Selected Projects Comercial/Mixed-Use Complexes


Pace Circle...................................................................................................................................................................... 1
Shopping Center, Bank Road, Muzaffarabad, AJK.......................................................................................................... 3
Metro Cash and Carry, Islamabad................................................................................................................................... 4
Metro Cash and Carry, Karachi....................................................................................................................................... 6
Metro Cash and Carry, Lahore........................................................................................................................................ 9
Fauji Fertilizer Bin Qasim (FFBQ), Head Office Building, Islamabad............................................................................13
Employee Old Age Benefit Insurance (EOBI) House, Islamabad..................................................................................13
New Auriga Shopping Mall, Lahore............................................................................................................................... 15
K&Ns Headquarter Building, Lahore............................................................................................................................ 17
Park & Ride Parking Plaza, Lahore............................................................................................................................... 18
Shopping Center, Old District Court, Muzaffarabad, AJK..............................................................................................19
Descon Headquarter Building, Lahore.......................................................................................................................... 17
Suzuki Sethi Motors, Lahore......................................................................................................................................... 20
Military Survey Building, Riyadh, KSA........................................................................................................................... 21
Corps of Engineers Quarter, Ibqiq Road, Eastern Province, KSA.................................................................................22
Fauji Fertilizer Company Ltd., Head Office Building, Rawalpindi..................................................................................20
NESPAK House, Islamabad.......................................................................................................................................... 20
Jabal Omar Project, Makkah, Kingdom Saudi Arabia.................................................................................................... 21
Summary of Commercial/Mixed Use Complexes.......................................................................................................... 23

C o n s u l ti n g E n g i n e e r s

Pace Circle
Pace Circle Project, Lahore is a large scale Mixed-Use Development envisaged having a built up area of around
1,800,000 square feet comprising of:

Serviced Apartments Tower (11-Story RCC Building)

Pace Apartments Tower(11-Story RCC Building)

Hyatt Regency Hotel Tower (11-Story RCC Building)

Client

PACE Barka Properties Limited

Professional Staff

No. of Staff

Pace Mall, Fortress Stadium, Lahore


Services

Detailed Design

Design Review

Project Management

Value Engineering

Resident Construction Supervision

Site Location

Near Allama Iqbal International Airport

Staff Months

60

Cost

Rs. 3,000 Million

Value of Services

7.5

[PKR Million]
Start Date

[PKR Million]
August 2006

Completion Date

February 2007

Key Staff

Muhammad Waqas Cheema, Project Manager

Zaki-ud-Din Sheikh, Contract Specialist

Hafiz Rashid Minhas, Resident Engineer

Buildings Mixed-Use: 2 of 25

C o n s u l ti n g E n g i n e e r s

Excavation

Lowering of Pile Steel Reinforcement Cage

Pile Concreting

Ground Excavation

Buildings Mixed-Use: 3 of 25

C o n s u l ti n g E n g i n e e r s

Buildings Mixed-Use: 4 of 25

C o n s u l ti n g E n g i n e e r s

Shopping Center, Bank Road, Muzaffarabad, AJK


This is a 5 storied shopping center with 300 shops and one floor offices with a total built up area of 275,000 square
feet.
Client

China International Water & Electric Corp.

Professional Staff

Kund Airport Road, Near Harri Stop, MZD


Services

Topographic Survey, Geotechnical


Investigation, Master Planning and complete
Design of

Architectural,

Civil/Structural,

MEP Services

No. of Staff

12

Site Location

76 D1, Main Boulevard, Gulberg III, Lahore

Staff Months

60

Cost

1,250

Value of Services

7.5

[PKR Million]
Start Date

[PKR Million]
April 2010

Completion Date

August 2010

Key Staff

Naeem-ur-Rahman Durrani, Team Leader

Zaki-ud-Din Sheikh, Contract Specialist

Muhammad Imran, Structural Engineer

Asad Rehman, Electrical Engineer

Sultan M.K. Durrani, MEP Engineer

Buildings Mixed-Use: 5 of 25

C o n s u l ti n g E n g i n e e r s

Metro Cash and Carry, Islamabad


Whole Sale Store and Infrastructure spread over 50,000 square-yards of land. The Store had a built up area of
130,000 square-feet with a pre-engineered steel roof. The Project was built on fast track with several specialist
Contractors from Europe working round the clock.
Client

Metro Cash & Carry, Pakistan

Professional Staff

Services

Structural

No. of Staff

Geotechnical and Plumbing Design


Review

Project Management

Resident Supervision of works

Site Location

Islamabad

Staff Months

60

Cost

USD 15 Million

Value of Services

10

[PKR Million]
Start Date

[PKR Million]
August 2007

Completion Date

Key Staff

Sultan M.K. Durrani, Project Manager

Muhammad Abrar Malikl, Resident Engineer

Engr. Zaki-ud-Din Sheikh, Contract Specialist

Front View

Purlins Top of Jack Beams

Buildings Mixed-Use: 6 of 25

C o n s u l ti n g E n g i n e e r s

Excavation in progress

Formwork

Project Structure

Buildings Mixed-Use: 7 of 25

C o n s u l ti n g E n g i n e e r s

Metro Cash and Carry, Karachi


Whole Sale Store and Infrastructure spread over 50,000 square-yards of land. The Store had a built up area of
130,000 square-feet with a pre-engineered steel roof. The Project was built on fast track with several specialist
Contractors from Europe working round the clock.
Client

Metro Cash & Carry, Pakistan

Professional Staff

Services

Resident supervision and Quality Control of


works executed round the clock

No. of Staff

10

Site Location

Karachi

Staff Months

80

Cost

USD 15 Million

Value of Services

20

[PKR Million]
Start Date

[PKR Million]
December 2007

Completion Date

May 2009

Key Staff

Sultan M.K. Durrani, Project Manager

Ahmad Dawood Faisal, Resident Engineer

Engr. Zaki-ud-Din Sheikh, Contract Specialist

Front-view of Mezzanine

Boundary Wall Reinforcement

Buildings Mixed-Use: 8 of 25

C o n s u l ti n g E n g i n e e r s

Cutting in Hard Rock Stone Area

Boundary Wall Dressing is complete for Lean

Columns ready for PEB Structure

Concrete in progress for Column Foundation

Excavation in Hard Rock Foundation

Column Foundation ready for Concreting

Buildings Mixed-Use: 9 of 25

C o n s u l ti n g E n g i n e e r s

View from West of Mezzanine

Super Structure Columns have been poured

Backfilling of Parking Area

Plumbing Work in progress

Buildings Mixed-Use: 10 of 25

C o n s u l ti n g E n g i n e e r s

Project Structure

Metro Cash and Carry, Lahore


Whole Sale Store and Infrastructure spread over 50,000 square-yards of land. The Store had a built up area of
130,000 square-feet with a pre-engineered steel roof. The Project was built on fast track with several specialist
Contractors from Europe working round the clock.

Client
Services

Metro Cash & Carry, Pakistan

Design of Architectural

Civil/Structural

Plumbing

Fire Fighting

Security System

Electrical

Heating, Ventilation and Air-Conditioning


(HVAC)

Design Review of PEB Structure

Project Management

Construction Supervision and Quality


Control of Works executed round the
clock

Professional Staff

No. of Staff

10

Site Location

Lahore Airport

Staff Months

60

Cost

USD 15 Million

Value of Services

20

Buildings Mixed-Use: 11 of 25

C o n s u l ti n g E n g i n e e r s

[PKR Million]
[PKR Million]
Start Date

March 2008

Completion Date

January 2009

Key Staff

Sultan M.K. Durrani, Project Manager

Khawaja Sajid Bashir, Resident Engineer

Engr. Zaki-ud-Din Sheikh, Contract Specialist

Buildings Mixed-Use: 12 of 25

C o n s u l ti n g E n g i n e e r s

Excavation in Progress for Main Foundations

Backfilling in progress inside Store Area

Boundary Wall Reinforcement

Pouring of Concrete Wall

Pedestal and Peripheral Wall Reinforcement

Mixing Lean Concrete by Batching Plant

Buildings Mixed-Use: 13 of 25

C o n s u l ti n g E n g i n e e r s

Installation of PEB Structure

Roof Sheeting and PEB Structure

Conduits for Refrigeration

Fiber Flooring in progress

Buildings Mixed-Use: 14 of 25

C o n s u l ti n g E n g i n e e r s

Fiber Flooring in progress

A view of the Aisles

Buildings Mixed-Use: 15 of 25

C o n s u l ti n g E n g i n e e r s

Project Structure

Fauji Fertilizer Bin Qasim (FFBQ), Head Office Building, Islamabad


This is the Corporate Head Quarters of Fauji Fertilizer Bin Qasim Ltd., 12 storied office building (up-to 120 ft. high)
with a gross built up area of 325,000 sq. ft.
Client

Fauji Fertilizer Bin Qasim Ltd.

Professional Staff

73 Harley Street, Rawalapindi


Services

Design Review, Project Management, and


Construction Supervision

No. of Staff

12

Site Location

Islamabad

Staff Months

116

Cost

Rs. 800 Million

Value of Services

Rs. 22.25 Million


(approximate)

[PKR Million]
Start Date

[PKR Million]
October 2011

Completion Date

Key Staff

Naeem-ur-Rahman Durrani, Project Manager

Sheikh Ilyas Ahmad, Structural Engineer

Sultan M.K. Durrani, MEP Engineer

Zaki-ud-Din Sheikh, Contract Specialist


Buildings Mixed-Use: 16 of 25

C o n s u l ti n g E n g i n e e r s

Asad Rehman, Electrical Engineer

Mohsin Ali Syed, Planning Engineer

M. Waqas Cheema, Resident Engineer

Buildings Mixed-Use: 17 of 25

C o n s u l ti n g E n g i n e e r s

Employee Old Age Benefit Institution (EOBI) House, Islamabad


A 12 storied building with a built up area of around 206,000 square feet.
Client

EOBI

Professional Staff

Services

Review of Structural Design

No. of Staff

Site Location

Islamabad

Staff Months

Cost

Rs. 700 Million

Value of Services

[PKR Million]
Start Date

[PKR Million]
July 2007

Completion Date

July 2007

Key Staff
Naeem-ur-Rahman Durrani, Chief Engineer
Muhammad Imran, Senior Structural Engineer

Buildings Mixed-Use: 18 of 25

C o n s u l ti n g E n g i n e e r s

New Auriga Shopping Mall, Lahore


New Auriga Shopping Mall comprises of 9 storied building with a built up area of about 400,000 square feet.

Client
Services

Builders and Developers (Pvt.) Ltd.

Structural

Geotechnical

Plumbing Design

Project Management

Resident Supervision of works

Professional Staff

No. of Staff

Site Location

76 D1, Main Boulevard, Gulberg III, Lahore

Staff Months

180

Cost

Rs. 650 Million

Value of Services

10.8

[PKR Million]
Start Date

[PKR Million]
April 2002

Completion Date

April 2004

Key Staff
Naeem-ur-Rahman Durrani, Project Manager
Muhammad Ashraf, Design Engineer
Shamshad Hussain, Resident Engineer
Muhammad Aslam, Assistant Resident Engineer

Elevation

Atrium

Buildings Mixed-Use: 19 of 25

C o n s u l ti n g E n g i n e e r s

Flat Slab Reinforcement

Shell Slab

Project Structure

Buildings Mixed-Use: 20 of 25

C o n s u l ti n g E n g i n e e r s

K&Ns Headquarter Building, Lahore


This is the Corporate Head Quarters of K & Ns with a Gross Built up area of 110,000 sq. ft. NDA provided Structural
Design Service. The structure comprises of 10 floors above Ground Level (up to 150 ft. high) and 2 car parking
basements. RCC Framing (RCC Columns, flat slabs with drop panels) A Raft Foundation was adopted.

Descon Headquarter Building, Lahore


This is the Corporate Head Quarters of Descon with a Gross Built up area of 140,000 sq. ft. NDA Provided Structural
Design Services. The structure comprises of 9 floors. RCC Framing (RCC Columns, flat slabs with drop panels). A
Raft Foundation was adopted.

K&Ns Headquarter

Descon Headquater

Buildings Mixed-Use: 21 of 25

C o n s u l ti n g E n g i n e e r s

Park & Ride Parking Plaza, Lahore


This is a Car Parking Building, with a total built up area of 15,000 sq. m. NDA Provided Structural Design Services.
The structure comprises of 11 floors (up-to 110 ft. high). RCC Framing (RCC Columns, flat slabs with drop panels)
support the gravity loads while Shear Walls resist Lateral Loads. A Raft Foundation was adopted.
Client

Al Imam Enterprises, Lahore

Professional Staff

No. of Staff

47 L, Model Town, Ext. Lahore


Services

Structural Design

Construction Drawings

Site Location

Liberty, Lahore

Staff Months

12

Cost

Rs. 500 Million

Value of Services

1.6

[PKR Million]
Start Date

[PKR Million]
July 2009

Completion Date

September 2009

Key Staff

Naeem-ur-Rahman Durrani, Chief Engineer

Muhammad Imran, Structural Engineer

Mohsin Ali, Design Engineer

Buildings Mixed-Use: 22 of 25

C o n s u l ti n g E n g i n e e r s

Shopping Center, Old District Court, Muzaffarabad, AJK


This is a shopping center envisaged to have 5 stories with a built up area of around 75,000 square feet.

Client

China International Water & Electric Corp.

Professional Staff

Kund Airport Road, Near Harri Stop, MZD


Services

Complete Design of

Architectural,

Civil/Structural,

MEP Services

No. of Staff

12

Site Location

Muzaffarabad, AJK

Staff Months

20

Cost

Rs. 300 Million

Value of Services

1.5

[PKR Million]
Start Date

[PKR Million]
December 2009

Completion Date

February 2010

Key Staff

Naeem-ur-Rahman Durrani, Team Leader

Zaki-ud-Din Sheikh, Contract Specialist

Muhammad Imran, Structural Engineer

Asad Rehman, Electrical Engineer

Sultan M.K. Durrani, MEP Engineer

Buildings Mixed-Use: 23 of 25

C o n s u l ti n g E n g i n e e r s

Fauji Fertilizer Company Ltd., Head Office Building, Rawalpindi


Client

NESPAK, Islamabad

Professional Staff

No. of Staff

NESPAK House, Sector G, 5/2, Islamabad


Services

Review of Structural Design

Value Engineering

Site Location

Rawalpindi

Staff Months

Start Date

November 2007

Completion Date

November 2007

Key Staff

Naeem-ur-Rahman Durrani, Chief Engineer

Muhammad Imran, Senior Structural Engineer

NESPAK House, Islamabad


Client

NESPAK, Islamabad

Professional Staff

NESPAK House, Sector G, 5/2, Islamabad


Services

Review of Structural Design

No. of Staff

Site Location

Islamabad

Staff Months

Start Date

December 2007

Completion Date

December 2007

Key Staff

Naeem-ur-Rahman Durrani, Chief Engineer

Muhammad Imran, Senior Structural Engineer

Fauji Fertilizer Company Head Office Building

NESPAK House, Islamabad

Buildings Mixed-Use: 24 of 25

C o n s u l ti n g E n g i n e e r s

Suzuki Sethi Motors, Lahore


This is a multi-storied show room with a built up area of 100,000 sq. ft.
Client

Suzuki Motors, Lahore

Professional Staff

Services

Structural Design

No. of Staff

Project Management

Resident Supervision of works

Site Location

Ferozepur Road, Lahore

Staff Months

50

Cost

Rs. 180 Million

Value of Services

2.0

[PKR Million]
Start Date

[PKR Million]
October 2005

Completion Date

October 2006

Key Staff

Muhammad Waqas Cheema, Project Manager

Muhammad Abbas, Resident Engineer

Engr. Zaki-ud-Din Sheikh, Contract Specialist

Jabal Omar Project, Makkah, Kingdom Saudi Arabia


NDA was hired by Bullivant Arabia Ltd. Riyadh, Kingdom Saudi Arabia to conduct Analysis of Slab and supervise the
slab load test.

Buildings Mixed-Use: 25 of 25

C o n s u l ti n g E n g i n e e r s

Military Survey Building, Riyadh, KSA


NDA provided Structural Appraisal Works including Investigation Program, Review of in situ testing, Structural Analysis
of the Building Framing System, Design check of the Structural Members (including Foundations), Prepare structural
appraisal report, and Detailed Design provided for Strengthening Regime.

Corps of Engineers Quarter, Ibqiq Road, Eastern Province, KSA


NDA provided Structural Appraisal Works including Investigation Program, Review of in situ testing, Structural Analysis
of the Building Framing System, Design check of the Structural Members (including Foundations), Prepare structural
appraisal report, and Detailed Design provided for Strengthening Regime.

Buildings Mixed-Use: 26 of 25

C o n s u l ti n g E n g i n e e r s

Summary of Commercial/Mixed Use Complexes

A. Detailed Design

B. Value Engineering

C. Resident Construction Supervision

D. Project Management

E. Design Review

Project

Stories

Built up
Area
[Sq. Ft.]

Services

Project Cost
[Rs. Millions]

A,B,C,D,E

5,000

Under
Construction

1,250

Under
Construction

1.

Pace Circle, Lahore

16

1,500,000

2.

Shopping Center, Bank


Road, Muzaffarabad, AJK

275,000

3.

Metro Cash and Carry,


Islamabad

4.

Metro Cash and Carry,


Karachi

5.

Metro Cash and Carry,


Lahore

6.

Fauji Fertilizer Co.,


Islamabad

12

325,000

7.

My Mall, Bahawalpur

8.

Mall of Multan, Multan

9.

Status

C, D

USD 50M

Complete

C, D

USD 50M

Complete

A, C, D

USD 50M

Complete

B,E

800

Complete

225,000

700

Under
construction

200,000

A, B

700

Under
construction

Employee Old Age Benefit


Insurance (EOBI) House,
Islamabad

12

206,000

700

Complete

10.

New Auriga Shopping

400,000

A, C, D

650

Complete

11.

Naafeh Tower, Gujranwala

10

300,000

600

Under
construction

12.

Madinah Center, Lahore

16

200,000

600

Under
construction

13.

Al-Rehman Plaza, College


Road Sargodha

300,000

550

Complete

14.

Usmania Tower, Lahore

250,000

500

Complete

15.

Lahore Heights, Fatima


Jinnah Road, Lahore

13

290,000

500

Complete

Stores spread over


12.5 acres with PEB
roof

Buildings Mixed-Use: 27 of 25

C o n s u l ti n g E n g i n e e r s

Project

Stories

Built up
Area
[Sq. Ft.]

Services

Project Cost
[Rs. Millions]

Status

16.

K&N Center, Lahore

15

125,000

500

Under
construction

17.

Parking Plaza, Gujranwala

170,000

500

Under
construction

18.

Park & Ride Parking Plaza,


Lahore

11

154,000

500

Complete

19.

Shopping Center, Old


District Court,
Muzaffarabad, AJK

75,000

300

Under
Construction

20.

Pace Shopping Centre,


Model Town Link Road,
Lahore

120,000

250

Complete

21.

Pace Shopping Centre,


Gujranwala

140,000

250

Complete

22.

Pace Shopping Centre


Gujrat

140,000

250

Complete

23.

Fountain Avenue Main


Blvd., Gulberg, Lahore

250

Complete

24.

NHA Head Office Building,


Islamabad

125,000

250

Complete

25.

Descon Headquarter,
Lahore

137,500

237

Complete

26.

Century Tower
Office/Commercial
Building, Kalima Chowk,
Lahore

15

175,000

A,C,D

210

Complete

27.

Office Building, 201 A,


Upper Mall, Lahore

50,000

A, C, D

200

Complete

28.

Suzuki Sethi Motors,


Ferozepur Road, Lahore

100,000

A,C,D

180

Complete

29.

Suzuki Township Motors,


Office/Commercial Building

50,000

A,C,D

80

Complete

30.

Warid Telecom, MSC III


Gujranwala and Karachi

25,000

50

Complete

31.

Al-Rehman Business
Centre, Sargodha

20,000

Complete

32.

Burj Ismail, Sargodha

15,000

Under
Construction

33.

Worker Welfare Fund


Secretariat Building,

75,000

Complete
Buildings Mixed-Use: 28 of 25

C o n s u l ti n g E n g i n e e r s

Project

Stories

Built up
Area
[Sq. Ft.]

Services

Project Cost
[Rs. Millions]

Status

Islamabad
34.

Military Survey Building,


Riyadh, KSA

35.

Corps of Engineers
Quarter, Ibqiq Road,
Eastern Province KSA

Complete

Complete

Buildings Mixed-Use: 29 of 25