PERTAMINA EP
MATINDOK GAS DEVELOPMENT PROJECT (MGDP)

TABULATION OF REVISION SHEET


SHEET

1
2
1
X
2
X
3
X
4
X
ATTACHMENT
1
X
2
X
3
X
4
X
5
X
6
X
7
X
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

REVISION
3 3A 4

Contractor Doc. No.


Vendor Document No.
Revision
Page

REMARKS

X
X

: MTDF-SAS-MS-0510-C1008-1001
: PV06-MF01-MP14
: 3A
: 2 of 4

SHEET
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77

REVISION
3 3A 4

REMARKS

PT. PERTAMINA EP
MATINDOK GAS DEVELOPMENT PROJECT (MGDP)

REVISION SHEET DESCRIPTION


NO

PAGE

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

ALL
ALL
ALL
2,5,6

SUBJECT
ALL
ALL
ALL
Packing Style

Contractor Doc. No.


Vendor Document No.
Revision
Page

DESCRIPTION OF CHANGE
First issue
Issued for approval
Issued for construction
Replace wooden support with steel support

: MTDF-SAS-MS-0510-C1008-1001
: PV06-MF01-MP14
: 3A
: 3 of 4

REV.
1
2
3
3A

PT. PERTAMINA EP
MATINDOK GAS DEVELOPMENT PROJECT (MGDP)

TABLE OF CONTENT
TABULATION OF REVISION SHEET..2
REVISION SHEET DESCRIPTION3
TABLE OF CONTENT4
ATTACHMENT
GENERAL...................................................................................................................................................1
APPLICABLE CODE AND STANDARD................................................................................................1
APPLICABLE ITEM.......................................................................................................1
PREPARATION..........................................................................................................................................1
APPLICATION ..................................................................1

Contractor Doc. No.


Vendor Document No.
Revision
Page

: MTDF-SAS-MS-0510-C1008-1001
: PV06-MF01-MP14
: 3A
: 4 of 4

PT. PERTAMINA EP
MATINDOK GAS DEVELOPMENT PROJECT (MGDP)

1. GENERAL
This procedure covers minimum requirements for packing after finish fabrication, painting
and before transportation from PT. BBI Workshop, Pasuruan, East Java.
2. APPLICABLE CODE AND STANDARD
Customers specs
: MTDF-MS-300-SPE-3101 Rev. 3 (Spec. for pressure vessel)
: MTDF-MS-300-SPE-3110 Rev. 3 (Spec. for high alloy & clad PV)
Safety manual Doc. No. : OHSM-001-Rev.2 -ed.1.2011 Edition
3. APPLICABLE ITEM
NO.

ITEM NO.

EQUIPMENT

1.

340-T-1001

ACID GAS ABSORBER

2.

340-D-1003 /
340-T-1002

ACID GAS FLASH DRUM /


FLASH GAS ABSORBER

3.

340-T-1003

AMINE STRIPPER COLUMN

4.

340-T-1004

H2S ABSORBER

5.

320-T-1001

WASH TOWER

4. PREPARATION
4.1. Mobile crane / overhead crane capacity as per necessity.
4.2. All consumable packing i.e. : Wooden skid, bolt & nut, wire rope, temporary cover,
wooden bandage & etc.
4.3. Column shall be throughly cleaned inside and outside and free of all dirt and foreign
matter.
4.4. Place desicant bag in the inside of column according to preservation procedure
(MTDF-SAS-MS-0510-C1008-1002)
4.5. All flange faces shall be sealed with cover plate blinds, machined surface, all threads
& all surface not painted shall be coated with a suitable anti corrosive material
(grease), an appropriate gasket shall be used between the flange face cover and the
cover.
5. APPLICATION
5.1. Placement the wooden support on the ground with position according to the drawing
at sheet 3 into 8.
5.2. Placement column to above wooden support with orientation as per requirement.
5.3. Install wire robe, hose, clamp, turnbuckle to eyebolt and tightened.
5.4. Place the shipping mark, caution mark, packing list and weight indication to column
according to the drawing at sheet 3 into 8.
5.5. Inspection.
5.6. Ready for shipment.
Contractor Doc. No.
Vendor Document No.
Revision
Page

: MTDF-SAS-MS-0510-C1008-1001
: PV06-MF01-MP14
: 3A
: 15 of
of 47