Page 1 of 5
WORK INSTRUCTION
C1-7002
Revision no.
Prepared by
Reviewed by
Approved by
Revision : 00
Date :
Effective date
Issue no.
DCC
Signature
Name Surname
Date
Guruh Iriyanto
08/05/2015
Steam Turbine
Emergency Shut Down Procedure
Page 2 of 5
REVISION HISTORY
Rev.
Effective date
00
Description of Revision
Prepared
Reviewed
Approved
Initial Issue
ENGLISH
BAHASA INDONESIA
1. UNIT
1. UNIT
Utility
Utility
2. SYSTEM
Turbine
Revision : 00
Date :
2. SISTIM
Turbin
Steam Turbine
Emergency Shut Down Procedure
Page 3 of 5
3. SAFETY
3. KESELAMATAN
PPE
disarankan
Preparation
Persiapan
Emergency shutdown
sesegera mungkin
ENGLISH
BAHASA INDONESIA
main
steams
Stop
Valve
immediately
Revision : 00
Date :
local
2. Pastikan Main Stop Valve tertutup dengan
(AC Pump) or
segera
3. Pastikan semua check valve steam extraction
Steam Turbine
Emergency Shut Down Procedure
Page 4 of 5
Emergency G1-7010
harus tertutup
4. Auxiliary Oil Pump G1-7009 (AC Pump) atau
7002
3. Turbin C1-7002 mengalami water hammer atau
temperature turun drastis tiba-tiba hingga 50C
4. Turbin C1-7002
dengan
normal
proteksi
system
bermasalah
5. Terjadi kebocoran pada line main steam atau
5. Leaking from main steams line or oil system
pun oli
6. Terjadinya abnormality pada equipment yang
Revision : 00
Date :
Steam Turbine
Emergency Shut Down Procedure
Page 5 of 5
Revision : 00
Date :