Muhammad Umar Draz

Trainee Engineer Electrical


List of assignments and documents studied
Safety Documents
Sr. No.

Title
1 PPEs
2 WAH
3 Energy Isolation
4 Workplace noise
Production and Process
3 Plant Process Diagram
Quarry process and Managmnet
Atox Raw Mill technical Agenda
4 Kiln Heat and Mass Balance
6 Kiln Systems
7 Cement Milling
Electrical Documentation
8 Single line Diagram of Plant
9 VFD drawings ( Sami gs for r1j10 feed belt,Acs800 for r1s22u01)
10 Typical MCC Drawing
11 MV Panel Drawings
studied micom p220 motor protection relay
micom p1xx series relays study
pu 321 undervoltage/overvoltage relay
PS431 overcurrent relay
Liquid rotor Starter Complete Study
Rotor Starter Drawings
Packer Elecetrical Drawing
Truck Loader Electrical Drawing
12 Induction motor Starting methods and their advantages and disadva
13 Power factor improvement and their benefits
Maintenace Miscellaneous
14 Lafarge Maintenance Guide
Assignments
15 JHERA & HECP of P1 & utility area
16 Lighting Design Of Dispatch Parking Area
17 FHRAs of P1 & utility Area complete
18 List of VFDs in Kiln,Cooler and Coal Area with specifications
prepare a list of all important electrical equipments in substations.
19 List of Motors of P1 & utility area
List of Trainings
20 PPEs
Energy Isolation
Emex

21 LOTOTO
rescue 1122 training
Safety training modules complete
Mobile Equipment
Training Delivered
1 Micom220 motor protection relay
2 Motor liquid rotor starter
3 pu 321 undervoltage/overvoltage relay

d
Status
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
in progress
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed

PFISTER
PLC
LOCAL PLC
FEEDER
REPLACING EEPROM
SOPS
IKA
PROGRAMMING
BYPASS
PROGRAM MODIFICATION
UNITY PRO XL
ECS OPSTATION
QCX
DESIGN MIMIC
PLC Studied
Harzog Program PLC
s7 200
s7 300

Completed

Completed

Main Problems in P1 Area


1 R1S22U01 FREQUENCY DRIVE
2 Cement mill rotor starter
3 Raw mill E.p
4 Raw mill main drive rotor starter
5

Main Problems in P1 Area


48V missing, check the complete circuit, and verify the path of 48 v supply.Problem was in power supp
CCt relay did not work, check complete circuit ,at the end the neutral point of the coil is missing
A1 chamber did not work. Perform megger testing on all insulators,tlf and cables, check the control pa
Showing not ready in ccr. Check the ready path on the drawing. A realy was perorming mall functionin

oblem was in power supply, which did not take load when connect with control card. Replace the supply and wo
the coil is missing
bles, check the control pannel components. At the end make the tlf secondary open and on t/f. and verify the tlf
erorming mall functioning. Replace it.

place the supply and work well

d on t/f. and verify the tlf condition which was ok. Problm was not on electrical side.