Occassional Rotary Equipment Maintenance Jobs
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
10
658.85 INR/EA
PM
of
Reciprocating /Metering/Diaph Pump:Job include
1.Check gland leakage. Rectify if any 2.Check piping spring
supports. 3.Ensure stuffing box drain outlet in waste
drum.4.Remove coupling guard 5.General visual check: wear:
damage: rust: paint 6.Check coupling condition for any
crack: Holes: Bolts: Others.Motor to GB: & GB to pump
7.Check nitrogen pressure in discharge dampener.Recharge if
required
8.Visual Check the oil quality of gearbox:
packing: & pump.9.Clean packing oil drain line & drain
chamber 10.Grease: all M.S. fasteners 11.Clean suction
strainer 12.Clean lube oil filters & breathers 13.Check for
cleaniness & house keeping around the equipment
473.02 INR/EA
"PM
of
Screw / Gear Pump:Job include 1.Check
tightness of foundation bolts 2.Check coupling general
condition
for
crack:
holes:
bolts:others
(without
dismantling) 3.Check pump seal for any leakage 4.Check free
rotation of the pump 5.Check pipe line for any leakage
6.Check
piping
supports for proper clamping 7.Check
pressure regulation valve, reset if required 8.Check /
clean
suction strainer 9.Tighten and grease all m.s
fasteners
10.Visual
check wear: damage: rust: paint
condition: etc 11.Ensure fixing of safety guards 12.Check
for cleaniness & house keeping around the equipment"
1,013.62
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 2
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
591.28 INR/EA
PM of Fin Fan:Job includes1.Clean equipment from oil and dirt & surrounding platform
2.Check freeness of fan by rotating the shaft with hand
3.Check tightness of all M.S. fasteners of plummer block,
bearing pedestal, motor base and then greased
4.Check the condition of fan blades and angles
5.Grease the bearings of plummer block
6.Check the equipment for any crack, damage
7.Check the pulley condition, belt tension, belt condition
and alignment. Adjust the belt tension and correct the
alignment if required.
8.Check the condition of safty guard over fan & pulleys
503.42 INR/EA
"PM
of Rotary Soot Blowers:Job include 1.Check
lubrication condition, replace / top up as required 2.Check
valve & flange leakage if any & rectify 3.Check the valve
opening
linkages free for operation.4.Replace missing
cotter pins & springs.5.Check the mountings & hanger
supports of the blower.6.Check the valve for steam leakage
through packing & valve seat & rectify if required 7.Check
coupling condition for any crack, wear, damage, rust &
paint., repair/rectify as required.8.Clean the area.
1,846.48
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 3
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
506.81 INR/EA
PM
of Centrifugal Fan/Blower:Steps Activites 1.Remove
coupling guard.2.Check coupling condition for crack: holes:
bolts: other: if it is belt drive, check belt condition:
tightness: pulley condition: and alignment:3.Check freeness
of blower by rotating motor shaft by hand 4. Check and
grease the bearings 5.Check tightness of motor: blower:
foundation bolts 6.Inspect and clean suction: discharge
filters 7.Check fan condition and clean it.8. Ensure proper
fixing of the casing drain 9.Check casing for any internal
corrosion / damage 10.Check inlet dampner/vanes/linkage
functioning & Grease if reqd.for passing: proper operation
11.Check
spring:
sliding:
clamp: supports: 12.Check
condition of expansion joint / bellow in discharge line &
report condition replace / top up. 13.Grease all M.S.
fasteners 14.Visual check: wear: damages: paint:15. Ensure
fixing of all safety guards
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
633.53 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 4
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
413.90 INR/EA
413.90 INR/EA
1,307.58
INR/EA
371.66 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 5
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,182.55
INR/EA
633.53 INR/EA
PM
of
Rack & Pinion Lifts:1. Wall tie bolts
tightening.2.Mast bolt tightening.3. Changing D - Shackle
of
Counter weight.4.Cabin Bolts tightening and cabin
alignment 5.Checking of Wire rope condition.6.Checking
flappers if required.7.Lubrication of all moving parts.
3,284.14
INR/EA
675.76 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 6
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
473.02 INR/EA
549.05 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 7
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
976.45 INR/EA
1,981.63
INR/EA
* 20
** 20.1
185.82 INR/EA
280.44 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 8
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
562.57 INR/EA
788.93 INR/EA
1,098.09
INR/EA
**
20.2
Alignment
844.68 INR/EA
Cold Allignment Up to 30 KW
Job
includes-1.Removal and reinstallation of coupling
guard(s)2.Checking
tightness of coupling bolts3.Spacer
removal
reinstallation/replacement,
alignment Checking
andCorrection
1,182.55
INR/EA
2,365.12
INR/EA
3,316.22
INR/EA
3,547.66
INR/EA
**
20.3
Number : CCM/
Date
: 25.05.2015
Page No. : 9
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,267.03
INR/EA
1,689.37
INR/EA
2,111.71
INR/EA
3,696.33
INR/EA
4,434.60
INR/EA
**
20.4
275.36 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 10
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
369.97 INR/EA
528.77 INR/EA
1,013.62
INR/EA
1,216.35
INR/EA
1,182.55
INR/EA
1,689.37
INR/EA
2,111.71
INR/EA
**
20.5
Number : CCM/
Date
: 25.05.2015
Page No. : 11
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,696.33
INR/EA
1,689.37
INR/EA
2,534.05
INR/EA
3,547.66
INR/EA
4,730.24
INR/EA
**
20.6
Number : CCM/
Date
: 25.05.2015
Page No. : 12
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
**
20.7
844.68 INR/EA
1,267.03
INR/EA
1,689.37
INR/EA
2,027.25
INR/EA
1,013.62
INR/EA
1,267.03
INR/EA
**
20.8
Number : CCM/
Date
: 25.05.2015
Page No. : 13
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,520.44
INR/EA
1,858.31
INR/EA
2,365.12
INR/EA
1,520.44
INR/EA
2,280.64
INR/EA
* 30
PUMPS
** 30.01 CENTRIFUGAL PUMP-SINGLE STAGE OVERHUNG(H
*** 30.01.01Replacement of Casing Gasket
3159181 RCG CP-SSO (HRZNTL)-UPTO30KW
Valid from: 25.05.2015 Valid to: 31.07.2016
Number : CCM/
Date
: 25.05.2015
Page No. : 14
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
4,223.43
INR/EA
5,912.79
INR/EA
2,745.22
INR/EA
3,801.08
INR/EA
Impeller
assembly
job. CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Up to 30 KW
Job includes1. Removal & Re-installation of pump assembly from pump
casing.
2. Replacement of casing gasket.
3. Dismantling & Reassembly of impeller assembly including
cleaning, inspection, removal & reinstallation/replacement
of components with necessary measurement & checks for
dimension, clearance, run out etc
4. Removal and re-installation of coupling guard.
5. Removal and re-installation of spacer.
6. Alignment checking and correction after assembly.
Impeller
assembly
job.CENTRIFUGAL
PUMP-SINGLE
OVERHUNG (Horizontal) -Above 30 and up to 100 KW.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
STAGE
Number : CCM/
Date
: 25.05.2015
Page No. : 15
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
5,405.98
INR/EA
6,757.47
INR/EA
4,054.49
INR/EA
Impeller
assembly
job. CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Above 100 and up to 250 KW.
Job includes1. Removal & Re-installation of pump assembly from pump
casing.
2. Replacement of casing gasket.
3. Dismantling & Reassembly of impeller assembly including
cleaning, inspection, removal & reinstallation/replacement
of components with necessary measurement & checks for
dimension, clearance, run out etc
4. Removal and re-installation of coupling guard.
5. Removal and re-installation of spacer.
6. Alignment checking and correction after assembly.
Impeller
assembly
job. CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Above 250 KW and up to 1000 KW.
Job includes1. Removal & Re-installation of pump assembly from pump
casing.
2. Replacement of casing gasket.
3. Dismantling & Reassembly of impeller assembly including
cleaning, inspection, removal & reinstallation/replacement
of components with necessary measurement & checks for
dimension, clearance, run out etc
4. Removal and re-installation of coupling guard.
5. Removal and re-installation of spacer.
6. Alignment checking and correction after assembly.
Seal
replacement
job.
CENTRIFUGAL
OVERHUNG (Horizontal) -Up to 30 KW
PUMP-SINGLE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
STAGE
Number : CCM/
Date
: 25.05.2015
Page No. : 16
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
7,602.15
INR/EA
9,629.41
INR/EA
Seal
replacement
job.
CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Above 30 and up to 100 KW.
Job includes1. Removal & Re-installation of pump assembly from pump
casing.
2. Replacement of casing gasket.
3. Dismantling & Reassembly of impeller assembly including
cleaning, inspection, removal & reinstallation/ replacement
of components with necessary measurement and checks for
dimension, clearance, run out etc.
4.
Replacement
of
seal
cartridge
or
removal
&
reinstallation including reconditioning of seal assembly in
case of non cartridge seals.
5. Removal and re-installation of coupling guard.
6. Removal and re-installation of spacer.
7. Alignment checking and correction after assembly.
Seal
replacement
job.
CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Above 100 and up to 250 KW.
Job includes1. Removal & Re-installation of pump assembly from pump
casing.
2. Replacement of casing gasket.
3. Dismantling & Reassembly of impeller assembly including
cleaning, inspection, removal & reinstallation/ replacement
of components with necessary measurement and checks for
dimension, clearance, run out etc.
4.
Replacement
of
seal
cartridge
or
removal
&
reinstallation including reconditioning of seal assembly in
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 17
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
11,487.71 INR/EA
Seal
replacement
job.
CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Above 250 and up to 1000 KW.
Job includes1. Removal & Re-installation of pump assembly from pump
casing.
2. Replacement of casing gasket.
3. Dismantling & Reassembly of impeller assembly including
cleaning, inspection, removal & reinstallation/ replacement
of components with necessary measurement and checks for
dimension, clearance, run out etc.
4.
Replacement
of
seal
cartridge
or
removal
&
reinstallation including reconditioning of seal assembly in
case of non cartridge seals.
5. Removal and re-installation of coupling guard.
6. Removal and re-installation of spacer.
7. Alignment checking and correction after assembly.
5,068.10
INR/EA
7,095.35
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 18
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
seal.Removal,
all checks.
inspection
11,149.84 INR/EA
15,204.32 INR/EA
675.76 INR/EA
1,013.62
INR/EA
1,351.49
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 19
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,027.25
INR/EA
5,912.79
INR/EA
8,446.84
INR/EA
Pump
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
11,825.58 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 20
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
15,204.32 INR/EA
1,689.37
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 21
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,365.12
INR/EA
3,040.86
INR/EA
4,054.49
INR/EA
5,405.98
INR/EA
2,294.16
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 22
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
seal(s).2.Removal,
Inspection
&
replacement
of
bearing(s).3.Removal
and
re-installation
of coupling
guard.4.Removal and re-installation of spacer.5.Driver side
Coupling
hub
removal
and re-installation.6.Alignment
checking and correction after assembly.
3,378.75
INR/EA
6,757.47
INR/EA
8,446.84
INR/EA
9,967.28
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 23
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,351.49
INR/EA
2,027.25
INR/EA
2,702.99
INR/EA
4,054.49
INR/EA
5,405.98
INR/EA
2,294.16
INR/EA
3,441.25
INR/EA
NDE
Bearing
replacement. CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Up to 30 KW
NDE Bearing replacement: Job includes: Removal, Inspection
& replacement of housing seal(s). Removal, Inspection &
replacement of bearing(s)
NDE
Bearing
replacement. CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 30 and up to 100 KW.
NDE Bearing replacement: Job includes: Removal, Inspection
& replacement of housing seal(s). Removal, Inspection &
replacement of bearing(s)
NDE
Bearing
replacement. CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 250 and up to 1000 KW.
NDE Bearing replacement: Job includes: Removal, Inspection
& replacement of housing seal(s). Removal, Inspection &
replacement of bearing(s)
NDE
Bearing
replacement. CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 1000 KW.
NDE Bearing replacement: Job includes: Removal, Inspection
& replacement of housing seal(s). Removal, Inspection &
replacement of bearing(s)
Number : CCM/
Date
: 25.05.2015
Page No. : 24
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
6,757.47
INR/EA
8,446.84
INR/EA
9,967.28
INR/EA
449.37 INR/EA
675.76 INR/EA
1,353.18
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 25
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,773.84
INR/EA
2,111.71
INR/EA
3,547.66
INR/EA
5,068.10
INR/EA
8,108.97
INR/EA
Repl
of
casing
gasket(Ver
Split),DE
Side
CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Up to 30
KW.
Replace casing gasket (Vert Split) - DE: Job includes:
Removal, inspection & replacement of housing seal (s).
Removal, inspection & replacement of Bearing(s). Removal,
inspection & repair/replacement of DE Mechanical seal
cartridge or removal, reinstallation of seal assembly in
case
of
non-cartridge
mechanical
seals. Removal &
reinstallation of DE casing cover with new gasket
Repl
of
casing
gasket(Ver
Split),DE
Side
CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 30
and up to 100 KW.
Replace casing gasket (Vert Split) - DE: Job includes:
Removal, inspection & replacement of housing seal (s).
Removal, inspection & replacement of Bearing(s). Removal,
inspection & repair/replacement of DE Mechanical seal
cartridge or removal, reinstallation of seal assembly in
case
of
non-cartridge
mechanical
seals. Removal &
reinstallation of DE casing cover with new gasket
Repl
of
casing
gasket(Ver
Split),DE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Side
CENT.
Number : CCM/
Date
: 25.05.2015
Page No. : 26
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
11,318.77 INR/EA
Repl
of
casing
gasket(Ver
Split),DE
Side
CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 250
and up to 1000 KW.
Replace casing gasket (Vert Split) - DE: Job includes:
Removal, inspection & replacement of housing seal (s).
Removal, inspection & replacement of Bearing(s). Removal,
inspection & repair/replacement of DE Mechanical seal
cartridge or removal, reinstallation of seal assembly in
case
of
non-cartridge
mechanical
seals. Removal &
reinstallation of DE casing cover with new gasket
15,204.32 INR/EA
Repl
of
casing
gasket(Ver
Split),DE
Side
CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 1000
KW.
Replace casing gasket (Vert Split) - DE: Job includes:
Removal, inspection & replacement of housing seal (s).
Removal, inspection & replacement of Bearing(s). Removal,
inspection & repair/replacement of DE Mechanical seal
cartridge or removal, reinstallation of seal assembly in
case
of
non-cartridge
mechanical
seals. Removal &
reinstallation of DE casing cover with new gasket
Repl
of
PUMP-SINGLE/TWO
KW.
2,838.15
INR/EA
4,054.49
INR/EA
6,487.17
INR/EA
Repl
of
casing
PUMP-SINGLE/TWO STAGE
and up to 100 KW.
gaske(Ver
Split),NDE
SideCENT.
BETWEEN BRG (Horizontal).- Above 30
Number : CCM/
Date
: 25.05.2015
Page No. : 27
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Repl
of
casing
gaske(Ver
Split),NDE
Side
CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 100
and up to 250 KW.
9,055.03
INR/EA
Repl
of casing gaske(Ver Split),NDE Side CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 250
and up to 1000 KW.
12,163.45 INR/EA
Repl
of casing gaske(Ver Split),NDE Side CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 1000
KW.
8,446.84
INR/EA
12,670.27 INR/EA
20,062.93 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 28
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
coupling
guard(s),Spacer
removal
&
reinstallation/replacement,Alignment
Checking
and
Correction(including
hot
allignment
wherever
applicable).Removal
and
Replacement/Reinstallation
of
Coupling
hubs
Inspection
&
replacement
of
DE
housingseal(s).Inspection
&
replacement
of
DE
bearing(s).Inspection, repair /replacement of DE Mechanical
seal cartridge or non cartidge.
21,961.80 INR/EA
24,495.84 INR/EA
1,351.49
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 29
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,027.25
INR/EA
2,702.99
INR/EA
4,054.49
INR/EA
5,405.98
INR/EA
2,534.05
INR/EA
NDE Mech
to 30 KW
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 30
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,378.75
INR/EA
6,757.47
INR/EA
8,446.84
INR/EA
9,967.28
INR/EA
NDE Mech seal. CENTRIFUGAL PUMP MULTISTAGE HORIZONTALAbove 30 and up to 100 KW.
NDE Mech seal: Job includes: Removal and reinstallation of
(NDE) bearing housing assembly. Inspection of bearing(s),
adjustment of thrust bearings including any replacement if
required. Inspection of housing seal(s) and seat on shaft,
correct repair if any & replacement of Seal(s) Replacement
of seal cartridge and shaft sleeve.
NDE Mech seal. CENTRIFUGAL PUMP MULTISTAGE HORIZONTALAbove 100 and up to 250 KW.
NDE Mech seal: Job includes: Removal and reinstallation of
(NDE) bearing housing assembly. Inspection of bearing(s),
adjustment of thrust bearings including any replacement if
required. Inspection of housing seal(s) and seat on shaft,
correct repair if any & replacement of Seal(s) Replacement
of seal cartridge and shaft sleeve.
Number : CCM/
Date
: 25.05.2015
Page No. : 31
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,534.05
INR/EA
3,885.54
INR/EA
5,912.79
INR/EA
8,446.84
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 32
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
removal,
reinstallation of seal assembly in case of
non-cartridge mechanical seals. Removal & reinstallation of
NDE casing cover with new gasket
11,825.58 INR/EA
1,351.49
INR/EA
2,027.25
INR/EA
2,702.99
INR/EA
4,054.49
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 33
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
5,405.98
INR/EA
540.61 INR/EA
Repl
of casing gasket (Hori Split) CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Up to 30 KW.
Replace casing gasket (Horizontal Split): Jobs includes:
Removal & reinstallation of Horizontal split casing cover.
Replacement of casing gasket
810.90 INR/EA
Repl
of casing gasket (Hori Split) CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 30 and up to 100 KW.
Replace casing gasket (Horizontal Split): Jobs includes:
Removal & reinstallation of Horizontal split casing cover.
Replacement of casing gasket
1,623.48
INR/EA
2,128.62
INR/EA
Repl
of casing gasket (Hori Split) CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 250 and up to 1000 KW.
Replace casing gasket (Horizontal Split): Jobs includes:
Removal & reinstallation of Horizontal split casing cover.
Replacement of casing gasket
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 34
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,534.05
INR/EA
2,787.46
INR/EA
4,561.30
INR/EA
6,588.54
INR/EA
8,615.78
INR/EA
Repl
of casing gasket (Hori Split) CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 1000KW.
Replace casing gasket (Horizontal Split): Jobs includes:
Removal & reinstallation of Horizontal split casing cover.
Replacement of casing gasket
Number : CCM/
Date
: 25.05.2015
Page No. : 35
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
10,305.14 INR/EA
2,534.05
INR/EA
3,378.75
INR/EA
6,757.47
INR/EA
8,446.84
INR/EA
DE Mech Seal . CENTRIFUGAL PUMP MULTISTAGE HORIZONTALAbove 100 and up to 250 KW.
DE Mech Seal:Job includes :Removal and reinstallation of
bearing housingassembly.Inspection of bearing(s) including
replacement if required.
DE Mech Seal . CENTRIFUGAL PUMP MULTISTAGE HORIZONTALAbove 250 and up to 1000 KW.
DE Mech Seal:Job includes :Removal and reinstallation of
bearing housingassembly.Inspection of bearing(s) including
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 36
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
replacement if required.
9,967.28
INR/EA
7,391.00
INR/EA
14,557.28 INR/EA
Capital
repair.CENTRIFUGAL PUMP MULTISTAGE HORIZONTALAbove 30 and up to 100 KW.
Capital Repair:Job Includes:Removal & Reinstallation of
Couplinggaurd(s).Spacer
removal
and
installation/replacement.Alignment
checking
&correction.Removal
&
reinstallation/replacement
of
coupling hub.Removal andreinstallation of (NDE) bearing
housing assembly.Inspection of bearing(s),adjustment of
thrust
bearings
including
any
replacement
if
required.Inspectionof housing seal(s) and seat on shaft,
correctivve
repair
if
any
and
repalcementof
Seal(s).Replacement of seal cartridge and shaft sleeve,
balance
drum (ifapplicable).Replacement of NDE Casing
Gasket.
Capital
repair.CENTRIFUGAL PUMP MULTISTAGE HORIZONTALAbove 100 and up to 250 KW.
Capital Repair:Job Includes:Removal & Reinstallation of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
20,272.43 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 37
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Couplinggaurd(s).Spacer
removal
and
installation/replacement.Alignment
checking
&correction.Removal
&
reinstallation/replacement
of
coupling hub.Removal andreinstallation of (NDE) bearing
housing assembly.Inspection of bearing(s),adjustment of
thrust
bearings
including
any
replacement
if
required.Inspectionof housing seal(s) and seat on shaft,
correctivve
repair
if
any
and
repalcementof
Seal(s).Replacement of seal cartridge and shaft sleeve,
balance
drum (ifapplicable).Replacement of NDE Casing
Gasket.
22,806.47 INR/EA
Capital
repair.CENTRIFUGAL PUMP MULTISTAGE HORIZONTALAbove 250 and up to 1000 KW.
Capital Repair:Job Includes:Removal & Reinstallation of
Couplinggaurd(s).Spacer
removal
and
installation/replacement.Alignment
checking
&correction.Removal
&
reinstallation/replacement
of
coupling hub.Removal andreinstallation of (NDE) bearing
housing assembly.Inspection of bearing(s),adjustment of
thrust
bearings
including
any
replacement
if
required.Inspectionof housing seal(s) and seat on shaft,
correctivve
repair
if
any
and
repalcementof
Seal(s).Replacement of seal cartridge and shaft sleeve,
balance
drum (ifapplicable).Replacement of NDE Casing
Gasket.
27,029.90 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 38
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,540.70
INR/EA
2,312.76
INR/EA
4,627.18
INR/EA
5,490.44
INR/EA
6,757.47
INR/EA
2,111.71
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 39
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,209.81
INR/EA
4,899.17
INR/EA
5,912.79
INR/EA
7,095.35
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 40
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,534.05
INR/EA
3,378.75
INR/EA
6,652.73
INR/EA
8,446.84
INR/EA
Impeller Assembly
CENTRIFUGAL PUMP-SINGLE STAGE VERTICAL
INLINE - Above 250 and up to 1000 KW.
Impeller assembly job:Job includes:Removal & reinstallation
of pump assemblyfrom pump casing Replacement of casing
Gasket.Removal
&reinstallation/replacement
of impeller
and/or impeller bolt includinggasket/O-ring
12,839.20 INR/EA
3,096.61
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 41
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Gasket.Removal
&
reinstallation/replacementof impeller
and/or
impeller
bolt
including gasket/O-ring.Removal
&reinstallation
of mechanical seal assembly including
complete
dismantling
&reassembly,
inspection
&
repair/replacement of components, inspection &replacement
(if reqd) of shaft sleeve, replace of all gaskets/O-rings
4,561.30
INR/EA
9,122.59
INR/EA
Mechanical
seal.CENTRIFUGAL PUMP-SINGLE STAGE VERTICAL
INLINE - Above 30 and up to 100 KW.
Mechanical seal:Job includes:Removal & reinstallation of
pump
assembly
frompump
casing.Replacement of casing
Gasket.Removal
&
reinstallation/replacementof impeller
and/or
impeller
bolt
including gasket/O-ring.Removal
&reinstallation
of mechanical seal assembly including
complete
dismantling
&reassembly,
inspection
&
repair/replacement of components, inspection &replacement
(if reqd) of shaft sleeve, replace of all gaskets/O-rings
Mechanical
seal.CENTRIFUGAL PUMP-SINGLE STAGE VERTICAL
INLINE - Above 100 and up to 250 KW.
Mechanical seal:Job includes:Removal & reinstallation of
pump
assembly
frompump
casing.Replacement of casing
Gasket.Removal
&
reinstallation/replacementof impeller
and/or
impeller
bolt
including gasket/O-ring.Removal
&reinstallation
of mechanical seal assembly including
complete
dismantling
&reassembly,
inspection
&
repair/replacement of components, inspection &replacement
(if reqd) of shaft sleeve, replace of all gaskets/O-rings
PUMP-SINGLE
STAGE VERTICAL
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 42
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
4,223.43
INR/EA
6,588.54
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 43
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
checks.Completedismantling
of pump unit, inspection &
repair/replacement of bearing, oilseals, other internals as
required, reassembly and installation.
Capital
repair.CENTRIFUGAL
PUMP-SINGLE STAGE VERTICAL
INLINE - Above 100 and up to 250 KW.
Capital Repair:Job includes:Removal & Reinstallation of
Couplinggaurd(s).Removal & Reinstallation / Replacement of
coupling spacer.Checking &correction of alignment between
driver & Pump.Removal & reinstallation of pumpassembly from
pump
casing
Replacement
of
casing Gasket. Removal
&reinstallation/replacement of impeller and/orimpeller bolt
includinggasket/O-ring.Removal
&
reinstallation
of
mechanical seal assembly includingcomplete dismantling &
reassembly, inspection & repair/replacement ofcomponents,
inspection
&
replacement
(if
required)
of
shaft
sleeve,replacementof all gaskets/O-rings.Removal,inspection
&
replacement
of
housingseal(s).Removal,inspection &
replacement
of
Bearing(s)
with
all
checks.Completedismantling
of pump unit, inspection &
repair/replacement of bearing, oilseals, other internals as
required, reassembly and installation.
Capital
repair.CENTRIFUGAL
PUMP-SINGLE STAGE VERTICAL
INLINE - Above 250 and up to 1000 KW.
Capital Repair:Job includes:Removal & Reinstallation of
Couplinggaurd(s).Removal & Reinstallation / Replacement of
coupling spacer.Checking &correction of alignment between
driver & Pump.Removal & reinstallation of pumpassembly from
pump
casing
Replacement
of
casing Gasket. Removal
&reinstallation/replacement of impeller and/orimpeller bolt
includinggasket/O-ring.Removal
&
reinstallation
of
mechanical seal assembly includingcomplete dismantling &
reassembly, inspection & repair/replacement ofcomponents,
inspection
&
replacement
(if
required)
of
shaft
sleeve,replacementof all gaskets/O-rings.Removal,inspection
&
replacement
of
housingseal(s).Removal,inspection &
replacement
of
Bearing(s)
with
all
checks.Completedismantling
of pump unit, inspection &
repair/replacement of bearing, oilseals, other internals as
required, reassembly and installation.
Capital
repair.
CENTRIFUGAL
PUMP-SINGLE
STAGE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
VERTICAL
Number : CCM
Date
: 25.05.2015
Page No. : 44
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,027.25
INR/EA
3,209.81
INR/EA
5,912.79
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 45
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
7,602.15
INR/EA
9,122.59
INR/EA
3,378.75
INR/EA
5,279.27
INR/EA
7,391.00
INR/EA
Seal jobs. CENT. MULTI STAGE VERTICAL SUMP / TURBINE PUMP Above 30 and up to 100 KW.
Seal job:Job includes :Removal & reinstallation of driver
spool.Removal
&reinstallation/replacement
of
bearing
including replacement ofgaskets/O-rings/oil seals, Vertical
lift
checking,
adjustment
(ifrequired).Removal
&
reinstallation
of
adapter
piece
(ifrequired).Repair/replacement of seal/cartridge seal and
sleeve
Seal jobs. CENT. MULTI STAGE VERTICAL SUMP / TURBINE PUMP Above 100 and up to 250 KW.
Seal job:Job includes :Removal & reinstallation of driver
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 46
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
spool.Removal
&reinstallation/replacement
of
bearing
including replacement ofgaskets/O-rings/oil seals, Vertical
lift
checking,
adjustment
(ifrequired).Removal
&
reinstallation
of
adapter
piece
(ifrequired).Repair/replacement of seal/cartridge seal and
sleeve
INR/EA
Seal jobs. CENT. MULTI STAGE VERTICAL SUMP / TURBINE PUMP Above 250 and up to 1000 KW.
Seal job:Job includes :Removal & reinstallation of driver
spool.Removal
&reinstallation/replacement
of
bearing
including replacement ofgaskets/O-rings/oil seals, Vertical
lift
checking,
adjustment
(ifrequired).Removal
&
reinstallation
of
adapter
piece
(ifrequired).Repair/replacement of seal/cartridge seal and
sleeve
Seal jobs. CENT. MULTI STAGE VERTICAL SUMP / TURBINE PUMP Above 1000 KW.
Seal job:Job includes :Removal & reinstallation of driver
spool.Removal
&reinstallation/replacement
of
bearing
including replacement ofgaskets/O-rings/oil seals, Vertical
lift
checking,
adjustment
(ifrequired).Removal
&
reinstallation
of
adapter
piece
(ifrequired).Repair/replacement of seal/cartridge seal and
sleeve
6,335.13
INR/EA
8,869.18
INR/EA
Casing
Gasket
job.
CENT.
MULTI
STAGE
VERTICAL
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
SUMP /
Number : CCM/
Date
: 25.05.2015
Page No. : 47
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
16,260.17 INR/EA
19,216.56 INR/EA
7,602.15
INR/EA
11,041.71 INR/EA
1st
Stage
Impeller
jobs:Job
includes
:Removal
&
reinstallation of pump assemblyfrom vessel/pit including
discharge
pipe(where applicable). Replacement ofcasing
gasket.Removal & reinstallation/replacement of impeller
and/or fastenerswith all necessary checks for dimension &
clearances including replacement ofall gaskets/O-rings
14,781.97 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 48
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
16,260.17 INR/EA
19,216.56 INR/EA
12,670.27 INR/EA
16,260.17 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 49
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
guards.Removal
&reinstallation/replacment
of
coupling
spacer Removal &reinstallation/replacment of coupling Hub
Removal
&
reinstallation
of
driverspool Removal &
reinstallation/replacement
of bearing incl replacement
ofgaskets/O-rings/oil seals. Removal & reinstalllation of
pump
assembly
fromvessel/pit
including
discharge
pipe.Removal & reinstallation of adapter pieceif installed
Repair/replacement
of
seal/cartridge seal and sleeve
Completedismentling of pump assembly, inspection of all
internals
withrepair/replacement
of
components,
all
necessary
checks
for dimension &clearances including
reassembly and reinstallation
23,651.16 INR/EA
27,029.90 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 50
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
necessary
checks
for dimension
reassembly and reinstallation
&clearances
including
30,408.64 INR/EA
15,204.32 INR/EA
18,583.05 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 51
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
22,806.47 INR/EA
27,029.90 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 52
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
32,098.00 INR/EA
2,534.05
INR/EA
3,885.54
INR/EA
7,771.09
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 53
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
9,629.41
INR/EA
11,825.58 INR/EA
4,400.80
INR/EA
6,600.36
INR/EA
12,670.27 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 54
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
16,049.00 INR/EA
18,583.05 INR/EA
15,204.32 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 55
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
18,583.05 INR/EA
22,806.47 INR/EA
Capital Repair. CENTRIFUGAL PUMP-VERTICAL TURBINE/CAN Above 100 and up to 250 KW.
Capital Repair:Job includes : Removal & Reinstallation of
Coupling gaurd(s).Removal & Reinstallation/replacement of
coupling spacer. Checking & correctionof alignment between
driver
&
pump.Removal
&
Reinstallation/replacement
ofcoupling
hub.Removal & Reinstallation/replacement of
bearings(s) includingreplacement of gasket / O-rings / Oil
seals , shaft sleeve , adapter etcRemoval& reistallation of
adapter
piece
if
installed
Replacement
of
cartridge/non-cartridge
seal
including
repair
/
reconditioning of components in case ofnon-cartridge seal
Removal & reistallation of complete unit from sump /
vesselRemoval
&
reistallation
of
barrel Removal &
reistallation/
replacement
of rotorassembly including
dismanttling
&
reassembly of all components ,repair
/replacement of parts as required, replacement of all
gaskets / O-rings
Capital Repair. CENTRIFUGAL PUMP-VERTICAL TURBINE/CAN Above 250 and up to 1000 KW.
Capital Repair:Job includes : Removal & Reinstallation of
Coupling gaurd(s).Removal & Reinstallation/replacement of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
27,029.90 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 56
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
32,098.00 INR/EA
Capital
Repair.CENTRIFUGAL PUMP-VERTICAL TURBINE/CAN Above 1000KW.
Capital Repair:Job includes : Removal & Reinstallation of
Coupling gaurd(s).Removal & Reinstallation/replacement of
coupling spacer. Checking & correctionof alignment between
driver
&
pump.Removal
&
Reinstallation/replacement
ofcoupling
hub.Removal & Reinstallation/replacement of
bearings(s) includingreplacement of gasket / O-rings / Oil
seals , shaft sleeve , adapter etcRemoval& reistallation of
adapter
piece
if
installed
Replacement
of
cartridge/non-cartridge
seal
including
repair
/
reconditioning of components in case ofnon-cartridge seal
Removal & reistallation of complete unit from sump /
vesselRemoval
&
reistallation
of
barrel Removal &
reistallation/
replacement
of rotorassembly including
dismanttling
&
reassembly of all components ,repair
/replacement of parts as required, replacement of all
gaskets / O-rings
4,730.24
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 57
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
7,335.25
INR/EA
11,487.71 INR/EA
13,852.83 INR/EA
8,108.97
INR/EA
12,300.30 INR/EA
16,571.02 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 58
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
17,368.40 INR/EA
5,405.98
INR/EA
8,274.53
INR/EA
16,552.44 INR/EA
18,583.05 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 59
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,709.86
INR/EA
5,568.15
INR/EA
11,134.64 INR/EA
14,359.62 INR/EA
2,632.04
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 60
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
pump
casing.Removal of old gasket,cleaning
seat,installation
of
new gasket inclduing
ofcasing joint after reassembly
of gasket
leak test
3,949.75
INR/EA
7,899.49
INR/EA
9,502.69
INR/EA
3,836.56
INR/EA
5,755.68
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 61
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Impeller
/
diffuser
Repair
/
Replacement:Job
includes:Removal & reinstallationof pump casing cover with
Gear
Box
unit
from
pump
casing.Removal
of
old
gasket,cleaning of gasket seat, installation of new gasket
inclduing leak test ofcsing joint after reassembly,Removal
&
reinstallation of diffuser and/orimpeller including
repair/replacement
9,502.69
INR/EA
13,514.95 INR/EA
2,632.04
INR/EA
3,801.08
INR/EA
6,335.13
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 62
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
9,291.53
INR/EA
5,574.92
INR/EA
9,291.53
INR/EA
12,670.27 INR/EA
16,893.69 INR/EA
5,574.92
INR/EA
9,291.53
INR/EA
O/H
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 63
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
12,670.27 INR/EA
16,893.69 INR/EA
12,332.39 INR/EA
18,657.38 INR/EA
27,589.07 INR/EA
42,234.21 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 64
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
9,798.33
INR/EA
14,746.51 INR/EA
CETRIFUGAL PUMP-SUNDYNE. -
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
20,272.43 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 65
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
27,029.90 INR/EA
1,390.35
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 66
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
bolts & end cover Removal of old stator & fixing of new
stator fixing of tie bolts with end cover fixing of dish.
Spool
2,027.25
INR/EA
2,255.32
INR/EA
3,801.08
INR/EA
6,757.47
INR/EA
8,446.84
INR/EA
GEAR BOX OIL SEAL REPLACEMENT.SCREW PUMP-SINGLE SCREW Above 30 and up to 100 KW.
SCREW PUMP GEAR BOX OIL SEAL REPLACEMENT: Job includes
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 67
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
--Removal
of
discharge
Spool Removal of pump from
foundation Removal of gear box Dismantling of gear box
Removal of old oil seal & fixing new oil seal Gear box
assembly & fix up with pump installation on foundation &
alignment Discharge spool fixing
6,757.47
INR/EA
8,446.84
INR/EA
1,267.03
INR/EA
1,900.55
INR/EA
4,400.80
INR/EA
Bearing
30 KW
Bearing
replacement
replacement
Job
includes:
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Removal
&
Number : CCM/
Date
: 25.05.2015
Page No. : 68
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
6,588.54
INR/EA
1,900.55
INR/EA
2,534.05
INR/EA
4,223.43
INR/EA
3,649.04
INR/EA
5,068.10
INR/EA
DE cover gasket replacement job. SCREW PUMP-TWIN SCREW Above 30 and up to 100 KW.
SCREW PUMP-TWIN SCREW - DE cover gasket replacement job:
Job includes: Removal & reinstallation of end cover.
Replacement of casing gasket
Number : CCM/
Date
: 25.05.2015
Page No. : 69
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
8,446.84
INR/EA
2,027.25
INR/EA
2,871.93
INR/EA
4,223.43
INR/EA
2,871.93
INR/EA
4,223.43
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 70
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
5,912.79
INR/EA
1,689.37
INR/EA
2,871.93
INR/EA
4,223.43
INR/EA
5,068.10
INR/EA
7,095.35
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 71
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
replacement.
Alignment
checking
and
correction.
Removal/replacement of coupling hub. Complete dismantling
and reassembly of pump unit. Inspection of all internals
components including repair/replacement as required
10,136.22 INR/EA
1,993.46
INR/EA
2,534.05
INR/EA
3,378.75
INR/EA
3,040.86
INR/EA
4,392.35
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 72
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
DE Bearing / Oil Seal jobs. SCREW PUMP- TRIPLE SCREW Above 30 and up to 100 KW.
DE
Bearing
/ Oil Seal jobs: Job includes: Removal
reinstallation of end cover. Replacement of casing gasket
Removal, inspection & pair/replacement of mechanical seal
Removal, reinstallation of bearing including inspection &
replacement of bearing
6,081.73
INR/EA
3,040.86
INR/EA
4,392.35
INR/EA
6,081.73
INR/EA
3,547.66
INR/EA
DE Bearing / Oil Seal jobs. SCREW PUMP- TRIPLE SCREW Above 100 KW.
DE
Bearing
/ Oil Seal jobs: Job includes: Removal
reinstallation of end cover. Replacement of casing gasket
Removal, inspection & pair/replacement of mechanical seal
Removal, reinstallation of bearing including inspection &
replacement of bearing
NDE Bearing job. SCREW PUMP- TRIPLE SCREW - Above 100 KW.
NDE Bearings jobs: Job includes: Removal & reinstallation
of end cover. Replacement of gasket / O-ring. Removal &
reinstallation/replacement
of
bearing(s).
Removal
&
reinstallation of time gear (if applicable)
Number : CCM/
Date
: 25.05.2015
Page No. : 73
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
5,405.98
INR/EA
8,277.91
INR/EA
2,871.93
INR/EA
4,343.35
INR/EA
8,615.78
INR/EA
5,574.92
INR/EA
Timing Gears (If applicable). SCREW PUMP- TRIPLE SCREW Above 30 and up to 100 KW.
Timing Gears (If applicable): Job includes: Removal &
reinstallation of end cover. Replacement of casing gasket.
Removal & replacement of seal(s)
Timing Gears (If applicable). SCREW PUMP- TRIPLE SCREW Above 100 KW.
Timing Gears (If applicable): Job includes: Removal &
reinstallation of end cover. Replacement of casing gasket.
Removal & replacement of seal(s)
Number : CCM/
Date
: 25.05.2015
Page No. : 74
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
8,406.30
INR/EA
16,814.29 INR/EA
1,540.70
INR/EA
2,312.76
INR/EA
1,540.70
INR/EA
2,312.76
INR/EA
2,444.52
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 75
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,667.62
INR/EA
951.12 INR/EA
1,267.03
INR/EA
1,858.31
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 76
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,267.03
INR/EA
1,900.55
INR/EA
2,956.40
INR/EA
633.53 INR/EA
951.12 INR/EA
1,689.37
INR/EA
1,267.03
INR/EA
1,584.63
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 77
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Suction
/ Discharg Dampner.DIAPHRAGM / PLUNGER PUMP,
DIAPHRAGM COMPRESSOR. -Above 25 KW and up to 50 KW.
Suction / Discharg Dampner:Job includes :Dismantling &
reassembly of dampner including inspection & replacement of
diaphragm if reqd itrogen/Gas charging and leak testin
2,534.05
INR/EA
3,040.86
INR/EA
3,378.75
INR/EA
4,223.43
INR/EA
Diaphram-Liq
Head.Applicable
for
Diaphragm Pump and
Compressors. - Above 25 KW and up to 50 KW.
Diaphram-Liquid Head (Applicable for Diaphragm Pump and
Compressors).Job includes :Removal & reinstallation of
liquid suction valve including complete dismantling &
reassembly,
inspection of all internals with repair/
replacement as required.Removal &reinstallation of liquid
discharge
valve
including
complete
dismantling
&
reassembly,of all internals with repair/replacement as
required. Removal & reinstallation of liquid
Diaphram-Liq
Head.Applicable
for
Diaphragm Pump and
Compressors. - Above 25 KW and up to 50 KW.
Diaphram-Liquid Head (Applicable for Diaphragm Pump and
Compressors).Job includes :Removal & reinstallation of
liquid suction valve including complete dismantling &
reassembly,
inspection of all internals with repair/
replacement as required.Removal &reinstallation of liquid
discharge
valve
including
complete
dismantling
&
reassembly,of all internals with repair/replacement as
required. Removal & reinstallation of liquid
Diaphram-Liq
Head.Applicable
for
Diaphragm Pump and
Compressors. - Above 50 KW.
Diaphram-Liquid Head (Applicable for Diaphragm Pump and
Compressors).Job includes :Removal & reinstallation of
liquid suction valve including complete dismantling &
reassembly,
inspection of all internals with repair/
replacement as required.Removal &reinstallation of liquid
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 78
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
discharge
valve
including
complete
dismantling
reassembly,of all internals with repair/replacement
required. Removal & reinstallation of liquid
&
as
7,095.35
INR/EA
7,602.15
INR/EA
8,108.97
INR/EA
Cylinder & Plunger assembly.(Applicable for Plunger pump) Above 25KW to 50 KW.
Cylinder & Plunger assembly:Job includes : Removal &
reinstallation
of
gland chamber cover (s) including
replacement of gasket. All necessary measurement checks
like dimensions, clearances,concentricity, rod runout etc.
with correction as required Removal & reinstallation of
plunger assmbly Removal & reinstallation/replacement of
plunger
rings Removal & reinstallation/replacement of
punger rider rings Removal & reinstallation /replacement of
plunger Removal & reinstallation/replacement of plunger rod
Removal
&
reinstallation/replacement
of plunger rod
packing/seats
including removal and reinstallation of
stuffing box/gland housing
Number : CCM/
Date
: 25.05.2015
Page No. : 79
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
plunger
rings Removal & reinstallation/replacement of
punger rider rings Removal & reinstallation /replacement of
plunger Removal & reinstallation/replacement of plunger rod
Removal
&
reinstallation/replacement
of plunger rod
packing/seats
including removal and reinstallation of
stuffing box/gland housing
7,602.15
INR/EA
8,446.84
INR/EA
9,291.53
INR/EA
8,446.84
INR/EA
8,953.64
INR/EA
Oil
Chamber
jobs.
DIAPHRAGM
PLUNGER
PUMP, DIAPHRAGM
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 80
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
9,629.41
INR/EA
6,757.47
INR/EA
7,602.15
INR/EA
8,446.84
INR/EA
Crankcase
jobs.DIAPHRAGM
/
PLUNGER
PUMP, DIAPHRAGM
COMPRESSOR. - Up to 25 KW.
Crankcase jobs:Job includes Removal & reinstallation of all
covers
necessaryto
access
the
internals
including
replacement of all gaskets/O-rings.
"Crankcase
jobs.DIAPHRAGM
/
PLUNGER PUMP, DIAPHRAGM
COMPRESSOR. -Above 25 KW and up to 50 KW.
Crankcase jobs:Job includes Removal & reinstallation of all
covers
necessaryto
access
the
internals
including
replacement of all gaskets/O-rings.
"Crankcase
jobs.DIAPHRAGM
/
PLUNGER PUMP, DIAPHRAGM
COMPRESSOR. -Above 50 KW.
Crankcase jobs:Job includes Removal & reinstallation of all
covers
necessaryto
access
the
internals
including
replacement of all gaskets/O-rings.
Trble.shoot.of
diaph./dos.pumps
.Trouble
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
shooting
of
Number : CCM/
Date
: 25.05.2015
Page No. : 81
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
* 40
FANS
** 40.01 ID/FD FAN, CENTRIFUGAL FANS / BLOWERS.
*** 40.01.01Bearing job (DE / NDE).
3159485 "BJ (DE/NDE)ID/FD FAN,CF/BLWR-BB<=30KW"
Valid from: 25.05.2015 Valid to: 31.07.2016
2,545.88
INR/EA
3,817.97
INR/EA
7,264.29
INR/EA
9,502.69
INR/EA
1,001.79
INR/EA
Removal
of
seal
chamber.
ID/FD
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 82
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,503.54
INR/EA
2,255.32
INR/EA
3,007.08
INR/EA
6,831.80
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 83
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
10,136.22 INR/EA
14,359.62 INR/EA
20,272.43 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 84
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Fan
CENTRIFUGAL
KW
844.68 INR/EA
damper
adjustment
/
repairs.ID/FD
FAN,
FANS / BLOWERS (BETWEEN BEARINGS). - Up to 30
1,098.09
INR/EA
1,351.49
INR/EA
1,689.37
INR/EA
Fan
damper
adjustment
/
repairs.ID/FD
FAN,
CENTRIFUGAL FANS / BLOWERS (BETWEEN BEARINGS). - Above 100
and up to 250 KW.
Remov
CENTRIFUGAL
KW
449.37 INR/EA
&
reinstallation
of actuator.ID/FD FAN,
FANS / BLOWERS (BETWEEN BEARINGS). - Up to 30
675.76 INR/EA
1,001.79
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 85
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,503.54
INR/EA
248.34 INR/EA
449.37 INR/EA
523.71 INR/EA
633.53 INR/EA
1,202.83
INR/EA
1,753.56
INR/EA
Casing
/ inspection Door Gasket.ID/FD FANS, OVERHUNG
WITHOUT COUPLING - Up to 30 KW
ID/FD FANS, OVERHUNG WITHOUT COUPLING -Casing / inspection
Door Gasket: Job includes: Removal & reinstallation of seal
chamber cover and/or inspection door. Removal, inspection &
reinstallation/replacement
of
seal
including
all
measurement checks on shaft surface / seating face
Casing
/ inspection Door Gasket.ID/FD FANS, OVERHUNG
WITHOUT COUPLING - Above 30 and up to 100 KW.
ID/FD FANS, OVERHUNG WITHOUT COUPLING -Casing / inspection
Door Gasket: Job includes: Removal & reinstallation of seal
chamber cover and/or inspection door. Removal, inspection &
reinstallation/replacement
of
seal
including
all
measurement checks on shaft surface / seating face
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 86
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
751.77 INR/EA
466.27 INR/EA
675.76 INR/EA
2,702.99
INR/EA
3,642.27
INR/EA
Capital repair job. ID/FD FANS, OVERHUNG WITHOUT COUPLING Above 30 and up to 100 KW.
929.14 INR/EA
Fan Blade Angle change job: FANS-FOR FINNED TUBE COOLERS Above 30 and up to 50KW.
FANS-FOR FINNED TUBE COOLERS - Fan Blade Angle change
job::Jobincludes:Inspection
&
adjustment
of
fan
blade(s).Inspection
&
Adjustment
ofhub.Removal
&
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
1,351.49
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 87
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,182.55
INR/EA
2,044.13
INR/EA
FinFan
- Up to
FinFan
chamber
844.68 INR/EA
FinFan
- Above
FinFan
chamber
1,351.49
INR/EA
5,912.79
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 88
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
8,446.84
INR/EA
3,167.57
INR/EA
4,223.43
INR/EA
1,520.44
INR/EA
2,702.99
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 89
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,689.37
INR/EA
3,040.86
INR/EA
6,335.13
INR/EA
7,602.15
INR/EA
2,534.05
INR/EA
3,801.08
INR/EA
Capital repair(OH). FANS-FOR COOLING TOWERS WITH GEAR BOX Above 50 andup to 100 KW.
Capital repair(OH):Job includes :Removal & reinstallation
of drive shaftassembly.Removal & reinstallation/replacement
of hub(s).Inspection & adjustmentof fan blade(s) &/or
clamp(s).
Dismantling
&
reassembly
of
fan
unit
includingrepair/replacement of all components excluding
replacement of gearbox
Replacement
of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 90
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
5,405.98
INR/EA
8,446.84
INR/EA
4,137.27
INR/EA
5,517.48
INR/EA
8,446.84
INR/EA
Capital repair job. FANS-FOR COOLING TOWERS WITH GEAR BOX Up to 50 KW.
Capital
Repair
of
Gear
box:Job includes :Complete
dismantling & reassembly ofgearbox including inspection of
all internal, bearings,shafts, gears, sealsetc. with all
applicable
&
necessary checks and repair/replacement
ofcomponents as required
Capital repair job. FANS-FOR COOLING TOWERS WITH GEAR BOX Above 50 andup to 100 KW.
Capital
Repair
of
Gear
box:Job includes :Complete
dismantling & reassembly ofgearbox including inspection of
all internal, bearings,shafts, gears, sealsetc. with all
applicable
&
necessary checks and repair/replacement
ofcomponents as required
Number : CCM/
Date
: 25.05.2015
Page No. : 91
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
11,825.58 INR/EA
3,760.53
INR/EA
5,015.74
INR/EA
7,602.15
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 92
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
10,643.02 INR/EA
3,801.08
INR/EA
6,335.13
INR/EA
9,502.69
INR/EA
DE bearing/seal replacement. BLOWER-TWIN LOBE-BELT DRIVEN Above 250 and up to 1000 KW.
DE bearing/seal replacement:Job includes:Dismantling and
reassembling of DEbearing cover.Inspection, checking and
replacement of gears and bearingsincluding all measurement
checks
of
bearing
/ seal seat on shaft.Inspection
andreplacement of seal (s) including all measurement checks
DE bearing/seal replacement. BLOWER-TWIN LOBE-BELT DRIVEN Above 250 and up to 1000 KW.
DE bearing/seal replacement:Job includes:Dismantling and
reassembling of DEbearing cover.Inspection, checking and
replacement of gears and bearingsincluding all measurement
checks
of
bearing
/ seal seat on shaft.Inspection
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
12,670.27 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 93
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
844.68 INR/EA
Checking / repair of
DRIVEN - Above 30 and up
Checking / repair of
including
adjustment
reassembling of RV after
1,351.49
INR/EA
2,196.17
INR/EA
3,378.75
INR/EA
14,021.76 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 94
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
17,738.37 INR/EA
25,762.87 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 95
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,267.03
INR/EA
1,689.37
INR/EA
4,730.24
INR/EA
MIXER-SIDE ENTRY
Number : CCM/
Date
: 25.05.2015
Page No. : 96
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
- Up to25 KW.
DE
bearing
job:
Job
includes:
Removal
&
reinstallation/replacement
of
pulley
end
bearing(s)
including
dismantling
& reassembly of all necessary
component, inspection of seat on shaft & housing, all
necessary checks for dimension, clearance, runout etc
necessary
6,335.13
INR/EA
7,602.15
INR/EA
6,335.13
INR/EA
7,602.15
INR/EA
11,403.25 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 97
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Impeller
End
Bearing:
Job
includes:
Removal
&
reinstallation of mixer assembly with driver, including
removal & reinstallation of hanger supports.
6,757.47
INR/EA
8,446.84
INR/EA
10,136.22 INR/EA
13,041.93 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 98
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
including
dismantling
& reassembly of all necessary
component, inspection of seat on shaft & housing, all
necessary checks for dimension, clearance, runout etc.
Removal & reinstallation of mixer assembly with driver,
including removal & reinstallation of hanger support(s).
Removal & reinstallation of impeller/propeller assembly
from shaft including dismantling & reassembly, inspection,
cleaning, repair/replacement of components, replacement of
all gaskets / O-rings. Removal & reinstallation of mixer
mounting flange. Removal & reinstallation of seal including
dismantling
&
reassembly
of seal unit, inspection,
cleaning, repair/replacement of components, replacement of
all gaskets/O-rings. Removal & reinstallation of Swivel
joint
(As
applicable).
Removal
&
reinstallation
/replacement
of
impeller
end
bearing(s)
including
dismantling
& reassembly of all necessary component,
inspection of seat on shaft & housing
17,738.37 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 99
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
21,961.80 INR/EA
2,534.05
INR/EA
3,040.86
INR/EA
3,716.61
INR/EA
3,378.75
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 100
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Removal
& Refixing of Rigid coupling.
assembly of shaft & Mixer blades.
Dismantling
&
3,716.61
INR/EA
4,054.49
INR/EA
1,689.37
INR/EA
2,027.25
INR/EA
2,534.05
INR/EA
3,167.57
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 101
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,547.66
INR/EA
4,054.49
INR/EA
* 50
SOOT BLOWER
** 50.01 Rotary soot blower
3159588 SMOOTH OPERATION CHKG
506.81 INR/EA
INR/EA
D-Asm
Rep-Asm-Sealing-Air
NRV
Assembly of Sealing Air NRV.
Soot Blower -Rotary soot blower
-Disassembly
Repair
&
**
Poppet
1,013.62
INR/EA
1,182.55
INR/EA
1,013.62
INR/EA
Valve Disassembly
Poppet
V/v
D-Assembly
&
Rep.
REGISTERED
Rapair.
OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 102
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
LSRB
Rtractabe
Lance
removal/Replacement.
Rmvl.Rep
LSRB
RECTBLE
2,108.33
INR/EA
1,182.55
INR/EA
4,162.60
INR/EA
3,378.75
INR/EA
lance
Comp.Overhauling-Soot
Blower.
* 60
STEAM TURBINE
** 60.01 SINGLE STG 2-BLADE, VERTI SPLIT(COPPUS)
*** 60.01.01Governor Job
3159626 "OTSGST-S/S 2-BLD,VS(CPUS)-ADJST O/S GOV
Valid from: 25.05.2015 Valid to: 31.07.2016
Decoupling-Coupling (govornor).STEAM
2-BLADE, VERTICALLYSPLIT(COPPUS) Job
reinstallation/replacement of guards
shaft.
Steam Turbine- SINGLE STG 2-BLADE,
Governor Job
TURBINE-SINGLE STAGE
includes : Removal &
and spacer on output
VERTI SPLIT (COPPUS)
4,223.43
INR/EA
7,602.15
INR/EA
Casing
gasket.
STEAM
TURBINE-SINGLE
STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Up to 20 KW
Casing
gasket
job:
Job
includes:
Removal
&
reinstallation/replacement of guards and spacer on output
shaft. Removal & reinstallation of trip lever & latch set.
Removal & reinstallation of governor mounting yoke. Removal
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 103
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
&
reinstallation
of governor end bearing housing &
components.
Inspection
removal & replacement bearing
including oil ring, oil ring sleeve, circlip and oil seals.
Removal & reinstallation of gland housing. Removal &
reinstallation
of
seal
ring
including
inspection,
repair/replacement and checks on seal seating area on
shaft. Including yoke removal & reinstallation if needed.
Removal & reinstallation of casing cover. Replacement of
casing gasket
INR/EA
Casing
gasket.
STEAM
TURBINE-SINGLE
STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Above 20 and up to 50 KW.
Casing
gasket
job:
Job
includes:
Removal
&
reinstallation/replacement of guards and spacer on output
shaft. Removal & reinstallation of trip lever & latch set.
Removal & reinstallation of governor mounting yoke. Removal
&
reinstallation
of governor end bearing housing &
components.
Inspection
removal & replacement bearing
including oil ring, oil ring sleeve, circlip and oil seals.
Removal & reinstallation of gland housing. Removal &
reinstallation
of
seal
ring
including
inspection,
repair/replacement and checks on seal seating area on
shaft. Including yoke removal & reinstallation if needed.
Removal & reinstallation of casing cover. Replacement of
casing gasket
"Casing
gasket.
STEAM
TURBINE-SINGLE STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Above 50 and up to 100 KW."
Casing
gasket
job:
Job
includes:
Removal
&
reinstallation/replacement of guards and spacer on output
shaft. Removal & reinstallation of trip lever & latch set.
Removal & reinstallation of governor mounting yoke. Removal
&
reinstallation
of governor end bearing housing &
components.
Inspection
removal & replacement bearing
including oil ring, oil ring sleeve, circlip and oil seals.
Removal & reinstallation of gland housing. Removal &
reinstallation
of
seal
ring
including
inspection,
repair/replacement and checks on seal seating area on
shaft. Including yoke removal & reinstallation if needed.
Removal & reinstallation of casing cover. Replacement of
casing gasket
"Casing
gasket.
STEAM
TURBINE-SINGLE
STAGE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
2-BLADE,
Number : CCM/
Date
: 25.05.2015
Page No. : 104
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,182.55
INR/EA
1,267.03
INR/EA
1,435.96
INR/EA
1,689.37
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 105
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,182.55
INR/EA
1,267.03
INR/EA
1,435.96
INR/EA
1,689.37
INR/EA
1,182.55
INR/EA
1,267.03
INR/EA
1,435.96
INR/EA
"Repair
of
Throttle Valve.STEAM TURBINE-SINGLE STAGE
2-BLADE, VERTICALLY SPLIT(COPPUS) - Up to 20 KW"
Repair
of
Throttle
Valve:
Job includes: Repair /
replacement of Trip throttle valve
Repair
of
Throttle
Valve.STEAM TURBINE-SINGLE STAGE
2-BLADE, VERTICALLY SPLIT (COPPUS) - Above 20 and up to 50
KW.
Repair
of
Throttle
Valve:
Job includes: Repair /
replacement of Trip throttle valve
"Repair
of
Throttle Valve.STEAM TURBINE-SINGLE STAGE
2-BLADE, VERTICALLY SPLIT(COPPUS) - Above 50 and up to 100
KW."
Repair
of
Throttle
Valve:
Job includes: Repair /
replacement of Trip throttle valve
Repair
of
Throttle
Valve.STEAM TURBINE-SINGLE STAGE
2-BLADE, VERTICALLY SPLIT (COPPUS) - Above 100 KW.
Repair
of
Throttle
Valve:
Job includes: Repair /
replacement of Trip throttle valve
Number : CCM/
Date
: 25.05.2015
Page No. : 106
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,689.37
INR/EA
5,777.64
INR/EA
7,602.15
INR/EA
9,882.81
INR/EA
DE
bearing
job. STEAM TURBINE-SINGLE STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Up to 20 KW
DE bearing job: Job includes: Removal & reinstallation of
bearing housing cover. Removal & reinstallation of output
end bearing housing. Inspection, removal & replacement of
bearing including oil ring and oil seals
DE
bearing
job. STEAM TURBINE-SINGLE STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Above 20 and up to 50 KW.
DE bearing job: Job includes: Removal & reinstallation of
bearing housing cover. Removal & reinstallation of output
end bearing housing. Inspection, removal & replacement of
bearing including oil ring and oil seals
"DE
bearing job. STEAM TURBINE-SINGLE STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Above 50 and up to 100 KW."
DE bearing job: Job includes: Removal & reinstallation of
bearing housing cover. Removal & reinstallation of output
end bearing housing. Inspection, removal & replacement of
bearing including oil ring and oil seals
13,683.88 INR/EA
DE
bearing
job.STEAM
TURBINE-SINGLE
STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Above 100 KW.
DE bearing job: Job includes: Removal & reinstallation of
bearing housing cover. Removal & reinstallation of output
end bearing housing. Inspection, removal & replacement of
bearing including oil ring and oil seals
NDE
bearing
replacement..STEAM
TURBINE-SINGLE
STAGE
2-BLADE, VERTICALLY SPLIT (COPPUS) - Up to 20 KW
NDE
bearing
replacement:
Job
includes:
Removal &
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
6,419.60
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 107
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
reinstallation
of
governor.
Removal
&
reinstallation/replacement of spider and/or coupling hub at
governor end. Removal & reinstallation of trip lever &
latch set. Removal & reinstallation of governor mounting
yoke. Removal & replacement of bearing including oil ring,
circlip and oil seals
8,446.84
INR/EA
"NDE
bearing
replacement..STEAM
TURBINE-SINGLE STAGE
2-BLADE, VERTICALLY SPLIT(COPPUS) - Above 20 and up to 50
KW."
NDE
bearing
replacement:
Job
includes:
Removal &
reinstallation
of
governor.
Removal
&
reinstallation/replacement of spider and/or coupling hub at
governor end. Removal & reinstallation of trip lever &
latch set. Removal & reinstallation of governor mounting
yoke. Removal & replacement of bearing including oil ring,
circlip and oil seals
10,980.90 INR/EA
NDE
bearing
replacement..STEAM
TURBINE-SINGLE
STAGE
2-BLADE, VERTICALLY SPLIT (COPPUS) - Above 50 and up to 100
KW.
NDE
bearing
replacement:
Job
includes:
Removal &
reinstallation
of
governor.
Removal
&
reinstallation/replacement of spider and/or coupling hub at
governor end. Removal & reinstallation of trip lever &
latch set. Removal & reinstallation of governor mounting
yoke. Removal & replacement of bearing including oil ring,
circlip and oil seals
15,204.32 INR/EA
NDE
bearing
replacement..STEAM
TURBINE-SINGLE
STAGE
2-BLADE, VERTICALLY SPLIT (COPPUS) - Above 100 KW.
NDE
bearing
replacement:
Job
includes:
Removal &
reinstallation
of
governor.
Removal
&
reinstallation/replacement of spider and/or coupling hub at
governor end. Removal & reinstallation of trip lever &
latch set. Removal & reinstallation of governor mounting
yoke. Removal & replacement of bearing including oil ring,
circlip and oil seals
3,801.08
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 108
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
5,068.10
INR/EA
6,335.13
INR/EA
8,869.18
INR/EA
16,893.69 INR/EA
26,185.22 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 109
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
37,166.11 INR/EA
47,302.32 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 110
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,689.37
INR/EA
3,378.75
INR/EA
8,446.84
INR/EA
Overspeed
Trip
Setting
of
Governor.STEAM
TURBINE-SINGLE STAGE 2-BLADE, VERTICALLY SPLIT(COPPUS) Adjustment of overspeed Governor.
Number : CCM/
Date
: 25.05.2015
Page No. : 111
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
13,514.95 INR/EA
16,893.69 INR/EA
6,757.47
INR/EA
Drive
end
bearing.
STEAM
TUR.-SINGLE
STAGE 2-BL.
(Horizontally split) -Up to 100 KW
Drive end bearing: Job includes: Removal & reinstallation
of
bearing
housing
cover.
Removal
&
reinstallation/replacement of journal bearing & oiling.
10,136.22 INR/EA
Drive
end
bearing.
STEAM
TUR.-SINGLE
STAGE 2-BL.
(Horizontally split) -Above 100 and up to 350 KW.
Drive end bearing: Job includes: Removal & reinstallation
of
bearing
housing
cover.
Removal
&
reinstallation/replacement of journal bearing & oiling.
Drive
end
bearing.STEAM
TUR.-SINGLE
STAGE
2-BL.
(Horizontally split) -Above 350 KW.
Drive end bearing: Job includes: Removal & reinstallation
of
bearing
housing
cover.
Removal
&
reinstallation/replacement of journal bearing & oiling.
13,514.95 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 112
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
8,973.93
INR/EA
Turbine
Shaft
Seals.STEAM
TUR.-SINGLE
STAGE
2-BL.
(Horizontally split) - Up to 100 KW
Turbine Shaft Seals: Job includes: Removal & reinstallation
of seal rings including inspection, repair/replacement &
checks
on
seal seating area on shaft. Removal and
reinstallation of casing top half
Turbine
Shaft
Seals.STEAM
TUR.-SINGLE
STAGE
2-BL.
(Horizontally split) -Above 100 and up to 350 KW.
Turbine Shaft Seals: Job includes: Removal & reinstallation
of seal rings including inspection, repair/replacement &
checks
on
seal seating area on shaft. Removal and
reinstallation of casing top half
Turbine
Shaft
Seals
STEAM
TUR.-SINGLE STAGE 2-BL.
(Horizontally split) - Above 350 KW.
Turbine Shaft Seals: Job includes: Removal & reinstallation
of seal rings including inspection, repair/replacement &
checks
on
seal seating area on shaft. Removal and
reinstallation of casing top half
INR/EA
Casing
gasket
job.
STEAM
TUR.-SINGLE
STAGE 2-BL.
(Horizontally split) - Up to 100 KW
Casing gasket job:Job includes: Removal & reinstallation of
turbine casing cover. Removal & reinstallation of seal
rings including inspection, repair/replacement and checks
on
seal
seating
area
on
shaft.
Yoke removal &
reinstallation (if required). Replacement of casing gasket
Casing
gasket
job.
STEAM
TUR.-SINGLE
STAGE 2-BL.
(Horizontally split) - Above 100 and up to 350 KW.
Casing gasket job:Job includes: Removal & reinstallation of
turbine casing cover. Removal & reinstallation of seal
rings including inspection, repair/replacement and checks
on
seal
seating
area
on
shaft.
Yoke removal &
reinstallation (if required). Replacement of casing gasket
Casing
gasket
job.STEAM
TUR.-SINGLE
(Horizontally split) - Above 350 KW.
STAGE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
2-BL.
Number : CCM/
Date
: 25.05.2015
Page No. : 113
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
21,961.80 INR/EA
32,098.00 INR/EA
42,234.21 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 114
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,182.55
INR/EA
1,267.03
INR/EA
1,435.96
INR/EA
1,182.55
INR/EA
1,267.03
INR/EA
1,435.96
INR/EA
1,182.55
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 115
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,267.03
INR/EA
1,435.96
INR/EA
16,893.69 INR/EA
Front
Bearing
Jobs:STEAM
TURBINE JOBS (Multi Stage
Horizontally Split).-2500 KW to 5000 KW
STEAM TURBINE (Multi Stage Horizontal).-Front Bearing Jobs
(NDE): Job includes: Examine all parts of Bearing, Clean
housing. Examine all free bolts, nuts, adjusting devices &
guides & replace spherical washers. Clean Bearing sealing
rings,
inspect & fit new sealing ring if required.
Disassemble, clean, measure clearance & refit Journal
bearing.
Disassemble, Clean, refit Thrust bearings &
measure axial clearance. Blue Matching if required
25,340.52 INR/EA
Front
Bearing
Jobs:STEAM
TURBINE JOBS (Multi Stage
Horizontally Split).- Above 5,000 KW and up to 10,000 KW
STEAM TURBINE (Multi Stage Horizontal).-Front Bearing Jobs
(NDE): Job includes: Examine all parts of Bearing, Clean
housing. Examine all free bolts, nuts, adjusting devices &
guides & replace spherical washers. Clean Bearing sealing
rings,
inspect & fit new sealing ring if required.
Disassemble, clean, measure clearance & refit Journal
bearing.
Disassemble, Clean, refit Thrust bearings &
measure axial clearance. Blue Matching if required
Front
Bearing Jobs: STEAM TURBINE JOBS (Multi Stage
Horizontally Split).- Above 10,000 KW and up to 15,000 KW
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
33,787.37 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 116
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
42,234.21 INR/EA
Front
Bearing
Jobs:STEAM
TURBINE JOBS (Multi Stage
Horizontally Split).- Above 15,000 KW and up to 20,000 KW
STEAM TURBINE (Multi Stage Horizontal).-Front Bearing Jobs
(NDE): Job includes: Examine all parts of Bearing, Clean
housing. Examine all free bolts, nuts, adjusting devices &
guides & replace spherical washers. Clean Bearing sealing
rings,
inspect & fit new sealing ring if required.
Disassemble, clean, measure clearance & refit Journal
bearing.
Disassemble, Clean, refit Thrust bearings &
measure axial clearance. Blue Matching if required
50,681.06 INR/EA
Front
Bearing
Jobs:STEAM
TURBINE JOBS (Multi Stage
Horizontally Split).-Above 20,000 KW
STEAM TURBINE (Multi Stage Horizontal).-Front Bearing Jobs
(NDE): Job includes: Examine all parts of Bearing, Clean
housing. Examine all free bolts, nuts, adjusting devices &
guides & replace spherical washers. Clean Bearing sealing
rings,
inspect & fit new sealing ring if required.
Disassemble, clean, measure clearance & refit Journal
bearing.
Disassemble, Clean, refit Thrust bearings &
measure axial clearance. Blue Matching if required
10,558.55 INR/EA
12,670.27 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 117
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Jobs.
12,670.27 INR/EA
16,893.69 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 118
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
21,961.80 INR/EA
27,029.90 INR/EA
33,787.37 INR/EA
Rear
(DE)
Bearing
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
7,918.07
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 119
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
9,502.69
INR/EA
11,085.64 INR/EA
12,670.27 INR/EA
15,837.82 INR/EA
4,223.43
INR/EA
7,602.15
INR/EA
Manual
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 120
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
11,825.58 INR/EA
18,583.05 INR/EA
25,340.52 INR/EA
3,801.08
INR/EA
5,912.79
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 121
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
refitment
strainer,
Checking
Functional
9,291.53
INR/EA
11,825.58 INR/EA
16,893.69 INR/EA
11,825.58 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 122
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
16,893.69 INR/EA
23,651.16 INR/EA
28,719.27 INR/EA
33,787.37 INR/EA
6,335.13
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 123
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
8,446.84
INR/EA
13,092.61 INR/EA
16,893.69 INR/EA
20,272.43 INR/EA
3,801.08
INR/EA
5,068.10
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 124
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
wherever required,
6,757.47
INR/EA
8,446.84
INR/EA
10,136.22 INR/EA
3,801.08
INR/EA
4,645.77
INR/EA
5,912.79
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 125
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
7,602.15
INR/EA
8,446.84
INR/EA
3,378.75
INR/EA
5,068.10
INR/EA
6,757.47
INR/EA
8,446.84
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 126
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
10,136.22 INR/EA
380,107.91 INR/EA
Capital
repair.
STEAM
TURBINE
JOBS
(Multi
Stage
Horizontally Split).-2500 KW to 5000 KW
Capital repair of Turbine: Job includes: A) Outer casing
Jobs: Inspection of top & bottom halves of casing, cleaning
& measuring. Sealing of connecting & mating surfaces,
examination & refitting of Taper pins & holes, alignment
check of Rotor to casing. Fit & tighten outer casing joints
(60). B) Inner Casing: Examination of all parts, blades,
carriers for cracks. Examination of blades & sealing
strips.
Renewal
of
sealing
surfaces
if required.
Measurement of clearance & vertical alignment. C) L P Guide
Blade Carrier: Examine joints, faces. Overhaul & free
adjusting devices. Examine guide blades & sealing strips,
renewal of sealing strips measurement of Axial & radial
clearances.
D)
Gland Bushes; Examination of bushes,
cleaning & refitment of joint faces, renewal of sealing
strips. Check axial freedom of movement of all internals
when fitted. E) Rotor: Cleaning of rotor, measurement of
axial & radial runout. Inspection & smoothen bearing
journals, sealing ring areas. Inspection & measurement of
coupling flange, runout checks. Check & measure of internal
& external alignment. Fitting of main oil pump, coupling to
HP shaft. Alignment checks of LP shaft to gearbox. F)
Emergency stop valves related jobs: Removal, dismantling,
cleaning, inspection, replacement of O rings, refitment of
components,
check
assembly adjustment of clearances.
Checking
of
position indicator, renew if necessary.
Functional check after repair.
"Capital
repair.
STEAM
TURBINE
JOBS
(Multi Stage
Horizontally Split).-Above 5,000 KW and up to 10,000 KW"
Capital repair of Turbine: Job includes: A) Outer casing
Jobs: Inspection of top & bottom halves of casing, cleaning
& measuring. Sealing of connecting & mating surfaces,
examination & refitting of Taper pins & holes, alignment
check of Rotor to casing. Fit & tighten outer casing joints
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
464,576.32 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 127
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
"Capital
repair.
STEAM
TURBINE
JOBS
(Multi Stage
Horizontally Split).-Above 10,000 KW and up to 15,000 KW"
Capital repair of Turbine: Job includes: A) Outer casing
Jobs: Inspection of top & bottom halves of casing, cleaning
& measuring. Sealing of connecting & mating surfaces,
examination & refitting of Taper pins & holes, alignment
check of Rotor to casing. Fit & tighten outer casing joints
(60). B) Inner Casing: Examination of all parts, blades,
carriers for cracks. Examination of blades & sealing
strips.
Renewal
of
sealing
surfaces
if required.
Measurement of clearance & vertical alignment. C) L P Guide
Blade Carrier: Examine joints, faces. Overhaul & free
adjusting devices. Examine guide blades & sealing strips,
renewal of sealing strips measurement of Axial & radial
clearances.
D)
Gland Bushes; Examination of bushes,
cleaning & refitment of joint faces, renewal of sealing
strips. Check axial freedom of movement of all internals
when fitted. E) Rotor: Cleaning of rotor, measurement of
axial & radial runout. Inspection & smoothen bearing
journals, sealing ring areas. Inspection & measurement of
coupling flange, runout checks. Check & measure of internal
& external alignment. Fitting of main oil pump, coupling to
HP shaft. Alignment checks of LP shaft to gearbox. F)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
574,385.27 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 128
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
701,087.91 INR/EA
Capital
repair.
STEAM
TURBINE
JOBS
(Multi
Stage
Horizontally Split).-Above 15,000 KW and up to 20,000 KW
Capital repair of Turbine: Job includes: A) Outer casing
Jobs: Inspection of top & bottom halves of casing, cleaning
& measuring. Sealing of connecting & mating surfaces,
examination & refitting of Taper pins & holes, alignment
check of Rotor to casing. Fit & tighten outer casing joints
(60). B) Inner Casing: Examination of all parts, blades,
carriers for cracks. Examination of blades & sealing
strips.
Renewal
of
sealing
surfaces
if required.
Measurement of clearance & vertical alignment. C) L P Guide
Blade Carrier: Examine joints, faces. Overhaul & free
adjusting devices. Examine guide blades & sealing strips,
renewal of sealing strips measurement of Axial & radial
clearances.
D)
Gland Bushes; Examination of bushes,
cleaning & refitment of joint faces, renewal of sealing
strips. Check axial freedom of movement of all internals
when fitted. E) Rotor: Cleaning of rotor, measurement of
axial & radial runout. Inspection & smoothen bearing
journals, sealing ring areas. Inspection & measurement of
coupling flange, runout checks. Check & measure of internal
& external alignment. Fitting of main oil pump, coupling to
HP shaft. Alignment checks of LP shaft to gearbox. F)
Emergency stop valves related jobs: Removal, dismantling,
cleaning, inspection, replacement of O rings, refitment of
components,
check
assembly adjustment of clearances.
Checking
of
position indicator, renew if necessary.
Functional check after repair.
Capital
repair.
STEAM
TURBINE
JOBS
(Multi
Stage
Horizontally Split).-Above 20,000 KW
Capital repair of Turbine: Job includes: A) Outer casing
Jobs: Inspection of top & bottom halves of casing, cleaning
& measuring. Sealing of connecting & mating surfaces,
examination & refitting of Taper pins & holes, alignment
check of Rotor to casing. Fit & tighten outer casing joints
(60). B) Inner Casing: Examination of all parts, blades,
carriers for cracks. Examination of blades & sealing
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
929,152.66 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 129
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
strips.
Renewal
of
sealing
surfaces
if required.
Measurement of clearance & vertical alignment. C) L P Guide
Blade Carrier: Examine joints, faces. Overhaul & free
adjusting devices. Examine guide blades & sealing strips,
renewal of sealing strips measurement of Axial & radial
clearances.
D)
Gland Bushes; Examination of bushes,
cleaning & refitment of joint faces, renewal of sealing
strips. Check axial freedom of movement of all internals
when fitted. E) Rotor: Cleaning of rotor, measurement of
axial & radial runout. Inspection & smoothen bearing
journals, sealing ring areas. Inspection & measurement of
coupling flange, runout checks. Check & measure of internal
& external alignment. Fitting of main oil pump, coupling to
HP shaft. Alignment checks of LP shaft to gearbox. F)
Emergency stop valves related jobs: Removal, dismantling,
cleaning, inspection, replacement of O rings, refitment of
components,
check
assembly adjustment of clearances.
Checking
of
position indicator, renew if necessary.
Functional check after repair.
"Alignment
KW."
checking
&
8,446.84
INR/EA
Alignment
to 10,000 KW.
10,136.22 INR/EA
11,825.58 INR/EA
13,514.95 INR/EA
15,204.32 INR/EA
361.51 INR/PC
915.63 INR/PC
Number : CCM/
Date
: 25.05.2015
Page No. : 130
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Bladder-
Repair
&
1,268.72
INR/PC
4,755.57
INR/PC
4,755.57
INR/PC
1,268.72
INR/PC
D-Asm
Rep-Asm-Rmvl-Rep/Re/Cplg - Disassembly Repair &
Assembly Removal Repair & Refixing of Coupling Guard
(Bottom).
Disassembly
&
Disassembly
&
Box/Trbin
- Alignment Check
INR/NOS
Check &
70.96 INR/H
* 70
COMPRESSOR
** 70.01 RECIPROCATING COMPRESSOR.
*** 70.01.01Guard removal
3159851 GUARD REM RECIPROCATING CMPRSR-UPTO100KW
Valid from: 25.05.2015 Valid to: 31.07.2016
633.53 INR/EA
Guard
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
844.68 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 131
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
to 250KW.
Compressor - RECIPROCATING COMPRESSOR. Guard removal: Job
includes: Removal & reinstallation of coupling guard(s)
1,267.03
INR/EA
1,584.63
INR/EA
3,040.86
INR/EA
5,068.10
INR/EA
8,446.84
INR/EA
Alignmt driver & Gear Box. RECIPROCATING COMPRESSOR. Above 100 and up to 250KW.
Alignment driver & Gear Box: Job includes: Removal &
reinstallation of coupling guard(s) Alignment check and
correction between driver and gearbox
Alignmt driver & Gear Box. RECIPROCATING COMPRESSOR. Above 250 and up to 1000KW.
Alignment driver & Gear Box: Job includes: Removal &
reinstallation of coupling guard(s) Alignment check and
correction between driver and gearbox
11,403.25 INR/EA
Alignmt driver & Gear Box. RECIPROCATING COMPRESSOR. Above 1000 KW.
Alignment driver & Gear Box: Job includes: Removal &
reinstallation of coupling guard(s) Alignment check and
correction between driver and gearbox
1,689.37
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 132
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,702.99
INR/EA
3,885.54
INR/EA
5,068.10
INR/EA
Unloaders
Remvl/reinst
unloaders<4"
-Removal
reinstallation/replacement of suction unloaders
&
Remvl/reinst
unloaders
4"-6"Removal
reinstallation/replacement of suction unloaders
&
Remvl/reinst
unloaders
6"-8"
-Removal
reinstallation/replacement of suction unloaders
1,013.62
INR/EA
1,267.03
INR/EA
&
Remvl/reinst
unloaders
>8"
Removal
reinstallation/replacement of suction unloaders
&
500.05 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 133
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Remv/ins/repl
of suction/discharge valve RECIPROCATING
COMPRESSOR. - Above 4" and up to 6".
Job includes: Removal & reinstallation of valve cover(s) on
cylinder. Removal & reinstallation/replacement of suction /
discharge valve assembly
1,267.03
INR/EA
1,584.63
INR/EA
Recond
suc/dis
v/v
suction/discharge valves
<
4"
-Reconditioning
of
Recond
suc/dis v/v
suction/discharge valves
v/v-4"-6"
-Reconditioning
1,055.84
INR/EA
1,267.03
INR/EA
2,111.71
INR/EA
2,647.24
INR/EA
of
"Recond
suc/dis
v/v
suction/discharge valves"
v/v-6"-8"
-Reconditioning
of
"Recond
suc/dis
v/v v/v
suction/discharge valves"
>
8""
Reconditioning
of
Number : CCM/
Date
: 25.05.2015
Page No. : 134
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
4,054.49
INR/EA
5,933.06
INR/EA
Cylinder/piston
450 mm.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
10,136.22 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 135
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Cylinder/piston
assembly:
Job
includes: Removal and
reinstallation of cylinder cover(s) including replacement
of gasket. Removal and reinstallation of distance piece
cover(s) including replacement of gasket. All necessary
measurement
checks
like
dimensions,
clearances,
concentricity, run out etc with correction as required.
Removal and reinstallation / replacement of piston / piston
rod assembly. Removal & reinstallation / replacement of
piston rings. Removal & reinstallation / replacement of
piston rider rings. Removal & reinstallation / replacement
of rod packing /seals including removal / reinstallation of
stuffing box gland housing
2,702.99
INR/EA
4,054.49
INR/EA
5,912.79
INR/EA
8,446.84
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 136
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Packing.
Cover
opening and box up, replacement and
reconditioning of packing, replacement of piston rings &
rider rings (as required)
2,365.12
INR/EA
2,702.99
INR/EA
3,040.86
INR/EA
3,378.75
INR/EA
3,716.61
INR/EA
Crankcase
common
job.(Per
Cylinde.
RECIPROCATING
COMPRESSOR. - Up to 200 KW
Crankcase job: Common jobs. Rate is per Cylinder. Removal
and reinstallation of all covers necessary to access the
internals including replacement of gaskets. Check web
deflection. Clean internal LO strainer in crank case. Check
MOP
Crankcase
common
job.(Per
Cylinde.
RECIPROCATING
COMPRESSOR. - Above 200 KW and up to 500 KW.
Crankcase job: Common jobs. Rate is per Cylinder. Removal
and reinstallation of all covers necessary to access the
internals including replacement of gaskets. Check web
deflection. Clean internal LO strainer in crank case. Check
MOP
Crankcase
common
job.(Per
Cylinde.
RECIPROCATING
COMPRESSOR. - Above 500 KW and up to 1000 KW.
Crankcase job: Common jobs. Rate is per Cylinder. Removal
and reinstallation of all covers necessary to access the
internals including replacement of gaskets. Check web
deflection. Clean internal LO strainer in crank case. Check
MOP
Crankcase
common
job.(Per
Cylinde.
RECIPROCATING
COMPRESSOR. - Above 1000 KW and up to 2500 KW.
Crankcase job: Common jobs. Rate is per Cylinder. Removal
and reinstallation of all covers necessary to access the
internals including replacement of gaskets. Check web
deflection. Clean internal LO strainer in crank case. Check
MOP
Number : CCM/
Date
: 25.05.2015
Page No. : 137
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
4,054.49
INR/EA
4,476.84
INR/EA
2,365.12
INR/EA
2,702.99
INR/EA
3,040.86
INR/EA
3,378.75
INR/EA
Crankcase
common
job.(Per
Cylinde
RECIPROCATING
COMPRESSOR. - Above 3500 KW and up to 5000 KW.
Crankcase job: Common jobs. Rate is per Cylinder. Removal
and reinstallation of all covers necessary to access the
internals including replacement of gaskets. Check web
deflection. Clean internal LO strainer in crank case. Check
MOP
Crankcase
common
job.(Per
Cylinde
-RECIPROCATING
COMPRESSOR. - Above 5000 KW.
Crankcase job: Common jobs. Rate is per Cylinder. Removal
and reinstallation of all covers necessary to access the
internals including replacement of gaskets. Check web
deflection. Clean internal LO strainer in crank case. Check
MOP
Main Bearing job - Crankcase RECIPROCATING COMPRESSOR. Above 200 KW and up to 500 KW.
Main Bearing job: Removal and reinstallation / replacement
of
main
bearings including all necessary checks on
dimensions, clearances etc with correction as required
Main Bearing job - Crankcase RECIPROCATING COMPRESSOR. Above 500 KW and up to 1000 KW.
Main Bearing job: Removal and reinstallation / replacement
of
main
bearings including all necessary checks on
dimensions, clearances etc with correction as required
Main
Bearing
job - Crankcase
RECIPROCATING COMPRESSOR. -
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 138
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,716.61
INR/EA
4,054.49
INR/EA
4,476.84
INR/EA
2,365.12
INR/EA
2,702.99
INR/EA
3,040.86
INR/EA
Main Bearing job - Crankcase RECIPROCATING COMPRESSOR. Above 2500 KW and up to 3500 KW.
Main Bearing job: Removal and reinstallation / replacement
of
main
bearings including all necessary checks on
dimensions, clearances etc with correction as required
Main Bearing job - Crankcase RECIPROCATING COMPRESSOR. Above 3500 KW and up to 5000 KW.
Main Bearing job: Removal and reinstallation / replacement
of
main
bearings including all necessary checks on
dimensions, clearances etc with correction as required
Crank Shaft job - Crankcase .RECIPROCATING COMPRESSOR. Above 200 KW and up to 500 KW.
Crank Shaft job: Removal and reinstallation / replacement
of crank shaft assembly including all necessary checks on
dimensions, clearances etc with correction as required
Crank Shaft job - Crankcase .RECIPROCATING COMPRESSOR. Above 500 KW and up to 1000 KW.
Crank Shaft job: Removal and reinstallation / replacement
of crank shaft assembly including all necessary checks on
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 139
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,378.75
INR/EA
3,716.61
INR/EA
4,054.49
INR/EA
4,476.84
INR/EA
2,365.12
INR/EA
2,702.99
INR/EA
3,040.86
INR/EA
Crank Shaft job - Crankcase. RECIPROCATING COMPRESSOR. Above 1000 KW and up to 2500 KW.
Crank Shaft job: Removal and reinstallation / replacement
of crank shaft assembly including all necessary checks on
dimensions, clearances etc with correction as required
Crank Shaft job - Crankcase.RECIPROCATING COMPRESSOR. Above 2500 KW and up to 3500 KW.
Crank Shaft job: Removal and reinstallation / replacement
of crank shaft assembly including all necessary checks on
dimensions, clearances etc with correction as required
Crank Shaft job - Crankcase. RECIPROCATING COMPRESSOR. Above 3500 KW and up to 5000 KW.
Crank Shaft job: Removal and reinstallation / replacement
of crank shaft assembly including all necessary checks on
dimensions, clearances etc with correction as required
Number : CCM/
Date
: 25.05.2015
Page No. : 140
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,378.75
INR/EA
3,716.61
INR/EA
4,054.49
INR/EA
4,476.84
INR/EA
2,365.12
INR/EA
2,702.99
INR/EA
Small
end
bearing
job
Crankcase .RECIPROCATING
COMPRESSOR. - Above 1000 KW and up to 2500 KW.
Small end bearing: Removal and reinstallation / replacement
of small-end bearing including all necessary checks on
dimensions, clearances etc with correction as required
Small
end
bearing
job
Crankcase .RECIPROCATING
COMPRESSOR. - Above 2500 KW and up to 3500 KW.
Small end bearing: Removal and reinstallation / replacement
of small-end bearing including all necessary checks on
dimensions, clearances etc with correction as required
Small
end
bearing
job
Crankcase .RECIPROCATING
COMPRESSOR. - Above 3500 KW and up to 5000 KW.
Small end bearing: Removal and reinstallation / replacement
of small-end bearing including all necessary checks on
dimensions, clearances etc with correction as required
Small
end
bearing
job - Crankcase . RECIPROCATING
COMPRESSOR. - Above 5000 KW.
Small end bearing: Removal and reinstallation / replacement
of small-end bearing including all necessary checks on
dimensions, clearances etc with correction as required
Number : CCM/
Date
: 25.05.2015
Page No. : 141
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,040.86
INR/EA
3,378.75
INR/EA
3,716.61
INR/EA
4,054.49
INR/EA
4,476.84
INR/EA
2,365.12
INR/EA
2,702.99
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 142
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Connecting Rod job.- Crankcase RECIPROCATING COMPRESSOR. Above 200 KW and up to 500 KW.
Connecting
Rod
job:
Removal
and
reinstallation /
replacement of connecting rod(s) including all necessary
checks on dimensions, clearances etc with correction as
required
3,040.86
INR/EA
3,378.75
INR/EA
3,716.61
INR/EA
4,054.49
INR/EA
4,476.84
INR/EA
Connecting Rod job.- Crankcase RECIPROCATING COMPRESSOR. Above 500 KW and up to 1000 KW.
Connecting
Rod
job:
Removal
and
reinstallation /
replacement of connecting rod(s) including all necessary
checks on dimensions, clearances etc with correction as
required
Connecting Rod job.- Crankcase RECIPROCATING COMPRESSOR. Above 1000 KW and up to 2500 KW.
Connecting
Rod
job:
Removal
and
reinstallation /
replacement of connecting rod(s) including all necessary
checks on dimensions, clearances etc with correction as
required
Connecting Rod job.- Crankcase -RECIPROCATING COMPRESSOR. Above 2500 KW and up to 3500 KW.
Connecting
Rod
job:
Removal
and
reinstallation /
replacement of connecting rod(s) including all necessary
checks on dimensions, clearances etc with correction as
required
Connecting Rod job.- Crankcase RECIPROCATING COMPRESSOR. Above 3500 KW and up to 5000 KW.
Connecting
Rod
job:
Removal
and
reinstallation /
replacement of connecting rod(s) including all necessary
checks on dimensions, clearances etc with correction as
required
Number : CCM/
Date
: 25.05.2015
Page No. : 143
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
*** 70.01.15Cross Head Assly job 3159926 CRS HED ASY-CRKC-REPRC CMPRSR<=200KW
Valid from: 25.05.2015 Valid to: 31.07.2016
2,365.12
INR/EA
2,702.99
INR/EA
3,040.86
INR/EA
3,378.75
INR/EA
3,716.61
INR/EA
4,054.49
INR/EA
4,476.84
INR/EA
1,503.54
INR/EA
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Number : CCM/
Date
: 25.05.2015
Page No. : 144
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,517.16
INR/EA
2,534.05
INR/EA
3,801.08
INR/EA
6,757.47
INR/EA
10,136.22 INR/EA
12,670.27 INR/EA
15,204.32 INR/EA
6,757.47
INR/EA
10,136.22 INR/EA
12,670.27 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 145
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
15,204.32 INR/EA
15,204.32 INR/EA
19,005.40 INR/EA
27,874.58 INR/EA
32,942.69 INR/EA
Number : CCM
Date
: 25.05.2015
Page No. : 146
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
oil
pipingconnected
to
coupling
guard
revoval b)
De-coupling - Spacer removal of GB-Motor,GB-Compressor &
reassembly
with Torque tightening c) Bearing housing
removald) Bearing removal, inspection, replacement (if
required)
&
re-assembly.e) DECoupling Hub removal &
re-installation
f)
Dry
Gas
Seal
removal
&
new
sealreplacement
11,403.25 INR/EA
16,049.00 INR/EA
20,272.43 INR/EA
24,707.02 INR/EA
101,362.12 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 147
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
118,255.81 INR/EA
135,149.47 INR/EA
152,043.16 INR/EA
23,651.16 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 148
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
30,408.64 INR/EA
37,166.11 INR/EA
43,923.59 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 149
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
&
replacement
(ifrequired) b) LS DE & NDE Bearing
Inspection & replacement (if required) c) LSThrust bearing
Inspection,
replacement(if
required) d) Backlash,Gear
toothsurface
contact,labryinth
end
clearance,shaft
run-outs,axail play e) Lube oiljet cleaning at bearings 5)
Gear box HS shaft coupling hub bolts inspection &torque
checking
6) Gear box LS shaft coupling spacer bolt
inspection & torqueCHECKING
27,029.90 INR/EA
33,787.37 INR/EA
40,544.85 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 150
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
47,302.32 INR/EA
5,068.10
INR/EA
6,757.47
INR/EA
8,446.84
INR/EA
10,558.55 INR/EA
8,446.84
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 151
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
10,136.22 INR/EA
11,825.58 INR/EA
13,514.95 INR/EA
Gearbox
to Compr-alignment check & corre CENTRIFUGAL
COMPRESSOR - Above 10,000 KW.
Gearbox to Compressor - alignment:Gearbox to Compressor alignment
checking
&correction Job includes Removal,
refixing
of
Coupling
guards,
piping,couplingspacer,
alignment check and correction
8,446.84
INR/EA
10,136.22 INR/EA
11,825.58 INR/EA
Motor
to Gearbox-alignm checking & corre CENTRIFUGAL
COMPRESSOR - Above 5,000 and up to 10,000KW.
Motor to Gearbox -alignment checking:Job includes :Motor to
Gearbox -alignment checking & correction. Removal, refixing
of Coupling guards, piping,coupling spacer, alignment check
and correction
13,514.95 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 152
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
6,419.60
INR/EA
7,391.00
INR/EA
8,446.84
INR/EA
11,656.64 INR/EA
3,040.86
INR/EA
4,223.43
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 153
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
6,335.13
INR/EA
7,391.00
INR/EA
20,272.43 INR/EA
30,408.64 INR/EA
69,686.45 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 154
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
to
access
the
internals.
Removal
&
Reinstallation/Replacement of Mechanical seal. Removal &
Reinstallation/Replacement of Rotor bearing(s).Inspection
and Repair/Replacement of compressor internals including
male/female
rotor,
compressor, casing, bearings etc.
completes with correction required
5,912.79
INR/EA
6,926.41
INR/EA
Compressor
1000 KW.
to
Motor
Allignment.Screw
compressor - Above
1,267.03
INR/EA
1,584.63
INR/EA
Coupling / De-coupling
and up to 250 KW.
Coupling / De-coupling
Coupling
/ De-coupling job
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 155
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Coupling
and up to
Coupling
including
2,111.71
INR/EA
2,640.49
INR/EA
**
22,806.47 INR/EA
101,362.12 INR/EA
COMPRESSOR
OVERHAULING
Integrally
Geared
Centrifugal Compressor. Job includes : 1st stage suction
spool, IGV, Interstage piping Removal & re-installation.
All Stages Bellow removal/re-installation, locking and
unlocking of bellows.Coupling guard, cou
38,855.48 INR/EA
COMPRESSOR
GEAR
INSPECTION - Integrally Geared
Centrifugal Compressor. Job includes : Coupling guard
removal/re-installation. Spacer removal. Gear box housing
removal & Re- assembly. Complete Gear box Inspection as per
SMP. a) HS - DE & NDE Bearing Inspect
50,681.06 INR/EA
GEARBOX
MAJOR
OVERHAULING
- Integrally Geared
Centrifugal
Compressor.
Job
includes
:
Decoupling/Coupling - Spacer removal Motor to Compressor,
coupling guard removal/re- installation. Gear box housing
removal & Re-assembly. HS Shaft - HS shaft removal
MOTOR
DE/NDE SLEEVE BEARING INPECTION-Integrally
Geared Centrifugal Compressor. Job includes:Lube oil piping
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
15,204.32 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 156
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3160002 ALIGNMENT
Valid from: 25.05.2015 Valid to: 31.07.2016
8,615.78
INR/EA
3,378.75
INR/EA
5,068.10
INR/EA
6,757.47
INR/EA
5,490.44
INR/EA
4,223.43
INR/EA
2,027.25
INR/EA
* 80
GEAR BOX / STACK DAMPERS
** 80.01 Valve GB / Stack dampers.
Gear Box / Stack Dampers -Valve GB / Stack dampers.
Number : CCM/
Date
: 25.05.2015
Page No. : 157
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,365.12
INR/EA
2,871.93
INR/EA
4,223.43
INR/EA
5,068.10
INR/EA
6,757.47
INR/EA
3,696.33
INR/EA
5,068.10
INR/EA
Oil seal leak attending.GEAR BOX-ALL EXCEPT SUNDYNES Above 30 and up to 100KW.
GEAR BOX-ALL EXCEPT SUNDYNES - Oil seal leak attending.:Job
includes:Removal &reinstallation of housing top cover and
/or side covers.
Number : CCM/
Date
: 25.05.2015
Page No. : 158
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
6,335.13
INR/EA
Oil seal leak attending. GEAR BOX-ALL EXCEPT SUNDYNES Above 100 and up to 250 KW
GEAR BOX-ALL EXCEPT SUNDYNES - Oil seal leak attending.:Job
includes:Removal &reinstallation of housing top cover and
/or side covers.
10,136.22 INR/EA
Oil seal leak attending. GEAR BOX-ALL EXCEPT SUNDYNES Above 250 and up to 1000 KW.
GEAR BOX-ALL EXCEPT SUNDYNES - Oil seal leak attending.:Job
includes:Removal &reinstallation of housing top cover and
/or side covers.
16,893.69 INR/EA
Oil seal leak attending. GEAR BOX-ALL EXCEPT SUNDYNES Above 1000 KW.
GEAR BOX-ALL EXCEPT SUNDYNES - Oil seal leak attending.:Job
includes:Removal &reinstallation of housing top cover and
/or side covers.
5,279.27
INR/EA
7,602.15
INR/EA
Antifriction
bearing replacement -GEAR BOX-ALL EXCEPT
SUNDYNES - Up to 30 KW
Antifriction bearing replacement:Job includes:Removal &
reinstallation
ofhousing
top
cover
and
/or
side
covers.Replacement of elastomeric seals /inspection, repair
or replacement of labyrinth seals.Removal & Reinstallation
/replacement of bearing(s)
Antifriction
bearing
replacement GEAR BOX-ALL EXCEPT
SUNDYNES - Above 30 and up to 100 KW.
Antifriction bearing replacement:Job includes:Removal &
reinstallation
ofhousing
top
cover
and
/or
side
covers.Replacement of elastomeric seals /inspection, repair
or replacement of labyrinth seals.Removal & Reinstallation
/replacement of bearing(s)
Antifriction
bearing
replacement GEAR BOX-ALL EXCEPT
SUNDYNES - Above 100 and up to 250 KW.
Antifriction bearing replacement:Job includes:Removal &
reinstallation
ofhousing
top
cover
and
/or
side
covers.Replacement of elastomeric seals /inspection, repair
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
10,136.22 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 159
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
15,204.32 INR/EA
Antifriction
bearing replacement GEAR BOX-ALL EXCEPT
SUNDYNES - Above 250 and up to 1000 KW.
Antifriction bearing replacement:Job includes:Removal &
reinstallation
ofhousing
top
cover
and
/or
side
covers.Replacement of elastomeric seals /inspection, repair
or replacement of labyrinth seals.Removal & Reinstallation
/replacement of bearing(s)
5,279.27
INR/EA
7,602.15
INR/EA
Babbit
bearings repair /replacem GEAR BOX-ALL EXCEPT
SUNDYNES - Up to 30 KW
Babbit bearings repair /replacement:Job includes:Removal &
reinstallation
ofcasing
cover.Removal,
inspection,
repair/replacement
of bearing(s) /bearingpad(s) thrust
collar and reassembly
Babbit
bearings repair /replacem GEAR BOX-ALL EXCEPT
SUNDYNES - Above 30 and up to 100 KW.
Babbit bearings repair /replacement:Job includes:Removal &
reinstallation
ofcasing
cover.Removal,
inspection,
repair/replacement
of bearing(s) /bearingpad(s) thrust
collar and reassembly
10,136.22 INR/EA
13,514.95 INR/EA
Babbit
bearings repair /replacem GEAR BOX-ALL EXCEPT
SUNDYNES - Above 250 and up to 1000 KW.
Babbit bearings repair /replacement:Job includes:Removal &
reinstallation
ofcasing
cover.Removal,
inspection,
repair/replacement
of bearing(s) /bearingpad(s) thrust
collar and reassembly
16,893.69 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 160
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Babbit
bearings repair /replacem GEAR BOX-ALL EXCEPT
SUNDYNES - Above 1000 KW.
Babbit bearings repair /replacement:Job includes:Removal &
reinstallation
ofcasing
cover.Removal,
inspection,
repair/replacement
of bearing(s) /bearingpad(s) thrust
collar and reassembly
12,143.19 INR/EA
16,471.34 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 161
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
17,554.23 INR/EA
18,807.74 INR/EA
2,111.71
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 162
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Gearbox replacement
Above 30 and up to 100 KW.
GEAR
2,640.49
INR/EA
3,167.57
INR/EA
5,068.10
INR/EA
* 90
Plant specific and Miscellaneous
** 90.01 Plant specific - Aromatics
3163699 ROTARY VALVE BEARING REPLACEMENT
Valid from: 25.05.2015 Valid to: 31.07.2016
16,893.69 INR/EA
Job
includes:
1)
Sealpot
assembly removal &
re-assemble
2) Hydraulic cylinder assembly removal &
re-assembly. 3) Resolver assembly removal & re-assembly 4)
Top bearing removal, inspection, if required replacement &
re-assembly 5) Rachet wheel assembly removal & re-assembly
6)
Main
bearing
removal,
inspection,
if required
replacement & re-assembly
28,719.27 INR/EA
Job
includes:
1)
Sealpot
assembly removal &
re-assemble
2) Hydraulic cylinder assembly removal &
re-assembly. 3) Resolver assembly removal & re-assembly 4)
Top bearing removal, inspection, if required replacement &
re-assembly 5) Rachet wheel assembly removal & re-assembly
6)
Main
bearing
removal,
inspection,
if required
replacement & re-assembly 7) Mechanical non-catridge type
seal replacement & re-assembly
33,787.37 INR/EA
Job
includes:
1)
Sealpot
assembly removal &
re-assemble
2) Hydraulic cylinder assembly removal &
re-assembly. 3) Top head flange bolts removal/ torque
tightening, top head lifting with turn-buckle assembly &
re-installation 4) Rotor plate removal & installation of
new rotor plate after cleaning/de-greasing, also track
plate cleaning & inspection. 5) Final alignment after
completed assembly of top head with new rotor plate
Job
includes:
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
15,204.32 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 163
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
**
20,272.43 INR/EA
8,446.84
INR/EA
1,351.49
INR/EA
62,506.64 INR/EA
4,054.49
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 164
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
INR/EA
Removal
and
Replacement
of
end.Removal/Replacement of Gear Box.
Motor
on
1,601.52
INR/EA
2,001.90
INR/EA
1,000.95
INR/EA
input
9,379.36
INR/EA
1,601.52
INR/EA
1,018.69
INR/EA
Complete
dismentling of Gear Box. Inspection &
Replacement as required of gears, gear shafts, bearings,
seals etc. Assembly of Gear Box.
Job includes:Cleaning
assembly and assembly.
and
greasing
including
dis
Number : CCM/
Date
: 25.05.2015
Page No. : 165
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,344.84
INR/EA
1,601.52
INR/EA
2,344.84
INR/EA
1,520.44
INR/EA
2,402.28
INR/EA
8,446.84
INR/EA
1,018.69
INR/EA
3163683 SPROCKET.
Valid from: 25.05.2015 Valid to: 31.07.2016
Removal
of
Rope
Rope
679.13 INR/EA
508.50 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 166
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
driver/driven sprocket(s).
508.50 INR/EA
1,358.24
INR/EA
1,018.69
INR/EA
4,223.43
INR/EA
1,358.24
INR/EA
Complete
Overhauling
of
GB
including
Repair/Replacement of Seals, Bearings, Gears, Shafts etc.
599.72 INR/EA
84.46 INR/EA
16,893.69 INR/PC
440.93 INR/PC
4,116.98
INR/PC
1,525.49
INR/PC
403.75 INR/PC
Number : CCM/
Date
: 25.05.2015
Page No. : 167
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Disassembly,
Inspection
&
Assembly
of
Fuel
Stop
Valve.
Disassembly
(moog).
Repair
&
Assembly
of
By
Pass
Valve
4,983.64
INR/PC
4,154.15
INR/PC
1,108.23
INR/PC
1,765.39
INR/PC
1,902.22
INR/PC
Gas Turbine & Accessory Gear Box Coupling Removal & Fixing.
Disassembly
N.D.E. Bearing.
Repair
&
Assembly
of
General D.E. or
15,888.51 INR/PC
883.53 INR/PC
662.24 INR/PC
662.24 INR/PC
662.24 INR/PC
1,324.46
INR/PC
522.02 INR/PC
Number : CCM/
Date
: 25.05.2015
Page No. : 168
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
697.71 INR/PC
Disassembly
Roof.
INR/PC
Disassembly
Repair
Calibration
&
Assembly of Fuel
NRV.
Disassembly
(GT).
INR/NOS
INR/PC
Disassembly
Coupling.
&
Assembly
of
Generator
to
4,983.64
INR/IND
1,076.13
INR/PC
Gear Box
Disassembly
Repair
half.
Disassembly
Bottom Half.
Repair
&
Assembly
of
radial
1,267.03
INR/PC
1,371.76
INR/PC
bearing
Number : CCM/
Date
: 25.05.2015
Page No. : 169
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,985.11
Disassembly
Cooler.
Repair
&
Assembly
of
INR/PC
Generator Water
440.93 INR/PC
633.53 INR/NOS
Alignment
Gear Box.
check
&
3,804.46
INR/NOS
Disassmbly
Repair
271.99 INR/PC
Vlves.
Disassmbly
&
Assembly
180.76 INR/PC
Joint.
361.51 INR/PC
2,716.50
INR/EA
2,402.28
INR/EA
1,383.60
INR/EA
8.45 INR/M
9,379.36
INR/EA
2,402.28
INR/EA
3,689.57
INR/EA
229.75 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 170
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
628.45 INR/MT
Check
628.45 INR/MT
KG)
915.63 INR/EA
3,659.17
INR/EA
4,649.15
INR/EA
459.50 INR/EA
114.89 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 171
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,870.12
INR/EA
3,486.86
INR/EA
1,743.44
INR/EA
1,378.53
INR/EA
6,571.65
INR/EA
1,743.44
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 172
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Includes Jobs:
159" X 59" X Mesh
INR/EA
INR/EA
Includes
Jobs:Removal
of intermediate troughing
idlers Replacement of Conveyor belt Dismantling, inspection
& replacement of DE Bearings
Includes
Jobs:Removal,
inspection/replacement of
bearings, belt to be loosened, Gear box to be removed
Removal & Refixing of Plummer block unit, Gear box & Motor.
Removal,
inspection/replacement of bearings Check the
lagging on pulley, surface at bearing assembly, repair/
replacement
INR/EA
Loosening
30" wide.
&
boards,
Size
45.61 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 173
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,689.37
INR/EA
3,167.57
INR/EA
109.81 INR/EA
422.35 INR/EA
493.31 INR/EA
1,584.63
INR/EA
Removal
179.07 INR/EA
660mm
829.47 INR/EA
457.81 INR/ST
Number : CCM/
Date
: 25.05.2015
Page No. : 174
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Includes Jobs
Nozzle (App 1000 KG)
INR/MT
1,229.85
INR/ST
1,229.85
INR/ST
*** 90.05.07Granulator
3163635 REPL.OF VENTURI DAMPER BEARINGS
723.06 INR/EA
**
size
10" X 10"
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
2,534.05
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 175
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,378.75
INR/EA
1,689.37
INR/EA
2,534.05
INR/EA
3,167.57
INR/EA
844.68 INR/EA
3,547.66
INR/EA
1,942.78
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 176
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,013.62
INR/EA
1,267.03
INR/EA
5,405.98
INR/EA
8,108.97
INR/EA
5,912.79
INR/EA
REPLACEMENT
OF
RACK
ARM
BOTTOM
FLIGHTS
OF
OST,BST,CLARIFIER Job includes : Removing old flights,
Removing old pvc rubber & fixing new pvc rubber strip
Fixing flights, Checking tip clearance by rotating arm with
motor
Number : CCM/
Date
: 25.05.2015
Page No. : 177
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
546.73 INR/EA
691.10 INR/EA
Secondary
Fiters
Replacement
in
Centrifugal
Compressor : 1 set consisting of 5 nos elements. Removal,
cleaning, gap sealing & re-fixing same or new filter
elements
998.27 INR/EA
998.27 INR/EA
1,666.35
INR/EA
215.01 INR/EA
508.60 INR/EA
950.05 INR/EA
Belt Replacement.
**
228.06 INR/EA
675.76 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 178
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
4,223.43
INR/EA
337.88 INR/EA
70.96 INR/H
760.21 INR/EA
304.07 INR/EA
380.11 INR/EA
380.11 INR/EA
380.11 INR/EA
675.76 INR/EA
*** 90.08.02Others
3142711 Gear Box Overhauling Job
Valid from: 25.05.2015 Valid to: 31.07.2016
597.46 INR/H
22.84 INR/EA
45.68 INR/EA
68.53 INR/EA
138.33 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 179
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Gas
cylinder
shifting for calibration
location as per instruction of EIC.
to
designated
Gas
cylinder
shifting for calibration
location as per instruction of EIC.
to
designated
21.13 INR/IND
21.92 INR/IND
Number : CCM/
Date
: 25.05.2015
Page No. : 180
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
23.79 INR/IND
25.61 INR/IND
Number : CCM/
Date
: 25.05.2015
Page No. : 181
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
26.91 INR/IND
27.11 INR/IND
Number : CCM/
Date
: 25.05.2015
Page No. : 182
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
one time flange opening and one time box up. 4.Ifboth the
activity
is performed (opening and box up) quantity
payableshall be two times of corressponding inch dia.
5.Scope of Scaffoldingwhere ever required will be as per
DOR.
33.35 INR/IND
33.35 INR/IND
Number : CCM/
Date
: 25.05.2015
Page No. : 183
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
36.17 INR/IND
27.03 INR/IND
27.03 INR/IND
27.30 INR/IDS
Number : CCM/
Date
: 25.05.2015
Page No. : 184
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
packing
in all types and ratings of valves at all
elevations and completing the job as per direction of EIC.
Provision of all PPE, tools and tackles are in contractor's
scope.
1. Scaffolding wherever required shall be covered under
seperate item code.
2. All consumables and gland packing material are in
owner's scope.
44.10 INR/IDS
78.20 INR/EA
64.42 INR/IND
55.64 INR/IND
Number : CCM/
Date
: 25.05.2015
Page No. : 185
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
44.29 INR/EA
57.75 INR/EA
422.35 INR/EA
Removal
empty Nitrogen Cylinders & Transportation of
refilled Cylinders & refixing of new nitrogen Cylinders for
Flushing plan 53
87.83 INR/EA
174.50 INR/EA
43.91 INR/EA
597.46 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 186
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
4,683.75
INR/EA
4,162.56
INR/EA
3,030.05
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 187
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,879.82
INR/EA
Opening the
barring
manually
guard
of
385.98 INR/EA
of
192.99 INR/EA
298.15 INR/EA
2,072.04
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 188
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
149.08 INR/EA
298.15 INR/EA
448.38 INR/EA
597.46 INR/EA
524.65 INR/EA
HT
of
hydro-testing
seal
oil coolers - Removal, cleaning,
& box-up of seal oil cooler in case of water
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
755.14 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 189
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
HT
of
brg./stuffing box jacket - Dismantling,
cleaning, hydro-testing & box-up of brg./stuffing box
jacket in case of water ingress in lube or seal oil.
CR
of
pneumatic hoist - Corrective Repair of
Pneumatic hoist:Jobs includes:Checking of pneumatic drive,
Cleaning of Air filters,Cleaning of oil filters,Lubrication
of parts,Attending leakages,Minor repair (if any),Checking
of hoist operation,Checking
Dechoking
8"NB.
jacketed
Opening
of
Cam
mechanism
of
pilot
burner
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
valve
and
Number : CCM/
Date
: 25.05.2015
Page No. : 190
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,027.25
INR/EA
2,702.99
INR/EA
2,111.71
INR/EA
1,030.82
INR/EA
Providing mechanical
completion (for
jobs other than PM)
lock
and
1,545.08
INR/EA
1,099.00
INR/EA
2,548.16
INR/EA
JOb
scope
Cleaning,
Inspection,
piston ring
inclues:
dimension
Complete
dismantling
of
cylinder,
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 191
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,622.89
INR/EA
1,194.92
INR/EA
no
parts
replacement-
169.88 INR/EA
Oil top up in plan 52/53 by hand pump after taking out oil
from oil
dispenser unit upto 20 ltrs
580.12 INR/EA
498.08 INR/EA
759.25 INR/EA
3,826.10
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 192
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
3,023.41
INR/EA
1,814.04
INR/EA
3,827.43
INR/EA
2,208.75
INR/EA
2,313.73
INR/EA
1,472.50
INR/EA
736.25 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 193
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
104.98 INR/EA
*Filling
up
of grease in cleaned grease guns
*Connection of grease gin hose with the grease gun *Filling
up of grease * *Disconnection of the grease gun from the
grease nipple
578.10 INR/EA
6,111.92
INR/EA
1,169.49
INR/EA
2,338.99
INR/EA
4,780.30
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 194
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
assembly
4,780.30
INR/EA
4,780.30
INR/EA
578.10 INR/EA
*Removal
of
upstream
and
downstream
bellows
*Loosening
of
bolts
and removal of discharge tube
*Decoupling
and
pulling
out of screw Insertion of
new/cleaned screw and coupling *Box up of discharge tube
*Fixing of upstream and downstream bellows
578.10 INR/EA
*Removal
of
upstream
and
downstream
bellows
*Loosening
of
bolts
and removal of discahrge tube
*Decoupling
and
pulling
out of screw Insertion of
new/cleaned screw and coupling *Box up of discharge tube
*Fixing of upstream and downstream bellows
578.10 INR/EA
578.10 INR/EA
578.10 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 195
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
7,018.29
INR/EA
532.92 INR/EA
CLEAN
EQUIPMENT
FROM
POWDER, DIRT ETC. CHECK
TIGHTENESS OF ALL M.S. FASTENERS CHECK FOR GENERAL CRACKS [
], WEAR [ ], DAMAGE [ ]. CHECK CONDITION OF BEARINGS.
REPLACE IF REQUIRED REPLACE GLAND PACKING CHECK OIL LEVEL
IN GEAR BOX.
TOP UP IF REQUIRED CHECK GEAR BOX OIL SEAL
LEAKAGE
IF ANY CHECK COUPLING CONDITION CHECK SCREW
CONDITION FOR ANY CRACK [ ], WEAR [ ], DAMAGE [ ]. (IF
REQUIRED ) ENSURE PROPER MOUNTING OF ALL SAFETY GUARDS
CHECK GLAND PURGING LINE FOR ANY CHOKING AND CLEAN IT CHECK
GLAND PURGING FLUID FLOW
3164856 PM OF BLENDER/MIXER
Valid from: 25.05.2015 Valid to: 31.07.2016
1,330.30
INR/EA
1,064.51
INR/EA
CLEAN
EQUIPMENT
FROM
POWDER, DIRT ETC. CHECK
TIGHTENESS OF ALL M.S. FASTENERS CHECK FOR GENERAL CRACKS [
], WEAR [ ], DAMAGE [ ]. CHECK CONDITION OF BEARINGS.
REPLACE IF REQUIRED REPLACE GLAND PACKING CHECK OIL LEVEL
IN GEAR BOX.
TOP UP IF REQUIRED CHECK GEAR BOX OIL SEAL
LEAKAGE
IF ANY CHECK COUPLING CONDITION CHECK SCREW
CONDITION FOR ANY CRACK [ ], WEAR [ ], DAMAGE [ ]. (IF
REQUIRED ENSURE PROPER MOUNTING OF ALL SAFETY GUARDS CHECK
GLAND PURGING LINE FOR ANY CHOKING AND CLEAN IT CHECK GLAND
PURGING FLUID FLOW
CLEAN
EQUIPMENT FROM OIL & DIRT##### CHECK COUPLING
CONDITION FOR ANY CRACKS [ ]##### CHECK FOUNDATION BOLTS OF
MOTOR AND COMPRESSOR FOR TIGHTENESS CHECK SUCTION AND
DISCHARGE VALVES, REPLACE IF REQUIRED.## EXAMINE CYLINDER
BORE AND GAS PASSAGES#### CLEAN THE SURFACE OF THE EXPOSED
PORTION OF PISTON ROD### OBTAIN LUB OIL SAMPLE AND SEND FOR
ANALYSIS
IF
REQUIRED
BY EIC.#### CLEAN CRANK CASE
BREATHER##### CLEAN THE SUCTION STRAINER##### CHECK AND
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 196
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,064.51
INR/EA
ADDITIONAL ITEMS
11,000.00 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 197
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
27,000.00 INR/EA
1)
2)
3)
4)
5)
6)
7)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
860,000.00 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 198
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
8)
9)
10)
473,000.00 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 199
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
5Crankcase Jobs
1)
Web deflection initial reading
2)
Connecting rod big end bearing inspection
3)
Connecting rod inspection
4)
Connecting rod bolt UT Checking
5)
Small end bearing inspection
6)
Gudgeon pin inspection
7)
Main bearing inspection
8) Intermediate bearing inspection
9) Thrust bearing Inspection
10) Counterweight bolt UT
6Crosshead Removal & inspection/replacement of shoes
7Rod Drop measurement before dismantling and after assembly
of Piston
8Gas Packing Inspection & Replacement if required
9Intermediate packing Inspection & Replacement if
required
10 Oil wiper packing Inspection& Replacement if required
11 Piston inspection
12 Piston rod cleaning/preparation for UT
13 Cylinder Liner inspection & Replacement if required
14 Suction /Discharge & Clearance pocket Valves
overhauling
15 Motor bearing inspection and vibration / temperature
probes
provision
16 Cylinder jackets cover opening ,cleaning and box up
17 Lub oil pump / Lubricator Pumps/Jacking oil pump PM
18 Removal of DE & NDE Motor Cover for Inspection of Fan &
Windings.
19 Servicing & Testing of Pneumatic Barring Device if any.
20 Lubricator points injection checking, Auxillary Oil Pump
PM &
Lube Oil Filter replacements
21 Suction Volume Bottles removal & Strainer Cleaning
22 Lube oil coolers inspection & hydro testing
23 Compressor PSV's Calibration
24 Suction / Discharge Volume Bottle cover opening / box up
for
inspection
25 Torque tightening of all the necessary Bolts connected
to
Compressor.
236,500.00 INR/EA
Number : CCM
Date
: 25.05.2015
Page No. : 200
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Overhauling
of
reciprocating
compressor,
24000 hrs
overhauling for
capacity less than 1000 kW.
Jobs to be done as below:
1Lube oil draining from Crankcase
2Removal of lube oil tubing
3Main motor lube oil draining
4Removal & Cleaning of Coupling guard
5Crankcase Jobs
1)
Web deflection initial reading
2)
Connecting rod big end bearing inspection
3)
Connecting rod inspection
4)
Connecting rod bolt UT Checking
5)
Small end bearing inspection
6)
Gudgeon pin inspection
7)
Main bearing inspection
8) Intermediate bearing inspection
9) Thrust bearing Inspection
10) Counterweight bolt UT
6Crosshead Removal & inspection/replacement of shoes
7Rod Drop measurement before dismantling and after assembly
of Piston
8Gas Packing Inspection & Replacement if required
9Intermediate packing Inspection & Replacement if
required
10 Oil wiper packing Inspection& Replacement if required
11 Piston inspection
12 Piston rod cleaning/preparation for UT
13 Cylinder Liner inspection & Replacement if required
14 Suction /Discharge & Clearance pocket Valves
overhauling
15 Motor bearing inspection and vibration / temperature
probes
provision
16 Cylinder jackets cover opening ,cleaning and box up
17 Lub oil pump / Lubricator Pumps/Jacking oil pump PM
18 Removal of DE & NDE Motor Cover for Inspection of Fan &
Windings.
19 Servicing & Testing of Pneumatic Barring Device if any.
20 Lubricator points injection checking, Auxillary Oil Pump
PM &
Lube Oil Filter replacements
21 Suction Volume Bottles removal & Strainer Cleaning
22 Lube oil coolers inspection & hydro testing
23 Compressor PSV's Calibration
24 Suction / Discharge Volume Bottle cover opening / box up
REGISTERED
for OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 201
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
inspection
25 Torque tightening of all the necessary Bolts connected
to
Compressor.
1)
2)
3)
4)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
698,750.00 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 202
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
inspection
23 Torque tightening of all the necessary Bolts connected
to
Compressor.
1)
2)
3)
4)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
376,250.00 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 203
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
inspection
23 Torque tightening of all the necessary Bolts connected
to
Compressor.
1)
2)
3)
4)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
172,000.00 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 204
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
inspection
23 Torque tightening of all the necessary Bolts connected
to
Compressor.
Job Scope
1. All suction, discharge & clearance pocket valves (46
nos.)
replacement with OEM refurbished valves
2. All suction valves & clearance pocket unloaders (24
nos.) stem length
checking & gasket replacement.
3. All 6 cylinders head-end opening, piston pullout &
inspection
4. All cylinder O-rings & gaskets replacement
5. All 6 cylinder Piston & rider rings inspection &
replacement if
required
6. All 6 cylinder Piston rod inspection and replacement if
required
7. All 6 cylinder Liner inspection & replacement if
required.
8. All 6 cylinder Stuffing box removal and soft parts
replacement.
9.
All 6 cylinder intermediate seals (total 12nos.)
inspection & soft
parts replacement if required.
10.All 6 cylinder crosshead clearances & guide inspection.
Crosshead
shoe replacement if required.
11.All 6 cylinder liner roughness measurements
12.Web deflection measurements (Crank # 6)
13.Piston rod run-out & bumping clearances measurements
14. Lubricator sump cleaning, refilling and NRV testing at
all
lubricator points (22 nos.)
15. All foundation,
frame & small-bore piping bolts
tightening check as
per List
16. Compressor cleaning (outside)
17.Motor NDE Bearing Inspection & Lube oil replacement
18. All 6 Cranks main bearings inspection
19. Crank case oil draining & refilling.
20.Main lube oil replacement if required (on condition
basis, OAR)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
752,500.00 INR/LS
Number : CCM/
Date
: 25.05.2015
Page No. : 205
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
483,750.00 INR/LS
Scope of Work:1. All suction, discharge & clearance pocket valves (46
nos.) removal,
refurbishment (in-house).
2. All suction valves & clearance pocket unloaders (24
nos.) stem length
checking & gasket replacement.
3. All 6 cylinders head-end opening, piston pullout &
inspection
4. All cylinder O-rings & gaskets replacement
5. All 6 cylinder Piston & rider rings inspection &
replacement if
required
6. All 6 cylinder Piston rod inspection and replacement if
required
7. All 6 cylinder Liner inspection & replacement if
required.
8. All 6 cylinder Stuffing box removal and soft parts
replacement.
9. All 6 cylinder intermediate seals (total 12nos.)
inspection & soft
parts replacement if required.
10.All 6 cylinder crosshead clearances & guide inspection.
Crosshead
shoe replacement if required.
11.All 6 cylinder liner roughness measurements
12.Web deflection measurements (Crank # 6)
13.Piston rod run-out & bumping clearances measurements
14.Lubricator sump cleaning, refilling and NRV testing at
all
lubricator points (22 nos.)
15.Main lube oil replacement if required (on condition
basis, OAR)
16.All foundation, frame & small-bore piping bolts
tightening check
as per list
17.Compressor cleaning (outside)
SITE SPECIFIC MAINTENANCE JOBS-JAMNAGAR
COMBUSTION INSPECTION:
A. DISASSEMBLY:
1Blind and de-blind Fuel, water wash, steam lines to
REGISTERED
turbine.
OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
412,800.00 INR/AU
Number : CCM/
Date
: 25.05.2015
Page No. : 206
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Number : CCM/
Date
: 25.05.2015
Page No. : 207
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Number : CCM/
Date
: 25.05.2015
Page No. : 208
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Number : CCM/
Date
: 25.05.2015
Page No. : 209
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
258,000.00 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 210
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,490,000.00
INR/LS
Number : CCM/
Date
: 25.05.2015
Page No. : 211
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
gearbox
Removal of hub at the
input shaft of Gearbox
Removal of top housing
section (7)Weight: 6720
kg
Removal of shaft 100
Weight: 1020 kg
Removal of shaft 500
Weight:3000 kg
Removal of top housing
section (4)Weight:3690 kg
Removal of shaft 400
(Top)Weight:960 kg
Removal of centre
housing section (2)Weight:2750 kg
Removal of screw shaft
coupling sleeves at shafts 200 &
300
Removal of shaft 300
Weight:1400 kg
Removal of shaft 200
Weight:5200 kg
Removal of housing
section (3)Weight:2900 kg
Removal of shaft 400
(Bottom)
Removal of old bearings
& installation of new bearings on
all the removed shafts under
expert
Bearings=29 Nos
supervision
of Coperion
Number : CCM/
Date
: 25.05.2015
Page No. : 212
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Number : CCM/
Date
: 25.05.2015
Page No. : 213
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Number : CCM/
Date
: 25.05.2015
Page No. : 214
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
2,127,500.00
INR/LS
2,500,000.00
INR/LS
Number : CCM/
Date
: 25.05.2015
Page No. : 215
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Number : CCM/
Date
: 25.05.2015
Page No. : 216
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Number : CCM/
Date
: 25.05.2015
Page No. : 217
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
1,490,000.00
INR/LSM
Number : CCM/
Date
: 25.05.2015
Page No. : 218
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
Number : CCM/
Date
: 25.05.2015
Page No. : 219
________________________________________________________________________
Sr. No. Item Code
Material/Service Description
Unit Rate
________________________________________________________________________
LLF
Others
70.96 INR/H
________________________________________________________________________