THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
1.

INSTRUMENTATION

1.1

General
The Contractor is to make clear differentiation, from installation
point of view, between the two terms:
Plant Supply:

Which includes a complete system/plant,


around the main equipment, with all
related
accessories,
appurtenances,
control, instrumentation etc. for details
requirements, contractor will relate to item
1.3.2 Installation

Equipment Supply: Which include the main equipment within


the plant.
In this case item 1.3.2 shall be
disregarded.
Note:

All other items are relevant for both type


of supply.

1.1.1

General Requirements

1.1.1.1

The Contractor shall supply all the elements for sensing,


conditioning and transmitting signals from the equipment within
the Scope of Supply, as required, to assure safe, reliable and
economic manual and automatic operation.

1.1.1.2

Instrument Identification Tag Numbers


-

Instrument identification tag numbers will be assigned to all


instruments by the Purchaser. The Contractor shall use the
number when assigned, in all references to the instrument or
devices on drawings, correspondence and in manuals.

If the Contractor chooses to also use its instrument number,


both Contractors and Purchasers numbers shall appear
wherever instrument numbers are shown.

-1-

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
-

1.1.1.3

For field or indoor-mounted instruments: the instrument


identification tag number shall be stamped on a stainless
steel tag and shall be attached to the instrument with rustproof wire.

Nameplate (Manufacturers Marking)


-

The Contractor shall use a nameplate (Manufacturers


marking) in reference to an instrument or a device on
drawings, correspondence and manuals, where applicable.

The nameplate (Manufacturers marking) tag shall include


the following identifying data:
*
*
*
*

manufacturers name,
model number,
serial number;
additional information, such as voltage, frequency, etc.

Construction of nameplate (Manufacturers marking).


For field mounted instruments the Manufacturers Marking
Data shall be stamped on a tag fastened permanently to the
instrument. Adhesive fastening is not acceptable.

1.1.2

Control and Instrumentation Documentation

1.1.2.1

The Contractor shall submit the following documents (language


of documentation and drawings shall be English).

1.1.2.1.1

General Arrangement and/or assembly dwg. and/or layout dwg.,


and/or Isometric Piping dwg. and/or Equipment Cross Section
and/or Instrument Location dwg.

1.1.2.1.2

Instrument List

1.1.2.1.3

Instrument Data Sheets

1.1.2.1.4

Part List and Connection List

1.1.2.1.5

Installation Detail Diagram (Hook-ups)

-2-

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
1.1.2.1.6

P&I Diagram

1.1.2.1.7

Other Technical Documentation

1.1.2.2

For the Detailed Requirements of the above drawings, see


annexure "JA" for "ESSENTIAL DOCUMENTION FOR
PROPOSAL AND "JB" for TECHNICAL DOCUMENTATION
SUBMISSION SCHEDULE"

1.1.3

Packing and Shipping


(For instruments which are supplied loose).

1.1.3.1

The instruments shall be packed, crated and braced to protect


them from damage in handling, during shipment, and from
inclement weather.

1.1.3.2

The contents, Contract or Bill of Material, Item Number and


Purchaser Order number shall be clearly marked on the exterior
of each packing unit.

1.1.3.3

The Contractor shall furnish the Purchaser with the necessary


storage instructions required to maintain the original condition of
the instruments before installation and until the equipment is
placed in service.

1.1.3.4

All process and electrical connections shall be plugged in to


prevent water/dust infiltration. Plastic plugs/caps are acceptable.

1.1.3.5

All components or accessories shipped detached for field


mounting or field assembly shall be suitably tagged to show
identification and service. Tags shall be exceptionally durable
and securely tied to items.

1.1.3.6

The Contractor shall submit, prior to erection, a detailed


tabulation of all field mounted items, with at least the following
information:
-

Purchasers Tag Numbers.


Item number, consistent with Contractors Bill of Materials.
Contractor's shop order number (if any).
Number of items.
Manufacturer and/or Contractor, if other than Contractor.
-3-

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
-

Type or catalog number, if listed.


Short description including service and on what device it is
mounted.
Date shipped.
Shipping details.

1.1.4

Quality Assurance

1.1.4.1

The Contractor's Quality Assurance Program shall meet the


requirements described in ISO Standard 9001.

1.1.4.2

Certification of Conformance (C.O.C.)


-

The Contractor shall provide a certified Bill of Lading signed


by its Quality Control Department for all supplied
Instrumentation.

The Purchaser shall have the right to audit and comment on


Contractor's Quality Assurance System regardless of
whether it was previously audited by a certifying agency or
any other body.

The Contractor shall submit with his Proposal a copy of his


Quality Assurance Manual including Quality Control
Procedures.

1.2

General Technical Requirements

1.2.1

Instruments

1.2.1.1

Environmental Conditions:
-

All instruments for sensing, conditioning and transmitting,


electrical and pneumatic actuators, including linkages and
solenoid valves, as well as instrument piping (sensing lines,
fittings, valves, supports etc.) shall be suitable to work in a
salt-laden polluted atmosphere when the Fossile or
Combined Cycle Oil Fuel Power Plant is located near the
sea shore, and according to the fuel type, 100% humidity
and at ambient temperatures ranging from 5 to 60 C.

-4-

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
Concerning an inland Power
atmosphere is not relevant.

1.2.1.2

Station,

salt

laden

However, the Contractor shall recognize that extremes of


temperature, moisture, vibration and dust do exist in certain
locations in the plant and the instruments shall be designed
for these conditions according to NEMA 4X Standard or IP66
Epoxy coated as approved by Purchaser.
All field instruments shall be of heavy duty construction.

Instruments located in hazardous areas shall also have


explosion-proof
protection
according
to
area
classification/NFPA, NEC or other internationally
recognized code, as approved by Purchaser, according to
relevant protection degree standards.

All instruments to withstand electro-magnetic and radio


frequency interference (EMI/RF) according to relevant
updated European or American Standards).

All instruments shall be lightning protected.

Painting
All accessories parts constructed of non-corrosion resistant
materials such as linkages, brackets, racks, supports, etc.
should be provided with a protective epoxy coat to withstand and
operate in an outdoor or indoor atmosphere (whichever applies),
as specified above.

1.2.1.3

Operational Requirements.
-

Shut-down devices shall activate Purchaser's alarm as well


as the indicating lights at the local panel. Shut-down devices
shall have electrically independent contacts.
Wherever possible the Contractor shall provide, as an
option, a remote start-up/shut-down from Purchasers Main
Control Room. Local control in this case can be operated
when permission is given from MCR.

-5-

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
1.2.1.4

1.2.1.5

Calibration Requirement
-

A Certification of Test (C.O.T.) including a Certificate of


Calibration and including the calibration method, date of
calibration, date of next calibration due and traceability to a
nationally or internationally recognized standard shall be
provided for all instruments. All instruments, scales, charts,
gauges, recorders and the like shall have metric graduations
(kg/cm2, C, mmWC, etc.).

Where applicable, instrument calibration shall be specific to


50 Hz. The use of correction curves from 60 Hz to 50 Hz is
not acceptable.

Required Manufacturers
-

All Instruments that are herein specified in


regard to Manufacturer and model or type
shall be considered the Standard of Supply
throughout
the
Power
Station
for
standardization purposes and according to
I.E.C.s
"List
of
already
approved
instruments Manufacturer's" No. XXO/M3006-CK0002-00 last updated revision.
See Appendices "Supplements B".

However, the Purchaser reserves the right to approve or


reject the manufacturer, as well as the model number or type
selected by the Contractor from the above list and the latter
shall abide by it.

Contractor will be responsible for his Subcontractors, in


regards to the above requirements.

1.2.1.6

Other Technical Requirements

1.2.1.6.1

Electrical Signals and Supply

-6-

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
Signal:
-

The Contractor shall provide electrically


independent dry Contact to indicate alarm
for all significant parameters of the process.
A list of these signals shall be submitted to
the Purchaser for review and approval.

All analog signals from pressure sensors and other


instruments (if applicable) shall have 4-20mA DC current
signal from a two-wire system. Other signals and output
ranges are not acceptable (except thermocouples, which
shall have millivolt signals and ohms in case of RTD).

Field Bus is acceptable only for the auxiliary system (not the
major system) and based on Purchaser's approval).

Power Supply:
-

Electrical power supply shall be according to elec.std.spec.


EPD-A.19

Electrical Connection:
-

1.2.1.6.2

Electrical connection shall be made on terminal blocks


conveniently located for external wiring.

Pneumatic Signal and Supply


Supply:
-

The instrument air provided by the Purchaser will be


maximum in the pressure and temperature of 110-125 psig.
The pressure will not be lower than normally 60 psig.

Signal:
-

All pneumatic control signals for modulating control shall


have an operating pressure of 3-15 or 6-30 psig.

-7-

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
-

The Instrument air quality will be according to ISA Standard


ANSI MC11.1-1975-ISA S7.3.

However, the power plant operates at an instrument air


supply minimum available pressure of 60 psig, therefore the
actuators required pressure shall not exceed 45-60 psig.
Any exception or additional equipment proposed by the
Contractor to fulfill I.E.C.s minimum available pressure shall
be subject to I.E.C.s approval.

1.2.2

Installation

1.2.2.1

All sensors, instruments and root valves shall be accessed


easily for maintenance personnel, taking into consideration
physical limitations, such as: process piping, equipment, cable
trays, columns, beams, etc.

1.2.2.2

Primary Points and Root Valve Requirements

1.2.2.3

The primary measuring point shall preferably be on the pipes


and not on the equipment itself.

Primary points provided by Contractor for pressure, level and


flow measurements shall be equipped with root valves,
except on air ducts.
Root valve size shall be the same as the Boss size (see
Table A in Item 1.2.2.7.
The Contractor will use the same Table when selecting
bosses for temperature measurement.

Any redundant measurement should be taken from a


separate primary point.

The Contractor shall permit the Purchaser to mount loose


instruments, supplied with the equipment, on Purchasers local
panels located at a distance not greater than 15 meters from the
measuring point. Mounting and installation accessories, except
manifolds, will be provided by the Purchaser according to
I.E.C.s Standards, except for manifolds which will be provided
by Contractor as an integral part of the instruments and
according to the requirements detailed in item 1.2.2.4.

-8-

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
The Purchaser will ensure the competent installation according
to a high quality practice and with professional engineering.
1.2.2.4

In cases where instruments are mounted by the Contractor on


the equipment, the Contractor shall meet with the following
minimal requirements:

1.2.2.4.1

The Contractor shall use the best technical means and


engineering skills to install all field instruments to assure a safe
and reliable operation of the equipment with the best overall
performance.

1.2.2.4.2

Field instruments and/or air consumers, shall be mounted on


local instrument panels equipped with doors and windows where
necessary and/or enclosure box for protection purposes. Panels
and enclosure box shall contain as many instruments as
possible without affecting their easy operation and maintenance.

1.2.2.4.3

The Contractor shall supply manifold valves for each pressure


and differential pressure instruments.
For pressure transmitters the manifold should be of a direct type.
For pressure measurement a two-valve manifold (shut-off and
test) and for differential pressure measurement a five-valve
manifold (two shut-off, two test and one equalizer) are required.
For sea-water the manifolds shall be assembled with separate
ball valves. All manifolds should be equipped with 1/2 N.P.T.F.
process connections. All manifolds should have mounting hols.

1.2.2.5

1.2.2.6

Flange type("T" or "H" types) are not acceptable.


When instruments for level measurement, control and alarms
are required, the Contractor shall provide nozzles for water
column (for sizes see Table A in item 1.2.2.7) to enable
Purchaser to install all the above instruments.
All instruments provided loose (separate from the equipment)
shall be with a process connection according to Table B in item
1.2.2.8.
In cases of temperature measurement (especially in process
lines with small diameters) Contractor shall ensure the following:

-9-

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
-

When a thermowell with thermocouple or RTD is used, its tip


shall be mounted approximately 1/2 below the center line of
the process pipe.

When a thermowell, with a thermo-indicator is used, its tip


shall be mounted approximately 1/2 below the center line of
the process pipe and at least 2 1/2 of stem length should be
immersed in the process line.

- 10 -

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
1.2.2.7
FLUID
C
O
M
P
R
E
S
S
E
D

W
A ... A
I
R T

Boss Sizes for Primary Points - Table A (wherever applicable)


MEASURED
VARIABLE
PRESS.
TEMP.
FLOW

&. E
LEVEL
R
PRESS.
S
T
E
A
M

TEMP.
FLOW

LEVEL

PRESS.
O

TEMP.

FLOW

MAJOR SYSTEMS (*)

OTHER

SYSTEMS

1 SW

SW
1 NPTF
3/4"
NPTF FOR TEMP. SWITCH
1/2" NPTF FOR ORIFICE PLATE
3/4" SW FOR FLOW NOZZLE ON PIPES WITH 8" NPS & SMALLER
1" SW FOR FLOW NOZZLE ON PIPES WITH 8" NPS & GREATER
3/4" SW. FOR LEVEL GLASS
1"
SW. FOR LEVEL SWITCH
2"
SW. FOR LEVEL CONTROLLER
4"
FLG. FOR ULTRA SONIC
1" SW
3/4" SW
1 1/4" NPTF
3/4" NPTF FOR TEMP. SWITCH
1/2" NPTF FOR ORIFICE PLATE
3/4" SW FOR FLOW NOZZLE ON PIPES WITH 8" NPS & GREATER
1" SW FOR FLOW NOZZLE ON PIPES WITH 8" NPS & GREATER
3/4" SW FOR LEVEL SWITCH
1" SW FOR LEVEL SWITCH
2" SW FOR LEVEL CONTROLLER
4" BW FOR WATER COLUMN (STAND PIPE)

1 NPTF
" NPTF FOR TEMP. SWITCH
NPTF FOR ORIFICE PLATE
3/4" SW FOR FLOW NOZZLE ON
PIPES WITH 8" NPS & SMALLER

LEVEL
F
L
U
E
G
A
S
&

C
0
M
B
U
S
T
I
O
N

PRESS.

A
I
R

TEMP.
FLOW

DUCT
BOILER
WALL
MILL
DUCT
MILL
DUCT

1 SW FOR FLOW NOZZLE ON PIPES


WITH 8 NPS & GREATER
SW FOR LEVEL GLASS
1 SW FOR LEVEL SWITCH
2 SW FOR LEVEL CONTROLLER
2 NPTF
2 NPTF
1" NPTF
2 NPTF
1 NPTF
2 NPTF

(*) Major Systems are: MS, FW, CD, CR, HR, ME, LE, HE.

- 11 -

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
1.2.2.8

Required Instruments Process Connections - Table B (wherever


applicable) (cont.)
INSTRUMENT TYPE

INDICATOR

INDICATOR W/DIAPHRAGM SEAL

INDICATOR W/MANIFOLD

SWITCH

SWITCH W/DIAPHRAGM SEAL

SWITCH W/MANIFOLD

TRANSMITTER

TRANS. W/DIAPHRAGM SEAL

TRANS. W/MANIFOLD

CONTROLLER

CONTROLLER WITH DIAPHRAGM SEAL


CONTROLLER W/MANIFOLD

N.P.T.M.
N.P.T.M.
N.P.T.F.
N.P.T.F.
N.P.T.F.
N.P.T.F.
N.P.T.F.
N.P.T.M.
N.P.T.F.
N.P.T.M.
N.P.T.M.
N.P.T.F.

P
R
E
S
S
U
R
E

INDICATOR
INDICATOR W/DIAPHRAGM SEAL
INDICATOR W/MANIFOLD
SWITCH
SWITCH W/DIAPHRAGM SEAL
SWITCH W/MANIFOLD
TRANSMITTER
TRANS. W/DIAPHRAGM SEAL
TRANS. W/MANIFOLD
CONTROLLER
CONTROLLER W/DIAPHRAGM SEAL
CONTROLLER W/MANIFOLO

N.P.T.M.
N.P.T.M.
N.P.T.F.
N.P.T.F.
N.P.T.F.
N.P.T.F.
N.P.T.F.
N.P.T.M
N.P.T.F.
N.P.T.M
N.P.T.M.
N.P.T.F.

L
E
V
E
L

INDICATOR
SWITCH (EXTERNAL CAGE)
TRANSMITTER(EXTERNAL DISPLACER)
TRANSMITTER (D/P CELL)
TRANS. W/MANIFOLD
ULTRA SONIC

1
2

FLG. R.F
FLG. R.F
FLG. R.F
N.P.T.F.
N.P.T.F.
FLG. R.F

INDICATOR

N.P.T.M.

SWITCH

N.P.T.F.

ELEMENT (THERMOCOUPLE)

N.P.T.M.

INDICATOR (THERMAL)

N.P.T.M

SWITCH (THERMAL)

N.P.T.M

P
R
E
S
S
U
R
E

D
I
F
F
E
R
E
N
T
I
A
L

CONNECTION SIZE

T
E
M
P
E
R
A
T
U
R
E
F
L
O
W

- 12 -

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
1.3

Specific Technical Requirement

1.3.1

Instruments

1.3.1.1

For specific Technical Requirements Contractor shall receive,


after Contract Award, partly filled in data sheets based on ISA
standard.
These will be "SUPPLEMENT A" of the contract and will include
minimal requirements for all field instruments, which will be
mandatory for contractor.
Contractor to fill in all remaining fields and return to purchaser
for final approval.

1.3.1.2

Switches

1.3.1.3

All level, pressure, temperature, flow, limit and other


switches shall have DPDT double pole, double throw dry
contacts. Each pole shall be electrically independent and
ungrounded. These switches shall have a narrow dead
band.

Electrical rating shall be according to elec. Std. spec. EPDA.20


Mercury switches are not acceptable.

Micro switches are not acceptable.

Temperature
All temperature instruments shall be equipped with thermowells,
except for thermocouples mounted on bearing assemblies. All
screwed thermowells shall be welded to the equipment/piping
with sealing weld. For local temperature measurements bimetal
thermometers or inert gas bulb types must be used. Glass
thermometers are not acceptable.
Temperature indicators with temperature switch on one
enclosure are not acceptable.
Thermocouples shall be dual element dual element type "E".
The thermocouples (RTD'S) shall be dual element, PT-100
type.

- 13 -

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
1.3.1.4

Pressure
-

Local Indicator shall be equipped with pulsation dampners


and/or liquid filled to withstand pulsations on process, if
required according to process conditions.

Pressure and Differential Pressure Transmitter shall be


suitable for direct manifold mounting.

Pressure Indicators with pressure switch on one enclosure


are not acceptable.

1.3.1.5

Flow

1.3.1.5.1.

a.

An orifice plate type low element shall be of a thin plate,


square edged, paddles type, faced and recessed in
accordance with latest ASME or AGA recommended
practice or equivalent Standard and the Instrument Data
Sheets. Orifice flanges, gaskets and jacking screws shall
be furnished by Contractor, unless stated otherwise on the
instrument Data Sheets. Contractor shall furnish all
necessary data for a proper fit and mounting of orifice
flanges on the pipes.

b.

Flow nozzles shall be in accordance with the instrument


Data Sheets and ASME/ISO Standard (last edition) or
equivalent standards.
Flow elements shall be furnished with accessory items as
required, suitable for pressure and temperature involved.

c.

Flow nozzles, accessories welding adaptors shall be


fabricated and installed by Contractors in the pipe sections
supplied by him. Contractor shall design and machine the
pipe sections. Pipe section weld ends shall fit the main
pipes.

d.

Process shut-off valves and nipples for instrument sensing


lines will be furnished by the main Contractor.

- 14 -

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
e.

1.3.1.5.2

Complete design data shall be furnished by the Contractor


for each flow element. Design data shall be subject to
review by the Purchaser.
Flow measurement by ultrasonic principles is acceptable
only after approval by the purchaser.

1.3.1.6

Actuators

1.3.1.6.1

General
-

1.3.1.6.2

The Contractor shall secure all necessary data (in addition to


that specified) to ensure that the control electrical actuators
and pneumatic actuators furnished by him shall have ample
power to successfully operate the various equipment to be
controlled. Control drive units and actuators shall have
adequate power to accommodate operation resistance due
to dirt, corrosion and wear that may develop due to the
normal environment at the steam generating units.

Pneumatic Actuator
a. All accessories (Electro-pneumatic positioners, controller
converters, filter regulators, limit switches and solenoid
valves) shall be completely piped and mounted on the valve
actuator in the Contractor's shop and shall be properly
adjusted prior to delivery.
b. Every pneumatic control loop shall be equipped with two air
sets, each including a pressure regulator with integral drain
valve and a filter. One air set will be for the instrument air
supply to the controller and the other for the Air Supply to the
positioner.
c. Each pneumatic actuated valve shall be provided with two
(2) limit switches.
d. Diaphragm actuator shall be of the spring return valve type.
Actuator size shall correspond to control air pressure ranges
(3-15 psig, 6-30 psig, based on the moment the actuator
must develop to control/position the valve.

- 15 -

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
e. The Actuator diaphragm area (and spring) shall be sufficient
to close against the maximum differential pressure
encountered in the process when the valve is closed.
f.

Actuator shall be designed for either valve spring opening or


valve spring closing, as specified in Data Sheets. Failure
action shall be based on failure of either the control signal or
the instrument air supply.

g. Piston actuators shall usually be without springs, double


acting type, with the appropriate solenoid valve type.
h. Pneumatic piston actuators for on-off valves shall be of
maintenance-free, non-lubricating type (or with initial
greasing by Manufacturer). If a pneumatic piston actuator
needs lubrication, the lubricator shall be connected to the air
supply with a flexible hose connection made of Teflon tubing,
reinforced by a 316 ST.ST. jacket (braided). All pistons shall
have a protective cover (flexible cover on the piston rod).
I.

1.3.1.6.2.1

Piston actuators shall be designed for maintaining the valve


in its last position on failure either of the control signal or the
instrument air supply.

Positioner/I/P Converter
Actuators shall be equipped with Pneumatic positioners and I/P
converters, unless otherwise specified in the Data Sheets.
a. Pneumatic positioners shall be provided where specifically
called for in the Data Sheets, or where satisfactory operation
of supplier's hardware and/or systems can only be assured
with their use. Contractor shall be responsible for discussing
his design with the Purchaser to obtain the necessary
engineering data for determining the need for ElectroPneumatical positioners.
All the pneumatic positioners shall include a valve position
transmitter, output 4-20 mA, 24VDC power supply, two-wire
type.
b. Positioners shall include I/P converters. Range and zero
adjustment shall be provided.
- 16 -

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
Valve Pneumatic positioners and I/P converters shall be
provided with pressure gauges indicating "supply" (from
pressure regulator), diaphragm pressure and signal output
pressure.
1.3.1.6.2.2

Solenoid Valves
Solenoid coils shall have Class H insulation and power supply
shall be according to elec. Std. spec. EPD-A.19. The solenoid
valves should be able with non-lubricating air(Asco model suffix
"p" or equivalent)

1.3.1.6.2.3

Limit Switches
a. Each pneumatic actuated valve shall be provided with two
limit switches indicating the fully-open and the fully-closed
positions.
b. The housing shall be of cast iron or bronze and the levers
and rollers shall be made of stainless steel.
The external components of the limit switches not
manufactured of corrosion-resistant materials shall be
adequately corrosion-protected.
c. Limit switches shall be mounted in a manner that will not
interfere with the normal operation of the valve. Mounting
shall be of sufficient rigidity to preclude misalignment and
false indication of position due to vibration, etc.

1.3.1.6.2.4

Proximity Switches
Proximity Switches shall be according to valve data sheets and
are acceptable for non-major systems in the power plants (see
Table 1.2.2.7).
a. The proximity switches shall be of cylindrical design,
inductive type, with at least two (2) meter cables, two (2)
wires, sealed on the switch enclosure side.
b. Operating voltage: 180-250V AC/50 Hz or 24-125V-DC.

- 17 -

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
c. Switching mode: Normal open (de-energized).
d. Ambient temperature: +25 C - +80 C.
e. Repeated accuracy: 5%.
1.3.1.7

Electrical Actuator
The Contractor shall furnish complete torque and limit switch
data for electrical actuator valve.
All technical requirements for electrical actuators shall be
according to elec.std. spec.EPD-A.16

1.3.1.8

Hand help"hart" communicator


Instrument provided with hart protocol facility shall include at
least one suitable communicator per each type of instrument to
permit site maintenance of instrument.

1.3.2

Installation (Specific for Plant Supply)

1.3.2.1

The Contractor shall design all the installation from


Instrumentation primary points (take off connection) on process
lines and/or any equipment, to and including all the field
instruments, as well as air consumers, according to I.E.C.s
Installation Standards Document No. XXO/M3-006-CS0300-00,
last updated revision. Those will be Appendices Supplements
C. Dwgs. will be provided after Contract award (Sample No. 1
is attached as a part of Supplement "C").

1.3.2.2

The Contractor shall provide all the material tubing, piping,


fittings, valves, manifold, etc., necessary for installation works,
according to I.E.C.s installation standards mentioned below and
according to document XX0/M3-006-CS0002-00 last and
updated revision Instrumentation Piping Code.
Those will be appendices Supplements D. Dwgs. will be
provided after Contract award. (Sample No. 2 is attached as a
part of Supplement "D").

1.3.2.3

All local panels and/or enclosures will be provided by the


Purchaser to the Power Station site. Catalogs and/or drawings

- 18 -

THE ISRAEL ELECTRIC CORPORATION LTD.

SUPPLEMENT #15

Engineering Division
which describe configuration, dimensions, etc., will be given to
the Contractor by the Purchaser.
Quantities of the above will be the Contractors responsibility,
taking into consideration at least a three-month supply time.

- 19 -