CONTRACTCHANGEORDERNO.
CONTRACT AWARDED BY: City Council
22
Apr 7, 2015
1 of 1
DATE OF AWARD
--~~~--~~~----~~~~~----------~--~--~~--~~--~-------------
You are hereby requested to make the herein described changes from the plans and specifications or do the
following described work not included in the plans and specifications on this contract.
Cha
(9,000.00)
(9,000.00)
CONTRACT PRICE
CONTRACT TIME
0
7
: 1/4/1
1/8/1
(9,000.00)
1,462,236.00
89,184.00
80,184.00
5.5%
We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services
necessary for the work above specified, and will accept as full payment therefore the price shown above.
Date
I {')..) /-2o
(b
If the
Contractor:
Title:
Submitted By:
Andy Vanderford
Date
;2-/-/6
Date
2(1/1~
Project Manager
Approved:
Authorized:
rBl
rBl
Date
Authorized:
rBl
Attachments:
City Council
J.ltt/16
Note to Contracts and Budgets Office: Council awarded a 10% construction contingency in the amount of $146,224.00 and the cost of ceo
#4 i.e. the "Terraced Step" design at a Not to Exceed amount of $45,000.00 (actual cost @ $21 ,346.00). Thus $167,570.00 is the adjusted
total amount of all change orders which the City Administrator has authority, or 11.46% of the Original Contract Price.
OTTO
Project
FontlJt Theater Renovation
PCO#:
Related RFP I:
Related BUL II:
Related RFII#
15-3141-00
Description of Change
MIU%
DATE:
70
N/A
N/A
N/A
01/13116
MIU TOTAL
GC DIRECT COSTS
$0
$0
$0
$0
GC DIRECT LABOR
GC DIRECT MATERIALS
GC DIRECT EQUIPMENT
GC OTHER/INDIRECTS
$0
$0
$0
$0
$0
$0
10.0%
10.0%
10.0%
10.0%
$0
$0
$0
$0
GC SUBCONTRACT($) OR 'OTHERS'
($9,000)
Quality landscape
-$9,000
GC FEE ON SUBCONTRACT(S)
-$9,000
0.0%
$0
TOTAL GC FEE ON SUBCONTRACT{S)
$0
Any associated General Conditions costs will be submitted as a separate Change Order with all General Condition Costs related
to the Forest Theater Project
-$9,000
$0
DAY(S)
$0
-$9,000