Egor Martiniuc
Level 3
Network
development
Evaluation
& expansion
10 % of all
Engineering Time
Troubleshooting
& assurance
Level 2
Troubleshooting
30 % of all
Engineering Time
Level 1
Foundational Audit
60 % of all
Engineering Time
1.
2.
3.
4.
5.
6.
7.
Coverage optimization
Parameter routine audit
Alarm monitoring and resolved
Capacity monitoring and audit
KPI monitoring and report
Neighbor cell/PSC audit & optimization
Interference monitoring and test
Tools
Tool Name
Level
1, 2
1,2,3
Redirect To Table
1,2
Counter View
2,3
1,2
1,2
2.
Inventory Configuration
Export Element BarCodes, System Boards
3.
Report generation
Mismatch configuration find (PCI, TAC, One way HO, Empty HO, Missing HO, Missing X2, Extra X2 )
Integration with MapInfo tool set
Mismatch configuration parameters UMTS Vs LTE
Coming soon:
LTE Template Configuration Check
Description:
Application has several options to update self database. Also use CFGMML from UMTS RNC and inventory Export
from M2000. You can use M2000 connection to have update the system data. Base on this data application
prepared to make reports. Friendly user Interface.
Coming soon:
3G -> 2G Handover Optimization Features.
Description:
Application uses odbc driver for M2000 database direct connection. All necessary counters are
copied to local database for further post processing in order to not load M2000 server. RNC
configuration file (INNERCFGMML) and 3G cells file (GEO data) are imported to local database
through the same application. After all inputs processing the handover report is generated base on
user defined statistic period.
Coming soon:
Automatic batch command generation for new user defined handover relation.
Description :
MapBasic based Application uses Radio Design and BSC/RNC/eNodeB configuration data. Allows
quick troubleshooting of worst KPI cells, Neighbor Relations through friendly user interface
App buttons
Coming soon:
LTE propagation delay
Description :
The application is directly connecting to M2000 server. Get statistic by selected counter and put it
in the chart.
Description :
The Application work with Huawei Files that was Redirected by M2000 from NodeBs, eNodeBs
and parse it to Excel format.
Coming soon:
None
Description:
Application is connecting to M2000 database and copy raw counters data to user defined database
server.
Coming soon:
Completely Board dimensioning
Description:
Application is connecting to M2000 database and copy raw counters and build the reports.
Coming soon:
For LTE
Description :
The application is running on any PC connected to M2000 Server. Periodically it is checking
network element KPIs (30/60 min). In case if KPI exceeds user defined thresholds tool sends alert
message with attached explicit problem report to receivers mail list.
For real time 3G KPI monitoring OSE mainly uses PRS. PRS has a delay of 2 hours in displaying data. In
order to improve team reactivity the mail KPI alerter was implemented.
Main characteristics:
Hard coded KPIs:
UMTS_KPI_3GSuccessRateR99Data_R012
UMTS_KPI_3GSuccessRateHSDPAData_R012
UMTS_KPI_3GSuccessRateHSUPAData_R012
UMTS_KPI_3GSuccessRateSpeech_R012
UMTS_KPI_3GDropRateR99Data_R012
UMTS_KPI_3GDropRateHSDPAData_R012
UMTS_KPI_3GDropRateHSUPAData_R012
UMTS_KPI_3GDropRateSpeech_R012
UMTS_KPI_3G2GHOSUCCRateR99Data_R012
UMTS_KPI_3G2GHOSUCCRateSpeech_R012
Coming soon:
MML Command changes History
Description :
The application is running on any PC connected to RNC. Periodically (user defined) tool gets
Configuration File (INNERCFGMML) and uploads it to local database. User friendly GUI is
displaying time evolution of the selected parameter.
Description :
This is multi-thread application. The application connect to NodeB through telnet protocol and
collects data, from specific command, during the user defined time. After make clearly
understanding report with synchronization problems.
Coming soon:
Extrapolation of capacity expansion
Description :
This is multi-thread application. The application connect to the traffic Node (this case NEC)
through SNMP protocol and collects data, from specific OIDs , during the user defined time. After
make clearly understanding report with problems.