Anda di halaman 1dari 63

El Palito Refinery Expansion Project

UNIT No - 9700 BUILDINGS


SIH-03 Structural Calculation Report

Doc. No : 97-YCIV-CS-0003

E. Reveron
-/0

04-20-2010

W. Graterol

J. Kesic

For Internal Review


/ S. Volpe

Rev

Issue Date

97-YCIV-CS-0003.doc

Prepared

Checked

Authorized

Description

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 2 of 63

CONTENTS
1.

2.

3.

4.

OBJECTIVE..................................................................................................................................4
1.1

SAP-2000 3D Frame Model..................................................................................................5

1.2

SAP-2000 3D Wall Model. ....................................................................................................6

1.3

SAP2000 Roof Plan..............................................................................................................7

1.4

SAP2000 Front Wall Elevation..............................................................................................7

1.5

SAP2000 Typical Side Wall Elevation...................................................................................8

1.6

SAP2000 Internal Frame Elevation.......................................................................................9

1.7

SAP2000 Internal Frame Elevation.....................................................................................10

REFERENCE DOCUMENTS AND CODES. ...............................................................................10


2.1

Job Specifications...............................................................................................................10

2.2

Codes & Design Manual. ....................................................................................................11

2.3

Reference Drawing. ............................................................................................................11

MATERIALS. ..............................................................................................................................12
3.1

Material Strength. ...............................................................................................................12

3.2

Dynamic Yield Stress..........................................................................................................12

3.3

Dynamic Reinforced Concrete. ...........................................................................................12

3.4

Applied Material Properties.................................................................................................13

LOAD ANALYSIS........................................................................................................................13
4.1

Load Case. .........................................................................................................................13

4.2

Dead and Live Load Definition............................................................................................14

4.3

Earthquake Forces. ............................................................................................................15

4.4

Blast Load Definition...........................................................................................................20

4.4.1

Peak side-on positive overpressure. ...............................................................................20

4.4.2

Peak sde-on negative overpressure...............................................................................29

4.5
5.

Combination Definitions......................................................................................................34

STRUCTURAL CALCULATIONS................................................................................................45
5.1

Earthquake Computation. ...................................................................................................45

5.1.1

Masses Computation. .....................................................................................................45

5.1.2

Minimum Design Base Shear..........................................................................................47

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

5.1.3
5.2

Page 3 of 63

Total Lateral Drift. ...........................................................................................................47


Blast Resistant Deformation Limits. ....................................................................................51

5.2.1

Compute simplification mathematical model for Precast Concrete Wall. .........................52

5.2.2

Front Wall. ......................................................................................................................54

5.2.3

Rear Wall........................................................................................................................55

5.3

Verification steel elements and design concrete elements. .................................................61

5.3.1

Steel Elements ...............................................................................................................61

5.3.2

Concrete Elements .........................................................................................................62

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 4 of 63

1. OBJECTIVE.
The present calculation report is relevant to the predesign of a SIH-03 Building. This calculation
report covers Concrete and Steel Preesign for Blast Resistant Building
Steel Structure has been designed in accordance with COVENIN 1618-98.
Reinforced Concrete has been designed in accordance with FONDONORMA 1753:2006.

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project

1.1

Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

SAP-2000 3D Frame Model.

97-YCIV-CS-0003.doc

Page 5 of 63

El Palito Refinery Expansion Project

1.2

Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

SAP-2000 3D Wall Model.

97-YCIV-CS-0003.doc

Page 6 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

1.3

SAP2000 Roof Plan.

1.4

SAP2000 Front Wall Elevation.

97-YCIV-CS-0003.doc

Page 7 of 63

El Palito Refinery Expansion Project

1.5

Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

SAP2000 Typical Side Wall Elevation.

97-YCIV-CS-0003.doc

Page 8 of 63

El Palito Refinery Expansion Project

1.6

Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

SAP2000 Internal Frame Elevation.

97-YCIV-CS-0003.doc

Page 9 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

1.7

Page 10 of 63

SAP2000 Internal Frame Elevation.

2. REFERENCE DOCUMENTS AND CODES.


2.1

Job Specifications.

00-FSTC-SP-0001

Civil Design Loads.

00-FSTC-SP-0002

Design of Blast Resistant Buildings

00-FSTC-SP-0003

Foundations and Elevated Concrete Structures Design.

00-FSTC-SP-0005

Reinforced Concrete Construction & Durability

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

00-FSTC-SP-0006

Structural Steel Design.

00-FSTC-SP-0007

Structural Steel Fabrication & Erection.

2.2

Page 11 of 63

Codes & Design Manual.

COVENIN 1618-88

Estructuras de Acero para Edificios Mtodos de los Estados


Limites.

FONDONORMA 1753-2006

COVENIN 1756-1-2001 Edificaciones Sismorresistentes.

AISC-LRFD Manual

Proyecto y Construccin de Obras en Concreto Estructural.

Specification for Design, Fabrication and Erection of Structural


Steel. LRFD FOR REFERENTE.

2.3

Designo f Blast Resistant Buildings in Petrochemical Facilities FOR REFERENTE.


Reference Drawing.

97-YCIV-DW-0020

9700 BUILDINGS / SIH-03 FOUNDATION PLAN STRUCTURE

97-YCIV-DW-0021

9700 BUILDINGS / SIH-03 GROUND FLOOR PLAN STRUCTURE

97-YCIV-DW-0022

9700 BUILDINGS / SIH-03 ROOF PLAN STRUCTURE

97-YCIV-DW-0023

9700 BUILDINGS / SIH-03 FRAMING ELEVATION STRUCTURE

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

3. MATERIALS.
3.1

Material Strength.
Applied yield strength Fy= 2530 kg/cm (ASTM A-36)
Ultimate strength = Fu= 4100 kg/cm.
Nominal concrete strength fc=280 kg/cm.
Reinforcing Bar Fy=4200 kg/cm

3.2

Dynamic Yield Stress.


Fdy = Fy x SIF x DIF
SIF = Strength increase factor.

SIF = 1.1 for structural steel

SIF = 1.2 for cold formed steel cladding panels


DIF = Dynamic increase factor.

DIF = 1.29 for bendign / shear

DIF = 1.19 for tension / compression

3.3

Dynamic Reinforced Concrete.


Fdy = Fy x SIF x DIF
SIF = Strength increase factor.

SIF = 1.0 for concrete


DIF = Dynamic increase factor.

DIF = 1.19 for flexure

DIF = 1.12 for compression.

DIF = 1.00 for other.

97-YCIV-CS-0003.doc

Page 12 of 63

El Palito Refinery Expansion Project

3.4

Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 13 of 63

Applied Material Properties.


Structural steel

Fdy = 3590/3312 kg/cm (Bending-Shear/ tension-compression).

Sheeting

Fdy = 3916/3613 kg/cm (Bending-Shear/ tension-compression).

Concrete

fdc = 333/314/280 kg/cm (flexure/compression/other)

4. LOAD ANALYSIS.
4.1

Load Case.
The following load cases are used Turing the analysis.
Load Name

Description.

DL

Dead Load.

LL

Live Load

Sx

Earthquake Load on Structure in X Direction compute automatically by SAP2000

Sy

Earthquake Load on Structure in Y Direction compute automatically by SAP2000

Sz

Earthquake Load on Structure in Z Direction compute automatically by SAP2000

BLFW

Blast Load Front Wall

BLSW

Blast Load Side Wall.

BLRW

Blast Load Rear Wall.

BLRS

Blast Load Roof Slab.

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project

4.2

Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 14 of 63

Dead and Live Load Definition.


Dead and Live load to be considered in this structural design shall be in accordance with
00-FSTC-SP-0001 Civil Design Loads specification.
GROUND FLOOR: DL=200 kg/m; LL=1000 kg/m :
Toping = 0.08*2000 kg/m3= 160 kg/m
Finished = 40 kg/m.
Equipment = 1000
ROOF FLOOR: DL=200 kg/m ; LL=100 kg/m
Toping = 0.08*2000 kg/m3= 160 kg/m
Ceiling = 20 kg/m.
Other = 20 kg/m
Roof with access for maintenance = 100 kg/m

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project

4.3

Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 15 of 63

Earthquake Forces.
Seismic loading shall bi in accordance with COVENIN 1756-1-2001. In this report Modal
Superposition Method is adopted, thus the minimum design base shear in a given direction shall
be determined by the following formula
Vo = Ad W

(9.1)

where:
Ad=Ordinate of the design spectrum defined in Article 7.2 for the period T given in Section 9.3.2.
W=

Total weight of the building above the base level (Article 7.1).

The larger of the following values:

N+9
= 14
.
2 N + 12
1 T

= 0.80 +
1

20 T *
where:
N =

Number of levels =

1.

T =

Fundamental period 1.6 * Ct hn0.75 = 1.6*0.07*5. 0.75 =0.374s.

T* =

Period given in Table 7.1 = (0.70s)

Where: = 1, Ad=0.2177 and Vo=0.2177W.

97-YCIV-CS-0003.doc

(9.2)

(9.3)

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Response Spectrum Data:

97-YCIV-CS-0003.doc

Page 16 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Seismic X Direction Definition.

97-YCIV-CS-0003.doc

Page 17 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Seismic Y Direction Definition.

97-YCIV-CS-0003.doc

Page 18 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Seismic Z Direction Definition.

97-YCIV-CS-0003.doc

Page 19 of 63

El Palito Refinery Expansion Project

4.4

Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Blast Load Definition.

4.4.1 Peak side-on positive overpressure.

97-YCIV-CS-0003.doc

Page 20 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 21 of 63

Front Wall Loading:


The front wall is assumed to span vertically from foundation to roof. The design will be for a
typical wall segment one meter wide.
Reflected Overpressure
Pr= Cr * Pso Where
Cr= (2+0.05*Pso)
Pr =
[ 2 + 0.05(Pso) ] Pso

Ecu. 3.2
Ecu. 3.3
=
=

13.80 psi
9702.36 kg/m 2

Clearing Distance,
Minimum of H or B/2
S =

5.50 m

Reflected overpressure clearing time,


tc =
3 (S / U) <td

Drag Coefficient, Cd =

0.0413

1 for Front Wall

Staganation Pressure,
Ps =
Pso + Cd(q0)

=
=

Front wall Impulse,


0.5[(Pr - Ps)tc + Ps td] =
Iw =
=
0.345 psi
Effective duration
te =
2*Iw / Pr

6.79 psi
4775.25 kg/m 2

Ecu. 3.7

0.31 psi
2
221.03 kg/m

Ecu. 3.9

0.0456 sec

Ecu. 3.10

Pr= 9702.36

0.0456
Time History Funtion I

97-YCIV-CS-0003.doc

Ecu. 3.8

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

97-YCIV-CS-0003.doc

Page 22 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 23 of 63

Side Wall Loading


The side wall is same as the front wall, spannig vertically from foundation to roof.
Because the highest loads are on the front wall, a side wall analysis would only be necessary
to check the interaction of in-plane and out-of-plane shear wall forces.
This calculation will be for wall segment of 1 m wide.
Width of wall segment considered for Calculation, L1 =
Drag Co-efficient, Cd =
Equivalent load Co-efficient,
Lw/L1 =
therefore
Ce
=

-0.4

20.00
1.00 (From fig. 3.9)

Effective side on overpressure


Ce Pso + Cd q0
Pa =

Rise Time
tr =

1.00

5.68 psi
2
3995.69 kg/m

L1 / U

Ecu. 3.11

0.0025 sec

tf =
tr+td
=
0.0525 sec
If an average overpressure over the entire side wall is neded, the value of L1 would then be the
length of the building. The value of Ce would then be less than one and thus reduce value of Pa.
The rise time would become significant.

3995.69

Time History Funtion II


0.0025
0.0525

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

97-YCIV-CS-0003.doc

Page 24 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 25 of 63

Rear Wall Load:


The rear wall is proportioned the same as the front and side walls, spanning vertically from
foundation to roof. Because the highest loads are on the front wall, a rear wall analysis would
only be necessary to determine a net loading on the overall building. The analysis will
be for a wall segment 1 m wide.

Drag Co-efficient, Cd =
Equivalent load co-efficient,
Lw / S =
Therefore
Ce
=

-0.40

3.64
0.80 (From fig. 3.9)

Equivalent peak overpressure,


Pb =
Ce Pso + Cd q0

Time of arrival,
ta =
L/U

4.48
2
3152.00 kg/m

0.0250 sec
3152.00

Rise time,
tr =

S /U

t2 =

ta+tr

0.0138 sec
=

0.0388 sec

Total Positive Phase duration


t0 =
tr + td

0.0638 sec

t3 =

0.0888 sec

97-YCIV-CS-0003.doc

ta+t0

0.0250

0.0388

0.0888

Time H istory Funtion IV

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

97-YCIV-CS-0003.doc

Page 26 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 27 of 63

Roof Load:
The roof is a slab spanning between roof beams. For the design of the roof, a section 1 m wide by
2.5 m long will be used.
L1
=
Drag Co-efficient C d =
Equivalent Load Co-efficient,
Lw / L1 =
therefore
Ce
=

2.50 m
-0.40
8.00
0.90 (From fig. 3.9)

Equivalent peak overpressure


Ce Pso + Cd q0
Pa =

Rise Time
tr =

L1 / U

=
=

5.08 psi
3573.84 kg/m 2

0.0063 sec

Time of Duration, td =

0.0500 sec

Total Positive Phase duration


tf =
tr + td

0.0563 sec

3573.84

0.0063
0.0563
Time History Funtion III
For structural roof element orientated in the opposite direction, the length of the element in
the direction of the traveling wave, L1 would be only 1 m.
In this case,like side wall panel, there would be essentially no averaging necessary.
If an average overpressure over the entire roof is needed, the value of L1 would then be the
length of the building. The value of Ce would then be reducrd along with the value of Pa.
Therise time would be greater.

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

97-YCIV-CS-0003.doc

Page 28 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

4.4.2 Peak sde-on negative overpressure.

97-YCIV-CS-0003.doc

Page 29 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 30 of 63

Front Wall Loading:


The front wall is assumed to span vertically from foundation to roof. The design will be for a
typical wall segment one meter wide.
Reflected Overpressure
Pr= Cr * Pso Where
Cr= (2+0.05*Pso)
Pr =
[ 2 + 0.05(Pso) ] Pso

Ecu. 3.2
Ecu. 3.3
=
=

6.45 psi
4534.80 kg/m 2

Clearing Distance,
S =
Minimum of H or B/2

5.50 m

Reflected overpressure clearing time,


tc =
3 (S / U) <td

Drag Coefficient, Cd =

0.0442

1 for Front Wall

Staganation Pressure,
Ps =
Pso + Cd(q0)

=
=

Front wall Impulse,


Iw =
0.5[(Pr - Ps)tc + Ps td] =
=
0.345 psi
Effective duration
te =
2*Iw / Pr

3.20 psi
2248.42 kg/m 2

Ecu. 3.7

0.15 psi
2
106.75 kg/m

Ecu. 3.9

0.0471 sec

Ecu. 3.10

Pr= 4534.80

0.0471
Time History Funtion I

97-YCIV-CS-0003.doc

Ecu. 3.8

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 31 of 63

Side Wall Loading


The side wall is same as the front wall, spannig vertically from foundation to roof.
Because the highest loads are on the front wall, a side wall analysis would only be necessary
to check the interaction of in-plane and out-of-plane shear wall forces.
This calculation will be for wall segment of 1 m wide.
Width of wall segment considered for Calculation, L1 =
Drag Co-efficient, Cd =
Equivalent load Co-efficient,
Lw/L1 =
therefore
Ce
=

-0.4

18.66
1.00 (From fig. 3.9)

Effective side on overpressure


Pa =
Ce Pso + Cd q0

Rise Time
tr =

1.00

2.92 psi
2
2053.53 kg/m

L1 / U

Ecu. 3.11

0.0027 sec

tf =
tr+td
=
0.0527 sec
If an average overpressure over the entire side wall is neded, the value of L1 would then be the
length of the building. The value of Ce would then be less than one and thus reduce value of Pa.
The rise time would become significant.

2053.53

Time History Funtion II


0.0027
0.0527

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 32 of 63

Rear Wall Load:


The rear wall is proportioned the same as the front and side walls, spanning vertically from
foundation to roof. Because the highest loads are on the front wall, a rear wall analysis would
only be necessary to determine a net loading on the overall building. The analysis will
be for a wall segment 1 m wide.

Drag Co-efficient, Cd =
Equivalent load co-efficient,
Lw / S =
Therefore
Ce
=

-0.40

3.39
0.80 (From fig. 3.9)

Equivalent peak overpressure,


Pb =
Ce Pso + Cd q0

Time of arrival,
ta =
L/U

2.32
2
1631.68 kg/m

0.0268 sec
1631.68

Rise time,
tr =

S /U

t2 =

ta+tr

0.0147 sec
=

0.0415 sec

Total Positive Phase duration


t0 =
tr + td

0.0647 sec

t3 =

0.0915 sec

97-YCIV-CS-0003.doc

ta+t0

0.0268

0.0415

0.0915

Time H istory Funtion IV

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 33 of 63

Roof Load:
The roof is a slab spanning between roof beams. For the design of the roof, a section 1 m wide by
2.5 m long will be used.
L1
=
Drag Co-efficient C d =
Equivalent Load Co-efficient,
Lw / L1 =
therefore
Ce
=

2.50 m
-0.40
7.46
0.90 (From fig. 3.9)

Equivalent peak overpressure


Ce Pso + Cd q0
Pa =

Rise Time
tr =

L1 / U

=
=

2.62 psi
1842.60 kg/m 2

0.0067 sec

Time of Duration, td =

0.0500 sec

Total Positive Phase duration


tf =
tr + td

0.0567 sec

1842.60

0.0067
0.0567
Time History Funtion III
For structural roof element orientated in the opposite direction, the length of the element in
the direction of the traveling wave, L1 would be only 1 m.
In this case,like side wall panel, there would be essentially no averaging necessary.
If an average overpressure over the entire roof is needed, the value of L1 would then be the
length of the building. The value of Ce would then be reducrd along with the value of Pa.
Therise time would be greater.

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

4.5

Page 34 of 63

Combination Definitions.
Load combinations according to the design loads spec. (Rev. B/C01) are accounted in the
following tables.
TABLE: Combination Definitions

ComboName ComboType
Text

Text

CaseType

CaseName ScaleFactor SteelDesign ConcDesign

Text

Text

Unitless

Yes/No

Yes/No

CI1

Linear Add

Linear Static

DEAD

1.4 Yes

Yes

CI2

Linear Add

Linear Static

DEAD

1.2 Yes

Yes

Linear Static

LIVE

1.6

Linear Static

DEAD

1.2 Yes

Linear Static

LIVE

SX

SY

0.3

Spectrum

SZ

0.3

Linear Static

DEAD

1.2 Yes

Linear Static

LIVE

SX

SY

0.3

Spectrum

SZ

-0.3

Linear Static

DEAD

Linear Static

LIVE

CI2
CI15

Linear Add

CI15

Yes

Response
CI15

Spectrum
Response

CI15

Spectrum
Response

CI15
CI16

Linear Add

CI16

Yes

Response
CI16

Spectrum
Response

CI16

Spectrum
Response

CI16
CI17

Linear Add

CI17

1.2 Yes

Response
CI17

Spectrum

SX

CI17

Response

SY

-0.3

97-YCIV-CS-0003.doc

Yes

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 35 of 63

Spectrum
Response
CI17
CI18

Linear Add

CI18

Spectrum

SZ

0.3

Linear Static

DEAD

1.2 Yes

Linear Static

LIVE

SX

SY

-0.3

Spectrum

SZ

-0.3

Linear Static

DEAD

Linear Static

LIVE

Yes

Response
CI18

Spectrum
Response

CI18

Spectrum
Response

CI18
CI19

Linear Add

CI19

1.2 Yes

Yes

Response
CI19

Spectrum

SX

-1

SY

0.3

Spectrum

SZ

0.3

Linear Static

DEAD

1.2 Yes

Linear Static

LIVE

Response
CI19

Spectrum
Response

CI19
CI20

Linear Add

CI20

Yes

Response
CI20

Spectrum

SX

-1

SY

0.3

Spectrum

SZ

-0.3

Linear Static

DEAD

Linear Static

LIVE

Response
CI20

Spectrum
Response

CI20
CI21

Linear Add

CI21

1.2 Yes
1

Response
CI21

97-YCIV-CS-0003.doc

Spectrum

SX

-1

Yes

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 36 of 63

Response
CI21

Spectrum

SY

-0.3

Spectrum

SZ

0.3

Linear Static

DEAD

1.2 Yes

Linear Static

LIVE

Response
CI21
CI22

Linear Add

CI22

Yes

Response
CI22

Spectrum

SX

-1

SY

-0.3

Spectrum

SZ

-0.3

Linear Static

DEAD

Linear Static

LIVE

Response
CI22

Spectrum
Response

CI22
CI23

Linear Add

CI23

1.2 Yes

Yes

Response
CI23

Spectrum

SX

0.3

SY

Spectrum

SZ

0.3

Linear Static

DEAD

1.2 Yes

Linear Static

LIVE

Response
CI23

Spectrum
Response

CI23
CI24

Linear Add

CI24

Yes

Response
CI24

Spectrum

SX

0.3

SY

Spectrum

SZ

-0.3

Linear Static

DEAD

CI25

Linear Static

LIVE

CI25

Response

SX

Response
CI24

Spectrum
Response

CI24
CI25

Linear Add

97-YCIV-CS-0003.doc

1.2 Yes
1
-0.3

Yes

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 37 of 63

Spectrum
Response
CI25

Spectrum

SY

Spectrum

SZ

0.3

Linear Static

DEAD

1.2 Yes

Linear Static

LIVE

Response
CI25
CI26

Linear Add

CI26

Yes

Response
CI26

Spectrum

SX

-0.3

SY

Spectrum

SZ

-0.3

Linear Static

DEAD

Linear Static

LIVE

Response
CI26

Spectrum
Response

CI26
CI27

Linear Add

CI27

1.2 Yes

Yes

Response
CI27

Spectrum

SX

0.3

SY

-1

Spectrum

SZ

0.3

Linear Static

DEAD

1.2 Yes

Linear Static

LIVE

Response
CI27

Spectrum
Response

CI27
CI28

Linear Add

CI28

Yes

Response
CI28

Spectrum

SX

0.3

SY

-1

Spectrum

SZ

-0.3

Linear Static

DEAD

Linear Static

LIVE

Response
CI28

Spectrum
Response

CI28
CI29

Linear Add

CI29

97-YCIV-CS-0003.doc

1.2 Yes
1

Yes

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 38 of 63

Response
CI29

Spectrum

SX

-0.3

SY

-1

Spectrum

SZ

0.3

Linear Static

DEAD

1.2 Yes

Linear Static

LIVE

Response
CI29

Spectrum
Response

CI29
CI30

Linear Add

CI30

Yes

Response
CI30

Spectrum

SX

-0.3

SY

-1

Spectrum

SZ

-0.3

Linear Static

DEAD

Linear Static

LIVE

Response
CI30

Spectrum
Response

CI30
CI31

Linear Add

CI31

1.2 Yes

Yes

Response
CI31

Spectrum

SX

0.3

SY

0.3

Spectrum

SZ

Linear Static

DEAD

Linear Static

LIVE

Response
CI31

Spectrum
Response

CI31
CI32

Linear Add

CI32

1.2 Yes

Yes

Response
CI32

Spectrum

SX

-0.3

SY

0.3

Spectrum

SZ

Linear Static

DEAD

Response
CI32

Spectrum
Response

CI32
CI33

Linear Add

97-YCIV-CS-0003.doc

1.2 Yes

Yes

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

CI33

Linear Static

LIVE

Page 39 of 63

Response
CI33

Spectrum

SX

0.3

SY

-0.3

Spectrum

SZ

Linear Static

DEAD

Linear Static

LIVE

Response
CI33

Spectrum
Response

CI33
CI34

Linear Add

CI34

1.2 Yes

Yes

Response
CI34

Spectrum

SX

-0.3

SY

-0.3

Spectrum

SZ

Linear Static

DEAD

Linear Static

LIVE

Response
CI34

Spectrum
Response

CI34
CI35

Linear Add

CI35

1.2 Yes

Yes

Response
CI35

Spectrum

SX

0.3

SY

0.3

Spectrum

SZ

-1

Linear Static

DEAD

Linear Static

LIVE

Response
CI35

Spectrum
Response

CI35
CI36

Linear Add

CI36

1.2 Yes
1

Response
CI36

Spectrum

SX

-0.3

SY

0.3

SZ

-1

Response
CI36

Spectrum
Response

CI36

97-YCIV-CS-0003.doc

Spectrum

Yes

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

CI37

Linear Add

CI37

Linear Static

DEAD

Linear Static

LIVE

Page 40 of 63

1.2 Yes

Yes

Response
CI37

Spectrum

SX

-0.3

SY

0.3

Spectrum

SZ

-1

Linear Static

DEAD

Linear Static

LIVE

Response
CI37

Spectrum
Response

CI37
CI38

Linear Add

CI38

1.2 Yes

Yes

Response
CI38

Spectrum

SX

-0.3

SY

-0.3

Spectrum

SZ

-1

Linear Static

DEAD

Response
CI38

Spectrum
Response

CI38
CI39

Linear Add

0.9 Yes

Yes

Response
CI39

Spectrum

SX

SY

0.3

Spectrum

SZ

0.3

Linear Static

DEAD

0.9 Yes

Response
CI39

Spectrum
Response

CI39
CI40

Linear Add

Yes

Response
CI40

Spectrum

SX

SY

0.3

Spectrum

SZ

-0.3

Linear Static

DEAD

Response
CI40

Spectrum
Response

CI40
CI41

Linear Add

97-YCIV-CS-0003.doc

0.9 Yes

Yes

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 41 of 63

Response
CI41

Spectrum

SX

SY

-0.3

Spectrum

SZ

0.3

Linear Static

DEAD

0.9 Yes

Response
CI41

Spectrum
Response

CI41
CI42

Linear Add

Yes

Response
CI42

Spectrum

SX

SY

-0.3

Spectrum

SZ

-0.3

Linear Static

DEAD

Response
CI42

Spectrum
Response

CI42
CI43

Linear Add

0.9 Yes

Yes

Response
CI43

Spectrum

SX

-1

SY

0.3

Spectrum

SZ

0.3

Linear Static

DEAD

0.9 Yes

Response
CI43

Spectrum
Response

CI43
CI44

Linear Add

Yes

Response
CI44

Spectrum

SX

-1

SY

0.3

Spectrum

SZ

-0.3

Linear Static

DEAD

Response
CI44

Spectrum
Response

CI44
CI45

Linear Add

0.9 Yes

Response
CI45

Spectrum

SX

-1

CI45

Response

SY

-0.3

97-YCIV-CS-0003.doc

Yes

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 42 of 63

Spectrum
Response
CI45
CI46

Linear Add

Spectrum

SZ

0.3

Linear Static

DEAD

0.9 Yes

Yes

Response
CI46

Spectrum

SX

-1

SY

-0.3

Spectrum

SZ

-0.3

Linear Static

DEAD

0.9 Yes

SX

0.3

SY

Spectrum

SZ

0.3

Linear Static

DEAD

0.9 Yes

SX

0.3

SY

Spectrum

SZ

-0.3

Linear Static

DEAD

Response
CI46

Spectrum
Response

CI46
CI47

Linear Add

Yes

Response
CI47

Spectrum
Response

CI47

Spectrum
Response

CI47
CI48

Linear Add

Yes

Response
CI48

Spectrum
Response

CI48

Spectrum
Response

CI48
CI49

Linear Add

0.9 Yes

Response
CI49

Spectrum

SX

-0.3

SY

SZ

0.3

Response
CI49

Spectrum
Response

CI49

97-YCIV-CS-0003.doc

Spectrum

Yes

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

CI50

Linear Add

Linear Static

DEAD

Page 43 of 63

0.9 Yes

Yes

Response
CI50

Spectrum

SX

-0.3

SY

Spectrum

SZ

-0.3

Linear Static

DEAD

0.9 Yes

SX

0.3

SY

-1

Spectrum

SZ

0.3

Linear Static

DEAD

0.9 Yes

SX

0.3

SY

-1

Spectrum

SZ

-0.3

Linear Static

DEAD

Response
CI50

Spectrum
Response

CI50
CI51

Linear Add

Yes

Response
CI51

Spectrum
Response

CI51

Spectrum
Response

CI51
CI52

Linear Add

Yes

Response
CI52

Spectrum
Response

CI52

Spectrum
Response

CI52
CI53

Linear Add

0.9 Yes

Yes

Response
CI53

Spectrum

SX

-0.3

SY

-1

Spectrum

SZ

0.3

Linear Static

DEAD

0.9 Yes

Response
CI53

Spectrum
Response

CI53
CI54

Linear Add

Response
CI54

97-YCIV-CS-0003.doc

Spectrum

SX

-0.3

Yes

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 44 of 63

Response
CI54

Spectrum

SY

-1

Spectrum

SZ

-0.3

Linear Static

DEAD

1 Yes

COM+BL

NonLin Modal Hist

BLFW

COM+BL

NonLin Modal Hist

BLSW

COM+BL

NonLin Modal Hist

BLRS

COM+BL

NonLin Modal Hist

BLRW

COM+BL

Linear Static

LIVE

NonLin Modal Hist

-BLFW

1 Yes

COM-BL

NonLin Modal Hist

-BLSW

COM-BL

NonLin Modal Hist

-BLRS

COM-BL

NonLin Modal Hist

-BLRW

Response Combo

COM-BL

1 Yes

Response Combo

COM+BL

Response
CI54
COM+BL

COM-BL

COM+BL-BL

Linear Add

Linear Add

Envelope

COM+BL-BL

97-YCIV-CS-0003.doc

Yes

Yes

Yes

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 45 of 63

5. STRUCTURAL CALCULATIONS.
5.1

Earthquake Computation.

5.1.1 Masses Computation.


Masses on Structure in X, Y, Z direction computed automatically by SAP2000 show in the following
tables.
TABLE: Assembled Joint Masses
Joint

U1

U2

U3

Joint

U1

U2

U3

Text

Ton-s2/m

Ton-s2/m

Ton-s2/m

Text

Ton-s2/m

Ton-s2/m

Ton-s2/m

0.930

0.930

0.930

186

0.089

0.089

0.089

0.900

0.900

0.900

187

0.160

0.160

0.160

0.820

0.820

0.820

188

0.089

0.089

0.089

16

1.060

1.060

1.060

189

0.160

0.160

0.160

17

0.830

0.830

0.830

190

0.160

0.160

0.160

19

0.930

0.930

0.930

191

0.160

0.160

0.160

21

0.900

0.900

0.900

192

0.160

0.160

0.160

23

0.820

0.820

0.820

193

0.160

0.160

0.160

33

1.060

1.060

1.060

194

0.160

0.160

0.160

34

0.830

0.830

0.830

195

0.160

0.160

0.160

41

1.060

1.060

1.060

196

0.160

0.160

0.160

42

0.830

0.830

0.830

197

0.160

0.160

0.160

49

1.060

1.060

1.060

198

0.089

0.089

0.089

50

0.830

0.830

0.830

199

0.089

0.089

0.089

69

0.180

0.180

0.180

200

0.089

0.089

0.089

70

0.092

0.092

0.092

201

0.160

0.160

0.160

71

0.180

0.180

0.180

202

0.089

0.089

0.089

72

0.092

0.092

0.092

203

0.160

0.160

0.160

73

0.180

0.180

0.180

204

0.160

0.160

0.160

74

0.092

0.092

0.092

205

0.160

0.160

0.160

75

0.180

0.180

0.180

206

0.160

0.160

0.160

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 46 of 63

76

0.092

0.092

0.092

207

0.160

0.160

0.160

77

0.180

0.180

0.180

208

0.160

0.160

0.160

78

0.180

0.180

0.180

209

0.160

0.160

0.160

79

0.180

0.180

0.180

210

0.160

0.160

0.160

80

0.180

0.180

0.180

211

0.160

0.160

0.160

81

0.180

0.180

0.180

212

0.089

0.089

0.089

82

0.180

0.180

0.180

213

0.089

0.089

0.089

83

0.180

0.180

0.180

214

0.089

0.089

0.089

84

0.180

0.180

0.180

215

0.160

0.160

0.160

85

0.180

0.180

0.180

216

0.089

0.089

0.089

86

0.180

0.180

0.180

217

0.160

0.160

0.160

87

0.180

0.180

0.180

218

0.160

0.160

0.160

88

0.180

0.180

0.180

219

0.160

0.160

0.160

89

0.180

0.180

0.180

220

0.160

0.160

0.160

90

0.180

0.180

0.180

221

0.160

0.160

0.160

91

0.180

0.180

0.180

222

0.160

0.160

0.160

92

0.180

0.180

0.180

223

0.160

0.160

0.160

93

0.092

0.092

0.092

224

0.160

0.160

0.160

94

0.092

0.092

0.092

225

0.160

0.160

0.160

95

0.092

0.092

0.092

226

0.089

0.089

0.089

96

0.092

0.092

0.092

227

0.089

0.089

0.089

172

0.089

0.089

0.089

228

0.089

0.089

0.089

173

0.160

0.160

0.160

229

0.160

0.160

0.160

174

0.089

0.089

0.089

230

0.089

0.089

0.089

175

0.160

0.160

0.160

231

0.160

0.160

0.160

176

0.160

0.160

0.160

232

0.160

0.160

0.160

177

0.160

0.160

0.160

233

0.160

0.160

0.160

178

0.160

0.160

0.160

234

0.160

0.160

0.160

179

0.160

0.160

0.160

235

0.160

0.160

0.160

180

0.160

0.160

0.160

236

0.160

0.160

0.160

181

0.160

0.160

0.160

237

0.160

0.160

0.160

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 47 of 63

182

0.160

0.160

0.160

238

0.160

0.160

0.160

183

0.160

0.160

0.160

239

0.160

0.160

0.160

184

0.089

0.089

0.089

240

0.089

0.089

0.089

185

0.089

0.089

0.089

241

0.089

0.089

0.089

26.969

26.969

26.969

TOTAL

5.1.2 Minimum Design Base Shear.


Minimum design base shear in a given direction shall be determined by the following formula
Vo = Ad W (see section 4.3)
Vo= 1*0.2177*(26.969*9.81)=57.596 t.
TABLE: Base Reactions
OutputCase

CaseType

Text

Text

StepType GlobalFX GlobalFY GlobalFZ


Text

Ton

Ton

Ton

SX

LinRespSpec Max

89.4634

0.0011

0.0039

SY

LinRespSpec Max

0.0013

79.3989

1.4845

SZ

LinRespSpec Max

0.0034

1.0387

36.2612

SX = 89.463 > 57.596 OK minimum design base shear.


SY = 79.399 > 57.596 OK minimum design base shear.
5.1.3 Total Lateral Drift.
Total lateral drift according to COVENIN 1756-1-2001
The total lateral displacement i at level i will be calculated as:
i = 0.8 R ei
where:

97-YCIV-CS-0003.doc

(10.1)

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

R =

Reduction factor given in Article 6.4.

ei

Page 48 of 63

Lateral displacement of level i calculated for the design forces, assuming that

the structure behaves elastically, including translational and torsional effects at that level, as well
as P- effects.
The drift i, is the difference of the total lateral displacements between two consecutive levels:
i = i - i-1

(10.2)

LIMIT VALUES
The limits given in Table 10.1 shall be checked at each resistance line and at the farmost points of
the rigidity center. The ratio that follows, will not exceed at any level the values given in Table
10.1:

i
( hi h i 1 )
where:
(hi - hi-1) = Separation of two consecutive levels.

97-YCIV-CS-0003.doc

(10.3)

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

TABLE:

Page 49 of 63

Sx Joint Displacements

Joint

OutputCase

CaseType

StepType

Ux

Uy

Text

Text

Text

Text

mm

mm

SX

LinRespSpec

Max

0.0720

0.0110

SX

LinRespSpec

Max

0.0680

0.0130

16

SX

LinRespSpec

Max

0.0680

0.0016

17

SX

LinRespSpec

Max

0.0640

0.0007

19

SX

LinRespSpec

Max

0.0720

0.0110

23

SX

LinRespSpec

Max

0.0680

0.0130

33

SX

LinRespSpec

Max

0.0650

0.0009

34

SX

LinRespSpec

Max

0.0620

0.0002

41

SX

LinRespSpec

Max

0.0650

0.0009

Maximum Displacements X =

0.072 mm

Reduction factor =

i = 0.8 R ei

0.8*0.072*5

0.029

i = i -i-1

0.029-0.00

0.029

Limit Value=

0.029/5000 =

0.000006

( hi h i 1 )

0.000006 << 0.012 (table 10.1 COVENIN 1756-1-20001)

97-YCIV-CS-0003.doc

OK

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 50 of 63

TABLE: Sy Joint Displacements


Joint

OutputCase

CaseType

StepType

Ux

Uy

Text

Text

Text

Text

mm

mm

SY

LinRespSpec Max

0.0664

0.3449

SY

LinRespSpec Max

0.0659

0.3424

16

SY

LinRespSpec Max

0.0889

0.1730

17

SY

LinRespSpec Max

0.0882

0.1725

19

SY

LinRespSpec Max

0.0240

0.4329

23

SY

LinRespSpec Max

0.0238

0.4297

33

SY

LinRespSpec Max

0.0240

0.4329

34

SY

LinRespSpec Max

0.0238

0.4297

41

SY

LinRespSpec Max

0.0664

0.3449

42

SY

LinRespSpec Max

0.0659

0.3424

Max

0.0889

0.4329

Maximum Displacements =
Reduction factor =
i = 0.8 R ei
i = i - i-1

0.4329 mm
5

0.8*0.4329*5

0.1730

0.1730-0.00

0.1730

( hi h i1 )
Limit Value=

0.1730/5000 =

0.000035

0.000035 << 0.012 (table 10.1 COVENIN 1756-1-20001)

97-YCIV-CS-0003.doc

OK

El Palito Refinery Expansion Project

5.2

Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 51 of 63

Blast Resistant Deformation Limits.


Deformation limits for Medium Response Range according to 00-FSTC-SP-0002 specifications.

Shear Wall:
Ductility

=3

Rotation = 1.5
1.5
Deflection < H/50 mm.
H/50=5000/50 = 100 mm.

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 52 of 63

5.2.1 Compute simplification mathematical model for Precast Concrete Wall.

Compute Cracked moment of inertia.


b=

100.00 cm

h=

20.00 cm

r=

3.00 cm

d=h-r=
As=

97-YCIV-CS-0003.doc

in clear cover

17.00
8.47 cm

Vertical bars outside of horizontal bars

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Es=

2038901.90 kg/cm

Ec=

252671.33 kg/cm

Steel modulus
Concrete modulus

gross moment of inertia


Ig=b*h3/12

66666.67 cm4

cracked moment of inertia


n=Es/Ec

8.07

nAs=

68.35
1/2

C={-nAs+[nAs(nAs+2bd)] }/b
Icr=b*C3/12+nAs*(d-C)2

11834.71 cm4

averaged moment of inertia


Ia=(Ig+Icr)/2

39250.69 cm4

Factor=Ia/Ig

0.59

97-YCIV-CS-0003.doc

4.19 cm

Page 53 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

5.2.2 Front Wall.

Joint Displacements (BLFW Case)

97-YCIV-CS-0003.doc

Page 54 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 55 of 63

Yield deflection ye=9.72 mm


Maximum deflection ym = ye = 9.72*3

= 29.16 mm

Support rotation,

= arctan(ym/.5H) = arctan (29.16/2500) = 0.668 < 1.5

OK.

max=100 mm , 9.72<< max OK.


5.2.3 Rear Wall.
Joint Displacements BLRW Case

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 56 of 63

Yield deflection ye=33.86 mm


Maximum deflection ym = ye = 33.86*3 = 101.58 mm
Support rotation,

= arctan(ym/.5H) = arctan (101.58/2500) = 2.327 > 1.5


max=100 mm , 33.86<< max OK.
NOTE: it changes the thickness the wall at 25 cm
Compute Cracked moment of inertia.

97-YCIV-CS-0003.doc

NOT OK.

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

b=

100.00 cm

h=

25.00 cm

r=

3.00 cm

d=h-r=

22.00

As=

19.00 cm

Es=

2038901.90 kg/cm

Ec=

252671.33 kg/cm

in clear cover

3/4"@15cm Vertical bars outside of horizontal bars


Steel modulus
Concrete modulus

gross moment of inertia


Ig=b*h3/12

130208.33 cm4

cracked moment of inertia


n=Es/Ec

8.07

nAs=

153.32

C={-nAs+[nAs(nAs+2bd)]1/2}/b
Icr=b*C3/12+nAs*(d-C)2

Ia=(Ig+Icr)/2

84086.98 cm4

Factor=Ia/Ig

0.65

97-YCIV-CS-0003.doc

6.82 cm
37965.64 cm4

averaged moment of inertia

Page 57 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Joint Displacements BLRW Case

Yield deflection ye=16.21 mm


Maximum deflection ym = ye = 16.21*3 = 48.60 mm

97-YCIV-CS-0003.doc

Page 58 of 63

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 59 of 63

Support rotation,

= arctan(ym/.5H) = arctan (48.60/2500) = 1.11 < 1.5


max=100 mm , 16.21<< max OK.
Deformation Limints for Main Steel Beam:
Medium Response Range.
Ductility

=2

Rotation = 1.5
Deflection < L/50 mm.
L=10000 mm
L/50=10000/50 =

97-YCIV-CS-0003.doc

200 mm.

OK.

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 60 of 63

Yield deflection ye=39.39 mm


Maximum deflection ym = ye = 2*39.39 = 78.78 mm
Support rotation,

= arctan(ym/.5L) = arctan (78.78/5000) = 0.90 < 1.5


max=200 mm , 78.78<< max OK.

97-YCIV-CS-0003.doc

OK.

El Palito Refinery Expansion Project

5.3

Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 61 of 63

Verification steel elements and design concrete elements.

5.3.1 Steel Elements


Automatic verification steel elements by the software SAP2000 in accordance with
AISC-LRFD99

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

Page 62 of 63

5.3.2 Concrete Elements


Automatic design for reinforce concrete elements by the software SAP2000 in accordance with
ACI-2005
Rebar Percentage as show:

97-YCIV-CS-0003.doc

El Palito Refinery Expansion Project


Document Title

SIH-03 Structural Calculation Report

Document No.

97-YCIV-CS-0003

97-YCIV-CS-0003.doc

Page 63 of 63

Anda mungkin juga menyukai