Anda di halaman 1dari 86

Brief Introduction

ICON Builders (Private) Limited has been established in April, 2009 at


Islamabad, Pakistan. Being Successor Company of M/S Gillan Enterprises,
ICON Builders (Private) Limited has the capability to under-take civil
engineering works and accomplishing these with highest degree of
quality. The Managing Director, controlling the firm, is an experienced
person in the field of civil works supervision and execution, the team
working for the firm have substantial experience in their field of
specializations

and

in

the

past

have

undertaken

numerous

civil

engineering projects as member of ICON Builders (Private) Limited.


The Managing Director of the firm has excellent experience in individual
capacity regarding his contribution towards the development projects in
different civil work departments as contractor.
The firm intends to contribute its efforts towards planning, designing and
specially construction of civil engineering projects in various disciplines
with highest standards of QA/QC. Quality Assurance and Quality Control
are extremely important aspects of any engineering or construction
project without which successful completion of the project cant be
imagined. In fact, these two are integral parts of virtually any project one
can think of. Proper implementation of Quality Assurance and Quality
Control not only results in a sound project but also leads to more
economy by means of optimization.
The firm is also associated with the local architects and has necessary
office and field equipments in its custody. The intentions are to provide
appropriate services to the clients in the following disciplines of civil
engineering: -

Page 1 of 86

Conceptual studies

Carry out pre-feasibility and feasibility studies

Conduct land surveys and collection of necessary field data

Plan and design projects in various disciplines

Prepare BOQs and project estimates

Prepare contract agreement and related documents

Manage / organise execution of contracts

Provide construction / maintenance services

Execute construction / maintenance of civil engineering projects

Project commissioning

The firm is confident to provide the above mentioned services to the best
satisfaction of the clients, as and when required.

SHAKEEL AHMAD
CEO

Page 2 of 86

Nature of Business

Civil Engineering Works


Limited Company
Incorporated under SECP,
Pakistan

Contact Us

House No: - 412, Tariq


Heights, Street No-13, F
11/1, Islamabad,
Pakistan.
+92 51 2111 692
+92 51 2111 693
iconisb@gmail.com

Consultants
Architects
Qadri Associates
Asadullah Varzgani & Associates
Interior Designers
Escale Associates
Mr. Anjum Ahmad
Legal Advisors
Sardar Ahmad Haleemi
Afzal Hashmi & Company (Income Tax Lawyers)
Bankers
Habib Bank Limited
Bank Al-Habib Limited

Page 3 of 86

National Tax Number

3325460-5

PEC LICENSE

00999 (C-1)

Enlistment with Different Government/Sami Government/Multinational


Companies/Private Entrepreneurs

Pakistan Engineering Council


Category: - C-1
License No: - 00999
Capital Development Authority
Category: - C-1
Water & Power Development Authority
Category: - C-1

Page 4 of 86

Page 5 of 86

Page 6 of 86

Page 7 of 86

Page 8 of 86

Organizational Hierarchy

Managing Director/CEO

Board of
Directors

GM Opeartions

GM Finance

GM Admin

Team Leader

Manager Finance

Manager Admin

PM

Finance Staff

CM

CM

Site Supervisor

Site Supervisor

Labour

Admin Staff

Labour

Page 9 of 86

Affidavits
AFFIDAVIT
We ICON Builders (Private) Limited do hereby solemnly state as under:1- THAT the company main office situated at: - H.No. 8, Main Ibn-e-Sina
Road, G 10/3, Islamabad.
2- That our firms has never been black listed by any procuring Agency,
Government or Sami Government Departments, Autonomous Bodies,
International organization in or out side Pakistan.
3- That the documents/information presented in this documents is true and
correct to the best of our knowledge and belief and nothing has been
concealed.

Whatever stated above is true and correct to the best of my knowledge


and belief.

Islamabad

SHAKEEL AHMAD
CEO

Page 10 of 86

Operational Capabilities
List of Staff
MANAGMENT STAFF
#

NAME

1
2
3
4

Shakeel Ahmad
Saqib Naseem
Abdul Ghafoor Chisti
Raja Abid

QUALIFICATION
M.A, L.L.B
M.B.A
M.B.A.
M. A.

DESIGNATION
CEO
Director
Manager Finance
Manager Admin.

EXPERIENCE
18
16
03
06

Years
Years
Years
Years

PROFESSIONAL ENGINEERS
#
1
2
3
4

NAME
Eng.Akhtar Hussain
Chaudry
Eng. Jawaid Khan
Eng. Hamid Iqbal
Ar. Baz Muhammad

QUALIFICATION

DESIGNATION

EXPERIENCE

Civil/00689

Project Manager

18 Years

Civil/00689
Civil -18458
A-04277

Project Manager
Project Manager
Architect Engineer

16 Years
16 Years
03 Years

QUALIFIED SUB ENGINEER


#

NAME

Rizwan Daud Rao

Nasir Mahmood
Sandhu

3
4
5
6
7
8

Irshad Rabbani
Rehman Ullah
Faisal Khan
Sadam Hussain
Ibrar Khan
Haider Shah

QUALIFICATION
Associate
Engineer
Associate
Engineer
Associate
Engineer
Associate
Engineer
Associate
Engineer
Associate
Engineer
Associate
Engineer
Associate
Engineer

DESIGNATION
Construction Manager
Project Incharge
Project Incharge
Project Incharge
Site Incharge
Site Incharge
Site Incharge
Supervisor

EXPERIENCE
33 Years
15 Years
07 Years
08 Years
03 Years
04 Years
05 Years
04 Years

Page 11 of 86

List of Equipment
EQUIPMENTS, PLANTS, TOOLS & ACCESSORIES
MAJOR EQUIPMENT LIST
#
1
2
3

TYPE
Dozer
Excavator/Bac
khoe
Hydraulic
Excavator

QTY

MAKE

YEAR

CAPACITY

CAT

1988

D-8

Kato

1987

.75 M

Hitachi &
Caterpillar

1987

.75 M

Dump Trucks

Hino

1984

12 Ton.

Loader

Caterpillar

1986

3 M

China
Shahzor

1980-90

10-15 Ton

Road Roller

Grader

Caterpillar

1987-88

230 HP

Sheep Foot
Roller

China/Pak

1986

1-3 Ton

Transit Mixer

Japan/China

1999

3M

10

Transit Mixer

Japan/China

1999

5M

11

Concrete
Pump

China

1987

5M/hrs

12

Batching Plant

China

2001

3M/hrs

13

Water Tanker

Japan

1882

30000/Gln

14

Water Tanker

Japan

1882

15000/Gln

15

Tractors

10

Diff.

1988-92

16

Cars

Toyota

1983-95

17

Jeep

Land Cruisers

1984-94

5M
1300-2600
cc
1000-2500
cc

REMARKS
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
working.
Good
Working

Page 12 of 86

MAJOR TOOL & PLANTS


No.

Description

Unit

Quantity

Remarks / Make /
Ownership Status

Scaffolding Pipes

Rft

100,000

Good/Own

Formwork / Shuttering Plates

Rft

55,000

Good/Own

Concrete Mixers

No

Good/Own

Concrete Vibrators

No

10

Good/Own

Vibrating plate Compactor

No

10

Good/Own

Lifts for hoisting

No

Good/Own

Steel Bending Machine

No

Good/Own

Steel Cutting / Shearing


Machine

No

Good/Own

Generators (150 KVA)

No

Good/Own

10

Generators (50 KVA)

No

Good/Own

11

Laboratory Equipments

No

1 Set

Good/Own

Balance

No

Good/Own

Set of sleeves

No

1 Set

Good/Own

Mechanical Shaker

No

Good/Own

Electric Oven

No

Good/Own

No

Good/Own

No

Good/Own

E
12

Density Apparatus (Sand


Replacement Method)
Complete Set
Total station / Leveling and
Survey Equipments

13

Water Pumps

No

Good/Own

14

Air Compressor 350 cfm

No

Good/Own

15

Air Compressor 125 cfm

No

Good/Own

Page 13 of 86

MAJOR ACCESSORIES
No.

Description

Unit

Quantity

Remarks / Make /
Ownership Status

Welding plant

No.

Good/Own

Electric Drill Machine

No.

Good/Own

Electric Cutter

No

Good/Own

Earth Tester

No

Good/Own

H.T Gloves

Pair

Good/Own

Safety belt

No

Good/Own

Tong tester

No

Good/Own

Chain Block 3 Ton

No

Good/Own

Chain block 5Ton

No

Good/Own

10

Tripod

No

Good/Own

11

Pipe cutter

No

Good/Own

12

Die for pipe threading

No

Good/Own

13

Thimble punching machine

No

Good/Own

14

L key set

No

2 Set

Good/Own

15

Pipe wrench up to 36 inches

No

18

Good/Own

16

Screw wrench up 30

No

18

Good/Own

17

D-Spanner set

No

2 Set

Good/Own

18

Pliers/Nose pliers

No

12

Good/Own

19

Chisel

No

12

Good/Own

20

Hammer

No

10

Good/Own

21

Grease Gun

No

Good/Own

22

Ring Spanner

No

1-Set

Good/Own

Page 14 of 86

Financials
Attached:NTN Certificate
Bankers Certificates
Last 3 years Financial Statements
Last 6 Months Bank Statement

Page 15 of 86

Page 16 of 86

Page 17 of 86

Page 18 of 86

Page 19 of 86

Page 20 of 86

Page 21 of 86

Page 22 of 86

Page 23 of 86

Page 24 of 86

Page 25 of 86

Page 26 of 86

Page 27 of 86

Page 28 of 86

Page 29 of 86

Page 30 of 86

Page 31 of 86

Page 32 of 86

Page 33 of 86

Page 34 of 86

Page 35 of 86

Page 36 of 86

Page 37 of 86

Page 38 of 86

Page 39 of 86

Page 40 of 86

Page 41 of 86

Page 42 of 86

Page 43 of 86

Page 44 of 86

Page 45 of 86

Page 46 of 86

Page 47 of 86

Page 48 of 86

Page 49 of 86

Page 50 of 86

Page 51 of 86

Page 52 of 86

Page 53 of 86

Page 54 of 86

Page 55 of 86

Page 56 of 86

Page 57 of 86

Page 58 of 86

Page 59 of 86

Page 60 of 86

Page 61 of 86

Page 62 of 86

Page 63 of 86

Page 64 of 86

Page 65 of 86

Page 66 of 86

Page 67 of 86

Page 68 of 86

Page 69 of 86

Page 70 of 86

Page 71 of 86

Page 72 of 86

Past Performance
Major Works in Past
#

Project

Location

Employer

Cost

Date
Start

Remarks

Compl.

1 Development of
infrastructure
Water supply,
Sewerage & Allied
works canal view
Housing Society,
Gujranwala

2
3

Gujranwala AUILA Builders425 million May 2006 Sept. 2007 Development


works consisting
roads Main and
Sub-main water
supply Lines
sewage disposal
septic tank
soakage pits rain
water &
Sewerage
disposal system
Construction of
Sialkot
Punjab
15 million 2000
2001
Bridge work at
Bridge at Sialkot
Government
Sialkot
Guest Houses &
ISB
Islamabad
14.35
April
Aug 2004 2nd Floor 5 star
library Extension at
club.
Million
2002
Guest Rooms
Islamabad club
+Library Incl. E &
Islamabad
M Work
Widening
Gujranwala Pak PWD
95474811
June 2012 Widening of Road
improvement of road
Work
from Eastern by pass
(piplywala)
to Tatly Mali Via
Emanabad in
Gujranwala (NA-98)
PSDP
Widening
Gujranwala Pak PWD
257505583
June 2012 Widening of Road
improvement of road
work
from Gillwala to
Ghumanwala via
Botala Jhanda Singh
and Qila Didar Singh
district Gujranwala
(NA-98)
Construction of
ISB
Pak PWD Govt 99425026
Des 2012 Over head Bridge
Bridge Over river
of Pakistan
on Korang river
Korang to link Main
Road to village
phulgram including
apron/ wingwall/
retaining wall
approach roads in
district Islamabad
sponsored by begum
Akhtar Naseem
Chaudrhary MNA-300
Activation of Existing Rawalpindi RDA
Aug 2009 Water supply
over head reservoir
Rawalpindi
scheme
including
Development
replacement of old
Authority42.1
M.S pipe line in
3 Million

Page 73 of 86

10

11

12

13

14

Rawalpindi.
Rawalpindi
Rawalpindi
Environmental
improvement project
contact package
No.REIP/NCB/SD/SW
/-078- Laying of
secondary and
Lateral sewer in
eastern part of
muree road
Construction of
Islamabad
petroleum house
Sector G-5
Islamabad
Construction of allied Islamabad
work of flyover as a
part of work
construction of
flyover & Faisal
Avenue & Jinnah
Avinua, Islamabad
Construction of 7th
Islamabad
Avenue underpass,
blue area Islamabad
award of sub contract
work for road work of
main 7th avenue
Construction of water Karachi
supply to baba bhit
island and salehabad
in Monora
ICB contract No. 7-IIISwabi PKP
widening and
improvement of
Kunda more-swabi
section of jhagireswabi Road
PAF Intermediate
ISB
college Islamabad

15 Construction of
practicing Hall (300
Seats) at P,S,B, Isb

ISB

Project
19468501
Management
UNIT
Rawalpindi

May 2008

Sewerage work

Pak PWD Govt 1514000


of Pakistan
00

July 2010

Building of
petroleum house

CDA

157.42
million

Nov 2008

Allied work of
under pass

CDA

1277545

Dec 2006

Allied work of
under pass

Karachi water 309791532


and sewerage
Board

Jan 2008

Karachi water
and sewerage
Board

Frontier
Highway
Authority

Jan 2010

Road work of
main Peshawar
road

370791532

PAF Peshawar 56 million


Mr.
Muhammad
Sharif
Principal
Pakistan Sport 14.79
Board
Million
Islamabad

16 Construction of
ISB
Beahria college at E-8
Islamabad

Bahria college 20 Million


Islamabad

17 Construction of
Memorial Christian
Hospital Sialkot

Mr. ERIC
59.50
Pulliam
Million
Administrative
Paris Road
Sialkot

Sialkot

Dec 2001 Dec 2002

Basement +2
Floor college
Building incl.
Electrical and
Mechanical
May 1994 Mar 1995 Main Hall +2
Floor Service
Building incl.
Electrical and
Technical Works.
Sep 2000 Dec. 2001 2nd Floor college
building incl.
Electrical and
Mechanical
Works.
1991
1995
4 Story Hospital
building incl.
central air
Conditioning
Electrical works
External services
water supply &

Page 74 of 86

18 Construction of
Federal Science
college for Boys
Gujranwala

Gujranwala Wapda
secretary

19 Construction of
Rahimyar
Hockey Stadium
khan
compound wall
sadiqabad Rahimyar
khan

PBS
Islamabad

20 Construction of Girl Azad


School Barakot Garhi Kashmir
Bibullah

ICI Pakistan
limited

21 Construction of
Government Girls
High school
Muzafrabad

Muzafrabad JICA Mr.


Makoto
Takahashi

22 Construction of
Arid
Gymnasium &
Agricultural
Development of sport university
Ground (Atheltic
Rawalpindi
cricket, Foot Ball) at
university, RWP

Pir Mehr Ali


Shah ARID
university
Rawalpindi

23 Construction water Abbottabad Tobishima


treatment plant and
corporation
construction of
treatment water
transmission line
24 RCC structure works Muree
Minawa
for four number
construction
blocks of Islamabad
Country club
Apartments
25 Construction &
ISB
installation of Modern
slaughter Housing
Fatehjang Islamabad

MEFSA

sewage works.
July 2003 April 2005 2 story college
building incl. and
allied works.
Electrical and
Mechanical works
55 Million Sept.
April 2005 Hocky stadium
2004
Foot ball stadium
squash court
Basketball volley
ball and External
Development.
12 Million Nov. 2006 April 2007 Single story High
school building
External
Development
works incl.
Electrical
plumbing Water
supply and
sewage disposal
works
+Boundary wall
41.63
Sept 2006 March 2007 Disaster
Million
prevention High
school Building
External
development
road incl.
Electrical
plumbing water
and sewage
Disposal works+
boundary wall
50.74
Nov. 2007 Jan 2010 Construction of
Million
Gymnasium &
Development of
sport Ground
(Atheltic cricket,
Foot Ball)
including
Electrical &
plumbing works.
500 Million Aug 2001 Aug 20013 Under Ground
55.56
pipe line
Million
32 Million

173859597 9 March
2007

5033050
Million $

14
October
2013

31 October Construction of
2009
four number
Block of
Islamabad
country club at
Muree Express
way Meanga
24 April
Construction &
2014
installation of
modern slaughter
House at
Fatehjang

Page 75 of 86

26 Construction of
Larkana
School and
intermediate college
at Larkana

Shaheed
Zulfikar Ali
Bhutto

340200541 28
June 29
December 2012
2010

Islamabad
Construction of
school and
intermediate
college at
Larkana

Page 76 of 86

Present Engagements
Major Works in Hand
#

Project

Location

Construction
of Embassy
Islamabad
Complex of
Tajikistan
Construction
of 1 X Block
of G + 7 (3
X Bed)(32 X
Lahore
Apartments)
Cantt
, Block No;
52 at
Sector-B
Askari-11
Construction
of 1 X Block
of G + 7 (3
X Bed)(32 X
Lahore
Apartments)
Cantt
, Block No;
53 at
Sector-B
Askari-11
Construction
of 1 X Block
of G + 7 (3
X Bed)(32 X
Islamabad
Apartments)
, Block No;
10 at DHA
Phase-II
Construction
of 1 X Block
of G + 7 (3
X Bed)(32 X
Islamabad
Apartments)
, Block No;
10 at DHA
Phase-II

Employer

Cost

Date
Start
Completion

Remarks

Embassy
of
US 2.6 M
Tajikistan

Aug, 2014

Nov,2015

Excellent
Quality of
Work
Produced,
Building will
be handed
over on Time.

GHQ,
Housing
Dte.

189.962 M

27th Jan,
2015

26th Dec,
2016

Site handed
over

GHQ,
Housing
Dte.

189.962 M

27th Jan,
2015

26th Dec,
2016

Site handed
over

GHQ,
Housing
Dte.

179.331 M

25th April,
2015

30th Oct,
2016

Site handed
over, work
started.

GHQ,
Housing
Dte.

179.331 M

25th April,
2015

30th Oct,
2016

Site handed
over, work
started.

Page 77 of 86

Photographic View of Projects

Page 78 of 86

Page 79 of 86

Page 80 of 86

Page 81 of 86

Page 82 of 86

Page 83 of 86

Page 84 of 86

Page 85 of 86

Page 86 of 86

Anda mungkin juga menyukai