2.Purpose
The primary purpose of this plan is to provide a guideline
for preventing any accidents and incidents which may injure
Employees, damage property or damage the environment at the
construction site.
Project Description
1.Summary of the project
2.Project Administration
3.Project Manpower
4Site work Details
5.Equipment Details
6.HSE Role and Responsibilities
7.Records of Documents
8.Security Details
9.Company's material storage
details
1 0 . L a y d o w n o ffi c e s a n d A r e a
details.
11.Meeting with Consultant and
Clients.
12.Daily HSE Project Report to
P r o j e c t M a n a g e r.
1 3 . B a d fi n d i n g a n d r e c t i fi c a t i o n
reports to Consultant or Client.
2.Project Administration
I t w i l l b e d e fi n e d t h a t w h a t a r e t h e r o l e s
and responsibilities of the Project
M a n a g e r , H S E Te a m , C o n s t r u c t i o n M a n a g e r ,
QA/QC Manager and Engineer as well.
3.Project Manpower
I t w i l l b e d e fi n e d t h a t h o w m u c h m a n p o w e r
will use in this project, how many
competent supervisors/foreman will
present for each and every work and task.
5.Equipment Details
I t w i l l b e d e fi n e d t h a t h o w m a n y t y p e s o f
equipment will be use on the project.
E v e r y e q u i p m e n t w i l l fi r s t a p p r o v e d b y H S E
S t a ff t h e n w o r k o n s i t e . P r o p e r t r a i n i n g ,
inspection and record will collect by HSE
department.
12.1
Statutory Requirements
26
12.2
Personnel Protective Equipment (PPE)
26
12.3
Signs, Signals and Barricades
28
12.4
Work Permits
28
12.5
Piling Activity
31
12.6
E x c a v a t i o n , Tr e n c h i n g a n d S h o r i n g
31
12.7
Reinforcement/ Form Work/Shoring &
Concreting
32
12.8
S c a ff o l d i n g a n d L a d d e r s
32
12.9
Steel Erection
34
12.10
Floor and Wall Openings and Stairways
34
12.11
E n t r y i n t o C o n fi n e d S p a c e s
35