06032
Preface
The design, manufacture and service of this product are based on the following quality
assurance system:
GB/T19001:2000 idt ISO9001:2000 Quality Management System-- Requirements
API Spec Q1 Specification for Quality Programs for the Petroleum and Natural Gas Industry
This manual contains information relating to Top Drive operation, service and maintenance.
The technical information of this product is included respectively in the following documents:
<Operation Manual>
<Electric Manual>
<Hydraulic Manual>
< Installation and Trouble Shooting Manual>
<Maintenance Manual>
<Electric House Manual>
<HSE Manual>
<Data Backup and Recovery Manual>
<Electric Drawing>
<Mechanical Drawing>
<Hydraulic Drawing>
With individualized design provided for the Top Drive based on the service operating
condition and special requirements of the customers, the technical document for this product
may not be suitable for the other products of the same type. Product type and No. shall be
checked when the technical document is used.
For information not covered by the accompanying documents and other problems arising
from the installation, operation and maintenance, contact the manufacturer if necessary:
BPM
Ads:
Postcode:
100083
Tel:
( 010) 62097381
Fax:
( 010) 62097613
E-mail:
Bpm.zhaojing@vip.163.com
-I-
Contents
1.
OVERVIEW...................................................................................................................1
2.
3.
5.
ELECTRIC HOUSE.......................................................................................................7
EQUIPMENT INSTALLATION...................................................................................22
1. Overview
Top Drive Drilling Equipment (hereinafter referred to as Top Drive) is a piece of new oil drill
equipment in place of rotary table. Top Drive is a high-tech product with
mechanical-electrical-hydraulic integration of high level, for which the trouble shooting,
operation and maintenance of the electric system is a very important work.
For Top Drive product of Beijing Petroleum Machinery Factory, the installation, trouble
shooting, operation and maintenance of the electric system and the electric house shall be
performed by competent personnel with certain qualification and sufficient technical
experience. Training the above personnel so that they are qualified is the obligation of the
customers.
The following warning signs are used in this manual:
This sign is used for additional notes for matters relating to
Notes
bodily and equipment safety.
Caution
Warning
2. Safety notes
The following safety notes are vital for the correct installation, operation and maintenance of
Top Drive, which the operating and maintenance people must carefully read and understand:
1) Users shall be aware of regulations for the safe operation of equipment relating to the
electric house.
2) Hot line work is prohibited, including removal of the safety cover for point with high
voltage, repair or removal of any electric components and connection/disconnection of
cable plugs when power is on.
3) Never open the junction box or operator console in a flammable atmosphere when power
is on.
4) Before the operation of Rectifier or the voltage of DC bus drops below the safety limit
DC 24V, never attempt to replace the DC fuse between the DC bus and the Inverter.
Otherwise, it may endanger human bodies and equipment.
5) When repair is necessary for the Rectifier or Inverter or motors, turn rightward (to the
locking position) the key switch on the main air switch 3WLto prevent faulty
operation.
6) The insulation of Inverter and Rectifier cant be checked by megameter, or else the high
test voltage will damage the equipment.
7) Each motor and control box must be correctly connected to the PE bus bar or PE wire.
8) In case of temperature at over 40 and humidity of over 95% or condensation, never start
the drive and other control power before starting the air conditioning for temperature and
humidity reduction.
9) When the system is re-energized after the main power supply shuts down accidentally,
always make sure that there is no condensate in the electric control cabinet.
10) In damp environment, when the temperature in the electric house is lower than that of the
outside environment, leaving the door of the electric house open for a long time is
prohibited. Otherwise, it may lead to condensation on the electric equipment.
11) To lift the electric house, use special lifting sling to lift from the 4 trapezes of the base.
Never lift by using trailing bars or by holding other parts of the house. To replace the
damaged sling, never change the size and length.
12) The distribution for the house shall be provided in strict compliance with the description.
Never increase freely the power of the electric house or change the circuits in the house.
-2-
13) Switch off the power when the electric house is not in use.
14) This manual does not give specific regulations for the repair and rejection of the electric
house, which does not mean that the electric house may be used for unlimited period.
Users and maintenance people shall make appropriate judgment of the electric house in
terms of maintenance, overhaul or rejection.
15) For design improvement and other causes, the products may differ slightly from this
manual. Accompanying structural drawings, circuit diagram and list of components and
devices are provided.
16) In case of strong wind, lightning, rain and snow, stop installation or dismantling
operations.
17) Suitable tools shall be made available. Particularly, note the withstand voltage and
insulating property of the tools and provide suitable protection.
18) Before making sure that all works are completed, switch off the power and attach the sign
of Do Not Switch On.
19) Before dismantling the electric connection, always mark the wires (cables) and terminals
to ensure correct reconnection.
Never connect the power cables before the installation is completed and
the inspection shows conformity to ensure bodily and equipment safety.
-3-
7000 mm2680mm2750mm
600 VAC
445 A 2
770 A 2
35 +55
Elevation:
1200 m
80 kVA
Primary voltage:
600/690VAC
Secondary voltage:
380VAC
YBDB60H/YBOH30E1B2
Cooling capacity:
58 kW
Heating capacity:
62 kW
7.5kW
29.19 kW
28.17 kW
39 A
38 A
22.2 kg
Throttle element:
-4-
Compressor:
gyre type
Number of compressors:
Heat exchanger:
Outdoor fan:
213000m3 / h
Indoor fan:
centrifugal type
12000 m3 / h
-5-
Top Drive
Driller console
Electric house
Generating unit
-6-
HPU
5. Electric house
The electric control system for Top Drive is installed in the electric house, which includes AC
variable frequency drive system and PLC / MCC system. The variable frequency Top Drive
system mainly consists of the master power distributing cabinet, Rectifier cabinet, Inverter
cabinet and braking resistor. The electric house accommodates auxiliary transformer, coil in
box, coil out box, desk and 1 YORK industrial air conditioning at 60 kW.
Coil in box
Desk
Rectifier cabinet
Inverter cabinet
Transformer
Braking resistor
-7-
lighting in the electric house when the power at 600VAC shuts down as well as for the manual
tools during the maintenance period.
Transformer
Plug base
Plug base
Plug base
Indoor lamp
Door lamp
Door lamp
2) Before transportation of the electric house, close the windows and the air conditioning
cover and lock the door and window from inside.
3) During transportation of the electric house, do not place heavy weights in the house. To
fix it to the truck, use the corner parts of the standard container at the base as opposed to
the walls and roof.
4) Avoid contact of the walls, floor, ceiling, furniture and the like in the electric house with
water, oil and other liquids.
5) Never place sundry articles on the roof.
6) Read the operating instruction manual for the maintenance of the articles provided in the
electric house.
- 11 -
6. Air conditioning
6.1. Brief introduction of air conditioning
In the electric house, split air-duct unit from America-based YORK is used, which consists of
indoor unit and outdoor unit.
YBDB indoor unit has a galvanized housing finished with polyester powder, providing good
resistance to corrosion. With a design of frame construction, all panels are removable,
facilitating maintenance. The heat exchanger is based on copper tubes with hydrophilic
aluminum foil-inner thread, enabling high-efficient heat exchange. Thermostatic expansion
valve is used to control the flow of the refrigerant with a large range of regulation and high
accuracy. For the fan motor, belt sheave is used for drive, providing large weight, high
pressure head, robust construction and low noise.
YBOH outdoor unit is based on heat pump unit, of which the galvanized housing is finished
with polyester powder, providing good resistance to corrosion. The heat exchanger is based
on copper tubes with hydrophilic aluminum foil-inner thread, enabling high-efficient heat
exchange. Thermostatic expansion valve is used to control the flow of the refrigerant with a
large range of regulation and high accuracy. Telinai, the YORK proprietary piston
reciprocating compressor is used, providing good power.
The YORK air conditioning has overload protection and time delay protection, the fan has
overload protection and the refrigerant circuit has low/high pressure protection, enabling a
safer operation for the air conditioning system.
Missing phase controller is available on the indoor unit, providing coil in protection for the
fan motor. Before starting the unit, check if phase is missing for the power. The lit indicator
for the missing phase controller means normal condition. If both the red and green indicators
do not light, it means that phase is missing for the input power supply of the air conditioning.
Switch off the power for inspection. In case of missing phase, never start the indoor/outdoor
units or switch off the indoor unit as soon as possible.
- 12 -
6.2.1. Excessively high temperature in the house may lead to unstable operation of the
microcircuits in the electro-control system and system failures. When indoor temperature is
high, close the door and use air conditioning to decrease the temperature.
6.2.2. Excessively high humidity in the house may lead to condensation on the surface of the
devices in the electro-control system, poor insulation and short circuit in the system, and
accidents of equipment.
6.2.3. Excessively low humidity in the house will lead to more serious hazards. Excessively
dry air tends to generate static electricity, which may break down the microelectronic
components and devices and likewise lead to the damage to the devices in the electro-control
system and accidents of equipment.
While the moisture content in the air does not change, lowering the temperature by cooling
will raise the relative humidity in the air, or even up to the saturation of moisture content in
the air with a relative humidity of 100%. Now, the temperature is the dew point temperature.
Namely, lowering the air temperature will lead to increase the relative humidity in house.
Therefore, dehumidification in the electric house is really complex. It is necessary to raise the
temperature in the electric house with the heater in the electric cabinet, the electric heater for
air conditioning and the heating function of the air conditioning to vaporize the water droplets
possibly condensed on the electric components before lowering the temperature through
cooling by the air conditioning and forming condensate with the indoor unit of the air
conditioning for emission. Repeat the cycle several times to reduce the absolute temperature
in the electric house before raising the indoor temperature to 2630, thus achieving a low
relative humidity in the house. The relative humidity in the electric house shall preferably be
maintained at 3055%.
However, when a specific temperature is achieved at the condenser of the air conditioning,
frosting will take place, thus substantially reducing the dehumidifying efficiency of the air
conditioning. If necessary, dehumidifier may be used, which works better.
6.2.4. Dehumidifying modes: dehumidification by cooling, dehumidification by compression
and chemical dehumidification.
Cost-efficient cooling type is dehumidifier.
In case of high humidity, close the house door properly, reduce the number of entry/exit of
people and ensure that the absolute temperature in the house does not rise.
The indoor temperature and humidity are vital to the safe operation of the
electric equipment in the electro-control system of Top Drive.
- 13 -
6.2.5. For the safe operation of the electric equipment in the electro-control system of Top
Drive, strictly follow the requirements below:
1) During the operation of the air conditioning, close all doors of the electric house and
frequent entry/exit house is prohibited.
2) During the operation of the air conditioning, all doors of the compartment for the air
conditioning must be closed and only internal circulation is used to minimize the ingress
of outside air with high humidity.
3) To ensure the normal operation of the electric equipment in the electric house and reduce
condensation, strictly set the air conditioning at 2630.
4) For the Inverter compartment and the indoor unit compartment of the air conditioning, in
case of damage at the sealing strips on the door frames, make prompt replacement and
ensure the tightness of the house.
Close all doors of the Inverter compartment when air conditioning is running.
Entry/exit the house frequently is strictly prohibited.
When air conditioning is running, all doors of the indoor unit compartments
for the air conditioning must be closed and only internal circulation is used to
minimize the ingress of outside air with high humidity.
In order to reduce indoor condensation and make sure the electric equipments
in electric house could run normally, operator should set the indoor
temperature between 26 and 30 strictly.
- 14 -
Fresh air
Aux. Heating
Model
Display
Mode
Clock
Sleep
Reset
Set
Timer
When system is working normally, the screen at left side of middle will indicate return air
temperature or outdoor unit number.
b) or
Under running status (not setting status), pressorcould adjust setting temperature,
namely setting value of return air temperature1630. During adjusting, SETPOINT
will be displayed on screen, and will be disappeared after five seconds.
c) Fresh Air
Switch to on/off of fresh air. (There is no fresh air function under YBDB standard model)
d) Model
PressModelcould modify present model (refers to model input) when air conditioning is
power off.
PressModelcould switch to each units running status when air conditioning is power on.
The screen at right side of middle will indicate the No. of the unit.
e) Aux. Heating
TheAux. Heatingis used to positive closing the auxiliary electric heat and start the air
conditioning. Five seconds after pressing this key, system will execute this operation. Press
Aux. Heating again could resume auxiliary electric heat function.
f)
Sleep
Sleepis used to login or out sleep status. Five seconds after pressing this key, system will
- 15 -
execute this operation. Under sleep working condition, the sleep sign will come out.
g) Reset
It is used to manually reset.
h) Mode
It is used to switch work mode: Auto-Cool-Wind-Heat-Auto
Cool Mode: pressModecontinuously till Cool Sign come out and become flash. Five
seconds after pressing, system will switch to Cool Mode automatically.
Heat Mode: pressModecontinuously till Heat Sign come out and become flash. Five
seconds after pressing, system will switch to Heat Mode automatically.
Wind Mode: pressModecontinuously till Winding Sign come out and become flash. Five
seconds after pressing, system will switch to Winding Mode automatically.
Auto Mode: pressModecontinuously till Auto Sign come out and become flash. Five
seconds after pressing, system will switch to Auto Mode automatically.
i)
Timerand setting
Set on timer setting: pressTimertill timer on and hour: minute signs become flash.
Pressandcould preset the hour and minute of power on, and then pressTimer
could execute the operation.
Cancel timer on setting: adjust the relevant hour to 00 and minute to 00.
Set off timer setting: pressTimertill timer on and hour: minute signs become flash.
Pressandcould preset the hour and minute of power off, and then pressTimer
could execute the operation.
Cancel timer off setting: adjust the relevant hour to 00 and minute to 00.
k) Display
Under one of the units, pressDisplaycould inquire relevant outdoor units sensor sampling
value and system working conditions. Left side of screen indicates code, and the right side
indicates inquire information. PressDisplaycontinuously could indicate below items:
- 16 -
l)
Code
Display content
01
4080
02
4080
03
4080
04
05
NC
06
Model
07
NC
08
Parameter illustrate
Set
When air conditioning is working, pressSetonce and then keep hands away from the keys,
the left side of screen will indicate code, while the right side will indicate parameter value
(refer to parameter setting table). PressSetcontinuously, the screen will indicate each setting
parameter successively. Pressandcould adjust the parameter value. Press any of
other keys could finish parameter adjusting operation, or system will logout automatically
after eight seconds waiting.
Code
Parameter
2080
25
099
20
01
060S
10S
420
12
030
12
D03 Inner air blower run or stop when outdoor frost is melting
D07 NC
120MIN
6MIN
19
- 17 -
Code
Parameter
D10 NC
D11 NC
D12 NC
D13 NC
5+5
D15 NC
01
Code
Fault alarm
E1
E2
E3
E4
E5
E6
E7
E8
E9
10
EA
No.
Code
Fault alarm
11
Eb
12
EF
Communication fault
Among them, E6Eb could indicate different outdoor unit, that is : Left side of screen
indicates alarm code, while the right side indicates relevant No. of model.
6.3.5. Ambient temperature probe
When system is alert and unit power supply is on, if probe detects ambient temperature is
below 3C, system will start auxiliary heat and inner air blower automatically. If ambient
temperature is above 5C, system will stop auxiliary heat and inner air blower automatically.
In winter, preheat the units for 2030 minutes before starting the system. Or
else, the compressor will be damaged.
- 19 -
Factory wiring
Operation handle
Customer wiring
Select provided device
Two pair four cores twisted pair
.
1# compressor
- 20 -
L1 coil in
L3 coil in
L2 coil in
N coil in
Factory wiring
Customer wiring
- 21 -
7. Equipment installation
7.1. Installation of electric house
According to the layout of Top Drive, prepare plane ground for locating the electric house. To
comply with the requirements for lifting of house body, lift the electric house from the truck
and place it in the planned place.
Face the side where come out the cables of the electric house to the derrick to facilitate the
laying of cables.
7.1.1. Installation of earths
In this system, 2 earth bars at 1.80m in length are provided, which connect with the earth
cables of 5m in length. Earthing requirement: the resistance of the earth bars shall be less than
4 , driven in better soil insofar as practicable and maintained wet by regular watering. The
other end of the cable is reliably connected to the body of the electric house through cable
connector.
The configuration of the earth bar is as shown in the figure below:
Drive the earth bar (galvanized steel rod at 1.8m) as required into the ground (the earth must
contact the moisture below the surface). Connect the earth bar reliably to one end of the earth
cables cable core.
The body of the electric house must be fully and reliably earthed normally
at 2 points to ensure body and equipment safety.
The temporary power is 380VAC/50Hz with a terminal block at 63A (5 terminals). Two sets
of Manneikeshi plug base are provided for conversion between long-term/temporary
powers.
Sketch for the mounting plate of the coil in box:
Temporary
power supply
Long-term
power supply
T3 terminals at 1500A
5 terminals at 60A
frequency output of the main control cabinet to the main motor on the top of Top Drive.
Connectors are used for fast connection between the main cable and the electric house,
providing high level of convenience for well site operation.
To connect the cables, always note the colors of the cable connector (red,
white and black) and plug by matching the color.
In any cases, never use surface bumper sub. Otherwise, it may damage Top
Drive.
The connector used for the electric house must be used only after the
equipment is completely installed to prevent accidental electric shock during
installation.
After each jarring operation, all cable connections for Top Drive should be
subject to inspection. Proceed with prompt reconnection where loosening is
found.
2) Control cable for Local Control BoxLCB X1 and LCB X101
For the control cables, multi-core cable is used, for which fast connection is provided through
connectors, facilitating well site operation.
In normal condition, the Local Control Box communicates with the CPU in PLC/MCC
cabinet via optical fiber, providing good resistance to interference and accurate and reliable
control.
Control cables from electric house to the top of Top Drive are multi-core cables and routed
parallel to the main control cable. The control cable includes two parts:
A is a power cable with 12-core, serving power at 380V and 220V to the fan of
- 24 -
The main power HSC POWERfor the HPU is 3 380VAC and served from the PLC/MCC
cabinet. Fast plug is used at the connection with the coil out cabinet of the electric house for
easy and fast connection. Coupled explosion-proof device with isolation is used at the
connection with the HPU for easy power disconnection during maintenance.
HPU digital signal cable (HSC X101), which send the operation order to the HPU, and then
send the working status of HPU back to electric house; HPU analog signal cable (HSC X102),
which send the pressure and temperature signal of HPU back to electric house. Both of these
two cables are LAPPKABEL shielded cables, of which the 2 ends are connected by means of
Hummel plugs with protection level of up to IP67, which allow min. 500 plug-in/pull-out
operations while the plug for the signal cable allows up to 1,000 plug-in/pull-out operations.
4) Cables for Driller Console X1, X101, X102 and X200
The control cables for the Driller Console are four in total, of which the two ends are
connected by means of Hummel plugs with protection level of up to IP67, which allow min.
500 plug-in/pull-out operations while the plug for the signal cable allows up to 1,000
plug-in/pull-out operations.
X1passes the manual signal of the Driller Console to the PLC/MCC cabinet for emergency
operation.
X101provides control power at 24VDC for the Driller Console, which also includes well
control and E.Stop.
X102shielded cable used for output of the speed/torque of Top Drive.
X200PROFIBUS cable for communication with good resistance to interference.
- 25 -
7.2. Inspection
After the electric house is installed, it should be totally checked to make sure that all the
installation works are properly completed and ready for start and trouble shooting.
The inspection shall be given by the lead engineer for the installation of Top Drive.
The inspection may be conducted as per the appendix 1Examination Form for Install of Top
Drive Electric System of <Installation and Trouble Shooting Manual>. This list serves only
as a prompt for the inspection, which may not cover all items subject to inspection and
therefore, shall not substitute the normal judgment of the inspectors.
- 26 -