
Rate Analysis

for 6' x 4' = 24 Sft.

MATERIAL
1

Same as per item No: 41 (a)


(excluding cost of glass panes)
Cost of 3 mm thick glass
Total
Contractor's Profit &20.00 Percent
Total

24 Sft.

LABOUR
Same as per item No. 41 a (i)
Total
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

Rs.
Rs.
Rs.
Rs.

Page 47

Unit Rate Per Sft.


Rate
Per Unit

Amount

0.0
0.00 Per Sft.

0.0
0.0
0.0
0.0

.01
.01

0.0
0.0

Say
Say

0.0
0.0

-.05
0.0

Say
Say

0.0
0.0

41

a (iv Using 4 mm thick glass panes

Detail
Qty
Rate Analysis for 6' x 4'

24 Sft.

MATERIAL
1

Same as per item No: 41 (a)


excluding cost of glass
Cost of 4 mm thick glass
Total
Contractor's Profit &20.00 Percent
Total

24 Sft.

LABOUR
Same as per item No. 41 a (i)
Total
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

Rs.
Rs.
Rs.
Rs.

Page 48

Unit Rate Per Sft.


Rate
Per Unit

Amount

0.0
0.00 Per Sft.

0.0
0.0
0.0
0.0

.01
.01

0.0
0.0

Say
Say

0.0
0.0

0.0
0.0

Say
Say

0.0
0.0

41

a (v Using 5 mm thick glass panes

Detail
Qty
Rate Analysis for 6'x4' = 24 Sft.
MATERIAL
1

Same as per item No: 40 (a)


excluding cost of glass
Cost of 5 mm thick glass panes
Total
Contractor's Profit &20.00 Percent
Total

24 Sft.

LABOUR
Same as per item No. 40 a(i)
Total
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

Rs.
Rs.
Rs.
Rs.

Page 49

Unit Rate Per Sft.


Rate
Per Unit

Amount

0.0
0.00 Per Sft.

0.0
0.0
0.0
0.0

.01
.01

0.0
0.0

Say
Say

0.0
0.0

-.05
0.0

Say
Say

0.0
0.0

41

- b Fixed with Wire Gauze 22 SWG.

Detail
Qty
Rate Analysis for 6' x 4'

24 Sft.

MATERIAL
1

Beam section 1\"1\"x5/8\"1/8\"


Horizontal 2x6
Vertical 5x4
Total
Wastage 5%
Total
Z-section \"x1\"x\"x1/8\"
Horizontal 8'x1-5\"
Vertical 8x3'-11\"
Total
Wastage 5%
Total
T-section 1\"x1\"x1/8\"
Horizontal 8x1-5\"
Add 5% wastage

Wire gauze 24x12 mesh


1x6'x4'
Add wastage 5%
Total

Flat Iron 3/4\"x1/8\"


Horizontal 2x6
Vertical 5x3 1/8\"
Total
Add 5% wastage
Total

Machine screws \"x3/16\" (3\"


wire gauze)
Horizontal 2x6x12/3
Vertical 5x4x12/3
Total
Iron holdfast

12.00 Rft
20.00 Rft.
32.00 Rft.
1.60 Rft.
33.60 Rft.
@ 1.22

18.6

11.67 Rft.
31.67 Rft.
43.33 Rft.
2.16 Rft.
45.49 Rft.
@ 0.96

19.81

11.66 Rft.
0.59 Rft.
12.25 Rft.
@ 0798

4.44

24.00 Sft.
2.40 Sft.
26.4

26.4

12 Rft.
15.625 Rft.
27.625 Rft.
1.381 Rft
29.006 Rft.
@ 0.32
4.21
apart for fixing
48 Nos
80 Nos
128 No

13
6

Page 50

Unit Rate Per Sft.


Rate
Per Unit

Amount

Kg.

0.0

Kg

0.0

Kg.

0.0

Per Kg.

0.0

Kg.

0.0

Per Kg.

0.0

Sft.

0.00 Per Sft.

0.0

Kg.

0.0

Per Kg.

0.0

Dozen
Nos.

0.0
0.0

Dozen
Each

0.0
0.0

Window hinges 1/4\" thick with 5

Mild steel casement handles 6\"


4
flat & catching hook 4 Nos. @ Rs. 4.00 each

10

Mild steel casement, 15\" long w


catch pins

11

Wooden screeds to form the glass

68

12

96 Nos steel glazing clips for f


in position before applying putty
Total

96

Page 51

Nos

0.0 Each

0.0

Nos.

0.0 Each

0.0

Nos.

0.0 Each

0.0

Rft.
Nos.

0.00 Per Rft.


0.0 Each

0.0
0.0
0.0

41 - b ( Using

glass panes 2 mm thick

Detail

Rate Analysis for 6' x 4' = 24

Qty
Sft.

MATERIAL
1
2

Same as per item No. 41 (b) excluding cost of


glass.
2 mm thick glass panes
24
Total
Contractor's Profit &20.00 Percent
Total

LABOUR
1
2

4
5
6

Labour for fabrication, welding


42
fixture 42 welds for 24 Sft.
Labour for fixing 12 Nos. Glass
24
position by making 128 No. holes & fixing
128 Nos screws
Labour for fixing 12 No. glass panes in
position by fixing 96 Nos. glazing clips in position
and then fixing wooden strips wi
24
Labour for fixing in position
Painting with black Japan paint
Carriage to site of work
L.S
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Sft
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate Sq.m

24

Page 52

Unit Rate Per Sft.


Rate
Per Unit

Amount

0.0
Sft.

0.00

welds

0.00 per weld

Sft.

Sft.

Per Sft.

0.0

240
240
48
288

0.0
P.Sft

0.00 Per Sft.

0.0

0.0
Sft.

0.0

0.0

0.00 Per Sft.

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.
Rs.
Rs.

0.0
11.95
-.05
128.88

Say
Say
Say
Say

0.0
11.95
0.0
128.9

41 - b ( Using 2.5 mm thick glass panes

Detail
Qty
Rate Analysis for 6'x4' = 24 Sft.
MATERIAL
1

Same as per item No. 41 (b)


glass.
2.5 mm thick glass panes
Total
Contractor 20.00 Percent
Total

excluding cost of
24

LABOUR
1

Labour for fabrication, welding & fixing


fixture, 42 welds for 24 Sft.
42
Labour for fixing 12 Nos. Glass
24
position by making 128 No. holes & fixing
128 Nos screws

Labour for fixing 12 No. glass panes in


position by fixing 96 Nos. glazi
24
and then fixing wooden strips with screws
@ Rs. 0.75 per Sft.

Labour for fixing in position

5
6

Painting with black Japan paint


Carriage to site of work
L.S.
Total
Sundries
10.00 Percent
Total
Contractor 20.00 Percent
Total

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

24

Page 53

Unit Rate Per Sft.


Rate
Per Unit

Amount

0.0
Sft.

0.00 Per Sft.

0.0
0.0
0.0
0.0

welds
Sft.

0.00 per weld


0.00 Per Sft.

0.0
0.0

Sft.

0.00 Per Sft.

0.0

0.0
Sft.

Rs.
Rs.
Rs.
Rs.

0.0

0.00 per Sft/


0.0

0.0
-.05
-.05
-.24

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
-.2

41 - b ( Using 3 mm thick glass panes

Detail
Qty
Rate Analysis for 6'x4' = 24 Sft.
MATERIAL
1

Same as per item No. 41 (b) excluding cost of


glass.
3 mm thick glass panes
24
Total
Contractor's Profit &20.00 Percent
Total

LABOUR
1

Labour for fabrication, welding


42
fixture, 42 welds for 24 Sft.
Labour for fixing 12 Nos. Glass
24
position by making 128 No. holes & fixing
128 Nos screws

Labour for fixing 12 No. glass p


24
position by fixing 96 Nos. glazing clips in position
and then fixing wooden strips with screws
@ Rs. 0.75 per Sft.

4
5

Labour for fixing in position


Painting with black Japan paint

Carriage to site of work


L.S.
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

24

Page 54

Unit Rate Per Sft.


Rate
Per Unit

Amount

0.0
Sft.

0.00 Per Sft.

0.0
0.0
0.0
0.0

welds

0.00 per weld

0.0

Sft.

0.00 Per Sft.

0.0

Sft.

0.00 Per Sft.

0.0

Sft,

0.0
0.00 Per Sft.

0.0
0.0

0.0

Rs.
Rs.
Rs.
Rs.

0.0
-.05
-.05
-.29

0.0
0.0
0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
-.2

41 - b ( Using 4 mm thick glass panes

Detail
Qty
Rate Analysis for 6'x4' = 24 Sft.
MATERIAL
1

Same as per item No. 41 (b) excluding cost of


glass.
4 mm thick glass panes
24
Total
Contractor's Profit &20.00 Percent
Total

LABOUR
1

Labour for fabrication, welding


42
fixture 42 welds for 24 Sft.
Labour for fixing 12 Nos. Glass
24
position by making 128 No. holes & fixing
128 Nos screws

Labour for fixing 12 No glass pa


24
position by fixing 96 Nos. glazing clips in position
and then fixing wooden strips with screws
@ Rs. 0.75 per Sft.

4
5

Labour for fixing in position


Painting with black Japan paint

Carriage to site of work

24
L.S.

Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

Page 55

Unit Rate Per Sft.


Rate
Per Unit

Amount

0.0
Sft.

0.00 Per Sft.

0.0
0.0
0.0
0.0

Weld

0.00 per weld

0.0

Sft

0.00 Per Sft.

0.0

Sft.

0.00 Per Sft.

0.0

Sft.

0.0
0.00 Per Sft.

0.0
0.0

0.0

0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0
-.05

Say
Say

0.0
0.0

Rs.
Rs.

-.05
-.24

Say
Say

0.0
-.2

41 - b (v Using 5 mm thick glass panes

Detail
Qty
Rate Analysis for 6'x4' = 24 Sft.
MATERIAL
1
2

Same as per item No. 41 (b)


glass.
5 mm thick glass panes

excluding cost of
24

Total
Contractor's Profit &20.00 Percent
Total
LABOUR
1

Labour for fabrication, welding


42
fixture, 42 welds for 24 Sft.
Labour for fixing 12 Nos. Glass
24
position by making 128 No. holes & fixing
128 Nos screws

Labour for fixing 12 No glass pa


24
position by fixing 96 Nos. glazing clips in position
and then fixing wooden strips with screws

4
5

Labour for fixing in position


Painting with black Japan paint

Carriage to site of work

24
L.S.

Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

Page 56

Unit Rate Per Sft.


Rate
Per Unit

Amount

0.0
Sft.

0.00 Per Sft.

0.0
0.0
0.0
0.0

Weld

0.00 per weld

0.0

Sft

0.00 Per Sft.

0.0

Sft.

0.00 Per Sft.

0.0

Sft.

0.0
0.00 Per Sft.

0.0
0.0

0.0

0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0
-.05

Say
Say

0.0
0.0

Rs.
Rs.

-.05
-.29

Say
Say

0.0
-.2

42

a)

Providing and fixing steel windows using M.S. sheet (16 SWG
1\"x1\" for frame and 1\"x1\" for leaves including M.S.
each panel of frame, 5 mm thick glass panes fixed with doub
3/8\"x3/8\" (22 SWG) beading with 'U' shapped rubber lining
including painting three coats complete in all respects.

For openable pannels fixed with wire gauze 24 SWG, 12x12 me


thick
Detail

Rate Analysis for 6'x6'=36 Sft.


MATERIAL
1
a)

b)

c)

M.S. moulded tubular pipe of 18 SWG


1\"x1\"
Beam for frame
Horizontal 3x6'
18.00 Rft.
Vertical 4x5'-7\"
22.50 Rft.
40.50 Rft.
Wastage 5%
2.02 Rft.
42.52
42.52 Rft. @ 1 lb/Rft.
Beams for openable pannels 1\"x1 \"
Upper Portion
i) Horizontal 2x3 x(1'-10\")
11.00 Rft.
ii) Vertical 3x2 x(1'-1\")
7.00 Rft.
Lower Portion
ii) Horizontal 2x3x (1'-10\") 11.00 Rft.
iv) Vertical 3x2 x (4'-1\")
24.25 Rft.
Hold fast 3x2 (0-6\")
3.00 Rft.
56.25 Rft.
Add 5% wastage
2.81 Rft.
59.06
@ 0.84 lb/ft.
M.S. square beading 3/8\"x3/8\" tubuler pipe all
around the glass pannels
Upper Portion
i) Horizontal 2x3x (1'-7\")
9.75 Rft.
ii) Vertical 3x2 x (1'-1\")
6.62 Rft.
Lower Portion
ii) Horizontal 2x3 x(1'-7\") 9.75 Rft.
iv) Vertical 3x2 x (3'-11\")
23.87 Rft.
50.00 Rft.
For both sides 50x2 =
100 Rft.
Add 5% wastage
5 Rft.
@ 0.478 lb/ft.
105 Rf
M.S. square bars \"x\" fixed all around each
panes.

Page 57

ws using M.S. sheet (16 SWG) moulded tubuler pipe


" for leaves including M.S. Square bars \"x\" welded around
glass panes fixed with double M.S. square tubular pipe
h 'U' shapped rubber lining, brass fitting, holdfast,
omplete in all respects.

wire gauze 24 SWG, 12x12 mesh and glass panes 5 mm

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

8.00 Rft.
2.50 Rft.
0.50 Rft.
19.29 Kg.

0.0

Per Kg.

0.0

22.51 Kg.

0.0

Per Kg.

0.0

0.0

Per Kg.

0.0

1.00 Rft.
7.00 Rft.

1.00 Rft.
4.25 Rft.

6.25 Rft.
.81 Rft.

tubuler pipe all

6.62 Rft.

.75 Rft.
3.87 Rft.
0.00 Rft.

ll around each

22.77 Kg.

a)

Upper Portion
i) Horizontal 2x3x (1'-10\")
11.00 Rft.
ii) Vertical 3x2 x (1'-4\")
8.00 Rft.
b)
Lower Portion
iii) Horizontal 2x3x (1'-10\") 11.00 Rft.
iv) Vertical 3x2 x (4'-2\")
25.25 Rft.
55.25 Rft.
Add 5% wastage
2.76 Rft.
@ 0.213 lb/ft.
58
Brass hinges (4\" long)

Brass Handles (4\" long)

5 mm thick glass
3x(1'-7\")x(4'-1\")
3x(1-7\")x(1'-2\")

19.70 Sft.
5.68 Sft.
25.38 Sft.
Add 5% wastage
1.25 Sft.
26.63
U' shapped rubber linning (\" thick) sing
quality as in item No. 2
24 SWG (12x12) mesh wire gauze galvanized
Screws

7
8
9
10

11

LABOUR
1
2
3
4
5
6

M.S. flat 3/4\"x1/8\" for fixing wire gauze


5x6'
30.00 Rft.
4x5'-8\"
22.75 Rft.
52.75 Rft.
Add 5% wastage
2.63 Rft.
55.38
@0.318 lb/ft.
Painting 3 costs
Total
Contractor's Profit &20.00 Percent
Total
Black smith
Welder
Welding machine on hire basis
Electric charges with electrode
Painter
Glazier
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Composite

Labour Rate per Sft.


Rate/Sft.

Labour Rate per Sq.m


Composite Rate per Sq.m

Page 58

1.00 Rft.
8.00 Rft.

1.00 Rft.
5.25 Rft.
5.25 Rft.
2.76 Rft.
5.61 Kg.
12 Nos.
3 Nos.

0 Per Kg.
0.0 Each

0
0.0

0.0 Each

0.0

9.70 Sft.
5.68 Sft.
5.38 Sft.
1.25 Sft.
26.63 Sft.
50 Rft.
36 Sft.
15 Dozen

0.00 Per Sft.


0.00 per Per Rft

0.0
0.0

0.00 Per Sft.


0.00 per Dozen

0.0
0.0

0.00per Per Kg.

0.0

wire gauze
0.00 Rft.
2.75 Rft.
2.75 Rft.
2.63 Rft.
7.99 Kg.

0.318 lb/ft.
.5 gln

.5 No.
.5 No.
0.50 No./day
L.S
.34 No.
.5 No.

0.0 per gln

0.0
0.0
0.0
0.0

0.0
0.0
120
0.0
0.0
0.0

0.0
0.0
60
0.0
0.0
0.0

per day
per day
per day
per day
per day

0.0
0.0
0.0
0.0
Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

42
b)

For fixed pannels without wire gauze

Detail

Rate Analysis for 6'x6' = 36 Sft.


MATERIAL
1
a)

M.S. moulded tubular pipe of 16 SWG 1\"x1\"


Beam for frame
1 . Horizontal 3x6
2 . Vertical 4x5'-7\"
3 . Holdfast 3x2x0.5
Wastage 5%

45.67 Rft. @ 1.33 lb/Rft. = 60.74 lbs = 27.56


M.S. square beading of 3/8\"x3/8\" (22 SWG)
tubular pipe all around the glass pannels
Upper Portion
i) Horizontal 2x3 (1'-10\")
ii) Vertical 3x2 (1'-3\")
Lower Portion
ii) Horizontal 2x3 (1'-10\")
iv) Vertical 3x2 (4'-2\")
Total
For both sides 55x2 =
Add 5% wastage
@ 0.145 lb/Rft.
5 mm thick glass
Upper Portion
3(1'-4\") (1'-10\")
Lower Portion
3(4'-3\") (1'-10\")
Add 5% wastage

4
5
6

Say 32.48 Sft.


U-shapped rubber lining (\" thick single
quantity as per item No. 2
Screws (25 mm) for fixing
Painting 3 coats
Total
Contractor's Profit & O
Total

20.00 Percent

LABOUR
1
2
3

Black smith
Welder
Welding machine on hire basis

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

SWG 1\"x1\"

18.00 Rft.
22.50 Rft.
3.00 Rft.
43.50 Rft.
2.17 Rft.
45.67 Rft.
4 lbs = 27.56
\" (22 SWG)

27.56 Kg.

0.0

Per Kg.

0.0

11.00 Rft.
7.85 Rft.
11.00 Rft.
25.12 Rft.
55 Rft.
110.00 Rft.
5.50 Rft.
115.50 7.60

Kg.

0.00per Per Kg.

Sft.

0.00 Per

0.0

7.56 Sft.
23.375 Sft.
30.935 Sft.
1.54 Sft.
32.475 32.48

ck single

0.00 Percent

55 Rft.
15 Dozen
.25 gln

Sft.

0.00 per Per Rft


0.00 per dozen
0.0

0.0
0.0

per gln

0.0
0.0
0.0
0.0
0.0

Page 59

.5 No.
.5 No.
.5

0.0
0.0
120

per day
per day

0.0
0.0
60

4
5
6

Electric charges with electrodes


Painter
Glazier
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

.25
.5

Page 60

No.
No.

L.S.
0.0 per day
0.0 per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

Rs.
Rs.

0.0 Say
0.0 Say

0.0
0.0

43 Providing and fixing windows consisting of M.S. Box section frame 2\"
1-\"x1\" Box section frame for glazing 3/8\"x3/8\" using 16 SWG shee
supported with 1\"x1/8\" M.S. flat for fixing 5 mm thick glass panes
\"x\" of 16 SWG for fixing 24 SWG wire gauze on outer side by means
and screws I/C all C.P. fitting and painting 3 coats complete in all

Detail
Qty
Rate Ananysis for 6'x4' = 24 Sft.
MATERIAL
1

M.S. box section frame 1\"x2\" 16 SWG for


chowkat.
Vertical
2x12.00 Rft.
central side 1x5' 5.75 Rft.
Horizontal wall top
bottom 2x4'
8.00 Rft.
Central
2x1'-13/163.63 Rft.
Total
29.375 Rft.
Add 5% wastage
1.468 Rft.
Total
30.343 21.34
@ 1.55 lb/ft.
M.S. box section for leaf 1'-1\"x1\" of 16 SWG
Vertical
2x2x4-'17.00 Rft.
Horizontal 2x2x1 - 3 7.25 Rft.
24.25 Rft.
Leaf for fixed light
Vertical
2x2x1-3/5.50 Rft.
Horizontal 2x2x1-13/ 7.25 Rft.
37.00 Rft.
Add 5% wastage
1.85 Rft.
Total
38.85
19.74
@ 1.12 lb/Rft.
M.S. Box section 3/8\"x3/8\" of 16 SWG for glazing.
for leave
2x2x4-' 17.00 Rft.
Horizontal 2x2x1-13/ 7.25 Rft.
Fan light 2x2x1'-3/8 5.50 Rft.
2x2x1'-13/16
7.25 Rft.
Total
37.00 Rft.
Add 5% wastage
1.85 Rft.
38.85
5.82
@ 0.33 lb/Rft.
M.S. box section \"x\" of 16 SWG for fixing wire
gauze
for leave
2x2x4'-17.00 Rft.
2x2x1'-13/16
7.25 Rft.
for fan light 2x2x1' 5.50 Rft.
2x2x1'-13/16
7.25 Rft.

Total
37.00 Rft.
Add 5% wastage
1.85 Rft.
Total
38.85
@ 0.45 lb/Rft.
M.S. flat 1\"x1/8\" for fixing glazing.
for leaves
2x2x4-'17.00 Rft.
2x2x1'-13/16
7.25 Rft.
for fixed glazing 2x 5.50 Rft.
2x2x1'-13/16
7.25 Rft.
Total
37.00 Rft.
Add 5% wastage
1.85 Rft Page 61

7.93

M.S. Box section frame 2\"x1\", leaves frame


\"x3/8\" using 16 SWG sheet 'U' shaped rubber
ng 5 mm thick glass panes M.S. box section frame
uze on outer side by means of \"x1/8\" M.S. flat
g 3 coats complete in all respect.

Unit Rate Per Sft.


Rate
Per Unit

Amount

Kg.

0.0 Per

Kg.

0.0

Kg.

0.0 Per Kg.

0.0

Kg.

0.0 Per Kg.

0.0

Kg.

0.0 Per Kg.

0.0

7
8

10

Total
38.85
@ 0.424 lb/ft.
M.S. flat for wire gauze \"x1/8\"
side
2x6'
12.00 Rft.
central 2x6'
12.00 Rft.
horizontal 2x4x1'-13/16
14.50 Rft.
38.50 Rft.
Add 5% wastage
1.93 Rft.
Total
40.43
@ 0.318 lb/ft.
Holdfast of angle iron (1-\"x1\")x1/8\"
6x' = 4.50 Rft.
@ 1.27 lb/Rft.
G.I. wire gauze 24 SWG 12x12 meshes
2x4-'x1-13/16'
15.40 Sft.
2x1-3/8'x1-13/16'
4.98 Sft.
Total
20.38 Sft.
Add 10% wastage
2.04 Sft.
22.42
Glazing with glass panes 5 mm thick
2x4-1/6'x1-'
14.52
2x1-1/3'x1-3/4'
4.66
Total
19.18
Add 10% wastage
1.92
U' shape rubber
2x2x4-'
2x2x1-13/16'
2x2x1-3/8'
2x2x1-13/16'
Total
Add 10% wastage
Total

Sft.
Sft.
Sft.
Sft.
21.1

17.00 Rft.
7.25 Rft.
5.50 Rft.
7.25 Rft.
37.00 Rft.
3.70 Rft.
40.7

7.47

5.83
2.59

22.42

21.1

40.7
91

11

Machine screws

12

M.S. hinges special type 3x2 (100 mm long)

13

C.P. tower bolt

14

Brass handle special type

15
16

G.I. stay
PCC 1:2:4 for fixing holdfast

17

Paint

(225 mm long)

Total
Contractor's Profit &20.00 Percent
Total
LABOUR

.5

1
2
3
4

Black smith
Welder
Welding machine on hire basis for day
Electrode
Page 62

.34
.34
.34

Kg.

0.00per Per Kg.

kg.

0.0 Per Kg.

0.0

Kg.

0.0 Per Kg.

0.0

Sft.

0.00 Per Sft.

0.0

Sft.

0.00 Per Sft.

0.0

Rft.
Nos.

0.00 Per Rft.


0.00 per dozen

0.0
0.0

Nos.

0.0 Each

0.0

Nos.

0.0 Each

0.0

Nos.

0.0 Each

0.0

Nos.

0.0 Each
64 L.S.

0.0
64

gln

0.0 per gln

0.0

0.0
0.0

No.
No.
day

0.0 per day


0.0 per day
0.0 per day
L.S

0.0
0.0
0.0

5
6

Fixer (glass panes)


Painter 0.25

(Glazier)

Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

.5

Page 63

No.
No.

0.0 per day


0.0 per

day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0 Say
Say

0.0
0.0

Rs.
Rs.

Say
Say

0.0
0.0

44 Providing and fixing windows consisting of M.S. Box section frames 2\


1\"1\" box section frame for glazing 3/8\"x3/8\" using 16 SWG sheet
supported with 1\"x1/8\" M.S. flat for fixing 5 mm thick glass panes
\"x\" of 16 SWG for fixing 24 SWG wire gauze on outer side by means
and screws including grill of M.S. flat \"x1/8\" or \"x\" square b
of \"x\" box section of 16 SWG i/c all C.P. fitting and painting 3
respect.

Detail

Rate Analysis for 6'x4' = 24 Sft.


MATERIAL
1

M.S. box section frame 1\"x2\" 16 SWG for


chowkat.
Vertical side
2x6'
central side 1x5'-
Horizontal top
bottom 2x4'
Central
2x1'-13/16

12.00 Rft.
5.75 Rft.

Total
Add 5% wastae

8.00 Rft.
3.63 Rft.
29.375 Rft.
1.468 Rft.
30.343 21.34

Total
@ 1.55 lb/ft.
M.S. box section for leaf 1\"x1\" of 16 SWG
Vertical
2x2x4'-
17.00 Rft.
Horizontal 2x2x1 - 13/16'
7.25 Rft.
24.25 Rft.
Leaf for fixed light
Vertical
2x2x1-3/8'
5.50 Rft.
Horizontal 2x2x1'-13/16
7.25 Rft.
37.00 Rft.
Add 5% wastage
1.85 Rft.
Total
38.85
@ 1.12 lb/Rft.
M.S. Box section 3/8\"x3/8\" of 16 SWG for glazing.
for leaves
2x2x4'-
17.00 Rft.
Horizontal 2x2x1'-13/16
7.25 Rft.
Fan light 2x2x1'-3/8
5.50 Rft.
2x2x1'-13/16
7.25 Rft.
Total
37.85 Rft.
Add 5% wastage
1.85 Rft.
38.85
@ 0.33 lb/Rft.
M.S. box section \"x\" of 16 SWG for fixing
wire gauge
for leaves
2x2x4-'
17.00 Rft.
2x2x1'-13/16
7.25 Rft.

for fan light


2x2x1'-13/16

2x2x1'-3/6
Total

Add 5% wastage
Total
@

0.45

lb/ft.

5.50 Rft.
7.25 Rft.
37.00 Rft.
1.85 Rft.
38.85
Page 64

M.S. Box section frames 2\"1\" leaves frame


x3/8\" using 16 SWG sheet 'U' shaped rubber
ng 5 mm thick glass panes M.S. box section frame
uze on outer side by means of \"x1/8\" M.S. flat
x1/8\" or \"x\" square bar with independent frame
P. fitting and painting 3 coats complete in all

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

2.00 Rft.
.75 Rft.

.00 Rft.
.63 Rft.
9.375 Rft.
.468 Rft.
0.343 21.34

7.00
7.25
4.25

Kg.

0.00per Per Kg.

0.0

19.74 Kg.

0.00per Per Kg.

0.0

5.82 Kg.

0.00per Per Kg.

0.0

Rft.
Rft.
Rft.

.50 Rft.
7.25 Rft.
7.00 Rft.
.85 Rft.

7.00
7.25
5.50
7.25
7.85
1.85

7.00
7.25

Rft.
Rft.
Rft.
Rft.
Rft.
Rft.

Rft.
Rft.

5.50
7.25
7.00
1.85

Rft.
Rft.
Rft.
Rft.
7.93 Kg.

0.00per Per Kg.

0.0

10

M.S. flat 1\"x1/8\" for fixing glazing.


for leave
2x2x4'-
17.00 Rft.
2x2x1'-13/16
7.25 Rft.
for fixed glazing 2x2x1'-3/8
5.50 Rft.
2x2x1'-13/16
7.25 Rft.
Total
37.00 Rft.
Add 5% wastage
1.85 Rft.
Total
38.85
@ 0.424 lb/ft.
M.S. flat for wire gauze \"x1/8\"
side
2x6'
12.00 Rft.
central 2x6'
12.00 Rft.
horizontal 2x4x1'-13/16
14.50 Rft.
38.50 Rft.
Add 5% wastage
1.93 Rft.
Total
40.43
@ 0.318 lb/ft.
Holdfast of angle iron 1-\"x1\"
6x = 4.50 Rft.

7.47

5.83
2.59

Porividng fixing M.S. grill \"x1/8\" M.S. flat


frame without holdfast including painting
2x4 1/6'x1-3/16'
15.09 Sft.
2x1 1/16'x1 13/16'
3.84 Sft.
Total
18.93
18.93
G.I. wire gauge 24 SWG 12x12 meshes
2x4-'x1-13/16'
15.40 Sft.
2x1-3/8x1-13/16
4.98 Sft.
Total
20.38 Sft.
Add 5% wastage
2.04 Sft.
22.42
22.42
Glazing with glass panes 5 mm thick
2x4-1/6x1-
14.52 Sft.
2x1-1/3x1-3/4
4.66 Sft.
Total
19.18 Sft.
Add 5% wastage
1.92 Sft.
21.1
21.1

Page 65

Kg.

0.00per Per Kg.

0.0

Kg.

0.00per Per Kg.

0.0

Kg.

0.00per Per Kg.

0.0

Sft.

0.00 Per Sft.

0.0

Sft.

0.00 Per Sft.

0.0

Sft.

0.00 Per Sft.

0.0

11

U' shape rubber


2x2x4-'
2x2x1-13/16'
2x2x21-3/8
2x2x1-13/16
Total
Add 5% wastage
Total

17.00 Rft.
7.25 Rft.
5.50 Rft.
7.25 Rft.
37.00 Rft.
3.70 Rft.
40.7

40.7

12
13

Machine screws
M.S. hinges special type 3x2 (100 mm long)

14

C.P. tower bolt (225 mm long)

15

Brass handle special type

16

G.I. stay

17

Cement 0.250 Cft.


Sand
Bajri
Paint 0.25

18

91
6

0.60 Cft.
1.2

Total
Contractor's Profit &20.00 Percent
Total
LABOUR
1
2
3
4
5
6

Black smith
Welder
Welding machine on hire basis for 1 day
Electrode
Fixer (glass panes) (Glazier)
Painter 0.25
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

.5
.5
.5
.427
.5

Page 66

Rft.

0.00 per Per Rft

0.0

Nos.
Nos.

0.00 per dozen


0.0 Each

0.0
0.0

Nos.

0.0 Each

0.0

Nos.

0.0 Each

0.0

Nos.

0.0 Each

0.0

gln

0.0
0.00 Per %
200.00 100
0.0

P.
Cft.
Cft.
per

Bag

gln

0.0
0.0
2.4
0.0

0.0
0.0

No.
No.
No.
0.00 P.
No.
No.

0.0 per day


0.0 per day
0.0 per day
Bundle
0.0 per day
0.0 per

Rs.
Rs.

0.0 Say
Say

0.0
0.0

Rs.
Rs.

Say
Say

0.0
0.0

day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

45

Flapping G.I. Pipes for bathroom drains

Detail

Rate Analysis for Each Job


MATERIAL
1

Cost of flaps including hinges

Total
Contractor's Profit & O
Total

20.00 Percent

LABOUR
Fitter
Total
Sundries
Total
Contractor's Profit & O
Total

ITEM RATE
Labour Rate / Each
Composite Rate/Each

10.00 Percent
20.00 Percent

Unit Rate Per Each Job


Rate
Per Unit

Qty

Each

0.0

Each

Amount

0.0

0.0
0.0
0.0

0.00 Percent

.75 No.

0.0

Per day

0.0
0.0
0.0
0.0
0.0
0.0

Say
Say

0.0
0.0

0.00 Percent

0.00 Percent

Rs.
Rs.

Page 67

46 Supply & Fixing iron grating for fire places

Detail
Qty
Rate Analysis for Sft.
MATERIAL
1

Cost of grating
Total
Contractor's Profit &20.00 Percent
Total

LABOUR
1
2

Mason
Cololies (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate /Sft.
Composite Rate per Sft.
Labour Rate per Sq.m
Composite Rate per Sq.m

.1
.05

Page 68

Unit Rate Per Sft.


Rate
Per Unit

Sft.

Nos
Nos.

Amount

0.00 Per Sft.

0.0
0.0

0.0
0.0
0.0
0.0

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

0.0
0.0

Say
Say

0.0
0.0

Rs.
Rs.

0.0

Say
Say

0.0
0.0

47 Fixing Copper flashing, including cutting of sheets, grooving and riv

Detail
Qty
Rate Analysis for 30 Lft.
LABOUR
1
2

Black Smith
Coolies (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate /Lft.
Labour Rate Per Metre

1
1

Page 69

f sheets, grooving and rivetting.

Unit Rate Per Lft.


Rate
Per Unit

No.
No.

0.0
0.0

Amount

Per day
Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.

Say
Say

0.0
0.0

48 Providing and fixing angle Iron railing, using 2\"x2\"x3/8\" angle


2\"x2\"x3/8\" angle iron top rail and two rows of M.S. flat 2\"x
structure with \"U\" bolt 1' long \" dia, painting etc complete in

Detail
Qty
Rate Analysis for 24 Rft.
MATERIAL
1

3
4

Angle Iron post 2\"x2\"x3/8\"


Vertical 5x4'
22.50 Rft.
Horizontal 1x24
24.00 Rft.
46.50 Rft.
Wastage 5%
2.33 Rft.
Total
48.83
132.71
@ 5.99 lb/ft.
M.S. flat 2\"x\"
Horizontal 2x 24
48.00 Rft.
wastage 5%
2.40 Rft.
50.4
49.39
@ 2.16 lb/Rft.
1 ft. long M.S. U-Clamp 3/4\" dia threade 5
both ends including nuts complete.
Paint for 2 coats
.056
Total
Contractor's Profit &20.00 Percent
Total

LABOUR
1
2
3
4

Welding 15 No . welds
Fitter
Coolies (Unskilled)
Painter
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate /Rft.
Composite Rate/Rft.
Labour Rate per RM
Composite Rate per RM

15
.375
1.5
.125

Page 70

ing 2\"x2\"x3/8\" angle iron post 4 foot long, 5' to 6'


o rows of M.S. flat 2\"x\" including fixing to side of bri
, painting etc complete in all respects.

Unit Rate Per Rft.


Rate
Per Unit

Amount

Kg.

0.0

Per Kg.

0.0

Kg.

0.0

Per Kg.

0.0

Nos.

0.0

Each

0.0

Litre

0.00 Per Litre

0.0
0.0
0.0
0.0

Nos
No.
Nos.
No.

0.00 Per weld


0.0
0.0
0.0

Rs.
Rs.
Rs.
Rs.

0.0
0.0

Per day
per day
per day

Say
Say
Say
Say

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

49 Providing and fixing barbed wire fencing, consisting of 1\"x1\"3/16


long 5 to 6 ft. centre to centre embedded in cement concrete 1:4:8 ba
and three rows of barbed wire painting posts etc complete in all resp

Detail

Rate Analysis for 44 Rft.


MATERIAL
1

Angle Iron 1\"x1\"x3/16\"


9 Nos.x 3.25'
Wastage 5%
Total
Cement Concrete 1:4:8
9x9\"x9\"x12\"
Strained Barbed Wire 3 rows
3'x44
Wastage 5%

29.25 Rft.
1.46 Rft.
30.71 Rft.
@ 1.84
5.06

132 .00 Rft


6.60 Rft.
138.6 Rft.
@ 1.25
Painting small detached articles not
exceeding one Sft. of painted surface, 2 coats
Total
Contractor's Profit &20.00 PercentItem 1 &3
Total

LABOUR
1
2

Cement concrete (1:4:8)


Fixing barbed wire and angle iron
i) Black smith for wire and angle iron
ii) Coolies (Unskilled)
Painting small detached articles not exceeding
1 Sq.ft. area painted surface 2 coats
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

ITEM RATE
Labour Rate /100 Rft.
Composite Rate/100Rft.
Labour Rate per RM
Composite Rate per RM

25.64

Page 71

onsisting of 1\"x1\"3/16\" angle iron post 3 ft.


n cement concrete 1:4:8 base of size 9\"x9\"12\"
s etc complete in all respects.

Unit Rate Per 100 Rft.


Rate
Per Unit

Qty

Kg.

0.0

Per Kg.

0.0

5.06 Cft.

0.0

Cft.

0.0

6.52 Kg.

0.0

Kg

0.0

0.0

per No.

0.0
0.0
0.0
0.0

9 Nos.

5.06 Cft.

Amount

.25 No.
.25 No.
Nos.

0.00 per Cft.


0.0
0.0
0.0

0.0
per day
per day
Each

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rs.
Rs.
Rs.
Rs.

0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

50 Providing and fixing barbed wire fencing on compound wall consisting


angle iron post 3 ft. long 4 apart embedded in cement concrete 1:4:8
and 4 rows of barbed wire , including binding wire, painting posts, e
respects.

Detail
Qty
Rate Analysis for 48
MATERIAL
1

Rft.

Angle Iron 1\"x1\"x3/16\"


13 Nos.x 3'
Wastage 5%
Total
Cement Concrete 1:4:8
13\"x6\"x6\"x9\"
Strained Barbed Wire 4 rows
4'x48
Wastage 5%

39.00 Rft.
3.90 Rft.
42.90 Rft.
@ 1.84
2.44

192 .00 Rft


9.60 Rft.
201.60 Rft.
@ 1.25
Painting small detached articles not
exceeding one Sft. of painted surface, 2 c

35.81
2.44

9.49
13

Total
Contractor's Profit &20.00 Percent 0.00
Total
LABOUR
1
2

Cement concrete (1:4:8)


Fixing angle iron and barbed wire fencing
i) Black smith
ii) Coolies
Painting small detached articles not excee 13
1 Sq.ft. area painting surface 2 coats
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total
Say

ITEM RATE
Labour Rate /100 Rft.
Composite Rate/100Rft.
Labour Rate per RM
Composite Rate per RM

2.44
.7
.75

Page 72

compound wall consisting of 1\"x1\"3/16\"


in cement concrete 1:4:8 base of size 6\"x6\"x9\"
ng wire, painting posts, etc. complete in all

Unit Rate Per 100 Rft.


Rate
Per Unit

Amount

Kg.

0.0

Per Kg.

0.0

Cft.

0.0

Cft.

0.0

Kg.

0.0

Per Kg.

0.0

Nos.

0.0

per No.

0.0
0.0
0.0
0.0

Cft.
No.
No.
Nos.

0.00 per Cft.


0.0
0.0
0.0

0.0
per day
per day
Each

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.0
0.0
0.0
0.0

51

Providing and fixing all types of partly fixed and partly openable gl
delux section of M/s. Al-Cop or Pakistan cables boring showkhat frame
x 40mm wide sections i/c the cos tof 5mm thick imported tinted glass
to support the glass and leaf edgings using approved standard fitting
required as approved by the engineer inchrage (Follow Note Below).

Detail
Qty
MATERIAL
a)

1.6 mm thick
Unit = 4 x 10
Cost of Material

40 Sft.
4'x1\"

i) Chowkha 40mm x 100 mm


13\"x6\"x6\"x9\"
3 x 4
=
2 x 10 =
1 x 3
Total
Add Wastage 10%
Total

12
20
3
35
3.5
38.5

ii) Leaf Frames Section


40mm x 60mm (1\" 2\")
4 x 6.75
2x2x1.375 5.50

27
=

Total
Add Wastage 10%
Total
iii) Leaf Edging

32.5
3.25
35.75

4 x 7
2 x 4

=
=

Total
Add Wastage 5%
Total
iv) Imported tinted glass 5 mm
4 x 10

28
8
36
1.8
37.8

40

v) Aluminum tringular gola and gasket


to 4 (2 + 3) =
Leaver 4 x 7 =

20
28

4 x 1.375
=
Total
Add Wastage 10%
Total

5.5
53.5
5.35
58.85
Page 73

xed and partly openable glazed anodized bronze colour a


bles boring showkhat frame of size 40mm x 100mm and lea
ick imported tinted glass with aluminium triangular gol
approved standard fittings, locks, 3\" wide long handle
ge (Follow Note Below).

Unit Rate Per 100 Rft.


Rate
Per Unit

Amount
3

4'-0
Rft.
Rft.
Rft.
Rft.
Rft.

0.0

Rft

0.0

0.0

per No.

0.0

Rft.

0.0

per No.

0.0

Sft.

0.0

Sft.

0.0

Rft.
Rft.
Rft.
Rft.

Rft.
Rft.
Rft.

Rft.
Rft.

Rft.
Rft.
Rft.

0.0

per No.

0.0

vi) Pivots
vii) Cost of Hardwares

4
L.S

viii) Long Handle 4 x 2 =

B)

ix) Lock

x) Aluminium tower bolts


Total
Labour

a) Labour Charges
For Manuracturing and Fabrication
Aluminium Technician
Carriage Cooly
Carriage Charges
b) Labour for Fixing the Glass P
Total
Sundries
10.00 Percent
Total
Contractor's Profit &20.00 Percent
Total

2
3

40

ITEM RATE
Labour Rate /100 Rft.
Composite Rate per RM
Note :

i) Increase rate by 20/- P. Sft,. If sections will be of 2mm thicknes


ii) Reduce rate by 20/- P. Sft. If sections will be of dull aluminium
iii) Reduce rate by 20/- P. Sft if using local pain glass

Page 74

Nos.

0 Each

0
0

Rft.

0 Rft.

No.

0 Each

Nos.

0 Each

0
0

Nos.
Nos.
L.S.

0 per day
0 per day

0
0
0

Sft.

0 Sft.

0
0
0
0
0
0

Say

0 Say

Rs.
Rs.

ns will be of 2mm thickness


will be of dull aluminium shade

ANALYSIS OF RATE
IRON WORK
52

Providing and fixing all types of glazed aluminium windows of anodized bronze colo
party sliding using deluxe section of M/s. Al-Cop or Pakistan Cables having Frame o
20mm and leaf frame sections of 50mm x 20mm, all of 1.6mm thickness i/c 5mm
tinted glass with rubber gasket using approved standard latches, hardware etc., as
engineer incharge.

Unit = 6 x 4.50 = 27.00 Sft.

6'-0
(A)

COST OF MATERIAL
a)

Frame 100mm x 20mm (4\" x \")


2x6 =
12.00 Rft.
2 x 4.50 = 9.00 Rft.
Total
21.00 Rft.
Wastage 10%
2.10 Rft.
Total
23.10 Rft.
@ Rs. 60/-

b)

Leaf frame sections 50mm x 20mm (2\" x \")


4x4 =
2x6 =
Total
Wastage 10%
Total
@ Rs.

c)

12.00 Rft.
12.00 Rft.
24.00 Rft.
2.40 Rft.
26.40 Rft.

Rubber gasket
4x4 =
16.00 Rft.
2 x 5.25 = 10.50 Rft.
Total
26.50 Rft.
Wastage 10%
2.65 Rft.
Total
29.15 Rft.
@ Rs.

B/F
d)

Cost of hard L.S

e)
f)

Latches of matching
shade
1 No.
Imported tinted glass Page 75

indows of anodized bronze colour partly fixed and


Pakistan Cables having Frame of size 100mm x
l of 1.6mm thickness i/c 5mm thick imported
dard latches, hardware etc., as approved by the

4'

6'-0

Rs.

x 20mm (2\" x \")

Rs.

Rs.
Rs.

Rs.

Rs.

Rs.

6 x 4.50 = 27 Sft.
@ Rs.

(B)

g)

Polistevene or polisulphide
for water tig L.S
Total
Contractor's 20% Prof
Total

a)

For Manufacturing & Fabricating

LABOUR

Aluminium technician
@ Rs.

2 Nos.

Cooly

3 Nos.
@ Rs.

b)

Labour for fixing of glass panes


27 Sft. @ /Sft
Total
Sundries 10%
Total
Contractor's 20% Prof
Total

Notes :
i)
ii)
iii)

Reduce rate by
Reduce rate by
Reduce rate by
Labour Rate

P. Sft if sections will be of 1.2mm thick


P. Sft if dull sections of aluminium will
P. Sft if local plain glass will be used.
=

Composite Rate =
27

Say Rs.

27

Page 76

Rs.

Rs.
Rs.
Rs.
Rs.

Rs.

Rs.

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

sections will be of 1.2mm thickness.


dull sections of aluminium will be used.
local plain glass will be used.
P. Sft

P. Sft

P. Sft

S.No.
LB-001
LB-002
LB-003
LB-004
LB-005
LB-006
LB-007
LB-008
LB-009
LB-010
LB-011
LB-012
LB-013
LB-014
LB-015
LB-016
LB-017
LB-018
LB-019
LB-020
LB-021
LB-022
LB-023
LB-024
LB-025
LB-026
LB-027
LB-028
LB-029
LB-030
LB-031
LB-032
LB-033
LB-034
LB-035
LB-036
LB-037
LB-038
LB-039
LB-040
LB-041
LB-042
LB-043

Labour
Chowkidar
Gate Keeper
Beldar
Boatman
Bullockman
Cartman
Camelman
Donkeyman
Greaser
Oiler
Punkha Cooly
Sweeper
Sewerman
White Washer
Cooly Un-skilled (all types)
Waherman
Bahishti
Chainman
Dresser Earthwork
Head Khalasi Survey
Hammar Man
Mali
Quarryman
Skilled Cooly
Tar Sprayer
Armature Winder
Auto Electric Mechanic
Blacksmith
Carpenter
Caner
Chiseler
Denter
Driller
Driver
Electrician
Furniture Polisher
Glazier
Instrument Machanic
Machine Man
Mason
Electric Motor Winder
Moulder
Mechanic

LB-044
LB-045
LB-046
LB-047
LB-048
LB-049
LB-050
LB-051
LB-052
LB-053
LB-054
LB-055
LB-056
LB-057
LB-058

Pettern Maker
Pipe Fitter
Plumber
Spray Painter
Sawyer
Turner
Tailor
Tin Smith
Welder
Boatman with large boat
Boatman with small boat
Bullock (each) (without attendant)
Camel (each) (without attendant)
Donkey (each) (without attendant)
Bullock Cart (without bullock & attendant)
Page 1

UNIT
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day

RATE

Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per

day
day
day
day
day
day
day
day
day
day
day
day
day
day
day

LB-059
LB-060
LB-061
LB-062
LB-063
LB-064
LB-065
LB-066
LB-067
LB-068
LB-069
LB-070
LB-071
LB-072
LB-073
LB-074
LB-075
LB-076
LB-077
LB-078
LB-079
LB-080
LB-081
LB-082
LB-083
LB-084
LB-085
LB-086
LB-087
LB-088
LB-089
LB-090
LB-091
LB-092
LB-093
LB-094
LB-095
LB-096
LB-097
LB-098
LB-099
LB-100
LB-101
LB-102

Camel Cart (without bullock & attendant)


Donkey or Mule Cart (without animal & attendant)
Helper
Painter
Polisher
Foreman
Mate
Diggers
Kharkar P.Month
Belcha men
Gantiman (with pick axes)
Topalies (men with donkeys for carrying earth)
Langri (Cooks)
Dobashi (man for supervision)
Bullockman with pair of bullocks
Charkhara-man
Aluminum Technician
Riveted
Blowman
Crane operator
Hire charges of cart with Bullock & Bullock man
Diver Sinker
Ploughing Charges
Carriage Charges of RCC Pipe 4\" (Class L)
Carriage Charges of RCC Pipe 6\" (Class L)
Carriage Charges of RCC Pipe 9\" (Class L)
Testing Charges of RCC Pipes 4\" (Class L)
Testing Charges of RCC Pipes 6\" (Class L)
Testing Charges of RCC Pipes 9\" (Class L)
Carriage Charges of Non-reinforced Concrete Pipe 4\"(Class I)
Carriage Charges of Non-reinforced Concrete Pipe 6\"(Class I)
Carriage Charges of Non-reinforced Concrete Pipe 8\"(Class I)
Carriage Charges of Non-reinforced Concrete Pipe 9\"(Class I)
Carriage Charges of Non-reinforced Concrete Pipe 10\"(Class I) Per Pipe
Testing Charges of Non-reinforced Concrete Pipe 4\"(Class I)
Testing Charges of Non-reinforced Concrete Pipe 6\"(Class I)
Testing Charges of Non-reinforced Concrete Pipe 8\"(Class I)
Testing Charges of Non-reinforced Concrete Pipe 9\"(Class I)
Testing Charges of Non-reinforced Concrete Pipe 10\"(Class I)
Carriage Charges of RCC Pipe 12\" (Class II, III & IV)
Carriage Charges of RCC Pipe 15\" (Class II, III & IV)
Carriage Charges of RCC Pipe 18\" (Class II, III & IV)
Carriage Charges of RCC Pipe 21\" (Class II, III & IV)
Carriage Charges of RCC Pipe 24\" (Class II, III & IV)

LB-103 Carriage Charges of RCC Pipe 27\" (Class II, III &
LB-104 Carriage Charges of RCC Pipe 30\" (Class II, III &
LB-105 Carriage Charges of RCC Pipe 33\" (Class II, III &
LB-106 Carriage Charges of RCC Pipe 36\" (Class II, III &
LB-107 Carriage Charges of RCC Pipe 42\" (Class II, III &
LB-108 Carriage Charges of RCC Pipe 48\" (Class II, III &
LB-109 Carriage Charges of RCC Pipe 54\" (Class II, III &
LB-110 Carriage Charges of RCC Pipe 60\" (Class II, III &
LB-111 Carriage Charges of RCC Pipe 66\" (Class II, III &
LB-112 Carriage Charges of RCC Pipe 72\" (Class II, III &
Carriage Charges of Non-reinforced Concrete Pipe 12\"
LB-113 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 15\"
LB-114 (Class II, III & IV)
Page 2

IV)
IV)
IV)
IV)
IV)
IV)
IV)
IV)
IV)
IV)

Per
Per
Per
Per
Per
Per
Per
Per

day
day
Day
day
day
day
day
day

P.Month
P.Month
P.Month
P.Month
P.Month
P.Day
P.Day
Per Day
Per Day
Per Day
P.Day
Per Day
Per Day
P. Acre
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
10\"(Class I) Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe

Per
Per
Per
Per
Per
Per
Per
Per
Per
Per

Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe

Per Pipe
Per Pipe

Carriage Charges of Non-reinforced


LB-115 (Class II, III & IV)
Carriage Charges of Non-reinforced
LB-116 (Class II, III & IV)
Carriage Charges of Non-reinforced
LB-117 (Class II, III & IV)
Carriage Charges of Non-reinforced
LB-118 (Class II, III & IV)
Carriage Charges of Non-reinforced
LB-119 (Class II, III & IV)
Carriage Charges of Non-reinforced
LB-120 (Class II, III & IV)
Carriage Charges of Non-reinforced
LB-121 (Class II, III & IV)
Carriage Charges of Non-reinforced
LB-122 (Class II, III & IV)
Carriage Charges of Non-reinforced
LB-123 (Class II, III & IV)
Carriage Charges of Non-reinforced
LB-124 (Class II, III & IV)
Carriage Charges of Non-reinforced
LB-125 (Class II, III & IV)
Carriage Charges of Non-reinforced
LB-126 (Class II, III & IV)
Carriage Charges of Non-reinforced
LB-127 (Class II, III & IV)

Concrete Pipe 18\"


Concrete Pipe 21\"
Concrete Pipe 24\"
Concrete Pipe 27\"
Concrete Pipe 30\"
Concrete Pipe 33\"
Concrete Pipe 36\"
Concrete Pipe 42\"
Concrete Pipe 48\"
Concrete Pipe 54\"
Concrete Pipe 60\"
Concrete Pipe 66\"
Concrete Pipe 72\"

Page 3

Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe

CHAPTER NO. 14

LINING OF CANAL
DESCRIPTION

OF

ITEM NO

1:
a)

Detail

Formation, dressing and preparing subIn Bed.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

Labour
Rate Analyses for 125 Sft
Dresser
0.33 No
Unskilled Cooly
0.77 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Sft
Rs.
Labour Rate for 1 Sqm
Rs.

1
2
3

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 1

dressing and preparing sub-grade.

British System) per 100 Sft


Rate
er Unit (Rs.)
Amount (Rs.)

P. Day
P. Day

Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

Item No.

Formation, dressing and preparing sub-grade.


b)
Detail

On Slope.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

Labour
Rate Analyses for 125 Sft
Dresser
0.50 No
Unskilled Cooly
1.00 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
1
2
3

Rs.
Rs.

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 2

d preparing sub-grade.

British System) per 100 Sft

Rate
er Unit (Rs.)

Amount (Rs.)

P. Day
P. Day

Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

DESCRIPTION

OF

ITEM NO

2:

Detail

Stabilized layer of cement sand ratio


(50mm) thick on slope.
Unit Rate (British System) per 100 Sft
Qty
Per Unit (Rs.)

Material
Cement
Sand

0.50 Bag
18.00 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Rate Analyses for 125 Sft
Mason
0.50 No
Unskilled Cooly
1.50 No
Bahishti
0.50 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Sft
Rs.
Labour Rate for 1 Sqm
Rs.
Composite Rate for 100 Sft
Rs.
Composite Rate for 1 Sqm
Rs.
1
2
3

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 3

layer of cement sand ratio 1:30 2\"


k on slope.
British System) per 100 Sft

Rate
er Unit (Rs.)

Amount (Rs.)

P. Bag
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

DESCRIPTION

OF

ITEM NO

3:

a)
Detail

Cement plaster \" (12mm) thick, ratio


In Bed.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

Material
Cement
Sand

0.34 Bag
4.20 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Rate Analyses for 125 Sft
Mason
0.33 No
Unskilled Cooly
1.00 No
Bahishti
0.50 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Sft
Rs.
Labour Rate for 1 Sqm
Rs.
Composite Rate for 100 Sft
Rs.
Composite Rate for 1 Sqm
Rs.
1
2
3

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 4

ter \" (12mm) thick, ratio 1:10.

British System) per 100 Sft

Rate
er Unit (Rs.)

Amount (Rs.)

P. Bag
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

Item No.

Cement plaster \" (12mm) thick, ratio 1:10.


b)
Detail

On Slope.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

Material
Cement
Sand

0.34 Bag
4.20 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Rate Analyses for 125 Sft
Mason
0.50 No
Unskilled Cooly
1.25 No
Bahishti
0.50 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Sft
Rs.
Labour Rate for 1 Sqm
Rs.
Composite Rate for 100 Sft
Rs.
Composite Rate for 1 Sqm
Rs.
1
2
3

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 5

mm) thick, ratio 1:10.

British System) per 100 Sft

Rate
er Unit (Rs.)

Amount (Rs.)

P. Bag
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

DESCRIPTION

OF

ITEM NO

4:

a)
Detail

Cement plaster 3/8\"(10mm) thick,

rat

In Bed.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

Material
Cement
Sand

0.70 Bag
2.50 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Rate Analyses for 125 Sft
Mason
0.33 No
Unskilled Cooly
1.00 No
Bahishti
0.50 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Sft
Rs.
Labour Rate for 1 Sqm
Rs.
Composite Rate for 100 Sft
Rs.
Composite Rate for 1 Sqm
Rs.
1
2
3

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 6

ter 3/8\"(10mm) thick,

ratio 1:3

British System) per 100 Sft

Rate
er Unit (Rs.)

Amount (Rs.)

P. Bag
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

Item No.

Cement plaster 3/8\"(10mm) thick,


b)
Detail

ratio 1:3.

On Slope.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

Material
Cement
Sand

0.70 Bag
2.50 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Rate Analyses for 125 Sft
Mason
0.50 No
Unskilled Cooly
1.25 No
Bahishti
0.50 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Sft
Rs.
Labour Rate for 1 Sqm
Rs.
Composite Rate for 100 Sft
Rs.
Composite Rate for 1 Sqm
Rs.
1
2
3

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 7

0mm) thick,

ratio 1:3.

British System) per 100 Sft

Rate
er Unit (Rs.)

Amount (Rs.)

Each
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

DESCRIPTION

OF

ITEM NO

5:

a)
Detail

Cement plaster 1\" (40mm) thick, rati

In Bed.
Unit Rate (British System) per 100 Sft
Qty
Per Unit (Rs.)

Material
Cement
Sand

1.56 Bag
11.70 Cft

Total
Contractor's Profit & Ov ## Percent
Total
Labour for 125 Sft
Mason
0.50 No
Unskilled Cooly
1.25 No
Bahishti
0.50 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm
1
2
3

Rs.
Rs.
Rs.
Rs.

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 8

ter 1\" (40mm) thick, ratio 1:6.

British System) per 100 Sft

Rate
er Unit (Rs.)

Amount (Rs.)

P. Bag
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

Item No.

Cement plaster 1\" (40mm) thick, ratio 1:6.


b)
Detail

On Slope.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

Material
Cement
Sand

1.56 Bag
11.70 Cft

Total
Contractor's Profit & Ov ## Percent
Total
Labour for 125 Sft
Mason
0.75 No
Unskilled Cooly
1.50 No
Bahishti
0.50 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm
1
2
3

Rs.
Rs.
Rs.
Rs.

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 9

0mm) thick, ratio 1:6.

British System) per 100 Sft

Rate
er Unit (Rs.)

Amount (Rs.)

P. Bag
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

DESCRIPTION

OF

ITEM NO

6:
a)

Detail

Tile lining (12\"x6\"x2\") (300x150x50


cement sand mortar.
In Bed.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

Material
Brick Tiles
###### Nos
Cement
3.44 Bag
Sand
25.70 Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
2.50 No
Unskilled Cooly
5.00 No
Bahishti
0.75 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Rs.
Labour Rate for 1 Cum
Rs.
Composite Rate for 100 Cft
Rs.
Composite Rate for 1 Cum
Rs.
1

Rates for all finished work include the removal of surplus debris, un
and byproducts.
2
The rates include curing for specified period wherever necessary.
3
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.
The rates are only for laying tiles over 1/8\" ( 6mm) thick layer of 1:6 mortar
above are payable separately.

Page 10

(12\"x6\"x2\") (300x150x50mm) in 1:6

British System) per 100 Sft


Rate
er Unit (Rs.)
Per
1000 Nos
P. Bag
Cft

Amount (Rs.)

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement
thick layer of 1:6 mortar items 1 to 5

Item No.

6
b)
Detail

Tile lining (12\"x6\"x2\") (300x150x50mm) in 1:6


cement sand mortar.
On Slope.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

Material
Brick Tiles
###### Nos
Cement
3.44 Bag
Sand
25.70 Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
2.75 No
Unskilled Cooly
6.00 No
Bahishti
0.75 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Rs.
Labour Rate for 1 Cum
Rs.
Composite Rate for 100 Cft
Rs.
Composite Rate for 1 Cum
Rs.
1

Rates for all finished work include the removal of surplus debris, un
and byproducts.
2
The rates include curing for specified period wherever necessary.
3
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.
The rates are only for laying tiles over 1/8\" ( 6mm) thick layer of 1:6 mortar
above are payable separately.

Page 11

2\") (300x150x50mm) in 1:6

British System) per 100 Sft


Rate
er Unit (Rs.)

1000 Nos
P. Bag
Cft

Amount (Rs.)

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement
thick layer of 1:6 mortar items 1 to 5

DESCRIPTION

OF

ITEM NO

7:
a)

Detail

Tile lining (12\"x6\"x2\") (300x150x50


cement sand mortar.
In Bed.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

Material
Brick Tiles
###### Nos
Cement
6.00 Bag
Sand
22.50 Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
2.50 No
Unskilled Cooly
5.00 No
Bahishti
0.75 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Rs.
Labour Rate for 1 Cum
Rs.
Composite Rate for 100 Cft
Rs.
Composite Rate for 1 Cum
Rs.
1

Rates for all finished work include the removal of surplus debris, un
and byproducts.
2
The rates include curing for specified period wherever necessary.
3
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.
The rates are only for laying tiles over 1/8\" (6mm) thick layer of 1:3 mortar i
1 to 5 above are payable separately.

Page 12

(12\"x6\"x2\") (300x150x50mm) in 1:3

British System) per 100 Sft


Rate
er Unit (Rs.)

1000 Nos
P. Bag
Cft

Amount (Rs.)

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

hick layer of 1:3 mortar items

Item No.

7
b)
Detail

Tile lining (12\"x6\"x2\") (300x150x50mm) in 1:3


cement sand mortar.
On Slope.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

Material
Brick Tiles
###### Nos
Cement
6.00 Bag
Sand
22.50 Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
2.75 No
Unskilled Cooly
6.00 No
Bahishti
0.75 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Rs.
Labour Rate for 1 Cum
Rs.
Composite Rate for 100 Cft
Rs.
Composite Rate for 1 Cum
Rs.
1

Rates for all finished work include the removal of surplus debris, un
and byproducts.
2
The rates include curing for specified period wherever necessary.
3
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.
The rates are only for laying tiles over 1/8\" (6mm) thick layer of 1:3 mortar i
1 to 5 above are payable separately.

Page 13

2\") (300x150x50mm) in 1:3

British System) per 100 Sft


Rate
er Unit (Rs.)

1000 Nos
P. Bag
Cft

Amount (Rs.)

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

hick layer of 1:3 mortar items

DESCRIPTION

OF

ITEM

8:
a)
Detail

Material
Bricks
Cement
Sand

Brick lining (9\"x4\"x3\") (225x114x7


1:6 cement sand mortar.
In Bed.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

###### Nos
3.44 Bags
25.70 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
2.50 No
Unskilled Cooly
5.00 No
Bahishti
0.75 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Rs.
Labour Rate for 1 Cum
Rs.
Composite Rate for 100 Cft
Rs.
Composite Rate for 1 Cum
Rs.
1

Rates for all finished work include the removal of surplus debris, un
and byproducts.
2
The rates include curing for specified period wherever necessary.
3
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.
The rates are only for laying bricks over 1/8\" (6mm) thick layer of 1:6 mortar
1 to 5 above are payable separately.

Page 14

g (9\"x4\"x3\") (225x114x75mm) in
sand mortar.

British System) per 100 Sft


Rate
er Unit (Rs.)

1000 Nos
P. Bag
Cft

Amount (Rs.)

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

thick layer of 1:6 mortar items

Item No.

8
b)
Detail

Material
Bricks
Cement
Sand

Brick lining (9\"x4\"x3\") (225x114x75mm) in


1:6 cement sand mortar.
On Slope.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

###### Nos
3.44 Bags
25.70 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
2.75 No
Unskilled Cooly
6.00 No
Bahishti
0.75 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Rs.
Labour Rate for 1 Cum
Rs.
Composite Rate for 100 Cft
Rs.
Composite Rate for 1 Cum
Rs.
1

Rates for all finished work include the removal of surplus debris, un
and byproducts.
2
The rates include curing for specified period wherever necessary.
3
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.
The rates are only for laying bricks over 1/8\" (6mm) thick layer of 1:6 mortar
1 to 5 above are payable separately.

Page 15

x3\") (225x114x75mm) in

British System) per 100 Sft


Rate
er Unit (Rs.)

1000 Nos
P. Bag
Cft

Amount (Rs.)

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

thick layer of 1:6 mortar items

DESCRIPTION

OF

ITEM No

9:
a)

Detail

Material
Bricks
Cement
Sand

Brick lining (9\"x4\"x3\") (225x114x7


1:3 cement sand mortar.
In Bed.

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

###### Nos
6.00 Bags
22.50 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
2.50 No
Unskilled Cooly
5.00 No
Bahishti
0.75 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
1

Rs.
Rs.
Rs.
Rs.

Rates for all finished work include the removal of surplus debris, un
and byproducts.
2
The rates include curing for specified period wherever necessary.
3
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.
The rates are only for laying bricks over 1/8\" (6mm) thick layer of 1:3 mortar
1 to 5 above are payable separately.

Page 16

g (9\"x4\"x3\") (225x114x75mm) in
sand mortar.

British System) per 100 Sft


Rate
er Unit (Rs.)

1000 Nos
P. Bag
Cft

Amount (Rs.)

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

thick layer of 1:3 mortar items

Item No.

9
b)

Brick lining (9\"x4\"x3\") (225x114x75mm) in


1:3 cement sand mortar.
On Slope.

Detail

Material
Bricks
Cement
Sand

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

###### Nos
6.00 Bags
22.50 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
2.75 No
Unskilled Cooly
6.00 No
Bahishti
0.75 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
1

Rs.
Rs.
Rs.
Rs.

Rates for all finished work include the removal of surplus debris, un
and byproducts.
2
The rates include curing for specified period wherever necessary.
3
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.
The rates are only for laying bricks over 1/8\" (6mm) thick layer of 1:3 mortar
1 to 5 above are payable separately.

Page 17

x3\") (225x114x75mm) in

British System) per 100 Sft


Rate
er Unit (Rs.)

1000 Nos
P. Bag
Cft

Amount (Rs.)

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

thick layer of 1:3 mortar items

DESCRIPTION

OF

ITEM NO

10:
a)
i)

Detail

Cement concrete lining, using washed s


and graded stone aggregate.
In Bed.
Ratio 1:2:4

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)

Material
Cement
Sand
Aggregate

17.60 Bags
44.00 Cft
88.00 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour

Mason
1.00 No
Unskilled Cooly
6.00 No
Bahishti
0.60 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Rs.
Labour Rate for 1 Cum
Rs.
Composite Rate for 100 Cft
Rs.
Composite Rate for 1 Cum
Rs.
1
Rates for all finished work include the removal of surplus debris, un
and byproducts.
2
The rates include curing for specified period wherever necessary.
3
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 18

rete lining, using washed screened


stone aggregate.

British System) per 100 Sft

er Unit (Rs.)

Amount (Rs.)

P. Bag
Cft
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say
oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

Item No.

10
a)
ii)
Detail

Cement concrete lining, using washed screened


and graded stone aggregate.
In Bed.
Ratio 1:3:6

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)

Material
Cement
Sand
Aggregate

13.00 Bags
46.00 Cft
92.00 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
1.00 No
Unskilled Cooly
6.00 No
Bahishti
0.60 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Rs.
Labour Rate for 1 Cum
Rs.
Composite Rate for 100 Cft
Rs.
Composite Rate for 1 Cum
Rs.
1
2
3

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 19

, using washed screened

British System) per 100 Sft

er Unit (Rs.)

Amount (Rs.)

P. Bag
Cft
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

Item No.

10
a)
iii)
Detail

Cement concrete lining, using washed screened


and graded stone aggregate.
In Bed.
Ratio 1:4:8

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)

Material
Cement
Sand
Aggregate

9.60 Bags
48.00 Cft
96.00 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
1.00 No
Unskilled Cooly
6.00 No
Bahishti
0.60 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Rs.
Labour Rate for 1 Cum
Rs.
Composite Rate for 100 Cft
Rs.
Composite Rate for 1 Cum
Rs.
1
2
3

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 20

, using washed screened

British System) per 100 Sft

er Unit (Rs.)

Amount (Rs.)

P. Bag
Cft
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

Item No.

10
b)
i)
Detail

Cement concrete lining, using washed screened


and graded stone aggregate.
On Slope.
Ratio 1:2:4

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)

Material
Cement
Sand
Aggregate

17.60 Bags
44.00 Cft
88.00 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
1.25 No
Unskilled Cooly
7.00 No
Bahishti
0.50 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Rs.
Labour Rate for 1 Cum
Rs.
Composite Rate for 100 Cft
Rs.
Composite Rate for 1 Cum
Rs.
1
2
3

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 21

, using washed screened

British System) per 100 Sft

er Unit (Rs.)

Amount (Rs.)

P. Bag
Cft
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

Item No.

10
b)
ii)
Detail

Cement concrete lining, using washed screened


and graded stone aggregate.
On Slope.
Ratio 1:3:6

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)

Material
Cement
Sand
Aggregate

13.00 Bags
46.00 Cft
92.00 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
1.25 No
Unskilled Cooly
7.00 No
Bahishti
0.50 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Rs.
Labour Rate for 1 Cum
Rs.
Composite Rate for 100 Cft
Rs.
Composite Rate for 1 Cum
Rs.
1
2
3

Rates for all finished work include the removal of surplus debris, un
and byproducts.
The rates include curing for specified period wherever necessary.
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 22

, using washed screened

British System) per 100 Sft

er Unit (Rs.)

Amount (Rs.)

P. Bag
Cft
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say

oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

Item No.

10
b)
iii)
Detail

Cement concrete lining, using washed screened


and graded stone aggregate.
On Slope.
Ratio 1:4:8

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)

Material
Cement
Sand
Aggregate

9.60 Bags
48.00 Cft
96.00 Cft
Total
Contractor's Profit & Ov ## Percent
Total

Labour

Mason
1.25 No
Unskilled Cooly
7.00 No
Bahishti
0.50 No
Total
Sundries
## Percent
Total
Contractor's Profit & Ov ## Percent
Total
Item Rates
Labour Rate for 100 Cft
Rs.
Labour Rate for 1 Cum
Rs.
Composite Rate for 100 Cft
Rs.
Composite Rate for 1 Cum
Rs.
1
Rates for all finished work include the removal of surplus debris, un
and byproducts.
2
The rates include curing for specified period wherever necessary.
3
Nominal dimensions of tile or brick shall be taken for the purpose on
& payments.

Page 23

, using washed screened

British System) per 100 Sft

er Unit (Rs.)

Amount (Rs.)

P. Bag
Cft
Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say
oval of surplus debris, unused material

od wherever necessary.
e taken for the purpose on measurement

CHAPTER NO. 2

LOADING UNLOADING AND STACKING


DESCRIPTION

OF

ITEM NO

1:

Detail

Rate Analysis for 1250 Bricks


Labour
Unskilled Cooly

Loading or unloading into or from Rail


Wagons lead within one chain Shingle,
ballast, surkhi ashes, kankar, brick b
Lime or 1000 Nos. tiles size 12\"x6\"x
9\"x4\"x1\" properly laid and stacke

Unit Rate (British System) per 100 Cft


Qty
Rate
Per Unit (Rs.)

1.00 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Cft
Labour Rate Per Cum

Rs.
Rs.

0
0

Page 1

ND STACKING

unloading into or from Railway


within one chain Shingle, sand,
rkhi ashes, kankar, brick bats, coal.
0 Nos. tiles size 12\"x6\"x2\" or
\" properly laid and stacked.

British System) per 100 Cft

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

DESCRIPTION

OF

ITEM NO

2:

a)
Detail

Rate Analysis for 1250 Bricks


Labour
Unskilled Cooly

Loading or unloading bricks into or fr


Wagons laid and stacked lead within on
Bricks 10\" size.

Unit Rate (British System) per 1000 No


Qty
Rate
Per Unit (Rs.)

1.25 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 1000 Nos

Rs.

Page 2

unloading bricks into or from Railway


and stacked lead within one chain.

British System) per 1000 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

Item No.

2
b)
Detail

Rate Analysis for 1250 Bricks


Labour
Unskilled Cooly

Loading or unloading bricks into or fr


Wagons laid and stacked lead within on
Bricks 9\" or smaller size.

Unit Rate (British System) per 1000 No


Qty
Rate
Per Unit (Rs.)

1.00 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 1000 Nos

Rs.

Page 3

unloading bricks into or from Railway


and stacked lead within one chain.
or smaller size.

British System) per 1000 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

DESCRIPTION

OF

ITEM NO

3:

Detail

Rate Analysis for 125 Bags


Labour
Unskilled Cooly

Loading or unloading into or from Rail


Wagons cement in bags (from inside or
the go-down) and stacking within one c

Unit Rate (British System) per 100 Bag


Qty
Rate
Per Unit (Rs.)

1.25 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Bags

Rs.

Page 4

unloading into or from Railway


nt in bags (from inside or outside
) and stacking within one chain.

British System) per 100 Bags

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

DESCRIPTION

OF

ITEM NO

4:

Detail

Rate Analysis for 125 Nos.


Labour
Unskilled Cooly

Loading or unloading into of from Rail


Wagons empty cement bags (from inside
outside the go-down) and stacking.

Unit Rate (British System) per 100 Nos


Qty

0.12 No

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

0
125

Page 5

unloading into of from Railway


y cement bags (from inside or
go-down) and stacking.

British System) per 100 Nos


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 P. Day

Say

DESCRIPTION

OF

ITEM NO

5:

Detail

Rate Analysis for 125 Mds


Labour
Unskilled Cooly

Loading or unloading into or from Rail


Wagons (from inside or outside the gostacking white lime in bags.

Unit Rate (British System) per 100 Mds


Qty
Rate
Per Unit (Rs.)

0.75 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Mds
Labour Rate Per 100 Kg

Rs.
Rs.

0
0

Page 6

unloading into or from Railway


m inside or outside the go-down) and
ite lime in bags.

British System) per 100 Mds

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

DESCRIPTION

OF

ITEM NO

6:

Detail

Rate Analysis for 125 Ton


Labour
Unskilled Cooly

Loading or unloading into or from Rail


Wagons structural steel, joists, broad
meter gauge rail and rail fastening et
Unit Rate (British System) per Ton
Qty
Rate
Per Unit (Rs.)

0.60 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per Ton
Labour Rate per Tonne

Rs.
Rs.

0
0

Page 7

unloading into or from Railway


ctural steel, joists, broad, narrow or
rail and rail fastening etc.

British System) per Ton

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

DESCRIPTION

OF

ITEM NO

7:

Detail

Labour
Unskilled Cooly

Loading or unloading 45 gallons drum f


or from Railway Wagons lead upto one c
Unit Rate (British System) per Each
Qty
Rate
Per Unit (Rs.)

0.06 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per Each

Rs.

Page 8

unloading 45 gallons drum full into


lway Wagons lead upto one chain.

British System) per Each

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

DESCRIPTION

OF

ITEM NO

8:

Detail

Labour
Unskilled Cooly

Loading or unloading packages or stock


sorts upto I cwt. except cement in jut
bags.
Unit Rate (British System) per Each
Qty
Rate
Per Unit (Rs.)

0.03 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per Each No.

Rs.

Page 9

unloading packages or stock of all


I cwt. except cement in jute or paper

British System) per Each

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

DESCRIPTION

OF

ITEM NO

9:

a)
Detail

Rate Analysis for 125 Nos.


Labour
Unskilled Cooly

Loading or unloading sleepers other th


including stacking lead within one cha
Broad gauge sleepers.

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

2.50 Nos

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Page 10

unloading sleepers other than wooden


tacking lead within one chan in.
sleepers.

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

Item No.

9
b)
Detail

Rate Analysis for 125 Nos


Labour
Unskilled Cooly

Loading or unloading sleepers other th


including stacking load within one cha
Metre guage and narrow guage sleepers.

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

1.25 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Page 11

unloading sleepers other than wooden


tacking load within one chan in.
and narrow guage sleepers.

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

DESCRIPTION

OF

ITEM NO

10:

Detail

Rate Analysis for


Labour
Unskilled Cooly

20

Loading or unloading timber logs or ti


shuttering into or from Railway Wagons
gauge including stacking, lead within
Unit Rate (British System) per Ton
Qty
Rate
Per Unit (Rs.)

Ton
5.00 Nos

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per Ton
Per Tonne

Rs.
Rs.

0
0

Page 12

unloading timber logs or timber for


into or from Railway Wagons of any
ding stacking, lead within one chain.

British System) per Ton

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

DESCRIPTION

OF

ITEM NO

11:

Detail

Rate Analysis for 125 Mds


Labour
Unskilled Cooly

Loading or unloading bhoosa in Railway


lead upto 150 feet.

Unit Rate (British System) per 100 Mds


Qty
Rate
Per Unit (Rs.)

3.00 Nos

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Mds.
Labour Rate Per 100 Kg

Rs.
Rs.

0
0

Page 13

unloading bhoosa in Railway Wagons

British System) per 100 Mds

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

DESCRIPTION

OF

ITEM NO

12:

Detail

Rate Analysis for 1.25 Ton


Labour
Unskilled Cooly

Loading or unloading timber scrap or w


plugs into or from Railway Wagons and
within one chain lead.
Unit Rate (British System) per Ton
Qty
Rate
Per Unit (Rs.)

0.50 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne

Rs.
Rs.

Page 14

unloading timber scrap or wooden


or from Railway Wagons and stacking
chain lead.

British System) per Ton

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

DESCRIPTION

OF

ITEM NO

13:

Detail

Rate Analysis for 125 Cft.


Labour
Unskilled Cooly

Loading or unloading pitching stone or


from Railway Wagons of any gauge (incl
clearing 5 feet away from the rail)

Unit Rate (British System) per 100 Cft


Qty
Rate
Per Unit (Rs.)

0.37 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Cft
Labour Rate Per Cum

Rs.
Rs.

0
0

Page 15

unloading pitching stone or spawl


y Wagons of any gauge (including
feet away from the rail)

British System) per 100 Cft

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

DESCRIPTION

OF

ITEM NO

14:

Detail

Rate Analysis for 125 Cft.


Labour
Unskilled Cooly

Loading or unloading building stone (i


clearing 5 feet away from rails)

Unit Rate (British System) per 100 Cft


Qty
Rate
Per Unit (Rs.)

0.48 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Cft
Labour Rate Per Cum

Rs.
Rs.

0
0

Page 16

unloading building stone (including


feet away from rails)

British System) per 100 Cft

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

DESCRIPTION

OF

ITEM NO
a)

15:

Detail

Rate Analysis for 1250 Gallons


Labour
Unskilled Cooly
Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total

Unloading oil, bitumen tar etc.


Crude oil (to be pumped from tank wago
tank).

Unit Rate (British System) per 1000 Gl


Qty

Rate
Per Unit (Rs.)

1.25 No

0.00 P. Day

Item Rates
Labour Rate Per 1000 Gln.

Rs.

Labour Rate Per 100 Liters

Rs.

Page 17

il, bitumen tar etc.


to be pumped from tank wagon, into

British System) per 1000 Gln

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

Say

Item No.

15
b)

Detail

Rate Analysis for 1250 Gallons


Labour
Unskilled Cooly

Unloading oil, bitumen tar etc.


Crude oil (drained by gravity).

Unit Rate (British System) per 1000 Gl


Qty
Rate
Per Unit (Rs.)

1.25 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 1000 Gln.
Labour Rate Per 100 Liters

Rs.
Rs.

0
0

Page 18

il, bitumen tar etc.


drained by gravity).

British System) per 1000 Gln

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

Item No.

15
c)

Detail

Rate Analysis for 125 Cft


Labour
Unskilled Cooly

Unloading oil, bitumen tar etc.


Crude oil materials from Railway Wagon

Unit Rate (British System) per 100 Cft


Qty
Rate
Per Unit (Rs.)

0.16 No

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Cft
Labour Rate Per Cum

Rs.
Rs.

0
0

Page 19

il, bitumen tar etc.


aterials from Railway Wagons.

British System) per 100 Cft

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

Item No.

15
d)

Unloading oil, bitumen tar etc.


Fuel oil from tank into empty drums an
within one chain.

Detail

Unit Rate (British System) per Ton


Qty

Rate Analysis for 45 Ton


Labour
Unskilled Cooly
Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne

Rate
Per Unit (Rs.)

16.00 Nos 0.00 P. Day

Rs.
Rs.

0
0

Page 20

il, bitumen tar etc.


om tank into empty drums and stacking

British System) per Ton

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

Item No.

15
e)

Detail

Rate Analysis for 125 Nos


Labour
Unskilled Cooly

Unloading oil, bitumen tar etc.


Petrol (2 gallon tin)

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

0.63 Nos

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Page 21

il, bitumen tar etc.


allon tin)

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

Item No.

15
f)

Detail

Rate Analysis for 125 Nos


Labour
Unskilled Cooly

Unloading oil, bitumen tar etc.


Kerosine oil (4 gallons tin).

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

1.25 Nos

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Page 22

il, bitumen tar etc.


l (4 gallons tin).

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

DESCRIPTION

OF

ITEM NO
a)

16:

Detail

Rate Analysis for 125 Cft


Labour
Unskilled Cooly
Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total

Removing and stacking within one chain


Stones, Spawl, Brick Bats, shingle, sa
Surki, ashes, Kankar & Coal etc.

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs.)

0.50 No

0.00 P. Day

Item Rates
Labour Rate Per 100 Cft

Rs.

Labour Rate Per Cum

Rs.

Page 23

d stacking within one chain lead.


wl, Brick Bats, shingle, sand, lime.
s, Kankar & Coal etc.

British System) per 100 Cft

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

Say

Item No.

16
b)

Detail

Rate Analysis for


Labour
Unskilled Cooly

Removing and stacking within one chain


Bricks

Unit Rate (British System) per 1000 No


Qty
Rate
Per Unit (Rs.)

15,000 Nos
16.00 Nos 0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 1000 Nos

Rs.

Page 24

d stacking within one chain lead.

British System) per 1000 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

Item No.

16
c)

Detail

Rate Analysis for


Labour
Unskilled Cooly

Removing and stacking within one chain


Broad gauge wooden sleepers

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

2,500 Nos
16.00 Nos 0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Page 25

d stacking within one chain lead.


wooden sleepers

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

Item No.

16
d)

Detail

Rate Analysis for


Labour
Unskilled Cooly

Removing and stacking within one chain


Metre gauge or narrow gauge wooden sle

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

4,200 Nos
16.00 Nos 0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Page 26

d stacking within one chain lead.


or narrow gauge wooden sleepers.

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

Item No.

16
e)

Detail

Rate Analysis for


Labour
Unskilled Cooly

Removing and stacking within one chain


Rails, girders, pipes, cement etc.

Unit Rate (British System) per Ton


Qty
Rate
Per Unit (Rs.)

90 Ton
16.00 Nos 0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne

Rs.
Rs.

Page 27

d stacking within one chain lead.


ers, pipes, cement etc.

British System) per Ton

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

Item No.

16
f)

Detail

Rate Analysis for


Labour
Unskilled Cooly

Removing and stacking within one chain


Bridge and crossing timber etc.

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

750 Nos
16.00 Nos 0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Page 28

d stacking within one chain lead.


crossing timber etc.

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

DESCRIPTION

OF

ITEM NO

17:

Detail

Loading into Wagons Girders, Rails, pe


way material (except wooden sleepers)
M.S. Bars, Pipes, etc. including lead
and stacking inside Wagons.
Unit Rate (British System) per Ton
Qty

Rate Analysis for 40 Ton


Labour
Unskilled Cooly
Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne

Rate
Per Unit (Rs.)

16.00 Nos 0.00 P. Day

Rs.
Rs.

Page 29

o Wagons Girders, Rails, permanent


l (except wooden sleepers) iron work,
Pipes, etc. including lead one chain
g inside Wagons.
British System) per Ton

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

DESCRIPTION

OF

ITEM NO

18:

Detail

Unloading from Wagons Girders, Rails,


permanent way material (except wooden
iron work, M.S. Bars, Pipes, etc. lead
chain but excluding stacking.
Unit Rate (British System) per Ton
Qty

Rate Analysis for 70 Ton


Labour
Unskilled Cooly
Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne

Rate
Per Unit (Rs.)

16.00 Nos 0.00 P. Day

Rs.
Rs.

0
0

Page 30

rom Wagons Girders, Rails,


ay material (except wooden sleepers)
M.S. Bars, Pipes, etc. lead upto one
xcluding stacking.
British System) per Ton

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

DESCRIPTION

OF

ITEM NO

19:

Detail

Rate Analysis for


Labour
Unskilled Cooly

Loading into Wagons, wooden broad gaug


sleepers including one chain lead and

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

1,000 Nos
16.00 Nos 0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Page 31

o Wagons, wooden broad gauge


cluding one chain lead and stacking.

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

DESCRIPTION

OF

ITEM NO

20:

Detail

Rate Analysis for


Labour
Unskilled Cooly

Unloading wooden broad gauge sleepers


Wagons including one chain lead and st

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

2,100 Nos
16.00 Nos 0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Page 32

ooden broad gauge sleepers from


uding one chain lead and stacking.

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

DESCRIPTION

OF

ITEM NO

21:

Detail

Rate Analysis for


Labour
Unskilled Cooly

Loading metre gauge or narrow gauge wo


sleepers including one chain lead and
inside Wagons.

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

2,000 Nos
16.00 Nos 0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Page 33

re gauge or narrow gauge wooden


cluding one chain lead and stacking

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

DESCRIPTION

OF

ITEM NO

22:

Detail

Rate Analysis for


Labour
Unskilled Cooly

Unloading metre gauge or narrow gauge


sleepers including one chain lead but
stacking

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

3,800 Nos
16.00 Nos 0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Page 34

etre gauge or narrow gauge wooden


cluding one chain lead but excluding

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

DESCRIPTION

OF

ITEM NO

23:

Detail

Rate Analysis for 125 Nos


Labour
Unskilled Cooly

Loading Bridge and grossing timber inc


one chain lead and stacking.

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

4.00 Nos

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Page 35

dge and grossing timber including


ead and stacking.

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

DESCRIPTION

OF

ITEM NO

24:

Detail

Rate Analysis for 125 Nos


Labour
Unskilled Cooly

Unloading Bridge and crossing timber i


one chain lead but excluding stacking.

Unit Rate (British System) per 100 Nos


Qty
Rate
Per Unit (Rs.)

2.00 Nos

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per 100 Nos

Rs.

NOTE :
Rate for loading and unloading for Mobile trucks/ boats, item 1-15 will be 80%
of the rate of Railway Wagons.

Page 36

ridge and crossing timber including


ead but excluding stacking.

British System) per 100 Nos

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say

s, item 1-15 will be 80%

DESCRIPTION

OF

ITEM NO

25:

Detail

Rate Analysis for


Labour
Unskilled Cooly

Loading or unloading bitumen, asphalt


drums, into or from Railway Wagons lea
one chain.
Unit Rate (British System) per Ton
Qty
Rate
Per Unit (Rs.)

25 Ton
6.00 Nos

0.00 P. Day

Total
Sundries #### Percent
Total
Contractor's Profit & Ove #### Percent
Total
Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne

Rs.
Rs.

0
0

Page 37

unloading bitumen, asphalt or tar in


or from Railway Wagons lead upto

British System) per Ton

er Unit (Rs.)

Amount (Rs.)

.00 P. Day

Say
Say

0
0

LIST OF LUMPSUM ITEMS-1


S.No.

MATERIAL
Kitchen Expenses (tea, meat, milt fuel fat & appliances)
LS-01 Ch. 3 Item 16 (i)
Lantern,
Patromax
LS-02 consumption Ch. 3 Item 16 (i)

lamp

LS-03 Kitchen Utensil, cost of repair and replacement etc. Ch. -3 Item 16 (i)
LS-04 Kitchen Utensil, cost of repair and replacement etc. Ch. -3 Item 16 (i)
LS-05 Construction of Temporary Island (Ch. 6 Item 7 (i)
LS-06 Carriage of material to site of work (Boring Material) -(Ch
6 Item 7 (i)
LS-07 Hire charges of plant (Ch. 6 Item 8 (a) & (b)
Hire
charges
of
assembling
LS-08 stressing,
jack
Hydraulic
injecting
pump
relievable
recorded data of stresses. (Ch. 6 Item 20)
LS-09 Repair of plate for the down struts spacers (Ch. 6 Item -21)
LS-10 pump Hire charges of wire cutter stressing, Jack, Hydraulic
LS-11
d Fixture (Ch. 9 Itemf
(Ch
6
LS-12 Hire Charges of Spray Machine (Ch. 11 Item 6 i, ii & iii) -LS-13 Nail & Screws bolt and brackets (Ch. 12 Item 24 (a)
LS-14 Accessories for fixing of Eave Board (Ch. 12 Item 28 (b)
LS-15 Cost of Putty and Nails (Ch. 12 Item 44 a)
LS-16 Electricity Charges (Ch. 12 Item 51)
LS-17 Hold Fast (Ch. 12 Item. 57 b)
LS-18 Burner Charges, Kerosene Oil & Scraper (Ch. 13 Item 16)
LS-19 Misc. i.e. small T&P, working of Crane & Tar Boiler (Ch. -18 Item 10)
LS-20 Excavation and fixing (Ch. 18 Item 18 (iv) a)
LS-21 Jointing Plate with T Iron (Ch. 18 Item 18 (iv) a)
LS-22 Painting and lettering (Ch. 18 Item 18 (iv) a)
LS-23 Fixing manhole frame & cover including carriage to site -(Ch
21 Item
15)
LS-24 Rental Charges of T&P (Ch. 21 Item. 19 a i)
Carriage from store to site of work for reverse rotary
LS-25 drilling reg complete set and generator set etc. (Ch. 23 -Item 5 (a) i)
LS-26 Mix. Expenditure (Ch. 23 Item 5 (a) i)
LS-27 Taking and preserving box 2 lbs sample of strata. (Ch. 23 -Item 7) samples of water from bore hole including bailing
Taking
LS-28 or 'pumping.
(Ch. 23 Item 7)

Sealing the water sample and providing necessary packing


LS-29 etc. (Ch. 23 Item 7)
LS-30 Handling charges (Ch. 23
LS-31 C. Oil (Ch. 23 item 17 i
Providing
LS-32 hard wood to each end of
19 C)
Providing
LS-33 hard wood to each end of
19 C)
Providing
LS-34 hard wood to each end of
19 C)

Item 7)
& ii)
and
fixing temporary wooden
pipe line for 3\" (Ch. 23 Table -and
fixing temporary wooden
pipe line for 4\" (Ch. 23 Table -and
fixing temporary wooden
pipe line for 5\" (Ch. 23 Table --

IST OF LUMPSUM ITEMS-1


Unit

& appliances)
-depreciation

and

K.

oil
--

etc. Ch. --

etc. Ch. ---

erial) --bunch
cable
pump,
conce,
observation

wire
fixer
and

supply

cutter
grout
of --

6 Item --

, Hydraulic
21)
ii & iii) --

--------

ler (Ch. -----

to site ---

erse rotary
(Ch. 23 ---

. (Ch. 23 -luding bailing

--

RATE

ssary packing
----

orary wooden
23 Table --

tapered plug

of

orary wooden
23 Table --

tapered plug

of

orary wooden
23 Table --

tapered plug

of

Page 1

LIST OF LUMPSUM ITEMS-1


S.No.
LS-35

LS-36

LS-37

LS-38

LS-39

LS-40
LS-41
LS-42
LS-43
LS-44
LS-45
LS-46
LS-47
LS-48
LS-49
LS-50
LS-51
LS-52
LS-53
LS-54
LS-55
LS-56

MATERIAL
Providing and
fixing temporary woodtapered plug
hard wood to each end of pipe line for 6\" (Ch. 23 Table -19 C)
Providing and
fixing temporary woodtapered plug
hard wood to each end of pipe line for 8\" (Ch. 23 Table -19 C)
Providing and
fixing temporary woodtapered plug
hard wood to each end of pipe line for 10\" (Ch. 23 Table -19 C)
Providing and
fixing temporary woodtapered plug
hard wood to each end of pipe line for 12\" (Ch. 23 Table -19 C)
Providing and
fixing temporary woodtapered plug
hard wood to each end of pipe line for 15\" (Ch. 23 Table -19 C)
Providing and
fixing temporary woodtapered plug
hard wood to each end of pipe line for 18\" (Ch. 23 Table -19 C)
Soldering etc. (Ch. 24 Item 5 i)
Locking arrangement (Ch. 24 Item 44 i)
Extra labour for shuttering (Ch. 24 Item 44 i)
Testing Fee (Ch. 24 Item 75 a & b)
Leatheride Paper (Ch. 24 Item 76 i)
Carriage from stone to site (Ch. 24 Item 42 a)
Carriage to site of work (Ch. 25 Item 41 a)
Carriage to site of work (Ch. 25 Item 41 b)
Electric charges with electrode (Ch. 24 Item 42 a)
Sewing charges (Labour) (Ch. 26 Item 4)
Cost of Polish & Nails (Ch. 26 Item 20)
Rope, rags, etc. (Ch. 26 Item 22)
Filling cement bags with coal (Ch. 26 Item 27)
Cotton Waste, Grease & Packing etc. (Ch. 26 Item 35 b)
Accessories, repair and replacement portion (Ch. 26 Item -35 b)
Spraying Machine (Ch. 26 Item 42)

Page 2

Unit

apered plug
23 Table --

of

apered plug
23 Table --

of

apered plug
23 Table --

of

apered plug
23 Table --

of

apered plug
23 Table --

of

apered plug
23 Table --

of

--------------26 Item ---

RATE

LIST OF MATERIAL

ITEM
MATERIAL
01.001Cotton waste
01.002Grease
01.003H.S. Diesel oil
01.004Kerosine oil
01.005Mobil oil
01.006Average diesel consumption of a truck
01.007Average mobile oil consumption of a truck
03.001Gun powder and fuse for blasting (1 pound and 1 fuse)
03.002Jhambs
03.003Charakharies complete
03.004Manila Rope 1\"
03.005Cost of repair and replacement of 4 Nos. picks axes and 8 No Per Da
03.006Palana with namda for one donkey
03.007Repair and replacement of sacks
03.008Tent
03.009Donkey hut
03.010Royalty for pit sand
03.011Nail bolts and nuts
03.012Atta
03.013Phak
03.014Grams
06.001Brick Ballast 1\" (at site)
06.002Brick Ballast 1\" to 1\" (at site)
06.003Stone Ballast 1\" to 1\" (at source)
06.004Brick Bats
06.005Coarse sand (Chenab) (at site)
06.006Harrow/Sand (at site)
06.007Sand (Local) (at site)
06.008Cement (Grey)
06.009Cement (White)
06.010Shingle (Naturally Graded) at site (Bajri)
06.011Aggregate/Stone Crushed \" to 1\" (Graded) (at site)
06.012M.S. Bars (Plain) \" and above (36000 PSI)
06.013M.S. Bars (Deformed) (40 grade)
06.014M.S. bars (Tor Steel 60 grade)
06.015Cost of casing pipe of 18\" dia
06.016Cost of casing pipe of 20\" dia
06.017Cost of casing pipe of 22\" dia
06.018Cost of casing pipe of 24\" dia
06.019Nail and Screw (Copper)
06.020Brush (Large)
06.021Brush (Small)
06.022Binding wire
06.023Special Clamps with bolts and nuts

06.024Welding electrode
06.025Prestressing Cable having 12 Nos. wire
06.026Anchorage cone
06.027Corrugated sheath of 1-9/16\" for 12/0.276\" (7mm) cable
06.028Making good recesses
06.029Steel rope 1\"
06.030U Clamp i/c 5/8\" bolts & nuts
06.031Steel rope \" dia
06.032Railway track including sleepers bolts & nuts complete
06.033Crow bar
06.034Aluminum powder
06.035Aluminum sheet 1/16\" to 1/8\" (1.6 to 3 mm) thick
06.036Helical core (compressed for 10 tons)
06.037G.I. Sheet special \"V shaped \"
06.038Mastic strip
06.039Copper flashing 1/16\" thick
06.040Rubber water stopper 10\" wide and 1/4\" thick
06.041Bitumen
06.042Sawdust
06.043Wood for heating
06.044Thermopore sheet 1\" (40 mm) thick
06.045Thermopore sheet 1\" (25 mm) thick
06.046Polythene @ 1.13 kg % Sft
06.047Broken glass
07.001Ist class bricks 9\" x 4\" x 3\" (225 x 112.5 x 75 mm)
07.002Fire Clay Bricks 225 x 112.5 x 75 mm
07.003Good earth/clay
07.004Fire resistant cement
Page 1

ATERIAL

UNIT
RATE
Per Kg
Per Kg
Per Ltr.
Per Ltr.
Per Ltr.
miles/gallon
miles/gallon
nd 1 fuse)
Each
Each
Each
Rft
cks axes and 8 No Per Day
Each
Each
Each
Each
% Cft
Kg.
P.Kg.
per Md
per Md
100 Cft
100 Cft
100 Cft
100 Cft
100 Cft
100 Cft
100 Cft
Per Bag
Per Bag
100 Cft
(at site)
100 Cft
M. Ton
M. Ton
M. Ton
Per Rft
Per Rft
Per Rft
Per Rft
Per. Kg.
Each
Each
Kg
Each

" (7mm) cable

ts complete

m) thick

2.5 x 75 mm)

P.Bundle
P.Ton
per set
per metre
Each end
Rft
each
Rft
Rft
Each
per kg
per kg
per metre
each
P.Rft
P.Sft
P.Rft
P.Kg.
P.Cft
P.Kg.
m
m
P.Kg.
% kg
%o Nos.
Each
100 Cft
0 Kg per bag

ITEM
MATERIAL
07.005Moulded Special bricks 9\" x 4\" x 3\"
07.006Sun dried bricks
07.007Lime (Slaked)
07.008Lime (Unslaked)
07.009Brick grinded and sand
07.010Hoop Iron
08.001Quarried Stone at source
08.002Headers or through stone (1.5\" x 8\" x 10\")
08.003Pitching stone at source
08.004Charcoal
08.005Wood preservative (Heptaclore)
08.006Steel
08.007Hand dressed stone average (2 Cft)
08.008Hand dressed stone average (4 Cft.)
09.001Brick tiles 300 x 150 x 50 mm (12\"x6\"x2\" )
1
09.002Brick tiles 300 x 150 x 40 mm 12\"x6\"x1 /2

09.003Brick tiles 300 x 150 x 32 mm (12\"x6\"x1\" )


1

09.004Brick tiles 225 x 112.5 x 50 mm (9\"x4 / \2


09.005Brick tiles 225 x 112.5 x 40 mm (9\"x41/2\"x1\")
09.006G.I. Plain Sheet 18 - 20 SWG
09.007G.I Plain Sheet 22 - 24 SWG
09.008G.I. Corrugated sheet 18 - SWG
09.009G.I. Corrugated sheet 22 - 24 SWG
09.010G.I. Corrugated sheet 20 SWG
09.011G.I. Hook, Nuts and Bolts
09.012G.I. Washers
09.013Washers Limpet
09.014Bhoosa
09.015Pig lead
09.016Cowdung (wet)
09.017A.C. T-bend 100 mm
09.018A.C. Shoe 100 mm
09.019A.C. Ridge Sheet (6mm)
09.020Fuel wood
09.021Wire Nails
09.022Wind tie (rod)
09.023Bitumen washers
09.024Brick Aggregate
09.025Lead flashing 1/16\" thick
09.026C.I. Heads 4\"
09.027Clamps with hold fasts etc. (For Rain Water Pipe)
09.028C.I. water down pipe 4\" (100mm) dia
09.029C.I. water down pipe down 3\" (75mm) dia

09.030C.I. shoes bend or offsets 4\"


09.031Corrugated A.C. sheets
09.032G.I. or limpet washers and bitumastic washers
09.033Wrought iron bracket complete with bolts, Nuts and rivets et
09.034Polythene 0.03\" (0.08 mm)
09.035Thermopore \" (12mm) thick
09.036Thermopore \" (19mm) thick
09.037Thermopore 1\" (25mm) thick
09.038A.C. pipe 4\" (100mm) dia
09.039U.I. Clips
09.040Screws 3\" & 2\"
10.001Murrum powder fine.
10.002Cement concrete tiles 200 x 200 x 20 mm (8\" x 8\" x \")
10.003Cement Concrete tiles 300 x 300 x 25 mm (12\" x 12\" x 1\")
10.004Cement Concrete tiles 225 x 225 x 20 mm (9\" x 9\" \")
10.005Cement concrete tiles 150 x 150 x 20 mm (6\" x 6\" x \")
10.006White Tile (Glazed) 6\"x6\"x\"
10.007Coloured Glazed tiles 150 x 150 x 6 mm (6\" x 6\" x \")
10.008Coloured Glazed tiles 300 x 300 x 6 mm (12\" x 12\" \")
10.009Mosaic marble chips tiles300 x 300 x 25 mm (12\" x 12\" x 1\"
10.010Rubber tiles 300 x 300 x 3 mm (12\" x 12\" x 1/8\")
10.011White glazed tiles 300 x 300 x 6mm (12\" x 12\" x \")
10.012Dressed Stone 2'x2'x2\"
10.013Dressed Stone 2'x2'x3\"
10.014Carborandum Stone
10.015Pigment for Cement/Concrete
10.016Marble Chips
10.017Marble Powder
10.018Neoprene strip 100 x 6 mm
10.019Wax Polish
Page 2

UNIT
RATE
%o Nos.
%o Nos.
Kg
Kg
Cft
Per Kg.
100 Cft
Each
% Cft
Per Kg
Per Ltr.
Per Kg.
Each
Each
%o Nos.
%o Nos.
%o Nos.
%o Nos.
%o Nos.
Per kg
Kg
Per Kg
Per Kg
Per Kg
Doz
Per Kg
Per Dozen
Kg
Kg
% Kg
Each
Each
Rft
Per Kg.
Per Kg.
P Kg.
Doz
P. Cft
P. Sft
Each
Each
P. Rft
P. Rft.

Each
P.Sft
Doz
uts and rivets et Each
Pr. Kg.
Per Sft.
Per Sft.
Per Sft.
P.Rft
Kg.
Kg.
% Cft
" x 8\" x \")
Each
\" x 12\" x 1\") Each
" x 9\" \")
Each
" x 6\" x \")
Each
Each
x 6\" x \")
Each
" x 12\" \")
Each
(12\" x 12\" x 1\" Each
Each
12\" x \")
Each
Each
Each
Each
Per Kg
Per Kg
100 Kg
P. Foot
3 Kg.

ITEM
MATERIAL
10.020Tartaric Acid
10.021Hessian Cloth
10.022Linen Cloth
10.023Asphalt
10.024Sand Paper
10.025Brass Screws 50 mm long
10.026Glass stip 3 mm thick 40 mm wide
10.027Glass Strips 4 mm thick 40 mm wide
10.028Glass Strips 5 mm thick 50 mm wide
10.029Marble strips 6 mm thick 40 mm wide
10.030Marble strips 10 mm thick 40 mm wide
10.031Sutli
10.032Steam coal
10.0339\" thick rubble or broken hard bricks
10.034Hard Marrum
10.035Floor Polish
10.036Adhesive Mixture dry
10.037Surkhi
10.038Fine Aggregate
10.039Primer
11.001Chopped Jute
11.002Distemper (Vinyle Emulsion)
11.003Distemper Plastic bound (Plastic Emulsion)
11.004Distemper Water bound
11.005Rice
11.006Pigment for colour wash
11.007Primer/red oxide pigment
11.008Chopped Straw
11.009Expended metal edge bead 5\" wide
12.001Chir Ist Class
12.002Deodar Wood best quality
12.003Deodar Wood 2nd class
12.004Fire Wood
12.005Kail Ist class
12.006Shisham wood Ist class
12.007Teak wood
12.008Partal wood
12.009Kikar wood
12.010Sheets Aluminum 8 - SWG - 24 SWG (local)
12.011Sheets Aluminum \" thick and above (local)
12.012Copper sheet 0.80 mm to 2.50 mm
12.013Copper sheet 3.00 mm to 6.00 mm
12.014Formica sheet (8' x 4')
12.015Plain Galvanized iron sheet
12.016Corrugated Galvanized iron sheet

Per Kg

12.017Commercial ply 6 mm thick


12.018Commercial ply 3 mm thick
12.019Shisham wood ply (6 mm thick)
12.020Teak wood ply (6 mm thick)
12.021Thermopore sheet \" (12 mm) thick 20 kg/m (39\" x 39\")
12.022Thermopore sheet \" (20 mm) thick 20 kg/m (39\" x 39\")
12.023Thermopore sheet 1\" (25 mm) thick 20 kg/m (39\" x 39\")
12.024Masonite sheet 5 mm thick for partitions
12.025Masonite Sheet for ceiling
12.026Bacolite sheet (2.50 mm) thick (size 4' x 4')
12.027Bacolite sheet (3.75 mm) thick (size 4' x 4')
12.028Bacolite sheet (4.00 mm) thick (size 4' x 4')
12.029Rubber sheet 5 mm (size 4' x 6')
12.030Zinc Plate 525 x 11 mm
12.031Spike
12.032Glass pan 3 mm thick 16 x to 18 oz
12.033Glass pan 3 mm thick 24 x to 26 oz
12.034Glass plate \" (6 mm) thick upto 8 SFT
12.035Glass plate \" (6 mm) thick not exceeding 24 SFT
12.036Glass Plate 6 mm thick
12.037Glass Plate 8 mm
12.038Glass Plate \" (12 mm) thick
12.039Glue
12.040Machine Screws 38.10 x 7.35 mm
12.041Iron strips 1\" x 1/8\"
12.042Brass finger plate
12.043Brass hinges 50 mm
12.044Brass hinges 63 mm
Page 3

UNIT
RATE
Per Kg
Per Mtr.
P. Kg.
P. Kg.
Per Doz.
Per Doz.
% Rft
% Rft
% Rft
Rft
Rft
Per Kg
Kg
%Cft.
%Cft.
P. Kg.
Per Kg.
P. % Cft.
% Cft.
P.Kg.
Per Kg
Per Gallon
Per Gallon
Per Gallon
Per Kg
Per Kg
Per Gln.
P.Kg
P. Rft
CFT
CFT
CFT
Kg
CFT
CFT
CFT
CFT
CFT
Per Kg
Per Kg
Per Kg
Per Kg
Per sheet
Per Kg
Per Kg

(39\" x 39\")
(39\" x 39\")
(39\" x 39\")

SFT
SFT
SFT
SFT
P. sheet
P. sheet
P. sheet
P. Sft
P.Sft
eet 4'x4'
eet 4'x4'
eet 4'x4'
eet 4'x6'
Kg
Per Kg
SFT
SFT
SFT
SFT
SFT
SFT
PSF
Per Kg
Per Doz.
Kg
Each
Each
Each

size
size
size
size

ITEM
MATERIAL
12.045Brass hinges 75 mm
12.046Brass hinges 100 mm
12.047Brass hinges 125 mm
12.048Brass tower bolts 300 mm
12.049Brass tower bolts 225 mm
12.050Brass tower bolts 200 mm
12.051Brass tower bolts 150 mm
12.052Steel nut and bolts (all sizes)
12.053Iron hold fast (for doors/windows)
12.054Iron handle 100 mm 4\"
12.055Iron handle 150 mm (6\")
12.056Iron handle 200 mm (8\")
12.057Brass handle 100 mm
12.058Brass handle 150 mm
12.059C.P. handles 4\" (2nd Quality)
12.060C.P. handles 4\"
12.061C.P Handle 6\"
12.062C.P. handles 6\" (Best Quality)
12.063Handle
12.064Iron sliding bolt 200 mm (8\") with screws
12.065Iron sliding bolt 250 mm (10\") with screws
12.066Iron sliding bolt 300 mm (12\") with screws
12.067Racal plugs 1\" (40mm) long
12.068Racal Plug (small)
12.069Push plate (Stainless)
12.070Kikai plate (Aluminum) 4\" wide 22 gauge 12\" long
12.071Rim lock (China)
12.072Mortise lock (Local)
12.073Sliding bolts Brass 300 mm (12\")
12.074Hinges (Iron) 50 mm
12.075Hinges (Iron) 75 mm
12.076Hinges (Iron) 100 mm
12.077Hinges (Iron) 125 mm
12.078Double action spring Hinges (Brass) Medium 4\" - 5\" (100 to 1 Per
12.079Double action spring Hinges (Iron) 4\"-5\" (100 to 125 mm)
12.080Brass screw 20 mm
12.081Brass screw 25 mm
12.082Brass screw 40 mm
12.083Door Stops 150 mm
12.084Door stopper 150 mm (wooden)
12.085Foot hinges 1\"
12.086Tee hinges 250 mm
12.087Tee hinges 150 mm
12.088Tee hinges 200 mm
12.089Butt Hinges (125mm)

12.090Butt Hinges (150mm)


12.091Hasp & staples (medium size)
12.092Iron tower bolt 100 mm long
12.093Iron tower bolt 150 mm long
12.094Iron tower bolt 225mm long
12.095Iron tower bolt 250 mm long
12.096Iron tower bolt 300 mm long
12.097Hold fast with pivot & clamp 4\"
12.098Hold fast with pivot & clamp 6\"
12.099Hold fast with pivot & clamp 8\"
12.100spring hinges (doors/windows)
12.101Wrought Iron Hold Fast (small)
12.102Wrought Iron Hold Fast (Large)
12.103Deodar wooden beading (1\" x \")
12.104Deodar wooden lipping 6 mm
12.105Deodar wooden lipping 3/8
12.106Chord with hook (\" x \")
12.107Wooden cleat for door
12.108G.I. hook with clamp (doors/windows)
12.109Khunda - Chapka (For Almirah)
12.110Rubber Pad Stopper
12.111Wire Gauze (12x12)
12.112Wooden Plug for door
12.113Expended Metal (12mm to 20mm mesh of 16 gauge)
12.114Hinges 10\" (250mm)
12.115Hinges chocks 4\" (100mm) (for battened doors)
12.116Hasp and staple
12.117Hold fast with pivots & clamp for framed and braced doors
Page 4

UNIT
RATE
Each
Each
Each
Each
Each
Each
Each
Per Kg
Each
Each
Each
Each
Each
Each
Rft
Each
P.Doz
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
4\" - 5\" (100 to 1 Per pair
(100 to 125 mm)
Each set
Doz.
Doz.
Doz.
Each
Each
Each
Each
Each
Each
Each

d braced doors

Each
Each
Per Doz.
Per Doz.
Per Doz.
Per Doz.
Per Doz.
Each
Each
Each
Each
Each
Each
Rft
Rft
Rft
Each
Each
Each
Each
Each
Sft.
Each
Sft.
Each
Each
Each
Each

ITEM
MATERIAL
12.118Sliding bolts 18\" (450mm) long
12.119M.S. Angle Iron 1\"x1\"x\" (40x40x6mm)
12.120M.S. Flat 6\"x\"x1/8\" (150x6x3mm)
12.121Hinges Chocks 3\" (75mm)
12.122Screws upto 1\" long
12.123Screws above 1\" long
12.124Nails of sorts
12.125Brass spring hinges Complete with Screws
12.126Brass sliding bolt 10\" (250mm) long 'complete with screws &
12.1271\" (25mm) thick solid flush shutter
12.128Solid flush door 1\" thick
12.129C.P. dasti I/C screws
12.130Hard Board
12.131Brass butt hinges 2\" (50mm)
12.132Brass butt hinges 6\" (150mm)
12.133Sawing Charges
12.134Tie rod welding and fixing arragement
12.135Vin board \" thick
12.136Vin board \" thick
12.137Chip Board \" (20mm) 700 density
12.138Chip Board \" (12mm) 700 density
12.139Full hinges \" (20mm) wide (Imported)
12.140Catcher
12.141lock China
12.142C.P. Hanger rod with 2 hooks
12.143Hanger hook including pull out rod
12.144Brass hooks
12.145Door rubber stopper
12.146G.I. Hook
12.147Hooks forPunkha Pole
12.148Nails
12.149Washers
12.150Hard Wood Gutty
12.151M.S clamp
12.152M.S hook
12.153Sand Paper
12.154Tower bolt C.P.
12.155C.P. finger plate with screws
12.156M.S. sheets (plain) 20 SWG
12.157M.S. Sheet 18 SGW
12.158M.S. Sheet 22 SGW
12.159Curtain Railing
12.160Electrod
12.161Gola (Wood)
13.001Black Japan paint

13.002Chalk powder
13.003Dana Lakh
13.004Emulsion paint
13.005Paint Enamel
13.006French Polish
13.007Gum and Gun rasin
13.008Linseed oil
13.009Road marking enamel
13.010Solignum paint (Imported)
13.011Spirit
13.012Varnish
13.013White Enamel paint
13.014Caustic Soda
13.015Painting Brushes (average rate)
13.016Mineral Pitch
13.017Primer Paint
13.018Reflective Paint
13.019Reflective Tape/Paper
13.020Creosote
13.021Steel Scrapper
13.022Kerosine Oil
13.023Terpentine oil
13.024Water Proofing Emulsion Paint
16.001Jute bag (Empty) (1.25 Cft.)
16.002New jute bag (4 to 5 Cft.)
16.003Pitching Stone
16.004Munj patha ban
16.005G.I Wire No.15
Page 5

UNIT
RATE
Each
P.Kg.
P.Kg.
Each
Doz
Per Doz.
Pr. Kg.
Each
ete with screws & Each
Sft.
Sft.
Each
Sft
Each
Each
Sft
Each
Sft.
Sft.
P.Sft
P.Sft
Rft
Each
Each
Each
Each
Each
Each
Each
Per Dozen
P.Kg.
Each
Each
Each
Each
Each
Each
Each
Kg
Sft
Sft
Rft.
Pkt
P. Ft.
Gln.

Per Kg
Per Kg
Per Gallon
P. Gln
Per Kg
Per Gallon
Per Kg
Per Ltr.
Per Gallon
Per Ltr.
Kg
Per Gln.
Kg
Each
Kg
P.Gln
P. Gln
P. Sft.
P. Gln
Each
Litre
Per Ltr.
P.Kg.
Each
Each
% Cft
Per Kg
Per Kg

ITEM
MATERIAL
16.006Bamboo (60 - 120 mm dia) 2.5 meter to 3.0 metre long
16.007Bamboo (60 - 120 mm dia) 3.0 meter to 3.75 metre long
16.008Bamboo (60 - 120 mm dia) 3.75 meter to 4.25 metre long
16.009Bamboo (60 - 120 mm dia) 4.25 meter to 4.90 metre long
16.010Bamboo (60 - 120 mm dia) 4.90 meter to 6.25 metre long
16.011G.I Wire No. 8 to 10
16.012Sutli
16.013wooden vertical stakes 7\" to 12\" dia for groynes
16.014Royality charges of wooden stakes
16.015Shingle / spawl
16.016Boulder
16.017Supply pilchi lead within one mile
16.018Pilchi Roll 6\" dia 5' long
16.019Bajri / shingle
16.020Royality kikar brush wood
16.021Kikar wood for pegs
18.001Course aggregate (bajri) for surface dressing (Quarry site)
18.002Graded stone for base course (Quarry site)
18.003Brick Aggregate For Sub Base course (Quarry site)
18.004Pit-run/Bedrun graval (Quarry site)
18.005Stone screaned (Crusher site)
18.006Stone Dust (Quarry/Plant site)
18.007Steel bars (including binding wire)
18.008Iron post
18.009Elbow 2\"
18.010Tee 2\" x 2\" x 2\"
18.011Steel bearing (standard quality)
18.012Rubber bearing pad 1\" x 1\" x 1\" (2.5x2.5x2.5 cm)
18.013A.C pipe 3\" i/d
18.014T.Iron and M.S Plate
18.015Lettering 4\" height
18.016Lettering 3\" height
19.001Cast iron head 4\"
19.002Cast iron shoe 4\"
19.003Cast iron bend 4\"
19.004Cast iron off set 4\"
19.005G.I spout 4\" 460 mm long
19.006AC - bend 4\" (100 mm)
19.007AC Shoe 4\" (100 mm)
19.008AC Tee (100 mm)
19.009Angle Iron Bracket Set for W.H.B & Cistern
19.010'Angle Iron Bracket Set for Sink
19.011Waste pipe 3 cm (1\") (PVC)
19.012Waste pipe 4 cm (1\") (PVC)
19.013C.P. waste coupling 3 cm (1\")

19.014C.P. waste coupling 4 cm (1\")


19.015Rubber plug with chain 3 cm (1\")
19.016Rubber plug with chain 4 cm (1\")
19.017PVC Flushing bend 3 cm (1\")
19.018PVC Flushing bend 4 cm (1\")
19.019Plastic rubber connection with check nut
19.020Copper connectionn with check nut:
19.021C.P. Shower rose 1.5 x 10 cm (\" x 4\")
19.022C.P. Shower rose 2.0 x 15 cm (\" x 6\")
19.023C.I brackets for high level flushing cistern
19.024C.I. Bracket for Wash hand basin
19.025White Glazed earthen ware low down cistern 13.63 ltr. (3/Gln
19.026Coloured Glazed earthen ware low down cistern 13.63 ltr. (3/
19.027White Glazed cast iron low down cistern 13.63 ltr. (3/Gln)
19.028RCC Pipe 4\" dia
19.029Plastic made low down flushing cistern 13.63 litre (3 gallo
19.030Pedestal for W.H.B
19.031Bolt and Nuts for W.C. (European Type)
19.032A.C soil pipe 6cm (2\" dia)
19.033A.C soil pipe 7.5cm (3\" dia)
19.034A.C soil pipe 10cm (4\" dia)
19.035A.C soil pipe 15cm (6\" dia)
19.036C.I. Soil Down 50 mm (2\") dia
19.037C.I Soil Down 100 mm (4\") dia (30 PSI)
19.038Yarn
19.039Chromium plated T-stop cock 1.5 c.m (\")
19.040Brass gas cock 1.5 c.m (\")
19.041Brass gas cock 2.0 c.m (\")
Page 6

etre long
metre long
5 metre long
0 metre long
5 metre long

ng (Quarry site)

UNIT
RATE
Each
Each
Each
Each
Each
Per Kg
P.Kg
P. % Nos.
Each
P.% Cft
P.% Cft
P.% Cft
P.% Cft
P.% Cft
P.% Mds
P. Cft
100 Cft
100 Cft
100 Cft
100 Cft
100 Cft
100 Cft
Per Kg.
Per Kg
Each
Each
Each
P.Cub
per metre
P. Kg.
Each
Each
Per Kg
Per Kg
Per Kg
Per Kg
Each
Each
Each
Each
Each
Each
Each
Each
Each

Each
Each
Each
Each
Each
Each
Each
Each
Each
Per pair
Each
13.63 ltr. (3/Gln Each
rn 13.63 ltr. (3/ Each
63 ltr. (3/Gln)
Each
Rft.
63 litre (3 gallo Each
Each
Each
Metre
Metre
Metre
Metre
Metre
Metre
per lbs
Each
Each
Each

ITEM
MATERIAL
19.042Brass bib cock \" (1.5 cm)
19.043Brass bib cock \" (2 cm) / brass stop cock
19.044Glazed Earthenware sink 60 x 45 cm (24\" x 18\")
19.045Glazed Earthenware sink 37.5 x 45 cm (15\" x 18\")
19.046Statinless steel sink with drain board 120 x 60 cm (48 x 24
19.047 Te board
19.048Brass ball float valves 15 mm (\") dia
19.049Brass ball float valves 20 mm (\") dia
19.050Brass ball float valves 25 mm (1\") dia
19.051Brass ball float valves 30 mm (1\") dia
19.052Brass ball float valves 40 mm (1\") dia
19.053Brass ball float valves 50 mm (2\") dia
19.054C.P. Mixing Valves \" dia (Mixer)
19.055Glass Shelf 60 x 13 cm (24\" x 5\")
19.056Chromium plated bracket and railling for glass shelf
19.057 Gl chromium plated bracket and railing (Coloured)
19.058 Gl withchromium plated bracket and railing (White)
19.059Soap dish chromium plated
19.060Soap dish glazed earthen ware white colour
19.061Soap dish plastic
19.062Toilet Paper Holder (Chromium plated)
19.063Toilet Paper Holder (Plastic)
19.064Towel Rail With Brackets (Chromium plated) 60 x 2 cm (24\" x
19.065Towel Rail With Brackets (Chromium plated) 50 x 1.5 cm (20\"
19.066Towel Rail With Brackets (Plastic)
19.067C.I floor trap including grating size 10 x 5 cm (4\" x 2\")
19.068Chromium plated bottle trap 3 cm (1\") (with waste pipe)
19.069Chromium plated bottle trap 4 cm (1\") (with waste pipe)
19.070Cast iron P-trap 10 cm (4\")
19.071Concrete gully trap 4\"
19.072Glazed Pee trap 10 cm (4\" dia)
19.073PVC grating 15 x 15 cm (6\" x 6\")
19.074 Wh cm x 40 cm) with padestal
19.075Wash Hand Basin (22\" x 16\") (56 cm x 40 cm)} without pedesta
19.076Coloured wash hand basin with pedestal (22\" x 16\") (56 cm x
19.077Coloured wash hand basin without pedestal (22\" x 16\") (56 cm
19.078European type water closet without seat and cover (coloured)
19.079European type water closet without seat and cover (white)
19.080Double seat and cover Bekelite
19.081Double seat and cover Plastic
19.082 White Glazed earthenware squater (Orisa pattern) WC
combined with footrest
19.083 Co combined with footrest}
19.084Terazzo concrete water closet squater type
19.085 Gl rest (Orisa pattern)

19.086Urinal Glazed earthenware flat back


19.087Pillar cock chromium plated heavy duty 2 cm (\")
19.088Pillar cock chromium plated heavy duty 1.5 cm (\")
19.089Stop cock under ground 15 mm (\") with C.P cover
19.090Stop cock chromium plated heavy duty 2 cm (\")
19.091Stop cock chromium plated heavy duty 1.5 cm (\")
19.092Swan neck cock single way chromium plated 1.5 cm (\")
19.093Swan neck cock double way chromium plated 1.5 cm (\")
19.094Swan neck cock three way chromium plated 1.5 cm (\")
19.095Gas cock chromium plated oxidised (\") single way
19.096Gas cock chromium plated oxidised (\") double way
19.097Gas cock chromium plated oxidised (\") three way
19.098Looking glass 5 mm thick 55 x 40 cm (22\" x 16\")
19.099Hanger hook with pullout rod
19.100Gun metal peat/gate valve (screwed) 15 mm (\") dia
19.101Gun metal peat/gate valve (screwed) 20 mm (\") dia
19.102Gun metal peat/gate valve (screwed) 25 mm (1\") dia
19.103 Gun metal peat/gate valve (screwed) 30 mm (1\") dia
19.104 Gun metal peat/gate valve (screwed) 40 mm (1\") dia
19.105Gun metal peat/gate valve (screwed) 50 mm (2\") dia
19.106Gun metal peat/gate valve (screwed) 65 mm (2\") dia
19.107Gun metal peat/gate valve (screwed) 80 mm (3\") dia
19.108Foot rest for squatter type W.C.
19.109Waste coupling with bracket and waste pipe
19.110Screw (75 mm) 3\" long
Page 7

x 60 cm (48 x 24

ass shelf

60 x 2 cm (24\" x
50 x 1.5 cm (20\"

5 cm (4\" x 2\")
th waste pipe)
th waste pipe)

m)} without pedesta


" x 16\") (56 cm x
22\" x 16\") (56 cm
cover (coloured)
cover (white)

ttern) WC

UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

RATE

.5 cm (\")
.5 cm (\")
5 cm (\")

\") dia

(1\") dia
(1\") dia
(1\") dia

(2\") dia
(3\") dia

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

ITEM
MATERIAL
19.111 C. capacity including accessories
19.112C.I. High level flushing cistern I/C all accessaries (1 gall
19.113Soap dish coloured (glazed earthen weare)
19.114Plastic shelf with railing
19.115Bracket
19.1162 cm (\") bib cock
19.1171.5 cm (\") bib cock
19.118Union brass cock \" (1.5 cm)
19.119Union brass cock \" (2 cm)
19.120C.I floor trap including grating size 10 x 7.5 cm (4\" x 3\")
19.121Manhole cover 30 cm (12\" dia)
19.122C.I. manhole cover with frame 45 cm (18\" dia)
19.123C.I. manhole cover with frame 60 cm (24\" dia)
1
19.124C.P Bottle trap with waste pipe 3cm (1 / \4
1
19.125C.P Bottle trap with waste pipe 4cm (1 / \2

19.126Nail with Cutter for angle iron brackets


19.127 Copper connection with assessories \" dia
19.1281.5 cm (\" dia) brass ball valve with assessaries
21.001C.I. gully grating 12\" x 12\" with hinged safety type (81 lb
21.002Concrete gully trap 12\" x 12\"
21.003China ware trap with C.I screen
21.004Iron Bolt 12\"
21.005C.I Ventilating Shaft tool 6\" to 12\" I/d 18' to 36' long
21.006 RCC sewer pipes confirming to ASTM C-76-79 (class III wall
B)
300 mm (12\") i/d
21.007 RC B) 375 mm (15\") i/d
21.008 RCC sewer pipes confirming to ASTM C-76-79 (class III wall
B) 450 mm (18\") i/d
21.009 RC B) 525 mm (21\") i/d
21.010 RCC sewer pipes confirming to ASTM C-76-79 (class III wall
B) 600 mm (24\") i/d
21.011 RC B) 675 mm (27\") i/d
21.012 RCC sewer pipes confirming to ASTM C-76-79 (class III wall
B) 750 mm (30\") i/d
21.013 RC B) 825 mm (33\") i/d
21.014 RCC sewer pipes confirming to ASTM C-76-79 (class III wall
B)
900 mm (36\") i/d
21.015 RC B) 1070 mm (42\") i/d
21.016 RC B) 1220 mm (48\") i/d
21.017 RC B) 1370 mm (54\") i/d
21.018 RC B) 1520 mm (60\") i/d
21.019 RC B) 1680 mm (66\") i/d

21.020 RC B) 1830 mm (72\") i/d


21.021 RCC Pipes conforming (to BS 5911 part I, 1981 class 'L')
'100 mm (4\") i/d
21.022 RC '150 mm (6\") i/d
21.023 RCC Pipes conforming (to BS 5911 part I, 1981 class 'L')
225 mm (9\") i/d
21.024 Non/reinforced concrete pipe 100 mm (4\") dia conforming to
ASTM C-14-73 Class I
21.025 No ASTM C-14-73 Class I
21.026 No ASTM C-14-73 Class I
21.027 No ASTM C-14-73 Class I
21.028 No ASTM C-14-73 Class I
21.029 dia RCC Sewer pipe 300 mm (12\") Conforming to ASTM C-76-79 Per
(ClassII wall 'B')
21.030 RCC Sewer pipe '375 cc (15\") dia Conforming to ASTM C-76-79 Per
(ClassII wall 'B') mm (18\") dia Conforming to ASTM C-76-79
21.031 RCC Sewer pipe 450
(ClassII wall 'B') mm (21\") dia Conforming to ASTM C-76-79
21.032 RCC Sewer pipe 525
(ClassII wall 'B') mm (24\") dia Conforming to ASTM C-76-79
21.033 RCC Sewer pipe 600
(ClassII wall 'B') mm (27\") dia Conforming to ASTM C-76-79
21.034 RC (ClassII wall 'B') mm (30\") dia Conforming to ASTM C-76-7
21.035 RCC Sewer pipe 750
(ClassII wall 'B') mm (33\") dia Conforming to ASTM C-76-79
21.036 RC (ClassII wall 'B') mm (36\") dia Conforming to ASTM C-76-7
21.037 RCC Sewer pipe 900
(ClassII wall 'B')
21.038 RCC Sewer pipe 1070 mm (42\") dia Conforming to ASTM C-76-79 Per
(ClassII wall 'B')
21.039 RCC Sewer pipe 1220 mm (48\") dia Conforming to ASTM C-76-79 Per
(ClassII wall 'B')
21.040 RCC Sewer pipe 1370 mm (54\") dia Conforming to ASTM C-76-79 Per
(ClassII wall 'B')
Page 8

UNIT
Each

RATE

cessaries (1 gall Each


Each
Each
Each
Each
Each
Each
Each
7.5 cm (4\" x 3\") Each
Each
Each
Each
Each

Each
Each
Each
Each
safety type (81 lb Each
Each
Each
Each
18' to 36' long
Kg
(class III wall Per Ft.

(class III wall

Per Ft.
Per Ft.

(class III wall

Per Ft.
Per Ft.

(class III wall

Per Ft.
Per Ft.

(class III wall

Per Ft.
Per Ft.
Per
Per
Per
Per
Per

Ft.
Ft.
Ft.
Ft.
Ft.

981 class 'L')

Per Ft.
Rft

981 class 'L')

Rft
Rft

dia conforming to Rft

Rft
Rft
Rft
Rft
ng to ASTM C-76-79 Per Ft.

ng to ASTM C-76-79 Per Ft.


ming to ASTM C-76-79
Per Ft.
ming to ASTM C-76-79
Per Ft.
ming to ASTM C-76-79
Per Ft.
ming to ASTM C-76-79
ming to ASTM C-76-7Per Ft.
Per Ft.
ming to ASTM C-76-79
ming to ASTM C-76-7Per Ft.
Per Ft.

ng to ASTM C-76-79

Per Ft.

ng to ASTM C-76-79

Per Ft.

ng to ASTM C-76-79

Per Ft.

ITEM
MATERIAL
21.041 RC (ClassII wall 'B')
21.042 RC (ClassII wall 'B')
21.043 RCC Sewer pipe 1830 mm (72\") dia Conforming to ASTM C-76-79
(ClassII wall 'B')

Per

21.044Rubber Ring
21.045 RCC Sewer pipe 300 mm (12\") dia Conforming to ASTM C-76-79
(class IV wall 'B')
21.046 RCC Sewer pipe 380 mm (15\") dia Conforming to ASTM C-76-79
(class IV wall 'B')
21.047 RCC Sewer pipe 460 mm (18\") dia Conforming to ASTM C-76-79
(class IV wall 'B')
21.048 RCC Sewer pipe 535 mm (21\") dia Conforming to ASTM C-76-79
(class IV wall 'B')
21.049 RCC Sewer pipe 610 mm (24\") dia Conforming to ASTM C-76-79
(class IV wall 'B')
21.050 RCC Sewer pipe 685 mm (27\") dia Conforming to ASTM C-76-79
(class IV wall 'B')
21.051 RCC Sewer pipe 760 mm (30\") dia Conforming to ASTM C-76-79
(class IV wall 'B')
21.052 RC (class IV wall 'B'
21.053 RC (class IV wall 'B')
21.054 RC (class IV wall 'B')
21.055 RC (class IV wall 'B')
21.056 RCC Sewer pipe 1370 mm (54\") dia Conforming to ASTM C-76-79
(class IV wall 'B')
21.057 RCC Sewer pipe 1520 mm (60\") dia Conforming to ASTM C-76-79
(class IV wall 'B')
21.058 RCC Sewer pipe 1680 mm (66\") dia Conforming to ASTM C-76-79
(class IV wall 'B')
21.059 RCC Sewer pipe 1830 mm (72\") dia Conforming to ASTM C-76-79
(class IV wall 'B')
21.060Steel bolt 12\" long
21.061Foundation bolts & nuts \" dia 2' long .
21.062Rubber sheet 1/8\" thick
21.063Foundation bolts & nuts \" dia 1' long
21.064Foundation bolts \" dia 2' long.
7
21.065Fou 8

22.001Winch including cost of tripod, tackle etc. for sinking of w


22.002Steel rope 3/4\" dia
22.003One cusic capacity pumping set for dewatering

Per
Per
Per
Per

22.004Sleeper
22.005Bolts & Nuts
23.001 A. joint and
23.002 A.C pressure
joint and
23.003 A.C pressure
joint and
23.004 A.C pressure
joint and
23.005 A.C pressure
joint and
23.006 A.C pressure
joint and
23.007 A.C pressure
joint and
23.008 A.C pressure
joint and
23.009 A.C pressure
joint and
23.010 A.C pressure
joint and
23.011 A. joint and
23.012 A. joint and
23.013 A.C pressure
joint and
Page 9

rubber rings
pipe 100 mm (4\") dia Class 'B' BSS with comet
rubber rings.
pipe 150 mm (6\") dia Class 'B' BSS with comet
rubber rings.
pipe 200 mm (8\") dia Class 'B' BSS with comet
rubber rings.
pipe 250 mm (10\") dia Class 'B' BSS with comet
rubber rings.
pipe 300 mm (12\") dia Class 'B' BSS with comet
rubber rings.
pipe 350 mm (14\") dia Class 'B' BSS with comet
rubber rings.
pipe 400 mm (16\") dia Class 'B' BSS with comet
rubber rings.
pipe 450 mm (18\") dia Class 'B' BSS with comet
rubber rings.
pipe 500 mm (20\") dia Class 'B' BSS with comet
rubber rings.
rubber rings.
rubber rings
pipe 100 mm (4\") dia Class 'C' BSS with comet
rubber rings.

Per
Per
Per
Per
Per
Per

UNIT

ng to ASTM C-76-79

Per Ft.

Per Inch
dia of
pipe
g to ASTM C-76-79 Per Ft.

g to ASTM C-76-79 Per Ft.

g to ASTM C-76-79 Per Ft.

g to ASTM C-76-79 Per Ft.

g to ASTM C-76-79 Per Ft.

g to ASTM C-76-79 Per Ft.

g to ASTM C-76-79 Per Ft.


Per Ft.
Per Ft.

ng to ASTM C-76-79

Per Ft.

ng to ASTM C-76-79

Per Ft.

ng to ASTM C-76-79

Per Ft.

ng to ASTM C-76-79

Per Ft.
Each
Each
P.Kg
Each
Each

Each
for sinking of w Each
Per Rft.
Each

RATE

Each
P.Kg
Per Ft.
B' BSS with comet Per Ft.

B' BSS with comet Per Ft.

B' BSS with comet Per Ft.

'B' BSS with comet

Per Ft.

'B' BSS with comet

Per Ft.

'B' BSS with comet

Per Ft.

'B' BSS with comet

Per Ft.

'B' BSS with comet

Per Ft.

'B' BSS with comet

Per Ft.

Per Ft.
C' BSS with comet Per Ft.

ITEM
MATERIAL
23.014 A. joint and rubber rings.
23.015 A. joint and rubber rings.
23.016 A.C pressure pipe 250 mm (10\") dia Class 'C' BSS with comet
joint and rubber rings.
23.017 A.C pressure pipe 300 mm (12\") dia Class 'C' BSS with comet
joint and rubber rings.
23.018 A.C pressure pipe 350 mm (14\") dia Class 'C' BSS with comet
joint and rubber rings.
23.019 A.C pressure pipe 400 mm (16\") dia Class 'C' BSS with comet
joint and rubber rings.
23.020 A.C pressure pipe 450 mm (18\") dia Class 'C' BSS with comet
joint and rubber rings.
23.021 A.C pressure pipe '500 mm (20\") dia Class 'C' BSS with
comet joint and rubber rings.
23.022 A.C pressure pipe 600 mm (24\") dia Class 'C' BSS with comet
joint and rubber rings.
23.023 A.C pressure pipe 80 mm (3\") dia Class 'D' BSS with comet
joint and rubber rings
23.024 A. joint and rubber rings.
23.025 A. joint and rubber rings.
23.026 A. joint and rubber rings.

Per
Per
Per
Per
Per

Per

23.027 A. joint and rubber rings.


23.028 A. joint and rubber rings.
23.029 A.C pressure
joint and
23.030 A.C pressure
joint and
23.031 A.C pressure
joint and
23.032 A.C pressure
joint and
23.033G.I. pressure
23.034G.I. pressure
23.035G.I. pressure
23.036G.I. pressure
23.037G.I. pressure
23.038G.I. pressure
23.039G.I. pressure
23.040G.I. pressure
23.041G.I. pressure
23.042G.I. pressure

pipe 350 mm (14\") dia Class 'D' BSS with comet


rubber rings.
pipe 400 mm (16\") dia Class 'D' BSS with comet
rubber rings.
pipe 450 mm (18\") dia Class 'D' BSS with comet
rubber rings.
pipe 500 mm (20\") dia Class 'D' BSS with comet
rubber rings.
pipe 15 mm (\") dia BSS-1387 - 1967 (light qua
pipe 20 mm (\") dia BSS-1387 - 1967 (light qua
pipe 25 mm (1\") dia BSS-1387 - 1967 (light qua
pipe 30 mm (1\") dia BSS-1387 - 1967 (light qu
pipe 40 mm (1\") dia BSS-1387 - 1967 (light qu
pipe 50 mm (2\") dia BSS-1387 - 1967 (light qua
pipe 65 mm (2\") dia BSS-1387 - 1967 (light qu
pipe 80 mm (3\") dia BSS-1387 - 1967 (light qua
pipe 100 mm (4\") dia BSS-1387 - 1967 (light qu
pipe 15 mm (\") dia BSS-1387 - 1967 (medium qu

Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per

F
F
F
F
F
F
F
F
F
F

23.043G.I.
23.044G.I.
23.045G.I.
23.046G.I.
23.047G.I.
23.048G.I.
23.049G.I.
23.050G.I.
23.051G.I.
23.052G.I.
23.053G.I.
23.054G.I.
23.055G.I.
23.056G.I.
23.057G.I.
23.058G.I.
23.059G.I.
23.060G.I.
23.061G.I.
23.062G.I.
23.063G.I.

pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure
pressure

pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe
pipe

20 mm (\") dia BSS-1387 - 1967 (medium q


25 mm (1\") dia BSS-1387 - 1967 (medium q
30 mm (1\") dia BSS-1387 - 1967 (medium
40 mm (1\") dia BSS-1387 - 1967 (medium
50 mm (2\") dia BSS-1387 - 1967 (medium q
65 mm (2\") dia BSS-1387 - 1967 (medium
75 mm (3\") dia BSS-1387 - 1967 (medium q
100 mm (4\") dia BSS-1387 - 1967 (medium
125 mm (5\") dia BSS-1387 - 1967 (medium
150 mm (6\") dia BSS-1387 - 1967 (Medium q
15 mm (\") dia BSS-1387 - 1967 (heavy qua
20 mm (\") dia BSS-1387 - 1967 (heavy qua
25 mm (1\") dia BSS-1387 - 1967 (heavy qua
30 mm (1\") dia BSS-1387 - 1967 (heavy qu
40 mm (1\") dia BSS-1387 - 1967 (heavy qu
50 mm (2\") dia BSS-1387 - 1967 (heavy qua
65 mm (2\") dia BSS-1387 - 1967 (heavy qu
75 mm (3\") dia BSS-1387 - 1967 (heavy qua
100 mm (4\") dia BSS-1387 - 1967 (heavy qu
'125 mm (5\") dia BSS-1387 - 1967 (heavy q
150 mm (6\") dia BSS-1387 - 1967 (heavy qu

Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per

F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F

1
23.064Joi 2
3

23.065Jointing Mate 4
23.066Jointing Material of Socket Joint for 1\" dia G.I. Pipe for 1 Per %
1

23.067Jointing Mate 4
1

23.068Jointing Mate 2
Page 10

UNIT
Per Ft.

'C' BSS with comet

Per Ft.

'C' BSS with comet

Per Ft.

'C' BSS with comet

Per Ft.

'C' BSS with comet

Per Ft.

'C' BSS with comet

Per Ft.

'C' BSS with

'C' BSS with comet

' BSS with comet

Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.

'D' BSS with comet

Per Ft.

'D' BSS with comet

Per Ft.

'D' BSS with comet

Per Ft.

'D' BSS with comet

Per Ft.

- 1967 (light qua


- 1967 (light qua
- 1967 (light qua
7 - 1967 (light qu
7 - 1967 (light qu
- 1967 (light qua
7 - 1967 (light qu
- 1967 (light qua
7 - 1967 (light qu
- 1967 (medium qu

Per
Per
Per
Per
Per
Per
Per
Per
Per
Per

Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.

RATE

7 - 1967 (medium q
7 - 1967 (medium q
87 - 1967 (medium
87 - 1967 (medium
7 - 1967 (medium q
87 - 1967 (medium
7 - 1967 (medium q
87 - 1967 (medium
87 - 1967 (medium
7 - 1967 (Medium q
- 1967 (heavy qua
- 1967 (heavy qua
- 1967 (heavy qua
7 - 1967 (heavy qu
7 - 1967 (heavy qu
- 1967 (heavy qua
7 - 1967 (heavy qu
- 1967 (heavy qua
7 - 1967 (heavy qu
87 - 1967 (heavy q
7 - 1967 (heavy qu

Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per

Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.

ia G.I. Pipe for 1 Per % Rft.

ITEM
MATERIAL
23.069Jointing Material of Socket Joint for 2\" dia G.I. Pipe for 1 Per %
1
23.070Joi 2

23.071Jointing Material of Socket Joint for 3\" dia G.I. Pipe for 1 Per %
23.072Jointing Material of Socket Joint for 4\" dia G.I. Pipe for 1 Per %
23.073Jointing Material of Socket Joint for 5\" dia G.I. Pipe for 1 Per %
23.074Jointing Material of Socket Joint for 6\" dia G.I. Pipe for 1 Per %
23.075Testing charges of G.I. Pipes for 1\" dia
23.076Testing charges of G.I. Pipes for 1\" dia
23.077Testing charges of G.I. Pipes for 1\" dia
23.078Testing charges of G.I. Pipes for 2\" dia
23.079Testing charges of G.I. Pipes for 2\" dia
23.080Testing charges of G.I. Pipes for 3\" dia
23.081Testing charges of G.I. Pipes for 4\" dia
23.082Testing charges of G.I. Pipes for 5\" dia
23.083Testing charges of G.I. Pipes for 6\" dia
23.08450 mm (2\") dia 3 mm (1/8\") thick M.S blind pipes
23.08580 mm (3\") dia 3 mm (1/8\") thick M.S blind pipes
23.086100 mm (4\") dia 3 mm (1/8\") thick M.S blind pipes
23.087125 mm (5\") dia 5 mm (3/16\") thick M.S blind pipes
23.088150 mm (6\") dia 5 mm (3/16\") thick M.S blind pipes
23.089175 mm (7\") dia 5 mm (3/16\") thick M.S blind pipe
23.090200 mm (8\") dia 5 mm (3/16\") thick M.S blind pipes
23.091225 mm (9\") dia 5 mm (3/16\") thick M.S blind pipes
23.092250 mm (10\") dia 6 mm (3/16\") thick {M.S blind pipe
23.093300 mm (12\") dia 6 mm (3/16\") thick {M.S blind pipe
23.094375 mm (15\") dia 6 mm (3/16\") thick {M.S blind pipes
23.095450 mm (18\") dia 6 mm (3/16\") thick {M.S blind pipes
23.096500 mm (20\") dia 6 mm (3/16\") thick {M.S blind pipes
23.097550 mm (22\") dia 6 mm (3/16\") thick {M.S blind pipes
23.098 80 rubber ring) For A.C Pipes}
23.09980-450 mm (3\"- 18\") dia C.I Specials of BSS Class B with S Per
23.10080-450 mm (3\"- 18\") dia C.I Specials of BSS Class B With Fla Per
23.10180-450 mm (3\"- 18\") dia C.I Specials of BSS Class B with Tyt Per
23.10280 mm (3\") dia Sluice Valves of BSS for AC & CI pipe line
23.103100 mm (4\") dia Sluice Valves of BSS for AC & CI pipe line
23.104125 mm (5\") dia Sluice Valves of BSS for AC & CI pipe line
23.105150 mm (6\") dia Sluice Valves of BSS for AC & CI pipe line
23.106200 mm (8\") dia Sluice Valves of BSS for AC & CI pipe line
23.107250 mm (10\") dia Sluice Valves of BSS for AC & CI pipe line
23.108300 mm (12\") dia Sluice Valves of BSS for AC & CI pipe line
23.109375 mm (14\") dia Sluice Valves of BSS for AC & CI pipe line
23.110450 mm (18\") dia Sluice Valves of BSS for AC & CI pipe line
23.111Single Air Valve 75 mm (3\")
23.112Double Air Valve 75 mm (3\")

23.113Fire Hydrant BSS 65 mm (2\")


23.11480 mm (3\") dia P.V.C tapperd core BSS Class 'B'
23.115100 mm (4\") dia P.V.C tapperd core BSS Class 'B'
23.116125 mm (5\") dia P.V.C tapperd core BSS Class 'B'
23.117150 mm (6\") dia P.V.C tapperd core BSS Class 'B'
23.118200 mm (8\") dia P.V.C tapperd core BSS Class 'B'
23.119250 mm (10\") dia P.V.C tapperd core BSS Class 'B'
23.120300 mm (12\") dia P.V.C tapperd core BSS Class 'B'
23.121350 mm (14\") dia P.V.C tapperd core BSS Class 'B'
1
4

23.12215
23.12340 mm (1\") dia P.V.C tapperd core BSS Class 'D'
23.12450 mm (2\") P.V.C tapperd core BSS Class 'D'
23.12575 mm (3\") dia P.V.C Bends BSS class 'B'
23.126100 mm (4\") dia P.V.C Bends BSS class 'B'
23.127100 mm (5\") dia P.V.C Bends BSS class 'B'
23.128150 mm (6\") dia P.V.C Bends BSS class 'B'
23.12930 mm (1\") dia P.V.C Bends BSS class 'D'
23.13040 mm (1\") dia P.V.C Bends BSS class 'D'
23.13150 mm (2\") dia P.V.C Bends BSS class 'D'
23.13280 mm (3\") dia P.V.C Bends BSS class 'D'
23.133100 mm (4\") dia P.V.C Bends BSS class 'D'
23.134125 mm (5\") dia P.V.C Bends BSS class 'D'
23.135150 mm (6\") dia P.V.C Bends BSS class 'D'
23.13680 mmm (3\") dia P.V.C Tee BSS Class 'B'
23.137100 mm (4\") dia P.V.C Tee BSS Class 'B'
23.138125 mm (5\") dia P.V.C Tee BSS Class 'B'
23.139150 mm (6\") dia P.V.C Tee BSS Class 'B'
23.140200 mm (8\") dia P.V.C Tee BSS Class 'B'
Page 11

UNIT
RATE
ia G.I. Pipe for 1 Per % Rft.

ia
ia
ia
ia

G.I.
G.I.
G.I.
G.I.

Pipe
Pipe
Pipe
Pipe

for
for
for
for

1
1
1
1

Per % Rft.
Per % Rft.
Per % Rft.
Per % Rft.
Per % Rft.
Per % Rft.
Per % Rft.
Per % Rft.
Per % Rft.
Per % Rft.
Per % Rft.
Per % Rft.
Per % Rft.
Per Ft.
Per Ft.
nd pipes
Per Ft.
ind pipes
Per Ft.
ind pipes
Per Ft.
ind pipe
Per Ft.
ind pipes
Per Ft.
ind pipes
Per Ft.
blind pipe
Per Ft.
blind pipe
Per Ft.
blind pipes
Per Ft.
blind pipes
Per Ft.
blind pipes
Per Ft.
blind pipes
Per Ft.
Per Kg
BSS Class B with S Per Kg
SS Class B With Fla Per Kg
SS Class B with Tyt Per Kg
& CI pipe line
Each
C & CI pipe line Each
C & CI pipe line Each
C & CI pipe line Each
C & CI pipe line Each
AC & CI pipe line Each
AC & CI pipe line Each
AC & CI pipe line Each
AC & CI pipe line Each
Each
Each

lass 'B'
lass 'B'
lass 'B'

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

ITEM
MATERIAL
23.141250 mm (10\") dia P.V.C Tee BSS Class 'B'
23.142300 mm (12\") dia P.V.C Tee BSS Class 'B'
23.143350 mm (14\") dia P.V.C Tee BSS Class 'B'
23.14430 mm (1\") dia P.V.C Tee BSS Class 'D'
23.14540 mm (1\") dia P.V.C Tee BSS Class 'D'
23.14650 mm (2\") dia P.V.C Tee BSS Class 'D'
23.14780 mm (3\") dia P.V.C Tee BSS Class 'D'
23.148100 mm (4\") dia P.V.C Tee BSS Class 'D'
23.149125 mm (5\") dia P.V.C Tee BSS Class 'D'
23.150150 mm (6\") dia P.V.C Tee BSS Class 'D'
23.15180 mmm (3\") dia P.V.C sockets BSS Class 'B'
23.152100 mm (4\") dia P.V.C sockets BSS Class 'B'
23.153125 mm (5\") dia P.V.C sockets BSS Class 'B'
23.154150 mm (6\") dia P.V.C sockets BSS Class 'B'
23.155200 mm (8\") dia P.V.C sockets BSS Class 'B'
23.156250 mm (8\") dia P.V.C sockets BSS Class 'B'
23.157300 mm (12\") dia P.V.C sockets BSS Class 'B'
23.158350 mm (14\") dia P.V.C sockets BSS Class 'B'
23.15930 mm (1\") dia P.V.C sockets BSS Class 'D'
23.16040 mm (1\") dia P.V.C sockets BSS Class 'D'
23.16150 mm (2\") dia P.V.C sockets BSS Class 'D'
23.16280 mm (3\") dia P.V.C sockets BSS Class 'D'
23.163100 mm (4\") dia P.V.C sockets BSS Class 'D'
23.164125 mm (5\") dia P.V.C sockets BSS Class 'D'
23.165150 mm (6\") dia P.V.C sockets BSS Class 'D'
23.166Bleaching powder/chlorine
23.16750 mm (2\") dia 4 mm (5/32\") Brass strainer incluidng specia
23.16875 mm (3\") dia 4 mm (5/32\") Brass strainer incluidng specia
23.169100 mm (4\") dia 5 mm (3/16\") Brass strainer incluidng spec
23.170125 mm (5\") dia 5 mm (3/16\") Brass strainer incluidng speci
23.171150 mm (6\") dia 5 mm (3/16\") Brass strainer incluidng speci
23.172175 mm (7\") dia 5 mm (3/16\") Brass strainer incluidng speci
23.173200 mm (8\") dia 5 mm (3/16\") Brass strainer incluidng speci
23.174225 mm (9\") dia 5 mm (3/16\") Brass strainer incluidng speci
23.175250 mm (10\") dia 5 mm (3/16\") Brass strainer incluidng spec
23.176250 mm (10\") dia 6 mm (\") Brass strainer incluidng special
23.177300 mm (12\") dia 6 mm (\") Brass strainer incluidng special
23.178375 mm (15\") dia 6 mm (\") Brass strainer incluidng special
23.179450 mm (18\") dia 6 mm (\") Brass strainer incluidng special
23.180500 mm (20\") dia 6 mm (\") Brass strainer incluidng special
23.181550 mm (22\") dia 6 mm (\") Brass strainer incluidng special
23.18275 mm (3\") dia P.V.C strainer Class 'B'
23.183100 mm (4\") dia P.V.C strainer Class 'B'
23.184125 mm (5\") dia 60 cm P.V.C strainer Class 'B'
23.185150 mm (6\") dia 60 cm P.V.C strainer Class 'B'

Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per

23.186200 mm (7\") dia 60 cm P.V.C strainer Class 'B'


23.187250 mm (8\") dia 60 cm P.V.C strainer Class 'B'
23.188300 mm (9\") dia 60 cm P.V.C strainer Class 'B'
23.189350 mm (10\") dia 60 cm P.V.C strainer Class 'B'
23.190PVC Stainer Class D 1\" dia (30mm)
23.191PVC Stainer Class D 1 dia (40 mm)
23.192PVC Stainer Class D 2\" dia (50 mm)
23.193PVC Stainer Class D 3\" dia (75 mm)
23.194PVC Stainer Class D 4\" dia (100 mm)
23.195PVC Stainer Class D 5\" dia (125 mm)
23.196PVC Stainer Class D 6\" dia (150 mm)
23.19750 mm (2\") i/d, Bail Plug-mild steel
23.19875 mm (3\") i/d Bail Plug-mild steel
23.199100 mm (4\") i/dBail Plug-mild steel
23.200125 mm (5\") i/d Bail Plug-mild steel
23.201150 mm (6\") i/d Bail Plug-mild steel
23.202175 mm (7\") i/d
Bail Plug-mild steel
23.203200 mm (8\") i/d
Bail Plug-mild steel
23.204225 mm (9\") i/d
Bail Plug-mild steel
23.205250 mm (10\") i/d Bail Plug-mild steel
23.206300 mm (12\") i/d Bail Plug-mild steel
23.207375 mm (15\") i/d Bail Plug-mild steel
23.208450 mm (18\") i/d Bail Plug-mild steel
23.209500 mm (20\") i/d Bail Plug-mild steel
23.210550 mm (22\") i/d Bail Plug-mild steel
23.21175 mm (3\") dia PVC BSS Class 'B' Bail Plug
23.212100 mm (4\") dia PVC BSS Class 'B' Bail Plug
23.213125 mm (5\") dia PVC BSS Class 'B' Bail Plug
Page 12

UNIT
RATE
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Per Kg
er incluidng specia Per Ft.
er incluidng specia Per Ft.
ner incluidng spec Per Ft.
ner incluidng speci Per Ft.
ner incluidng speci Per Ft.
ner incluidng speci Per Ft.
ner incluidng speci Per Ft.
ner incluidng speci Per Ft.
iner incluidng spec Per Ft.
r incluidng special Per Ft.
r incluidng special Per Ft.
r incluidng special Per Ft.
r incluidng special Per Ft.
r incluidng special Per Ft.
r incluidng special Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.

Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Each
Each
Each

ITEM
MATERIAL
23.214150 mm (6\") dia PVC BSS Class 'B' Bail Plug
23.215200 mm (8\") dia PVC BSS Class 'B' Bail Plug
23.216250 mm (10\") dia PVC BSS Class 'B' Bail Plug
23.217300 mm (12\") dia PVC BSS Class 'B' Bail Plug
23.218350 mm (14\") dia PVC BSS Class 'B' Bail Plug
23.21930 mm (1\") dia P.V.C. Class 'D' Bail Plug
23.22040 mm (1\") dia P.V.C. Class 'D' Bail Plug
23.22150 mm (2\") dia P.V.C. Class 'D' Bail Plug
23.22280 mm (3\") dia P.V.C. Class 'D' Bail Plug
23.223100 mm (4\") dia P.V.C. Class 'D' Bail Plug
23.224125 mm (5\") dia P.V.C. Class 'D' Bail Plug
23.225150 mm (6\") dia P.V.C. Class 'D' Bail Plug
23.226G.I. pipe with flanged joint 1\" dia 40mm (Heavy Quality)
23.227G.I. pipe with G.I. flanged joint 2\" dia 50 mm (Heavy Qualit
23.228G.I. pipe with GI. flanged joint 2\" dia 65 mm (Heavy Qualit
23.229G.I. pipe with G.I. flanged joint 3\" dia 75 mm (Heavy Quali
23.230G.I. pipe with G.I. flanged joint 4\" dia 100 mm (Heavy Quali
23.231G.I. pipe with G.I. flanged joint 5\" dia 125 mm (Heavy Quali
23.232G.I. pipe with G.I. flanged joint 6\" dia 150 mm (Heavy Quali
23.233G.I. pipe with C.I. flanged joint 1\" dia 40mm (Medium Quali
23.234G.I. pipe with C.I. flanged joint 2\" dia 50 mm (Medium Quali
23.235G.I. pipe with C.I. flanged joint 2\" dia 65 mm (Medium Qual
23.236G.I. pipe with C.I. flanged joint 3\" dia 75 mm (Medium Qual
23.237G.I. pipe with C.I. flanged joint 4\" dia 100 mm (Medium Qual
23.238G.I. pipe with C.I. flanged joint 5\" dia 125 mm (Medium Qual
23.239G.I. pipe with C.I. flanged joint 6\" dia 150 mm (Medium Qual
23.24075 mm Sluice Valve for A.C. Pipe Line with commet joint & ru
23.241100 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.242150 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.243200 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.244250 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.245300 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.246400 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.247450 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.248Lock for wooden box for pressuring samples off strata from b
23.249Cost of Lubricant for PVC Pipe
23.250Steel Handle 4\" (100mm)
23.25175 mm PVC Blind/Pressure Pipe Class \"B\"
23.252100 mm PVC Blind/Pressure Pipe Class \"B\"
23.253125 mm PVC Blind/Pressure Pipe Class \"B\"
23.254150 mm PVC Blind/Pressure Pipe Class \"B\"
23.255200 mm PVC Blind/Pressure Pipe Class \"B\"
23.256250 mm PVC Blind/Pressure Pipe Class \"B\"
23.257300 mm PVC Blind/Pressure Pipe Class \"B\"
23.258350 mm PVC Blind/Pressure Pipe Class \"B\"

Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per

F
F
F
F
F
F
F
F
F
F
F
F
F

23.25930 mm PVC Blind/Pressure Pipe Class \"D\"


23.26040 mm PVC Blind/Pressure Pipe Class \"D\"
23.26150 mm PVC Blind/Pressure Pipe Class \"D\"
23.26275 mm PVC Blind/Pressure Pipe Class \"D\"
23.263100 mm PVC Blind/Pressure Pipe Class \"D\"
23.264125 mm PVC Blind/Pressure Pipe Class \"D\"
23.265150 mm PVC Blind/Pressure Pipe Class \"D\"
23.266Loading expenses for pipes
23.267(Petty store) bolts & nuts etc. for 5\" dia bore
23.268(Petty store) bolts & nuts etc. for 6\" dia bore
23.269(Petty store) bolts & nuts etc. for 8\" dia bore
23.270(Petty store) bolts & nuts etc. for10\" dia bore
23.271(Petty store) bolts & nuts etc. for 12\" dia bore
23.272(Petty store) bolts & nuts etc. for15\" dia bore
23.273(Petty store) bolts & nuts etc. for 18\" dia bore
23.274Hire charges of boring material, installation & Carriage
23.275Hire charges of boring material, installation & Carriage
23.276Hire charges of boring material, installation & Carriage
23.277Hire charges of boring material, installation & Carriage
23.278Hire charges of boring material, installation & Carriage
23.279Hire charges of boring material, installation & Carriage
23.280Hire charges of boring material, installation & Carriage
23.281Hire charges of boring material, installation & Carriage
23.282Hire charges of boring material, installation & Carriage
23.283 Hi for (5\" dia bore) from 100.10 to 200 Ft. depth
23.284 Hi for (6\" dia bore) from 100.10 to 200 Ft. depth
Page 13

(3
(4
(5
(6
(8
(10
(12
(15
(18

Per
Per
Per
Per

Ft
Ft
Ft
Ft

UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
(Heavy Quality)
Per Ft.
0 mm (Heavy Qualit Per Ft.
5 mm (Heavy Qualit Per Ft.
5 mm (Heavy Quali Per Ft.
00 mm (Heavy Quali Per Ft.
25 mm (Heavy Quali Per Ft.
50 mm (Heavy Quali Per Ft.
40mm (Medium Quali Per Ft.
0 mm (Medium Quali Per Ft.
65 mm (Medium Qual Per Ft.
5 mm (Medium Qual Per Ft.
00 mm (Medium Qual Per Ft.
25 mm (Medium Qual Per Ft.
50 mm (Medium Qual Per Ft.
commet joint & ru Each
commet joint & r Each
commet joint & r Each
commet joint & r Each
commet joint & r Each
commet joint & r Each
commet joint & r Each
commet joint & r Each
off strata from b Each
Per Kg.
Each
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.

RATE

on
on
on
on
on
on
on
on
on

&
&
&
&
&
&
&
&
&

Carriage
Carriage
Carriage
Carriage
Carriage
Carriage
Carriage
Carriage
Carriage

(3
(4
(5
(6
(8
(10
(12
(15
(18

Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
P. Day
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.

ITEM
MATERIAL
23.285 Hi for (8\" dia bore) from 100.10 to 200 Ft. depth
23.286 Hi for (10\" dia bore) from 100.10 to 200 Ft. depth
23.287 Hire charges of boring material, installation & Carriage
for (12\" dia bore) from 100.10 to 200 Ft. depth
23.288 Hire charges of boring material, installation & Carriage
for (15\" dia bore) from 100.10 to 200 Ft. depth
23.289 Hire charges of boring material, installation & Carriage
for (18\" dia bore) from 100.10 to 200 Ft. depth
23.290 Hire charges of boring material, installation & Carriage
for (5\" dia bore) from 200.10 to 300 Ft. depth
23.291 Hire charges of boring material, installation & Carriage
for (6\" dia bore) from 200.10 to 300 Ft. depth
23.292 Hire charges of boring material, installation & Carriage
for (8\" dia bore) from 200.10 to 300 Ft. depth
23.293 Hire charges of boring material, installation & Carriage
for (10\" dia bore) from 200.10 to 300 Ft. depth
23.294 Hire charges of boring material, installation & Carriage
for (12\" dia bore) from 200.10 to 300 Ft. depth
23.295 Hire charges of boring material, installation & Carriage
for (15\" dia bore) from 200.10 to 300 Ft. depth
23.296 Hire charges of boring material, installation & Carriage
for (18\" dia bore) from 200.10 to 300 Ft. depth
23.297 Hire charges of boring material, installation & Carriage
for (8\" dia bore) from 300.10 to 400 Ft. depth
23.298 Hire charges of boring material, installation & Carriage
for (10\" dia bore) from 300.10 to 400 Ft. depth
23.299 Hire charges of boring material, installation & Carriage
for (12\" dia bore) from 300.10 to 400 Ft. depth
23.300 Hire charges of boring material, installation & Carriage
for (15\" dia bore) from 300.10 to 400 Ft. depth
23.301 Hire charges of boring material, installation & Carriage
for (18\" dia bore) from 300.10 to 400 Ft. depth
23.302Repair charges of T&P for 5\" dia bore hole
23.303Repair charges of T&P for 6\" dia bore hole
23.304Repair charges of T&P for 8\" dia bore hole
23.305Repair charges of T&P for 10\" dia bore hole
23.306Repair charges of T&P for 12\" dia bore hole
23.307Repair charges of T&P for 15\" dia bore hole
23.308Repair charges of T&P for 18\" dia bore hole
23.309Solvent for PVC Strainer 3\" dia (Class B)
23.310Solvent for PVC Strainer 4\" - 5\" dia (Class B)
23.311Solvent for PVC Strainer 6\" dia (Class B)
23.312Solvent for PVC Strainer 8\" - 10\" dia (Class B)

23.313Solvent for
23.314Solvent for
23.315Solvent for
23.316Solvent for
23.317Solvent for
23.318Solvent for
23.319Solvent for
23.320Solvent for
23.321Solvent for
23.322Solvent for
23.323Solvent for
23.324Solvent for
23.325Solvent for
23.326Solvent for
23.327Solvent for
23.328Solvent for
23.329Solvent for
23.330Solvent for
23.331Solvent for
23.332Solvent for
23.333Solvent for
23.334Solvent for
23.335Solvent for
23.336Testing and
23.337Testing and
23.338Testing and
23.339Testing and
23.340Testing and
Page 14

PVC Strainer 12\" - 14\" dia (Class B)


PVC Strainer 1\" dia (Class D)
PVC Strainer 1\" dia (Class D)
PVC Strainer 2\" dia (Class D)
PVC Strainer 3\" dia (Class D)
PVC Strainer 4\" dia (Class D)
PVC Strainer 5\" dia (Class D)
PVC Strainer 6\" dia (Class D)
PVC Bail Plug 3\" dia (Class B)
PVC Bail Plug 4\" dia (Class B)
PVC Bail Plug 5\" dia (Class B)
PVC Bail Plug 6\" dia (Class B)
PVC Bail Plug 8\" dia (Class B)
PVC Bail Plug 10\" dia (Class B)
PVC Bail Plug 12\" dia (Class B)
PVC Bail Plug 14\" dia (Class B)
PVC Bail Plug 1\" dia (Class D)
PVC Bail Plug 1\" dia (Class D)
PVC Bail Plug 2\" dia (Class D)
PVC Bail Plug 3\" dia (Class D)
PVC Bail Plug 4\" dia (Class D)
PVC Bail Plug 5\" dia (Class D)
PVC Bail Plug 6\" dia (Class D)
Disinfecting of PVC Pipe 3\" dia
Disinfecting of PVC Pipe 4\" dia
Disinfecting of PVC Pipe 5\" dia
Disinfecting of PVC Pipe 6\" dia
Disinfecting of PVC Pipe 8\" dia

UNIT
Per Ft.

Ft. depth

Per Ft.

ion
Ft.
ion
Ft.
ion
Ft.
ion

& Carriage
depth
& Carriage
depth
& Carriage
depth
& Carriage

Per Ft.

ion & Carriage

Per Ft.

ion & Carriage

Per Ft.

ion
Ft.
ion
Ft.
ion
Ft.
ion
Ft.
ion

& Carriage
depth
& Carriage
depth
& Carriage
depth
& Carriage
depth
& Carriage

Per Ft.

ion
Ft.
ion
Ft.
ion
Ft.
ion
Ft.

& Carriage
depth
& Carriage
depth
& Carriage
depth
& Carriage
depth

Per Ft.

Per Ft.
Per Ft.
Per Ft.

Per Ft.
Per Ft.
Per Ft.
Per Ft.

Per Ft.
Per Ft.
Per Ft.
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per

Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.

RATE

Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
100 Ft.
100 Ft.
100 Ft.
100 Ft.
100 Ft.

ITEM
MATERIAL
23.341Testing and Disinfecting of PVC Pipe 10\" dia
23.342Testing and Disinfecting of PVC Pipe 12\" dia
23.343Testing and Disinfecting of PVC Pipe 14\" dia
23.344Testing and Disinfecting of G.I Pipe 40mm (1\") dia
23.345Testing and Disinfecting of G.I Pipe 50mm (2\") dia
23.346Testing and Disinfecting of G.I Pipe 63mm (2\") dia
23.347Testing and Disinfecting of G.I Pipe 75mm (3\") dia
23.348Testing and Disinfecting of G.I Pipe 100mm (4\") dia
23.349Testing and Disinfecting of G.I Pipe 125mm (6\") dia
23.350Testing and Disinfecting of G.I Pipe 150mm (7\") dia
23.351Disc for bail plugs
23.352Testing and Disinfecting of G.I Pipe
23.353Bottle 2 lbs capacity
23.35475 mm to 450 mm dia CI flanges for pipes
23.355Cost of C.I. Flanges for Pipe
23.356Welding Charges of spigot or socket, flanged or tyton ends er Inch
23.357Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.358Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.359Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.360Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.361Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.362Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.363Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.364Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.365Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.366Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.367Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.368Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.369Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.370Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.371Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft
23.372M.S. Bolt & Nut 6\" to 22\" dia bore hole bail plug
23.373M.S. Bolt & Nut 2\" to 5\" dia bore hole bail plug
23.374Threading Clamp 2\" to 6\"
23.375Threading Clamp 7\" to 22\"
23.376Water for testing and disinfecting of pipes
23.377Lead
23.378Yarn
23.379Disinfecting agent for C.I. Pipe
23.380Bolt and nuts (3\" to 4\") for flanged joint
23.381Bolt and nuts (5\" to 12\") for flanged joint
23.382Bolt and nuts (15\" to 18\") for flanged joint
23.383Cost of ring for cast iron pipe(3\") with tyton joints
23.384Cost of ring for cast iron pipe(4\") with tyton joints
23.385Cost of ring for cast iron pipe(5\") with tyton joints

23.386Cost of ring for cast iron pipe(6\") with tyton joints


23.387Cost of ring for cast iron pipe(8\") with tyton joints
23.388Cost of ring for cast iron pipe(10\") with tyton joints
23.389Cost of ring for cast iron pipe(12\") with tyton joints
23.390Cost of ring for cast iron pipe(15\") with tyton joints
23.391Cost of ring for cast iron pipe(18\") with tyton joints
23.392Cost of material for joints of sluice Valve for A.C. pipe wi
23.393Cost of material for joints of sluice Valve for A.C. pipe wi
23.394Cost of material for joints of sluice Valve for A.C. pipe wi
23.395Cost of material for joints of sluice Valve for A.C. pipe wi
23.396Cost of material for joints of sluice Valve for A.C. pipe wi
23.397Cost of material for joints of sluice Valve for A.C. pipe wi
23.398Cost of material for joints of sluice Valve for A.C. pipe wi
23.399Cost of material for joints of sluice Valve for A.C. pipe wi
23.400Material for jointing of fire hydrant
23.401Material for jointing of air valve
23.402Cost of Bolt and nuts for G.I. Flanged Joints 1\" to 2\"
23.403Cost of Bolt and nuts for G.I. Flanged Joints 2\" to 7\"
23.404Rubber Insertion for G.I. flanged joints
23.405Solvent for PVC bends
23.406Lubricant
23.407Material for C-I specials with spigot and socket joint fo
23.408Material for C-I specials with spigot and socket joint fo
23.409Material for C-I specials with spigot and socket joint fo
23.410Material for C-I specials with spigot and socket joint fo
23.411Material for C-I specials with spigot and socket joint fo
23.412Material for C-I specials with spigot and socket joint fo
23.413Material for C-I specials with spigot and socket joint fo
Page 15

2
2
2
2
2
2
2
2

join
join
join
join
join
join
join
join

2
2
2
2
2
2
2

join
join
join
join
join
join
join

UNIT
100 Ft.
100 Ft.
100 Ft.
1\") dia
100 Ft.
100 Ft.
2\") dia
100 Ft.
100 Ft.
(4\") dia
100 Ft.
(6\") dia
100 Ft.
(7\") dia
100 Ft.
P. Kg.
P. Lbs
Each
P. Kg.
100 cwt
d or tyton ends er Inch Bore
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
r in Tubewel Bore Per Ft.
Each
Each
Each
Each
% Gallon 0
Per Kg.
Per Kg.
P. Kg.
Each
Each
Each
yton joints
Each
yton joints
Each
yton joints
Each

RATE

yton joints
yton joints
tyton joints
tyton joints
tyton joints
tyton joints
for A.C. pipe
for A.C. pipe
for A.C. pipe
for A.C. pipe
for A.C. pipe
for A.C. pipe
for A.C. pipe
for A.C. pipe

wi
wi
wi
wi
wi
wi
wi
wi

nts 1\" to 2\"


nts 2\" to 7\"

socket
socket
socket
socket
socket
socket
socket

joint
joint
joint
joint
joint
joint
joint

fo
fo
fo
fo
fo
fo
fo

Each
Each
Each
Each
Each
Each
2 joints
2 joints
2 joints
2 joints
2 joints
2 joints
2 joints
2 joints
Each
Each
Each
Each
Per Lbs
Per Kg.
Per Kg.
2 joints
2 joints
2 joints
2 joints
2 joints
2 joints
2 joints

ITEM
MATERIAL
23.414Material for C-I specials with spigot and socket joint fo 2 join
23.415Material for C-I specials with spigot and socket joint fo 2 join
23.416Material for CI flanged speical with flanged and flanged joi 2 join
23.417Material for CI flanged speical with flanged and flanged joi 2 join
23.418Material for CI flanged speical with flanged and flanged joi 2 join
23.419Material for CI flanged speical with flanged and flanged joi 2 join
23.420Material for CI flanged speical with flanged and flanged joi 2 join
23.421Material for CI flanged speical with flanged and flanged joi 2 join
23.422Material for CI flanged speical with flanged and flanged joi 2 join
23.423Material for CI flanged speical with flanged and flanged joi 2 join
23.424Material for CI flanged speical with flanged and flanged joi 2 join
Casting material (supply of speicals I/c moulding, painting
23.425carriage to site of work)
CI specials with Per Cw
spigot an socket joint
23.426car Casting material (supply of speicals I/c moulding, paintin
speical with flanged and flanged joints
Casting material (supply of speicals I/c moulding, painting
23.427carriage to site of work)
CI speicals with Per Cw
tyton joints / with comet joint and rubber ring complete
23.428Material for AC pipe line with comet joint and rubber ring 2 join
23.429Material for AC pipe line with comet joint and rubber ring 2 join
23.430Material for AC pipe line with comet joint and rubber ring 2 join
23.431Material for AC pipe line with comet joint and rubber ring 2 join
23.432Material for AC pipe line with comet joint and rubber ring 2 join
23.433Material for AC pipe line with comet joint and rubber ring 2 join
23.434Material for AC pipe line with comet joint and rubber ring 2 join
23.435Material for AC pipe line with comet joint and rubber ring 2 join
23.436Material for AC pipe line with comet joint and rubber ring 2 join
23.437Material for AC pipe line with comet joint and rubber ring 2 join
24.00117.5 x 10 x cm (7\" x 4\") {Sal Wood Boards (4.5 cm) 1\" th
24.00222.5 x 10 x cm (9\" x 4\") {Sal Wood Boards (4.5 cm) 1\" th
24.00322.0 x 25 x cm (8\" x 10\") {Sal Wood Boards (4.5 cm) 1\" t
24.00425.0 x 30 x cm (10\" x 12\") {Sal Wood Boards (4.5 cm) 1\"
24.00530.0 x 37 x cm (12\" x 14\") {Sal Wood Boards (4.5 cm) 1\"
24.00617.5 x 10 x cm (7\" x 4\") {Teak Wood Boards (4.5 cm) 1.75\"
24.00722.5 x 10 x cm (9\" x 4\") {Teak Wood Boards (4.5 cm) 1.75\"
24.00820.0 x 25 x cm (8\" x 10\") {Teak Wood Boards (4.5 cm) 1.75\
24.00925.0 x 30 x cm (10\" x 12\") {Teak Wood Boards (4.5 cm) 1.75
24.01030.0 x 37 x cm (12\" x 14\") {Teak Wood Boards (4.5 cm) 1.75
2 way 15 Amp Branch distribution board iron/aluminium clad
24.011250 volts angle iron frame with 3 mm (1/8\") M.S. sheet
covering for BDB 250 volts
24.012250 3 way 15 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
24.013250 4 way 15 Amp Branch distribution board iron/aluminium clad

covering for BDB 250 volts


24.014250 5 way 15 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
24.015250 6 way 15 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
24.016250 7 way 15 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
24.017250 8 way 15 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
24.018250 9 way 15 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
24.019250 10 way 15 Amp Branch distribution board iron/aluminium cla
covering for BDB 250 volts
24.020250 11 way 15 Amp Branch distribution board iron/aluminium cla
covering for BDB 250 volts
24.021250 12 way 15 Amp Branch distribution board iron/aluminium cla
covering for BDB 250 volts
24.022250 2 way 30 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
24.023250 3 way 30 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
24.024250 4 way 30 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
24.025250 5 way 30 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
24.026250 6 way 30 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
24.027250 7 way 30 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
Page 16

UNIT
socket joint fo 2 joints
socket joint fo 2 joints
d and flanged joi 2 joints
d and flanged joi 2 joints
d and flanged joi 2 joints
d and flanged joi 2 joints
d and flanged joi 2 joints
d and flanged joi 2 joints
d and flanged joi 2 joints
d and flanged joi 2 joints
d and flanged joi 2 joints
c moulding, painting
CI specials with Per Cwt

c moulding, paintinPer Cwt

c moulding, painting
CI speicals with Per Cwt
ber ring complete
and rubber ring 2 joints
and rubber ring 2 joints
and rubber ring 2 joints
and rubber ring 2 joints
and rubber ring 2 joints
and rubber ring 2 joints
and rubber ring 2 joints
and rubber ring 2 joints
and rubber ring 2 joints
and rubber ring 2 joints
s (4.5 cm) 1\" th Each
s (4.5 cm) 1\" th Each
ds (4.5 cm) 1\" t Each
rds (4.5 cm) 1\" Each
rds (4.5 cm) 1\" Each
ds (4.5 cm) 1.75\" Each
ds (4.5 cm) 1.75\" Each
rds (4.5 cm) 1.75\ Each
ards (4.5 cm) 1.75 Each
ards (4.5 cm) 1.75 Each
iron/aluminium clad
) M.S. sheet
Each

iron/aluminium cladEach

iron/aluminium cladEach

RATE

iron/aluminium cladEach

iron/aluminium cladEach

iron/aluminium cladEach

iron/aluminium cladEach

iron/aluminium cladEach
iron/aluminium claEach
iron/aluminium claEach
iron/aluminium claEach

iron/aluminium cladEach

iron/aluminium cladEach

iron/aluminium cladEach

iron/aluminium cladEach

iron/aluminium cladEach

iron/aluminium cladEach

ITEM

MATERIAL
8 way 30 Amp Branch distribution board iron/aluminium clad
24.028250 volts angle iron frame with 3 mm (1/8\") M.S. sheet
covering for BDB 250 volts
24.029250 9 way 30 Amp Branch distribution board iron/aluminium clad
covering for BDB 250 volts
24.030250 10 way 30 Amp Branch distribution board iron/aluminium cla
covering for BDB 250 volts
24.031PVC insulated single core copper conductor cable 3/0.029\" 25
24.032PVC insulated single core copper conductor cable 3/0.036\" 2
24.033PVC insulated single core copper conductor cable 7/0.029\" 2
24.034PVC insulated single core copper conductor cable 7/0.036\" 2
24.035PVC insulated single core copper conductor cable 7/0.044\" 2
24.036PVC insulated single core copper conductor cable 7/0.064\" 2
24.037PVC insulated single core copper conductor cable 19/0.052\" 2
24.038PVC insulated single core copper conductor cable 19/0.064\" Per Me
24.039 PVC insulated cotton braided and compounded copper
conductor cable 3/0.029\" 250/440 Volts
24.040 PVC insulated cotton braided and compounded copper
conductor cable 3/0.036\" 250/440 Volts
24.041 PVC insulated cotton braided and compounded copper
conductor cable 7/0.029\" 250/440 Volts
24.042 PVC insulated cotton braided and compounded copper
conductor cable 7/0.036\" 250/440 Volts
24.043 PVC insulated cotton braided and compounded copper
conductor cable 7/0.044\" 250/440 Volts
24.044 PVC insulated cotton braided and compounded copper
conductor cable 7/0.064\" 250/440 Volts
24.045 PVC insulated sheathed single core copper conductor cable
3/0.029\" 250/440 Volts
24.046 PVC insulated PVC sheathed single core copper conductor
cable 3/0.036\" 250/440 Volts
24.047 PVC insulated PVC sheathed single core copper conductor
cable 7/0.074\" 250/440 Volts
24.048 PVC insulated PVC sheathed single core copper conductor
cable 7/0.036\" 250/440 Volts
24.049 PV cable 7/0.044\" 250/440 Volts
24.050 PV cable 7/0.064\" 250/440 Volts
24.051 PV cable 7/0.064\" 660/1100 volts grade
24.052 PV cable 19/0.064\" 660/1100 volts grade
24.053 PV cable 19/0.064\" 660/1100 volts grade
24.054 PV cable 19/0.083\" 660/1100 volts grade
24.055 PV cable 37/0.072\" 660/1100 volts grade

24.056 PV cable 37/0.083\" 660/1100 volts grade


24.057 PV cable 37/0.103\" 660/1100 volts grade
24.058 PV cable 3/0.029\" 250/440 volts
24.059 PVC insulated, PVC sheathed twin core
cable 3/0.036\" 250/440 volts
24.060 PVC insulated, PVC sheathed twin core
cable 7/0.029\" 250/440 volts
24.061 PVC insulated, PVC sheathed twin core
cable 7/0.036\" 250/440 volts
24.062 PVC insulated, PVC sheathed twin core
cable 7/0.044\" 250/440 volts
24.063 PVC insulated, PVC sheathed twin core
cable 7/0.064\" 250/440 volts
24.064PVC insulated, PVC sheathed three core
24.065PVC insulated, PVC sheathed three core
24.066PVC insulated, PVC sheathed three core
24.067PVC insulated, PVC sheathed three core
24.068PVC insulated, PVC sheathed three core
24.069PVC insulated, PVC sheathed three core
24.070PVC sheathed 4 core non armoured cable
24.071PVC sheathed 4 core non armoured cable
24.072PVC sheathed 4 core non armoured cable
Page 17

copper conductor
copper conductor
copper conductor
copper conductor
copper conductor

cable 660/1100 volts Per Met


cable 660/1100 voltsPer Met
cable 7/0.029\"
66Per Me
cable 7/0.036\"
660Per Me
cable 7/0.044\"
660Per Me
cable 7/0.064\" 660/Per Me
3/0.029\" 660/1100 vPer Me
3/0.036\" 660/1100 vPer Me
7/0.029\" 660/1100 vPer Me

UNIT
iron/aluminium clad
) M.S. sheet
Each

RATE

iron/aluminium cladEach
iron/aluminium claEach

cable 3/0.029\" 25 Metre


cable 3/0.036\" 2 Metre
cable 7/0.029\" 2 Metre
cable 7/0.036\" 2 Metre
cable 7/0.044\" 2 Metre
cable 7/0.064\" 2 Metre
cable 19/0.052\" 2 Metre
cable 19/0.064\" Per Metre
d copper
Per Metre

d copper

Per Metre

d copper

Per Metre

d copper

Per Metre

d copper

Per Metre

d copper

Per Metre

conductor cable

Per Metre

per conductor

Per Metre

per conductor

Per Metre

per conductor

Per Metre
Per
Per
Per
Per
Per

Metre
Metre
Metre
Metre
Metre

Per Metre
Per Metre

Per Metre
Per Metre

er conductor

Per Metre
Per Metre

er conductor

Per Metre

er conductor

Per Metre

er conductor

Per Metre

er conductor

Per Metre

e 660/1100 volts Per Metre


e 660/1100 voltsPer Metre
e 7/0.029\"
66Per Metre
e 7/0.036\"
660Per Metre
e 7/0.044\"
660Per Metre
e 7/0.064\" 660/Per Metre
.029\" 660/1100 vPer Metre
.036\" 660/1100 vPer Metre
.029\" 660/1100 vPer Metre

ITEM
MATERIAL
24.073PVC sheathed 4 core non armoured cable 7/0.036\" 660/1100
24.074PVC sheathed 4 core non armoured cable 7/0.044\" 660/1100
24.075PVC sheathed 4 core non armoured cable 7/0.064\" 660/1100
24.076PVC sheathed 4 core non armoured cable 19/0.052\" 660/1100
24.077 PVC sheathed armoured with G.I. WIRE 16 SWG cable
19/0 052\ 660/1100 volts
24.078 PV 19/0 064\ 660/1100 volts
24.079 PVC sheathed armoured with G.I. WIRE 16 SWG cable
19/0 072\ 660/1100 volts
24.080 PV 19/0 083\ 660/1100 volts
24.081 PVC sheathed armoured with G.I. WIRE 16 SWG cable
37/0 072\ 660/1100 volts
24.082 PV 37/0 083\ 660/1100 volts
24.083 PVC sheathed armoured with G.I. WIRE 16 SWG cable
37/0 093\" 660/1100 volts
24.084 PV 37/0 103\ 660/1100 volts
24.085 Aluminium
(7/0 122\")
24.086she Flexible wire 7/3.099 mm (7/.122\") {PVC insulated PVC
conneciton 3 core:}
24.087Flexible twin wire 23/.0076\" (23/0.195mm)
24.088PVC wire (3/.029\")
24.089Capacitor 2.2 UF for ceiling fan
24.090M.S Clamp \" dia (16mm)
3
/ 4

24.091M.S Clamp
24.092M.S Clamp 1\" dia (25mm)
1
24.093M.S Clamp 1 / 4

24.094M.S Clamp 1\" dia (40mm)


24.095M.S Clamp 2\" dia (50mm)
24.096M.S Clamp 4\" dia (100mm)
24.097Clamps for electric wiring
24.098Clamps for electric wiring
24.099Clamps for electric wiring
24.100Clamps for electric wiring
24.101Clamps for electric wiring
24.102Clamps for electric wiring
24.103Clamps for electric wiring
24.104Clamps for electric wiring
24.105Clamps for electric wiring
24.106PVC Inspection Boxes 15 mm
24.107PVC Inspection Boxes 20 mm
24.108PVC Inspection Boxes 25 mm
24.109PVC Inspection Boxes 30 mm

15 mm (\")
20 mm (\")
'25 mm (1\")
'32 mm (1\")
40 mm (1\")
50 mm (2\")
'63 mm (2\")
'80 mm (3\")
100 mm (4\")
(\")
(\")
(1\")
(1\")

vPer
vPer
vPer
vPer

Me
Me
Me
Me

24.110PVC Inspection Boxes 40 mm (1\")


24.111PVC Inspection Boxes 50 mm (2\")
24.112PVC Inspection Boxes 75 mm (3\")
24.113PVC Inspection Boxes 100 mm (4\")
24.114Chokes 40 watts
24.115Chokes 20 watts
24.116Round block of Sahl wood
GEC design Pole mounted street light with holder shade and
24.117glass for fitting 125/250 watts mercury Vapour lamp
(excluding cost of lamp) with bracket clamp nuts & bolts
24.118Street light pole bracket
24.119Cost of bracket 1\" (32 mm) G.I pipe 7 ft. long half round
24.120Shackle Insulator for holding insulated wire
24.121Pin Insulator greeen (medium size)
24.122Staining screws for stay wire of electric pole
24.123Stay wire for electric pole 7/12\"
24.124Stay wire for electric pole 7/14\"
24.125Bakelite button holder shade large size
24.126Bakelite button holder shade Large size
24.127Bakelite Button Holder large size
24.128Bell push or bed switch
24.129Bakelite lamp holder
24.130Braket lamp holder
24.131Brass bracket with holder
24.132Brass bracket with holder
24.133Brass Button Holder
24.134Call bell 220/250 volts
24.135Ceiling rose bakelite
24.136Cut out bakelite open type
24.137Cut out backolite recessed type
24.138Electric Energy Metre Single Phase} 250 volts 10 AMP
24.139Electric Energy Metre Single Phase 250 volts 30 AMP
24.140Electric Energy Metre Single Phase 250 volts 60 AMP
24.141Three phase 4 wires, 400 volts: 3 x 15 Amps
24.142Three phase 4 wires, 400 volts:3 x 50 Amps
Page 18

.036\"
.044\"
.064\"
.052\"
G cable

660/1100
660/1100
660/1100
660/1100

UNIT
RATE
vPer Metre
vPer Metre
vPer Metre
vPer Metre
Per Metre

G cable

Per Metre
Per Metre

G cable

Per Metre
Per Metre

G cable

Per Metre
Per Metre

C insulated PVC

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Per Doz.
Per Doz.
Per Doz.
Per Doz.

Per Doz.
Per Doz.
Per Doz.
Per Doz.
Each
Each
Each
th holder shade and
our lamp
Each
lamp nuts & bolts
Each
long half round Each
Each
Each
Each
Metre
Metre
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
ts 10 AMP
Each
s 30 AMP
Each
s 60 AMP
Each
Each
Each

ITEM
MATERIAL
24.143Three phase 4 wires, 400 volts: 3 x 80 Amps
24.144Electric shoe 3 pin 10/15 Amps
24.145Wall Shoe 3 pin 5 Amps
24.146Wall socket 3 pin 5 Amps
24.147Wall socket 3 pin 5 Amps without Shoe.
24.148Wall socket 3 pin 10/15 Amp open type
24.149Wall socket 3 pin 10/15 Amp recessed type
24.150Wall socket 3 pin 10/15 Amp with shoe
24.151Flouresent tube 40 watts
24.152Starter for Flourscent Tube 40 watts
24.153Kit kat fuses 500 volt 15/20 Amp
24.154Kit kat fuses 500 volt 30/35 Amp
24.155Kit kat fuses 500 volt 60/65 Amp
24.156Kit kat fuses 500 volt 100 Amp
24.157Kit kat fuses 500 volt 200 Amp
24.158Kit kat fuses 500 volt 300 Amp
24.159Kit kat fuses 500 volt 400 Amp
24.160Kit kat fuses 500 volt 500 Amp
24.161Leathoride paper
24.162Cooper nail 2\" / 3\"
24.163Cooper plates 600 x 600 x 3 mm (2' x 2' x 1/8\")
24.164Lightining arrestor Horn type
24.165Copper enamel wire No. 26 to 32
24.166Soldering and varnishing for A.C. ceiling fan
24.167Wooden Gutties
24.168Switch double control open type (5 Amp)
24.169Switch double control piano type (5 Amp)
24.170Switch double controil ring type recessed (5 Amp)
24.171Switch Piano type (5 Amp)
24.172Switch plate type recessed (5 Amp)
24.173Switch ring type (5 Amp)
24.174 Double pole 15/20 Amp {Iron/Alminum clad 500 volt main
switch with kit kat fuse}
24.175 Double pole 30/35 Amp {Iron/Alminum clad 500 volt main
switch with kit kat fuse}
24.176 Double pole 60/65 Amp {Iron/Alminum clad 500 volt main
switch with kit kat fuse}
24.177 Double pole 100 Amp {Iron/Alminum clad 500 volt main switch
with kit kat fuse}
24.178 Tr switch with kit kat fuse}
24.179 Tr switch with kit kat fuse}
24.180Tripple pole with neutral link 30/35 Amp main switch
24.181Tripple pole with neutral link 60/65 Amp main switch
24.182Tripple pole with neutral link 100 Amp main switch
24.183 Iron/Aluminum clad 500 volt main switch with tripple pole

and neutral link with HRC fueses: 60/65 Amps


24.184 Iron/Aluminum clad 500 volt main switch
and neutral link with HRC fueses:
100 Amps.
24.185 Iron/Aluminum clad 500 volt main switch
and neutral link with HRC fueses:
150 Amps.
24.186 Iron/Aluminum clad 500 volt main switch
and neutral link with HRC fueses:
200 Amps.
24.187 Iron/Aluminum clad 500 volt main switch
and neutral link with HRC fueses:
300 Amps.
24.188 Iron/Aluminum clad 500 volt main switch
and neutral link with HRC fueses:
400 Amps.
24.189 Iron/Aluminum clad 500 volt main switch
and neutral link with HRC fueses:
500 Amps.
24.190Thimble copper 60/65 Amp
24.191Thimble copper 100 Amp
24.192Thimble 150 Amp.
24.193Thimble copper 200 Amp
24.194Thimble copper 300 Amp
24.195Thimble copper 400 Amp
24.196Thimble copper 500 Amp
24.197G.I bend \" (15 mm) dia
24.198G.I bend \" (20 mm) dia
24.199G.I bend 1\" (25 mm) dia
24.200G.I bend 1\" (32 mm) dia
24.201G.I bend 1\" (40 mm) dia
24.202G.I. Bend 2\" dia (50 mm) dia
24.203G.I bend 3\" (80 mm) dia
Page 19

with tripple pole


with tripple pole
with tripple pole
with tripple pole
with tripple pole
with tripple pole

00 volt main

UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Job
Each
Kg
Each
Kg
each
Dozen
Each
Each
Each
Each
Each
Each
Each

500 volt main

Each

00 volt main

Each

volt main switch Each

in switch
in switch

th tripple pole

Each
Each
Each
Each
Each
Each

RATE

th tripple pole

Each

th tripple pole

Each

th tripple pole

Each

th tripple pole

Each

th tripple pole

Each

th tripple pole

Each
Each
Each
each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

ITEM
MATERIAL
24.204M.S. Bend \"
(15 mm) dia
24.205M.S. Bend \" (20 mm) dia
24.206M.S. Bend 1\" (25 mm) dia
24.207M.S. Bend 1\" (40 mm) dia
24.208M.S. Conduit Bend 1\" (32 mm) dia
24.209M.S. Conduit Bend 1\" (40 mm) dia
24.210M.S. Conduit Bend 2\" (50 mm) dia
24.211PVC Bend \" (12 mm) dia ordinary
24.212PVC Bend \" (20 mm) dia ordinary
24.213PVC Bend 1\" (25 mm) dia ordinary
24.214PVC Bend 1\" (30 mm) dia ordinary
24.215PVC Bend 1\" (40 mm) dia ordinary
24.216PVC Bend 2\" (50 mm) dia ordinary
24.217PVC Bend 3\" dia (75 mm) ordinary
24.218PVC Bend 4\" dia (100 mm) ordinary
24.219Inspection box \" (15 mm) dia
24.220Inspection box \" (20 mm) dia
24.221Inspection box 1\" (25 mm) dia
24.222M.S. Inspection box 1\" (32 mm) dia
24.223M.S. Inspection box 1\" (40 mm) dia to 3\" (80mm) dia
24.224Hooks for \" to 1\" dia pipe
1

24.225Hoo 4
24.226Hook for 2\" dia pipe
24.227Hook for 3\" dia pipe
24.228 M.S. Conduit pipe \"
(15 mm) dia
24.229M.S. Conduit pipe \" (20 mm) dia
24.230M.S. Conduit pipe 1\" (25 mm) dia
24.231M.S. Conduit pipe 1\" (32 mm) dia
24.232M.S. Conduit pipe 1\" (40 mm) dia
24.233M.S. Conduit pipe 2\" (50 mm) dia
24.234PVC pipe \" (12 mm) dia ordinary
24.235PVC pipe \" (20 mm) dia ordinary
24.236PVC pipe 1\" (25 mm) dia ordinary
24.237PVC pipe 1\" (30 mm) dia ordinary
24.238PVC pipe 1\" (40 mm) dia ordinary
24.239PVC pipe 2\" (50 mm) dia ordinary
24.240PVC Pipe 3\" dia (75 mm) ordinary
24.241PVC Pipe 4\" dia (100 mm) ordinary
24.242PVC Flexible Pipe \" (12 mm) dia
24.243G.I. pipe \" dia (15 mm i/d)
24.244G.I. Pipe \" dia (20 mm i/d)
24.245G.I. Pipe 1\" dia (25 mm i/d)
24.246G.I. pipe 1\" dia (32 mm i/d)
24.247G.I. pipe 1\" dia (40 mm i/d)

24.248G.I. pipe 2\" dia (50 mm i/d)


24.249G.I. pipe 3\" dia (75 mm i/d)
24.250G.I. Flexible Pipe \" (12 mm) dia
24.251G.I. Flexible Pipe \" (20 mm) dia
24.252G.I. Flexible Pipe 1\" (25 mm) dia
24.253G.I. Flexible Pipe 1\" (32 mm) dia
24.254G.I. Flexible Pipe 1\" (40 mm) dia
24.255G.I. Flexible Pipe 2\" (50 mm) dia
24.256G.I. Flexible Pipe 3\" (80 mm) dia
24.257G.I. Flexible pipe 4\" (100 mm)
24.258Screws 1\" (25 mm) long
24.259Screws 2\" (25 mm) long
24.260Screws 3\" (25 mm) long
24.261Screws 4\" (25 mm) long
24.262Screws 6\" (25 mm) long
24.263G.I reducing socket size 2 x \" (50 x 13 mm)
24.264G.I Reducing socket 2 x \" dia (50 x 20 mm)
24.265Boring \" dia
24.266G.I. Socket \" (12 mm) dia
24.267G.I. Socket \" (20 mm) dia
24.268G.I. Socket 1\" (25 mm) dia
24.269G.I. Socket 1\" (32 mm) dia
24.270G.I. Socket 1\" (40 mm) dia
24.271G.I. Socket 2\" (50 mm) dia
24.272G.I. Socket 3\" (80 mm) dia
24.273Brass Socket 1\" (40 mm) dia
24.274Brass Socket 2\" (50 mm) dia
24.275Brass Socket 4\" (100 mm) dia
24.276PVC Socket \" (12 mm) dia
Page 20

(80mm) dia

UNIT
RATE
Each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
Each
Each
Each
per doz.
per doz.
Each
Each
Each
Each
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
per mtr.
per mtr.
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr

Per Mtr
Per Mtr
per mtr.
per mtr.
per mtr.
per mtr.
per mtr.
per mtr.
per mtr.
each
Dozen
Dozen
Dozen
Dozen
Dozen
each
each
Metre
each
each
each
each
each
each
each
each
each
each
each

ITEM
MATERIAL
24.277G.I. Nipple \" (12 mm) dia
24.278G.I. Nipple \" (20 mm) dia
24.279G.I. Nipple 1\" (25 mm) dia
24.280G.I. Nipple 1\" (32 mm) dia
24.281G.I. Nipple 1\" (40 mm) dia
24.282G.I. Nipple 2\" (50 mm) dia
24.283G.I. Nipple 3\" (80 mm) dia
24.284Brass nipple 1\" dia (25mm)
24.285Brass Nipple 1\" dia (32 mm)
24.286Brass Nipple 1\" (40 mm) dia
24.287Brass Nipple 2\" (50 mm) dia
24.288Brass Nipple 4\" (100 mm) dia
24.289PVC Nipple \" (12 mm) dia
24.290Brass Check nut \" (12 mm) dia
24.291Brass check nut 1\" (40 mm)
24.292Brass check nut 1\" (25 mm)
24.293Brass check nut 1\" (32 mm)
24.294Brass check nut 2\" (50 mm)
24.295Brass check nut 4\" (100 mm)
24.296Check Nuts \" (12 mm) dia
24.297Check Nuts \" (20 mm) dia
24.298Check Nuts 1\" (25 mm) dia
24.299Check Nuts 1\" (32 mm) dia
24.300Check Nuts 1\" (40 mm) dia
24.301Check Nuts 2\" (50 mm) dia
24.302Check Nuts 3\" (80 mm) dia
24.303M.S Box 4\" x 4\" (100 x 100 mm)
24.304M.S Box 7\" x 4\" (175 x 100 mm)
24.305M.S Box 9\" x 4\" (225 x 100 mm)
24.306M.S Box 8\" x 10\" (200 x 250 mm)
24.307M.S Box 10\" x 12\" (250 x 300 mm)
24.308M.S Box 12\" x 14\" (300 x 350 mm)
24.309Angle iron board including paints (9\"x9\"x1\")
24.310Angle Iron board including paint (9\"x12\"x1\")
24.311Angle Iron board including paint (10\"x12\"x1\")
24.312Angle Iron board including paint (12\"x15\"x1\")
24.313Angle Iron board including paint (12\"x18\"x1\")
24.314Angle Iron board including paint (10\"x15\"x1\")
24.315Anle Iron board including paint (15\"x18\"x1\")
24.316Copper strip 1\" x 1/8\" x 14\" (40 x 3 x 350 mm)
24.317Copper strip 14\" x 2\" x 1/8\" to 3/16\" (350 x 50 x 3 mm to
24.318Copper strip 14\" x 2\" x 1/4\" (350 x 50 x 6 mm) to 6mm
24.319Rag bolts 9\" x 5/8\" (225 x 16 mm)
24.320Reg bolts 12\" x 5/8\" (300 x 16 mm)
24.321Eye bolts

24.322Eye bolts (bigger size) for straining posts, stiffening post


24.323PVC/weather proof cable 3/0.029\" (3/0.74 mm) Single core
24.324PVC/weather proof cable /0.029\" (7/0.74 mm) Single core
24.325PVC/weather proof cable /0.036\" (7/0.91 mm) Single core
24.326PVC/weather proof cable /0.044\" (7/1.12 mm) Single core
24.327Nut & Screw
24.328Straining Screw for electric pole
24.329Sal wood casing for wiring
24.330Wooden strip casing
24.331Insulated cleat (small)
24.332Insulated cleat (big size)
24.333Leather or wooden cleats
24.334M.S Hooks
24.335M.S bar hook 3/8\" (!0 mm) dia
24.336Canopy nipple & hook
24.337Hook 5/8\" (16 mm) with nut & bolts
24.338Girder clamp hook 5/8\" (16 mm)
24.339PVC bushes \" (12 mm) dia
24.340Glazed porcelain (Imported)
24.341Glazed Porcelain counter weight with accessories
24.342VIR/PVC cable 3/0.29
24.343Brass lamp holder
24.344Brass lamp holder
24.345Brass lamp holder
24.346Double cone reflector
24.347Switch ring type
24.348Switch 10/15 Amp
24.349Switch 10/15 Amp. recessed
Page 21

UNIT
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
350 x 50 x 3 mm to each
6 mm) to 6mm
each
each
each
Each

RATE

, stiffening post
m) Single core
) Single core
) Single core
) Single core

Each
per mtr.
per mtr.
per mtr.
per mtr.
Each
Each
Per mtr.
Per % mtr.
each
each
each
each
each
Per Job
each
each
each
each
each
per mtr.
each
each
each
each
each
each
each

ITEM
24.350Plug 3 pin and switch (combined) 10/15 Amp.
24.351Plug 3 pin and switch (recessed) 10/15 Amp.
24.352Pole mounted street light holder shade and glass
24.353Frame with holder
24.354Frame set
24.355Round tube 32 watts
24.356Starter
24.357Choke
24.358Holder
24.359Base patti for tube light
24.360Ball bearing size (6201, 6202, 6203)
24.361Plastic cover
24.362Handle chromium plated for iron box
24.363Nut & bolts \" (12 mm) dia 1\" (40 mm) long
24.364T - Iron \" x 1\" x 1\" x 5\"
24.365Clamps
24.366Steel channel 75 x 40 x 3 mm
24.367steel plate 3\"x1\"x\" )75x40x40 mm)
3

24.368Steel plate 3\"x / x / (75 x


4 4
24.369Bolts and nuts 5/8\" dia (16 mm)
24.370Double clamp for anchor rod henley type for pole
24.371Double clamp 9\" dia (225 mm)
24.372Clamps with bolts & nuts etc. for street pole
24.373Clamp double for erection of house service pipe Henley
24.374Clamp 2\" dia (50 mm)
24.375Steel clamp \" dia (12 mm)
24.376G.I clamp (small)
24.377G.I. Clamp (large)
24.378Pole clamp with bolt & nuts for street light pole
24.379Shakle insulator
24.380M.S bolts for suport
24.381Copper wire No.2 to 10
24.382G.I wire (all size)
24.383Cut out
24.384Wooden & leather cleats
24.385Vapour mercury lamp 125 watt with choke set
24.386Vapour mercury lamp 250 watt with choke set
24.387Silver paint
24.388G.I Nuts & Bolts 2\" long \" ( 50 mm x 13 mm)
24.389G.I Nuts & Bolts 1\" x \" long (40 x 6 mm)
24.390Copper wire No.16 & 20 SWG
24.391Copper Wire Old
24.392Enemal wire No.26 SWG to 32 SWG
1

24.393Copper tap 1\" to 2\" x / \"


8
24.394Copper rod 1\" dia (25 mm)
24.395Copper nail (small)
24.396Copper stapple
24.397Soldering and Vernishing
24.398Salt
24.399Loop wire 4 loop 3/0.029 (3/0.74 mm)
24.400Knob with shaff and plate
25.001Locking arrangements with sliding bolt 1' long and 1\" dia
25.002Hard wood stair railing
25.003M.S. Channels
25.004Steel beam
25.005Steel chisel
25.006Grating 3/4\"x3/4\" size
25.007M.S. Box section of 16 SWG 1\" x 3\" hand rail
25.008Conduit pipe 2\" dia including specials
25.009Roller 3\" dia
25.010Rivets with heads 2\" long
25.011Rivets 1\" long
25.012Locking arrangement collapsible gate
25.013 Handles 12\" long of 3/4\"x1/4\" steel channels for collapsibl
25.014GI sheet 24 SWG
25.015GI bracket for railing shutter
25.016GI Holdfast for railing shutter
25.017GI Pipe 1\" dia (light quality)
25.018Handle for railing shutter
25.019GI spring for railing shutter
25.020Rolling gear for railing shutter
25.021Iron Holdfast for steel windows
25.022GI pipe 2\" dia (light quality)

MATERIAL

pipe Henley

UNIT
each
each
each
Per Job
Per Job
each
each
each
each
each
each
each
each
each
P.kg
P. Kg.
P.Kg.
P.Kg.
per kg
Each
Each
Each
each
each
each
each
each
each
each
each
each
per kg
per kg
each
each
each
each
P.Gln
each
each
per kg
per kg
per kg

RATE

long and 1\" dia

nnels for collapsibl

Page 22

per kg
per kg
each
each
each
per kg
Rft
each
Each
Rft
Kg
Kg
P.Kg.
P.Kg.
P.Rft
P.Ft
each
Each
Each
Each
Each
P.Kg.
Each
Each
P. Rft
Each
Each
Each
Each
P. Foot

ITEM

MATERIAL

25.023Win 4
16
25.024Brass casement handle 6\" for steel windows
25.025Mild steel casement stay 15\" long for steel windows
25.026Wooden strips for fixing glass pans
25.027Steel glazing clips for fixing glass panes
25.028Glass panes 2 mm thick
25.029Glass panes 2.5 mm thick
25.030Glass panes 3 mm thick
25.031Glass panes 4 mm thick
25.032Glass panes 5 mm thick
25.033M.S. moulded tubular pipe of 18 SWG
25.034Brass hinges (4\" long)
25.035Brass Handles (4\" long)
25.036U' shapped rubber linning (\" thick)
25.037Wire gauze galvanized 24 SWG (12x 12 mesh)
25.038 x M.S square box of 16 SWG for fixing wire gauge
25.039C.P. tower bolt (225 mm long)
25.040Brass handle special type for steel windows
25.041G.I. Stay for windows
1
25.042Grill of M.S. flat \"x8

25.043Cost of flaps including hinges for G.I. Pipes


25.044Steel grating
25.0451 ft. long M.S. U-Clamp 3/4\" dia threaded at both ends incl
25.046Painting small detached articles not exceding 1\" sft.
3
25.047Aluminum frame 100x20mm4

25.048Aluminum frame 100x40mm (4 x1\")


25.049Aluminum frame 60x40mm (1\" x 2\")
3
25.050Aluminum frame 50x20mm 4

25.051Aluminum leaf edging for aluminium windows


25.052Tinted glass 5mm thick
25.053Aluminum tringular gola and gasket
25.054Pivot for aluminium doors
25.055Alimuninum tower bolt 9\" long
25.056locking arrangement
25.057Handle Large
25.058Rubber gasket for Aluminium Windows
25.059Latch for Aluminium Windows
25.060Steam Coal
26.0017 Strand barbed wire
26.002Anti termite (Heptachlore)
26.003Cane Singapore

26.0043/16\" dia washers for straining posts, stiffening posts & in


26.005Cost of bamboo 10' to 12' long
26.006Cost of iron shoes for survey Jhandy
26.007Cost of red cloth for survey Jhandy
26.008Cost of ordinary wood for pegs
26.009Hooks for fixing iron gauges
26.010Filling cement bags with coal
26.011Cost of manure
26.012Polythene sheet of 300 gauge (0.003 thick)
26.013Soap
26.014Eye bolt
26.015Primer (Zinc)
26.016Weather Sheet Paint

Page 23

l windows

ire gauge

UNIT
Each
Each
Each
P.Rft
Each
P. Sft.
P. Sft.
P. Sft.
P. Sft.
P. Sft.
P.Kg.
Each
Each
P. Rft
P.Sft.
P. Kg.
Each
Each
Each

P. Sft.
Each
P.Sft
at both ends incl Each
ing 1\" sft.
Each
Rft
Rft.
Rft.
Rft.
Rft.
Sft.
Rft.
each
each
each
Rft
Rft.
each
P. Kg.
P.Kg.
P-Ltr
Per Kg.

RATE

ffening posts & in Dozn


Each
Each
Each
P. Cft.
Dozen
Per Kg.
per Cart
P.Kg.
P. Kg.
Each
P. Kg.
P. Lt

CHAPTER NO. 26

MISCELLANEOUS
DESCRIPTION OF ITEM:

1 Notice Board made of cement sand mortar


Note :
The board is to be of cement plaster \" (12 mm)
1\" (25mm) thick beading

Detail
Qty
Size of Board 4' x 5' = 20 Sft.
4' (1.22m) x 5' (1.53m) = 20 Sft. (1.87 Sqm)
MATERIAL
1
2

Sand
Cement

1.2
.3

Total
Contractor's Profit &20.0 Percent
Total
LABOUR
1
2

Mason
Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

.75
1

ITEM RATE
Labour Rate Per Sft.
Labour Rate Per Sqm
Composite Rate Per Sft.
Composite Rate Per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 1

cement plaster \" (12 mm) thick with 2\" (50

Cft
bag

Unit Rate Per Sft.


Rate
Per Unit

Amount

0.0 %Cft.
0.00 per bag

No.
No.

0.00 Per day


0.00 Per day

Say
Say

0.0
0.0
0.0
0.0

Fixing handles to iron hammers.

Detail
Qty
FOR 12 NOS.
LABOUR
1

Carpenter
Sundries
Percent
Total
Contractor Percent
Total for 12 Nos.

1.25

ITEM RATE
Labour Rate Per Each

Rs.

Page 2

Unit Rate Per Each


Rate
Per Unit

Nos.

Amount

0.00 Per day

Say

0.0

3 Providing and fixing barbed wire fencing with 4 horizontal and 2 numb
(1:2:4) straining posts 7'x9\"x9\" (2.14m x 225mm) at 100' (30m) cen
x 15 mmx 50mm) at 50' (15m) interval and intermediate posts 7'x5\"x5\
steel, its fabrication and placing of steel reinforcement, eye bolt,

Detail
Qty
MATERIAL FOR 48 RFT.
1
R.C.C. posts (1:2:4) straining
posts = x 7' x 0.75
2 Cft.
Collar around the straining posts
x (1.5)2xxx22/7=
.44 Cft.
Stiffening post 6\"x6\"
x7xx
.88 Cft.
Intermediate posts 5\"x5\"
5x7x5/12x5/12
6.07 Cft.
Deduction for portion of posts
xxx
-.14 Cft.
9.25 Cft.
2
M.Steel with binding wire straining
posts
Vertical bars \" dia14
stirrups \" = x 812
Stiffening posts
3
Vertical b 8
14
stirrups = x 8 x 28
Intermediate Posts
Vertical bars 3/8\" d140
Stirrups \" = 5x8x5/67
weight \" 14..0' @ 0
9.368 Lbs.
\" 12+8+67 = 87 ft.
14.53 Lbs.
3/8\" 14+140 = 154' @
57.75
Total
81.648
add wastage 5%
4.082
85.73

9.25

38.89
85.73

Page 3

th 4 horizontal and 2 number cross wires fixed


x 225mm) at 100' (30m) centre to centre stiffenin
termediate posts 7'x5\"x5\" at 8' centre to centr
reinforcement, eye bolt, washers, etc. complet

Unit Rate for 100 Cft.


Rate
Per Unit
Amount

Cft.

0.00 Per C -

Kg.
Lbs.

0.00 Per K -

B / F :
MATERIAL
3

7 Strand barbed wires


Horizontal 4x48 =
cross wire 2x6x9
Add 5% wastage

192 Rft.
108 Rft.
300 Rft.
15 Rft.
315

Total
315 Rft. @ 1.25 Cwt/450 Yards
Eye bolts (bigger size)
For straining posts
4 Nos
For stiffening posts
2 Nos
For intermediate posts
20 Nos
Total
26 No
3/16\" washers
For straining posts
4 Nos
For stiffening posts
2 Nos
For intermediate posts
20 Nos
Total
26 No
Total
Contractor's Profit &20.0 Percent #
Total
Total for 100 Rft.
2462.21 x 100
48

LABOUR
i)
R.C.C. work (Item 6a(ii) Chap. 6)
ii) Fabrication of steel work 9Item 9(b) Chap. 6)
iii) Blacksmith for wire fencing
erection.
iv)
Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate Per LM
Composite Rate 100 Lft.
Composite Rate Per LM

14.82

26

26

Rs.

9.25
38.89
.75
2

Rs.
Rs.
Rs.
Rs.

4 Supplying bamboo jhandies 10' to 12' (3m to 2054m) with iron shoes an

Detail
Page 4

Kg

0.00 Per Kg.

Nos.

0.0 Each

Nos

0.0 Dozen

Cft.
Kg.

0.00 Per Cft.


0.00 Per Kg.

No.
Nos.

0.00 Per day


0.00 Per day

Say
Say
Say
Say

2054m) with iron shoes and flag 15\" (375 mm) s

0.0
0.0
0.0
0.0

Unit Rate Each

Qty
MATERIAL
1
2

Cost of bamboo
Cost of iron shoes
Cost of red cloth
Total
Contractor's Profit &20.0 Percent
Total

1
1
1

LABOUR
1
2

Carpenter
Sewing charges
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATE
Labour Rate for Each
Composite Rate for Each

.04

Page 5

Rate
Per Unit

No.
No.
No.

No.
L.S.

Amount

0.0 Each
0.0 Each
0.0 Each

0.00 Per day

Rs.
Rs.

Say
Say

0.0
0.0

Supplying wooden pegs for leveling 1\" (40mm) dia 6\" (150

Detail
Qty
MATERIAL FOR 300 NOS.
Cost of wood
Contractor 20.0 Percent
Total for 300 Nos.
Total for 100 Nos.

0.78

LABOUR
1

Carpenter
Sundries
Percent
Total
Contractor Percent
Total for 300 Nos.
Total for 100 Nos.

.5

ITEM RATE
Labour Rate Per 100 Nos.
Composite Rate Per 100 Nos.

Rs.
Rs.

Page 6

ng 1\" (40mm) dia 6\" (150mm)

long

Unit Rate Per 100 Nos


Rate
Per Unit

Amount

Cft.

0.00 Per Cft.

No.

0.00 Per day

Say
Say

0.0
0.0

Supplying wooden pegs for alignment 2\" to 3\" (50 to 75mm)

Detail
Qty
MATERIAL
Cost of wood
Contractor 20.0 Percent
Total

LABOUR
1

Carpenter
Sundries
Percent
Total
Contractor Percent
Total

.4

ITEM RATE
Labour Rate Per 100 Nos.
Composite Rate Per 100 Nos.

Rs.
Rs.

Page 7

ent 2\" to 3\" (50 to 75mm) dia 9\"

Unit Rate Per 100 Nos.


Rate
Per Unit

(225mm)

Amount

Cft

0.00 Per Cft.

No.

0.00 Per day

Say
Say

long

0.0
0.0

7 Fixing enamalled iron gauges flush with masonry including cost of hoo

Detail

Unit Rate Per Lft. / Assume


Qty

MATERIAL
1

Hooks

Total
Contractor's Profit &20.0 Percent
Total for 20 Lft.
LABOUR
1
2

Mason
Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 20 Lft.

1
1

ITEM RATE
Labour Rate Per Lft.
Labour Per LM
Composite Rate Per Lft.
Composite Rate Per LM

Rs.
Rs.
Rs.
Rs.

8 Placing boundary pillars in position including digging pits.

Detail
Qty
LABOUR FOR 30 NOS.
1
2

Mason
Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 30 Nos.

1
1

ITEM RATE
Labour Rate Each

Rs.

Page 8

onry including cost of hooks.

nit Rate Per Lft. / Assumed for 20 Lft.


Rate
Per Unit

Nos.

0.0

Amount

Each

No.
No.

0.00 Per day


0.00 Per day

Say
Say
Say
Say

0.0
0.0
0.0
0.0

ing digging pits.

Unit Rate Per Each


Rate
Per Unit

No.
No.

Amount

0.00 Per day


0.00 Per day

Say

0.0

9 Fixing mainline iron distance marks in position including making 1:3;


size of block 10x14\"x15\" = 14.58 Cft.

Detail

Unit Rate Per Each / Assume


Qty

MATERIAL
1
2
3

LABOUR
1
2

Cement
Sand
Aggregate stone
Total
Contractor's Profit &20.0 Percent
Total

1.8
6.75
13.5

Mason
Coolies

1
2

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.

Page 9

tion including making 1:3;6 cement concrete blo

nit Rate Per Each / Assumed for 10 Nos.


Rate
Per Unit

Amount

Bags
Cft.
Cft.

0.00 per bag


0.00100 Cft.
0.00per Cft.

No.
No.

0.00 Per day


0.00 Per day

Say
Say

0.0
0.0

10 Cutting Pipes upto 2\" (50mm) dia.

Detail
Qty
LABOUR FOR 30 CUT
1
2

Blacksmith
Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 30 Nos.

1
1

ITEM RATE
Labour Rate Per Cut

Rs.

11 Cutting Pipes above 2\" (50mm) dia.


Detail
Qty
LABOUR FOR 25 CUTS
1
Blacksmith
2
Coolies

1.75
1.25

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 25 Nos.
ITEM RATE
Labour Rate Per Cut

Rs.

Page 10

Unit Rate Per Cut


Rate
Per Unit

No.
No.

0.00 Per day


0.00 Per day

Nos.
Nos.

Amount

Say

0.0

Unit Rate Per Each


Rate
Per Unit

Amount

0.00 Per day


0.00 Per day

Say

0.0

12 Threading pipe ends 1\" to 4\" (40 mm to 100 mm) dia

Detail
Qty
LABOUR FOR 30 NOS.
1
2

Blacksmith
Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 30 Nos.

1.5
1

ITEM RATE
Labour Rate Per Each End

13 Assembling 1\" (40mm)

Rs.

dia pressure pipes

Detail
Qty
LABOUR FOR 800 LFT.
1
Fitter Grade II
2
Coolies

1
1.5

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 800 Lft.
ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate Per Lm

Rs.
Rs.

Page 11

00 mm) dia

Unit Rate Per Each End


Rate
Per Unit

Nos.
No.

0.00 Per day


0.00 Per day

Amount

Say

0.0

Unit Rate Per 100 Lft.


Rate
Per Unit

Amount

No.
Nos.

0.00 Per day


0.00 Per day

Say
Say

0.0
0.0

14 Boring and fixing 1\"

(40mm)

dia pressure pipe

Detail
Qty
LABOUR FOR 40 LFT.
a)

b)

c)

In ordinary soil
Fitter 1.00
Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 40 Lft.
Labour Rate Per Lft.
Labour Rate Per Lm.
In clay (For 40 Lft.)
Fitter 1.00
Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 40 Rft.
Labour Rate Per Lft.
Labour Rate Per Lm.

3.5

Rs.
Rs.

Rs.
Rs.

In Shingle (For 40 Lft.)


Fitter 1.00
Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 40 Rft.

12.5

ITEM RATE
Labour Rate Per 1 Lft.
Labour Rate Per Lm.

Rs.
Rs.

Page 12

Unit Rate Per Lft.


Rate

No.
Nos.

Per Unit

Amount

0.00 Per
day
0.00 Per day

No.
Nos.

0.00 Per
day
0.00 Per day

No.
Nos.

Say
Say

0
0

Say
Say

0
0

0.00 Per
day
0.00 Per day

Say

15 Repair to hand pumps pulling out and

re-fitting.

Detail
Qty
LABOUR FOR 50 LFT
1
2

Blacksmith
Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 50 Rft.

.5
2

ITEM RATE
Labour Rate Per Lft.
Labour Rate Per Lm.

Rs.
Rs.

16 Fixing Hand pump (machine only)

Detail
Qty
LABOUR
1

Blacksmith
Sundries

.2
Percent

Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Each

Rs.

Page 13

Unit Rate Per Lft.


Rate
Per Unit

No.
Nos.

Amount

0.00 Per day


0.00 Per day

Say
Say

Unit Rate Per Each


Rate
Per Unit

No.

0.0
0.0

Amount

0.00 Per day

Say

0.0

17 Washing Niwar of Bed

Detail
Qty
MATERIAL
1

Soap etc.

.42

Total
Contractor's Profit &20.0 Percent
Total
LABOUR
1

Coolies (washerman)
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATE
Labour Rate Per Bed
Composite Rate Per Bed

.75

Page 14

Unit Rate Per Bed


Rate
Per Unit

Kg.

Amount

0.00 P. Kg.

No.

0.00 Per day

Rs.
Rs.

Say
Say

0.0
0.0

18 Washing

Durries

Detail
Qty
MATERIAL

LABOUR
1

Cost of Soap
Total
Contractor's Profit &20.0 Percent
Total

Coolies (washerman)

Total
Sundries

Percent

Contractor's Profit & Percent


Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate Per 100 Sft.
Composite Rate Per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 15

Unit Rate Per 100 Sft.


Rate
Per Unit

Amount

Kg.

0.00 P. Kg.

Nos.

0.00 Per day

Say
Say
Say
Say

0.0
0.0
0.0
0.0

19

Recaning Chairs.

(i)

Office chair single caning seat only.

Detail
Qty
MATERIAL
1

Cane

3.00 Ozs (0.085 Kg

Total
Contractor's Profit &20.0 Percent
Total
LABOUR
1

Canners

.35

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 16

Unit Rate Per Each


Rate
Per Unit

0.0 Kg.

Amount

No.

0.00 Per day

Say
Say

0.0
0.0

19 (iOffice chairs double caning seat only

Detail
Qty
MATERIAL
1

Cane (Singapur)

4 Ozs. (0.12 Kg.

Total
Contractor's Profit &20.0 Percent
Total
LABOUR
1

Canners

.45

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.

Page 17

Unit Rate Per Each


Rate
Per Unit

Amount

0.0 Kg.

No.

0.00 Per day

Say
Say

0.0
0.0

19 (iOffice chairs single caning back only

Detail

Unit Rate Per Each / Assume


Qty

MATERIAL
1

Cane (Singapur)

1.5 Ozs (0.043 Kg

Total
Contractor's Profit &20.0 Percent
Total
LABOUR
1

Canners

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 18

nit Rate Per Each / Assumed for 8 Nos.


Rate
Per Unit

0.0 Kg.

Amount

Nos.

0.00 Per day

Say
Say

0.0
0.0

19 (iOffice chairs double caning back only

Detail

Unit Rate Per Each / Assume


Qty

MATERIAL
1

Cane (Singapur)

.23

Total
Contractor's Profit &20.0 Percent
Total for 5 Nos.
LABOUR
1

Canners
Total
Sundries

2
Percent

Contractor's Profit & Percent


Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 19

nit Rate Per Each / Assumed for 5 Nos.


Rate
Per Unit

Kg.

0.0 Kg.

Amount

Nos.

0.00 Per day

Say
Say

0.0
0.0

19 (vEasy chairs single caning seat only

Detail
Qty
MATERIAL
1

Cane 0.114
Total
Contractor's Profit &20.0 Percent
Total

LABOUR
1

Canners
Total
Sundries

.25

Percent

Contractor's Profit & Percent


Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Page 20

Unit Rate Per Each


Rate
Per Unit

Kg.

0.0

Amount

Kg.

No.

0.00 Per day

Rs.
Rs.

Say
Say

0.0
0.0

19 (vEasy chairs double caning seat only

Detail
Qty
MATERIAL
1

Cane 0.17
Total
Contractor's Profit &20.0 Percent
Total

LABOUR
1

Canners

.7

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 21

Unit Rate Per Job


Rate
Per Unit

Kg.

0.0 Kg.

Amount

No.

0.00 Per day

Say
Say

0.0
0.0

19 (vEasy chairs, single caning only back and seat in one piece.

Detail
Qty
MATERIAL
1

Cane

12 Ozs (0.70 Kg.

Total
Contractor's Profit &20.0 Percent
Total
LABOUR
1

Canners

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 22

one piece.

Unit Rate Per Each


Rate
Per Unit

0.0 Kg.

Amount

No.

0.00 Per day

Say
Say

0.0
0.0

19 (vEasy chairs double caning back and seat in one piece or couches (caned area
about 16 Sft. 1.50 Sqm)

Detail
Qty
MATERIAL
1

Cane

32.00 Ozs (1.70 Kg

Total
Contractor's Profit &20.0 Percent
Total
LABOUR
1

Canners

1.5

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 23

ece or couches (caned area

Unit Rate Per Each


Rate
Per Unit

Amount

0.0 Kg.

Nos.

0.00 Per day

Say
Say

0.0
0.0

20

Making and fixing hat pegs ordinary

Detail
Qty
MATERIAL
1

Shisham wood 1x2.5'x.0.4' x 0.1'=00.1


3x0.75' x 0.2' x 0.1'
=0.04
Total
.145
Wastage 20%
.029
0.174 Cft
Cost of Polish & Nails
L.S.
Total
Contractor's Profit &20.0 Percent
Total

.17

Carpenter
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

.18

LABOUR
1

ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 24

Unit Rate Per Each


Rate
Per Unit

Cft.

Amount

0.0 Cft

No.

0.00 Per day

Say
Say

0.0
0.0

21. Weaving charpoys

Detail
Qty
LABOUR
1

Coolies Skilled

.65

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
Say
ITEM RATE
Labour Rate Per Each

22

Rs.

Sweeping Chimneys
Detail

Unit Rate Per Each / Assume


Qty

MATERIAL
Rope, rags, etc.
Contractor's Profit &20.0 Percent

L.S

Total
LABOUR
Coolies Unskilled

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each 13.20+181.50
12

Rs.
Rs.

Page 25

No.

Unit Rate Per Each


Rate
Per Unit

Amount

0.00 Per day

Say

nit Rate Per Each / Assumed for 12 Nos.


Rate
Per Unit

0.0

0.0

Amount

Nos.

0.00 Per day

Say
Say

0.0
0.0

23. Picture, railing including making, fixing and painting

Detail

Unit Rate Per Lft. / Assume


Qty

MATERIAL FOR 20 LFT.


1
2
3
4

LABOUR
1
2

Deodar wood for 0.3' x 0.1' x 1.5' = 0.45


.5
+ coastage 10% = 0.05
Paint
0.38 / 0.04 Gallon
Nails
.006
Brush
.05
Total
Contractor's Profit &20.0 Percent
Total
Carpenter
Painter
Total
Sundries

1
.03
Percent

Contractor's Profit & Percent


Total
ITEM RATE
Labour Rate Per Rft.
Labour Rate Per Metre
Composite Rate Per Rft.
Composite Rate Per Metre 297.82 + 211.87
12

Rs.
Rs.
Rs.
Rs.

Page 26

nit Rate Per Lft. / Assumed for 20 Lft.


Rate
Per Unit

Cft

0.00 Per Cft.

Kg.
No.

0.00 Per Gallon


0.00 Per Kg.
0.0 Each

No.
No.

0.00 Per day


0.00 Per day

Say
Say
Say
Say

Amount

0.0
0.0
0.0
0.0

24. Cutting fuel wood from plantation

Detail
Qty
Analysis for 15 Mds. (560 Kg.)
LABOUR
1

Coolies

1.25

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per 100 Kg.

25. Splitting fuel wood

Detail
Qty
LABOUR FOR (385 Kg.)
1

Coolies Unskilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 385 Kg.

1.8

ITEM RATE
Labour Rate Per 100 Kg.

Rs.

Page 27

Unit Rate Per 100 Kg.


Rate

Nos.

Per Unit

Amount

0.00 Per day

Rs.

Say

0.0

Unit Rate Per 100 Kg.


Rate

Nos.

Per Unit

Amount

0.00 Per day

Say

0.0

26

Burning charcoal including loading unloading and repairing

Detail

LABOUR FOR 100 MAUNDS (3732 KG.)


1
2
3
4

Coolies for repairing kiln


Coolies for loading & unloading
wood
Coolies skilled
Mason for repairing kiln
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATE
Labour Rate Per 100 Kg.
27. Filling cement bags with coal and sewing including cost of string.

Detail

MATERIAL FOR 500 CFT.


Filling cement bags with coal
Contractor's Profit &20.0 Percent
Total
LABOUR
1

Coolies Unskilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate Per 100 Cft.
Composite Rate Per Cum

Page 28

ng unloading and repairing kiln

Unit Rate Per 100 Kg.


Rate
Qty

Per Unit

Amount

3 Nos.

0.00 Per day

15 Nos.
8 Nos.
1 No.

0.00 per day


0.00 per day
0.00 per day

Rs.

Say

0.0

cost of string.

Qty

Unit Rate Per 100 Cft.


Rate
Per Unit

L.S

0.0

10.25 Nos

Rs.
Rs.
Rs.
Rs.

Amount

0.00 Per day

Say
Say
Say
Say

0.0
0.0
0.0
0.0

28. Supply manure (capacity of cart 200 ft. or 0.57 cum)

Detail
Qty
MATERIAL
1

Cost of manure

Total
Contractor's Profit &20.0 Percent
Total
LABOUR
1

Cart with cartman


Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

.25

ITEM RATE
Labour Rate Per Cart Load
Composite Rate Per Cart Load

29

Rs.
Rs.

Washing punkha frills.


Detail
Qty

LABOUR
1

Washerman Cooly Skilled

.2

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Each

Rs.

Page 29

Unit Rate Per Cart Load


Rate
Per Unit

Amount

Cart

0.00 per Cart

Nos

0.00 Per day

No.

Say
Say

0.0
0.0

Unit Rate Per Each


Rate
Per Unit

Amount

0.00 Per day

Say

0.0

30

Washing

a) Table Cloth

Detail
Qty
LABOUR FOR 10 NOS.
Washerman Cooly Skilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 10 Nos.

.5

ITEM RATE
Labour Rate Per Each

b)

Rs.

Napkins, dusters etc.

Detail
Qty
LABOUR FOR 15 NOS.
Washerman Cooly Skilled

.5

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 15 Nos.
ITEM RATE
Labour Rate Per Each

Rs.

Page 30

Unit Rate Per Each


Rate
Per Unit

No.

0.00 Per day

No.

Amount

Say

0.0

Unit Rate Per Job


Rate
Per Unit

Amount

0.00 Per day

Say

0.0

31

Hoisting and placing sleepers for centring, including carriage within

Detail
Qty
LABOUR FOR 40 NOS.
1
2

Mason
Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 40 No.s

.5
3

ITEM RATE
Labour Rate Per Each

Rs.

32. Dismantling sleeper from centring including stacking within one chain

Detail
Qty
LABOUR FOR 80 SLEEPERS
1
2

Coolies (skilled)
Coolies (unskilled)
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

1
7

ITEM RATE
Labour Rate Per Each

Rs.

Page 31

including carriage within one chain.

Unit Rate Per Each


Rate
Per Unit

No.
Nos.

0.00 Per day


0.00 Per day

Amount

Say

0.0

ng within one chain

Unit Rate Per Each


Rate
Per Unit

No.
Nos.

0.00 Per day


0.00 Per day

Say

Amount

0.0

33. Dredging sumps

Detail
Qty
LABOUR
1

Coolies Unskilled
Sundries
Percent
Total
Contractor's Profit & Percent
Total

3.75

ITEM RATE
Labour Rate Per Shift

Rs.

34. Fixing 'U' bolt in masonry or concrete including leveling and tying for fixi
post.
Detail
Qty

LABOUR FOR 12 NOS.


1
Mason
2
Blacksmith
3
Cooly

1
1
1

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 12 Nos.
ITEM RATE
Labour Rate Per Each

Rs.

Page 32

Unit Rate Per Shift


Rate

Nos.

Per Unit

Amount

0.00 per day

Say

0.0

eveling and tying for fixing angle iron

No.
No.
No.

Unit Rate Per Each


Rate
Per Unit

Amount

0.00 per day


0.00 per day
0.00 per day

Say

0.0

35 Bailing out water


a) By hand

Detail
Qty
LABOUR
1

Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATE
Labour Rate Per 1000 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Page 33

Unit Rate Per 1000 Cft.


Rate
Per Unit

Nos.

Amount

0.00 per day

Say

0.0

35 b) By pump (Rate including cost of pump P.O.L etc. and operational charges)
Detail

Analysis for 800 Cft.


MATERIAL
i)

Depreciation
Cost of pump set 6\"x5\" with 15 HP
diesel engine.
0
Anticipated life of p10000
Residual Charges
0
1/6 x
Rate of depriciation/hour00
10000
Total
Contractor's Profit &20.0 Percent
Total
ii)
Operation charges
LABOUR FOR 800 CFT.
1
Driver
Cooly
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
Rate Per Hour =
296.45
8
iii)
P.O.L Charges Etc.
H.S. Diesel Oil
0.6 / Ltr Per Hour =0
4.8
Mobil Oil
Cotton Waste, Grease & Packing etc.
Total
Contractor's Profit & Percent
Total
Rate Per Hour =
148.5
8
iv) Accessories, repair and replacement portion
(maintenance charges etc.)
ITEM RATE
Labour Rate Per 1000 Cft.
Labour Rate Per Cum
Composite Rate Per 1000 Cft.
Composite Rate Per Cum.

Hours
= 0
-

Rs.

37.06

Litre

Rs.

18.56

Page 34

and operational charges)


Unit Rate Per 1000 Cft.
Rate
Per Unit
Amount

Qty

1 No.
1 No.

Rs.

37.06

4.80 Litre
1.00 Litre
L.S.

Rs.

18.56

0.00 per d 0.00 per d -

0.00Per Li 0.00Per Li -

L.S.
Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.0
0.0
0.0
0.0

36

Drilling holes in R.C. trough

Detail
Qty
LABOUR FOR 12 NOS.
1
2

Blacksmith
Cooly
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total for 12 Nos.

1
1

ITEM RATE
Labour Rate Per No.

Rs.

Page 35

Unit Rate Per No.


Rate
Per Unit

No.
No.

0.00 per day


0.00 per day

Say

Amount

0.0

37 Supplying and Laying polythene sheet over D.P.C., under floor and on
i)

300 Gauge (0.003\" thick)

Detail

Unit Rate Per Sft. / Assume


Qty

MATERIAL
1

LABOUR
1

Polythene of (0.003 thick) size 100 Sft.


1.5
Add 5%overlap
= 5%
.08
1.58 Lbs (0.717 Kg
Contractor's Profit &20.0 Percent
Total

Cooly (skilled)

.15

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Sft.
Labour Rate Per Sqm.
Composite Rate Per Sft.
Composite Rate Per SQm.

Rs.
Rs.
Rs.
Rs.

Page 36

.P.C., under floor and on roof etc.

nit Rate Per Sft. / Assumed for 100 Sft.


Rate
Per Unit
Amount

Lbs.
Lbs.
0.00 Per K -

No.

0.00 per d -

Say
Say
Say
Say

0.0
0.0
0.0
0.0

37 ii500 Gauge (0.005\" thick)

Detail

Unit Rate Per Sft. / Assume


Qty

MATERIAL
1

LABOUR
1

Polythene sheet of 0.005\" gaug1.32 Lbs (0.600 Kg


Including 5% Extra for Overlap
Total
Contractor's Profit &20.0 Percent
Total

Cooly (skilled)

.3

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Sft.
Labour Rate Per Sqm.
Composite Rate Per Sft.
Composite Rate Per Sqm

Rs.
Rs.
Rs.
Rs.

Page 37

nit Rate Per Sft. / Assumed for 100 Sft.


Rate
Per Unit
Amount

0.0 Kg.

No.

0.00 per day

Say
Say
Say
Say

0.0
0.0
0.0
0.0

38 Laying 2\" thick sand and bitumen carpet on top of foundation of oil

Detail

MATERIAL
1
2
3
4

(
6

Unit Rate 100 Sft. / Assume

2464

Qty
= 410 Cft.)

Sand
410
Bitumen
1.23
Coal
1.00 Mnd. (37.324 K
Fuel wood
58.2
Total
Contractor's Profit &20.0 Percent
Total

LABOUR
1
2

Mason
Cooly 35.00
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate Per 100 Sft.
Composite Rate Per Sqm

12

Page 38

top of foundation of oil tanks

nit Rate 100 Sft. / Assumed for 246 Sft.


Rate
Per Unit
Amount

Cft.
Ton
Kg.

0.00
0.00
0.00
0.00

er 100 Cf
Per Ton
Per Kg.
Per Kg.

Nos.
Nos.

0.00 Per day


0.00 Per
day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.0
0.0
0.0
0.0

39

Cutting hole 4\" x 6\" in stone masonry or brick wall with chisel, re
removing debris within one chain lead.

Detail
Qty
LABOUR FOR 7 HOLES
1
Mason 1.00
2
Cooly Unskilled

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per Hole

40

Making 1\"x1\" groove in wall of stone or


9\" deep.

brick masonry in cement

Detail
Qty
LABOUR FOR 4 NOS. PLANKS
1
2

Mason
Cooly 0.50
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATE
Labour Rate Per Plank

.5

Page 39

brick wall with chisel, repairing masonry and

Unit Rate Per Hole


Rate
Per Unit

No.
No.

0.00 per
0.00 per day

Amount

day

Rs.

Say

0.0

brick masonry in cement for fixing planks upto

Unit Rate Per Plank


Rate
Per Unit

Amount

No.
No.

0.00 per day


0.00 per

day

Rs.

Say

0.0

41. Drilling holes in stone or bricks masonry upto 2\" dia, per inch depth.

Detail

Unit Rate Per Hole Per Inch


Qty

LABOUR FOR 10 NOS.


1

Cooly Unskilled
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total

ITEM RATE
Labour Rate Per Hole per Inch Depth
Per CM

Page 40

dia, per inch depth.

nit Rate Per Hole Per Inch. Depth


Rate
Per Unit

No.

0.00 per day

Rs.
Rs/

Say
Say

Amount

0.0
0.0

42

Spraying anti termite liquid mixed with water in

Detail

the ratio of (1.40)

Unit Rate Per 100 Sft. / Assumed for 1


Qty

MATERIAL FOR 1000 SFT.


1
2

Termite Liquid
Spraying Machine
Total
Contractor's Profit &20.0 Percent
Total

1.04 Litre

LABOUR for 1000 sft


1
Sprayman

Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate Per 100 Sft.
Composite Rate Per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 41

er in

the ratio of (1.40)

er 100 Sft. / Assumed for 1000 Sft.


Rate
Per Unit

.04 Litre

Amount

L.S.

0.00 P. Litre
0.0

No.

0.00 per day

Say
Say
Say
Say

0.0
0.0
0.0
0.0

43

Providing and fixing barbed wire fencing with 4 horizontal


1:2:4 posts 5.5' x 6\" x9\" at 8 ft. centre to centre. Rei
1/8\" dia stirrups 12\" centre to centre, complete in all r
i)
Without cement concrete base.
Detail

ASSUMED FOR 48 RFT.


MATERIAL
i)

RCC Post (1:2:4)


6.5 x 5'.5x0.5x0.75 = 13.40 Cft.
(Item 6 a (i) of Concrete)
ii) Fabrication of steel work as per
S No. 9 (b) Chapter Concrete
3/8\" dia 4 x 5.5
= 22 Rft. @ Lbs /Rft
1/8 dia stirrups 5 x 2 = 10 Rft @ 0.042 Lbs/R
For 6.5 x 8.67 lbs = 8.67
Lbs
iii) Strained barbed wire
Horizontal 4x48'
Cross 2 Nox6x9.4
Wastage 5%
320 Lt. @ 1.25 Cwt/450 Yard =0.29 Cwt
iv) Eye bolts 4 No.x7 post
v)
Washers 28.00
Contractor's Profit & Percent
on item iii and iv and (v)
Total
(I to V)
x
Rate per 100 Rft.
48
LABOUR
i)
RCC as per item 6 - a (i) Chap. Concrete
ii) Fabrication of steel as per item 9 (b) Chap.
iii) Fixing barbed wire black smith
Coolies
Total
Sundries (Item-III)
Percent #Contractor's Profit & Percent #Total for 48 Rft.
Rate per 100 Rft.
ITEM RATE
Labour Rate Per 100 Rft.
Labour Rate Per Metre
Composite Rate Per 100 Rft
Composite Rate Per Metre

Page 42

fencing with 4 horizontal and two cross wires, with RCC


ft. centre to centre. Reinforced with 4 number 3/8\" dia ve
o centre, complete in all respects.
ent concrete base.
Unit Rate Per 100 Rft.
Rate
Per Unit

Qty

Amount

13.4 Cft.

0.00 Per Cft.

25.51 Kgs.

0.00 Per Kg.

14.74 Kg.

0.00 Per Kg.

Lbs /Rft
@ 0.042 Lbs/R

192.00 Lft.
112.8 Lft.
304.80 Lft.
15
320.00 Lft.

28 Nos.
Nos.

0.0 Each
0.0 dozen

100

13.40per Cft
25.51 Per Kg.
.75 No.
2 Nos.

0.00
0.00
0.00
0.00

Per
Per
Per
Per

Cft.
Kg.
day
day

867.21

100 =

Say

48
Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.0
0.0
0.0
0.0

ii)

In cement concrete base. (1:4:8) of size 12\"x12\"x21\")


Detail
Qty

MATERIAL FOR 48 RFT


i)
RCC Post (1:2:4) as per part (i) Ref. 6 a
ii) Base (1:4:8) 12\"X12\"X21\"
1.75 Cft.
d/D=0.5X0.75X0.75 =
0.28
Net
1.47 x 6.5
iii) Fabrication of steel
as per Item 9 (b) of Chapter Concrete
iv) Strained barbed wire
Horizontal 4x48'
192.00 Lft.
Cross 2 Nox6x9.4
112.8 Lft.
304.80 Lft.
Add 5% wastage
15.2 Lft.
320.00 Lft.
14.74
iv) Eye bolts 4 No.x7 post
v)
Washers 28.00
Total
Contractor's Profit & Percent
#
Total for 48 Rft.
Rate for 100 Rft.
48
LABOUR
i)
RCC (1:2:4) (Rate as per item 6 a (i) of C
ii) PCC (1:4:8) (Rate as per item 3 b of Chap No.
iii) Fabrication of steel as per item 9 (b) of Chap
iv) Fixing barbed wire
Blacksmith for wire
Coolies for erection
Total
Sundries (Item-IV)
Percent #Total
Contractor's Profit & Percent #Total for 48 Rft.
Rate for 100 Rft.

Labour Rate Per 100 Rft.


Labour Rate Per Metre
Composite Rate Per 100 Rft.
Composite Rate Per Metre

9.55
25.51

28

13.4
9.55
25.51

.75
2

48
ITEM RATE

13.4

Page 43

\"x12\"x21\")
Unit Rate Per 100 Rft.
Rate
Per Unit

Cft.

Amount

Per Cft.

Cft.

0.00 Per Cft.

Kg.

0.00 Per Kg.

Kg.
Nos.
Nos.

0.00 Per

Kg.
0 Each
0 dozen

x 100

Say

0.0

Cft.
Cft.
Kg.

0.00 Per Cft.


0.00 Per Cft.
0.00 Per Kg.

No.
Nos.

0.00 Per day


0.00 Per day

Rs.
Rs.
Rs.
Rs.

100

Say
Say
Say
Say

0.0
0.0
0.0
0.0

CHAPTER NO. 17

OUTLETS
DESCRIPTION OF ITEM:
1 Earth Work for Outlet excavation, refilling, ramming and Puddling

Rate for all finished works include the removal of the surplus debris un-used ma
a)

Channel Discharge upto 50 Cs.


Detail
Qty

Assumed for 1.5 Job


LABOUR
1

Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit &
Total

2.5
Percent
20 Percent

ITEM RATE
Labour Rate Per Job

b)

Rs.

Channels discharge from 51-100 Cs.

Detail
Qty
Assumed for 1.5 Job
LABOUR
1

Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit &
Total

3.3
Percent
20 Percent

ITEM RATE
Labour Rate Per Job

Rs.

Page 1

, ramming and Puddling


surplus debris un-used material and

by

Unit Rate Per Job


Rate
Per Unit

Nos.

0.0 =
1.5

Amount

per day

Say

m 51-100 Cs.

Unit Rate Per Job


Rate
Per Unit

Nos.

0.0 =
1.5

Amount

per day

Say

c)

Channels discharge from 101-200 Cs.


Detail

Assumed for 1.5 Job


LABOUR
1

Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total

Percent
20 Percent

ITEM RATE
Labour Rate Per Job
d)

Channels discharge from 201-350 Cs.

Detail

Assumed for 1.5 Job


LABOUR
1

Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total

Percent
20 Percent

ITEM RATE
Labour Rate Per Job

e)

Channels Discharges Over 350 Cusecs

Detail

Assumed for 1.5 Job


LABOUR
1

Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total

ITEM RATE
Labour Rate Per Job

Percent
20 Percent

Page 2

scharge from 101-200 Cs.


Unit Rate Per Job
Rate
Per Unit

Qty

5 Nos.

Rs.

0.0 =
1.5

Amount

per day

Say

scharge from 201-350 Cs.

Unit Rate Per Job


Rate
Per Unit

Qty

6.75 Nos.

Rs.

0.0 =
1.5

Amount

per day

Say

scharges Over 350 Cusecs

Unit Rate Per Job


Rate
Per Unit

Qty

10 Nos.

Rs.

0.0 =1.5

Amount

per day

Say

2.
Note :

Dismantling Outlets

These rates are for total dismantlement and removal of material. The ra
not include earth work for which rates are given in item No. 1 above
a)

Old types such as K.G.O's Orifices etc

Detail

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total

Percent
20 Percent

ITEM RATE
Labour Rate for Each

b)

A.P.M. or O.F.H upto 2.0 Ft. (610mm)

Detail

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total

ITEM RATE
Labour Rate for Each

Percent
20 Percent

Page 3

moval of material. The rates do


given in item No. 1 above

uch as K.G.O's Orifices etc.

Unit Rate for Each


Rate
Per Unit

Qty

2.5 Nos.

Rs.

0.0 =
1.5

Amount

per day

Say

.F.H upto 2.0 Ft. (610mm)

Unit Rate for Each


Rate
Per Unit

Qty

3.75 Nos.

Rs.

0.0 =
1.5

Amount

per day

Say

c)

A.P.M.

or O.F.H from 2.1 ft. (635mm)

Detail

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total

Percent
20 Percent

ITEM RATE
Labour Rate for Each

d)

A.P.M. or O.F. 'H' above 3.0 ft. (915m


Detail

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total

Percent
20 Percent

ITEM RATE
Labour Rate for Each

e)

Tail Cluster bifurcation


Detail

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total

ITEM RATE
Labour Rate for Each

Percent
20 Percent

Page 4

O.F.H from 2.1 ft. (635mm) to 3.00 ft. (915mm)

Unit Rate for Each


Rate
Per Unit

Qty

5 Nos.

Rs.

0.0 =1.5

Amount

per day

Say

.F. 'H' above 3.0 ft. (915mm)


Unit Rate for Each
Rate
Per Unit

Qty

6.25 Nos.

Rs.

0.0 =1.5

Amount

per day

Say

r bifurcation
Unit Rate for Each
Rate
Per Unit

Qty

3.75 Nos.

Rs.

0.0 =-

Amount

per day

Say

1.5

f)

Tail cluster trifurcation


Detail

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total

Percent
20 Percent

ITEM RATE
Labour Rate for Each

g)

Tail Cluster Quadrification

Detail

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total

ITEM RATE
Labour Rate for Each

Percent
20 Percent

Page 5

r trifurcation
Unit Rate for Each
Rate
Per Unit

Qty

5 Nos.

Rs.

0.0 =1.5

Amount

per day

Say

r Quadrification

Unit Rate for Each


Rate
Per Unit

Qty

6.25 Nos.

Rs.

0.0 =1.5

Amount

per day

Say

Making Temporary A.P.M. Bricks Block and fixing at Site


Detail

MATERIAL
1
2
3

LABOUR
1

Brick
Cement
Sand
Total
Contractor's Profit & Ove
Total

20 Percent

Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Total

Percent
20 Percent

ITEM RATE
Labour Rate for Each
Composite Rate for Each

Dismentalling Walls, taking out Temporary A.P.M. Bricks Block and fix
iron block and rebuilding dismantled walls.
Detail

Assumed for 1.25 Job


LABOUR
1

Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Total

ITEM RATE
Labour Rate Per Job

Percent
20 Percent

Page 6

xing at Site
Unit Rate for Each
Rate
Per Unit

Qty

20
1

Amount

Nos.
.25 Bag
Cft.

Per 1000 N Per Bag


Cft.

.33 No.
.33 No.

per day
per day

Say
Say

Rs.
Rs.

.P.M. Bricks Block and fixing

Unit Rate Job


Rate
Per Unit

Qty

.75 No.
1 No.

Rs.

0.0 =
1.25

Amount

per day
per day

Say

3.5
3.5
.7
4.2

Dismantling walls and fitting iron block of O.F. Outlets

Detail

Assumed for 1.25 Nos.


LABOUR
1

Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Total

20

ITEM RATE
Labour Rate for Each
6

Constructing watching and removing bund for outlet built in

Detail

Assumed for 1.25 Nos.


LABOUR
a)

Upto 3.0 ft. (915mm) depth


Cooly (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total

20

ITEM RATE
Labour Rate for Each

b)

Assumed for 1.25 Nos.


Above 3.0 ft. (915mm) depth
Cooly (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total

ITEM RATE
Labour Rate for Each

20

Page 7

on block of O.F. Outlets

Unit Rate Each


Rate
Per Unit

Qty

.75 No.
1 No.

per day
per day

Say

Percent
Percent

Rs.

0.0 =
1.25
ng bund for outlet built in running water

Unit Rate Each


Rate
Per Unit

Qty

5 Nos.

Say

per day

Say

Percent

0.0 =1.25

6.75 Nos.
Percent
Percent

Rs.

0.0 =
1.25

Amount

per day

Percent

Rs.

Amount

Adjusting 'B' of tail cluster by dismantling and rebuilding throat wa

Detail

MATERIAL
1
2
3

Brick
Cement
Sand
Total
Contractor's Profit & Ove
Total
LABOUR FOR 1.5 NOS.
Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Total
ITEM RATE

20 Percent

Percent
20 Percent

Labour Rate for Each

Composite Rate for Each


Adjusting 'Y' of an A.P.M. Outlets including dismantling and rebuildi

Detail

MATERIAL
1
2
3

Brick
Cement
Sand
Total
Contractor's Profit & Ove
Total
LABOUR FOR 1.5 NOS.
Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Total
ITEM RATE
Labour Rate for Each

20 Percent

Percent
20 Percent

Composite Rate for Each

Page 8

g and rebuilding throat walls.

Unit Rate Each


Rate
Per Unit

Qty

30

Nos.
.3 Bag
2 Cft.

.4 No.
.75 No.

Rs.

0.0 =1.5

Rs.
g dismantling and rebuilding

Nos.
.5 Bag
2 Cft.

.75 No.
1.5 Nos.

Rs.

Per 1000 No
Per Bag
100 Cft.

per
per day

day

Say

Say

Unit Rate Each


Rate
Per Unit

Qty

50

Amount

0.0 =1.5

Amount

Per 1000 No
Per Bag
100 Cft.

per
per day

Say

day

Rs.

Say

Extra Labour in Fixing A.P.M. and O.F. Outlets block including Dressi

Note:

Rate to be Rs. 5.00 less in case of O.F.


Outlets when there is no O.F. iron block
a)
For Channel Depth of 5.0 ft. (1.5 Metr

Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove
Total
LABOUR (FOR 1.25 NOS.)

20 Percent

Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Grand Total

Percent
20 Percent

ITEM RATE
Labour Rate for Each
Composite Rate for Each
b)

For Channel depth of 4.0 ft. (1.2 m)


Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove
Total
LABOUR (ASSUMED FOR 1.25 NOS.)

20 Percent

Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Total
ITEM RATE

Percent
20 Percent

Labour Rate for Each


Composite Rate for Each
Page 9

ets block including Dressing of Bricks.

Depth of 5.0 ft. (1.5 Metre)

Unit Rate Each


Rate
Per Unit

Qty
.2 Bag
1 Cft.

Per Bag
100 Cft.

1 No.
1 No.

per
per day

Rs.

0.0 =
1.25
=

Rs.

Amount

day

Say

Say

Unit Rate Each


Rate
Per Unit

Qty

.2 Bag
1 Cft.

.75 No.
.75 No.

Amount

Per Bag
Per 100 Cft

per
per day

day

Rs.
Rs.

0.0 =
1.25
=

Say

Say

c)

For Channel depth of 3.0 ft. (915mm)


Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove
Total
LABOUR (FOR 1.25 NO.)
Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Grand Total
ITEM RATE

20 Percent

Percent
20 Percent

Labour Rate for Each

d)

Composite Rate for Each


For Channel depth of 2.0 ft. (610mm)

Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove
Total
LABOUR (FOR 1.25 NOS.)
Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Total
ITEM RATE
Labour Rate for Each

20 Percent

Percent
20 Percent

Composite Rate for Each

Page 10

Unit Rate Each


Rate
Per Unit

Qty

.2 Bag
1 Cft.

Amount

Per Bag
Per 100 Cft.
-

.6 No.
.6 No.

Rs.

per
per day

0.0 =1.25
=

Rs.

.15 Bag
1 Cft.

.5 No.
.5 No.

0.0 =
1.25

Say

Say

Unit Rate Each


Rate
Per Unit

Qty

Rs.

day

Amount

Per Bag
Per 100 Cft

per
per day

Say

day

Rs.

Say

e)

For Channel depth of less than 2.0 ft (610mm)

Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove
Total
LABOUR (FOR 1.25 NOS.)
Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Total
ITEM RATE

20 Percent

Percent
20 Percent

Labour Rate for Each


Composite Rate for Each
10

Repairing damaged reducing collar of

Hume Pipe Outlets

Detail

MATERIAL
1
2
3

Shingle/Stone Crushed
Cement
Sand
Total
Contractor's Profit & Ove
Total

20 Percent

LABOUR
Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Total
ITEM RATE
Labour Rate for Each

Percent
20 Percent

Composite Rate for Each

Page 11

Unit Rate Each


Rate
Per Unit

Qty

Amount

.1 Bag
1 Cft.

Per Bag
Per 100 Cft

.4 No.
.4 No.

per
per day

Rs.

0.0 =
1.25

Rs.

day

Say

Say

Pipe Outlets

Unit Rate Each


Rate
Per Unit

Qty

Rs.

Amount

1 Cft.
.25 Bag
1 Cft.

Per 100 Cft


Per Bag
Per 100 Cft

.33 No.
.33 No.

per
per day

Say

day

Rs.

Say

11

Laying Iron Pipes of Outlets

Detail

LABOUR FOR 1.25 RFT.


Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Grand Total

Percent
20 Percent

ITEM RATE
Labour Rate Per Foot
Labour Rate per Metre
12

Water allowance for constructing outlets or culverts when canal water

Note:

At the discreation of Engineering-in-charges depending upon


the distance and source or supply
Detail

Assumed for 1.5 Nos


LABOUR
(i)

Cooly (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Grand Total

Percent
20 Percent

ITEM RATE
Labour Rate Per Each

Assumed for 1.5 Nos.


LABOUR
(ii)

Coolies (Unskilled)
Sandries
Total
Contractor's Profit & Ove
Grand Total

ITEM RATE
Labour Rate Per Each

10 Percent
20 Percent

Page 12

Unit Rate Per Foot


Rate
Per Unit

Qty

.02 No.
.02 No.

Rs.

per
per day

0.0 =
1.25

Rs.

Amount

day

Say

Say

culverts when canal water is not flowing

s depending upon

Unit Rate Each


Rate
Per Unit

Qty

1.22 Nos.

Rs.

0.0 =
1.5

2.5 Nos.

Rs.

0.0 =

Amount

per day

Say

per day

Say

1.5

13

Hoisting and placing R.C. slabs or stone in position in out

Detail

Assumed for 1.5 Nos.


LABOUR
Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Grand Total

20

ITEM RATE
Labour Rate for Each

14
a)

Fixing Pipe Outlet Including Back Filling or Earth and Pudd


Portion Under Bank
Detail

Assumed for 15 Rft.


MATERIAL
1
2

LABOUR
1
2

Cement for Joining R.C. Collar


Sand
Total
Contractor's Profit & Ove
Total
Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Grand Total

ITEM RATE
Labour Rate Per Foot
Compsite Rate for Foot
Labour Rate per Metre
Composite Rate per Metre

20

20

Page 13

or stone in position in outlets or W.C. culverts

Unit Rate Each


Rate
Per Unit

Qty

.2 No.
.65 No.

per
per day

Amount

day

Percent
Percent

Rs.

0.0 =
1.5

Say

k Filling or Earth and Puddling

Unit Rate Per Foot


Rate
Per Unit

Qty

.2 Bag
1 Cft.

Amount

Per Bag
Per 100 Cft.
-

Percent

.25 No.
2 Nos.

per day
per day

0.0 =

Say

0.0 =

Say

=
=

Say
Say

Percent
Percent

Rs.
15
Rs.
15
Rs.
Rs.

b)

Portion under road beyond bank

Detail

Assumed for 15 Rft.


MATERIAL
1
2

Cement for Joining R.C. Collar


Sand
Total
Contractor's Profit & Ove
Total

20 Percent

LABOUR
1
2

Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Grand Total

Percent
20 Percent

ITEM RATE
Labour Rate Per Foot
Composite Rate Per Foot
Labour Rate Per Metre
Composite Rate per metre

15

Removing Pipe Outlets Refilling Earth and Pudding

a)

Portion Under Bank


Detail

Analysis for 15 Ft.


LABOUR
Coolies (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total for 15.0 Feet
ITEM RATE
Labour Rate Per Foot

Percent
20 Percent

Labour Rate Per Metre

Page 14

Unit Rate (British System) per Rft.


Rate
Qty
Per Unit

.2 Bag
1 Cft.

.2 No.
.75 No.

Rs.

Amount

Per Bag
Per 100 Cft

per day
per day

0.0 =-

Say

0.0 =-

Say

Say
Say

15
Rs.
15
Rs.
Rs.

=
=

Unit Rate (British System) per Rft.


Rate
Qty
Per Unit

2 Nos.

Rs.

per day

0.0 =
15

Amount

Say

Rs.

Say

b)

Portion Under Road Byond Bank

Detail

Analysis for 15.0 Ft.


LABOUR
Cooly (Unskilled)
Sundries 10.00
Total
Contractor's Profit & Ove
Total for 15 Feet

Percent
20 Percent

ITEM RATE
Labour Rate Per Foot
Labour Rate Per Metre

16

Changing Pipe Outlets by removing One Pipe and replacing it at the sa


with another pipe complete with earth and puddling

a)

Portion Under Bank


Detail

Analysis for 15.0 Ft.


MATERIAL
1
2

Cement for Joining R.C. Collar


Sand
Total
Contractor's Profit & Ove
Total for 12 Feet

20 Percent

LABOUR
1
2

Mason
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Total for 15 Feet

ITEM RATE
Labour Rate Per Foot
Composite Rate per Foot

Percent
20 Percent

Labour Rate Per Metre


Composite Rate per Metre
Page 15

Unit Rate (British System) per Foot


Rate
Qty
Per Unit

0.75 No.

Rs.

Amount

per day

0 =

Say

Say

15
Rs.

and replacing it at the same site

Unit Rate (British System) per Foot


Rate
Qty
Per Unit

.2 Bag
1 Cft.

.2 No.
2.5 Nos.

Rs.
Rs.

15
15

Amount

Per Bag
Per 100 Cf -

per day
per day

Say

Say

Rs.
Rs.

Say
Say

b)

Portion Under Road Beyond Bank

Detail

Analysis for 15.0 Ft


MATERIAL
1 Cement for Joining R.C. Collar
2 Sand
Total
Contractor's Profit & Ove
Total
LABOUR
1 Mason
2 Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & Ove
Grand Total
ITEM RATE
Labour Rate Per Foot
Composite Rate Per Foot
Labour Rate Per Metre
Composite Rate Per Metre

20

10
20

Page 16

Unit Rate (British System) per Foot


Rate
Qty
Per Unit
Amount

0.2 Bag
1 Cft.
Percent

0.1 No.
1.25 Nos.

Per Bag
Per 100 Cf per day
per day

Percent
Percent

Rs.
Rs.
Rs.
Rs.

15
15

0 Say

Say

Say
Say

CHAPTER NO. 13

PAINTING AND VARNISHING


DESCRIPTION

OF

ITEM NO

Note :

Rates for all finished work


surplus debris, unused mate

a)

Cleaning painted wood work

1:

Detail

Unit Rate (British System)

Material
Oil Terpen tine
Brushes (Small)
Sand Paper
Total
Contractor's Profit & Ove ##### Percent
Total

0.5Lbs (0. 26) Ltr


0.04 No.
0.16 No.

Labour
Unskilled Cooly
Total
Sundries
Total

0.20 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Rs.
Rs.

Page 1

NO. 13

ISHING

ates for all finished works include the re


urplus debris, unused material and by-prod

leaning painted wood work with oil and wat

nit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.) Amount (Rs.)

.5Lbs (0. 26) Ltr

P. Ltr
Each
P. Doz

P. Day

Say
Say

Say
Say

Item No.

1
b)
Detail

Oiling wood work with boiled linseed o


Unit Rate (British System)

Material
Linseed oil
Brushes (Small)

0.40 Kg
0.06 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Unskilled Cooly

0.20 No

Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.
Rs.
Rs.

Page 2

work with boiled linseed oil.

nit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
Each

P. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

2:

Brushing and Scraping blist


wood works.
Unit Rate (British System)

Detail

Material
N I L

Labour
Rate Analysis for 125 Sft
Unskilled Cooly
Total
Sundries
Total

0.50 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

Page 3

rushing and Scraping blisters of old paint


ood works.
nit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

P. Day

0
1.25

Say

Say

DESCRIPTION

OF

ITEM NO

3:

Scraping, brushing and remo


metal surface.
Unit Rate (British System)

Detail

Material
N I L
Rate Analysis for 125 Sft
Labour
Unskilled Cooly
Total
Sundries
Total

2.00 No

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

Page 4

craping, brushing and removing old paints


etal surface.
nit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

P. Day

0
1.25

Say

Say

DESCRIPTION

OF

ITEM NO

4:
a)
i)
Detail

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 5

Painting old surfaces.


Painting corrugated surfaces, patent roofin
with oil paint.
First Coat
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

2Lbs (0. 20) Gln


0.06 No.

P. Gln
Each

0.33 No
0.33 No

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

ii)

Painting old surfaces.


Painting corrugated surface
with oil paint.
Each Subsequent Coat

Detail

Unit Rate (British System)

a)

Qty
Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Cooly
Total
Sundries
Total

1Lbs (0. 10) Gln


0.06 No.

0.25 No
0.25 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 6

ainting old surfaces.


ainting corrugated surfaces, patent roofin
ith oil paint.
ach Subsequent Coat

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Lbs (0. 10) Gln

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

4
b)
i)

Painting old surfaces.


Painting sashes, fanlights, glazed or gauzed doo
and windows.
First Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

1Lbs (0. 10) Gln


0.12 No.

0.20 No
0.20 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 7

ghts, glazed or gauzed doors

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Lbs (0. 10) Gln

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

4
b)
ii)

Painting old surfaces.


Painting sashes, fanlights, glazed or gauzed doo
and windows.
Each Subsequent Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.75Lbs ( 0.08) Gln


0.12 No.

0.17 No
0.17 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 8

ghts, glazed or gauzed doors

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

.75Lbs ( 0.08) Gln

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

4
c)
i)

Painting old surfaces.


Painting doors & windows any type.
First Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

2Lbs (0. 20) Gln


0.12 No.

0.33 No
0.33 No

Page 9

ws any type.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Lbs (0. 20) Gln

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

4
c)
ii)

Painting old surfaces.


Painting doors & windows any type.
Each Subsequent Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

1.5Lbs (0. 15) Gln


0.12 No.

0.25 No
0.25 No

Page 10

ws any type.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

.5Lbs (0. 15) Gln

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

4
d)

i)

Painting old surfaces.


Painting guard bars, gates of iron bars, grating
railing (including) standards, braces etc.) and
similar open works.
First Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

1Lbs (0. 10) Gln


0.12 No.

0.20 No
0.20 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 11

ates of iron bars, gratings,


andards, braces etc.) and

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Lbs (0. 10) Gln

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

4
d)

ii)

Painting old surfaces.


Painting guard bars, gates of iron bars, grating
railing (including) standards, braces etc.) and
similar open works.
Each Subsequent Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.75Lbs ( 0.08) Gln


0.12 No.

0.17 No
0.17 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 12

ates of iron bars, gratings,


andards, braces etc.) and

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

.75Lbs ( 0.08) Gln

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

4
e)
i)

Painting old surfaces.


Painting fillets, framing, skirtings, pipes, gut
and similar linear work, not exceeding 6\" in gi
First Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Rft
Painter
Unskilled Cooly
Total
Sundries
Total

1Lbs (0. 10) Gln


0.12 No.

0.17 No
0.17 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm

Page 13

ing, skirtings, pipes, gutters


k, not exceeding 6\" in girth.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Lbs (0. 10) Gln

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

4
e)
ii)

Painting old surfaces.


Painting fillets, framing, skirting, pipes, gutt
and similar linear work, not exceeding 6\" in gi
Each Subsequent Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Rft
Painter
Unskilled Cooly
Total
Sundries
Total

0.75Lbs ( 0.08) Gln


0.12 No.

0.12 No
0.12 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm

Page 14

ing, skirting, pipes, gutters


k, not exceeding 6\" in girth.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

.75Lbs ( 0.08) Gln

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

4
f)
i)

Painting old surfaces.


Painting small detached articles not exceeding o
square foot of painted surface.
First Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 200 Nos
Painter
Unskilled Cooly
Total
Sundries
Total

1.00 No
0.25 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos
Composite Rate Per 100 Nos

2Lbs (0. 20) Gln


0.06 No.

Page 15

d articles not exceeding one

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Lbs (0. 20) Gln

P. Gln
Each

P. Day
P. Day

Rs.

Say

Rs.

Say

Item No.

4
f)
ii)

Painting old surfaces.


Painting small detached articles not exceeding o
square foot of painted surface.
Each Subsequent Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 No.
Painter
Unskilled Cooly
Total
Sundries
Total

1Lbs (0. 10) Gln


0.12 No.

0.75 No
0.25 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos
Composite Rate Per 100 Nos

Page 16

d articles not exceeding one

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Lbs (0. 10) Gln

P. Gln
Each

P. Day
P. Day

Rs.
Rs.

Say
Say

Item No.

4
g)

i)

Painting old surfaces.


Painting small detached articles, exceeding one
square foot (0.09 Sqm) but not exceeding three
square foot (0.81 Sqm) of painted surface.
First Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 No.
Painter
Unskilled Cooly
Total
Sundries
Total

6Lbs (0. 60) Gln


0.12 No.

2.00 No
0.50 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos
Composite Rate Per 100 Nos

Page 17

d articles, exceeding one


but not exceeding three
of painted surface.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Lbs (0. 60) Gln

P. Gln
Each

P. Day
P. Day

Rs.
Rs.

Say
Say

Item No.

4
g)

ii)

Painting old surfaces.


Painting small detached articles, exceeding one
square foot but not exceeding three square foot
painted surface.
Each Subsequent Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 No.
Painter
Unskilled Cooly
Total
Sundries
Total

3Lbs (0. 30) Gln


0.06 No.

1.00 No
0.50 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos
Composite Rate Per 100 Nos

Page 18

d articles, exceeding one


ceeding three square foot of

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Lbs (0. 30) Gln

P. Gln
Each

P. Day
P. Day

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO
a)

5:

i)

Painting/ new surface preparing surface and


painting corrugated surface, patent roofing etc.
Priming Coat

Detail

Unit Rate (British System)


Qty

Material
Paint
3Lbs (0. 30) Gln
Brushes (Small)
0.12 No.
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Unskilled Cooly
Total
Sundries
Total

0.50 No
0.12 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 19

preparing surface and


rface, patent roofing etc.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

5
a)
ii)

Painting/ new surface preparing surface and


painting corrugated surface, patent roofing etc.
Each Subsequent Coat of paint.

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes (Small)

2.50Lbs (0 .25) Gln


0.06 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.25 No
0.08 No

Page 20

preparing surface and


rface, patent roofing etc.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

5
b)

i)
Detail

Preparing surface and painting sashes, fan light


glazed or gauzed doors and windows etc. any type
(including edges)
Priming Coat.
Unit Rate (British System)
Qty

Material
Paint
Brushes (Small)

1.75Lbs(0 .175) Gln


0.12 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.25 No
0.08 No

Page 21

painting sashes, fan light


and windows etc. any type

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

5
b)

ii)
Detail

Preparing surface and painting sashes, fan light


glazed or gauzed doors and windows etc. any type
(including edges)
Each Subsequent Coat of Paint.
Unit Rate (British System)
Qty

Material
Paint
Brushes (Small)

1.4Lbs (0 .14) Gln


0.06 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.12 No
0.12 No

Page 22

painting sashes, fan light,


and windows etc. any type

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

5
c)
i)
Detail

Preparing surface and painting of doors and


windows any type (including edges).
Priming Coat.
Unit Rate (British System)
Qty

Material
Paint
Brushes (Small)

3Lbs (0 .3) Gln


0.06 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.50 No
0.12 No

Page 23

painting of doors and


uding edges).

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

5
c)
ii)
Detail

Preparing surface and painting of doors and


windows any type (including edges).
Each Subsequent Coat of Paint.
Unit Rate (British System)
Qty

Material
Paint
Brushes (Small)

2.50Lbs ( 0.25) Gln


0.06 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.25 No
0.08 No

Page 24

painting of doors and


uding edges).

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

5
d)

i)
Detail

Preparing surface and painting guard bars, gates


iron bars, gratings, railing (including standard
braces, etc.) and in similar open work.
Priming Coat.
Unit Rate (British System)
Qty

Material
Paint
Brushes (Small)

1.75Lbs(0 .175) Gln


0.12 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Unskilled Cooly
Total
Sundries
Total

0.25 No
0.17 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 25

painting guard bars, gates of


ailing (including standards
imilar open work.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

5
d)

ii)
Detail

Preparing surface and painting guard bars, gates


iron bars, gratings, railing (including standard
braces, etc.) and in similar open work.
Each Subsequent Coat of Paint.
Unit Rate (British System)
Qty

Material
Paint
Brushes (Small)

1.4Lbs (0 .14) Gln


0.06 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.12 No
0.12 No

Page 26

painting guard bars, gates of


ailing (including standards
imilar open work.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

5
e)

i)
Detail

Preparing surface and painting of fillets, frami


skirtings, pipes gutters and similar linear work
exceeding 6\" girth.
Priming Coat.
Unit Rate (British System)
Qty

Material
Paint
Brushes (Small)

1.3Lbs (0 .13) Gln


0.12 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Unskilled Cooly
Total
Sundries
Total

0.17 No
0.17 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Item Rates
Labour Rate Per 100 Lft
Labour Rate Per Rm
Composite Rate Per 100 Lft
Composite Rate Per Rm

Page 27

painting of fillets, framing,


rs and similar linear work not

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

5
e)

ii)
Detail

Preparing surface and painting of fillets, frami


skirting, pipes gutters and similar linear work
exceeding 6\" girth.
Each Subsequent Coat of Paint.
Unit Rate (British System)
Qty

Material
Paint
Brushes (Small)

1.1Lbs (0 .11) Gln


0.12 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Rft
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Rft.
Item Rates
Labour Rate Per 100 Lft
Labour Rate Per Rm
Composite Rate Per 100 Lft
Composite Rate Per Rm

0.08 No
0.08 No

Page 28

painting of fillets, framing,


s and similar linear work not

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Gln
P. Gln

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

5
f)

i)
Detail

Preparing surface and painting of small detached


articles not exceeding one square foot of painte
surface.
Priming Coat.
Unit Rate (British System)
Qty

Material
Paint
Brushes (Small)

6.25Lbs(0 .625) Gln


0.12 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Nos
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total

0.75 No
0.75 No

Contractor's Profit & Ove ##### Percent


Total
Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos

Rs.

Composite Rate Per 100 Nos

Rs.

Page 29

painting of small detached


one square foot of painted

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Say

Say

Item No.

5
f)

ii)
Detail

Preparing surface and painting of small detached


articles not exceeding one square foot of painte
surface.
Each Subsequent Coat of Paint.
Unit Rate (British System)
Qty

Material
Paint
Brushes (Small)

5Lbs (0 .50) Gln


0.06 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 No
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total

0.40 No
0.33 No

Contractor's Profit & Ove ##### Percent


Total
Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos

Rs.

Composite Rate Per 100 Nos

Rs.

Page 30

painting of small detached


one square foot of painted

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Say

Say

Item No.

5
g)

i)
Detail

Preparing surface and painting of small detached


articles exceeding one square foot and not
exceeding 3 square foot of painted surface.
Priming Coat.
Unit Rate (British System)
Qty

Material
Paint
Brushes (Small)

12Lbs (0 1.2) Gln


0.12 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Unskilled Cooly
Total
Sundries
Total

1.75 No
1.00 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Item Rates
Labour Rate Per 100 Nos

Rs.

Composite Rate Per 100 Nos

Rs.

Page 31

painting of small detached


square foot and not
t of painted surface.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Say

Say

Item No.

5
g)

ii)
Detail

Preparing surface and painting of small detached


articles exceeding one square foot and not
exceeding 3 square foot of painted surface.
Each Subsequent Coats of Paint.
Unit Rate (British System)
Qty

Material
Oil Paint
Brushes (Small)

9Lbs (0 .9) Gln


0.06 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 No
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total

0.75 No
0.50 No

Contractor's Profit & Ove ##### Percent


Total
Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos

Rs.

Composite Rate Per 100 Nos

Rs.

Page 32

painting of small detached


square foot and not
t of painted surface.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Say

Say

Item No.

5
h)
Detail

Extra for knotting and stopping to priming coats


new surface of wood.
Unit Rate (British System)
Qty

Material
Paint etc.

0.018 Gln.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Rft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.06 No

Rs.
Rs.
Rs.
Rs.

Page 33

stopping to priming coats on

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln

P. Day

Say
Say

Say
Say

DESCRIPTION

OF

ITEM NO

6:
i)

Detail

Material
Coaltar
Mineralpitch
Slaked lime
Kerosene Oil
Fuel Wood
Material
For 100 Sft
i) First Coat
=
0
20
Brushes
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 34

Applying Khanki Mixture hot to barrage gate


First Coat.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

0.75Cwt ( 38) Kg
10Lbs (4. 5) Kg
9Lbs (4 ) Kg
1Gln (4. 55) Ltr
32.45 Kg.

P.
P.
P.
P.
P.

0.18 No.

Each

0.25 No
0.25 No

P. Day
P. Day

Kg
Kg
Kg
Ltr
Kg

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

Applying Khanki Mixture hot to barrage gates.


ii)
Detail

Second Coats.
Unit Rate (British System)
Qty

Material
For 100 Sft
ii Second Coat

Material 0.62 of Item No. (6-I)


0.62

Brushes
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.18 No.

0.16 No
0.25 No

Page 35

e hot to barrage gates.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

7:

French polishing complete.


a)

On new works.

Detail

Material
French Polish
Brushes
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 Sft
Polisher
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.5Lbs

23) Kg

Page 36

rench polishing complete.

n new works.
Unit Rate (British System) per 100 Sft

.5Lbs

Qty

Rate
Per Unit (Rs.) Amount (Rs.)

23) Kg
0.12 No.

P. Kg
Each

4.50 No
1.00 No

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

French polishing complete.


b)
Detail

Old work.
Unit Rate (British System)
Qty

Material
French Polish
Brushes

0.25Lbs ( 0.11) Kg
0.12 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 Sft
Polisher
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

2.00 No
1.00 No

Page 37

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

8:
a)

Varnishing wood work, inclu


preparing surface.
First Coat.

Detail

Material
Varnish
Brushes
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Polisher
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.33Gln ( 1.50) Kg

Page 38

arnishing wood work, including cleaning an


reparing surface.
irst Coat.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

.33Gln ( 1.50) Kg
0.12 No.

P. Kg
Each

0.20 No
0.20 No

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

8
b)

Varnishing wood work including cleaning and


preparing surface.
Second Coat.

Detail

Unit Rate (British System)


Qty

Material
Varnish
Brushes

0.25Gln ( 1.13) Kg
0.10 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 200 Sft
Polisher
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.10 No
0.10 No

Page 39

ncluding cleaning and

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

8
c)

Varnishing wood work including cleaning and


preparing surface.
Third Coat.

Detail

Unit Rate (British System)


Qty

Material
Varnish
Brushes

0.2Gln ( 0.91) Kg
0.06 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 200 Sft
Polisher
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.10 No
0.10 No

Page 40

ncluding cleaning and

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

9:
i)

Bitumen coating to plastere


surface.
20 Lbs per 100 Sft.

Detail

Material
Bitumen
Fuel
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

20Lbs ( 9.07) Kg

Page 41

itumen coating to plastered or cement conc

0 Lbs per 100 Sft.


Unit Rate (British System) per 100 Sft
Qty

0Lbs ( 9.07) Kg
4.26 Kg.

Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
P. Kg

0.50 No

P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

9
ii)

Bitumen coating to plastered or cement concrete


surface.
14 Lbs per 100 Sft.

Detail

Material
Bitumen
Fuel
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Cooly
Total
Sundries
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

##### Percent

Page 42

stered or cement concrete

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

10Lbs ( 4. P. Kg
2.84 Kg.
P. Kg

0.40 No

P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

9
iii)

Bitumen coating to plastered or cement concrete


surface.
10 Lbs per 100 Sft.

Detail

Unit Rate (British System)


Qty

Material
Bitumen
Fuel

10Lbs ( 4.
2.84 Kg.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Cooly

0.33 No

Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.
Rs.
Rs.

Page 43

stered or cement concrete

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
P. Kg

P. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

10:

Writing letters or figures


height.
Detail

Rate Analysis for

100 Nos

Material
Paint
Brushes

0.6Lbs (0. 06) Gln

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per No.
Labour
Rate Analysis for 150 Nos
Painter (Artisit)
Unskilled Cooly
Total
Sundries
Total

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per No.
Item Rates
Labour Rate Per No.
Composite Rate Per No.

Page 44

riting letters or figures per letter, per

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.) Amount (Rs.)

.6Lbs (0. 06) Gln


0.18 No.

P. Gln
Each

0
100

1.00 No
1.00 No

P. Day
P. Day

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO

11:

Writing letters or figures


reflective paint of approve
letter, per inch height.
Detail

nalysis for 100 Letters, P. Inch Height


Material
Reflective Paint
Brushes

0.6Lbs (0. 06) Gln

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per No.
Labour
Rate Analysis for 150 No.
Painter (Artisit)
Unskilled Cooly
Total
Sundries
Total

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per No.
Item Rates
Labour Rate P. Letter, P. Inch height

Composite Rate P. Letter, P. Inch height

Page 45

riting letters or figures at any surface w


eflective paint of approved quality and co
etter, per inch height.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

.6Lbs (0. 06) Gln


0.18 No.

P. Gln
Each

0
100

1.00 No
1.00 No

P. Day
P. Day

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO

12:

Detail

Writing letters or figures on any surf


reflective tape of approved quality an
letter, per inch height.
Unit Rate (British System)
Qty

nalysis for 100 Letters, P. Inch Height


Material
Reflective tape/ paper

1.00 Sft

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Plinth, Per Inch height
Labour
Painter (Artisit)
Unskilled Cooly

1.00 No
0.50 No

Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Plinth, Per Inch height
Item Rates
Labour Rate P. Letter, P. Inch height

Rs.

Composite Rate P. Letter, P. Inch height

Rs.

Page 46

ters or figures on any surface w


tape of approved quality and col
inch height.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs.) Amount (Rs.)

P. Sft

0.59

P. Day
P. Day

Say

Say

DESCRIPTION

OF

ITEM NO

13:

Coaltar Painting.
a)

First Coat laid hot.

Detail

Material
Coaltar
Fuel etc.
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Skilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

16Lbs (7. 26) Kg

Page 47

oaltar Painting.

irst Coat laid hot.


Unit Rate (British System) per 100 Sft
Qty

6Lbs (7. 26) Kg


2.18 Kg.

Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
P. Kg

0.33 No

P. Day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

13

Coaltar Painting.
b)
Detail

Second Coat laid hot.


Unit Rate (British System)
Qty

Material
Coaltar
Fuel etc.

10Lbs (4 .5) Kg
2.18 Kg.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Skilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.20 No

Rs.
Rs.
Rs.
Rs.

Page 48

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
P. Kg

P. Day

Say
Say

Say
Say

DESCRIPTION

OF

ITEM NO

14:

Solignum Painting.
a)

One Coat applied hot.

Detail

Material
Solignum Paint
Brushes
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.20Lbs ( 0.02) Gln

Page 49

olignum Painting.

ne Coat applied hot.


Unit Rate (British System) per 100 Sft
Qty

.20Lbs ( 0.02) Gln


0.12 No.

Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

0.33 No

P. Day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

14

Solignum Painting.
b)
Detail

Two Coat applied hot.


Unit Rate (British System)
Qty

Material
Solignum Paint
Brushes

0.34Lbs(0 .034) Gln


0.16 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.50 No

Rs.
Rs.
Rs.
Rs.

Page 50

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day

Say
Say

Say
Say

DESCRIPTION

OF

ITEM NO

15:

Creosote Painting.
a)

Detail

Material
Creosote
Brushes fuel
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

One Coat applied hot.

Page 51

reosote Painting.

ne Coat applied hot.


Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

0.20 Gallo P. Gln


0.12 No.
Each

0.33 No

P. Day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

15

Creosote Painting.
b)
Detail

Two Coat applied hot.


Unit Rate (British System)
Qty

Material
Creosote
Brushes fuel

0.34 Gln
0.16 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.50 No

Page 52

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

16:

Detail

Burning off or rubbing down with pumic


paint from wood work.
Unit Rate (British System)
Qty

Material
Burner Charges
Kerosene Oil
Scraper

L.S.
L.S.
L.S.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Skilled Cooly
Unskilled Cooly

1.00 No
0.25 No

Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 53

or rubbing down with pumice sto


wood work.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

17:

Detail

Removing with caustic soda, old paint


work.
Unit Rate (British System)
Qty

Material
Caustic soda

0.09

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.50 No

Page 54

th caustic soda, old paint from

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Kg.

P. Kg.

P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

18:

Painting distance marks for


lettering on both faces.
Detail

Unit Rate (British System)


Qty

Rate Analysis for 10 Nos


Material
Brushes
White paint
Black japan

0.04 No.
0.5Lbs (0. 05) Gln
0.2Lbs (0. 02) Gln

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per No.

0
10

Labour
Rate Analysis for 15 No.
Painter (Artist)
Unskilled Cooly
Total
Sundries
Total

0.50 No
0.50 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per No.
Item Rates
Labour Rate Per No.
Composite Rate Per No.

Rs.
Rs.

Page 55

ainting distance marks for white ground an


ettering on both faces.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

.5Lbs (0. 05) Gln


.2Lbs (0. 02) Gln

Each
P. Gln
P. Gln

P. Day
P. Day

Say
Say

DESCRIPTION

OF

ITEM NO

19:

Painting two feet (M) with


a foot (M).
Detail

Rate Analysis for

10 Rft

Material
Paint white and black
Brushes

1Lbs (0. 1) Gln

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft
Labour
Rate Analysis for 15 Rft
Painter (Artist)
Unskilled Cooly
Total
Sundries
Total

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per Rft.
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Page 56

ainting two feet (M) with gauge reading to


foot (M).
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Lbs (0. 1) Gln


0.12 No.

P. Gln
Each

0
10

1.00 No
1.00 No

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

20:

Painting sounding rods and


10th of a foot (M).
Detail

Rate Analysis for

10 Rft

Material
Paint black and white
Brushes

0.25Lbs ( 0.03) Gln

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft
Labour
Rate Analysis for 15 Rft
Painter (Artist)
Unskilled Cooly
Total
Sundries
Total

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per Rft.
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Page 57

ainting sounding rods and other gauge, rea


0th of a foot (M).
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

.25Lbs ( 0.03) Gln


0.06 No.

P. Gln
Each

0
10

0.50 No
0.50 No

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

21:

Painting levelling staves.

Detail

Rate Analysis for

10 Rft

Material
Paint black and white
Brushes
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft
Labour
Rate Analysis for 15 Rft
Painter (Artist)
Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Lft.
Item Rates
Labour Rate Per Lft
Labour Rate Per Rm
Composite Rate Per Lft
Composite Rate Per Rm

0.5Lbs (0 .05) Gln

Page 58

ainting levelling staves.

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.) Amount (Rs.)

.5Lbs (0 .05) Gln


0.06 No.

P. Gln
Each

0
10

2.00 Nos
1.00 No

Rs.
Rs.
Rs.
Rs.

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

22:
a)
i)

Painting and lettering mile


One Coat.

Detail

Material
Paint black and white
Brushes
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 2 Nos
Painter (Artist)
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each
Item Rates
Labour Rate Per Each
Composite Rate Per Each

0.35Lbs(0 .035) Gln

Page 59

ainting and lettering mile/Km stones on bo

Unit Rate (British System) per 100 Sft


Qty

.35Lbs(0 .035) Gln


0.06 No.

Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

1/7/2012 No
1/7/2012 No

P. Day
P. Day
-

Rs.

Say

Rs.

Say

Item No.

22
a)
ii)
Detail

Painting and lettering mile


Two Coat.
Unit Rate (British System)
Qty

Material
Paint white and black
Brushes

0.6Lbs (0. 06) Gln


0.02 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 2 Nos
Painter (Artist)
Cooly

0.25 No
0.25 No

Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each
Item Rates
Labour Rate Per Each

Rs.

Composite Rate Per Each

Rs.

Page 60

ainting and lettering mile/Km stones on bo

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
P. Day

Say

Say

Item No.

22
b)
i)
Detail

Rate Analysis for


Material

No.

Paint white and black


Brushes
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each
Labour
Rate Analysis for 15 Nos
Painter (Artist)
Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per No.
Item Rates
Labour Rate Per Each
Composite Rate Per Each

0.35Lbs (0 .035) Gln

Page 61

Painting and lettering furlong Km stone o


sides.
One Coat.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

.35Lbs (0 .035) Gln


0.02 No.

P. Gln
Each

1/7/2012 No
1/7/2012 No

P. Day
P. Day
-

Rs.

Say

Rs.

Say

Item No.

22
b)
ii)

Painting and lettering furlong Km st


sides.
Two Coat.

Detail

Rate Analysis for


Material

No.

Paint white and black


Brushes
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each
Labour
Rate Analysis for 15 No.
Painter (Artist)
Cooly
Total
Sundries
Total
Rate Per No.
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per Each
Composite Rate Per Each

##### Percent

Page 62

d lettering furlong Km stone on both

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

0.6Lbs (0 P. Gln
0.06 No.
Each

0.25 No
0.25 No

P. Day
P. Day

Rs.
Rs.

Say
Say

Item No.

22
c)
i)

Painting and lettering sign posts.


One Coat.

Detail

Rate Analysis
Material

for

1.5

Nos.

Paint white and black


Brushes

0.35Lbs (0 .035) Gln

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each
Labour
Rate Analysis for 2.5 No.
Painter (Artist)
Cooly
Total
Sundries
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each
Item Rates
Labour Rate Per Each
Composite Rate Per Each

##### Percent

Page 63

d lettering sign posts.

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

.35Lbs (0 .035) Gln


0.04 No.

P. Gln
Each

0
1.5

0.20 No
0.20 No

P. Day
P. Day

Rs.

Say

Rs.

Say

Item No.

22
c)
ii)

Painting and lettering sign posts.


Two Coat.

Detail

Rate Analysis for 1.5 Nos


Material
Paint white and black
Brushes

0.6Lbs (0 .06) Gln

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each
Labour
Rate Analysis for 2.5 No.
Painter (Artist)
Cooly
Total
Sundries
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each
Item Rates
Labour Rate Per Each
Composite Rate Per Each

##### Percent

Page 64

d lettering sign posts.

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

.6Lbs (0 .06) Gln


0.06 No.

P. Gln
Each

0
1.5

0.33 No
0.33 No

P. Day
P. Day

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO

23:

Detail

Removing paint or varnish from wall.

Unit Rate (British System)


Qty

Rate Analysis for 125 Sft


Labour
Unskilled Cooly
Total
Sundries
Total

1.00 No

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

Page 65

int or varnish from wall.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Day

Say

Say

DESCRIPTION

OF

ITEM NO

24:

a)
Detail

Scraping from hydraulic gates.


Khanki Paint.
Unit Rate (British System)
Qty

Rate Analysis for 125 Sft


Labour
Unskilled Cooly

2.00 No

Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

Page 66

om hydraulic gates.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Day

Say

Say

Item No.

24

Scraping from hydraulic gates.


b)
Detail

Aluminium paint.
Unit Rate (British System)
Qty

Rate Analysis for 125 Sft


Labour
Unskilled Cooly

2.00 No

Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

Page 67

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Day

Say

Say

DESCRIPTION

OF

ITEM NO

25:

Detail

Painting lettering with shade.

Unit Rate (British System)


Qty

nalysis for 100 Letters, P. Inch Height


Material
Paint
Brushes

0.5Lbs (0 .05) Gln


0.12 No.

Total
Contractor's Profit & Ove ##### Percent
Total
36.85
Labour
Rate Analysis for 150 Letters
Painter (Artist)
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 litters
Item Rates
Labour Rate Per 100 Litter
Labour Rate Per Each
Composite Rate Per 100 Litter
Composite Rate Per Each

100
1.60 No
1.60 No

Page 68

ttering with shade.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

0.37

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

26:

Detail

Scraping rust for old rail or girders.

Unit Rate (British System)


Qty

Material
Sand Paper
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

1.50 No

Page 69

st for old rail or girders.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

No.

P. Doz

P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

27:

Detail

Chiselling old paint from brick work.

Unit Rate (British System)


Qty

Material
Steel Scrapper
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

2.00 Nos

Page 70

old paint from brick work.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

No.

P. Doz

P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

28:

Cleaning glasses with chalk

Detail

Rate Analysis

for

600 Sft

Material
Chalk 1.00
Spirit
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft
Labour
Rate Analysis for 750 Sft
Unskilled Cooly
Total
Sundries
Total

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 71

leaning glasses with chalk and spirit etc

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

No.
P.
1.00 Litre P. Lit

Doz

0
6

10.00 Nos P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

29:

Detail

Cleaning and oiling rafter or rolled s


Unit Rate (British System)
Qty

Material
Oil
Brushes

0.5Lbs (0 .37) Ltr


0.04 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.50 Nos

Rs.
Rs.
Rs.
Rs.

Page 72

d oiling rafter or rolled steel

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Ltr
Each

P. Day

Say
Say

Say
Say

DESCRIPTION

OF

ITEM NO

30:

Cleaning and painting punkha poles, in


fixing hooks.

Detail

Unit Rate (British System)


Qty

Rate Analysis for

3 Nos

Material
Paint
Brushes

0.25Lbs (0 .025) Gln


0.04 No.
Total
Contractor's Profit & Ove ##### Percent
Total
Rate for Each

0
3

Labour
Rate Analysis for 4 Nos
Skilled cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per No.
Item Rates
Labour Rate Per Each
Composite Rate Per Each

1.00 No

Rs.
Rs.

Page 73

d painting punkha poles, includi

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day

Say

Say

DESCRIPTION

OF

ITEM NO

31:
a)
Detail

Material
Paint
Brushes
Sand Paper

1.57Lbs ( 0.16) Gln

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter
Unskilled Cooly

125 Sft

Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 74

Preparing surface and painting with emulsio


First Coat.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

.57Lbs ( 0.16) Gln


0.08 No.
0.33 No.

P. Gln
Each
P. Doz

0.33 No
0.06 No

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

31
b)

Preparing surface and painting with emulsion pai


2nd Coat and subsequent coat.

Detail

Unit Rate (British System)


Qty

Material
Emulsion Paint
Sand paper

1.18Lbs (0 .118) Gln


1.17 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.25 No
0.05 No

Page 75

painting with emulsion paint.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
P. Doz

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

32:

a)
i)
Detail

Preparing surface and paint


coloured cement finish, lik
other finishes with similar
etc.
New Surface
Ist Coat.
Unit Rate (British System)
Qty

Material
Paint Durasum
Brushes 0.12 No.
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter
Unskilled Cooly
Total
Sundries
Total

1.50 Kg

125 Sft
0.33 No
0.06 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 76

reparing surface and painting with water p


oloured cement finish, like duracem, buxce
ther finishes with similar specifications

ew Surface

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
Each

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

32

a)
ii)
Detail

Preparing surface and painting with water proof


coloured cement finish, like duracem, buxcem or
other finishes with similar specifications on wa
etc.
New Surface
2nd Coat and subsequent coat.
Unit Rate (British System)
Qty

Material
Emulsion Paint
Brushes 0.12 No.
Sand Paper
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Unskilled Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

1.25 Kg
0.17 No.

0.25 No
0.05 No

Page 77

painting with water proof


, like duracem, buxcem or
milar specifications on walls,

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
Each
P. Doz

P. Day
P. Day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

32

b)
i)
Detail

Preparing surface and painting with water proof


coloured cement finish, like duracem, buxcem or
other finishes with similar specifications on wa
etc.
Old Surface
Ist Coat.
Unit Rate (British System)
Qty

Material
Paint
Brushes 0.10 No.
Total
Contractor's Profit & Ove ##### Percent
Total

1.25Lbs ( 0.57) Kg

Labour Rate for 125 Sft.


Painter
Unskilled Cooly
Total
Sundries
Total

0.33 No
0.06 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 78

painting with water proof


, like duracem, buxcem or
milar specifications on walls,

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
Each

P. Day
P. Day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

32

b)
ii)
Detail

Preparing surface and painting with water proof


coloured cement finish, like duracem, buxcem or
other finishes with similar specifications on wa
etc.
Old Surface
2nd Coat and subsequent coat.
Unit Rate (British System)
Qty

Material
Emulsion Paint
Sand paper
Total
Contractor's Profit & Ove ##### Percent
Total

1.10Lbs ( 0.50) Kg
0.67 No.

Labour for 125 Sft.


Painter
Unskilled Cooly
Total
Sundries
Total

0.25 No
0.05 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 79

painting with water proof


, like duracem, buxcem or
milar specifications on walls,

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
P. Doz

P. Day
P. Day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

32A

Providing and applying weather shield paint of approved


quality on external surface of building including
preparation of surface application of primer complete
in all respects.
a) New Surface
i) Ist Coat
Detail
Unit Rate (British System)
Qty

Material
i) Varnish
ii) Putty and sand paper (L.S)
iii) Primer (Zine) 1 Kg (for % Sft) @ Rs.80.00 per Kg.
iv) Weather shield paint 0.7 Litre (for 100 Sft)
@ Rs.120.00 per Litre
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Cooly
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Item Rates
Labour Rate Per % Sft
Labour Rate Per Sqm
Composite Rate Per % Sft
Composite Rate Per Sqm

1 kg
1 LS
1
.7

0.40 No
0.80 No

Page 80

paint of approved

imer complete

nit Rate (British System) per 10 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Kg
L.S
P. Kg

P. Day
P. Day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

32A

Providing and applying weather shield paint of approved


quality on external surface of building including
preparation of surface application of primer complete
in all respects.
a) New Surface
ii) 2nd Coat
Detail
Unit Rate (British System)
Qty

Material
i) Weather Shield paint
0.67 litre (for 100 Sft) @ 120/- per litre

0.67

P.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Cooly
Total
Sundries
Total

0.25 No
0.40 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Item Rates
Labour Rate Per % Sft
Labour Rate Per Sqm
Composite Rate Per % Sft
Composite Rate Per Sqm

Page 81

paint of approved

imer complete

nit Rate (British System) per 10 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Lit

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

32A

Providing and applying weather shield paint of approved


quality on external surface of building including
preparation of surface application of primer complete
in all respects.
b) Old Surface

Detail

Unit Rate (British System)


Qty

Material
i) Weather Shield paint
0.67 litre (for 100 Sft) @ 120/- per litre
Total
Contractor's Profit & Ove ##### Percent
Total

0.67

P.

Labour
Painter
Cooly
Total
Sundries
Total

0.25 No
0.40 No
##### Percent

Contractor's Profit & Ove ##### Percent


Total
Item Rates
Labour Rate Per % Sft
Labour Rate Per Sqm
Composite Rate Per % Sft
Composite Rate Per Sqm

Page 82

paint of approved

imer complete

nit Rate (British System) per 10 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

Lit

P. Day
P. Day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

33:

Painting traffic lanes 5\"


marking enamel.
Detail

Rate Analysis for

700 Rft

Material
Road marking enamel
Brushes

7.3Lbs ( 3.32) Ltr

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft
Labour
Rate Analysis for 1000 Rft
Painter
Cooly
Total
Sundries
Total

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Rft.
Item Rates
Labour Rate Per Rft
Labour Rate Per P.Rm
Composite Rate Per Rft
Composite Rate Per Rm

Page 83

ainting traffic lanes 5\" (125mm) wide with


arking enamel.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

.3Lbs ( 3.32) Ltr


0.18 No.

P. Ltr
Each

0
700

1.00 No
1.00 No

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

34:

Painting traffic lanes 5\"


paint, complete in all resp
Detail

Rate Analysis
Material

for

700 Rft

Reflective Paint
Brushes

7.3Lbs ( 3.32) Ltr

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft
Labour
Rate Analysis for 1000 Rft
Painter
Cooly
Total
Sundries
Total

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Rft.
Item Rates
Labour Rate Per Rft
Labour Rate Per P.Rm
Composite Rate Per Rft
Composite Rate Per Rm

Page 84

ainting traffic lanes 5\" (125mm) wide with


aint, complete in all respects. marking en
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

.3Lbs ( 3.32) Ltr


0.18 No.

P. Ltr
Each

0
700

1.00 No
1.00 No

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

35:

Repainting of ceiling fan (all sizes a


including painting of blades, canopy,
rod and regulator, with suitable ename

Detail

Unit Rate (British System)


Qty

Material
Paint
Brush

0.13Lt (0 .03) Gln


0.12 No.
Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Rate Analysis for

14 No

Painter

1.00 No

Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Job
Item Rates
Labour Rate Per Job

Rs.

Composite Rate Per Job

Rs.

Page 85

of ceiling fan (all sizes and ty


ainting of blades, canopy, suspe
ulator, with suitable enamel pai

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day

Say

Say

DESCRIPTION

OF

ITEM NO

36:

Repainting of iron poles with cross ar


bitumen or other approved paint.

Detail

Unit Rate (British System)


Qty

Material
Paint
Brush

0.6Ltr (0 .13) Gln


0.12 No.
Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Rate Analysis for

6 Nos

Painter

1.00 No

Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Job
Item Rates
Labour Rate Per Job

Rs.

Composite Rate Per Job

Rs.

Page 86

of iron poles with cross arms, w


other approved paint.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day

Say

Say

DESCRIPTION

OF

ITEM NO

37:

i)
Detail

Material
Rate Analysis for 7 Metre
Paint
Brush
Total
Contractor's Profit & Ove ##### Percent
Total
Rate for One Metre
Labour
Rate Analysis for 200 Metre
Painter
Total
Sundries
Total

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate for One Metre

Item Rates
Labour Rate Per Rm
Composite Rate Per Rm
Labour Rate Per Rft
Composite Rate Per Rft

Page 87

Repainting of pipes and specials of G.I. M


conduit etc. fixed on surface for electric
with approved paint.
Upto 40mm (1\") dia.
Unit Rate (Metric System) per Meter
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

0.1Ltr (0. 022) Gln


0.12 No.

P. Gln
Each

0
7

1.00 No

P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

37

ii)

Repainting of pipes and specials of G.


conduit etc. fixed on surface for elec
with approved paint.
Above 40mm (1\") to 50mm (2\") dia.

Detail

Material
Rate Analysis for 7 Metre
Paint
Brushes

0.2Ltr (0. 044) Gln

Total
Contractor's Profit & Ove ##### Percent
Total
Rate for One Metre
Labour
Rate Analysis for 100 Metre
Painter
Total
Sundries
Total
Contractor's Profit & Ove ##### Percent
Total
Rate for One Metre

Item Rates
Labour Rate Per Rm
Composite Rate Per Rm
Labour Rate Per Rft
Composite Rate Per Rft

##### Percent

Page 88

of pipes and specials of G.I. M.S. or


. fixed on surface for electric wiring

(1\") to 50mm (2\") dia.


Unit Rate (Metric System) per Meter
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

.2Ltr (0. 044) Gln


0.12 No.

P. Gln
Each

0
7

1.00 No

P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

37

iii)

Repainting of pipes and specials of G.


conduit etc. fixed on surface for elec
with approved paint.
Above 50mm (2\") to 100mm (4\") dia.

Detail

Material
Rate Analysis for 7 Metre
Paint
Brushes

0.3Ltr (0. 066) Gln

Total
Contractor's Profit & Ove ##### Percent
Total
Rate for One Metre

Labour
Rate Analysis for 60 Metre
Painter
Total
Sundries
Total
Contractor's Profit & Ove ##### Percent
Total
Rate for One Metre
Item Rates
Labour Rate Per Rm
Composite Rate Per Rm
Labour Rate Per Rft
Composite Rate Per Rft

##### Percent

Page 89

of pipes and specials of G.I. M.S. or


. fixed on surface for electric wiring

(2\") to 100mm (4\") dia.


Unit Rate (Metric System) per Meter
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

.3Ltr (0. 066) Gln


0.18 No.

P. Gln
Each

0
7

1.00 No

P. Day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

38:

Repainting main switches and branch di


boards of all sizes and types, with ap
(complete set).

Detail

Unit Rate (British System)


Qty

Material
Paint
Brushes

0.2Ltr (0. 044) Gln


0.16 No.
Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Painter

0.03 No
Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total

Item Rates
Labour Rate Per Each

Rs.

Composite Rate Per Each

Rs.

Page 90

main switches and branch distrib


ll sizes and types, with approve

nit Rate (British System) per Job


Rate
Per Unit (Rs.) Amount (Rs.)

P. Gln
Each

P. Day
-

Say

Say

DESCRIPTION

OF

ITEM NO

39:

Detail

Extra labour for painting, varnishing,


(6 M) height and above, for every addi
(3.05 M) height, or scaffolding.

it Rate (British System) per 100 Sft p


Qty

Rate Analysis for 125 Sft


Labour
Unskilled Cooly

0.16 No

Total
Sundries
##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft Per Coat
Labour Rate Per Sqm Per Coat

Rs.
Rs.

Page 91

r for painting, varnishing, etc


t and above, for every additiona
ight, or scaffolding.

itish System) per 100 Sft per Co


Rate
Per Unit (Rs.) Amount (Rs.)

P. Day

Say
Say

CHAPTER NO. 16

PROTECTION & DIVERSION WORKS


DESCRIPTION OF ITEM
1

Cutting pilchi frash or sarkanda including carriage within one mile (


Detail
Qty
Analysis for 125 Cft.

LABOUR
Coolies

1.9
Total
Sundries (10%)
Total
Contractor's Profit &
Total for 125 Cft.

10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum

Rs.
Rs.

DESCRIPTION OF ITEM
Weaving matresses

Detail
Qty
Analysis for 125 Cft.
LABOUR
Coolies

3.6
Total
Sundries (10%)
Total
Contractor's Profit &
Total for 125 Cft.

10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum

Rs.
Rs.

Page 1

ION WORKS

carriage within one mile (1.6 Km.)


Unit Rate Per 100 Cft.
Rate
Per Unit (Rs.) Amount (Rs.)

Nos.

0.00 per

day

Say
Say

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Nos.

0.00 per

day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
3 a)

Supplying and filling jute bags 1.25 Cft. capacity with sand or earth
stacking in dry

Detail

(Rate Analysis for 10 Nos.)


MATERIAL
Empty Jute Bags 1.25 Cft. Capacity
Sutli
Total
Contractor's Profit &
20 Percent
Total for 10 Bags

1/8 Sr. (0.12 Kg.)

LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit &
Total for 10 Bags

.45
10 Percent
20 Percent

ITEM RATE
Labour Rate Per Bag

Composite Rate Per Bag

Page 2

apacity with sand or earth sewing and

Unit of Rate Per Bag


Rate
Per Unit (Rs.) Amount (Rs.)

Qty

10
/8 Sr. (0.12 Kg.)

Nos.

0.0 Each
0.00 Per Kg.

No.

0.00 Per day

0.0 =

0.0 -

0.0 -

10
+ 0.00
10

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

b)

Supplying and filling jute bags 1.25 Cft. Capacity with sand or earth
and laying in position under water

Detail

(Rate Analysis for 10 Nos.)


MATERIAL
Empty Jute Bags 1.25 Cft. Capacity
Sutli
Total
Contractor's Profit &
20 Percent
Total for 10 Bags

1/8 Sr. (0.12 Kg.)

LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit &
Total for 10 Bags

.7
10 Percent
20 Percent

ITEM RATE
Labour Rate Per Bag

Composite Rate Per Bag

Page 3

apacity with sand or earth sewing

Unit of Rate Per Bag


Rate
Per Unit (Rs.) Amount (Rs.)

Qty

10
/8 Sr. (0.12 Kg.)

Nos.

0.0 Each
0.00 Per Kg.

No.

0.00 Per day

0.0 =

0.0 -

0.0 -

10
+ 0.00
10

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
4 a)

Supplying and filling new jute bags 4 to 5 Cft. capacity, with sand o
Sewing and stacking in dry.
Detail
Qty
(Rate Analysis for 65 Bags)

MATERIAL
New jute bags 4 to 5 Cft capacity
50
Cost of Sutli
1.50 Sr. (1.40 Kg.)
Total
Contractor
20 Percent
Total for 65 Bags
LABOUR
Coolies required for filling, sewing
and stacking in dry (50 Nos. bags)
Sundries (
10 Percent
Total
Contractor
20 Percent
Total for 65 Bags

ITEM RATE
Labour Rate Per Bag
Composite Rate Per Bag

0.0
-

65
+ 0.00
65

Page 4

Cft. capacity, with sand or earth

Unit of Rate Per Bag


Rate
Per Unit (Rs.) Amount (Rs.)

Nos.

0.0 Each
0.00 Per Kg.

Nos.

0.00 Per day

0.0 -

0.0 -

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

b)

Supply and filling new jute bags 4 to 5 Cft. capacity with sand or ea
and laying in position under water.

Detail

Unit of Rate Per Bag


Qty

(Rate Analysis for 65 Bags)


MATERIAL
New jute bags 4 to 5 Cft capacit50
Nos.
Cost of Sutli
1.50 Sr. (1.40 Kg.)
Total
Contractor
20 Percent
Total for 65 Bags
LABOUR
Coolies required for filling, se10
and stacking in dry 50 Nos. bags.
Sundries (
10 Percent
Total
Contractor
20 Percent
Total for 65 Bags

Nos.

ITEM RATE
Labour Rate Per Bag

0.0
65

Composite Rate Per Bag

+ 0.00
65

Page 5

. capacity with sand or earth, sewing

nit of Rate Per Bag


Rate
Per Unit (Rs.) Amount (Rs.)

0.0 Each
0.00 Per Kg.

0.00 Per day

0.0 -

0.0 -

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
5

Carriage of jute bags 1.25 Cft. capacity filled with sand or earth

Detail

Unit of Rate 100 Bags


Qty

A)

First Chain (30.0 Metre)

LABOUR FOR 125 BAGS


Cooly
Sundries -1,000.%
10 Percent
Total
Contractor
20 Percent
Total
Labour of Rate for 100 Bags

.5 No.

Rs.

B)
Second to Fourth Chain
(Above 30.0 metre to 120 Metre)
LABOUR FOR 125 BAGS
Cooly
Sundries -1,000.%
10 Percent
Total
Contractor
20 Percent
Total
Labour of Rate for 100 Bags
C) Fifth and Subsequent Chain
(120 metres and above)

.18 No.

Rs.

LABOUR FOR 125 BAGS


Cooly
Sundries -1,000.%
10 Percent
Total
Contractor
20 Percent
Total
Labour of Rate for 100 Bags

.07 No.

Rs.

Page 6

lled with sand or earth

nit of Rate 100 Bags


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per

Day

0.0 Say

0.00 Per

Day

0.0 Say

0.00 Per

Day

0.0 Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
6

Carriage of new jute bags 4 to 5 Cft. Capacity filled with sand or ea

Detail

Unit of Rate 100 Bags


Qty

A)

First Chain

LABOUR FOR 125 BAGS


Cooly
Sundries -1,000.%
10 Percent
Total
Contractor
20 Percent
Total
Labour of Rate for 100 Bags
B)
Second to Fourth Chain
(30.0 metre to 120.0 metre)

2 Nos.

Rs.

LABOUR FOR 125 BAGS


Cooly
Sundries -1,000.%
10 Percent
Total
Contractor
20 Percent
Total
Labour of Rate for 100 Bags/Per Rs.

.7 No.

C) Fifth and Subsequent Chain


(120 metres and above)
LABOUR FOR 125 BAGS
Cooly
Sundries -1,000.%
10 Percent
Total
Contractor
20 Percent
Total
Labour of Rate per 100 Bags/per Rs.

.27 No.

Page 7

ity filled with sand or earth

nit of Rate 100 Bags


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per

day

0.0 Say

0.00 Per

day

0.0 Say

0.00 Per

day

0.0 Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
7

Rolling matresses to river edge and floating after unrolling

Detail

Unit of Rate
Qty

a)

Area of matress upto 2000 Sft

LABOUR
Cooly
Sundries -1,000.%
Total
Contractor
Total

.9 Nos.
10 Percent
20 Percent

Labour Rate Per 100 Sft.


Labour Rate Per Sqm
b)

Area of matresses from 2000


to 2500 Sft.

LABOUR
Cooly
Sundries -1,000.%
Total
Contractor
Total

1.5 Nos.
10 Percent
20 Percent

Labour Rate Per 100 Sft.


Labour Rate Per Sqm
c)

Rs.
Rs.

Rs.
Rs.

Area of matresses over 2500 Sft.

LABOUR
Coolies
Sundries -1,000.%
10 Percent
Total
Contractor
20 Percent
Total
Labour Rate Per 100 Sft.
Labour Rate Per Sqm

1.75 Nos.

Rs.
Rs.

100 Sft.

Page 8

g after unrolling

nit of Rate 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per

day

0.0 Say
0.0 Say

0.00 Per

day

0.0 Say
0.0 Say

0.00 Per

day

0.0 Say
0.0 Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
8

Sewing empty cement bags in sheets

Detail

Unit of
Qty

MATERIAL
1

Sutli, Strings
Contractor
Total

1 Sr. (0.933 Kg.)


20 Percent

LABOUR
Coolies

1.4 No.
Sundries (
Total
Contractor
Total

10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Nos.
Composite Rate Per 100 Nos.

Rs.
Rs.

Rate Per 100 Nos.

Page 9

nit of

Rate Per 100 Nos.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per Kg.

0.00 Per

day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
9

Making compact round pilchi, frash or sarkanda round bundles of speci


size for the work
Detail

Unit of Rate Per 100 Cft.


Qty

MATERIAL
Munjban
100 x 5 se = 2.31 Seers (2.1
216 Cft.
Contractor
20 Percent
Total

2.15 Kg.

LABOUR
Coolies

1.95 Nos.
Sundries (
Total
Contractor
Total

10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 10

nda round bundles of specified

nit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per Kg.

0.00 Per

day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
10

Launching and placing in position, compact round pilchi, frash or Sar


bundles of specified size.

Detail

Unit of Rate Per 100 Cft.


Qty

Rate Analysis for 125 Cft.


LABOUR
Coolies
Sundries -1,000.%
Total
Contractor
Total

1.2 Nos.
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

DESCRIPTION OF ITEM
11

Supplying within 5 chains


a)
Boulders 9\" and above

Detail

Unit Rate Per 100 Cft.


Qty

Rate Analysis for 125 Cft.


LABOUR
Coolies
Sundries -1,000.%
Total
Contractor
Total
ITEM RATE

3.62 Nos.
10 Percent
20 Percent

Labour Rate Per 100 Cft.


Labour Rate Per Cum.

Rs.
Rs.

Page 11

round pilchi, frash or Sarkanda

nit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per

Day

Say
Say

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per

Day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

b)

Over size shingle 3\" to 9\"

Detail

Unit Rate Per 100 Cft.


Qty

Rate Analysis for 125 Cft.


LABOUR
Coolies
Sundries -1,000.%
Total
Contractor's Profit &
Total
ITEM RATE

2.42 Nos.
10 Percent
20 Percent

Labour Rate Per 100 Cft.


Labour Rate Per Cum.

c)

Rs.
Rs.

Mixed graded shingle

Detail

Unit Rate Per 100 Cft.


Qty

Rate Analysis for 125 Cft.


LABOUR
Coolies
Sundries -1,000.%
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.

2.87 Nos.
10 Percent
20 Percent

Rs.
Rs.

Page 12

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per

Day

Say
Say

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per

Day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
12

Supply munj or patha trungers 6\" mesh to hold 3 Cft.

Detail
Qty
(Rate Analysis for Two Nos.)
MATERIAL
Munjban (rough)
Contractor
Total

2 seer (1.87 Kg.)


20 Percent

LABOUR
Coolies

.25
Sundries (
Total
Contractor
Total

10 Percent
20 Percent

ITEM RATE
Labour Rate Per Bag

0.0
2

Composite Rate Per Bag

+ 0.00
2

Page 13

old 3 Cft.

Unit of

Rate Per No
Rate
Per Unit (Rs.) Amount (Rs.)

No.

0.00 Per kg.

0.00 Per

day

0.0

0.0

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
13

Providing and weaving G.I. wire netting for wire crates with G.I. wir
(including siding and partition to make crates).
a)

6\" mesh

(i)

G.I. Wire 15 SWG

Detail
Qty
MATERIAL
G.I. Wire No. 15 (500' long)
Contractor's Profit &
20 Percent
Total

6.8 Lbs (3.08 Kg.)

LABOUR
Black smith

.7
.7

Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total

10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 14

wire crates with G.I. wire of approved size

.I. Wire 15 SWG


Unit Rate Per 100 Sft.
Rate
Per Unit (Rs.) Amount (Rs.)

.8 Lbs (3.08 Kg.)

No.
No.

1.00 Per Kg.

3.08
.62
3.7

0.00 Per day


0.00 Per
day

Say
Say
3.7 Say
.4 Say

3.7
.4

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
13

Providing and weaving G.I. wire netting for wire crates with G.I. wir
(including siding and partition to make crates).
a)

6\" mesh

(ii)

G.I. Wire 10 SWG

Detail
Qty
MATERIAL
G.I. Wire No. 10 (500' long)
Contractor's Profit &
20 Percent
Total

22.0 Lbs (10.0 Kg.)

LABOUR
Black smith

.75
.75

Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total

10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 15

wire crates with G.I. wire of approved size

.I. Wire 10 SWG


Unit Rate Per 100 Sft.
Rate
Per Unit (Rs.) Amount (Rs.)

2.0 Lbs (10.0 Kg.)

No.
No.

0.00 Per Kg.

0.00 Per day


0.00 Per
day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

a)

6\" mesh

(iii)

G.I. Wire 8 SWG

Detail

Unit Rate Per 100 Sft.


Qty

MATERIAL
G.I. Wire No. 8 (500' long)
Contractor's Profit &
20 Percent
Total
LABOUR
Black smith
Cooly
Total
Sundries (10%)
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

34.5 Lbs (15.68 Kg.

0.75 No.
0.75 No.
10 Percent
20 Percent

Rs.
Rs.
Rs.
Rs.

Page 16

nit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per Kg.

0.00 Per day


0.00 Per
day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

13 b)

4\" mesh

(i)

G.I. Wire 15 SWG

Detail

Unit Rate Per 100 Sft.


Qty

MATERIAL
G.I. Wire No. 15 750' long
Contractor's Profit &
Total
LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

10.20 Lbs (4.63 Kg.


20 Percent

0.9 No.
0.9 No.
10 Percent
20 Percent

Rs.
Rs.
Rs.
Rs.

Page 17

nit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per Kg.

0.00 Per day


0.00 Per
day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

13 b)

4\" mesh

(ii)

G.I. Wire 10 SWG

Detail

Unit Rate Per 100 Sft.


Qty

MATERIAL
G.I. Wire No. 10 750' long
Contractor's Profit &
Total
LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

33.0 Lbs (14.97 Kg.


20 Percent

1 No.
1 No.
10 Percent
20 Percent

Rs.
Rs.
Rs.
Rs.

Page 18

nit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per Kg.

0.00 Per day


0.00 Per
day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

13 b)

4\" mesh

(iii)

G.I. Wire 8 SWG

Detail

Unit Rate Per 100 Sft.


Qty

MATERIAL
G.I. Wire No. 8 750' long
Contractor's Profit &
Total
LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

51.75 Lbs (23.47 Kg


20 Percent

1 No.
1 No.
10 Percent
20 Percent

Rs.
Rs.
Rs.
Rs.

Page 19

nit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per Kg.

0.00 Per day


0.00 Per
day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

14

Providing and laying shingle on top of bund, including handling of ma


three chains (90 metres)

Detail

Unit Rate Per 100 Cft.


Qty

MATERIAL
Shingle

110 Cft.
Contractor
Total

20 Percent

Sundries (
Total
Contractor
Total

10 Percent

LABOUR
Cooly

1 No.

20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 20

, including handling of material within

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00r 100 Cf

0.00 Per

day

Say
Say
Say
.02 Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
15

Supply and Dumping at site, without boat, including handling of mater


three chains (90 metres).
a)
Stone or boulder

Detail

Unit Rate Per 100 Cft.


Qty

MATERIAL
Boulder

110 Cft.
Contractor
Total

20 Percent

Sundries (
Total
Contractor
Total

10 Percent

LABOUR
Cooly

1.75 No.

20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
b)

Rs.
Rs.
Rs.
Rs.

Shingle or Spawl
Detail

Unit Rate Per 100 Cft.


Qty

MATERIAL
Shingle / Spawl
Contractor
Total

110 Cft.
20 Percent

LABOUR
Cooly

1.75 No.
Sundries (
Total
Contractor
Total

10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

c)

Brick Bats
Page 21

ncluding handling of material within

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)
0.00er 100 C

0.00 Per

day

Say
Say
Say
Say

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00er 100 C

0.00 Per

day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail

Unit Rate Per 100 Cft.


Qty

MATERIAL
Brick
Bat
Contractor's Profit &
Total

110 Cft.
20 Percent

LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

1.35 No.
10 Percent
20 Percent

Rs.
Rs.
Rs.
Rs.

Page 22

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00er 100 C

0.00 Per

day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
16

Supply and damping by boat including loading into boats within 3 chai
and hire charges of boat and boatman
a)

Stone, Boulder
Detail
Qty

MATERIAL
Stone or Boulder
Contractor's Profit &
Total

110
20 Percent

LABOUR
Boatman with large boat
Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total

1
2
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 23

g into boats within 3 chains lead

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Cft.

0.00er 100 C

No.
No.

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

b)

Shingle, Spawl

Detail
Qty
MATERIAL
Spawl

110
Contractor's Profit &
Total

20 Percent

LABOUR
Boatman with large boat
Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total

1
2
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
c)

Rs.
Rs.
Rs.
Rs.

Brick Bats
Detail
Qty

MATERIAL
Brick

Bat
Contractor's Profit &
Total

110
20 Percent

LABOUR
Boatman with Large Boat
Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total

1
1.6
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

17

DESCRIPTION OF ITEM
Providing and filling bricks bats in crates (excluding cost of crates
Page 24

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)
Cft.

0.00er 100 C

No.
No.

0.00 Per day


0.00 Per day

Say
Say
Say
Say

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Cft.

0.00er 100 C

No.
No.

0.00 Per day


0.00 Per day

Say
Say
Say
Say

(excluding cost of crates)


C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail

Unit Rate Per 100 Cft.


Qty

MATERIAL
Brick
Bat
Contractor's Profit &
Total

110 Cft.
20 Percent

LABOUR
Skilled Cooly
Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

1 No.
1.3 Nos.
10 Percent
20 Percent

Rs.
Rs.
Rs.
Rs.

Page 25

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00er 100 C

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
18

Supplying and filling bricks in wire crates and hand packing (excludi

Detail

Unit Rate Per 100 Cft.


Qty

MATERIAL
Bricks

1,500 Nos.
Contractor
Total

20 Percent

LABOUR
Cooly (Skilled)
Coolies (Unskilled)
Total
Sundries (
10 Percent
Total
Contractor
20 Percent
Total

1 No.
1.8 Nos.

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate Per 100 Cft.
Composite Rate Per Cum.

Rs.
Rs.
Rs.
Rs.

Page 26

and hand packing (excluding cost of crates)

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00r 1000 No

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
19

Supplying and filling in wire crates, including sewing crates (exclud


i)

Stone or Boulders
Detail
Qty

MATERIAL
Stone or Boulders
Contractor's Profit &
Total

110
20 Percent

LABOUR
Cooly (Skilled)
Coolies (unskilled)
Total
Sundries (10%)
Total
Contractor's Profit &
Total

1
2.2
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate Per 100 Cft.
Composite Rate Per Cum.

Rs.
Rs.
Rs.
Rs.

Page 27

ding sewing crates (excluding cost of crates)

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Cft.

0.00er 100 C

No.
Nos.

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

ii

Shingle or Spawl

Detail

Unit Rate Per 100 Cft.


Qty

MATERIAL
Shingle or Sprawl
Contractor's Profit &
Total
LABOUR
Cooly (Skilled)
Coolies 2.20
Total
Sundries (10%)
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

110 Cft.
20 Percent

1 No.
Nos.
10 Percent
20 Percent

Rs.
Rs.
Rs.
Rs.

Page 28

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00er 100 C

0.00 Per day


0.00 Per

Say
Say
Say
Say

day

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
20

Extra for anchoring boat for dumping by boats or tipping crates.

Detail

Unit Rate Per 100 Cft.


Qty

Rate Analysis for 125 Cft.


LABOUR
Boatman

.44 No.
Sundries (
Total
Contractor
Total

10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

DESCRIPTION OF ITEM
21

Extra for tipping crates (in addition to anchoring boats)

Detail

Unit Rate Per 100 Cft.


Qty

Rate Analysis for 125 Cft.


LABOUR
Coolies

2 Nos.
Sundries (
10 Percent
Total
Contractor
20 Percent
Total
Extra L.s. for ballies
Total

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Page 29

ts or tipping crates.

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per

day

Say
Say

choring boats)

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
22

Pilchi revetment, including carriage upto one mile (1.6 Km)

Detail
Qty
MATERIAL
Supply pilchi lead within one m######
(As per item No. 1 of this chapter)
Total
LABOUR
Cooly

1
Sundries (
Total
Contractor
Total

10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

DESCRIPTION OF ITEM
23

Surface protection with pilchi matresses carriage upto one


Detail
Qty

MATERIAL
Supply pilchi lead

within one m Cft.

LABOUR
Coolies

2.5
Sundries (
Total
Contractor
Total

10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 30

iage upto one mile (1.6 Km)

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

Sft.

0.00er 100 S

No.

0.00 Per day

Say
Say
Say
Say

atresses carriage upto one mile (1.76 Km)


Unit Rate Per 100 Sft.
Rate
Per Unit (Rs.) Amount (Rs.)

20
No.

0.00er 100 C

0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

24

DESCRIPTION OF ITEM
Pilchi, sarkanda or frash pitching on slopes, including supply of pil
sarkanda or frash within one mile, also supply and driving of pegs 1
sharpened at one end and typing with wire or Munj ban (excluding cost
placing earth between rolls.
Detail

MATERIAL
Cutting pilchi and carriage to river ba
lead upto one mile
i.
Pilchi rolls 6\" dia 10 long
10x10x 22 x x x = 20 Cft.
7
Pilchi rolls 6\" dia 5' long
Cross wise
2
10x20x5x 22
x (0.5) x = 196 Cft
7
Total
= 20 + 196
= 216 Cft.
ii.
Kiker wood for pegs 18\" long 2\" dia=25 N
1
1
25 x / x 6
6
7
Wastage 2%
= 0.17 Cft.
= 1.02 Cft.
Binding wire 1 Lbs (0.454 Kg.)
Total
Contractor's Profit & Ov
20 Percent
Total
LABOUR FOR 125 SFT.
i.
Making pilchi rolls 6\" dia .
ii.
For laying pitchi rolls in position and
dressing page
Coolies (Unskilled)
Coolies (Skilled)
iii.
Sharpening wooden pegs 2\" dia and
18\" long
Total
Sundries (10%)
10 Percent
Total
Contractor's Profit & Ov
20 Percent
Total
Labour Per 100 Sft.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

s, including supply of pilchi,


ply and driving of pegs 1' long
r Munj ban (excluding cost of

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

Qty

######

1.02
.45

######

2
.5
Nos.

25

Cft.

0.00r 100 Cf

Cft.
Kg.

0.00Per Cft.
0.00 Per Kg.

Cft.

0.00r 100 Cf

Nos.
No.

0.00 Per day


0.00 Per day
0.00er 100 No

551.06

Rs.
Rs.
Rs.
Rs.

######
59.29
######
59.29

Say
Say
Say
Say

551.05
59.3
551.05
59.3

Page 31

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
25

Construction groynes upto 5 feet with single row of woodem vertical s


to 12\" dia. One average lead one mile

Detail
Qty
LABOUR
Vertical stakes 7\" - 12\" dia 1 foot a p
21
Supports
4
Total
No.
Wastage 10%
2.5
Total
Nos.
Say
Nos.
Ordinary coir (Ban)
0.35 Sr. (0.33 Kg.)
Royalty charges for 28 Nos. Stakes
28
Total
Contractor's Profit &
20 Percent
LABOUR
Skilled

Cooly
Cooly
Total
Sundries (10%)
Total
Contractor's Profit &
Total

.85
1
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 32

e row of woodem vertical stacks 7\"

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

Nos.
25
Nos.

27.5
28
.35 Sr. (0.33 Kg.)
Nos.

0.00r 100 No
0.00 Per Kg.
0.0 Each

No.
No.

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
26

Constructing groynes upto 10 ft height with double roww of wooden ver


stackes 7\" to 12\" dia, 2' apart, average lead one mile.

Detail
Qty
LABOUR
Lai stickes 7\" - 12\" thick
vertical stakes 9\" - 12\" thick
2' apart or two rows cross wise
Supports
Total
Wastage 10%
Total
Say
Ordinary coir (Ban)
Royalty charges for 32 Nos. Stakes
Total
Contractor's Profit &
20 Percent
LABOUR
Skilled

Cooly
Cooly
Total
Sundries (10%)
Total
Contractor's Profit &
Total

Nos
3
4
Nos.
2.9
Nos.
Nos.
Seer (0.47 Kg.)
32

1.2
2
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 33

double roww of wooden vertical


lead one mile.

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

22
Nos.
Nos.
29
Nos.
31.9
32
Seer (0.47 Kg.)
Nos.

0.00r 100 No
0.00 Per Kg.
0.0 Each

No.
No.

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
27

Providing and laying stone pitching/filling, dry hand packed, as fill


retaining walls or in pitching and aprons

Detail
Qty
MATERIAL
Stone

######
Contractor's Profit &

20 Percent

LABOUR
Skilled

Cooly
Cooly
Total
Sundries (10%)
Total
Contractor's Profit &
Total

1
1
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 34

, dry hand packed, as filling behind

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Cft.

0.00r

100 C

No.
No.

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
28

Providing and laying stone pitching with hammer dressed stones on sur
laid in courses

Detail
Qty
MATERIAL
Pitching

Stone
Contractor's Profit &

######
20 Percent

LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total

2.25
3
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Note : Carriage of stone will be paid for separately.


DESCRIPTION OF ITEM

Page 35

mmer dressed stones on surface

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Cft.

0.00r

100 C

No.
No.

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

29

Providing and laying stone pitching for top layer only


a)

On slope

Detail
Qty
MATERIAL
Pitching

Stone
Contractor's Profit &

######
20 Percent

LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total

1.5
3
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Note : Carriage of stone will be paid separately.

Rs.
Rs.
Rs.
Rs.

Page 36

layer only

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Cft.

0.00r

100 C

Nos
Nos

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

29 b)

On level

Detail

Unit Rate Per 100 Cft.


Qty

MATERIAL
Pitching Stone
Contractor's Profit &

LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total

######
20 Percent

1.5 Nos
2.5 Nos
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Cft.

Rs.
Rs.
Rs.
Rs.

Note : Carriage of stone will be paid separately.

Page 37

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00r

100 C

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
30

Providing and laying stone or spawl filling


a)

On level
Detail
Qty

MATERIAL
Spawl

######
Contractor's Profit &

20 Percent

LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total

.25
1
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 38

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Cft.

0.00r

100 C

No.
No.

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

b)

On Slope

Detail

Unit Rate Per 100 Cft.


Qty

MATERIAL
Spawl
Contractor's Profit &

LABOUR
Mason
Cooly
Total
Sundries (10%)
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

######

Cft.

20 Percent

0.48 No.
1 No.
10 Percent
20 Percent

Rs.
Rs.
Rs.
Rs.

Page 39

nit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00r

100 C

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
31

Providing and laying stone pitching hand packed, with surface leveled
section and voide filled in 1:8 cement, sand mortar, in floors of bri
and in aprons, etc.
i)

Top layer on slope


Detail
Qty

MATERIAL
Pitching

Stone
Cement
Sand
Total
Contractor's Profit &

######
2.7
Cft.
20 Percent

LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit &
Total

2.5
2.78
.5
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Note

Rs.
Rs.
Rs.
Rs.

Carriage of stone will be paid for separately

Page 40

cked, with surface leveled off to the correct


d mortar, in floors of bridges along banks

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Cft.
Bags

0.00r 100 C
0.00 Per Bag
0.00r 100 C

Nos.
Nos.
No.

0.00 Per day


0.00 Per day
0.00 Per day

26.4

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

PROT-DIV.XLS/ZAK

ii)

Top layer on level

Detail
Qty
MATERIAL
Pitching

Stone
Cement
Sand
Total
Contractor's Profit &

######
2.7
Cft.
20 Percent

LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit &
Total

2.5
2.28
0.5
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Note

Rs.
Rs.
Rs.
Rs.

Carriage of stone will be paid for separately

Page 41

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Cft.
Bags

0.00r 100 C
0.00 Per Bag
0.00r 100 C

Nos.
Nos.
No.

0.00 Per day


0.00 Per day
0.00 Per day

26.4

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

PROT-DIV.XLS/ZAK

iii)

Stone pitching/filling on slope or on level (oth

Detail
Qty
MATERIAL
Pitching

Stone
Cement
Sand
Total
Contractor's Profit &

######
2.7
Cft.
20 Percent

LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit &
Total

1.25
1.5
0.37
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Note

Rs.
Rs.
Rs.
Rs.

Carriage of stone will be paid for separately

Page 42

on slope or on level (other than top layer)

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Cft.
Pegs

0.00r 100 C
0.00 Per Peg
0.00r 100 C

Nos.
Nos.
No.

0.00 Per day


0.00 Per day
0.00 Per day

26.4

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
32

Grouting stone pitching or apron, etc. in


a)

Cement sand mortar (1:3)


Detail
Qty

MATERIAL
Cement
Sand
Total
Contractor's Profit &

6
Cft.
20 Percent

LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit &
Total

.5
1.34
.25
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 43

Unit of Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

Pegs

0.00 Per Peg


0.00r 100 C

No.
Nos.
No.

0.00 Per day


0.00 Per day
0.00 Per day

22.3

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

PROT-DIV.XLS/ZAK

Pitching or grouting stone apron etc. in :b)

Cement sand mortar (1:8)

Detail
Qty
MATERIAL
Cement
Sand
Total
Contractor's Profit &
Total
Say
LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm
Composite Rate per 100 Sft.
Composite Rate per Sqm.

2.7
Cft.

26.4

20 Percent

0.5
1
0.25
10 Percent
20 Percent

Rs.
Rs.
Rs.
Rs.

Page 44

Unit of Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

Pegs

0.00 Per Peg


0.00r 100 C

636

No.
Nos.
No.

0.00 Per day


0.00 Per day
0.00 Per day

######
Say

Say
Say
Say

636
68.45

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
33

Sand grouting in stone apron, with high pressure hose

Detail
Qty
MATERIAL
Sand
Contractor
Total
Say

Cft.

50

20 Percent

LABOUR
Mason
Coolies
Total
Sundries (
Total
Contractor
Total
Say

.2
.5
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 45

ssure hose

Unit of Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00r

100 C

193

No.
No.

0.00 Per day


0.00 Per day

86.52

86.52 Say
9.31
######
30.08 Say

Say
Say

86.5
9.3
279.5
30.1

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
34

Grouting stone filling or pitching with bajri

Detail
Qty
MATERIAL
Pegri
Contractor

Cft.

30

20 Percent

LABOUR
Coolies
Sundries (
Total
Contractor
Total

1.25
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate per 100 Cft.
Composite Rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 46

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00r

Nos.

100 C

0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
35

Removing stone and repitching hand packed on slopes or level after ma


damaged slope/portion.

Detail

Unit of Rate Per 100 Cft.

Qty
Rate Analysis for 125 Cft.
LABOUR
Cooly For Dismantlin
.85
Masons for repitching
1.5
Coolies
3
Total
Sundries (
10 Percent
Total
Contractor
20 Percent
Total
ITEM RATE
Labour Rate Per 100 CRs.
Labour Rate Per Cum Rs.

No.
Nos.
Nos.

Page 47

n slopes or level after making good

nit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day


0.00 Per day
0.00 Per day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
36

Collecting and stacking boulders from nullah beds or loose shale, or


site, within 3 chains lead

Detail
Qty
Rate Analysis for 125 Cft.
LABOUR
Coolies
Sundries (
Total
Contractor
Total

2
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum

Rs.
Rs.

DESCRIPTION OF ITEM
37

Levelling and dressing stone filling under blocks and grouting with s
Detail
Qty

MATERIAL
Shingle
Contractor

Cft.

30

20 Percent

LABOUR
Masons
Coolies
Total
Sundries (
Total
Contractor
Total
Say

.25
1
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate per 100 Cft.
Composite Rate per Cum

Rs.
Rs.
Rs.
Rs.

38

DESCRIPTION OF ITEM
Grouting jharies between blocks with bajri
Page 48

h beds or loose shale, or from any other

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Nos.

0.00 Per day

Say
Say

blocks and grouting with shingle


Unit of Rate Per 100 Cft.
Rate
Per Unit (Rs.) Amount (Rs.)

0.00r

No.
No.

100 C

0.00 Per day


0.00 Per day

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail
Qty
MATERIAL
Bajri
Contractor

Cft.

20

20 Percent

LABOUR
Masons
Coolies
Total
Sundries (
Total
Contractor
Total
Say

0.25
1
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate per 100 Cft.
Composite Rate per Cum

39

Rs.
Rs.
Rs.
Rs.

DESCRIPTION OF ITEM
Breaking stone into spawls and stacking

Detail
Qty
Rate Analysis for 125 Cft.
LABOUR
Coolies
Sundries (
Total
Contractor
Total

1.5
10 Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum

Rs.
Rs.

DESCRIPTION OF ITEM
40

Fixing floating spurs with materials from canal plantation within one
a)

Upto 2 foot F.s. depth

Detail
Page 49

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00r

No.
No.

100 C

0.00 Per day


0.00 Per day

Say
Say
Say
Say

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

No.

0.00 Per day

Say
Say

anal plantation within one mile lead

Unit of Rate Per No.


Rate
C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Qty
Analysis for 225 Nos.
LABOUR
Carpenter
Mate
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
ITEM RATE

1
1
7
10 Percent
20 Percent

Labour Rate Per No.

Rs.

b)

2.0' to 3.0' F.s. Depth

Detail
Qty
Analysis for 200 Nos.
LABOUR
Carpenter
Mate
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
ITEM RATE
Labour Rate Per No.

1
1
7
10 Percent
20 Percent

Rs.

Page 50

Per Unit (Rs.) Amount (Rs.)

No.
No.
Nos.

225

0.00 Per day


0.00 Per day
0.00 Per day

0 Say

Unit of Rate Per No.


Rate
Per Unit (Rs.) Amount (Rs.)

No.
No.
Nos.

200

0.00 Per day


0.00 Per day
0.00 Per day

0.0 Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

3.0' to 4.0' F.s. depth

Detail

Unit of Rate Per No.


Qty

Analysis for 150 Nos.


LABOUR
Carpenter
Mate
Coolies
Total
Sundries (10%)
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate Per No.

d)

1 No.
1 No.
7 Nos.
10 Percent
20 Percent

Rs.

Above

######

4'-0\" F.S. Depth

Detail

Unit of Rate Per No.


Qty

Analysis for 60 Nos.


LABOUR
Carpenter
Mate
Coolies
Total
Sundries 10.00
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate Per No.

1 No.
1 No.
7 Nos.
Percent
20 Percent

Rs.

60

Page 51

nit of Rate Per No.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day


0.00 Per day
0.00 Per day

0 Say

nit of Rate Per No.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day


0.00 Per day
0.00 Per day

0 Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
41

Staking and bushing from canal plantation within one mile. (Royalty t
Forest Department or private owner if and when required.

a (i)

Cutting and supply un-sharpened pegs 3.5 long, 3\" to 6\" dia from ca
sites lead within one mile (1.6 Km.)

Detail
Qty
MATERIAL
Kikar wood required for 100 No. Pegs
100 x 3.5 x 9/24x9/24 x 1/4x22/7 =38.70 Cft
Add 20% Wastage
7.74 / 46.44
Say
46.5 Cft.
Weight of 46.50 Cft. of green wood at
62 Lbs/ per Cft.
46.50 x 62/82.5 = 35 Mds (1306 Kgs.)
Royalty of Wood @ 70.00 per 100 Mds.
Total

35

LABOUR
Coolies for Cutting of wood for Pegs
Sundries 10.00
Percent
Total
Contractor
20 Percent
Total
ITEM RATE
Labour Rate for 100 Pegs
Composite Rate for 100 Pegs.

Rs.
Rs.

Page 52

ithin one mile. (Royalty to be paid to


hen required.

ng, 3\" to 6\" dia from canal plantation

Unit of Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

0.00r 100

Nos.

0.00Per

24.7

Say

Md

No.

Say

24.7
24.7

24.7

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (a)
3\" to

Sharpening one end of pegs 3.5 long


6 \" dia.

Detail

Unit of Rate Per 100 No. Pe


Qty

Rate Analysis for 125 Pegs


LABOUR
Carpenter
Cooly
Total
Sundries 10.00
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate for 100 Pegs

0.5 No.
0.5 No.
Percent
20 Percent

Rs.

41 (a) Driving pegs 3.5 long 3\" to 6\" (Driven


1.0' below the available bed or ground)
Detail

Unit of Rate Per 100 No. Pe


Qty

Rate Analysis for 125 Pegs


LABOUR
Cooly Skilled
Sundries 10.00
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate for 100 Pegs

1.4 Nos.
Percent
20 Percent

Rs.

Page 53

nit of Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

0.00Per
0.00Per

day
day

Say

nit of Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (a)

Tying pegs with Munj/Patha ban one line including tying around the pegs.

Detail

Unit of Rate Per Chain of O


Qty

MATERIAL
Requirement of ban for one chain
length of row of killas including a tie
around the pegs.
100 + (50x1 x 9/24 x 158.96 Lft.
Add 10% wastage
15.89 Lft.
Total
174.85 Lft.
Say
175.00 Lft.
Length of 1 Seer (0.933 Kg.) of Ban 250'
Hence Weight of 175 Lft
175
= 0.70 Seer
250
a) Supplying Ban Munj /
0.70 Seer (0.65 Kg.)
Contractor's Profit &
20 Percent
Total
LABOUR
Cooly
Sundries 10.00
Total
Contractor's Profit &
Total

.65 Kg.

.1 No.
Percent
20 Percent

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 54

ing tying around the pegs.

nit of Rate Per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per Kg.

0.00Per

day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (a) Cutting and supplying brushwood from canal plantation on private source
and wattling between stakes and intertwining. (Thickness of wattled brush wood

Detail

Unit Rate Per Chain of One


Qty
i. Brush wood measured in thoroughly
shapes before filling in the

MATERIAL
Requirement of brush wood
Length 100 Ft.
Thickness 1 Ft.
Height 2.5 Ft.
Contents 100x1.0'x2.5'
250 Cft.
250 Cft. or 188 Mds.
Royalty charges @ 20.00 % Cft.
LABOUR
Cutting brushwood
Cooly skilled for wattling
Total
Sundries 10.00
Total
Contractor's Profit &
Total
Say
ITEM RATE

ii.

The composite rates include the c


royalty and cost of cutting and
one mile vide item No. 58-A of C
the forest Deptt. or private ow

188

######

Percent
20 Percent

Labour Rate Per Chain of One Row


Composite Rate Per Chain of One Row

Rs.
Rs.

Mds.

Mds.
1 No.

Page 55

ntation on private source (Lead within one mile)


ess of wattled brush wood 1.0 average)

nit Rate Per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)
ood measured in thoroughly compacted & pa
before filling in the

mposite rates include the cost of labour


ty and cost of cutting and supplying brus
le vide item No. 58-A of C.S.R. (Royalty
forest Deptt. or private owner if and whe
Per 100 Mds

Per 100 Md 0.00 Per day


-

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (b)

Cutting and supplying un-sharpened pegs 4'.0 long

(4 feet)

Detail
Qty
MATERIAL
Wood required for 100 No. pegs =
= 100 x 4 x 9/24 x 9/24 x x 22/7 = 44.20 Cft.
20% Wastage 8.84/53.04 = 8.84
Cft.
53.04
Weight of 53 Cft. green wood
@ 62 Lbs per Cft.
= 53 x 62/82.50 = 39.83 Mds.
Royalty of Wood @ 70.00 Per % Mds.
Mds.

39.83

LABOUR
Cutting of wood
Total Material and Labour

Mds.

39.83

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
41 (b)

Rs.
Rs.

Sharpening one end of pegs 4'.0 long 3\" to 6\" dia.

Detail
Qty
Analysis for 125 Nos.
LABOUR
Carpenter
Cooly (Unskilled)
Total
Sundries 10.00
Total
Contractor's Profit &
Total
Rate Per 100 No. Pegs-

0.5
0.5
Percent
20 Percent

1.25
ITEM RATE
Labour Rate for 100 No. Pegs

Rs.

3\"-6\" dia

41 (b)

Driving pegs 4'-0\" long 3\" to 6\" dia (driven 1.25' below the availabl

Page 56

ong

(4 feet)

3\"-6\" dia from canal plantation l

Unit of Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

0.00er % Mds

0.00er % Mds

Say
Say

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

No.
No.

0.00 Per day


0.00Per day

Say

n 1.25' below the available bed or ground (average)

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail

Unit of Rate Per 100 No. Pe


Qty

Analysis for 125 Nos.


LABOUR
Cooly Skilled
Cooly Unskilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total
Rate Per 100 No. Pegs

1 No.
0.73 No.
Percent
20 Percent
158.63
1.25

ITEM RATE
Labour Rate for 100 No. Pegs

41 (b)

Tying pegs with Munj /

Rs.

Patha

ban (one line including tying around the

Detail

Unit of Rate Per Chain of O


Qty

MATERIAL
Same as per item No. 41(a) (iv)
LABOUR
Same as per item No. 41(a)(iv)
Total
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 57

nit of Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day


0.00Per day

Say

ncluding tying around the pegs).

nit of Rate Per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (b) Cutting and supplying brushwood from canal plantation or private source
wattling between stakes and intertwining. (Thickness of wattled brush wood 1.0'

Detail

Unit Rate Per Chain of One


Qty

MATERIAL
Requirement

of brushwood

Brushwood measured in thoroughly compa


shape before filling in the desi

Length 100'
Thickness 1'-0\"
Height 2.75'
Content 100x1.0x2.75 = 275 Cft.
Royalty of brush wood 275 Cft.
LABOUR
Cooly Unskilled
for cutting brushwood
Cooly skilled for wattling
Total
Sundries 10.00
Total
Contractor's Profit &
Total
ITEM RATE

######

Cft.

2.5 Nos.
1 Nos.
Percent
20 Percent

Labour Rate Per Chain of One Row


Composite Rate Per Chain of One Row

Rs.
Rs.

Page 58

ntation or private source (lead within one mile)


f wattled brush wood 1.0' (average)

nit Rate Per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

easured in thoroughly compacted and packe


e filling in the desi

20.00 r 100 Cf

55

0.00 Per day


0.00 Per day

Say
55

Say

55

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (c)

Cutting and supplying unsharpened pegs 5'-0\" long 3\" to 6\" dia from c
(lead within one mile)

Detail
Qty
MATERIAL

Wood required for 100 No. pegs


Brushwood measured in thoro
100 x 5'.0 x 9/24 x 9/24 x x 22/7
shape before filling in the
55.25 Cft.
Add wastag
11.05
66.30 Cft.
Weight of 66.30 cft green wood
@ 62 Lbs per Cft. (66.30x62) / 82.5 = 49.82 Mds.
Royalty of wood per 100 Mds @ 70.00 % Md
49.82
LABOUR
Cutting wood for pegs
Total Material and Labour

Mds.

ITEM RATE
Labour Rate Per 100 No. Pegs
Composite Rate Per 100 No. Pegs

41 (c)

Rs.
Rs.

Sharpening one end of pegs 5'-0\" long 3\" to 6\" dia.

Detail
Qty
Analysis for 125 Nos.
LABOUR
Carpenter
Cooly Unskilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

0.55
0.5
Percent
20 Percent

ITEM RATE
Labour Rate

Per 100 No. Pegs

Rs.

41 c -

Driving pegs 5'-0\" long 3\" to 6\" dia (driven 1.5' below the available

Page 59

long 3\" to 6\" dia from canal plantation

Unit of Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

rushwood measured in thoroughly compacted and packe


hape before filling in the desi

0.00Per % Md

49.82

0.02er % Mds

0.01 Say
0.01 Say

0.01

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

No.
No.

0.00 Per day


0.00 Per day

Say

n 1.5' below the available bed on ground (average).

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail

Unit Rate Per 100 No. Pegs


Qty

Analysis for 125 Nos.


LABOUR
Cooly skilled
Cooly unskilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total
ITEM RATE
Labour Rate

41 (c)

1 No.
1 No.
Percent
20 Percent

Per 100 No. Pegs

Rs.

Tying Peg with Munj / Patha ban one line including tying around the pegs

Detail

Unit Rate Per Chain of One


Qty

MATERIAL
Same as per Item 41 (a) (iv)
LABOUR
Same as per item 41 (a) (iv)
Total
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 60

nit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day


0.00 Per day

Say

ding tying around the pegs.

nit Rate Per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (c) Cutting and supply brushwood from canal plantation or private source (le
between stakes and intertwining thickness of wattled brush wood 1.0')

Detail

Unit Rate Per Chain of One


Qty

Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of brush wood
Length 100 Ft.
Thickness 1.0'
Height 3.5'
CONTENTS
100 X 1.0 X 3.5
= 350 Cft.
Weight of brush wood 350x62
263 Mds ######
82.5
MATERIAL
Cooly skilled for wattling brush wood
Sundries 10.00
Percent
Total
Contractor's Profit &
20 Percent
Total
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Mds.

1.5 No.

Rs.
Rs.

Page 61

tion or private source (lead within one mile) an


rush wood 1.0')

nit Rate Per Chain of One Row


Rate
er Unit (Rs.) Amount (Rs.)

0.00r 100 Cf

0.00 Per day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (d)

Cutting and supplying unsharpened pegs 6'-0\" long 3\" to 6\" dia from c

Detail

MATERIAL
Wood required for 100 No. pegs
9
100 x 6 x / x / x24
Add wastage 20% 13.26 Cft.
Say
Weight of 79.60 Cft green wood
@ 62 Lbs / per cft.
79.6 x 62/82.50 59.80 Mds.
Royalty of wood

9
24

22

LABOUR
Coolies for cutting wood for pegs.
Sundries 10.00
Total
Contractor's Profit & Ov
Total

20

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

41 (d)

Sharpening one end of pegs 6'-0\" long

Detail

Analysis for 125 Nos.


MATERIAL
Carpenter
Cooly
Total
Sundries 10.00
Total
Contractor's Profit & Ov
Total
ITEM RATE
Labour Rate Per 100 No. Pegs

20

long 3\" to 6\" dia from canal plantation (lead wit

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

Qty

7
79.6 Cft.

Mds.

59.8

Nos.

0.00r 100 Md

0.00 Per No.

Percent
Percent

Rs.
Rs.

Say
Say

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

Qty

.65
.6

No.
No.

0.00 Per day


0.00 Per day

Percent
Percent

Rs.

.01 Say

Page 62

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (d)

Driving pegs 6'-0\" long 3'-6\" driven 1.75' below the available bed of

Detail

Unit Rate Per 100 No. Pegs


Qty

Analysis for 125 Nos.


LABOUR
Cooly Skilled
Cooly Unskilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit &
20 Percent
Total
ITEM RATE
Labour Rate Per 100 No. Pegs

41 (d)

1.2 Nos.
1.2 Nos.

Rs.

Tying pegs with Munj / Patha ban (one line including tying around the pe

Detail

Unit Rate Per Chain of Row


Qty

MATERIAL
Same as per item No. 41 (a)(iv)
LABOUR
Same as per Item No. 41 (a)(iv)
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 63

elow the available bed of ground (average)

nit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day


0.00 Per day

Say

luding tying around the pegs)

nit Rate Per Chain of Row


Rate
Per Unit (Rs.) Amount (Rs.)

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (d) Cutting and supplying brush wood from canal plantation or private source
wattling between stakes and intertwining, thickness of wattled brush wood 1'.0 a

Detail

Unit Rate Per Chain


Qty

MATERIAL
Requirement of brush wood
Length 100 Ft.
Thickness 1 Ft.
Height
4.25 Ft.
Contents 100 x 1.0 x 4.25 = 425
Weight of brush wood 425 x 62 =
82.5
LABOUR
For cutting brush wood
Coolies skilled for wattling
Total
Sundries 10.00
Total
Contractor's Profit &
20
Total
ITEM RATE
Total Labour Per Chain
Composite Rate Per Chain

Cft.
319.40 ######

Mds.

3 Nos.
1 Nos.
Percent
Percent

Rs.
Rs.

Page 64

antation or private source (lead within one mile


wattled brush wood 1'.0 average

nit Rate Per Chain


Rate
Per Unit (Rs.) Amount (Rs.)

0.00r 100 Md

0.00 Per No.


0.00 Per day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (e) Cutting and supplying un-sharpened pegs 6'-1\" to 8'-0\" long 4\" to 8\"
within one mile.

Detail
Qty
MATERIAL
Wood required for 100 No. pegs
100 x 7'.0 x x x x
22
7
Add wastage 20%
Total
Weight of 165 Cft. green wood
@ 62 Lbs per Cft.
165 x 62/82.5 = 124.00 Mds
Royalty of wood
LABOUR

= 137.
27.50 Cft.
165.00 Cft.

######

Coolies for Cutting Wood


Sundries 10.00
Total
Contractor's Profit & Ov
Total
ITEM RATE

3
Percent
20 Percent

Total Labour Per 100 No. Pegs


Composite Rate Per 100 No. Pegs

41 (e)

Rs.
Rs.

Sharpening one end of pegs 6'-1\" to 8'-0\" long, 4\" to 8\" dia.
Detail
Qty

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly Unskilled
Total
Sundries 10.00
Total
Contractor's Profit & Ov
Total
ITEM RATES
Labour Rate Per 100 No. Pegs

.8
.8
Percent
20 Percent

Rs.

Page 65

to 8'-0\" long 4\" to 8\" dia from canal plantation

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

Mds.

0.00er 100 Md

Nos.

0.00 Per No.

Say
Say

ng, 4\" to 8\" dia.


Unit Rate Per 100 No. Pegs
Rate
Per Unit (Rs.) Amount (Rs.)

No.
No.

0.00 Per day


0.00 Per day

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (e)

Driving pegs 6'-1\" to 8'-0' long 4\" to 8\" dia driven 2'-0\" below the

Detail

Unit Rate Per 100 No. Pegs


Qty

Analysis for 125 Nos.


LABOUR
Cooly skilled
Cooly unskilled
Total
Sundries 10.00
Total
Contractor
Total

1.3 Nos.
1.35 Nos.
Percent
20 Percent

ITEM RATE
Labour Rate Per 100 No. Pegs

Rs.

Page 66

ia driven 2'-0\" below the available bed or ground (

nit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day


0.00 Per day

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (e)

Tying pegs 4\" to 8\" dia with Munj / Patha ban (one line including tyin

Detail

Unit Rate Per Chain of One


Qty

Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirements of Munj / Patha ban for one
Chain length including winding of Peg
100 + (50 x x 22 / 7)
=
178.57
Add. wastage @ 10% =
17.86
196.43
Total length = 196
Say = 200 Lft.
hence weight of 200'
Length of Munj / Patha ban
@ 250 per sor. 200 / 250 =
Munj / Patha ban
Contractor's Profit &
Total

080

Lft.

Sr.
0.80 Sr. (0.36 Kg.)

20 Percent

LABOUR
Same as per Item 41 (a) (iv)

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 67

n (one line including tying around the pegs).

nit Rate Per Chain of One Row


Rate
er Unit (Rs.) Amount (Rs.)

0.00 Per Kg.

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (e) Cutting and supplying brush wood (from canal plantation or private sourc
wattling between stacks and intertwining (thickness or wattled brush wood 1.0 av

Detail

Unit Rate Per Chain of One


Qty

MATERIAL
Requirement of brush wood
Length
100.00 Ft.
Thickness
1.00
Ft.
Height
5.00
Ft.
Contents 100 x 1'.0\" x 5'.0\" = 500 Cft.
Weight of 500 Cft. Brush Wood
500 x 62 =
375.75 Mds]
Royalty of brush wood 500 Cft.
######
Mds.
Total
Say
LABOUR
Coolies Unskilled
for cutting brush wood
3 Nos.
Cooly skilled for wattling
1.5 Nos.
Total
Sundries 10.00
Percent
Total
Contractor's Profit &
20 Percent
Total
Say
ITEM RATE
Labour Rate Per Chain of One Row
Rs.
Composite Rate Per Chain of One Row
Rs.

Page 68

lantation or private source lead within one mile


wattled brush wood 1.0 average).

nit Rate Per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

0.00er 100 Md

0.00 Per day


0.00 Per day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

42

Staking with bamboos from market and brushing from canal plantation
(Royalty of brush wood for brushing or cost to private owners if and

a - i) Supplying bamboos 8'-1\" to 10' long, 2\" to 5\" dia

Detail

Unit of Rate Per 100 No. Ba


Qty

MATERIAL
Bamboos
Contractor
Total

######

Nos.

20 Percent

ITEM RATE
Cost of 100 No. Bamboos

(a)

Rs.

i Sharpening one end of bamboos 8'-1\" to 10' long 2\" to 5\" dia

Detail

Unit of Rate Per 100 No. Ba


Qty

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly
Total
Sundries 10.00
Total
Contractor
Total

.7 No.
.7 No.
Percent
20 Percent

ITEM RATE
Labour Rate Per 100 No. Bamboos Rs.

Page 69

ing from canal plantation or private source


to private owners if and when required).

nit of Rate Per 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

0.0 Each

Say

ng 2\" to 5\" dia

nit of Rate Per 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

0.0 Each
0.0 Each

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

(a) ii Driving bamboos 8'-1\" to 10'-0\" long 2\" to 5\" dia. Driven2.5' below

Detail

Unit of Rate Per 100 No. Ba


Qty

Analysis for 125 Nos.


LABOUR
Cooly skilled
Cooly unskilled
Total
Sundries 10.00
Total
Contractor
Total

1.45 Nos.
1.45 Nos.
Percent
20 Percent

ITEM RATE
Labour Rate Per 100 No. Bamboos Rs.

2 (a) ivTying bamboos 2\" to 5\" dia with munj/Patha ban two lines including ty

Detail

Unit of Rate per Chain of O


Qty

MATERIAL
Requirement of Munj/Patha ban for
one chain length
200 + 50 (15/48 x 22 / 7) = 249 Lft.
Add wastage 10%
=
25 Lft.
Total
= 274 Lft.
Say
=
275 Lft.
Length of one Sr. Munj/Patha ban=250 Lft.
hence weight of 275 Lft.
Munj/Patha ban 275/250 Lft=1.10 Sr.
Munj/Patha ban
1.10 Sr.
2.26 Lbs (1.02 Kg.)
Contractor
20 Percent
Total
LABOUR
Cooly unskilled
Sundries 10.00
Total
Contractor
Total

0.15 No.
Percent
20 Percent

ITEM RATE
Labour Rate Per Chain of One RowRs.
Composite Rate Per Chain of One Rs.

42 (a) v Cutting and supply brushwood from canal plantation or private source le
between stakes and intertwining (thickness of wattled brushwood 1'.0
Page 70

5\" dia. Driven2.5' below the available 'bed or gro

nit of Rate Per 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day


0.00 Per day

Say

ban two lines including tying around the bamboos.

nit of Rate per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per Kg.

0.00 Per day

Say
Say

ation or private source lead within one mile and


of wattled brushwood 1'.0 average)
C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail

Unit of Rate per Chain of O


Qty

MATERIAL
Requirement of brush wood
Length
100.00 Ft.
Thickness
1.00
Ft.
Height
6.50
Ft.
Contents 100 x 1.0' x 6.5 = 650 Cft.
Weight of 650 x 62= 488 Mds ######
82.5
Total

Mds.

LABOUR
Unskilled Coolies
for cutting brushwood
Cooly skilled for wattling
Total
Sundries 10.00
Percent
Total
Contractor
20 Percent
Total

3.5 Nos.
2 Nos.

ITEM RATE
Labour Rate Per Chain of One RowRs.
Composite Rate Per Chain of One Rs.

42 (b) i Supplying bamboos 10'-1\" to 12'-0\" long 2\" to 5\" dia

Detail

Unit of Rate 100 No. Bamboo


Qty

MATERIAL
Bamboos
Contractor
Total

######

Nos.

20 Percent

ITEM RATE
Material Rate Per 100 No. BambooRs.

2 (b) iiSharpening one end of bamboo 10'-1\" to 12'-0\" long 2\"

to 5\"

dia

Detail

Unit of Rate 100 No. Bamboo


Qty
Page 71

nit of Rate per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

0.00r 100 Md

0.00 Per day


0.00 Per day

Say
Say

" to 5\" dia

nit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

0 Each

" long 2\"

Say

to 5\"

dia

nit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)
C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly Unskilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit &
20 Percent
Total
ITEM RATE
Total Labour Rate Per 100 No. Bamboos

0.8 No.
0.8 No.

Rs.

(b) ii Driving bamboos 10'-1\" to 12'-0\" long 2\" to 5\" (driven 2.75' below

Detail

Unit of Rate 100 No. Bamboo


Qty

Analysis for 125 Nos.


LABOUR
Coolies Skilled
Cooly Unskilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total
ITEM RATE

1.55 Nos.
1.6 Nos.
Percent
20 Percent

Total Labour Rate Per 100 No. Bamboos

Rs.

Page 72

0.00 Per day


0.00 Per day

Say

o 5\" (driven 2.75' below the available bed or groun

nit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day


0.00 Per day

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

2 (b) ivTying bamboos 2\" to 5\" dia with BSWG No. 10 (two lines including tyin
tie around the topend only)

Detail

Unit RatePer Chain of One R


Qty

Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of B.S.W.G 10 for one chain
length (two lines 2(100 + 50 x 15/48x22/7)=298 Lft
top and only 50 x 15/48x22/7 = 50 Lft.
Total 348 Lft.
Add 5% wastage = 18 Lft. = 366 Lft.
Weight of 100 yard of
B.S.S.W.G. No. 10(13.12) Lbs.
Weight of 366 Left = 366/300x13.12
= 16 Lbs or 0.143 Cwt.
B.S.W.G. No. 10
16.00 Lbs. (7.27 Kg
Contractor's Profit &
20 Percent
Total
LABOUR
Cooly Unskilled
0.5 No.
Sundries 10.00
Percent
Total
Contractor's Profit &
20 Percent
Total
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 73

(two lines including tying around the bamboos and

nit RatePer Chain of One Row


Rate
er Unit (Rs.) Amount (Rs.)

0.00 Per Kg.

0.00 Per day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

42 (b) v Wattling brushwood between stakes and intertwining (thickness of wattle

Detail

Unit of Rate per Chain of O


Qty

MATERIAL
Requirement of brush wood lenth=100 Ft.
Thickness
= 1'-0\"
Height
= 8.25 Ft.
Contents 100 x 1 x 8.25 = 825 Cft.
Weight of brush wood 825 x 62= 620 Mds
82.5
Royality of brush wood
Total
LABOUR
Cooly Unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries 10.00
Percent
Total
Contractor's Profit &
20
Percent
Total
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

######

4.5
2.25

Rs.
Rs.

42 (c) i Supplying bamboos 12'-1\" to 14' long 2\" to 5\" dia

Detail
Qty
MATERIAL
Bamboos
Contractor's Profit &
Total
ITEM RATE

######
20

Material Rate Per 100 No. Bamboos

Percent

Rs.

2 (c) iiSharpening one end of bamboo 12'-1\" to 14' long 2\" to 5\" dia.

Page 74

ining (thickness of wattled brush wood 1'.0 avera

nit of Rate per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

Mds.

0.00r 100 Md

Nos.
Nos.

0.00 Per day


0.00 Per day

Say
Say

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

Nos.

0 Each

Say

ng 2\" to 5\" dia.

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail

Unit of Rate 100 No. Bamboo


Qty

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly Unskilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total
ITEM RATE

0.9 No.
0.9 No.
Percent
20 Percent

Labour Rate Per 100 No. Bamboos

Rs.

(c) ii Driving bamboos 12'-1\" to 14' long 2\" to 5\" dia . Driven 3.5' below

Detail

Unit of Rate 100 No. Bamboo


Qty

Analysis for 125 Nos.


LABOUR
Coolies Skilled
Coolies Unskilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit &
20 Percent
Total
ITEM RATE
Labour Rate Per 100 No. Bamboos

1.8 Nos.
1.8 Nos.

Rs.

Page 75

nit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

0 Each
0 Each

Say

" dia . Driven 3.5' below the available bed or grou

nit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

0 Each
0 Each

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

2 (c) ivTying bamboos 2\" to 5\" dia with B.S.W.G. No. 10 Two lines including t
third tying around the topend only.

Detail

Unit of Rate per Chain of O


Qty

MATERIAL
Same as per Item No. 42 (b) (iv)
LABOUR
Same as per Item No. 42 (b) (iv)
Total
ITEM RATE
Labour Rate Per Chain of One RowRs.
Composite Rate Per Chain of One Rs.

42 (c) v Cutting and supplying brushwood from canal plantation / private source
between stakes and intertwining thickness of wattled brush wood 1'-0\
Detail

Unit of Rate per Chain of O


Qty

MATERIAL
Requirement of brush wood length=100 Ft.
Thickness
= 1'-0\"
Height
= 9.50 Ft.
Contents 100 x 1 x 9.50 = 950 Cft.
Weight of 950x62
=714 Mds
82.5
Royality of brush wood
714
Mds.
Total
LABOUR
Coolies unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries 10.00
Percent
Total
Contractor
20 Percent
Total
ITEM RATE
Labour Rate Per Chain of One RowRs.
Composite Rate Per Chain of One Rs.

5.5 Nos.
2.5 Nos.

42 (d) i Supplying bamboos 14'-1\" to 16'-0\"

long 2\" to 5\" dia

Page 76

. 10 Two lines including tying around the bamboo a

nit of Rate per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

Say
Say

antation / private source lead within one mile an


f wattled brush wood 1'-0\" average.

nit of Rate per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

0.00r 100 Md

0.00 Per day


0.00 Per day

Say
Say

\" to 5\" dia

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail

Unit of Rate 100 No. Bamboo


Qty

MATERIAL
Bamboos
Contractor's Profit &
Total

100

Nos.

20 Percent

ITEM RATE
Material Rate Per

100 No. Bamboos

Rs.

2 (d) iiSharpening one end of bamboo 14'-1\" to 16'-0\"

Detail

Unit of Rate 100 No. Bamboo


Qty

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly Unskilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total
Rate per 100 Nos.
-

long 2\" to 5\" dia.

1 No.
1 No.
Percent
20 Percent

1.25
ITEM RATE
Labour Rate Per 100 No. Bamboos

Rs.

Page 77

nit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

"

0.0 Each

Say

long 2\" to 5\" dia.

nit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

0.0 Each
0.0 Each

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

(d) ii Driving bamboos 14'-1\" to 16'-0\"

long 2\" to 5\" dia. Driven 4'-0\"'

Detail

Unit of Rate 100 No. Bamboo


Qty

Rate Analysis for 125 Nos.


LABOUR
Cooly Skilled
Cooly Unskilled
Total
Sundries 10.00
Total
Contractor
Total
Rate per 1 125

2 Nos.
2 Nos.
Percent
20 Percent
x 100 =

ITEM RATE
Labour Rate Per 100 Nos.

(d)

Rs.

iv Tying bamboos 2\" to 5\" dia with B.S.W.G. No. 10 Two lines including
third tying around the top only.

Detail

Unit of Rate per Chain of O


Qty

MATERIAL
Same as per Item No. 42 (b) (iv)
LABOUR
Same as per Item No. 42 (b) (iv)
Total
ITEM RATE
Labour Rate Per 100 Nos.
Comparative Rate Per 100 Nos.

Rs.
Rs.

Page 78

to 5\" dia. Driven 4'-0\"' below the available bed or

nit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

0 Each
0 Each

Say

o. 10 Two lines including tying around the bamboo a

nit of Rate per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

42 (d) v Cutting and supplying brush wood from canal plantation / private source
between stakes and intertwining thickness of wattled brush wood 1'-0\" average.

Detail

Unit of Rate per Chain of O


Qty

MATERIAL
Requirement of brush wood length=100 Ft.
Thickness
= 1'-0\"
Height
= 11 Ft.
Contents 100 x 1 x 11
= 1100 Cft.
Weight of brush wood = 1100 x 62=826.67
82.5 Mds.
Royalty of brush wood
######
Total

Mds.

LABOUR
Cooly Unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries 10.00
Total
Contractor's Profit &
Total

6.2 Nos.
3 Nos.
Percent
20 Percent

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 79

lantation / private source lead within one mile a


rush wood 1'-0\" average.

nit of Rate per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

0.00er 100 Md

0.00 Per day


0.00 Per day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

2 (e)

iSupplying bamboos 16'-1\" to 20'-0\"

Detail

long 2\" to 5\" dia

Unit of Rate 100 No. Bamboo


Qty

MATERIAL
Bamboos
Contractor's Profit &

100
20 Percent

ITEM RATE
Composite Rate Per 100 Nos.

(e)

Nos.

Rs.

i Sharpening one end of bamboo 16'-1\" to 20' long 2\" to 5\" dia.

Detail

Unit of Rate 100 No. Bamboo


Qty

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly
Total
Sundries 10.00
Total
Contractor's Profit &
Total
Rate for 100 Nos.

1.2 Nos.
1.2 Nos.
Percent
20 Percent
1.25

ITEM RATE
Labour Rate Per 100 No. Bamboos

Rs.

Page 80

" to 5\" dia

nit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

0.0 Each

Say

ng 2\" to 5\" dia.

nit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

0.0 Each
0.0 Each

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

(e) ii Driving bamboos 16'-1\" to 20'-0\"

long 2\" to 5\". Driven 4'-0\"' bel

Detail

Unit of Rate 100 No. Bamboo


Qty

Analysis for 125 Nos.


LABOUR
Cooly Skilled
Cooly Unskilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total
Rate for 100 Nos.
-

2.4 Nos.
2.4 Nos.
Percent
20 Percent

1.25
Labour Rate Per 100 No. Bamboos

Rs.

2 (e) ivTying bamboos 2\" to 5\" dia with B.S.W.G. No. 10 Two lines including t
third tying around the top only.
Detail

Unit of Rate per Chain of O


Qty

MATERIAL
Same as per Item No. 42 (b) (iv)
LABOUR
Same as per Item No. 42 (b) (iv)
Total
ITEM OF RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 81

to 5\". Driven 4'-0\"' below the available bed or gro

nit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

0 Each
0 Each

Say

. 10 Two lines including tying around the bamboos

nit of Rate per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

42 (e) v Cutting and supplying brush wood from canal plantation / private source
between stakes and intertwining thickness of wattled brush wood 4'-0\" average

Detail

Unit of Rate per Chain of O


Qty

MATERIAL
Requirement of brush wood length=100 Ft.
Thickness
= 1'-0\"
Height
= 14 Ft.
Contents 100 x 1' x 14' = 1400 Cft.
Weigth of brush wood = 1400 x 62 =1052
82.5 Mds.
Royalty of brush wood
######
Total

Mds.

LABOUR
Cooly Unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries 10.00
Percent
Total
Contractor's Profit &
20 Percent
Total
Say
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

7.5 Nos.
4 Nos.

Rs.
Rs.

Page 82

lantation / private source lead within one mile a


rush wood 4'-0\" average

nit of Rate per Chain of One Row


Rate
Per Unit (Rs.) Amount (Rs.)

0.00r 100 Md

0.00 Per day


0.00 Per day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

43

Cutting and supplying brush wood from canal plantation or from any ot
within one mile

Detail
Qty
MATERIAL

Remarks

Weight of 100 Cft. brush wood


82.5
Mds.
Royalty of brush wood

Royalty to be paid to the fo

ii)
= 100 x 62
Mds.

75

LABOUR
Cooly
Sundries 10.00
Total
Contractor
Total

.5
Percent
20 Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate Per 100 Cft.
Composite Rate Per Cum

44

Rs.
Rs.
Rs.
Rs.

Filling brush wood only thoroughly packed


Detail
Qty
Rate Analysis for 125 Cft.

LABOUR
Cooly Unskilled
Sundries 10.00
Percent
Total
Contractor
20 Percent
Total
Rate per 100 Cft.
=1.25

.5

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum

Rs.
Rs.

= 75

45

Covering road 10' to 12' wide with 3\" sarkanda or jungle upto one ch

Page 83

plantation or from any other source

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

oyalty to be paid to the forest department


and when required.
Measured in thoroughly compacted and packed
shapebefore filling.

No.

0.00r 100 Md

0.00 Per day

Say
Say
Say
Say

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

No.

0.00 Per day

Say
Say

anda or jungle upto one chain lead

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail

Unit Rate per Chain


Qty

Rate Analysis for 125 Rft.


LABOUR
Cooly Unskilled
Sundries 10.00
Total
Contractor's Profit &
Total
Rate per 100 Rft.
=1.25
ITEM RATE
Labour Rate Per Chain
Labour Rate Per 30 Metre

1.2 Nos.
Percent
20 Percent

Rs.
Rs.

46 a) Gachi pitching 1\" thick

Detail

Unit Rate Per 100 Sft.


Qty

Rate Analysis for 125 Sft.


LABOUR
Cooly Unskilled
Sundries 10.00
Total
Contractor's Profit &
Total
Rate per 100 Sft.
=1.25
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.

6.5 Nos.
Percent
20 Percent

Rs.
Rs.

Page 84

nit Rate per Chain


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day

Say
Say

nit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

46 b) Gachi pitching done with silt clearance and berm dressing

Detail

Unit Rate Per 100 Sft.


Qty

Rate Analysis for 125 Sft.


LABOUR
Cooly Unskilled
Sundries 10.00
Total
Contractor's Profit &
Total
Rate per 100 Sft.
=1.25
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.

5.5 Nos.
Percent
20 Percent

Rs.
Rs.

Page 85

dressing

nit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

0.00 Per day

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

PLUMBING SANITARY INSTALLATION


DESCRIPTION OF ITEM:
Item No. 1

Providing and fitting glazed earthen ware water


excluding seat and cover.
(i)

White

Detail

Unit Rate (British System)


Qty

MATERIAL
1

W.C. European Type

1.00 No.

Rubber Sheet

0.222 Kg.

Bolts & Nuts

4.00 Nos.

Cement

0.161 Bag

Sand

0.40 Cft.

Bajri

0.80 Cft.

Total
Contractor's Profit &

20 Percent

Total
LABOUR

For 4 Nos.

Plumber

1.00 No.

Skilled Cooly

1.00 No.

Total
Sundries 10.00

Percent

Total
Contractor's Profit &

20 Percent

Total

ITEM RATES
Labour rate for Each

Rs.

Composite rate for Each

Rs.

Page 1

TALLATION

glazed earthen ware water closet European Typ

nit Rate (British System) for Each


Rate Per U Amount (Rs.)

each
P. Kg.
each
Bag
% Cft.
% Cft.

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 1

Providing and fitting glazed earthen ware water


excluding seat and cover.
(ii)

Coloured
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5
6

LABOUR
1
2

W.C. European Type


Rubber Sheet
Bolts & Nuts
Cement
Sand
Bajri
Total
Contractor's Profit &
Total
For 4 Nos.
Plumber
Skilled Cooly
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.222 Kg.
4.00 Nos.
0.161 Bag
0.40 Cft.
0.80 Cft.
20 Percent

1.00 No.
1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 2

glazed earthen ware water closet European Typ

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each
0.00 P. Kg.
0.0 each
0.0 Bag
0.00 % Cft.
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
.05 Say

0.0
.05

DESCRIPTION OF ITEM:
Item No. 2
(i)

Providing and fixing double seat and cover only.


Bakelite.

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Seat and cover double (Bakelite)

LABOUR

Total
Contractor's Profit &
Total
For 48 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

20 Percent

0.25 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 3

ouble seat and cover only.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0

0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 2

Providing and fixing double seat and cover only.


(ii)

Plastic.
Detail

Unit Rate (British System)


Qty

MATERIAL
1

Seat and cover double (Plastic)


Total
Contractor's Profit &
Total

LABOUR
1

1.00 No.

20 Percent

For 48 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

0.25 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 4

ouble seat and cover only.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 3

Providing and fitting glazed earthen ware water


(orisa pattern) combined with foot rest.
(i)

White

Detail

MATERIAL
1
2
3

LABOUR
1
2

Unit Rate (British System)


Qty

W.C Orisa pattern with foot rest


Cement
Sand
Total
Contractor's Profit &
20 Percent
Total
For 4 Nos.
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.021 Bag
0.056 Cft.

1.00 No.
0.50 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 5

glazed earthen ware water closet, squatt


ed with foot rest.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

Item No. 3
(ii)

Providing and fitting glazed earthen ware water


(orisa pattern) combined with foot rest.
Coloured.

Detail

MATERIAL
1
2
3

LABOUR
1
2

Unit Rate (British System)


Qty

W.C Orisa pattern with foot rest


coloured
Cement
Sand
Total
Contractor's Profit &
20 Percent
Total
For 4 Nos.
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.021 Bag
0.056 Cft.

1.00 No.
0.50 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 6

glazed earthen ware water closet, squatt


ed with foot rest.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0

0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 4

Providing and fitting white glazed earthen ware


with separate foot rest.
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

LABOUR
1
2

W.C. squatter type


Foot rest
Total
Contractor's Profit &
Total

1.00 No.
2.00 Nos.
20 Percent

For 4 Nos.
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.50 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 7

white glazed earthen ware water closet, squat

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.0 each

0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 5

Providing and fitting water closet squatter type

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

W.C. squatter type of terrazzo concrete


Cement
Sand
Total
Contractor's Profit &
20 Percent
Total

LABOUR
1
2

For 4 Nos.
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.021 Bag
0.056 Cft.

1.00 No.
0.50 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 8

water closet squatter type of terrazzo concre

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 6
(i)

Providing and fitting glazed earthen ware wash h


(22\" x 16\"), including bracket set, waste pipe
White with padestal.

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

LABOUR
1
2

Glazed earthen ware wash hand basin


Padestal
Waste coupling, Bracket, Waste Pipe
Total
Contractor's Profit &
20 Percent
Total
For 4 Nos.

1.00 No.
1.00 No.
1.00 No.

Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 9

glazed earthen ware wash hand basin 56 x 40 c


ng bracket set, waste pipe and waste coupling,

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each
0.0 each
0.0 each

0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 6

Providing and fitting glazed earthen ware wash h


(22\" x 16\"), including bracket set, waste pipe
(ii)

Coloured with padestal.


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

LABOUR
1
2

Earthen ware wash hand basin (coloured)


Pedestal
Waste coupling, Bracket Waste
Pipe
Total
Contractor's Profit &
20 Percent
Total
For 4 Nos.

1.00 No.
1.00 No.

Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
1.00 No.

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 10

glazed earthen ware wash hand basin 56 x 40 c


ng bracket set, waste pipe and waste coupling,

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.0 each

0.0
0.0

0.0 each

0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 6

Providing and fitting glazed earthen ware wash h


(22\" x 16\"), including bracket set, waste pipe
(iii)

White without padestal.


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

W.H. Basin
Waste coupling, Bracket, Waste Pipe
Total
Contractor's Profit &
20 Percent
Total

LABOUR
1
2

For 4 Nos.
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
1.00 No.

1.00 No.
0.75 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 11

glazed earthen ware wash hand basin 56 x 40 c


ng bracket set, waste pipe and waste coupling,

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.0 each

0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 6
(iv)

Providing and fitting glazed earthen ware wash h


(22\" x 16\"), including bracket set, waste pipe
Coloured without padestal.

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

Coloured W.H. Basin


Coupling, C.I. Bracket, Waste Pipe

LABOUR

Total
Contractor's Profit &
Total
For 4 Nos.

1
2

Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
1.00 No.

20 Percent

1.00 No.
0.75 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 12

glazed earthen ware wash hand basin 56 x 40 c


ng bracket set, waste pipe and waste coupling,

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each
0.0 each

0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 7

Providing and fixing stainless steel sink with d


(48\" x 24\") including bracket set, waste pipe

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5
6

LABOUR
1
2

Stainless steel sink with drain


board 120 x 60 cm (48\" x 24\")
Waste coupling
Waste pipe
Bracket
Cement
Sand
Total
Contractor's Profit &
20 Percent
Total
For 4 Nos.
Plumber
Cooly un-skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit &
20 Percent
Total

1.00 No.
1.00 No.
1.00 No.
2.00 Nos.
0.042 Bag
0.130 Cft.

1.00 No.
0.75 No.

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 13

tainless steel sink with drain board, size 12


g bracket set, waste pipe and waste coupling.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.0 each
0.0 each
0.0 each
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 8

Providing and fitting terrazzo concrete sink 60


drain board of mosaic including bracket set wast

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5
6

LABOUR
1
2

Terrazzo concrete sink


60 x 45 cm (24\" x 18\")
C.I. Bracket
Waste coupling
Waste pipe
Cement
Sand
Total
Contractor's Profit &
Total
For 4 Nos.
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
2.00 Nos.
1.00 No.
1.00 No.
0.067 Bag
0.280 Cft.
20 Percent

1.00 No.
0.75 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 14

terrazzo concrete sink 60 x 45 cm (24\" x 18\")


including bracket set waste pipe and waste co

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.0 each
0.0 each
0.0 each
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
-.05 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 9

Providing and fixing glazed earthen ware sink, i


pipe and waste coupling.
(i)

60 x 45 cm (24\" x 18\")
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5
6

LABOUR
1
2

Glazed earthen ware sink


C.I. Bracket
Waste pipe
Waste coupling
Cement
Sand
Total
Contractor's Profit &
Total
For 4 Nos.
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
2.00 Nos.
1.00 No.
1.00 No.
0.053 Bag
0.144 Cft.
20 Percent

1.00 No.
0.75 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 15

lazed earthen ware sink, including bracket se

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.0 each
0.0 each
0.0 each
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
-.05 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 9

(ii)

Providing and fixing glazed earthen ware sink, i


pipe and waste coupling.
37.5 x 45 cm (15\" x 18\")
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
6
7

LABOUR
1
2

G.E. Sink Size 37.5 x 45 cm


(15\" x 18\")
Waste pipe
Waste coupling
C.I. Bracket
Cement
Sand
Total
Contractor's Profit &
Total
For 4 Nos.
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
1.00 No.
1.00 No.
2.00 Nos.
0.053 Bag
0.144 Cft.
20 Percent

1.00 No.
0.75 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 16

lazed earthen ware sink, including bracket se

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.0 each
0.0 each
0.0 each
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
-.05 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 10

Providing and fixing glazed earthen ware Flat Ba


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

G.E. flat Back Urinal Complete set


Gutties
Screw (75 mm) 3\" long

LABOUR

Total
Contractor's Profit &
Total
For 4 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
2.00 Nos.
2.00 Nos.

20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 17

lazed earthen ware Flat Back Urinal.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.0 each

0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
-.2 Say

0.0
-.2

DESCRIPTION OF ITEM:
Item No. 11
(i)

Providing and fitting glazed earthen ware low do


litres (3 gallons) capacity, including bracket s
White
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5

LABOUR
1
2

Low down flushing cistern 3 gallon


or 13.63 litters
C.I. Bracket
Copper connection with check nut
Cement
Sand
Total
Contractor's Profit &
20 Percent
Total
For 4 Nos.
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
one pair
1.00 No.
0.04 Bag
0.23 Cft.

1.00 No.
0.75 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 18

glazed earthen ware low down flushing cistern


acity, including bracket set, copper connecti

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00per pair
0.0 each
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
.2 Say

0.0
.2

DESCRIPTION OF ITEM:
Item No. 11

(ii)

Providing and fitting glazed earthen ware low do


litres (3 gallons) capacity, including bracket s
Coloured
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5

LABOUR
1
2

Low down flushing cistern


C.I. Bracket
Copper connection with check nut
Cement
Sand
Total
Contractor's Profit &
20 Percent
Total
For 4 Nos.

1.00 No.
one pair
1.00 No.
0.04 Bag
0.23 Cft.

Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.75 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 19

glazed earthen ware low down flushing cistern


acity, including bracket set, copper connecti

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00per pair
0.0 each
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
.2 Say

0.0
.2

DESCRIPTION OF ITEM:
Item No. 12

Providing and fitting plastic made low down flus


(3 gallons) capacity, including bracket set, cop
complete.
Coloured & White.
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5

LABOUR
1
2

Low down flushing cistern


C.I. Bracket
Copper connection with check nut
Cement
Sand
Total
Contractor's Profit &
20 Percent
Total
For 4 Nos.

1.00 No.
one pair
1.00 No.
0.04 Bag
0.23 Cft.

Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.75 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each (White)
Composite rate for Each (Coloured)

Rs.
Rs.
Rs.

Page 20

plastic made low down flushing cistern 13.63


including bracket set, copper connection, etc

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00per pair
0.0 each
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
.2 Say
687.45 Say

0.0
.2
687.45

DESCRIPTION OF ITEM:
Item No. 13

Providing and fixing white enamelled cast iron l


13.63 litters (3 gallons) capacity, including br
etc.

Detail

MATERIAL
1

2
3
4

LABOUR
1
2

Unit Rate (British System)


Qty

White enamelled C.I low down


flushing cistern 3 gallons or
13.63 litters capacity including
all assessaries.
C.I. Bracket
Cement
Sand
Total
Contractor's Profit &
20 Percent
Total
For 4 Nos.
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
one pair
0.021 Bag
0.056 Cft.

1.00 No.
0.75 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 21

hite enamelled cast iron low down flushing ci


ns) capacity, including bracket set, copper c

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.00 each
0.00 per pair
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
.05 Say

0.0
.05

DESCRIPTION OF ITEM:
Item No. 14

Providing and fixing C.I. highlevel flushing cis


bracket set copper connection etc.
(i)

13.63 litters (3 gallons) capacity.


Detail

Unit Rate (British System)


Qty

MATERIAL
1

2
3
4

LABOUR
1
2

C.I. High level flushing cistern


13.63 letters or 3 gallon
capacity including
accessories.
C.I. Bracket
Cement
Sand
Total
Contractor's Profit &
20 Percent
Total
For 4 Nos.

1.00 No.

Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.10 Nos.
0.75 No.

one pair
0.021 Bag
0.056 Cft.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 22

.I. highlevel flushing cistern including cost


nection etc.

ns) capacity.

nit Rate (British System) for Each

.056 Cft.

Rate Per Unit

Amount (Rs.)

0.0 each

0.0

0.00per pair
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
.05 Say

0.0
.05

DESCRIPTION OF ITEM:
Item No. 14

(ii)

Providing and fixing C.I. highlevel flushing cis


bracket set copper connection etc.
4.55 liters (1 gallon) capacity.
Detail

MATERIAL
1
2
3
4

Unit Rate (British System)


Qty

C.I. High level flushing cistern


I/C all accessaries
C.I. Bracket
Cement
Sand
Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 4 Nos.

1
2

Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
one pair
0.021 Bag
0.056 Cft.

1.10 Nos.
0.75 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 23

.I. highlevel flushing cistern including cost


nection etc.
capacity.

nit Rate (British System) for Each


Rate Per Unit

.056 Cft.

Amount (Rs.)

0.0 each

0.0

0.00per pair
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
.05 Say

0.0
.05

DESCRIPTION OF ITEM:
Item No. 15

Providing and fixing, chromium plated soap dish.

Detail

MATERIAL
1
2
3

Chromuim plated soap dish


Gutties Plastic
Screws 3/4\"
Total
Contractor's Profit &
Total

LABOUR
1

Unit Rate (British System)


Qty

1.00 No.
2.00 Nos.
2.00 Nos.

20 Percent

For 40 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 24

chromium plated soap dish.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.00 P. Doz

0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0
0.0

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 16
(i)

Providing and fitting, glazed earthen ware soap


White.

Detail

MATERIAL
1
2
3

Glazed earthen ware soap dish


Gutties Plastic
Screws 3/4\"
Total
Contractor's Profit &
Total

LABOUR
1

Unit Rate (British System)


Qty

1.00 No.
2.00 Nos.
2.00 Nos.

20 Percent

For 40 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 25

glazed earthen ware soap dish.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.00 P. Doz

0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0
0.0

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 16
(ii)

Providing and fitting, glazed earthen ware soap


Soap dish coloured.

Detail

MATERIAL
1
2
3

Soap dish coloured


Gutties Plastic
Screws 3/4\"
Total
Contractor's Profit &
Total

LABOUR

For 40 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

Unit Rate (British System)


Qty

1.00 No.
2.00 Nos.
2.00 Nos.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 26

glazed earthen ware soap dish.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.00 P. Doz

0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0
0.0

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 17

Providing and fixing chromium plated toilet pape


Detail

MATERIAL
1
2
3
4
5

LABOUR
1

C.P. Toilet holder


Gutties Plastic
Screws 3/4\"
Cement
Sand
Total
Contractor's Profit &
Total

Unit Rate (British System)


Qty

1.00 No.
2.00 Nos.
4.00 Nos.
0.010 Bag
0.060 Cft.
20 Percent

For 30 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 27

hromium plated toilet paper holder.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.00 P. Doz
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0
-.01

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 18

Providing and fixing chromium plated towel rail.


(i)

60 cm (24\") long and


Detail

2 cm (3/4\") dia.
Unit Rate (British System)
Qty

MATERIAL
1
2
3

C.P. Towel rail


Gutties
Screws

LABOUR

Total
Contractor's Profit &
Total
For 30 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
2.00 Nos.
4.00 Nos.

20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 28

hromium plated towel rail.


2 cm (3/4\") dia.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.00 P. Doz

0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0
0.0

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 18
(ii)

Providing and fixing chromium plated towel rail.


50 cm (20\") long and 1.5 cm (\" dia).
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3

LABOUR
1

C.P. Towel rail 50 cm (20\") long


1.5 cm (\" dia)
Gutties
Screws
Total
Contractor's Profit &
20 Percent
Total
For 30 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
2.00 Nos.
4.00 Nos.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 29

hromium plated towel rail.

1.5 cm (\" dia).

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.00 P. Doz

0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0
0.0

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 19

Providing and fixing looking glass 55 x 40 cm (2


thick first quality.

Detail

MATERIAL
1
2
3

LABOUR
1

Looking glass 5 mm thick


55 x 40 cm (22\" x 16\")
Gutties
Screw
4.00 Nos.
Total
Contractor's Profit &
Total

Unit Rate (British System)


Qty

1.00 No.
4.00 Nos.

20 Percent

For 16 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 30

ooking glass 55 x 40 cm (22\" x 16\") size and

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz

0.0
0.0

0.00 P.

0.0
0.0

Doz
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 20

Providing and fixing glass shelf 60 x 13 cm (24\


glass.
(i)

With chromium plated brackets and railing.


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5
6

LABOUR
1
2

Glass 60 x 13 cm (24\" X 5\")


with 5 mm thick glass
Chromium plated brackets and railing
Screws
Gutties
Cement
Sand
Total
Contractor's Profit &
20 Percent
Total
For 16 Nos.
Plumber
Cooly skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit &
20 Percent
Total

1.00 No.
1.00 No.
4.00 Nos.
2.00 Nos.
0.010 Bag
0.060 Cft.

1.00 No.
0.25 No.

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 31

lass shelf 60 x 13 cm (24\" x 5\") with 5 mm th

rackets and railing.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.0 each
0.00 P. Doz
0.00 P. Doz
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
-.01 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 20

(ii)

Providing and fixing glass shelf 60 x 13 cm (24\


glass.

Glass Shelf only without chromium plated bracket


Detail

MATERIAL
1

Glass Shelf
Total
Contractor's Profit &
Total

LABOUR
1

Unit Rate (British System)


Qty

1.00 No.

20 Percent

For 20 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 32

lass shelf 60 x 13 cm (24\" x 5\") with 5 mm th

ut chromium plated brackets and railing.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 21

Providing and fitting glazed earthen ware shelf


chromium plated bracket and railing.
(i)

White.
Detail

MATERIAL
1
2
3
4
5

LABOUR
1
2

Unit Rate (British System)


Qty

G.E. shelf 60 x 13 cm (24\" x 5\")


with C.P bracket and railing.
Gutties
Screw
Cement
Sand
Total
Contractor's Profit &
20 Percent
Total
For 16 Nos.
Plumber
Cooly skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
2.00 Nos.
4.00 Nos.
0.010 Bag
0.060 Cft.

1.00 No.
0.25 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 33

glazed earthen ware shelf 60 x 13 cm (24\" x 5


t and railing.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.00 P. Doz
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0
-.01

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 21

(ii)

Providing and fitting glazed earthen ware shelf


chromium plated bracket and railing.
Coloured.
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5

LABOUR
1
2

G.E. shelf 60 x 13 cm (24\" x 5\")


with C.P bracket and railing.
Gutties
Screw
Cement
Sand
Total
Contractor's Profit &
20 Percent
Total
For 16 Nos.
Plumber
Cooly skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
2.00 Nos.
4.00 Nos.
0.010 Bag
0.060 Cft.

1.00 No.
0.25 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 34

glazed earthen ware shelf 60 x 13 cm (24\" x 5


t and railing.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.00 P. Doz
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0
-.01

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 22

Providing and fitting.


(i)

Plastic soap dish.

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5

LABOUR
1

Plastic soap dish


Gutties
Screw
Cement
Sand
Total
Contractor's Profit &
Total
For 40 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
2.00 Nos.
2.00 Nos.
0.005 Bag
0.030 Cft.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 35

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.00 P. Doz
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0
0.0

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 22
(ii)

Providing and fitting.


Plastic toilet paper holder.

Detail

MATERIAL
1
2
3
4
5

LABOUR
1

Plastic toilet paper holder


Gutties
Screw
Cement
Sand
Total
Contractor's Profit &
Total

Unit Rate (British System)


Qty

1.00 No.
2.00 Nos.
4.00 Nos.
0.010 Bag
0.060 Cft.
20 Percent

For 30 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 36

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.00 P. Doz
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0
0.0

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 22
(iii)

Providing and fitting.


Plastic towel rail.

Detail

MATERIAL
1
2
3
4
5

LABOUR
1

Plastic towel rail


Gutties
Screw
Cement
Sand
Total
Contractor's Profit &
Total

Unit Rate (British System)


Qty

1.00 No.
2.00 Nos.
4.00 Nos.
0.010 Bag
0.06 Cft.
20 Percent

For 30 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 37

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.00 P. Doz
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0
0.0

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 22
(iv)

Providing and fitting.


Plastic Shelf with bracket and railing.

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5
6

LABOUR
1

Plastic shelf with railing


Bracket
Gutties
Screw
Cement
Sand
Total
Contractor's Profit &
Total
For 30 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
2.00 Nos.
2.00 Nos.
4.00 Nos.
0.004 Bag
0.020 Cft.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 38

cket and railing.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each
0.0 each
0.00 P. Doz
0.00 P. Doz
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
.01 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 23

Providing and fixing chromium plated pillar - co


(i)

2 cm

(\").

Detail

Unit Rate (British System)


Qty

MATERIAL
1

2 cm (\") Pillar Cock


Total
Contractor's Profit &
Total

LABOUR
1

1.00 No.

20 Percent

For 30 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 39

hromium plated pillar - cock, heavy.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 23
(ii)

Providing and fixing chromium plated pillar - co


1.5 cm (\").
Detail

Unit Rate (British System)


Qty

MATERIAL
1

15 cm (\") Pillar Cock heavy


Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 30 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 40

hromium plated pillar - cock, heavy.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 24

Providing and fixing chromium plated stop Cock H


(i)

2 cm (\").

Detail

Unit Rate (British System)


Qty

MATERIAL
1

2 cm (\") stop cock


Total
Contractor's Profit &
Total

LABOUR

For 30 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 41

hromium plated stop Cock Heavy.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 24
(ii)

Providing and fixing chromium plated stop Cock H


1.5 cm (\").
Detail

Unit Rate (British System)


Qty

MATERIAL
1

1.5 cm (\") stop cock


Total
Contractor's Profit &
Total

LABOUR

For 30 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 42

hromium plated stop Cock Heavy.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 25

Providing and fixing underground stop cock 13 mm


plated cover.

Detail

MATERIAL
1
2
3
4
5

LABOUR
1
2

Unit Rate (British System)


Qty

Underground stop cock with chromium


plated cover
Gutties
Screw
Cement
Sand
Total
Contractor's Profit &
20 Percent
Total
For 30 Nos.
Plumber
Cooly un-killed
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
4.00 Nos.
4.00 Nos.
0.022 Bag
0.060 Cft.

1.25 No.
0.25 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 43

nderground stop cock 13 mm (\") with chromium

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.00 P. Doz
0.00 P. Doz
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0
.02

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 26

Providing and fixing chromium plated bib cock.


(i)

2 cm (\").
Detail

Unit Rate (British System)


Qty

MATERIAL
1

2 cm (\") bib cock


Total
Contractor's Profit &
Total

LABOUR

For 30 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 44

hromium plated bib cock.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 26
(ii)

Providing and fixing chromium plated bib cock.


1.5 cm (\").

Detail

Unit Rate (British System)


Qty

MATERIAL
1

1.5 cm (\") bib cock

LABOUR

Total
Contractor's Profit &
Total
For 30 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 45

hromium plated bib cock.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 27

Providing and fixing chromium plated tee stop co

Detail

MATERIAL
1

Unit Rate (British System)


Qty

1.5 cm (\") Chromium plated


tee stop cock
Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 30 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 46

hromium plated tee stop cock 1.5 cm (\").

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 28

Providing and fixing, chromium plated shower ros


(i)

1.5 cm x 10 cm (\" x 4\")

Detail

Unit Rate (British System)


Qty

MATERIAL
1

LABOUR
1

Chromium plated shower rose


1.5 cm x 10 cm (\" x 4\")
Total
Contractor's Profit &
Total
For 30 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 47

chromium plated shower rose.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 28
(ii)

Providing and fixing, chromium plated shower ros


2 cm x 15 cm (\" x 6\")

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Chromium plated shower rose


2 cm x 15 cm (\" x 6\")
Total
Contractor's Profit &
Total

LABOUR

For 30 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 48

chromium plated shower rose.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 29

Providing & Fixing, chromium plated mixing valve


sinks or shower.
Detail

Unit Rate (British System)


Qty

MATERIAL
1

Chromium plated mixing valve


Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 24 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 49

romium plated mixing valve, for wash hand bas

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
.02 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 30

Providing and fixing gun metal peet/gate valve (


(i)

Peet valve 3 cm (1\") dia.


Detail

Unit Rate (British System)


Qty

MATERIAL
1

Gun Metal Peet Valve


Total
Contractor's Profit &
Total

LABOUR

For 20 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 50

un metal peet/gate valve (screwed).

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 30
(ii)

Providing and fixing gun metal peet/gate valve (


Peet valve 4 cm (1\") dia.

Detail

Unit Rate (British System)


Qty

MATERIAL
1

G.M. Peet Valve 4 cm (1\") dia


Total
Contractor's Profit &
Total

LABOUR
1

1.00 No.

20 Percent

For 20 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 51

un metal peet/gate valve (screwed).

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 30
(iii)

Providing and fixing gun metal peet/gate valve (


G.M. Peet Valve 5 cm (2\" dia).
Detail

Unit Rate (British System)


Qty

MATERIAL
1

G.M. Peet Valve 5 cm (2\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 20 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 52

un metal peet/gate valve (screwed).

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 30
(iv)

Providing and fixing gun metal peet/gate valve (


G.M. Peet Valve 6.5 cm (2\") dia.
Detail

Unit Rate (British System)


Qty

MATERIAL
1

G.M. Peet Valve 6.5 cm (2\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 20 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 53

un metal peet/gate valve (screwed).


(2\") dia.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 30

Providing and fixing gun metal peet/gate valve (


(v)

G.M. Peet Valve 7.5 cm (3\" dia)


Detail

Unit Rate (British System)


Qty

MATERIAL
1

G.M. Peet Valve 7.5 cm (3\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 20 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 54

un metal peet/gate valve (screwed).


(3\" dia)

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 31

Providing and fitting, Chromium plated or brass


1.5 cm (\" dia).
(i)

Single way 1.5 cm (\" dia).


Detail

Unit Rate (British System)


Qty

MATERIAL
1

Cost of cock
Total
Contractor's Profit &
Total

LABOUR

For 30 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 55

Chromium plated or brass oxidised, swan neck

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 31

(ii)

Providing and fitting, Chromium plated or brass


1.5 cm (\" dia).
Two way 1.5 cm (\" dia).
Detail

Unit Rate (British System)


Qty

MATERIAL
1

Cost of cock
Total
Contractor's Profit &
Total

LABOUR

For 20 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 56

Chromium plated or brass oxidised, swan neck

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 31

(iii)

Providing and fitting, Chromium plated or brass


1.5 cm (\" dia).
Three way 1.5 cm (\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Cost of cock
Total
Contractor's Profit &
Total

LABOUR

For 15 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 57

Chromium plated or brass oxidised, swan neck

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 32

Providing and fixing, union brass cock.


(i)

1.5 cm (\" dia).

Detail

MATERIAL
1

Cost of cock
Total
Contractor's Profit &
Total

LABOUR
1

Unit Rate (British System)


Qty

1.00 No.

20 Percent

For 30 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 58

union brass cock.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 32
(ii)

Providing and fixing, union brass cock.


2 cm (\" dia).

Detail

MATERIAL
1

Cost of cock
Total
Contractor's Profit &
Total

LABOUR
1

Unit Rate (British System)


Qty

1.00 No.

20 Percent

For 30 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 59

union brass cock.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 33
(i)

Providing and fixing floor trap of Cast Iron inc


all-round and C.I grating.
10 x 5 cm (4\" x 2\").
Detail

MATERIAL
1
2
3
4

LABOUR
1

Unit Rate (British System)


Qty

C.I floor trap including grating


size 10 x 5 cm (4\" x 2\")
Cement
Sand
Crushed Stone
Total
Contractor's Profit &
20 Percent
Total
For 10 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.065 Bag
0.160 Cft.
0.310 Cft.

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 60

loor trap of Cast Iron including concrete cha

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each
0.0 Bag
0.00 % Cft.
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 33
(ii)

Providing and fixing floor trap of Cast Iron inc


all-round and C.I grating.
Floor trap size 10 x 7.5 cm (4\" x 3\").

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

LABOUR
1

C.I floor trap including grating


size 10 x 7.5 cm (4\" x 3\")
Cement
Sand
Crushed Stone
Total
Contractor's Profit &
20 Percent
Total
For 10 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.065 Bag
0.160 Cft.
0.310 Cft.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 61

loor trap of Cast Iron including concrete cha

.5 cm (4\" x 3\").

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each
0.0 Bag
0.00 % Cft.
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 34

Providing and fitting P-trap including concrete


gully grating.
(i)

Cast Iron 10 cm (4\" dia)


Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4

LABOUR
1

C.I. P-trap 10 cm (4\" dia)


Cement
Sand
Crushed Stone
Total
Contractor's Profit &
Total
For 12 Nos.
Plumber/Mason
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.016 Bag
0.040 Cft.
0.081 Cft.
20 Percent

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 62

P-trap including concrete chamber with cast i

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.0 Bag
0.00 % Cft.
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 34
(ii)

Providing and fitting P-trap.


Glazed 10 cm (4\" dia)

Detail

MATERIAL
1
2
3
4

LABOUR
1

Unit Rate (British System)


Qty

Glazed Pee trap 10 cm (4\" dia)


Cement
Sand
Crushed Stone
Total
Contractor's Profit &
20 Percent
Total
For 12 Nos.
Plumber/Mason
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.016 Bag
0.040 Cft.
0.081 Cft.

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 63

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each
0.0 Bag
0.00 % Cft.
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 35

Providing and fitting 10 cm (4\") gully trap, in


costof PVC grating 15 x 15 cm (6\" x 6\") and Ma
cm(12\" x 12\").
Detail

Unit Rate (British System)


Qty

MATERIAL
1
2
3
4
5
6

LABOUR
1

Concrete Gully trap


P.V.C grating 15 x 15 cm (6\" x 6\")
Cement
Sand
Crushed Stone
Brick
Total
Contractor's Profit &
20 Percent
Total
For 8 Nos.
Plumber/Mason
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
1.00 No.
0.119 Bag
0.190 Cft.
0.323 Cft.
20.00 No.

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 64

10 cm (4\") gully trap, including cement cncre


x 15 cm (6\" x 6\") and Masonry chamber 30 x 30

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.0 each
0.0 Bag
0.00 % Cft.
0.00 % Cft.
0.00 % No 0

0.0
0.0
0.0
0.0
0.0
0.0
0
-

0.00 per day

0.0
0.0
-

0.0 Say
.01 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 36 (i)
(a)

Providing & fitting cast iron soil pip


Lead caulked, yarn joint 10 cm (4\") d

Detail

MATERIAL FOR 2 METRE)


1
C.I Soil 10 cm (4\") dia
Cost of lead joint
a)
Lead
b) Yarn 0.25 Lbs
c) Fuel wood

LABOUR
1
2

Total
Contractor's Profit &
Total
Material cost/metre
0.0 =
2
For 20 Metre
Plumber/Mason
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

20 Percent

0.0

Percent
20 Percent

Page 65

fitting cast iron soil pipe with:


d, yarn joint 10 cm (4\") dia.

Unit Rate (Metric) per R.M


Qty

Rate Per Unit

Amount (Rs.)

2.00 Metre 0.00per metre

0.0

2.36 Kg.

0.0
0.0
0.0

1.45 Kg.

0.00 Per Kg.


0.0 Lbs
0.00 Per Kg.

0.0
0.0

1.00 No.
0.00 per day
2.00 Nos. 0.00 per day

0.0
0.0
0.0
-

Rs.
Rs.
Rs.
Rs.

0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 36 (i)
(b)

Providing & fitting cast iron soil pip


Lead caulked, yarn joint 5 cm (2\") di

Detail

MATERIAL FOR 2 METRE)


1
C.I Soil 5 cm (2\") dia
Cost of lead joint
a)
Lead
b) Yarn 0.13 Lbs
c) Fuel wood
Total
Contractor's Profit & Overh
Total
Material cost/metre
449.46 =
2
LABOUR
For 50 Metre
1
Plumber/Mason
2
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit & Overh
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

20 Percent

224.73

Percent
20 Percent

Page 66

fitting cast iron soil pipe with:


d, yarn joint 5 cm (2\") dia.

Unit Rate (Metric) per R.M


Qty
Rate Per Unit

Amount (Rs.)

2.00 Metre 0.00per metre

0.0

0.23 Kg.

0.0
0.0
0.0
0.0

0.73 Kg.

0.00 Per Kg.


0.0 Lbs
0.00 Per Kg.
0

1.00 No.
2.00 No.

0.00 per day


0.00 per day

0.0
0.0
0.0
-

Rs.
Rs.
Rs.
Rs.

0.0
0.0
-.01
.02

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 36 (ii)

Cement caulked joint.


(a)

10 cm (4\") dia.
Detail

Unit Rate (Metric) per R.M


Qty

MATERIAL FOR 2 METRE)


1
2
3

LABOUR
1
2

C.I Soil pipe 10 cm (4\") dia


Yarn
Cement
Total
Contractor's Profit &
20 Percent
Total
Material cost per metre
For 40 Metres

2.00 Meter
0.25 Lbs
0.022 Bag

Mason/Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.25 No.
Percent
20 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per metre
Composite rate per Ft.

Rs.
Rs.
Rs.
Rs.

Page 67

nit Rate (Metric) per R.M


Rate Per Unit

Amount (Rs.)

0.00per metre
0.0 Lbs
0.0 Bag

0.0
0.0
0.0
0.0
0.0

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 36 (ii)

Cement caulked joint.


(b)

5 cm (2\") dia.
Detail

Unit Rate (Metric) per R.M


Qty

MATERIAL FOR 2 METRE)


1
2
3

LABOUR
1
2

C.I Soil pipe 5 cm (2\") dia


Yarn
Cement 0.011 Bag
Total
Contractor's Profit &
20 Percent
Total
Material cost per metre
For 100 Metre

2.00 Metre
0.13 Lbs

Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.25 No.
Percent
20 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per metre
Composite rate per Ft.

Rs.
Rs.
Rs.
Rs.

Page 68

nit Rate (Metric) per R.M


Rate Per Unit

Amount (Rs.)

0.00per metre
0.0 Lbs
0.0 Bag

0.0
0.0
0.0
0.0
0.0

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 37
(i)

Providing and fitting, A.C Soil pipe with cement


specials.
6 cm i/d.

Detail

Unit Rate (Metric) per R.M


Qty

Rate Analysis for 3 Metre


MATERIAL
1
2
3
4

LABOUR
1
2

A.C Soil Pipe


Specials @ 10%
Yarn
Cement
Total
Contractor's Profit &
Total
Material cost per metre
For 50 Metre
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

3.00 Metre
0.25 Lbs
0.022 Bag
20 Percent

1.00 No.
0.25 No.
Percent
20 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

Rs.
Rs.
Rs.
Rs.

Page 69

A.C Soil pipe with cement caulked joint, inc

nit Rate (Metric) per R.M


Rate Per Unit

Amount (Rs.)

0.00per metre

0.0
0.0
0.0
0.0
0.0

0.0 Lbs
0.0 Bag
-

0.0

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0
0.0
.02
.01

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 37
(ii)

Providing and fitting, A.C Soil pipe with cement


including all specials.
7.5 cm (3\" dia).

Detail

Unit Rate (Metric) per R.M


Qty

MATERIAL FOR 3 METRE


1
A.C Soil Pipe
2
Specials @ 10%
3
Yarn
4
Cement
Contractor's Profit &
Total
Material cost per metre
LABOUR
1
2

For 45 Metre
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

3.00 Metre
0.25 Lbs
0.022 Bag
20 Percent

1.00 No.
0.25 No.
Percent
20 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

Rs.
Rs.
Rs.
Rs.

Page 70

A.C Soil pipe with cement caulked joint,

nit Rate (Metric) per R.M


Rate Per Unit

Amount (Rs.)

0.00per metre

0.0
0.0
0.0
0.0
0.0

0.0 Lbs
0.0 Bag
-

0.0

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 37
(iii)

Providing and fitting, A.C Soil pipe with cement


including all specials.
10 cm (4\" dia).

Detail

Unit Rate (Metric) per R.M


Qty

MATERIAL FOR 3 METRE


1
A.C Soil Pipe
2
Specials @ 10%
3
Yarn
4
Cement
Contractor's Profit &
Total
Material cost per metre
LABOUR
1
2

For 40 Metre
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

4.00 Metre
0.31 Lbs
0.028 Bag
20 Percent

1.00 No.
0.25 No.
Percent
20 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

Rs.
Rs.
Rs.
Rs.

Page 71

A.C Soil pipe with cement caulked joint,

nit Rate (Metric) per R.M


Rate Per Unit

Amount (Rs.)

0.00per metre

0.0
0.0
0.0
0.0
0.0

0.0 Lbs
0.0 Bag
-

0.0

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 37
(iv)

Providing and fitting, A.C Soil pipe with cement


including all specials.
15 cm (6\" dia) A/C Soil Pipe.

Detail

Unit Rate (Metric) per R.M


Qty

MATERIAL FOR 4 METRE


1
A.C Soil pipe 50 cm (6\" dia)
2
Special at 10%
3
Yarn
4
Cement
Contractor's Profit &
Total
Material cost per metre
LABOUR
1
2

For 30 Metre
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

4.00 Metre
0.500 Lbs
0.044 Bag
20 Percent

1.00 No.
0.25 No.
Percent
20 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

Rs.
Rs.
Rs.
Rs.

Page 72

A.C Soil pipe with cement caulked joint,

nit Rate (Metric) per R.M


Rate Per Unit

Amount (Rs.)

0.00per metre

0.0
0.0
0.0
0.0
0.0

0.0 Lbs
0.0 Bag
-

0.0

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 38
(i)

Providing and fitting cast iron specials, such a


plain type.
Lead Caulked Joint.

Detail

MATERIAL FOR 5 KG.


1
C.I. bend 100 mm (4\" dia)
2
Lead
3
Fuel
4
Yarn
Total
Contractor's Profit &
Total cost for 5 kg
Material cost per Kg
LABOUR FOR 60 NOS.
1
Plumber
2
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

Unit Rate (British System)


Qty

5.00
0.91
2.91
0.50
20 Percent

1.00 No.
1.20 Nos.
Percent
20 Percent

ITEM RATES
Labour rate per Kg
Composite rate per Kg

kg
kg
kg
lbs

Rs.
Rs.

Page 73

cast iron specials, such as tee bend, collar,

nit Rate (British System) per Kg


Rate Per Unit
Amount (Rs.)

0.00
0.00
0.00
0.00

per
per
per
per

kg
kg
kg
lbs

0.0
0.0
0.0
0.0
0.0
0.0

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 38
(ii)

Providing and fitting cast iron specials, such a


cross, etc. plain type.
Cement caulked joint.

Detail

Unit Rate (British System)


Qty

MATERIAL FOR 5 KG.


1
2
3
4

LABOUR
1
2

C.I. bend 10 cm (4\" dia)


Yarn
Cement 0.040 Bag
Sand
Total
Contractor's Profit &
Total
Material cost per Kg
For 90 Nos.
Plumber
Cooly un-skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

5.00 kg
0.50 lbs
0.230 Cft.
20 Percent

1.00 No.
1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate per Kg
Composite rate per Kg

Rs.
Rs.

Page 74

cast iron specials, such as tee bend, collar,

nit Rate (British System) per Kg


Rate Per Unit
Amount (Rs.)

0.00 per kg
0.00 per lbs
0.0 Bag
0.00 % Cft.

0.0
0.0
0.0
0.0
0.0
0.0

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 39

Supply and fitting of cast iron Manhole cover wi


(i)

30 cm (12\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Manhole cover 30 cm (12\" dia)

LABOUR

Total
Contractor's Profit &
Total
For 20 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 75

cast iron Manhole cover with frame, etc. comp

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 39
(ii)

Supply and fitting of cast iron Manhole cover wi


45 cm (18\" dia).

Detail

MATERIAL
1

LABOUR
1

Unit Rate (British System)


Qty

C.I. manhole cover with frame 45 cm


(18\" dia)
Total
Contractor's Profit &
Total
For 20 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 76

cast iron Manhole cover with frame, etc. comp

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0

0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 39
(iii)

Supply and fitting of cast iron Manhole cover wi


C.I. Manhole cover 60 cm (24\" dia)

Detail

Unit Rate (British System)


Qty

MATERIAL
1

C.I manhole cover with frame 60 cm (24\" d 1.00 No.

LABOUR

Total
Contractor's Profit &
Total
For 15 Nos.

1
2

20 Percent

2
Helper (Cooly)
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
0.25 No.
Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 77

cast iron Manhole cover with frame, etc. comp

cm (24\" dia)

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 40

Providing and fitting R.C.C Pipe 10 cm (4\" dia)


laying and jointing in trenches.

Detail

Unit Rate (British System)


Qty

MATERIAL FOR 2 METRE


1

LABOUR
1
2

R.C.C pipe 10 cm (4\" dia)


Total
Contractor's Profit &
Total
Material cost per metre
For 40 Metre
Plumber
Helper (Cooly)
Total
Sundries 10.00
Total
Contractor's Profit &
Total

2.00 metre
6.56 Rft
20 Percent

1.00 No.
2.00 Nos.
Percent
20 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Composite rate per Metre
Composite rate per Ft.

Rs.
Rs.
Rs.
Rs.

Page 78

R.C.C Pipe 10 cm (4\" dia) including


trenches.

nit Rate (British System) per L.M


Rate Per Unit
Amount (Rs.)

.00 metre
0.00 per Rft

0.0
0.0
0.0

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 41

Providing and fitting chromium plated or oxidise


6 mm (\" dia)
(i)

Single way.

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Gas Cock of 6 mm (\" dia)


Total
Contractor's Profit &
Total

LABOUR

For 30 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
20 Percent

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 79

chromium plated or oxidised gas Cock

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 41
(ii)

Providing and fitting chromium plated or oxidise


6 mm (\" dia)
Two way cock.

Detail

MATERIAL
1

Gas Cock of 6 mm (\" dia)

LABOUR

Total
Contractor's Profit &
Total
For 20 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

Unit Rate (British System)


Qty

1.00 No.

20 Percent

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 80

chromium plated or oxidised gas Cock

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 41
(iii)

Providing and fitting chromium plated or oxidise


6 mm (\" dia)
Three way cock.

Detail

MATERIAL
1

Gas Cock of three way

LABOUR

Total
Contractor's Profit &
Total
For 15 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

Unit Rate (British System)


Qty

1.00 No.

20 Percent

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 81

chromium plated or oxidised gas Cock

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 42

Providing and fitting nipple or bush 6 mm to 10


Detail

Unit Rate (British System)


Qty

MATERIAL
1

LABOUR
1

Nipple or bush 6 mm to 10 mm
(1/4\" - 3/8\") i/d.
Total
Contractor's Profit &
20 Percent
Total
For 40 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 82

nipple or bush 6 mm to 10 mm (\" - 3/8\") i/d.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 43
(i)

Providing and fixing, brass gas cock.


1.5 cm (\" dia).

Detail

MATERIAL
1

Brass gas cock 1.5 cm (\" dia)


Total
Contractor's Profit &
Total

LABOUR
1

Unit Rate (British System)


Qty

1.00 No.

20 Percent

For 48 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

0.25 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 83

brass gas cock.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 43
(ii)

Providing and fixing, brass gas cock.


2 cm (\" dia).

Detail

MATERIAL
1

Brass gas cock 2 cm (\" dia)

Contractor's Profit &


Total
LABOUR
1

Unit Rate (British System)


Qty

1.00 No.

20 Percent

For 48 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

0.25 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 84

brass gas cock.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 44
(i)

Providing and fixing brass stop cock/bib cock.


1.5 cm (\" dia).

Detail

MATERIAL
1

Brass stop cock/bib cock.

LABOUR

Total
Contractor's Profit &
Total
For 30 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

Unit Rate (British System)


Qty

1.00 No.

20 Percent

0.25 No.
Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 85

rass stop cock/bib cock.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 44
(ii)

Providing and fixing brass stop cock/bib cock.


2 cm (\" dia).

Detail

MATERIAL
1

Brass stop cock/brass bib cock


Total
Contractor's Profit &
Total

LABOUR
1

Unit Rate (British System)


Qty

1.00 No.

20 Percent

For 30 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

0.25 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 86

rass stop cock/bib cock.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 45

Hoisting and placing in position precast R.C lat

Detail

LABOUR
1
2

Unit Rate (British System)


Qty

For 8 Nos.
Plumber/Mason
Coolies skilled
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
3.00 Nos.

Percent
20 Percent

ITEM RATES
Labour rate per Each

Rs.

Page 87

n position precast R.C latrine seats.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0 Say

0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 1

Providing and fixing, chromium plated waste coup


(i)

3 cm (1\" dia)

Detail

Unit Rate (British System)


Qty

MATERIAL
1

C.P. coupling 3 cm (1\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 20 Nos.

Plumber/Mason
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 88

chromium plated waste coupling.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 1

Providing and fixing, chromium plated waste coup


(ii)

4 cm (1\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

C.P. coupling 4 cm (1\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR
1

For 20 Nos.
Plumber/Mason
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 89

chromium plated waste coupling.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 2

Providing and fixing rubber plug with chain.


(i)

3 cm (1\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

LABOUR
1

Rubber plug with chain 3 cm


(1\" dia)
Total
Contractor's Profit &
Total

1.00 No.
20 Percent

For 50 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

0.10 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 90

ubber plug with chain.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 2

Providing and fixing rubber plug with chain.


(ii)

Rubber plug with chain 4 cm (1\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

LABOUR
1

Rubber plug with chain 4 cm


(1\" dia)
Total
Contractor's Profit &
Total
For 50 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.
20 Percent

0.10 No.
Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 91

ubber plug with chain.


4 cm (1\" dia).

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 3

Providing and fixing waste pipe of PVC.


(i)

3 cm (1\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

P.V.C. waste pipe 3 cm (1\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR
1

For 40 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 92

aste pipe of PVC.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 3

Providing and fixing waste pipe of PVC.


(ii)

P.V.C Waste Pipe 4 cm (1\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

P.V.C. waste pipe 4 cm (1\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR
1

For 40 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 93

aste pipe of PVC.

(1\" dia).

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 4

Providing and fixing flushing


(i)

bend of P.V.C.

3 cm (1\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

P.V.C. flushing bend 3 cm (1\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 45 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 94

lushing

bend of P.V.C.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

.01
-.02

Say
Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 4

Providing and fixing flushing


(ii)

bend of P.V.C.

P.V.C Flusing bend 4 cm (1\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

P.V.C. Flusing bend 4 cm (1\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 45 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 95

lushing

bend of P.V.C.

m (1\" dia).

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

.01 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 5

Providing and fixing chromium plated bottle trap


pipe etc. complete.
(i)

3 cm (1\" dia).
Detail

Unit Rate (British System)


Qty

MATERIAL
1

C.P Bottle trap with waste pipe


Contractor's Profit &
Total

LABOUR
1

1.00 No.

20 Percent

For 20 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 96

hromium plated bottle trap with waste

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 5

Providing and fixing chromium plated bottle trap


pipe etc. complete.
(ii)

C.P. Bottle Trap with waste pipe 4 cm (1\" dia)


Detail

Unit Rate (British System)


Qty

MATERIAL
1

C.P Bottle trap 4 cm with waste pipe


Contractor's Profit &
Total

LABOUR
1

20 Percent

For 20 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 97

hromium plated bottle trap with waste

waste pipe 4 cm (1\" dia).

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 6

Providing and fixing angle iron brackets for


(i)

Wash hand basin and cistern.

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

LABOUR
1

Angle Iron Bracket


Nail with Cutter
Total
Contractor's Profit &
Total

2.00 Nos.
4.00 Nos.
20 Percent

For 20 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 98

ngle iron brackets for

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each
0.0 each

0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 6

Providing and fixing angle iron brackets.


(ii)

Sink.

Detail

Unit Rate (British System)


Qty

MATERIAL
1
2

LABOUR
1

Angle Iron Bracket for Sink


Nail with cutter
Total
Contractor's Profit &
Total

2.00 Nos.
4.00 Nos.
20 Percent

For 20 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 99

ngle iron brackets.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each
0.0 each

0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 7

Providing and fixing 1.5 cm (\" dia) connection


nuts etc.
(i)

Plastic rubber connection.


Detail

Unit Rate (British System)


Qty

MATERIAL
1

LABOUR
1

Rubber connection with


assessories
Total
Contractor's Profit &
Total

1.00 Nos.
20 Percent

For 50 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 100

.5 cm (\" dia) connection, including check

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 7

(ii)

Providing and fixing 1.5 cm (\" dia) connection


nuts etc.
Copper connection.
Detail

Unit Rate (British System)


Qty

MATERIAL
1

LABOUR
1

Copper Connection
assessories
Total
Contractor's Profit &
Total

1.00 Nos.
20 Percent

For 50 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 101

.5 cm (\" dia) connection, including check

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 8

Providing and fixing brass ball float valve.


(i)

1.5 cm (\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

1.5 cm (\" dia) brass ball valve with


assessaries
Contractor's Profit &
Total

LABOUR
1

20 Percent

For 24 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 102

rass ball float valve.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 8

Providing and fixing brass ball float valve.


(ii)

2 cm (\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Brass ball valve 2 cm (\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 24 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 103

rass ball float valve.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 8

Providing and fixing brass ball float valve.


(iii)

2.5 cm (1\" dia).


Detail

Unit Rate (British System)


Qty

MATERIAL
1

Brass ball valve 2.5 cm (1\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 24 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 104

rass ball float valve.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 8

Providing and fixing brass ball float valve.


(iv)

3 cm (1\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Brass ball float valve 3 cm (\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR

For 24 Nos.

Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.
Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 105

rass ball float valve.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 8

Providing and fixing brass ball float valve.


(v)

4 cm (1\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Brass ball float valve 4 cm (1\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR
1

For 24 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 106

rass ball float valve.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 8

Providing and fixing brass ball float valve.


(vi)

5 cm (2\" dia).

Detail

Unit Rate (British System)


Qty

MATERIAL
1

Brass ball float valve 5 cm (2\" dia)


Total
Contractor's Profit &
20 Percent
Total

LABOUR
1

For 24 Nos.
Plumber
Total
Sundries 10.00
Total
Contractor's Profit &
Total

1.00 No.

1.00 No.

Percent
20 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 107

rass ball float valve.

nit Rate (British System) for Each


Rate Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

CHAPTER NO. 18

ROAD & ROAD STRUCTURE

DESCRIPTION OF ITEM:
Item No. 1
Providing and laying sub-base course of brick on
4\" (114 mm)thick including compaction to requi
camber and grade.
Detail
Unit Rate (British System)
Qty
MATERIAL
1
2

Brick
Sand
Total
Contractor
Total

1400 Nos.
22 Cft
20

LABOUR
1
2
3

Mason
Cooly
Bahisthi
Total
Sundries 1 Percent
Total
Contractor
20
Total
COMPACTION CHARGES
1
Working of DRR

1.35 Nos.
2.65 Nos.
0.10 No.

0.25 hour

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composit rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 1

RUCTURE

ub-base course of brick on edge


luding compaction to required

nit Rate (British System) per 100 Cft


Rate

Per Unit

Amount (Rs.)

0.0 No.
0.0 % Cft

0.0
0.0
0.0
-

0.00 per day


0.00 per day
0.00 per day

0.0
0.0
0.0
0.0
-

0.00per hour

0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 2

Providing and laying sub-base course of brick ag


includingcompaction of sub-base course material
required depth, cambergrade and density.
Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1
2

Brick aggregate
Sand
Total
Contractor
Total

122 Cft
24 Cft
20

LABOUR
2

Cooly Skilled
2.00 Nos.
Total
Sundries 1 Percent
Total
Contractor
20
Total
COMPACTION CHARGES
1
Working of DRR
0.75 hour
ITEM RATES
Labour rate per 100 CRs.
Labour rate per Cum Rs.
Composit rate per 100Rs.
Composite rate per CuRs.

Page 2

ub-base course of brick aggregate


sub-base course material to
grade and density.

British System) per 100 Cft


Rate Per Unit

Amount (Rs.)

0.0 % Cft
0.0 % Cft

0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.00per hour

0.0
0.0
-.55
-.19

Say
Say
Say
Say

0.0
0.0

0.0
0.0
-.5
-.1

DESCRIPTION OF ITEM:
Item No. 3

(i)

Providing and laying sub-base course o


quality and grade, including placing,
of sub-base material to required depth
modified AASHO dry density, including
work, except gravel and aggregate for
is included in the rate.
Pit run or bed run gravel.
Detail
Unit Rate (British System)
Qty

MATERIAL
1

Pit run or bed run gravel


Total
Contractor's Profit &
Total

LABOUR
2

Cooly Skilled

120 Cft

20

2.00 Nos.

Total
Sundries 10.00
Percent
Total
Contractor's Profit &
20
Total
COMPACTION CHARGES
1
Working of DRR
0.75 hour
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composit rate per 100 Cft
Composite rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 3

nd laying sub-base course of stone product of approved


grade, including placing, mixing, spreading and compaction
material to required depth, grade to achieve 100% maximum
SHO dry density, including carriage of all material to site
t gravel and aggregate for which supply within 3 Miles (5 km
in the rate.
bed run gravel.
nit Rate (British System) per 100 Cft
Rate

Per Unit

Amount (Rs.)

0.0 % Cft

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.00per hour

0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 3 (a)

(ii)

Providing and laying sub-base course of stone pr


quality and grade, including placing, mixing, sp
of sub-base material to required depth, grade to
modified AASHO dry density, including carriage o
work, except gravel and aggregate for which supp
is included in the rate.
Crushed stone aggregate.
Detail
Unit Rate (British System) per 100 Cft
Qty

MATERIAL
1

Crushed stone
Total
Contractor
Total

120 Cft
20

LABOUR
2

Cooly Skilled
2.00 Nos.
Total
Sundries 1 Percent
Total
Contractor
20
Total
COMPACTION CHARGES
1
Working of DRR
0.75 hour

ITEM RATES
Labour rate per 100 CRs.
Labour rate per Cum Rs.
Composit rate per 100Rs.
Composite rate per CuRs.

Page 4

ub-base course of stone product of approved


luding placing, mixing, spreading and compaction
o required depth, grade to achieve 100% maximum
sity, including carriage of all material to site
d aggregate for which supply within 3 Miles (5 km

British System) per 100 Cft


Rate Per Unit

Amount (Rs.)

0.0 % Cft

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.00per hour

0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 4

Providing and laying base course of crushed ston


approved quality and grade and supply and spread
screening including placing mixing spreading and
course material to required camber and grade to
Modified AASHTO dry density, including carriage
of work except crushed stone aggregate for which
(5 km) is included in rate.
Detail
Unit Rate (British System) per 100 Cft
Qty

MATERIAL
1
2

Crushed Stone aggrega122 Cft


Screeing
22 Cft
Total
Contractor
20
Total

LABOUR
1

Cooly Skilled
2.50 Nos.
Total
Sundries 1 Percent
Total
Contractor
20
Total
COMPACTION CHARGES
1
Working of DRR
0.75 hour

ITEM RATES
Labour rate per 100 CRs.
Labour rate per Cum Rs.
Composit rate per 100Rs.
Composite rate per CuRs.

Page 5

ase course of crushed stone aggregate of


rade and supply and spreading of stone
acing mixing spreading and compaction of base
uired camber and grade to achieve 100% maximum
nsity, including carriage of all materials to sit
stone aggregate for which supply within 3 Miles

British System) per 100 Cft


Rate

Per Unit

Amount (Rs.)

0.0 % Cft
0.0 % Cft

0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.00per hour

0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 5

Providing and laying road edging of 3\" (75 mm)


deep brick on end. complete in all respects.
Detail

Unit Rate (British System) per Foot


Qty

Analysis for 100 feet


MATERIAL
1

LABOUR
1
2

Bricks
Total
Contractor
Total

288 Nos.
20

Mason
0.50 No.
Cooly skilled
0.50 No.
Total
Sundries 1 Percent
Total
Contractor
20
Total

ITEM RATES
Labour rate per one fRs.
Labour rate per metreRs.
Composit rate per fooRs.
Composite rate per meRs.

Page 6

oad edging of 3\" (75 mm) wide and 9\" (228 mm)
plete in all respects.

British System) per Foot


Rate Per Unit

Amount (Rs.)

0.00 Nos.

0.0
0.0
-

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0
0.0
0.0
-.05

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 6
Providing and laying bituminous prime coat, usin
Kerosene Oil and 10 lbs (4.55 kg) binder.
Detail

Unit Rate (British System) per 100 Sft


Qty

Analysis for 100 Sft


MATERIAL
1
2
3

LABOUR
1

Binder (Bitumen)
Kerosene oil
Fuel wood
Total
Contractor
Total

4.55 kg
4.537 litre
0.07 kg
20

Cooly un-skilled for laying priming


coat after cleaning 0.20 No.
Total
Sundries 1 Percent
Total
Contractor
20
Total

ITEM RATES
Labour rate per 100 SRs.
Labour rate per Sqm Rs.
Composit rate per 100Rs.
Composite rate per SqRs.

Page 7

ituminous prime coat, using 10 lbs (4.537 liters)


s (4.55 kg) binder.

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

100.00per tonne
0.00per litre
0.00 per kg

4.55
0.0
0.0
4.55
.91
5.46

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say
Say
0.0 Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 7
Providing and laying bituminous tack coat, using
bitumen.
Detail

Unit Rate (British System) per 100 Sft


Qty

Analysis for 100 Sft


MATERIAL
1
2

LABOUR
1

Bitumen
Fuel wood
Total
Contractor
Total

6.80 kg
0.11 kg
20

Cooly un-skilled for cleaning road,


surface and laying ta0.20 No.
Total
Sundries 1 Percent
Total
Contractor
20
Total

ITEM RATES
Labour rate per 100 SRs.
Labour rate per Sqm Rs.
Composit rate per 100Rs.
Composite rate per SqRs.

Page 8

ituminous tack coat, using 15 lbs (6.80 kg) of

British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

per tonne
0.00 per kg

0.0
0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0
0.0
0.0
0.0

Say
Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 8 (I - i)
Providing surface treatment to roads including s
bajri/crushed stone aggregate of approved qualit
road surface heating and spraying bitumen spread
with road roller (including its operation cost,
complete, including carriage of all materials to
bajri/crushed stone aggregate for which supply w
included in the rate.
1- Ist Coa Using 40 lbs (18.1590 kg) of bitumen and 5.5 Cft
nominal size 1 inch (25 mm) per 100 Sft.
Detail
Analysis for 10000 Sft Area
MATERIAL
1
2
3

LABOUR
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor
20 % on 1&0.00
Total
Material cost per 10030549.86 x 100
10000

Tar Sprayer
Chowkidar
Cooly
Total
Sundries 1 Percent
Total
Contractor
20
Total
HIRE CHARGES OF MACHINERY
INCLUDING POL AND CREW CHARGES
1
Road Roller
2
Tar Boiler
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Page 9

tment to roads including supply of bitumen and


gregate of approved quality, including cleaning o
nd spraying bitumen spreading bajri and rolling
uding its operation cost, fuel and hire charges,
rriage of all materials to site of work except
gregate for which supply within 3 miles (5.0 km)

kg) of bitumen and 5.5 Cft (0.156 Cum) bajri of


5 mm) per 100 Sft.
Unit Rate (British System) per 100 Sft
Qty
Rate Per Unit
Amount (Rs.)

550 Cft
0.0 % Cft
1.81 Tonne
per tonne
223.92 kg 0.00 per kg

0.0
0.0
0
0
0.0

1.00 No.
0.00 per day
1.00 No
RATE
per day
12.00 Nos. 0.00 per day

0.0
#VALUE!
0.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

8.00 hrs
8.00 hrs

0.00per hour
0.00per hour

0.0
0.0
#VALUE!

Rs.
Rs.
Rs.
Rs.

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 8 (1-ii)
FIRST COAT
Using 35 lbs (15.880 kg) bitumen and 4.0 Cft (0.
size \" (20 mm) per 100 Sft.
Detail

Analysis for 10000 Sft area


MATERIAL
1
2
3

LABOUR
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor
Total
Rate per 100 Sft

20 % on 1&0.00
= 26392.90
10000

Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries 1 Percent
Total
Contractor
20
Total
HIRE CHARGES OF MACHINERY
INCLUDING POL AND CREW CHARGES
1
Road Roller
2
Tar Boiler
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

100

Page 10

g) bitumen and 4.0 Cft (0.113 cu.m) bajri of nomi

Unit Rate (British System) per 100 Sft


Qty
Rate Per Unit
Amount (Rs.)

400 Cft
0.0 % Cft
1.588 Tonne
per tonne
196 kg
0.00 per kg

0.0
0.0
0.0
0.0
0.0

1.00 No.
0.00 per day
1.00 No
RATE
per day
12.00 Nos. 0.00 per day

0.0
#VALUE!
0.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

8.00 hrs
8.00 hrs

0.00per hour
0.00per hour

0.0
0.0
#VALUE!

Rs.
Rs.
Rs.
Rs.

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 8 (2-i)
SECOND COAT.
Using 25 lbs (11.343 kg) bitumen and 2.75 Cft (0
size \" (12 mm) per 100 Sft.
Detail

Unit Rate (British System)


Qty

Analysis for 13000 Sft area


MATERIAL
1
2
3

LABOUR
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor
Total
Rate per 100 Sft

357.5 Cft
1.475 Tonne
182.5 kg
20 % on 1&0.00
= 24446.69
13000

Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries 1 Percent
Total
Contractor
20
Total
HIRE CHARGES OF MACHINERY
INCLUDING POL AND CREW CHARGES
1
Road Roller
2
Tar Boiler
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

100

1.00 No.
1.00 No
12.00 Nos.

8.00 hrs
8.00 hrs

Rs.
Rs.
Rs.
Rs.

Page 11

g) bitumen and 2.75 Cft (0.077 m) bajri of nomin

nit Rate (British System) per 100 Sft


Rate Per Unit
Amount (Rs.)

0.0 % Cft
.475 Tonne
tonne
0.00 per Kg

0.0
0.0
0.0
0.0
0.0

0.00 per day


RATE
per day
0.00 per day

0.0
#VALUE!
0.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

0.00per hour
0.00per hour

0.0
0.0
#VALUE!

Say
0.0 Say
Say
0.0 Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 8 (2-ii)
SECOND COAT
Using 18 lbs (8.17 kg) bitumen and 2.0 Cft (0.05
nominal size 3/8\" (10 mm).
Detail

Analysis for 13000 Sft area


MATERIAL
1
2
3

LABOUR
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor
Total
Rate per 100 Sft

20 % on 1&0.00
=17614.43
13000

Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries 1 Percent
Total
Contractor
20
Total
HIRE CHARGES OF MACHINERY
INCLUDING POL AND CREW CHARGES
1
Road Roller
2
Tar Boiler
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

100

Page 12

bitumen and 2.0 Cft (0.056 m) bajri of

Unit Rate (British System) per 100 Sft


Qty
Rate Per Unit
Amount (Rs.)

260.0 Cft
0.0 % Cft
1.062 Tonne
per tonne
131.38 kg 0.00 per kg

0.0
0.0
0.0
0.0
0.0

1.00 No.
0.00 per day
1.00 No
RATE
per day
12.00 Nos. 0.00 per day

0.0
#VALUE!
0.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

8.00 hrs
8.00 hrs

0.0
0.0
#VALUE!

Rs.
Rs.
Rs.
Rs.

0.00per hour
0.00per hour

0.0 Say
0.0 Say
0.0 Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 8 (3)
THIRD COAT
Using 14 lbs (6.35 kg) bitumen and 1.5 Cft (0.04
nominal size \" (6 mm) per 100 Sft.
Detail

Analysis for 19000 Sft area


MATERIAL
1
2
3

LABOUR
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor
20 % on 1&0.00
Total
Rater par 100 Sft
19967.39 x 100
19000

Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries 1 Percent
Total
Contractor
20
Total
HIRE CHARGES OF MACHINERY
INCLUDING POL AND CREW CHARGES
1
Road Roller
2
Tar Boiler
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Page 13

bitumen and 1.5 Cft (0.0472 m) bajri of


) per 100 Sft.
Unit Rate (British System) per 100 Sft
Qty
Rate Per Unit
Amount (Rs.)

285.0 Cft
0.0 % Cft
1.207 Tonne
per tonne
149.3 kg
0.00 per kg

0.0
0.0
0.0
0.0
0.0

1.00 No.
0.00 per day
1.00 No
RATE
per day
12.00 Nos. 0.00 per day

0.0
#VALUE!
0.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

8.00 hrs
8.00 hrs

0.0
0.0
#VALUE!

Rs.
Rs.
Rs.
Rs.

0.00per hour
0.00per hour

Say
0.0 Say
0.0 Say
0.0 Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 9 (a)
Resurfacting of road, including supply of bitume
stone aggregate of approved quality, including c
heating and spraying of bitumen, and spreading b
aggregate and rolling with road roller (includin
to site of work except bajri/crushed stone aggre
within 3.0 Miles (5 km) is included in the rate.
(i)
Using 22 lbs (9.981 kg) bitumen and 2.5 Cft (0.0
\" (12 mm).
Detail
Unit Rate (British System)
Qty
Analysis for 15000 Sft area
MATERIAL
1
2
3

LABOUR
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor
Total
Rate per 100 Sft

375.0 Cft
1.497 Tonne
185.11 kg
20 % on 1&0.00
= 24871.21
15000

Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries 1 Percent
Total
Contractor
20
Total
HIRE CHARGES OF MACHINERY
INCLUDING POL AND CREW CHARGES
1
Road Roller
2
Tar Boiler
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

100

1.00 No.
1.00 No
12.00 Nos.

8.00 hrs
8.00 hrs

Rs.
Rs.
Rs.
Rs.

Page 14

including supply of bitumen and bajri/crushed


roved quality, including cleaning of road surface
f bitumen, and spreading bajri/crushed stone
with road roller (including carriage of all mater
bajri/crushed stone aggregate for which supply
) is included in the rate.
) bitumen and 2.5 Cft (0.07 m) bajri of nominal

nit Rate (British System) per 100 Sft


Rate Per Unit

Amount (Rs.)

0.0 % Cft
.497 Tonne
0.00 per kg

0.0
0.0
0.0
0.0
-.01

0.00 per day


RATE
per day
0.00 per day

0.0
#VALUE!
0.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

0.00per hour
0.00per hour

0.0
0.0
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 9 a (ii)

Using 20 lbs (9.074 kg) bitumen and 2.0 Cft (0.0


size 3/8\" (10 mm) per 100 Sft.
Detail

Analysis for 15000 Sft area


MATERIAL
1
2
3

LABOUR
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor
Total
Rate per 100 Sft

20 % on 1&0.00
= 22409.14
15000

Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries 1 Percent
Total
Contractor
20
Total
HIRE CHARGES OF MACHINERY
INCLUDING POL AND CREW CHARGES
1
Road Roller
2
Tar Boiler
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

100

Page 15

) bitumen and 2.0 Cft (0.056 m) bajri of nominal

Unit Rate (British System) per 100 Sft


Qty
Rate Per Unit
Amount (Rs.)

300 Cft
0.0 % Cft
1.361 Tonne
per tonne
168.31 kg 0.00 per kg

0.0
0.0
0.0
0.0
0.0

1.00 No.
0.00 per day
1.00 No
RATE
per day
12.00 Nos. 0.00 per day

0.0
#VALUE!
0.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

8.00 hrs
8.00 hrs

0.00per hour
0.00per hour

0.0
0.0
#VALUE!

Rs.
Rs.
Rs.
Rs.

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Item No. 10(vii)

Providing and laying plant pre-mixed bituminous


compaction and finishing to required camber, gra
density.
Detail
Unit Rate (British System)

Qty
Analysis for 2\" thick Carpet
Mixed Design
(9.29 Sqm)
Coarse aggregate = 90-5,400.%
Fine aggregate = 90 x-3,600.%
Filler
(4%)
Bitumen
= (6%)
MATERIAL
Unit weight of Mix
= 145 lbs/Cft
100 x 2/12
= 16.67 Cft (% Sft)
Total weight = 16.67 x 145 = 2417 lbs/%Sft
Quantity of Materials/100 Sft
1
Course aggregate
2417 x 54
12.43 Cft
100 x 105
2
Fine aggregate (Herrow sand)
2417 x 36
8.70 Cft
100 x 100
3
Filler
2417 x 4
1.07 Cft
100 x 90
4
Bitumen
2417 x 6
145.00 lbs
100
65.91 kg
Total
5
Contractor
20 12&3
6
Cost of Brushes and other specia
.3
7
Contractor's Profit & Overheads (20%) on item '6'
Material cost per 100 Sft (2\" thick)
LABOUR
Labour required at site of work co-ordinating the
working of Machinery of complete unit of premix
plant (Mixing plant, Generator, pick up, including
establishment P.O.L and Depreciation etc.
(Mixing plant, Generator, Pickup, including
establishment POL and depreciation etc.)

Page 16

lant pre-mixed bituminous carpet, including


ng to required camber, grade and

nit Rate (British System) per 100 Sqm.


Rate Per Unit

Amount (Rs.)

(4%)
= (6%)
= 145 lbs/Cft

17 lbs/%Sft

0.0 % Cft

0.0

0.0 % Cft

0.0

0.0 % Cft

0.0

45.00 lbs

(20%) on item '6'

per ton

0.0
0.0
-

0.0

0.0
0.0

Plant Running Charges including crew charges


1
Asphalt plant
2
Dumper
3
Loader
4
Bulldozer 1.00 No.
5
Paver Finisher
6
Road Roller
7
Water Loory
8
Road Roller
9
Tractor
10 Misc. i.e. small T&P, working
of Crane & Tar Boiler
Total cost of working of machinary (P/Hr.)
Working hours of machining = 6 hours
Total cost for working of machinary per day
0
x6 =
Area completed per day
45 x 6 x 2204 x 6
145
Rate of machinery per 100 Sft (2\" thick)
Labour charges included in it
Assume at 12.5% of machinery charges
12.5 x
0.0
100
Sundries on Labour
Total
Contractor's Profit & O Percent 0.000
Total
Labour rate per 100 Sft (2\" thick)
(a) Labour Rate per 100 Sft carpet (1\" thick)

(b) Material cost per 100 Sft (1\" thick)

ITEM RATES
Labour rate per 100 Sft (1\" thick)
Labour Sqm (25 mm thick)
Composite rate per 100 Sft (1\" thick)
Composite rate per Sqm (25 mm)

1.00 No.
0.00per hour
10.00 Nos. 0.00per hour
2.00 Nos. 0.00per hour
0.00per hour
1.00 No.
0.00per hour
1.00 No.
0.00per hour
1.00 No.
0.00per hour
1.00 No.
0.00per hour
1.00 No.
0.00per hour
L.S

ry (P/Hr.)

ary per day


0
24624 Sft (2\" thick)

=
Percent

0.0

10

0.0

20

0.00
2

0.0

0.0

0.0

2
Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Page 17

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0

0.0
0.0

0.0

0.0

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 11

Scarifying old road surface including removal of


Detail

Unit Rate (British System) per 100 Sft


Qty

LABOUR
1

Cooly un-skilled
0.33 No.
Total
Sundries 1 Percent
Total
Contractor
20
Total

ITEM RATES
Labour rate for 100 SRs.
Labour rate for 1 SqmRs.

Page 18

rface including removal of debris within 1 chain (30.0 m)

British System) per 100 Sft


Rate Per U Amount (Rs.)

0.00 per day


0.0
0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 12
Providing R.C.C railing on bridges as per standa
Detail

Unit Rate (British System)

Qty
Analyses for 12.5 feet
MATERIAL
1
2

Cement concrete 1 : 2 : 4 (Material cost)


Post 3 x 3.5' x 10\" 5.88 Cft
Railing 2 x 10 x 9\" 5.00 Cft
Total
10.88 Cf
10.88 Cft
Steel bars 3/8\" dia
Steel 3/8\ 22
= 77 ft
12
Railing 18 18
=
27 ft.
37.44 lbs
12
Total
104 ft.
104'.0 @ 0.36 lbs/ft 37.44 lbs
Steel 5/8\ 60
60.0 ft.
12
Railing 8 x 12 =
96.0 ft.
156.00 lbs
156 ft.
156 ft @ 1.0 lbs/ft
156
Wastage 15% (37.44 + 193.44 l
29.01 lbs
Total steel
222.45 lbs
100.93 kg

Total material cost for 12.5 ft.


Material cost per foot
LABOUR
1
2

Cement concrete1:2:4(item 6a(ii)10.88 Cft


Steel
100.93 kg
Labour rate/foot (item 9(a) Chap 6 =291.81-18.00 = 273.80

ITEM RATES
Labour rate per foot
Labour rate per metre
Composite rate per foot
Composit rate per metre

Rs.
Rs.
Rs.
Rs.

Page 19

g on bridges as per standard drawing.

nit Rate (British System) per foot


Rate Per Unit

Amount (Rs.)

0.00 per Cft

0.0

0.00 per kg
including
cost of
binding wire

0.0

56.00 lbs

2,524
201.92
-0.82 per Cft
-18.00 per % kg
6 =291.81-18.00 = 273.80

35.84
117.54
237.76
779.85

Say
Say
Say
Say

-8.92
-18.17
448.04
35.84
35.85
117.55
237.75
779.85

DESCRIPTION OF ITEM:
Item No. 13

Providing and fixing G.I pipe railing as per sta


Detail

Unit Rate (British System)


Qty

Analysis for 15.5 feet


MATERIAL
1

3
4

LABOUR
1
2

Iron post 3 No x 4'-4\" x 4\" x 4\" x 3/8\" = 22.1 lbs


Wastage 3%
= 0.66 l
10.35 kg
= 22.76 lbs
(10.35 kg)
G.I pipe 2\" dia
3 x 15'- 6 46 - 6\"
50' - 2\"
2 x 1'-1\ 2' - 3\"
15.30 metre
48.9\"
Wastage 3%
1.5\"
50'.2\"
= 15.3 mtr
Short bend (
elbow) 2\"
4.00 Nos.
Tee 2 x 2\" x 2\"
2.00 Nos.
Total
Contractor
20
Total
Rate per f 3989.63 =
257.4
15.5
Pipe fitter
Cooly
Total
Sundries 1 Percent
Total
Contractor
20
Total

1.00 No.
1.00 No.

Labour rate per foot


Labour rate per metre
Composit rate per foot
Composite rate per metre

Rs.
Rs.
Rs.
Rs.

ITEM RATES

Page 20

.I pipe railing as per standard drawing.

nit Rate (British System) per foot


Rate Per Unit
Amount (Rs.)

4\" x 3/8\" = 22.1 lbs


0.00 per kg

0.00per metre
5.30 metre

3,064.44

0.0
0.0

0.0
0.0
3,064.44
612.89
3,677.33
257.4

0.00 per day


0.00 per day

0.0
0.0
0.0
-

0.0
0.0
257.45
844.24

Say
Say
Say
Say

0.0
0.0
257.45
844.25

DESCRIPTION OF ITEM:
Item No. 14

Providing and fixing steel bearings of standard


work.
Detail

Unit Rate (British System) per each


Qty

MATERIAL
1

Steel bearing
Total
Contractor
Total

1.00 No.
20

ITEM RATES
Composit rate for eacRs.

DESCRIPTION OF ITEM:
Item No. 15

Providing and fixing rubber bearing pad at site


Detail

Unit Rate (British System) per cubic i


Qty

MATERIAL
1

Rubber bearing pad 1


Total
Contractor
20
Total Rate per cubic inch

ITEM RATES
Composite rate per cuRs.
Composite rate per cuRs.

1 cubic

Page 21

teel bearings of standard quality and type at sit

British System) per each


Rated Per Unit

Amount (Rs.)

0.0 each

0.0
0.0
-

0.0

Say

0.0

ubber bearing pad at site of work.

British System) per cubic inch


Rated Per Unit

Amount (Rs.)

0.00per cub.

0.0
cm.
0.0
-

0.0
0.0

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 16

Providing and laying expansion joint of neoprine


and plastic bitumen.
Detail

MATERIAL
1
2

LABOUR
1

Unit Rate (British System) per foot


Qty

Expansion joint of ne0.80 Foot


Plastic Bitumen (PB -1.14 kg
Total
Contractor
20
Total
Cooly skilled

0.10 No.

Total
Sundries 1 Percent
Total
Contractor
20
Total
ITEM RATES
Labour rate per foot Rs.
Labour rate per foot Rs.
Composit rate per fooRs.
Composite rate per meRs.

Page 22

xpansion joint of neoprine strip 4\" x \" (100 x 6

British System) per foot


Rate Per Unit

Amount (Rs.)

0.00per metre
per kg

0
0
0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say
Say
Say

0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM:
Item No. 17

Providing and fixing rain water outlet of A.C. P


Detail

Unit Rate (British System) per each


Qty

MATERIAL
1

A.C pipe 3\" i/d (1.50.457 Metre

LABOU
1

Total
Contractor
Total
For 20 Nos.
Cooly skilled

20

1.00 No.

Total
Sundries 1 Percent
Total
Contractor
20
Total
ITEM RATES
Labour rate per each Rs.
Composit rate per eacRs.

Page 23

ain water outlet of A.C. Pipe.

British System) per each


Rate Per U Amount (Rs.)

0.00per metre

0.0
0.0
-

0.00 per day

0.0
0.0
-

0.0 Say
0.0 Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 18
Providing and erection at site of work.
(i)

R.C.C Mile/km stone including cost of fabricatio


Detail

MATERIAL
i) P.C.C 1 : 4: 8 in foundation
1 x 3.5 x 1.875 x 1.75 =
11.48 Cft
D/d mile stone 1 x 2 x 0.375 x 11.13 Cft
Rate as per item 6 (3)
10.35 Cf
ii) R.C.C 1: 2: 4
1 x 2 x 0.375 x 4.5 =
3.38 Cft
D/d 15 x 0.375 x 0.08 =
0.47 Cft
(Rate as per item 6 (6 b) (i)
2.91 Cft
iii) Steel reinforcement \" dia
12 x 5 = 60.0'
Tie
4 x 5
20
80. 0 Rft @ .17 lbs/Rft
Rate as per item 8(a)=13.6 lbs = 6.1
iv) Cement plastec 3/8\" thick 1:2 moster
1 x 4.75 x 3
=
14.25 Sft
1 x 2 x 0.375
=
0.75 Sft
Rate as per item 11(7.i)
15.00 Sf
v) Painting 2 coats of mile stone
Rate as per item 13(22 a ii)
vi) Lettering 28 Nos. letres 4\" height
Total
LABOUR
i) Excavation of foundation (Item No.21(b) Chap.3)
1 x 3.5 x 1.875 x 1.25 =
8.20 Cft
Rate as per item 3(1)
ii) P.C.C 1 : 4 : 8 in foundation
as per item (i) above
Rate as per (Item 3(b) of Chapter No.6)
iii) R.C.C 1 : 2: 4 (as per item (ii) above
Rate as per (Item 6a(i) Chapter No.6)
vi)
Steel reinforcement \" dia
(as per item (iii) above)
(Rate as per (Item 9(a) of Chapter No.6)
v) Cement plaster 3/8\" thick 1 : 2 morar
(as per item (iv) above)
Rate as per (Item 7(i) of Chapter No.11)

Page 24

at site of work.

cluding cost of fabrication etc.


Unit Rate (British System) for Each
Qty
Rate Per Unit
Amount (Rs.)

10.35 Cft 0.00Per % Cft

2.91 Cft

.17 lbs/Rft
6.18 kg

Per Cft

0.00 per kg

15.00 Sft 0.00Per % Sft

each
28.00 Nos.

0
0
0

8.20 Cft

0 each
0 each

0.00Per Cft

10.35 Cft 0.00Per


2.91 Cft

6.18 kg

15.08 Sft

Cft
Per Cft

0.00 per kg

% Sft

0
0

vi) Painting 2 coats on mile stone


(as per item (v) above)
Rate as per (Item 22 (a) (ii) of Chapter No.13)
vii) Lettering 28 No. letters 4\28.00 Nos.
(Item No.11 of Chapter 13)
Total
ITEM RATES
Labour rate per Mile/Km Stone
Rs.
Composite rate per Mile/Km StoneRs.

Page 25

each
each

Say
Say

0
0

DESCRIPTION OF ITEM:
Item No. 18
(ii)

Providing and erection at site of work


R.C.C Furlong/ km stone including cos
Detail

MATERIAL
i) P.C.C 1 : 4: 8 in foundation
1 x 1.5 x 0.75 x 1.0 =
D/d mile stone 0.75 x 0.208 x 1.5 =
Rate as per item 6 (3)
ii) R.C.C 1: 2: 4
0.75 x 0.23 x 1.50
=
D/d 1.5 x 0.375 x 0.083 =
(Rate as per item 6 (6 b) (i)
iii) Steel reinforcement dia
6 x 1'-1 11.0 ft.
Tie
3 x 1-6\" 4.6
15.6 Rft @ 0.17 lbs/Rft
Rate as per item 8(a)=2.64 lbs = 1.2
iv) Cement plastec 3/8\" thick 1:2 master
1 x 1.92 x 0.75 =
1 x 0.75 x 0.21 =
Rate as per item 11(6 a)
v) Painting lettering 2 coats furlong post
(Rate as per item No.20(22 bii)
vi) Lettering 3\" height
Total
LABOUR
i) Excavation of foundation (Item NO.21(b) of Chap.3)
1.50 x 0.75 x 0.50
=
ii) P.C.C 1 : 4 : 8 in foundation
as per item (i) above
Rate as per (Item No.3(b) Chapter No.6)
iii) R.C.C 1 : 2: 4 (as per item (ii) above
Rate as per (Item 6(a)i Chapter No.6)
vi)
Steel reinforcement \" dia
(as per item (iii) above)
Rate as per (Item 9(b) Chapter No.6)
v) Cement plaster 3/8\" thick 1 : 2 mortar
(as per item (iv) above)
Rate as per (Item 7(i) of Chapter 11)
vi) Painting 2 coats of Furlong / km
(as per item (v) above)
(Rate as per item 20(b)) (Item No.22(b) (ii) Ch
ITEM RATES

Labour rate per furlong ( Km) Stone


Composite rate per furlong ( Km) Stone

nd erection at site of work.


ng/ km stone including cost of fabrication etc.
Unit Rate (British System) for Each
Qty

Rate Per Unit

1.13 Cft
0.23 Cft
0.90 Cft

0.90 Cft

0.00Per % Cft

0.23 Cft
0.05 Cft
0.18 Cft

0.18 Cft

Per % Cft

Amount (Rs.)

0.17 lbs/Rft

1.44 Sft
0.16 Sft
1.60 Sft

of Chap.3)
0.56 Cft

o.22(b) (ii) Ch

1.20 kg

0.00 per kg

1.60 Sft

0.00Per % Sft
0 each

0
0

0 each

each

0.56 Cft

0.00Per Cft

0.90 Cft

0.00Per % Cft

0.18 Cft

Per % Cft

1.20 kg

0.00 per kg

1.60 Sft

0.01Per % Sft

each

0 each

0
0

Rs.
Rs.
Page 26

0 Say
Say

0
0

DESCRIPTION OF ITEM:
Item No. 18
Providing and erection at site of work.
(iii)

R.C.C Boundry pillar.


Detail

Unit Rate (British System)


Qty

MATERIAL
i) R.C.C 1: 2: 4
0.75 x 0.75 x 3
= 1.70 Cft
(Rate as per item 6 (6 b) (i)
1.70 Cft
ii) Steel reinforcement 3/8\" dia
1 x 2.5 = 2.5 Rft
2.5 Rft @ 0.37 lbs/Rft
Rate as pe 0.93 lbs = 0.42
0.42 kg
Total
LABOUR
i) Excavation of foundation (Item No.21(b) Chap.3)
0.75 x 0.75 x 1.50
0.84 Cft
0.84 Cft
ii) R.C.C 1 : 2: 4 (as per item (ii) above)
Rate as per (Item No.6(a) (i) of1.70 Cft
iii)
Steel reinforcement \" dia
(as per item (iii) above)
Rate as per (Item No.9(b) Chapte0.42 kg
ITEM RATES
Labour rate for each pillar
Composite rate for each pillar

Rs.
Rs.

Page 27

at site of work.

nit Rate (British System) for Each


Rate Per Unit
Amount (Rs.)

Per

Cft

0.00 per kg

m No.21(b) Chap.3)
0.00Per Cft
Per % Cft

0.00 per kg

0 Say
Say

0
0

0
0

0
0
0
0

DESCRIPTION OF ITEM:
Item No. 18 (iv)

Providing and erection at s


(a)

Sign post of M.S plate 1/8\


Detail

MATERIAL
i) P.C.C. 1 : 4 : 8 in foundation
2 x 2 x 2.5
=
Rate as per item 6(3)
ii) Steel
a)

T. Iron 0.25 x 0.25 x 0.375 =


9 Rft @ 7.17 lbs/ft. =
b) M.S plate 1/8\" thick
11x2x2 4 = 3.14 Sft @ 5.10 lbs
Total
Rate as per item 8(a)
iii) Painting and lettering
Total
LABOUR
i) Excavation and fixing
ii) P.C.C (1 : 4: 8) in foundation
(as per item (i) above)
Rate as per (Item 3(b) of Chapter No.6)
iii)
Febrication of steel
(as per item (ii) above)
Rate as per (Item 9(b) Chapter No.6)
iv) Jointing plate with T Iron
v)
Painting & lettering
ITEM RATES
Labour rate for each sign
Composite rate for each sign

roviding and erection at site of work.

ign post of M.S plate 1/8\" thick (Mandatory) Road Signs.


Unit Rate (British System) for Each
Qty
Rate Per Unit
Amount (Rs.)

10.00 Cft
10.00 Cft 0.00Per % Cft

9.00 Rft
64.53 lbs
16.01 lbs
80.54 lb
36.60 kg

0.00 per kg

each

0 each

L.S
10.00 Cft 0.00Per

Cft

0
0
0
0
0

of Chapter No.6)
36.60 kg

0.00 per kg

Chapter No.6)
L.S

0
0
0

Rs.
Rs.

Say
Say

0
0

Page 28

DESCRIPTION OF ITEM:
Item No. 18 (iv)

Providing and erection at site of work


(b)

Warning/Direction/Informatory, Road Si
Detail

MATERIAL
i) P.C.C. 1 : 4 : 8 in foundation
2 x 2 x 2.5
=
10.00 Cft
Rate as per item 6(3)
ii) Steel
a)

T. Iron 0.25 x 0.25 x 0.379.00 Rft


9 Rft @ 7.17 lbs/ft. =
64.53 lbs
b) M.S plate 1/8\" thick
1.7.3 2 @ 5.10 lbs/sft=
8.83 lbs
Total
73.36 lb
Rate as per item 8(a)
iii) Painting and lettering
Total
LABOUR
i) Excavation and fixing
ii) P.C.C (1 : 4 : 8) in foundation
(as per item (i) above)
Rate as per (Item 3(b) of Chapter No.6)
iii)
Febrication of steel
(as per item (ii) above)
Rate as per (Item 9(a) of Chapter No.6)
iv) Jointing of plate with T. Iron
v) Painting and lettering
ITEM RATES
Labour rate for each Post
Composite rate for each Post

Page 29

nd erection at site of work.

ection/Informatory, Road Signs.


Unit Rate (British System) per 100 Cft
Qty
Rate Per U Amount (Rs.)

10.00 Cft 0.00Per %

33.35 kg

0.00 per k

each

each

0
0

64.53 lbs

L.S
10.00 Cft 0.00Per

33.35 kg

0
0

0.00 per k

L.S
L.S

Rs.
Rs.

0
0
0
Say
Say

0
0

DESCRIPTION OF ITEM:
Item No. 19
Providing and laying dry brick pavement/soling i
sand grouted, laid in proper camber including pr
compaction of bed to proper camber, and sand cus

Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1
2

LABOUR
1
2
3

Brick
Sand
Total
Contractor
Total

1400.00 Nos.
22.00 Cft
20

Cooly skilled
1.35 Nos.
Cooly
2.65 Nos.
Bahishti
0.10 No.
Total
Sundries 1 Percent
Total
Contractor
20

ITEM RATES
Labour rate per 100 CRs.
Labour rate for m
Rs.
Composite rate per 10Rs.
Composit rate per m Rs.

Page 30

ry brick pavement/soling in streets or roads etc.


proper camber including preparation, watering,
roper camber, and sand cushion.

British System) per 100 Cft


Rate Per Unit

Amount (Rs.)

0.00 Nos.
0.0 % Cft

0.0
0.0
0.0
-

per day
per day
per day

0
0
0
0
-

0
0
0
0

Say
Say
Say
Say

0
0
0
0

CHAPTER NO. 9

ROOFING
Note 1.
Note 2.
DESCRIPTION

OF

Rates for all finished works include the removal of surplus


material and by products.
Add extra 13%, 32% and 51% on labour rates only or 6%, 15%
composite rates for 2nd, 3rd fourth and subsequent floors r
ITEM NO 1:
First class tiles roofing consisting of 4\" (100
earth and 1\" (25mm) mud plaster with Gobri
leaping over \" (12mm) thick cement plaster 1:6
with 34 Ibs of hot bitumen coating sand blinded
provided over two layers of tiles 12\" x 6\" x 1
(300x150x32mm) laid in 1:6 cement mortar
with 1\" (25mm) thick sand-wiched layer of 1:6
cement mortar including 1:2 cement pointing
under side of tiles, complete including curing e
Detail
Unit Rate (British System) per 100 Sft
Qty

Material
Tiles 12\"x6\"x1\"
400 Nos
Cement for laying
0.26 Bag
Pointing under side 1:2
0.17 Bag
Plaster of tiles in between and over tiles 1.10 Bag
Plaster along parapet
0.23 Bag
1.76 Bags
Sand for laying in 1:6 mortar
1.96 Cft
Sand for pointing 1:2
0.41 Cft
Sand for Plaster
1:6
8.28 Cft
Sand for Plaster
1:6 along parapet
1.71 Cft
Sand for blinding of bitumen
1.00 Cft
13.36 Cft
Earth upto 100' (30 M) lead and lift
upto 20' (6 M)
For 1\" (25mm) mud plaster
10.00 Cft
For 4\" (100mm) filling over tiles
33.00 Cft
43.00 Cft

Page 1

lude the removal of surplus debris, unused

bour rates only or 6%, 15% and 23% on


rth and subsequent floors respectively.
ing consisting of 4\" (100mm)
ud plaster with Gobri
) thick cement plaster 1:6
umen coating sand blinded
rs of tiles 12\" x 6\" x 1\"
1:6 cement mortar
sand-wiched layer of 1:6
g 1:2 cement pointing
omplete including curing etc.
British System) per 100 Sft
Rate
Per Unit (Rs.)Amount (Rs.)
1000 Nos

P. Bag

P. Cft

P. Cft

Item No.

1
Detail

Unit Rate (British System) per 100 Sft


Qty

Bhoosa for top layer only


Clay for gobri leeping
Cowdung for Gobri leeping
Two coats of bitumen
Fuel wood
Total
Contractor Percent
Total
Labour
Rate Analysis for 125 Sft
Masons for laying tiles
Mason for pointing
Mason for cement plaster
Mason for mud plaster
Unskilled Coolies
Bahishti
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per 100 S
Labour Rate P/ Sqm
Composite Rate Per 10
Composite Rate P/ Sqm

17Sr (15 .
0.75 Cft
0.75Cft (
34Lbs(15 .
0.2Md (7 .

Rate
Per Unit (Rs.)Amount (Rs.)
P. Kg
P. Cft
P 100
P. Kg
P. Kg

1.50
0.75
1.00
0.40
3.65
6.00
1.25

Each
P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Nos
Nos
No
No
Nos
Nos
Nos

Page 2

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)


. Cft
100
-

. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

2:

Detail

Second class tile roofing consisting o


earth and 1\" (25mm) mud plaster with
over \" thick cement plaster 1:6 with
Sft or 1.72 Kg/Sqm of hot bitumen coat
blinded provided over one layer of 12\
(300x150x50mm) tiles, laid in 1:6 ceme
underneath of tiles complete, includin
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Tiles 12\"x6\"x2\"
Cement for laying in 1:6 mortar
Cement for plaster
1:6
Cement for pointing 1:2
Cement for Plaster along parapet
Sand
Sand
Sand
Sand
Sand

for
for
for
for
for

laying in 1:6 mortar


Plaster
1:6
pointing 1:2
Plaster
1:6 along parapet
blinding of bitumen

Earth upto 100' (30 M) and lift upto


20' (6 M)
For 1\" (25mm) mud plaster
For 4\" (100mm) filling over tiles
Fine clay for gobri
Bhoosa
Cowdung
Bitumen for 2 coats 1/16\" (2mm) thick
Fuel wood
Total
Contractor's Profit & Percent
Total

Per
200.00 Nos 1000 N
0.23 Bag
0.55 Bag
0.17 Bag
0.23 Bag
1.18 Bags P. Bag
1.68 Cft
4.14 Cft
0.43 Cft
1.71 Cft
1.00 Cft
8.96 Cft
P. Cft

10.00 Cft
33.00 Cft
43.00 Cft
0.75 Cft
17Sr (15.
0.75Cft (
34Lbs(15 .
0.2Mds(7 .

P. Cft
P. Cft
P. Kg
P 100
P. Kg
P. Kg

Page 3

s tile roofing consisting of 4\" (100mm)


\" (25mm) mud plaster with gobri leeping
ick cement plaster 1:6 with 34 lbs per %
Kg/Sqm of hot bitumen coating sand
vided over one layer of 12\"x6\"x2\"
mm) tiles, laid in 1:6 cement pointing
of tiles complete, including curing etc.
British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

000 N

. Bag

. Cft

. Cft
. Cft

100

Item No.

2
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Rate Analysis for 125 Sft
Masons 2.50 Nos
Unskilled Coolies
Bahishti
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Composite Rate Per 10
Composite Rate Per Sq

5.00 Nos
1.00 No

Rs.
Rs.
Rs.
Rs.

Page 4

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

P.
P. Day
P. Day

Day

Say

Say
Say
Say

DESCRIPTION

OF

ITEM NO

3:

Covering mud roof with coaltar and fin

Detail

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Coaltar
Fine sand
Charcoal for heating coaltar
Total
Contractor's Profit & Percent
Total
Labour
Mason
Unskilled Cooly
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

7.72 Kg.
1.00 Cft
3.00 Kg.

P. Kg
P. Cft
P. Kg.

0.12 No
0.25 No

P. Day
P. Day

10

Rs.
Rs.
Rs.
Rs.

Page 5

d roof with coaltar and fine sand.

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Cft
. Kg.

. Day
. Day

Say
Say
Say
Say

Note.
DESCRIPTION OF ITEM NO

4:

a)
Detail

The unit of rate is for filling 100 Sf


Filling spaces in between.

Wooden battons over beams filled with


wood pieces (spacers).
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Deodar wood 2x10 (9\"x1\"x5\")
Wastage 20%
Wire Nails
Total
Contractor Percent
Total
Labour
Rate Analysis for 150 Sft
Carpenter for making grooves in batten
and fixing of wooden strips
Unskilled Cooly
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Composite Rate Per 10
Composite Rate Per Sq

0.54
0.11
0.65
0.28

Cft
Cft
Cft
Kg.

0.50 No
0.50 No

Rs.
Rs.
Rs.
Rs.

P. Cft
P. Kg

Each
P. Day

Page 6

rate is for filling 100 Sft of roof.


ces in between.

ons over beams filled with deodar


(spacers).
British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Cft

. Day

Say
Say
Say
Say

Item No.

Filling spaces in between.


RCC Battens Filled with C.C. Blocks (1

b)
Detail

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
9 No x2/3\"x5/12\"
2 No x2/3\"x5/12\"
Cement for blocks
For laying
Sand for blocks
For laying

1.88 Cft
0.28 Cft
0.27
0.17
0.44
1.02
0.65
1.67
2.04

Bag
Bag
Bag
Cft
Cft
Cft
Cft

Bajri
Total
Contractor's Profit & Percent
Total
Labour
Rate Analysis for 125 Sft
Mason
0.50 No
Unskilled Cooly
1.00 No
Bahishti
0.13 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per 100 S Rs.
Labour Rate Per Sqm Rs.
Composite Rate Per 10 Rs.
Composite Rate Per Sq Rs.

P. Bag

P. Cft
P. Cft

Page 7

ces in between.
Filled with C.C. Blocks (1:3:6)

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Bag

. Cft
. Cft

Say
Say
Say
Say

Item No.

4
c)
Detail

Filling spaces in between.


Spaces filled with bricks

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Bricks including wastage (30+15)
Cement
Sand
Total
Contractor Percent
Total
Labour
Rate Analysis for 125 Sft
Mason
Cooly
Bahishti
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Composite Rate Per 10
Composite Rate Per Sq

Per
45.00 Nos 1000 N
0.20 Bag
P. Bag
0.75 Cft
P. Cft

0.17 No
0.17 No
0.10 No

Rs.
Rs.
Rs.
Rs.

P. Day
P. Day
P. Day

Page 8

ces in between.
ed with bricks

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

000 N
. Bag
. Cft

. Day
. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

Detail

ITEM NO

5:

Single layer of tiles 9\"x4x1\" (225


40mm) laid over 4\" (100mm) earth and
mud plaster without Bhoosa grouted wit
sand 1:3 on top of RCC roof slab provi
Ibs. per % Sft bitumen coating sand bl
Unit Rate (British System) per 100 Sft
Qty

Material
Brick tiles 225 x 112.5 x 40 mm (9\"x41/2\ 360.00 Nos
Sand for grouting
2.50 Cft
Sand for blinding
1.25 Cft
3.75 Cft
Cement
0.75 Bag
Good earth lead upto 100' (30 M) and lift
upto 20' (6 M)
43.00 Cft
Two coats of bitumen
15.42 4Lbs(15 .42) Kg
Total
Contractor Percent
Total
Labour
Rate Analysis for 150 Sft
Plasterer
0.125 No
Mason for Laying
0.500 No
Mason for Grouting
0.125 No
0.75 No
Cooly for and plaster
0.50 No
Cooly for grouting laying
0.65 No
Cooly for grouting
0.25 No
1.40 Nos
Painter for bitumen
0.50 No
Bahishti
0.50 No
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per 100 S
Rs.
Labour Rate Per Sqm
Rs.
Composite Rate Per 10
Rs.
Composite Rate Per Sq
Rs.

Page 9

r of tiles 9\"x4x1\" (225 x 112.5 x


over 4\" (100mm) earth and 1\" (25mm)
without Bhoosa grouted with cement
top of RCC roof slab provided with 34
Sft bitumen coating sand blinded.
British System) per 100 Sft
Rate
Per Unit (Rs.)Amount (Rs.)
Per
1000 N
-

P. Cft
P. Bag

P. Cft
P. Kg

Each

Each
Each
Each

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

6:

a)
Detail

Jack arch roofing 4\" (112.5mm) thick


cement mortar including an average dep
(100mm) thick cement concrete in haunc
over crown with 3\" (75mm) earth and 1
plaster soffits of arches cement plast
and \" (12mm) thick. The rate also in
bitumen coating centering, laying skew
cement sand mortar 1:3 and encasing ex
of the joints with fine cement concret
stone aggregate.
Cement concrete in haunches. (1:6:12)
Unit Rate (British System) per 100 Sft
Qty

Material
Bricks
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand

9\"x4\"x3\"
for laying
for plastering Soffits
for concrete in haunches
for concrete in flanges

for
for
for
for

laying
plastering soffit
concrete in haunches
concrete in flanges

Stone aggregate for concrete in haunches


Stone aggregate for concrete in flanges
Earth for filling and plastering
Bhoosa
Fine Clay
Cowdung

550.00 Nos
1.60 Bag
0.57 Bag
2.00 Bag
0.60 Bag
4.77 Bags
10.00 Cft
4.26 Cft
16.20 Cft
1.50 Cft
31.96 Cft
32.00 Cft
3.00 Cft
35.00 Cft
33.00 Cft
17Lbs(15 .81) Kg
0.75 Cft
0.75 Cft ( 15) Kg

Page 10

oofing 4\" (112.5mm) thick laid in 1:5


ar including an average depth of 4\"
ck cement concrete in haunches and
with 3\" (75mm) earth and 1\" (25mm)
fits of arches cement plastered 1:6
mm) thick. The rate also includes
ting centering, laying skew bricks in
mortar 1:3 and encasing exposed flanges
ts with fine cement concrete 1:2:4. Using

rete in haunches. (1:6:12)


British System) per 100 Sft
Rate
Per Unit (Rs.)Amount (Rs.)
Per
1000 N

P. Bag

P. Cft

P.
P.
P.
P.
P.

Cft
Cft
Kg
Cft
100

a)
Detail

Cement concrete in haunches. (1:6:12)


Unit Rate (British System) per 100 Sft
Qty

Bitumen
Fuel
Kail wood for centring
Total
Contractor Percent
Total
Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Unskilled Coolies
Bahishti
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Composite Rate Per 10
Composite Rate Per Sq

Rate
Per Unit (Rs.)Amount (Rs.)

34Lbs(15 .42) Kg
0.2Mds(7 .44) Kg
0.4 Cft.

3.50
0.50
7.00
1.00

Nos
No
Nos
No

Rs.
Rs.
Rs.
Rs.

Page 11

rete in haunches. (1:6:12)


British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)


P. Kg
P. Kg
P. Cft

P.
P.
P.
P.

Say
Say
Say
Say

Day
Day
Day
Day

Item No.

b)
Detail

Material
Bricks 9\"x4\"x3\"
Cement for laying
Cement for plastering Soffits
Cement for concrete in haunches
Cement for concrete in flanges
Sand
Sand
Sand
Sand

for
for
for
for

laying
plastering soffit
concrete in haunches
concrete in flanges

Stone aggregate for concrete in haunches


Stone aggregate for concrete in flanges
Earth for filling and plastering
Bhoosa
Fine Clay
Cowdung
Bitumen
Fuel
Kail wood for centring
Total
Contractor's Profit & Percent
Total

Jack arch roofing 4\" (112.5mm) thick


cement mortar including an average dep
(100mm) thick cement concrete in haunc
over crown with 3\" (75mm) earth and 1
plaster soffits of arches cement plast
and \" (12mm) thick. The rate also in
bitumen coating centering, laying skew
cement sand mortar 1:3 and encasing ex
flanges of the joints with fine cement
1:2:4. Using stone aggregate.
Cement concrete in haunches (1:3:6)
Unit Rate (British System) per 100 Sft
Qty

550.00 Nos
1.60 Bag
0.57 Bag
4.10 Bag
0.60 Bag
6.87 Bags
10.00 Cft
4.26 Cft
15.40 Cft
1.50 Cft
31.16 Cft
31.00 Cft
3.00 Cft
34.00 Cft
33.00 Cft
17Lbs(15 .81)
0.75 Cft
0.75Cft ( 15)
34Lbs(15 .43)
0.2Mds(7 .44)
0.411 Cft.

Kg
Kg
Kg
Kg

Page 12

oofing 4\" (112.5mm) thick laid in 1:5


ar including an average depth of 4\"
ck cement concrete in haunches and
with 3\" (75mm) earth and 1\" (25mm)
fits of arches cement plastered 1:6
mm) thick. The rate also includes
ting centering, laying skew bricks in
mortar 1:3 and encasing exposed
the joints with fine cement concrete
g stone aggregate.
rete in haunches (1:3:6)
British System) per 100 Sft
Rate
Per Unit (Rs.)Amount (Rs.)
Per
1000 N
-

P. Bag

P. Cft

P. Cft
P. Cft
P. Kg
P. Cft
P.% Kg
P. Kg
P. Kg
P. Cft

b)

Cement concrete in haunches (1:3:6)

Detail

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Unskilled Coolies
Bahishti
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Composite Rate Per 10
Composite Rate Per Sq

3.50
0.50
7.00
1.00

Nos
No
Nos
No

Rs.
Rs.
Rs.
Rs.

Page 13

rete in haunches (1:3:6)

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

P.
P.
P.
P.

Say
Say
Say
Say

Day
Day
Day
Day

DESCRIPTION

OF

ITEM NO

7:

a)
Detail

Jack arch roofing 4\" (112.5mm) thick


cement mortar including an average dep
(100mm) thick cement concrete in haunc
over crown with \" (12mm) thick cemen
1:6 on top (Except earth filling, plas
soffits of arches cement plastered. Th
includes bitumen coating centering, la
bricks in cement sand mortar 1:3 and e
exposed flanges of the joints with fin
concrete 1:2:4. Using stone aggregate.
Cement concrete in haunches. (1:6:12)
Unit Rate (British System) per 100 Sft
Qty

Material
Bricks
Cement
Cement
Cement
Cement
Cement

9\"x4\"x3\"
for laying
for plastering top
for plastering soffits
for concrete in haunches
for concrete in flanges

Sand for laying


Cement for plastering top
Sand for plastering soffits
Sand for concrete in haunches
Sand for concrete in flanges
Stone aggregate for concrete in haunches
Stone aggregate for concrete in flanges

550.00 Nos
1.60 Bag
0.51 Bag
0.57 Bag
2.00 Bag
0.60 Bag
5.28 Bags
10.00 Cft
3.84 Cft
4.26 Cft
16.20 Cft
1.50 Cft
35.80 Cft
32.00 Cft
3.00 Cft
35.00 Cft

Page 14

oofing 4\" (112.5mm) thick laid in 1:5


ar including an average depth of 4\"
ck cement concrete in haunches and
with \" (12mm) thick cement plaster
(Except earth filling, plaster and gobri),
arches cement plastered. The rate also
tumen coating centering, laying skew
ement sand mortar 1:3 and encasing
nges of the joints with fine cement
2:4. Using stone aggregate.
rete in haunches. (1:6:12)
British System) per 100 Sft
Rate
Per Unit (Rs.)Amount (Rs.)
Per
1000 N

P. Bag

P. Cft

P. Cft

a)
Detail

Cement concrete in haunches. (1:6:12)


Unit Rate (British System) per 100 Sft
Qty

Bitumen
Fuel
Deodar wood (2nd Class)
Total
Contractor Percent
Total
Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Unskilled Coolies
Bahishti
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Composite Rate Per 10
Composite Rate Per Sq

Rate
Per Unit (Rs.)Amount (Rs.)

34Lbs(15 .43) Kg
0.2Mds(7 .44) Kg
0.50 Cft

2.75
0.50
5.50
1.00

Nos
No
Nos
No

Rs.
Rs.
Rs.
Rs.

Page 15

rete in haunches. (1:6:12)


British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)


P. Kg
P. Kg
P. Cft

P.
P.
P.
P.

Say
Say
Say
Say

Day
Day
Day
Day

Item No.

b)
Detail

Jack arch roofing 4\" (112.5mm) thick


cement mortar including an average dep
(100mm) thick cement concrete in haunc
over crown with \" (12mm) thick cemen
1:6 on top (Except earth filling, plas
soffits of arches cement plastered. Th
includes bitumen coating centering, la
bricks in cement sand mortar 1:3 and e
exposed flanges of the joints with fin
concrete 1:2:4. Using stone aggregate.
Cement concrete in haunches. (1:3:6)
Unit Rate (British System) per 100 Sft
Qty

Material
Bricks
Cement
Cement
Cement
Cement

9\"x4\"x3\"
for laying
for plastering soffits
for concrete in haunches
for concrete in flanges

Sand for laying


Cement for plastering top
Sand for plastering soffits
Sand for concrete in haunches
Sand for concrete in flanges
Stone aggregate for concrete in haunches
Stone aggregate for concrete in flanges

550.00 Nos
1.60 Bag
0.57 Bag
4.10 Bag
0.60 Bag
6.87 Bags
10.00 Cft
3.84 Cft
4.26 Cft
15.40 Cft
1.50 Cft
35.00 Cft
31.00 Cft
3.00 Cft
34.00 Cft

Page 16

oofing 4\" (112.5mm) thick laid in 1:5


ar including an average depth of 4\"
ck cement concrete in haunches and
with \" (12mm) thick cement plaster
(Except earth filling, plaster and gobri),
arches cement plastered. The rate also
tumen coating centering, laying skew
ement sand mortar 1:3 and encasing
nges of the joints with fine cement
2:4. Using stone aggregate.
rete in haunches. (1:3:6)
British System) per 100 Sft
Rate
Per Unit (Rs.)Amount (Rs.)
Per
1000 N

P. Bag

P. Cft

P. Cft

b)
Detail

Cement concrete in haunches. (1:3:6)


Unit Rate (British System) per 100 Sft
Qty

Bitumen
Fuel
Kail wood centring
Total
Contractor Percent
Total
Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Unskilled Coolies
Bahishti
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Composite Rate Per 10
Composite Rate Per Sq

Rate
Per Unit (Rs.)Amount (Rs.)

34Lbs(15 .43) Kg
0.2Mds(7 .44) Kg
0.411 Cft.

2.75
0.50
5.50
1.00

Nos
No
Nos
No

Rs.
Rs.
Rs.
Rs.

Page 17

rete in haunches. (1:3:6)


British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)


P. Kg
P. Kg
P. Cft

P.
P.
P.
P.

Say
Say
Say
Say

Day
Day
Day
Day

DESCRIPTION

OF

ITEM NO

8:

Detail

Extra for vaulted jack arch roofing

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate for Per 1
Labour Rate for P/ Sq

1.00 No
1.00 No

Rs.
Rs.

P. Day
P. Day

Page 18

aulted jack arch roofing

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Day
. Day

DESCRIPTION

OF

ITEM NO

9:

Detail

Jack arch roofing of shingle and cemen


(1:3:6), 4\" (112.5mm) thick at crown
(12mm) cement plaster including cost o
supplying erecting and dismantling ce
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Cement 7.46 Bags
Sand
28.00 Cft
Shingle
56.00 Cft
Kail wood
0.411 Cft.
Total
Contractor's Profit & Percent
Total
Labour
Masons
0.50 No
Coolies for stacking & mixing
3.00 Nos
Coolies for ramming
3.00 Nos
Coolies for carrying
2.00 Nos
Coolies for carpenter
1.00 No
Carpenter
1.00 No
Bahishti
1.00 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per 100 S Rs.
Labour Rate Per Sqm Rs.
Composite Rate Per 10 Rs.
Composite Rate Per Sq Rs.

P.
P. Cft
P. Cft
P. Cft

P.
P.
P.
P.
P.
P.
P.

Day
Day
Day
Day
Day
Day
Day

Page 19

oofing of shingle and cement concrete


\" (112.5mm) thick at crown, with \"
nt plaster including cost of
recting and dismantling centering.
British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)


Bag

. Cft
. Cft
. Cft

.
.
.
.
.
.
.

Day
Day
Day
Day
Day
Day
Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

10:

a)
Detail

Earth filling over roof including wate


ramming with 1\" (25mm) mud plaster fi
with gobri leeping.
3\" (75mm) thick earth filling and 1\"
plaster.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Earth lead upto 100' (30 M) and lift upto
20' (6 M)
Bhoosa
Clay
Cowdung
Total
Contractor Percent
Total
Labour
Rate Analysis for 125 Sft
Bahishti
Coolies for lifting and ramming earth
Mason
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Composite Rate Per 10
Composite Rate Per Sq

33 Cft
17Lbs(15 .
0.75 Cft
0.75Cft (

P. Cft
P. Kg
P. Cft
P % Kg

0.12 No
1.00 No
0.12 No

P. Day
P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Page 20

ng over roof including watering


h 1\" (25mm) mud plaster finished

thick earth filling and 1\" (25mm) mud

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Cft

. Cft
% Kg

. Day
. Day
. Day

Say
Say
Say
Say

Item No.

10

b)
Detail

Earth filling over roof including wate


ramming with 1\" (25mm) mud plaster fi
with gobri leeping.
4\" (100mm) thick earth filling and 1\
mud plaster.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Earth lead upto 100' (30 M) and lift upto
20' (6 M)
43 Cft
P. Cft
Bhoosa
17Lbs(15 . P. Kg
Fine clay for gobri
0.75 Cft
P. Cft
Cowdung
0.75 Cft ( P % Kg
Total
Contractor's Profit & Percent
Total
Labour
Bshishti
0.18 No
P. Day
Coolies for lifting and ramming earth
1.00 No
P. Day
Mason
0.12 No
P. Day
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per 100 S Rs.
Labour Rate Per Sqm Rs.
Composite Rate Per 10 Rs.
Composite Rate Per Sq Rs.

Page 21

ng over roof including watering


h 1\" (25mm) mud plaster finished
thick earth filling and 1\" (25mm)

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Cft

. Cft
% Kg

. Day
. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM

NO

11:

Detail

Material
Fine clay
Cowdung
Total
Contractor Percent
Total
Labour
Rate Analysis for 150 Sft
Mason
Bahishti
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Composite Rate Per 10
Composite Rate Per Sq

1/8\"(3mm) thick gobri leeping on roof

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

0.75 Cft
P. Cft
0.75 Cft ( P. 100

0.12 No
0.06 No

Rs.
Rs.
Rs.
Rs.

P. Day
P. Day

Page 22

thick gobri leeping on roofs or floors.

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Cft
. 100

. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

12:

Detail

2 coats of bitumen laid hot using 34 l


(1.72Kg/Sqm) per % Sft over roof and
blinded with sand at 1 Cft per % Sft.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Bitumen
34Lbs(15 . P. Kg
Sand
1.00 Cft
P. Cft
Fuel wood
0.12Mds( 4 P. Kg
Total
Contractor's Profit & Percent
Total
Labour
Rate for 125 Sft
Cooly for heating & laying
1.00 No
P. Day
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate for Per 1 Rs.
Labour Rate for P/ Sq Rs.
Composite Rate for Pe Rs.
Composite Rate for P/ Rs.

Page 23

bitumen laid hot using 34 lbs


) per % Sft over roof and
h sand at 1 Cft per % Sft.
British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Cft

. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

13:

a)
Detail

Fixing corrugated galvanized iron shee


G.I. bolts, nuts, limpet and bitumen w
wind ties complete in all respect with
and ridges.
20 - S. W. G.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Sheets of 20 gauge
= 100 Sft.
wastage & overlaping @ 20% = 20 Sft
=120 Sft 2Cwt (102 .65P. Kg
Wind tie (rod)
22Lbs(9 .9 P. Kg
G.I. bolts and nuts
2.00 Doz
Doz
Limpet washers
2.00 Doz
Doz
G.I. Hook, bolts & nuts
1.50 Doz
Doz
Bitumen washers
3.85 Doz
Doz
Charcoal
4 Sr. (3. P. Kg
Total
Contractor's Profit & Percent
Total
Labour (for 150 Sft.)
Blacksmith
1.00 No
P. Day
Cooly
1.00 No
P. Day
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per 100 S Rs.
Labour Rate Per Sqm Rs.
Composite Rate Per 10 Rs.
Composite Rate Per Sq Rs.

Page 24

ugated galvanized iron sheets with


nuts, limpet and bitumen washers,
omplete in all respect without valleys

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Day
. Day

Say
Say
Say
Say

Item No.

13

b)
Detail

Fixing corrugated galvanized iron shee


G.I. bolts, nuts, limpet and bitumen w
ties complete in all respect without v
ridges.
22 - S. W. G.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
C.G.I. Sheets of 22 gauge including over
lapping and wastage.
120 Sft
1.7Cwt (8
Wind tie (rod)
22Lbs(9 .9
G.I. bolts and nuts
2.00 Doz
Limpet washers
2.00 Doz
G.I. Hook, bolts & nuts
1.50 Doz
Bitumen washers
3.82 Doz
Charcoal
4 Sr. (3.
Total
Contractor's Profit & Percent
Total
Labour for 150 Sft.
Blacksmith
1.00 No
Cooly
1.00 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate for Per 1 Rs.
Labour Rate for P/ Sq Rs.
Composite Rate for Pe Rs.
Composite Rate for P/ Rs.

P. Kg
P. Kg
Doz
Doz
Doz
Doz
P. Kg

0.00 P. Day
0.00 P. Day

Page 25

ugated galvanized iron sheets with


nuts, limpet and bitumen washers, wind
te in all respect without valleys and

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

.00 P. Day
.00 P. Day

Say
Say
Say
Say

Item No.

13

c)
Detail

Fixing corrugated galvanized iron shee


G.I. bolts, nuts, limpet and bitumen w
ties complete in all respect without v
ridges.
24 - S. W. G.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
C.G.I. Sheets of 24 gauge including over
lapping and wastage.
120 Sft
1.34Cwt(6
Wind tie
22Lbs(9 .9
G.I. bolts and nuts
2.00 Doz
Limpet washers
2.00 Doz
G.I. Hook, bolts & nuts
1.50 Doz
Bitumen washers
3.82 Doz
Charcoal
4 Sr. (3.
Total
Contractor's Profit & Percent
Total
Labour
Rate for 150 Sft
Blacksmith
1.00 No
Cooly
1.00 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per 100 S Rs.
Labour Rate Per Sqm Rs.
Composite Rate Per 10 Rs.
Composite Rate Per Sq Rs.

P. Kg
P. Kg
Doz
Doz
Doz
Doz
P. Kg

P. Day
P. Day

Page 26

ugated galvanized iron sheets with


nuts, limpet and bitumen washers, wind
te in all respect without valleys and

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

14:

Detail

Rate Analysis for 15 Rft


Material
Cement for \" (12mm) plaster
Cement for floating
Cement for side filling
Sand 1.10 Cft
Total
Contractor Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate for Per R
Composite Rate Per Rf
Composite Rate Per Rm

Khassi parnalas in cement and sand mor


12\" (300mm) outside width finished sm
a floating coat of neat cement.
Unit Rate (British System) per 100 Rft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

0.18
0.06
0.26
0.50

Bag
Bag
Bag
Bags P. Bag
P.

0.67 No
0.67 No
0.09 No

Rs.
Rs.
Rs.
Rs.

P. Day
P. Day
P. Day

Page 27

alas in cement and sand mortar (1:2)


) outside width finished smooth with
coat of neat cement.
British System) per 100 Rft

er Unit (Rs.)Amount (Rs.)

. Bag
Cft

. Day
. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

15:

Detail

Making Khuras, on roof size 2' x 2' x


100mm)
Unit Rate (British System) per Each
Qty

Material
Cement
0.20
Sand 0.55 Cft
Aggregate (Stone)
1.25
Total
Contractor's Profit & Percent
Total
Labour for 125 Nos)
Mason
0.20
Unskilled Cooly
0.20
Bahishti
0.05
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate for Each Rs.
Composite Rate for Ea Rs.

Rate
Per Unit (Rs.)Amount (Rs.)
Bag
Cft

P. Bag
P.
P. Cft

No
No
No

P. Day
P. Day
P. Day

Page 28

as, on roof size 2' x 2' x 4\" (600 x 600 x

British System) per Each

er Unit (Rs.)Amount (Rs.)

. Bag
Cft

. Cft

. Day
. Day
. Day

Say
Say

DESCRIPTION

OF

Detail

ITEM NO

16:

Bottom khuras of brick masonry in ceme


(1:6) 4'x2'x4\" (1200x600x114mm) over
(75mm) cement concrete (1:4:8)
Unit Rate (British System) per Each
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Cement
0.37 Bag
Sand 2.00 Cft
Brick Aggregate
2.00 Cft
Bricks
42.00 No
Total
Contractor's Profit & Percent
Total
Labour
Rate Analysis for 1.25 No.
Mason
0.20 No
Cooly
0.20 No
Bahishti
0.05 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate for Each Rs.
Composite Rate for Ea Rs.

P. Bag
P.
P. Cft
1000 N

P. Day
P. Day
P. Day

Page 29

as of brick masonry in cement mortar


x4\" (1200x600x114mm) over 3\"
nt concrete (1:4:8)
British System) per Each

er Unit (Rs.)Amount (Rs.)

. Bag
Cft

. Cft
000 N

. Day
. Day
. Day

Say
Say

DESCRIPTION

OF

a)
Detail

ITEM NO

17:

Plain galvanized iron sheets of 22 S.W


water down pipe including clamp and fi
position.
4\" (100mm) dia down pipe
Unit Rate (British System) per Rft
Qty

Material
G.I. sheets =
1.05 Sft
Add. 10% for joints and wastage 0.10 Sft
1.15 Sft @ 1.31 Lbs/Sft
1.5Lbs(0. 68) Kg
Add for clamps bolts nuts and rivets.
0.125 Kg
Total
Contractor's Profit & Percent
Total
Labour
Rate Analysis for 1.25 Rft
Blacksmith
0.03 No
Unskilled Cooly
0.03 No
Mason
0.03 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per Rft Rs.
Labour Rate for Per R Rs.
Composite Rate Per Rf Rs.
Composite Rate Per Rm Rs.

Page 30

nized iron sheets of 22 S.W.G. rain


pipe including clamp and fixing in

dia down pipe


British System) per Rft
Rate
Per Unit (Rs.)Amount (Rs.)

P. Kg
P. Kg.

P. Day
P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

17:

b)
Detail

Plain galvanized iron sheets of 22 S.W


water down pipe including clamp and fi
position.
5\" (125mm) dia down pipe.
Unit Rate (British System) per Rft
Qty

Material
G.I. sheets
1.31 Sft
Add. 10% for joints and wastage 0.13 Sft
1.44 Sft @ 1.31 Lbs/Sft
1.90Lbs(0 .86) Kg
Add for clamps bolts nuts and rivets.
0.125 Kg
Total
Contractor's Profit & Percent
Total
Labour 1.25 Rft
Blacksmith
0.03 No
Unskilled Cooly
0.03 No
Mason
0.03 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per Rft Rs.
Labour Rate for Per R Rs.
Composite Rate Per Rf Rs.
Composite Rate Per Rm Rs.

Page 31

nized iron sheets of 22 S.W.G. rain


pipe including clamp and fixing in

dia down pipe.


British System) per Rft
Rate
Per Unit (Rs.)Amount (Rs.)

P. Kg
P. Kg.

P. Day
P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

18:

Detail

Plain galvanized iron sheets flashing


Unit Rate (British System) per Sft
Qty

Material
G.I. sheets
1.00 Lbs
22 guage
0.96 Sft
0.96 Sft @ 1.31 Lbs/Sft
1.26Lbs(0
Fixture L.S.
Total
Contractor's Profit & Percent
Total
Labour for 1.25 Sft
Blacksmith
0.03 No
Cooly
0.03 No
Mason
0.03 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per Sft Rs.
Labour Rate Per Sqm Rs.
Composite Rate Per Sf Rs.
Composite Rate Per Sq Rs.

Rate
Per Unit (Rs.)Amount (Rs.)

P. Kg

P. Day
P. Day
P. Day

Page 32

nized iron sheets flashing of 22 gauge.

British System) per Sft

er Unit (Rs.)Amount (Rs.)

. Day
. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

19:

Detail

Rate Analysis for 100 Sft


Material
Lead flashing 1/16\" thick
Nails (Copper) etc.
Total
Contractor Percent
Total
Labour
Driller 1.00 No
Helper
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sf
Composite Rate Per Sq

Providing and fixing 1/16\" (1.5mm) th


flashing over roof expansion joint com
respects.
Unit Rate (British System) per Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

100.00 Sft
1.00 Kg.

1.00 No

Rs.
Rs.
Rs.
Rs.

Page 33

nd fixing 1/16\" (1.5mm) thick lead


er roof expansion joint complete in all

British System) per Sft

er Unit (Rs.)Amount (Rs.)

Sft
P. Kg.

P.
P. Day

Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

20:

Cast iron rain water down pipe


excluding heads and shoes, but
and clamps, etc.
4\" (100mm) dia Cast Iron down
Unit Rate (British System) per
Qty

a)
Detail

Rate Analysis

for

6 Rft

Material
C.I. pipe 4\" (100mm) dia
Hold fasts with bolts
Cement mortar for fixing hold fast
Cement
Sand
Pig lead
Paint
Total
Contractor Percent
Total
Rate per Rft

6.00 Rft
1.00 No
0.07 Bag
0.58 Cft
0.5Lbs(0 .23) Kg
0.05 Gln

0
6

Labour
Unskilled Cooly
Mason
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rf
Composite Rate Per Rm

0.20 No
0.20 No

Rs.
Rs.
Rs.
Rs.

fixed i
includi
pipe.
Rft

Page 34

ain water down pipe fixed in position,


eads and shoes, but including painting

dia Cast Iron down pipe.


British System) per Rft
Rate
Per Unit (Rs.)Amount (Rs.)

P. Rft
Each

Bag
% Cft.
P. Kg
P. Gln

P. Day
P. Day

Say
Say
Say
Say

Item No.

20

Cast iron rain water down pipe fixed i


excluding heads and shoes, but includi
and clamps, etc.
3\" (75mm) dia Cast Iron down pipe.
Unit Rate (British System) per Rft
Qty

b)
Detail

Rate Analysis

for

6 Rft

Material
C.I. pipe down 3\" (75mm) dia
Hold fasts with bolts
Cement mortar for fixing hold fast
Cement
Sand
Pig lead
Paint
Total
Contractor Percent
Total
Rate for One Reft

6.00 Rft
1.00 No
0.048 Bag
0.39 Cft
0.5Lbs(0 .23) Kg
0.03 Gln

0
6

Labour
Cooly
Mason
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rf
Composite Rate Per Rm

0.20 No
0.20 No

Rs.
Rs.
Rs.
Rs.

Page 35

ain water down pipe fixed in position,


eads and shoes, but including painting

dia Cast Iron down pipe.


British System) per Rft
Rate
Per Unit (Rs.)Amount (Rs.)

P. Rft
Each

Bag
% Cft.
P. Kg
P. Gln

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

21:

Detail

Rain water down pipe cast iron heads f


place, including cost of clamp, holdfa
painting.
Unit Rate (British System) per Each
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
C.I. Heads 4\"
1.00 No
Each
Clamps with hold fasts etc.
1.00 No
Each
Cement
0.05 Bag
Bag
Sand
0.29 Cft
% Cft.
Pig lead
0.5Lbs(0 . P. Kg
Paint
0.01 Gln
P. Gln
Total
Contractor's Profit & Percent
Total
Labour
Cooly
0.09 No
P. Day
Mason
0.09 No
P. Day
Pipe fitter
0.09 No
P. Day
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate for Each Rs.
Composite Rate for E Rs.

Page 36

down pipe cast iron heads fixed in


uding cost of clamp, holdfast, and

British System) per Each

er Unit (Rs.)Amount (Rs.)


-

Cft.

. Gln

. Day
. Day
. Day

Say
Say

DESCRIPTION

OF

ITEM NO

22:

Shoes bends or offsets for cast iron r


down pipe including fixing and paintin
Unit Rate (British System) per Each

Detail

Qty
Material
C.I. shoes bend or offsets 4\"
Pig lead
Paint
Total
Contractor's Profit & Percent
Total
Labour
Pipe fitter
Cooly
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate for Each
Composite Rate

Rate
Per Unit (Rs.)Amount (Rs.)

1.00 No
Each
0.5Lbs ( 0 P. Kg
0.01 Gln
P. Gln

0.05 No
0.05 No

Rs.

for E Rs.

P. Day
P. Day

Page 37

or offsets for cast iron rain water


ncluding fixing and painting.
British System) per Each

er Unit (Rs.)Amount (Rs.)


-

. Gln

. Day
. Day

Say

Say

DESCRIPTION

OF

ITEM NO

23:

Detail

Plain G.I. sheet iron spouts fixed in


including painting.
Unit Rate (British System) per Each
Qty

Material
G.I. sheets 22 gauge length 28\" (712mm)
and width 6\" (150mm)
28 x 6
=
1.17 Sft
1.28Lbs (
12 x 12
Cost of cement mortor for fixing
Cement
0.048 Bag
Sand
0.39 Cft
Total
Contractor's Profit & Percent
Total
Labour
Cooly
0.10 No
Mason
0.10 No
Blacksmith
0.10 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate for Each Rs.
Composite Rate for E Rs.

Rate
Per Unit (Rs.)Amount (Rs.)

P. Kg

Bag
% Cft.

P. Day
P. Day
P. Day

Page 38

sheet iron spouts fixed in position,

British System) per Each

er Unit (Rs.)Amount (Rs.)

Cft.

. Day
. Day
. Day

Say
Say

DESCRIPTION

OF

ITEM NO

24:

Laying \" (12mm) thick deo


(including sawing planing a
Unit Rate (British System)

Detail

Qty
Rate Analysis

for

100 Sft

Material
Deodar wood
1
Screw 1 / 2
Nails of sorts
Contractor's Profit & Ove 20
Total
Labour
Unskillied Cooly
Carpenter
Total
Sundries
Total
Contractor's Profit & Ove 20
Total
Item Rates

5.00 Cft
4.50 Doz
1.64 88Sr
Total
Percent

3.00 Nos
4.00 Nos
Percent

10

Percent

Labour Rate Per 100 S Rs.


Labour Rate Per Sqm Rs.
Composite Rate Per 10 Rs.
Composite Rate Per Sq Rs.

Page 39

aying \" (12mm) thick deodar ceiling complete


including sawing planing and fixing)
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs.)Amount (Rs.)

P. Cft

Doz
P. Kg

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

25:

Flat sheet roof with galvan


including battens, rolls, s
to be paid for separately).
22 B. W. G. Sheets Roofin
Unit Rate (British System)
Qty

a)
Detail

Rate Analysis
Material
a)

for 400 Sft

22 B.W.G. sheet of size 6'x4' (1.8x1.20


M) in 400 sft (40 Sm) area including over
lapping and wastage 25% for 100 sft
5.85/4 = 1.46 cwt .
Wastage 25% (400+25%) 500 Sft
@ 1.12 Lbs/Sft
Rolls 5\" (0.125m) wide 16' (4.86 M)
long or
16x5x7/12 = 0.54/4 = 0.14
Deodar wood for battens 2\"x1\" size 7
Nos of 16' length = 7x16x1/6x1/8.
Add. 23% wastage
Bolts, nuts
Limpet Washer
U.I. Clips
Total
Contractor Percent
Total
Rate for 100 Sft

5.85Cwt(29 7.20)Kg
7 Nos (27 .08) Sft

2.33 Cft
0.58 Cft
2.91 Cft
1
4.00 Doz.
1.29

0
4

Page 40

lat sheet roof with galvanized iron sheets


ncluding battens, rolls, screw, clips etc. (planking
o be paid for separately).
2 B. W. G. Sheets Roofing.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs.)Amount (Rs.)

.85Cwt(29 7.20)Kg

P. Kg

Nos (27 .08) Sft

P. Kg

P. Cft
P. Kg.
Doz.
Per Kg

Kg.
Kg.

Detail

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Rate Analysis for 500 Sft
Cooly
Carpenter
Blacksmith
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Rate for 100 Sft
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Composite Rate Per 10
Composite Rate Per Sq

12.00 Nos P. Day


1.50 Nos
P. Day
8.00 Nos
P. Day

Rs.
Rs.
Rs.
Rs.

Page 41

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Day
. Day
. Day

Say
Say
Say
Say

Item No.

25

Flat sheet roof with galvan


including battens rolls scr
to be psid for separately).
24 B. W. G. Sheets Roofin
Unit Rate (British System)
Qty

b)
Detail

Rate Analysis for 400 Sft


Material
b)

24 B.W.G. sheet roofing


24 B.W.G. sheeting
400 Sft
over laping
100 Sft
Wastage 25%
500 Sft
500 Sft @ 1.12 Lbs/Sft =
560 Lbs
Rolls = 47 Sft @ 1.12 = 52.64 Lbs
Deodar wood
Screws of size 3\"&2\"
Clips
Total
Contractor's Profit & Percent
Total
Rate for 100 Sft

Labour

254.08 Kg
23.88 Kg
2.90 Cft
1.6
1.29

0
4

Rate Analysis for 500 Sft


Cooly
Carpenter
Blacksmith
Total
Sundries
Percent
Total
Contractor's Profit & Percent
Total
Rate for 100 Sft

12.00 Nos
1.50 No
8.00 Nos
10

0.0
5

Item Rates
Labour Rate Per 100 S Rs.
Labour Rate Per Sqm
Composite Rate Per 10 Rs.
Composite Rate Per Sq Rs.

Page 42

lat sheet roof with galvanized iron sheets


ncluding battens rolls screw clips etc. (planking
o be psid for separately).
4 B. W. G. Sheets Roofing.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs.)Amount (Rs.)

Kg.
Kg.

Rs.

P.
P.
P.
P.
P.

Kg
Sft
Cft
Kg.
Kg.

P. Day
P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

26:

Detail

Asbestos cement corrugated sheet roofi


including necessary over laps and G.I.
bolts, nuts, screws washers and bitume
etc. (excluding valleys and ridges etc
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Corrugated A.C. sheets with 25% over
lapping and wastage.
125 Sft
G.I. or limpet washers and bilumatic
washers.
G.I. bolts with nuts.
G.I. hook bolts and nuts 6\"x5/16\"
1.5 Doz
Total
Contractor's Profit & Percent
Total
Labour
Rate for 150 Sft
Cooly
2.00 Nos
Carpenter
1.00 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per 100 S Rs.
Labour Rate Per Sqm
Composite Rate Per 10 Rs.
Composite Rate Per Sq Rs.

7 Doz
2 Doz

Rs.

Page 43

ment corrugated sheet roofing


ecessary over laps and G.I. hooks,
, screws washers and bitumen washers
ding valleys and ridges etc.)
British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

P. Sft

Doz
Doz
Doz

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

27:

Detail

Extra labour for erection of G.I. shee


or asbestos sheet roofing, above 20' h
difficult position including lifting w
special scaffolding along live electri
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Rate Analysis for 150 Sft


Labour
Unskillied Cooly
Fitter
Total
Sundries
Percent
Total
Contractor Percent
Total

0.50 No
0.06 No
10

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

P. Day
P. Day

Page 44

r for erection of G.I. sheets, flat sheet


sheet roofing, above 20' height in
osition including lifting with care and
ffolding along live electric wires.
British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Day
. Day

Say
Say

DESCRIPTION

OF

ITEM NO

28:

Detail

Rate Analysis for


61 Rft
Material
A.C. ridge sheet for a shed of 60'x30'
(18x15 M) or 61 Rft
G.I. bolts and nut with washers
Bituminous washer
Total
Contractor Percent
Total
Rate Per Rft

Fixing asbestos cement sheet ridges an


\" (6mm) thick.

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

61.00 Rft P. Rft


5.00 Doz
Doz
5.00 Doz
Doz

0
61

Labour
Rate Analysis for 100 Rft
Cooly
Carpenter
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rf
Composite Rate Per Rm

2.00 Nos
1.50 No

Rs.
Rs.
Rs.
Rs.

P. Day
P. Day

Page 45

stos cement sheet ridges and valleys

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Rft

. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

29:

a)
Detail

Plain galvanized iron sheet ridging in


fixture, timber for ridge roll and rid
6\" (150mm) lap and 18\" (450mm) over
22 gauge G.I. sheet ridging.
Unit Rate (British System) per Rft
Qty

Material
G.I. Sheet 22 gauge
10% for over lapping

Rate
Per Unit (Rs.)Amount (Rs.)

1.50 Sft
0.15 Sft

1.65 Sft @ 1.12 Lbs/Sft =


1.85 Lbs
0.84
Deodar wood
0.08
Total
Contractor's Profit & Percent
Total
Labour
Cooly
0.03
Carpenter
0.03
Blacksmith
0.03
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per Rft Rs.
Labour Rate Per Rm
Rs.
Composite Rate Per Rf Rs.
Composite Rate Per Rm Rs.

Kg
Cft

1.65 Sft
P. Kg
P. Cft

No
No
No

P. Day
P. Day
P. Day

Page 46

nized iron sheet ridging including


mber for ridge roll and ridge sheeting.
lap and 18\" (450mm) over all of
I. sheet ridging.
British System) per Rft

er Unit (Rs.)Amount (Rs.)

. Cft

. Day
. Day
. Day

Say
Say
Say
Say

Item No.

29
b)
Detail

Plain galvanized iron sheet ridging in


fixture, timber for ridge roll and rid
9\" lap and 24\" over all of 24 gauge
sheet ridging.
Unit Rate (British System) per Rft
Qty

Material
G.I. Sheet 24 gauge
10% for over lapping

Rate
Per Unit (Rs.)Amount (Rs.)

2.10 Sft
0.21 Sft

2.31 Sft @ 0.83 Lbs/Sft =


1.94 Lbs
0.88
Deodar wood
0.07
Total
Contractor's Profit & Percent
Total
Labour
Cooly
0.06
Carpenter
0.03
Blacksmith
0.03
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per Rft Rs.
Labour Rate Per Rm
Rs.
Composite Rate Per Rf Rs.
Composite Rate Per Rm Rs.

2.31 Sft
Kg
P. Kg
Cft
P. Cft

No
No
No

P. Day
P. Day
P. Day

Page 47

nized iron sheet ridging including


mber for ridge roll and ridge sheeting.
24\" over all of 24 gauge G.I.

British System) per Rft

er Unit (Rs.)Amount (Rs.)

. Cft

. Day
. Day
. Day

Say
Say
Say
Say

Item No.

29

Plain galvanized iron sheet ridging in


fixture, timber for ridge roll and rid
12\" (300mm) lap and 30\" (750mm) over
22 gauge G.I. sheet ridging.
Unit Rate (British System) per Rft

c)
Detail

Qty
Material
22 Gauge G.I. Sheet
Add 10% for over lapping

Rate
Per Unit (Rs.)Amount (Rs.)

2.50 Sft
0.25 Sft

2.75 Sft @ 1.12 Lbs/Sft =


3.08 Lbs
1.40
Deodar wood
0.07
Total
Contractor's Profit & Percent
Total
Labour
Cooly
0.06
Carpenter
0.03
Blacksmith
0.03
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rf Rs.
Composite Rate Per Rm Rs.

Kg
Cft

2.75 Sft
P. Kg
P. Cft

No
No
No

P. Day
P. Day
P. Day

Rs.
Rs.

Page 48

nized iron sheet ridging including


mber for ridge roll and ridge sheeting.
) lap and 30\" (750mm) over all of
I. sheet ridging.
British System) per Rft

er Unit (Rs.)Amount (Rs.)

2.75 Sft
-

. Cft

. Day
. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

30:

Detail

Plain 22 Gauge G.I. sheet gutter semi8\" dia meter.


Unit Rate (British System) per Rft
Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
G.I. Sheet
(22 Guage)
1.38Lbs(0 P. Kg
Wrought iron bracket complete with bolts,
Nuts and rivets etc.
1.00 No
Each
Total
Contractor's Profit & Percent
Total
Labour
Cooly
0.03 No
Blacksmith
0.03 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per Rft Rs.
Labour Rate Per Rm
Rs.
Composite Rate Per Rf Rs.
Composite Rate Per Rm Rs.

P. Day
P. Day

Page 49

uge G.I. sheet gutter semi-circular

British System) per Rft

er Unit (Rs.)Amount (Rs.)


-

. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

31:

Detail

Making masonry ventilators in cement s


mortar (1:4)
Unit Rate (British System) per Each
Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Pacca bricks
Cement
Sand
Total
Contractor Percent
Total
Labour
Rate Analysis for 1.5 No.
Cooly
Mason
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate for Each
Composite Rate for Ea

Per
50.00 Nos 1000 N
0.17 Bag
P. Bag
0.88 Cft
P. Cft

1.00 No
1.00 No

Rs.
Rs.

P. Day
P. Day

Page 50

nry ventilators in cement sand

British System) per Each

er Unit (Rs.)Amount (Rs.)

000 N
. Bag
. Cft

. Day
. Day

Say
Say

DESCRIPTION

OF

ITEM NO

32:

Detail

Fixing water spouts or parnalas.


Unit Rate (British System) per Each
Qty

Rate Analysis for 1.25 No.


Labour
Unskilled Cooly
Mason
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate for Each

0.25 No
0.25 No

Rs.

Rate
Per Unit (Rs.)Amount (Rs.)

Page 51

r spouts or parnalas.

British System) per Each

er Unit (Rs.)Amount (Rs.)

Say

DESCRIPTION

OF

ITEM NO

33:

Detail

Rate Analysis for 100 Rft


Material
Ready mortar 100 Rft
100x1/6x1/24 = 0.69 Cft
Say 0.75 Cft
Cement
0.75
=
0.25 Cft
3
Sand
Total
Contractor Percent
Total
Rate Per Rft

Making drip course 2\"x\" (50x12mm) u


RCC Slab edges in outer opening, in ce
mortar (1:2)
Unit Rate (British System) per Rft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

0.20 Bag

P. Bag

0.50 Cft

P. Cft

0.0
100

Labour
Rate Analysis for 150 Rft
Unskilled Cooly
Mason
Bahishti
For Making Surface
Unskilled Cooly
Bahishti
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Metre
Composite Rate Per Rf
Composite Rate Per Me

1.00 No
1.00 No
0.03 No

P. Day
P. Day
P. Day

0.13 No
0.44 No

P. Day
P. Day

Rs.
Rs.
Rs.
Rs.

Page 52

course 2\"x\" (50x12mm) under


ges in outer opening, in cement, sand

British System) per Rft

er Unit (Rs.)Amount (Rs.)

. Bag

. Cft

. Day
. Day
. Day

. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

34:

Detail

Material
G.I. sheet 20 gauge 2'x1'= 2Sft @ 1.44Lbs
Bitumen for paint
Polythene film 300 gauge
4 Nos x 3\" (75mm) long 3/8\" (10mm)
dia bar
=
0.18 Rft
Total
Contractor Percent
Total
Labour
Rate Analysis for 2 Sft
Cooly
placing in position
Blacksmith for cutting of G.I. sheet
Welding of bars 4 points
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sf
Composite Rate Per Sq

Supplying and laying twin G.I. sheet 2


duly painted with bitumen with polythe
gauge in between to provide a sliding
the bearing of beams with 3\" long 3/8
bar to act as hold fast on wall & beam
Unit Rate (British System) per Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)
2.88Lbs(1 P. Kg
2.72Lbs(1 P. Kg
0.05Lbs(0 P. Kg
0.03 Kg

P. Kg

0.02 No
0.03 No
4.00 Nos

P. Day
P. Day
P. Poi

Rs.
Rs.
Rs.
Rs.

Page 53

nd laying twin G.I. sheet 20 SWG


d with bitumen with polythene film 300
tween to provide a sliding joint under
of beams with 3\" long 3/8\" (10mm)
as hold fast on wall & beam.
British System) per Sft

er Unit (Rs.)Amount (Rs.)


-

. Day
. Day
. Poi

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

35:

i)
Detail

Providing and laying roof insulation,


single layer of tiles 9\"x4\"x1\" (2
40mm) grouted with cement sand mortar
over 2\" thick earth (including Mud Pl
thermopore sheet, over polythene sheet
over a layer of bitumen, complete in a
Thermopore sheet \" (13mm) thick.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Brick tiles 9\"x4\"x1\" (225x112.5x40mm) 350.00 Nos
Sand
2.00 Cft
Cement
0.50 Bag
Bitumen
34Lbs(15 .
Earth
20.00 Cft
Polythene 0.03\" (0.08mm) including
wastage 5%
1.58Lbs(0
Thermopore \" (12mm) thick 1/c 5%
wastage
105.00 Sft
Total
Contractor's Profit & Percent
Total
Labour
Plasterer
0.13 No
Mason for laying
0.50 No
Mason for grouting
0.13 No
0.75 No
Coolies for mud
0.50 No
for mud plaster
0.75 No
for tile laying grout0.25 No
1.50 Nos

Per
1000 N
P. Cft
P. Bag
P. Kg
P. Cft
P. Kg
P. Sft

P. Day

P. Day

Page 54

nd laying roof insulation, comprising of


r of tiles 9\"x4\"x1\" (225 x 112.5 x
ed with cement sand mortar 1:3 laid
ick earth (including Mud Plaster) over
sheet, over polythene sheet 300 gauge
r of bitumen, complete in all respect.
sheet \" (13mm) thick.
British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

000 N
. Cft
. Bag

. Cft

. Sft

. Day

. Day

i)

Thermopore sheet \" (13mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Painter for painting


0.50 No
Bahishti
0.50 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per 100 S Rs.
Labour Rate Per Sqm Rs.
Composite Rate Per 10 Rs.
Composite Rate Per Sq Rs.

P. Day
P. Day

Page 55

sheet \" (13mm) thick.

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Day
. Day

Say
Say
Say
Say

Item No.

35

ii)
Detail

Providing and laying roof insulation,


single layer of tiles 9\"x4\"x1\" (2
40mm) grouted with cement sand mortar
over 2\" thick earth (including Mud Pl
thermopore sheet, over polythene sheet
over a layer of bitumen, complete in a
\" (20mm) thick thermopore sheet.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Clay tiles 9\"x4\"x1\" (225x112.5x40mm)
Sand
Cement
Bitumen
Earth
Polythene 0.03\" (0.08mm) 1/c
wastage 5%
Thermopore \" (19mm) thick 1/c 5%
wastage
Total
Contractor's Profit & Percent
Total
Labour
Plasterer
Mason for laying
Mason for grouting

Coolies for mud

350.00 Nos
2.00 Cft
0.50 Bag
34Lbs(15 .
20.00 Cft

Per
1000 N
P. Cft
P. Bag
P. Kg
P. Cft

1.58Lbs(0 P. Kg
105.00 Sft P. Sft

0.13
0.50
0.13
0.75
0.75
0.50
for mud plaster
0.75
for tile laying grout0.25
1.50

No
No
No
No
Say
No
No
No
Nos

P. Day

P. Day

Page 56

nd laying roof insulation, comprising of


r of tiles 9\"x4\"x1\" (225 x 112.5 x
ed with cement sand mortar 1:3 laid
ick earth (including Mud Plaster) over
sheet, over polythene sheet 300 gauge
r of bitumen, complete in all respect.
thick thermopore sheet.
British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

000 N
. Cft
. Bag

. Cft

. Sft

. Day

. Day

ii)

\" (20mm) thick thermopore sheet.

Detail

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs.)Amount (Rs.)
0.50 No
P. Day
0.50 No
P. Day

Painter for painting


Bahishti
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per 100 S Rs.
Labour Rate Per Sqm Rs.
Composite Rate Per 10 Rs.
Composite Rate Per Sq Rs.

Page 57

thick thermopore sheet.

British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)


. Day
. Day
Say
Say
Say
Say

Item No.

35

iii)
Detail

Providing and laying roof insulation,


single layer of tiles 9\"x4\"x1\" (2
40mm) grouted with cement sand mortar
over 2\" thick earth (including Mud Pl
thermopore sheet, over polythene sheet
over a layer of bitumen, complete in a
Thermopore sheet 1\" (25mm) thick.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Material
Brick tiles 9\"x4\"x1\" (225x112.5x40mm) 350.00 Nos
Sand
2.00 Cft
Cement
0.50 Bag
Bitumen
34Lbs(15 .
Earth
20.00 Cft
Polythene 0.03\" (0.08mm) 1/c
wastage 5%
1.58Lbs(0
Thermopore 1\" (13mm) thick 1/c 5%
wastage
105.00 Sft
Total
Contractor's Profit & Percent
Total
Labour
Plasterer
0.13 No
Mason for laying
0.50 No
Mason for grouting
0.13 No
0.76 No
Coolies for mud
0.50 No
for mud plaster
0.75 No
for tile laying grout0.25 No
1.50 Nos

Per
1000 N
P. Cft
P. Bag
P. Kg
P. Cft
P. Kg
P. Sft

P. Day

P. Day

Page 58

nd laying roof insulation, comprising of


r of tiles 9\"x4\"x1\" (225 x 112.5 x
ed with cement sand mortar 1:3 laid
ick earth (including Mud Plaster) over
sheet, over polythene sheet 300 gauge
r of bitumen, complete in all respect.
sheet 1\" (25mm) thick.
British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

000 N
. Cft
. Bag

. Cft

. Sft

. Day

. Day

Item No.

35
iii)
Detail

Thermopore sheet 1\" (25mm) thick.


Unit Rate (British System) per 100 Sft
Qty

Painter for painting


0.50 No
Bahishti
0.50 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate Per 100 S Rs.
Labour Rate Per Sqm Rs.
Composite Rate Per 10 Rs.
Composite Rate Per Sq Rs.

Rate
Per Unit (Rs.)Amount (Rs.)
P. Day
P. Day

Page 59

sheet 1\" (25mm) thick.


British System) per 100 Sft

er Unit (Rs.)Amount (Rs.)

. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

36:

Providing and fixing A.C. rain water d


4\" (100mm) dia with shoe, T-bend, cla

Detail

Unit Rate (British System) per Rft


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Rate Analysis for


Material
A.C. pipe 4\" (100mm) dia
A.C. T-bend 4\" (100mm) dia
A.C. shoe
Clamps & Nuts
Total
Contractor Percent
Total
Rate Per Rft

13 Rft
13.00 Rft
1.00 No
1.00 No
2.00 Nos

P. Rft
Each
Each
Each

0
13

Labour
Rate Analysis

for

20 Rft

Plumber
Unskilled Cooly
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rf
Composite Rate Per Rm

0.20 No
0.20 No

Rs.
Rs.
Rs.
Rs.

P. Day
P. Day

Page 60

nd fixing A.C. rain water down pipe


dia with shoe, T-bend, clamp etc.

British System) per Rft

er Unit (Rs.)Amount (Rs.)

. Rft

. Day
. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

37:

Making jharries in existing brick maso


providing recesses for bearing of RCC
including repairing the damaged face.
For slab upto 6\" (150mm) thick

i)
Detail

Unit Rate (British System) per Rft


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Rate Analysis for


Material
Cement for repairing Jharry
Sand
Total
Contractor Percent
Total
Rate Per Rft

40 Rft
0.11 Bag
0.57 Cft.

0
40

Labour
Rate Analysis

for

50 Rft

Mason
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rf
Composite Rate Per Rm

1.00 No

Rs.
Rs.
Rs.
Rs.

Page 61

ries in existing brick masonry for


ecesses for bearing of RCC roof slab
epairing the damaged face.
to 6\" (150mm) thick

British System) per Rft

er Unit (Rs.)Amount (Rs.)

Bag
% Cft.

P. Day

Say
Say
Say
Say

Item No.

37

Making jharries in existing brick maso


providing recesses for hearing of RCC
including repairing the damaged face.
For slab exceeding 6\" (150mm) to 12\"
thick.
Unit Rate (British System) per Rft
Qty

ii)
Detail

Rate Analysis

for

40 Rft

Material
Cement
Sand
Total
Contractor Percent
Total
Rate Per Rft
Labour
Rate Analysis for 50 Rft
Mason
Cooly
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rf
Composite Rate Per Rm

0.2 Bag
1.15 Cft.

0
40
1.50 No
0.25 No

Rs.
Rs.
Rs.
Rs.

Page 62

ries in existing brick masonry for


ecesses for hearing of RCC roof slab
epairing the damaged face.
ceeding 6\" (150mm) to 12\" (300mm)

British System) per Rft


Rate
Per Unit (Rs.)Amount (Rs.)

Bag
% Cft.

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

38:

i)
Detail

Rate Analysis for 12 Holes


Material
Cement
Sand
Total
Contractor's Profit & Percent
Total
Labour
Mason

Making recess in exixting brick masone


bearing of beam, girder, R.S. joist, e
repairing damaged face.
Upto 1'.0\" (300mm) height of girder o
Unit Rate (British System) per Each
Qty

0.111 Bag
0.57 Cft.

1.00 No

Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate for Each
Composite Rate for Ea Rs.

Rs.

Page 63

ss in exixting brick masonery for


beam, girder, R.S. joist, etc. including
amaged face.
(300mm) height of girder or beam.

British System) per Each


Rate
Per Unit (Rs.)Amount (Rs.)

Bag
% Cft.

P. Day

Say
Say

Item No.

38

Making recess in exixting brick masone


bearing of beam, girder, R.S. joist, e
repairing damaged face.
For every 6\" (150mm) additional heigh
thereof.
Unit Rate (British System) per Each
Qty

ii)
Detail

Rate Analysis for 25 Holes


Material
Cement
Sand
Total
Contractor's Profit & Percent
Total
Labour
Mason

0.111 Bag
0.57 Cft.

1.00 No

Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate for Each
Composite Rate for Ea Rs.

Rs.

Page 64

ss in exixting brick masonery for


beam, girder, R.S. joist, etc. including
amaged face.
\" (150mm) additional height or part

British System) per Each


Rate
Per Unit (Rs.)Amount (Rs.)

Bag
% Cft.

P. Day

Say

Say

DESCRIPTION

OF

ITEM NO

39:

Detail

Hoisting R.S. Beams and wooden beams a


placing in position.
Unit Rate (British System) per Each
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Mason
0.20 No
Unskilled Coolies
0.60 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate for Each Rs.

P. Day
P. Day

Page 65

S. Beams and wooden beams and

British System) per Each

er Unit (Rs.)Amount (Rs.)

. Day
. Day

Rs.

DESCRIPTION

OF

ITEM NO

40:

Detail

Rate Analysis for 35 Nos


Labour
Mason
Unskilled Coolies
Total
Sundries
Percent
10
Total
Contractor Percent
Total
Item Rates
Labour Rate for Each

Hoisting and placing in position sahl


roof.
Unit Rate (British System) per Each
Qty

Rate
Per Unit (Rs.)Amount (Rs.)

1.00 No
1.00 No

P. Day
P. Day

Rs.

Page 66

d placing in position sahl ballies, over

British System) per Each

er Unit (Rs.)Amount (Rs.)

. Day
. Day

Rs.

DESCRIPTION

OF

ITEM NO

41:

Hoisting precast RCC/Pre-stressed conc


battens and placing in position.

Detail

Unit Rate (British System) per Each


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Mason
Unskilled Coolies
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
a) 5' to 6' (1.5 to 1.8 M) long
Labour per No./ Assumed for
70 Nos

1.00 No
3.00 Nos

0.0
70

b) 6' to 7' (1.8 to 2.10 M) long


Labour per No./ Assumed for 50 Nos

0.0
50

c) 7' to 8' (2.10 to 2.40 M) long


Labour per No./ Assumed for 40 Nos

0.0
40

d) 8' to 9' (2.40 to 2.70 M) long


Labour per No./ Assumed for 30 Nos

0.0
30

e) Above 9' (2.70 M) length


Labour per No./ Assumed for

25 Nos

0.0
25

P. Day
P. Day

Page 67

ecast RCC/Pre-stressed concrete


placing in position.

British System) per Each

er Unit (Rs.)Amount (Rs.)

. Day
. Day

Say

Say

Say

Say

Say

DESCRIPTION

OF

ITEM NO

42:

Hoisting and placing in pos

Detail

Unit Rate (British System)


Qty

Labour
Mason
Unskilled Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Ove 20
Percent
Total
a) Upto 10' (3 M) length
Labour per No./ Assumed for 25 Nos

1.00 No
3.00 Nos
10

0.0
25

b) 10' to 11' (3 to 3.30 M) length


Labour per No./ Assumed for 20 Nos

0.0
20

c) 11' to 12' (3.30 to 3.60 M) length


Labour per No./ Assumed for 15 Nos

0.0
15

d) 12' to 13' (3.60 to 3.90 M) length


Labour per No./ Assumed for 13 Nos

0.0
13

e) 13' to 14' (3.90 to 4.20 M) length


Labour per No./ Assumed for 12 Nos

0.0
12

f) 14' to 15' (4.20 to 4.50 M) length


Labour per No./ Assumed for 11 Nos

0.0
11

g) 15' to 16' (4.50 to 4.80 M) length


Labour per No./ Assumed for 10 Nos

0.0
10

h) 16' to 17' (4.80 to 5.1 M) length


Labour per No./ Assumed for 9 Nos

0.0
9

Page 68

oisting and placing in position RC trough.

nit Rate (British System) per Each


Rate
Per Unit (Rs.)Amount (Rs.)
P. Day
P. Day

Say

Say

Say

Say

Say

Say

Say

Say

Detail

Unit Rate (British System) per Each


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

i) 17' to 18' (5.1 to 5.4 M) length


Labour per No./ Assumed for 7 Nos

0 Say
7

j) 18' to 19' (5.4 to 5.7 M) length


Labour per No./ Assumed for 6.5 Nos

0.0 Say
6.5

k) 19' to 20' (5.7 to 6 M) length


Labour per No./ Assumed for 6 Nos

0.0 Say
6

Page 69

British System) per Each

er Unit (Rs.)Amount (Rs.)

DESCRIPTION

OF

ITEM NO

43:

Hoisting and placing in pos


battens.

Detail

Labour
Mason
Unskilled Coolies
Total
Sundries
Percent
Total
Contractor's Profit & Ove 20
Percent
Total
i) Upto 10' (3 M) Span
Labour per No./ Assumed for 40 Nos

Unit Rate (British System)


Qty

1.00 No
4.00 Nos
10

0.0
40

i) From 10' to 12' (3 to 3.6 M) Span


Labour per No./ Assumed for 18 Nos

0.0
18

i) From 12' to 13' (3.6 to 3.9 M) Span


Labour per No./ Assumed for 15 Nos

0.0
15

v) From 13' to 14' (3.9 to 4.2 M) Span


Labour per No./ Assumed for 12 Nos

0.0
12

v) From 14' to 15' (4.2 to 4.5 M) Span


Labour per No./ Assumed for 11 Nos

0.0
11

i) From 15' to 16' (4.5 to 4.8 M) Span


Labour per No./ Assumed for 10 Nos

0.0
10

i) From 16' to 18' (4.8 to 5.4 M) Span


Labour per No./ Assumed for 8 Nos

0.0
8

i) From 18' to 20' (5.4 to 6 M) Span


Labour per No./ Assumed for 5 Nos

0.0
5

Page 70

oisting and placing in position RC inverted

nit Rate (British System) per Each


Rate
Per Unit (Rs.)Amount (Rs.)

P. Day
P. Day

Say

Say

Say

Say

Say

Say

Say

Say

DESCRIPTION

OF

ITEM NO

44:

Detail

Material
Cement
Sand
Aggregate
Total
Total

Reinforced cement concrete spout, incl


fixing in position, with top & bottom
Unit Rate (British System) per Each
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

0.25 Bag
1.26 Cft
2.53 Cft

Contractor's Profit & Percent


Total
Labour for 1.5 Nos.
Mason
0.40 No
Unskilled Coolies
0.40 No
Total
Sundries
Percent
10
Total
Contractor's Profit & Percent
Total
Item Rates
Labour Rate for Each Rs.
Composite Rate for Ea Rs.

P. Bag
P. Cft
P. Cft

P. Day
P. Day

Page 71

cement concrete spout, including


osition, with top & bottom khurras.

British System) per Each

er Unit (Rs.)Amount (Rs.)

. Bag
. Cft
. Cft

. Day
. Day

Say

Say

CHAPTER NO. 15

SHEET PILING
1
2

Unless otherwise stated, the rate includes handling of materials with


Rates for all finished works include the removal of surplus debris, u
and by products.
3
For handling of all types of materials for shortleads including carri
(90 M) nothing is to be paid as extra. Where handling and carriage i
lead beyond 3 Chains, (90 M) carriage for whole of the distance shoul
The above notes are to be referred to all items of the chapter.
DESCRIPTION

OF

ITEM NO

1:

Cutting ransome and larson piles.

Detail

Unit Rate (British System) per Cut


Qty

Assumed for 1.25 cut


Labour
Blacksmith

0.25 No
Total
Sundries 10
Total

Percent

Contractor's Profit &20


Total
Item Rates
Labour Rate Per Cut

Rs.

0.0
1.25

Page 1

handling of materials with in 3 chains (90M).


moval of surplus debris, unused material

shortleads including carriage upto 3 Chains,


re handling and carriage involves an extra
hole of the distance should be paid.
chapter.

some and larson piles.

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day

0.0 Say

DESCRIPTION

OF

ITEM NO

2:

Cutting universal Piles.

Detail

Unit Rate (British System) per Cut


Qty

Assumed for 1.25 cut


Labour
Blacksmith
Total
Sundries 10
Total
Contractor's Profit & Ov
Total
Item Rates
Labour Rate Per Cut

0.37 No

Percent

Percen20

Rs.

0.0
1.25

Page 2

versal Piles.

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day

0.0 Say

DESCRIPTION

OF

ITEM NO

3:

Driving steel piles 25' to 30' (7.5 to

Detail

Unit Rate (British System) per Cut


Qty

Rate Analysis for 125 Sft


Labour
Skilled Cooly
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total rate for 125 Sft
Item Rates

4.25 Nos
2.00 Nos

Percent

Percen20

Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

0.0
1.25

Page 3

el piles 25' to 30' (7.5 to 9 M).

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 Say

0.0 Say

DESCRIPTION

OF

ITEM NO

4:

Driving steel piles more than 15' (4.5


less than 25' (7.5 M).

Detail

Unit Rate (British System) per Cut


Qty

Rate Analysis for 125 Sft


Labour
Skilled Cooly
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total rate for 125 Sft

4.00 Nos
2.00 Nos

Percent
Percen20

Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm


Rs.

0.0
1.25

Page 4

el piles more than 15' (4.5 M) and


5' (7.5 M).

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 Say

0.0 Say

DESCRIPTION

OF

ITEM NO

5:

Driving steel piles 15' (4.5 M) and un

Detail

Unit Rate (British System) per Cut


Qty

Rate Analysis for 125 Sft


Labour
Skilled Cooly
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total rate for 125 Sft

2.50 Nos
2.00 Nos

Percent

Percen20

Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm


Rs.

0.0
1.25

Page 5

el piles 15' (4.5 M) and under.

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 Say

0.0 Say

DESCRIPTION

OF

ITEM NO

6:

Dolleying piles.

Detail

Unit Rate (British System) per Cut


Qty

Assumed for 1.25 No.


Labour
Dolly man (Skilled Cooly)
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total
Item Rates
Labour Rate for Each

0.20 No
0.20 No

Percent

Percen20

Rs.

0.0
1.25

Page 6

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 Say

DESCRIPTION

OF

ITEM NO

7:

Drilling holes in piles by hand.

Detail

Unit Rate (British System) per Cut


Qty

Assumed for 12 Holes


Labour
Blacksmith
Total
Sundries 10
Total
Contractor's Profit & Ov
Total
Item Rates
Labour Rate for Each

0.33 No

Percent

Percen20

Rs.

0.0
12

Page 7

les in piles by hand.

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day

0.0 Say

DESCRIPTION

OF

ITEM NO

8:

Raising and lowering machine.

Detail

Unit Rate (British System) per Cut


Qty
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.5 Feet


Labour
Fitter
Skilled Cooly
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total

1.00 No
4.00 Nos
2.00 Nos

Percent
Percen20

Item Rates
Labour Rate Per Foot

Rs.

Labour Rate Per Rm

Rs.

0.0
1.5

Page 8

lowering machine.

British System) per Cut

Rate
er Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0 Say

0.0 Say

DESCRIPTION

OF

ITEM NO

9:

Turning machine 90.

Detail

Unit Rate (British System) per Cut


Qty

Assumed for 1.25 Jobs


Labour
Fitter
Skilled Cooly
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total

1.00 No
3.00 Nos
5.00 Nos

Percent
Percen20

Item Rates
Labour Rate Per Job

Rs.

0.0
1.25

Page 9

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0 Say

DESCRIPTION

OF

ITEM NO

10:

Turning machine 135.

Detail

Unit Rate (British System) per Cut


Qty

Assumed for 1.25 Jobs


Labour
Fitter
Skilled Cooly
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total

1.00 No
5.00 Nos
5.00 Nos

Percent
Percen20

Item Rates
Labour Rate Per Job

Rs.

0.0
1.25

Page 10

hine 135.

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0 Say

DESCRIPTION

OF

ITEM NO

11:

Turning machine 180.

Detail

Unit Rate (British System) per Cut


Qty

Assumed for 1.25 Jobs


Labour
Fitter
Skilled Cooly
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total

1.00 No
7.00 Nos
7.00 Nos

Percent
Percen20

Item Rates
Labour Rate Per Job

Rs.

0.0
1.25

Page 11

hine 180.

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0 Say

DESCRIPTION

OF

ITEM NO

12:

Traveling machine (Light).

Detail

Unit Rate (British System) per Cut


Qty

Assumed for 1.25 Chain


Labour
Fitter
Skilled Cooly
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total

1.25 Nos
8.00 Nos
8.50 Nos

Percent
Percen20

Item Rates
Labour Rate Per Chain

Rs.

Labour Rate Per 30 Meter

Rs.

0.0
1.25

Page 12

achine (Light).

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day
0.00 P. Day

-.05

Say

-.05

Say

DESCRIPTION

OF

ITEM NO

13:

Loading and unloading piles.

Detail

Unit Rate (British System) per Cut


Qty

Assumed for 1.25 Ton


Labour
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total
Item Rates

0.37 No

Percent

Percen20

Labour Rate Per Ton

Rs.

Labour Rate Per Tonne

Rs.

0.0
1.25

Page 13

unloading piles.

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day

0.0 Say

-.05 Say

DESCRIPTION

OF

ITEM NO

14:

Dismantling piling machine.

Detail

Unit Rate (British System) per Cut


Qty

Assumed for 1.5 No.


Labour
Foreman
Fitter
Skilled Cooly
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total
Item Rates
Labour Rate for Each

3.00 Nos
18.00 Nos
12.00 Nos
9.50 Nos

Percent
Percen20

Rs.

0.0
1.5

Page 14

piling machine.

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

P.
P.
P.
P.

Day
Day
Day
Day

0.0 Say

DESCRIPTION

OF

ITEM NO

15:

Erecting pilling machine.

Detail

Unit Rate (British System) per Cut


Qty

Assumed for 1.3 No.


Labour
Foreman
Fitter
Skilled Cooly
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total
Item Rates
Labour Rate for Each

3.00 Nos
18.00 Nos
12.00 Nos
9.50 Nos

Percent
Percen20

Rs.

0.0
1.3

Page 15

lling machine.

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

P.
P.
P.
P.

Day
Day
Day
Day

0.0 Say

DESCRIPTION

OF

ITEM NO

16:

Carriage of pile machine under differe


condition.

Detail

Unit Rate (British System) per Cut


Qty

Assumed for 1.25 Chain


Labour
Fitter
Skilled Cooly
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ov
Total

1.00 No
2.50 Nos
3.75 Nos

Percent
Percen20

Item Rates
Labour Rate Per Chain

Rs.

Labour Rate Per 30 Meter

Rs.

0.0
1.25

Page 16

pile machine under different

British System) per Cut


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0 Say

0.0 Say

CHAPTER NO. 22

SINKING OF WELLS
DESCRIPTION
Item No. 1

OF

ITEM:

Excavation of well in dry upto 20' (6 M) below ground level


A)

In ordinary soil or sand.

i)

from 0' (0 M) to 5' (1.5 M)


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

3 Nos
4.43 Nos
7.43 Nos.

Rs.
Rs.

Page 1

0' (6 M) below ground level and disposal of soil within

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 1
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil
A)

In ordinary soil or sand.

ii)

from 5'-1\" (1-55 M) to 10' (3 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

3 Nos
4.76 Nos
7.76 Nos.

Rs.
Rs.

Page 2

level and disposal of soil within one chain (30 M).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 1
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil
A)
iii)

In ordinary soil or sand.


from 10'-1\" (3.05 M) to 15' (4.5M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

3 Nos
5.73 Nos
8.73 Nos.

Rs.
Rs.

Page 3

level and disposal of soil within one chain (30 M).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 1
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil
A)
iv)

In ordinary soil or sand.


from 15'-1\" (4.55 M) to 20' (6M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

3 Nos
7.02 Nos
10.02 Nos.

Rs.
Rs.

Page 4

level and disposal of soil within one chain (30 M).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 1
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil
B)
i)

In

Hard

Soil.

from 0' (0 M) to 5' (1.5 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

4 Nos
5.05 Nos
9.05 Nos.

Rs.
Rs.

Page 5

level and disposal of soil within one chain (30 M).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No.

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil
B)
ii)

In

Hard

Soil.

from 5'-1\" (1.55 M)

to 10' (3 M) depth

Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

4 Nos
5.46 Nos
9.46 Nos.

Rs.
Rs.

Page 6

level and disposal of soil within one chain (30 M).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 1
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil
B)
iii)

In

Hard

Soil.

from 10'-1\" (3.05 M) to 15' (4.5 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

4 Nos
6.34 Nos
10.34 Nos.

Rs.
Rs.

Page 7

level and disposal of soil within one chain (30 M).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 1
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil
B)
iv)

In

Hard

Soil.

from 15'-1\" (4.55 M) to 20' (6 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

4 Nos
7.63 Nos
11.63 Nos.

Rs.
Rs.

Page 8

level and disposal of soil within one chain (30 M).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 1
Excavation of well in dry upto 20' (6 M) below ground level and dispo
C)
i)

In

Hard

Strata such as Shingle, gravel etc.

from 0' (M) to 5' (1.5M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1
2

Coolies for digging


Coolies for lifting
Total
Sundries 1 Percent
Total
Contractor Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

4 Nos
15.52 Nos
19.52 Nos.

Rs.
Rs.

Page 9

low ground level and disposal of soil within one chain (30 M).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0.0
0.0

Item No. 1
Excavation of well in dry upto 20' (6 M) below ground level and dispo
C)

In

ii)

Hard

Strata such as Shingle, gravel etc.

from 5'-1\" (1.55 M) to 10' (3 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1
2

Coolies for digging


Coolies for lifting
Total
Sundries 1 Percent
Total
Contractor Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

4 Nos
16.22 Nos
20.22 Nos.

Rs.
Rs.

Page 10

low ground level and disposal of soil within one chain (30 M).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0.0
0.0

Item No. 1
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil
C)
iii)

In

Hard

Strata such as Shingle, gravel etc.

from 10'-1\" (3.05 M) to 15' (4.5 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

4 Nos
17.08 Nos
21.08 Nos.

Rs.
Rs.

Page 11

level and disposal of soil within one chain (30 M).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 1
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil
C)
iv)

In

Hard

Strata such as Shingle, gravel etc.

from 15'-1\" (4.55 M) to 20' (6 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

4 Nos
18.63 Nos
22.63 Nos.

Rs.
Rs.

Page 12

level and disposal of soil within one chain (30 M).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

DESCRIPTION
Item No. 2

OF

ITEM :

Dry sinking of well including loading and removing excavated material, within on
A)

In ordinary soil.

i)

from 10'-1\" (3.05 M) to 15' (4.5 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

10 Nos
30 Nos
40 Nos.

Rs.
Rs.

Page 13

avated material, within one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
A)
ii)

In ordinary soil.
from 15'-1\" (4.55 M) to 20' (6 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

10 Nos
40 Nos
50 Nos.

Rs.
Rs.

Page 14

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
A)
iii)

In ordinary soil.
from 20'-1\" (6.05 M) to 25' (7.5 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

10 Nos
50 Nos
60 Nos.

Rs.
Rs.

Page 15

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
A)
iv)

In ordinary soil.
from 25'-1\" (7.55 M) to 30' (9 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

10 Nos
60 Nos
70 Nos.

Rs.
Rs.

Page 16

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
A)

In ordinary soil.

v)

from 30'-1\" (9.05 M) to 35' (10.5 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

10 Nos
70 Nos
80 Nos.

Rs.
Rs.

Page 17

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
A)
vi)

In ordinary soil.
from 35'-1\" (10.55 M) to 40' (12 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

10 Nos
80 Nos
90 Nos.

Rs.
Rs.

Page 18

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
A)
vii)

In ordinary soil.
from 40'-1\" (12.05 M) to 45' (13.5 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

10 Nos
90 Nos
100 Nos.

Rs.
Rs.

Page 19

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
A)
viii)

In ordinary soil.
from 45' (13.5 M) to any depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

10 Nos
100 Nos
110 Nos.

Rs.
Rs.

Page 20

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
B)

In Hard Soil.

i)

from 10' (3 M) to 15' (4.5 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

25 Nos
30 Nos
55 Nos.

Rs.
Rs.

Page 21

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No.

Dry sinking of well including loading and removing excavated material, with in o
B)
ii)

In Hard Soil.
from 15'-1\" (4.55) to 20' (6 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

25 Nos
40 Nos
65 Nos.

Rs.
Rs.

Page 22

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
B)
iii)

In Hard Soil.
from 20'-1\" (6.05 M) to 25' (7.5 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

25 Nos
50 Nos
75 Nos.

Rs.
Rs.

Page 23

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
B)
iv)

In Hard Soil.
from 25'-1\" (7.55 M) to 30' (9 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

25 Nos
60 Nos
85 Nos.

Rs.
Rs.

Page 24

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
B)

In Hard Soil.

v)

from 30'-1\" (9.05 M) to 35' (10.5 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

25 Nos
70 Nos
95 Nos.

Rs.
Rs.

Page 25

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
B)
vi)

In Hard Soil.
from 35'-1\" (10.55 M) to 40' (12 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

25 Nos
80 Nos
105 Nos.

Rs.
Rs.

Page 26

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
B)
vii)

In Hard Soil.
from 40'-1\" (12.05 M) to 45' (13.5 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

25 Nos
90 Nos
115 Nos.

Rs.
Rs.

Page 27

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
B)
viii)

In Hard Soil.
from 45' (13.5 M) to any depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

25 Nos
100 Nos
125 Nos.

Rs.
Rs.

Page 28

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
C)

In hard strata such as shingle, gravel etc.

i)

from 10' (3 M) to 15' (4.5 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

40 Nos
35 Nos
75 Nos.

Rs.
Rs.

Page 29

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
C)
ii)

In hard strata such as shingle, gravel etc.


from 15'-1\" (4.5 M) to 20' (6 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

40 Nos
45 Nos
85 Nos.

Rs.
Rs.

Page 30

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
C)
iii)

In hard strata such as shingle, gravel etc.


from 20'-1\" (6.05 M) to 25' (7.5 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

40 Nos
55 Nos
95 Nos.

Rs.
Rs.

Page 31

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
C)

In hard strata such as shingle gravel etc.

iv)

from 25'-1\" (7.55 M) to 30' (9 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

40 Nos
65 Nos
105 Nos.

Rs.
Rs.

Page 32

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
C)

In hard strata such as shingle, gravel etc.

v)

from 30'-1\" (9.05 M) to 35' (10.5 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

40 Nos
75 Nos
115 Nos.

Rs.
Rs.

Page 33

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
C)

In hard strata such as shingle, gravel etc.

vi)

from 35'-1\" (10.55 M) to 40' (12 M) depth


Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

40 Nos
85 Nos
125 Nos.

Rs.
Rs.

Page 34

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
C)
vii)

In hard strata such as shingle, gravel etc.


from 40'-1\" (12.05 M) to 45' (13.5 M) depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

40 Nos
95 Nos
135 Nos.

Rs.
Rs.

Page 35

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

Item No. 2
Dry sinking of well including loading and removing excavated material, with in o
C)
viii)

In hard strata such as shingle, gravel etc.


from 45'-1\" (13.55 M) to any depth
Detail

Unit Rate (British System) per 1000 C


Qty

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging
2 Coolies for lifting
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 1250 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

40 Nos
105 Nos
145 Nos.

Rs.
Rs.

Page 36

avated material, with in one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Per day

Say
Say

Amount

0
0

DESCRIPTION
Item No. 3

OF

ITEM:

Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring
machinery shoring, kentlege and removal of excavated soil within one chain (30 M
i)

from 0' (0 M) to 10' (3 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 90 Cft.
LABOUR
1 Divers
2 Coolies
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 170 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

2 Nos
6 Nos

Rs.
Rs.

Page 37

5) for depths below spring level including charges of


oil within one chain (30 Metre).

(British System) per 1000 Cft


Rate
Per Unit

Amount

Per day
Per day
-

#######
Say

Say

10621.65
198.6

Item No. 3
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring
machinery shoring, kentlege and removal of excavated soil within one chain (30 m
ii)

from 10' (3.05 M) to 20' 6 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 80 Cft.
LABOUR
1 Divers
2 Coolies
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 80 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

2 Nos
6 Nos

Rs.
Rs.

Page 38

5) for depths below spring level including charges of


oil within one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Amount

Per day
Per day
-

Say
Say

0
0

Item No. 3
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring
machinery shoring, kentlege and removal of excavated soil within one chain (30 m
iii)

from 20' (6.05 M) to 30' (9 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 65 Cft.
3
LABOUR
1 Divers
2 Coolies
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 65 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

2 Nos
6 Nos

Rs.
Rs.

Page 39

5) for depths below spring level including charges of


oil within one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Amount

Per day
Per day
-

Say
Say

0.0
0.0

Item No. 3
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring
machinery shoring, kentlege and removal of excavated soil within one chain (30 m
iv)

from 30' (9.05 M) to 40' (12 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 50 Cft.
LABOUR
1 Divers
2 Coolies
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 50 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

2 Nos
6 Nos

Rs.
Rs.

Page 40

5) for depths below spring level including charges of


oil within one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Amount

Per day
Per day
-

Say
Say

0
0

Item No. 3
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring
machinery shoring, kentlege and removal of excavated soil within one chain (30 m
v)

from 40' (12.05 M) to 50' (15 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 45 Cft.
LABOUR
1 Divers
2 Coolies
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 45 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

2 Nos
6 Nos

Rs.
Rs.

Page 41

5) for depths below spring level including charges of


oil within one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Amount

Per day
Per day
-

Say
Say

0
0

Item No. 3
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring
machinery shoring, kentlege and removal of excavated soil within one chain (30 m
vi)

from 50' (15.05 M) to 60' (18 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 40 Cft.
LABOUR
1 Divers
2 Coolies
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 40 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

2 Nos
6 Nos

Rs.
Rs.

Page 42

5) for depths below spring level including charges of


oil within one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Amount

Per day
Per day
-

Say
Say

0
0

Item No. 3
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring
machinery shoring, kentlege and removal of excavated soil within one chain (30 m
vii)

from 60' (18.05 M) to 70' (21 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 39 Cft.
LABOUR
1 Divers
2 Coolies
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 39 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

2 Nos
6 Nos

Rs.
Rs.

Page 43

5) for depths below spring level including charges of


oil within one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Amount

Per day
Per day
-

Say
Say

0
0

Item No. 3
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring
machinery shoring, kentlege and removal of excavated soil within one chain (30 m
viii)

from 70' (21.05 M) to 80' (24 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 38 Cft.
LABOUR
1 Divers
2 Coolies
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 38 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

2 Nos
6 Nos

Rs.
Rs.

Page 44

5) for depths below spring level including charges of


oil within one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Amount

Per day
Per day
-

Say
Say

0
0

Item No. 3
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring
machinery shoring, kentlege and removal of excavated soil within one chain (30 m
ix)

above 80' (24 M) to any depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 35 Cft.
LABOUR
1 Divers
2 Coolies
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate for 35 Cft.
ITEM RATE
Labour Rate per 1000 Cft.
Labour Rate per Cum

2 Nos
6 Nos

Rs.
Rs.

Page 45

5) for depths below spring level including charges of


oil within one chain (30 metre).

(British System) per 1000 Cft


Rate
Per Unit

Amount

Per day
Per day
-

Say
Say

0
0

DESCRIPTION OF ITEM
Item No. 4

Wet Sinking of Well in cohesive soil (value of C more than 5) for dep
machinery, shoring, kentledge and removal of excavated soil within on
Detail

A.

Material (T&P for wet sinking)


1 Winch including cost of tripod,
tackle etc.
Less Residual Value 25%
Net Total
2 3/4\" dia steel rope
3 Loading gunny bags for one side
4 Sleepers / planks
Cost of 15 Nos. sleeper @ Rs.
Each
0.00
Depriciation 1/6
=
0.00
Total
0.00
Take 50 time Use, rate per use =
50
Rate Per Sleeper =
0.0 =
15
5 Cotton waste
Grease
Total
Contractor's Profit & Percent
Total
Sinking in 10 years in term of Cft.
Assume Cost for 350 Cft.

0 =
0.0

of C more than 5) for depth below spring level including charges of


f excavated soil within one chain (30 Metre).
Unit Rate (British System) per 1000 Cft
Rate
Qty

Per Unit

1 No.

350 Rft.
100 Nos.

Amount

Per No.

Per Rft.
er 100 Nos -

Each

P. Kg.
P. Kg.

0
15 Nos.
.38 Kg.
.4 Kg.

######### Cft.
0.0 x
26000

350

Page 46

B.

Pumping for Dewatering

a)

One cusic capacity set for dewatering


@ Rs. 60000.00 Each
Residual Value 1/6
Total
Life of pump - 5 years
40 x 40 = 1600 R
To be used on 40 wells of 40 Rft.
depth each
Per Rft.
1600
Maintenance Cost 1/5
=
0.0
Running Cost
Fuel etc.
1.137 Litre
Diesel Oil
gallon/Hrs/Pump
Working 8 Hrs per day after every 3 days
2 x 1.137 x 10 x 8
= 60.64
3
CREW
Driver

b)

c)

Per Rft of Well


Sundries 10.00
Percent
Total
Total for a+b+c
Contractor's Profit & Percent
Total Cost (A+B) for machinery & equipment

0.0

Nos.

0.0

Nos.

0.0

Page 47

Each

Each
-

Item No.

Wet sinking of well in cohesive soil (value of C more than 5) for depth below s
machinery, shoring kentledge and removal of excavated soil within one chain (3
-1
i)

0' (0 M) to 10' (3 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Material and Equipment as
per above details.
LABOUR 150
1 Driver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 150 Cft.
Total Composite Rate Per 1000 Cft.

2
4
1

150

ITEM RATE
Composite Rate per 1000 Cft
Composite Rate per Cum

Rs.
Rs.

+=
0.0 x 1000

Page 48

than 5) for depth below spring level including charges of


d soil within one chain (30 metre).

(British System) per 1000 Cft


Assuming for 150 Cft.
Rate
Per Unit

Amount
-

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No.
1)
ii)

10' (3 M) to 20' (6 M) depth

Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 120 Cft.
Material and Equipment as
per above details. (4, i)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 1 Percent
Total
Contractor Percent
Total
Total Labour Rate Per 120 Cft. Total Composite Rate Per 1000 Cf
120
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Composite Rate per Cum
Rs.

2
4
1

+=
0 x 1000

Page 49

(British System) per 1000 Cft


Assuming for 120 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No. 4
-1
iii) 20' (6 M) to 30' (9 M) depth

Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 100 Cft.
Material and Equipment as
per above details. (4, i)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 100 Cft.
Total Composite Rate Per 1000 Cft.

2
4
1

100

ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

Rs.
Rs.

+=
0.0 x 1000

Page 50

(British System) per 1000 Cft


Assuming for 100 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No.

iv)

30' (9 M) to 40' (12 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 75 Cft.
Material and Equipment as
per above details. (4, i)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 75 Cft.
Total Composite Rate Per 1000 Cft.

2
4
1

75

ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

Rs.
Rs.

+=
0 x 1000

Page 51

(British System) per 1000 Cft


Assuming for 75 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No.

v)

40' (12 M) to 50' (15 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 65 Cft.
Material and Equipment as
per above details. (4, i)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 65 Cft.
Total Composite Rate Per 1000 Cft.

2
4
1

65

ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

Rs.
Rs.

+=
0 x 1000

Page 52

(British System) per 1000 Cft


Assuming for 65 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No.

vi)

50' (15 M) to 60' (18 M) depth

Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 60 Cft.
Material and Equipment as
per above details. (4, i)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 60 Cft.
Total Composite Rate Per 1000 Cft.

2
4
1

60

ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

Rs.
Rs.

+=
0 x 1000

Page 53

(British System) per 1000 Cft


Assuming for 60 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No.
-1
vii)

60' (18 M) to 70' (21 M) depth

Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 55 Cft.
Material and Equipment as
per above details. (4, i)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 55 Cft.
Total Composite Rate Per 1000 Cft.

2
4
1

55

ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

Rs.
Rs.

+=
0.0 x 1000

Page 54

(British System) per 1000 Cft


Assuming for 55 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No.

viii)

70' (21 M) to 80' (24.5 M) depth

Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 53 Cft.
Material and Equipment as
per above details. (4, i)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 53 Cft.
Total Composite Rate Per 1000 Cft.

2
4
1

53

ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

Rs.
Rs.

+=
0 x 1000

Page 55

(British System) per 1000 Cft


Assuming for 53 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No.

ix)

80' (24 M)

- to any depth
Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 50 Cft.
Material and Equipment as
per above details. (4, i)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 50 Cft.
Total Composite Rate Per 1000 Cft.

2
4
1

50

ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

Rs.
Rs.

+=
0 x 1000

Page 56

(British System) per 1000 Cft


Assuming for 50 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

DETAIL OF SLEEPERS

Detail

Unit Rate (British System) per Sleeper


Assuming for 15 No Sleeper
Qty

MATERIAL
Sleeper

15

Depreciation

1/6

Take 50 time use of


Sleepers

0 =
50

Rate for 15 Nos.


ITEM RATE
Rate for 1

Sleeper

Rs.

Page 57

British System) per Sleeper


ssuming for 15 No Sleeper
Rate
Per Unit

Nos

Amount

Each

DESCRIPTION OF ITEM:
Item No. 5
Wet sinking of well in shingle, or gravel etc. for depth below spring
removal of excavated spoil within one chain load.
Detail

A.

Material (T&P for wet sinking)


1 Winch including cost of tripod,
tackle etc.
Less Residual Value 25%
Net Total
2 3/4\" dia steel rope
3 Loading gunny bags for one side
4 Sleepers / planks
Cost of 15 Nos. sleeper @ Rs.
Each
0.00
Depriciation 1/6
=
0.00
Total
0.00
Take 50 time Use, rate per use =
Rate Per Sleeper

0.0

15
5 Cotton waste
Grease
Total
Contractor's Profit & Ove 20.00 Percent
Total
Sinking in 10 years in term of Cft.
Assume Cost for 350 Cft.
B.
a)

b)

Pumping for Dewatering


One cusic capacity set for dewatering
@ Rs. 60000.00 Each
Residual Value 1/6
Total
Life of pump - 5 years
40 x 40 = 1600 R
To be used on 40 wells of 40 Rft.
depth each
Per Rft.
4
1600
Maintenance Cost 1/5
=
0.0 +=
Running Cost
Fuel etc.
1.137 Litre
Diesel Oil
gallon/Hrs/Pump
Working 8 Hrs per day after every 3 days
2 x 1.137 x 10 x 8
= 60.64

0.0

c)

3
CREW
Driver
Rft of Well

tc. for depth below spring level, including charges of machinery, sho

Unit Rate (British System) per 1000 Cft


Qty

Per Unit
1 No.

350 Rft.
100 Nos.

0
50
=

0
0.0

15 Nos.

.38 Kg.
.4 Kg.

######### Cft.
0.0 x
26,000

2 Nos.

0.0

0.0

0.0

350

2 Nos.
4
Page 58

Rate
Amount
Per No.

Per Rft.
er 100 Nos -

Each

P. Kg.
P. Kg.

Each

4
4

Each
-

Sundries 10.00
Percent
Total
Total for a+b+c
Contractor's Profit & Percent
Total Cost (A+B) for machinery &-

Page 59

0 =

0
0
0

Item No. 5
Wet sinking of well in shingle or gravel etc. for depths below spring
shoring, kentledge and removal of excavated soil with in one chain.

level inc

i) From 0' to 10' depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 110 Cft.
Material and Equipment as
per above details.
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 195 Cft.
Labour Rate Per 1000 Cft.

Labour Rate per 1000 Cft.


Composite Rate per Cum

2
4
1

110
Rs.
Rs.

+=
x 1000

Page 60

hs below spring
in one chain.

level including charges of machinery,

(British System) per 1000 Cft


Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

0.02

.02 Say
.01 Say

0.0
0.0

Item No. 5
Wet sinking of well in shingle or gravel etc. for depths below spring
shoring, kentledge and removal of excavated soil with in one chain.

level inc

ii) Above 10' to 20' depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 90 Cft.
Material and Equipment as
per above details. (5, i)
LABOUR

As per Item 4 (i)


Total
Total Labour Rate Per 90 Cft.
Total Composite Rate Per 1000 Cft.

Composite Rate per 1000 Cft.


Composite Rate per Cum

90

Rs.
Rs.

+=
x 1000

Page 61

hs below spring
in one chain.

level including charges of machinery,

(British System) per 1000 Cft


Assuming for 90 Cft.
Rate
Per Unit

Amount

Say
.01 Say

0.0
0.0

Item No. 5
Wet sinking of well in shingle or gravel etc. for depths below spring
shoring, kentledge and removal of excavated soil with in one chain.
iii)

level inc

20' (6 M) to 30' (9 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 75 Cft.
Material and Equipment as
per above details. (5, i, ii)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 75 Cft.
Total Composite Rate Per 1000 Cft.
ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

2
4
1

75
Rs.
Rs.

+=
x 1000

Page 62

hs below spring
in one chain.

level including charges of machinery,

(British System) per 1000 Cft


Assuming for 75 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No. 5
Wet sinking of well in shingle or gravel etc. for depths below spring
shoring, kentledge and removal of excavated soil with in one chain.
iv)

level inc

30' (9 M) to 40' (12 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 55 Cft.
Material and Equipment as
per above details. (5, i, ii)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 55 Cft.
Total Composite Rate Per 1000 Cft.
ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

2
4
1

55
Rs.
Rs.

+=
x 1000

Page 63

hs below spring
in one chain.

level including charges of machinery,

(British System) per 1000 Cft


Assuming for 55 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No. 5
Wet sinking of well in shingle or gravel etc. for depths below spring level inc
shoring, kentledge and removal of excavated soil with in one chain (30 metre).
v)

40' (12 M) to 50' (15 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 50 Cft.
Material and Equipment as
per above details. (5, i, ii)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 50 Cft.
Total Composite Rate Per 1000 Cft.
ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

2
4
1

50
Rs.
Rs.

+=
x 1000

Page 64

hs below spring level including charges of machinery,


in one chain (30 metre).

(British System) per 1000 Cft


Assuming for 50 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No.

Wet sinking of well in shingle or gravel etc. for depths below spring level inc
shoring, kentledge and removal of excavated soil with in one chain (30 metre)
vi)

50' (15 M)

to 60' (18 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 45 Cft.
Material and Equipment as
per above details. (5, i, ii)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 45 Cft.
Total Composite Rate Per 1000 Cft.
ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

2
4
1

45
Rs.
Rs.

+=
x 1000

Page 65

hs below spring level including charges of machinery,


in one chain (30 metre)

(British System) per 1000 Cft


Assuming for 45 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No. 5
Wet sinking of well in shingle or gravel etc. for depths below spring level inc
shoring, kentledge and removal of excavated soil with in one chain (30 metre).

vii)

60' (18 M) to 70' (21 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 43 Cft.
Material and Equipment as
per above details. (5, i, ii)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 43 Cft.
Total Composite Rate Per 1000 Cft.

2
4
1

43

ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

Rs.
Rs.

+=
x 1000

Page 66

hs below spring level including charges of machinery,


in one chain (30 metre).

(British System) per 1000 Cft


Assuming for 43 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No. 5
Wet sinking of well in shingle or gravel etc. for depths below spring level inc
shoring, kentledge and removal of excavated soil with in one chain (30 metre).
viii)

70' (21 M) to 80' (24 M) depth


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 42 Cft.
Material and Equipment as
per above details. (5, i, ii)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 42 Cft.
Total Composite Rate Per 1000 Cft.
ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

2
4
1

42
Rs.
Rs.

+=
x 1000

Page 67

hs below spring level including charges of machinery,


in one chain (30 metre).

(British System) per 1000 Cft


Assuming for 42 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

Item No. 5
Wet sinking of well in shingle or gravel etc. for depths below spring level inc
shoring, kentledge and removal of excavated soil with in one chain (30 metre).
ix)

80' (24 M) - above


Detail

Unit Rate (British System) per 1000 C

Qty
Rate Analysis for 38 Cft.
Material and Equipment as
per above details. (5, i, ii)
LABOUR
1 Diver
2 Coolies
3 Coolies skilled
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
Total Labour Rate Per 38 Cft.
Total Composite Rate Per 1000 Cft.
ITEM RATE
Composite Rate per 1000 Cft.
Composite Rate per Cum

2
4
1

38
Rs.
Rs.

+=
x 1000

Page 68

hs below spring level including charges of machinery,


in one chain (30 metre).

(British System) per 1000 Cft


Assuming for 38 Cft.
Rate
Per Unit

Amount

Nos
Nos
Nos

Per day
Per day
Per day

Say
Say

0.0
0.0

DESCRIPTION OF ITEM:
Item No. 6
Making and fixing in position Keekar wood well curb.

Detail

MATERIAL
Kikar Wood

2
1 x 1 / ' x
(1

/ '
/

+ ) x 1

/ '

1
3
2
3
=

M.S. Round bar \" 7) x1.5 / 2.204 = 4.76 kg.


Angle Iron (6\"x6\"x\" = 20 Lbs / 9.07 Kg.
Total
Contractor's Profit & Ove 20.00
Percent
Total
Material Rate Per Cft.
LABOUR
1 Carpenter
2 Cooly
3 Black Smith
4 Hammar Man
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Ove 20.00
Percent
Total Rate for 2.36 Cft.
ITEM RATE
Labour Rate per Cft.
Labour Rate per Cum
Composite Rate per Cft.
Composite Rate per Cum

2.36 Cft.

Unit Rate (British System) per Cft


Assuming 2.36 Cft.
Rate
Qty
Per Unit

Amount

2.36 Cft

Per Cft.

4.76 Kg
9.07 Kg.

Per kg.
Per Kg.

Per
Per
Per
Per

Say
.15 Say
Say
.25 Say

2
3
2.36 Cft.

Rs.

1
1
.5
.5

Rs.
Rs.
Rs.
Rs.

No
No
No
No

day
day
day
day

0.0
.15
0.0
.25

Page 69

DESCRIPTION OF ITEM:
Item No. 7
LAYING WELL CURB IN POSITION ONLY

Detail

Unit Rate (British System) per No.


Qty

LABOUR
1 Carpenter
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total
ITEM RATE
Labour Rate per Each

0.4 No

Rs.

Page 70

(British System) per No.


Rate
Per Unit

Per day

Say

Amount

DESCRIPTION OF ITEM:
Item No. 8
MAKING AND LAYING RCC WELL
Providing making and laying RCC Well Curb in position, using coarse s
form, moulds, curing, shuttering, rendering and finishing the exposed
and washing of aggregrate.
(a)
Concrete Mix (1: 1: 3)
Detail
Unit Rate (British System) per Cft

Qty
MATERIAL
1 Cement
2 Sand (Lawrancepur)
3 Shingle (Bajri)
4 Bolts & Nuts
5 Partal Wood for Template
6 Tar Coal
7 Nails
Total
Contractor Percent
Total

22.5 Bags
42 Cft
84 Cft
1.75 Kg.
1.2 Cft
20 .00 Lbs (9.07 Kg.
0.25 Lbs (0.11 Kg.)

LABOUR
1 Mason
2 Carpenter
3 Coolies
4 Bahishties
Total
Sundries 1 Percent
Total
Contractor Percent
Total Rate
ITEM RATE
Labour Rate per Cft.
Labour Rate per Cum
Composite Rate per Cft.
Composite Rate per Cum

6
6
13
3

Rs.
Rs.
Rs.
Rs.

Nos
Nos
Nos
Nos

Page 71

n position, using coarse sand, including all kinds of


and finishing the exposed surface, (including screening

(British System) per Cft


Assuming 100 Cft.
Rate
Per Unit

Amount

Per
Per
Per
Per
Per
Per
Per

Bag
Cft.
Cft.
Kg.
Cft.
Kg.
Kg.

Per
Per
Per
Per

day
day
day
day

Say
Say
Say
Say

0
0
0
0

DESCRIPTION OF ITEM:
Item No. 8

(b)

MAKING AND LAYING RCC WELL


Providing making and laying RCC Well Curb in position, using coarse s
form, moulds, curing, shuttering, rendering and finishing the exposed
and washing of aggregrate.
Concrete Mix (1:2:4)
Detail

Unit Rate (British System) per Cft

Qty
MATERIAL
1 Cement
17.6 Bags
2 Sand (Lawrancepur)
44 Cft
3 Shingle (Bajri)
88 Cft
4 Bolts & Nuts
1.75 Kg.
5 Partal Wood for Template 1/10t
1.2 Cft.
6 Tar Coal
20.00 Lbs (9.07 Kg.)
7 Nails
0.25 Lbs (0.11 Kg.)
Total
Contractor Percent
Total
LABOUR
1 Mason
2 Carpenter
3 Coolies
4 Bahishties
Total
Sundries 1 Percent
Total
Contractor Percent
Total Rate
ITEM RATE
Labour Rate per Cft.
Labour Rate per Cum
Composite Rate per Cft.
Composite Rate per Cum

6
6
13
3

Rs.
Rs.
Rs.
Rs.

Nos
Nos
Nos
Nos

Page 72

n position, using coarse sand, including all kinds of


and finishing the exposed surface, (including screening

(British System) per Cft


Assuming 100 Cft.
Rate
Per Unit

Amount

Per
Per
Per
Per
Per
Per
Per

Bag
Cft
Cft.
Cft.
Kg.
Kg.
Kg.

Per
Per
Per
Per
-

day
day
day
day

Say
Say
Say
Say

0
0
0
0

DESCRIPTION OF ITEM:
Item No. 9
FIXING STRUCTURAL STEEL
Providing and fixing structural steel for cutting edge.

Detail

Unit Rate (British System) per 100 Kg

Qty
MATERIAL FOR 50 KG.
1 L. Iron/ Steel
Wastage 8%
Total
Contractor's Profit & Percent
Total for 50 Kg.
Total for 100 Kg.
LABOUR FOR 100 KG.
Fitter for fabrication of steel
and iron work
1 Coolies
for Joining ends
Total
Sundries 10.00
Percent
Total
Contractor's Profit & Percent
Total Rate
ITEM RATE
Labour Rate Per 100 Kg.
Composite Rate per 100 Kg.

1.00 Cwt (50.08 Kg.)


4.01 Cwt.
54.09 Kg.

0.5 No
0.5 No

Rs.
Rs.

Page 73

(British System) per 100 Kg.


Rate
Per Unit

Amount

Per Kg.

Per day
Per day

Say
Say

0
0

DESCRIPTION OF ITEM:
Item No. 10
MAKING AND REMOVING FALSE MASONRY
Making and removing false masonry on well.
Detail

Unit Rate (British System)

Qty
MATERIAL
Pacca
Brick
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
Cost of bricks (70% bricks at
depreciated value )
1350 x 65
= 950 Nos @ RS. 1000
100
Cost of Brick bats 24 Cft @ Rs. 350
Net Cost of Material
Total
LABOUR FOR 150 CFT.
1 Masons
2 Coolies
4 Coolies
5 Bahishti
Coolies for demolishing
Coolies for Scraping mortar of bricks
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total Rate for 150 Cft.
Total Rate for 100 Cft.
ITEM RATE
Labour Rate per 100 Cft.
Labour Rate per Cum
Composite Rate per 100 Cft.
Composite Rate for Cum

Nos
2.66
26.67
Percent

No

Cft

0
0
0
0
1034

2.5
3
1
0.5
4.25
2.9
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 74

Unit Rate (British System) per 100 Cft


Rate
Per Unit

Bags
Cft

0
er / Nos 0
Per Bag
er 100 Cft

Amount

950
84
Nos
Nos
No
No
Nos
Nos

Per
Per
Per
Per
Per
Per

Say
Say
Say
Say

day
day
day
day
day
day

0
0
0
0

CHAPTER NO. 8

STONE MASONRY
DESCRIPTION

OF

ITEM NO

1:
a)

Detail

Random, rubble masonry (unc


foundation and plinth.
Dry Masonry
Unit Rate (British System)
Qty

Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
Total
Contractor's Profit & Ove ##### Percent
Total
Labour

100 Cft

Mason
Unskilled Coolies
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total

2.00 Nos
3.00 Nos

Labour Rate for 100 Cft


Labour Rate P/ Cum
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.
Rs.
Rs.

20 Nos

Page 1

MASONRY

andom, rubble masonry (uncoursed), in


oundation and plinth.
ry Masonry
nit Rate (British System) per 100 Cft
Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each

Per Day
Per Day

Say
Say
Say
Say

Item No.

1
Detail

b)

In Mud Mortar

Unit Rate (British System) per 100 Cft


Qty

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Good earth
45 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
2.50 Nos
Unskilled Coolies
3.50 Nos
Bahishti
0.25 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total

Labour Rate for 100 Cft


Labour Rate P/ Cum
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.
Rs.
Rs.

Page 2

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
%Cft

Per Day
Per Day
Per Day

Say
Say
Say
Say

Item No.

1
Detail

c)

In Lime Mortar, Ratio

Unit Rate (British System) per 100 Cft


Qty

Material
Quarried Stone

(1 Lime 2 Sand)

100 Cft

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Lime Slaked (Ground)
224 Kg
Sand
30 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.00 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.50 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 3

tar, Ratio

(1 Lime 2 Sand).

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Per Kg.
Per %Cft

Per Day
Per Day
Per Day

0.05
-

Say
Say

Say
Say

Item No.

1
i)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:3 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm)
20 Nos.
20 Nos
Cement
9 Bag
Sand
33.75 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.00 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.50 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 4

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
P. Bag
Per %Cft

Per Day
Per Day
Per Day

Say
Say

0.03
Say

118.13
118.13
23.63
141.75

141.75
50.06

Say

141.75
50.05

Item No.

1
ii)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:4 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Cement
7.20 Bag
Sand
36.0 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.00 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.50 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 5

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per % Cft

Per Day
Per Day
Per Day

0.02
-

Say
Say

Say
Say

Item No.

1
iii)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:6 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Cement
5.14 Bag
Sand
38.57 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.00 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.50 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 6

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per%Cft

Per Day
Per Day
Per Day

0.02

Say
Say

0.05

Say
Say

Item No.

1
iv)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:8 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Cement
4 Bag
Sand
40 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.00 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.50 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 7

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per%Cft

Per Day
Per Day
Per Day

0.02
-

Say
Say

Say
Say

DESCRIPTION

OF

ITEM NO

a)
Detail

2:

Coursed Rubble Masonry hammer dressed,


foundation and plinth.

Dry Masonry
Unit Rate (British System) per 100 Cft
Qty

Material
Quarried Stone
100 Cft
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
3.00 Nos
Unskilled Coolies
3.00 Nos
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 8

ble Masonry hammer dressed,


and plinth.

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each

Per Day
Per Day

Say
Say

Say
Say

Item No.

2
Detail

b)

In Mud Mortar

Unit Rate (British System) per 100 Cft


Qty

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Good earth
45 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.00 Nos
Unskilled Coolies
4.00 Nos
Bahishti
0.50 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total

Labour Rate for 100 Cft


Labour Rate P/ Cum
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.
Rs.
Rs.

Page 9

British System) per 100 Cft


Rate
Amount (Rs)

Per Unit (Rs)


-

Per % Cft -

Each
Per% Cft

300
300
60
360

Say
Say

360
127.13

Per Day
Per Day
Per Day

Say
Say

360
127.15

Item No.

c)

Detail

In Lime Sand Mortar.

Unit Rate (British System) per 100 Cft


Qty

Material
Quarried Stone

(Ratio 1:2)

100 Cft

Through Stone or headers


Lime Slaked (Ground)
Sand
Total
Contractor's Profit & Ove #####
Total
Labour

20 Nos
5.33/ 199 Kg
26.67 Cft

Mason
Unskilled Coolies
Bahishti
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove #####
Total

4.75 Nos
5.00 Nos
0.75 No

Labour Rate for 100 Cft


Labour Rate P/ Cum
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.
Rs.
Rs.

Percent

Percent

Page 10

d Mortar.

(Ratio 1:2)

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Per Per Kg
Per%Cft

Per Day
Per Day
Per Day

0.01

Say
Say
Say
Say

Item No.

2
i)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:3 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 35x1.5'x8\"x10\"
(457x200x250mm) 35 Nos.
35 Nos
Cement
8 Bag
Sand
30 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.75 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 11

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per%Cft

Per Day
Per Day
Per Day

Say
Say

Say
Say

Item No.

2
ii)
Detail

d)

In Cement Sand Mortar


Ratio ( 1:4 )

Unit Rate (British System) per 100 Cft


Qty

Material
Quarried Stone including wastage100 Cft
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8\"x10\"
(450x200x250mm) 35 Nos.
35 Nos
Cement
6.40 Bag
Sand
32 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.75 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 12

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per%Cft

Per Day
Per Day
Per Day

0.01
-

Say
Say

Say
Say

Item No.

2
iii)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:6 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 35x1.5'x8\"x10\"
(450x200x250mm) 35 Nos.
35 Nos
Cement
4.57 Bag
Sand
34.20 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.75 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 13

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per%Cft

Per Day
Per Day
Per Day

Say
Say

Say
Say

Item No.

2
iv)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:8 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 35x1.5'x8\"x10\"
(457x200x250mm) 35 Nos.
35 Nos
Cement
3.56 Bag
Sand
35.60 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.75 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 14

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per%Cft

Per Day
Per Day
Per Day

Say
Say

Say
Say

DESCRIPTION

OF

ITEM NO

a)
Detail

3:

Random Rubble Masonry (uncoursed) in g


floor or 20'(6 M) height,building/othe

Dry Masonry
Unit Rate (British System) per 100 Cft
Qty

Material
Quarried Stone
100 Cft
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
2.50 Nos
Unskilled Coolies
3.00 Nos
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 15

le Masonry (uncoursed) in ground


'(6 M) height,building/other than

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each

Per Day
Per Day

Say
Say

Say
Say

Item No.

3
Detail

b)

In Mud Mortar

Unit Rate (British System) per 100 Cft


Qty

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Good earth
45 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
3.00 Nos
Unskilled Coolies
4.00 Nos
Bahishti
0.50 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total

Labour Rate for 100 Cft


Labour Rate P/ Cum
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.
Rs.
Rs.

Page 16

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Per % Cft

Per Day
Per Day
Per Day

0.01
-

Say
Say
Say
Say

Item No.

3
Detail

c)

In Lime Sand Mortar.

Unit Rate (British System) per 100 Cft


Qty

Material
Quarried Stone

(Ratio 1:2)

100 Cft

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Lime Slaked (Ground)
224 Kg
Sand
30 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.50 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 17

d Mortar.

(Ratio 1:2)

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Per Per Kg
Per % Cft

Per Day
Per Day
Per Day

Say
Say

Say
Say

Item No.

3
i)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:3 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Cement
9 Bag
Sand
33.75 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.50 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 18

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per % Cft

Per Day
Per Day
Per Day

1.2

Say
Say

Say
Say

1.2

Item No.

3
ii)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:4 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
Cement
7.2 Bag
Sand
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.50 Nos
Unskilled Coolies
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total

20 Nos
36 Cft

5 Nos

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 19

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per % Cft

Per Day
Per Day
Per Day

Say
Say

Say
Say

Item No.

3
iii)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:6 )

Unit Rate (British System) per 100 Cft


Qty

100.00 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Cement
5.14 Bag
Sand
38.57 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.50 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 20

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per % Cft

Per Day
Per Day
Per Day

0.01
0

Say
Say

Say
Say

Item No.

3
iv)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:8 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250) 20 Nos.
20 Nos
Cement
4 Bag
Sand
40 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
4.50 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 21

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per % Cft

Per Day
Per Day
Per Day

Say
Say

Say
Say

DESCRIPTION

OF

ITEM NO

a)

4:

Detail

Coursed Rubble Masonry hammer dressed


ground floor or 20' (6 M) height, buil
than building.
Dry Masonry

Unit Rate (British System) per 100 Cft


Qty

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 20x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
3.50 Nos
Unskilled Coolies
3.50 Nos
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.
Rs.
Rs.

Page 22

ble Masonry hammer dressed in


r or 20' (6 M) height, building o

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each

Per Day
Per Day

0.01
-

Say
Say
Say
Say

Item No.

4
Detail

b)

In Mud Mortar

Unit Rate (British System) per 100 Cft


Qty

Material
Quarried Stone

100 Cft

Headers or through stones


Note: Special size of stone for headers
average size = 30x1.5'x8\"x10\"
(457x200x250mm) 20 Nos.
20 Nos
Good earth
43 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
5.00 Nos
Unskilled Coolies
5.00 Nos
Bahishti
0.50 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total

Labour Rate for 100 Cft


Labour Rate P/ Cum
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.
Rs.
Rs.

Page 23

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Per % Cft

Per Day
Per Day
Per Day

0.01
-

Say
Say
Say
Say

Item No.

c)

Detail

In Lime Sand Mortar.

(Ratio 1:2)

Unit Rate (British System) per 100 Cft


Qty

Material
Quarried Stone including wastage100 Cft
Through Stone or headers
Lime Slaked (Ground)
Sand
Total
Contractor's Profit & Ove #####
Total
Labour

20 Nos
5.33 Mds(19 9)Kg
26.67 Cft

Mason
Unskilled Coolies
Bahishti
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove #####
Total

5.50 Nos
5.50 Nos
0.75 No

Labour Rate for 100 Cft


Labour Rate P/ Cum
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.
Rs.
Rs.

Percent

Percent

Page 24

d Mortar.

(Ratio 1:2)

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Per Per Kg
Per % Cft

Per Day
Per Day
Per Day

0.01
0

Say
Say
Say
Say

Item No.

4
i)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:3 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or headers


Note: Special size of stone for headers
average size = 35x1.5'x8\"x10\"
(457x200x250)
35 Nos.
35 Nos
Cement
8 Bag
Sand
30 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
5.50 Nos
Unskilled Coolies
5.50 Nos
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 25

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per % Cft

Per Day
Per Day
Per Day

Say
Say

Say
Say

Item No.

4
ii)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:4 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 35x1.5'x8\"x10\"
(457x200x250mm) 35 Nos.
35 Nos
Cement
6 Bag
Sand
32 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
5.50 Nos
Unskilled Coolies
5.50 Nos
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 26

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per % Cft

Per Day
Per Day
Per Day

Say
Say

Say
Say

Item No.

4
iii)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:6 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 35x1.5'x8\"x10\"
(457x200x250mm) 35 Nos.
35 Nos
Cement
4.57 Bag
Sand
34.20 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
5.50 Nos
Unskilled Coolies
5.50 Nos
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 27

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per % Cft

Per Day
Per Day
Per Day

Say
Say

Say
Say

Item No.

4
iv)
Detail

Material
Quarried Stone

d)

In Cement Sand Mortar


Ratio ( 1:8 )

Unit Rate (British System) per 100 Cft


Qty

100 Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 35x1.5'x8\"x10\"
(457x200x250mm) 35 Nos.
35 Nos
Cement
3.56 Bag
Sand
35.60 Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
5.50 Nos
Unskilled Coolies
5.50 Nos
Bahishti
0.75 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 28

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft

Each
Each
Per % Cft

Per Day
Per Day
Per Day

Say
Say

Say
Say

DESCRIPTION

OF

ITEM NO

5:

a)
Detail

Material
Quarried Stone
Lime Slaked (Ground)
Sand
Charcoal
Steel
Total
Contractor's Profit & Ove #####
Total
Labour

Ashlar block in course or scabbled mas


(including dressing etc.) in ground fl
(6 M) height, Building other than buil
In Lime Sand.
(Ratio 1:2)
Unit Rate (British System) per 100 Cft
Qty

200 Cft
4Md (149.30 Kg)
20 Cft
30Lb (13.61 Kg)
3.3Lb (1.50 Kg)
Percent

Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove #####
Total

17.00 Nos
10.00 Nos
1.00 No
1.00 No
1.00 No

Labour Rate for 100 Cft


Labour Rate P/ Cum
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.
Rs.
Rs.

Percent

Page 29

k in course or scabbled masonry


dressing etc.) in ground floor or
t, Building other than building.
d.
(Ratio 1:2)
British System) per 100 Cft
Rate
Per Unit (Rs)

Per
Per
Cft
Per
Per

% Cft
Kg.

Per
Per
Per
Per
Per

Day
Day
Day
Day
Day

0.01

Amount (Rs)

Kg.
Kg.

Say
Say
Say
Say

Item No.

5
i)

b)

Detail

Material
Quarried Stone
Cement
Sand
Charcoal
Steel
Total
Contractor's Profit & Ove #####
Total
Labour

In Cement Sand Mortar


Ratio ( 1:3 )

Unit Rate (British System) per 100 Cft


Qty

200 Cft
6 Bag
22.50 Cft
30Lb (13.61 Kg)
3.3Lb (1.50 Kg)
Percent

Mason
17.00 Nos
Unskilled Coolies
10.00 Nos
Bahishti
1.00 No
Blacksmith
1.00 No
Bellow-man
1.00 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Rs.
Labour Rate P/ Cum
Rs.
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.

Page 30

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft
Each
Cft
Per Kg.
Per Kg.

Per
Per
Per
Per
Per

Say
Say

Say
Say

0.01

Day
Day
Day
Day
Day

Item No.

5
ii)

b)

Detail

Material
Quarried Stone
Cement
Sand
Charcoal
Steel
Total
Contractor's Profit & Ove #####
Total
Labour

In Cement Sand Mortar


Ratio ( 1:4 )

Unit Rate (British System) per 100 Cft


Qty

200 Cft
4.80 Bag
24 Cft
30Lb (13.61 Kg)
3.3Lb (1.50 Kg)
Percent

Mason
17.00 Nos
Unskilled Coolies
10.00 Nos
Bahishti
1.00 No
Blacksmith
1.00 No
Bellow-man
1.00 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Rs.
Labour Rate P/ Cum
Rs.
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.

Page 31

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft
Each
% Cft
Per Per Kg
Per Per Kg

Per
Per
Per
Per
Per

Say
Say

Say
Say

Day
Day
Day
Day
Day

Item No.

5
iii)

b)

Detail

Material
Quarried Stone
Cement
Sand
Charcoal
Steel
Total
Contractor's Profit & Ove #####
Total
Labour

In Cement Sand Mortar


Ratio ( 1:6 )

Unit Rate (British System) per 100 Cft


Qty

200 Cft
3.44 Bag
25.70 Cft
30Lb (13.61 Kg)
3.3Lb (1.50 Kg)
Percent

Mason
17.00 Nos
Unskilled Coolies
10.00 Nos
Bahishti
1.00 No
Blacksmith
1.00 No
Bellow-man
1.00 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Rs.
Labour Rate P/ Cum
Rs.
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.

Page 32

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft
Each
Cft
Per Per Kg
Per Per Kg

Per
Per
Per
Per
Per

Say
Say

Say
Say

Day
Day
Day
Day
Day

DESCRIPTION

OF

ITEM NO

6:

a)
Detail

Ashlar fine masonry (including dressin


ground floor or 20' (6 M) height, Buil
than building.
In Lime Sand Mortar.
(Ratio 1:2)
Unit Rate (British System) per 100 Cft
Qty

Material
Quarried Stone
Lime Slaked (Ground)
Sand
Charcoal
Steel
Total
Contractor's Profit & Ove #####
Total
Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove #####
Total
Labour Rate Per 100 Cft
Labour Rate P/ Cum
Composite Rate Per 100 Cft
Composite Rate P/ Cum

250 Cft
2Md (74.65 Kg)
10 Cft
0.73Md(27. 5)Kg
4Lb (1.82 Kg)
Percent

40.00 Nos
8.00 Nos
1.00 No
1.50 No
1.50 No

Percent

Rs.
Rs.
Rs.
Rs.

Page 33

masonry (including dressing etc.


r or 20' (6 M) height, Building o

d Mortar.
(Ratio 1:2)
British System) per 100 Cft
Rate
Per Unit (Rs)

Amount (Rs)

Per
Per
Cft
Per
Per

% Cft Per Kg Per Kg Per Kg -

Per
Per
Per
Per
Per

Day
Day
Day
Day
Day

Say
Say
Say
Say

Item No.

6
i)

b)

Detail

Material
Quarried Stone
Cement
Sand
Charcoal
Steel
Total
Contractor's Profit & Ove #####
Total
Labour

In Cement Sand Mortar


Ratio ( 1:3 )

Unit Rate (British System) per 100 Cft


Qty

250 Cft
3 Bag
11.25 Cft
0.73Md (27.25 Kg)
4Lb (1.82 Kg)
Percent

Mason
40.00 Nos
Unskilled Coolies
8.00 Nos
Bahishti
1.00 No
Blacksmith
1.50 No
Bellow-man
1.50 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Rs.
Labour Rate P/ Cum
Rs.
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.

Page 34

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft
Each
Per % Cft
Per Per Kg
Per Per Kg

Per
Per
Per
Per
Per

Say
Say

0.01 Say
0 Say

Day
Day
Day
Day
Day

Item No.

6
ii)

b)

Detail

Material
Quarried Stone
Cement
Sand
Charcoal
Steel
Total
Contractor's Profit & Ove #####
Total
Labour

In Cement Sand Mortar


Ratio 1:4

Unit Rate (British System) per 100 Cft


Qty

250 Cft
2.40 Bag
12 Cft
60Lb (27.22 Kg)
4Lb (1.82 Kg)
Percent

Mason
40.00 Nos
Unskilled Coolies
8.00 Nos
Bahishti
1.00 No
Blacksmith
1.50 No
Bellow-man
1.50 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Rs.
Labour Rate P/ Cum
Rs.
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.

Page 35

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft
Each
Per % Cft
Per Per Kg
Per Per Kg

Per
Per
Per
Per
Per

Say
Say

Say
Say

Day
Day
Day
Day
Day

Item No.

6
iii)

b)

Detail

Material
Quarried Stone
Cement
Sand
Charcoal
Steel
Total
Contractor's Profit & Ove #####
Total
Labour

In Cement Sand Mortar


Ratio 1:6

Unit Rate (British System) per 100 Cft


Qty

250 Cft
1.73 Bag
13 Cft
60Lb (27.22 Kg)
4Lb (1.82 Kg)
Percent

Mason
40.00 Nos
Unskilled Coolies
8.00 Nos
Bahishti
1.00 No
Blacksmith
1.50 No
Bellow-man
1.50 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft
Rs.
Labour Rate P/ Cum
Rs.
Composite Rate for 100 Cft
Composite Rate P/ Cum

Rs.
Rs.

Page 36

and Mortar

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft
Each
Per % Cft
Per Per Kg
Per Per Kg

Per
Per
Per
Per
Per

Say
Say

Say
0.01 Say

Day
Day
Day
Day
Day

DESCRIPTION

OF

ITEM NO
i)

Detail

7:

Extra labour on items 3,4,5 and 6 for


First Floor

Unit Rate (British System) per 100 Cft


Qty

Labour for 125 Cft.


Mason
0.40 No
Unskilled Coolies
1.35 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate for 100 Cft

Rs.

Labour Rate P/ Cum

Rs.

Page 37

r on items 3,4,5 and 6 for work i

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per Day
Per Day

0.01

Say

Say

tem No.

ii)
Detail

Second Floor
Unit Rate (British System) per 100 Cft
Qty

Labour for 125 Cft.


Mason
Unskilled Coolies

1.20 No
2.60 Nos

Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total for 125 Cft.
Rate for 100 Cft.
Labour Rate for 100 Cft

Rs.

Labour Rate P/ Cum

Rs.

Page 38

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per Day
Per Day

Say

Say

Item No.

7
Detail

iii) Third Floor

Unit Rate (British System) per 100 Cft


Qty

Labour for 125 Cft.


Mason
Unskilled Coolies
Total
Sundries ##### Percent
Total

2 Nos
3.90 Nos

Contractor's Profit & Ove ##### Percent


Total for 125 Cft.
Rate for 100 Cft.
Labour Rate for 100 Cft
Labour Rate P/ Cum

Rs.
Rs.

Page 39

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per Day
Per Day

Say
Say

Item No.

7
Detail

iv)

Fourth Floor
Unit Rate (British System) per 100 Cft
Qty

Labour for 125 Cft.


Mason
Unskilled Coolies

3.60 Nos
5.60 Nos

Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total for 125 Cft.
Rate for 100 Cft.
Labour Rate for 100 Cft
Rs.
Labour Rate P/ Cum

Rs.

Page 40

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per Day
Per Day

Say

Say

DESCRIPTION

OF

ITEM NO

Detail

8:

Extra labour on items 3,4,5 and 6 abov


5ft (1.5 M) additional height building
building part thereof.

Unit Rate (British System) per 100 Cft


Qty

Labour for 125 Cft.


Mason
Unskilled Coolies

0.50 No
1 No

Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Totalfor 125 Cft.
Rate for 100 Cft.
Labour Rate for 100 Cft

Rs.

Labour Rate P/ Cum

Rs.

Page 41

r on items 3,4,5 and 6 above for


additional height building other
rt thereof.

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per Day
Per Day

Say

Say

DESCRIPTION

OF

Detail

ITEM NO

9:

Extra labour for arch work in stone ma


including centering and de-centering,
Unit Rate (British System) per 100 Cft
Qty

Material
Semi circular opening 15'x1.5'x1.5' = 33.8 Cft
Kikar wood = 3.75 Cft to be used for
60 times 3.75/60 = 0.06 Cft
0.06 Cft
Earth
2.00 Cft
Contractor's Profit & Ove ##### Percent
Total for 33.8 Cft
Total for 100 Cft
19.8 x 100
33.8
Labour
Mason
1.50 Nos
Unskilled Coolies
1.50 Nos
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Total (i+ii)
Labour Rate for 100 Cft
Rs.
Labour Rate P/ Cum
Rs.

Page 42

r for arch work in stone masonry


entering and de-centering, etc.
British System) per 100 Cft
Rate
Per Unit (Rs)

Amount (Rs)

Per Cft
% Cft

Per Day
Per Day

Say
Say

DESCRIPTION OF
a)
Detail

ITEM NO

10:

Extra labour for :Coping and caps etc

Unit Rate (British System) per 100 Cft


Qty

Material for 125 Cft.


Stone 12\" (300mm) and above
30 Cft
Steel
0.75Lb (0.34 Kg)
Charcoal
10Lb (4.54 Kg)
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason

18.00 Nos

Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total for 125 Cft.
Rate for 100 Cft.
Extra Rate Per 100 Cft

Rs.

Extra Rate P/ Cum

Rs.

Page 43

British System) per 100 Cft


Rate
Per Unit (Rs)

Amount (Rs)

Per % Cft
Per Kg.
Per Kg.

Per Day

Say

Say

tem No.

10
Detail

b)

Cornice and string course


Unit Rate (British System) per 100 Rft
Qty

Labour for 125 Rft


Mason
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total for 125 Rft
Rate for 100 Rft
Labour Rate for 100 Rft

18 Nos

Labour Rate P/ LM.

Rs.

Rs.

Page 44

string course
British System) per 100 Rft
Rate
Per Unit (Rs)

Amount (Rs)

Per Day

Say

Say

DESCRIPTION

OF
a)

ITEM NO

Detail

11:

Dressing Stones
Hammer Dressed

Unit Rate (British System) per 100 Sft


Qty

Labour for 125 Sft


Mason
Unskilled Coolies
2.50 Nos
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total for 125 Sft
Rate for 100 Sft.

5 Nos

Labour Rate for 100 Sft


Labour Rate P/ Sq.m

Rs.
Rs.

Page 45

British System) per 100 Sft


Rate
Per Unit (Rs)

Amount (Rs)

Per Day
Per Day

Say
Say

tem No.

11
Detail

b)

Rough tooled dressed


Unit Rate (British System) per 100 Sft
Qty

Labour for 125 Sft


Mason
Unskilled Coolies
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total for 125 Sft
Rate for 100 Sft
Labour Rate for 100 Sft
Labour Rate P/ Sq.m

10 Nos
4 Nos

Rs.
Rs.

Page 46

British System) per 100 Sft


Rate
Per Unit (Rs)

Amount (Rs)

Per Day
Per Day

Say
Say

tem No.

11
Detail

c)

Chisel dressed
Unit Rate (British System) per 100 Sft
Qty

Labour for 125 Sft


Mason
Unskilled Coolies

12 Nos
5 Nos

Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total for 125 Sft
Rate for 100 Sft
Labour Rate for 100 Sft

Rs.

Labour Rate P/ Sq.m

Rs.

Page 47

British System) per 100 Sft


Rate
Per Unit (Rs)

Amount (Rs)

Per Day
Per Day

Say

Say

tem No.

11
Detail

d)

Fine dressed
Unit Rate (British System) per 100 Sft
Qty

Labour for 125 Sft


Mason
Unskilled Coolies
Blacksmith
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total for 125 Sft
Rate for 100 Sft
Labour Rate for 100 Sft
Labour Rate P/ Sq.m

28 Nos
5 Nos
1 No

Rs.
Rs.

Page 48

British System) per 100 Sft


Rate
Per Unit (Rs)

Amount (Rs)

Per Day
Per Day
Per Day

Say
Say

DESCRIPTION

OF

ITEM NO

12:

Detail

Dhajji walling 5\"x5\" (125


deodar framing with stone l
sand mortar and (1:4) cemen
both sides.
Unit Rate (British System)
Qty

Rate Analysis for 234 Sft


a) Detail of Wood
i)Top bottom
2x18'x5x5 =
6.25 Cft
12x12
iiVertical post 4\" (100mm) apart
6x13'x5/12x5/12 = 13.55 Cft
iii) Horizontal Pieces
3x18'x5/12x
=
5.62 Cft
iv) Diagonl Strutts
20x6x5/12x1/6
=
6.25 Cft
31.67 Cft
Wastage 20%

6.33

38.00 Cft
This wood can be used 10 time hence
wood for our operation would be = 38/10
3.80 Cft
b) Stone (Quarried)
1x18x13x5/12
= 98.00 Cft
Deduct Scantling
= 32.00 Cft
66.00 Cft
Therefore stone required = 66 x 2
112 Cft
Material
Wood as above 2nd Class
3.80 Cft
Spikes \" (20mm)
0.333 Kg.
Wire nail 4\" (100mm)
0.333 Kg.
Wood preservative
0.304 Ltr
Stone quarried
112.00 Cft
Cement for 1:6 ratio for laying
3.00 Bag
Cement for plastering \" thick both
side (1:4)
3.40 Bag

Page 49

hajji walling 5\"x5\" (125x125mm) thick


eodar framing with stone laid in 1:6 cement
and mortar and (1:4) cement sand plaster on
oth sides.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs)
Amount (Rs)

12.00 Cft

Cft
Per
Per
Per
Per
Per

Per Bag

Kg.
Kg.
Litre
% Cft
Bag

Item No.

12
Detail

Unit Rate (British System) per 100 Sft


Qty

Sand
Steel
Coal
Total
Contractor's Profit & Ove #####
Total
Labour

40 Cft
3Lb (1.36 Kg)
0.5Md (18.66 Kg)
Percent

Carpenters for wood work


4.00 Nos
UnsKilled Coolies
2.00 Nos
Masons for dressing of stones including
laying
10.00 Nos
Unskilled Coolies for laying
5.00 Nos
Masson for plaster
3.00 Nos
Unskilled Coolies
3.00 Nos
Blacksmith
0.50 No
Bellow-man
0.50 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total for 234 Sft
Rate for 100 Sft
Labour Rate for 100 Sft
Rs.
Labour Rate P/ Sqm
Rs.
Composite Rate for 100 Sft
Rs.
Composite Rate P/ Sqm
Rs.

Page 50

British System) per 100 Sft


Rate
Per Unit (Rs)

Amount (Rs)

% Cft
Per Kg.
Per Kg.

Per Day
Per Day

Per
Per
Per
Per
Per
Per

Day
Day
Day
Day
Day
Day

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

13:

Detail

Rate Analysis
Material

for

Providing and fixing stone blocks from


Cft (0.06 to 017 M) each, including l
20' (6 M).
Unit Rate (British System) per Cft
Qty

4 Cft

Hand dressed stone average 4 Cft1


No
Cement
.06 Bag
Sand
.3 Cft.
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Blacksmith
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove #####
Total for 4 Cft
Rate for Per Cft
Labour Rate Per Cft
Labour Rate P/ Cum
Composite Rate Per Cft
Composite Rate P/ Cum

0.25 No
2.00 Nos
0.12 No

Percent

Rs.
Rs.
Rs.
Rs.

Page 51

nd fixing stone blocks from 2 Cft


o 017 M) each, including lift up

British System) per Cft


Rate
Per Unit (Rs)

Amount (Rs)

Each
Bag
% Cft

Per Day
Per Day
Per Day

.08
.3

Say
Say
Say
Say

.3

DESCRIPTION

OF

ITEM NO

Detail

14:

Providing and fixing stone blocks unde


(0.05 M) each, including lift upto 20

Material

Unit Rate (British System) per Cft


Qty
Rate Analysis

for

2 Cft

Hand dressed stone average (2 Cf1


Cement
0.03 Bag
Sand
0.17 Cft.
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 1 Cft
Mason
0.05 No
Unskilled Coolies
0.25 No
Blacksmith
0.03 No
Total
Sundries ##### Percent
Total
Contractor's Profit & Ove ##### Percent
Total
Labour Rate Per Cft
Labour Rate P/ Cum

Rs.
Rs.

Composite Rate Per Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 52

nd fixing stone blocks under 2 Cf


ach, including lift upto 20 Cft (

British System) per Cft


Rate
Per Unit (Rs)

No

Amount (Rs)

Each
Bag
% Cft

.01
2
-

.01
.01
Per Day
Per Day
Per Day

Say
Say

.25
.01
.33

Say
Say

.25

.35

CHAPTER NO. 20

SURFACE DRAINAGE
DESCRIPTION

OF

ITEM NO

1:

a)
i)
Detail

Tega formed of pacca bricks on end, la


sand mortar projecting to a height of
(150mm) top of drain along the propert
laid to lines, grades, slopes and shap
engineer's drawing.
3\" (75mm) Thick.
Ratio (1:3)

Unit Rate (British System) per 100 Rft


Qty
Per Unit (Rs.)

Material
Cement 0.96 Bag
Sand 3.20 Cft
Bricks
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Rft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm

260.00 Nos
Percent

0.67 No
1.00 No
0.25 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

374.39

Page 1

of pacca bricks on end, laid in and over cement


projecting to a height of not more than 6\"
of drain along the property side where required,
es, grades, slopes and shape according to the

British System) per 100 Rft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Each
0.00 P.
Cft
0.00 Per 1000 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
12.08

312
312
62.4
374.4

Say
Say
Say
Say

374.4
12.1

Item No.

Tega formed of pacca bricks on end, laid in and


sand mortar projecting to a height of not more t
(150mm) top of drain along the property side whe
laid to lines, grades, slopes and shape accordin
engineer's drawing.
a)
ii)
Detail

3\" (75mm) Thick.


Ratio (1:5)
Unit Rate (British System) per 100 Rft
Qty
Per Unit (Rs.)

Material
Cement 0.64 Bag
Sand 4.00 Cft
Bricks
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Rft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm

260.00 Nos
Percent

0.67 No
1.00 No
0.25 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 2

ricks on end, laid in and over cement


to a height of not more than 6\"
long the property side where required,
slopes and shape according to the

British System) per 100 Rft

Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Each
0.00 P.
Cft
0.00 Per 1000 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

Item No.

b)
i)
Detail

Tega formed of pacca bricks on end, laid in and


over cement sand mortar projecting to a height o
not more than 6\" (150mm) top of drain along the
property side where required, laid to lines,
grades, slopes and shape according to the
engineer's drawing.
4\" (115mm) Thick.
Ratio (1:3)
Unit Rate (British System) per 100 Rft
Qty
Per Unit (Rs.)

Material
Cement 1.30 Bag
Sand 4.70 Cft
Bricks
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Rft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm

380.00 Nos
Percent

1.00 No
1.50 No
0.38 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 3

ricks on end, laid in and


r projecting to a height of
mm) top of drain along the
quired, laid to lines,
pe according to the

British System) per 100 Rft

Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Each
0.00 P.
Cft
0.00 Per 1000 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0.01
0

Say
Say
Say
Say

Item No.

b)
ii)
Detail

Tega formed of pacca bricks on end, laid in and


over cement sand mortar projecting to a height o
not more than 6\" (150mm) top of drain along the
property side where required, laid to lines,
grades, slopes and shape according to the
engineer's drawing.
4\" (115mm) Thick.
Ratio (1:5)
Unit Rate (British System) per 100 Rft
Qty
Per Unit (Rs.)

Material
Cement 0.83 Bag
Sand 5.20 Cft
Bricks
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Rft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm

380.00 Nos
Percent

1.00 No
1.50 No
0.38 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 4

ricks on end, laid in and


r projecting to a height of
mm) top of drain along the
quired, laid to lines,
pe according to the

British System) per 100 Rft

Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Each
0.00 P.
Cft
0.00 Per 1000 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

2:

a)

Pacca flat brick 3\" (75mm) thick, laid in


reimbursement, in cement, sand mortar on sides
of drains and in other works where required. All
joints to be completely filled and struck flush.
Ratio (1:3)

Detail

Material
Pacca Bricks
Cement
Sand 5.60 Cft
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

350.00 Nos
1.50 Bag

Percent

1.00 No
1.50 No
0.33 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 5

75mm) thick, laid in


nt, sand mortar on sides
works where required. All
y filled and struck flush.

British System) per 100 Sft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Per 1000 No


0.00 Each
0.00 P.
Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0.01
0

Say
Say
Say
Say

Item No.

b)

Pacca flat brick 3\" (75mm) thick, laid in


reimbursement, in cement, sand mortar on sides
of drains and in other works where required. All
joints to be completely filled and struck flush.
Ratio (1:5)

Detail

Material
Bricks
Cement 1.00 Bag
Sand 6.25 Cft
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

350.00 Nos

Percent

1.00 No
1.50 No
0.33 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 6

75mm) thick, laid in


nt, sand mortar on sides
works where required. All
y filled and struck flush.

British System) per 100 Sft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Per 1000 No


0.00 Each
0.00 P.
Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

Item No.

c)

Pacca flat brick 3\" (75mm) thick, laid in


reimbursement, in cement, sand mortar on sides
of drains and in other works where required. All
joints to be completely filled and struck flush.
Ratio (1:6)

Detail

Material
Bricks
Cement 0.86 Bag
Sand 6.40 Cft
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

350.00 Nos

Percent

1.00 No
1.50 No
0.33 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 7

75mm) thick, laid in


nt, sand mortar on sides
works where required. All
y filled and struck flush.

British System) per 100 Sft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Per 1000 No


0.00 Each
0.00 P.
Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

3:

a)

Pacca brick on edge, laid in reimbursement, in


cement, sand mortar on sides of drains and in
other works where required. All joints to be
completely filled and struck flush.
Ratio (1:3)

Detail

Material
Bricks
Cement
Sand 8.55 Cft
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

525.00 Nos
2.30 Bag

Percent

1.50 No
2.00 No
0.50 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 8

aid in reimbursement, in
sides of drains and in
ired. All joints to be
struck flush.

British System) per 100 Sft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Per 1000 No


0.00 Each
0.00 P.
Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

Item No.

b)

Pacca brick on edge, laid in reimbursement, in


cement, sand mortar on sides of drains and in
other works where required. All joints to be
completely filled and struck flush.
Ratio (1:5)

Detail

Material
Bricks
Cement 1.50 Bag
Sand 9.50 Cft
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

525.00 Nos

Percent

1.50 No
2.00 No
0.50 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 9

aid in reimbursement, in
sides of drains and in
ired. All joints to be
struck flush.

British System) per 100 Sft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Per 1000 No


0.00 Each
0.00 P.
Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

Item No.

c)

Pacca brick on edge, laid in reimbursement, in


cement, sand mortar on sides of drains and in
other works where required. All joints to be
completely filled and struck flush.
Ratio (1:6)

Detail

Material
Bricks
Cement 1.30 Bag
Sand 9.78 Cft
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

525.00 Nos

Percent

1.50 No
2.00 No
0.50 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 10

aid in reimbursement, in
sides of drains and in
ired. All joints to be
struck flush.

British System) per 100 Sft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Per 1000 No


0.00 Each
0.00 P.
Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
-0.01

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

4:

a)

Pacca flat brick, herring bond pitching in cemen


sand mortar laid to lines, grades, shapes and
slopes as per Engineer's Drawing.
Ratio (1:3)

Detail

Material
Bricks
Cement
Sand 5.60 Cft
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

350.00 Nos
1.50 Bag

Percent

0.75 No
1.50 No
0.50 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 11

ing bond pitching in cement,


nes, grades, shapes and
's Drawing.

British System) per 100 Sft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Per 1000 No


0.00 Each
0.00 P.
Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

Item No.

b)

Pacca flat brick, herring bond pitching in cemen


sand mortar laid to lines, grades, shapes and
slopes as per Engineer's Drawing.
Ratio (1:5)

Detail

Material
Bricks
Cement 1.00 Bag
Sand 6.25 Cft
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

350.00 Nos

Percent

0.75 No
1.50 No
0.50 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 12

ing bond pitching in cement,


nes, grades, shapes and
's Drawing.

British System) per 100 Sft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Per 1000 No


0.00 Each
0.00 P.
Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

Item No.

c)

Pacca flat brick, herring bond pitching in cemen


sand mortar laid to lines, grades, shapes and
slopes as per Engineer's Drawing.
Ratio (1:6)

Detail

Material
Bricks
Cement 0.86 Bag
Sand 6.40 Cft
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

350.00 Nos

Percent

0.75 No
1.50 No
0.50 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 13

ing bond pitching in cement,


nes, grades, shapes and
's Drawing.

British System) per 100 Sft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Per 1000 No


0.00 Each
0.00 P.
Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

5:

a)

Pacca brick on edge, herring bond pitching in


cement, sand mortar laid to lines, grades, shape
and slopes as per Engineer's Drawing.
Ratio (1:3)

Detail

Material
Bricks
Cement
Sand 8.55 Cft
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

525.00 Nos
2.30 Bag

Percent

1.00 No
2.80 Nos
0.50 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 14

erring bond pitching in


id to lines, grades, shapes
neer's Drawing.

British System) per 100 Sft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Per 1000 No


0.00 Each
0.00 P.
Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

Item No.

b)

Pacca brick on edge, herring bond pitching in


cement, sand mortar laid to lines, grades, shape
and slopes as per Engineer's Drawing.
Ratio (1:5)

Detail

Material
Bricks
Cement 1.50 Bag
Sand 9.50 Cft
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

525.00 Nos

Percent

1.00 No
2.80 Nos
0.50 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 15

erring bond pitching in


id to lines, grades, shapes
neer's Drawing.

British System) per 100 Sft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Per 1000 No


0.00 Each
0.00 P.
Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

Item No.

c)

Pacca brick on edge, herring bond pitching in


cement, sand mortar laid to lines, grades, shape
and slopes as per Engineer's Drawing.
Ratio (1:6)

Detail

Material
Bricks
Cement 1.30 Bag
Sand 9.78 Cft
Total
Contractor's Profit & Ove 20
Total
Labour for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Unit Rate (British System) per 100 Sft


Qty
Per Unit (Rs.)

525.00 Nos

Percent

1.00 No
2.80 Nos
0.50 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 16

erring bond pitching in


id to lines, grades, shapes
neer's Drawing.

British System) per 100 Sft


Rate
er Unit (Rs.)

Amount (Rs.)

0.00 Per 1000 No


0.00 Each
0.00 P.
Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

6:

a)
Detail

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades, sl
and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar \"(6mm)
thick as per Engineers Drawing (excluding
Excavation).
Type I
Unit Rate (British System) per Rft
Qty

CC 1:6:12
1x100x5/6'x1/6'
CC 1:2:5
1x100x5/6'x11/24'
D/D 1x100x22/7xxxx
D/D 1x100x(6\"+10\")x\"
2
Surface Rendering
1x100x22/7x3/12'
1x100x(2\"+2\")
12
Material
Cement for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
\" Cement PLaster 1:1
Sand for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
\" Cement PLaster 1:1

Rate
Per Unit (Rs.)

13.89 Cft
Say: 13.90 Cft
38.19 Cft
2.45 Cft
2.78 Cft
32.96 Cft
Say: 33.00 Cft
78.57 Sft
33.33 Sft
111.90 Sft
Say: 112 Sft

0.90
4.78
1.03
6.71

Bag
Bag
Bag
Bag

6.81 Cft
14.95 Cft
1.29 Cft
23.05 Cft

0.00 Each

0.00 P. Cft

Page 17

andard drains of cement


ement concrete bedding
laid to lines, grades, slopes
exposed surface of
nt sand mortar \"(6mm)
Drawing (excluding

tem) per Rft

er Unit (Rs.)

.00 P. Cft

Amount (Rs.)

a)

Type I

Detail

Unit Rate (British System) per Rft


Qty
Rate
Per Unit (Rs.)

Brick ballast 1:6:12


Bajri for 1:2:5
Total
Contractor's Profit & Ove 20
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

13.62 Cft 0.00 P. Cft


29.70 Cft 0.00 P. Cft
Percent

1.50 No
3.00 Nos
0.75 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

Percent
Percent

Rs.
Rs.
Rs.
Rs.

0.05
0.26
0.1
0.33

Page 18

British System) per Rft

er Unit (Rs.)

Amount (Rs.)

.00 P. Cft
.00 P. Cft

.00 P. Day
.00 P. Day
.00 P. Day

Say
Say
Say
Say

0.05
0.25
0.1
0.35

Item No.

b)
Detail

CC 1:6:12
1x100x(1'-2\"+1'-8\")x7\"
2
Deduction.
1x100x(8\"+11\")x4\"
2
Net Total
CC 1:2:5
1x100x(11\"+8\")x4\"
2
1x100x(1-8\")x4\"
Total
Deduction.
1x100x0.82 8.20 Cft
1x100(7 3/8\"+10\") 2 1/8\"
2
1x100(10\"+1\"-8\")x0.87
2
Total
85.71 - 29.75
Net Tot
Surface Rendering
With Cement Sand Mortar1:1of\" thick
Material
Cement for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
\" Cement PLaster 1:1
Sand for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
\" Cement PLaster 1:1

Constructing Punjab standar


concrete 1:2:5 with cement
ratio 1:6:12 complete, laid
slopes and shapes, renderin
concrete with 1:1 cement sa
thick as per Engineers Draw
Excavation).
Type II
Unit Rate (British System)
Qty

88.10 Cft

28.77 Cft
59.33 Cft
28.77 Cft
56.94 Cft
85.71 Cft

17.34 Cft
4.21 Cft
29.75 Cft
55.96 Cft
220.00 Sft

3.84 Bags
5.62 Bags
2.27 Bags
11.73 Bags
28.86 Cft
17.54 Cft
2.86 Cft
49.26 Cft

Page 19

onstructing Punjab standard drains of cement


oncrete 1:2:5 with cement concrete bedding
atio 1:6:12 complete, laid to lines, grades,
lopes and shapes, rendering exposed surface of
oncrete with 1:1 cement sand mortar \"(6mm)
hick as per Engineers Drawing (excluding
xcavation).

nit Rate (British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

20.00 Sft

1.73 Bags

0.00 Each

0.00 P. Cft

b)

Type II

Detail

Unit Rate (British System) per Rft


Qty
Rate
Per Unit (Rs.)

Brick ballast for 1:6:12


Bajri for 1:2:5
Total
Contractor's Profit & Ove 20
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

57.70 Cft 0.00 P. Cft


35.10 Cft 0.00 P. Cft
Percent

3.00 Nos
6.00 Nos
1.50 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

Percent
Percent

Rs.
Rs.
Rs.
Rs.

0
0
0
0

Page 20

British System) per Rft

er Unit (Rs.)

Amount (Rs.)

.00 P. Cft
.00 P. Cft

.00 P. Day
.00 P. Day
.00 P. Day

Say
Say
Say
Say

Item No.

c)
Detail

Material
CC 1:6:12
1x100(1'-3 5/8\"+1'-11\")
2
2'x100'x4\"x1\"
Total
Deduction.
1x100x(8\"+1'-\")x5\"
2
Net Total
CC 1:2:5
1x100(8\"+1'-2\") 5\"
2
1x100x1'-11\"x4\"
Total
Deduction.
1x100x.082
1x100(7-3/8\"+1'-\")6\"
2
1x100(1'-\"+1'-11\")x\"
2
Total
107.81 - 58.84
Net Total
Surface Rendering.
Surface Area.
1x9.4'x100
12
2x6\"x100
12

Constructing Punjab standar


concrete 1:2:5 with cement
ratio 1:6:12 complete, laid
slopes and shapes, renderin
concrete with 1:1 cement sa
thick as per Engineers Draw
Excavation).
Type III
Unit Rate (British System)
Qty

117.33 Cft
9.38 Cft
126.71 Cft
40.93 Cft
85.78 Cft
43.92 Cft
63.89 Cft
107.81 Cft
8.20 Cft
41.40 Cft
9.24 Cft
58.84 Cft
48.97 Cft

78.33 Sft
108.33 Sft

Page 21

onstructing Punjab standard drains of cement


oncrete 1:2:5 with cement concrete bedding
atio 1:6:12 complete, laid to lines, grades,
lopes and shapes, rendering exposed surface of
oncrete with 1:1 cement sand mortar \"(6mm)
hick as per Engineers Drawing (excluding
xcavation).

nit Rate (British System) per Rft


Rate
Per Unit (Rs.)
Amount (Rs.)

17.33 Cft

26.71 Cft

07.81 Cft

08.33 Sft

c)
Detail

Type III
Unit Rate (British System) per Rft
Qty

2x5\"x100
12

87.50 Sft
274.16 Sft
Say: 274.20 Sft

Material Required.
Cement for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
Cement for Surface rendering

Sand
Sand
Sand
Sand

5.57 Bags
7.10 Bags
2.52 Bags
15.19 Bags
15

Say
for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Bajri for 1:2:5
Total
Contractor's Profit & Ove 20
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

40.00 Cft
22.00 Cft
3.00 Cft
65.00 Cft
84.00 Cft
44.07 Cft
Percent

2.75 Nos
10.00 Nos
1.30 Nos
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 22

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Each

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

Item No.

d)
Detail

Material
CC 1:6:12
1x100(1'-3 \"+2'-1\")x11\"
2
2x100x4\"x1\"
Total
Deduction.
1x100x(8\"+1-3\")x8\"
2
Net Total
CC 1:2:5
1x100(8\"+1'-4\") 8\"
2
1x100x2'-1\"x4\"
Total
Deduction.
1x100x0.082
1x100(7'-3/8\"+1'-2\")x8\"
2
1x100(1'-2\"+2'-1\")x\"
2
Total
141.74 - 85.82
Net Total
Surface Rendering.
1x9.4/1x100
12
2x5x100
12
2x9x100
12

Constructing Punjab standar


concrete 1:2:5 with cement
ratio 1:6:12 complete, laid
slopes and shapes, renderin
concrete with 1:1 cement sa
thick as per Engineers Draw
Excavation).
Type IV
Unit Rate (British System)
Qty

164.73 Cft
9.38 Cft
174.11 Cft
69.35 Cft
104.76 Cft
71.60 Cft
70.14 Cft
141.74 Cft
8.20 Cft
67.20 Cft
10.42 Cft
85.82 Cft
55.92 Cft
78.33 Sft
87.50 Sft
158.33 Sft
324.16 Sft
Say: 324.16 Sft

Page 23

onstructing Punjab standard drains of cement


oncrete 1:2:5 with cement concrete bedding
atio 1:6:12 complete, laid to lines, grades,
lopes and shapes, rendering exposed surface of
oncrete with 1:1 cement sand mortar \"(6mm)
hick as per Engineers Drawing (excluding
xcavation).

nit Rate (British System) per Rft


Rate
Per Unit (Rs.)

64.73 Cft

74.11 Cft

04.76 Cft

41.74 Cft

58.33 Sft
24.16 Sft
ay: 324.16 Sft

Amount (Rs.)

d)

Type IV

Detail

Unit Rate (British System) per Rft


Qty

Material Required.
Cement for.
Cement for 1:6:12
Cement for 1:2:5
Cement for Surface rendering
Sand
Sand
Sand
Sand

6.81 Bags
8.11 Bags
2.98 Bags
17.90 Bags

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5
Total
Contractor's Profit & Ove 20
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

51.33 Cft
25.33 Cft
3.73 Cft
80.39 Cft
102.66 Cft
50.33 Cft
Percent

3.25 Nos
11.83 Nos
1.67 Nos
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 24

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Each -

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
-0.05
0
0

Say
Say
Say
Say

Item No.

e)
Detail

Constructing Punjab standard drains of


concrete 1:2:5 with cement concrete b
ratio 1:6:12 complete, laid to lines,
slopes and shapes, rendering exposed s
concrete with 1:1 cement sand mortar
thick as per Engineers Drawing (exclud
Excavation).
Type V
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-7\"+2'-3\")x10\"
2
2x100x(6\"x4\")5\"
2
Total
Deduction.
1x100x(8\"+1'-2\")x7\"
2
Net Total
CC 1:2:5
1x100(8\"+1'-6\")x1'-1\"
2
1x100x2'-3\"x4\"
Total
Deduction.
1x100x0.082
1x100(7-3/8\"+1'-5\")x11\"
2
1x100(1-5\"+2'-3\")x\"
2
Total
97.83 - 120.40
Net Total
Surface Rendering with 1:1 C/S.
Mortor \" thick.
1x9.4\"x100
12

170.44 Cft
44.01 Cft
214.45 Cft
59.24 Cft
155.21 Cft
120.75 Cft
77.08 Cft
197.83 Cft
8.20 Cft
100.48 Cft
11.72 Cft
120.40 Cft
77.43 Cft

78.33 Sft

Page 25

g Punjab standard drains of cement


2:5 with cement concrete bedding
2 complete, laid to lines, grades,
shapes, rendering exposed surface of
th 1:1 cement sand mortar \"(6mm)
r Engineers Drawing (excluding

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

e)
Detail

Type V
Unit Rate (British System) per Rft
Qty

2x5\"x100
12
2x1'-1\"x100

87.50 Sft
216.66 Sft
382.49 Sft
Say: 382.50 Sft

Total
Material Required.
Cement for.
Cement for 1:6:12
Cement for 1:2:5
Cement for Surface rendering
Sand
Sand
Sand
Sand

9.96 Bags
11.22 Bags
3.52 Bags
24.70 Bags

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5
Total
Contractor's Profit & Ove 20
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

75.00 Cft
35.00 Cft
4.40 Cft
114.40 Cft
150.15 Cft
69.70 Cft
Percent

4.00 Nos
16.00 Nos
2.20 No
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 26

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Each

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0
-.02
0.0
0.0

Say
Say
Say
Say

Item No.

f)
Detail

Material
CC 1:6:12
1x100(1'-7\"+2'-6\")x1-1\"
2
2x100x(6\"x4\")5\"
2
Total
Deduction.
1x100x(8\"+1-5 1/8\")x10\"
2
Net Total
CC 1:2:5
1x100(8\"+1'-9 1/8\")x1'-4\"
2
1x100x2'-6-1/8\"x4\"
Total
Deduction.
1x100(7'-3/8\"+1'-7 5/8\")x1'-2\"
2
1x100(1'-7 5/8\"+2'-6 1/8\")x0.75\"
2
1x100x0.082
Total
45.49 - 159.44
Net Total
Surface Rendering.
1x9.4x100
12
2x5\"x100
12
2x1'-4/12\"x100
Total

Constructing Punjab standard drains of


concrete 1:2:5 with cement concrete b
ratio 1:6:12 complete, laid to lines,
slopes and shapes, rendering exposed s
concrete with 1:1 cement sand mortar
thick as per Engineers Drawing (exclud
Excavation).
Type VI
Unit Rate (British System) per Rft
Qty

230.25 Cft
42.01 Cft
272.26 Cft
91.58 Cft
180.68 Cft
161.81 Cft
83.68 Cft
245.49 Cft
138.28 Cft
12.96 Cft
8.20 Cft
159.44 Cft
86.05 Cft
78.33 Sft
87.50 Sft
266.66 Sft
432.49 Sft
Say: 432.50 Sft

Page 27

g Punjab standard drains of cement


2:5 with cement concrete bedding
2 complete, laid to lines, grades,
shapes, rendering exposed surface of
th 1:1 cement sand mortar \"(6mm)
r Engineers Drawing (excluding

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

f)

Type VI

Detail

Unit Rate (British System) per Rft


Qty

Material Required.
Cement for.
Cement for 1:6:12
Cement for 1:2:5
Cement for Surface rendering
Sand
Sand
Sand
Sand

11.74 Bags
12.48 Bags
3.98 Bags
28.20 Bags

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5
Total
Contractor's Profit & Ove 20
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

88.53 Cft
38.98 Cft
4.97 Cft
132.48 Cft
177.07 Cft
77.45 Cft
Percent

4.55 Nos
18.50 Nos
2.50 Nos
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 28

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Each

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

Item No.

g)
Detail

Constructing Punjab standard drains of


concrete 1:2:5 with cement concrete b
ratio 1:6:12 complete, laid to lines,
slopes and shapes, rendering exposed s
concrete with 1:1 cement sand mortar
thick as per Engineers Drawing (exclud
Excavation).
Type VII
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-7\"+2'-8\")x1-4 3/8\"
2
2x100x(6\"x4\")5\"
2
Total
Deduction.
1x100x(8\"+9'-7\")1'-1 3/8\"
2
Net Total
CC 1:2:5
1x100(8\"+1'-11\")1'-6.5/8\"
2
1x100x2'-8\"x4\"
Total
Deduction.
1x100x0.082
1x100(7 3/9\"+1'-10\")1'-5\"
2
1x100(1'-10\"+2'-8\")x7/8\"
2
Total
93.99 - 203.28
Net Total
Surface Rendering with 1:1 CS mortor.
1x9.4x100
12

292.82 Cft
40.10 Cft
332.92 Cft
127.71 Cft
205.21 Cft
203.71 Cft
90.28 Cft
293.99 Cft
8.20 Cft
178.52 Cft
16.56 Cft
203.28 Cft
90.71 Cft
78.33 Sft

Page 29

g Punjab standard drains of cement


2:5 with cement concrete bedding
2 complete, laid to lines, grades,
shapes, rendering exposed surface of
th 1:1 cement sand mortar \"(6mm)
r Engineers Drawing (excluding

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

g)
Detail

Type VII
Unit Rate (British System) per Rft
Qty

2x5\"x100
12
2x1'-7/12\"x100

87.50 Sft
316.66 Sft
482.49 Sft
Say: 482.50 Sft

Material Required.
Cement for.
Cement for 1:6:12
Cement for 1:2:5
Cement for Surface rendering
Sand
Sand
Sand
Sand

13.34 Bags
13.15 Bags
4.44 Bags
30.93 Bags

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5
Total
Contractor's Profit & Ove 20
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

100.55 Cft
41.09 Cft
5.55 Cft
147.19 Cft
201.00 Cft
81.64 Cft
Percent

5.04 Nos
20.50 Nos
2.78 Nos
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 30

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Each

0.00 P. Cft
0.90 P. Cft
0.00 P. Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

-.01
-.01
-.01
-.03

Say
Say
Say
Say

Item No.

h)
Detail

Constructing Punjab standard drains of


concrete 1:2:5 with cement concrete b
ratio 1:6:12 complete, laid to lines,
slopes and shapes, rendering exposed s
concrete with 1:1 cement sand mortar
thick as per Engineers Drawing (exclud
Excavation).
Type VIII
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-7\"+2'-10 7/8\")1' 7\"
2x100x(6\"+4\")5\"
2
Total
Deduction.
1x100x(8\"+1'-9 7/8\")1'-4\"
2
Net Total
CC 1:2:5
1x100(8\"+2-1 7/8\")1'-9\"
2
1x100(2'-10 7/8\")4\"
Total
Deduction.
1x100x0.082
1x100(7 3/8\"+2'-3/8\")1'-8\"
2
1x100(2'-3/8\"+2'-10 7/8\")x\"
2
Total
6.83 - 247.05
Net Total
Surface Rendering with 1:1 CS mortor.
1x9.4/x100
12

355.43 Cft
40.10 Cft
395.53 Cft
165.97 Cft
229.56 Cft
249.95 Cft
96.88 Cft
346.83 Cft
8.20 Cft
223.42 Cft
15.43 Cft
247.05 Cft
99.78 Cft
78.33 Sft

Rate
Per Unit (Rs.)

Page 31

g Punjab standard drains of cement


2:5 with cement concrete bedding
2 complete, laid to lines, grades,
shapes, rendering exposed surface of
th 1:1 cement sand mortar \"(6mm)
r Engineers Drawing (excluding

British System) per Rft

er Unit (Rs.)

Amount (Rs.)

h)
Detail

Type VIII
Unit Rate (British System) per Rft
Qty

2x5\"x100
12
2x1'-10.1/12\"x100

87.50 Sft
375.00 Sft
540.83 Sft
Say :
540.85 Sft

Material Required.
Cement for.
Cement for 1:6:12
Cement for 1:2:5
Cement for Surface rendering
Sand
Sand
Sand
Sand

14.92 Bags
14.50 Bags
4.98 Bags
34.40 Bags

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5
Total
Contractor's Profit & Ove 20
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

112.48 Cft
45.30 Cft
6.22 Cft
164.00 Cft
250.00 Cft
90.00 Cft
Percent

5.63 Nos
22.90 Nos
3.10 Nos
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 32

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Each

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0
0.0
0.0
0.0

Say
Say
Say
Say

Item No.

i)
Detail

Constructing Punjab standar


concrete 1:2:5 with cement
ratio 1:6:12 complete, laid
slopes and shapes, renderin
concrete with 1:1 cement sa
thick as per Engineers Draw
Excavation).
Type IX
Unit Rate (British System)
Qty

Material
CC 1:6:12
1x100(1'-10 3/8\"+3'-3\")x1'-8\"
2
2x100x(7\"+4\")9\"
2
Total
Deduction.
1x100x(9 3/8\"+1'-11\")x1'-4\"
2
Net Total
CC 1:2:5
1x100(9 3/8\"+2'-6\")x2'-1\"
2
1x100(3'-3\")4\"
Total
Deduction.
1x100x0.082
1x100(7 3/8\"+2'-11/2\")x2'-\"
2
1x100(2'-2\"+3'-3\")x\"
2
Total
0.11 - 303.80
Net Total
Surface Rendering with (1:) C/S Mortar.
1x9.4/x100
12
2x6x100
12

427.99 Cft
80.30 Cft
508.29 Cft
181.22 Cft
327.07 Cft
347.45 Cft
122.66 Cft
470.11 Cft
8.20 Cft
278.41 Cft
17.19 Cft
303.80 Cft
166.31 Cft
78.33 Sft
104.17 Sft

Page 33

onstructing Punjab standard drains of cement


oncrete 1:2:5 with cement concrete bedding
atio 1:6:12 complete, laid to lines, grades,
lopes and shapes, rendering exposed surface of
oncrete with 1:1 cement sand mortar \"(6mm)
hick as per Engineers Drawing (excluding
xcavation).

nit Rate (British System) per Rft

27.99 Cft

08.29 Cft

81.22 Cft

27.07 Cft

47.45 Cft

22.66 Cft
70.11 Cft

78.41 Cft

03.80 Cft
66.31 Cft

04.17 Sft

Rate
Per Unit (Rs.)

Amount (Rs.)

i)
Detail

Type IX
Unit Rate (British System) per Rft
Qty

2x1'-10.1/12\"x100

375.00 Sft
557.50 Sft

Material Required.
Cement for.
Cement for 1:6:12
Cement for 1:2:5
Cement for Surface rendering
Sand
Sand
Sand
Sand

21.26 Bags
24.11 Bags
5.13 Bags
50.50 Bags

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5
Total
Contractor's Profit & Ove 20
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

160.26 Cft
75.34 Cft
6.41 Cft
242.01 Cft
320.53 Cft
149.68 Cft
Percent

6.66 Nos
31.91 Nos
4.03 Nos
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 34

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Each

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

Item No.

j)
Detail

Constructing Punjab standar


concrete 1:2:5 with cement
ratio 1:6:12 complete, laid
slopes and shapes, renderin
concrete with 1:1 cement sa
thick as per Engineers Draw
Excavation).
Type X
Unit Rate (British System)
Qty

Material
CC 1:6:12
1x100(1'-10\"+3'-5\")x1'-10\"
2
2x100x(8\"+4\")9\"
2
Total
Deduction.
1x100x(9\"+2'-1\")1'-6\"
2
Net Total
CC 1:2:5
1x100(9\"+2'-8\")2'-4\"
2
1x100x3'-5\"4\"
Total
Deduction.
1x100x0.082
1x100(7' 3/8\"+2'-5\")2'-2\"
1x100(2'-5\"+3'-5\")x\"
2
Total
23 - 360.49
Net Total
Surface Rendering with (1:1) Cement
Sand Mortar.

503.91 Cft
82.47 Cft
586.38 Cft
226.43 Cft
359.95 Cft
410.76 Cft
130.47 Cft
541.23 Cft
8.20 Cft
333.86 Cft
18.43 Cft
360.49 Cft
180.74 Cft
620.00 Sft

Page 35

onstructing Punjab standard drains of cement


oncrete 1:2:5 with cement concrete bedding
atio 1:6:12 complete, laid to lines, grades,
lopes and shapes, rendering exposed surface of
oncrete with 1:1 cement sand mortar \"(6mm)
hick as per Engineers Drawing (excluding
xcavation).

nit Rate (British System) per Rft

03.91 Cft

86.38 Cft

26.43 Cft

59.95 Cft

10.76 Cft

30.47 Cft
41.23 Cft

33.86 Cft

60.49 Cft
80.74 Cft

20.00 Sft

Rate
Per Unit (Rs.)

Amount (Rs.)

j)

Type X

Detail

Unit Rate (British System) per Rft


Qty

Material Required.
Cement for.
Cement for 1:6:12
Cement for 1:2:5
Cement for Surface rendering
Sand
Sand
Sand
Sand

23.40 Bags
26.20 Bags
5.70 Bags
55.30 Bags

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5
Total
Contractor's Profit & Ove 20
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

176.37 Cft
81.85 Cft
7.13 Cft
265.35 Cft
352.75 Cft
162.61 Cft
Percent

7.35 Nos
35.00 Nos
4.43 Nos
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 36

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Each

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
0
0

Say
Say
Say
Say

Item No.

k)
Detail

Constructing Punjab standar


concrete 1:2:5 with cement
ratio 1:6:12 complete, laid
slopes and shapes, renderin
concrete with 1:1 cement sa
thick as per Engineers Draw
Excavation).
Type XI
Unit Rate (British System)
Qty

Material
CC 1:6:12
1x100(1'-10\"+3'-8\")x2'-1 3/8\"
2
2x100x(8\"+4\")9\"
2
Total
Deduction.
1x100x(9\"+2'-4\")1'-9\"
2
Net Total
CC 1:2:5
1x100(9\"+2'-11\")2'-7\"
1x100x3'-8\"x4\"
Total
Deduction.
1x100x0.082
1x100(7' 3/8\"+2'-7\")2'-5\"
2
1x100(2'-7\"+3'-8\")x\"
2
Total
.27 - 428.70
Net Total
Surface Rendering with (1:1) Cement
Sand Mortar.

599.05 Cft
82.47 Cft
681.52 Cft
285.09 Cft
396.43 Cft
490.99 Cft
138.28 Cft
629.27 Cft
8.20 Cft
400.71 Cft
19.79 Cft
428.70 Cft
200.57 Cft
711.70 Sft

Page 37

onstructing Punjab standard drains of cement


oncrete 1:2:5 with cement concrete bedding
atio 1:6:12 complete, laid to lines, grades,
lopes and shapes, rendering exposed surface of
oncrete with 1:1 cement sand mortar \"(6mm)
hick as per Engineers Drawing (excluding
xcavation).

nit Rate (British System) per Rft

99.05 Cft

81.52 Cft

85.09 Cft

96.43 Cft

90.99 Cft
38.28 Cft
29.27 Cft

00.71 Cft

28.70 Cft
00.57 Cft

11.70 Sft

Rate
Per Unit (Rs.)

Amount (Rs.)

k)
Detail

Type XI
Unit Rate (British System) per Rft
Qty

Material Required.
Cement for.
Cement for 1:6:12
Cement for 1:2:5
Cement for Surface rendering
Sand
Sand
Sand
Sand

25.77 Bags
29.08 Bags
6.55 Bags
61.40 Bags

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5
Total
Contractor's Profit & Ove 20
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

194.25 Cft
91.12 Cft
8.18 Cft
293.55 Cft
388.50 Cft
180.51 Cft
Percent

8.34 Nos
38.94 Nos
4.96 Nos
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 38

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Each

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
-0.02
-0.02

Say
Say
Say
Say

Item No.

l)
Detail

Constructing Punjab standar


concrete 1:2:5 with cement
ratio 1:6:12 complete, laid
slopes and shapes, renderin
concrete with 1:1 cement sa
thick as per Engineers Draw
Excavation).
Type XII
Unit Rate (British System)
Qty

Material
CC 1:6:12
1x100(1'-10\"+3'-10\")x2'-4\"
2
2x100x(8\"+4\")9\"
2
Total
Deduction.
1x100x(9\"+2'-6\")2'-\"
2
Total
CC 1:2:5
1x100(9\"+3'-1\")2'-10\"
1x100x3'-10\"x4\"
Total
Deduction.
1x100x0.082
1x100(7' 3/8\"+2'-10\")2'-8\"
2
1x100(2'-10\"+3'-10\")x\"
2
Total
90 - 495.98
Net Total
Surface Rendering with (1:1) Cement
Sand Mortar.

681.72 Cft
84.63 Cft
766.35 Cft
338.91 Cft
427.44 Cft
557.81 Cft
146.09 Cft
703.90 Cft
8.20 Cft
466.17 Cft
21.61 Cft
495.98 Cft
207.92 Cft
765.82 Sft

Page 39

onstructing Punjab standard drains of cement


oncrete 1:2:5 with cement concrete bedding
atio 1:6:12 complete, laid to lines, grades,
lopes and shapes, rendering exposed surface of
oncrete with 1:1 cement sand mortar \"(6mm)
hick as per Engineers Drawing (excluding
xcavation).

nit Rate (British System) per Rft

81.72 Cft

66.35 Cft

38.91 Cft

27.44 Cft

57.81 Cft
46.09 Cft
03.90 Cft

66.17 Cft

95.98 Cft
07.92 Cft

65.82 Sft

Rate
Per Unit (Rs.)

Amount (Rs.)

l)
Detail

Type XII
Unit Rate (British System) per Rft
Qty

Material Required.
Cement for.
Cement for 1:6:12
Cement for 1:2:5
Cement for Surface rendering
Sand
Sand
Sand
Sand

27.78 Bags
30.15 Bags
7.05 Bags
64.98 Bags

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5
Total
Contractor's Profit & Ove 20
Total
Labour
Mason
Cooly
Bahishti
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

209.45 Cft
94.19 Cft
7.05 Cft
310.69 Cft
418.90 Cft
187.12 Cft
Percent

8.89 Nos
41.50 Nos
5.30 Nos
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 40

British System) per Rft


Rate
Per Unit (Rs.)

Amount (Rs.)

0.00 Each

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

0
0
-0.05
-0.01

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

7:

Laying RC hume pipes in positions, inc


jointing.

a)

6\" to 12\" (150 to 300mm) Dia.

Detail

t Rate (British System) per Rft/Assume


Qty
Per Unit (Rs.)

Material
Cement
Sand
Total
Contractor's Profit & Ove 20
Total
Labour for 50 Lft
Mason
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

0.25 Bags
1.20 Cft

Percent

1.00 No
4.00 Nos
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 41

ume pipes in positions, including

(150 to 300mm) Dia.

tish System) per Rft/Assumed for 40


Rate
er Unit (Rs.)
Amount (Rs.)

0.00 Each
0.00 P. Cft

0.00 P. Day
0.00 P. Day

0
0
0.25
0.87

Say
Say
Say
Say

0.25
0.85

Item No.

Laying RC hume pipes in positions, inc


jointing.
b)

12\" to 24\" (300 to 600mm) Dia.

Detail

t Rate (British System) per Rft/Assume


Qty
Per Unit (Rs.)

Material
Cement
Sand
Total
Contractor's Profit & Ove 20
Total
Labour for 50 Lft
Mason
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

0.50 Bags
2.40 Cft

Percent

1.00 No
7.00 Nos
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 42

ume pipes in positions, including

" (300 to 600mm) Dia.

tish System) per Rft/Assumed for 40


Rate
er Unit (Rs.)
Amount (Rs.)

0.00 Each
0.00 P. Cft

0.00 P. Day
0.00 P. Day

0
0
0.55
1.8

Say
Say
Say
Say

0.55
1.8

Item No.

Laying RC hume pipes in positions, inc


jointing.
c)

24\" to 36\" (600 to 900mm) Dia.

Detail

t Rate (British System) per Rft/Assume


Qty
Per Unit (Rs.)

Material
Cement
Sand
Total
Contractor's Profit & Ove 20
Total
Labour for 50 Lft
Mason
Unskilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove 20
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

0.75 Bags
3.75 Cft

Percent

2.00 No
8.00 Nos
Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 43

ume pipes in positions, including

" (600 to 900mm) Dia.

tish System) per Rft/Assumed for 40


Rate
er Unit (Rs.)
Amount (Rs.)

0.00 Each
0.00 P. Cft

0.00 P. Day
0.00 P. Day

0
0
0.8
2.62

Say
Say
Say
Say

CHAPTER NO. 12

WOOD WORK
DESCRIPTION

OF

ITEM NO.

1:

Plain wood work sawn wrough


in position including cost
Deodar Wood.

a)
Detail

Unit Rate (British System)

Material
Deodar Wood including wastage (II Class)
Nail 0.020 Kg.
Screws above 1\" long
Total
Contractor's Profit & Ove
Total

20

1.15 Cft
1.00 Dozen

Percent

Labour
Carpentre
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate Per Cft
Labour Rate Per Cum
Composite Rate Per Cft
Composite Rate Per Cum

0.63 No
0.25 No
10

Percent

20

Percent

Rs.
Rs.
Rs.
Rs.

Page 1

lain wood work sawn wrought planed & fixed


n position including cost of nails & screw
eodar Wood.

nit Rate (British System) per Cft

.00 Dozen

Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
0.00 P.
0.00 P.Doz

Cft

0.00 P. Day
0.00 P. Day

Say
Say
#####
#####

.01
.23

Say
Say

.25
.1
5

Item No.

1
b)

Plain wood work sawn wrough


in position including cost
Shisham Wood

Detail

Unit Rate (British System)

Material
Shisham wood including 15% wastage
Nail 0.023 Kg.
Screws above 1\" long
Total
Contractor's Profit & Ove
20
Total

1.15 Cft
1.00 Dozen
Percent

Labour for 1.50 Cft.


Carpenters
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total
Labour for 1 Cft.

1.00 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Cft
Labour Rate Per Cum

Rs.
Rs.

Composite Rate Per Cft


Composite Rate Per Cum

Rs.
Rs.

Page 2

lain wood work sawn wrought planed & fixed


n position including cost of nails & screw
hisham Wood

nit Rate (British System) per Cft

.00 Dozen

Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
0.00 P.
0.00 P.Doz

Cft

0.00 P. Day
0.00 P. Day

Say
Say

#####
#####

.1

.1
Say
Say

.3
10.4

DESCRIPTION

OF

ITEM NO.

2:

Plain wood work for regulat


needles etc. including sawi
wroughting wood providing &
of karries i.e. end strips
a)

Deodar Wood.

Detail

Unit Rate (British System)


Qty

Material
i) Deodar Wood
5.5x5/12x5/12 =
Wastage 15%

0.97

0.97 Cft
0.15 Cft
1.12 Cft

ii)1.6' (480mm) long iron strip 1\"


(37mm) wide x1/8\" (3mm) thick @
0.625 Lbs/ft. (0.930 Kg/Mtr).
2 Nox1' (380mm) long iron bars
\" ( 20mm) on both ends @ 1.502
Lbs/ft. (2.235 Kg/m).
Wastage

2.00 Lbs

3.80 Lbs
5.80 Lbs
0.29 Lbs
6.09Lb (2 .76)Kg
1.00 Dozen

5%

iii) Iron Screw 1\" (25mm) long


Total
Contractor's Profit & Ove
20
Total

Percent

Page 3

lain wood work for regulation karries or


eedles etc. including sawing plaining
roughting wood providing & fixing steel pa
f karries i.e. end strips and rods etc.

eodar Wood.

nit Rate (British System) per Cft

.09Lb (2 .76)Kg
.00 Dozen

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00 P. Kg
0.00 P. Doz

Detail

Unit Rate (British System)

Labour
Carpenters
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.32 No
0.25 No
10

Percent

20

Percent

Item Rates
Labour Rate Per Cft
Labour Rate Per Cum

Rs.
Rs.

Composite Rate Per Cft


Composite Rate Per Cum

Rs.
Rs.

Page 4

nit Rate (British System) per Cft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

Say
Say

.1
Say

Say

.12

.26

.25

Item No.

Plain wood work for regulat


etc. including sawing plain
providing & fixing steel pa
strips and rods etc.
b)

Shisham Wood

Detail

Unit Rate (British System)


Qty

Material
i)

ii)

Shisham Wood
5.5x5/12x5/12 =
Wastage 15%

0.97

0.97 Cft
0.15 Cft
1.12 Cft

Iron Strip
1.6' (480mm) long iron strip 1\"
(37mm) wide x1/8\" (3mm) thick @
0.625 Lbs/ft. (0.930 Kg/Mtr).
2 Nox1' (380mm) long iron bars
\" ( 20mm) on both ends @ 1.502
Lbs/ft. (2.235 Kg/m).
Wastage

5%

iii) Iron Screw 1\" (25mm) long


Total
Contractor's Profit &20
Total

Percent

2.00 Lbs

3.80 Lbs
5.80 Lbs
0.29 Lbs
6.09Lb (2 .76)Kg
1.00 Dozen

Page 5

lain wood work for regulation karries or n


tc. including sawing plaining wroughting w
roviding & fixing steel parts of karries i
trips and rods etc.

hisham Wood

nit Rate (British System) per Cft

.09Lb (2 .76)Kg
.00 Dozen

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00 P. Kg
0.00 P. Doz

Detail

Unit Rate (British System)

Labour
Carpenters
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.32 No
0.25 No
10

Percent

20

Percent

Item Rates
Labour Rate Per Cft
Labour Rate Per Cum

Rs.
Rs.

Composite Rate Per Cft


Composite Rate Per Cum

Rs.
Rs.

Page 6

nit Rate (British System) per Cft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

Say
Say

#####
#####

.12

.1
Say
Say

.2

DESCRIPTION

OF

ITEM NO

3:

First class teak wood wroug


windows etc. panelled, pane
glazed & fixed in position
fast tower bolts, chocks ru
clamps, chords with hooks,
complete (Excluding sliding
i)

Detail

Rate Analysis for


Material

4' x 6.75' =

Teak Wood
Frame
Top Rail 4'x3\"x4\"
Vertical 2x7'x3\"x4\"
Vertical Style 4x6'-6\"x4\"x2\"
Horizental Rail 2x1'-10\"x4\"x2\"
Middle Rail 2x1'-10\"x6\"x2\"
Lock Rail 2x1'-10\"x6\"x2\"
Bottom Rail 2x1'-10\"x8\"x2\"
Panells
2x14\"x22\"x\"
4x14\"x18.5\"x\"
Beading
2(14\"+14\"+22\"+22\")x5/8\"
(1 + 2)
2x8
4(14\"+14\"+18\"+18\")5/8\"
(1 + 2)
2x8
Wastage 12%

27 Sft

2\" (50mm) Thick.

Page 7

irst class teak wood wrought joinery in do


indows etc. panelled, panelled and glazed
lazed & fixed in position including chowkh
ast tower bolts, chocks rubber stop, cleat
lamps, chords with hooks, nails screws etc
omplete (Excluding sliding bolt and lock).

\" (50mm) Thick.


Unit Rate (British System) per Sft
Qty

0.45
1.33
1.46
0.20
0.20
0.31
0.42

Rate
Per Unit (Rs.)Amount (Rs.)

Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.27 Cft
0.45 Cft

0.02 Cft

0.02 Cft
5.13 Cft
0.62 Cft
5.75 Cft

0.00 P. Cft

Detail

Unit Rate (British System)

Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (225mm)
Handles 6\" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws above 1\" long
Glue
Spikes
Total
Contractor's Profit & Ove
Total for 27 Sft.

8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20
20

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.

Percent

Rate Per Sft


27
Labour
Carpenters
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.

3.00 Nos
1.25 Nos

10

Percent

20

Percent

Rate Per Sft


27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 8

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P. Kg.
P. Kg.

0.0 =

0.00 P. Day
0.00 P. Day

730.54 =

Rs.
Rs.
Rs.
Rs.

#####
#####
#####
#####

27.06

Say
Say
Say
Say

27.05
291.15
27
291.15

Item No.

First class teak wood wrought joinery


windows etc. panelled, panelled and gl
glazed & fixed in position including c
hold fast tower bolts, chocks rubber s
G.I. clamps, chords with hooks, nails
complete (Excluding sliding bolt and l
1\" (45mm) Thick.

ii)
Detail

Unit Rate (British System)


Qty

Rate Analysis for


Material

4' x 6.75'

Teak Wood
Frame
Top Rail 4'x3\"x4\"
Vertical 2x7'x3\"x4\"
Vertical Style 4x6'-6\"x4\"x1\"
Horizontal Rail
Top 2x1'-10\"x4\"x1\"
Middle 2x1'-10\"x4\"x1\"
Lock 2x1'-10\"x6\"x1\"
Bottom 2x1'-10\"x8\"x1\"
Panels
2x14\"x22\"x\"
4x14\"x18.5\"x\"
Beading
2(14\"x14\"x22\"+22\")x5/8\"
(1 + 2)
2x8
4(14\"+14\"+18.5\"+18.5\")5/8\"
(1 + 2)
2x8
Wastage 12%

27 Sft

0.45 Cft
1.33 Cft
1.25 Cft

0.18
0.18
0.27
0.36

Cft
Cft
Cft
Cft

0.27 Cft
0.44 Cft

0.01 Cft

0.02 Cft
4.76 Cft
0.57 Cft
5.33 Cft

Page 9

teak wood wrought joinery in do


. panelled, panelled and glazed
xed in position including chowkh
ower bolts, chocks rubber stop,
, chords with hooks, nails screw
xcluding sliding bolt and lock).

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

Detail

Unit Rate (British System)

Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (225mm)
Handles 6\" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws above 1\" long
Glue
Spikes
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20
20

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.

Percent

27
Labour
Carpenters
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

3.00 Nos
1.25 Nos

10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 10

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)
7462
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P. Kg.
P. Kg.

7462
1,492.4
8,954.4
331.64

8,954.4 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.

Say
Say

Rs.
Rs.

#####
#####

Say
Say

331.6
3,568.1

Item No.

First class teak wood wrought joinery


windows etc. panelled, panelled and gl
glazed & fixed in position including c
hold fast tower bolts, chocks rubber s
G.I. clamps, chords with hooks, nails
complete (Excluding sliding bolt and l
1\" (37mm) Thick.

iii)
Detail

Rate Analysis for

4' x 6.75' =

Unit Rate (British System)


Qty
27 Sft

Material
Teak Wood for Frame
Frame
Top Rail 1x4'x3\"x4\"
Vertical 2x7'x3\"x4\"
Vertical style 4x6'-6\"x4\"x1\"
Leaves
Top Rail 2x1'-10\"x4\"x1\"
Middle 2x1'-10\"x4\"x1\"
Lock 2x1'-10\"x6\"x1\"
Bottom 1x1'-10\"x8\"x1\"
Panels
2x14\"x22\"x5/8\"
4x14\"x18.5\"x5/8\"
Beading
2(14\"x14\"x22\"+22\")x5/8\"
(1 + 2)
2x8
4(14\"+14\"+18.5\"+18.5\")5/8\"
(1 + 2)
2x8
Wastage 12%

0.45 Cft
1.33 Cft
1.08 Cft

0.15
0.15
0.23
0.30

Cft
Cft
Cft
Cft

0.23 Cft
0.44 Cft

0.01 Cft

0.02 Cft
4.39 Cft
0.53 Cft
4.92 Cft

Page 11

teak wood wrought joinery in do


. panelled, panelled and glazed
xed in position including chowkh
ower bolts, chocks rubber stop,
, chords with hooks, nails screw
xcluding sliding bolt and lock).

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

Detail

Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (225mm)
Handles 6\" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws above 1\" long
Glue
Spikes
Total
Contractor's Profit & Ove
Total for 27 Sft.

Unit Rate (British System)

8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20
20

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.

Percent

Rate Per Sft


27
Labour
Carpenters
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.

3.00 Nos
1.25 Nos

10

Percent

20

Percent

Rate Per Sft


27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 12

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)
6888
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P. Kg.
P. Kg.

6888
1,377.6
8,265.6

8,265.6 =

306.13

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.

Say
Say

Rs.
Rs.

#####
#####

Say
Say

306.05
3,292.95

DESCRIPTION

OF

ITEM NO

4:

First class teak wood wroug


gauze doors & windows with
galvanized iron wire gauze
square inchs (625mm) includ
bars etc. complete :
a)
i)

Detail

Rate Analysis for

4' x 6.75'

27 Sft

Material
Teak Wood
Top Rail 1x4'x3\"x\"
Vertical 2x7'x3\"x\"
Fillet 2(15\"+15\"+25\"+25\")1\"x3/8\"
Fillet 2(15\"+15\"+19\"+19\")x\"x3/8\"
Leaf
Vertical Style 4x6'-6\"x4\"x1\"
Horizontal
Top 2x1'-10\"x1\"x1\"
Middle 2x1'-10\"x3\"x1\"
Lock 2x1'-10\"x6\"x1\"
Bottom 2x1'-10\"x6\"x1\"
Wastage 10%

Teak wood framing 1\" (45m


gauze fixed in position:
Without spring or spring hi

Page 13

irst class teak wood wrought joinery in wi


auze doors & windows with frames 22 SWG
alvanized iron wire gauze 12x12 meshes to
quare inchs (625mm) including brass fittin
ars etc. complete :

eak wood framing 1\" (45mm) thick with wir


auze fixed in position:
ithout spring or spring hinges.
Unit Rate (British System) per Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

0.04
0.15
0.02
0.03

Cft
Cft
Cft
Cft

1.27 Cft
0.06
0.07
0.27
0.27
2.18
0.22
2.40

Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

Detail

Unit Rate (British System)

Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (225mm)
Handles 6\" (150mm)
Hook & Clamps
Screws above 1\" long
Wire Gauze
2x1'-2\"x2'-1\"
4x1'-2\"x1'-7\"

6.00
2.00
2.00
2.00
2.00

4.83 Sft
7.33 Sft
12.16 Sft
1.82 Sft
13.98 Sft

Wastage 15%

Total
Contractor's Profit & Ove
Total for 27 Sft
Rate Per Sft

Nos
Nos
Nos
Nos
Doz

20

Percent

27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft
Rate Per Sft

0.50 Nos
0.25 No

10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 14

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)
3360
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz

0.00 Sft

3360
672
4,032
149.33

4,032 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

149.3
1,606.3

DESCRIPTION

OF

ITEM NO

4:

First class teak wood wroug


gauze doors & windows with
galvanized iron wire gauze
square inch (625mm) includi
bars etc. complete :

a)

Teak wood framing 1\" (45m


gauze fixed in position:
With spring or spring hinge

ii)
Detail

Rate Analysis for

4' x 6.75' =

27 Sft

Material
Teak Wood
Top Rail 1x4'x3\"x\"
Vertical 2x7'x3\"x\"
Fillet 2(15\"+15\"+25\"+25\")1\"x3/8\"
Fillet 2(15\"+15\"+19\"+19\")1\"x3/8\"
Leaf
Vertical Style = 4'x6'-6\"x4\"x1\"
Horizontal
Top 2x1'-10\"x1\"x1\"
Middle 2x1'-10\"x3\"x1\"
Lock 2x1'-10\"x6\"x1\"
Bottom 2x1'-10\"x6\"x1\"
Wastage 10%

Page 15

irst class teak wood wrought joinery in wi


auze doors & windows with frames 22 SWG
alvanized iron wire gauze 12x12 meshes to
quare inch (625mm) including brass fitting
ars etc. complete :

eak wood framing 1\" (45mm) thick with wir


auze fixed in position:
ith spring or spring hinges.
Unit Rate (British System) per Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

0.04
0.15
0.02
0.03

Cft
Cft
Cft
Cft

1.27 Cft
0.06
0.07
0.27
0.27
2.18
0.22
2.40

Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

Detail

Unit Rate (British System)

Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (225mm)
Handles 6\" (150mm)
Hook & Clamps
Screws / Nail
Spring Hings
Wire Gauze
2x1'-2\"x2'-1\" =
4x1'-2\"x1'-7\" =

6.00
2.00
2.00
2.00
2.00
2.00

4.83 Sft
7.33 Sft
12.16 Sft
1.22 Sft
13.38 Sft

Wastage 10%

Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

Nos
Nos
Nos
Nos
Doz
Nos

20

Percent

27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

0.50 Nos
0.25 No

10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 16

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz
Each

0.00 Sft

3,986.8
147.66

3,986.8 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

147.65
1,588.8

Item No.

First class teak wood wroug


gauze doors & windows with
galvanized iron wire gauze
square inch (625mm) includi
bars etc. complete:
b)
i)
Detail

Rate Analysis for

4' x 6.75'

27 Sft

Material
Ist Class Teak Wood
Vertical Style 4x6'-6\"x4\"x1\"
Horizontal
Top Rail 2x1-10\"x3\"x1\"
Middle 2x1-10\"x1\"x1\"
Lock 2x1'-10\"x6\"x1\"
Bottom 2x1'-10\"x6\"x1\"
Fillet 2(15\"+15\"+25\"+25\")\"x3/8\"
Fillet 2(15\"+15\"+19\"+19\")\"x3/8\"
Top Rail 1x4'x3\"x\"
Vertical Rail 2x7'x3\"x\"
Wastage 10%
Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (225mm)
Handles 6\" (150mm)
Hook & Clamps
Screws / Nail

Teak wood framing 1\" (40m


gauze fixed in position.
Without spring or spring hi

Page 17

irst class teak wood wrought joinery in wi


auze doors & windows with frames 22 SWG
alvanized iron wire gauze 12x12 meshes to
quare inch (625mm) including brass fitting
ars etc. complete:

eak wood framing 1\" (40mm) thick with wir


auze fixed in position.
ithout spring or spring hinges.
Unit Rate (British System) per Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

1.09 Cft

0.12
0.06
0.24
0.24
0.02
0.03
0.05
0.15
2.00
0.20
2.20
6
2
2
2
2

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Nos
Nos
Nos
Nos
Doz

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz

Detail

Unit Rate (British System)


Qty

Wire Gauze
2x1'-2\"x2'-1\"
4x1'-2\"x1'-7\"

4.83 Sft
7.33 Sft
12.16 Sft
1.82 Sft
13.98 Sft

Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.

20

Percent

Rate Per Sft


27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.

0.50 Nos
0.25 No

10

Percent

20

Percent

Rate Per Sft


27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 18

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.

Say
Say

Rs.
Rs.

#####

Say
Say

Item No.

First class teak wood wroug


gauze doors & windows with
galvanized iron wire gauze
square inch (625mm) includi
bars etc. complete:
b)

Teak wood framing 1\" (40m


gauze fixed in position.
With spring or spring hinge

ii)
Detail

Rate Analysis for

4' x 6.75'

27 Sft

Material
Ist Class Teak Wood
Vertical Style 4x6-6\"x4\"x1\"
Horizontal
Top Rail 2x1'-10\"x3\"x1\"
Middle 2x1'-10\"x1\"x1\"
Lock 2x1'-10\"x6\"x1\"
Bottom 2x1'-10\"x6\"x1\"
Fillet 2(15\"+15\"+25\"+25\")\"x3/8\"
Fillet 2(15\"+15\"+19\"+19\")\"x3/8\"
Top Rail 1x4'x3\"x\"
Vertical Rail 2x7'x3\"x\"
Wastage 10%
Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (225mm)
Handles 6\" (150mm)
Hook & Clamps
Screws / Nail
Spring hings

Page 19

irst class teak wood wrought joinery in wi


auze doors & windows with frames 22 SWG
alvanized iron wire gauze 12x12 meshes to
quare inch (625mm) including brass fitting
ars etc. complete:

eak wood framing 1\" (40mm) thick with wir


auze fixed in position.
ith spring or spring hinges.
Unit Rate (British System) per Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

1.09 Cft

0.12
0.06
0.24
0.24
0.02
0.03
0.05
0.15
2.00
0.20
2.20
6
2
2
2
2
2

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Nos
Nos
Nos
Nos
Doz
Nos

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Doz
Each

Detail

Unit Rate (British System)

Wire Gauze
2x1'-2\"x2'-1\"
4x1'-2\"x1'-7\"

4.83 Sft
7.33 Sft
12.16 Sft
1.82 Sft
13.98 Sft

Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.

20

Percent

Rate Per Sft


27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.

0.50 Nos
0.25 No

10

Percent

20

Percent

Rate Per Sft


27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 20

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.

Say
Say

Rs.
Rs.

#####

Say
Say

Item No.

First class teak wood wroug


gauze doors & windows with
galvanized iron wire gauze
square inch (625mm) includi
bars etc. complete:

Rate Analysis for

c)

G.I. Wire gauze 22 SWG 12x1


Inch (25mm) fixed to chowkh
teak wood strips and screws

Detail

Unit Rate (British System)


Qty

3' x 4'

12

Sft

Material
Teak Wood
Horizontal Strips 2x3'x3\"x\"
Vertital Strips 2x3.5'x3\"x\"

0.09 Cft
0.11 Cft
0.2 Cft
0.03 Cft
0.23 Cft
12 Sft
1.2 Sft
13.20 Sft

Wastage 15%
Wire gauze =
Wastage 10%

1x3x4

Fitting
Screws above 1\" long
Nail
Total
Contractor's Profit & Ove
Total for 12 Sft.

2.00 Doz
0.07 Kg.

20

Percent

Rate Per Sft


12

Page 21

irst class teak wood wrought joinery in wi


auze doors & windows with frames 22 SWG
alvanized iron wire gauze 12x12 meshes to
quare inch (625mm) including brass fitting
ars etc. complete:

.I. Wire gauze 22 SWG 12x12 meshes per Sq


nch (25mm) fixed to chowkhat with \" (20mm
eak wood strips and screws.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cf -

0.00 Sft

0.00 Doz
0.00 P. Kg -

5.28

5.28
1.06
6.34
6.34 =

.53

Detail

Unit Rate (British System)


Qty

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 12 Sft.

0.40 No
0.20 No
10

Percent

20

Percent

Rate Per Sft


12
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 22

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.55
5.7

Item No.

Rate Analysis for

First class teak wood wroug


gauze doors & windows with
galvanized iron wire gauze
square inch (625mm) includi
bars etc. complete:
d)

G.I. Wire gauze 22 SWG 12x1


Inch (25mm) fixed with \"
wood strips and screws.

Detail

Unit Rate (British System)


Qty

4' x 2'

8 Sft

Material
Teak Wood
Horizontal Rail 2x4'x2\"x2\"
Vertital Rail 2x2'x2\"x2\"
Strip Rail 2x4'x2\"x2\"
Strips Rail 2x1 2/3'x2\"x2\"
Moulding

0.22
0.11
0.05
0.03
0.15
0.56
0.09
0.65

Wastage 15%

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

Wire gauze 12x12 meshes/Sq. in (25mm)


Area 4x2 = 8 Sft.
Wastage 10%
Fitting
Screws
Nail
Wooden Plug
Total
Contractor's Profit & Ove
Total for 8 Sft

8.00 Sft
0.80 Sft
8.80 Sft
2.00 Doz
0.07 Doz
6.00 Nos
20

Percent

Rate Per Sft


8

Page 23

irst class teak wood wrought joinery in wi


auze doors & windows with frames 22 SWG
alvanized iron wire gauze 12x12 meshes to
quare inch (625mm) including brass fitting
ars etc. complete:

.I. Wire gauze 22 SWG 12x12 meshes per Sq


nch (25mm) fixed with \" (12mm) teak
ood strips and screws.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cf -

0.00 Sft

0.00 P. Do 0.00 P. Do 0.00 Each

3.6 =

3
3
.6
3.6
.45

Detail

Unit Rate (British System)


Qty

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 8 Sft.

0.25 No
0.125 No
10

Percent

20

Percent

Rate Per Sft

0.0
8

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Rs.
Rs.
Rs.
Rs.

Page 24

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

Say
Say
Say
Say

.05

.05
.45
4.95

DESCRIPTION

OF

ITEM NO

5:

Detail

Rate Analysis for

4' x 2'

8 Sft

Material
Teak Wood
Cover moulding/ Strips.
2x2'x1/12'x3/12' 0.08 Cft
2x3x10/12'x1/12'x3/12' 0.16 Cft
Wastage 15%
Expended Metal
4'x2' 8.00 Sft
Wastage 5%
Nail and Screw
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft

20

Percent

10

Percent

20

Percent

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 25

Providing and fixing expanded metal \" to


(12mm to 20mm) mesh 16 gauze fixed to
chowkhat with 1\" (25mm) teak wood strips an
screws etc. complete.
Unit Rate (British System) per Sft
Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.24 Cft
0.04 Cft
0.28 Cft

0.00 P. Cft

0.40 Sft
8.40 Sft
2.00 Doz

0.00 Sft
0.00 P. Doz

0.00 P. Day
0.00 P. Day

0.0 8

0.25 No
0.25 No

0.0
8
Rs.
Rs.
Rs.
Rs.

Say
Say

Say
#####

Say

DESCRIPTION

OF

ITEM NO

6:

Detail

Rate Analysis

for

4' x 3'

12 Sft

Material
Teak Wood Frame
2Nox4'x2\"x2\" 0.23 Cft
2Nox3'x2\"x2\" 0.17 Cft
Moulding 13 2/3x1/12x2/12
Wastage 15%
Expanded Metal
1'x4'x3' 12.00 Sft
Wastage 5%
Nail and Screw
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft

20

Percent

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 26

Providing and fixing expanded metal \" to


(12mm to 20mm) mesh 16 gauze fixed to chowk
with 1\" (25mm) cover moulding & screws
including teak wood frame 2\"x2\" (50x50mm).
Unit Rate (British System) per Sft
Qty

0.20
0.60
0.09
0.69

Rate
Per Unit (Rs.)Amount (Rs.)

Cft
Cft
Cft
Cft

0.00 P. Cft

0.60 Sft
12.60 Sft
L.S.

0.00 Sft

9.6 12
0.50 No
0.25 No

=
0.00 P. Day
0.00 P. Day

.01

12
Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.01

8
8
1.6
9.6
.8
.01
0.0

.8
8.6

DESCRIPTION

OF

ITEM NO

7:

First class deodar wood wro


windows etc. panelled or pa
glazed fixed in position in
fast, hinges, tower bolt ru
handles and chord with hook
(excluding sliding bolts or
a)

2\" (50mm) thick.

Detail

Rate Analysis
Material

for

4' x 6.75'

27 Sft

Top Rail 4x3\"x4\"


Vertical Rail 2x7'x3\"x4\"
Vertical Style 4x6'x6\"x4\"x2\"
Horizotal Style 2x1'-10\"x4\"x2\"
Middle Style 2x1'-10\"x4\"x2\"
Middle Style 2x1'-10\"x4\"x2\"
Bottom Style 2x1'-10\"x8\"x2\"
Panells
2'x14\"x22\"x\"
4'x14\"x18.5\"x\"
Beading
2(14\"+14\"+22\"+22\")5/8\"(1\"+2\")
2x8
4(14\"+18.5\"+18.5\")5/8\"(1\"+2\")
2x8
Wastage 15%

Page 27

irst class deodar wood wrought joinery in


indows etc. panelled or panelled or glazed
lazed fixed in position including chowkhat
ast, hinges, tower bolt rubber stop cleats
andles and chord with hooks etc. complete
excluding sliding bolts or lock)

\" (50mm) thick.


Unit Rate (British System) per Sft
Qty

0.45
1.33
1.46
0.20
0.20
0.31
0.42

Rate
Per Unit (Rs.)Amount (Rs.)

Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.27 Cft
0.45 Cft

0.02 Cft
0.02 Cft
5.13 Cft
0.77 Cft
5.90 Cft

0.00 P. Cft

Detail

Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (225mm)
Handles 6\" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws / Nail
Glue
Spikes
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

Unit Rate (British System)

8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20
20

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.

Percent

27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

3.00 Nos
1.00 No
10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 28

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
Doz
P. Kg.
P. Kg.

0.00 P. Day
0.00 P. Day

0.0 =

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####
#####
#####

Say
Say
Say
Say

Item No.

First class deodar wood wrought joiner


windows etc. panelled or panelled or g
glazed fixed in position including cho
fast, hinges, tower bolt rubber stop c
handles and chord with hooks etc. comp
(excluding sliding bolts or lock)
b)

1\" (45mm) thick.

Detail

Rate Analysis

for

4' x 6.75' =

Unit Rate (British System)


Qty
27 Sft

Material
Top Rail 4x3\"x4\"
Vertical Rail 2x7'x3\"x4\"
Vertical Style 4x6-6\"x4\"x1\"

0.45 Cft
1.33 Cft
1.25 Cft

Horizontal Rail
Top 2x1'-10\"x4\"x1\"
Middle 2x1'-10\"x4\"x1\"
Lock 2x1'-10\"x6\"x1\"
Bottom 2x1'-10\"x8\"x1\"
Panells
2'x14\"x22\"x\"
4'x14\"x18.5\"x\"

0.18
0.18
0.27
0.36

Cft
Cft
Cft
Cft

0.27 Cft
0.44 Cft

Beadings
2(14\"+14\"+22\"+22\")5/8\" (1\"+2\")

0.01 Cft
2x8

4(14\"+14\"+18.5\"+18.5\")5/8\"(1\"+2\")

0.02 Cft
2x8

Wastage 15%

4.76 Cft
0.71 Cft
5.47 Cft

Page 29

deodar wood wrought joinery in


. panelled or panelled or glazed
d in position including chowkhat
s, tower bolt rubber stop cleats
chord with hooks etc. complete
sliding bolts or lock)

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

Detail

Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (225mm)
Handles 6\" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws / Nail
Glue
Spikes
Total for 27 Sft.
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

Unit Rate (British System)

8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20
20

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.

Percent

27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

3.00 Nos
1.00 No
10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 30

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
Doz
P. Kg.
P. Kg.

0.0 =

.01

0.00 P. Day
0.00 P. Day

.01
0.0

.01 =

Rs.
Rs.
Rs.
Rs.

Say
#####
#####
#####

Say
Say
Say

.1

Item No.

First class deodar wood wrought joiner


windows etc. panelled or panelled or g
glazed fixed in position including cho
fast, hinges, tower bolt rubber stop c
handles and chord with hooks etc. comp
(excluding sliding bolts or lock)
c)

1\" (40mm) thick.

Detail

Rate Analysis

for

4' x 6.75'

Unit Rate (British System)


Qty
=

27 Sft

Material
Top Rail 1x4x3\"x4\"
Vertical Rail 2x7x3\"x4\"
Vertical Style 4x6'-6\"x4\"x1\"

0.45 Cft
1.33 Cft
1.20 Cft

Horizontal Rail
Top 2x1'-10\"x4\"x1\"
Middle 2x1'-10\"x4\"x1\"
Lock 2x1'-10\"x6\"x1\"
Bottom 2x1'-10\"x8\"x1\"
Panells
2'x14\"x22\"x\"x5/8\"
4'x14\"x18.5\"x5/8\"

0.15
0.15
0.23
0.30

Cft
Cft
Cft
Cft

0.22 Cft
0.44 Cft

Beadings
2(14\"+14\"+22\"+22\")5/8\"(1\"+2\")

0.01 Cft
2x8

4(14\"+14\"+18.5\"+18.5\")5/8\"(1\"+2\")

0.02 Cft
2x8

Wastage 15%

4.50 Cft
0.68 Cft
5.18 Cft

Page 31

deodar wood wrought joinery in


. panelled or panelled or glazed
d in position including chowkhat
s, tower bolt rubber stop cleats
chord with hooks etc. complete
sliding bolts or lock)

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

Detail

Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (225mm)
Handles 6\" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws / Nail
Glue
Spibes
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

Unit Rate (British System)

6.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20
20

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.

Percent

27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

3.00 Nos
1.00 No
10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 32

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
Doz
P. Kg.
P. Kg.

0.00 P. Day
0.00 P. Day

0.0 =

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

8:

Deodar wood framed braced a


windows complete with iron
position including chowkhat

a)

2\"(55mm) thick with 1\"(

Detail

Unit Rate (British System)


Qty

Rate Analysis

for

3' x 7'

21 Sft

Material
Deodar Wood
Top Rail 1x3x3\"x4\"
Vertical Rail 2x7\"x3\"x4\"

0.35 Cft
1.36 Cft

Leaf
Plank 1x2 2/12x6 17/24x1/12
Battens 3x2x1/3'x3/8'x5/8'
Braces 2x3 47/48x3/8x5/8

1.44
0.27
0.31
3.73
0.56
4.29

Wastage 15%
Fitting
Hinges 10\" (250mm)
Tower Bolts 9\" (225mm)
Bolts 8\" (200mm) with staple for pad
lock.
Wrought Iron hold fast
Hinges chocks 4\" (100mm)
Door stop 6\" (150mm)
Handles 6\" (150mm)
Screws above 1\" long
Nails of sorts
Total
Contractor's Profit & Ove
20
Total for 21 Sft.

Cft
Cft
Cft
Cft
Cft
Cft

3.00 Nos
1.00 No
1.00
6.00
1.00
1.00
2.00
2.00
0.06
Percent

Rate Per Sft


21

No
Nos
No
No
Nos
Doz
Kg

Page 33

eodar wood framed braced and battened door


indows complete with iron fitting & fixed
osition including chowkhat.

\"(55mm) thick with 1\"(32mm) thick planks

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cf 0.00 Each 0.00 Each 0.00


0.00
0.00
0.00
0.00
0.00
0.00

0.0 =

Each
Each
Each
Each
Each
Doz
P. Kg

Detail

Unit Rate (British System)


Qty

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 21 Sft.
Rate Per Sft

2.50 Nos
1.00 No
10

Percent

20

Percent
0.0
21

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm

Rs.
Rs.

Composite Rate Per Sft


Composite Rate Per Sqm

Rs.
Rs.

Page 34

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

.01

#####
#####
Say
Say

Say
Say

.1
1

Item No.

Deodar wood framed braced a


windows complete with iron
position including chowkhat
b)

1\" (45mm) thick with 1\"


planking.

Detail

Unit Rate (British System)


Qty

Rate Analysis
Material

for

3' x 6.5'

19.5 Sft

Deodar Wood
Top Rail 1x3'x'x3/8
Vertical Rail 2x6'xx3/8
Leaf Plank 1x2 7/12x6 5/24x 1/16
Ledges 2x3 13/20x1/3x1/12
Braces 2x3 13/20x1/3x1/12
Wastage 15%
Fitting
Hinges 5\" (125mm)
Tower Bolts 9\" (225mm)
Wrought Iron hold fast
Hinges chocks 4\" (100mm)
Door stops 6\" (150mm)
Handles 6\" (150mm)
Screws above 1\" long
Nails of sorts
Total
Contractor's Profit & Ove
Total for 19.5 Sft.
Rate Per Sft

20

0.35
1.17
1.00
0.20
0.20
2.92
0.44
3.36

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

3.00
3.00
4.00
1.00
1.00
2.00
2.00
0.06

Nos
Nos
Nos
No
No
Nos
Doz
Kg

Percent

19.5

Page 35

eodar wood framed braced and battened door


indows complete with iron fitting & fixed
osition including chowkhat.

\" (45mm) thick with 1\" (25mm) battens and

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cf 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0 =

Each
Each
Each
Each
Each
Each
P. Do
P. Kg

Detail

Unit Rate (British System)


Qty

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 19.5

2.00 Nos
1.00 No
10

Percent

20

Percent

Rate Per Sft


Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.0
19.5
Rs.
Rs.
Rs.
Rs.

Page 36

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

#####
#####

Say
Say
Say
Say

.7
7.2

DESCRIPTION

OF

ITEM NO

9:

1\" (25mm) thick battened d


in position complete with i
chowkhat.

Detail

Unit Rate (British System)


Qty

Rate Analysis

for

100 Sft

Material
Deodar Wood
T. Hinges 6\" (150mm)
Tower bolt 6\" (150mm)
Stops
Nails 0.063 Kg.
Screws
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

9.50
4.00
2.00
2.00

Cft
Nos
Nos
Nos

2.00 Dozen
20

Percent

100
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.

16.00 Nos
3.00 Nos
10

Percent

20

Percent

Rate Per Sft


100
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 37

\" (25mm) thick battened doors and windows


n position complete with iron fittings wit

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00
0.00
0.00

.00 Dozen

Cft
Each
Each
Each
Kg.
P. Doz

0.00 P. Day
0.00 P. Day

0.0 =

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

10:

Deodar battened ledged & br


windows 2\" (56mm) thick (
ledge braces and 1\" thick
iron fittings chowkhats and

Detail

Unit Rate (British System)


Qty

Rate Analysis

for

3' x 6.5' =

19.5 Sft

Material
Deodar Wood
Chowkhat 2x6'x3\"x4\"
1x3\"x3\"x4\" 0.19 Cft
Leaf Batten 1x2'-7\"x6\"-3\"x1/12
Styles 3x2'-5\"x4\"-1\"
Braces 2x3.0\"x4\"x1\"

1.30 Cft

Wastage 15%
Fitting
Hinges Chocks 4\" (100mm)
Door Stop 6\" (150mm)
Tower Bolts 9\" (225mm)
Tower Hinges 8\" (200mm)
Wrought Iron hold fast
Hasp and staple
Handles 2.00 Nos
Screws above 1' long
Nails of sorts
Total
Contractor's Profit & Ove
Total for 19.5 Sft
Rate Per Sft

1.35
0.26
0.20
3.30
0.50
3.80

Cft
Cft
Cft
Cft
Cft
Cft

1.00
1.00
2.00
2.00
4.00
1.00

No
No
Nos
Nos
Nos
No

2.00 Doz
0.13 Kg
20

Percent
2,237.69
19.5

Page 38

eodar battened ledged & braced doors and


indows 2\" (56mm) thick (1\" (30mm) thick
edge braces and 1\" thick battens complete
ron fittings chowkhats and fixed in positi

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
Each
P. Doz
P. Kg

2,237.69
114.75

Detail

Unit Rate (British System)


Qty

Labour
Carpenters
Skilled Cooly
Total
Sundries
10
Total
Contractor's Profit &20
Total for 19.5 Sft.

2.50 Nos
1.00 No

Percent
Percent

Rate Per Sft

0.0
19.5

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm

Rs.
Rs.

Composite Rate Per Sft


Composite Rate Per Sqm

Rs.
Rs.

Page 39

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

Say
Say

#####
#####

.05

.05

Say
Say

114.75
1,234.75

DESCRIPTION

OF

ITEM NO

11:

i)
Detail

Deodar wood framed with bra


G.I. Sheet facing including
beading, hinges and locking
Directed by the Engineer In
G.I. Sheet facing one side
Unit Rate (British System)
Qty

Rate Analysis for

8' x 8'

64 Sft

Material
Deodar Wood
22 gauge G.I. Plain sheet
Wastage 10%

7.00 Cft
64.00 Sft
6.40 Sft
70.40 Sft
6.00 Nos
3.00 Doz
1.00 No

Hold fast with pivots & clamp


Screws above 1\" long
Sliding bolts 18\" (450mm) long
Nails 0.23 Kg
Total
Contractor's Profit &20
Total for 64 Sft.
Rate Per Sft

Percent

64
Labour
Carpenters
Skilled Cooly
Total
Sundries
10
Total
Contractor's Profit &20
Total for 64 Sft.
Rate Per Sft

3.50 Nos
1.50 Nos

Percent
Percent

64
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 40

eodar wood framed with braces and 22 SWG


.I. Sheet facing including hold fast, wood
eading, hinges and locking arrangement, as
irected by the Engineer Incharge.
.I. Sheet facing one side

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Cft

0.00
0.00
0.00
0.00
0.00

Sft
Each
P. Doz
Each
P.
Kg

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.05

DESCRIPTION

OF

ITEM NO

11:

ii)
Detail

Deodar wood framed with bra


G.I. Sheet facing including
beading, hinges and locking
Directed by the Engineer In
G.I. Sheet facing on both s
Unit Rate (British System)
Qty

Rate Analysis

for

8' x 8'

64 Sft

Material
Deodar Wood
22 gauge G.I. Plain sheet
Wastage 10%
Hold fast with pivots & clamp
Screws above 1\" long
Sliding bolts 1\" (450 mm) long
Nails 0.47 Kg
Total
Contractor's Profit &20
Percent
Total for 64 Sft.
Rate Per Sft

7.00 Cft
128.00 Sft
12.80 Sft
140.80 Sft
6.00 Nos
3.00 Doz
1.00 No

64
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total

4.00 Nos
1.50 Nos
10

Percent

Contractor's Profit &20


Total for 64 Sft.
Rate Per Sft

Percent

64
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 41

eodar wood framed with braces and 22 SWG


.I. Sheet facing including hold fast, wood
eading, hinges and locking arrangement, as
irected by the Engineer Incharge.
.I. Sheet facing on both side.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00

28.00 Sft

40.80 Sft

Sft
Each
P. Doz
Each
P.

Kg

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say

Say

Say

.05

.05
.05

Item No.

11

Partal wood frame with brac


Sheet facing including hold
hinges and locking arrangem
Engineering incharge.
G.I. Sheet facing one side

i)
Detail

Unit Rate (British System)


Qty

Rate Analysis

for

8' x 8'

64 Sft

Material
Partal Wood
22 gauge G.I. Plain sheet
Wastage 10%
Hold fast with pivots & clamp
Screws above 1\" long
Sliding bolts 1\" (450 mm) long
Nails 0.23 Kg
Total
Contractor's Profit &20
Percent
Total for 64 Sft.
Rate Per Sft

7.00 Cft
64.00 Sft
6.40 Sft
70.40 Sft
6.00 Nos
3.00 Doz
1.00 No

64
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total

3.50 Nos
1.50 Nos

10

Percent

Contractor's Profit &20


Total
Rate Per Sft

Percent

64
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 42

artal wood frame with braces & 22 SWG G.I.


heet facing including hold fast wooden bea
inges and locking arrangement as directed
ngineering incharge.
.I. Sheet facing one side

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00

Sft
Each
P. Doz
Each
P.
Kg

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####

Say
Say
Say
Say

Item No.

11

ii)

Partal wood frame with brac


Sheet facing including hold
hinges and locking arrangem
Engineering incharge.
G.I. Sheet facing on both s

Detail

Unit Rate (British System)


Qty

Rate Anaylsis

for

8' x 8'

64 Sft

Material
Partal Wood
22 gauge G.I. Plain sheet
Wastage 10%
Hold fast with pivots & clamp
Screws above 1\" long
Sliding bolts 18\" (450 mm) long
Nails 0.47 Kg
Total
Contractor's Profit &20
Percent
Total for 64 Sft.
Rate Per Sft

7.00 Cft
128.00 Sft
12.80 Sft
140.80 Sft
6.00 Nos
3.00 Doz
1.00 No

64
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total

4.00 Nos
1.50 Nos
10

Percent

Contractor's Profit &20


Total for 64 Sft.
Rate Per Sft

Percent

64
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 43

artal wood frame with braces & 22 SWG G.I.


heet facing including hold fast wooden bea
inges and locking arrangement as directed
ngineering incharge.
.I. Sheet facing on both side

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00

28.00 Sft

40.80 Sft

Sft
Each
P. Doz
Each
P.

Kg

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say

Say

Say

.05

.05
.05

DESCRIPTION

OF

ITEM NO

12:

First class deodar wood wrought joiner


wire gauze doors and windows with 22 S
galvanized wire gauze 12x12 mashes per
inch (625mm) including iron fittings c

a)

Deodar framing 1\" (45mm) with wire g


fixed in position.
Without Springs or Spring Hinges.

i)
Detail

Unit Rate (British System)


Qty

Rate Analysis
Material

for

4' x 6.75'

Deodar Wood Frame


Top Rail 1x4x3\"x\"
Vertical Rail 2x7x3\"x\"
Fillet 2(15+15+25+25)x3/8
Leaves 2(15+15+19+19)x3/8
Vertical Style
4x6'-6\"x4\"x1
Horizontal
Top 2x1'-10\"x3\"x1\"
Middle 2x1'-10\"x1\"x1\"
Lock 2x1'-10\"x6\"x1\"
Bottom 2x1'-10\"x6\"x1\"
Wastage 10%
Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (225mm)
Handles 6\"
Hook & Clamp
Screws / Nails

27 Sft

0.04
0.15
0.02
0.03

Cft
Cft
Cft
Cft

1.27 Cft
0.07
0.06
0.27
0.27
2.18
0.22
2.40

Cft
Cft
Cft
Cft
Cft
Cft
Cft

6.00
2.00
2.00
2.00
2.00

Nos
Nos
Nos
Nos
Doz

Page 44

deodar wood wrought joinery wor


doors and windows with 22 SWG
wire gauze 12x12 mashes per squa
) including iron fittings comple

ing 1\" (45mm) with wire gauge

ings or Spring Hinges.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz

Detail

Unit Rate (British System)


Qty

Wire Gauge
2x1'-2\"x2'-1\"
4x1'-2\"x1'-7\"

4.83 Sft
7.33 Sft
12.16 Sft
1.82 Sft
13.98 Sft

Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Percent

27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

1.50 Nos
0.75 No

10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 45

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

12

First class deodar wood wrought joiner


wire gauze doors and windows with 22 S
galvanized wire gauze 12x12 mashes per
inch (625mm) including iron fittings c
a)

Deodar wood framing 1\" (45mm) thick


wire gauge fixed in position.
With Springs & Spring Hinges.

ii)
Detail

Rate Analysis

for

4' x 6.75'

Unit Rate (British System)


Qty
=

27 Sft

Material
Deodar Wood Frame
Top Rail 1x4'x3\"x\"
Vertical Rail 2x7'x3\"x\"
Fillet 2(15\"+15\"+25\"+25\")\"x3/8\"
Leaves 2(15\"+15\"+19\"+19\")\"x3/8\"
Vertical Style
4x6'-6\"x4\"x1\"
Horizontal
Top 2x1'-10\"x3\"x1\"
Middle 2x1'-10\"x1\"x1\"
Lock 2x1'-10\"x6\"x1\"
Bottom 2x1'-10\"x6\"x1\"
Wastage 10%
Fitting
Hinges 4\" (100mm)
Tower Bolts
Handles 6\" (150mm)
Hook & Clamp
Screws / Nails
Spring Hinges

0.04
0.15
0.02
0.03

Cft
Cft
Cft
Cft

1.27 Cft
0.07
0.06
0.27
0.27
2.18
0.22
2.40

Cft
Cft
Cft
Cft
Cft
Cft
Cft

6.00
2.00
2.00
2.00
2.00
2.00

Nos
Nos
Nos
Nos
Doz
Nos

Page 46

deodar wood wrought joinery wor


doors and windows with 22 SWG
wire gauze 12x12 mashes per squa
) including iron fittings comple

framing 1\" (45mm) thick with


fixed in position.
s & Spring Hinges.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz
Each

Detail

Unit Rate (British System)


Qty

Wire Gauge
2x1'-2\"x2'-1\"
4x1'-2\"x1'-7\"

4.83 Sft
7.33 Sft
12.16 Sft
1.82 Sft
13.98 Sft

Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Percent

27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

1.50 Nos
0.75 No

10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 47

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.

Say
Say

Rs.
Rs.

#####

Say
Say

Item No.

12

First class deodar wood wrought joiner


wire gauze doors and windows with 22 S
galvanized wire gauze 12x12 mashes per
inch (625mm) including iron fittings c
b)

Deodar Wood framing 1\" (40mm) thick


wire gauze fixed in position.
Without Springs as Spring Hinges.

i)
Detail

Rate Analysis

for

4'x6.75' =

Unit Rate (British System)


Qty
27 Sft

Material
1st Class Deodar Wood
Vertical Style 4x6'-6\"x4\"x1\"
Horizontal
Top 2x1'-10\"x3\"x1\"
Middle 2x1'-10\"x1\"x1\"
Lock 2x1'-10\"x6\"x1\"
Bottom 2x1'-10\"x6\"x1\"
Fillets 2(15\"+15\"25+25) x 3/8
Frame 4(15\"+15\"19+19) x 3/8
Top Rail 1x4x3\"x1\"
Vertical Rail 2x7x3\"x1\"
Wastage 10%
Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (228mm)
Handles 6\" (150mm)
Hook & Clamp
Screws / Nails

1.09 Cft

0.12
0.06
0.24
0.24
0.02
0.03
0.05
0.15
2.00
0.20
2.20

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

6.00
2.00
2.00
2.00
2.00

Nos
Nos
Nos
Nos
Doz

Page 48

deodar wood wrought joinery wor


doors and windows with 22 SWG
wire gauze 12x12 mashes per squa
) including iron fittings comple

framing 1\" (40mm) thick with


fixed in position.
ings as Spring Hinges.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz

Detail

Unit Rate (British System)

Wire Gauge
2x1'-2\"x2'-1\"
4x1'-2\"x1'-7\"

4.83 Sft
7.33 Sft
12.16 Sft
1.82 Sft
13.98 Sft

Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Percent

27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

1.50 Nos
0.75 No

10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 49

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

12

First class deodar wood wrought joiner


wire gauze doors and windows with 22 S
galvanized wire gauze 144 mashes per s
inch (625mm) including iron fittings c
b)

Deodar Wood framing 1\" (40mm) thick


wire gauze fixed in position.
With Springs as Spring Hinges.

ii)
Detail

Rate Analysis

for

4'x6.75' =

Unit Rate (British System)


Qty
27 Sft

Material
1st Class Deodar Wood
Vertical Style 4x6'-6\"x4\"x1\"
Horizontal
Top 2x1'-10\"x3\"x1\"
Middle 2x1'-10\"x1\"x1\"
Lock 2x1'-10\"x6\"x1\"
Bottom 2x1'-10\"x6\"x1\"
Fillets 2(15\"+15\"25+25) x 3/8
Top Rail 1x4'x3\"x1\"
Vertical Rail 2x7'x3\"x1\"
Wastage 10%
Fitting
Hinges 4\" (100mm)
Tower Bolts 9\" (228mm)
Handles 6\" (150mm)
Hook & Clamp
Screws / Nails
Spring

1.09 Cft

0.12
0.06
0.24
0.24
0.02
0.05
0.15
1.97
0.22
2.19

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

6.00
2.00
2.00
2.00
2.00
2.00

Nos
Nos
Nos
Nos
Doz
Nos

Page 50

deodar wood wrought joinery wor


doors and windows with 22 SWG
wire gauze 144 mashes per square
) including iron fittings comple

framing 1\" (40mm) thick with


fixed in position.
s as Spring Hinges.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz
Each

Detail

Unit Rate (British System)

Wire Gauge
2x1'-2\"x2'-1\"
4x1'-2\"x1'-7\"

4.83 Sft
7.33 Sft
12.16 Sft
1.82 Sft
13.98 Sft

Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Percent

27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

1.50 No
0.75 No

10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 51

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

12

G.I. wire gauze 22 SWG, 12x


inch (256mm) fixed to chowk
thick deodar wood screw and
Detail

Rate Analysis

for

4' x 3'

Unit Rate (British System)

12 Sft

Material
Wood Work
Wood
Wire gauze
Nails
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft

0.25 Cft
12.00 Sft

20

Percent

12
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

0.50 No
0.25 No
10

Percent

20

Percent

12
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 52

.I. wire gauze 22 SWG, 12x12 meshes per sq


nch (256mm) fixed to chowkhat with \" (20m
hick deodar wood screw and strip.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
0.00 Sft

L.S.

8
8
1.6
9.6
.8

9.6 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.8
8.6

Item No.

12

G.I. wire gauze 22 SWG, 12x


square inch (625mm) fixed t
(12mm) strip on separate fr
2\"x2\" (50x50mm).
Detail

Unit Rate (British System)


Qty

Rate Analysis

for

2' x 4'

8 Sft

Material
Deodar Wood
Horizontal Rail 2x4\"x2\"x2\"
Vertical Rail 2x2\"x2\"x2\"
Strips 2x4\"x2\"x\"
Strips 2x1'-8\"x2\"x\"
Moulding

0.22
0.11
0.05
0.03
0.06
0.47
0.09
0.56
8.00
0.80
8.80

L.S.

Wastage 20%
Wire Gauze 144 Mesh/Sqare in CW 4x2
Wastage 10%

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Sft
Sft
Cft

Fitting
Screws above 1\" long
Nails
Wooden Plugs
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft

2.00 Doz
0.08 Kg
6.00 Nos

20

Percent

Page 53

.I. wire gauze 22 SWG, 12x12 meshes per


quare inch (625mm) fixed to chowkhat with
12mm) strip on separate frame of deodar wo
\"x2\" (50x50mm).

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00 P. Sft

0.00 P. Doz
0.00 P. Kg
0.50 Each

3.43 =

0.14
3
2.86
.57
3.43
.43

Detail

Unit Rate (British System)


Qty

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft

0.50 No
0.25 No
10

Percent

20

Percent

8
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 54

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.05

.05
.45
4.75

DESCRIPTION

OF

ITEM NO

13:

Making and fixing trellis d


deodar wood complete.

Detail

Rate Analysis

for

Unit Rate (British System)

18 Sft

Material
Deodar Wood
Nail 0.126 Kg.
Screws above 1\" long
Hinges 4\" (100mm)
Tower Bolt 9\" (225mm)
Hasp & Staple
Total
Contractor's Profit &20
Total for 18 Sft.
Rate Per Sft

2.30 Cft
2.50
4.00
2.00
1.00

Doz
Nos
Nos
No

Percent

18
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total

1.50 No
1.00 No
10

Percent

Contractor's Profit &20


Total for 18 Sft.
Rate Per Sft

Percent

18
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 55

aking and fixing trellis doors and windows


eodar wood complete.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00
0.00
0.00

P. Cft
P.
P. Doz
Each
Each
Each

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Kg.

Say
Say
Say
Say

.05

DESCRIPTION

OF

ITEM NO

14:

Providing & fixing mild ste


windows, C. Window etc. inc
making and threading holes
complete

a)

M.S. angle iron 1\"x1\"x


welded M.S. flat 2\"x\" (5

Detail

Unit Rate (British System)


Qty

Rate Analysis
Material

for

4' x 6.75'

27 Sft

Structural Steel
M.S. Angle Iron 1\"x1\"x\" (40x40x6mm)
Vertical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.90 Rft @ 2.32 Lbs/Rft
M.S. Flat 2\"x\" (50x6mm)
Vertical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.9 @ 1.68 Lbs/ft
M.S. Flat Patti 1\"x1/8\" (25x3mm) at
bottom.
4 @ 0.42 Lbs/ft
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

43.85 Lbs

31.75 Lbs

1.68 Lbs
77.28Lb (3 5.06)Kg
Percent

27

Page 56

roviding & fixing mild steel chowkhat of d


indows, C. Window etc. including hold fast
aking and threading holes for hinges etc.

.S. angle iron 1\"x1\"x\" (40x40x6mm)


elded M.S. flat 2\"x\" (50x6mm)

nit Rate (British System) per Sft

7.28Lb (3 5.06)Kg

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Kg

0.0 =

Detail

Unit Rate (British System)


Qty

Labour
Making holes in frame for hinges 4x4
Welding plate with angle iron
Welding hold fast with frame
Welding M.S.Steel bar with frame
Total
Sundries
10
Total
Contractor's Profit & Ove
Total
Rate Per Sft

20

16.00 Nos
18.00 Nos
6.00 Nos
2.00 Nos
Percent

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 57

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

Each
Each
Each
Each

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

14

Providing & fixing mild ste


windows, C. Window etc. inc
making and threading holes
complete
b)

M.S. Tee iron 1\"x1\"x\"


welded with M.S. Flat \"x

Detail

Unit Rate (British System)


Qty

Rate Analysis
Material

for

4' x 6.75' =

27 Sft

Structural Steel
Tee Iron 1\"x1\"x\" (40x40x6mm)
Vertical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.90ft @ 2.32 Lbs/ft
M.S. Flat \"x\" (12x6mm)
18.90ft @ 0.425 Lbs/ft
M.S. Bar \" dia 4' @ 0.67 Lbs/ft

Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

44.60 Lbs
8.03 Lbs
2.68 Lbs
55.31Lb (2 5.10) Kg

Percent

27

Page 58

roviding & fixing mild steel chowkhat of d


indows, C. Window etc. including hold fast
aking and threading holes for hinges etc.

.S. Tee iron 1\"x1\"x\" (40x40x6mm)


elded with M.S. Flat \"x\" (12x6mm)

nit Rate (British System) per Sft

5.31Lb (2 5.10) Kg

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Kg

0.0 =

Detail

Unit Rate (British System)


Qty

Labour
Making holes in frame for hinges 4x4
Welding plate with angle iron
Welding hold fast with frame
Welding M.S.Steel bar with frame
Total
Sundries
10
Total
Contractor's Profit & Ove
Total
Rate Per Sft

20

16.00 Nos
18.00 Nos
6.00 Nos
2.00 Nos
Percent

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 59

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

Each
Each
Each
Each

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

15

Providing and fixing M.S. Sheet hollow


frame of doors, windows, CW, etc. (Ch
only) of 20 SWG welded with M.S. flat
6\"x1\"x1/8\" (150x40x3mm) M.S. hold
9\"x1\"x1/8\" (225x25x3mm) welded/ scr
(100mm) long iron hinges including fit
chowkhat with cement sand mortar 1:8 a
embedding hold fast in cement concrete
complete in all respects.
Single Rebate.

a)
Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

4' x 7'

28 Sft

Material
M.S. Sheet 20 Swg 15\"(375mm) wide
18' long x15/12 (5.486x0.380m)
Wastage 10%

M.S. Flat
3.5 Rft @
M.S. Flat
4.5 Rft @

22.50 Kg.
2.25 Kg.
24.75 Kg.
25.00 Kg. Or
17.02 Kg
1.86 Lbs

SAY
6\"x\"x1/8\" (150x6x3mm)
0.531 Lbs/Rft
hold fast 9\"x1\"x1/8\" (225x25x3mm)
0.425 Lbs/Rft
1.91 Lbs
3.77Lb (1 .71) Kg

Fitting
Hinges 4\" (100mm)
Screws
Nails
Welding Charges
Cement sand mortar ratio 1:8 for
filling hollow space 18'x4'/12\"x3/12
including wastage (0.057m)
(5.486x0.100x0.075m) 2.00 Cft

6.00 Nos
3.00 Doz
0.28 Kg.

Page 60

nd fixing M.S. Sheet hollow pres


oors, windows, CW, etc. (Chowkha
SWG welded with M.S. flat
8\" (150x40x3mm) M.S. hold fast
\" (225x25x3mm) welded/ screwed 4\"
g iron hinges including fitting
th cement sand mortar 1:8 and
old fast in cement concrete 1:2:
all respects.

nit Rate (British System) per Sft

5.00 Kg. Or

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Kg.

0.00 P. Kg

0.00 Each
0.00 P. Doz
0.00 P. Kg.

Detail

Unit Rate (British System)

Material
Cement
Sand
Cement Concrete 1:2:4 for fixing hold fast
Cement
Sand
Bajri
Total
Contractor's Profit & Ove
20
Percent
Total for 28 Sft.
Rate Per Sft

0.20 Bag
2.00 Cft
0.08 Bag
0.20 Cft.
0.40 Cft.

28
Labour
Moulder/ Black Smith
Cooly
SKilled Cooly (for Mortor Filling in the
hallow space)
Total
Sundries
10
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

20

0.50 No
0.50 No
0.50 No
Percent

Percent

28
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 61

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Each
0.00 P. Cft

0
0.00 % Cft.
0.00 % Cft.

Bag

0.0 =

0.00 P. Day
0.00 P. Day

0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.1

.1

Item No.

15

b)

Providing and fixing M.S. S


frame of doors, windows, C
(Chowkhat only) of 20 SWG w
6\"x1\"x1/8\" (150x32x3mm)
9\"x1\"x1/8\" (225x25x3mm)
(100mm) long iron hinges in
chowkhat with cement sand m
embedding hold fast in ceme
complete in all respects.
Double Rebate.

Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

4' x 7'

28 Sft

Material
M.S. Sheet 20SWG 17\"(432mm) wide
19' longx18x18/17(5.486x0.432)= 25.50 Sft
Wastage 10%
2.55 Sft
28.05 Sft
19.10 Kg
M.S. Flat 7.5x1\"x1/8(2.30x0.032x0.003)=7 No.
4.50 Rft @ 0.531 Lbs/Rft
2.39 Lbs
M.S. Flat hold fast 9\"x1\"x1/8\"= 6 No
4.50 Rft @ 0.425 Lbs/Rft
1.91 Lbs
4.30Lbs (1 .95) Kg
Fitting
Hinges 4\" (100mm)
6.00 Nos
Screws
3.00 Doz
Nails
0.28 Kg.
Welding Charges
Cement sand mortar ratio 1:8 for
filling hollow space
18\"x11/24x4/12 = (5.486x0.275x0.1m) 2.75 Cft

Page 62

roviding and fixing M.S. Sheet hollow pres


rame of doors, windows, C. window, etc.
Chowkhat only) of 20 SWG welded with M.S.
\"x1\"x1/8\" (150x32x3mm) M.S. hold fast
\"x1\"x1/8\" (225x25x3mm) welded/ screwed 4\"
100mm) long iron hinges including fitting
howkhat with cement sand mortar 1:8 and
mbedding hold fast in cement concrete 1:2:
omplete in all respects.
ouble Rebate.

nit Rate (British System) per Sft

.30Lbs (1 .95) Kg

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Kg

0.00 P. Kg

0.00 Each
0.00 P. Doz
0.00 P. Kg.

Detail

Unit Rate (British System)

Material
Cement
Sand
Cement Concrete 1:2:4 for (fixing
hold fast)
Cement
Sand
Bajri
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

20

0.28 Bag
2.75 Cft

0.08 Bag
0.20 Cft.
0.40 Cft.

Percent

28
Moulder/ Black Smith
Cooly
SKilled Cooly (for Mortor Filling in the
hollow space)
Total
Sundries
10
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

20

0.75 No
0.50 No
0.50 No
Percent

Percent

28
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 63

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Each
0.00 P. Cft

0 Bag
0.00 % Cft.
0.00 % Cft.

0.0 =

0.00 P. Day
0.00 P. Day

0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

1.3
8.5

DESCRIPTION

OF

ITEM NO

16:

Extra for providing & fixin


hinges, with brass fittings
finger plate, 6\" tower bol

Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

21 Sft

Material
4\" (100mm) double section spring
hinges iron.
Brass finger plate
6\" (150mm) brass tower bolt
Brass screws 1\" (40mm)
Brass Screw 1\" (25mm)

3.00
2.00
1.00
2.00
2.50

Nos
Nos
No
Doz
Doz

4.00
2.00
2.00
2.00
2.00
3.00
3.00

Nos
Nos
Nos
Nos
Nos
Doz
Doz

Deduct Cost of Iron Fittings


5\" (125mm) Butt Hinges
9\" (225mm) Tower Bolts
6\" (150mm) Handle
Hinges Chocks
Door Stops
Screws 1\"
Screws 1\"
Total 262.50-112.96
Contractor's Profit & Ove
Total for 21 Sft.
Rate Per Sft

20

Percent
-2.4
21

Page 64

xtra for providing & fixing iron double sp


inges, with brass fittings (it shall inclu
inger plate, 6\" tower bolts)

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00
0.00

Each
Each
Each
P. Doz
P. Doz

0.50
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
P. Doz
P. Doz

2
2
2
.4
2.4
.11

Detail

Unit Rate (British System)


Qty

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

0.05 No
0.05 No
10

Percent

20

Percent

21
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 65

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.

#####

Say
Say

Rs.
Rs.

#####
#####

Say
Say

.2

DESCRIPTION

OF

ITEM NO

17:

Providing and fixing brass


gauzed doors.

Detail

Unit Rate (British System)p


Qty

Material
Brass spring hinges Complete with
screws
Total
Contractor's Profit & Ove
Total

20

1 No

Percent

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.05 No
0.05 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

Rs.

Composite Rate for Each

Rs.

Page 66

roviding and fixing brass spring hinges, t


auzed doors.

nit Rate (British System)per Each


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Each

0.00 P. Day
0.00 P. Day

0.0 Say

0.0 Say

DESCRIPTION

Rate

OF

Analysis

ITEM NO

for

18:

Providing and fixing slidin

i)

Iron sliding bolt 10\" (250

Detail

Unit Rate (British System)p

16 Each

Material
Sliding bolt 10\"(250mm) long complete with
screws & nuts.

Total
Contractor's Profit & Ove
Total

20

Percent

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00 No
0.50 No
10

Percent

20

Percent

Item Rates
Labour Rate for Each

Rs.

Composite Rate for Each

Rs.

Page 67

roviding and fixing sliding bolt to doors.

ron sliding bolt 10\" (250mm) long.

nit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

16 Nos

0.00 Each

0.00 P. Day
0.00 P. Day

0.0

0.0 Say

0.0

0.0 Say

16
16

Item No.

Rate

18

Analysis

Providing and fixing slidin

for

ii)

Iron sliding bolt 12\" (300

Detail

Unit Rate (British System)p

16 Each

Material
Sliding bolt 12\" (300mm) long complete
with screws with & nuts.

Total
Contractor's Profit & Ove
Total

20

Percent

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00 No
0.50 No
10

Percent

20

Percent

Item Rates
Labour Rate for Each

Rs.

Composite Rate for Each

Rs.

Page 68

roviding and fixing sliding bolt to doors.

ron sliding bolt 12\" (300mm) long.

nit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

16 Nos

0.00 Each

0.00 P. Day
0.00 P. Day

0.0

0.0 Say

0.0

0.0 Say

16
16

Item No.

Rate

18

Anaylysis

Providing and fixing slidin


iii)

Brass sliding bolt 10\" (25

Detail

Unit Rate (British System)p

for

16 Each

Material
Brass sliding bolt 10\" (250mm) long
complete with screws & nuts.

Total
Contractor's Profit & Ove
Total

20

Percent

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

Rs.

Composite Rate for Each

Rs.

Page 69

roviding and fixing sliding bolt to doors.

rass sliding bolt 10\" (250mm) long.

nit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

16 Nos

0.00 Each

0.00 P. Day
0.00 P. Day

0.0

0.0 Say

0.0

0.0 Say

16
16

Item No.

Rate

18

Analysis

Providing and fixing slidin

for

iv)

Brass sliding bolt 12\" (30

Detail

Unit Rate (British System)p

16 Each

Material
Brass sliding bolt 12\" (300mm) long
complete with screws & nuts.

Total
Contractor's Profit & Ove
Total

20

Percent

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

Rs.

Composite Rate for Each

Rs.

Page 70

roviding and fixing sliding bolt to doors.

rass sliding bolt 12\" (300mm) long.

nit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

16 Nos

0.00 Each

0.00 P. Day
0.00 P. Day

0.0

0.0 Say

0.0

0.0 Say

16
16

DESCRIPTION

OF

ITEM NO

19:

Extra for brass fittings to


except for hinges, which s
Deodar wood panelled or pan
fully glazed.

i)

Detail

Rate
Material

Analysis

for

Unit Rate (British System)

4' x 7' =

28

Sft

(Brass Fittings)
9\" (225mm) Tower bolt
6\" (150mm) Handles
2\" (50mm) Butt hinges
Screws 1\"

Deduct Cost of Iron Fittings


9\" (225mm) Tower Bolts
6\" (150mm) Handle
2\" (50mm) butt hinges
Screws above 1\" long
Total 222.38-101.04
Contractor's Profit &20
Total for 28 Sft.
Rate Per Sft

3.00
3.00
2.00
3.50

Nos
Nos
Nos
Doz

3.00
3.00
2.00
3.50

Nos
Nos
Nos
Doz

Percent

28
Labour
Carpenter
Skilled Cooly
Total
Sundries
10
Total
Contractor's Profit &20
Total
Rate Per Sft

0.04 No
0.04 No

Percent
Percent

28
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 71

xtra for brass fittings to doors and windo


xcept for hinges, which shall be of iron.
eodar wood panelled or panelled and glazed
ully glazed.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

Each
Each
Each
P. Doz

0.00
0.00
0.00
0.00

Each
Each
Each
P. Doz

0.00 P. Day
0.00 P. Day

0.0 =

0.0 =
Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.1
.9

Item No.

19

Rate
Material

Extra for brass fittings to


except for hinges, which s
ii)

Deodar wood wire gauzed shu

Detail

Unit Rate (British System)

Analysis

for

4' x 7'

28

(Brass Fittings)
9\" (225mm) Tower balt
6\" (150mm) Handles
2\" (50mm) butt hinges
Screws 1\"

Deduct Cost of Iron Fittings


9\" (225mm) Tower Bolts
8\" (200mm) Handle
2\" (50mm) Butt hinges
Screws 1\"
Total 153.75-73.12
Contractor's Profit &20
Total for 28 Sft.
Rate Per Sft

Sft

2.00
2.00
2.00
3.50

Nos
Nos
Nos
Doz

2.00
2.00
2.00
3.00

Nos
Nos
Nos
Doz

Percent

28
Labour
Carpenter
Skilled Cooly
Total
Sundries
10
Total
Contractor's Profit &20
Total for 28 Sft.
Rate Per Sft

0.04 No
0.04 No
Percent
Percent

28
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 72

xtra for brass fittings to doors and windo


xcept for hinges, which shall be of iron.

eodar wood wire gauzed shutters.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

Each
Each
Each
P. Doz

0.00
0.00
1.00
0.00

Each
Each
Each
P. Doz

2
2
2
.4
2.4
.09

-2.4 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

.8

DESCRIPTION

OF

ITEM NO

20:

Extra for providing and fix


rim lock adjustable over th

Detail

Unit Rate (British System)p


Qty

Material
Rim lock complete with screws
Deduct cost of handle
Total
Contractor's Profit & Ove
Total

1.00 No
2.00 Nos

20

Percent

Labour
Carpenter
Skilled Cooly

Total
Sundries 10
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate for Each
Composite Rate for Each

0.17 No
0.13 No

Percent
20

Percent

Page 73

xtra for providing and fixing, approved qu


im lock adjustable over the style surface.

nit Rate (British System)per Each


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Each
0.00 Each

0.00 P. Day
0.00 P. Day

Rs.

0.0 Say

Rs.

0.0 Say

DESCRIPTION

OF

ITEM NO

21:

Providing and fixing approv


lock.

Detail

Unit Rate (British System)p


Qty

Material
Mortice lock compelte with screws
Deduct cost of handles
Total
Contractor's Profit & Ove
Total

20

1.00 No
2.00 Nos

Percent

Labour
Carpenter
Skilled Cooly

Total
Sundries 10
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate for Each
Composite Rate for Each

0.25 No
0.17 No

Percent
20

Percent

Page 74

roviding and fixing approved quality morti

nit Rate (British System)per Each


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Each
0.00 Each

0.00 P. Day
0.00 P. Day

14.45

14.45
1.45
15.9
3.18
19.07

Rs.

19.07 Say

19.05

Rs.

19.07 Say

19.05

DESCRIPTION

OF

ITEM NO

22:

Providing and fixing expand


(12mm to 20mm) mesh 16 gaug
Fixed to chowkhat with 1\"
wood strip and screws etc.

a)

Detail

Unit Rate (British System)

Rate Analysis for


4' x 2' =
Material
Deodar Wood
Strips vertical 2x2x\"x3/12\"
Horizontal 2x3-10/12x\"x3/12\"

8 Sft

Wastage 20%
SAY
Expanded metal 1x4x2
Wastage 10%
Nails / Screws
Total
Contractor's Profit &20
Total for 8 Sft.
Rate Per Sft

0.08
0.16
0.24
0.05
0.29
0.30
8.00
0.80
8.80
2.00

Cft
Cft
Cft
Cft
Cft
Cft
Sft
Sft
Sft
Doz

Percent

8
Labour
Carpenter
Skilled Cooly
Total
Sundries
10
Total
Contractor's Profit &20
Total for 8 Sft.
Rate Per Sft

0.25 No
0.25 No
Percent
Percent

8
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 75

roviding and fixing expanded metal \" to


12mm to 20mm) mesh 16 gauge.
ixed to chowkhat with 1\" (25mm) thick deod
ood strip and screws etc.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00 Sft
0.00 P. Doz

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

.2
1.9

Item No.

22

Providing and fixing expand


(12mm to 20mm) mesh 16 gaug
Fixed with 1\" (25mm) cover
including deodar wood frame

b)

Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

4' x 3'

12 Sft

Material
Deodar Wood Frame
2 No 4'x2/12\"x212\"
2 No 3'x2/12\"x212\"
Moulding 1x13 2/3'x1/12x2/12

0.23 Cft
0.17 Cft
0.20 Cft
0.60 Cft
0.12 Cft
0.72 Cft
12.00 Sft
1.20 Sft
13.20 Sft
2.00 Doz

Wastage 20%
Expended metal 1x4x3
Wastage 10%
Nails / Screws
Total
Contractor's Profit &20
Total for 12 Sft.
Rate Per Sft

Percent

12
Labour
Carpenter
Skilled Cooly
Total
Sundries
10
Total
Contractor's Profit &20
Total for 12 Sft.
Rate Per Sft

0.50 No
0.25 No
Percent
Percent

12
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 76

roviding and fixing expanded metal \" to


12mm to 20mm) mesh 16 gauge.
ixed with 1\" (25mm) cover moulding & screw
ncluding deodar wood frame 2\"x2\" (50x50mm)

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00 Sft
0.00 P. Doz

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

.1
1.3

DESCRIPTION

OF

ITEM NO

23:

Detail

Providing and fixing deodar


12\" (225 to 300mm) depth,
with back shelves, shutter
complete.
Unit Rate (British System)
Qty

Rate

Analysis

for

3' x 5'

15 Sft

Material
Deodar Wood
Sides 2x1'x5'x1/12\"
Back 1x3'x5'x\"
Top & Bottom 2x3'x1'x1/12\"
Plank 3x3'x1'x1/12\"
Shutters 2x1.5'x5'x1/12\"

0.84
0.94
0.50
0.75
1.25
4.28
0.43
4.71

Wastage 10%

Fittings Brass
Hings 3\" (75mm)
Hasp & Staple (Brass)
Brass Handle 6\" (150mm)
Wooden Plugs
Nails / Screws
Bitumen
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

6.00 Nos
1.00 No
2.00 Nos
10.00 Nos
L.S.
1.43
20

Percent

15

Page 77

roviding and fixing deodar wood almirah 9\"


2\" (225 to 300mm) depth, including boxing
ith back shelves, shutter and brass fittin

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cf -

0.00
0.00
0.00
0.50
Kg.

Each Each Each Each

5
19

0.00 P. Kg -

28.8 =

24
4.8
28.8
1.92

Detail

Unit Rate (British System)


Qty

Labour
Carpenter
Skilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft

2.50 No
0.50 No

Percent
20

Percent

15
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 78

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
#####

Say

1.9
20.6

Item No.

23

Providing and fixing deodar


12\" (225 to 300mm) depth,
and brass fittings, etc. wi
complete.
Detail

Rate

Analysis

for

Unit Rate (British System)

3' x 5'

15 Sft

Material
Deodar Wood
Plank 3x10x3'x1'x1/12\"
Shutters 2x1.5'x5'x1/12\"
Wastage 10%
Fittings Brass
Hings 3\" (75mm)
Hasp & Staple (Brass)
Brass Handle 6\" (150mm)
Wooden Plugs
Nails / Screws
Total
Contractor's Profit &20
Total for 15 Sft.
Rate Per Sft

0.75
1.25
2.00
0.20
2.20

Cft
Cft
Cft
Cft
Cft

6.00
1.00
2.00
6.00

Nos
No
Nos
Nos

Percent

15
Labour
Carpenter
Skilled Cooly
Total
Sundries
10
Total
Contractor's Profit &20
Total for 15 Sft.
Rate Per Sft

1.75 Nos
0.50 No
Percent
Percent

15
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 79

roviding and fixing deodar wood almirah 9\"


2\" (225 to 300mm) depth, with shelves shut
nd brass fittings, etc. without boxing & b
complete.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00
0.00
0.00
0.50

Each
Each
Each
Each

3
12
15
3
18
1.2

L.S.

18 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say

Say
#####

Say

1.2
12.9

Item No.

24

Providing and fixing class room almira


consisting of 1\" (25mm) thick solid f
with deodar wood lipping \" (6mm) thi
(sterling made) fixed in deodar wood f
(75x25mm) I/C full hinges C.P. fitting
R.C.C. (1:1-:3) shelves 1-\" (40mm)
coats of painting.
Detail

Unit Rate (British System)


Qty

Rate Analysis for 4.5' x 3.5' = 15.75 Sft


Material
Precast reinforced cement concrete
(1:1-\"3)
Shelves 2x3-x1-1/8x1/8
Steel \" (12mm) dia
4x3.25 (4x0.975=3.900Rm) 13.00 Rft
5x1 1'/6(5x0.375=1.875Rm)
5.63 Rft
18.63 Rft
Wastage 5%
0.93 Rft
19.56 Rft
@ 0.167 Lbs/Rft
Deodar wood frame I/C sawing
2x4'x'x1/12'
2x3'xx'x1/12'
Wastage 35%
1\" (25mm) thick solid flush shutter
(Sterling made)
1x3'x4' (1x0.900x1.200 = 1.080)
Wastage 5%
Deodar wood lipping 6mm thick
(Sterling made)
2x4' (2x1.200 = 2.400)
2x2x-' (2x2x0.450 = 1.800)

0.91 Cft

1.48 Kg

0.19
0.15
0.34
0.12
0.46

Cft
Cft
Cft
Cft
Cft

12.00 Sft
0.60 Sft
12.60 Sft

8.00 Rft
6.00 Rft
14.00 Rft

Page 80

nd fixing class room almirah


of 1\" (25mm) thick solid flush s
wood lipping \" (6mm) thick alr
ade) fixed in deodar wood frame
/C full hinges C.P. fittings wit
-:3) shelves 1-\" (40mm) thick

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

3.68 P. Cft

3.35

0.00 Kg

0.00 P. Cft

0.00 Sft

0.00 Rft

Detail

Unit Rate (British System)


Qty

Full hinges 1\" (25mm) I/C screws 2x4


C.P. dasti I/C screws
Khunda chapks (Best quality) I/C screws
Rawal plug 1-\" long
Screws 1-\" long
Glue 0.20 Kg.
Painting 3 coats
Total
Contractor's Profit & Ove
20
Total for 15.75 Sft.
Rate Per Sft

8.00 Nos
2.00 Nos
1.00 No
12.00 Nos
1.00 Doz
0.428 Gln.
Percent

15.75
Labour
For bringing the leaves to proper size
fixing deodar wood lipping with glue
and nail making/ fixing deodar wood
frame & fixing at site with rawal plug &
screws.
Carpenter
Helper
Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 15.75 Sft.
Rate Per Sft

1.00 No
1.00 No

Percent

20

Percent

15.75
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 81

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00

.428 Gln.

Each
Each
Each
Each
P. Doz
P.Kg.
P. Gln.

3.35
.67
4.02
.26

4.02 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.25
2.5

DESCRIPTION

OF

ITEM NO

25:

Providing and fixing wooden box type w


22\" (550mm) deep including \" (20mm)
boxing and shelves, hanger rods, hard
drawers, brass fitting locking arrange
handles internal bolts shoe rods, etc.
three coats of enamel paints.
Partal wood boxing and deodar wood she
leaves etc.

i)

Detail

Unit Rate (British System)


Qty

Rate Analysis for


Material

4' x 6.5' =

Partal Wood
Boxing
Side 2x6-1/3x22/12x3/48
Top & Bottom 2x4 22/12x3/48
Foot Rack 1x3-7/8x22/12x3/48
Vertical Style 1x5x22/12x3/48
Strips 6x22/12x1/8x3/48
Back 2x1x22/12x3/48
Wastage 15%
Shutters Deodar Wood
1x1-2/3x6x1/12
1x2-1/3x6x1/12
Wastage 15%
Hard Board
4x6
Wastage 10%
Sawing Charges
6.88x10 68.80 Sft

26 Sft

1.45
0.92
0.44
0.57
0.09
0.34
3.81
0.57
4.38

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.91
1.26
2.17
0.33
2.50

Cft
Cft
Cft
Cft
Cft

26.00 Sft
2.60 Sft
28.60 Sft

Page 82

nd fixing wooden box type ward r


) deep including \" (20mm) thick
shelves, hanger rods, hard board
ass fitting locking arrangements
ernal bolts shoe rods, etc. incl
of enamel paints.
boxing and deodar wood shelves

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00 P. Cft

0.00 Sft

0.00 Sft

Detail

Unit Rate (British System)

Fittings
Hings 4\" (100mm)
Handle
Tie rod welding fixing arragement
Hanger hook including pull out rod
Tower bolt 4\" (100mm)
Bitumen Painting
Total
Contractor's Profit & Ove
20
Total for 26 Sft.
Rate Per Sft

6.00
2.00
2.25
2.00
1.00
1.43

Nos
Nos
Nos
Nos
Nos
Kg.

Percent

26
Labour
Carpenters
Skilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove
Total
Rate Per Sft

4.00 No
2.00 No
Percent

20

Percent

26
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 83

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Each
0.00 Each
0.00 Each
0.00 Each
-0.08 Each
0.00 Each

0.08
0.08
.02
.1
0.0

-.1 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

3.7
39.9

Item No.

25

Providing and fixing wooden box type w


22\" (550mm) deep including \" (20mm)
boxing and shelves, hanger rods, hard
drawers, brass fitting locking arrange
handles internal bolts shoe rods, etc.
three coats of enamel paints.
Deodar wood boxing and shelves & leave

ii)
Detail

Unit Rate (British System)


Qty

Rate Analysis for


Material

8' x 5'

40 Sft

Deodar Wood
Boxing
Vetical Side 2x8x22/12x3/48
Control Side 1x7-7/8x22/12x3/48
Horizontal T&B 2x4 11/12x22/12x3/48
Shelves 5x2x22/12x3/48
Vertical 1x1x22/12x3/48
Shoes 2xx1/5x1/12
Sutter 2x2 3/5x8x1/12
Strips 2x8x1/12x1/24
Strips 2x5x1/12x1/24

1.83 Cft
0.90 Cft
1.13 Cft
1.15 Cft
0.17 Cft
0.02 Cft
3.47 Cft
0.06 Cft
0.03 Cft
8.76 Cft
1.31 Cft
10.07 Cft

Wastage 15%
Hard Wood Board
Back 5x8
Wastage 10%
Sawing Charges :
10.20x10
Bitumen Painting 2 Coat
Painting 3 Coats

40.00 Sft
4.00 Sft
44.00 Sft
102.00 Sft
1.43 Kg.
0.27 Kg.

Page 84

nd fixing wooden box type ward r


) deep including \" (20mm) thick
shelves, hanger rods, hard board
ass fitting locking arrangements
ernal bolts shoe rods, etc. incl
of enamel paints.
boxing and shelves & leaves etc

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00 Sft

0.00 Sft
0.00 Each
0.00 P. Gln.

Detail

Unit Rate (British System)

Fittings
Hings 4\" (100mm)
Handle
Tie rod welding fixing arragement
Hanger hook including full out rod
Screws
Tower bolt 4\" (100mm)
Nail
Locking arrangement
Total
Contractor's Profit & Ove
20
Total for 40 Sft.
Rate Per Sft

6.00 Nos
2.00 Nos
2.00
4.00
1.00
0.19
1.00

Nos
Doz
Nos
Kg
Nos

Percent

40
Carpenters
Skilled Cooly
Painter
Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 40 Sft.
Rate Per Sft

6.00 Nos
2.00 Nos
1.00 Nos
Percent

20

Percent

40
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 85

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

-0.10 Each
0.00 Each

0.6
-

0.00 Each
0.00 P. Doz
-0.08 Each
0.00 P. Kg
0.00 Each

0.08
0.68
.14
.82
.02

-.82 =

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

.2
2.8

Item No.

26

Providing/ fixing ward robe 22\" (550m


consisting of RCC shelves 1-\" (40mm)
(12mm) thick vin board boxing and back
ply) vin board shutter \" (20mm) thic
wood lipping \"(6mm) on all edges fix
wood frame 3\"x1\" with hanger rod in
drawers at bottom and openable shutter
portion I/c full hinges C.P. fitting a
coats.
Detail

Rate Analysis for

7.5' x 7' =

Unit Rate (British System) per Sft


Qty
52.50 Sft

Material
RCC shelves (Precast RCC 1x1-x3 top
and bottom
2x7-x2x1/8 3.62 Cft
4x2-x2x1/8
Steel Reinforcement
6.12x1.50 9.18 Kg
\" thick vin board (one side ply) for
boxing.
Top/ Bottom 6x2x2-x1-7/8
Side 6x2x1-1/8x1-7/8
Back 6x2-x1-1/8
Top/ Bottom 3x2x2-x1-7/8
Vertical 6x2x1-x1-7/8
Side 2x4x1-7/8
Back 3x2x2-x1-
Back 1x2-x4
Wastage 10%
Vin board \" thick on both side ply
6x2-x1-
3x4x2-
Wastage 10%

2.50 Cft
6.12 Cft

50.63 Sft
25.31 Sft
15.18 Sft
25.31 Sft
28.12 Sft
15.00 Sft
16.87 Sft
9.00 Sft
185.42 Sft
18.54 Sft
203.96 Sft
16.87 Sft
27.00 Sft
43.87 Sft
4.38 Sft
48.25 Sft

Page 86

fixing ward robe 22\" (550mm) dee


of RCC shelves 1-\" (40mm) thick
k vin board boxing and back (one
ard shutter \" (20mm) thick I/c
g \"(6mm) on all edges fixes I/c
3\"x1\" with hanger rod in centre
bottom and openable shutter on u
full hinges C.P. fitting and pa

British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
0.00 P.

Kg

0.00 Sft

0.00 Sft

Detail

Unit Rate (British System)


Qty

Deodar Wood
Frame 4x7x3/12x1/12
Frame 4x7-x3/12x1/12
Lipping 3x6x2-x1/16x1/24
Lipping 6x2x1-1/8x1/16x1/24
Lipping 2x3x4x1/16x1/24
For drawers side supporting
3x2x1-7/8x1/12x1/24
Drawers 3x2-x1-1/8x1/24
Side 2x3x1-7/8x1-1/8x1/24
Wastage 35%
Hard Board for drawers
3x2-x1-7/8(3x0.686x0.573=1.179
Wastage 10%
Full hinges \" (20mm) wide (Imported)
3x4 (3x1.219 = 3.657)
3x1-1/8 (3x0.343 = 1.029)
Wastage 5% (Add Wastage 5%)
C.P. Handle
Catcher (Germany)
China Lock (Glone)
Rawal Plug 1\" (40mm)
Screws above 1\" long
C.P. Hanger rod with 2 hooks
C.P. Hooks

0.58
0.62
0.11
0.04
0.06

Cft
Cft
Cft
Cft
Cft

0.04
0.32
0.53
2.30
0.81
3.11

Cft
Cft
Cft
Cft
Cft
Cft

12.65 Sft
1.26 Sft
13.91 Sft
12.00 Rft
3.37 Rft
15.37 Rft
0.76 Rft
16.13 Rft
9.00 Nos
9.00 Nos
3.00 Nos
30.00 Nos
2.50 Doz
1.00 No
2.00 Nos

Page 87

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00 Sft

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rft
Each
Each
Each
Each
P. Doz
Each
Each

Detail

Unit Rate (British System)


Qty

Glue
Nail
Painting

2.00 Kg
L.S.
2.86 Gln.

4(7 x 7)

Total
Contractor's Profit & Ove
Total for 52.50 Sft.
Rate Per Sft

20

Percent

52.5
Labour
Labour for making ward robe complete
Total
Sundries 10
Total
Contractor's Profit & Ove
Total
Rate Per Sft

52.50 Sft

Percent

20

Percent

52.5
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 88

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)
0.00 P. Kg

0.00 P. Gln.

32

.86 Gln.

32.01
6.4
38.41
.73

38.41 =

29.00 Sft

1,522.5
1,522.5
152.25
1,674.75
334.95
2,009.7
38.28

2,009.7 =

Rs.
Rs.

#####
#####

Say
Say

38.3
411.9

Rs.
Rs.

#####
#####

Say
Say

64.75
696.85

DESCRIPTION

Rate Analysis

OF

ITEM NO

for

27:

a)

Providing and fixing chowkh


& C. Windows including hold
Teak Wood.

Detail

Unit Rate (British System)

4' x 6.75'

27 Sft

Material
Teak Wood
Top Rail 1x4x3\"x4\"
Vertical Rail 2x7x3\"x4\"

0.45
1.33
1.78
0.22
2.00
6.00

Wastage 12%
Iron hold fast
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Cft
Cft
Cft
Cft
Cft
Nos

Percent

27
Labour
Carpenter
Skilled Cooly

0.70 No
0.50 No

Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 89

roviding and fixing chowkhat for doors, wi


C. Windows including hold fast etc.
eak Wood.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
0.00 Each

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

27

Rate Analysis

for

b)

Providing and fixing chowkh


& C. Windows including hold
Deodar Wood.

Detail

Unit Rate (British System)

4' x 6.75'

27 Sft

Material
For Frame
Top Rail 1x4'x3\"x4\"
Vertical Rail 2x7'x3\"x4\"

0.45
1.33
1.78
0.27
2.05
6.00

Wastage 15%
Iron hold fast
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Cft
Cft
Cft
Cft
Cft
Nos

Percent

27
Labour
Carpenter
Skilled Cooly

0.50 No
0.25 No

Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 90

roviding and fixing chowkhat for doors win


C. Windows including hold fast etc.
eodar Wood.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
0.00 Each

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Rate

27

Analysis

for

c)

Providing and fixing chowkh


& C. Windows including hold
Shisham Wood.

Detail

Unit Rate (British System)

4' x 6.75'

27 Sft

Material
Shishim Wood
Top Rail 1x4'x3\"x4\"
Vertical Rail 2x7'x3\"x4\"

0.45
1.33
1.78
0.27
2.05
6.00

Wastage 15%
Iron hold fast
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Cft
Cft
Cft
Cft
Cft
Nos

Percent

27
Labour
Carpenter
Skilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

0.50 No
0.40 No
Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 91

roviding and fixing chowkhat for doors, wi


C. Windows including hold fast etc.
hisham Wood.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
0.00 Each

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.05

DESCRIPTION

OF

Rate Analysis
Material

ITEM NO

28:

a)

Making & fixing deodar wood


boards etc. planed on both
including nails & screws, b
1\" (25mm) Thick.

Detail

Unit Rate (British System)

for

100 Sft

Deodar Wood
Nail & Screws bolt and brackets

Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

9.50 Cft

20

Percent

100
Labour
Carpenters
Skilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.00 Nos
1.00 No
Percent

20

Percent

100
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 92

aking & fixing deodar wood planking in eav


oards etc. planed on both side related & f
ncluding nails & screws, bolt & brackets.
\" (25mm) Thick.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
L.S.

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

28

Rate Analysis
Material

Making & fixing deodar wood


boards etc. planed on both
including nails & screws, b
b)

\" (20mm) Thick.

Detail

Unit Rate (British System)

for

100 Sft

Deodar Wood
Asscessories for fixing

Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

7.12 Cft

20

Percent

100
Labour
Carpenters
Skilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.00 Nos
1.00 No
Percent

20

Percent

100
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 93

aking & fixing deodar wood planking in eav


oards etc. planed on both side related & f
ncluding nails & screws, bolt & brackets.

\" (20mm) Thick.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
L.S.

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

28

Rate Analysis
Material

Making & fixing deodar wood


boards etc. planed on both
including nails & screws, b

for

c)

\" (12mm) Thick

Detail

Unit Rate (British System)

100 Sft

Deodar Wood
Asscessories for fixing

Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.75 Cft

20

Percent

100
Labour
Carpenters
Skilled Cooly

4.00 Nos
1.00 No

Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

Percent

20

Percent

100
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 94

aking & fixing deodar wood planking in eav


oards etc. planed on both side related & f
ncluding nails & screws, bolt & brackets.

\" (12mm) Thick

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
L.S.

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.05

DESCRIPTION

OF

ITEM NO

29:

Making and fixing deodar wo


including brackets.

Rate Analysis
Material

i)

1\" (25mm) Thick.

Detail

Unit Rate (British System)

for

100 Sft

Deodar Wood
Accessoires for fitting

Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

9.50 Cft

20

Percent

100
Labour
Carpenters
Skilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.00 Nos
1.00 No
Percent

20

Percent

100
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 95

aking and fixing deodar wood shelves,


ncluding brackets.

\" (25mm) Thick.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
L.S.

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

29

Making and fixing deodar wo


including brackets.
ii)

1\" (40mm) Thick

Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

100 Sft

Material
Deodar Wood
Asscessories for fixing

Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

14.25 Cft
L.S.

20

Percent
0.0
100

Labour
Carpenters
Skilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.00 Nos
1.00 No
Percent

20

Percent
0.0
100

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Rs.
Rs.
Rs.
Rs.

Page 96

aking and fixing deodar wood shelves,


ncluding brackets.

\" (40mm) Thick

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00 P. Day
0.00 P. Day

Say
Say
Say
Say

.05

Item No.

Rate

29

Analysis

Making and fixing deodar wo


including brackets.
iii)

2\" (50mm) Thick.

Detail

Unit Rate (British System)

for

100 Sft

Material
Deodar Wood
Asscessories for fixing

Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

19.00 Cft

20

Percent

100
Labour
Carpenters
Skilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.00 Nos
1.00 No
Percent

20

Percent

100

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 97

aking and fixing deodar wood shelves,


ncluding brackets.

\" (50mm) Thick.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
L.S.

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

30:

a)

Making and fixing cleats fo


including hinges and screws

Detail

Rate

Analysis

for

Unit Rate (British System)p

10 Nos

Material
Hinges 2\" (50mm)
Screws 1\" (25mm)
Deodar wood
Total
Contractor's Profit & Ove
Total

10.00 Nos
3.50 Doz
0.21 Cft

20

Percent

Labour
Carpenters
Skilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove
Total

0.40 No
0.20 No
Percent

20

Percent

Item Rates
Labour Rate for Each

Rs.

Composite Rate for Each

Rs.

Page 98

aking and fixing cleats for doors and wind


ncluding hinges and screws.

nit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Each
0.00 P. Doz
0.00 P. Cft

0.00 P. Day
0.00 P. Day

0.0

0.0 Say

0.0

-.25 Say

10

10

.2

Item No.

30

Making and fixing cleats wi


ventilator.

Detail

Unit Rate (British System)p

Material
Brass hooks
Deodar Wood
Screws/ Nails
Total
Contractor's Profit & Ove
Total

0.01 Cft
2.00 Nos

20

Percent

Labour for 1.25 Nos.


Carpenter
Skilled Cooly
Total
Sundries 10
Total
Contractor's Profit & Ove
Total

0.05 No
0.05 No
Percent

20

Percent

Item Rates
Labour Rate for Each

Rs.

Composite Rate for Each

Rs.

Page 99

aking and fixing cleats with brass hooks f


entilator.

nit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

1 No

0.00 Each
0.00 P. Cft
0.00 P. Doz

0.44
0.44
.09
.53

0.00 P. Day
0.00 P. Day

0.0
1.25

0.0 Say

.48 Say

.5

Item No.

30

Providing and fixing door s


dia rubber block.
Detail

Rate

Analysis

for

Unit Rate (British System)p

30 Nos

Material
Door rubber stopper
Gutty
Screws
Total
Contractor's Profit & Ove
Total

30.00 Nos
30.00 Nos
2.5
20

Percent

Labour
Carpenter
Total
Sundries 10
Total
Contractor's Profit & Ove
Total

0.25 No

Percent
20

Percent

Item Rates
Labour Rate for Each

Rs.

Composite Rate for Each

Rs.

Page 100

roviding and fixing door stops of 1\" (40m


ia rubber block.

nit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Doz

0.00 Each
0.00 Each
0.00 P. Doz

0.00 P. Day

0.0

0.0 Say

0.0

-.1 Say

30

30

.1

Item No.

30

Providing and fixing G.I. h


doors.

Detail

Unit Rate (British System)p

Material
G.I. Hook
Gutty
Total
Contractor's Profit & Ove
Total

1.00 No
1.00 No

20

Percent

Labour (Labour for 30 No.)


Carpenter
Total
Sundries 10
Total
Contractor's Profit & Ove
Total

0.08 No

Percent
20

Percent

Item Rates
Labour Rate for Each

Rs.

Composite Rate for Each

Rs.

Page 101

roviding and fixing G.I. hook with clamps

nit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Each
0.00 Each

0.00 P. Day

0.0

0.0 Say

0.0 Say

30

DESCRIPTION OF
Item No. 31

Rate Analysis
Material

ITEM:

Hard wood railing of any sh


including bends and corners
including polishing complet
by Engineer Incharge.

for

a)

Shisham Wood.

Detail

Unit Rate (British System)

12 Rft

Shisham wood
Sand paper
Polishing material
Total
Contractor's Profit & Ove
Total 12 Rft.
Rate Per Rft

0.90 Cft
3.00 Nos
0.075 Kg.

20

Percent

12
Labour
Carpenters
Skilled Cooly
Polisher

1.50 No
0.75 No
0.50 No

Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 12 Rft.
Rate Per Rft

Percent

20

Percent

12
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Page 102

ard wood railing of any shape and design


ncluding bends and corners fixed in positi
ncluding polishing complete as directed
y Engineer Incharge.

hisham Wood.

nit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
0.00 Each
0.00 P. Kg.

0.0 =

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

31

Rate Analysis
Material

Hard wood railing of any sh


including bends and corners
including polishing complet
by Engineer Incharge.

for

b)

Teak Wood.

Detail

Unit Rate (British System)

10 Rft

Teak wood
Sand paper
Polishing material
Total
Contractor's Profit & Ove
Total for 10 Rft.
Rate Per Rft

0.90 Cft
3.00 Nos
0.075 Kg.

20

Percent

10
Labour
Carpenters
Skilled Cooly
Polisher
Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 10 Rft.
Rate Per Rft

1.00 No.
0.50 No
0.20 No
Percent

20

Percent

10
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Page 103

ard wood railing of any shape and design


ncluding bends and corners fixed in positi
ncluding polishing complete as directed
y Engineer Incharge.

eak Wood.

nit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
0.00 Each
0.00 P. Kg.

0.0 =

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say

.01
Say

Say

DESCRIPTION

OF

ITEM NO

32:

Deodar wood dado or Picture


(50x40mm) as per approved d
moulding and fixed in place
plugs and painting complete
Detail

Rate

Analysis

for

Unit Rate (British System)

Material
Deodar wood
Sand paper
Rawal Plugs
Screws
Polishing material
Total
Contractor's Profit & Ove
Total for 10 Rft.
Rate Per Rft

10 Rft

0.60 Cft
1.00 Sht
0.50 No
0.50 Doz
0.038 Kg.
20

Percent

10
Labour
Carpenter
Skilled Cooly
Polisher
Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 10 Rft.
Rate Per Rft

0.50 No
0.25 No
0.10 No
Percent

20

Percent

10
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Page 104

eodar wood dado or Picture Rail 3\"x1\"


50x40mm) as per approved design including
oulding and fixed in place, cost of screws
lugs and painting complete.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00
0.00

P. Cft
P. Sht
Each
P. Doz
P. Kg.

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0 =

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

.1

DESCRIPTION

Rate

OF

Analysis

ITEM NO

for

33:

Sawing wood by hand.

a)

Soft wood (Deodar Kail, Chi

Detail

Unit Rate (British System)

300 Sft

Labour
Sawyer
Skilled Cooly

1.50 Nos
1.50 Nos

Total
Sundries 10
Total
Contractor's Profit & Ove
Total

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

Page 105

awing wood by hand.

oft wood (Deodar Kail, Chir)

nit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 x 100 =154.28

.02

300
0.00 Say

Item No.

33:

Sawing wood by hand.


b)

Hard Wood (Shisham, Kikar,

Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

450 Sft

Labour
Sawyer
Skilled Cooly

3.00 Nos
3.00 Nos

Total
Sundries 10
Total
Contractor's Profit & Ove
Total

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

Page 106

awing wood by hand.

ard Wood (Shisham, Kikar, Sal or Teak)

nit Rate (British System) per 100 Sft


Rate
Per Unit

Amount

0.00 P. Day
0.00 P. Day

0.0 x 100=205.7

Say

450
0.0

DESCRIPTION

Rate

OF

Analysis

ITEM NO

for

34:

Sawing wood by machine.

a)

Soft Wood.

Detail

Unit Rate (British System)

300 Sft

Labour
Sawyer
Skilled Cooly

1.00 No
0.77 No

Total
Sundries 10
Total
Contractor's Profit & Ove
Total

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

Page 107

awing wood by machine.

oft Wood.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 x 100=94.97 Say

.01

300
0.0 Say

Item No.

Rate

34

Analysis

Sawing wood by machine.

for

b)

Hard Wood.

Detail

Unit Rate (British System)

300 Sft

Labour
Sawyer
Skilled Cooly

1.50 Nos
1.16 Nos

Total
Sundries 10
Total
Contractor's Profit & Ove
Total

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

Page 108

awing wood by machine.

ard Wood.

nit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

300

0.0 x 100=142.62 S
0.0 Say

DESCRIPTION

OF

ITEM NO

35:

Making and fixing sun shade


including fixing brackets.

Detail

Rate

Analysis

for

Unit Rate (British System)

5 Sft

Material
Deodar Wood
Horizontal Planks
Top 4x5x1/3x1/24
Vertical 2x1x1/6x5/68
Supports along sun shade
2x3/2x1/8x5/48
Suporting brackets 2x1x1/8x5/48
Front ears hard strips 1x5x1/4x1/12
Wastage 10%
Sawing & Nails
Total
Contractor's Profit &20
Total for 5 Sft.
Rate Per Sft

0.28 Cft
0.06 Cft
0.04 Cft
0.03
0.10
0.51
0.05
0.56

Cft
Cft
Cft
Cft
Cft

Percent

5
Labour
Carpenter
Cooly Skilled
Total
Sundries 10
Total
Contractor's Profit &20
Total for 5 Sft.
Rate Per Sft

0.25 No
0.10 No
Percent

Percent

5
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 109

aking and fixing sun shade of deodar wood


ncluding fixing brackets.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

L.S.

8
8
1.6
9.6
1.92

9.6 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say

Say
#####

Say

1.9
20.65

DESCRIPTION

OF

ITEM NO

36:

Making and fixing 1\" (25mm


wooden notice board with fr

Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

18 Sft

Material
Kail or Chir Wood
Nails
Glue
Iron Hook
Total
Contractor's Profit & Ove
Total for 18 Sft.
Rate Per Sft

1.64 Cft
0.093 Kg.
0.075 Kg.
1.00 No.
20

Percent

18
Labour
Carpenter
Cooly Skilled
Total
Sundries 10
Total
Contractor's Profit & Ove
Total for 18 Sft.
Rate Per Sft

0.75 No
0.75 No
Percent

20

Percent

18
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 110

aking and fixing 1\" (25mm) thick Kail or C


ooden notice board with frame.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

P. Cft
P. Kg.
P. Kg.
Each

0.00 P. Day
0.00 P. Day

0.0 =

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

37:

Making deodar Punkha Pole =


(3.047x0.150x0.150M).

Detail

Unit Rate (British System)

Material
Deodar wood
Hooks
Total
Contractor's Profit & Ove
Total

2.50 Cft
2

20

Percent

Labour
Carpenter
Cooly Skilled
Total
Sundries 10
Total
Contractor's Profit & Ove
Total

0.20 No
0.10 No

Percent
20

Percent

Item Rates
Labour Rate for Each

Rs.

Composite Rate for Each

Rs.

Page 111

aking deodar Punkha Pole = 10'x6\"x6\"


3.047x0.150x0.150M).

nit Rate (British System) per Each


Qty

Doz

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
0.00 P. Doz

0.00 P. Day
0.00 P. Day

Say

0.0 Say

DESCRIPTION

OF

ITEM NO

38:

Dismantling and refixing ea

Detail

Rate

Analysis

for

Unit Rate (British System)

70 Rft

Labour
Carpenter
Cooly Skilled
Total
Sundries 10
Total
Contractor's Profit & Ove
Total

1.00 No
0.50 No
Percent

20

Percent

Item Rates
Labour Rate Per Rft

Rs.

Labour Rate Per Rm

Rs.

Page 112

ismantling and refixing eaves boards.

nit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 -

Say

0.0

Say

70

DESCRIPTION

OF

ITEM NO

39:

Making wooden stair cases c


915mm) wide frame 1\" (40m
deodar wood, including hand

Detail

Unit Rate (British System)


Qty

Rate Analysis for =


Material
Deodar Wood
Detail of Deodar Wood
2x5/6x15x1/8
Stops 14x2x1/8x5/6
and Rail 2x15xx
and Rail 2x4x3xx
Wastage

15 Rft

L. S

Nails
Bolts \" to 3\" (12 to 76mm) long
Steel rods dia 3x3'-6\" = 10.5 Rft
Washers
Total
Contractor's Profit &20
Percent
Total for 15 Rft.
Rate Per Rft

3.12 Cft
3.65 Cft
1.88 Cft
1.50 Cft
10.15 Cft
0.35 Cft
10.50 Cft
0.93 Kg
5.880 Kg.
15.3Lb (7 .5Kg)
12.00 Nos

15
Labour
Carpenter
Blacksmith
Hammer-man
Cooly Skilled
Total
Sundries 10
Total
Contractor's Profit &20
Total for 15 Rft.
Rate Per Rft

2.00
0.50
0.50
2.00
Percent
Percent

15
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Nos
No
No
Nos

Page 113

aking wooden stair cases complete 2' to 3'


15mm) wide frame 1\" (40mm) thick planks o
eodar wood, including hand rails.

nit Rate (British System) per Rft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00
0.00

5.3Lb (7 .5Kg)

P. Cft
P. Kg
P. Kg
P. Kg
Each

P.
P.
P.
P.

0.0 =

0.00
0.00
0.00
0.00

Day
Day
Day
Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
#####
#####

Say
.01
Say
Say

7.3
24

DESCRIPTION

OF

ITEM NO 40:
a - (i)

Providing and fixing partit


Sheets on one side of frame
Hard Board.

Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

128 Sft

Material
Hard Board Sheet
1x8x16
Wastage 5%

128.00 Sft
6.40 Sft
134.40 Sft

Deodar Wood & other Accessories


Frame work 2x16x3\"x2\"
Horizontal post 1x16x2\"x2\"
2x8x3\"x2\"
3x8x2\"x2\"

1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.47

Wastage 15%
Nails of all sorts
Screws 2.00 Doz
Total
Contractor's Profit &20
Total for 128 Sft.
Rate Per Sft

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg

Percent

128
Labour
Carpenter
Cooly Skilled
Total
Sundries
10
Total
Contractor's Profit &20
Total for 128 Sft.
Rate Per Sft

1.00 Nos
1.00 Nos
Percent
Percent

128
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 114

roviding and fixing partition including fr


heets on one side of frame work.
ard Board.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.)Amount (Rs.)

28.00 Sft

34.40 Sft

0.00 Sft

0.00 P. Cft
0.00 P. Kg
0.00 P.
Doz

0.0

100

0.00 P. Day
0.00 P. Day

0.0

Rs.
Rs.
Rs.
Rs.

100

#####
#####

Say
Say
Say
Say

1
.1

Item No.

40
a - (ii)

Detail

Rate

Analysis

for

128 Sft

Material
Ply Wood 1x8'x16
Wastage 5%
Deodar Wood
Frame work 2x16x3\"x2\"
Horizontal post 1x16x2\"x2\"
Vertical post 3x8x2\"x2\"
Vertical post 3x8x2\"x2\"
Wastage 15%
Nails of all sorts
Screws 2.00 Doz
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

20

Percent

10

Percent

20

Percent

Page 115

Providing and fixing partition including fr


Ply wood \" (6mm) thick.
One Side.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.)Amount (Rs.)

128.00 Sft
6.40 Sft
134.40 Sft
1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.47

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg

0.00 Sft

0.00 P. Cft
0.00 Kg
0.00 P.
Doz

0.0

100

128
1.00 Nos
1.00 Nos

0.00 P. Day
0.00 P. Day

0.0

100

128
Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

1
.1

Item No.

40
a - (iii)

Providing and fixing partit


Masonite sheet.
One Side.

Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

128 Sft

Material
Masonite sheet 1x8x16
Wastage 5%

128.00 Sft
6.40 Sft
134.40 Sft

Deodar Wood & other Accessories


Frame work 2x16x3\"x2\"
Horizontal post 1x16x2\"x2\"
2x8x3\"x2\"
3x8x2\"x2\"

1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.47

Wastage 15%
Nails of all sorts
Screws 2.00 Doz
Total
Contractor's Profit &20
Total for 128 Sft.
Rate Per Sft

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg

Percent

128
Labour
Carpenter
Cooly Skilled
Total
Sundries
10
Total
Contractor's Profit &20
Total for 128 Sft.
Rate Per Sft

1.00 Nos
1.00 Nos
Percent
Percent

128
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 116

roviding and fixing partition including fr


asonite sheet.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.)Amount (Rs.)

28.00 Sft

34.40 Sft

0.00 Sft

0.00 P. Cft
0.00 P. Kg
0.00 P.
Doz

0.0

100

170.00 P. Day
85.00 P. Day

336.6

Rs.
Rs.
Rs.
Rs.

100

#####
#####
#####
#####

Say
Say
Say
Say

170
85
255
25.5
280.5
56.1
336.6
262.97

262.95
28.3
261.9
28.2

Item No.

40
b (1)

Providing and fixing partit


Sheets on both sides of fra
Hard Board.

Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

128 Sft

Material
Hard Board Sheet
2 x 16 x 8
Wastage 5%

256.00 Sft
12.80 Sft
268.80 Sft

Deodar Wood & other Accessories


Horizontal Post.
2x16x3\"x2\"
1x16x2\"x2\"
Vertical post 2x8x3\"x2\"
3x8x2\"x2\"

1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.70
2.00

Wastage 15%
Nails of all sorts
Screws of all sorts
Total
Contractor's Profit &20
Total for 128 Sft.
Rate Per Sft

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz

Percent

128
Labour
Carpenter
Cooly Skilled
Total
Sundries
10
Total
Contractor's Profit &20
Total for 128 Sft.
Rate Per Sft

1.20 Nos
1.20 Nos
Percent
Percent

128
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 117

roviding and fixing partition including fr


heets on both sides of frame work.
ard Board.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.)Amount (Rs.)

56.00 Sft

68.80 Sft

0.00 Sft

0.00 P. Cft
0.00 P. Kg
0.00 P. Doz

0.0

100

0.00 P. Day
0.00 P. Day

0.0

Rs.
Rs.
Rs.
Rs.

100

#####
#####

Say
Say
Say
Say

1
.1

Item No.

40
b - (ii)
Detail

Rate

Analysis

for

128 Sft

Material
Ply Wood Sheet 2 x 16 x 8 (2 x 4.876 x
2.438) =
23.78 M
Wastage 5%
Deodar Wood for frame work
Horizontal post 2x16x3\"x2\"
Cross 1x16x2\"x2\"
Vertical post 2x8x3\"x2\"
Vertical post 3x8x2\"x2\"
Wastage 15%
Nails of all sorts
Screws 3.00 Doz
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

20

Percent

10

Percent

20

Percent

Page 118

Providing and fixing partition including fr


Ply wood.
\" (6mm) thick
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.)Amount (Rs.)

256.00 Sft
12.80 Sft
268.80 Sft
1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.70

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg

0.00 Sft

0.00 P. Cft
0.00 P. Kg
0.00 P.
Doz

0.0

100

128
1.20 Nos
1.20 Nos

0.00 P. Day
0.00 P. Day

0.0

100

128
Rs.
Rs.
Rs.
Rs.

#####
#####
#####

Say
Say
Say
Say

1.6
.1

Item No.

40
b - (iii)

Providing and fixing partit


Masonite sheet.

Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

128 Sft

Material
Masonite sheet 2x16'x8'
Wastage 5%

256.00 Sft
12.80 Sft
268.80 Sft

Deodar Wood & other Accessories


Horizontal Post.
2x16x3\"x2\"
1x16x2\"x2\"
Vertical post 2x8x3\"x2\"
3x8x2\"x2\"

1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.70

Wastage 15%
Nails of all sorts
Screws 2.00 Doz
Total
Contractor's Profit &20
Total
Rate Per Sft

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg

Percent

128
Labour
Carpenter
Cooly Skilled
Total
Sundries
10
Total
Contractor's Profit &20
Total
Rate Per Sft

1.20 Nos
1.20 Nos
Percent
Percent

128
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 119

roviding and fixing partition including fr


asonite sheet.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.)Amount (Rs.)

56.00 Sft

68.80 Sft

0.00 Sft

0.00 P. Cft
0.00 P. Kg
0.00 P.
Doz

0.0

100

0.00 P. Day
0.00 P. Day

0.0

Rs.
Rs.
Rs.
Rs.

100

#####
#####
#####

Say
Say
Say
Say

1
.1

DESCRIPTION

OF

ITEM NO
i)

41:

Providing and fixing ceilin


Hard Board.

Detail

Rate

Analysis

for

Unit Rate (British System)

192 Sft

Material
Hard Board 16x12

192.00 Sft

Partal Wood
7x16x3\"x1\"
9x16x3\"x1\"

3.50 Cft
3.38 Cft
6.88 Cft
0.69 Cft
7.57 Cft
32.00 Nos
3.00 Doz
0.70 Kg
0.178 Bag
4.00 Nos
4.00 Nos

Wastage 10%
Hard Wood Gutti
Screws
Nail
Cement for grouting
M.S clamp
M.S hook
Total
Contractor's Profit &20
Total for 192 Sft.
Rate Per Sft

Percent

192
Labour
Carpenter
Cooly Skilled
Cooly
Total
Sundries
10
Total
Contractor's Profit &20
Total for 192 Sft.
Rate Per Sft

3.00 Nos
2.00 Nos
1.00 No
Percent
Percent

192
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 120

roviding and fixing ceiling including fram


ard Board.

nit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

92.00 Sft

0.00 Sft

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0

P. Cft
Each
P. Doz
P. Kg
P. Bag
Each
Each

100

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0

Rs.
Rs.
Rs.
Rs.

100

#####
#####

Say
Say
Say
Say

1
.1

Item No.

41

Rate

ii)

Providing and fixing ceilin


Chip Board Sheets.

Detail

Unit Rate (British System)

Analysis

for

192 Sft

Material
Chip Board 1x16x12

192.00 Sft

Partal Wood & other Accessories


Partal Wood.
7x16x3\"x1\"
9x16x3\"x1\"

3.50 Cft
3.38 Cft
6.88 Cft
0.69 Cft
7.57 Cft
32.00 Nos
3.00 Doz
0.70 Kg
0.178 Bag
4.00 Nos
4.00 Nos

Wastage 10%
Wooden Hand Gutti
Screws
Nail
Cement for grouting
M.S clamp
M.S hook
Total
Contractor's Profit &20
Total for 192 Sft.
Rate Per Sft

Percent

192
Labour
Carpenter
Cooly Skilled
Cooly
Total
Sundries
10
Total
Contractor's Profit &20
Total for 192 Sft.
Rate Per Sft

3.00 Nos
2.00 Nos
1.00 No
Percent
Percent

192
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 121

roviding and fixing ceiling including fram


hip Board Sheets.

nit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

92.00 Sft

0.00 Sft

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0

P. Cft
Each
P. Doz
P. Kg
P. Bag
Each
Each

100

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0

Rs.
Rs.
Rs.
Rs.

100

#####
#####

Say
Say
Say
Say

1
.1

Item No.

41

Rate

iii)

Providing and fixing ceilin


work.
Ply Wood \" (6mm) thick.

Detail

Unit Rate (British System)

Analysis

for

192 Sft

Material
Ply Wood \" (6mm) 12x16

192.00 Sft

Partal Wood & other Accessories


Partal Wood :
7x16x3\"x1\"
9x16x3\"x1\"

3.50 Cft
3.38 Cft
6.88 Cft
0.69 Cft
7.57 Cft
32.00 Nos
3.00 Doz
0.70 Kg
0.178 Bag
4.00 Nos
4.00 Nos

Wastage 10%
Wooden Hand Gutti
Screws
Nail
Cement for grouting
M.S clamp
M.S hook
Total
Contractor's Profit &20
Total for 192 Sft.
Rate Per Sft

Percent

192
Labour
Carpenter
Cooly Skilled
Cooly
Total
Sundries
10
Total
Contractor's Profit &20
Total
Rate Per Sft

3.00 Nos
2.00 Nos
1.00 No
Percent
Percent

192
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 122

roviding and fixing ceiling including fram

ly Wood \" (6mm) thick.

nit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

92.00 Sft

0.00 Sft

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0

P. Cft
Each
P. Doz
P. Kg
P. Bag
Each
Each

100

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0

Rs.
Rs.
Rs.
Rs.

100

#####
#####

Say
Say
Say
Say

1
.1

Item No.

41

Rate

iv)

Providing and fixing ceilin


Masonite Sheet.

Detail

Unit Rate (British System)

Analysis

for

192 Sft

Material
Masonite Sheet 1x16x12
Partal Wood & other Accessories
Partal Wood.
7x16x3\"x1\"
9x16x3\"x1\"

192.00 Sft

3.50 Cft
3.38 Cft
6.88 Cft
0.69 Cft
7.57 Cft
32.00 Nos
3.00 Doz
0.70 Kg
0.178 Bag
4.00 Nos
4.00 Nos

Wastage 10%
Wooden Hand Gulli
Screws
Nail
Cement for grating
M.S clamp
M.S hook
Total
Contractor's Profit &20
Total for 192 Sft.
Rate Per Sft

Percent

192
Labour
Carpenter
Cooly Skilled
Cooly Unskilled
Total
Sundries
10
Total
Contractor's Profit &20
Total for 192 Sft.
Rate Per Sft

3.00 Nos
2.00 Nos
1.00 No
Percent
Percent

192
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 123

roviding and fixing ceiling including fram


asonite Sheet.

nit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

92.00 Sft

0.00 Sft

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0

P. Cft
Each
P. Doz
P. Kg
P. Bag
Each
Each

100

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.0

Rs.
Rs.
Rs.
Rs.

100

#####
#####

Say
Say
Say
Say

1
.1

Item No.

42

Providing and fixing thermo


including wooden frame pane
clamps, making holes in wal
damaged surface, complete i
a)
i)

Deodar wood frame panelling


\" (20mm) Thick.

Detail

Unit Rate (British System)


Qty

Rate Analysis
Material

for

12' x 12' =

144 Sft

Thermopore \" thick


Wastage 5%

144.00 Sft
7.20 Sft
151.20 Sft

Deodar Wood
Frame Main 3x12x3\"x2\"
Cross 3x12x1\"x2\"
Wooden Strips 12x1\"x\"

1.53 Cft
0.77 Cft
0.25 Cft
2.55 Cft
0.51 Cft
3.06 Cft
3.06 Cft
L.S.
16.00 Nos
6.00 Doz
0.70 Kg
4.00 Nos
4.00 Nos
0.083 Bag
1.500 Cft.

Wastage 20%
Sawing charge
Making holes in walls
Wooden gutties 3 interval
Screws above 1\" long
Nail
M.S. hooks
M.S. clamps
Cement sand for repair
Sand
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

20

Percent

144

Page 124

roviding and fixing thermopore false ceili


ncluding wooden frame panelling, cost of M
lamps, making holes in walls and repairing
amaged surface, complete in all respects.

eodar wood frame panelling.


\" (20mm) Thick.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.)Amount (Rs.)

44.00 Sft

51.20 Sft

.500 Cft.

0.00 Sft

0.00 P. Cf 0.00 P. Cf 0.00 Each 0.00 P. Do 0.00 P. Kg 0.00 Each 0.00 Each 0.00 P. Ba 0.00 % Cft 0.0
100 -

Detail

Unit Rate (British System)


Qty

Labour
Carpenters
Cooly Skilled
Cooly
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

2.25
2.00
0.50
0.25
10

Percent

20

Percent

144
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Nos
Nos
No
No

Page 125

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

0.0

P.
P.
P.
P.

Rs.
Rs.
Rs.
Rs.

Day
Day
Day
Day

100

#####
#####

Say
Say
Say
Say

2.9
.3

Item No.

42

Providing and fixing thermo


including wooden frame pane
clamps, making holes in wal
damaged surface, complete i
a)
ii)

Deodar wood frame panelling


1\" (25mm) Thick.

Detail

Unit Rate (British System)


Qty

Rate Analysis
Material

for

12' x 12' =

144 Sft

Thermopore 1\" thick


Wastage 5%

144.00 Sft
7.20 Sft
151.20 Sft

Deodar Wood
Frame Main 3x12x2\"x3\"
Cross 3x12x1\"x2\"
Wooden Strips 4x12x1\"x\"

1.53
0.77
0.25
2.55
0.51
3.06
3.06
L.S.
6.00
0.70
4.00
4.00
L.S.

Wastage 20%
Sawing charge
Making holes in walls
Screws of all sorts
Nail
M.S. hooks
M.S. clamps
Cement sand for repair
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

20

Percent

144

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Doz
Kg
Nos
Nos

Page 126

roviding and fixing thermopore false ceili


ncluding wooden frame panelling, cost of M
lamps, making holes in walls and repairing
amaged surface, complete in all respects.

eodar wood frame panelling


\" (25mm) Thick.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.)Amount (Rs.)

44.00 Sft

51.20 Sft

0.00 Sft

0.00 P. Cf 0 0.00 P. Do 0.00 P. Kg 0.00 Each 0.00 Each -

24

100

20
20
4
24
16.67

Detail

Unit Rate (British System)


Qty

Labour
Carpenter
Cooly Skilled
Cooly
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

2.25
2.00
0.50
0.25
10

Percent

20

Percent

144

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Nos
Nos
No
No

Page 127

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

0.0

P.
P.
P.
P.

Rs.
Rs.
Rs.
Rs.

Day
Day
Day
Day

100

#####
Say

Say
Say
Say

13.85
1.5

Item No.

42

Providing and fixing thermo


including wooden frame pane
clamps, making holes in wal
damaged surface, complete i
b)
i)

Pertal wood frame panelling


\" (20mm) Thick.

Detail

Unit Rate (British System)


Qty

Rate Analysis
Material

for 12' x 12' =

144 Sft

Thermopore \" thick


Wastage 5%

144.00 Sft
7.20 Sft
151.20 Sft

Pertal Wood
Frame Main Style 3x12x2\"x3\"
Cross Style 3x12x1\"x2\"
Cross Style 4x12x1\"x\"

1.53 Cft
0.77 Cft
0.25 Cft
2.55 Cft
0.51 Cft
3.06 Cft
3.06 Cft
L.S.
16.00 Nos
6.00 Nos
0.70 Kg
4.00 Nos
4.00 Nos
0.083 Bag
1.500 Cft.

Wastage 20%
Sawing charge
Making holes in walls
Wooden gutties 3 interval
Screws of all sorts
Nail
M.S. hooks
M.S. clamps
Cement sand for repair
Sand
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

20

Percent

144

Page 128

roviding and fixing thermopore false ceili


ncluding wooden frame panelling, cost of M
lamps, making holes in walls and repairing
amaged surface, complete in all respects.

ertal wood frame panelling


\" (20mm) Thick.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.)Amount (Rs.)

44.00 Sft

51.20 Sft

0.00 Sft

.500 Cft.

0.00 P. Cf 0.00 P. Cf 0.50 Each


0.00 P. Do 0.00 P. Kg 0.00 Each 0.00 Each 0.00 P. Ba 0.00 % Cft -

9.6

100

8
1.6
9.6
6.67

Detail

Unit Rate (British System)


Qty

Labour
Carpenter
Cooly Skilled
Cooly
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

2.25
2.00
0.50
0.25
10

Percent

20

Percent

144
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Nos
Doz
No
No

Page 129

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

0.0

Rs.
Rs.
Rs.
Rs.

P.
P.
P.
P.

Day
Day
Day
Day

100

Say
Say
Say
Say

3.7
.4

Item No.

42

Providing and fixing thermo


including wooden frame pane
clamps, making holes in wal
damaged surface, complete i
b)
ii)

Pertal wood frame panelling


1\" (25mm) Thick.

Detail

Unit Rate (British System)


Qty

Rate Analysis for


Material

12' x 12' =

144 Sft

Thermopore 1\" thick


Wastage 5%

144.00 Sft
7.20 Sft
151.20 Sft

Pertal Wood
Frame Main Style 3x12x2\"x3\"
Cross Style 3x12x1\"x2\"
Cross Style 4x12x1\"x\"

1.53 Cft
0.77 Cft
0.25 Cft
2.55 Cft
0.51 Cft
3.06 Cft
3.06 Cft
L.S.
16.00 Nos
6.00 Doz
0.70 Kg
4.00 Nos
4.00 Nos
0.083 Bag
1.500 Cft.

Wastage 20%
Sawing charge
Making holes in walls
Wooden gutties 3 interval
Screws of all sorts
Nail
M.S. hooks
M.S. clamps
Cement sand for repair
Sand
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

20

Percent

144

Page 130

roviding and fixing thermopore false ceili


ncluding wooden frame panelling, cost of M
lamps, making holes in walls and repairing
amaged surface, complete in all respects.

ertal wood frame panelling


\" (25mm) Thick.

nit Rate (British System) per 100 Sft


Rate
Per Unit

Amount

0.00 Sft

44.00 Sft

51.20 Sft

.500 Cft.

0.00 P. Cf 0.00 P. Cf 0.00 Each 0.00 P. Do 0.00 P. Kg 0.00 Each 0.00 Each 0.00 P. Ba 0.00 % Cft 0.0
100 -

Detail

Unit Rate (British System)


Qty

Labour
Carpenter
Cooly Skilled
Cooly
Mason
Total
Sundries
Total

2.25
2.00
0.50
0.25
10

Percent

Contractor's Profit &20


Total for 144 Sft.
Rate Per Sft

Percent

144
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Nos
Nos
No
No

Page 131

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

0.0

P.
P.
P.
P.

Rs.
Rs.
Rs.
Rs.

Day
Day
Day
Day

100

#####
#####

Say
Say
Say
Say

2.8
.3

DESCRIPTION

OF

ITEM NO

43:

Fixing door including chowkhat.

Detail

Unit Rate (British System)p


Qty

Labour
Mason
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate for Each

0.25 No
0.25 No

10

Percent

20

Percent

Rs.

Page 132

including chowkhat.

nit Rate (British System)per Each


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

.01

.01 Say

Item No.

43

Fixing windows including chowkhat.

Detail

Unit Rate (British System)p


Qty

Labour
Mason
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate for Each

0.125 No
0.125 No
10

Percent

20

Percent

Rs.

Page 133

ows including chowkhat.

nit Rate (British System)per Each


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 Say

DESCRIPTION

OF

ITEM NO

44:

a)

Detail

Glazing with panes 160Z to


Gm) including cost of putty
Unit Rate (British System)
Qty

Rate

Analysis

for

14 Sft

Material
Detail of glass panes
Glass Panes
Wastage 10%

14.00 Sft
1.40 Sft
15.40 Sft
L.S.

Cost of Putty and nails


Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft

20

Percent

14
Labour
Glazier for cutting and fixing glass
panes including supplying front & back.
Cooly Skilled
Total
Sundries
10
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft

20

0.25 No
0.25 No
Percent

Percent

14
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 134

lazing with panes 160Z to 180Z (454Gm to 5


m) including cost of putty.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

44

Glazing with panes 16 Oz.


Gm) using deodar wooden fil

Detail

Rate

Analysis

for

Unit Rate (British System)

14 Sft

Material
Glass Panes
D. Wood
Cost of nails and putty.
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft

14.00 Sft
0.09 Cft

20

Percent

14
Labour
Glazier for cutting and fixing glass
panes including supplying front & back.
Cooly Skilled
Cartpenter for
Total
Sundries
10
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft

20

0.25 No
0.25 No
0.13 No
Percent

Percent

14
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 135

lazing with panes 16 Oz. to 18 Oz. (454Gm


m) using deodar wooden fillets and putty.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft
0.00 P. Cft
L.S.

0.0 =

0.00 P. Day
0.00 P. Day
0.00 P. Day

#####

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

45:

Glazing with glass panes 24


737Gm) using putty and deod

Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

15 Sft

putty and deodar wooden fillet.


Considering 5 Nos panes of average
size i.e. 5x18\"x24\"
Material
Glass Panes
Wastage 10%

15 Sft
15.00 Sft
1.50 Sft
16.50 Sft
0.06 Cft
L.S.

D. Wood for fillets


Cost of putty and nails
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft

20

Percent

15
Labour
Glazier 0.38 No
Cooly Skilled
Cartpenter
Cooly 0.13 No
Total
Sundries
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft

0.38 No
0.13 No

10

Percent

20

Percent

15
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 136

lazing with glass panes 24 Oz. to 26 Oz. (


37Gm) using putty and deodar wooden fillet

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft
0.00 P. Cft

0.0 =

0.00
0.00
0.00
0.00

P.
Day
P. Day
P. Day
P.
Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO
a)

46:

Cutting to required sizes a


with putty.

Detail

Rate

Analysis

for

Unit Rate (British System)

14 Sft

Material
Cost of nails & putty
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft

20

Percent

14
Labour
Glazier 0.20 No
Cooly Skilled

Total
Sundries
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft

0.15 No

10

Percent

20

Percent

14
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 137

utting to required sizes and fixing glass


ith putty.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

L.S.

0.0 =

0.00 P.
Day
0.00 P. Day

0.0 =

Rs.
Rs.

#####

Say
Say

Rs.
Rs.

Say
Say

Item No.

46

Cutting to required sizes a


with wooden fillets and put
Detail

Rate

Analysis

for

Unit Rate (British System)

16 Sft

Material
Deodar wood for fillets
Putty and nails
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft

0.10 Cft

20

Percent

16
Labour
Glazier 0.20 No
Cooly Skilled
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft

0.20 No
0.10 No
0.10 No
10

Percent

20

Percent

16
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 138

utting to required sizes and fixing glass


ith wooden fillets and putty.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
L.S.

0.0 =

0.00
0.00
0.00
0.00

P.
Day
P. Day
P. Day
P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

47:

Glazing with plate glass \


the cost of deodar wood fil
Glazing upto 8 Sft (0.744M

a)
Detail

Rate

Unit Rate (British System)

Analysis

for

8 Sft

Material
Plate glass \" (6mm) thick
Wastage 10%

8.00
0.80
8.80
0.05

Deodar wood for fillets


Cost of nails and putty

Total
Contractor's Profit &20
Total for 8 Sft.
Rate Per Sft

Sft
Sft
Sft
Cft

Percent

8
Labour
Glazier 0.17 No
Cooly Skilled
Carpenter
Cooly Skilled
Total
Sundries
Total

0.17 No
0.06 No
0.06 No
10

Percent

Contractor's Profit &20


Total for 8 Sft.
Rate Per Sft

Percent

8
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 139

lazing with plate glass \" (6mm) thick inc


he cost of deodar wood fillets and putty.
lazing upto 8 Sft (0.744M).

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft
0.00 P. Cft
L.S.

0.0 =

0.00
0.00
0.00
0.00

P.
Day
P. Day
P. Day
P. Day

0.0 =

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

47

Glazing exceeding 8 Sft (0.


and not exceeding 24 Sft (2
Detail

Unit Rate (British System)


Qty

Rate

Analysis

for

16 Sft

Material
Plate glass \" (6mm) thick
Wastage 10%
Deodar wood for fillets
Cost of nails and putty
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft

16.00 Sft
1.60 Sft
17.60 Sft
0.10 Cft
L.S.
20

Percent

16
Labour
Glazier 0.33 No
Cooly Skilled
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft

0.33 No
0.13 No
0.13 No
10

Percent

20

Percent

16
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 140

lazing exceeding 8 Sft (0.744M)


nd not exceeding 24 Sft (2.230M)

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft
0.00 P. Cft

0.0 =

0.00
0.00
0.00
0.00

P.
P. Day
P. Day
P. Day

Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

.2

DESCRIPTION

OF

ITEM NO

48:

i)

Providing and fixing 1\" (40mm) thick


wood panelled or panelled and glazed,
windows, with mild steel chowkhat (fra
complete in all respects (excluding sl
lock) with :
M.S. angle iron 1\"x1\"x\" (40x40x6
welded with M.S. flat 2\"x\" (50x6mm)

Detail

Unit Rate (British System)


Qty

Rate Analysis for 4' x 6.75' = 27 Sft


Material
Angle Iron 1\"x1\"x\"
Vertical
2 x 7 = 14.00 Rft.
Horizontal l
1 x 4 =
4.00 Rft.
18.00 Rft.
Wastage 5%
0.90 Rft.
18.90 Rft.
18.90 Rft. @ 2.34 lbs/Rft.
MS Bar \"dia 4' @ 0.67 lbs/Rft.
MS Flat 2\"x = 18.90 Rft. @ 1.70 lbs/Rft

Wood
Vertical Style 4x6'-8\"x4\"x1\"
Horizontal Top 2x1'-11\"x4\"x1\"
Middle Top 2x1'-11\"x4\"x1\"
Local Top 2x1'-11\"x6\"x1\"
Bottom Top 2x1'-11\"x8\"x1\"
Panells
2x16\"x23\"x5/8\"
4x16\"x19\"x5/8\"
Beading
2(16+16+23+23) 5/8
(1+2) =
0.01
2x8
4(16+16+19+19) 5/8
(1+1)
2x8
Wastage 30%

44.23 lbs
2.68 lbs
32.13 lbs
79.04 lbs
35.85 Kgs
1.12
0.16
0.16
0.24
0.32

Cft
Cft
Cft
Cft
Cft

0.24 Cft
0.47 Cft

0.01 Cft

0.02 Cft
2.74 Cft
0.82 Cft
3.56 Cft

Page 141

nd fixing 1\" (40mm) thick deoda


ed or panelled and glazed, doors
th mild steel chowkhat (frame),
all respects (excluding sliding

iron 1\"x1\"x\" (40x40x6mm)


M.S. flat 2\"x\" (50x6mm)

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 per Kg

0.00 P. Cft

Detail

Unit Rate (British System)

Fitting
Hinges 4\" (100mm)
Tower bolt 9: (225mm)
Handle 6\" (150mm)
Iron hold fast
Rubber
Hook & clamp
Screws
Glue
Spikes
Sawing charge

Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

8.00 Nos
3.00 Nos
3.00 Nos
6.00 Nos
2.00 Nos
2.00 Nos
2.50 Doz
0.05 Kg.
0.13 Kg.
35.60 Sft

20

Percent

27
Labour
Carpenter
Cooly Skilled
Welder
Blacksmith
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

2.40
1.80
1.00
0.57

10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Nos
Nos
No
No

Page 142

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P.Kg.
P.Kg.
Sft

0.0 =

0.00
0.00
0.00
0.00

P.
P.
P.
P.

Day
Day
Day
Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

1.3
14.1

Item No.

48

ii)

Providing and fixing 1\" (


wood panelled or panelled a
windows, with mild steel ch
complete in all respects (e
lock) with :
M.S. Tee Iron 1\"x1\"x\"
welded with M.S. flat \"x

Detail

Rate Analysis for 4' x 6.75' = 27 Sft


Material
T-Iron 1\"x1\"x\"
Vetical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.90 Rft 2.36 Lbs/Rft
M.S. bar \" 0.67@ ' 4= Lbs
M.S. flat \"x\"=18.90 Rft @ 0.425 Lbs
55.31Lbs ( 25.10)Kg
Deodar Wood
Vertical Style 4x6'-8\"x4\"x1\"
Horizontal Top 2x1'-11\"x4\"x1\"
Middle Top 2x1'-11\"x4\"x1\"
Local Top 2x1'-11\"x6\"x1\"
Bottom Top 2x1'-11\"x8\"x1\"
Panells
2x16\"x23\"x5/8\"
4x16\"x19\"x5/8\"
Beading
2(16+16+23+23) 5/8
(1+2)
2x8
4(16+16+19+19) 5/8
(1+1)
2x8
Wastage 30%

Page 143

roviding and fixing 1\" (40mm) thick deoda


ood panelled or panelled and glazed, doors
indows, with mild steel chowkhat (frame),
omplete in all respects (excluding sliding
ock) with :
.S. Tee Iron 1\"x1\"x\" (40x40x6mm)
elded with M.S. flat \"x\" (12x6mm).
Unit Rate (British System) per Sft
Qty

Rate
Per Unit (Rs.)Amount (Rs.)

44.60 Lbs
2.68 Lbs
8.03 Lbs
5.31Lbs ( 25.10)Kg
1.12
0.16
0.16
0.24
0.32

0.00 P. Kg

0.00 P. Cft

Cft
Cft
Cft
Cft
Cft

0.24 Cft
0.47 Cft

0.01 Cft

0.02 Cft
2.74 Cft
0.82 Cft
3.56 Cft

Detail

Fitting
Hinges 4\" (100mm)
Tower bolt 9: (225mm)
Handle 6\" (150mm)
Iron hold fast
Rubber
Hook & clamp
Screws
Glue
Spikes
Sawing charge
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

Unit Rate (British System)

8.00 Nos
3.00 Nos
3.00 Nos
6.00 Nos
2.00 Nos
2.00 Nos
2.50 Doz
0.05 Kg.
0.13 Kg.
35.60 Sft
20

Percent

27
Labour
Carpenter
Cooly Skilled
Welder
Blacksmith
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

2.40
1.80
1.00
0.57
10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Nos
Nos
No
No

Page 144

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P.Kg.
P.Kg.
Sft

P.
P.
P.
P.

0.0 =

0.00
0.00
0.00
0.00

Day
Day
Day
Day

0.0 =

Rs.
Rs.

Say
Say

Rs.
Rs.

#####
#####

Say
Say

.1
.6

DESCRIPTION

OF

ITEM NO

49:

Providing and fixing 1\" (


doors and windows, with com
both faces of deodar wood s
(32mm) thick and partal woo
(76mm) apart and deodar woo
(40x10mm) fixed with M.S. c
including chromium plated f
all respects (without slidi
M.S. Angle Iron 1\"x1\"x
flat 2\"x\"

a)

Detail

Rate

Analysis

for

4' x 6.75'

Unit Rate (British System)


Qty
=

27 Sft

Material
Angle Iron 1\"x1\"x\"
Vetical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
M.S. flat 2\"x\" (50x6mm)
Vetical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.90 Rft @ 1.68 Lbs/Rft
M.S. flat patti 1\"x1/8\" (25x3mm) at bott
Deodar Wood
Vertical Style 2x6'-8\"x4\"x1\"
Vertical Style 3x6'-8\"x2\"x1\"
Horizontal Style 1x3'-11\"x4\"x1\"
Middle Style 1x3'-11\"x4\"x1\"
Lock Style 1x3'-11\"x6\"x1\"
Bottom Style 1x3'-11\"x8\"x1\"
Side Strip 2x6'-8\"x1\"x1/8\"
Side Strip 2x3'-8\"x1\"x1/8\"
Wastage 35%

43.85 Lbs

31.75 Lbs
1.68 Lbs
77.28Lbs (35.06 Kg.
0.47
0.35
0.14
0.14
0.21
0.27
0.02
0.01
1.61
0.56
2.17

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

Page 145

roviding and fixing 1\" (40mm) thick hollo


oors and windows, with commercial ply (3mm
oth faces of deodar wood shutter frame 1\"
32mm) thick and partal wood braces at abou
76mm) apart and deodar wood lipping 1\"x3/
40x10mm) fixed with M.S. chowkhat (frame),
ncluding chromium plated fittings, etc. co
ll respects (without sliding bolt or lock)
.S. Angle Iron 1\"x1\"x\" welded with M.S.
lat 2\"x\"

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

7.28Lbs (35.06 Kg.

0.00 P. Kg

0.00 P. Cft

Detail

Unit Rate (British System)


Qty

Fitting
Hinges 4\" (100mm)
Tower bolt 9: (225mm)
Handle 6\" (150mm)
Iron hold fast
Rubber chocks
Hook & clamp
Screws
Glue
Spikes
Sawing charge
Commercial Ply (3mm)
2x3'-11\"x6'-8\"
Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

4.00 Nos
2.00 Nos
2.00 Nos
6.00 Nos
1.00 No
1.00 No
2.50 Doz
0.75 Kg.
0.20 Kg.
21.70 Sft
53.38 Sft
8.01 Sft
61.39 Sft
20

Percent

27
Labour
Welder for making frame
Black Smith

1 No
1 Nos

For Panelling pressing and erecting door


Carpentre
Skilled Cooly

1 Nos
1 No

Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 146

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P.Kg.
P.Kg.
Sft

0.00 Sft

0.0 =

0.00 Each
0.00 Each

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

1.3
14.1

DESCRIPTION

OF

ITEM NO

49:

Providing and fixing 1\" (


doors and windows, with com
both faces of deodar wood s
(32mm) thick and partal woo
(76mm) apart and deodar woo
(40x10mm) fixed with M.S. c
including chromium plated f
all respects (without slidi
M.S. Tee Iron 1\"x1\"x\"
flat \"x\"
Unit Rate (British System)

b)
Detail

Qty
Rate

Analysis

for

4' x 6.75'

27 Sft

Material
Tee Iron 1\"x1\"x\"
Vetical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft @ 2.36
M.S. flat \"x\" (40x6mm)
Vetical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft @ 0.423L
M.S. bar \" dia = 4 Rft @ 0.67 Lbs
Deodar Wood
Vertical Style 2x6'-8\"x4\"x1\"
Vertical Style 3x6'-8\"x2\"x1\"
Horizontal Style 1x3'-11\"x4\"x1\"
Middle Style 1x3'-11\"x4\"x1\"
Lock Style 1x3'-11\"x6\"x1\"
Bottom Style 1x3'-11\"x8\"x1\"
Side Strip 2x6'-8\"x1\"x1/8\"
Side Strip 2x3'-8\"x1\"x1/8\"
Wastage 35%

44.60 Lbs

8.03 Lbs
2.68 Lbs
55.31Lbs ( 25.10 Kg
0.47
0.35
0.14
0.14
0.21
0.27
0.02
0.01
1.61
0.56
2.17

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

Page 147

roviding and fixing 1\" (40mm) thick hollo


oors and windows, with commercial ply (3mm
oth faces of deodar wood shutter frame 1\"
32mm) thick and partal wood braces at abou
76mm) apart and deodar wood lipping 1\"x3/
40x10mm) fixed with M.S. chowkhat (frame),
ncluding chromium plated fittings, etc. co
ll respects (without sliding bolt or lock)
.S. Tee Iron 1\"x1\"x\" welded with M.S.
lat \"x\"
nit Rate (British System) per Sft

5.31Lbs ( 25.10 Kg

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Kg

0.00 P. Cft

Detail

Unit Rate (British System)


Qty

Fitting
Hinges 4\" (100mm)
Tower bolt 9: (225mm)
Handle 6\" (150mm)
Iron hold fast
Rubber chocks
Hook & clamp
Screws
Glue
Spikes
Sawing charge
Commercial Ply (3mm)
2x3'-11\"x6'-8\"
Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

4.00 Nos
2.00 Nos
2.00 Nos
6.00 Nos
1.00 No
1.00 No
2.50 Doz
0.75 Kg.
0.20 Kg.
21.70 Sft
53.38 Sft
8.01 Sft
61.39 Sft
20

Percent

27
Labour
Welder for making frame
Black Smith

1 No
1 Nos

For Rendring & Erection Door


Carpentre
Skilled Cooly

1 Nos.
1 No.

Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

10

Percent

20

Percent

27
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 148

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P.Kg.
P.Kg.
Sft

0.00 Sft

0.0 =

0.00 Each
0.00 Each

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####

Say
Say
Say
Say

1.3
14.1

DESCRIPTION

OF

ITEM NO

50:

Providing and fixing 1\" (


door shutter sterling or eq
ply (5mm thick) on both sid
deodar wood lipping 1\"x3/
shutter including chromium
hinges with aluminium kick
sides & finger plate comple

Remarks :

If C.I. finger plate and ki


provided/ fixed the composi
by Rs. 7.60 Per Sft
(81.
Unit Rate (British System)

Detail

Qty
Rate

Analysis for

3.5' x 7' =

24.5 Sft

Material
Solid flush
Door leaf 1\" (40mm) thick sterling
or equivalent with commerical ply
(5mm) thick both sides.
3\"x7'-0' = 24.50 Sft
Deodar Wood Lipping 3/8\"
(3.5+3.5+7.0+7.0)
Hinges 4\" (100mm)
Tower bolt C.P.
C.P. Handle best quality
Door stopper
C.P. finger plate with screws
Kick plate 22 SWG on both sides
Total
Contractor's Profit & Ove
20
Total for 24.5 Sft.
Rate Per Sft

24.50 Sft
21.00 Rft
4.00
2.00
2.00
1.00
1.00
2.00

Nos
Nos
Nos
No
No
Nos

Percent

24.5

Page 149

roviding and fixing 1\" (40mm) thick solid


oor shutter sterling or equivalent with co
ly (5mm thick) on both sides double presse
eodar wood lipping 1\"x3/8\" (40x10mm) arou
hutter including chromium plated fittings,
inges with aluminium kick plate 22SWG on b
ides & finger plate complete in all respec

f C.I. finger plate and kick plate are not


rovided/ fixed the composite rate will be
y Rs. 7.60 Per Sft
(81.76M).
nit Rate (British System) per Sft
Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft

0.00 per/f 0.00


0.00
0.00
0.00
0.00
0.00

0.0 =

Each
Each
Each
Each
Each
Each

Detail

Unit Rate (British System)


Qty

Labour
For planning & fixing of lipping with
door fitting complete.
Carpentre
Skilled Cooly
Total
Sundries
10
Total
Contractor's Profit & Ove
Total for 24.5 Sft.
Rate Per Sft

20

1.00 No
1.00 No
Percent

Percent

24.5
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 150

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####

Say
Say
Say
Say

.2

DESCRIPTION

OF

ITEM NO

51:

Providing and fixing panell


with forged door leaves of
in hollow frame chowkhat 3\
made of M.S. sheet 18 SWG,
concrete 1:3:6 etc. complet
hammer painting, including
fixing in position.

Detail

Unit Rate (British System)


Qty

Rate Analysis for


Material
M.S. Sheet 18 SWG
for chowkhat
18'x15\" 23.44 Sft
Wastage 20%

4' x 7'

28 Sft

4.69 Sft
28.13 Sft

M.S. Sheet 22 SWG


for shutter
26x7 1/8
Wastage 20%

31.50 Sft
6.30 Sft
37.80 Sft

M.S. Flat 1\"x1/16\" (25x2mm)


6'-9\"x0.21 1.43Lb
Fitting
Hinges 4\" (100mm)
Tower bolt 9: (225mm)
Handle 6\" (150mm)
Iron hold fast
Screws
Welding electrode
Electricity Charges
Cement concrete (1:3:6)
Cement
Sand
Bagri
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

(065) Kg
6.00
2.00
2.00
6.00
L.S.
4.00
L.S.

Nos
Nos
Nos
Nos
Nos

0.21 Bag
0.76 Cft
1.52 Cft

20

Percent

28

Page 151

roviding and fixing panelled door of M.S.


ith forged door leaves of M.S. Sheet 22 SW
n hollow frame chowkhat 3\"x4\" (76x114mm)
ade of M.S. sheet 18 SWG, filled with plai
oncrete 1:3:6 etc. complete, with all fitt
ammer painting, including carriage to site
ixing in position.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Sft

0.00 Sft

0.00 P. Kg 0.00
0.00
0.00
0.00

Each
Each
Each
Each

0.00 Each 0.00 Each 0.00 P. Cf 0.00 P. Cf -

4.8 =

4
.8
4.8
.17

Detail

Unit Rate (British System)


Qty

Labour
Welder
Blacksmith
Mason
Coolies
Total
Sundries
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

0.50
2.50
0.25
0.75
10

Percent

20

Percent

28
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

No
Nos
No
No

Page 152

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

P.
P.
P.
P.

Day
Day
Day
Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.15
1.85

DESCRIPTION

OF

ITEM NO

52:

Providing and laying 24 SWG


plate 4\" (100mm) high fixe
(100mm) Centre to Centre on
doors only. of commercial p

Detail

Rate

Analysis

for 4

Unit Rate (British System)

Rft

Material
Aluminium plate 4\" (100mm) wide
and 24 SWG

Total
Contractor's Profit & Ove
Total for 4 Rft.
Rate Per Rft

20

0.18 Kg

Percent

4
Labour
Carpenter
Total
Sundries
Total
Contractor's Profit & Ove
Total for 4 Rft.
Rate Per Rft

0.12 No

10

Percent

20

Percent

4
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rqm

Page 153

roviding and laying 24 SWG aluminium kick


late 4\" (100mm) high fixed with screws 4\"
100mm) Centre to Centre on bottom rail of
oors only. of commercial ply.

nit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Kg

0.0 =

0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

53:

Detail

Material
Rate For

10 Rft

Railing 10.00 Rft


Cutting of Railing
Screws
Guttis
Deodar wood
Total
Contractor's Profit & Ove
Total for 10 Rft.

20

Percent

10

Percent

20

Percent

Material Rate Per Rft.


Labour
Rate For
Carpenter
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

80 Rft

Page 154

Providing and fixing curtain railing to doo


windows, comprising of TOSO-elite Japan mad
superior type of railing or equivalent, fix
4\"x\" (100x20mm) deodar wood strip, includi
painting.
Unit Rate (British System) per Rft
Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P.
1.00 Dozen
6.00 Nos
0.21 Cft

Rft

0.00 P, Doz
0.00 Each
0.00 P. Cft

0.0 =

10

1.00 No

0.00 P. Day

0.0 =
80
Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.54

.15
.55

DESCRIPTION

OF

ITEM NO

54:

Providing and fixing M.S. f


grill including \"x1/8\" (
of windows of approved desi
coat complete in all respec

Detail

Unit Rate (British System)


Qty

Rate Analysis for

2 x 3

8.75 Sft

Material
M.S. Flat Frame for Grill \"x1/8\"
(20x3mm)
2'+3'+2'+3'
12 Sft
@ 0.32 Lbs/Rft
M.S. Flat \"x1/8\" (12x3mm)
Straight 3x2x3
Flower 6x4x1
Side 6x4x
Front 6x1x2
Total
Wastage 5%

Hold fast 6\" (150mm) long


Electrical Charges
Electrod 0.33 Pkt
Paint
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

3.84 Lbs (1 .88)Kg


21.00 Rft.
30.00 Rft.
6.00 Rft.
12.00 Rft.
69.00 Rft.
3.45 Rft.
72.45Lb (7.0 )Kg
@ 0.21 lbs/rft 15.21 lbs
6.00 Nos
L.S.
0.098Lb (0. 08) Gl

20

Percent

8.75

Page 155

roviding and fixing M.S. flat \"1/8\" (12x3


rill including \"x1/8\" (20x3mm) M.S. Flat
f windows of approved design including pai
oat complete in all respect.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Kg -

1.00 Rft.
0.00 Rft.

2.00 Rft.
9.00 Rft.

2.45Lb (7.0 )Kg


0.21 lbs/rft 15.21 lbs

0.00 P. Kg

154

0.00 Each 0.00 Pkt


0.00 P. Gl -

196.94 =

11
21.12
164.12
32.82
196.94
22.51

Detail

Unit Rate (British System)


Qty

Labour
Welder
Blacksmith
Masson
Painter
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.17
0.17
0.20
0.09
10

Percent

20

Percent

Nos
No
Nos
No

0.0
8.75

Rs.
Rs.
Rs.
Rs.

Page 156

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00
0.00
0.00
0.00

P.
P.
P.
P.

Day
Day
Day
Day

#####
#####

Say
Say
Say
Say

22.45
241.8

DESCRIPTION

OF

ITEM NO

55:

Providing and fixing G.I. W


12x12 meshes per Sq Inch (6
window complete with flat i
(12x3mm) and machine made s

Detail

Unit Rate (British System)


Qty

Rate Analysis for

4 x 3

12 Sft

Material
Wire Gauge 144 (12x12) Mesh
Wastage 10%

12.00 Sft
1.20 Sft
13.20 Sft

Flat Iron \"x1/8\" (12x3mm)


3+3+4+4+4
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft @ 0.21
Screws
Total
Contractor's Profit & Ove
20
Total for 100 Sft.
Rate Per Sft

4 Lbs (1. 82) Kg


6.70 Dozen
Percent

12
Labour Rate for 55 Sft.
Blacksmith
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

1.00 No
0.40 No

10

Percent

20

Percent

55
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 157

roviding and fixing G.I. Wire gauge 22 SWG


2x12 meshes per Sq Inch (625mm) fixed to s
indow complete with flat iron putti \"x1/8
12x3mm) and machine made screws.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

.70 Dozen

0.00 Sft

0.00 P. Kg
0.00 P. Doz

0.0 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

56:

a)

Providing and fixing wooden


2\"x5/8\" (63x16mm) on doo
of approved quality complet
Teak Wood Moulding.

Detail

Unit Rate (British System)

Rate Analysis for

16 Sft

Material Teak Wood


2x(6'-10')+2'-3\"
16x2\"x5/8\"
Wastage 25%
Glue
Nails
Total
Contractor's Profit &20
Total for 16 Sft.
Rate Per Sft

16.00 Rft
0.17 Cft
0.04 Cft
0.22 Cft
0.19 Kg.
0.116 Kg.
Percent

16
Labour
Labour for sawing, planning and fixing
16 Rft (4.876Rm) moulding in position
carpenter.
Total
Sundries
10
Total
Contractor's Profit &20
Total for 16 Sft.
Rate Per Sft

0.50 No
Percent

Percent

16
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 158

roviding and fixing wooden moulding stoppe


\"x5/8\" (63x16mm) on door frame fitted wit
f approved quality complete in all respect
eak Wood Moulding.

nit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.0 =

0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
#####

Say

Say
Say

.05

.05
.1

Item No.

56

b)

Providing and fixing wooden


2\"x5/8\" (63x16mm) on doo
of approved quality complet
Deodar Wood Moulding.

Detail

Unit Rate (British System)

Rate Analysis for

16 Sft

Material
Deodar wood 2x(6'-10')+2'-3\"
16x2\"x5/8\"
Wastage 25%

16.00 Rft
0.17 Cft
0.04 Cft
0.22 Cft
0.26 Kg.
0.116 Kg.

Glue
Nails
Total
Contractor's Profit &20
Total for 16 Sft.
Rate Per Sft

Percent

16
Labour
Labour for sawing, planning and fixing
16 Rft (4.876Rm) moulding in position
carpenter.
Total
Sundries
10
Total
Contractor's Profit &20
Total for 16 Sft.
Rate Per Sft

0.50 No
Percent

Percent

16
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 159

roviding and fixing wooden moulding stoppe


\"x5/8\" (63x16mm) on door frame fitted wit
f approved quality complete in all respect
eodar Wood Moulding.

nit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.0 =

0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

.05

.05
.05
.15

DESCRIPTION

OF

ITEM NO

57:

Providing and fixing deodar


having 1\"x1\" (40x40mm)
horizontal double posts wit
full width of jamb braces a
including filling of hollow
with 1:3:6 P.C.C. fixing of
quality there upon & hold f
respects.
Teak Wood Ply

a)
Detail

Rate Analysis for

Unit Rate (British System)


Qty

13 Sft

Material (Daodar Wood)


Vertical 2x2x7x1\"x1\"
Horizontal 2x3.5x0.125x0.125
Braces 12\"x17.25x0.125

0.44 Cft
0.11 Cft
0.20 Cft
0.75 Cft
0.19 Cft
0.94 Cft
0.82 Cft
0.08 Cft
0.90 Cft
12.94 Sft
1.29 Sft
14.23 Sft
0.29 Kg.
0.116 Kg.
4.00 Nos

Wastage 25%
PCC (1:3:6) 6\"x10\"x1\"
Wastage 10%
Teak Wood Ply
Wastage 10%

17.25 x 0.75

Glue
Nails
Hold fast
Total
Contractor's Profit & Ove
Total for 13 Sft.
Rate Per Sft

20

Percent

13

Page 160

roviding and fixing deodar wood dolly fram


aving 1\"x1\" (40x40mm) vertical and
orizontal double posts with 1\"x\" (40x40m
ull width of jamb braces at 12\" (300mm)
ncluding filling of hollow space in betwee
ith 1:3:6 P.C.C. fixing of ply of approved
uality there upon & hold fasts complete in

eak Wood Ply

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cf -

0.00 P. Cf -

0.00
0.00
0.00
0.00

0.0 =

Sft
P. Cf
P. Cf
Each

Detail

Unit Rate (British System)


Qty

Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 13 Sft.
Rate Per Sft

0.50 No
0.50 No
10

Percent

20

Percent

13
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 161

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
Say

Say
Say
Say

.1
.05

Item No.

57

Providing and fixing deodar


1\"x1\" (40x40mm) vertica
with 1\"x\" (40x40mm) ful
(300mm) including filling o
braces with 1:3:6 P.C.C. fi
there upon & hold fasts com
b)

With Commercial Ply.

Detail

Unit Rate (British System)

Rate Analysis for 13 Sft


Deodar wood
PCC (1:3:6)
Commercial ply
Glue
Nails
Hold fast
Total
20
Total
Contractor's Profit & Ove
Total for 13 Sft.
Rate Per Sft

0.94 Cft
0.90 Cft
14.23 Sft
0.29 Kg.
0.116 Kg.

Percent
20

Percent

13
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 13 Sft.
Rate Per Sft

0.50 No
0.50 No

10

Percent

20

Percent

13
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 162

roviding and fixing deodar wood dolly fram


\"x1\" (40x40mm) vertical and horizontal d
ith 1\"x\" (40x40mm) full width of jamb br
300mm) including filling of hollow space i
races with 1:3:6 P.C.C. fixing of ply of a
here upon & hold fasts complete in all res

ith Commercial Ply.

nit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)
0.00
0.31
0.00
0.00
0.00

P.
P.
P.
P.
P.

Cft
Cft
Sft
Cft
Cft

0.28
-

L.S.

0.28
.06
.33
.33
.03

.33 =

0.00 P. Day
0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

#####
#####
#####

Say
Say
Say
Say

.1
.6
6.4

DESCRIPTION

OF

ITEM NO

58:

a)
Detail

Rate Analysis for

3.5 x 7

24.50 Sft

Material
Length of Architrave
2(7'-0\")+3'-6\"
17.50 Rft
quantity (3/12'x'x1/12')x17.5'
Wastage 25%
Teak Wood
Nails
Total
Contractor's Profit & Ove
Total for 24.50 Sft.
Rate Per Sft
Labour
Carpenter
Fixing in position
Total
Sundries
Total
Contractor's Profit & Ove
Total for 24.50 Sft.
Rate Per Sft

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

20

Percent

10

Percent

20

Percent

Page 163

Providing and fixing ornamental wooden


architrave 3\"x\" (75x12mm) tapered to \"
(6mm) all along the door frame complete in
respects.
Teak Wood Architrave.
Unit Rate (British System) per Sft
Qty

Rate
Per Unit (Rs.)Amount (Rs.)

0.18 Cft
0.05 Cft
0.23 Cft

0.00 P. Cft

0.093 Kg.

0.00 P. Kg.

0.0 =
24.5
0.25 No
L.S.

0.00 P. Day

0.0 =
24.5

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

58

b)

Providing and fixing orname


architrave 3\"x\" (75x12mm
(6mm) all along the door fr
respects.
Deodar Wood Architrave.

Detail

Unit Rate (British System)


Qty

Rate Analysis for 3.5 x 7

24.50 Sft

Material
Length of Architrave
2(7')+3'-6\"
17.50 Rft
quantity (3/12'x'x1/12')x17.5'
Wastage 25%

0.18 Cft
0.05 Cft
0.23 Cft

Deodar wood
Nails
Total
Contractor's Profit &20
Total for 24.50 Sft.
Rate Per Sft

0.186 Kg.

Percent

24.5
Labour
Carpenter
Fixing in position
Total
Sundries
10
Total
Contractor's Profit &20
Total for 24.50
Rate Per Sft

0.25 No
L.S.
Percent
Percent

24.5
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 164

roviding and fixing ornamental wooden


rchitrave 3\"x\" (75x12mm) tapered to \"
6mm) all along the door frame complete in

eodar Wood Architrave.

nit Rate (British System) per Sft


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

0.00 P. Kg.

0.0 =

0.00 P. Day

0.0 =

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Item No.

58

Detail

Material
a) Vin Board 3/4
Vin Board
Total
Wastage 20%
Total

2x8x1 =
5x2x1 =

b) Front Shutter Vin Board


4 x 2 x 2 = 16
c) Frame Deodar Wood 3\"x1\"
2 x 8 = 16
2 x 5 = 10
Total
Wastage 20%
Total
31.2 x
12 x 12

d) Termite
e) Gola
Wastage 20%
Total

8x2x2

f) Painting / polishing including material + labour


Enamal Paint
Painter

g) Handle

Providing and fixing vin board cabinet in k


proofing and polishing / painting with synt
specific with handle and draws screw comple
respects as per drawing
2'8'Take Qty 8 x 2 = 16 Sft.
Unit Rate (British System) per Sft
Qty
Rate
Per Unit (Rs.)Amount (Rs.)

24.00 Sft.
15.00 Sft.
39.00 Sft.
7.8
46.80 Sft.

0.00 P. Sft.

16.00 Sft.

0.00 P. Sft.

0.65 Ft.

0.00 P. Cft.

0.08 Litre

0.00 P. Litr

32.00 Ft.
6.4
38.40 Ft.

0.00 P. Ft.

0.011 Gallon
0.041 No.

0.00 P. Gall
0.00 P. Day

16.00 Ft.
4.00 Nos.

0.0
0.00 Each

16.00 Ft.
10.00 Ft.
26.00 Ft.
5.2
31.2 Ft.
3\"

0.0
-

Page 165

h) Screws

3.75 Dozen

i) Hinges

2.00 Nos.

Total
Contractor's Profit & Ove
Total

20

Percent

Labour
Carpenter
Helper
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

1.50 Nos.
1.25 Nos.
10

Percent

20

Percent
0.0
16

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 166

.75 Dozen

0.00 P. Doz

0.00 Each

0.00 P. Day
0.00 P. Day

Rs.
Rs.
Rs.
Rs.

Say
Say

Say
Say

37

Providing and Installing PVC Bends of BSS.


(i)
Class \"B\" Working Pressure

Sr.

Size

No.

1
1
2
3
4

2
3\"
4\"
5\"
6\"

MATERIAL

Rate Contractor's Total


Each
Profit
20
Percent
3
4
(75mm) (100mm)(125mm)(150mm)-

(3 + 4) Quantity
Kgs.
5
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

(ii) CLASS \"D\" WORKING PRESSURE

1
2
3
4
5
6
7

1\" (32mm)1\" (40mm)2\" (50mm) 3\" (75mm) 4\" (100mm)5\" (125mm)6\" (150mm)DAILY PROGRESS
Plumber 1 0.00 Per day
Cooly
0.90.00 Per day
Total

0.0
0.0
0.0

LABOUR

3 + 4) Quantity

SOLVENT
Total Contractor
Profit

Rate
Per

Total

1/27/2012
1/20/2012
1/16/2012
1/15/2012

0.0
0.0
0.0
0.0

20 (8 + 9)
(Joints)
10
11
0.0
0.0
50
0.0
0.0
50
0.0
0.0
40
0.0
0.0
40

1/64
1/50
1/40
1/27/2012
1/20/2012
1/16/2012
1/15/2012

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Kg.

Daily Daily
progress Charges

Sundries
Total
Contractor Profit

10.00 Percent
20.00 Percent

0.0
0.0
0.0
0.0
0.0
0.0
0.0

60
60
60
50
50
40
40

0.0
0.0
0.0

JOINTING

Daily Daily
rogress Charges

12

Grand

RATE

Amount

Total
(10 + 13)

Labour Composite
(5 + 15)

13

14

.01
.01
.01
.01

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

15
-

.01
.01
.01
.01
.01
.01
.01

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Total
Say

.01
.01

16
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

38

Providing and Installing PVC Tee of BSS.

Class \"B\" Working Pressure


MATERIAL
Rate Contractor's Total
Each
Profit
20
12 3 4 567 8 9 1 1 1 11 1 1
1
3\" (75mm) 2
4\" (100mm)3
5\" (125mm)4
6\" (150mm)(ii) CLASS \"D\" WORKING PRESSURE
Sr.
No.

1
2
3
4
5
6
7

(i)
Size

1\" (32mm)1\" (40mm)2\" (50mm) 3\" (75mm) 4\" (100mm)5\" (125mm)6\" (150mm)DAILY PROGRESS
Plumber 1 0.00 Per day
Cooly
0.90.00 Per day
Total

(3 + 4) Quantity

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0

20

3 + 4) Quantity
Kgs.

Rate
Per Kg.

1/18/2012
1/13/2012
1/11/2012
1/10/2012

1/40
1/33
1/27/2012
1/18/2012
1/13/2012
1/11/2012
1/10/2012

LABOUR
JOINTING
SOLVENT
Daily Daily
TotalContractor's Total
progress Charges
20 (8 + 9)
(Joints)
0 1 2 34 5 6
0.0
0.0
0.0
50
.01
0.0
0.0
0.0
50
.01
0.0
0.0
0.0
40
.01
0.0
0.0
0.0
40
.01

Sundries
Total
Contractor Profit

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

10.00 Percent
20.00 Percent

0.0
0.0
0.0
0.0
0.0
0.0
0.0

60
60
60
50
50
40
40

0.0
0.0
0.0

.01
.01
.01
.01
.01
.01
.01

Amount

Total
Say

Grand
Total
(10 + 13)

RATE
Labour Composite
(5 + 15)

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

.01
.01

39

Providing and Installation of PVC Sockets B.S.S

Class \"B\" Working Pressure


MATERIAL
Rate
ContrEach
actor's
10
10
12 3 4 567 8 9 1 1 1 11 1 1
1
3\" (75mm)
2
4\" (100mm)
3
5\" (125mm)
4
6\" (150mm)
5
8\" (200mm)
6
10\" (250mm)
7
12\" (300mm)
8
14\" (350mm)
(ii) CLASS \"D\" WORKING PRESSURE
1
1\" (32mm)
2
1\" (40mm)
3
2\" (50mm)
4
3\" (75mm)
5
4\" (100mm)
6
5\" (125mm)
7
6\" (150mm)
DAILY PROGRESS
Sr.
No.

(i)
Size

Plumber 1 N
Cooly
0.9
Total

0.00 Per day


0.00 Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Total
(3 + 4) Quantity
Kgs.

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rate
Per Kg.

LABOUR
SOLVENT
Total

Contractor's

1/27/2012
1/20/2012
1/16/2012
1/15/2012
1/10/2012
1/8/2012
1/7/2012
1/6/2012

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0 1/64
0.0 1/50
0.0 1/40
0.0
1/27/2012
0.0
1/20/2012
0.0
1/16/2012
0.0
1/15/2012

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0

Sundries
Total
Contractor Profit

0 1 2 34 5 6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

10.00 Percent
20.00 Percent

No. of
Joints

Total
(8 + 9)

0.0
0.0
0.0
0.0
0.0
0.0
0.0

50
50
40
40
30
30
25
25
60
60
60
50
50
40
40

0.0
0.0
0.0

JOINTING
Daily
Charges

Amount

Grand
Total
(10 + 13)

RATE
Labour Composite
(5 + 15)

.01
.01
.01
.01
.01
.01
.01
.01

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

.01
.01
.01
.01
.01
.01
.01

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Total
Say

.01
.01

40 -

Sr.
No.

Providing and installing PVC Tappered Core BSS


41 (i)
Size

Class \"B\" Working Pressure


MATERIAL
Rate
ContraEach
ctor's
Profit
20

12 3 4 567 8 9 1 1 1 11 1 1
1
3\" (75mm)
2
4\" (100mm)
3
5\" (125mm)
4
6\" (150mm)
5
8\" (200mm)
6
10\" (250mm)
7
12\" (300mm)
8
14\" (350mm)
36 (ii) CLASS \"D\" WORKING PRESSURE
1
1\" (32mm)
2
1\" (40mm)
3
2\" (50mm)
DAILY PROGRESS
Plumber 1 N
Cooly
0.9
Total

0.00 Per day


0.00 Per day

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Total
(3 + 4) Quantity
Kgs.

Rate
Per Kg.

LABOUR
SOLVENT
Total

Contractor's
Profit

Total
(8 + 9)
20

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0 1/64
0.0 1/50
0.0 1/40

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

Sundries
Total
Contractor Profit

1/27/2012
1/20/2012
1/16/2012
1/15/2012
1/10/2012
1/8/2012
1/7/2012
1/6/2012

10.00 Percent
20.00 Percent

0 1 2 34 5 6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

JOINTING
Daily
Daily
Progress Charges

Amount

Grand
Total
(10 + 13)

RATE
Labour Composite
(5 + 15)

1 2 34 5 6
50
50
40
40
30
30
25
25

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

60
60
60

0.0
0.0
0.0

0.0
0.0
0.0

0.0 0.0 0.0 -

0.0
0.0
0.0

0.0
0.0
0.0

Total
Say

0.0
0.0

1-

Boring for tube well in all types of soil except shingle and rock from ground le
including sinking and with-drawing of casing pipe complete.

S.
No.

Dia of
bore

Time (Day) Daily


required to labour
complete
charges
100' (30M)

Labour
per foot

Hire charges
of boring
material
installation
and carriage

12
13
24

\"
\"

357
46
3 #VALUE! #VALUE!
4 #VALUE! #VALUE!

5\"

#VALUE!

#VALUE!

0.0

4
5

6\"
8\"

9
11

#VALUE!
#VALUE!

#VALUE!
#VALUE!

0.0
0.0

10\"

13

#VALUE!

#VALUE!

0.0

12\"

14

#VALUE!

#VALUE!

0.0

8
9

15\"
18\"

17
18

#VALUE!
#VALUE!

#VALUE!
#VALUE!

0.0
0.0

0.0
0.0

le and rock from ground level to 100 Ft (30 Metre) depth

Loading Expenses
Per Foot
No. of
Rate per
day
day

Repair
charges
of T & P

Amount

Petty store Total


Contractors,
bolts &
Column (6, Profit& over heads 20%
nuts etc.
9, 10, 11) on Column
No.12

nd carriage
.02
.04

8 01
0.0
0.0

91

12
0.0 0.0 -

.1

0.0

0.0

0.0

0.0

0.0

.2
.3

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

.4

0.0

0.0

0.0

0.0

0.0

.4

0.0

0.0

0.0

0.0

0.0

.5
.5

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

1
-

1
0.0
0.0

ontractors,
rofit& over heads 20%

Total

Grand Total
Rate per Ft/

Rs. per
foot

(12 + 13)

(5 + 14)

Say

11
46
0.0 0.00 #VALUE!
0.0 0.00 #VALUE!

5
#VALUE!
#VALUE!

0.0 0.00 #VALUE!

#VALUE!

0.0 0.00 #VALUE!


0.0 0.00 #VALUE!

#VALUE!
#VALUE!

0.0 0.00 #VALUE!

#VALUE!

0.0 0.00 #VALUE!

#VALUE!

0.0 0.00 #VALUE!


0.0 0.00 #VALUE!

#VALUE!
#VALUE!

Rate per
Metre

1
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

2S.
No.

Boring for tube well in all types of soil


below ground level, including sinking and
Dia of
Time (Day) Daily
bore
required to labour
complete
charges
100' (30M)

except shingle gravel and rock from a


with drawing of casing pipe complete.
Labour
Hire charges
per foot
of boring
material
installation
and carriage

12
1

5\"

357
10

46
#VALUE!

#VALUE!

0.0

2
3

6\"
8\"

14
15

#VALUE!
#VALUE!

#VALUE!
#VALUE!

0.0
0.0

10\"

16

#VALUE!

#VALUE!

0.0

12\"

17

#VALUE!

#VALUE!

0.0

6
7

15\"
18\"

20
21

#VALUE!
#VALUE!

#VALUE!
#VALUE!

0.0
0.0

le gravel and rock from a depth of 100.10 to 200 Ft


of casing pipe complete.
Loading Expenses
Repair
Per Foot
charges
No. of
Rate per
Amount
of T & P
day
day
nd carriage
8 01
91
12
0.0
0.0
.3
0.0

(30 to 60 Metre)
Petty store Total
Contractors'
bolts &
Column (6, Profit& overheads 20%
nuts etc.
9, 10, 11) on Column
No.12
1

1
0.0

0.0

.4
.4

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

.5

0.0

0.0

0.0

0.0

0.0

.5

0.0

0.0

20

0.0

20

.6
.6

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

ontractors'
rofit& overheads 20%

Total

Grand Total
Rate per Ft/

(12 + 13)

(5 + 14)

11
46
0.0 0.00 #VALUE!

Rate per
Rft

5
#VALUE!

0.0 0.00 #VALUE!


0.0 0.00 #VALUE!

#VALUE!
#VALUE!

0.0 0.00 #VALUE!

#VALUE!

2 22.00 #VALUE!
0.0 0.00 #VALUE!
0.0 0.00 #VALUE!

#VALUE!
#VALUE!
#VALUE!

Rate per
Metre

1
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

3S.
No.

12
1

Boring for tube well in all types of soil except shingle gravel and rock from a
below ground level including sinking and with drawing of casing pipe complete.
Dia of
Time (Day) Daily
Labour
Hire charges
bore
required to labour
per foot
of boring
complete
charges
material
100' (30M)
installation
and carriage
357
46
0.0
5\"
14
#VALUE!
#VALUE!

2
3

6\"
8\"

18
19

#VALUE!
#VALUE!

#VALUE!
#VALUE!

0.0
0.0

10\"

20

#VALUE!

#VALUE!

0.0

12\"

21

#VALUE!

#VALUE!

0.0

6
7

15\"
18\"

22
23

#VALUE!
#VALUE!

#VALUE!
#VALUE!

0.0
0.0

le gravel and rock from a depth of 200.10 to 300 Ft


of casing pipe complete.
Loading Expenses
Repair
Per Foot
charges
No. of
Rate per
Amount
of T & P
day
day
nd carriage
8 01
91
12
0.0
0.0
.4
0.0

(60 to 90 Metre)
Petty store Total
Contractors,
bolts &
Column (6, Profit& over heads 20%
nuts etc.
9, 10, 11) on Column
No.12
1

1
0.0

0.0

.5
.5

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

.6

0.0

0.0

0.0

0.0

0.0

.6

0.0

0.0

0.0

0.0

0.0

.7
.7

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

ontractors,
rofit& over heads 20%

Total

Total
Rate per Ft/

Rate per
Rft

(12 + 13)

(5 + 14)

Say

11
46
0.0 0.00 #VALUE!

5
#VALUE!

0.0 0.00 #VALUE!


0.0 0.00 #VALUE!

#VALUE!
#VALUE!

0.0 0.00 #VALUE!

#VALUE!

0.0 0.00 #VALUE!

#VALUE!

0.0 0.00 #VALUE!


0.0 0.00 #VALUE!

#VALUE!
#VALUE!

Rate per
Metre

1
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

4-

Boring for tube well in all types of soil except shingle gravel and rock from a
below ground level including sinking and with drawing of casing pipe complete.

S.
No.

Dia of
bore

Time (Day) Daily


required to labour
complete
charges
100' (30M)

Labour
per foot

Hire charges
of boring
material
installation
and carriage

12
1
2

8\"
10\"

357
23
24

46
#VALUE!
#VALUE!

#VALUE!
#VALUE!

0.0
0.0

12\"

25

#VALUE!

#VALUE!

0.0

4
5

15\"
18\"

27
27

#VALUE!
#VALUE!

#VALUE!
#VALUE!

0.0
0.0

le gravel and rock from a depth of 300.10 to 400 Ft (90 to 120 Metre)
of casing pipe complete.
Loading Expenses
Per Foot
No. of Rate per Amount
day
bag
(7 x 8)

Repair
charges
of T & P

Petty store Total


Contractors'
bolts &
Column (6, Profit& overheads 20%
nuts etc.
9, 10, 11) on Column
No.12

nd carriage
8 01

91

12

.6
.7

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

.7

0.0

0.0

0.0

0.0

0.0

.8
.8

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

ontractors'
rofit& overheads 20%

Total

Grand Total
Rate per Ft/

(12 + 13)

(5 + 14)

Say

5
#VALUE!
#VALUE!

11
46
0.0 0.00 #VALUE!
0.0 0.00 #VALUE!
0.0 0.00 #VALUE!

#VALUE!

0.0 0.00 #VALUE!


0.0 0.00 #VALUE!

#VALUE!
#VALUE!

Rate per
Metre

1
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Daily Labour Charges for


Daily charges for boring
(30 M) depth including si
of casing pipe.
a)
Detail

For 3\" to 4\"

Unit Rate (British System


Qty

Labour for 30 M
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar
Total
Sundries ####
Total

(75 to 10

1.00
2.00
1.00
1.00

Percent

Contractor's Profit & Ove ###Percent


Total rate for 100 Rft

No
Nos
No
No

aily Labour Charges for :


aily charges for boring of tube well per 100 ft
30 M) depth including sinking and with drawing
f casing pipe.

or 3\" to 4\"

(75 to 100mm)

dia bore.

nit Rate (British System) per Rft


Rate
Per Unit (Rs.)Amount (Rs.)

0
0
0
RATE

P.
P.
P.
P.

Day
Day
Day
Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Say

#VALUE!
#VALUE!
#VALUE!

b)
Detail

Labour
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar
Total
Contractor's Profit
Total

####

Contractor's Profit & Ove ####


Total rate for 100 feet

Percent

Percent

Daily Labour Charges for :


Daily charges for borring of tube well per 100 ft
(30 M) depth including sinking and with drawing
of casing pipe.
For 5\" to 6\"

(125 to 150mm)

dia bore.

Unit Rate (British System) per Rft


Qty

1.00
4.00
1.00
1.00

Rate
Per Unit (Rs.)Amount (Rs.)

No
Nos
No
No
RATE

0.0
0.0
0.0

P.
P.
P.
P.

DAY
DAY
DAY
DAY

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Say

#VALUE!
#VALUE!
#VALUE!

20

Daily Labour Charges for


Daily charges for borring
(30 M) depth including si
of casing pipe.
c)
Detail

For 8\" (200mm)

Unit Rate (British System


Qty

Labour
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar
Total
Sundries ####
Total

dia bore

1.00
6.00
1.00
1.00

Percent

Contractor's Profit & Ove ###Percent


Total rate for 100 feet

No
Nos
No
No

aily Labour Charges for :


aily charges for borring of tube well per 100 ft
30 M) depth including sinking and with drawing
f casing pipe.

or 8\" (200mm)

dia bore.

nit Rate (British System) per Foot


Rate
Per Unit (Rs.)Amount (Rs.)

0
0
0
RATE

P.
P.
P.
P.

Day
Day
Day
Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Say

#VALUE!
#VALUE!
#VALUE!

Daily Labour Charges for


Daily charges for borring
(30 M) depth including si
of casing pipe.
d)
Detail

For 10\" to 12\"

Unit Rate (British System


Qty

Labour
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar

1.00
6.00
2.00
1.00
Total

Sundries ####
Total

(250 to

Percent

Contractor's Profit & Ove ###Percent


Total rate for 100 feet

No
Nos
Nos
No

aily Labour Charges for :


aily charges for borring of tube well per 100 ft
30 M) depth including sinking and with drawing
f casing pipe.

or 10\" to 12\"

(250 to 300mm)

dia bore.

nit Rate (British System) per Foot


Rate
Per Unit (Rs.)Amount (Rs.)

0
0
0
RATE

P.
P.
P.
P.

Day
Day
Day
Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Say

#VALUE!
#VALUE!
#VALUE!

Daily Labour Charges for


Daily charges for borring
(30 M) depth including si
of casing pipe.
e)
Detail

For 15\" to 18\"

Unit Rate (British System


Qty

Labour
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar

1.00
8.00
2.00
1.00
Total

Sundries ####
Total

(375 to

Percent

Contractor's Profit & Ove ###Percent


Total rate for 100 feet

No
Nos
Nos
No

aily Labour Charges for :


aily charges for borring of tube well per 100 ft
30 M) depth including sinking and with drawing
f casing pipe.

or 15\" to 18\"

(375 to 450mm)

dia bore.

nit Rate (British System) per Foot


Rate
Per Unit (Rs.)Amount (Rs.)

0
0
0
RATE

P.
P.
P.
P.

Day
Day
Day
Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Say

#VALUE!
#VALUE!
#VALUE!

DESCRIPTION OF ITEM NO 5:

(a)
i)
Detail

Direct rotary/ reverse ro


tube wells in all type of
and rock.
From ground level to 250
15\" to 18\" i/d

Unit Rate (British System


Qty

Material
1 Reg pumps etc.
24.00 Hrs
2 Generator set light arrangement
8.00 Hrs
3 Carriage from store to site of work for
reverse rotary drilling reg complete set
and generator set etc.
L. S.
Total
Labour
Foreman for 3 shifts (One No. per shift 3.00 Nos
Driller for 3 shifts (One No. per shift 3.00 Nos
Helper for 3 shifts (One No. per shift) 54.00 No
Electrician for 8 hours
1.00 No
Mechanic for 3 shifts
Total
Sundries ####
Total

3.00 Nos

Percent

irect rotary/ reverse rotary drilling of bore for


ube wells in all type of soil except shingle, gravel
nd rock.
rom ground level to 250 ft. below ground level.
5\" to 18\" i/d

nit Rate (British System) per Foot bore


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Ph
0.00 Ph

0
0
0
0

Shi
Shi
Shi
Shi

0 P. Shi

Say

P.
P.
P.
P.

Detail

Unit Rate (British System


Qty

Material
( P.O.L )
H.S.D. for rig for 24 hours
H.S.D. for generator for 8 hours
Cotton waste for rig for 24 hours
Mobil oil
Mix. Expenditure

##### Ltr
72.64 Ltr
7.90 Kg
22.70 Ltr
L. S.
Total

Machinery
Labour
Material (lubricate P.O.L)
Total
Contractor's Profit&overhe ####
Total

Percent

Daily Expenditure
Daily Progress
Charges Per Feet

##### Ft

Rate Charges Per Metre

nit Rate (British System) per Foot bore


Rate
Per Unit (Rs.)Amount (Rs.)

0.00 Ltr
0.00 Ltr
RATE
Kg
0.00 Ltr

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
121

#VALUE!
say

#VALUE!
#VALUE!
#VALUE!

Item No.

Direct rotary/ reverse ro


tube wells in all type of
and rock.
a.
( ii)
Detail

From ground level to 250


20\" to 26\" (500 to 650

Unit Rate (British System


Qty

Daily Expenditure
Daily Progress

##### Ft

Charges Per Foot

Rate Per Metre

irect rotary/ reverse rotary drilling of bore for


ube wells in all type of soil except shingle, gravel
nd rock.

rom ground level to 250 ft. below ground level.


0\" to 26\" (500 to 650mm) dia

nit Rate (British System) per Rft of bore


Rate
Per Unit (Rs.)Amount (Rs.)
#VALUE!

#VALUE!
115
say
say

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Item No.

Direct rotary/ reverse ro


tube wells in all type of
and rock.
b.
( i)
Detail

Exceeding 250 ft (75 M) b


15\" to 18\" (375 to 450

Unit Rate (British System


Qty

Daily Expenditure
Daily Progress

92.00 Ft

Rate Per Rft

Rate Per Metre

irect rotary/ reverse rotary drilling of bore for


ube wells in all type of soil except shingle, gravel
nd rock.

xceeding 250 ft (75 M) below ground level.


5\" to 18\" (375 to 450mm) dia

nit Rate (British System) per Rft of bore


Rate
Per Unit (Rs.)Amount (Rs.)
#VALUE!

#VALUE!
92
say
say

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Item No.

Direct rotary/ reverse ro


tube wells in all type of
and rock.
b.
(ii)
Detail

Exceeding 250 ft (75 M) b


20\" to 26\" (500 to 650

Unit Rate (British System


Qty

Daily Expenditure
Daily Progress

88.40 Ft

Boring Charges Per Foot

Rate Per Metre

10

irect rotary/ reverse rotary drilling of bore for


ube wells in all type of soil except shingle, gravel
nd rock.

xceeding 250 ft (75 M) below ground level.


0\" to 26\" (500 to 650mm) dia

nit Rate (British System) per Rft of bore


Rate
Per Unit (Rs.)Amount (Rs.)
#VALUE!

#VALUE!
88.4
say
say

#VALUE!
#VALUE!
#VALUE!
#VALUE!

DESCRIPTION OF ITEM NO 6:

Boring for tube well in s


including sinking and wit
pipe.
a.
(i)

Detail

From ground level to 200


ground level.
12\" to 18\" (300 to 450

Unit Rate (British System


Qty

Daily Expenditure as per Item No. 5


Daily Progress

46.00 Ft

Charges Per Foot

Rate Per Metre

11

oring for tube well in shingle, gravel and rock,


ncluding sinking and with drawing of casing

rom ground level to 200 ft (60 M) below


round level.
2\" to 18\" (300 to 450mm) dia

nit Rate (British System) per Ft of bore


Rate
Per Unit (Rs.)Amount (Rs.)
#VALUE!

#VALUE!
46
say
say

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Item No.

Boring for tube well in s


including sinking and wit
pipe.
a.
(ii)
Detail

From ground level to 200


ground level.
20\" to 26\" (500 to 650

Unit Rate (British System


Qty

Daily Expenditure as per Item No. 5


Daily Progress

42.58 Ft

Charges Per Foot

Rate Per Metre

12

oring for tube well in shingle, gravel and rock,


ncluding sinking and with drawing of casing

rom ground level to 200 ft (60 M) below


round level.
0\" to 26\" (500 to 650mm) dia

nit Rate (British System) per Ft of bore


Rate
Per Unit (Rs.)Amount (Rs.)
#VALUE!

#VALUE!
42.58
say
say

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Item No.

Boring for tube well in s


including sinking and wit
pipe.
b.
(i)
Detail

Exceeding 200 ft depth (7


12\" to 18\" (300 to 450

Unit Rate (British System


Qty

Daily Expenditure
Daily Progress

38.68 Ft

Boring Charges Per Foot

Rate Per Metre

13

oring for tube well in shingle, gravel and rock,


ncluding sinking and with drawing of casing

xceeding 200 ft depth (70 M) below ground level.


2\" to 18\" (300 to 450mm) dia

nit Rate (British System) per Ft of bore


Rate
Per Unit (Rs.)Amount (Rs.)
#VALUE!

#VALUE!
38.68
say
say

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Item No.

Boring for tube well in s


including sinking and wit
pipe.
b.
(ii)
Detail

Exceeding 200 ft depth (7


20\" to 26\" (500 to 650

Unit Rate (British System


Qty

Daily Expenditure as per Item No. 5


Daily Progress

28.73 Ft

Charges Per Foot

Rate Per Metre

14

oring for tube well in shingle, gravel and rock,


ncluding sinking and with drawing of casing

xceeding 200 ft depth (70 M) below ground level.


0\" to 26\" (500 to 650mm) dia

nit Rate (British System) per Ft of bore


Rate
Per Unit (Rs.)Amount (Rs.)
#VALUE!

#VALUE!
28.73
say
say

#VALUE!
#VALUE!
#VALUE!
#VALUE!

DESCRIPTION OF ITEM NO 7:

Detail

Providing strong substant


wood (2nd class) 4'x2'x9
with compartments, lock a
for preserving samples of

Unit Rate (British System


Bore.

Material
Deodar Wood (2nd Class)
Top and bottom 2x4'x2.5'x1/12' 1.66 Cft
Sides 2(4'+2'-4\")x1/12'x'
0.79 Cft
Partition 9x2'-4\"x'x1/24'
0.44 Cft
Strips 6x3'x6\"xx1/24
0.44 Cft

3.33 Cft
Wastage
15%
Total
Lock
Hinges 2.00 No.
Steel Handle 4\" (100mm)
Total
Contractor's Profit & ove ####
Total

0.50 Cft
3.83 Cft

Percent

Labour
Sawing charges
Carpenter

(3.83Cft x 10)

38.30 Sft

roviding strong substantially built box of deodar


ood (2nd class) 4'x2'x9' (1.22x0.76x0.228)
ith compartments, lock and locking arrangement
or preserving samples of strata from bore hole.

nit Rate (British System) per Job for Complete


Qty
Rate
Per Unit (Rs.)Amount (Rs.)

3.83 Cft

0.00
0.00
0.00
2.00 Nos 0.00
1.00 No

P. C
Each
Each
Each

8.30 Sft
0.75 No
15

0.00 Sft 0.00 P. D -

Detail

Taking and preserving box 2 lbs


sample of strata.

Unit Rate (British System


Bore.
Qty

L. S.

Total
Sundries
####
Total
Contractor's Profit & ove ###Percent
Total

Labour Rate Per Job for complete bore. Rs.

Composite Rate per Job for complete bore

Rs.

nit Rate (British System) per Job for Complete


Rate
Per Unit (Rs.)Amount (Rs.)

say
Say

16

DESCRIPTION OF ITEM NO 8:
Detail

Furnishing Sample of Wate

Unit Rate (British System

Material
Bottle 2 lbs capcity
Total
Contractor's Profit & ove ####
Total

Percent

Labour
Taking samples of water from bore
hole including bailing or pumping.
Sealing the water sample and
providing necessary packing etc.
Handling charges
Total
Contractor's Profit & ove ####
Total

Labour Rate Per Set of 2 bottles


Composite Rate per Set

Percent

urnishing Sample of Water from Bore Hole.

nit Rate (British System) per Set of 2 bottles


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

2.00 Nos 0.00 Each

L. S.

L. S.
L. S.

Rs.
say
Rs.
Say

17

9-

Providing and installing Brass Strainer in Tube Well Bore Hole including Socket, special Socket, S
etc. complete.
S. Dia Thickness
of
Rate of
Contractor's
No.
Strainer
of
strainer
Profit
Strainer
(Per Ft i/c
20
Specials
Percent
Stud, and
Socket)
1
2
34 56 789 1
1
2\"
5/32\"
0.0
0.0
2
3\"
5/32\"
0.0
0.0
3
4

4\"
5\"

3/16\"
3/16\"

0.0
0.0

0.0
0.0

5
6

6\"
7\"

3/16\"
3/16\"

0.0
0.0

0.0
0.0

8\"

3/16\"

0.0

0.0

8
9

9\"
10\"

3/16\"
3/16\"

0.0
0.0

0.0
0.0

10
11

10\"
12\"

1/4\"
1/4\"

0.0
0.0

0.0
0.0

12
13

15\"
18\"

1/4\"
1/4\"

0.0
0.0

0.0
0.0

14
15

20\"
22\"

1/4\"
1/4\"

0.0
0.0

0.0
0.0

Contractor's Profit

luding Socket, special Socket, Studs


Total
Material

Daily
Progress
in Ft

4+5

LABOUR
Daily Labour
Lowering Contractor's Total Labour
Expenses
Per Ft EquipmentProfit & over Labour
Rs.
Charges
20 9 + 10
Percent
+ 11
0

0.0
0.0

200 #VALUE!
200 #VALUE!

#######
#######

11
12
0.0 0.00 ######
0.0 0.00 ######

0.0
0.0

150 #VALUE!
130 #VALUE!

#######
#######

0.0 0.00 ######


0.0 0.00 ######

0.0
0.0

120 #VALUE!
100 #VALUE!

#######
#######

0.0 0.00 ######


0.0 0.00 ######

0.0

80 #VALUE!

#######

0.0 0.00 ######

0.0
0.0

80 #VALUE!
70 #VALUE!

#######
#######

0.0 0.00 ######


0.0 0.00 ######

0.0
0.0

70 #VALUE!
70 #VALUE!

#######
#######

0.0 0.00 ######


0.0 0.00 ######

0.0
0.0

60 #VALUE!
60 #VALUE!

#######
#######

0.0 0.00 ######


0.0 0.00 ######

0.0
0.0

50 #VALUE!
50 #VALUE!

#######
#######

0.0 0.00 ######


0.0 0.00 ######

20

Composite
Rate/Ft
6 + 12

Labour
Rate
per Metre

Composite
Rate
per Metre

#VALUE!
#VALUE!

14
#VALUE!
#VALUE!

15
######
######

16
#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

######
######

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

######
######

#VALUE!
#VALUE!

#VALUE!

#VALUE!

######

#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

######
######

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

######
######

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

######
######

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

######
######

#VALUE!
#VALUE!

Rate
Per Ft.

13

Daily Labour Charges


Detail

Labour
Foreman
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries 10.00
Total
Contractor's Profit & Ove
Total

Daily Labour Charges P. Day

20

Unit Rate (British System) per day


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

1.00 No
1.00 No
4.00 Nos

0.00 P. Day
0.00 P. Day
0.00 P. Day

1.00 No

RATE

P. Day #VALUE!
#VALUE!
#VALUE!
#VALUE!

Percent

#VALUE!
#VALUE!

Percent

Rs.

#VALUE!

Daily Labour Charges


Detail

Labour
Foreman
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
Contractor's Profit & ove
Total

10

20

Daily Lab

bour Charges
Unit Rate (British System) per Day Charges
Qty

Rate
Per Unit (Rs.) Amount (Rs.)
20

1.00
2.00
6.00
1.00

No
Nos
Nos
No

0.0 P. Day
0.0 P. Day
0.0 P. Day
RATE

P. Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Rs.

#VALUE!

10

S.
No.

Providing and Installing M. S. Bai

Dia of
bore

Plug
Rate
Length Per Foot

12 3

2\"

1.5

0.0

3\"

1.5

0.0

4\"

0.0

5\"

0.0

6\"

0.0

7\"

0.0

8\"

0.0

9\"

0.0

10\"

0.0

10

12\"

0.0

and Installing M. S. Bail Plug in Tube Well Bore Hole (Eac


M A T E R I A L
Total

(3 x 4)

Wt. of Size of Wt. of Total Wastage


Disc
Bars
Bars
Wt.
Lbs.
(Lbs.) (Lbs.)
(6 + 8)

581

69

Total
Wt.
in Lbs
(9 + 10)

1,000.%

71

01

11

0.0

.14 1/4\"

.53

.67

.07

.74

0.0

.3 1/4\"

.53

.83

.08

.91

0.0

.51 3/8\"

1.5

2.01

.2

2.21

0.0

1.22 3/8\"

1.5

2.72

.27

2.99

0.0

1.72 3/4\"

7.72

.77

8.49

0.0

2.3 3/4\"

8.3

.83

9.13

0.0

2.97 3/4\"

8.97

.9

9.87

0.0

3.72 3/4\"

9.72

.97

10.69

0.0

6.23 3/4\"

6.00 12.23

1.22

13.45

0.0

8.83 3/4\"

6.00 14.83

1.48

16.31

Wt. in
Kg

Rate Amount
Per Kg
Rs.

11

25

Bolts &
Nuts

.33

0.0

0.0

0.0

.41

0.0

0.0

0.0

0.0

0.0

0.0

1.36

0.0

0.0

0.0

3.85

0.0

0.0

0.0

4.14

0.0

0.0

0.0

4.48

0.0

0.0

0.0

4.85

0.0

0.0

0.0

6.1

0.0

0.0

0.0

7.4

0.0

0.0

0.0

11

15\"

0.0

12

18\"

0.0

13

20\"

0.0

14

22\"

0.0

0.00 13.57 3/4\"

6.00 19.57

1.96

0.00 19.34 3/4\"

6.00 25.34

2.53 27.87 12.64

0.0

0.00 23.74 3/4\"

6.00 29.74

2.97 32.71 14.84

0.0

0.00 28.60 3/4\"

6.00 34.60

3.46 38.06 17.26

0.0

21.53

9.76

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

ch).

Material
Total

Threading
Clamp

Welding Cutting
Disc
Disc

Total

(5 + 14
+ 15)

Grand Say
Total

(18 + 19) (16 + 20)

16

17

18

19

20

21

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

L A B O U R
Contractor's
Profit

Total

Labour for Labour


Total
Lowering ContraEquipctor's
ment
Profit (25 + 26)
20
Percent
25
26
27

20 (22 + 23)

22

23

24

Progress
Daily

28

0 100

0 100

0 80

0 80

0 56

0 56

0 48

0.0

0 48

0 48

0 40

C O S T
Daily
Charges
@ Rs.
#VALUE!
per No.

Rate Say
Per Rft
of Each
Plug
(27 + 29)

29

30

(Rs.)

Rate
Per Plug
Length
(31 x 3)

Labour
Rate

Composite

31

32

33

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

#VALUE! ######

#VALUE!

(24 + 33)

34

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0 40

0 32

0 30

0 30

#VALUE! # #VALUE!

#VALUE! # #VALUE!

#VALUE! # #VALUE!

#VALUE! # #VALUE!

#VALUE! # #VALUE!

#VALUE! # #VALUE!

#VALUE! # #VALUE!

#VALUE! # #VALUE!

11-

Providing and installing PVC Strainer BSS Class \"B\" in Tube Well Bore Hole including Sockets an

S.
No.

Dia of
Strainer

Rate
Per Ft

Contractor's Total
Daily
Profit
Progress
20 (3 + 4)
in Ft
Percent
34 5 67 8 9 1
0.0
0.0
0.0 200.00 ####### #VALUE!
0.0
0.0
0.0 180.00 ####### #VALUE!

1
13
24

2
\"
\"

35

\"

0.0

0.0

0.0 180.00 ####### #VALUE!

46

\"

0.0

0.0

0.0 160.00 ####### #VALUE!

58

\"

0.0

0.0

0.0 128.00 ####### #VALUE!

10\"

0.0

0.0

0.0 128.00 ####### #VALUE!

12\"

0.0

0.0

0.0 104.00 ####### #VALUE!

14\"

0.0

0.0

0.0 104.00 ####### #VALUE!

Bore Hole including Sockets and Solvents etc. complete.

Labour
Charges
Per Day

Labour
Cost
Per Ft

Solvent

Lowering Contractor's
Charges
Profit

Total
(8 + 9 +
20 10 + 11)

Say

00.00 ####### #VALUE!


80.00 ####### #VALUE!

0.0
0.0

Percent
11
2
0.0 0.00 #VALUE!
0.0 0.00 #VALUE!

80.00 ####### #VALUE!

0.0

0.0 0.00 #VALUE!

#VALUE!

60.00 ####### #VALUE!

0.0

0.0 0.00 #VALUE!

#VALUE!

28.00 ####### #VALUE!

0.0

0.0 0.00 #VALUE!

#VALUE!

28.00 ####### #VALUE!

0.0

0.0 0.00 #VALUE!

#VALUE!

04.00 ####### #VALUE!

0.0

0.0 0.00 #VALUE!

#VALUE!

04.00 ####### #VALUE!

0.0

0.0 0.00 #VALUE!

#VALUE!

13
#VALUE!
#VALUE!

Rate per Rft


Labour
Composite
(5 + 14)

Rate per Metre


Labour
Composite

14
#VALUE!
#VALUE!

15
#VALUE!
#VALUE!

16
#VALUE!
#VALUE!

17
#VALUE!
#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

0.0 #VALUE!

0.0

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

12S.
No.

1
1

Providing and installing PVC Strainer BSS Class \"D\" in Tube Well Bore Hole including Sockets a
MATERIAL
Dia of
Rate for Contractor's
Total
Pipe
Per Ft
Profit
20 3 + 4
Percent
2
3 456 7 8911
1\"
0.0
0.0
0.0

1\"

0.0

0.0

0.0

32

\"

0.0

0.0

0.0

43

\"

0.0

0.0

0.0

54

\"

0.0

0.0

0.0

65

\"

0.0

0.0

0.0

76

\"

0.0

0.0

0.0

Bore Hole including Sockets and Solvents etc. complete.


LABOURE
Daily
Labour
Labour
Solvent
Lowering
Progress
Charges
Cost
Charges
Per Day
Per Ft

Total
Labour
(9 + 10)

Contractor's
Profit
20
Percent

14
200.00 ####### #VALUE!

0.0

0.0

0.0 0.00 #VALUE!

200.00 ####### #VALUE!

0.0

0.0

0.0 0.00 #VALUE!

200.00 ####### #VALUE!

0.0

0.0

0.0 0.00 #VALUE!

200

0.0

0.0

0.0

0.0

0.0

0.0

180

0.0

0.0

0.0

0.0

0.0

0.0

180

0.0

0.0

0.0

0.0

0.0

0.0

160

0.0

0.0

0.0

0.0

0.0

0.0

Rate per Rft


Labour
Composite
(5 + 13)

Rate per Metre


Labour
Composite

13
.00 #VALUE!

14
#VALUE!

15
#VALUE!

16
#VALUE!

17
#VALUE!

.00 #VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

.00 #VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

Total
(8 + 11
+ 12)

0.0 -

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

13 - i -

1
13

Providing and installing PVC Bail/ End Plug in T


MATERIAL
Dia of
Cost of
Contractor's
Bail /
Bail/
Profit
End Plug
End Plug
20
Percent
2
3
4
\"
0.0
0.0

24

\"

0.0

0.0

35

\"

0.0

0.0

46

\"

0.0

0.0

58

\"

0.0

0.0

10\"

0.0

0.0

7
8

12\"
14\"

0.0
0.0

0.0
0.0

S. No.

ng PVC Bail/ End Plug in Tube Well Bore Hole: BSS Class \"B\".
LABOURE
Total
Solvent
Contractor's Total
Lowering
Total
Labour
Profit
Charges
Labour
(3 + 4)
20 6 + 7
8+9
Percent
5
6
7
8
9
10
11
0.0
0.0
0.0
0.0
0.0
0.0 0.0

0.0

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0

0.0

0.0 -

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0 0.0 -

Rate
Composite
5 + 10
say
12
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -

13

ii

1
1

Providing and installing PVC Bail/ End Plug in T


MATERIAL
Dia of
Cost of
Contractor's
Bail /
Bail/
Profit
End Plug
End Plug
20
Percent
2
3
4
1\"
0.0
0.0

1\"

0.0

0.0

32

\"

0.0

0.0

43

\"

0.0

0.0

54

\"

0.0

0.0

65

\"

0.0

0.0

76

\"

0.0

0.0

S. No.

ng PVC Bail/ End Plug in Tube Well Bore Hole: BSS Class \"D\".
LABOURE
Total
Solvent
Contractor's Total
Lowering
Total
Labour
Profit
Charges
Labour
(3 + 4)
20 (6 + 7)
(8 + 9)
Percent
5
6
7
8
9
10
11
0.0
0.0
0.0
0.0
0.0
0.0 0.0

0.0

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0

0.0

0.0 -

Rate
Composite
(10 + 5)

say

12
0.0 0.0 0.0 0.0 0.0 0.0 0.0 -

14S.
No.

Providing and installing M.S. blind pipe socketed/ welded joint M.S. reducer (where necessary) i
Tube Well Bore Hole including jointing/ welding with strainer etc. complete.
Dia of
Thickness Rate
Contractor's Total
Pipe
of Pipe
Per Ft
Profit
20 (4 + 5)
Percent

1
1
2

2
2\"
3\"

34 5 67 8 9 1
1/8\"
1/8\"

0.0
0.0

0.0
0.0

0.0
0.0

3
4

4\"
5\"

1/8\"
3/16\"

0.0
0.0

0.0
0.0

0.0
0.0

5
6

6\"
7\"

3/16\"
3/16\"

0.0
0.0

0.0
0.0

0.0
0.0

7
8

8\"
9\"

3/16\"
3/16\"

0.0
0.0

0.0
0.0

0.0
0.0

9
10

10\"
12\"

\"
\"

0.0
0.0

0.0
0.0

0.0
0.0

11
12

15\"
18\"

\"
\"

0.0
0.0

0.0
0.0

0.0
0.0

13
14

20\"
22\"

\"
\"

0.0
0.0

0.0
0.0

0.0
0.0

S. reducer (where necessary) in


Daily
Daily
Progress Charges
Rs.
#VALUE!

Lowering Contractor's
Charges
Profit 20%

Total Grand
(9 + 10)

Total
(8 + 11)

Rate per Rft


Labour

100
100

#VALUE!
#VALUE!

0.0
0.0

11
2
0.0 0.00 #VALUE!
0.0 0.00 #VALUE!

13
#VALUE!
#VALUE!

80
80

#VALUE!
#VALUE!

0.0
0.0

0.0 0.00 #VALUE!


0.0 0.00 #VALUE!

#VALUE!
#VALUE!

56
56

#VALUE!
#VALUE!

0.0
0.0

0.0 0.00 #VALUE!


0.0 0.00 #VALUE!

#VALUE!
#VALUE!

48
48

#VALUE!
#VALUE!

0.0
0.0

0.0 0.00 #VALUE!


0.0 0.00 #VALUE!

#VALUE!
#VALUE!

48
40

#VALUE!
#VALUE!

0.0
0.0

0.0 0.00 #VALUE!


0.0 0.00 #VALUE!

#VALUE!
#VALUE!

40
32

#VALUE!
#VALUE!

0.0
0.0

0.0 0.00 #VALUE!


0.0 0.00 #VALUE!

#VALUE!
#VALUE!

30
30

#VALUE!
#VALUE!

0.0
0.0

0.0 0.00 #VALUE!


0.0 0.00 #VALUE!

#VALUE!
#VALUE!

Rate per Rft


Composite
(6 + 13)

Rate per Metre


Labour
Composite

say
14
#VALUE!
#VALUE!

15
#VALUE!
#VALUE!

16
#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

10

Daily Labour Charges


3\" - 6\" dia
Detail

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

#####

Contractor's Profit & Ove #####


Total

Daily Labour Charges P. Day

Unit Rate (British System) per day


Qty

1.00
0.50
0.75
1.00

Rate
Per Unit (Rs.) Amount (Rs.)

No
Nos
Nos
No
RATE

0 P. Day
0 P. Day
0 P. Day
P. Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Percent

#VALUE!
#VALUE!

Percent

Rs.
say

#VALUE!
#VALUE!

Daily Labour Charges


8\" - 14\" dia
Detail

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

#####

Contractor's Profit & Ove #####


Total

Contractor's Profit & Overheads

Unit Rate (British System) per day


Qty

1.00
0.50
1.50
1.00

Rate
Per Unit (Rs.) Amount (Rs.)

No
Nos
Nos
No
RATE

0.0 P. Day
0.0 P. Day
0.0 P. Day
P. Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Percent

#VALUE!
#VALUE!

Percent

Rs.
say

#VALUE!
#VALUE!

20

Daily Labour Charges


1

1 / \" - 4
Detail

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

#####

Contractor's Profit & Ove #####


Total

Daily Labour Charges P. Day

Unit Rate (British System) per day


Qty

0.50
0.60
1.00
1.00

Rate
Per Unit (Rs.) Amount (Rs.)

No
Nos
Nos
No
RATE

0.0 P. Day
0.0 P. Day
0.0 P. Day
P. Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Percent

#VALUE!
#VALUE!

Percent

Rs.

#VALUE!
#VALUE!

Daily Labour Charges


Detail

Labour
Foreman
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

#####

Contractor's Profit & Ove #####


Total

Daily Labour Charges P. Day

Unit Rate (British System) per day


Qty

1.00
2.00
6.00
1.00

Rate
Per Unit (Rs.) Amount (Rs.)

No
Nos
Nos
No
RATE

0 P. Day
0 P. Day
0 P. Day
P. Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Percent

#VALUE!
#VALUE!

Percent

Rs.

#VALUE!

15-

Providing and installing PVC blind pipe BSS Class \"B\" in Tube Well Bore Hole including Sockets
Solvents and jointing with strainer etc. complete.

S.
No.

Dia of
Strainer

Rate
Per Ft

12 3 5
13

\"

Contractor's Total
Profit
20 (3 + 4)
Percent
46
0.0
0.0
0.0

24

\"

0.0

0.0

0.0

35

\"

0.0

0.0

0.0

46

\"

0.0

0.0

0.0

58

\"

0.0

0.0

0.0

10\"

0.0

0.0

0.0

12\"

0.0

0.0

0.0

14\"

0.0

0.0

0.0

ell Bore Hole including Sockets and

Daily Labour Labour Lowering


Progress Charges Per Ft
Per Day

0.0

Total Contractor's Total


Profit
(9 + 10)
20
Percent
1
0.0
0.0 0.00 #####

###### ######

0.0

0.0

0.0 0.00 #####

180

###### ######

0.0

0.0

0.0 0.00 #####

160

###### ######

0.0

0.0

0.0 0.00 #####

128

###### ######

0.0

0.0

0.0 0.00 #####

128

###### ######

0.0

0.0

0.0 0.00 #####

104

###### ######

0.0

0.0

0.0 0.00 #####

104

###### ######

0.0

0.0

0.0 0.00 #####

200

7
8 04
###### ######

180

Solvent
Charges

91

20

Rate per Rft


Rate per Metre
(8 + 11 Labour
Composite Labour
Composite
+ 12)
(5 + 13)

13
.00 #####

14

#####

15
16
#VALUE! ######

16
#VALUE!

.00 #####

#####

#VALUE! ######

#VALUE!

.00 #####

#####

#VALUE! ######

#VALUE!

.00 #####

#####

#VALUE! ######

#VALUE!

.00 #####

#####

#VALUE! ######

#VALUE!

.00 #####

#####

#VALUE! ######

#VALUE!

.00 #####

#####

#VALUE! ######

#VALUE!

.00 #####

#####

#VALUE! ######

#VALUE!

Daily Labour Charges

Detail

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

10.00 Percent

Contractor's Profit 20.00 Percent


Total

Daily Labour Charges P. Day

bour Charges
a)

3\" to 6\" (75mm to 150mm) dia.


Unit Rate (British System) per day
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

1.00 No

0.00 P. Day

2.00 Nos
1.00 No
1.00 No
RATE

0
0

P. Day
P. Day
P. Day #VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Rs.

#VALUE!

Daily Labour Charges

Detail

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

10.00 Percent

Contractor's Profit 20.00 Percent


Total

Daily Labour Charges P. Day

bour Charges
b)

8\" to 14\" (200mm to 350mm) dia.


20

Unit Rate (British System) per day


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

1.00 No

0.00 P. Day

2.00 Nos
2.00 Nos
1.00 No
RATE

0.0
0.0

P. Day
P. Day
P. Day #VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Rs.

#VALUE!

16-

Providing and installing PVC blind pipe BSS Class \"D\" in Tube Well Bore Hole inclu
and jointing with strainer etc. complete.

S.
No.

Dia of
Strainer

Rate
Per Ft

Contractor's Total
Profit
20 (3 + 4)
Percent
4
5
0.0
0.0
0.0

1
1

2
1\"

1\"

0.0

0.0

0.0

32

\"

0.0

0.0

0.0

43

\"

0.0

0.0

0.0

54

\"

0.0

0.0

0.0

65

\"

0.0

0.0

0.0

76

\"

0.0

0.0

0.0

D\" in Tube Well Bore Hole including Sockets and Solvents

Daily
Daily
Progress Charges

Labour Solvent
Rate
Per Ft

0.0

Contractor's
Profit
(9 + 10)
20
Percent
11
4
0.0
0.0 0.00 ######

###### ######

0.0

0.0

0.0 0.00 ######

240

###### ######

0.0

0.0

0.0 0.00 ######

200

###### ######

0.0

0.0

0.0 0.00 ######

180

###### ######

0.0

0.0

0.0 0.00 ######

180

###### ######

0.0

0.0

0.0 0.00 ######

160

###### ######

0.0

0.0

0.0 0.00 ######

6
260

7
8
###### ######

260

Lowering
Charges

10

Total

Total
Rate per Rft
Rate per Metre
(8 + 11 Labour Composite Labour Composite
12)
(5 + 13)

13
.00 ######

14

####

15
16
17
#VALUE! ###### #VALUE!

.00 ######

####

#VALUE! ###### #VALUE!

.00 ######

####

#VALUE! ###### #VALUE!

.00 ######

####

#VALUE! ###### #VALUE!

.00 ######

####

#VALUE! ###### #VALUE!

.00 ######

####

#VALUE! ###### #VALUE!

.00 ######

####

#VALUE! ###### #VALUE!

Contractor's Profit

Daily Labour Charges

Detail

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Daily Labour Charges P. Day

Percent

Percent

a)

1\" to 3\" (32mm to 75mm) dia.


Unit Rate (British System) per day
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

1.00 No

0.00 P. Day

1.00 No
1.00 No
1.00 No

0
0
RATE

P. Day
P. Day
P. Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Rs.

#VALUE!

Daily Labour Charges

Detail

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

Percent

Percent

Daily Labour Cha

b)

4\" to 6\" (100mm to 150mm) dia.


20

Unit Rate (British System) per day


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

1.00 No

0.00 P. Day

2.00 Nos
1.00 No
1.00 No
RATE

0.0
0.0

P. Day
P. Day
P. Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

aily Labour Cha

Rs.

#VALUE!

DESCRIPTION OF ITEM NO 17:

i)
Detail

Material

(P. O.

L.)

For 100 Hours

Diesel Oil 2.50 gallon per hour


for 3 days (72 Hours).
Mobil Oil
3 gallon (for 72 hrs.)
Grease
2.5 Lbs
C. Oil
Total
Contractor's Profit & Ove 20.00
Total

Percent

Composite

Testing and developing of tube well of size


6\" (150mm) inner dia and above Continuously.
Upto 1.5 cusacs Discharge.
Unit Rate (British System) per Hours
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

##### Ltr
13.62 Ltr
1.13 Kg
L.S.

0 P. Ltr
0 P. Ltr
0 P. Kg

Rs.

100
Say

Item No.

17

ii)
Detail

Material

(P. O.

L.)

For 100 Hours

Diesel Oil 3 gallon per hour


for 3 days (72 Hours).
Mobil Oil
4 gallon (for 72 hrs.)
Grease
3 Lbs (for 72 hrs.)
C. Oil
Total
Contractor's Profit & Ove 20.00
Total

Percent

Composite

Testing and developing of tube well of size


6\" innner dia and above Continuously.
Upto 1.5 cusacs Discharge.
Unit Rate (British System) per Hour
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

##### Ltr
18.16 Ltr
1.36 Kg
L.S.

0 P. Ltr
0 P. Ltr
0 P. Kg

Rs.

100
Say

DESCRIPTION OF ITEM NO 18:

Detail

Analysis for
Material
Bajri 3/8\" - 1/8\" (10-3mm)
Wastage
5%
Total
Contractor's Profit & Ove 20.00
Total

Bajri 3/8\" - 1/8##### Cf


Wastage
5%

Percent

Labour
Washing and Pouring bag
Skilled Coolies
Unskilled Coolies
Total
Sundries 10.00
Total
Contractor's Profit & Ove 20.00
Total

100 Cft

Percent
Percent

Labour Ra
Labour Ra
Composite
Composite

Shrouding with graded pea gravel 3/8\" - 1/8\"


(10-3mm) around tube well in bore hole.
Unit Rate (British System) per Cft

Qty
nalysis for 100 Cft

ajri 3/8\" - 1/8##### Cft


astage
5%

Rate
Per Unit (Rs.) Amount (Rs.)
0 % Cft

3.30 Nos
1.00 No

0 P. Day
0 P. Day

Rs.
Rs.
Rs.
Rs.

19-

Laying, cutting, jointing, testing and disinfecting cast iron pipe line in trenches with spigot and
caulked lead joint, including cost of materials, such as lead, yarn, etc. complete in all respects.

S. nterna Weight of
No. dia of 18' length 100' length
pipe
of pipe in
lbs

Weight of

Carriage of
100' pipe
from field
store to site
lead four
chain @ Rs.

of pipe in
ton

Tons
5

Lowering
Cutting
into
ends
trenches
chipping, temporary disinfecting
strin- ging & fini- shing wooden
laying to
surface to
correct
uniform
alignment finish
and grade
6
7
0.0
0.0
0.0
0.0
0.0

12
1
2

3\"
4\"

170
190

.429
.48

5\"

324

.82

0.0

0.0

0.0

6\"

410

1.03

0.0

0.0

0.0

8\"

591

1.49

0.0

0.0

0.0

10\"

794

0.0

0.0

0.0

12\"

1,018

2.57

0.0

0.0

0.0

15\"

1,389

3.5

0.0

0.0

0.0

18\"

1,834

4.62

0.0

0.0

0.0

ne in trenches with spigot and socket


, etc. complete in all respects.

Pluging
Testing
with
and
hipping, temporary disinfecting
ni- shing wooden
plug

Jointing Total
with lead
joint

charges for
100' (30 M)
(5 + 6 + 7 +
+8+9+
10)

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Composite
rate Per Ft

Composite
rate Per
Metre

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

19 - a

Lowering into trenches, stringing and laying C.I. pipe line to correc

S. nterna
No.

dia

Daily
Progress

LABOUR
Daily
Amount per Rate 100 ft
Charges
100 ft

1
2
3

3\"
4\"
5\"

400
400
300

0.0 0.00
0.0 0.00
0.0 0.00

4
5

6\"
8\"

300
225

0.0 0.00
0.0 0.00

6
7

10\"
12\"

175
150

0.0 0.00
0.0 0.00

8
9

15\"
18\"

125
100

0.0 0.00
0.0 0.00

Contractor's Profit & Ove

g C.I. pipe line to correct alignment and gradient.

Analysis for daily charges

Plumber
Coolies
Total

1 No
2 Nos

Sundries
Total

10.00 Percen20

0.0

ontractor's Profit & Ove 20.00 PercenTotal

0.0

0.0
0.0

0.0
0.0
0.0

19 - b

Cutting cast iron pipe, chipping & finishing the face to uniform finish =

S.
No.

12
1
2

I/D
Labour for Cutting & finishing
of No.
of Daily
Rate per
Pipe cut P. day
Charges
200 ft
per cut
3
4
5
3\"
8
0.0
0.0
4\"
6
0.0
0.0

3
4
5
6

5\"
6\"
8\"
10\"

4
3
2
1.5

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

7
8
9

12\"
15\"
18\"

1.25
1.1
1

0.0
0.0
0.0

0.0
0.0 Total
0.0 0.00 Contractor's Profit
0.0
0.0

Rate per
100 ft
per cut
6
0.0
0.0 LABOUR
0.0
0.0
0.0
0.0

Pipe fitter
Unskilled Co
Total
Sundries

Cut a

to uniform finish =

Cut at every 200ft (60 M)


For 200' (60 M)

Analysis of Daily Charges

1 No
2 Nos

0.0
0.0

0.0
0.0
0.0

10 Percent

20 Percent

0.0
0.0

19 - c
S.
No.

Providing and fixing temporary wooden tapered plug of hard wood to ea


Size
of Area
plug

of Length
plug

12

13

24

35

46

4x144

x(3)

\"

x(4)

\"

4x144

.5
2
.5
2

4x144

x(5)

\"

x(6)

\"

4x144

.5
2
.5
2

58

\"

4x144

10\"

4x144

x(10)

x(12)

12\"

4x144

15\"

4x144

x(15)

x(18)

18\"

4x144

4
2

x(8)
.5
2
.75
2
.75
2
1
2
1

ed plug of hard wood to each end of pipe line.


PLUG
Content
in
Cft

Rate
Cft

Per

(5 X 6)

Assume for 500 ft.


LABOUR FOR MAKING PLUG
Daily
Daily
Amount
Progress
Charges
in No.
(9 / 8)

Amount

.02

0.0

0.0

34

0.0

.04

0.0

0.0

30

0.0

.07

0.0

0.0

25

0.0

.1

0.0

0.0

19

0.0

.17

0.0

0.0

15

0.0

.41

0.0

0.0

12

0.0

.59

0.0

0.0

0.0

1.23

0.0

0.0

0.0

1.77

0.0

0.0

0.0

ssume for 500 ft.


L. S.

LABOUR FOR FIXING


Sundries
10

Total
(11+12)

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Rate for 100 ft.


Grand
Total
for 500'
(15+10
+ 7)
1

Rate for
100'

0.0

0.0

0.0

0.0

Rate of Hard Wood

0.0

Hard Wood
1 Cft @
0.0 Rs.
Contractor's
Profit &
0.0 Overheads

0.0

0.0 Total

0.0

0.0

0.0

Carpenter
0.0 1

0.0

0.0

Turner
0.0 1

0.0

0.0

0.0

0.0 Total
Sundries
Total
Contractor's
Profit
Total

0.0

20

Daily Charges

10

20

0.0

0.0

0.0

0.0

0.0

0.0
0.0
0.0
0.0
0.0

19 - d

Testing and disinfecting C.I. Pi

S.
I/D of
No. pipe in of Water
Inch

Volume

Amount
@ Rs

required
in Gallon
3

Per
Gallons
4

Disinfecting
0 Agent
Lbs/Kg

Amount
@ Rs.

Hire
Charges
0 of testing
Per Lbs/Kg operatus

12
1
2

3\"
4\"

310
720

0.0
0.0

5
.5
1.2

6
0.0
0.0

7
0.0
0.0

3
4

5\"
6\"

850
1,830

0.0
0.0

1.4
2

0.0
0.0

0.0
0.0

5
6

8\"
10\"

2,180
3,410

0.0
0.0

3.65
5.7

0.0
0.0

0.0
0.0

12\"

4,910

0.0

0.0

0.0

8
9

15\"
18\"

8,730
11,000

0.0
0.0

14.5
18.5

0.0
0.0

0.0
0.0

Total

Assume for 1000' (300 M)


Total
Plugging
(8 + 9)
of Pipe

Contractor's
Profit

(7 + 6
+ 4)

LABOUR
Labour for
testing &
disinfecting

20
Percent
9

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

Rate for 100 ft.


Rate Charges
for 200 Rft

Total
(11 + 12)
2

1
1 No.
2 Nos

0.0
0.0

0.0 Mechanic
0.0 Coolies

0.0
0.0

0.0
0.0 Sundries

0.0
0.0

0.0
0.0 Contractor's 20.00

Total
Percent

0.0

0.0

Total

0.0
0.0

Rate per
0.0 100 Rft
0.0

10

Total
Percent

0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

19 - e

Jointing cast iron pipe line in trenches with spigot and socket. Caulked lead joints
including cost of material such as lead, yarn etc., complete in all respect.

S.
I/D of
No. pipe in
Inch

12
1
2
3
4
5
6
7
8
9

Lead
Lbs/Kg

3
3\"
4\"
5\"
6\"
8\"
10\"
12\"
15\"
18\"

Material Per Joint


Amount
Yarn
3x4
Lbs

Rate
Lbs/Kg

4
4.1
5.2
6.3
7.9
10.8
15
17.3
23
31.5

5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Plumber
Cooly
Assistant Plumber (skilled cooly)

Rate P.
Lbs

6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

7
.25
.38
.44
.44
.63
.75
1.06
1.5
2.07

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1 No
3 Nos
1 No

nd socket. Caulked lead joints


omplete in all respect.
Length of pipe 18' (6 M) P. Joint.
Detail per joint = Unit of
Total
ContraTotal
Amount
ctor's
Material
6x7
5+8
Profit
Per Joint
+9
20
10 + 11
Percent
8
9
1
0
1
1
1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Daily Charges
0.0
0.0
0.0
0.0
0.0
0.0
Contractor's Profit & Overheads
Total
0.0
Fuel

etail per joint = Unit of Rate 100'


abour Per Join
No. of
Days

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

.15
.19
.24
.28
.3
.5
.59
.76
.99
Sundires
Total

rofit & Overheads


Total

Composite
rate for 18'
length in
P. Joint
12 + 15
1
6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Composite
rate for
100' length
16 x 100
18
1
7
0.0
0.0
0.0
0.0

Composite Composite
rate for
Rft

rate for
Metre

8
-

8
-

20S.
No.

1
1
2
3
4
5
6
7
8
9
20 - a
S.
No.
1
2
3
4
5
6
7
8
9

Laying cutting, jointing, testing and disinfecting cast iron pipe line in trenches with
complete in all respects.
Internal Weight of
Weight
Carriage of Lowering into Cutting en
dia of
12' length of 100'
100' pipe
trenches strin- chipping, f
pipe
of pipe in
length from field storeging & laying toshing surfac
lbs
of pipe
to site lead correct alignmen to unifo
in ton.
four chain T and grade
@ of Rs.
2
3
4
5
6
3\"
.5
0.0
0.0
4\"
.65
0.0
0.0
5\"
.85
0.0
0.0
6\"
1.05
0.0
0.0
8\"
1.49
0.0
0.0
10\"
2.05
0.0
0.0
12\"
2.6
0.0
0.0
15\"
3.55
0.0
0.0
18\"
4.7
0.0
0.0
Lowering into trenches, stringing and laying C.I. pipe line
Internal
LABOUR
dia
Daily
Daily
Amount per Rate 100 ft
Progress
Charges
100 ft
3\"
400
0.0 0.00
4\"
400
0.0 0.00
5\"
300
0.0 0.00
6\"
300
0.0 0.00
8\"
225
0.0 0.00
10\"
175
0.0 0.00
12\"
150
0.0 0.00
15\"
125
0.0 0.00
18\"
100
0.0 0.00
-

t iron pipe line in trenches with flanged and flanged

owering into Cutting enPluging


renches strin- chipping, fwith
& laying toshing surfac temporary
rrect alignmen to unifo wooden plug
finish
7

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
g and laying C.I. pipe line to correct

Testing and Jointing


disinfecting with lead
joint

Total charges
for 100'
(30 M)
(5 + 6 + 7 +
8 + 9 + 10)

11

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
alignment

10
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
and gradient.

Plumber
Coolies
Total
Sundries
Total
Contractor's Profit & Overheads

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Analysis for daily charges


1 No
2 Nos
10.00 Percent
20.00 Percent

Total

0.0
0.0

Composite
rate per Ft

Composite
rate per
Metre

12

13
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

say
-

say
-

20 - b

Cutting cast iron pipe, chipping & finishing the face to uniform fini

S.
No.

I/D
of No.
Pipe

12
1
2
3
4
5
6
7
8
9
20 - c S.
No.

Labour for Cutting & finishing


of Daily
cut P. day
Charges

Rate
200 ft
per cut
5

3
3\"
4\"
5\"
6\"
8\"
10\"
12\"
15\"
18\"

4
8
0.0
6
0.0
4
0.0
3
0.0
2
0.0
1.5
0.0
1.25
0.0
1.1
0.0
1
0.0
Providing and fixing temporary wooden tapered plug of hard

Size
of Area Len of
plug
plug

12

PLUG
Contant
in
Cft
4

5
2

13

\"

x(3)
4x144

24

\"

x(4)
4x144

35

\"

x(5)
4x144

46

\"

x(6)
4x144

58

\"

x(8)
4x144

10\"

x(10)
4x144

12\"

x(12)
4x144

15\"

x(15)
4x144

.5
2
.5
2
.5
2
.5
2
.5
2
.75
2
.75
2
1

2
9

18\"

x(18)
4x144

g the face to uniform finish =

Cut at every 200ft (60 M)

Rate per
100 ft
per cut

per

6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
ooden tapered plug of hard wood to each end of pipe line.

Rate
Cft

Per

.02

0.0

Contractor's Profit & Overheads

(5 X 6)

LABOUR FOR MAKING PLUG


Daily
Daily
Progress
Charges
in No.

Amount

LABOUR
Pipe fitter
Unskilled Cooly

0.0

34

0.0

.04

275

11

30

0.0

.07

275

19.25

25

0.0

.1

275

27.5

19

0.0

.17

275

46.75

15

0.0

.41

275

112.75

12

0.0

.59

275

162.25

0.0

1.23

275

338.25

0.0

1.77

275

486.75

0.0

For 200' (60 M)

Analysis of Daily Charges


1 No
2 Nos

nskilled Cooly
Total
Sundries
Total
rofit & Overheads

0.0
0.0
10 Percent
20 Percent

Amount

L.

S.

LABOUR FOR FIXING


Total

Sundries
10

(9 / 8)
1

(11+12)
0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0
0.0
0.0
0.0
0.0

Contractor's
profit

Grand
Total
for 500'
(15+10
+ 7)
1

Total
(13+14)
20

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Detail

500'

Rate for 100'

Rate for
100'

0.0

Daily Charges

0.0
Hard Wood
0.0 Cft @ Rs.

0.0

0.0 Contractor's Profit & Overheads

20

0.0 Total

0.0

0.0 Carpenter 1 No.

0.0 Turner

0.0

1 No.

0.0

0.0 Total
Sundries
Total
Contractor's
Profit &
Overheads
Total

10

Percent

20

Percent

0.0

0.0

0.0

0.0

0.0

0.0
0.0

0.0

20 - d S.
No.

Testing and disinfecting C.I. Pipe.


I/D of
pipe in
Inch

Volume
of Water
required
in Gallon

Disinfecting
Agent
Lbs/Kg

Amount
@ Rs
0
Per Lbs/Kg

12
1
2
3
4
5

3\"
4\"
5\"
6\"
8\"

310
720
850
1,830
2,180

0.0
0.0
0.0
0.0
0.0

.5
1.2
1.4
2
3.65

6
7

10\"
12\"

3,410
4,910

0.0
0.0

5.7
8

8
9
20

15\"
18\"

S.
No.

12
1
2
3
4
5
6
7
8
9

Amount
@ Rs
Per
Gallons
4

- e

I/D of
pipe

3\"
4\"
5\"
6\"
8\"
10\"
12\"
15\"
18\"

8,730
0.0
14.5
11,000
0.0
18.5
Laying, cutting, jointing, testing & disinfecting C.I. pipe line in trenche
flanged joint complete in all respects.

Size
Dia

Length

3
5/8\"
5/8\"
5/8\"
5/8\"
3/4\"
3/4\"
3/4\"
7/8\"
7/8\"

4
2\"
2\"
3\"
3\"
3\"
3\"
3\"
4\"
4\"

Bolts & Nuts Per Joint


No
Rate
of
Bolts
5

6
4
4
6
6
8
12
12
12
12
Plumber
Cooly

Hire
Charges
of testing
operatus

Total

Assume for 1000' (300 M)


Total

Contractor's
Profit

(7 + 6
+ 4)

(8 + 9)
20

Percent
9

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0
0.0
0.0
fecting C.I. pipe line in trenches with flanged &

Rubber insertion 1/8\"


thick per joint.
Weight in
Lbs/kg

Amount
5x6

7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

1 No
1 No

.46
.61
1
1.18
1.2
1.86
2.5
2.84
3.42

Length of pipe 12' (4 M).


Total
Amount
7x8

7+9

24
28.32
28.8
44.86
60.24
69.36
82.08
Daily Charges

0
0.0
0.0
24
28.32
28.8
44.86
60.24
69.36
82.08

0.0
0.0
0.0 Contractor's Profit & Overheads

0.0
0.0

1000' (300 M)
LABOUR
Labour for
testing &
disinfecting

Plugging
of Pipe

(11+12)

(10 + 13)

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

Labour
Daily
Charges

No. of
Joints in
One Day

0.0
0.0
1.2
1.42
1.44
2.24
3.01
3.47
4.1

1
0.0
0.0
25.2
29.74
30.24
47.1
63.25
72.83
86.18

1
11
10
9
8
8
6
5
3
2

10

Percent

20

Percent

Total

1
0.0
0.0
0.0
0.0
0.0

20

Total

0.0
0.0
0.0
0.0
0.0

Total
Material
P. Joint
10 + 11

Sundires

Composite
for 1000 Rft

0.0
0.0
0.0
0.0
0.0

Contractor's
Profit
Percent
1

Total

Rate for 100' Rate for 10'


Rate Charges
for 200 Rft

Rate for
100'

or 1000 Rft

0.0
0.0
0.0
0.0
0.0

1
0.0 Mechanic
0.0 Coolies
0.0
0.0 Sundries
0.0
Contractor's
Profit &
0.0 Overheads
0.0
Rate per 100
0.0 Rft
0.0

0.0
0.0
0.0
0.0

1 No.
2 Nos
Total
10 Percent
Total

20 Percent
Total

Rate for 100'


Composite
rate
P. Joint
for 12'

Amount
14 / 13
4

1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rate Per
100' pipe
length
16 x 100
12
1

6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Composite
rate per

7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0' Rate for 10'


ate Charges

6
0.0
0.0

0.0
0.0
0.0
0.0

0.0
0.0

Composite
rate per
Metre

Ft

1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

21complete in all respects.


S.
No.

12
1
2
3
4
5
6
7
8
9
21 - a
S.
No.
1
2
3
4
5
6
7
8
9

Internal Weight of
dia of
12' length
pipe
of pipe in
lbs

3\"
4\"
5\"
6\"
8\"
10\"
12\"
15\"
18\"
Internal
dia
3\"
4\"
5\"
6\"
8\"
10\"
12\"
15\"
18\"

Weight
of 100'
length
of pipe
in ton.

Carriage of Lowering into


100' pipe
trenches strinfrom field store ging & laying to shing surfac
to site lead correct alignment
four chain T and grade
@ of Rs.
3
4
5
6
.47
0.0
.48
0.0
.8
0.0
1.02
0.0
1.47
0.0
1.97
0.0
2.52
0.0
3.45
0.0
4.55
0.0
Lowering into trenches, stringing and laying C.I. pipe line
LABOUR
Daily
Daily
Amount per Rate 100 ft
Progress
Charges
100 ft
400
0.0
0.0 400
0.0
0.0 300
0.0
0.0 300
0.0
0.0 225
0.0
0.0 175
0.0
0.0 150
0.0
0.0 125
0.0
0.0 100
0.0
0.0 -

owering into
Cutting endsPluging
Testing and Jointing Total charges
renches strinchipping, finiwith
disinfecting with lead
e ging & laying to shing surface
temporary
joint
orrect alignment
to uniform wooden plug
finish

7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
g and laying C.I. pipe line

8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
to correct

9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
alignment

1
0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
and gradient.

for 100'
(30 M)
(5 + 6 + 7 +
8 + 9 + 10)
1

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Analysis for daily charges


1 No
2 Nos

Plumber
Coolies
Total
Sundries 10.00 Percent
Total
Contractor's Profit & Overhe
Total

20.00 Percent

Composite
rate per Ft

Composite
rate per
Metre

5+6+7+

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0

1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

21 - b

Cutting cast iron pipe, chipping & finishing the face to uniform fini

S.
No.

I/D
of
Pipe

12
1
2
3
4
5
6
7
8
9
21 - c S.
No.

Labour for Cutting & finishing


No. of
cut P. day
3

3\"
4\"
5\"
6\"
8\"
10\"
12\"
15\"
18\"

Size
of
plug

8
6
4
3
2
1.5
1.25
1.1
1
Providing and fixing temporary wooden tapered plug of hard

Area of
plug

12

3
2

13

\"

x(3)
4x144

\"

x(4)
4x144

\"

x(5)
4x144

2
24

2
35

2
46

\"

x(6)
4x144

\"

x(8)
4x144

2
58

2
6

10\"

x(10)
4x144

12\"

x(12)
4x144

15\"

x(15)
4x144

2
7

2
8

2
x(18)

18\"

4x144

g the face to uniform finish =

Daily
Charges

Rate per
100 ft
per cut

Rate per
200 ft
per cut
5

Cut at every 200ft (60 M)

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
ooden tapered plug of hard wood to each end of pipe line.

Length

PLUG
Contant
in
Cft

Rate Per
Cft

LABOUR
Pipe fitter
Unskilled Cooly

Contractor's Profit & Overheads

(5 X 6)

LABOUR FOR MAKING PLUG


Daily
Daily
Progress
Charges
in No.

Amount

.5

.02

0.0

0.0

34

0.0

.5

.04

0.0

0.0

30

0.0

.5

.07

0.0

0.0

25

0.0

.5

.1

0.0

0.0

19

0.0

.5

.17

0.0

0.0

15

0.0

.75

.41

0.0

0.0

12

0.0

.75

.59

0.0

0.0

0.0

1.23

0.0

0.0

0.0

1.77

0.0

0.0

0.0

For 200' (60 M)

Analysis of Daily Charges


1 No

nskilled Cooly
Total
Sundries
Total
rofit & Overheads

0.0
0.0

2 Nos
10 Percent
20 Percent

R MAKING PLUG
Amount

L. S.

Sundries

(9 / 8)
1

LABOUR FOR FIXING


Total
10
(11+12)
2

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0
0.0
0.0
0.0
0.0

Contractor's
profit

Grand
Total
for 500'
(15+10
+ 7)
1

Total
(13+14)
20

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Detail

500'

Rate for 100'

Rate for
100'

0.0

Daily Charges

0.0
Hard Wood
0.0 Cft @ Rs.

0.0 Contractor's Profit & Over

20

0.0 Total

0.0

0.0 Carpenter 1 No.

0.0 Turner

0.0

1 No.

0.0

0.0 Total
Sundries
Total
Contractor's
Profit &
Overheads
Total

10 Percent

10 Percent

0.0

0.0

0.0

0.0

0.0

0.0

0.0
0.0

0.0

20 - d S.
No.

Testing and disinfecting C.I. Pipe.


I/D of
pipe in
Inch

Volume
of Water
required
in Gallon
3

Amount
@ Rs
Per
Gallons
4

Disinfecting
Agent
Lbs/Kg

12
1
2
3
4
5

3\"
4\"
5\"
6\"
8\"

310
720
850
1,830
2,180

0.0
0.0
0.0
0.0
0.0

5
.5
1.2
1.4
2
3.65

6
7

10\"
12\"

3,410
4,910

0.0
0.0

5.7
8

8
9

15\"
18\"

8,730
11,000

0.0
0.0

14.5
18.5

Amount
@ Rs.

Hire
Charges
0 of testing
Per Lbs/Kg operatus
6

Total

Assume for 1000' (300 M)


Total
Plugging
(8 + 9)
of Pipe

Contractor's
Profit

(7 + 6
+ 4)

20
Percent
9

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

LABOUR
Labour for
testing &
disinfecting
1

Total

Composite
for 1000 Rft

(11+12)

(10 + 13)

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

Rate for 100'


Rate for
100'

Rate Charges
for 200 Rft

1
0.0 Mechanic
1 No.
0.0 Coolies
2 Nos
0.0
0.0 Sundries
0.0
Contractor'
s Profit &
0.0 Overheads 10.00
0.0
Rate per
0.0 100 Rft
0.0

6
0.0
0.0

10

Total
Percent
Total

Percent
Total

0.0
0.0
0.0
0.0

0.0
0.0

21 Laying, cutting, jointing, testing & disinfecting cast iron pipe line in trenches with t
complete in all respect.

S.
No.

12
1
2
3
4
5
6
7
8
9

I/D of
pipe in
Inche

3\"
4\"
5\"
6\"
8\"
10\"
12\"
15\"
18\"

Rate
of ring

Amount

4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Length of pipe 18' (5.4 M). Rate for 1


Cost of Ring
Contra ctor'sTotal
Profit
Material
20 P. joint
Percent
5
6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

ron pipe line in trenches with tyton joints

ipe 18' (5.4 M). Rate for 100'


Total
Composite
Material
rate per
for 100'
100 ft
6 x 100
18
7
8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

21

Laying,cutting,jointing,testing and disinfecting Cast Iron Pipe line in trenches with T


S.
Internal
eight of 10 Carriage of Lowering int
No.
dia of
length of
100' pipe
trenches strin- chepping,
pipe
pipe in ton from field store ging & laying to shing
to site lead correctalign
four chain @and grade
Rs.
Tons
12 3
4
5
1
3\"
.47
0.0
0.0
2
4\"
.48
0.0
0.0
3
5\"
.8
0.0
0.0
4
6\"
1.02
0.0
0.0
5
8\"
1.47
0.0
0.0
6
10\"
1.97
0.0
0.0
7
12\"
2.52
0.0
0.0
8
15\"
3.45
0.0
0.0
9
18\"
4.55
0.0
0.0

Iron Pipe line in trenches with Tyton joints,complete in all respect.


Cutting endsPluging
Testing and Jointing Total charges
Composite
renches strin- chepping, with
disinfecting with rubber for 100'
rate Per Ft
ging & laying to shing temporary
ring
(30 M)
to uniform wooden plug
(4 + 5 + 6 +
finish
7 + 8 +9)
6

7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

891
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Composite
rate Per
Metre

2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

21 - a

Lowering into trenches, stringing and laying C.I. pipe line

S.
No.

Internal
dia

1
2
3
4
5
6
7
8
9

3\"
4\"
5\"
6\"
8\"
10\"
12\"
15\"
18\"

Daily
Progress
400
400
300
300
225
175
150
125
100

LABOUR
Daily
Amount
Charges
100 ft
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

per Rate 100 ft


0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

g and laying C.I. pipe line to correct alignment and gradient.

Plumber
Coolies

Analysis for daily charges


1 No
0.0
2 Nos
0.0

Total
Sundries 10.00 Percent
Total
Contractor's Profit & Ove 20.00 PercenTotal

0.0
0.0
0.0
0.0
0.0

21 - b

Cutting cast iron pipe, chipping & finishing the face to uniform fini

S.
No.

I/D
of
Pipe

12
1
2

3\"
4\"

3
4

5\"
6\"

5
6

Labour for Cutting & finishing


No. of
Daily
Rate per
cut P. day
Charges
200 ft
per cut
3
4
5
8
0.0
0.0
6
0.0
0.0

Rate per
100 ft
per cut
6
0.0
0.0

4
3

0.0
0.0

0.0
0.0

0.0
0.0

8\"
10\"

2
1.5

0.0
0.0

0.0
0.0

0.0
0.0

7
8

12\"
15\"

1.25
1.1

0.0
0.0

0.0
0.0

0.0
0.0

18\"

0.0

0.0

0.0

g the face to uniform finish =

Cut at every 200ft (60 M)


For 200' (60 M)

Analysis of Daily Charges


LABOUR
Pipe fitter
Unskilled Cooly

1 No
2 Nos

Total
Sundries

0.0
0.0

0.0
0.0
0.0

Total
Contractor's Profit & Ove

10 Percent

20 Percent

0.0

0.0

22

Providing, laying, cutting, jointing, testing and disinfecting GI pipeline in trenches, with socket j
complete in all respects, with specials and valves.
(I)

S. Dia of
No. pipe in
Inche

Rate per
100' for
light
quality

Material
Special
1,000.%

Adust- Wastage
orum
200.%
100.%

1
1
2

23 4 56
\"
\"

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

31

\"

0.0

0.0

0.0

0.0

4
5

1\"
1\"

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

62

\"

0.0

0.0

0.0

0.0

2\"

0.0

0.0

0.0

0.0

83

\"

0.0

0.0

0.0

0.0

94

\"

0.0

0.0

0.0

0.0

Plumber
Cooly

1 No.
2 Nos.

Total
Contractor's Profit & Overheads

20
Total

eline in trenches, with socket joint, using GI pipes of BSS 1387 - 1967

Length of pipe 18' (5.4 M).


Total

Contractor's
Profit

3+4+
5+6

Total

No of
Joints
in line

Progress

20
Perfect
7 8 9 1 1 1 11
0 1 2 3411 1 1
0.0
0.0 0.00 10.00
0.0
0.0 0.00 10.00

Daily
Charges

40
35

0.0
0.0

0.0
0.0

0.0

0.0

0.0

30

0.0

0.0

0.0
0.0

0.0
0.0

0.0
0.0

9
9

30
30

0.0
0.0

0.0
0.0

0.0

0.0

0.0

28

0.0

0.0

0.0

0.0

0.0

28

0.0

0.0

0.0

0.0

0.0

25

0.0

0.0

0.0

0.0

0.0

23

0.0

0.0

0.0
0.0

0.0
0.0
0.0

Percent

Cost
per
Joint

0.0

Sundries
Total

20 Percent

Light Quality
Labour
Total
jointing
material

Total
13 + 14
x 10

Carriage

Rate for 100'


Rate
CompoLabour Composite Labour
site for
for Per ft for per ft
100'
9 + 18
18 / 100 19 / 100

Testing Labour
15 + 16
+ 17

56 7 81 22 2
0.0
0.0
0.0
0.0

9 0 1 22
0.0 0.0 -

0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Rate per Metre


abour Composite Labour
Composite
or Per ft for per ft

8 / 100 19 / 100
3
0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

22

Providing, laying, cutting, jointing, testing and disinfecting GI pipeline in trenches, with socket j
complete in all respects, with specials and valves.
Length of pipe 18' (5.4

S. Dia of
No. pipe in
Inche

Rate per
100' for
light
quality

Material
Special
1,000.%

Adust- Wastage
orum
200.%
100.%

Total
3+4+
5+6

1
1
2

23 4 56
\"
\"

0.0
0.0

0.0
0.0

0.0
0.0

7 8 9 1 1 1 11
0.0
0.0
0.0
0.0

31

\"

0.0

0.0

0.0

0.0

0.0

4
5

1\"
1\"

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

62

\"

0.0

0.0

0.0

0.0

0.0

7
83

2\"
\"

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

94

\"

0.0

0.0

0.0

0.0

0.0

10
11

5\"
6\"

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

Plumber
Cooly

1 No.
2 Nos.

0.0
0.0

Total
Contractor's Profit & Overheads

20 Percent
Total

eline in trenches, with socket joint, using GI pipes of BSS 1387 - 1967

Contractor's
Profit

(ii)

Medium Quality

Cost
per
Joint

Labour
Total
jointing
material

20

ength of pipe 18' (5.4


Total

No of
Joints
in line

Progress

Daily
Charges

20
Perfect
8 9 1 1 1 11

0 1 2 3411 1 1
0.0 0.00 10.00
0.0 0.00 10.00

40
35

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

30

0.0

0.0

0.0

0.0
0.0

0.0
0.0

9
9

30
30

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

28

0.0

0.0

0.0

0.0
0.0

0.0
0.0

8
7

28
25

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

23

0.0

0.0

0.0

0.0
0.0

0.0
0.0

6
6

20
20

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0
0.0
0.0

Sundries
Total

10 Percent

0.0

edium Quality

Total
13 + 14
x 10

Carriage

Rate for 100'


Rate
CompoLabour Composite Labour
site for
for Per ft for per ft
100'
9 + 18
18 / 100 19 / 100

Testing Labour
15 + 16
+ 17

56 7 81 22 2
0.0
0.0

9 0 1 22
0.0 0.0 -

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

Rate per Metre


osite Labour
Composite

3
0.0
0.0

0.0
0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0
0.0

0.0
0.0

22

Providing, laying, cutting, jointing, testing and disinfecting GI pipeline in trenches, with socket j
complete in all respects, with specials and valves.

Length of pipe 18' (5.4 M).


S. Dia of
No. pipe in
Inche

Rate per
100' for
light
quality

Material
Special
1,000.%

Adust- Wastage
orum
200.%
100.%

Total
3+4+
5+6

1
1
2

23 4 56
\"
\"

0.0
0.0

0.0
0.0

0.0
0.0

7 8 9 1 1 1 11
0.0
0.0
0.0
0.0

31

\"

0.0

0.0

0.0

0.0

0.0

4
5

1\"
1\"

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

62

\"

0.0

0.0

0.0

0.0

0.0

7
83

2\"
\"

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

94

\"

0.0

0.0

0.0

0.0

0.0

10
11

5\"
6\"

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

Plumber
Cooly

1 No.
2 Nos.

0.0
0.0

Total
Contractor's Profit & Overheads

20 Percent
Total

eline in trenches, with socket joint, using GI pipes of BSS 1387 - 1967
(iii

Heavy Quality

Cost
per
Joint

Labour
Total
jointing
material

ength of pipe 18' (5.4 M).


Contractor's
Profit

Total

No of
Joints
in line

Progress

Daily
Charges

20
Perfect
8 9 1 1 1 11

0 1 2 3411 1 1
0.0 0.00 10.00
0.0 0.00 10.00

40
35

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

30

0.0

0.0

0.0

0.0
0.0

0.0
0.0

9
9

30
30

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

28

0.0

0.0

0.0

0.0
0.0

0.0
0.0

8
7

28
25

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

23

0.0

0.0

0.0

0.0
0.0

0.0
0.0

6
6

20
20

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0
0.0
0.0

Sundries
Total

10 Percent

0.0

eavy Quality

Total
13 + 14
x 10

Carriage

Rate for 100'


Rate
CompoLabour Composite Labour
site for
for Per ft for per ft
100'
9 + 18
18 / 100 19 / 100

Testing Labour
15 + 16
+ 17

56 7 81 22 2
0.0
0.0

9 0 1 22
0.0 0.0 -

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

0.0
0.0

Rate per Metre


osite Labour
Composite

3
0.0
0.0

0.0
0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0
0.0

0.0
0.0

0.0

0.0

0.0
0.0

0.0
0.0

10

23

Providing laying, cutting, jointing, testing & disinfecting AC pipeline of BSS with \"B\" Class work
trenches with cement joint & rubbering complete in all respect.

Material
S.
No.

1
13
24
36
48
5
6
7
8
9
10
11

Dia
Cost of
Wastof
pipe with
age
pipe coment
200.%
joint &
rubber
ring
2 34 5
\"
0.0
\"
0.0
\"
0.0
\"
0.0
10\"
0.0
12\"
0.0
14\"
0.0
16\"
0.0
18\"
0.0
20\"
0.0
24\"
0.0

Total

Contractor's
Profit

(3 + 4)

Total

20 (5 + 6)
Percent
67
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

ine of BSS with \"B\" Class working pressure pipe in

Carriage
for 100'
AC pipe
(4 chain)

Labour for 100'


Grand
Lowering Cutting Cleaning
Total
into end
end and
for 100 Ft trenches
pipe
& laying

Per ft
length

891

01
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

11
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

21
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

31
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

of

Testing

Plugging
wooden
plug

disinfecting

Rate per Metre


Rate per Ft
Labour Composite Labour Composite
for
for per
Per ft
ft

Rate per 100 Ft


Labour
Composite
10 + 16

41

51
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

611
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

7 81
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

92
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

ate per Metre

1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

24

Providing laying, cutting, jointing, testing & disinfecting AC pipeline of BSS with \"C\" Class work
trenches with cement joint & rubbering complete in all respect.

S.
No.

Dia
Cost of
Wastof
pipe with
age
pipe coment
200.%
joint &
rubber
ring
2 34 5
\"
0.0
\"
0.0
\"
0.0
\"
0.0
10\"
0.0
12\"
0.0
14\"
0.0
16\"
0.0
18\"
0.0
20\"
0.0
24\"
0.0

Material

1
13
24
36
48
5
6
7
8
9
10
11

Total

Contractor's
Profit

(3 + 4)

Total

20 (5 + 6)
Percent
67
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

ine of BSS with \"C\" Class working pressure pipe in

Carriage
for 100'
AC pipe
(4 chain)

Labour for 100'


Grand
Lowering Cutting Cleaning
Total
into end
end and
for 100 Ft trenches
pipe
& laying

Per ft
length

20
01

891
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

11
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

21
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

31
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

of

Testing
disinfecting

Rate per Metre


Rate per Ft
Labour Composite Labour Composite
for
for per
Per ft
ft

Rate per 100 Ft


Labour
Composite

Plugging
wooden
plug

10 + 16

41

51
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

611
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

7 81
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

92
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

ate per Metre

1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

25

Providing laying, cutting, jointing, testing & disinfecting AC pipeline of BSS with \"D\" Class work
trenches with commet joint & rubbering complete in all respect.

S.
No.

1
13

Dia
Cost of
Wastof
pipe with
age
pipe coment
200.%
joint &
rubber
ring
2 34 5
\"
0.0

0.0

0.0

0.0

0.0

24

\"

0.0

0.0

0.0

0.0

0.0

36

\"

0.0

0.0

0.0

0.0

0.0

48

\"

0.0

0.0

0.0

0.0

0.0

10\"

0.0

0.0

0.0

0.0

0.0

12\"

0.0

0.0

0.0

0.0

0.0

14\"

0.0

0.0

0.0

0.0

0.0

16\"

0.0

0.0

0.0

0.0

0.0

18\"

0.0

0.0

0.0

0.0

0.0

10

20\"

0.0

0.0

0.0

0.0

0.0

Material
Total

Contractor's
Profit

(3 + 4)

Total

20 (5 + 6)
Percent
67

ine of BSS with \"D\" Class working pressure pipe in

Carriage
for 100'
AC pipe
(4 chain)

Labour for 100'


Grand
Lowering Cutting Cleaning
Total
into end
end and
for 100 Ft trenches
pipe
& laying

Per ft
length

891

01

11

21

31

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

of

Testing
disinfecting

Rate per Metre


Rate per Ft
Labour Composite Labour Composite
for
for per
Per ft
ft

Rate per 100 Ft


Labour
Composite

Plugging
wooden
plug

10 + 16

41

51

611

7 81

92

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

ate per Metre

1
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0

re

re

re

23.Cleaning pipe placing rubber in position pressing


S.
#

12
1
2
3
4
5
6
7
8
9
10
11

I/D
of joining
Pipe

3\"
4\"
6\"
8\"
10\"
12\"
14\"
16\"
18\"
20\"
24\"

No of

Amount

per day

Labour
charges
per day

36
32
28
24
20
16
14
13
12
10
8

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

er in position pressing with assembling machine, of AC pipe.


Hire
Total
Charges
of Machine
6
0.0
0.0
0.0 0.00 machine, and jointing.
0.0
0.0 LABOUR
0.0 0.00 Plumber
1 No
0.0 0.00 Skilled Cooly
1 No
0.0
0.0
Total
0.0
0.0
Sundries 10.00
0.0
0.0
0.0
0.0
Total
0.0
0.0 Contractor's Profit & Ove
0.0
0.0

0.0
0.0
Percent

20 Percent

0.0
0.0
0.0
0.0
0.0
0.0
0.0

23 -

Lowering into trenches, stringing and laying to corre

S.
No.

Size
of
pipe

12

No. of
Labour for
Days Charges
for 100'
per day

Amount

3\"

.5

0.0

0.0

4\"

.515

0.0

0.0

6\"

.703

0.0

0.0

8\"

.974

0.0

0.0

10\"

1.289

0.0

0.0

12\"

1.673

0.0

0.0

14\"

1.915

0.0

0.0

16\"

2.157

0.0

0.0

18\"

2.555

0.0

0.0

10

20\"

2.981

0.0

0.0

11

24\"

3.48

0.0

0.0

ging and laying to correct alignment AC pipe \"Class B\" etc.

Daily Labour Charges

Plumber

1 No

0.0

0.0

Unskilled Cooly

2 Nos

0.0

0.0

Sundries

Total

0.0

10 Percent

0.0

Total

0.0

Contractor's Profit & Ove 20 20.00

0.0
0.0

S.
#

23

Providing, laying, cutting, jointing testing & disinfecting


pressure pipe in trenches with cement joint and rubber ring

Dia
of
pipe

Volume of
Water in
P. Gallon

Amount
@ Rs
0
Per
Gallons
4

Disinfecting
agent
in Lbs
5

Amount
@ Rs.
0
Per
Lbs
6

12
1
2
3
4
5
6
7
8
9
10

3\"
4\"
6\"
8\"
10\"
12\"
14\"
16\"
18\"
20\"

310
720
1,820
2,180
3,410
4,910
6,810
8,710
11,000
13,600

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

.5
1.2
2
3.65
5.7
8
11.15
14.3
18.5
22

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

11

24\"

19,600

0.0

32.15

0.0

Mechanic

1 No.

Cooly

2 Nos

ting testing & disinfecting A.C. pipe line of BSS with \"B Class\" working
ement joint and rubber ring complete in all respect.
Detail for 1000'
Hire
Total
ContraTotal
Labour
Charges
ctor's
Plugging
of testing
4+6
Profit
8+9
of pipe
apparatus + 7
20
Percent
7
8
9
1
0
1
1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0

0.0

Labour for Testing 2000 ft


0.0
0.0
0.0
Total

0.0

Per Joint

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Sundires

0.0
0.0 Contractor's Profit & Overheads

Total
Total

abour Per Joint


Labour
for testing
and disinfecting
1

(Disinfecting and testing rate


Composite Composite
Total
rate for
ft
11 + 12
10 + 13
2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0

0.0

0.00

10

0.0

20

0.0
0.0
0.0

rate for
% ft.

0
2

5
-

Rate for 100'


Composite Rate
Rate per
Rft

Rate per
Metre

6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7
-

0.00

Providing and fixing temporary wooden plug.


S.
#

Size
of
pipe

PLUG
Length

Area of
Plug Sft

12

5
2

\"

4x144

x(3)

13

\"

4x144

x(4)

24

\"

4x144

x(6)

36

\"

4x144

x(8)

48

x(10)

10\"

4x144

12\"

4x144

x(12)

x(14)

14\"

4x144

16\"

4x144

x(16)

x(18)

18\"

4x144

20\"

4x144

x(20)

10

x(20)

24\"

4x144

11

Rate
per Cft

.5
2

0.0

.5
2

0.0

.5
2

0.0

.5
2

0.0

.75
2

0.0

.75
2

0.0

.75
2

0.0

1
2

0.0

1
2

0.0

1
2

0.0

1.25

0.0

MATERIAL
Contents Amount
in Cft
5x6

LABOUR FOR MAKING PLUG


Daily
Daily
Amount
Progress
Rate
20
in No.
9/8/2012

L.S.

.02

0.0

34

0.0

0.0

.04

0.0

30

0.0

0.0

.1

0.0

19

0.0

0.0

.17

0.0

15

0.0

0.0

.41

0.0

12

0.0

0.0

.59

0.0

0.0

0.0

1.07

0.0

0.0

0.0

1.4

0.0

0.0

0.0

1.77

0.0

0.0

0.0

2.18

0.0

0.0

0.0

3.93

0.0

0.0

0.0

Assume

for

500'

Sundries
10
Percent

LABOUR FOR FIXING


Contractor's
Profit
20
Percent
1
4

Total

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Total

Grand
Total
for 500'
7 + 10
+ 15
1

13 + 14

Rate
for 100'

Rate
per Metre

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Rate for 100'

0.0

Daily Charges

0.0
Hard Wood
0.0 1 Cft
Contractor'
s Profit &
0.0 Overheads

0.0

0.0

20

0.0

0.0 Total

0.0

0.0
Carpenter
0.0 1 No.

0.0

0.0

Turner
0.0 1 No.

0.0

0.0

0.0 Total

0.0 Sundries

0.0 Total
Contractor'
s Profit &
Overheads
Total

0.0

20

0.0

0.0

20

0.0
0.0

Lowering into trenches, stringing and laying to correct alignment AC


S.
No.
12 3 4 5
1
2
3
4
5
6
7
8
9
10
11

Size
of
pipe
3\"
4\"
6\"
8\"
10\"
12\"
14\"
16\"
18\"
20\"
24\"

No. of Labour for Amount


Days Charges
for 100'
per day
.5
.515
.703
.974
1.289
1.673
1.92
2.157
2.555
2.981
3.48

0.0
0.0 Lowering into trenches stringing
0.0
0.0 Daily Labour Charges
0.0
0.0
0.0
0.0 Plumber
0.0
0.0 Unskilled Co
0.0
0.0
0.0
0.0 Sundries
0.0
0.0
0.0 0.00Contractor's Profit & Overheads
0.0
0.0
0.0
0.0

g to correct alignment AC pipe \"Class D\" etc.

owering into trenches stringing and laying to correct alignment.


Daily Labour Charges
1 No
2 Nos
Total

10
Total
or's Profit & Overheads 20

0.0
0.0
Percent
Percent

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Providing, laying cutting jointing testing and disinfecting PVC


pressure pipe in pipes trenches complete in all respect.

26

S.
No.

Dia
of
pipe

Rate
for 100'

MATERIAL
Total
Contractor's
Profit

Wastage
200.%

Total
(5 + 6)
20

Percent
1
13

2 345 6 7 8 9 1
\"

0.0

0.0

0.0

0.0

0.0

24

\"

0.0

0.0

0.0

0.0

0.0

35

\"

0.0

0.0

0.0

0.0

0.0

46

\"

0.0

0.0

0.0

0.0

0.0

58

\"

0.0

0.0

0.0

0.0

0.0

10\"

0.0

0.0

0.0

0.0

0.0

12\"

0.0

0.0

0.0

0.0

0.0

14\"

0.0

0.0

0.0

0.0

0.0

ing and disinfecting PVC pipeline of BSS with Class \"B\" working
e in all respect.
Assume for
Weight
in
Kg

Rate
of
Lubricant
in Kg

LABOUR
Contractor's
Profit

Amount
(8 x 9)

Total

Labour
as per
(10 + 11) detail

500'

Total
(12 +13)

20
Percent
11 11

01

2 341

.303

0.0

0.0

0.0

0.0

0.0

0.0

.339

0.0

0.0

0.0

0.0

0.0

0.0

.464

0.0

0.0

0.0

0.0

0.0

0.0

.544

0.0

0.0

0.0

0.0

20

20

.789

0.0

0.0

0.0

0.0

0.0

0.0

.865

0.0

0.0

0.0

0.0

0.0

0.0

1.037

0.0

0.0

0.0

0.0

0.0

0.0

1.179

0.0

0.0

0.0

0.0

0.0

0.0

Rate for P. ft
Rate per 100'
Labour Composite
for 100'
for 100'
(7 + 15)

51 11

Rate per Rft


Labour Composite
rate
rate

Rate per Metre


Labour
Composite
rate
rate

6781

92

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

20

.2

.2

.66

.66

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

#####

Labour for laying, cutting, jointing, pipeline in trenches with PVC pipes of BSS with
\"B\" Class working pressure, complete in all respect.

Rate for
S. #

Dia
Carriage
of
for lead
pipe
4 chains
2 3 4567 8

1
2
3
4
5
6
7
8
9

2\"
3\"
4\"
5\"
6\"
8\"
10\"
12\"
14\"

LAYING, FIXING, CUTTING, JOINTI


Time for
Daily
Amount
100'
Expenses

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

.1
1/8/2012
1/6/2012
1/5/2012
1/5/2012
2/7/2012
2/5/2012
1/2/2012
2/3/2012

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

100

ft

hes with PVC pipes of BSS with

ate for

100

ft

Testing
Total
&
Disinfecting 6 + 7

Rate
for 100'
9

-.22
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

-.22
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

#####
#####
-

Plumber
1 No
S. Coolies 2 No
Total
Sundries 10.00 Percent
Total
Contractor's 20.00 Percent
Total

0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

27

S.
#

Providing, laying, cutting, jointing, testing & disinfecting pipeline in tre


Class working pressure, complete in all respect.
Dia
of
pipe

Rate for
100'

Material
Total

Wastage
200.%

(3 + 4)

Contractor's
Profit
20

Percent
6

23

12

\"

0.0

0.0

0.0

0.0

23

\"

0.0

0.0

0.0

0.0

34

\"

0.0

0.0

0.0

0.0

45

\"

0.0

0.0

0.0

0.0

56

\"

0.0

0.0

0.0

0.0

ng & disinfecting pipeline in trenches with PVC pipes of BSS with \"D\"

Total
(5 + 6)

Lubricant
Kgs

Rate
per Kgs

Labour
Contractor's
Profit

Amount
(8 x 9)

Total

Labour
as per
detail
24

(10+11)
20

89 1

Percent
11

21 1

3 41

0.00 0.259

0.0

0.0

0.0

0.0

0.0

0.00 0.303

0.0

0.0

0.0

0.0

0.0

0.00 0.339

0.0

0.0

0.0

0.0

0.0

0.00 0.464

0.0

0.0

0.0

0.0

0.0

0.00 0.544

0.0

0.0

0.0

0.0

0.0

Unit of rate per ft.


Rate per 100'
Rate per Ft
Labour
Composite Labour Composite Labour Composite

Total
(12+13)

Rate per Metre

(7 + 15)

61

71

81 2

90

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Rate per Metre

0.0
0.0

0.0

0.0
0.0

28
a-

S.
No.

Providing and fixing cast iron special of BSS class \"B\" (such as bend,
cap, flanged socket, taper, angle branch, plug, etc.) for cast iron pipe
C-I specials with spigot and socket joint.

Dia
of
pipe

12
1

Average
Waight
in
Lbs
3

Labour
Material
for
for
2 Joints 2 Joints
4

3\"
4\"

46
61

5\"

88

6\"

111

8\"

182

10\"

273

12\"
15\"

392
540

18\"

746

BSS class \"B\" (such as bend, tee, cross collar, reducer, tail piece, flanged spigot,
h, plug, etc.) for cast iron pipe line, complete.

Labour
Total
Labour for
2 Joints
4+5
6

Total
weight
of special

Total
Cost

Rate
per Kg

Casting material (Supply of s


carriage to site of work.
Rate
per Cwt

0.0
0.0
0.0
or
138.84
0.0 Kg

0.0

0.0

0.0

0.0

0.0

0.0

0.0
0.0
or
396.55
0.0 Kg
0.0
or
583.48
0.0 Kg

asting material (Supply of specials i/c moulding, painting,


arriage to site of work.
Contractor's
Total
Profit
20
Percent
0
1
1
1
2

Rate
per Kg

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Rate per Kg
Labour

Composite
13 + 14

0.0

0.0

0.0

0.0

0.0

0.0

28 b-

S.
No.

12
1

Providing and fixing cast iron special of BSS class \"B\" (such as bend,
cap, flanged socket, taper, angle branch, plug, etc.) for cast iron pipe
CI flanged special with flanged and flanged joints.

Dia
of
pipe

Average
Weight
in
Lbs/Kg

Labour rate for 2


joints.
Labour
Material

3\"
4\"

32
48

5\"

83

6\"

93

8\"

161

10\"

250

12\"
15\"

376
453

18\"

646

BSS class \"B\" (such as bend, tee, cross collar, reducer, tail piece, flanged spigot,
h, plug, etc.) for cast iron pipe line, complete.
nged joints.
Labour
Labour rate per Lbs
Total

Total
weight

weight.
Total
Amount

Supply of special (cost of material,


with moulding, painting, and carriage to

(4 + 5)
6

Rate
per Kg
20

Rate
P/ Cwt

or
116.15
Kg

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

or
357.08
Kg
or
498
Kg

Material

cial (cost of material,


g, painting, and carriage to
site of work.
Contractor's
Profit
20
1
1

Total

Rate per Kg
Labour
rate per
Kg

Rate
per Kg
2

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Rate
Rate per Kg
Composite
rate per
Kg

0.0

0.0

0.0

0.0

0.0

0.0

28
c-

S.
No.

12
1

Providing and fixing cast iron special of BSS class \"B\" (such as bend,
cap, flanged socket, taper, angle branch, plug, etc.) for cast iron pipe
CI specials with tyton joints.
Weight
Dia
of
pipe

Average
Weight
in Labour
Lbs

Labour rate for 2


joints.
Material

3\"

42

4\"
5\"

60
84

6\"
8\"

109
175

10\"

265

12\"
15\"

374
654

18\"

898

BSS class \"B\" (such as bend, tee, cross collar, reducer, tail piece, flanged spigot,
h, plug, etc.) for cast iron pipe line, complete.

Labour
abour rate for 2

Labour rate per Lbs

Total

Total
weight of
specials

weight.
Total
cost

324.76
Lbs or
147.62
Kg

Rate
per
Kg

Supply of special (cost of material


with moulding, painting, and
carriage to site of work.
Rate
per Cwt

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Lbs or
244.2
Kg
921.8
Lbs or
419
Kg

Material
cial (cost of material
g, painting, and

Rate
Rate per Kg
Labour
rate per
Kg

Rate
per
Kg

Contractor's
Profit

Total

20
1

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Rate per Kg
Composite
rate per
Kg

0.0

0.0

0.0

0.0

0.0

0.0

29

Providing and fixing C.I. special of BSS Class \"B\" (such as bend, tee,
spigot, cap, taper, angle branch plug etc.) for AC pipe line with comet

S.
#

Dia
of
pipe

12
1

Average
Weight
in
Lbs

Labour rate for 2


joints.
Labour
Material

3
3\"
4\"

4
46
61

6\"
8\"
10\"
12\"
16\"

97
175
250
370
549

18\"
20\"

693
937

24\"

1,317

Class \"B\" (such as bend, tee, cross, collar, reducer, tail piece, flanged socket, flanged
tc.) for AC pipe line with comet joint and rubber ring complete.
Labour

Total

Total
weight

Labour rate per


Kg.
Total
Amount

Supply of special (cost of materi


with moulding, painting, and car
Rate
per Kg

Rate P.
Cwt

204 Lbs
or 92.56
Kgs

0.0

0.0

2037 Lbs
or
927.23
Kgs

0.0

0.0

2254 Lbs
or 1022
Kgs

0.0

0.0

Material

upply of special (cost of material,


with moulding, painting, and carriage to
site of work.
Contractor's
Profit
20
0
1
1

Total

Rate
per Lbs
2

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Rate per Kg
Labour
rate per
Kg

Composite
rate per
Kg

0.0

0.0

0.0

0.0

0.0

0.0

30 -

Providing and fixing sluice valve of BSS quality and weight Class \"B\"

Each
Dia of
sluice
valve

Cost of
sluice
valve

12
13
24
35

\"
\"
\"

3
-

Material
Contractor's Total
Profit
20
(3 + 4)
Percent
4
5
0
0
0

46
58
6

\"
\"
10\"

0
0
0.0

0
0
0.0

7
8

12\"
15\"

0.0
0.0

0.0
0.0

18\"

0.0

0.0

S.
No.

0
0
0

quality and weight Class \"B\" for cast iron pipe

Labour
Daily
Labour

No of
day

Total

Rate
Composite

Labour

(5 + 9)
678

0.34
0.37
0.666

0
0
0

0 0 0 -

0.71
0.829
.889

0
0
0.0

0 0 0.0 -

0
0.00 Sundries 10.00 Percent
0.0

.999
1.325

0.0
0.0

0.0 0.0 -

0.00 Contractor's Profit


0.0

1.525

0.0

0.0 -

0
0.00 Plumber
0.00 Skilled Coolies

0.0

Labour
.00 Plumber
.00 Skilled Coolies

3\" to 8\"
1 No
2 No

0
0

0
0

Total
.00 Sundries 10.00 Percent
Total

0
0
0.0

.00 Contractor's Profit

0.0
0.0

Labour
Plumber

20.00 Percent
Total
10\" to 18\"
1 No

Skilled Cooli 2 No
Unskilled Co 2 No

0.0

0.0

0.0
0.0

0.0
0.0

Total
Sundries 10.00 Percent

0.0
0.0

Total
Contractor's 20.00 Percent

0.0
0.0

Total

0.0

31

S.
No.

Providing and fixing sluice valve of BSS quali


commet joint & rubber ring complete i/c cost

\"

3
-

Material
Contractor's
Profit
20
Percent
4
0

24

\"

36

\"

48

\"

10\"

0.0

12\"

0.0

16\"

0.0

18\"

0.0

12
13

Dia
of
sluice

Cost of
sluice
valve

fixing sluice valve of BSS quality & weight for AC pipeline with
& rubber ring complete i/c cost of jointing material.
Labour for 2 joints
Labour
Material

Total

Total
6+7

Labour
rate

Rate
Composite
rate
5+8

(3 + 4)
5

0 -

0 -

0 -

0 -

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0

0.0 -

0.0

0.0

0.0

0.0

0.0 -

0.0

31a

Providing and fixing sluice valve of BSS quality and weigh


and rubber ring complete including cost of jointing mater

Sr.
No.
1

Size

2
3
4
5
6
7

4\"
6\"
8\"
10\"
12\"
16\"

11.4
10.35
7.4
9.3
6.93
6.1

18\"

5.78

No. of
Day

3\"

12.3

Labour 3' to 8'


Plumber
Skilled Cooly

10' to 18\"
Plumber
Skilled Cooly
Coolies

1 No.
2 Nos.
Total
Sundries
Total
Contractor's Pro

1 No.
2 Nos.
2 Nos.
Total
Sundries
Total
Contractor's Pro

valve of BSS quality and weight for A.C. pipe line with cement joint
ncluding cost of jointing material.
Labour
Charge
Amount
Daily Charge
per day
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0

0.0

0.0
0.0
10.00 Percent
20.00 Percent

0.0
0.0
0.0
10.00 Percent
20.00 Percent

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

32

Providing and fixing fire hydrant BSS quality


jointing material.

Sr.
No.

Dia of
Pipe

Cost of Contractor's
Hydrant

2\"

33

Providing and fixing Air Valve 3\" (75mm) int


with jointing material.

Sr.
No.

Dia of
Pipe

Cost of Contractor's
Air Valve

Single

Double

fixing fire hydrant BSS quality and weight of 2\" dia including cost of

Material
ost of Contractor's Total
Profit Labour Material
20
-

Fixing (Labour)

Rate
Labour Composite

Total

0.0 -

fixing Air Valve 3\" (75mm) internal dia of BSS quality and weight complete

Material
ost of Contractor's Total
Profit
20

Fixing (Labour)
Labour Material

Rate
Labour Composite

Total

0.0 -

0.0 -

20

34

Providing and fitting CI flanges on pipes, including turning, threading, facing and fit
complete in all respects.

S.
#

Dia
of
pipe

Per Flange

12 3
a

No of
Daily
end Charges
thread
P. day
4

Labour
End
thread

Cutting
end

3\"

15

0.0

0.0

0.0

4\"

14

0.0

0.0

0.0

5\"

12

0.0

0.0

0.0

6\"

11

0.0

0.0

0.0

8\"

0.0

0.0

0.0

10\"

0.0

0.0

0.0

12\"

0.0

0.0

0.0

15\"

0.0

0.0

0.0

18\"

0.0

0.0

0.0

urning, threading, facing and fitting etc.

er Flange
Total
per

Material
Weight cost per cwt
of
flange
(10
in Lbs
8
9

end

(5 + 6)
7

Total

Labour

0.0

8.4

0.0

0.0

0.0

12.6

0.0

0.0

0.0

17

0.0

0.0

0.0

21

0.0

0.0

0.0

35.7

0.0

0.0

0.0

52.5

0.0

0.0

0.0

74.55

0.0

0.0

0.0

110

0.0

0.0

0.0

153

0.0

0.0

0.0

Rates
Per Flange

Per Kgs
Labour Compo-

Composite
+
1

11)
2

31

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0
Average

Average

Average

site

4
0.0 Labour
0.00 Turner

1 No

0.00 Unskilled Coolies 1 No


0.0 Total

0.0

0.0

0.0

0.0
0.0

Sundries 10.00 Percen


0.0 Total

0.0
0.0

0.00 Contractor's Profi 10.00 Percen

0.0

0.00 MechanTotal
Electrical
charges

0.0

0.0 Total
0.0

L.S.
0.0

35

Cutting C.I. Pipe and welding spigot or socket, flanged or tyton end aft

Sr. No.

Dia of
Cutting
Pipe Inch. End

Circumference Welding Charges


of Pipe in Rate per
Inch.
Inch.

12
1

345
3\" (75mm)

0.0

9.42

0.0

4\" (100mm)

0.0

12.57

0.0

3
4

5\" (125mm)
6\" (150mm)

0.0
0.0

15.71
18.85

0.0
0.0

5
6

8\" (20mm)
10\" (250mm

0.0
0.0

25.13
31.42

0.0
0.0

12\" (300mm

0.0

37.7

0.0

15\" (385mm

0.0

47.12

0.0

18\" (450mm

0.0

56.55

0.0

socket, flanged or tyton end after finishing ends of pipes.

ce Welding Charges Cutting


Total
2 Ends and
(4 + 5)
Finishing
(Double Col. 3)
6
7
0.0

G.Total

Say

8911

Rate per
inch bore

01

0.0

0.0 -

0.0

0.0

0.0

0.0 -

0.0

0.0
0.0

0.0
0.0

0.0 0.0 -

0.0
0.0

Average
0.0
0.0

0.0
0.0

0.0 0.0 -

0.0
0.0

0.0

0.0

0.0 -

0.0

Average
0.0

0.0

0.0 -

0.0

0.0

0.0

0.0 -

0.0

Average

Rate per
cm bore

36

Providing, laying, cutting, jointing, testing and disinfecting


respects, including specials and valves:i)
G.I. FLANGED JOINTS
Sr.
Dia of
Cost
Speical
Advot
No. Pipe Inch
100'
1,000.%
100.%
heavy
quality
12
3
4
5
a 1\" (40mm)
0.0
b
2\" (50mm)
0.0
c 2\" (63mm)
0.0
d
3\" (75mm)
0.0
e 4\" (100mm)
0.0
f 6\" (125mm)
0.0
g 8\" (150mm)
0.0
DAILY PROGRESS
Mechanic 1 No. 170
0.0
Cooly
2 No. 75
0.0
Total
Sundries 10.00 Percent
Total
36
Providing, laying, cutting, jointing, testing and disinfecting
respects, including specials and valves:ii)
G.I. FLANGED JOINTS
Sr.
No.

Dia of
Pipe
Inch.

Cost of
Flanged
Pipe

12
3
a 1\" (40mm)
b
2\" (50mm)
c 2\" (63mm)
d
3\" (75mm)
e 4\" (100mm)
f 6\" (125mm)
g 8\" (150mm)
DAILY PROGRESS
Mechanic 1 No. 170
Cooly
2 No. 75
Total
Sundries 10.00 Percent
Total

G.I. Pipe Line in trenche

0.0
0.0
0.0
0.0
0.0
0.0
0.0

G.I. Pipe Line in trenche

Speical

Advot
20 100.%
Profit

4
-

5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

ecting G.I. Pipe Line in trenches, with flanged joints, using G.I. pipe of BSS 1387-1967 Heavy Quality complete in a

Wastage
200.%

Total
(3 + 4 +
+ 5 + 6)

Contractor Total
Profit
1,000.%
(7 + 8)

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

91
0.0
0.0
0.0
0.0
0.0
0.0
0.0

No. of
Joints

Daily
Progress

Daily
Charges

01

1
8
8
8
6
6
6
6

1
20
20
20
15
12
10
10

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
ecting G.I. Pipe Line in trenches, with flanged joints, using G.I. pipe of BSS complete in all 1387-1967 Medium Qua

Wastage
200.%

Total

Contractor's

Total

No. of
Joints

20
Daily
Progress

Daily
Charges

1
8
8
8
6
6
6
6

1
20
20
20
15
12
10
10

100'
20
6

7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

8
0.0
0.0
0.0
0.0
0.0
0.0
0.0

91
0.0
0.0
0.0
0.0
0.0
0.0
0.0

01
0.0
0.0
0.0
0.0
0.0
0.0
0.0

eavy Quality complete in a

Total
Size

21111
0.0
0.0
0.0
0.0
0.0
0.0
0.0

3 4 5 61
0.00 3/8
0.00 3/8
0.00 5/8
0.00 5/8
0.00 5/8
0.00 5/8
0.00 5/8

Material Per Ft. Length


No.
Rate
Amount
(15 x 16)
7
3
3
3
4
4
4
4

0.0
0.0
0.0
0.0
0.0
0.0
0.0

ll 1387-1967 Medium Qua

Labour
for

21111
0.0
0.0
0.0
0.0
0.0
0.0
0.0

3 4 5 61
0.00 3/8
0.00 3/8
0.00 5/8
0.00 5/8
0.00 5/8
0.00 5/8
0.00 5/8

Size

Bolts and Nuts


No.
Rate

Amount

7
3
3
3
4
4
4
4

0.0
0.0
0.0
0.0
0.0
0.0
0.0

all

h of Pipe
Wt. Amount
Lbs.
Rs.
per
18

Total
(13 +
17 +
0.0 19)

Lbs.
19
.35
.35
.5
.5
.6
.6
.6

Contrator Total
Profit
1,000.%
(20 +
21)

20
0.0
0.0
0.0
0.0
0.0
0.0
0.0

21
0.0
0.0
0.0
0.0
0.0
0.0
0.0

22
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

uality

Rubber Insertion
Wt. Amount (13 +
Lbs.
Rs.
per
Lbs.
18
19
.35
.35
.5
.5
.6
.6
.6

Total
17
+ 19)

20
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Contrator's
Profit
1,000.%

Total
(20 + 21)

21

22
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Carriage

Testing
&
Disfinecting

23

24
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Grand
Total
(22 + 23
+ 24)

Rate Per 100 Ft


Rate Per Foot
Labour
Composte Labour
Composite
(9 + 26)

25

26
-

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

27

28
0.0
0.0
0.0
0.0
0.0
0.0
0.0

29
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Carriage

Testing
and
disinfection

Grand
Total
(22 + 23
+ 24)

Rate Per 100 Ft.


Rate Per Ft.
Labour
Compo- Labour
Composite
site
(26 + 9)

23

24

25

26
-

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

27

28
0.0
0.0
0.0
0.0
0.0
0.0
0.0

29
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rate Per Metre


Labour
Composite

omposite

30
0.0
0.0
0.0
0.0
0.0
0.0
0.0

31
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Rate Per Metre.


Labour
Composite

30
0.0
0.0
0.0
0.0
0.0
0.0
0.0

31
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

Sr. No. 41

Making Connection for new Water Supply lines with the running main,
trench and refilling, complete, but excluding cost of pipe and specials,
i)
Upto 150mm (6\") i/d

Detail

Unit Rate (British System


Qty

Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting, connecting
pipe, etc. 2 cuts
0.25 No
Total
Sundries 10.00
Total

Percent

Contractor's 20.00 Percent


Total
Bailing out water from the trench
after cutting running main, taking
average quantity of water as 500
Cft. (14 Cum) @ Rs. 272.25% Cft
(Item No. 35, Chap: Miscellaneous)

Rate Per Connection

ly lines with the running main, including excavation of


uding cost of pipe and specials, etc.

nit Rate (British System) per Connection


Rate
Per Unit (Rs.) Amount (Rs.)

P. Day

P. Day

Say

Rs.

0
20

ii)

Upto 200mm (8\") i/d

Detail

Unit Rate (British System


Qty

Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting, connecting
pipe, etc. 2 cuts
0.25 No
Total
Sundries
10 Percent
Total
Contractor's#REF! Percent
Total
Bailing out water from the trench
after cutting running main, taking
average quantity of water as 700
Cft. (19.60 Cum) @ Rs. 272.25% Cft
( Item No. 35, Chap: 26 )

Rate Per Connection

nit Rate (British System) per Connection


Rate
Per Unit (Rs.) Amount (Rs.)

P. Day

P. Day

Say

Rs.

iii)

Upto 250mm (10\") i/d

Detail

Labour
Cooly for excavating/ refilling the
trench
Plumber for cutting pipe, etc.
2 cuts
Total
Sundries
Total
Contractor's 20.00
Total

10 Percent

Percent

Bailing out water from the trench


after cutting running main, taking
average quantity of water as 1000
Cft. (28 Rs.
% Cft.
( Item No. 35, Chap: 26 )

Labour Rate Per Connection

Upto 250mm (10\") i/d

Unit Rate (British System) per Connection


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

0.50 No

0.00 P. Day

0.50 No

0.00 P. Day

Say

Rs.

iv)

Upto 300mm (12\") i/d

Detail

Labour
Cooly for excavating/ refilling the
trench
Plumber for cutting pipe, etc.
2 cuts
Total
Sundries
Total
Contractor's 20.00
Total

10 Percent
Percent

Bailing out water from the trench


after cutting running main, taking
average quantity of water as 1500
Cft. (48 Rs.
% Cft.
( Item No. 35, Chap: 26 )

Labour Rate Per Connection

Upto 300mm (12\") i/d

Unit Rate (British System) per Connection


Qty
Rate
Per Unit (Rs.) Amount (Rs.)

0.50 No

0.00 P. Day

0.50 No

0.00 P. Day

Say

Rs.

v)

Upto 400mm (16\") i/d

Detail

Labour
Cooly for excavating/ refilling the
trench
Plumber for cutting pipe, etc.
2 cuts
Total
Sundries
Total
Contractor's 20.00
Total

10 Percent

Percent

Bailing out water from the trench


after cutting running main, taking
average quantity of water as 1825
Cft.(51.10 Rs.
% Cft.
( Item No. 35, Chap: 26 )

Labour Rate Per Connection

Upto 400mm (16\") i/d

Unit Rate (British System) per Connection


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

0.50 No

0.00 P. Day

0.75 No

0.00 P. Day

Say

Rs.

vi)

Detail

Labour
Cooly for excavating/ refilling the
trench
Plumber for cutting pipe, etc.
2 cuts
Total
Sundries
Total
Contractor's 20.00
Total
Bailing out water from the trench
after cutting running main, taking
average quantity of water as 2500
Cft.(70 Cum) @
Rs.
( Item No. 35, Chap: 26 )

Labour Rate Per Connection

10

Upto 500mm (20\") i/d

Unit Rate (British System) per Connection


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

0.50 No

0.00 P. Day

0.75 No

0.00 P. Day

Percent

Percent

% Cft.

Say

Rs.

vii)

Upto 600mm (24\") i/d

Detail

Labour
Cooly for excavating/ refilling the
trench
Plumber for cutting pipe, etc.
2 cuts
Total
Sundries
Total
Contractor's 20.00
Total

10 Percent

Percent

Bailing out water from the trench


after cutting running main, taking
average quantity of water as 3000
Cft. (85 C Rs.
% Cft.
( Item No. 35, Chap: 26 )

Labour Rate Per Connection

Upto 600mm (24\") i/d

Unit Rate (British System) per Connection


Qty
Rate
Per Unit (Rs.) Amount (Rs.)

0.50 No

0.00 P. Day

1.00 No

0.00 P. Day

Say

Rs.

DESCRIPTION OF ITEM NO. 15-A

Detail

Gully trap frame hinged saUnit Rate (Br

1 RCC Cover
a) 2\"x22\"x2\" size angle iron rings =
1 x 22 x 26 = 6.81 Rft.
7
12
Weight @ 4.04 Lbs/Ft = 27.51 Lbs (12.43) Kg
b) M.S. round bars \" dia
Straight bras
1 x 26 = 26 inch
2 x 24 = 48 inch
2 x 18 = 36 inch
bent up bars
1 x 2 = 28 inch
2 x 26 = 52 inch
2 x 20 = 40 inch
230 inch or 19.17 ft.
Bars in upper distribution ring 1x22/7x1.5 =
Bar in lower distribution ring 1x22/7x1.25 =
in overlaps distribution ring 2x =
28.81 Ft. @ 0.667 Lbs/Rft. = 19.22 Lbs
a + b = 27.51 + 19.22 = 46.73 Lbs or
21.20 Kg
2. Tee Shaped @ 1 frame 37.324 Kg
Material
Steel
Total
Contractor's Profit & overhead chg: 20%
Total

Providing and fixing, 6\" (150mm) thick RCC


manhole as per standard drawing STD/PD No.6
of 1977, complete in all respects.

ame hinged saUnit Rate (British System) per Set


Qty.
Rate Per Amount
Unit (Rs.) (Rs.)

19.17
4.71
3.93
1
28.81

Ft.
Ft.
Ft.
Ft.
Ft.

21.2 Kg

58.524

P. Kg

RCC (1:2:4) in situ or precast


1 x 22 x 26 x 26 x x 6+5+5 x 1
7
12 12
3
12
D/d for triangular portion
2xx1/6x = 0.04 Cft
Rectangular portion
2xx5/24
= 0.10 Cft
0.14 Cft
(Item 6 b(i) Chapter No. Total

1.74

0.14
1.6

Labour
1. Welding ends of engle iron rings
2. Welding ends of M.S. bar to angle iron
3. Fixing manhole cover and frame
including carriage to site complete in all
respect.
4. Labour for RCC 1:2:4 concrete
(Item 6 b(i) Chapter No. 6)
Total
Contractor's profit & overhead chg:20% on 1.2 Rs.
Total
Item Rates
Labour Rate Per Set
Composite Rate Per Set

1
20

L.S.
1.74

C.O.

Cft.

Cft
Cft

P. Cft
-

No.
Nos.

Each
Each

Cft

P. Cft

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM

1 Providing and Laying RCC Pipe moulded with cement concrete 1:1:3 wit
conforming to B.S. 5911 Part 1.1981, Class \"L\", including Carriage of Pip
alignment and grade, jointing, cutting pipes where necessary, finishing a
h C.I. Gully trap frame hinged safety type.
Dia
Material Per Meter Length
of Pipe
Market Wastage Rubber Contractor
mm
Rate per
200.%
Ring
Total
Meter
Per Inc
Dia Pipe
1
2
3
4
0.0
0.0
4\" (100mm)
0.0
0.0
0.0
6\" (150mm)
0.0
0.0
0.0
9\" (225mm)
0.0
DESCRIPTON OF ITEM

Dia of
Pipe
mm

Providing and laying non-reinforced concrete pipe moulded with Cement


Pipe from Factory to Site of Work, Lowering in Trenches to Correct Alignm
complete.

Material Per Meter Length of Pipe


Market Wastage Rubber Contractor
Rate per
300.%
Ring
Total
Metre
Per Inc
Dia Pipe
1 2 3456 78 91 1
0.0
0.0
4\" (100mm)
0.0
0.0
0.0
6\" (150mm)
0.0
0.0
0.0
8\"(200mm)
0.0
0.0
0.0
9\" (225mm)
0.0
0.0
0.0
10\"(250mm
0.0

cement concrete 1:1:3 with spigot socket or collar joint etc. including cost of reinforcement,
L\", including Carriage of Pipe from factory to site of work, lowering in trenches to correct
where necessary, finishing and testing etc. complete.
LABOUR PER PIPE OF 6 FEET
Carriage
Laying
Jointing
Total
Per Pipe
Daily
Daily
Amount (Rs)Progress Expenses

Profit
20
5

Percent
6
7
0.0
0.0
0.0
0.0
0.0
0.0

9
0.0
0.0
0.0

10
0.0 180.00
0.0 150.00
0.0 120.00

11
-

pipe moulded with Cement Concrete 1:1:3 Conforming to ASTM specification 14-73 Class-I including Carr
n Trenches to Correct Alignment and Grade Jointing Cutting Pipe where necessary, finishing and testing etc

Profit

Carriage
Wt. in

Total
Ton

20

LABOUR Per Pipe of 6 Ft. Length


Laying
Jointing
Amount Daily
Progress

Percent
0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

.043
.061
.094
.127
.133

0.0
0.0
0.0
0.0
0.0

180.00
150.00
144.00
136.00
135.00

reinforcement,
s to correct

Labour
Per Pipe
12

Testing
Charges

Labour Composite
Total
Per
Foot

Per Foot

13

14

16

0.0
0.0
0.0

0.0
0.0
0.0

15
0.0
0.0
0.0

0.0
0.0
0.0

Labour
Rate
Per
Metre

Composite
Rate
Per
Metre

17
0.0
0.0
0.0

18
0.0
0.0
0.0

14-73 Class-I including Carriage of


ary, finishing and testing etc.

Pipe of 6 Ft. Length


Daily
Expenses

Per
Pipe

11 11 5 1
-

2341

Testing
Charges

Per Per

Labour
Composite Rate
Per
Foot
Metre
6

0.0
0.0
0.0
0.0
0.0

Page 1

Labour
Total
Foot

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

1
0.0
0.0
0.0
0.0
0.0

omposite

0.0
0.0
0.0

Composite
Rate
Per
Metre
7

1
0.0
0.0
0.0
0.0
0.0

8
0.0
0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM
3 Providing and laying RCC Pipe Sewers, Moulded with Cement Concrete 1:1:3 Confirming to A
Pipe from Factory to t With C.I. Gully trap frame hinged safety type.
etc. Complete.
Sr.
Dia of
Length
Thicknes
No.
Pipe
of Pipe
of
Rate Per Wastage Rubber
Inch.
Ft.
Pipe
Ft.
200.%
Ring Per
(Inches)
Inch
0.0
1
2
3
4
5
6
1. 12\" (300mm)
2.439
2
0.0
0.0
2. 15\"(380mm) 2.439
2.25
0.0
0.0
3. 18\"(460mm)
2.439
2.5
0.0
0.0
4. 21\"(535mm)
2.439
2.75
0.0
0.0
5. 24\"(1610mm
2.439
3
0.0
0.0
6. 27\"(685mm)
2.439
3.25
0.0
0.0
7. 30\"(760mm)
2.439
3.5
0.0
0.0
8. 33\"(800mm)
2.439
3.75
0.0
0.0
9. 36\"(915mm)
2.439
4
0.0
0.0
10. 42\"(1070mm
2.439
4.5
0.0
12.5
11.
12.
13.
14.
15.

48\"(1220mm
54\"(1370mm
60\"(1520mm
66\"(1680mm
72\"(1830mm

2.439
2.439
2.439
2.439
2.439

5
5.5
6
6.5
7

0.0
0.0
0.0
0.0
0.0

14.5
16.8
22.6
27.5
32.5

rete 1:1:3 Confirming to ASTM Specification C-76-79 Class-II, Wall B, Including Carriage of

MATERIAL
Total
Rs.
7

Contractors
Profit
Total
20 Progress

Carriage
Daily Daily
Amount

10

11

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
12.5

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.5

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
15

23
17
13
10
8
7
6
5
4
3

0.0
0.0
0.0
0.0
0.0

14.5
16.8
22.6
27.5
32.5

2.9
3.36
4.52
5.5
6.5

17.4
20.16
27.12
33
39

2
2
1
1
1

Page 2

Progress Expenses

12
0.0 15.00
0.0 12.00
0.0 10.00
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

g Carriage of

LABOUR FOR 8 FT. PIPE


Laying Jointing
Daily
Per
rogress Expenses
Pipe
13

14

Testing
Charges

Total

15

16

Composite Labour
Labour Rate Per Ft.Rate Per Rate Per
rate per
ft.
17
18

8.00
7.00
6.00
5.00
4.00
3.25
2.50

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

7.00
5.00
4.00
2.50
2.00

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

omposite Labour
Composite
Per Ft.Rate Per Rate Per
Metre
Metre
19

20

DESCRIPTION OF ITEM

4 Providing and laying RCC Pipe Sewers, Moulded with Cement Concrete 1:1:3 Confirming to A
Pipe from Factory to the Site of Work, Lowering in Trenches to Correct Alignment an
etc. Complete. in all respects.

Sr.
No.

Dia of
Pipe
Inch

1
1. 12\" (300mm)
2. 15\"(380mm) 0.00
3. 18\"(460mm)
4. 21\"(535mm)
5. 24\"(1610mm
6. 27\"(685mm)
7. 30\"(760mm)
8. 33\"(800mm)
9. 36\"(915mm)
10. 42\"(1070mm
11. 48\"(1220mm
12. 54\"(1370mm
13. 60\"(1520mm
14. 66\"(1680mm
15. 72\"(1830mm

Market
Rate
Meter
2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Material Per Metre Length of Pipe


Wastage Rubber Contractor
200.%
Ring Per
Total
Profit
Inch
Rs.
0.0
3
4
5
6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

20

rete 1:1:3 Confirming to ASTM Specification C-76-79 Class-III wall B, Including Carriage of
hes to Correct Alignment and Grade Jointing with Rubber Ring, Cutting Pipes where necessary, Testing

Total
(Pipe)
7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Carriage
Daily
Progress

Amount
Rs.

9
23
17
13
10
8
7
6
5
4
3
2
2
1
1
1

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

LABOUR FOR 8' PIPE


Laying
Jointing
Total
Daily Daily
Rate
Progress Expenses
per Pipe
(Pipe)
10
11
12
.25
15.00
.25
12.00
.25
10.00
.25
8.00
.25
7.00
4.75
6.00
4.75
5.00
4.75
4.00
4.75
3.25
4.75
2.50
1.25
7.00
1.25
5.00
1.25
4.00
1.25
2.50
1.25
2.00

Page 3

g Carriage of
here necessary, Testing

Testing
Charges
Per
13

Total
per
Pipe
Pipe
14
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Labour
rate per
ft.
15
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM

5 Providing and laying RCC Pipe Sewers, Moulded with Cement Concrete 1:1:3 Confirming to A
Pipe from Factory to the Site of Work, Lowering in Trenches to Correct Alignment an
etc. Complete.
Sr.
Dia of
MATERIAL PER METRE LENGTH
No.
Pipe
Market
Wastage Rubber Contractors
mm
Rate
200.%
Ring Per
Total
Profit
Per
Inch
Rs.
20
Metre
0.0
1
2
3
4
5
6
1. 12\" (300mm)
0.0
0.0
0.0
0.0
2. 15\"(380mm) 0.00
0.0
0.0
0.0
3. 18\"(460mm)
0.0
0.0
0.0
0.0
4. 21\"(535mm)
0.0
0.0
0.0
0.0
5. 24\"(1610mm
0.0
0.0
0.0
0.0
6. 27\"(685mm)
0.0
0.0
0.0
0.0
7. 30\"(760mm)
0.0
0.0
0.0
0.0
8. 33\"(800mm)
0.0
0.0
0.0
0.0
9. 36\"(915mm)
0.0
0.0
0.0
0.0
10. 42\"(1070mm
0.0
0.0
0.0
0.0
11. 48\"(1220mm
0.0
0.0
0.0
0.0
12. 54\"(1370mm
0.0
0.0
0.0
0.0
13. 60\"(1520mm
0.0
0.0
0.0
0.0
14. 66\"(1680mm
0.0
0.0
0.0
0.0
15. 72\"(1830mm
0.0
0.0
0.0
0.0

rete 1:1:3 Confirming to ASTM Specification C-76-79 Class-IV, Wall B, Including Carriage of
hes to Correct Alignment and Grade Jointing with Rubber Ring, Cutting Pipes where necessary, Testing

Total

7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Carriage
Daily
Progress

Amount
(Rs.)

9
23
17
13
10
8
7
6
5
4
3
2
2
1
1
1

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

LABOUR FOR 8' FT. PIPE


Laying
Jointing
Daily
Daily
Rate
Progress Expenses
Per
Pipe
Pipe
10
11
12
15.00
12.00
10.00
8.00
7.00
6.00
5.00
4.00
3.25
2.50
7.00
5.00
4.00
2.50
2.00

Page 4

ng Carriage of
here necessary, Testing

Total
Testing
Charges
Per Pipe
13
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Labour Labour Composite


Total
Rate Per Rate Per
Per
Metre
Metre
Pipe
14
15
15
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Labour Composite
Rate Per Rate Per
Metre
Metre

Rate Per
Metre
16
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

17
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

18
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

6 Lowering of Sub Soil Water table by Installation of Tubewell along Sewer Line and Pumping Ou
Concreting, Curing, Laying and Jointing Pipes, Filling hauncher etc, till the Completio
Depth of Distance
Seria Lowering Between
No.
of
Bore Hole Hours
Meter
Meter

123456
1
0-1'
2
0-2'
3
0-3'
4
0-4'
5
0-5'
6
0-6'
7
0-7'
8
0-8'
9
0-9'
10
0-10'
11
0-11'
12
0-12'

100
76
62
52
550
43
38.5
34
33
31
30 102
29 106

PUMPING
Rate
per
Hour

20
64
70
75
80
88
92
94
96
99

Amount

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Sewer Line and Pumping Out Water, for Excavation in Open Cutting below Sub Soil Water Level,
ncher etc, till the Completion of Sewer Line, including Disposal of Pumped Out Water
Shifting
Depreciation
Pump &
Charges of
InstallationPumping
at New
Machinery
Site (Rs.) Boring
Equipment
7
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

BORING
Depth of
Bore

Rate
Per
Meter

Amount

11

20
29
45
57
60
64
69
70
55
60
65
70

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Page 5

Soil Water Level,

Disposal of Charges
pumped out by Pump
water Rate Per
per 30 M Hour
Amount
distance
21 1

3 411
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Total
6+7+8+
11+12+14
56
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Contractor Grand
Profit
Total
20
15+16
1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

71
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0

Rate
Per
Ft.

Adopted
in
CSR 1998

81

9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

DESCRIPTION OF ITEM NO 7:
Detail

Excavation in ordinary soil upto 5'(1.5m)


7
depth 1x3'x2 / 'x2 / '= 24.5
Item 7 (i) of Chapter No. 3
Cement concrete brick or stone ballast 1\"
to 2\" (40 to 50mm) gauge (1:6:12)
7
1x3'x2 / 'x = 2.34 Cft
8
Item 3 (d) of Chapter No. 6
Pacca brick work in foundation and plinth
in cement, sand, mortar (1:3)
3
1x2'xx2 / '
= 4.45'
8
3
1x2x3/8x2 /
= 2.23'
8
3
2x1xx2 /
= 3.56'
8
Total
10.24 Cft
Deduction
Sewer
'x'x22/7x
=
0.60
Drain
1x'x'x22/7x'
= 0.10
0.70 Cft
Net ( 10.24 - 0.70 ) =
9.5
Item No. 4(i) of Chap. 7
Cement Plaster (1:3) \" thick
inside chamber 1x4x2 3/8'
=
9.50
outside chamber 2x2'x'
=
3.75
2x2 1/8'x' =
3.19
16.44
Top
1x2'x'
1.87
1x1

/ 'x'

1x2'x / '

1.00

Item No. 8(b) Chapter 11


Cement concrete plain 1:2:4 including
placing, compacting finishing and curing
complete.

1.00

Floor bed
1x1x /
Item 5 (f) Chap. No. 6
Detail

Supplying and fixing C.I. gully grating


12\"x12\" with hinged safety. Type
weighing 81 Lbs
Supplying and fixing 12\"x6\" iron
Total Rate for Each

SEWERAGE
a)

Constructing gully grating chamber 12\"x12\"(300x300mm)


With C.I. Gully trap frame hinged safety type.
Unit Rate (British System) per Each
Qty.

Rate
Composite

Labour
5
8

24.50 Cft 0.00 %

Cf 0

2.34 Cft

0.00 % Cft

0.00 % Cft

9.54 Cft

0.00 % Cft

0.00 % Cft

3
8
3
8
20.31 Sft -0.01 % Sft

-0.01 % Sf

12

0.08 Cft

0.00 % Cft

0.00 % Cft

Qty.

Unit Rate (British System) per Each


Rate
Labour
Composite

1.00 No
2.00 Nos

0.00 P. No
0.00 P. No
Say

Page 7

er 12\"x12\"(300x300mm)
d safety type.
tem) per Each
Amount
Labour Composite

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

tem) per Each


Amount
Labour Composite

0.0
0.0

0.0
0.0
0.0
0.0

Item No.

Detail

Excavation in ordinary soil upto 5'(1.5m)


7
depth 1x3x2 / x2 / = 24.5 Cf
8
(As per item 7 (a))
Cement concrete 1:6:12 of brick or stone
7
ballast 1x3x2 / x = 2.34 Cft
(As per item 7 (a))
Pacca brick work in foundation and
plinth (1:3)
3
1x2x'x2 /
= 4.8
3
3
1x2x / x2 8
8
3
2x1x'x2 /
= 38
10.24 Cft
Deduction as per 3 (a)
Net ( 10.24 - 0.70 ) =
9.5
(As per item 4(i) Chapter 7
Cement Plaster (1:3)\" thick
inside chamber 1x4x2 /
=
outside chamber 2x2x =
2x2

9.50
3.75
/ x

3.19

16.44
Top

1x2x
1x1

1.87
/ x

1x2x /

1.00
1.00

As per item 8(b) Chapter 11


Cement concrete plain 1:2:4 including
placing, compacting finishing and curing
complete.
Floor bed
1x1x /
As per item No. 5 of Chapter 6

Constructing gully grating chamber 12\"x12\" (300x300mm)


b)

Concrete Gully Trap.


Unit Rate (British System) per Each
Qty.
Rate
Labour
Composite

5
8

24.50 Cft 0.00 %

Cf 0

2.34 Cft

0.00 % Cft

0.00 % Cft

9.54 Cft

0.00 % Cft

0.00 % Cft

3
8
1
8

3
8
3
8
20.31 Sft -0.01 % Sft

-0.01 % Sf

0.08 Cft

0.00 % Cft

1
12

0.00 % Cft

Page 8

er 12\"x12\" (300x300mm)

tem) per Each


Amount
Labour Composite

0.0 -

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Detail
Qty.

Supplying and fixing


(300x300mm) concrete
Supplying and fixing
iron bolt etc.

Unit Rate (British System) per Each


Rate
Labour
Composite

12\"x12\"
1.00 No
0.00 P. No
12\"x6\" (300x150mm)
2.00 Nos
P. No

Total Rate for Each


Say

Page 9

British System) per Each


Amount
Labour Composite

0
0
0

0
0

DESCRIPTION OF ITEM NO 8:

Detail

Excavation in foundation
1x5'x3'x3' = 53 Cft
Cement Concrete (1:6:12)
1
1x5'x3'x / ' = 5.83 Cft
3
Providing and laying 2\" (50mm) thick CC
1:2:4 in bed of gully grating.
1
1x2.5'x1.5'x / '
=
6
Foundation block 1x1'x'x1.0' = 0.75
To
Pacca brick work (1:3) other than building
in foundation & plinth.
short wall 2x1'x'x2' =
5.62
Long wall 2x4'x'x2' = 16.88
Total
22.50 Cft
D/d opening
1x1x1x0.75
=
0.75
1x0.5x0.5x0.75 =
0.19
Total
0.94 Cft
Net 22.50 - 0.94 = 21.56 Cft 21.56 Cft
Item No. 4(i) Chapter 7
Cement Plaster \" (12mm) thick (1:3)
1
inside chamber 2(3+1)x2 / = 2
3
Precast RCC (1:2:4) slab excluding cost
of steel.
1
Top slab 1x4x3'x / ' = 4.5 C
3
(Item 6(b.1) of Chap. 6)
Fabrication of steel including cost of steel
bending, binding complete.
4.5 Cft @ 4.5 cwt/100 Cft
=
0.20 cwt or 10.16 Kg
(Item 9 (b) Chap. 6)
Small iron work such as gusset plate
knees, bends, stirrups, straps rings etc.
including cutting drilling reviting
handling assembling and fixing M.S.
grating.
a.M.S. flat iron (1\"x1/8\")= 2x1 = 3.5'
Weight= 3.5 ft @ 0.78 Lbs/ft = 2.73 Lbs
Detail

b.\" dia M.S. bars 2\" centre to centre


4x1.0 = 4 ft
Weight @ 0.67 Lbs/ft = 2.68 Lbs
= 2.73 + 2.68 Lbs =
5.41 Lbs
(Item 10 of Chap. 25)
Supply and fixing China ware trap with
C.I. screen.
Making hole in existing manhole chamber
wall and rectification of the same after pipe
connection.
1
/ Mason @ 3
Sundries 10%
=
5.67
Contractor's Profit 20%
Labour for each manhole
Material including Contractor's Profit 9.16
Composite rate per No.
Total Rate for Each

Constructing standard gully grating chamber 3.0'x1.5'x2.5'


china ware trap as per PHED drawing
No. STD/PD No. 3 of 1977 complete in all respect.
Unit Rate (British System) per Each
Qty.
Rate
Amount
Labour
Composite Labour Composite
53.00 Cft 0.00 %

Cf 0

0 -

5.83 Cft

0.00 % Cft

0.00 % Cft

0.0

0.0

1.37 Cft

0.00 % Cft

0.00 % Cft

0.0

0.0

0.00 % Cft

0.00 % Cft

0.0

0.0

21.00 Sft % Sft

% Sft

0.0

0.0

4.50 Cft

0.00 % Cft

% Cft

0.0

0.0

10.16 Kg

0.00 P. Kg

0.00 P. Kg

0.0

0.0

Qty.

Unit Rate (British System) per Each


Rate
Amount

Labour

Composite Labour Composite

2.46 Kg

0.00 P. Kg

0.00 P. Kg

1.00 No

P. No

1.00 No

68.57 P. No

P. No

0.0

0.0

0.0

0.0

0.0
Say
Page 10

0.0
0.0

0.0
0.0

DESCRIPTION OF ITEM NO 9:

Material
Cement for 1/8\" thick nero
1
1
100x / x /
8
Total
Contractor's Profit & Ove
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm

12

Extra for making and finishing benching floor work


in manhole chamber, with 1/8\" (3mm) thick cement
finish.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs) Amount (Rs)

0.83 Bag

0.00 P. Bag

20.00 Percent

0.60 Nos
0.60 Nos
0.13 No

P. Day
P. Day
P. Day

Say
Say
Say
Say

10.00 Percent
20.00 Percent

Rs.
Rs.
Rs.
Rs.

Page 13

DESCRIPTION OF ITEM NO 10:

Detail

Restoration of brick pavement on edge,


service line, with 2\" (50mm) sand cus
soling.
Unit Rate (British System) per 100 Sft
Qty

Material
Total bricks required = 525 out of which
33% shall be replaced.
No: of new bricks required 175 Nos
Sand
Total
Contractor's Profit & 20.00 Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
10.00 Percent
Total
Contractor's Profit & 20.00 Percent
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm

175 Nos
16.70 Cft

0.65 No
1.25 Nos
0.08 No

Rs.
Rs.
Rs.
Rs.

Page 14

of brick pavement on edge, over laid


e, with 2\" (50mm) sand cushion under

British System) per 100 Sft


Rate
Per Unit (Rs) Amount (Rs)

% Nos
%Cft

0 -

P. Day
P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 11:

Detail

Restoration of flat brick p


grouted, over 2\" (50mm) th
cushion, under soling on la
Unit Rate (British System)
Qty

Rate Analysis for 100 Sft


Material
Total bricks required shall be 350 Nos
New brick to be supplied in replacement 33%
1
1.350x / = 117 Nos 3
1
2.100x / = 16.7 Cft 6
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm

117 Nos
16.70 Cft

0.40 No
0.75 No
0.05 No

Page 15

estoration of flat brick pavement sand


routed, over 2\" (50mm) thick dry sand
ushion, under soling on laid service line.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

% Nos

Rs.
Rs.
Rs.
Rs.

0.0 -

%Cft

P. Day
P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 12:


a)

Detail

Restoration of metalled road, on laid


line, including compaction.
Carpeted road, with 2\" (50mm) carpet
(250mm) depth of stone metal for sub b
base.
Unit Rate (British System) per 100 Sft
Qty

Assuming 67% material received from


dismantling. New material required for
sub-base/base = 100x10x.33= 27.50 Cft
12 100
Carpetting 2\" (50mm) thick = 100 Sft (9.291) Sqm
Material
Sub-base/base (Item 3(i) of Chap. 18)
27.50 Cft
Carpetting 2\" (50mm) thick (Item 10 Chap. 100.00 Sft
(Item 10 Chapter 18)
Total
Labour
Labour (Item 3(i) Chap 18)
27.50 Cft
Carpeting (Item 10 Chapter 18)
100.00 Sft
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm

Rs.
Rs.
Rs.
Rs.

Page 16

of metalled road, on laid service


ding compaction.
ad, with 2\" (50mm) carpet and 10\"
th of stone metal for sub base and

British System) per 100 Sft


Rate
Per Unit (Rs) Amount (Rs)

% Cft
%Sft

% Cft
% Sft

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 12:


b)

Detail

Restoration of metalled road, cut for


service line, including compaction.
Carpeted road with 1\" (40mm) carpet
(150mm) depth of stone metal for sub-b
base.
Unit Rate (British System) per 100 Sft
Qty

Assuming 67% material recovered from


dismantling, and 33% new material will be
needed
Total quantity required for= 100x 1 x 6 = 16.7 Cft
sub-base/bas
3 12
Carpetting 1\" (40mm) thick = 100 Sft (9.291) Sqm
Material
Sub-base (Item No.3 (i) Chapter 18
16.70 Cft
Carpeting 1\" (40mm) thick
100.00 Sft
Total
Labour
Sub-base (Item No. 3(i) Chapter 18
Carpeting
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm

16.70 Cft
100.00 Sft

Rs.
Rs.
Rs.
Rs.

Page 17

of metalled road, cut for laying


e, including compaction.
ad with 1\" (40mm) carpet and 6\"
th of stone metal for sub-base and

British System) per 100 Sft


Rate
Per Unit (Rs) Amount (Rs)

% Cft
% Cft

% Cft
% Sft

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 12:


c)

Detail

Assuming 33% material will be required


to replanish in restoration.
Quantity = 10 x 10 x 1 =
27.78 Cft
12
3
Black topped road surfacing = 100 Sft
Material
Sub-base (Item No. 3(i) of Chpater 18
Bajri
Bituman
Total
Contractor's Profit & 20.00 Percent
Item 2 & 3 on 'Rs.
Total
Labour
Sub base/base (Item No. 3(i) Chap. 18
100 Sft Surfacing (two coats)
(Item 8 (1-1) & (2-1) Chap 18)
(Road and Road Structure)
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm

Restoration of metalled road, cut for


service line, including compaction.
Black topped road with two coats of su
10\" (254mm) depth of stone metal for
base.
Unit Rate (British System) per 100 Sft
Qty

27.78 Cft
8.25 Cft
65Lbs (29 .50) Kg

27.78 Cft
100.00 Sft

Rs.
Rs.
Rs.
Rs.

Page 18

of metalled road, cut for laying


e, including compaction.
d road with two coats of surfacing and
) depth of stone metal for sub-base and

British System) per 100 Sft


Rate
Per Unit (Rs) Amount (Rs)

% Cft
%Cft
P. Kg

% Cft
% Sft

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 13:

Detail

Providing and fixing 1\"x1\"x / \"


(32x32x5mm) angle iron step, in manhol
chambers, including carriage and setti
same in work, to correct lines and lev
Unit Rate (British System) per 100 Sft
Qty

Material
3
Providing 1\"x1\"x 16
angle iron step of 8\"x12\" (200x300mm)
5
1
outer over all dimens16
12
(0.704x0.025x0.761) = 0.013 M
0.48 Sft @ 7.65 Lbs = 3.69 Lbs or
1.68 Kg.
1.68 Kg
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Blacksmith
0.01 No
Unskilled Cooly
0.01 No
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour for Fixing
Fixing mild iron step including carriage
and setting the same to correct line and
levels in masonry/concrete work

Page 19

3
16

nd fixing 1\"x1\"x / \"


angle iron step, in manhole
ncluding carriage and setting the
k, to correct lines and levels.
British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

P. Kg

P. Day
P. Day

Detail

Unit Rate (British System) per 100 Sft


Qty

Mason
Carriage from store to site
Total
Sundries
10.00 Percent
Total
Contractor's Profit & 20.00 Percent
Total
Item Rates
Labour Rate for Each
Composite Rate for Each

Rate
Per Unit (Rs) Amount (Rs)

0.05 No
L.S.

Rs.
Rs.

Page 20

British System) per 100 Sft

er Unit (Rs) Amount (Rs)


Each

Say

Say

DESCRIPTION OF ITEM NO 14:

Detail

Fixing manhole frame and cover in RCC


including carriage to site.

Unit Rate (British System) per 100 Sft


Qty

Carriage of Manhole
Frame and cover average weight of
each set = 127 Kg.
cart load up to 4 miles (6.44 Km)
@ Rs.
per cart load.
Total
Labour
Setting the frame to correct and level on
the reinforcement of man hole chamber
top/Rcc slab/ caping.
Unskilled Coolies
0.12 No
Mason
0.12 No
Total
Sundries
10.00 Percent
Total
Contractor's Profit & 20.00 Percent
Total
Item Rates
Labour Rate Per Set
Rs.

Page 21

ole frame and cover in RCC slab


arriage to site.

British System) per 100 Sft


Rate
Per Unit (Rs) Amount (Rs)

P. Day
P. Day

Say

DESCRIPTION OF ITEM NO 15:

Detail

Providing and fixing, 3\" (75mm) thick


manhole cover, 22\" (557mm) dia with t
shaped C.I. frame of 20\" (505mm) clea
(frame weighting 37.324 Kg. or one mau
as per standard drawing STD/ PD No. 5
1977, complete in all respects.
Unit Rate (British System) per Set
Qty

RCC Cover
1.M.S. flat iron ring 3\"x\" (75x6mm) =
1 x 22 x 22 x = 1.44 Sft
7
12
1.44 Sft weight @ 10.21 Lbs = 14.70 Lbs (6.67) Kg
2.M.S. round bars \" dia
Straight bars 4 x 22
=
7.33 ft
12
Straight bars 4 x 1.75 = 7.00 ft
14.33 Rft
Weight of bars @ 0.667 Lbs/Rft
(0.992 Kg/Rft) = 9.60 Lbs (4.36) Kg
Total 1+2 = 6.67+4.36 = 11.03 Kg
Material
Steel required
11.03 Kg
C.I. frame
1Md (37 .324)Kg
Total
Contractor's Profit & 20.00 Percent
Total
Precast or cast in situ. RCC (1:2:4)
1 x 22 x 22 x x 3+4+3 x 1 = 0.73 Cft
0.73 Cft
7
12
3
12
(Item 10 Chapter No. 6)

Page 22

nd fixing, 3\" (75mm) thick RCC


er, 22\" (557mm) dia with tee
frame of 20\" (505mm) clear i/d
hting 37.324 Kg. or one maund)
dard drawing STD/ PD No. 5 of
ete in all respects.
British System) per Set
Rate
Per Unit (Rs) Amount (Rs)

P. Kg
P. Kg

P. Cft

Detail

Labour
Welding of flat iron
Welding ends of M.S. round bars with
ring.
Fixing manhole frame & cover including
carriage to site
Labour for Precast Concrete
(Item 5 (f) Chapter No. 6)
Total
Contractor's Profit & 20.00 Percent on R
Total
Item Rates
Labour Rate Per Set
Composite Rate Per Set

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs) Amount (Rs)

1.00 No
16.00 Nos
L. S.
0.73 Cft

Rs.
Rs.

Page 23

British System) per 100 Sft

er Unit (Rs) Amount (Rs)

Each

Each

P. Cft

Say
Say

DESCRIPTION OF ITEM NO .16

Detail

Providing and fixing, 6\" (


manhole cover 22\" as per s
No. 6 of 1977, complete in
Unit Rate (British System)
Qty

RCC Cover
a.2\"x2\"x\" size angle iron rings =
1 x 22 x 26 =
6.81 Rft
7
12
Weight @ 4.04 Lbs/ft = 27.51 Lbs (12.430) Kg
b.M.S. round bars \" dia
Straight bras 1 x 26
=
26 inches
2 x 24
=
48
2 x 18
=
36
bent up bars 1 x 28
=
28
2 x 26
=
52
2 x 20
=
40
230 Inchs
or 19.17 ft
Bars in upper distribution ring 1x22/7x1.5 =
Bar in lower distribution ring 1x22/7x1.25 =
in overlaps distribution ring 2x =
28.81 ft @ 0.667 Lbs/Rft = 19.22 Lbs
a + b = 27.51 + 19.22 = 46.73 Lbs or
21.20 Kg
Tee Shaped C.I. Frame 37.324
Material
Steel 58.524 Kg
Total
Contractor's Profit & 20.00 Percent
Total

19.17 ft
4.71
3.93
1
28.81 Ft
21.2
37.324

Page 24

roviding and fixing, 6\" (150mm) thick RCC


anhole cover 22\" as per standard drawing STD/ PD
o. 6 of 1977, complete in all respects.

nit Rate (British System) per 100 Sft


Rate
Per Unit (Rs) Amount (Rs)

P.

Kg

Detail

RCC (1:2:4) in situ or precast


1 x 22 x 26 x 26 x x 6+5+5 x 1 =
7
12
12
D/d for traingular portion.
1
2xx / x =
0.04 C6
Rectangular portion
5
2xx /
=
0.1024

12

0.14 Cft
(Item 5 (f) Chapter No. 6)
Total
Labour
1 Welding ends of engle iron rings.
2 Welding ends of M.S. bar to angle iron.
3 Fixing manhole cover and frame
including carriage to site complete in all
respect.
4 Labour for RCC 1:2:4 concrete
(Item 5 (f) Chapter No. 6)
Total
Contractor's Profit & Ove
20.00 Percent on Rs. Item 1&2
Total
Item Rates
Labour Rate Per Set
Composite Rate Per Set

Page 25

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs) Amount (Rs)
1.74 Cft

0.14 Cft
1.60 Cft

P. Cft

1.00 No
20.00 No

Each
Each

L. S.
1.74 Cft

P. Cft

on Rs. Item 1&2

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 17:

Detail

Steel :
L. iron for frame 3\"x3\"x\"
1x 22 x 27 = 7.07 ft @ 4.89 Lbs/Rft = 34.57 Lbs
7
12
L. iron for cover 2\"x2\"x\"
1x 22 x 26 = 6.81 ft @ 4.04 Lbs/Rft = 27.51 Lbs
7
12
62.08 Lbs
M.S. round straight bars
1 x 26
=
26 inchs
2 x 24
=
48
2 x 18
=
36
1 x 28
=
28
2 x 26
=
52
2 x 20
=
40
230 Inchs
22
Bars in upper distribution ring 1x / x1.5 7
22
Bar in lower distribution ring 1x / x1.25 7
Bar in overlaps distribution ring
2x
Bar in holdfast of frame 4x0.75
weight @ 0.667Lbs/ft x31.81 = 21.22 lbs
= 62.08 + 21.22 =
83.30 Lbs or
37.80 Kg
Material
Steel 37.80 Kg
Total
Contractor's Profit & Ove
20.00 Percent
Total

Providing and fixing, 6\" (150mm) thick RCC


manhole cover with 3\"x3\"x\" (75x75x6mm)
angle iron frame, 22\" i/d (557mm) as per standard
drawing STD/ PD No. 7 of 1977, complete in all
respects.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs) Amount (Rs)

or 19.17 19.17 ft
4.71 ft
3.93 ft
1.00 ft
3.00 ft
31.81 Ft

P.

Kg

Page 26

Detail

RCC (1:2:4) in situ or precast laid in


position complete in all respect.
1 x 22 x 26 x 26 x x 6+5+5 x 1 =
7
12
12
3
D/d for traingular portion.
1
2xx / x 6
Rectangular portion
5
2xx /
24
0.14
(Item 5 (f) Chapter No. 6)

12

Total

Labour
1 i.
ii.
iii.
iv.
2

Welding ends of engle iron rings for


frame 3\"x3\"x\"
For cover 2\"x2\"x\"
Ends of MS bars to angle iron ring in
RCC cover
20 Nos
End of M.S. holdfast to the ring of the
frame.
Fixing manhole frame and cover
including carriage from store complete
in all respects.
Labour for RCC 1:2:4 concrete
(Item 5 (f) Chapter No. 6)
Total
Contractor's Profit & 20.00 Percent on Item 1
Total

Item Rates
Labour Rate Per Set
Composite Rate Per Set

Page 27

Unit Rate (British System) per 100 Sft


Qty
Rate
Per Unit (Rs) Amount (Rs)
1.74 Cft

1.60 Cft

0.14 Cft
P. Cft

Each
Each

24.00 Nos

Each

L.S.
1.60 Cft

P. Cft

1.00 No
1.00 No
20 Nos

on Item 1

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 18:

Detail

Desilting of disposal work collecting


removal of sludge with in 3 chains (90

Unit Rate (British System) per 100 Sft


Qty

Analysis Rate for 2100 Cft


T & P Required :
R.S. joist 6\"x12\" size 25'-0\"
Winch crab with steel rope and v-clamps.
M.S. bucket 2'x2'x2'
Tripod of G.I. pipe 3\" (75mm) i/d
Chain pully block of one ton capacity
Wooden plank 10\"x10\"x1\"
Cross planks
20 x 12 =
24 Nos
10
Longitudnal
=
6 Nos

1.00
1.00
1.00
1.00
1.00

No
No
No
No
No

30 Nos
Rental charges of equipments :
Taking average size of C. Tank
30.00 ft
Depth of silt.
3.00 ft
Quantity = 22 x 30' x 30' x x 3
2121.50 Cft (S2100 Cft)
7
Time for fitting equipment and removing. 0.50 Day
Time for clearing silt.
2.00 Days
Rental charges of all equipments including
carriage, fixing & removing.
2.50 Days
Total
Contractor's Profit & 20.00 Percent
Total

Page 28

f disposal work collecting tank including


sludge with in 3 chains (90M).

British System) per 100 Sft


Rate
Per Unit (Rs) Amount (Rs)

(S2100 Cft)

P. Day

Detail

Labour
Coolies Unskilled
For digging
For Lifting & removing
For carrying
Unskilled Cooly for 2 days
Total
Sundries
10.00 Percent
Total
Contractor's Profit & 20.00 Percent
Total
Item Rates
Labour Rate Per 100 Cft
Labour Rate Per Cum
Composite Rate Per 100 Cft
Composite Rate Per Cum

Unit Rate (British System) per 100 Sft


Qty

2.00 Nos
8.00 Nos
2.00 Nos
12.00 Nos
24.00 Nos

Rs.
Rs.
Rs.
Rs.

Page 29

British System) per 100 Sft


Rate
Per Unit (Rs) Amount (Rs)

Each

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 19:

a)

i)
Detail

Rate Analysis for 16 Cwt


Material
C.I. vantilating shaft 18' long weighing
16 cwt = 21.78 md. (813 Kg) including
column pipe, base, cowl, plates, and other
accessories including carriage to site.
Foundation bolts & nuts \" dia 1' long
Rubber sheets 1/8\" thick 10\"x8\" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Pipe fitter
Unskilled Cooly
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Providing and installing C.


painted with bituminous pai
bolts as per PHED standard
No. 4 of 1977 complete in a
concrete foundation block).
6\" (150mm) dia 18' long.
Unit Rate (British System)
Qty

813.00 Kg
4.00 Nos
0.37 Kg
L. S.

1.00 No
4.00 Nos

Page 30

roviding and installing C.I. vantilating shaft


ainted with bituminous paint with foundation
olts as per PHED standard drawing STD/PD
o. 4 of 1977 complete in all respects (except
oncrete foundation block).
\" (150mm) dia 18' long.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

Rs.
Rs.
Rs.
Rs.

P. Kg
No

P. Kg

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 19:

a)

ii)
Detail

Rate Analysis for 18 Cwt


Material
C.I. vantilating shaft 24' long weighing
18 cwt = 24.50 md. (915 Kg) including
column pipe, base, cowl, and other plates
and accessories including carriage to site.
Foundation bolts & nuts \" dia 2' long .
Rubber sheets 1/8\" thick 10\"x8\" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Pipe fitter for 1 day = 1 No
Unskilled Cooly for 1 day = 4 Nos
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Providing and installing C.


painted with bituminous pai
bolts as per PHED standard
No. 4 of 1977 complete in a
concrete foundation block).
6\" (150mm) i/d shaft 24'
Unit Rate (British System)
Qty

915.00 Kg
4.00 Nos
0.37 Kg
L. S.

1.25 Nos
5.00 Nos

Page 31

roviding and installing C.I. vantilating shaft


ainted with bituminous paint with foundation
olts as per PHED standard drawing STD/PD
o. 4 of 1977 complete in all respects (except
oncrete foundation block).
\" (150mm) i/d shaft 24' (7.232Rm) long.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

Rs.
Rs.
Rs.
Rs.

P. Kg
No

P. Kg

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 19:

a)

iii)
Detail

Rate Analysis for 20 Cwt


Material
C.I. vantilating shaft 30' including column pipe,
base, cowl and other accessories including
carriage to site weighing 20 cwt or 1016 kg
Foundation bolts & nuts \" dia 2' long .
Rubber sheets 1/8\" thick 10\"x8\" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Pipe fitter 1 No for 1.5 days
Unskilled Cooly 4 No for 1.5 days
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Providing and installing C.


painted with bituminous pai
bolts as per PHED standard
No. 4 of 1977 complete in a
concrete foundation block).
6\" (150mm) i/d shaft 30'
Unit Rate (British System)
Qty

1016.00 Kg
4.00 Nos
0.37 Kg
L. S.

1.50 Nos
6.00 Nos

Page 32

roviding and installing C.I. vantilating shaft


ainted with bituminous paint with foundation
olts as per PHED standard drawing STD/PD
o. 4 of 1977 complete in all respects (except
oncrete foundation block).
\" (150mm) i/d shaft 30' (9.143Rm) long.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

016.00 Kg

Rs.
Rs.
Rs.
Rs.

P. Kg
No

P. Kg

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 19:

a)

iv)
Detail

Rate Analysis for 22.3 Cwt


Material
C.I. vantilating shaft 36' long including
column pipe base, cowl, other plates,
accessories & carriage to site 22.3 Cwt
(1133.21 kg).
Foundation bolts & nuts \" dia 2' long .
Rubber sheets 1/8\" thick 10\"x8\" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Pipe fitter 1 No for 1 days
Unskilled Cooly 4 No for 1 days
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Providing and installing C.


painted with bituminous pai
bolts as per PHED standard
No. 4 of 1977 complete in a
concrete foundation block).
6\" (150mm) i/d vantilating
Unit Rate (British System)
Qty

1133.21 Kg
4.00 Nos
0.37 Kg
L. S.

1.75 Nos
7.00 Nos

Page 33

roviding and installing C.I. vantilating shaft


ainted with bituminous paint with foundation
olts as per PHED standard drawing STD/PD
o. 4 of 1977 complete in all respects (except
oncrete foundation block).
\" (150mm) i/d vantilating shaft 36' (11 M) long
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

133.21 Kg

Rs.
Rs.
Rs.
Rs.

P. Kg
Each

P. Kg

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 19:

b)

i)
Detail

Rate Analysis for 25 Cwt


Material
C.I. vantilating shaft 18' long including
column pipe base, cowl, plates and other
accessories including carriage to site 25 Cwt
(1270.42 kg).
Foundation bolts & nuts \" dia 2' long .
Rubber sheets 1/8\" thick 10\"x8\" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Pipe fitter
Unskilled Cooly
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Providing and installing C.


painted with bituminous pai
bolts as per PHED standard
No. 4 of 1977 complete in a
concrete foundation block).
9\" (225mm) i/d : shaft 18
Unit Rate (British System)
Qty

1270.42 Kg
4.00 Nos
0.37 Kg
L. S.

1.00 Nos
6.00 Nos

Page 34

roviding and installing C.I. vantilating shaft


ainted with bituminous paint with foundation
olts as per PHED standard drawing STD/PD
o. 4 of 1977 complete in all respects (except
oncrete foundation block).
\" (225mm) i/d : shaft 18' (5.48M) long.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

270.42 Kg

Rs.
Rs.
Rs.
Rs.

P. Kg
Each

P. Kg

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 19:

b)

ii)
Detail

Rate Analysis for 29 Cwt


Material
C.I. vantilating shaft 24' long including
base, column pipe, cowl, plates, other
accessories & carriage to site 29 Cwt or
39.47 Mds: cast iron pipe. (1473.68 kg).
Foundation bolts & nuts \" dia 2' long .
Rubber sheets 1/8\" thick 10\"x8\" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Pipe fitter 1 No for 1 day
Unskilled Cooly 6 Nos for 1 day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Providing and installing C.


painted with bituminous pai
bolts as per PHED standard
No. 4 of 1977 complete in a
concrete foundation block).
9\" (225mm) i/d : shaft 24
Unit Rate (British System)
Qty

1473.68 Kg
4.00 Nos
0.37 Kg
L. S.

1.25 Nos
7.50 Nos

Page 35

roviding and installing C.I. vantilating shaft


ainted with bituminous paint with foundation
olts as per PHED standard drawing STD/PD
o. 4 of 1977 complete in all respects (except
oncrete foundation block).
\" (225mm) i/d : shaft 24' (7M) long.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

473.68 Kg

Rs.
Rs.
Rs.
Rs.

P. Kg
Each

P. Kg

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 19:

b)

iii)
Detail

Rate Analysis for 32.5 Cwt


Material
C.I. vantilating shaft 30' long including base,
column pipe, cowl, plates, other accessories &
carriage to site 32.5cwt or 44.24md (1651.54)
Foundation bolts \" dia 2' long.
Rubber sheets 1/8\" thick 10\"x8\" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Pipe fitter 1 No for 1 day
Unskilled Cooly 6 Nos for 1 day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Providing and installing C.


painted with bituminous pai
bolts as per PHED standard
No. 4 of 1977 complete in a
concrete foundation block).
9\" (225mm) i/d : shaft 30
Unit Rate (British System)
Qty

1651.54 Kg
4.00 Nos
0.37 Kg
L. S.

1.50 Nos
9.00 Nos

Page 36

roviding and installing C.I. vantilating shaft


ainted with bituminous paint with foundation
olts as per PHED standard drawing STD/PD
o. 4 of 1977 complete in all respects (except
oncrete foundation block).
\" (225mm) i/d : shaft 30' (9M) long.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

651.54 Kg

Rs.
Rs.
Rs.
Rs.

P. Kg
Each

P. Kg

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 19:

b)

iv)
Detail

Rate Analysis for 36 Cwt


Material
C.I. vantilating shaft 36' long including
base, column pipe, cowl, plates, bolts and
other accessories 36 Cwt or 1829.40 kg.
Foundation bolts \" dia 2' long.
Rubber sheets 1/8\" thick 10\"x8\" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Pipe fitter 1 No for 2 day
Unskilled Cooly 6 Nos for 2 day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Providing and installing C.


painted with bituminous pai
bolts as per PHED standard
No. 4 of 1977 complete in a
concrete foundation block).
9\" (225mm) i/d : shaft 36
Unit Rate (British System)
Qty

1829.40 Kg
4.00 Nos
0.37 Kg
L. S.

2.00 Nos
12.00 Nos

Page 37

roviding and installing C.I. vantilating shaft


ainted with bituminous paint with foundation
olts as per PHED standard drawing STD/PD
o. 4 of 1977 complete in all respects (except
oncrete foundation block).
\" (225mm) i/d : shaft 36' (11M) long.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

829.40 Kg

Rs.
Rs.
Rs.
Rs.

P. Kg
Each

P. Kg

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 19:

c)

i)
Detail

Rate Analysis for 36 Cwt


Material
C.I. vantilating shaft including base column
pipe, cowl, plates, bolts, and other
accessories etc. 36 Cwt or 1829.40 kg.
7
Foundation bolts / \8
Rubber sheets 1/8\" thick 10\"x8\" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Pipe fitter for 1 day
Unskilled Cooly for 1 day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Providing and installing C.


painted with bituminous pai
bolts as per PHED standard
No. 4 of 1977 complete in a
concrete foundation block).
12\" (300mm) i/d : shaft 1
Unit Rate (British System)
Qty

1829.40 Kg
4.00 Nos
0.37 Kg
L. S.

1.00 Nos
8.00 Nos

Page 38

roviding and installing C.I. vantilating shaft


ainted with bituminous paint with foundation
olts as per PHED standard drawing STD/PD
o. 4 of 1977 complete in all respects (except
oncrete foundation block).
2\" (300mm) i/d : shaft 18' (5.45M) long.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

829.40 Kg

Rs.
Rs.
Rs.
Rs.

P. Kg

Each

P. Kg

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 19:

c)

ii)
Detail

Rate Analysis for 42 Cwt


Material
C.I. vantilating shaft including base column
pipe, cowl, plates, bolts, and other
accessories etc. 42 Cwt or 2134 kg.
7
Foundation bolts / \8
1
Rubber sheets / \" t8
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Pipe fitter 1 No for 1 day
Unskilled Cooly 8 Nos for 1 day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Providing and installing C.I. vantilating shaft


painted with bituminous paint with foundation
bolts as per PHED standard drawing STD/PD
No. 4 of 1977 complete in all respects (except
concrete foundation block).
12\" (300mm) i/d : shaft 24' (7M) long.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs) Amount (Rs)

2134.00 Kg

P. Kg

4.00 Nos

Each

0.37 Kg
L. S.

P. Kg

1.50 Nos
12.00 Nos

P. Day
P. Day

Say
Say
Say
Say

Rs.
Rs.
Rs.
Rs.

Page 39

DESCRIPTION OF ITEM NO 19:

c)

iii)
Detail

Rate Analysis for 48 Cwt


Material
C.I. vantilating shaft 30' long including base,
cowl, column pipe, plates. studs and other
accessories etc. 48 Cwt or 65.33 Md. =
7
Foundation bolts / \8
Rubber sheets 1/8\" thick 10\"x8\" =
0.55 Sft
@ 1.5 Lbs/Sft
Hire charges of T & P
Total
Contractor's Profit & Ove
20.00 Percent
Total
Labour
Pipe fitter 1 No for 2 day
Unskilled Cooly 8 Nos for 2 day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove
20.00 Percent
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Providing and installing C.


painted with bituminous pai
bolts as per PHED standard
No. 4 of 1977 complete in a
concrete foundation block).
12\" (300mm) i/d : shaft 3
Unit Rate (British System)
Qty

2439.00 Kg
4.00 Nos
0.37 Kg
L. S.

2.00 Nos
16.00 Nos

Page 40

roviding and installing C.I. vantilating shaft


ainted with bituminous paint with foundation
olts as per PHED standard drawing STD/PD
o. 4 of 1977 complete in all respects (except
oncrete foundation block).
2\" (300mm) i/d : shaft 30' (9M) long.
nit Rate (British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

439.00 Kg

Rs.
Rs.
Rs.
Rs.

P. Kg

Each

P. Kg

P. Day
P. Day

Say
Say
Say
Say

DESCRIPTION OF ITEM NO 20:


a)
Detail

Silt clearing 10' (3M) dia wells and r


slush out side the compound.
Upto 10' (3M) depth of slush.
Unit Rate (British System) per 100 Sft
Qty

Labour
Drivers
Unskilled Cooly
Total
Sundries
10.00 Percent
Total
Contractor's Profit & 20.00 Percent
Total
Item Rates

3.00 Nos
5.50 Nos

Labour Rate Per Well

Rs.

Page 41

ng 10' (3M) dia wells and removal of


ide the compound.
M) depth of slush.
British System) per 100 Sft
Rate
Per Unit (Rs) Amount (Rs)

P. Day
P. Day

Say

DESCRIPTION OF ITEM NO 20:


b)
Detail

Labour
Driver
Unskilled Cooly
Total
Sundries
10.00 Percent
Total
Contractor's Profit & 20.00 Percent
Total
Item Rates
Labour Rate Per Well

Silt clearing 10' (3M) dia wells and r


slush out side the compound.
Beyond 10' (3M) depth of slush.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs) Amount (Rs)

5.00 Nos
12.00 Nos

Rs.

Page 42

ng 10' (3M) dia wells and removal of


ide the compound.
(3M) depth of slush.
British System) per 100 Sft

er Unit (Rs) Amount (Rs)

P. Day
P. Day

Say