and
in
the
past
have
undertaken
numerous
civil
Page 1 of 86
Conceptual studies
Project commissioning
The firm is confident to provide the above mentioned services to the best
satisfaction of the clients, as and when required.
SHAKEEL AHMAD
CEO
Page 2 of 86
Nature of Business
Contact Us
Consultants
Architects
Qadri Associates
Asadullah Varzgani & Associates
Interior Designers
Escale Associates
Mr. Anjum Ahmad
Legal Advisors
Sardar Ahmad Haleemi
Afzal Hashmi & Company (Income Tax Lawyers)
Bankers
Habib Bank Limited
Bank Al-Habib Limited
Page 3 of 86
3325460-5
PEC LICENSE
00999 (C-1)
Page 4 of 86
Page 5 of 86
Page 6 of 86
Page 7 of 86
Page 8 of 86
Organizational Hierarchy
Managing Director/CEO
Board of
Directors
GM Opeartions
GM Finance
GM Admin
Team Leader
Manager Finance
Manager Admin
PM
Finance Staff
CM
CM
Site Supervisor
Site Supervisor
Labour
Admin Staff
Labour
Page 9 of 86
Affidavits
AFFIDAVIT
We ICON Builders (Private) Limited do hereby solemnly state as under:1- THAT the company main office situated at: - H.No. 8, Main Ibn-e-Sina
Road, G 10/3, Islamabad.
2- That our firms has never been black listed by any procuring Agency,
Government or Sami Government Departments, Autonomous Bodies,
International organization in or out side Pakistan.
3- That the documents/information presented in this documents is true and
correct to the best of our knowledge and belief and nothing has been
concealed.
Islamabad
SHAKEEL AHMAD
CEO
Page 10 of 86
Operational Capabilities
List of Staff
MANAGMENT STAFF
#
NAME
1
2
3
4
Shakeel Ahmad
Saqib Naseem
Abdul Ghafoor Chisti
Raja Abid
QUALIFICATION
M.A, L.L.B
M.B.A
M.B.A.
M. A.
DESIGNATION
CEO
Director
Manager Finance
Manager Admin.
EXPERIENCE
18
16
03
06
Years
Years
Years
Years
PROFESSIONAL ENGINEERS
#
1
2
3
4
NAME
Eng.Akhtar Hussain
Chaudry
Eng. Jawaid Khan
Eng. Hamid Iqbal
Ar. Baz Muhammad
QUALIFICATION
DESIGNATION
EXPERIENCE
Civil/00689
Project Manager
18 Years
Civil/00689
Civil -18458
A-04277
Project Manager
Project Manager
Architect Engineer
16 Years
16 Years
03 Years
NAME
Nasir Mahmood
Sandhu
3
4
5
6
7
8
Irshad Rabbani
Rehman Ullah
Faisal Khan
Sadam Hussain
Ibrar Khan
Haider Shah
QUALIFICATION
Associate
Engineer
Associate
Engineer
Associate
Engineer
Associate
Engineer
Associate
Engineer
Associate
Engineer
Associate
Engineer
Associate
Engineer
DESIGNATION
Construction Manager
Project Incharge
Project Incharge
Project Incharge
Site Incharge
Site Incharge
Site Incharge
Supervisor
EXPERIENCE
33 Years
15 Years
07 Years
08 Years
03 Years
04 Years
05 Years
04 Years
Page 11 of 86
List of Equipment
EQUIPMENTS, PLANTS, TOOLS & ACCESSORIES
MAJOR EQUIPMENT LIST
#
1
2
3
TYPE
Dozer
Excavator/Bac
khoe
Hydraulic
Excavator
QTY
MAKE
YEAR
CAPACITY
CAT
1988
D-8
Kato
1987
.75 M
Hitachi &
Caterpillar
1987
.75 M
Dump Trucks
Hino
1984
12 Ton.
Loader
Caterpillar
1986
3 M
China
Shahzor
1980-90
10-15 Ton
Road Roller
Grader
Caterpillar
1987-88
230 HP
Sheep Foot
Roller
China/Pak
1986
1-3 Ton
Transit Mixer
Japan/China
1999
3M
10
Transit Mixer
Japan/China
1999
5M
11
Concrete
Pump
China
1987
5M/hrs
12
Batching Plant
China
2001
3M/hrs
13
Water Tanker
Japan
1882
30000/Gln
14
Water Tanker
Japan
1882
15000/Gln
15
Tractors
10
Diff.
1988-92
16
Cars
Toyota
1983-95
17
Jeep
Land Cruisers
1984-94
5M
1300-2600
cc
1000-2500
cc
REMARKS
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
Working
Page 12 of 86
Description
Unit
Quantity
Remarks / Make /
Ownership Status
Scaffolding Pipes
Rft
100,000
Good/Own
Rft
55,000
Good/Own
Concrete Mixers
No
Good/Own
Concrete Vibrators
No
10
Good/Own
No
10
Good/Own
No
Good/Own
No
Good/Own
No
Good/Own
No
Good/Own
10
No
Good/Own
11
Laboratory Equipments
No
1 Set
Good/Own
Balance
No
Good/Own
Set of sleeves
No
1 Set
Good/Own
Mechanical Shaker
No
Good/Own
Electric Oven
No
Good/Own
No
Good/Own
No
Good/Own
E
12
13
Water Pumps
No
Good/Own
14
No
Good/Own
15
No
Good/Own
Page 13 of 86
MAJOR ACCESSORIES
No.
Description
Unit
Quantity
Remarks / Make /
Ownership Status
Welding plant
No.
Good/Own
No.
Good/Own
Electric Cutter
No
Good/Own
Earth Tester
No
Good/Own
H.T Gloves
Pair
Good/Own
Safety belt
No
Good/Own
Tong tester
No
Good/Own
No
Good/Own
No
Good/Own
10
Tripod
No
Good/Own
11
Pipe cutter
No
Good/Own
12
No
Good/Own
13
No
Good/Own
14
L key set
No
2 Set
Good/Own
15
No
18
Good/Own
16
Screw wrench up 30
No
18
Good/Own
17
D-Spanner set
No
2 Set
Good/Own
18
Pliers/Nose pliers
No
12
Good/Own
19
Chisel
No
12
Good/Own
20
Hammer
No
10
Good/Own
21
Grease Gun
No
Good/Own
22
Ring Spanner
No
1-Set
Good/Own
Page 14 of 86
Financials
Attached:NTN Certificate
Bankers Certificates
Last 3 years Financial Statements
Last 6 Months Bank Statement
Page 15 of 86
Page 16 of 86
Page 17 of 86
Page 18 of 86
Page 19 of 86
Page 20 of 86
Page 21 of 86
Page 22 of 86
Page 23 of 86
Page 24 of 86
Page 25 of 86
Page 26 of 86
Page 27 of 86
Page 28 of 86
Page 29 of 86
Page 30 of 86
Page 31 of 86
Page 32 of 86
Page 33 of 86
Page 34 of 86
Page 35 of 86
Page 36 of 86
Page 37 of 86
Page 38 of 86
Page 39 of 86
Page 40 of 86
Page 41 of 86
Page 42 of 86
Page 43 of 86
Page 44 of 86
Page 45 of 86
Page 46 of 86
Page 47 of 86
Page 48 of 86
Page 49 of 86
Page 50 of 86
Page 51 of 86
Page 52 of 86
Page 53 of 86
Page 54 of 86
Page 55 of 86
Page 56 of 86
Page 57 of 86
Page 58 of 86
Page 59 of 86
Page 60 of 86
Page 61 of 86
Page 62 of 86
Page 63 of 86
Page 64 of 86
Page 65 of 86
Page 66 of 86
Page 67 of 86
Page 68 of 86
Page 69 of 86
Page 70 of 86
Page 71 of 86
Page 72 of 86
Past Performance
Major Works in Past
#
Project
Location
Employer
Cost
Date
Start
Remarks
Compl.
1 Development of
infrastructure
Water supply,
Sewerage & Allied
works canal view
Housing Society,
Gujranwala
2
3
Page 73 of 86
10
11
12
13
14
Rawalpindi.
Rawalpindi
Rawalpindi
Environmental
improvement project
contact package
No.REIP/NCB/SD/SW
/-078- Laying of
secondary and
Lateral sewer in
eastern part of
muree road
Construction of
Islamabad
petroleum house
Sector G-5
Islamabad
Construction of allied Islamabad
work of flyover as a
part of work
construction of
flyover & Faisal
Avenue & Jinnah
Avinua, Islamabad
Construction of 7th
Islamabad
Avenue underpass,
blue area Islamabad
award of sub contract
work for road work of
main 7th avenue
Construction of water Karachi
supply to baba bhit
island and salehabad
in Monora
ICB contract No. 7-IIISwabi PKP
widening and
improvement of
Kunda more-swabi
section of jhagireswabi Road
PAF Intermediate
ISB
college Islamabad
15 Construction of
practicing Hall (300
Seats) at P,S,B, Isb
ISB
Project
19468501
Management
UNIT
Rawalpindi
May 2008
Sewerage work
July 2010
Building of
petroleum house
CDA
157.42
million
Nov 2008
Allied work of
under pass
CDA
1277545
Dec 2006
Allied work of
under pass
Jan 2008
Karachi water
and sewerage
Board
Frontier
Highway
Authority
Jan 2010
Road work of
main Peshawar
road
370791532
16 Construction of
ISB
Beahria college at E-8
Islamabad
17 Construction of
Memorial Christian
Hospital Sialkot
Mr. ERIC
59.50
Pulliam
Million
Administrative
Paris Road
Sialkot
Sialkot
Basement +2
Floor college
Building incl.
Electrical and
Mechanical
May 1994 Mar 1995 Main Hall +2
Floor Service
Building incl.
Electrical and
Technical Works.
Sep 2000 Dec. 2001 2nd Floor college
building incl.
Electrical and
Mechanical
Works.
1991
1995
4 Story Hospital
building incl.
central air
Conditioning
Electrical works
External services
water supply &
Page 74 of 86
18 Construction of
Federal Science
college for Boys
Gujranwala
Gujranwala Wapda
secretary
19 Construction of
Rahimyar
Hockey Stadium
khan
compound wall
sadiqabad Rahimyar
khan
PBS
Islamabad
ICI Pakistan
limited
21 Construction of
Government Girls
High school
Muzafrabad
22 Construction of
Arid
Gymnasium &
Agricultural
Development of sport university
Ground (Atheltic
Rawalpindi
cricket, Foot Ball) at
university, RWP
MEFSA
sewage works.
July 2003 April 2005 2 story college
building incl. and
allied works.
Electrical and
Mechanical works
55 Million Sept.
April 2005 Hocky stadium
2004
Foot ball stadium
squash court
Basketball volley
ball and External
Development.
12 Million Nov. 2006 April 2007 Single story High
school building
External
Development
works incl.
Electrical
plumbing Water
supply and
sewage disposal
works
+Boundary wall
41.63
Sept 2006 March 2007 Disaster
Million
prevention High
school Building
External
development
road incl.
Electrical
plumbing water
and sewage
Disposal works+
boundary wall
50.74
Nov. 2007 Jan 2010 Construction of
Million
Gymnasium &
Development of
sport Ground
(Atheltic cricket,
Foot Ball)
including
Electrical &
plumbing works.
500 Million Aug 2001 Aug 20013 Under Ground
55.56
pipe line
Million
32 Million
173859597 9 March
2007
5033050
Million $
14
October
2013
31 October Construction of
2009
four number
Block of
Islamabad
country club at
Muree Express
way Meanga
24 April
Construction &
2014
installation of
modern slaughter
House at
Fatehjang
Page 75 of 86
26 Construction of
Larkana
School and
intermediate college
at Larkana
Shaheed
Zulfikar Ali
Bhutto
340200541 28
June 29
December 2012
2010
Islamabad
Construction of
school and
intermediate
college at
Larkana
Page 76 of 86
Present Engagements
Major Works in Hand
#
Project
Location
Construction
of Embassy
Islamabad
Complex of
Tajikistan
Construction
of 1 X Block
of G + 7 (3
X Bed)(32 X
Lahore
Apartments)
Cantt
, Block No;
52 at
Sector-B
Askari-11
Construction
of 1 X Block
of G + 7 (3
X Bed)(32 X
Lahore
Apartments)
Cantt
, Block No;
53 at
Sector-B
Askari-11
Construction
of 1 X Block
of G + 7 (3
X Bed)(32 X
Islamabad
Apartments)
, Block No;
10 at DHA
Phase-II
Construction
of 1 X Block
of G + 7 (3
X Bed)(32 X
Islamabad
Apartments)
, Block No;
10 at DHA
Phase-II
Employer
Cost
Date
Start
Completion
Remarks
Embassy
of
US 2.6 M
Tajikistan
Aug, 2014
Nov,2015
Excellent
Quality of
Work
Produced,
Building will
be handed
over on Time.
GHQ,
Housing
Dte.
189.962 M
27th Jan,
2015
26th Dec,
2016
Site handed
over
GHQ,
Housing
Dte.
189.962 M
27th Jan,
2015
26th Dec,
2016
Site handed
over
GHQ,
Housing
Dte.
179.331 M
25th April,
2015
30th Oct,
2016
Site handed
over, work
started.
GHQ,
Housing
Dte.
179.331 M
25th April,
2015
30th Oct,
2016
Site handed
over, work
started.
Page 77 of 86
Page 78 of 86
Page 79 of 86
Page 80 of 86
Page 81 of 86
Page 82 of 86
Page 83 of 86
Page 84 of 86
Page 85 of 86
Page 86 of 86