Anda di halaman 1dari 60

SCHEDULE OF RATES FOR BUILDING WORKS FOR PUBLIC WORKS

DEPARTMENT IN FORCE FROM 01-06-2009


S.No.
1

PARTICULARS

UNIT

Surface dressing of the ground including removing


vegetation and making up undulations and in-equalities
not exceeding 15 cms in depth/ height including
disposal of rubbish upto 1.5 m lift and lead upto 50m (at
least 5m away from the dressed area).
Sqm
(Item no. 1.2)

QTY

RATE

AMOUNT

1050.00

4.15

4357.50

Excavation for all types and sizes of foundations,


trenches and drains or for any other purpose including
disposal of excavated stuff upto 1.5 m lift and lead upto
50m (at least 5m away from the excavated area),
including dressing and leveling of pits.
In all types of soil
(Item no. 1.1.1)

Cum

875.70

112.80

98778.96

Extra for every additional lift of 1.5 m or part thereof.


In all types of soil
(Item no. 1.6.1)

Cum

350.28

15.30

5359.28

Providing and laying nominal mix cement concrete with


crushed stone aggregate using concrete mixer in
foundation, plinth and at ground level excluding cost of
form work.
1:4:8 (1 cement : 4 coarse sand : 8 graded stone
aggregate 40mm nominal size).
(Item no. 3.1.2)

Cum

174.44

2051.00

357780.03

Cum

613.28

3290.90

2018231.07

Providing and laying nominal mix reinforcement cement


concrete with crushed stone aggregate using concrete
mixer in all works upto floor five level excluding cost of
reinforcement and form work.
1:1:3 (1 cement : 1 coarse sand : 3 graded stone
aggregate 20mm nominal size).
(Item no. 3.4.2)

UNIT
S.No.
PARTICULARS
5 Providing and fixing formwork including centering,
shuttering, strutting, staging, propping bracing etc.
complete and including its removal at all levels, for:
Foundations, footings, base of columns and plinth beam
in any shape and size.
Sqm
(Item no. 2.1.1)

QTY

RATE

AMOUNT

673.08

73.80

49673.30

Columns, Pillars, Piers and likes- rectangular or square


in shape
(Item no. 2.1.6)

Sqm

1215.00

183.50

222952.50

Suspended floors, roofs, access platform, balconies


(plain surfaces) and shelves (cast in situ)
(Item no. 2.1.8)

Sqm

1839.13

147.35

270995.66

Beams, lintels, cantilevers & walls


(Item no. 2.1.9)

Sqm

1140.06

136.75

155903.21

Stair cases of all types excluding spiral and folded plate


type, including risers and landings
Sqm
(Item no. 2.1.16)

167.78

163.80

27481.55

Kg

61400.00

46.80

2873520.00

Providing and filling in plinth with sand/ Crusher dust


and hard moorum under floor in layers not exceeding
20cm in depth consolidating each deposited layer by
ramming and watering, including dressing etc.
complete.
(Item no. 1.18)

cum

1517.59

316.75

480696.16

Brick work with modular well burnt clay bricks of


crushing strength not less than 25 kg/sqcm and water
absorption not more than 20% in foundation and plinth
in:
Cement Mortar 1:6 (1 Cement : 6 Coarse Sand)
(Item no. 7.2.2)

Cum

48.69

2479.60

120742.88

Providing and placing in position reinforcement for


R.C.C. work including straightening, cutting, bending,
binding etc. complete as per drawings including cost of
binding wire all complete:
Thermo-Mechanically treated bars
(Item no. 3.14.1)

UNIT
S.No.
PARTICULARS
9 Providing and laying damp proof course (upto 50mm
thick) with plain cement concrete 1:2:4 (1 cement : 2
coarse sand : 4 graded crushed stone aggregate 20mm
nominal size) including formwork.
Cum
(Item no. 3.17)
10

13

14

AMOUNT

2.71

3321.70

8991.84

Sqm

54.14

78.85

4268.94

Brick work with modular well burnt clay bricks of


crushing strength not less than 25 kg/sqcm and water
absorption not more than 20% in Superstructure

Cement Mortar 1:6 (1 Cement : 6 Coarse Sand)


(Item no. 7.5.1)
Cum
12

RATE

Applying a coat of hot bitumen 30/40 using @ 1.7kg/


sqm on damp proof course after cleaning the surface
with brushes and finally with a piece of cloth lightly
soaked in kerosene oil.
(Item no. 7.5.1)

11

QTY

486.72

2701.25

1314757.80

Half brick thick brick masonry with modular well-burnt


clay bricks of crushing strength not less than 25
kg/sqcm and water absorption not more than 20% in
superstructure above plinth level upto floor five level.
Cement Mortar 1:4 (1 cement : 4 coarse sand)
(Item no. 7.9.2)

Sqm

Providing wood work in frames of doors, windows,


clerestory windows and other frames wrought framed
and fixed in position.
Sal, bijasal, benteak, khair, haldu
(Item no. 8.1.2)

Sqm

458.62

283.70

130110.49

4.08 22307.10

91040.85

Providing and fixing flush door shutters, core of block


board construction with frame of first class hard wood
and well matched first class Indian teak ply veneering
on one face and commercial ply veneering on the other
face of the shutter with vertical grains, cross bands and
face veneering excluding hinges.
35 mm. thick (single leaf)
(Item no. 8.12.2)

Sqm

119.91

2076.40

248981.12

S.No.
15

PARTICULARS

UNIT

QTY

RATE

AMOUNT

Providing and fixing aluminium work for doors,


windows, ventilators and partitions made out of
extruded aluminium standard sections (main section
with minimum 1.5mm thickness) conforming to IS: 733,
IS: 1285 mitred and jointed mechanically including
aluminium cleats, neoprene weather stripping gasket
beveled edge beading, screws duly fixed in wall/ floor
with fixing clips or hold fasteners or bolts and nuts as
required aluminium sections shall be anodized
transparent or dyed to approved shade according to IS:
1868, minimum anodic coating shall be of grade AC-15.
(Glazing and panelling to be paid for separately
For shutter of doors, windows & ventilators including
providing and making provision for fixing of fitting
wherever required including the cost of PVC/ neoprene
gasket required (Fittings shall be paid for separately).
(Item no. 9.45.2)
16

Providing and fixing glazing in aluminium door, window,


ventilator shutters and partitions etc. with PVC/
neoprene gasket etc. complete. (Cost of aluminium
snap beading shall be paid in basic item):
With float glass panes of 4 mm thickness
(Item no. 9.49.1)

Kg

1239.84

290.10

359677.58

Sqm

154.98

494.50

76637.61

UNIT
S.No.
PARTICULARS
17 Providing and fixing 30mm thick factory made panel
PVC door shutter consisting of frame made out of M.S.
tubes of 19 gauge thickness and size of 19mm x 19mm
for styles and 15x15mm for top & bottom rails. M.S.
frame shall have a coat of steel primers of approved
make and manufacture . M.S. frame covered with 5mm
thick heat moulded PVC 'C' channel of size 30mm
thickness, 70mm width out of which 50mm shall be flat
and 20mm shall be tapered in 45degree angle on either
side forming styles; and 5mm thick, 95mm wide PVC
sheet out of which 75mm shall be flat and 20mm shall
be tapered in 45 degree on the inner side to form top
and bottom rail and 115mm wide PVC sheet out of
which 75mm shall be flat and 20mm shall be tapered on
both sides to form lock rail. Top, bottom and lock rails
shall be provided either side of the panel. 10mm (5mm
x 2 ) thick, 20mm wide cross PVC sheet be provided as
gap insert for top rail & bottom rail. paneling of 5mm
thick both side PVC sheet to be fitted in the M.S. frame
welded/ sealed to the styles & rails with 7mm
(5mm+2mm) thick x 15mm wide PVC sheet beading on
inner side, and joined together with solvent cement
adhesive. An additional 5mm thick PVC strip of 20mm
width is to be stuck on the interior side of the 'C'
Channel using PVC solvent adhesive etc. complete as
per Manufacturers specification including 3 nos ISI
marked stainless steel hinges of size 100x58x1.9 mm
complete. (for W.C. and bathroom door shutter).

Both side Pre-laminated panel PVC door shutter


(Item no. 8.158.2)
18

19

20

QTY

RATE

AMOUNT

Sqm

18.90

2564.70

48472.83

Providing and fixing S.S. finished brass butt hinges with


necessary S.S. finished MS screws complete:
125x85x5.50 mm (Heavy Type)
Each
(Item no. 8.86.1)

186.00

238.80

44416.80

Providing and fixing S.S. finished brass sliding door bolt


with necessary bolts, nuts and S.S. finished MS screws
complete:
300x16 mm
Each
(Item no. 8.88.1)

124.00

505.85

62725.40

Providing and fixing S.S. finished brass door latch with


necessary S.S. finished MS screws complete:

S.No.

PARTICULARS
250x16x5mm
(Item no. 8.89.2)

21

22

23

24

UNIT

QTY

RATE

AMOUNT

Each

124.00

287.30

35625.20

Providing and fixing S.S. finished brass handle with


necessary S.S. finished MS screws complete:
125 mm
Each
(Item no. 8.93.1)

124.00

59.65

7396.60

Providing and fixing 150mm S.S. finished brass floor


door stoppers with rubber cushion with necessary S.S.
finished MS screws to suit thickness of shutters.
(Item no. 8.99)

Each

62.00

79.45

4925.90

Providing and fixing S.S. finished brass tower bolts


(Barrel type) with necessary S.S. finished MS screws
complete:
200 x10mm
(Item no. 8.90.2)

Each

41.00

256.50

10516.50

150 x 10 mm
(Item no. 8.90.3)

Each

21.00

194.15

4077.15

Providing and fixing both side polished 30 mm thick


RAJIM SAND STONE shelves fixed in walls in cement
mortar 1:3 (1 cement : 3 coarse sand) including
finishing complete.
(Item no. 6.25)

Sqm

55.44

289.55

16052.65

Providing and fixing M.S. grill of approved pattern made


of M.S. flats or square or round bars welded to steel
frame of windows etc. including applying a priming coat
of red oxide zinc chromate primer..
(Item no. 9.1)
Kg
25

26

Providing stainless steel railing/ grill made of S.S. flats,


hollow S.S. pipe or square/ rectangular sections of
approved design fixing in stair case, balcony or other
places with metal fasteners and stainless steel bolts etc
complete.
(Item no. 9.54)

6301.80

Kg

60.70

258.48

382519.26

380.15

98261.17

UNIT
S.No.
PARTICULARS
27 Providing and fixing in position collapsible steel shutters
with vertical channels 20x10x2mm and braced with flat
iron diagonals 20x5mm size with top and bottom rails of
T-iron 40x40x6mm with 38mm steel pulleys complete
with bolts, nuts, locking arrangement stoppers, handles
including applying a priming coat of red oxide zinc
chromate primer.
Sqm
(Item no. 9.6)
28

29

30

32

RATE

AMOUNT

13.92

2355.95

32794.82

6mm thick cement plaster of mix:


In Cement mortar 1:3 (1 cement : 3 fine sand)
(Item no. 11.1.1)

Sqm

1805.02

75.40

136098.55

12mm thick cement plaster of mix:


In Cement Mortar 1:5 (1 cement : 5 fine sand)
(Item no. 11.2.3)

Sqm

4306.98

72.90

313978.84

Sqm

3233.31

120.90

390907.66

Size 600x600mm
(Item no. 12.11.1)

Sqm

1040.13

950.95

989111.62

25 mm thick KOTA stone slab flooring over 20mm


(average) thick base of cement mortar 1:4 laid over and
jointed with grey cement slurry mixed with pigment to
match the shade of the slab including grinding rubbing
and polishing etc. complete (Area of slab to be over
0.20 sq.m and upto 0.50 sq.m)
(Item no. 12.45)

Sqm

578.01

584.65

337933.55

18 mm thick cement plaster with under layer of 12mm


thick cement plaster 1:5 (1 cement : 5 fine sand)
finished with a top layer of 6mm thick cement plaster
1:3 (1 cement : 3 fine sand).
(Item no. 11.7)

31

QTY

Providing and laying vitrified floor tiles with double


charge/ multi charge printing with water absorption less
than 0.5% and conforming to IS : 15622 of approved
make in all colours and shades and size mentioned
below (+/- 10mm), laid on 20mm thick cement mortar
1:4 (1 cement : 4 coarse sand) including grouting the
joints with white cement and matching pigments etc.
complete:

UNIT
S.No.
PARTICULARS
33 KOTA stone slab 25mm thick in risers and treads of
steps, skirting dado and pillar laid in 12mm (average)
thick cement mortar 1:3 (1 cement : 3 coarse sand) and
jointed with grey cement slurry mixed with pigment to
match the shade of the slab including rubbing and
polishing complete. (single stone is to be used for riser
and treads of steps and the width of stone for skirting
and dado shall be equal to the height of skirting/ dado
with a minimum length of 1.0 M.)
(Item no. 12.46)
34

RATE

AMOUNT

Sqm

224.63

650.10

146034.56

Sqm

394.89

532.35

210219.69

Sqm

103.95

850.20

88378.29

Sqm

31.26

1521.30

47555.84

Metre

52.10

228.20

11889.22

Providing and fixing ceramic glazed wall tiles


conforming to IS : 15622 of approved make, colours,
shades and size on wall and dados over 12 mm thick
bed of cement Mortar 1:3 (1 cement : 3 coarse sand)
and jointing with grey cement slurry @ 3.3kg per sqm
including pointing in white cement mixed with matching
pigment complete
(Item no. 12.6)

35

QTY

Providing and laying rectified ceramic glazed floor tiles


300x300mm conforming to IS : 15622 of approved
make, colour, shade laid on 20 mm thick Cement Mortar
1:4 (1 cement : 4 coarse sand) including pointing the
joints with white cement mixed with matching pigment
etc., complete.
In colours such as White, Ivory, Grey, Fume Red Brown,
(Item no. 12.8.2)

36

15 mm thick Marble work (machine cut, table rubbed &


polished) for kitchen platform, vanity counters, window
sills and similar locations of required size laid over
20mm thick base cement mortar 1:4 (1 cement : 4
coarse sand) including joints treated with white cement
mixed with matching pigment including rubbing and
polishing to edge moulding to give high gloss finish.
Udaipur green marble
(Item no. 13.3.5)

37

Extra for fixing marble /granite stone in facia and drops


of width upto 150 mm with epoxy resin based adhesive
instead of cement mortar including cleaning etc.
complete.
(Item no. 13.8)

S.No.
38

PARTICULARS

41

228.20

1597.40

Sqm

709.21

171.35

121523.13

Providing and applying plaster of paris putty over


plastered wall surface including scaffolding complete
Upto 2 mm thickness to make surface even and smooth
in line and level.
Sqm
(Item no. 11.41.1)

4306.98

46.75

201351.32

1805.02

51.40

92778.05

Sqm

3233.31

42.65

137900.84

Wall painting with acrylic premium emulsion (plastic)


paint (2nd top most approved branded quality) to give an
even shade.
On new work (Two or more coats)
Sqm
(Item no. 14.7.1)

6112.00

37.45

228894.42

Cement concrete flooring with cement concrete 1:2:4 (1


cement : 2 coarse sand : 4 graded stone aggregate
20mm) finished with a floating coat of neat cement..

Providing and applying plaster of paris putty over


plastered ceiling surface including scaffolding complete.

Providing and applying 2mm thick ready mix exterior


grade putty (Birla wall care, Alltek Superfine W/R of
(NCL), J.K. wall putty) on walls to make the surface
smooth and even.
(Item no. 14.10)

43

44

AMOUNT

7.00

Upto 2 mm thickness to make surface even and smooth


in line and level.
Sqm
(Item no. 11.42.1)
42

RATE

Each

40 mm thick
(Item no. 12.2.1)
40

QTY

Extra for making opening of required size & shape for


wash basins/ kitchen sink in kitchen platform, vanity
counters and similar location in marble/Granite/stone
work including making necessary holes for pillar taps
etc. including rubbing and polishing of cut edges etc.
complete
(Item no. 13.9)

39

UNIT

Painting new exterior surface (two or more coats) with


PREMIUM TEXTURED paint as per manufacturer's
specifications to give protective and decorative finish
including cleaning washing of surface etc. complete
with:
On new work (Two or more coats )

S.No.

PARTICULARS
(Item no. 14.12.1)

45

QTY
RATE
3233.31
73.50

AMOUNT
237648.58

Making 50mm thick plinth protection of plain cement


concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded
crushed stone aggregate 20mm nominal size) over
75mm bed of dry brick ballast 40mm nominal size well
rammed and consolidated and grouted with sand
including finishing the top smooth.
(Item no. 14.12.1)

46

UNIT
Sqm

Providing arrangement of Rain Water Harvesting

Sqm

177.14

186.05

Lump - Sum

32956.90
500000.00

Total

13895481.10

Add 9% for Electrification work

1250593.30

Add 6% for Sanitary & Water Supply Work

833728.87
Total

Add 15 % for Anticipeted Tender Rate

15979803.26
2396970.49

Total
Add 3 % for Contingency

18376773.75
551303.21

Total

18928076.96

378561.54

Add 2 % for Supervision Charges of C.G. State


Agriculture Marketing (Mandi) Board, Raipur. (C.G.)
Grand Tot

19306638.50

SAY

19307000.00

Rs

( RUPEES ONE CRORES NINTY THREE LACKS SEVEN THOUSAND ONLY )

Sub Engineer
C.G.State Agril. Markt. Board

Asstt. Engineer
C.G.State Agril. Markt. Board

Executive Engineer
C.G.State Agril. Markt. Board

DETAILS OF MEASUREMENTS
S.No
Particulars
1 Surface dressing of the ground
including removing vegetation and
making up undulations and inequalities not exceeding 15 cms in
depth/ height including disposal of
rubbish upto 1.5 m lift and lead upto
50m (at least 5m away from the
dressed area).

Detail

1x1

No

70.00

15.00

D/H

Qty

Unit

Total

1050.00
1050.00

Sqm

2.50
2.50
Total

781.20
94.50
875.70

Cum

1.00
1.00
Total

312.48
37.80
350.28

Cum

Excavation for all types and sizes of


foundations, trenches and drains or
for any other purpose including
disposal of excavated stuff upto 1.5 m
lift and lead upto 50m (at least 5m
away from the excavated area),
including dressing and leveling of pits.
In all types of soil

For Columns

Extra for every additional lift of 1.5 m


or part thereof.
In all types of soil
For Columns

1x62
1x10

1x62
1x10

62
10

62
10

2.10
1.80

2.10
1.80

2.40
2.10

2.40
2.10

Providing and laying nominal mix


cement concrete with crushed stone
aggregate using concrete mixer in
foundation, plinth and at ground level
excluding cost of form work.
1:4:8 (1 cement : 4 coarse sand : 8 graded
stone aggregate 40mm nominal size).
For Columns
For Under floor
Lecture Theater
Gents Toilet
Store
Staircase I
U.G.Lab

1x62
1x10

62
10

2.10
1.80

2.40
2.10

0.15
1.15

46.87
43.47

1x1
1x1
1x1
1x1
1x1

1
1
1
1
1

6.00
3.30
3.30
3.30
10.30

11.10
5.20
4.00
6.00
6.00

0.15
0.15
0.15
0.15
0.15

9.99
2.57
1.98
2.97
9.27

S.No

Detail
No
Particulars
1x1
1
P.G.Class Room
1x1
1
Pantry
1x1
1
Lab Technician Room
1x1
1
P.G. Lab
1x1
1
Chambers for Assistant Professor
1x1
1
Associate Professor Room
1x1
1
H.O.D. Office
1x1
1
H.O.D. Room
1x1
1
Staircase II
1x1
1
Ladies Toilet
1x1
1
Ladies Staff Room
1x1
1
Corridor
1x1
1
1x1
1
1x1
1
1x1
1
1x2
2
For Steps

L
4.70
1.85
3.30
3.30
6.80
3.30
3.30
3.30
3.30
3.30
3.30
3.30
49.00
3.30
3.30
3.30
4.40

B
D/H
3.30
0.15
3.30
0.15
2.50
0.15
6.00
0.15
6.00
0.15
6.00
0.15
4.30
0.15
6.00
0.15
6.00
0.15
4.10
0.15
4.70
0.15
5.70
0.15
2.80
0.15
2.00
0.15
2.70
0.15
1.70
0.15
1.35
0.15
Total

Qty

Unit

2.33
0.92
1.24
2.97
6.12
2.97
2.13
2.97
2.97
2.03
2.33
2.82
20.58
0.99
1.34
0.84
1.78
174.44

Cum

117.18
12.15
9.18
3.42
141.93

Cum

Providing and laying nominal mix


cement concrete with crushed stone
aggregate using concrete mixer in all
works upto floor five level excluding cost
of form work.
1:1:3 (1 cement : 1 coarse sand :
3 graded stone aggregate 20mm
nominal size).
Ground Floor
Footing
Columns up to G.L.

Columns from G.L. to P.L.

1x62
1x10
1x62
1x10

62
10
62
10

1.80
1.50
0.20
0.30

2.10
1.80
0.40
0.60

0.50
0.45
1.85
1.90
Sub To

1x62
1x10

62
10

0.20
0.30

0.40
0.60

1.05
1.05

5.21
1.89

1x2
1x2
1x34
1x14
1x1
1x2x2
1x2
1x1
1x3
1x12x2
1x1

2
2
34
14
1
4
2
1
3
24
1

2.60
2.80
3.30
3.10
3.00
3.55
3.40
1.70
2.80
2.70
2.10

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.31
0.34
6.73
2.60
0.18
0.85
0.41
0.10
0.50
3.89
0.13

Plinth beams
Along X axis

Along Y axis

S.No

Particulars
Columns above P.L. upto Ground

Detail
No
1x1
1

L
3.30

B
D/H
0.20
0.30

Qty
0.20

Floor Slab

Beams at lintel level


Along X axis

Along Y axis

1x62
1x10

62
10

0.20
0.30

0.40
0.60

4.00
4.00

19.84
7.20

1x2
1x2
1x22
1x8
1x2
1x14
1x1
1x2x2
1x2
1x3
1x12x2
1x1
1x1
1x2x2
1x2

2
2
22
8
2
14
1
4
2
3
24
1
1
4
2

2.60
2.80
3.30
3.25
3.20
3.10
3.00
3.55
3.40
2.80
2.70
2.10
3.30
1.40
2.20

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.10
0.10

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20

0.31
0.34
4.36
1.56
0.38
2.60
0.18
0.85
0.41
0.50
3.89
0.13
0.20
0.11
0.09

1x19
1x3
1x10
1x1
1x3

19
3
10
1
3

2.20
1.30
2.90
2.70
2.90

0.60
0.60
0.60
0.60
1.20

0.10
0.10
0.10
0.10
0.10

2.51
0.23
1.74
0.16
1.04

1x1
1x2
1x1
1x1
1x1
1x1

1
2
1
1
1
1

3.30
6.00
10.30
3.30
4.00
1.50

0.80
0.80
0.80
0.60
0.80
0.80

0.10
0.10
0.10
0.10
0.10
0.10

0.26
0.96
0.82
0.20
0.32
0.12

1x2
1x2
1x28
1x8
1x2
1x14
1x1
1x2x2
1x2
1x1
1x16
1x12x2
1x1

2
2
28
8
2
14
1
4
2
1
16
24
1

2.60
2.80
3.30
3.25
3.20
3.10
3.00
3.55
3.40
1.70
2.80
2.70
2.10

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.31
0.34
5.54
1.56
0.38
2.60
0.18
0.85
0.41
0.10
2.69
3.89
0.13

Chhajja

Pantry Platform
U.G.Lab Platform
Loft for Pantry
Loft for Store
Ground floor Slab beams
Along X axis

Along Y axis

Unit

S.No

Particulars
1x1
1
3.30
0.20
0.30
0.20
1x3
3
6.00
0.30
0.60
3.24
Ground Floor Slab

Lecture Theater
1x1
1
6.00
3.55
0.12
2.56

1x1
1
6.00
3.42
0.12
2.46

1x1
1
6.00
3.57
0.12
2.57
Gents Toilet

Detail

No

D/H

Qty

Unit

S.No

Particulars
1x1
1
3.30
0.20
0.30
0.20
1x2x2
4
1.40
0.10
0.20
0.11
1x2
2
2.20
0.10
0.20
0.09
Chhajja

1x19
19
2.20
0.60
First
0.10Floor Slab
2.51
1x3
3
1.30
0.60
0.10
0.23
1x10
10
2.90
0.60
0.10
1.74
1x1
1
2.70
0.60

Detail

No

D/H

Qty

Unit

S.No

Particulars
Corridor

Projections with slab

Detail
No
1x1
1
1x1
1
1x14
14
1x1
1
1x1
1
1x11
11
1x3
3
1x12
12

L
3.30
3.30
3.30
3.30
3.30
0.60
4.10
1.30

B
D/H
5.70
0.12
4.80
0.12
2.80
0.12
2.50
0.12
1.50
0.12
0.60
0.15
0.60
0.15
0.60
0.12
Sub To

Qty
2.26
1.90
15.52
0.99
0.59
0.59
1.11
1.12
134.85

Second Floor
Columns above first floor slab upto
second floor slab

Beams at lintel level


Along X axis

Along Y axis

1x62
1x10

62
10

0.20
0.30

0.40
0.60

4.00
4.00

19.84
7.20

1x2
1x2
1x22
1x8
1x2
1x14
1x1
1x2x2
1x2
1x3
1x12x2
1x1
1x1
1x2x2
1x2

2
2
22
8
2
14
1
4
2
3
24
1
1
4
2

2.60
2.80
3.30
3.25
3.20
3.10
3.00
3.55
3.40
2.80
2.70
2.10
3.30
1.40
2.20

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.10
0.10

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20

0.31
0.34
4.36
1.56
0.38
2.60
0.18
0.85
0.41
0.50
3.89
0.13
0.20
0.11
0.09

1x19
1x3
1x10
1x1
1x3

19
3
10
1
3

2.20
1.30
2.90
2.70
2.90

0.60
0.60
0.60
0.60
1.20

0.10
0.10
0.10
0.10
0.10

2.51
0.23
1.74
0.16
1.04

1x1
1x1
1x1
1x1

1
1
1
1

3.30
3.30
4.00
1.50

0.80
0.60
0.80
0.80

0.10
0.10
0.10
0.10

0.26
0.20
0.32
0.12

1x2
1x2
1x28
1x8
1x2
1x14
1x1

2
2
28
8
2
14
1

2.60
2.80
3.30
3.25
3.20
3.10
3.00

0.20
0.20
0.20
0.20
0.20
0.20
0.20

0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.31
0.34
5.54
1.56
0.38
2.60
0.18

Chhajja

Pantry Platform
Loft for Pantry
Loft for Store
Second Floor Slab beams
Along X axis

Unit

Cum

S.No
Along Y axis

Particulars
1x2x2

Detail
No
L
3.55
0.20
0.30
1x2
2
3.40
1x1
1
1.70
1x16
16
2.80
1x12x2
24
2.70
1x1
1
2.10
1x1
1
3.30
1x3
3
6.00

B
D/H
0.85
0.20
0.30
0.20
0.30
0.20
0.30
0.20
0.30
0.20
0.30
0.20
0.30
0.30
0.60

Qty

Unit

0.41
0.10
2.69
3.89
0.13
0.20
3.24

Second Floor Slab


Lecture Theater

Gents Toilet
Store
U.G.Lab
P.G.Class Room
Pantry
Lab Technician Room
P.G. Lab
Chambers for Assistant Professor
Associate Professor Room
H.O.D. Office
H.O.D. Room
Ladies Toilet
Ladies Staff Room
Corridor

Projections with slab

1x1
1x1
1x1
1x1
1x1
1x2
1x1
1x1
1x1
1x1
1x1
1x2
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x14
1x1
1x1
1x11
1x3
1x12
1x1
1x1

1
1
1
1
1
2
1
1
1
1
1
2
1
1
1
1
1
1
1
14
1
1
11
3
12
1
1

6.00
6.00
6.00
3.30
3.30
3.25
3.20
4.70
1.85
3.30
3.30
3.25
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
0.60
4.10
1.30
10.30
4.10

3.55
3.42
3.57
5.20
4.00
6.00
6.00
3.30
3.30
2.50
6.00
6.00
6.00
4.30
6.00
4.10
4.70
5.70
4.80
2.80
2.50
1.50
0.60
0.60
0.60
0.60
0.60

0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.15
0.15
0.12
0.15
0.15
Sub To

2.56
2.46
2.57
2.06
1.58
4.68
2.30
1.86
0.73
0.99
2.38
4.68
2.38
1.70
2.38
1.62
1.86
2.26
1.90
15.52
0.99
0.59
0.59
1.11
1.12
0.93
0.37
136.14

Stair
Columns above Second floor slab
upto top

From P.L. to G.F. Slab Level


Waist slab

1x62
1x10

62
10

0.20
0.30

0.40
0.60

0.90
0.90

4.46
1.62

1x2x6

12

0.20

0.40

1.60

1.54

2x1

4.68

1.50

0.15

2.11

Cum

Detail
No
2x1
2
2x1
2
Landing
2x1
2
26
Steps 2x26x0.5
From G.F. Slab Level to F.F.Slab Level
S.No

Particulars

2x1
2x1
2x1
Landing
2x1
Steps 2x26x0.5

L
4.32
1.50
0.80
1.50

B
D/H
1.50
0.15
3.30
0.15
1.50
0.15
0.30
0.15

Qty
1.94
1.49
0.36
1.73

2
2
2
2
26

4.68
4.32
1.50
0.80
1.50

1.50
1.50
3.30
1.50
0.30

0.15
0.15
0.15
0.15
0.15

2.11
1.94
1.49
0.36
1.73

2x1
2x1
2x1
Landing
2x2
Steps 2x26x0.5

2
2
2
4
26

4.68
4.32
1.50
0.80
1.50

1.50
1.50
3.30
1.50
0.30

0.15
0.15
0.15
0.15
0.15

2.11
1.94
1.49
0.72
1.73

2x4
2x3
2x2
1x1

8
6
4
1

2.70
3.30
2.90
3.30

0.20
0.20
3.30
0.60

0.30
0.30
0.15
0.10
Sub To

1.30
1.19
5.74
0.20
39.28

Waist slab

From F.F. Slab Level to Terrace Floor


Slab Level
Waist slab

Stair tower slab beams


Stair tower slab
Chhajja

Unit

Cum

Grand Total 6(A13+.B2+8C+DC+uEm+F)


5

Providing and fixing formwork


including centering, shuttering,
strutting, staging, propping bracing
etc. complete and including its
removal at all levels, for:
Foundations, footings, base of
columns and plinth beam in any
shape and size.
Footings

Columns up to G.L.

Columns from G.L. to P.L.

1x2x62
1x2x62
1x2x10
1x2x10
1x2x62
1x2x62
1x2x10
1x2x10
1x2x62
1x2x62
1x2x10
1x2x10

124
124
20
20
124
124
20
20
124
124
20
20

1.80
2.10
1.50
1.80
0.20
0.40
0.30
0.60
0.20
0.40
0.30
0.60

0.50
0.50
0.45
0.45
1.85
1.85
1.90
1.90
1.05
1.05
1.05
1.05

111.60
130.20
13.50
16.20
45.88
91.76
11.40
22.80
26.04
52.08
6.30
12.60

S.No

Particulars
Plinth beams
Along X axis
1x2x2
4
2.60
0.30
3.12

1x2x2
4
2.80
0.30
3.36

1x34x2
38
3.30
0.30
37.62

1x14x2
28
3.10
0.30
26.04

1x1x2
2
3.00
0.30
1.80
Along Y axis
1x2x2x2
8
3.55
0.30

Detail

No

D/H

Qty

Unit

S.No
Particulars
* Suspended floors, roofs, access
platform, balconies (plain surfaces)
and shelves (cast in situ)
Chhajja

Pantry Platform
U.G.Lab Platform
Loft for Pantry
Loft for Store
Ground Floor Roof Slab
Lecture Theater

Gents Toilet
Store
U.G.Lab
P.G.Class Room
Pantry
Lab Technician Room
P.G. Lab
Chambers for Assistant Professor
Associate Professor Room
H.O.D. Office
H.O.D. Room
Ladies Toilet
Ladies Staff Room
Corridor

Projections with slab

Detail

No

1x19
1x3
1x10
1x1
1x3

19
3
10
1
3

2.20
1.30
2.90
2.70
2.90

0.60
0.60
0.60
0.60
1.20

1x1
1x2
1x1
1x1
1x1
1x1

1
2
1
1
1
1

3.30
6.00
10.30
3.30
4.00
1.50

0.60
0.60
0.60
0.40
0.60
0.60

1x1
1x1
1x1
1x1
1x1
1x2
1x1
1x1
1x1
1x1
1x1
1x2
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x14
1x1
1x1
1x11
1x3
1x12

1
1
1
1
1
2
1
1
1
1
1
2
1
1
1
1
1
1
1
14
1
1
11
3
12

6.00
6.00
6.00
3.30
3.30
3.25
3.20
4.70
1.85
3.30
3.30
3.25
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
0.60
4.10
1.30

3.55
3.42
3.57
5.20
4.00
6.00
6.00
3.30
3.30
2.50
6.00
6.00
6.00
4.30
6.00
4.10
4.70
5.70
4.80
2.80
2.50
1.50
0.60
1.20
0.60

D/H

Qty

25.08
2.34
17.40
1.62
10.44
0.00
1.98
7.20
6.18
1.32
2.40
0.90

Sub To

21.30
20.53
21.43
17.16
13.20
39.00
19.20
15.51
6.11
8.25
19.80
39.00
19.80
14.19
19.80
13.53
15.51
18.81
15.84
129.36
8.25
4.95
3.96
14.76
9.36
605.46

Chhajja
1x19
1x3
1x10

19
3
10

2.20
1.30
2.90

0.60
0.60
0.60

Unit

25.08
2.34
17.40

Sqm

S.No

Detail
No
1x1
1
1x3
3

Particulars

Pantry Platform
Loft for Pantry
Loft for Store

L
2.70
2.90

B
D/H
0.60
1.20

Qty
1.62
10.44

1x1
1x1
1x1
1x1

1
1
1
1

3.30
3.30
4.00
1.50

0.60
0.40
0.60
0.60

1.98
1.32
2.40
0.90

1x1
1x1
1x1
1x1
1x1
1x2
1x1
1x1
1x1
1x1
1x1
1x2
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x14
1x1
1x1
1x11
1x3
1x12

1
1
1
1
1
2
1
1
1
1
1
2
1
1
1
1
1
1
1
14
1
1
11
3
12

6.00
6.00
6.00
3.30
3.30
3.25
3.20
4.70
1.85
3.30
3.30
3.25
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
0.60
4.10
1.30

3.55
3.42
3.57
5.20
4.00
6.00
6.00
3.30
3.30
2.50
6.00
6.00
6.00
4.30
6.00
4.10
4.70
5.70
4.80
2.80
2.50
1.50
0.60
0.60
0.60

21.30
20.53
21.43
17.16
13.20
39.00
19.20
15.51
6.11
8.25
19.80
39.00
19.80
14.19
19.80
13.53
15.51
18.81
15.84
129.36
8.25
4.95
3.96
7.38
9.36
584.70

Unit

First Floor Roof Slab


Lecture Theater

Gents Toilet
Store
U.G.Lab
P.G.Class Room
Pantry
Lab Technician Room
P.G. Lab
Chambers for Assistant Professor
Associate Professor Room
H.O.D. Office
H.O.D. Room
Ladies Toilet
Ladies Staff Room
Corridor

Projections with slab

Sub To
Chhajja

Pantry Platform
U.G.Lab Platform
Loft for Pantry
Loft for Store

1x19
1x3
1x10
1x1
1x3

19
3
10
1
3

2.20
1.30
2.90
2.70
2.90

0.60
0.60
0.60
0.60
1.20

1x1
1x2
1x1
1x1
1x1
1x1

1
2
1
1
1
1

3.30
6.00
10.30
3.30
4.00
1.50

0.60
0.60
0.60
0.40
0.60
0.60

25.08
2.34
17.40
1.62
10.44
0.00
1.98
7.20
6.18
1.32
2.40
0.90

Sqm

S.No

Particulars
Second Floor Roof Slab
Lecture Theater

Gents Toilet
Store
U.G.Lab
P.G.Class Room
Pantry
Lab Technician Room
P.G. Lab
Chambers for Assistant Professor
Associate Professor Room
H.O.D. Office
H.O.D. Room
Ladies Toilet
Ladies Staff Room
Corridor

Projections with slab

Detail
1x1
1x1
1x1
1x1
1x1
1x2
1x1
1x1
1x1
1x1
1x1
1x2
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x14
1x1
1x1
1x11
1x3
1x12
1x1
1x1

No

1
1
1
1
1
2
1
1
1
1
1
2
1
1
1
1
1
1
1
14
1
1
11
3
12
1
1

6.00
6.00
6.00
3.30
3.30
3.25
3.20
4.70
1.85
3.30
3.30
3.25
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
0.60
4.10
1.30
10.30
4.10

D/H

3.55
3.42
3.57
5.20
4.00
6.00
6.00
3.30
3.30
2.50
6.00
6.00
6.00
4.30
6.00
4.10
4.70
5.70
4.80
2.80
2.50
1.50
0.60
0.60
0.60
0.60
0.60

Beams, lintels, cantilevers & walls


Ground Floor
Beams at lintel level
Along X axis

2x2
1x2

4
2

2.90
3.30

3.30
0.60

Sqm

38.28
3.96
Sub Total (D) 42.24
Grand
1839.13

Sqm
Sqm

Along Y axis

1x2x2
1x2x2
1x22x2
1x8x2
1x2x2
1x14x2
1x1x2
1x2x2x2
1x2x2
1x3x2
1x12x2x2

4
4
44
16
4
28
2
8
4
6
48

2.60
2.80
3.30
3.25
3.20
3.10
3.00
3.55
3.40
2.80
2.70

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

Unit

21.30
20.53
21.43
17.16
13.20
39.00
19.20
15.51
6.11
8.25
19.80
39.00
19.80
14.19
19.80
13.53
15.51
18.81
15.84
129.36
8.25
4.95
3.96
7.38
9.36
6.18
2.46
606.72

Sub To
Stair tower slab
Chhajja

Qty

3.12
3.36
43.56
15.60
3.84
26.04
1.80
8.52
4.08
5.04
38.88

S.No

Particulars

Ground floor Slab beams


Along X axis

Along Y axis

Detail
No
1x1x2
2
1x1x2
2
2x2x2
8
2x2
4

L
2.10
3.30
1.40
2.20

4
4
56
16
4
28
2
8
4
2
32
48
2
2
6

2.60
2.80
3.30
3.25
3.20
3.10
3.00
3.55
3.40
1.70
2.80
2.70
2.10
3.30
6.00

1x2x2
1x2x2
1x28x2
1x8x2
1x2x2
1x14x2
1x1x2
1x2x2x2
1x2x2
1x1x2x2
1x16x2
1x12x2x2
1x1x2
1x1x2
1x3x2

B
D/H
0.30
0.30
0.20
0.20
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.60
Sub To

First Floor
Beams at lintel level
Along X axis

Along Y axis

First floor Slab beams


Along X axis

Along Y axis

Qty
1.26
1.98
2.24
1.76
3.12
3.36
55.44
15.60
3.84
26.04
1.80
8.52
4.08
1.02
26.88
38.88
1.26
1.98
21.60
374.50

1x2x2
1x2x2
1x22x2
1x8x2
1x2x2
1x14x2
1x1x2
1x2x2x2
1x2x2
1x3x2
1x12x2x2
1x1x2
1x1x2
2x2x2
2x2

4
4
44
16
4
28
2
8
4
6
48
2
2
8
4

2.60
2.80
3.30
3.25
3.20
3.10
3.00
3.55
3.40
2.80
2.70
2.10
3.30
1.40
2.20

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20

3.12
3.36
43.56
15.60
3.84
26.04
1.80
8.52
4.08
5.04
38.88
1.26
1.98
2.24
1.76

1x2x2
1x2x2
1x28x2
1x8x2
1x2x2
1x14x2
1x1x2
1x2x2x2
1x2x2
1x1x2x2

4
4
56
16
4
28
2
8
4
2

2.60
2.80
3.30
3.25
3.20
3.10
3.00
3.55
3.40
1.70

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

3.12
3.36
55.44
15.60
3.84
26.04
1.80
8.52
4.08
1.02

Unit

Sqm

S.No

Particulars

Second Floor Slab


Beams at lintel level
Along X axis

Along Y axis

Second floor Slab beams


Along X axis

Along Y axis

Stair tower slab beams

Detail
No
1x16x2
32
1x12x2x2
48
1x1x2
2
1x1x2
2
1x3x2
6

L
2.80
2.70
2.10
3.30
6.00

B
D/H
0.30
0.30
0.30
0.30
0.60
Sub To

1x2x2
1x2x2
1x22x2
1x8x2
1x2x2
1x14x2
1x1x2
1x2x2x2
1x2x2
1x3x2
1x12x2x2
1x1x2
1x1x2
2x2x2
2x2

4
4
44
16
4
28
2
8
4
6
48
2
2
8
4

2.60
2.80
3.30
3.25
3.20
3.10
3.00
3.55
3.40
2.80
2.70
2.10
3.30
1.40
2.20

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20

1x2x2
1x2x2
1x28x2
1x8x2
1x2x2
1x14x2
1x1x2
1x2x2x2
1x2x2
1x1x2x2
1x16x2
1x12x2x2
1x1x2
1x1x2
1x3x2

4
4
56
16
4
28
2
8
4
2
32
48
2
2
6

2.60
2.80
3.30
3.25
3.20
3.10
3.00
3.55
3.40
1.70
2.80
2.70
2.10
3.30
6.00

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.60

2x4x2
2x3x2

16
12

2.70
3.30

0.20
0.20

Qty
26.88
38.88
1.26
1.98
21.60
374.50

Unit

Sqm

3.12
3.36
43.56
15.60
3.84
26.04
1.80
8.52
4.08
5.04
38.88
1.26
1.98
2.24
1.76
3.12
3.36
55.44
15.60
3.84
26.04
1.80
8.52
4.08
1.02
26.88
38.88
1.26
1.98
21.60
Sub Total (C3) 74.50 Sqm

Sub To

8.64
7.92
16.56

Sqm

Grand Tota1l 1(A4+0B.0+6C+DS)qm

S.No
Particulars
* Stair cases of all types excluding
spiral and folded plate type, including
risers and landings
Stair
From P.L. to G.F. Slab Level
Waist slab
Landing
Risers
From G.F. Slab Level to F.F.Slab Level
Waist slab
Landing
Risers
From F.F. Slab Level to T.F.Slab Level
Waist slab
Landing
Risers

Detail

No

D/H

Qty

Unit

2x1
2x1
2x1
2x1
2x27

2
2
2
2
54

4.68
4.32
1.50
0.80
1.50

1.50
1.50
3.30
3.30
0.15

14.05
12.95
9.90
5.28
11.99

2x1
2x1
2x1
2x1
2x27

2
2
2
2
54

4.68
4.32
1.50
0.80
1.50

1.50
1.50
3.30
3.30
0.15

14.05
12.95
9.90
5.28
11.99

2x1
2x1
2x1
2x27
2x27

2
2
2
4
54

4.68
4.32
1.50
0.80
1.50

1.50
1.50
3.30
3.30
0.15
Total

14.05
12.95
9.90
10.56
11.99
167.78

Sqm

Say
Total

613.28
614.00
61400.00

Cum
Cum
Kg

875.70
312.48

Cum

Providing and placing in position


reinforcement for R.C.C. work including
straightening, cutting, bending, binding
etc. complete as per drawings including
cost of binding
wire all complete:
Thermo-Mechanically treated bars
Total R.C.C.Work
Hence Qty A @ 100 Kg / cum
7

Providing and filling in plinth with


sand/ Crusher dust and hard moorum
under floor in layers not exceeding
20cm in depth consolidating each
deposited layer by ramming and
watering, including dressing etc.
complete.
(A)Back Filling
Total quantity of excavation
Deductions

614.00

100

S.No

Particulars

Detail

No

D/H

P.C.C.
R.C.C.up to G.L.
SubTot

Qty
46.87
141.93
999.38

Unit

Cum

(B)Under floor
Lecture Theater
Gents Toilet
Store
Staircase I
U.G.Lab
P.G.Class Room
Pantry
Lab Technician Room
P.G. Lab
Chambers for Assistant Professor
Associate Professor Room
H.O.D. Office
H.O.D. Room
Staircase II
Ladies Toilet
Ladies Staff Room
Corridor

Extra filling in lecture theater

1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

6.00
3.30
3.30
3.30
10.30
4.70
1.85
3.30
3.30
6.80
3.30
3.30
3.30
3.30
3.30
3.30
3.30
49.00
3.30
3.30
3.30
6.00

11.10
5.20
4.00
6.00
6.00
3.30
3.30
2.50
6.00
6.00
6.00
4.30
6.00
6.00
4.10
4.70
5.70
2.80
2.00
2.70
1.70
8.10

Total quantity of filling


8

Brick work with modular well burnt


clay bricks of crushing strength not
less than 25 kg/sqcm and water
absorption not more than 20% in
foundation and plinth in:
Cement Mortar 1:6 (1 Cement : 6
Coarse Sand)
Along X axis

Along Y axis

1x2
1x2
1x34
1x14
1x1
1x2x2
1x2
1x1
1x3
1x12x2
1x1

2
2
34
14
1
4
2
1
3
24
1

2.60
2.80
3.30
3.10
3.00
3.55
3.40
1.70
2.80
2.70
2.10

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

0.90
59.94
0.90
15.44
0.90
11.88
0.90
17.82
0.90
55.62
0.90
13.96
0.90
5.49
0.90
7.43
0.90
17.82
0.90
36.72
0.90
17.82
0.90
12.77
0.90
17.82
0.90
17.82
0.90
12.18
0.90
13.96
0.90
16.93
0.90
123.48
0.90
5.94
0.90
8.02
0.90
5.05
0.50
24.30
SubTotal (B) 518.21
Total

1517.59

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

0.78
0.84
16.83
6.51
0.45
2.13
1.02
0.26
1.26
9.72
0.32

Cum
Cum

S.No

Particulars

Detail
No
1x1
1
1x1
1
1x1
1

L
3.30
3.55
3.40

B
D/H
0.20
0.75
0.20
0.75
0.20
0.75

Qty
0.50
0.53
0.51

Unit

For Steps to Corridor


1x2
1x2
1x2
1x2
1x2
1x2

2
2
2
2
2
2

2.90
2.90
2.90
2.90
2.90
2.90

1.80
1.50
1.20
0.90
0.60
0.30

0.30
0.15
0.15
0.15
0.15
0.15
Total

3.13
1.31
1.04
0.78
0.52
0.26
48.69

Cum

0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
Total

0.05
0.06
1.12
0.43
0.03
0.14
0.07
0.02
0.08
0.65
0.02
0.03
2.71

Cum

Providing and laying damp proof


course (upto 50mm thick) with plain
cement concrete 1:2:4 (1 cement : 2
coarse sand : 4 graded crushed stone
aggregate 20mm nominal size)
including formwork.
Along X axis

Along Y axis

1x2
1x2
1x34
1x14
1x1
1x2x2
1x2
1x1
1x3
1x12x2
1x1
1x1

2
2
34
14
1
4
2
1
3
24
1
1

2.60
2.80
3.30
3.10
3.00
3.55
3.40
1.70
2.80
2.70
2.10
3.30

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

10 Applying a coat of hot bitumen 30/40


using @ 1.7kg/ sqm on damp proof
course after cleaning the surface with
brushes and finally with a piece of
cloth lightly soaked in kerosene oil.
Along X axis

Along Y axis

1x2
1x2
1x34
1x14
1x1
1x2x2
1x2
1x1
1x3
1x12x2
1x1

2
2
34
14
1
4
2
1
3
24
1

2.60
2.80
3.30
3.10
3.00
3.55
3.40
1.70
2.80
2.70
2.10

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

1.04
1.12
22.44
8.68
0.60
2.84
1.36
0.34
1.68
12.96
0.42

S.No

Detail
No
1x1
1

Particulars

L
3.30

B
D/H
0.20
Total

Qty
0.66
54.14

Unit
Sqm

11 Brick work with modular well burnt


clay bricks of crushing strength not
less than 25 kg/sqcm and water
absorption not more than 20% in
Superstructure
Cement Mortar 1:6 (1 Cement : 6
Coarse Sand)
Ground Floor
Along X axis

1x2
1x2
1x22
1x8
1x2
1x14
1x1
1x2x2
1x2
1x1
1x1
1x3
1x12x2
1x1
1x1

2
2
22
8
2
14
1
4
2
1
1
3
24
1
1

2.60
2.80
3.30
3.25
3.20
3.10
3.00
3.55
3.40
1.70
0.40
2.80
2.70
2.10
3.30

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.60
3.40
3.40
3.40
3.40

3.54
3.81
49.37
17.68
4.35
29.51
2.04
9.66
4.62
1.16
0.29
5.71
44.06
1.43
2.24

D1
D2
D3
D4

1x12
1x1
1x1
1x2

12
1
1
2

1.20
1.10
1.00
0.90

0.20
0.20
0.20
0.20

2.10
2.10
2.10
2.10

-6.05
-0.46
-0.42
-0.76

W1
W2
W3
V

1x19
1x1
1x2
1x13

19
1
2
13

1.80
1.20
0.90
0.90

0.20
0.20
0.20
0.20

1.20
1.20
1.20
0.60

-8.21
-0.29
-0.43
-1.40

CG
Openings in Corridor

1x2
1x12
1x1

2
12
1

2.90
2.70
1.10

0.20
0.20
0.20

2.40
1.50
1.50
SubTot

-2.78
-9.72
-0.33
148.62

3.40
3.40
3.40
3.40
3.40
3.40
3.40

3.54
3.81
49.37
17.68
4.35
29.51
2.04

Along Y axis

Deductions

First Floor
Along X axis

1x2
1x2
1x22
1x8
1x2
1x14
1x1

2
2
22
8
2
14
1

2.60
2.80
3.30
3.25
3.20
3.10
3.00

0.20
0.20
0.20
0.20
0.20
0.20
0.20

Cum

S.No

Detail
No
1x2x2
4
1x2
2
1x1
1
1x1
1
1x3
3
1x12x2
24
1x1
1
1x1
1

Particulars
Along Y axis

Second Floor

L
3.55
3.40
1.70
0.40
2.80
2.70
2.10
3.30

B
D/H
0.20
3.40
0.20
3.40
0.20
3.40
0.20
3.60
0.20
3.40
0.20
3.40
0.20
3.40
0.20
3.40

Qty
9.66
4.62
1.16
0.29
5.71
44.06
1.43
2.24

Deductions
D1
D2
D3
D4

1x12
1x1
1x1
1x2

12
1
1
2

1.20
1.10
1.00
0.90

0.20
0.20
0.20
0.20

2.10
2.10
2.10
2.10

-6.05
-0.46
-0.42
-0.76

W1
W2
W3
V

1x19
1x1
1x2
1x13

19
1
2
13

1.80
1.20
0.90
0.90

0.20
0.20
0.20
0.20

1.20
1.20
1.20
0.60

-8.21
-0.29
-0.43
-1.40

CG
Openings in Corridor

1x2
1x10
1x3
1x1

2
10
3
1

2.90
1.80
2.90
1.10

0.20
0.20
0.20
0.20

2.40
1.80
1.80
1.80
SubTot

-2.78
-6.48
-3.13
-0.40
148.66

Qty. Same as First floor

SubTotal (C)148.66

Cum

On Terrace
Staircase

Deductions
D2
Parapet
Along X axis

Along Y axis

P
arapet for elevation

2x2x2
2x2
2x2x2
2x2

8
4
8
4

2.70
3.30
2.70
3.30

0.20
0.20
0.20
0.20

2.20
2.20
0.30
0.30

9.50
5.81
1.30
0.79

1x2

1.10

0.20

2.10

-0.92

1x2
1x2
1x11
1x4
1x1
1x14
1x1
1x2
1x1
1x1
1x2
1x1
1x1

2
2
11
4
1
14
1
2
1
1
2
1
1

2.60
2.80
3.30
3.25
3.20
3.10
3.00
3.55
3.40
1.70
2.70
2.80
6.40

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.70

0.94
1.01
6.53
2.34
0.58
7.81
0.54
1.28
0.61
0.31
0.97
0.50
0.90

Unit

Cum

S.No

Detail

Particulars

No

D/H
SubTot

Qty
40.79

Unit
Cum

Grand Total 4(A86+.B7+2C+DC)um


12 Half brick thick brick masonry with
modular well-burnt clay bricks of
crushing strength not less than 25
kg/sqcm and water absorption not
more than 20% in superstructure
above plinth level upto floor five level.
Cement Mortar 1:4 (1 cement : 4
coarse sand)
Ground Floor
Gents Toilet
Ladies Toilet
For Boxes

Over Chhajjas

1x1
1x2
1x1
1x2
1x19
1x25
1x2
1x3
1x6
1x1
1x2
1x19
19x2
1x13
13x2

1
2
1
2
19
25
2
3
6
1
2
19
38
13
26

2.10
1.40
2.10
1.40
0.60
0.50
0.80
2.90
2.90
2.70
6.40
2.20
0.50
1.30
0.50

Deductions
D5
1x2x2
4
0.75
SubTot
185.22 Sqm

2.10
2.10
2.10
2.10
4.75
4.75
4.75
1.75
0.50
0.50
0.50
0.20
0.20
0.20
0.20
2.10

4.41
5.88
4.41
5.88
54.15
59.38
7.60
15.23
8.70
1.35
6.40
8.36
3.80
3.38
2.60

-6.30

First Floor
Gents Toilet
Ladies Toilet
For Boxes

Over Chhajjas

Deductions

1x1
1x2
1x1
1x2
1x17
1x21
1x2
1x3
1x5x2
1x10
1x19
19x2
1x13
13x2

1
2
1
2
17
21
2
3
10
10
19
38
13
26

2.10
1.40
2.10
1.40
0.60
0.50
0.80
2.90
2.10
0.50
2.20
0.50
1.30
0.50

2.10
2.10
2.10
2.10
3.70
3.70
3.70
2.70
0.50
0.50
0.20
0.20
0.20
0.20

4.41
5.88
4.41
5.88
37.74
38.85
5.92
23.49
10.50
2.50
8.36
3.80
3.38
2.60

S.No

Particulars
D5
Opening

Detail
No
1x2x2
4
1x3
3

L
0.75
2.90

D/H
2.10
1.80
SubTot

Qty
-6.30
-15.66
135.76

Unit

Sqm

Second Floor
Gents Toilet
Ladies Toilet
For Boxes

Over Chhajjas

Deductions
D5
Opening

1x1
1x2
1x1
1x2
1x17
1x21
1x2
1x3
1x5x2
1x10

1
2
1
2
17
21
2
3
10
10

2.10
1.40
2.10
1.40
0.60
0.50
0.80
2.90
2.10
0.50

2.10
2.10
2.10
2.10
3.70
3.70
3.70
2.70
0.50
0.50

4.41
5.88
4.41
5.88
37.74
38.85
5.92
23.49
10.50
2.50

1x19
19x2
1x13
13x2

19
38
13
26

2.20
0.50
1.30
0.50

0.20
0.20
0.20
0.20

8.36
3.80
3.38
2.60

1x2x2
1x3

4
3

0.75
2.90

2.10
-6.30
1.80
-15.66
SubTotal (C)135.76

Sqm

0.20
0.20
SubTot

Sqm

Terrace Floor
Over Chhajjas

1x2
2x2

2
4

3.70
0.50

1.48
0.40
1.88

Grand Total 4(A58+.B6+2C+DS)qm


13 Providing wood work in frames of
doors, windows, clerestory windows
and other frames wrought framed and
fixed in position.
Sal, bijasal, benteak, khair, haldu
Ground Floor
D1
D2
D3
D4
D5

1x12
1x1
1x1
1x2
1x4

12
1
1
2
4

5.40
5.30
5.20
5.10
4.95

0.100
0.100
0.100
0.100
0.100

0.125
0.125
0.125
0.125
0.125

0.81
0.07
0.07
0.13
0.25

D1
D2
D3
D4

1x12
1x1
1x1
1x2

12
1
1
2

5.40
5.30
5.20
5.10

0.100
0.100
0.100
0.100

0.125
0.125
0.125
0.125

0.81
0.07
0.07
0.13

First Floor

S.No

Particulars
D5

Detail
No
1x4
4

L
4.95

B
D/H
0.100 0.125

Qty

Unit
0.25

Second Floor
D1
D2
D3
D4
D5

1x12
1x1
1x1
1x2
1x4

12
1
1
2
4

5.40
5.30
5.20
5.10
4.95

0.100
0.100
0.100
0.100
0.100

0.125
0.125
0.125
0.125
0.125

0.81
0.07
0.07
0.13
0.25

D2

1x2

5.30

0.100

0.125
Total

0.13
4.08

Staircase
Cum

14 Providing and fixing flush door


shutters, core of block board
construction with frame of first class
hard wood and well matched first
class Indian teak ply veneering on
one face and commercial ply
veneering on the other face of the
shutter with vertical grains, cross
bands and face veneering excluding
hinges.
35 mm. thick (single leaf)
Ground Floor
D1
D2
D3
D4

1x12
1x1
1x1
1x2

12
1
1
2

1.20
1.10
1.00
0.90

2.10
2.10
2.10
2.10

30.24
2.31
2.10
3.78

D1
D2
D3
D4

1x12
1x1
1x1
1x2

12
1
1
2

1.20
1.10
1.00
0.90

2.10
2.10
2.10
2.10

30.24
2.31
2.10
3.78

D1
D2
D3
D4

1x12
1x1
1x1
1x2

12
1
1
2

1.20
1.10
1.00
0.90

2.10
2.10
2.10
2.10

30.24
2.31
2.10
3.78

D2

1x2

1.10

2.10

4.62
119.91

First Floor

Second Floor

Staircase
Total

Sqm

S.No
Particulars
15 Providing and fixing aluminium work
for doors, windows, ventilators and
partitions made out of extruded
aluminium standard sections (main
section with minimum 1.5mm
thickness) conforming to IS: 733, IS:
1285 mitred and jointed mechanically
including aluminium cleats, neoprene
weather stripping gasket beveled
edge beading, screws duly fixed in
wall/ floor with fixing clips or hold
fasteners or bolts and nuts as
required aluminium sections shall be
anodized transparent or dyed to
approved shade according to IS:
1868, minimum anodic coating shall
be of grade AC-15. (Glazing and
panelling to be paid for separately

For shutter of doors, windows &


ventilators including providing and
making provision for fixing of fitting
wherever required including the cost
of PVC/ neoprene gasket required
(Fittings shall be paid for separately).
Ground Floor
W1
W2
W3
V
First Floor

Second Floor

Detail

No

D/H

Qty

1x19
1x1
1x2
1x13

19
1
2
13

1.80
1.20
0.90
0.90

0.20
0.20
0.20
0.20

1.20
1.20
1.20
0.60

41.04
1.44
2.16
7.02

W1
W2
W3
V

1x19
1x1
1x2
1x13

19
1
2
13

1.80
1.20
0.90
0.90

0.20
0.20
0.20
0.20

1.20
1.20
1.20
0.60

41.04
1.44
2.16
7.02

W1
W2
W3
V

1x19
1x1
1x2
1x13

19
1
2
13

1.80
1.20
0.90
0.90

0.20
0.20
0.20
0.20

1.20
1.20
1.20
0.60
Total
@
Total

Unit

41.04
1.44
2.16
7.02
154.98 Sqm
8.00 Kg/Sqm
1239.84
Kg

S.No
Particulars
16 Providing and fixing glazing in
aluminium door, window, ventilator
shutters and partitions etc. with PVC/
neoprene gasket etc. complete. (Cost
of aluminium snap beading shall be
paid in basic item):
With float glass panes of 4 mm
thickness
Ground Floor
W1
W2
W3
V
First Floor

Second Floor

Detail

No

D/H

Qty

1x19
1x1
1x2
1x13

19
1
2
13

1.80
1.20
0.90
0.90

0.20
0.20
0.20
0.20

1.20
1.20
1.20
0.60

41.04
1.44
2.16
7.02

W1
W2
W3
V

1x19
1x1
1x2
1x13

19
1
2
13

1.80
1.20
0.90
0.90

0.20
0.20
0.20
0.20

1.20
1.20
1.20
0.60

41.04
1.44
2.16
7.02

W1
W2
W3
V

1x19
1x1
1x2
1x13

19
1
2
13

1.80
1.20
0.90
0.90

0.20
0.20
0.20
0.20

1.20
1.20
1.20
0.60
Total

41.04
1.44
2.16
7.02
154.98

Unit

Sqm

S.No
Particulars
17 Providing and fixing 30mm thick
factory made panel PVC door shutter
consisting of frame made out of M.S.
tubes of 19 gauge thickness and size
of 19mm x 19mm for styles and
15x15mm for top & bottom rails. M.S.
frame shall have a coat of steel
primers of approved make and
manufacture . M.S. frame covered
with 5mm thick heat moulded PVC 'C'
channel of size 30mm thickness,
70mm width out of which 50mm shall
be flat and 20mm shall be tapered in
45degree angle on either side forming
styles; and 5mm thick, 95mm wide
PVC sheet out of which 75mm shall
be flat and 20mm shall be tapered in
45 degree on the inner side to form
top and bottom rail and 115mm wide
PVC sheet out of which 75mm shall
be flat and 20mm shall be tapered on
both sides to form lock rail. Top,
bottom and lock rails shall be
provided either side of the panel.
10mm (5mm x 2 ) thick, 20mm wide
cross PVC sheet be provided as gap
insert for top rail & bottom rail.
paneling of 5mm thick both side PVC
sheet to be fitted in the M.S. frame
welded/ sealed to the styles & rails
with 7mm (5mm+2mm) thick x 15mm
wide PVC sheet beading on inner
side, and joined together with solvent
cement adhesive. An additional 5mm
thick PVC strip of 20mm width is to be
Both side Pre-laminated panel PVC
door shutter
Ground Floor
First Floor
Second Floor

18 Providing and fixing S.S. finished


brass butt hinges with necessary S.S.
finished MS screws complete:
125x85x5.50 mm (Heavy Type)
Ground Floor
D1
D2
D3
D4
D5

Detail

1x4
1x4
1x4

1x12x3
1x1x3
1x1x3
1x2x3
1x4x3

No

4
4
4

36
3
3
6
12

0.75
0.75
0.75

D/H

2.10
2.10
2.10
Total

Qty

6.30
6.30
6.30
18.90

36.00
3.00
3.00
6.00
12.00

Unit

Sqm

S.No

Detail

Particulars

No

D/H

Qty

Unit

First Floor
D1
D2
D3
D4
D5

1x12x3
1x1x3
1x1x3
1x2x3
1x4x3

36
3
3
6
12

36.00
3.00
3.00
6.00
12.00

D1
D2
D3
D4
D5

1x12x3
1x1x3
1x1x3
1x2x3
1x4x3

36
3
3
6
12

36.00
3.00
3.00
6.00
12.00

D2

1x2x3

Second Floor

Staircase
Total
19 Providing and fixing S.S. finished
brass sliding door bolt with necessary
bolts, nuts and S.S. finished MS
screws complete:
300x16 mm
Ground Floor
D1
D2
D3
D4
D5
First Floor
D1
D2
D3
D4
D5
Second Floor
D1
D2
D3
D4
D5
Staircase
D2

1x12x2
1x1x2
1x1x2
1x2x2
1x4x2

24
2
2
4
8

24.00
2.00
2.00
4.00
8.00

1x12x2
1x1x2
1x1x2
1x2x2
1x4x2

24
2
2
4
8

24.00
2.00
2.00
4.00
8.00

1x12x2
1x1x2
1x1x2
1x2x2
1x4x2

24
2
2
4
8

24.00
2.00
2.00
4.00
8.00

1x2x2

4
Total

20 Providing and fixing S.S. finished


brass door latch with necessary S.S.
finished MS screws complete:
250x16x5mm
Ground Floor

6.00
186.00

4.00
124.00

Nos

Nos

S.No

Particulars
D1
D2
D3
D4
D5

Detail
No
1x12x2
24
1x1x2
2
1x1x2
2
1x2x2
4
1x4x2
8

D/H

Qty
24.00
2.00
2.00
4.00
8.00

Unit

First Floor
D1
D2
D3
D4
D5

1x12x2
1x1x2
1x1x2
1x2x2
1x4x2

24
2
2
4
8

24.00
2.00
2.00
4.00
8.00

D1
D2
D3
D4
D5

1x12x2
1x1x2
1x1x2
1x2x2
1x4x2

24
2
2
4
8

24.00
2.00
2.00
4.00
8.00

D2

1x2x2

4.00
124.00

Second Floor

Staircase
Total
21 Providing and fixing S.S. finished
brass handle with necessary S.S.
finished MS screws complete:
125 mm
Ground Floor
D1
D2
D3
D4
D5
First Floor
D1
D2
D3
D4
D5
Second Floor
D1
D2
D3
D4
D5
Staircase
D2

1x12x2
1x1x2
1x1x2
1x2x2
1x4x2

24
2
2
4
8

24.00
2.00
2.00
4.00
8.00

1x12x2
1x1x2
1x1x2
1x2x2
1x4x2

24
2
2
4
8

24.00
2.00
2.00
4.00
8.00

1x12x2
1x1x2
1x1x2
1x2x2
1x4x2

24
2
2
4
8

24.00
2.00
2.00
4.00
8.00

1x2x2

4.00
124.00

Total

Nos

Nos

S.No
Particulars
22 Providing and fixing 150mm S.S.
finished brass floor door stoppers with
rubber cushion with necessary S.S.
finished MS screws to suit thickness
of shutters.
Ground Floor
D1
D2
D3
D4
D5
First Floor
D1
D2
D3
D4
D5
Second Floor
D1
D2
D3
D4
D5
Staircase
D2

Detail

No

D/H

Qty

Unit

1x12x1
1x1x1
1x1x1
1x2x1
1x4x1

12
1
1
2
4

12.00
1.00
1.00
2.00
4.00

1x12x1
1x1x1
1x1x1
1x2x1
1x4x1

12
1
1
2
4

12.00
1.00
1.00
2.00
4.00

1x12x1
1x1x1
1x1x1
1x2x1
1x4x1

12
1
1
2
4

12.00
1.00
1.00
2.00
4.00

1x2x1

2.00
62.00

Total

Nos

23 Providing and fixing S.S. finished


brass tower bolts (Barrel type) with
necessary S.S. finished MS screws
complete:
200 x10mm
Ground Floor
D1
D2
D1
D2

1x12x1
1x1x1
1x12x1
1x1x1

12
1
12
1

12.00
1.00
12.00
1.00

Second Floor

D1
D2

1x12x1
1x1x1

12
1

12.00
1.00

Staircase

D2

1x2x1

First Floor

Total
150 x 10 mm
Ground Floor

D3
D4

1x1x1
1x2x1

1
2

2.00
41.00

1.00
2.00

Nos

S.No

Particulars
D5

Detail
No
1x4x1
4

D/H

Qty

Unit
4.00

First Floor
D3
D4
D5

1x1x1
1x2x1
1x4x1

1
2
4

1.00
2.00
4.00

D3
D4
D5

1x1x1
1x2x1
1x4x1

1
2
4
Total

1.00
2.00
4.00
21.00

Second Floor

Nos

24 Providing and fixing both side polished


30 mm thick RAJIM SAND STONE
shelves fixed in walls in cement mortar
1:3 (1 cement : 3 coarse sand)
including finishing complete.
Ground Floor
Shelves of Pantry
Shelves of Store

1x3
1x3
1x3

3
3
3

3.300
4.000
1.500

0.70
0.70
0.70

6.93
8.40
3.15

Shelves of Pantry
Shelves of Store

1x3
1x3
1x3

3
3
3

3.300
4.000
1.500

0.70
0.70
0.70

6.93
8.40
3.15

Shelves of Pantry
Shelves of Store

1x3
1x3
1x3

3
3
3

3.300
4.000
1.500

0.70
0.70
0.70
Total

6.93
8.40
3.15
55.44

First Floor

Second Floor

25 Providing and fixing M.S. grill of


approved pattern made of M.S. flats
or square or round bars welded to
steel frame of windows etc. including
applying a priming coat of red oxide
zinc chromate primer..
Ground Floor
W1
W2
W3
V
Grills

1x19
1x1
1x2
1x13
1x11
1x1
1x1

19
1
2
13
11
1
1

1.80
1.20
0.90
0.90
2.90
2.70
1.10

0.20
0.20
0.20
0.20
0.20
0.20
0.20

1.20
1.20
1.20
0.60
1.50
1.50
1.50

41.04
1.44
2.16
7.02
47.85
4.05
1.65

W1
W2

1x19
1x1

19
1

1.80
1.20

0.20
0.20

1.20
1.20

41.04
1.44

First Floor

Sqm

S.No

Particulars
W3

Detail
No
1x2
2

L
0.90

B
D/H
0.20
1.20

Qty

Unit
2.16
V

1x13
13
0.90
Second Floor
0.20
0.60
7.02
Grills
1x11
11
1.80
0.20
1.80
35.64

1x3
3
2.90
0.20
1.80
15.66

1x1
1
1.10
0.20
1.80
1.98

W1
1x19
19
1.80
0.20
1.20
41.04
W2
1x1
1
1.20

S.No

Detail
No
Particulars
1x1
1
Lecture Theater
1x1
1
Gents Toilet
1x1
1
Store
1x1
1
U.G.Lab
1x1
1
P.G.Class Room
1x1
1
Pantry
1x1
1
Lab Technician Room
1x1
1
P.G. Lab
1x1
1
Chambers for Assistant Professor
1x1
1
Associate Professor Room
1x1
1
H.O.D. Office
1x1
1
H.O.D. Room
1x1
1
Ladies Toilet
1x1
1
Ladies Staff Room
1x1
1
Corridor
1x1
1
1x1
1
1x1
1
1x1
1
1x1
1
Ceiling of Stair
1x1
1
1x1
1
Landing
1x1
1
1x19
19
Chhajja
1x3
3
1x10
10
1x1
1
1x3
3

L
6.00
3.30
3.30
10.30
4.70
1.85
3.30
3.30
6.80
3.30
3.30
3.30
3.30
3.30
3.30
49.00
3.30
3.30
3.30
4.68
4.32
1.50
0.80
2.20
1.30
2.90
2.70
2.90

B
D/H
11.10
5.20
4.00
6.00
3.30
3.30
2.50
6.00
6.00
6.00
4.30
6.00
4.10
4.70
5.70
2.80
2.00
2.70
1.70
1.50
1.50
3.30
3.30
0.60
0.60
0.60
0.60
1.20

6.00
3.30
3.30
10.30
4.70
1.85
3.30
3.30
6.80
3.30
3.30
3.30
3.30
3.30
3.30
49.00
3.30
3.30
3.30

11.10
5.20
4.00
6.00
3.30
3.30
2.50
6.00
6.00
6.00
4.30
6.00
4.10
4.70
5.70
2.80
2.00
2.70
1.70

Qty
66.60
17.16
13.20
61.80
15.51
6.11
8.25
19.80
40.80
19.80
14.19
19.80
13.53
15.51
18.81
137.20
6.60
8.91
5.61
7.03
6.47
4.95
2.64
25.08
2.34
17.40
1.62
10.44

First floor
Lecture Theater
Gents Toilet
Store
Seminar Hall
P.G.Class Room
Pantry
Lab Technician Room
P.G. Lab
Chambers for Assistant Professor
Associate Professor Room
H.O.D. Office
H.O.D. Room
Ladies Toilet
Ladies Staff Room
Corridor

1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

66.60
17.16
13.20
61.80
15.51
6.11
8.25
19.80
40.80
19.80
14.19
19.80
13.53
15.51
18.81
137.20
6.60
8.91
5.61

Unit

S.No

Particulars
Ceiling of Stair
Landing
Chhajja

Detail
No
1x1
1
1x1
1
1x1
1
1x1
1
1x19
19
1x3
3
1x10
10
1x1
1
1x3
3

L
4.68
4.32
1.50
0.80
2.20
1.30
2.90
2.70
2.90

B
D/H
1.50
1.50
3.30
3.30
0.60
0.60
0.60
0.60
1.20

Qty
7.03
6.47
4.95
2.64
25.08
2.34
17.40
1.62
10.44

6.00
3.30
3.30
10.30
4.70
1.85
3.30
3.30
6.80
3.30
3.30
3.30
3.30
3.30
3.30
49.00
3.30
3.30
3.30
4.68
4.32
1.50
0.80
2.20
1.30
2.90
2.70
2.90
3.30
3.30

11.10
5.20
4.00
6.00
3.30
3.30
2.50
6.00
6.00
6.00
4.30
6.00
4.10
4.70
5.70
2.80
2.00
2.70
1.70
1.50
1.50
3.30
3.30
0.60
0.60
0.60
0.60
1.20
6.00
0.60

66.60
17.16
13.20
61.80
15.51
6.11
8.25
19.80
40.80
19.80
14.19
19.80
13.53
15.51
18.81
137.20
6.60
8.91
5.61
7.03
6.47
4.95
2.64
25.08
2.34
17.40
1.62
10.44
39.60
3.96
1805.02

Unit

Second Floor
Lecture Theater
Gents Toilet
Store
U.G.Lab
P.G.Class Room
Pantry
Lab Technician Room
P.G. Lab
Chambers for Assistant Professor
Associate Professor Room
H.O.D. Office
H.O.D. Room
Ladies Toilet
Ladies Staff Room
Corridor

Ceiling of Stair
Landing
Chhajja

Staircase Tower

1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x19
1x3
1x10
1x1
1x3
1x2
1x2

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
19
3
10
1
3
2
2

Total
29 12mm thick cement plaster of mix:
In Cement Mortar 1:5 (1 cement : 5
fine sand)
Ground Floor
Lecture Theater

1x2
1x2

2
2

6.00
11.10

3.88
3.88

46.56
86.14

Sqm

S.No

Detail
No
1x2
2
1x2
2
1x2
2
Store
1x2
2
1x2
2
U.G.Lab
1x2
2
1x2
2
P.G.Class Room
1x2
2
1x2
2
Pantry
1x2
2
1x2
2
Lab Technician Room
1x2
2
1x2
2
P.G. Lab
1x2
2
1x2
2
Chambers for Assistant Professor
1x2
2
1x2
2
Associate Professor Room
1x2
2
1x2
2
H.O.D. Office
1x2
2
1x2
2
H.O.D. Room
1x2
2
1x2
2
Ladies Toilet
1x2
2
1x2
2
Ladies Staff Room
1x2
2
1x2
2
Staircase I
1x1
1
1x2
2
Staircase II
1x1
1
1x2
2
Corridor
1x2
2
1x2
2
1x2
2
Deductions
1x12
12
D1
1x1
1
D2
1x1
1
D3
1x2
2
D4
Particulars

Gents Toilet

L
3.30
5.20
3.30
4.00
10.30
6.00
4.70
3.30
1.85
3.30
3.30
2.50
3.30
6.00
6.80
6.00
3.30
6.00
3.30
4.30
3.30
6.00
3.30
4.10
3.30
4.70
6.00
3.30
6.00
3.30
52.30
5.70
2.00
1.70

B
D/H
1.58
1.58
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
1.58
1.58
3.88
3.88
4.00
4.00
4.00
4.00
3.88
3.88
3.88
3.88

Qty
10.43
16.43
25.61
31.04
79.93
46.56
36.47
25.61
14.36
25.61
25.61
19.40
25.61
46.56
52.77
46.56
25.61
46.56
25.61
33.37
25.61
46.56
10.43
12.96
25.61
36.47
48.00
13.20
48.00
13.20
405.85
44.23
15.52
13.19

1.20
1.10
1.00
0.90

2.10
2.10
2.10
2.10

-30.24
-2.31
-2.10
-3.78

W1
W2
W3
V

1x19
1x1
1x2
1x13

19
1
2
13

1.80
1.20
0.90
0.90

1.20
1.20
1.20
0.60

-41.04
-1.44
-2.16
-7.02

CG
Openings in Corridor

1x2
1x12
1x1

2
12
1

2.90
2.70
1.10

2.40
1.50
1.50

-13.92
-48.60
-1.65

Unit

S.No

Detail

Particulars

No

D/H
SubTot

Qty
1396.95

First floor
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x1
1x2
1x1
1x2
1x2
1x2
1x2

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
2
1
2
2
2
2

6.00
11.10
3.30
5.20
3.30
4.00
10.30
6.00
4.70
3.30
1.85
3.30
3.30
2.50
3.30
6.00
6.80
6.00
3.30
6.00
3.30
4.30
3.30
6.00
3.30
4.10
3.30
4.70
6.00
3.30
6.00
3.30
52.30
5.70
2.00
1.70

3.88
3.88
1.58
1.58
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
1.58
1.58
3.88
3.88
4.00
4.00
4.00
4.00
3.88
3.88
3.88
3.88

46.56
86.14
10.43
16.43
25.61
31.04
79.93
46.56
36.47
25.61
14.36
25.61
25.61
19.40
25.61
46.56
52.77
46.56
25.61
46.56
25.61
33.37
25.61
46.56
10.43
12.96
25.61
36.47
48.00
13.20
48.00
13.20
405.85
44.23
15.52
13.19

Deductions
D1
D2
D3
D4

1x12
1x1
1x1
1x2

12
1
1
2

1.20
1.10
1.00
0.90

2.10
2.10
2.10
2.10

-30.24
-2.31
-2.10
-3.78

W1
W2
W3

1x19
1x1
1x2

19
1
2

1.80
1.20
0.90

1.20
1.20
1.20

-41.04
-1.44
-2.16

Lecture Theater
Gents Toilet
Store
Seminar Hall
P.G.Class Room
Pantry
Lab Technician Room
P.G. Lab
Chambers for Assistant Professor
Associate Professor Room
H.O.D. Office
H.O.D. Room
Ladies Toilet
Ladies Staff Room
Staircase I
Staircase II
Corridor

Unit
Sqm

S.No

Particulars
V
Openings in Corridor

Detail
No
1x13
13
1x10
10
1x3
3

L
0.90
1.80
2.90

B
D/H
0.60
1.80
1.80
SubTot

Qty
-7.02
-32.40
-15.66
1413.06

Second Floor
Lecture Theater
Gents Toilet
Store
U.G. Lab
P.G.Class Room
Pantry
Lab Technician Room
P.G. Lab
Chambers for Assistant Professor
Associate Professor Room
H.O.D. Office
H.O.D. Room
Ladies Toilet
Ladies Staff Room
Staircase I
Staircase II
Corridor

Deductions
D1
D2
D3
D4

1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x1
1x2
1x1
1x2
1x2
1x2
1x2

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
2
1
2
2
2
2

6.00
11.10
3.30
5.20
3.30
4.00
10.30
6.00
4.70
3.30
1.85
3.30
3.30
2.50
3.30
6.00
6.80
6.00
3.30
6.00
3.30
4.30
3.30
6.00
3.30
4.10
3.30
4.70
6.00
3.30
6.00
3.30
52.30
5.70
2.00
1.70

3.88
3.88
1.58
1.58
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
1.58
1.58
3.88
3.88
4.00
4.00
4.00
4.00
3.88
3.88
3.88
3.88

46.56
86.14
10.43
16.43
25.61
31.04
79.93
46.56
36.47
25.61
14.36
25.61
25.61
19.40
25.61
46.56
52.77
46.56
25.61
46.56
25.61
33.37
25.61
46.56
10.43
12.96
25.61
36.47
48.00
13.20
48.00
13.20
405.85
44.23
15.52
13.19

1x12
1x1
1x1
1x2

12
1
1
2

1.20
1.10
1.00
0.90

2.10
2.10
2.10
2.10

-30.24
-2.31
-2.10
-3.78

Unit

Sqm

S.No

Particulars
W1
W2
W3
V
Openings in Corridor

Detail
No
1x19
19
1x1
1
1x2
2
1x13
13
1x10
1x3

10
3

L
1.80
1.20
0.90
0.90
1.80
2.90

B
D/H
1.20
1.20
1.20
0.60
1.80
1.80
SubTot

Qty
-41.04
-1.44
-2.16
-7.02
-32.40
-15.66
1413.06

Unit

Sqm

Stair Tower

Deductions
D2

2x2
2x2

4
4

3.30
6.00

2.38
2.38

31.42
57.12

1x2

1.10

2.10

-4.62
SubTotal (D) 83.92
Total A
4306.98

30 18 mm thick cement plaster with


under layer of 12mm thick cement
plaster 1:5 (1 cement : 5 fine sand)
finished with a top layer of 6mm thick
cement plaster 1:3 (1 cement : 3 fine
sand).
1x1
1x1
1x6
1x10
1x2
1x1
1x6
1x6
1x6
1x6
1x1
1x6
1x1
1x2
1x14x2
1x3x2
1x4x2

1
1
6
10
2
1
6
6
6
6
1
6
1
2
18
6
8

62.60
2.70
0.60
0.60
0.60
0.60
1.20
1.20
0.60
0.60
10.30
0.60
62.40
3.70
0.20
0.30
0.20

13.95
13.95
12.93
11.75
12.93
13.95
7.75
2.75
6.70
3.70
1.30
3.15
13.95
1.80
13.95
13.95
1.80

873.27
37.67
46.55
70.50
15.52
8.37
55.80
19.80
24.12
13.32
13.39
11.34
870.48
13.32
50.22
25.11
2.88

Left side
Offsets

1x1
1x2x2

1
4

12.10
0.30

13.95
13.95

168.80
16.74

Right side
Offsets

1x1
1x1

1
1

10.20
0.20

13.95
13.95

142.29
2.79

Outer side of Staircase above terrace


floor

1x2

3.70

2.70

19.98

Front side
Offsets

Back side
Offsets

Sqm
Sqm

S.No

Detail
No
1x2x2
4

Particulars

Inner & Top Side Of Parapet

L
6.40

D/H
2.70

Qty
69.12

1x1
1x1
1x1
1x2
1x1
1x1

1
1
1
2
1
1

13.00
38.30
3.30
11.10
52.40
10.30

1.10
1.10
1.10
1.10
1.10
1.70

14.30
42.13
3.63
24.42
57.64
17.51

1x19x3x2
1x19x3x2
1x3x3x2
1x3x3x2
1x10x3x2
1x10x3x2
1x1x3x2
1x1x3x2
1x3x3x2
1x3x3x2
1x12x3x2
1x12x3x2
1x4x2
1x4x2
1x8x2
1x8x2
1x2x2
1x2x2

104
104
18
18
60
60
6
6
18
18
72
72
8
8
16
16
4
4

2.20
0.50
1.30
0.50
2.90
0.50
2.70
0.50
2.90
0.50
1.30
0.50
4.80
0.50
2.00
0.50
6.40
0.50

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
Total

137.28
31.20
14.04
5.40
104.40
18.00
9.72
1.80
31.32
5.40
56.16
21.60
23.04
2.40
19.20
4.80
15.36
1.20
3233.31

Unit

Inner side of Chhajjas

31 Providing and laying vitrified floor tiles


with double charge/ multi charge
printing with water absorption less
than 0.5% and conforming to IS :
15622 of approved make in all
colours and shades and size
mentioned below (+/- 10mm), laid on
20mm thick cement mortar 1:4 (1
cement : 4 coarse sand) including
grouting the joints with white cement
and matching pigments etc. complete:
Size 600x600mm
Ground Floor
Lecture Theater
Floor
Door Sill
Skirting

1x1
1x1
1x2
1x2
1x9

1
1
2
2
9

6.00
1.20
6.00
11.10
6.00

11.10
0.20
0.15
0.15
0.15

66.60
0.24
1.80
3.33
8.10

Sqm.

S.No

Particulars
Deductions

Detail
No
1x1
1

L
1.10

B
D/H
0.15

Qty
-0.17

Store
Floor
Door Sill
Skirting
Deductions

1x1
1x1
1x2
1x2
1x1

1
1
2
2
1

3.30
1.20
3.30
4.00
1.20

4.00
0.20
0.15
0.15
0.15

13.20
0.24
0.99
1.20
-0.18

1x1
1x2
1x2
1x2
1x2
1x1

1
2
2
2
2
1

10.30
1.20
6.00
11.30
1.20
3.30

6.00
0.20
0.15
0.15
0.15
2.50

61.80
0.48
1.80
3.39
-0.36
8.25

1x1
1x2
1x2
1x1

1
2
2
1

1.20
3.30
2.50
1.20

0.20
0.15
0.15
0.15

0.24
0.99
0.75
-0.18

1x1
1x1
1x2
1x2
1x1

1
1
2
2
1

4.70
1.20
4.70
3.30
1.20

3.30
0.20
0.15
0.15
0.15

15.51
0.24
1.41
0.99
-0.18

1x1
1x1
1x2
1x2
1x1

1
1
2
2
1

1.85
1.20
1.85
3.30
1.20

3.30
0.20
0.15
0.15
0.15

6.11
0.24
0.56
0.99
-0.18

U.G.Lab
Floor
Door Sill
Skirting
Deductions
Floor

Lab Technician Room

Door Sill
Skirting
Deductions
P.G. Class Room
Floor
Door Sill
Skirting
Deductions
Pantry
Floor
Door Sill
Skirting
Deductions
P.G. Lab

Unit

1x1
1x1
1x2
1x2
1x1

1
1
2
2
1

3.30
1.20
3.30
6.00
1.20

6.00
0.20
0.15
0.15
0.15

19.80
0.24
0.99
1.80
-0.18

Deductions

1x1
1x1
1x2
1x2
1x1

1
1
2
2
1

6.80
1.20
6.80
6.00
1.20

6.00
0.20
0.15
0.15
0.15

40.80
0.24
2.04
1.80
-0.18

Floor
Door Sill
Skirting

1x1
1x1
1x2

1
1
2

3.30
1.20
3.30

6.00
0.20
0.15

19.80
0.24
0.99

Floor
Door Sill
Skirting
Deductions
Chambers for Assistant Professor
Floor
Door Sill
Skirting

Associate Professor Room

S.No

Particulars
Deductions
H.O.D. Office
Floor
Door Sill
Skirting

L
6.00
1.20

Unit

3.30
1.20
3.30
4.30
1.20
1.10

4.30
0.20
0.15
0.15
0.15
0.15

14.19
0.24
0.99
1.29
-0.18
-0.17

1x1
1x1
1x1
1x2
1x2
1x1
1x1

1
1
1
2
2
1
1

3.30
1.20
1.10
3.30
6.00
1.20
1.10

6.00
0.20
0.20
0.15
0.15
0.15
0.15

19.80
0.24
0.22
0.99
1.80
-0.18
-0.17

1x1
1
3.30
1x1
1
1.00
Skirting
1x1
1
1.20
1x1
1
0.90
1x2
2
3.30
1x2
2
5.80
1x1
1
1.20
1x1
1
0.90
Qty. Same as Ground floor

4.70
1.10
0.20
0.20
0.15
0.15
0.15
0.15

15.51
1.10
0.24
0.18
0.99
1.74
-0.18
-0.14
SubTotal (B)346.71
SubTot
346.71

Sqm
Sqm

SubTot

346.71

Sqm

Total A+B+1C04=0.13

Sqm.

Floor
Door Sill

Deductions
Ladies Staff Room
Floor
Door Sill

First Floor

Qty
1.80
-0.18

1
1
2
2
1
1

Skirting

Deductions

B
D/H
0.15
0.15

1x1
1x1
1x2
1x2
1x1
1x1

Deductions
H.O.D. Room

Detail
No
1x2
2
1x1
1

Second Floor

32 25 mm thick KOTA stone slab flooring


over 20mm (average) thick base of
cement mortar 1:4 laid over and
jointed with grey cement slurry mixed
with pigment to match the shade of
the slab including grinding rubbing
and polishing etc. complete (Area of
slab to be over 0.20 sq.m and upto
0.50 sq.m)
Ground Floor
Corridor

Qty. Same as Ground floor

1x1
1x1
1x1
1x1
1x1

1
1
1
1
1

3.30
48.80
3.30
3.30
3.30

5.70
2.80
2.00
2.70
1.70

18.81
136.64
6.60
8.91
5.61

S.No

Particulars
Staircase Room I
Staircase Room II

Detail
No
1x2
2
1x1
1
1x1
1

L
2.90
3.30
3.30

B
D/H
0.20
6.00
6.00

Qty
1.16
19.80
19.80

Unit

First Floor
Corridor

1x1
1x1
1x1
1x1
1x1
1x2
1x3

1
1
1
1
1
2
3

3.30
48.80
3.30
3.30
3.30
2.90
2.90

5.70
2.80
2.00
2.70
1.70
0.20
0.60

18.81
136.64
6.60
8.91
5.61
1.16
5.22

Corridor

1x1
1x1
1x1
1x1
1x1
1x2

1
1
1
1
1
2

3.30
48.80
3.30
3.30
3.30
2.90

5.70
2.80
2.00
2.70
1.70
0.20

18.81
136.64
6.60
8.91
5.61
1.16
578.01

Second Floor

Total
33 KOTA stone slab 25mm thick in risers
and treads of steps, skirting dado and
pillar laid in 12mm (average) thick
cement mortar 1:3 (1 cement : 3
coarse sand) and jointed with grey
cement slurry mixed with pigment to
match the shade of the slab including
rubbing and polishing complete.
(single stone is to be used for riser and
treads of steps and the width of stone for
skirting and dado shall be equal to the height
of skirting/ dado with a minimum length of 1.0
M.)
Stair
From P.L. to G.F. Slab Level
Riser
Tread
Landing

2x27
2x25
2x1
2x1

54
50
2
2

1.50
1.50
1.50
1.00

0.15
0.30
3.30
3.30

11.99
22.50
9.90
6.60

2x27
2x25
2x1
2x1

54
50
2
2

1.50
1.50
1.50
1.00

0.15
0.30
3.30
3.30

11.99
22.50
9.90
6.60

2x27

54

1.50

0.15

11.99

From G.F. Slab Level to F.F.Slab Level


Riser
Tread
Landing
From F.F. Slab Level to S.F.Slab Level
Riser

Sqm.

S.No

Particulars
Tread
Landing

Detail
No
2x25
50
2x1
2
2x1
2

L
1.50
1.50
1.00

B
D/H
0.30
3.30
3.30

Qty
22.50
9.90
6.60

Unit

Steps to Corridor

Skirting of Corridor
G.F.

F.F.

S.F.

2x4
2x5

8
10

2.90
2.90

0.30
0.15

6.96
4.35

1x2
1x2
1x2
1x2
1x2
1x2x2
1x2
1x2
1x2
1x2
1x2
1x3x2
1x2
1x2
1x2
1x2
1x2

2
2
2
2
2
2
2
2
2
2
2
6
2
2
2
2
2

52.30
5.70
2.00
2.70
1.70
6.20
52.30
5.70
2.00
2.70
1.70
0.60
52.30
5.70
2.00
2.70
1.70

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

15.69
1.71
0.60
0.81
0.51
1.86
15.69
1.71
0.60
0.81
0.51
0.54
15.69
1.71
0.60
0.81
0.51
224.63

Total
34 Providing and fixing ceramic glazed
wall tiles conforming to IS : 15622 of
approved make, colours, shades and
size on wall and dados over 12 mm
thick bed of cement Mortar 1:3 (1
cement : 3 coarse sand) and jointing
with grey cement slurry @ 3.3kg per
sqm including pointing in white
cement mixed with matching pigment
complete
Ground Floor
Gents Toilet

W.C.
Deductions
D4
D5
W
U.G. Lab Platform Dado

1x2
1x2
2x2
2x2

2
2
4
4

3.30
5.20
1.40
1.10

2.30
2.30
2.30
2.30

15.18
23.92
12.88
10.12

1x1
1x2
1x1

1
2
1

1.00
0.75
0.90

2.10
2.10
1.20

-2.10
-3.15
-1.08

1x2
1x1

2
1

6.00
10.30

0.60
0.60

7.20
6.18

Sqm

S.No

Detail
No
1x2
2

Particulars

Pantry Platform Dado

L
0.60

B
D/H
0.60

Qty
0.72

1x1
1x2

1
2

3.30
0.60

0.60
0.60

1.98
0.72

1x2
1x2
2x2
2x2

2
2
4
4

3.30
4.10
1.40
1.10

2.30
2.30
2.30
2.30

15.18
18.86
12.88
10.12

1x1
1x2
1x1
1x2

1
2
1
2

1.00
0.75
3.30
1.20

2.10
2.10
2.10
2.10

-2.10
-3.15
6.93
5.04
136.33

Unit

Ladies Toilet

W.C.
Deductions
D4
D5
For Water Cooler Area

Sub To

Sqm

First Floor
Gents Toilet

W.C.
Deductions
D4
D5
W
Pantry Platform Dado

1x2
1x2
2x2
2x2

2
2
4
4

3.30
5.20
1.40
1.10

2.30
2.30
2.30
2.30

15.18
23.92
12.88
10.12

1x1
1x2
1x1

1
2
1

1.00
0.75
0.90

2.10
2.10
1.20

-2.10
-3.15
-1.08

1x1
1x2

1
2

3.30
0.60

0.60
0.60

1.98
0.72

1x2
1x2
2x2
2x2

2
2
4
4

3.30
4.10
1.40
1.10

2.30
2.30
2.30
2.30

15.18
18.86
12.88
10.12

1x1
1x2
1x1
1x2

1
2
1
2

1.00
0.75
3.30
1.20

2.10
2.10
2.10
2.10

-2.10
-3.15
6.93
5.04
SubTotal (B)122.23

Ladies Toilet

W.C.
Deductions
D4
D5
For Water Cooler Area

Second Floor
Gents Toilet

W.C.
Deductions
D4
D5

1x2
1x2
2x2
2x2

2
2
4
4

3.30
5.20
1.40
1.10

2.30
2.30
2.30
2.30

15.18
23.92
12.88
10.12

1x1
1x2

1
2

1.00
0.75

2.10
2.10

-2.10
-3.15

Sqm

S.No

Particulars
W

Detail
No
1x1
1

L
0.90

B
D/H
1.20

Qty
-1.08

Unit

U.G. Lab Platform Dado

1x2
1x1
1x2

2
1
2

6.00
10.30
0.60

0.60
0.60
0.60

7.20
6.18
0.72

Pantry Platform Dado

1x1
1x2

1
2

3.30
0.60

0.60
0.60

1.98
0.72

1x2
1x2
2x2
2x2

2
2
4
4

3.30
4.10
1.40
1.10

2.30
2.30
2.30
2.30

15.18
18.86
12.88
10.12

1x1
1x2
1x1
1x2

1
2
1
2

1.00
0.75
3.30
1.20

2.10
2.10
2.10
2.10

-2.10
-3.15
6.93
5.04
136.33

Sqm

Total (A+B+C3)94.89

Sqm

Ladies Toilet

W.C.
Deductions
D4
D5
For Water Cooler Area

SubTot

35 Providing and laying rectified ceramic


glazed floor tiles 300x300mm
conforming to IS : 15622 of approved
make, colour, shade laid on 20 mm
thick Cement Mortar 1:4 (1 cement : 4
coarse sand) including pointing the
joints with white cement mixed with
matching pigment etc., complete.
In colours such as White, Ivory, Grey,
Fume Red Brown,
Ground Floor
Gents Toilet
Floor
Ladies Toilet
Floor
For Water Cooler Area

1x1

3.30

5.20

17.16

1x1
1x1

1
1

3.30
3.30

4.10
1.20

13.53
3.96
34.65

Sqm

SubTotal (B) 34.65

Sqm

SubTot

34.65

Sqm

Total (A+B+C1)0=3.95

Sqm

Sub To
First Floor
Second Floor

Qty. Same as Ground floor


Qty. Same as First floor

S.No
Particulars
36 15 mm thick Marble work (machine
cut, table rubbed & polished) for
kitchen platform, vanity counters,
window sills and similar locations of
required size laid over 20mm thick
base cement mortar 1:4 (1 cement : 4
coarse sand) including joints treated
with white cement mixed with
matching pigment including rubbing
and polishing to edge moulding to
give high gloss finish.
Udaipur green marble
First Floor
U.G. Lab Platform Dado
Pantry Platform

Detail

No

D/H

Qty

Unit

1x2
1x1
1x1

2
1
1

6.00
9.10
3.30

0.60
0.60
0.60

7.20
5.46
1.98

1x1

3.30

0.60

1.98

1x2
1x1

2
1

6.00
9.10

0.60
0.60

7.20
5.46

1x1

3.30

0.60

First Floor
Pantry Platform
Second Floor
U.G. Lab Platform Dado

Pantry Platform

Total
37 Extra for fixing marble /granite stone
in facia and drops of width upto 150
mm with epoxy resin based adhesive
instead of cement mortar including
cleaning etc. complete.
Ground Floor
U.G. Lab Platform

First Floor
Second Floor

1.98
31.26

Pantry Platform

1x2
1x1
1x1

2
1
1

6.00
9.10
3.30

12.00
9.10
3.30

Pantry Platform

1x1

3.30

3.30

U.G. Lab Platform

1x2
1x1
1x1

2
1
1

6.00
9.10
3.30

Pantry Platform

Total

Sqm

12.00
9.10
3.30
52.10 Metre

S.No
Particulars
38 Extra for making opening of required
size & shape for wash basins/ kitchen
sink in kitchen platform, vanity
counters and similar location in
marble/Granite/stone work including
making necessary holes for pillar taps
etc. including rubbing and polishing of
cut edges etc. complete

Detail

No

D/H

Qty

Unit

Ground Floor

First Floor

U.G. Lab Platform


Pantry Platform

1x2
1x1

2
1

2.00
1.00

Pantry Platform

1x1

1.00

U.G. Lab Platform


Pantry Platform

1x2
1x1

2
1
Total

2.00
1.00
7.00

Each

Total

105.45
31.50
20.72
344.70
29.70
177.14
709.21

Sqm.

Total

4306.98
4306.98

Sqm.

Second Floor

39 Cement concrete flooring with cement


concrete 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate
20mm) finished with a floating coat of
neat cement..
40 mm thick
Terrace

On plinth protection

1x1
1x1
1x2
1x1
1x1
1x1

1
9.50
1
3.50
2
3.70
1 38.30
1
3.30
1 177.14

11.10
9.00
2.80
9.00
9.00
1.00

40 Providing and applying plaster of


paris putty over plastered wall surface
including scaffolding complete
Upto 2 mm thickness to make surface
even and smooth in line and level.
Quantity same as 12 mm thick
cement plaster

41 Providing and applying plaster of


paris putty over plastered ceiling
surface including scaffolding
complete.

S.No

Particulars
Upto 2 mm thickness to make surface
even and smooth in line and level.
Quantity same as 6 mm thick cement
plaster

Detail

No

D/H

Qty

Unit

Total

1805.02
1805.02

Sqm.

Total

3233.31
3233.31

Sqm.

42 Providing and applying 2mm thick


ready mix exterior grade putty (Birla
wall care, Alltek Superfine W/R of
(NCL), J.K. wall putty) on walls to
make the surface smooth and even.
Quantity same as 18 mm thick
cement plaster

43 Wall painting with acrylic premium


emulsion (plastic) paint (2nd top most
approved branded quality) to give an
even shade.
On new work (Two or more coats)
Quantity same as 6 mm thick cement
plaster
Quantity same as 12 mm thick
cement plaster

44 Painting new exterior surface (two or


more coats) with PREMIUM
TEXTURED paint as per
manufacturer's specifications to give
protective and decorative finish
including cleaning washing of surface
etc. complete with:
On new work (Two or more coats )
Quantity same as 18 mm thick
cement plaster

1805.02

Total

4306.98
6112.00

Sqm.

Total

3233.31

Sqm.

S.No
Particulars
45 Making 50mm thick plinth protection
of plain cement concrete 1:3:6 (1
cement : 3 coarse sand : 6 graded
crushed stone aggregate 20mm
nominal size) over 75mm bed of dry
brick ballast 40mm nominal size well
rammed and consolidated and
grouted with sand including finishing
the top smooth.

Detail

1x1

No

1 177.14

D/H

1.00
Total

Qty

177.14
177.14

Unit

Sqm.

Sub Engineer
C.G.State Agril. Markt. Board

Asstt. Engineer
C.G.State Agril. Markt. Board

Executive Engineer
C.G.State Agril. Markt. Board

Anda mungkin juga menyukai