CERTIFICATE
KRISHNA BHAGYA JALA NIGAMA LIMITED,REGD.OFFICE, BANGALORE

Sl No

Name of Agency

Name of Work and Awarded Amount

Agr.No And date

Date of
Commencement
of Work

Expenditure
incurred up to
previous Bill

Check Measurement as per PWD codal


Provision/MB No. & Page No
Date Of
Present RA Bill No And Amount
Inspection of EE

EE
Design,

Supply,

Installation,

Testing

and

Commissioning

SE

Remarks &
Recommendation reg

Satisifactory of
execution of work

Revised Cost With


approval of
Competent
authority

Recommended for
Payment

yes

CE

Operation,

Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package


1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate
Maintain and Transfer basis consisting of the following : Pumping Machineries,
Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of

NETAFIM-MEIL (JV)-LEAD
55 / 2013-14
Dated: 07MEMBER MEGHA ENGINEERING Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
01-2014
& INFRASTRUCTURES LTD

3092051377

RA BILL NO 13 & part


32088056.00

Rs

Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters,
Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves,
Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and
accessories etc. Including Operation and Maintenance of the System for Five
Years after the Date of completion on turnkey basis-

(1) J) PUjUU AAzlAv .q.r r-Pq,.q.r J-Pq U AAzl Dz v vU AiU Vz. ) PUjU Utl U PUjAi zqv
U R EafAigg zrPjz Avg PUjAi Cv (ZP dgAm)iqVz.(2) J) Cv PU Cw R xP zRAiAz jUt, z PUjU
CvU iv Cv Pz EP AiUAv zRVz . ) Cv vPz zRVg CvU z Eg CvUU vPAv E JAz zrPjVz v
CAzs-1 g zrPt v PqVz. (3) J)PUjU AAz mAqj Crz gu (P) UU vPAv Vz. ) mAqg AiUU CUtV Gv
Utqz PUjU vPgV z iv zR Pz zR wUV vAiijVz.(4) UtAiAvt sUAz qz jPgU Cv Pz
zRz PUjUU v AAzl zz PUjU j Azv JAzg U Cv P v zrPjVz. (5) g UnPU jit S
PjU JA. J. J CPAmU vUzPVz. (6) PUjU C Aiz F U AAzsl R AvU bAiav v rAi avU vUz AgQVz v
bAi avU F U UwVz. (7) F PUjAi Uw v Utlz U Adgz , zg , CAzfAv mAqg Pgj gv v AzsU U vAwP
gu (PU) CUtV PUjU Vz JAz zrPjVz. S EAfAigg wAU v CPP EAfAigg 25 U j gAi C g
Ai PAiP CAiAvgg z, R EAfAiggg gU Mz zj PUjAi w sg iqVz. (8) PUjUU AAzlAv gPg
Az / UAz PPP grg DzU v vU v PAiV ESAi J v r Pq g AiUU CUtV PUjAi
Vz JAz zrPjVz . (9) gPgz v AS dAE 100 JAJAP 2008 AP 30-9-2008 g UrzAv F PV itz zj PUjAi vu iqVz U
vPgVz JAz zrPjVz.
100% vVz
75%
50% vVz
25% vVz
vVz

AiP PAiP CAiAvgg


Psd, JD GsU
EP

PAiP CAiAvgg
Psd, JD rd,
Dn

CPP CAiAvgg
Psd, DuPl v,

Dn

R CAiAvgg
Psd, DuPl Ai
Dn

CHECK LIST TO BE SUBMITTED ALONG WITH THE RA BILL OF THE WORKS IN WHOSE CONTRACT VALUE IS
MORE THAN 1.00 CRORE
1

Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-

Name of Work:-

(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries,
Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane,
Supply Of Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers,
Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the
System for Five Years after the Date of completion on turnkey basis-

2
3
4
5
6
7
8
9
10
11
12
13
14

15

Name of Agency:Estimated cost and Year of SR :Entrustment cost as per the work Order :Agreement No and Date :Date of Commencement of Work:Stipulated date of Completion:Total expenditure up to previous Bill :Amount of Present Bill:Total up to expenditure:Excess quantites if any indicating item No. quantity and amount
with reasos:Date of Approval of EFI/Workslip by competent authority
reference No. and date.:Extension of Time reference No and date:As per Clause-2 of the Tender agreement carried out as laid
down /confirm reference NO. and date:a) Cum. Programme up to this bill:b) Cum. Progress achieved up to this bill:c) Short fall in Progress
d) Penalty to be imposed as per the clause-2 (d) :-

NETAFIM-MEIL (JV)-

369.535 Crores WRD/KPWD SR-2012-13 and KUWS & DB SR 2008-09


381.050 Crores
55/2013-14 Dated: 07-01-2014
1/7/2014
7/6/2015
3092051377 Rs
382088056 Rs
3474139433 Rs

307.198

e) Shortfall (No. of days and amount attributed to :


i) Contracor:ii) Department:f) No. of days X penalty per days or 7.5% of Contract Amount :If so, Please refer ( c & d above ) the delay to be apportioned
between the Department and Contractor judiciously.
16
Having Considered all the above issue payment of RA Bill NO 13 and part Date:- ________________ in the above work is hereby recommended ,as per certificates enclosed in Annexure-II

Assistant Executive Engineer


KBJNL, MAROL LIS, Sub-division
ILKAL

Executive Engineer
ARBC Division
Mattihal
ALMATTI

Superintending Engineer
KBJNL,DAM circle
Almatti

Chief Engineer
KBJNL,Dam Zone
Almatti

FROM P.W.G. 33 (REVISED)


RUNNING ACCOUNTS BILL
(See Para 215)

S.B.R. No
Date:
(Final payment must invariably be made on forms printed on yellow paper which should not be u
intermediate payments)

For contractors this form provides for (1) Advance payments, and (2) payments for measured works. The
secured advances, which has been printed seperately should be attached where necessary.
Sub Division

KBJNL: Marol LIS Sub Division, Ilkal.


Date:

Division:
KBJNL, ARBC Division, Almatti.
Cash Book Vr.No.______________
Agency: M/s NETAFIM- MEIL (JV)- LEAD MEMBER MEGHA ENGINEERING & INFRASTRUCT

Name of Work :- Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer

Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis cons

Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump

Crane, Supply Of Spare Parts, Tools, Drip Irrigation System Including Driplines, Auto Filters, Secondary Filters, Fertilizer Eq

Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Ope
System For Five Years After The Date of completion on turnkey basis

Serial No. of this bill:

R.A.Bill No.

13 th and Part

No. & Date of his previous bill for this work:


Agreement No : 55/2013-14 . Dated:07-01-2014.

R.A.Bill No.

12 th and Part

Date of commencement of work:


Date of actual completion of work:

1/7/2014
Work is in progress
1.ACCOUNT OF WORK EXECUTED

Item of work
grounded under Sub
Heads and Sub
work of Estimate

Unit

Rate

Quanity
executed
up to date
as per
measurement
book
4

Payments on the basis of actual


measurements upto date since
previous bill
5

Separate sheet enclosed

Total value of work done to date (A)


Deduct value of work done upto previos bill
Net value of work since previous bill (F)
Figures (F) in words Rupees

When there are two more entries in Colomn 6 relating to each Sub-head of estimate they shoul
case of works the accounts of which are kept by Sub-heads, be totalled and the total recored in colu
posting the works Abstract.

2
II. Cerificates and Signatures
1. The Measurements on which are based the entries in colmns 1 to 6 of Account were made by
officer on
and recorded at page
to
of Measurement Books Nos.
A.E

2. Certified that in addition to and quite apart from the quantites of work actually executed as shown in coloumn 4
actually been done in connection with several items and the value of such work of deducting there from the prop
advances if any, ultimately recoverable on accunt of the quantities of materials used therein, is in no case less tha
per item 2 of the memorandum of payments made as proposed to be made for convenience of the contractor in
the results of the detailed measurements, which will be made as soon as possible.

Date Signature of Officer preparing the


Bill _______________________________

(Rank) ___________________________
Date Signature of Officer authorising
Payment

Dated signature of Contractor

The Certificate must be signed by the Subdivisional Officer

The signature is necessary anly when the Officer who prepares the Bill is not officer who authorised t
the two signatures are essential.
III. Memorandum of payments
1. Total value of work actually measured.
2. Total upto date adance payment for work not yet measured as per details given below.
Rs. __________
Ps _________
(a) Total as per previous bill ______________
(b) Since previous bill __________ as per page _______ of M.B.No. ___________
3. Total upto date secured advances on Security of material, as per

Annexure (Form 26 A) coloumn 3-Entry ( C).


4. Total (1+2+3) _______________
5. Deduct amount withheld:
Figures for works abstract.

(a) From previous bill as per last running


(b) From this bill _____________

6. Balance ' i.e.,' upto date payments ____________________


7. Total amount of payment already made as per Entry (k of last Running Account Bill).
No. ___________ of __________ forwarded with ____________ account for _________ 19 ____

3
8.payment now to be made as detailed below:
(a) By recovery of amounts creditable to this work Rs_______________
6.5 % FSD.

Rs

2 % Income Tax

Rs

3.5 % KST
Royalty charges
CBF

Rs
Rs
Rs

1 % LWC

Rs

Total (5) b 8 (a)

(G)

b) by recovery of amounts creditable other works of


head of accounts
by C.B.F
Rs.
by N.S.C
Rs.
c) By cheque**
Total 8 (b) + c
pay Rs_______________________________________________

(H)
**cheque

Dated initials of Disbursing Officer,

Received______________________________as per above memorandum.


on account of this work.

Dated_________________________
Witness

(Amount in vernacular)
Stamp

Full signature of contracto


paid by me vide Cheque No.______________________Dated_________

*This figure should be tested to see that is agrees which the total of items 7and 8
**If the net amount tobe paid is less than Rs.10 and it cannot be included in cheque the payment sh
made in cash this entry beying already suitable and the alteration attested by dated initial.

**If the net amount tobe paid is less than Rs.10 and it cannot be included in cheque the payment sh
made in cash this entry beying already suitable and the alteration attested by dated initial.
Here specify the net amount payable vide item 8 ('c)

The payee's acknowledgement should be for the gross amount paid as per item 8 (I,e,a+b+c) pa
should be attested by some know person when the payee's acknowledgement is given by a mark; seal o
Impression.

4
IV REMARKS

This space is reserved for any remaraks which the disbursing officer or the Divisional Officer may wish
execution of the work, check of measurements of the state of state of Contractor's account.

Entries relating to ecah description of materials should be posted thus in column 3. First ente
quantities in column 1and 2.then show below this entry the quantities. If any brought to site against wh
been authorised this entry being prefixed by the plus sign. Finally,strike the total of the two entries whic
quantitiy outstanding.

Entries in column 8 show the money values of the total quantities outstanding as per column 3.

Certified (1) that the plus quantities of materials show in column 3 of the account above have ac
contractor to the site of the work and, the contractorhas not previously received any advance to the
materials are on an imperishable nature and are all requaired by the contractor use or the work in conne
races for finished work have been agreed upon and (3) that formal agreements in from 31signed and exe
accordance with paragraph 288 (a) of the Central publice works Accounts code is recorded in the division

Date Signature of Officer preparing the


Bill ______________________________

Rank ____________________________

Date Signature of Officer authorising


Payment _________________________

Rank ____________________________

These certificates must be signed by the Sub-divisional or divisional Officer.

This signature is necessary only when the Offier who prepares the bill is not the Officer who autho
case two signatures are essential.

(copy)

P.W.G. 33 (REVISED)
NG ACCOUNTS BILL
(See Para 215)

S.B.R. No.
Date:
s printed on yellow paper which should not be used for

nts, and (2) payments for measured works. The form of


uld be attached where necessary.
KBJNL: Marol LIS Sub Division, Ilkal.

EMBER MEGHA ENGINEERING & INFRASTRUCTURES LTD

sioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd

stem on Build Operate Maintain and Transfer basis consisting of the following : Pumping

uction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT

g Driplines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers,

se Valves, Fittings and accessories etc. Including Operation and Maintenance of the

13 th and Part
12 th and Part

ORK EXECUTED

Remarks

et enclosed

ating to each Sub-head of estimate they should in the


eads, be totalled and the total recored in column for

d Signatures

olmns 1 to 6 of Account were made by


asurement Books Nos.

Section

s of work actually executed as shown in coloumn 4 of Account I some work has


alue of such work of deducting there from the proportionate amount of secured
ties of materials used therein, is in no case less than the advance payments as
d to be made for convenience of the contractor in anticipation of and subject to
s soon as possible.

(Rank) ____________________________
Date Signature of Officer authorising

prepares the Bill is not officer who authorised the payment in such acase

(a) From previous bill as per last running account bill.

________ account for _________ 19 ____

_____________as per above memorandum.


on account of this work.

(Amount in vernacular)

Full signature of contractor.

cannot be included in cheque the payment should be

eration attested by dated initial.

ross amount paid as per item 8 (I,e,a+b+c) payments


s acknowledgement is given by a mark; seal or thumb

4
IV REMARKS

bursing officer or the Divisional Officer may wish in recod in respect of the
e of state of Contractor's account.

hould be posted thus in column 3. First enter the differences between


he quantities. If any brought to site against which a further advance has
n. Finally,strike the total of the two entries which will be present the total

ow in column 3 of the account above have actually been brouht by the


s not previously received any advance to their security. (2) that these
ired by the contractor use or the work in connection with items for which
at formal agreements in from 31signed and executed by the contractor in
works Accounts code is recorded in the divisional office.

Date Signature of Officer preparing the


Bill _______________________________

Rank ____________________________

Date Signature of Officer authorising


Payment _________________________

Rank ____________________________

ed by the Sub-divisional or divisional Officer.

ho prepares the bill is not the Officer who authorises the payment in such

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works,
EOT Crane, Supply Of Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Dated: 07-01-2014

Sl. No.

Agt Value : Rs.

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Amount

3810546305

Further Breakup
Percentage

Amount

Previous
Percentage

Qty

Present
Amount

Qty

Uptodate
Amount

Qty

Remarks

Amount

Detailed engineering, preparation of designs and drawings


Part A- Preliminaries.
1

Project Engineering and Design Services


Survey, investigations, setting out works, detailed topographical survey

1.1

for command area of 11,700 Ha

1.2

Detailed engineering, preparation of designs and drawings

11,431,639

50%

11,431,639

50%

Approval to Design and Drawings for Main and Feeder Pipeline

1.2 (a)

Approval to Design and Drawings for Main and Submains for Block

1.2 (b)

100%

11,431,639

100%

11,431,639

3,429,492

30%

100%

3,429,492

100%

3,429,492

3,429,492

30%

100%

3,429,492

100%

3,429,492

1.2 (c)

Approval to Design and Drawings for Drip net work

2,286,328

20%

100%

2,286,328

100%

2,286,328

1.2 (d)

Approval to Civil GAD

1,143,164

10%

100%

1,143,164

100%

1,143,164

1.2 (e)

Approval to Mechanical GAD

571,582

5%

100%

571,582

100%

571,582

1.2 (f)

Approval to Surge Protection for Pipeline

571,582

5%

100%

571,582

100%

Total Amount :-

22,863,278

571,582

22,863,278

22,863,278

Part B- Construction
2

Electro-Mechanical works
2.1

2.1.1

Design, supply, installation of pumping machinery and pump house electrical


works

83,832,019

88%

Pumps

41,916,010

50%

a Approval to Design and Drawings


b Supply
2.1.2

Motors

25,149,606

b Supply
Panels (all types)

8,383,202

10%

4,191,601

5%

a Approval to Design and Drawings


2.1.4

Valves (all types)


a Approval to Design and Drawings
b Supply
Total Amount :-

1%

100%

419,160

100%

419,160

69%

100%

28,922,047

100%

28,922,047

30%

a Approval to Design and Drawings

2.1.3

419,160
28,922,047

251,496

1%

100%

251,496

100%

251,496

17,353,228

69%

100%

17,353,228

100%

17,353,228

83,832

1%

100%

83,832

100%

83,832

41,916

1%

2,892,205

69%

100%

41,916
100%

37,724,409

47,071,679

2,892,205

100%

41,916

100%

2,892,205

2,892,205

49,963,884

3 Pipeline and related Civil Works


Construction of main and Branch pipelines including Earth work,
3.1

structures, supply, laying , jointing, testing and commissioning-(Bulk


Water Pipe line) Total Length Req=48547 Rmt

48547

350mm/248kpa/9Bar--8608 Rmt

1,433,771,395

56%

71,688,570

5%

a).Supply

Mts

8608

8608

5829.69

50,181,999

70%

8,608.000

50,181,972

8,608.000

50,181,972

b).Earth work, Laying and Jointing

Mts

8608

7461.414

1915.47

16,488,371

23%

7,461.414

14,292,115

7,461.414

14,292,115

c).Testing

Mts

8608

899.536

166.56

1,433,771

2%

899.536

149,827

899.536

149,827

350mm/248kpa/12Bar--1453 Rmt

114,701,712

8%

a).Supply

Mts

1453

1453

55258.91

80,291,198

70%

1,453.000

80,291,196

1,453.000

80,291,196

b).Earth work, Laying and Jointing

Mts

1453

1284.0161

18156.5

26,381,394

23%

1,284.016

23,313,238

1,284.016

23,313,238

400mm/248kpa/9Bar--13308 Rmt

143,377,140

10%

a).Supply

Mts

13308

13308

7541.63

100,363,998

70%

13,308.000

100,364,012

13,308.000

100,364,012

b).Earth work, Laying and Jointing

Mts

13308

12741.0792

2477.96

32,976,742

23%

12,741.079

31,571,885

12,741.079

31,571,885

c).Testing

Mts

13308

923.5752

215.48

2,867,543

2%

923.575

199,012

923.575

199,012

450mm/248kpa/9Bar--1073 Rmt

14,337,714

1%

a).Supply

Mts

1073

1073

9353.59

10,036,400

70%

1,073.000

10,036,402

1,073.000

10,036,402

b).Earth work, Laying and Jointing

Mts

1073

791.9813

3073.32

3,297,674

23%

791.981

2,434,012

791.981

2,434,012

500mm/248kpa/9Bar--119 Rmt

2,150,657

0%

a).Supply

Mts

119

119

12650.92

1,505,460

70%

119.000

1,505,459

119.000

1,505,459

b).Earth work, Laying and Jointing

Mts

119

115.0373

4156.73

494,651

23%

115.037

478,179

115.037

478,179

600mm/248kpa/9Bar--4154 Rmt

86,026,284

6%

a).Supply

Mts

4154

4154

14496.49

60,218,399

70%

4,154.000

60,218,419

4,154.000

60,218,419

b).Earth work, Laying and Jointing

Mts

4154

3753.9698

4763.13

19,786,045

23%

3,753.970

17,880,646

3,753.970

17,880,646

c).Testing

Mts

4154

857.801

414.19

1,720,526

2%

857.801

355,293

857.801

355,293

700mm/248kpa/9Bar--4193 Rmt

129,039,426

9%

a).Supply

Mts

4193

4193

21542.48

90,327,598

70%

4,193.000

90,327,619

4,193.000

90,327,619

b).Earth work, Laying and Jointing

Mts

4193

3696.1295

7078.24

29,679,068

23%

3,696.130

26,162,092

3,696.130

26,162,092

800mm/248kpa/9Bar--4068 Rmt

157,714,853

11%

21 OF 227

Sl. No.

10

11

12

13

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Amount

Further Breakup
Percentage

Amount

Previous
Percentage

Qty

Present
Amount

Qty

Uptodate
Amount

Qty

Amount

a).Supply

Mts

4068

4068

27138.74

110,400,397

70%

4,068.000

110,400,394

4,068.000

110,400,394

b).Earth work, Laying and Jointing

Mts

4068

3823.92

8917.01

36,274,416

23%

3,823.920

34,097,933

3,823.920

34,097,933

900mm/248kpa/9Bar--976 Rmt

43,013,142

3%

a).Supply

Mts

976

976

30849.59

30,109,199

70%

976.000

30,109,200

976.000

30,109,200

b).Earth work, Laying and Jointing

Mts

976

971.9984

10136.29

9,893,023

23%

971.998

9,852,458

971.998

9,852,458

900mm/248kpa/12Bar--3343 Rmt

200,727,995

14%

a).Supply

Mts

3343

3343

42030.99

140,509,597

70%

3,343.000

140,509,600

3,343.000

140,509,600

b).Earth work, Laying and Jointing

Mts

3343

3083.9175

13810.18

46,167,439

23%

3,083.918

42,589,456

3,083.918

42,589,456

1000mm/248kpa/9Bar--3589 Rmt

215,065,709

15%

a).Supply

Mts

3589

3589

41946.5

150,545,996

70%

3,589.000

150,545,989

3,589.000

150,545,989

b).Earth work, Laying and Jointing

Mts

3589

3105.9206

13782.42

49,465,113

23%

3,105.921

42,807,102

3,105.921

42,807,102

1000mm/248kpa/12Bar--2373 Rmt

143,377,140

10%

a).Supply

Mts

2373

2373

42294.14

100,363,998

70%

2,373.000

100,363,994

2,373.000

100,363,994

b).Earth work, Laying and Jointing

Mts

2373

2219.9415

13896.65

32,976,742

23%

2,219.942

30,849,750

2,219.942

30,849,750

78,785,744

1100mm/248kpa/9Bar--1290 Rmt

112,551,055

8%

a).Supply

Mts

1290

1290

61074.22

78,785,738

70%

1,290.000

78,785,744

1,290.000

b).Earth work, Laying and Jointing

Mts

1290

1163.967

20067.24

25,886,743

23%

1,163.967

23,357,605

1,163.967

Total Amount :-

Remarks

1,433,771,395

1,339,429,237

1,304,030,603

23,357,605
1,304,030,603

Construction of Main Feeder Pipe line including supply, Earth work,


Structure, laying , jointing, testing and commissioning--(total Length =
3.2
3.2.1

3.2.2

3.2.3

3.2.4

3.2.5

3.2.6

3.2.7

3.2.8

3.2.9

3.2.10

3.2.11

3.2.12

3.2.13

3.2.14

3.2.15

128.886 Km)

128.886

665,679,576

ZONE 1
Supply of pipes

Mts

6.360

6.360

3615410

22,994,006

70%

6.360

22,994,006

Earth work, Laying and Jointing

Mts

6.360

4.395

1187920

7,555,173

23%

2.411

2,864,076

ZONE 2

1.984

2,356,834

5.079

6,033,448

1.188

1,411,249

3.217

3,821,540

6.360
4.395

22,994,006
5,220,910 MB No :- 569 & Pg No - 57

48,653,086
Supply of pipes

Mts

9.420

9.420

3615410

34,057,160

70%

9.420

34,057,160

Earth work, Laying and Jointing

Mts

9.420

9.327

1187920

11,190,210

23%

4.248

5,046,286

ZONE 3

9.420

34,057,160

9.327

11,079,733 MB No :- 569 & Pg No - 57

5.202

18,807,362

26,867,659
Supply of pipes

Mts

5.202

5.202

3615410

18,807,362

70%

5.202

18,807,362

Earth work, Laying and Jointing

Mts

5.202

5.179

1187920

6,179,562

23%

3.991

4,740,990

5.460

19,740,137

ZONE 4

5.179

6,152,239 MB No :- 569 & Pg No - 57

28,200,196
Supply of pipes

Mts

5.460

5.460

3615410

19,740,137

70%

Earth work, Laying and Jointing

Mts

5.460

3.217

1187920

6,486,045

23%

ZONE 5

5.460
3.217

19,740,137
3,821,540 MB No :- 569 & Pg No - 57

29,873,614
Supply of pipes

Mts

5.784

5.784

3615410

20,911,530

70%

5.784

20,911,530

5.784

20,911,530

Earth work, Laying and Jointing

Mts

5.784

2.969

1187920

6,870,931

23%

2.969

3,172,047

2.969

3,172,047

4.902

17,722,739

4.902

17,722,739

ZONE 6

25,318,198
Supply of pipes

Mts

4.902

4.902

3615410

17,722,739

70%

Earth work, Laying and Jointing

Mts

4.902

3.967

1187920

5,823,186

23%

ZONE 7

3.967

4,712,480

3.095

3,676,614

1.328

1,577,558

0.475

564,262

2.270

2,696,579

3.967

4,712,480 MB no :- 572 & Pg no :- 81

28,943,938
Supply of pipes

Mts

5.604

5.604

3615410

20,260,757

70%

Earth work, Laying and Jointing

Mts

5.604

3.095

1187920

6,657,106

23%

ZONE 8

5.604

20,260,756

5.604
3.095

20,260,756
3,676,614 MB no :- 572 & Pg no :- 81

27,487,444
Supply of pipes

Mts

5.322

5.322

3615410

19,241,211

70%

5.322

19,241,211

Earth work, Laying and Jointing

Mts

5.322

3.758

1187920

6,322,112

23%

2.430

2,486,356

ZONE 9

5.322
3.758

19,241,211
4,063,914 MB no :- 572 & Pg no :- 81

22,467,189
Supply of pipes

Mts

4.350

4.350

3615410

15,727,032

70%

4.350

15,727,032

Earth work, Laying and Jointing

Mts

4.350

3.698

1187920

5,167,453

23%

3.223

3,828,667

ZONE 10

4.350
3.698

15,727,032
4,392,929 MB no :- 568 & Pg no :- 65

38,364,662
Supply of pipes

Mts

7.428

7.428

3615410

26,855,263

70%

7.428

26,855,264

Earth work, Laying and Jointing

Mts

7.428

5.676

1187920

8,823,872

23%

3.406

2,496,920

ZONE 11

7.428
5.676

26,855,264
5,193,499 MB no :- 568 & Pg no :- 65

27,766,347
Supply of pipes

Mts

5.376

5.376

3615410

19,436,443

70%

5.376

19,436,443

5.376

19,436,443

Earth work, Laying and Jointing

Mts

5.376

2.396

1187920

6,386,260

23%

2.396

2,426,942

2.396

2,426,942

5.346

19,327,981

5.346

19,327,981

ZONE 12

27,611,401
Supply of pipes

Mts

5.346

5.346

3615410

19,327,981

70%

Earth work, Laying and Jointing

Mts

5.346

4.614

1187920

6,350,622

23%

ZONE 13

4.614

5,481,065

1.381

1,640,518

4.614

5,481,065 MB no :- 573 & Pg no :- 22

28,386,132
Supply of pipes

Mts

5.496

5.496

3615410

19,870,292

70%

5.496

19,870,292

Earth work, Laying and Jointing

Mts

5.496

3.328

1187920

6,528,810

23%

1.947

1,929,084

ZONE 14

ZONE 15

0.26

32,848,580

5.496
3.328

19,870,292
3,569,602 MB no :- 573 & Pg no :- 23

22,715,103
Supply of pipes

Mts

4.398

4.398

3615410

15,900,572

70%

4.398

15,900,572

4.398

15,900,572

Earth work, Laying and Jointing

Mts

4.398

4.369

1187920

5,224,474

23%

4.369

5,190,024

4.369

5,190,024

29,439,765

22 OF 227

Sl. No.

3.2.16

3.2.17

3.2.18

3.2.19

3.2.20

3.2.21

3.2.22

3.2.23

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Amount

Further Breakup
Percentage

Amount

Previous
Percentage

Qty

Present
Amount

Qty

Uptodate
Amount

Qty

Remarks

Amount

Supply of pipes

Mts

5.700

5.700

3615410

20,607,836

70%

5.700

20,607,836

5.700

20,607,836

Earth work, Laying and Jointing

Mts

5.700

3.108

1187920

6,771,146

23%

3.108

2,969,191

3.108

2,969,191

4.584

16,573,038

4.360

5,179,333

4.788

17,310,582

4.788

5,519,626

4.986

18,026,433

ZONE 16

23,675,769
Supply of pipes

Mts

4.584

4.584

3615410

16,573,038

70%

4.584

16,573,038

Earth work, Laying and Jointing

Mts

4.584

4.360

1187920

5,445,427

23%

2.438

2,896,150

ZONE 17

1.922

2,283,183

1.466

1,741,491

1.374

1,632,203

2.199

2,612,237

24,729,403
Supply of pipes

Mts

4.788

4.788

3615410

17,310,582

70%

4.788

17,310,582

Earth work, Laying and Jointing

Mts

4.788

4.788

1187920

5,687,763

23%

3.322

3,778,135

4.986

18,026,433

ZONE 18

25,752,047
Supply of pipes

Mts

4.986

4.986

3615410

18,026,433

70%

Earth work, Laying and Jointing

Mts

4.986

1.374

1187920

5,922,971

23%

ZONE 19

1.374

1,632,203 MB no :- 573 & Pg no :- 24

24,016,651
Supply of pipes

Mts

4.650

4.650

3615410

16,811,656

70%

4.650

16,811,655

Earth work, Laying and Jointing

Mts

4.650

3.499

1187920

5,523,830

23%

1.300

1,522,377

ZONE 20

4.650
3.499

16,811,655
4,134,614 MB No :- 570 & Pg No 19

27,642,390
Supply of pipes

Mts

5.352

5.352

3615410

19,349,673

70%

5.352

19,349,673

5.352

19,349,673

Earth work, Laying and Jointing

Mts

5.352

0.954

1187920

6,357,750

23%

0.954

970,653

0.954

970,653

5.424

19,609,983

ZONE 21

28,014,261
Supply of pipes

Mts

5.424

5.424

3615410

19,609,983

70%

5.424

19,609,983

Earth work, Laying and Jointing

Mts

5.424

3.971

1187920

6,443,280

23%

1.290

1,295,096

ZONE 22

2.681

3,184,814

3.971

4,479,910 MB No :- 570 & Pg No 19

26,464,799
Supply of pipes

Mts

5.124

5.124

3615410

18,525,359

70%

5.124

18,525,360

5.124

18,525,360

Earth work, Laying and Jointing

Mts

5.124

0.533

1187920

6,086,904

23%

0.533

566,435

0.533

566,435

28,308,658

ZONE 23

40,440,941
Supply of pipes

Mts

7.830

7.830

3615410

28,308,659

70%

7.830

28,308,658

7.830

Earth work, Laying and Jointing

Mts

7.830

2.860

1187920

9,301,416

23%

2.860

3,397,452

2.860

Total Amount :-

665,679,575

619,082,005

517,552,584

38.24

45,426,074

21.270

1,091,930

3,397,452
562,978,658

Construction of Pipe network of Mains and Submains for Blocks----3.3


3.3.1

3.3.2

3.3.3

3.3.4

3.3.5

3.3.6

3.3.7

3.3.8

3.3.9

(Total Length 1950.030 Km)

1,950.030

435,252,031

ZONE 1

17%

20,506,082
Supply of pipes

Kms

91.872

91.872

156,242

14,354,257

70%

91.872

14,354,257

Earth work, Laying and Jointing

Kms

91.872

47.893

51,337

4,716,399

23%

26.623

1,366,735

Testing

Kms

91.872

4,464

410,122

2%

ZONE 2

91.872
47.893
-

14,354,257
2,458,665 MB No :- 569 & Pg No - 57
-

17,984,337
Supply of pipes

Kms

80.574

80.574

156,242

12,589,036

70%

80.574

12,589,036

Earth work, Laying and Jointing

Kms

80.574

63.932

51,337

4,136,398

23%

22.460

639,654

Testing

Kms

80.574

4,464

359,687

2%

ZONE 3

41.472

2,129,033
-

80.574
63.932
-

12,589,036
2,768,687 MB No :- 569 & Pg No - 57
-

17,701,763
Supply of pipes

Kms

79.308

79.308

156,242

12,391,234

70%

79.308

12,391,234

Earth work, Laying and Jointing

Kms

79.308

50.781

51,337

4,071,405

23%

26.122

1,341,015

Testing

Kms

79.308

4,464

354,035

2%

ZONE 4

24.659

1,265,910
-

79.308
50.781
-

12,391,234
2,606,925 MB No :- 569 & Pg No - 57
-

18,801,259
Supply of pipes

Kms

84.234

84.234

156,242

13,160,881

70%

84.234

13,160,881

Earth work, Laying and Jointing

Kms

84.234

45.327

51,337

4,324,290

23%

7.742

397,448

Testing

Kms

84.234

4,464

376,025

2%

ZONE 5

37.585

1,929,487
-

84.234
45.327
-

13,160,881
2,326,935 MB No :- 569 & Pg No - 57
-

17,413,831
Supply of pipes

Kms

78.018

78.018

156,242

12,189,682

70%

78.018

12,189,682

Earth work, Laying and Jointing

Kms

78.018

72.050

51,337

4,005,181

23%

23.126

1,187,211

Testing

Kms

78.018

4,464

348,277

2%

ZONE 6

48.924

2,511,593
-

78.018
72.050
-

12,189,682
3,698,804 MB no :- 572 & Pg no :- 81
-

18,222,718
Supply of pipes

Kms

81.642

81.642

156,242

12,755,903

70%

81.642

12,755,902

Earth work, Laying and Jointing

Kms

81.642

55.299

51,337

4,191,225

23%

9.486

486,979

Testing

Kms

81.642

4,464

364,454

2%

ZONE 7

45.813

2,351,885
-

81.642
55.299
-

12,755,902
2,838,864 MB no :- 572 & Pg no :- 81
-

18,924,021
Supply of pipes

Kms

84.784

84.784

156,242

13,246,815

70%

84.784

13,246,815

Earth work, Laying and Jointing

Kms

84.784

46.852

51,337

4,352,525

23%

7.409

380,353

Testing

Kms

84.784

4,464

378,480

2%

ZONE 8

39.443

2,024,871
-

84.784
46.852
-

13,246,815
2,405,224 MB no :- 572 & Pg no :- 82
-

20,100,299
Supply of pipes

Kms

90.054

90.054

156,242

14,070,209

70%

90.054

14,070,209

Earth work, Laying and Jointing

Kms

90.054

10.411

51,337

4,623,069

23%

2.250

115,507

Testing

Kms

90.054

4,464

402,006

2%

ZONE 9

8.161

418,958
-

90.054
10.411
-

14,070,209
534,466 MB no :- 572 & Pg no :- 82
-

20,173,956
Supply of pipes

Kms

90.384

90.384

156,242

14,121,769

70%

90.384

14,121,769

Earth work, Laying and Jointing

Kms

90.384

38.435

51,337

4,640,010

23%

24.333

1,249,174

14.102

723,949

90.384
38.435

14,121,769
1,973,123 MB no :- 568 & Pg no :- 65

23 OF 227

Sl. No.

Unit of
Measure

Description of Work
Testing

3.3.10

Req.Qty

Kms

Exe.Qty

90.384

Sub-Breakup

Rate
-

Amount
4,464

ZONE 10

3.3.11

82.698

156,242

12,920,894

70%

82.698

12,920,894

82.698

22.716

51,337

4,245,437

23%

1.714

87,991

Testing

Kms

82.698

4,464

369,168

2%

Supply of pipes

Kms

86.526

86.526

156,242

13,518,988

70%

Earth work, Laying and Jointing

Kms

86.526

29.008

51,337

4,441,953

23%

Testing

Kms

86.526

4,464

386,257

2%

22.716
-

86.526

1,489,173

29.008

83.196

83.196

156,242

12,998,703

70%

83.196

12,998,702

83.196

62.490

51,337

4,271,002

23%

14.840

761,836

Testing

Kms

83.196

4,464

371,392

2%

12,920,894
1,166,163 MB no :- 568 & Pg no :- 65
-

13,518,988
1,489,173 MB no :- 568 & Pg no :- 66
-

47.650

83.196

2,446,190

62.490

12,998,702
3,208,026 MB no :- 573 & Pg no :- 22
-

17,995,051
Supply of pipes

Kms

80.622

80.622

156,242

12,596,536

70%

80.622

12,596,536

Earth work, Laying and Jointing

Kms

80.622

24.639

51,337

4,138,862

23%

4.412

226,497

Testing

Kms

80.622

4,464

359,901

2%

20.227

80.622

1,038,386

24.639

12,596,536
1,264,883 MB no :- 573 & Pg no :- 23
-

16,901,358
Supply of pipes

Kms

75.722

75.722

156,242

11,830,951

70%

75.722

11,830,950

Earth work, Laying and Jointing

Kms

75.722

55.753

51,337

3,887,312

23%

18.673

958,609

Testing

Kms

75.722

4,464

338,027

2%

37.080

75.722

1,903,562

55.753

11,830,950
2,862,171 MB No :- 570 & Pg No 19
-

20,194,044
Supply of pipes

Kms

90.474

90.474

156,242

14,135,831

70%

90.474

14,135,831

Earth work, Laying and Jointing

Kms

90.474

27.906

51,337

4,644,630

23%

10.361

531,899

Testing

Kms

90.474

4,464

403,881

2%

17.545

90.474

900,701

27.906

14,135,831
1,432,600 MB No :- 570 & Pg No 19
-

19,706,570
Supply of pipes

Kms

88.290

88.290

156,242

13,794,599

70%

88.290

13,794,599

Earth work, Laying and Jointing

Kms

88.290

41.616

51,337

4,532,511

23%

30.130

1,546,773

Testing

Kms

88.290

4,464

394,131

2%

11.486

589,653
-

88.290

13,794,599

41.616

2,136,425

19,902,095
Supply of pipes

Kms

89.166

89.166

156,242

13,931,467

70%

89.166

13,931,467

Earth work, Laying and Jointing

Kms

89.166

41.067

51,337

4,577,482

23%

10.638

546,119

Testing

Kms

89.166

4,464

398,042

2%

30.429

1,562,122
-

89.166

13,931,467

41.067

2,108,241

19,136,063
Supply of pipes

Kms

85.734

85.734

156,242

13,395,244

70%

85.734

13,395,245

Earth work, Laying and Jointing

Kms

85.734

44.394

51,337

4,401,294

23%

5.372

275,780

Testing

Kms

85.734

4,464

382,721

2%

39.022

85.734

2,003,258

44.394

13,395,245
2,279,038 MB no :- 573 & Pg no :- 24
-

17,506,237
Supply of pipes

Kms

78.432

78.432

156,242

12,254,366

70%

78.432

12,254,366

Earth work, Laying and Jointing

Kms

78.432

52.770

51,337

4,026,435

23%

15.441

792,689

Testing

Kms

78.432

4,464

350,125

2%

37.329

78.432

1,916,345

52.770

12,254,366
2,709,034 MB No :- 570 & Pg No 19
-

17,354,906
Supply of pipes

Kms

77.754

77.754

156,242

12,148,434

70%

77.754

12,148,434

Earth work, Laying and Jointing

Kms

77.754

33.274

51,337

3,991,628

23%

18.049

926,575

Testing

Kms

77.754

4,464

347,098

2%

15.225

781,600
-

77.754

12,148,434

33.274

1,708,175

19,884,685
Supply of pipes

Kms

89.088

89.088

156,242

13,919,280

70%

89.088

13,919,280

Earth work, Laying and Jointing

Kms

89.088

53.662

51,337

4,573,478

23%

22.729

1,166,830

Testing

Kms

89.088

4,464

397,694

2%

30.933

89.088

1,587,996

53.662

13,919,280
2,754,826 MB No :- 570 & Pg No 19
-

18,412,886
Supply of pipes

Kms

82.494

82.494

156,242

12,889,020

70%

82.494

12,889,021

Earth work, Laying and Jointing

Kms

82.494

35.360

51,337

4,234,964

23%

16.535

848,851

Testing

Kms

82.494

4,464

368,258

2%

ZONE 23

18.825

82.494

966,412

35.360

12,889,021
1,815,263 MB no :- 568 & Pg no :- 66
-

22,089,036
Supply of pipes

Kms

98.964

98.964

156,242

15,462,325

70%

98.964

15,462,325

Earth work, Laying and Jointing

Kms

98.964

31.760

51,337

5,080,478

23%

16.534

848,800

Testing

Kms

98.964

4,464

441,781

2%

Total Amount :4

82.698

1,078,172

29.008

Kms

ZONE 22

3.3.23

21.002

13,518,988

Kms

ZONE 21

3.3.22

86.526

Supply of pipes

ZONE 20

3.3.21

Earth work, Laying and Jointing

ZONE 19

3.3.20

Remarks

Amount

18,569,575

ZONE 18

3.3.19

Qty

19,312,840

ZONE 17

3.3.18

Uptodate
Amount
-

82.698

ZONE 16

3.3.17

Qty

Kms

ZONE 15

3.3.16

2%

Present
Amount

Kms

ZONE 14

3.3.15

403,479

Qty

Supply of pipes

ZONE 13

3.3.14

Previous
Percentage

Earth work, Laying and Jointing

ZONE 12

3.3.13

Amount

18,458,420

ZONE 11

3.3.12

Further Breakup
Percentage

414,745,950

15.226

98.964

781,652

31.760

398,693,392

321,359,749

652.416

33,492,838

15,462,325
1,630,451 MB No :- 570 & Pg No 19
354,852,587

CIVIL WORKS

4.1

Construction of Sump

10,955,321

23%

Earthwork

95.00%

2,738,830

25%

95.00%

2,601,889

0.00

95.00%

2,601,889 95 % Amount claimed

Foundation Concrete work

42.41%

2,738,830

25%

42.41%

1,161,483

0.00

42.41%

1,161,483 95 % Amount claimed

Structure concrete work

9.86%

5,477,661

50%

9.86%

540,152

0.00

9.86%

540,152 95 % Amount claimed

24 OF 227

Sl. No.

Unit of
Measure

Description of Work

4.2

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Amount

Pump House

Further Breakup
Percentage

11,431,639

Amount

Previous
Percentage

Qty

Present
Amount

Qty

Uptodate
Amount

Qty

Remarks

Amount

24%

Earthwork

0.95

2,857,910

25%

95.00%

2,715,015

0.00

95.00%

2,715,015 95 % Amount claimed

Foundation Concrete work

0.95

1,143,164

10%

95.00%

1,086,006

0.00

95.00%

1,086,006 95 % Amount claimed

Structure concrete work

0.44

7,430,565

65%

44.00%

3,105,976

0.00

44.00%

3,105,976 95 % Amount claimed

4,431,576 95 % Amount claimed

4.3

Construction of Control rooms

23 Nos

25,244,869

53%

Earthwork

23

17

274,401

6,311,217

25%

14.00

3,649,533

3.00

782043

17.00

Foundation Concrete work

23

17

109,760

2,524,487

10%

11.00

1,146,992

6.00

625632

17.00

1,772,624 95 % Amount claimed

Structure concrete work

23

16

713,442

16,409,165

65%

11.00

7,455,468

5.00

3388850

16.00

10,844,318 95 % Amount claimed

Total Amount :-

786,999,821

772,027,743

23,462,514

4,796,524

28,259,038

5 DRIP SYSTEM
5.1 Primary HCU-Q=425 Cum/hr
5.1.1

Zone 1

5.1.2

Zone 2

5.1.3

Zone 3

5.1.4

Zone 4

5.1.5

Zone 5

5.1.6

Zone 6

5.1.7

Zone 7

5.1.8

Zone 8

5.1.9

Zone 9

5.1.10

Zone 10

5.1.11

Zone 11

5.1.12

Zone 12

5.1.13

Zone 13

5.1.14

Zone 14

5.1.15

Zone 15

5.1.16

Zone 16

5.1.17

Zone 17

5.1.18

Zone 18

5.1.19

Zone 19

5.1.20

Zone 20

5.1.21

Zone 21

5.1.22

Zone 22

5.1.23

Zone 23

23

29,722,261

Supply

Nos

1.0000

100.00%

904,586

100%

904,586

Nos

1.0000

904,591

70%

100.00%

904,591

100%

904,591

Nos

1.0000

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

86.78%

785,002

13.22%

119581

100.00%

904,583 MB no :- 12206 & Pg no :- 34

904,591

70%

86.92%

786,268

13.08%

118314

100.00%

904,583 MB No :- 12205 & Pg No - 31

904,591

70%

86.92%

786,268

13.08%

118314

100.00%

904,583 MB No :- 12205 & Pg No - 31

904,591

70%

77.36%

699,760

10.91%

98691

88.27%

798,451 MB No :- 554 & Pg No - 21

904,591

70%

77.38%

699,941

10.91%

98691

88.29%

798,632 MB No :- 554 & Pg No - 21

904,591

70%

77.38%

699,941

10.91%

98668

88.29%

798,609 MB No :- 555 & Pg No - 25

904,591

70%

77.38%

699,941

10.91%

98668

88.29%

798,609 MB No :- 555 & Pg No - 25

904,591

70%

77.38%

699,941

10.91%

98668

88.29%

798,609 MB No :- 12205 & Pg No - 31

904,591

70%

77.33%

699,513

10.91%

98668

88.24%

798,181 MB No :- 554 & Pg No - 21

904,591

70%

77.33%

699,513

10.91%

98668

88.24%

798,181 MB No :- 555 & Pg No - 25

904,591

70%

77.32%

699,442

10.91%

98668

88.23%

798,110 MB No :- 554 & Pg No - 21

904,591

70%

77.32%

699,442

10.91%

98668

88.23%

798,110 MB no :- 12206 & Pg no :- 34

904,591

70%

76.32%

690,396

11.97%

108237

88.29%

1,292,272
Supply

Nos

1.0000
1,292,272

Supply

Nos

1.0000
1,292,272

Supply

Nos

1.0000
1,292,272

Supply

Nos

1.0000
1,292,272

Supply

Nos

1.0000
1,292,272

Supply

Nos

1.0000
1,292,272

Supply

Nos

1.0000
1,292,272

Supply

Nos

1.0000
1,292,272

Supply

Nos

1.0000
1,292,272

Supply

Nos

1.0000
1,292,272

Supply

Nos

0.8827
1,292,272

Supply

Nos

0.8829
1,292,272

Supply

Nos

0.8829
1,292,272

Supply

Nos

0.8829
1,292,272

Supply

Nos

0.8829
1,292,272

Supply

Nos

0.8824
1,292,272

Supply

Nos

0.8824
1,292,272

Supply

Nos

0.8823
1,292,272

Supply

Nos

0.8823
1,292,272

Supply

Nos

0.8829

Total Amount :-

846,444,343

20,805,583

18,391,280

1,352,503

798,633 MB No :- 554 & Pg No - 21


19,743,778

Secondary HCU
Zone 1

1,076,894
Supply

5.2.2

70%

1,292,272
Supply

5.2

904,591
1,292,272

Supply

5.2.1

3.00%

1,292,272

Nos

10

10

Zone 2

753,825

70%

100.00%

753,825

100%

753,825

753,825

70%

100.00%

753,825

100%

753,825

1,076,894
Supply

Nos

10

10

25 OF 227

Sl. No.
5.2.3

Description of Work

5.2.4

Zone 4

5.2.5

Zone 5

5.2.6

Zone 6

5.2.7

Zone 7

10

Nos

10

10

Nos

10

10

Nos

10

10

5.2.10

Zone 10

5.2.11

Zone 11

5.2.12

Zone 12

Nos

10

10

Nos

10

10

Nos

10

10.00

Nos

10

10.00

Nos

10

9.99

Nos

10

10.00

Zone 13
Nos

10

10.00

Zone 14

5.2.18

Zone 18

Nos

10

8.37

Nos

10

8.37

Nos

10

8.37

Nos

10

8.37

Nos

10

8.37

Zone 19
Nos

10

8.37

Zone 20

753,825

753,825

70%

100.00%

753,825

100%

753,825

753,825

70%

100.00%

753,825

100%

753,825

753,825

70%

100.00%

753,825

100%

753,825

753,825

70%

100.00%

753,825

100%

753,825

753,825

70%

100.00%

753,825

100%

753,825

753,825

70%

83.69%

630,883

16.31%

122,967

100%

753,850 MB no :- 12206 & Pg no :- 35

753,825

70%

83.69%

630,883

16.31%

122,967

100%

753,850 MB no :- 12206 & Pg no :- 35

753,825

70%

83.52%

629,589

16.40%

123,627

99.92%

753,216 MB no :- 12206 & Pg no :- 35

753,825

70%

84.23%

634,967

15.77%

118,858

100.00%

753,826 MB No :- 12205 & Pg No - 31

753,825

70%

83.53%

629,664

16.47%

124,187

100.00%

753,852 MB No :- 12205 & Pg No - 31

753,825

70%

83.52%

629,627

0.17%

1,282

83.69%

630,908 MB No :- 554 & Pg No - 22

753,825

70%

83.52%

629,627

0.17%

1,282

83.69%

630,908 MB No :- 554 & Pg No - 22

753,825

70%

83.52%

629,627

0.17%

1,294

83.69%

630,920 MB No :- 555 & Pg No - 25

753,825

70%

83.52%

629,627

0.17%

1,294

83.69%

630,920 MB No :- 555 & Pg No - 25

753,825

70%

83.52%

629,627

0.17%

1,294

83.69%

630,920 MB No :- 12205 & Pg No - 31

753,825

70%

83.52%

629,627

0.17%

1,294

83.69%

630,920 MB No :- 554 & Pg No - 22

Nos

10

8.37

753,825

70%

83.52%

629,627

0.17%

1,294

83.69%

630,920 MB No :- 555 & Pg No - 25

Nos

10

8.37

753,825

70%

83.53%

629,660

0.17%

1,294

83.70%

630,954 MB No :- 554 & Pg No - 22

753,825

70%

83.53%

629,660

0.17%

1,294

83.70%

630,954 MB no :- 12206 & Pg no :- 35

629,660

0.17%

1,294

83.70%

1,076,894
Supply

Nos

10

8.37
1,076,894

Supply

Nos

10

8.37

Total Amount :-

\
753,825

24,768,551

83.53%

17,337,986

15,482,959

625517

630,954 MB No :- 554 & Pg No - 22


16,108,476

Automatic Electrical Valves per 4-6 growers parcel

5.3.1

Zone 1
Supply

5.3.2

1,292,272
Nos

100

100

Zone 2
Supply

5.3.3

100

100

Zone 3

5.3.4

Nos

Supply

100

100

Nos

Supply

100

100

Nos

Supply

100

100

5.3.8

Nos

100

100

100

100

Zone 8

5.3.9

100

100

Zone 9

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

1,292,272
Nos

Zone 10

904,591

1,292,272
Nos

Supply

100%

1,292,272
Nos

Supply

1,292,272

Zone 7
Supply

904,591

1,292,272

Zone 6

5.3.7

100.00%

1,292,272

Zone 5

5.3.6

70%

1,292,272

Zone 4

5.3.5

904,591
1,292,272

Nos

Supply

5.3.10

100%

1,076,894
Supply

5.3

1,076,894
Supply

Zone 23

1,076,894
Supply

5.2.23

753,825

1,076,894
Supply

Zone 22

100.00%

1,076,894
Supply

5.2.22

70%

1,076,894
Supply

Zone 21

753,825

1,076,894
Supply

5.2.21

Remarks

Amount

1,076,894
Supply

Zone 17

Qty

1,076,894
Supply

5.2.17

Uptodate
Amount

1,076,894
Supply

Zone 16

Qty

1,076,894
Supply

5.2.16

Present
Amount

1,076,894
Supply

Zone 15

Qty

1,076,894
Supply

5.2.15

Previous
Percentage

1,076,894
Supply

Zone 9

Amount

1,076,894

Zone 8

5.2.9

Further Breakup
Percentage

1,076,894

Supply

5.2.20

10

Sub-Breakup
Amount

1,076,894

Supply

5.2.19

Nos

Rate

1,076,894

Supply

5.2.14

Exe.Qty

1,076,894

Supply

5.2.13

Req.Qty

Zone 3
Supply

5.2.8

Unit of
Measure

100

100
1,292,272

26 OF 227

Sl. No.

Description of Work
Supply

5.3.11

Unit of
Measure

Req.Qty

Exe.Qty

Nos

100

100

Zone 11
Nos

100

Nos

100

100

Zone 13
Nos

100

100

Zone 14
Nos

100

100

Zone 15
Nos

100

100

Zone 16
Nos

100

100

Zone 17
Nos

100

100.00

Zone 18
Nos

100

100.00

Zone 19
Nos

100

100.00

Zone 20
Nos

100

100.00

Zone 21
Nos

100

100.00

Zone 22
Nos

100

100.00

Zone 23
Nos

100

100.00

Total Amount :-

29,722,261
44,583,392

Manual valves, fertilizer tank and fitting per grower parcel

Supply

Nos

490

489

5.4.3

Nos

478

477

5.4.4

Nos

478

477

Supply

Nos

473

472

Supply

Nos

503

502

Supply

Nos

507

506

Supply

Nos

603

602

5.4.9

Nos

618

617

5.4.10

Nos

578

577

Supply

Nos

561

560

Supply

Nos

578

573

Supply

Nos

506

501

5.4.14

Nos

509

504

5.4.15

Nos

452

447

5.4.16

Nos

510

505

Supply

Nos

531

254

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

100.00%

904,591

100%

904,591

904,591

70%

19.07%

172,528

80.93%

732,057

100.00%

904,585 MB No :- 555 & Pg No - 25

904,591

70%

19.07%

172,528

80.93%

732,057

100.00%

904,585 MB No :- 12205 & Pg No - 32

904,591

70%

19.07%

172,528

80.93%

732,057

100.00%

904,585 MB No :- 554 & Pg No - 22

904,591

70%

19.07%

172,528

80.93%

732,057

100.00%

904,585 MB No :- 555 & Pg No - 25

904,591

70%

19.07%

172,528

80.93%

732,057

100.00%

904,585 MB No :- 554 & Pg No - 22

904,591

70%

19.07%

172,528

80.93%

732,057

100.00%

904,585 MB no :- 12206 & Pg no :- 35

904,591

70%

19.07%

172,528

80.93%

732,057

100.00%

20,805,583

15,681,146

5,124,400

904,585 MB No :- 554 & Pg No - 22


20,805,546

5%

1,263,810

70%

99.05%

1,251,760

0.66%

8,294

99.71%

1,260,054 MB No :- 540 & Pg No - 34

1,232,860

70%

99.03%

1,220,810

0.67%

8,294

99.70%

1,229,104 MB No :- 540 & Pg No - 34

1,232,860

70%

99.03%

1,220,809

0.67%

8,294

99.70%

1,229,103 MB No :- 540 & Pg No - 34

1,219,964

70%

99.02%

1,207,913

0.68%

8,294

99.70%

1,216,207 MB No :- 540 & Pg No - 34

1,297,340

70%

99.08%

1,285,290

0.64%

8,294

99.71%

1,293,584 MB No :- 539 & Pg No - 33

1,307,657

70%

99.08%

1,295,607

0.63%

8,294

99.71%

1,303,901 MB No :- 539 & Pg No - 33

1,555,260

70%

99.22%

1,543,210

0.53%

8,294

99.75%

1,551,504 MB No :- 539 & Pg No - 33

1,593,948

70%

99.24%

1,581,898

0.52%

8,294

99.76%

1,590,192 MB No :- 539 & Pg No - 33

1,490,780

70%

99.20%

1,478,730

0.56%

8,294

99.75%

1,487,024 MB no :- 12206 & Pg no :- 36

1,446,934

70%

50.69%

733,465

49.05%

709,712

99.74%

1,443,177 MB no :- 12206 & Pg no :- 36

1,490,780

70%

52.14%

777,312

47.05%

701,418

99.19%

1,478,730 MB no :- 12206 & Pg no :- 36

1,305,077

70%

45.33%

591,610

53.75%

701,418

99.08%

1,293,028 MB No :- 12205 & Pg No - 32

1,312,815

70%

45.65%

599,348

53.43%

701,418

99.08%

1,300,766 MB No :- 12205 & Pg No - 32

1,165,800

70%

38.80%

452,332

60.17%

701,417

98.96%

1,153,749 MB No :- 554 & Pg No - 23

1,315,394

70%

39.82%

523,826

59.26%

779,518

99.08%

1,303,344 MB No :- 554 & Pg No - 23

1,369,558

70%

42.20%

577,989

5.70%

78,101

47.90%

656,090 MB No :- 555 & Pg No - 26

1,315,394

70%

39.82%

523,826

5.94%

78,101

45.76%

601,927 MB No :- 555 & Pg No - 26

1,879,135

Zone 17
Supply

100%

1,956,511

Zone 16

5.4.17

1,879,135

Zone 15
Supply

904,591

1,665,429

Zone 14
Supply

100.00%

1,875,450

Zone 13
Supply

70%

1,864,396

Zone 12

5.4.13

904,591

2,129,686

Zone 11

5.4.12

904,591

2,067,048

Zone 10

5.4.11

100%

2,129,686

Zone 9
Supply

2,277,069

Zone 8
Supply

904,591

2,221,800

Zone 7

5.4.8

100.00%

1,868,081

Zone 6

5.4.7

70%

1,853,343

Zone 5

5.4.6

904,591

1,742,805

Zone 4

5.4.5

904,591

1,761,228

Zone 3
Supply

100%

1,761,228

Zone 2
Supply

1,805,443

Zone 1

5.4.2

904,591

1,292,272

Supply

5.4.1

100.00%

1,292,272

Supply

5.4

70%

1,292,272

Supply

5.3.23

904,591

1,292,272

Supply

5.3.22

Remarks

Amount

1,292,272

Supply

5.1.21

Qty

1,292,272

Supply

5.3.20

Uptodate
Amount

1,292,272

Supply

5.3.19

Qty

1,292,272

Supply

5.3.18

Present
Amount

1,292,272

Supply

5.3.17

Qty

1,292,272

Supply

5.3.16

Previous
Percentage

1,292,272

Supply

5.3.15

Amount

1,292,272

Supply

5.3.14

Further Breakup
Percentage

100

Zone 12

5.3.13

Sub-Breakup
Amount

1,292,272

Supply
5.3.12

Rate

Nos

510

233

27 OF 227

Sl. No.

Description of Work

5.4.18

Zone 18

Req.Qty

Exe.Qty

Nos

533

256

Supply

Nos

470

Nos

521

244

Supply

Nos

505

201

Supply

Nos

553

249

Nos

633

329

Total Amount :-

Mts

Mts

3276778

3270722

Mts

3257121

3251066

Mts

3324053

3317996

Mts

3372997

3366939

Mts

3302037

3295981

Mts

3435457

3429398

Mts

3441823

34484

Mts

3435328

34484

Mts

3341017

34472

Mts

3249691

34460

Mts

3359754

3353707

Mts

3363281

3357227

Mts

3144563

3138510

Mts

3267865

3261810

Mts

3390591

3384532

Mts

3318554

3312497

Mts

3375403

3369345

Mts

3359235

3353178

Mts

3388749

3382691

Mts

3409192

3403133

Mts

3434300

3428241

Mts

3586875

3580813

Zone 5

Zone 6

Zone 7

Zone 8

Zone 9

Zone 10

Zone 11

Zone 12

Zone 13

Zone 14

Zone 15

Zone 16

Zone 17

Zone 18

Zone 19

Zone 20

70%

41.10%

552,197

5.81%

78,101

46.91%

630,298 MB No :- 555 & Pg No - 26

1,302,498

70%

33.72%

439,205

6.00%

78,101

39.72%

517,306 MB No :- 554 & Pg No - 23

1,426,300

70%

39.47%

563,007

5.48%

78,101

44.95%

641,108 MB no :- 12206 & Pg no :- 36

1,632,636

70%

44.21%

721,793

7.70%

125,651

51.90%

20,145,744

5,041,902

847,444 MB No :- 554 & Pg No - 23


25,187,646

Zone 21

Zone 22

99.82%

23,877,791

99.82%

23,877,791

23,561,066

70%

99.82%

23,517,521

99.82%

23,517,521

23,419,728

70%

1.06%

247,788

98.76%

23,128,400

99.81%

23,376,188 MB No :- 540 & Pg No - 34

23,900,994

70%

1.04%

247,850

98.78%

23,609,592

99.82%

23,857,442 MB No :- 540 & Pg No - 34

24,252,913

70%

1.02%

247,894

98.80%

23,961,460

99.82%

24,209,353 MB No :- 539 & Pg No - 34

23,742,691

70%

1.04%

247,830

98.77%

23,451,313

99.82%

23,699,143 MB No :- 539 & Pg No - 34

24,702,020

70%

1.00%

247,948

98.82%

24,410,503

99.82%

24,658,451 MB No :- 539 & Pg No - 34

24,747,793

70%

1.00%

247,953

1.00%

247,953

24,701,093

70%

1.00%

247,948

1.00%

247,948

24,022,968

70%

1.03%

247,865

1.03%

247,865

23,366,308

70%

1.06%

247,781

1.06%

247,781

24,157,693

70%

99.82%

24,114,501

0.9982

24,114,501

24,183,049

70%

99.82%

24,139,856

99.82%

24,139,856

22,610,402

70%

99.81%

22,566,881

99.81%

22,566,881

23,496,984

70%

99.81%

23,453,441

99.81%

23,453,441

24,379,417

70%

99.82%

24,335,855

99.82%

24,335,855

23,861,451

70%

99.82%

23,817,901

99.82%

23,817,901

24,270,216

70%

99.82%

24,226,656

99.82%

24,226,656

24,153,962

70%

99.82%

24,110,405

99.82%

24,110,405

24,366,176

70%

99.82%

24,322,614

99.82%

24,322,614

24,513,169

70%

99.82%

24,469,604

99.82%

24,469,604

24,693,701

70%

99.82%

24,650,132

99.82%

24,650,132

25,790,765

70%

0.96%

248,072

99.83%

25,747,174 MB No :- 554 & Pg No - 23

35,276,715

Zone 23

36,843,950

Supply
Total Amount :-

Zone 1

70%

35,018,813

Supply

Automation controller and communication to center

23,920,984

34,808,822

Supply

5.5.23

1,343,766

34,505,661

Supply

5.5.22

498,758 MB No :- 554 & Pg No - 23

34,671,737

Supply

5.5.21

41.15%

34,087,788

Supply

5.5.20

78,101

34,827,738

Supply

5.5.19

6.44%

33,567,119

Supply

5.5.18

420,657

32,300,574

Supply

5.5.17

34.70%

34,547,213

Supply

5.5.16

70%

34,510,991

Supply

5.5.15

1,212,226

33,380,439

Supply

5.5.14

661,248 MB No :- 12205 & Pg No - 32

34,318,526

Supply

5.5.13

48.10%

35,287,276

Supply

5.5.12

78,101

35,353,990

Supply

5.5.11

5.68%

35,288,600

Supply

5.5.10

583,147

33,918,130

Supply

5.5.9

42.42%

34,647,019

Supply

5.5.8

70%

34,144,277

Supply

5.5.7

1,374,716

31,208,373

3320827

Zone 4

5.5.6

Remarks

Amount

33,456,755

Supply

5.6

3326834

Zone 3
Supply

5.5.5

Qty

33,658,665

Supply

5.5.4

Uptodate
Amount

34,172,835

Zone 2

5.5.3

Qty

80%
Zone 1

Supply

5.6.1

44,583,392

Emitting pipe & drip manifold

5.5.2

Present
Amount

2,332,338

Zone 23
Supply

5.5

Qty

2,037,572

Zone 22

5.5.1

Previous
Percentage

1,860,712

Zone 21

5.4.23

Amount

1,919,665

Supply

5.4.22

Further Breakup
Percentage

193

Zone 20

5.4.21

Sub-Breakup
Amount

1,731,752

Zone 19

5.4.20

Rate

1,963,880

Supply
5.4.19

Unit of
Measure

792,593,631
19,814,841

554,815,542

314,082,085

98.87%

25,499,103
144,060,370

458,142,454

1%

861,515

28 OF 227

Sl. No.

Description of Work
Supply

5.6.2

Unit of
Measure

Req.Qty

Exe.Qty

Nos

0.785

Supply

Nos

Nos

1.000

Supply

Nos

1.000

Supply

Nos

1.000

Supply

Nos

1.000

Supply

Nos

1.000

Supply

Nos

1.000

Supply

Nos

1.000

Supply

Nos

1.000

Supply

Nos

1.000

Supply

Nos

1.000

Supply

Nos

0.993

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Total Amount :-

19,814,845
3,962,968

5.7 Radio net

Nos

0.161

Supply

Nos

0.161

Supply

Nos

0.161

Supply

Nos

0.161

Supply

Nos

0.161

5.7.7

Nos

0.161

5.7.8

Nos

0.161

603,061

603,060

70%

100.00%

603,061

100.00%

603,061

603,060

70%

100.00%

603,061

100.00%

603,061

603,060

70%

100.00%

603,061

100.00%

603,061

603,060

70%

100.00%

603,061

100.00%

603,061

603,060

70%

100.00%

603,061

100.00%

603,061

603,060

70%

100.00%

603,061

100.00%

603,061

603,060

70%

100.00%

603,061

100.00%

603,061

603,060

70%

100.00%

603,061

100.00%

603,061

603,060

70%

99.99%

603,030

0.00

99.99%

603,030

603,060

70%

100.00%

603,060

100.00%

603,060

603,060

70%

100.00%

603,060

100.00%

603,060

603,060

70%

100.00%

603,060

100.00%

603,060

603,060

70%

100.00%

603,060

100.00%

603,060

603,060

70%

100.00%

603,060

100.00%

603,060

603,060

70%

100.00%

603,060

100.00%

603,060

603,060

70%

100.00%

603,060

100.00%

603,060

603,060

70%

100.00%

603,060

100.00%

603,060

603,060

70%

100.00%

603,060

100.00%

603,060

603,060

70%

100.00%

603,060

100.00%

13,870,361

13,870,380

603,060
13,870,361

4%

1,206,121

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,995 MB No :- 540 & Pg No - 35

1,206,121

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,995 MB No :- 540 & Pg No - 35

1,206,121

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,995 MB No :- 540 & Pg No - 35

1,206,121

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,995 MB No :- 540 & Pg No - 35

1,206,121

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,995 MB No :- 539 & Pg No - 35

1,206,121

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,995 MB No :- 539 & Pg No - 35

1,206,121

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,995 MB No :- 539 & Pg No - 35

1,206,121

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,995 MB No :- 539 & Pg No - 35

1,723,030

Zone 8
Supply

100.00%

1,723,030

Zone 7
Supply

603,061

1,723,030

Zone 6
Supply

100.00%

1,723,030

Zone 5

5.7.6

70%

1,723,030

Zone 4

5.7.5

603,060

1,723,030

Zone 3

5.7.4

603,061

1,723,030

Zone 2

5.7.3

100.00%

1,723,030

Zone 1

5.7.2

603,061

861,515

Zone 23

Supply

100.00%

861,515

Zone 22

5.7.1

70%

861,515

Zone 21

5.6.23

603,060

861,515

Zone 20

5.6.22

603,061

861,515

Zone 19

5.6.21

100.00%

861,515

Zone 18

5.6.20

603,061

861,515

Zone 17

5.6.19

100.00%

861,515

Zone 16

5.6.18

70%

861,515

Zone 15

5.6.17

603,060

861,515

Zone 14

5.6.16

100%

861,515

Zone 13

5.6.15

603,060

861,515

Zone 12

5.6.14

603,060

861,515

Zone 11

5.6.13

100.00%

Remarks

Amount

861,515

Zone 10

5.6.12

70%

Qty

861,515

Zone 9

5.6.11

603,060

Uptodate
Amount

861,515

Zone 8

5.6.10

Qty

861,515

Zone 7

5.6.9

Present
Amount

861,515

Zone 6

5.6.8

Qty

861,515

Zone 5

5.6.7

Previous
Percentage

861,515

Zone 4

5.6.6

Amount

861,515

Supply

5.6.5

Further Breakup
Percentage

1.000

Zone 3

5.6.4

Sub-Breakup
Amount

861,515

Zone 2

5.6.3

Rate

Nos

0.161

29 OF 227

Sl. No.

Description of Work

5.7.9

Zone 9

Req.Qty

Exe.Qty

Nos

0.161

Supply

Nos

Nos

0.161

Supply

Nos

1.000

Zone 13

1,723,030

Supply

Nos

Nos

Nos

Nos

Nos

Nos

Nos

0.969

Nos

Nos

Nos

Nos

Nos

0.738

0.965

Nos

0.965

Nos

0.742

Nos

0.742

Nos

0.742

Nos

0.742

Nos

0.742

Nos

0.742

Nos

0.742

Nos

Supply

0.743

Nos

Supply

0.529

Nos

Supply

0.356

Nos

16.05%

193,595

80.87%

975,400

96.92%

1,168,994 MB No :- 12205 & Pg No - 32

70%

16.05%

193,595

80.88%

975,511

96.93%

1,169,106 MB No :- 554 & Pg No - 24

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,994 MB No :- 554 & Pg No - 24

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,994 MB No :- 555 & Pg No - 26

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,994 MB No :- 555 & Pg No - 26

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,994 MB No :- 12205 & Pg No - 32

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,994 MB No :- 554 & Pg No - 24

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,994 MB No :- 555 & Pg No - 26

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,994 MB No :- 554 & Pg No - 24

70%

16.05%

193,595

80.87%

975,400

96.92%

1,168,994 MB no :- 12206 & Pg no :- 37

70%

16.05%

193,595

80.88%

975,511

96.93%

34,374,432

4,452,683

22,434,414

1,169,106 MB No :- 554 & Pg No - 24


26,887,097

1%

301,530

70%

98.87%

298,143

0.84%

2534

99.71%

300,677 MB No :- 540 & Pg No - 35

301,530

70%

98.63%

297,404

0.84%

2534

99.47%

299,937 MB No :- 540 & Pg No - 35

301,530

70%

98.63%

297,404

0.84%

2534

99.47%

299,937 MB No :- 540 & Pg No - 35

301,530

70%

98.63%

297,405

0.84%

2534

99.47%

299,939 MB No :- 540 & Pg No - 35

301,530

70%

98.63%

297,405

0.84%

2534

99.47%

299,939 MB No :- 539 & Pg No - 35

301,530

70%

98.63%

297,405

0.84%

2534

99.47%

299,939 MB No :- 539 & Pg No - 35

301,530

70%

98.63%

297,405

0.84%

2534

99.47%

299,939 MB No :- 539 & Pg No - 35

301,530

70%

98.63%

297,405

0.84%

2534

99.47%

299,939 MB No :- 539 & Pg No - 35

301,530

70%

76.33%

230,158

23.14%

69781

99.47%

299,939 MB no :- 12206 & Pg no :- 38

301,530

70%

76.33%

230,158

23.14%

69781

99.47%

299,939 MB no :- 12206 & Pg no :- 38

301,530

70%

76.34%

230,158

23.14%

69781

99.48%

299,939 MB no :- 12206 & Pg no :- 38

301,530

70%

76.34%

230,157

23.14%

69781

99.48%

299,938 MB No :- 12205 & Pg No - 33

301,530

70%

59.09%

178,177

40.38%

121770

99.47%

299,947 MB No :- 12205 & Pg No - 33

0.354

301,530

70%

58.84%

177,437

40.38%

121770

99.23%

299,207 MB No :- 554 & Pg No - 25

301,530

70%

58.84%

177,437

40.38%

121770

99.23%

299,207 MB No :- 554 & Pg No - 25

430,757
Nos

Zone 16

70%

430,757

Zone 15
Supply

1,168,995 MB No :- 12205 & Pg No - 32

430,757

Zone 14

5.8.15

96.92%

430,757

Zone 13

5.8.14

975,400

430,757

Zone 12

5.8.13

80.87%

430,757

Zone 11
Supply

193,595

430,757

Zone 10

5.8.12

16.05%

430,757

Zone 9

Supply

70%

430,757

Zone 8

5.8.11

1,206,121

430,757

Zone 7

Supply

1,168,995 MB no :- 12206 & Pg no :- 37

430,757

Zone 6

5.8.10

96.92%

430,757

Zone 5

Supply

975,400

430,757

Zone 4

5.8.9

80.87%

430,757
Nos

Supply

5.8.16

Zone 3

5.8.8

193,595

430,757

Zone 2

Supply

16.05%

1,206,121

9,907,420

Zone 1

5.8.7

70%

53,069,323

Other control Accessories sourced locally in India

Supply

1,206,121

1,206,121

0.969

Total Amount :-

5.8.6

1,168,995 MB no :- 12206 & Pg no :- 37

1,723,030

Supply

Supply

96.92%

1,206,121

0.969

Zone 23

5.8.5

975,400

1,723,030

Supply

Supply

80.87%

1,206,121

0.969

Zone 22

5.8.4

193,595

1,723,030

Supply

Supply

16.05%

1,206,121

0.969

Zone 21

5.8.3

70%

1,723,030

Supply

Supply

1,206,121

1,206,121
1,723,030

Zone 20

5.8.2

1,168,995 MB no :- 12206 & Pg no :- 37

0.969

Zone 19
Supply

5.8

96.92%

1,206,121
1,723,030

Supply

5.8.1

975,400

0.969

Zone 18

5.7.23

80.87%

1,206,121
1,723,030

Supply

5.7.22

193,595

0.969

Zone 17

5.7.21

Remarks

Amount

16.05%

1,206,121
1,723,030

Supply

5.7.20

Qty

0.969

Zone 16

5.7.19

Uptodate
Amount

70%

1,206,121
1,723,030

Supply

5.7.18

Qty

0.969

Zone 15

5.7.17

Present
Amount

1,206,121

1,206,121
1,723,030

Supply

5.7.16

Qty

0.969

Zone 14

5.7.15

Previous
Percentage

1,723,030

Zone 12

5.7.14

Amount

1,723,030

Supply

5.7.13

Further Breakup
Percentage

0.161

Zone 11

5.7.12

Sub-Breakup
Amount

1,723,030

Zone 10

5.7.11

Rate

1,723,030

Supply
5.7.10

Unit of
Measure

0.354
430,757

30 OF 227

Sl. No.

Description of Work
Supply

5.8.17

Unit of
Measure

Req.Qty

Exe.Qty

Nos

0.353

Rate

Sub-Breakup
Amount

Zone 17
Supply

5.8.18

Nos

Supply

0.353

Nos

Supply

0.353

Nos

Supply

0.353

Nos

Supply

0.353

Nos

Supply

0.353

Uptodate
Amount

Qty

Remarks

Amount

301,530

70%

58.84%

177,439

40.38%

121770

99.23%

299,209 MB No :- 555 & Pg No - 27

301,530

70%

58.84%

177,439

40.38%

121770

99.23%

299,209 MB No :- 555 & Pg No - 27

301,530

70%

37.48%

113,010

40.38%

121770

77.86%

234,780 MB No :- 12205 & Pg No - 33

301,530

70%

37.48%

113,010

40.38%

121770

77.86%

234,780 MB No :- 554 & Pg No - 25

301,530

70%

37.48%

113,010

40.38%

121770

77.86%

234,780 MB No :- 555 & Pg No - 27

301,530

70%

37.48%

113,010

40.38%

121770

77.86%

234,780 MB No :- 554 & Pg No - 25

301,530

70%

37.48%

113,015

40.38%

121770

77.86%

234,785 MB no :- 12206 & Pg no :- 38

301,530

70%

37.48%

113,010

40.38%

121770

77.86%

430,757
Nos

0.353

Zone 23
Supply

Qty

430,757

Zone 22

5.8.23

Present
Amount

430,757

Zone 21

5.8.22

Qty

430,757

Zone 20

5.8.21

Previous
Percentage

430,757

Zone 19

5.8.20

Amount

430,757

Zone 18

5.8.19

Further Breakup
Percentage

430,757
Nos

0.353
Total Amount :-

9,907,420

Total Cumilative Amount :-

Section Engineer

6,935,194

234,780 MB No :- 554 & Pg No - 25

4,866,600

1638864

6,505,464

2,643,313,265

266,885,612.00

2,910,198,877

Assistant Executive Engineer,


KBJNL, MAROL LIS, Sub-division
Ilkal

Executive Engineer,
KBJNL.ARBC Division,
Almatti

31 OF 227

RA BILL NO 9 & PART

MONTH: January 2015

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries,
Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure
Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Dated: 07-01-2014

Agt Value : Rs.

Breakup as per costing done by agency

Sl. No.

Description of Work

Req.Qty

Exe.Qty

Sub-Breakup

3,810,546,305

Further Breakup

Previous

Present

uptodate

Rate
Amount

Percentage

29722261
1292272

3.00%

1292272
1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

Amount

Percentage

Amount

Percentage

qty

Amount

qty

Amount

qty

Amount

904591

70%

75.10%

679380

23.51%

212708

98.61%

892088

904591

70%

74.92%

677739

23.64%

213807

98.56%

891546

904591

70%

74.30%

672104

24.24%

219271

98.54%

891375

904591

70%

74.26%

671720

24.28%

219655

98.54%

891375

904591

70%

74.26%

671720

24.28%

219655

98.54%

891375

904591

70%

74.26%

671720

24.28%

219655

98.54%

891375

904591

70%

74.26%

671720

24.28%

219655

98.54%

891375

904591

70%

74.26%

671720

24.28%

219655

98.54%

891375

904591

70%

74.26%

671720

24.28%

219655

98.54%

891375

904591

70%

74.26%

671720

24.28%

219655

98.54%

891375

904591

70%

74.26%

671720

11.06%

100075

85.32%

771795

904591

70%

74.26%

671720

11.06%

100075

85.32%

771795

904591

70%

74.26%

671720

11.06%

100075

85.32%

771795

904591

70%

4.38%

39590

4.38%

39590

904591

70%

4.38%

39590

4.38%

39590

904591

70%

4.38%

39590

4.38%

39590

904591

70%

4.38%

39590

4.38%

39590

904591

70%

4.38%

39590

4.38%

39590

904591

70%

4.33%

39162

4.33%

39162

904591

70%

4.33%

39162

4.33%

39162

904591

70%

4.32%

39091

4.32%

39091

904591

70%

4.32%

39091

4.32%

39091

904591

70%

4.32%

39091

4.32%

39091

753825

70%

20.25%

152644

99.37%

749053

Detailed engineering, preparation of designs and drawings

5DRIP SYSTEM
5.1 Primary HCU-Q=425 Cum/hr
5.1.1

1.000

Supply
5.1.2

Supply

0.986

Zone 3
1

Supply
5.1.4

0.985

Zone 4
1

Supply
5.1.5

0.985

Zone 5
Supply

5.1.6

0.985

0.985

Zone 6
Supply

5.1.7

Zone 7
1

Supply
5.1.8

Supply

Supply

Supply

Supply
Supply

0.853

0.853

Zone 13
Supply

5.1.14

1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

0.853

Zone 12

5.1.13

1292272

0.985

Zone 11

5.1.12

1292272

0.985

Zone 10

5.1.11

1292272

0.985

Zone 9

5.1.10

1292272

0.985

Zone 8

5.1.9

1292272

Zone 14
1

Supply
5.1.15

0.044
1292272

Zone 15
1

Supply
5.1.16

0.044
1292272

Zone 16
1

Supply
5.1.17

0.044
1292272

Zone 17
1

Supply
5.1.18

0.044
1292272

Zone 18
Supply

5.1.19

0.044

0.043

1292272

Zone 19
Supply

5.1.20

1292272

Zone 20
1

Supply
5.1.21

0.043
1292272

Zone 21
1

Supply
5.1.22

0.043
1292272

Zone 22
1

Supply
5.1.23

0.043
1292272

Zone 23
1

Supply

0.043

Secondary HCU

5.2.1

Zone 1
Supply

26.00%

0.986

Zone 2

5.1.3

5.2

990742039

Zone 1

1076894

10

24768551
1076894

9.937
Page 32

2.50%
79.12%

596409

Breakup as per costing done by agency

Sl. No.

Description of Work

Req.Qty

Exe.Qty

Amount

5.2.2

Zone 2
10

Supply
5.2.3

10

Supply

10

Supply

10

Supply
Supply
Supply

9.613

10

Supply

10

Supply

10

Supply

10

Supply

10

Supply
Supply

1076894

1076894

1076894

1076894

1076894

1076894

1076894

1076894

1076894

1076894

1076894

1076894

1076894

1076894

1076894

1076894

1076894

8.035

Zone 13

5.2.14

1076894

7.965

Zone 12

5.2.13

1076894

7.982

Zone 11

5.2.12

1076894

7.982

Zone 10

5.2.11

1076894

9.613

Zone 9

5.2.10

10

7.965

10

0.793

Supply

10

Supply

0.793

10

Supply

0.793

10

Supply

0.793

10

Supply

0.793

Supply

10

0.793

10

0.793

Supply

10

Supply

0.792

10

Supply

0.792

10

0.792

29722261

Automatic Electrical Valves per 4-6 growers parcel

5.3.1

Zone 1
100

Supply
5.3.2
Supply

100

95.751

100

95.751

Zone 3
Supply

5.3.4

Zone 4
100

Supply
5.3.5

100

Supply

100

Supply

100

Supply

100
Zone 9

1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

1292272

95.661

Zone 8
Supply

1292272

95.661

Zone 7

5.3.8

1292272

95.661

Zone 6

5.3.7

1292272

95.751

Zone 5

5.3.6

1292272

95.754

Zone 2

5.3.3

Amount

qty

Amount

753825

70%

79.12%

596409

19.68%

148368

98.80%

744777

753825

70%

79.12%

596409

17.01%

128194

96.13%

724603

753825

70%

79.12%

596409

17.01%

128194

96.13%

724603

753825

70%

79.12%

596409

17.01%

128194

96.13%

724603

753825

70%

79.12%

596409

17.01%

128194

96.13%

724603

753825

70%

79.12%

596409

17.01%

128194

96.13%

724603

753825

70%

79.12%

596409

17.01%

128194

96.13%

724603

753825

70%

79.12%

596409

0.70%

5301

79.82%

601710

753825

70%

79.12%

596409

0.70%

5301

79.82%

601710

753825

70%

79.12%

596409

0.53%

4007

79.65%

600416

753825

70%

72.60%

547298

7.75%

58421

80.35%

605719

753825

70%

79.12%

596409

0.53%

4007

79.65%

600416

753825

70%

7.93%

59810

7.93%

59810

753825

70%

7.93%

59810

7.93%

59810

753825

70%

7.93%

59810

7.93%

59810

753825

70%

7.93%

59810

7.93%

59810

753825

70%

7.93%

59810

7.93%

59810

753825

70%

7.93%

59810

7.93%

59810

753825

70%

7.93%

59810

7.93%

59810

753825

70%

7.92%

59693

7.92%

59693

753825

70%

7.92%

59693

7.92%

59693

753825

70%

7.92%

59693

7.92%

59693

904591

70%

11.05%

99967

84.70%

766215

95.75%

866182

904591

70%

11.05%

99967

84.70%

766215

95.75%

866182

904591

70%

11.05%

99967

84.70%

766215

95.75%

866182

904591

70%

11.05%

99967

84.70%

766215

95.75%

866182

904591

70%

11.05%

99967

84.61%

765339

95.66%

865306

904591

70%

11.05%

99967

84.61%

765339

95.66%

865306

904591

70%

11.05%

99967

84.61%

765339

95.66%

865306

904591

70%

11.05%

99967

84.61%

765339

95.66%

865306

1076894

Zone 23
Supply

qty

1076894

Zone 22

5.2.23

Amount

1076894

Zone 21

5.2.22

qty

1076894

Zone 20

5.2.21

Percentage

1076894

Zone 19

5.2.20

Amount

1076894

Zone 18

5.2.19

uptodate

1076894

Zone 17

5.2.18

Present

1076894

Zone 16

5.2.17

Previous

1076894

Zone 15

5.2.16

Further Breakup

1076894

Zone 14

5.2.15

5.3.9

9.613

10
Zone 8

5.2.9

5.3

10
Zone 7

5.2.8

1076894

Percentage

9.613

Zone 6

5.2.7

1076894

9.613

Zone 5

5.2.6

Amount

9.613

Zone 4

5.2.5

Percentage

1076894

9.880

Zone 3

5.2.4

Sub-Breakup

Rate

95.661
Page 33

3.00%

Breakup as per costing done by agency

Sl. No.

Description of Work

Req.Qty

Exe.Qty

100

95.661

Amount

Supply
5.3.10

Zone 10
100

Supply
5.3.11

100

Supply

100

Supply
Supply

5.3.15

1292272

1292272

1292272

1292272

1292272

1292272

100

91.975

100

11.050
11.050

100

Supply

11.050

100

Supply

11.050

100

Supply

11.050

Supply

100

11.050

100

11.050

Supply

100

Supply

11.050

100

Supply

11.050

100

11.050

Manual valves, fertilizer tank and fitting per grower


parcel

5.4.1

44583392

Zone 1
490

Supply
5.4.2
Supply

478

455.160

478

424.885

473

419.881

Zone 3
Supply

5.4.4

Zone 4
Supply

5.4.5

Zone 5
503

Supply
5.4.6

507

Supply

603

Supply
Supply

618

269.789

578

229.842

Zone 9
Supply

5.4.10

Zone 10
561

Supply
5.4.11

578

Supply

506

Supply

509

Supply
Supply

Zone 16

765339

qty
95.66%

Amount
865306

904591

70%

11.05%

99967

80.96%

732391

92.01%

832358

904591

70%

11.05%

99967

80.96%

732391

92.01%

832358

904591

70%

11.02%

99642

80.96%

732391

91.98%

832033

904591

70%

11.02%

99642

80.96%

732391

91.98%

832033

904591

70%

11.05%

99980

11.05%

99980

904591

70%

11.05%

99980

11.05%

99980

904591

70%

11.05%

99980

11.05%

99980

904591

70%

11.05%

99980

11.05%

99980

904591

70%

11.05%

99980

11.05%

99980

904591

70%

11.05%

99980

11.05%

99980

904591

70%

11.05%

99980

11.05%

99980

904591

70%

11.05%

99980

11.05%

99980

904591

70%

11.05%

99980

11.05%

99980

904591

70%

11.05%

99980

11.05%

99980

1263810

70%

17.39%

219784

77.95%

985081

95.34%

1204865

1232860

70%

15.26%

188157

79.96%

985758

95.22%

1173915

1232860

70%

15.01%

185029

73.88%

910785

88.89%

1095814

1853343

1853343

1219964

70%

13.56%

165423

75.21%

917495

88.77%

1082918

1868081

1868081

1297340

70%

15.49%

200946

69.36%

899780

84.85%

1100726

2221800

2221800

1307657

70%

16.16%

211263

68.81%

899780

84.97%

1111043

2277069

2277069

1555260

70%

29.50%

458867

12.75%

198362

42.25%

657229

2129686

2129686

1593948

70%

31.22%

497555

12.44%

198362

43.66%

695917

1490780

70%

26.46%

394387

13.31%

198362

39.77%

2067048

2067048

592749

2129686

2129686

1446934

70%

24.23%

350540

5.73%

82908

29.96%

433448

1864396

1864396

1490780

70%

25.21%

375854

6.80%

101441

32.01%

477295

1875450

1875450

1305077

70%

14.57%

190151

7.23%

94317

21.80%

284468

1312815

70%

15.07%

197889

7.18%

94317

22.25%

292206

1165800

70%

12.45%

145190

12.45%

145190

1315394

70%

22.41%

294784

22.41%

294784

4.50%

1665429
452

56.274

510

114.291

1879135

Zone 15
Supply

1742805

113.271

Zone 14

5.4.15

1742805

110.308

Zone 13

5.4.14

1761228

185.029

Zone 12

5.4.13

1761228

168.055

Zone 11

5.4.12

1761228

254.793

Zone 8

5.4.9

1761228

430.777

Zone 7

5.4.8

1805443

426.791

Zone 6

5.4.7

1805443

467.169

Zone 2

5.4.3

Amount

84.61%

1292272

Zone 23
Supply

qty

99967

1292272

Zone 22

5.3.23

Amount

11.05%

1292272

Zone 21

5.3.22

qty

70%

1292272

Zone 20

5.1.21

Percentage

904591

1292272

Zone 19

5.3.20

Amount

1292272

Zone 18

5.3.19

uptodate

1292272

Zone 17

5.3.18

Present

1292272

Zone 16

5.3.17

Previous

1292272
100

Supply

Further Breakup

1292272

Zone 15

5.3.16

5.4.16

1292272

Zone 14
Supply

5.4

1292272

Percentage

91.975

Zone 13

5.3.14

Amount

92.011

Zone 12

5.3.13

Percentage

92.011

Zone 11

5.3.12

Sub-Breakup

Rate

1956511
Page 34

Breakup as per costing done by agency

Sl. No.

Description of Work

Req.Qty

Exe.Qty

531

135.246

Amount

Supply
5.4.17

510

Supply

Supply
Supply

66.802
146.793
34172835

3363281
Zone 1
1

Supply

Supply

Supply

Supply

Supply

Supply
Supply

1.000

1.000

Zone 8
Supply

5.6.9

Zone 9
1

Supply
5.6.10

Supply

Supply

Supply
Supply

0.993

0.489

Supply

Supply

1315394

70%

17.44%

229449

17.44%

229449

1374716

70%

21.01%

288770

21.01%

288770

1212226

70%

10.42%

126280

10.42%

126280

1343766

70%

19.19%

257820

19.19%

257820

1302498

70%

9.70%

126295

9.70%

126295

1426300

70%

12.08%

172349

12.08%

172349

1632636

70%

23.19%

378685

23.19%

378685

23920984

70%

99.82%

23877791

24157694

70%

99.82%

24114501

99.82%

24114501

24183049

70%

99.82%

24139856

99.82%

24139856

603060

70%

52.09%

314157

26.38%

159074

78.47%

473231

603060

70%

52.09%

314157

47.91%

288904

100.00%

603061

603060

52.09%

314157

47.91%

288904

100.00%

603061

603060

70%

52.09%

314157

47.91%

288904

100.00%

603061

603060

70%

52.09%

314157

47.91%

288904

100.00%

603061

603060

70%

52.09%

314157

47.91%

288904

100.00%

603061

603060

70%

52.09%

314157

47.91%

288904

100.00%

603061

603060

70%

52.09%

314157

47.91%

288904

100.00%

603061

603060

70%

52.09%

314157

47.91%

288904

100.00%

603061

603060

70%

52.09%

314157

47.91%

288904

100.00%

603061

603060

70%

52.09%

314157

47.91%

288904

100.00%

603061

603060

70%

52.09%

314157

47.91%

288904

100.00%

603061

603060

70%

51.41%

310026

47.90%

288873

99.31%

598899

603060

70%

48.91%

294939

48.91%

294939

603060

70%

48.91%

294939

48.91%

294939

603060

70%

48.91%

294939

48.91%

294939

603060

70%

48.91%

294939

48.91%

294939

603060

70%

48.91%

294939

48.91%

294939

603060

70%

48.91%

294939

48.91%

294939

99.82%

23877791

430757

861515

430757

861515

430757

861515

430757

861515

430757

861515

430757

861515

1.00%

861515
1

Zone 20

861515

0.489

Zone 19
Supply

348880

861515
1

Supply

430757

0.489

Zone 18

5.6.19

Amount

861515
1

Supply

861515

0.489

Zone 17

5.6.18

25.47%

861515
1

Supply

430757

0.489

Zone 16

5.6.17

qty

861515

Zone 15

5.6.16

348880

861515

Zone 14

5.6.15

861515

1.000

Zone 13

5.6.14

430757

1.000

Zone 12

5.6.13

861515

1.000

Zone 11

5.6.12

430757

1.000

Zone 10

5.6.11

861515

1.000

Zone 7

5.6.8

430757

1.000

Zone 6

5.6.7

861515

1.000

Zone 5

5.6.6

430757

1.000

Zone 4

5.6.5

19814841
861515

1.000

Zone 3

5.6.4

430757

0.785

Zone 2

5.6.3

Amount

25.47%

34547213

Automation controller and communication to center

5.6.2

Amount

34510991

Zone 13
Supply

qty

80%

3359754

Supply

5.6.1

792593631
34172835

3326834
Zone 12

5.5.13

qty

70%

2332338

Zone 1

5.5.12

Percentage

1369558

2037572

633

Supply

Amount

1860712

Emitting pipe & drip manifold

5.5.1

5.6.20

48.985

Zone 23
Supply

5.6

99.980

505
553

Supply

5.5

521

Zone 22

5.4.23

uptodate

1919665

Zone 21

5.4.22

Percentage

48.974

Zone 20

5.4.21

Present

1731752
470

Supply

Amount

111.983

Zone 19

5.4.20

Previous

1963880
533

Supply

Percentage

88.944

Zone 18

5.4.19

Further Breakup

1879135

Zone 17

5.4.18

Sub-Breakup

Rate

0.489
861515
Page 35

Breakup as per costing done by agency

Sl. No.

Description of Work

Req.Qty

Exe.Qty

0.489

Amount

Supply
5.6.21

Supply

5.7.2
Supply

0.161

0.161

0.161

Supply

0.161

Supply

0.161

Supply

0.161

Supply

0.161

0.161

Supply

Supply

0.161

Supply

0.161

Other control Accessories sourced locally in India

5.8.1

Zone 1
1

Supply
5.8.2
Supply

0.965

0.965

Zone 3
Supply

5.8.4

Zone 4
1

Supply
5.8.5

Supply

Supply

Supply

Supply
Supply

0.742

0.742

Zone 10
Supply

5.8.11

Zone 11
1

Supply
5.8.12

Supply

Supply

430757

430757

430757

430757

430757

430757

430757

430757

430757

430757

430757

430757

430757

430757

430757

430757

430757

0.356

603060

70%

48.91%

294939

48.91%

294939

603060

70%

48.91%

294939

48.91%

294939

603060

70%

48.91%

294939

48.91%

294939

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

301530.2

70%

34.22%

103199

39.54%

119236

73.76%

222435

301530.2

70%

55.65%

167800

40.90%

123341

96.55%

291141

301530.2

70%

55.65%

167800

40.90%

123341

96.55%

291141

301530.2

70%

55.65%

167800

18.60%

56095

74.25%

223895

301530

70%

55.65%

167800

18.60%

56095

74.25%

223895

301530

70%

55.65%

167800

18.60%

56095

74.25%

223895

301530

70%

55.65%

167800

18.60%

56095

74.25%

223895

301530

70%

55.65%

167800

18.60%

56095

74.25%

223895

301530

70%

55.65%

167800

18.60%

56095

74.25%

223895

301530

70%

55.65%

167800

18.60%

56095

74.25%

223895

301530

70%

55.65%

167800

18.61%

56095

74.26%

223895

301530

70%

34.28%

103371

18.61%

56095

52.89%

159466

301530

70%

34.28%

103371

1.36%

4115

35.64%

107486

301530

70%

35.40%

106746

35.40%

106746

1.00%

430757

Zone 14
Supply

430757

0.529

Zone 13

5.8.14

430757

0.743

Zone 12

5.8.13

430757

0.742

Zone 9

5.8.10

430757

0.742

Zone 8

5.8.9

430757

0.742

Zone 7

5.8.8

430757

0.742

Zone 6

5.8.7

430757

0.742

Zone 5

5.8.6

430757

9907420
430757

0.738

Zone 2

5.8.3

294939

1723030

Zone 12
Supply

Amount

1723030

Zone 11

5.7.12

48.91%

1723030

Zone 10

5.7.11

qty

1723030

Zone 9

5.7.10

294939

1723030

Zone 8

5.7.9

Amount

48.91%

1723030

Zone 7

5.7.8

Amount

1723030

Zone 6

5.7.7

qty

1723030

Zone 5

5.7.6

qty

70%

1723030
1

Supply

Percentage

603060

4%

0.161

Zone 4

5.7.5

Amount

1723030
1

Supply

uptodate

1723030

Zone 3

5.7.4

5.8

3962968
1723030

Zone 2

5.7.3

Percentage

0.489

Zone 1
Supply

Present

861515

5.7 Radio net


5.7.1

Amount

0.489

Zone 23
Supply

Previous

861515
1

Supply

Percentage

0.489

Zone 22

5.6.23

Further Breakup

861515

Zone 21

5.6.22

Sub-Breakup

Rate

0.354
Page 36

Breakup as per costing done by agency

Sl. No.

Description of Work

Req.Qty

Exe.Qty

Amount

5.8.15

Supply

1
1

0.353

Supply

0.353

Supply

0.353

0.353

Amount

Percentage

301530

qty

Amount

qty

Amount

qty

Amount

70%

35.40%

106746

35.40%

106746

301530

70%

35.34%

106565

35.34%

106565

301530

70%

35.34%

106565

35.34%

106565

301530

70%

35.34%

106565

35.34%

106565

301530

70%

35.34%

106565

35.34%

106565

301530

70%

35.34%

106565

35.34%

106565

301530

70%

35.34%

106565

35.34%

106565

301530

70%

35.34%

106570

35.34%

106570

301530

70%

35.34%

106565

35.34%

106565

430757

Zone 20
Supply

430757

Zone 21
1

Supply

0.353
430757

Zone 22
1

Supply
5.8.23

Percentage

430757

Zone 19

5.8.22

uptodate

430757

Zone 18

5.8.21

Present

430757

Supply

5.8.20

Amount

0.353

Zone 17

5.8.19

Previous

430757

Supply

5.8.18

Percentage

0.354

Zone 16

5.8.17

Further Breakup

430757

Zone 15

5.8.16

Sub-Breakup

Rate

0.353
430757

Zone 23
1

Supply
Total

0.353
430757

51331040

GRAND TOTAL =

Assistant Executive Engineer,


KBJNL, MAROL LIS, Sub-division
Ilkal

Page 37

262878956

Executive Engineer,
KBJNL.ARBC Division,
Almatti

2298124881

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical
Works, EOT Crane, Supply Of Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Dated: 07-01-2014

Sl. No.

Agt Value : Rs.

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Amount

3810546305

Further Breakup
Percentage

Amount

Previous
Percentage

Present
Qty

Uptodate
Amount

Qty

Remarks

Qty

Amount

Amount

100%

11431639

100%

11431639

Detailed engineering, preparation of designs and drawings


Part A- Preliminaries.
1

Project Engineering and Design Services


Survey, investigations, setting out works, detailed topographical survey

1.1

for command area of 11,700 Ha

1.2

Detailed engineering, preparation of designs and drawings

11431639

50%

11431639

50%

Approval to Design and Drawings for Main and Feeder Pipeline

1.2 (a)

Approval to Design and Drawings for Main and Submains for Block

1.2 (b)

3429491.7

30%

100%

3429492

100%

3429492

3429491.7

30%

100%

3429492

100%

3429492

1.2 (c)

Approval to Design and Drawings for Drip net work

2286327.8

20%

100%

2286328

100%

2286328

1.2 (d)

Approval to Civil GAD

1143163.9

10%

100%

1143164

100%

1143164

1.2 (e)

Approval to Mechanical GAD

571581.95

5%

100%

571582

100%

571582

1.2 (f)

Approval to Surge Protection for Pipeline

571581.95

5%

100%

571582

100%

Total Amount :-

22863278

571582

22863278

22863278

Part B- Construction
2

Electro-Mechanical works
2.1

2.1.1

Design, supply, installation of pumping machinery and pump house electrical


works

83832019

88%

Pumps

41916010

50%

a Approval to Design and Drawings


b Supply
2.1.2

Motors

25149606

b Supply
Panels (all types)

1%

100%

419160

100%

419160

69%

100%

28922047

100%

28922047

30%

a Approval to Design and Drawings

2.1.3

419160.1
28922046.9

8383202

10%

4191601

5%

251496.06

1%

100%

251496

100%

251496

17353228.14

69%

100%

17353228

100%

17353228

83832.02

1%

100%

83832

100%

83832

41916.01

1%

41916

100%

a Approval to Design and Drawings


2.1.4

Valves (all types)


a Approval to Design and Drawings
Total Amount :-

100%

37724409

41916

47071679

47071679

3 Pipeline and related Civil Works


Construction of main and Branch pipelines including Earth work,
3.1

structures, supply, laying , jointing, testing and commissioning-(Bulk


Water Pipe line) Total Length Req=48547 Rmt

48547

1433771395

350mm/248kpa/9Bar--8608 Rmt

71688569.75

56%
5%

a).Supply

Mts

8608

8608

5829.69

50181999

70%

8608

50181972

8608

50181972

b).Earth work, Laying and Jointing

Mts

8608

7461.414

1915.47

16488371

23%

7461.414

14292115

7461.414

14292115

c).Testing

Mts

8608

899.536

166.56

1433771

2%

899.536

149827

899.536

149827

350mm/248kpa/12Bar--1453 Rmt

114701711.6

8%

a).Supply

Mts

1453

1453

55258.91

80291198

70%

1453

80291196

1453

80291196

b).Earth work, Laying and Jointing

Mts

1453

1284.0161

18156.5

26381394

23%

1284.016

23313238

1284.016

23313238

a).Supply

Mts

13308

13308

7541.63

100363998

70%

13308

100364012

13308

100364012

b).Earth work, Laying and Jointing

Mts

13308

12741.0792

2477.96

32976742

23%

12741.079

31571885

12741.079

31571885

c).Testing

Mts

13308

923.5752

215.48

2867543

2%

923.575

199012

923.575

199012

400mm/248kpa/9Bar--13308 Rmt

143377139.5

450mm/248kpa/9Bar--1073 Rmt

14337713.95

10%

1%

a).Supply

Mts

1073

1073

9353.59

10036400

70%

1073

10036402

1073

10036402

b).Earth work, Laying and Jointing

Mts

1073

791.9813

3073.32

3297674

23%

791.981

2434012

791.981

2434012

500mm/248kpa/9Bar--119 Rmt

2150657.0925

0%

a).Supply

Mts

119

119

12650.92

1505460

70%

119

1505459

119

1505459

b).Earth work, Laying and Jointing

Mts

119

115.0373

4156.73

494651

23%

115.037

478179

115.037

478179

600mm/248kpa/9Bar--4154 Rmt

86026283.7

6%

a).Supply

Mts

4154

4154

14496.49

60218399

70%

4154

60218419

4154

60218419

b).Earth work, Laying and Jointing

Mts

4154

3753.9698

4763.13

19786045

23%

3753.97

17880646

3753.970

17880646

c).Testing

Mts

4154

857.801

414.19

1720526

2%

857.801

355293

857.801

355293

700mm/248kpa/9Bar--4193 Rmt

129039425.55

9%

a).Supply

Mts

4193

4193

21542.48

90327598

70%

4193

90327619

4193

90327619

b).Earth work, Laying and Jointing

Mts

4193

3696.1295

7078.24

29679068

23%

3696.130

26162092

3696.130

26162092

38 OF 227

Sl. No.
8

10

11

12

13

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Sub-Breakup

Rate

800mm/248kpa/9Bar--4068 Rmt

Further Breakup

Amount

Percentage

157714853.45

11%

Amount

Previous
Percentage

Present

Qty

Amount

Qty

Uptodate
Amount

Qty

Remarks

Amount

a).Supply

Mts

4068

4068

27138.74

110400397

70%

4068

110400394

4068

110400394

b).Earth work, Laying and Jointing

Mts

4068

3823.92

8917.01

36274416

23%

3823.92

34097933

3823.92

34097933

900mm/248kpa/9Bar--976 Rmt

43013141.85

3%

a).Supply

Mts

976

976

30849.59

30109199

70%

976

30109200

b).Earth work, Laying and Jointing

Mts

976

971.9984

10136.29

9893023

23%

972.00

9852458

900mm/248kpa/12Bar--3343 Rmt

200727995.3

976

30109200

971.998

9852458

14%

a).Supply

Mts

3343

3343

42030.99

140509597

70%

3343

140509600

3343

140509600

b).Earth work, Laying and Jointing

Mts

3343

3083.9175

13810.18

46167439

23%

3083.92

42589456

3083.918

42589456

1000mm/248kpa/9Bar--3589 Rmt

215065709

15%

a).Supply

Mts

3589

3589

41946.5

150545996

70%

3589

150545989

3589

150545989

b).Earth work, Laying and Jointing

Mts

3589

3105.9206

13782.42

49465113

23%

3105.921

42807102

3105.921

42807102

1000mm/248kpa/12Bar--2373 Rmt

143377139.5

10%

a).Supply

Mts

2373

2373

42294.14

100363998

70%

2373

100363994

2373

100363994

b).Earth work, Laying and Jointing

Mts

2373

2219.9415

13896.65

32976742

23%

2219.942

30849750

2219.942

30849750

78785744

1100mm/248kpa/9Bar--1290 Rmt

112551054.5075

8%

a).Supply

Mts

1290

1290

61074.22

78785738

70%

1290

78785744

1290

b).Earth work, Laying and Jointing

Mts

1290

1163.967

20067.24

25886743

23%

1163.967

23357605

1163.967

Total Amount :-

1433771395

1339429236.9765

1304030603.1098

23357605
1304030603.1098

Construction of Main Feeder Pipe line including supply, Earth work,


Structure, laying , jointing, testing and commissioning--(total Length =
3.2
3.2.1

3.2.2

3.2.3

128.886 Km)

128.886

Supply of pipes

Mts

6.36

6.36

3615410

22994006

70%

6.175

22325155

0.185

668851

6.36

22994006

Earth work, Laying and Jointing

Mts

6.36

2.411

1187920

7555173

23%

2.214

2630056

0.197

234020

2.411

2864076

48653086
Supply of pipes

Mts

9.42

9.42

3615410

34057160

70%

8.265

29881362

1.155

4175798

9.42

34057160

Earth work, Laying and Jointing

Mts

9.42

4.248

1187920

11190210

23%

2.9

3444969

1.348

1601317

4.248

5046286

5.202

18807362

1.885

2239230

3.991

4740990

5.46

19740137

ZONE 3

ZONE 4

3.2.5

ZONE 5

26867659
Supply of pipes

Mts

5.202

5.202

3615410

18807362

70%

5.202

18807362

Earth work, Laying and Jointing

Mts

5.202

3.991

1187920

6179562

23%

2.106

2501760

19740137

70%

5.46

19740137

5.784

20911530

28200196
Supply of pipes

3.2.6

ZONE 6

3.2.7

ZONE 7

3.2.8

ZONE 8

3615410

Supply of pipes

Mts

5.784

5.784

3615410

20911530

70%

Mts

5.784

2.969

1068389

6179562

23%

17722739

70%

4.902

20260757

70%

Mts

4.902

4.902

3615410

ZONE 13

20911530

2.969

3172047

17722739

4.902

17722739

Mts

5.604

5.604

3615410

5.604

20260756

5.604

20260756

5.322

19241211

27487444
Supply of pipes

Mts

5.322

5.322

3615410

19241211

70%

Earth work, Laying and Jointing

Mts

5.322

2.43

1023192

5445427

23%

5.322

19241211

2.43

2486356

2.43

2486356

4.35

15727032

3.223

4034623

3.223

4034623

0.834

3015252

7.428

26855264

3.406

2496920

3.406

2496920

5.376

19436443

2.396

2426942

2.396

2426942

5.346

19327981

22467189
Supply of pipes

Mts

4.35

4.35

3615410

15727032

70%

Earth work, Laying and Jointing

Mts

4.35

3.223

1251822

5445427

23%

4.35

15727032

38364662
Supply of pipes

Mts

7.428

7.428

3615410

26855263

70%

Earth work, Laying and Jointing

Mts

7.428

3.406

733095

5445427

23%

6.594

23840012

27766347
Supply of pipes

Mts

5.376

5.376

3615410

19436443

70%

Earth work, Laying and Jointing

Mts

5.376

2.396

1012914

5445427

23%

5.376

19436443

19327981

70%

5.346

19327981

5.496

19870292

27611401
Supply of pipes

Mts

5.346

5.346

3615410
28386132

Supply of pipes

Mts

5.496

5.496

3615410

19870292

70%

Earth work, Laying and Jointing

Mts

5.496

1.947

990798

5445427

23%

ZONE 14

ZONE 15

5.784

28943938

ZONE 11

3.2.13

0
3172047

2.969

25318198

ZONE 10

ZONE 12

3.2.15

5.46

ZONE 9

3.2.12

3.2.14

5.46

Earth work, Laying and Jointing

Supply of pipes

3.2.11

Mts

29873614

Supply of pipes

3.2.10

0.26

32848580

ZONE 2

3.2.4

3.2.9

665679576

ZONE 1

5.496

19870292

1.947

1929084

1.947

1929084

4.398

15900572

4.369

5409520

4.369

5409520

22715103
Supply of pipes

Mts

4.398

4.398

3615410

15900572

70%

Earth work, Laying and Jointing

Mts

4.398

4.369

1238160

5445427

23%

4.398

15900572

29439765

39 OF 227

Sl. No.

3.2.16

3.2.17

Unit of
Measure

Description of Work

3.2.19

ZONE 19

3.2.23

Amount

Further Breakup
Percentage

Previous

Present

Amount

Percentage

Qty

Amount

5.7

20607836

Supply of pipes

Mts

5.7

5.7

3615410

20607836

70%

Earth work, Laying and Jointing

Mts

5.7

3.108

955338

5445427

23%

Qty

Uptodate
Amount

Qty

Remarks

Amount

5.7

20607836

3.108

2969191

3.108

2969191

4.584

16573038

2.028

2409102

2.438

2896150

4.788

17310582

3.322

3778135

3.322

3778135

1.134

4099875

4.986

18026433

4.65

16811655

1.3

1522377

1.3

1522377

5.352

19349673

0.954

970653

0.954

970653

5.424

19609983

1.29

1295096

1.29

1295096

5.124

18525360

0.533

566435

0.533

566435

28308658

23675769
Supply of pipes

Mts

4.584

4.584

3615410

16573038

70%

4.584

16573038

Earth work, Laying and Jointing

Mts

4.584

2.438

1187920

5445427

23%

0.41

487047

4.788

17310582

24729403
Supply of pipes

Mts

4.788

4.788

3615410

17310582

70%

Earth work, Laying and Jointing

Mts

4.788

3.322

1137307

5445427

23%

18026433

70%

3.852

13926558

4.65

16811655

25752047
Supply of pipes

3.2.22

Sub-Breakup

Rate

ZONE 17

ZONE 18

3.2.21

Exe.Qty

ZONE 16

3.2.18

3.2.20

Req.Qty

Mts

4.986

4.986

3615410
24016651

Supply of pipes

Mts

4.65

4.65

3615410

16811656

70%

Earth work, Laying and Jointing

Mts

4.65

1.3

1171060

5445427

23%

ZONE 20

27642390
Supply of pipes

Mts

5.352

5.352

3615410

19349673

70%

Earth work, Laying and Jointing

Mts

5.352

0.954

1017456

5445427

23%

ZONE 21

5.352

19349673

28014261
Supply of pipes

Mts

5.424

5.424

3615410

19609983

70%

Earth work, Laying and Jointing

Mts

5.424

1.29

1003950

5445427

23%

ZONE 22

5.424

19609983

26464799
Supply of pipes

Mts

5.124

5.124

3615410

18525359

70%

Earth work, Laying and Jointing

Mts

5.124

0.533

1062730

5445427

23%

ZONE 23

5.124

18525360

40440941
Supply of pipes

Mts

7.83

7.83

3615410

28308659

70%

7.83

28308658

7.83

Earth work, Laying and Jointing

Mts

7.83

2.86

1187920

9301416

23%

2.86

3397452

2.86

Total Amount :-

665679575

577172175

466477211

40.013

51500825

3397452
517978036

Construction of Pipe network of Mains and Submains for Blocks----3.3


3.3.1

3.3.2

3.3.3

3.3.4

3.3.5

3.3.6

3.3.7

3.3.8

3.3.9

3.3.10

(Total Length 1950.030 Km)

1950.03

435252031

ZONE 1
Supply of pipes

Kms

91.872

91.872

156242

14354257

70%

91.872

14354257

91.872

14354257

Earth work, Laying and Jointing

Kms

91.872

26.623

51337

4716398.86

23%

10

513366

16.623

853369

26.623

1366735

11355819

7.893

1233217

80.574

12589036

12.46

639654

22.46

639654

ZONE 2

17984337
Supply of pipes

Kms

80.574

80.574

156242

12589035.9

70%

72.681

Earth work, Laying and Jointing

Kms

80.574

22.46

51337

4136397.51

23%

10

ZONE 3

17701763
Supply of pipes

Kms

79.308

79.308

156242

12391234.1

70%

78.867

12322331

0.441

68903

79.308

12391234

Earth work, Laying and Jointing

Kms

79.308

26.122

51337

4071405.49

23%

2.402

123311

23.72

1217705

26.122

1341015

84.234

13160881

84.234

13160881

7.742

397448

7.742

397448

78.018

12189682

23.126

1187211

23.126

1187211

81.642

12755902

9.486

486979

9.486

486979

84.784

13246815

7.409

380353

7.409

380353

90.054

14070209

2.25

115507

2.25

115507

90.384

14121769

24.333

1249174

24.333

1249174

0.306

47810

82.698

12920894

1.714

87991

1.714

87991

86.526

13518988

ZONE 4

18801259
Supply of pipes

Kms

84.234

84.234

156242

13160881.3

70%

Earth work, Laying and Jointing

Kms

84.234

7.742

51337

4324289.57

23%

ZONE 5

17413831
Supply of pipes

Kms

78.018

78.018

156242

12189681.7

70%

Earth work, Laying and Jointing

Kms

78.018

23.126

51337

4005181.13

23%

ZONE 6
Supply of pipes

Kms

81.642

81.642

156242

12755902.6

70%

Earth work, Laying and Jointing

Kms

81.642

9.486

51337

4191225.14

23%

Supply of pipes

Kms

84.784

84.784

156242

13246814.7

70%

Earth work, Laying and Jointing

Kms

84.784

7.409

51337

4352524.83

23%

Supply of pipes

Kms

90.054

90.054

156242

14070209.3

70%

Earth work, Laying and Jointing

Kms

90.054

2.25

51337

4623068.77

23%

12755902

84.784

13246815

90.054

14070209

20173956
Supply of pipes

Kms

90.384

90.384

156242

14121769.2

70%

Earth work, Laying and Jointing

Kms

90.384

24.333

51337

4640009.88

23%

ZONE 10

ZONE 12

81.642

20100299

ZONE 9

3.3.12

12189682

18924021

ZONE 8

ZONE 11

78.018

18222718

ZONE 7

3.3.11

17%

20506082

90.384

14121769

18458420
Supply of pipes

Kms

82.698

82.698

156242

12920894

70%

Earth work, Laying and Jointing

Kms

82.698

1.714

51337

4245436.6

23%

13518988

70%

82.392

12873084

19312840
Supply of pipes

Kms

86.526

86.526

156242

86.526

13518988

18569575

40 OF 227

Sl. No.

Unit of
Measure

Description of Work

3.3.13

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Amount

83.196

83.196

156242

12998702.5

70%

83.196

12998702

83.196

14.84

51337

4271002.25

23%

5.434

278963

80.622

12596536

Supply of pipes

Kms

80.622

80.622

156242

12596535.7

70%

Earth work, Laying and Jointing

Kms

80.622

4.412

51337

4138861.73

23%

Supply of pipes

Kms

75.722

75.722

156242

11830950.6

70%

Earth work, Laying and Jointing

Kms

75.722

18.673

51337

3887312.34

23%

Supply of pipes

Kms

90.474

90.474

156242

14135830.8

70%

Earth work, Laying and Jointing

Kms

90.474

10.361

51337

4644630.12

23%

90.474

83.196

12998702

482872

14.84

761836

80.622

12596536

4.412

226497

4.412

226497

75.722

11830950

18.673

958609

18.673

958609

90.474

14135831

10.361

531899

10.361

531899

88.29

13794599

18.917

971135

30.13

1546773

14135831

Kms

88.29

88.29

156242

13794599

70%

88.29

13794599

Kms

88.29

30.13

51337

4532511.1

23%

11.213

575638

19902095
Supply of pipes

Kms

89.166

89.166

156242

13931466.5

70%

89.166

13931467

89.166

13931467

Earth work, Laying and Jointing

Kms

89.166

10.638

51337

4577481.85

23%

2.393

122849

8.245

423271

10.638

546119

82.908

12953705

2.826

441540

85.734

13395245

5.372

275780

5.372

275780

78.432

12254366

15.441

792689

15.441

792689

77.754

12148434

16.795

862199

18.049

926575

89.088

13919280

22.729

1166830

22.729

1166830

82.494

12889021

16.535

848851

16.535

848851

15462325

19136063
Supply of pipes

Kms

85.734

85.734

156242

13395244

70%

Earth work, Laying and Jointing

Kms

85.734

5.372

51337

4401294

23%

17506237
Supply of pipes

Kms

78.432

78.432

156242

12254366

70%

Earth work, Laying and Jointing

Kms

78.432

15.441

51337

4026435

23%

78.432

12254366

17354906
Supply of pipes

Kms

77.754

77.754

156242

12148434

70%

77.754

12148434

Earth work, Laying and Jointing

Kms

77.754

18.049

51337

3991628

23%

1.254

64376

89.088

13919280

19884685
Supply of pipes

Kms

89.088

89.088

156242

13919280

70%

Earth work, Laying and Jointing

Kms

89.088

22.729

51337

4573478

23%

18412886
Supply of pipes

Kms

82.494

82.494

156242

12889020

70%

Earth work, Laying and Jointing

Kms

82.494

16.535

51337

4234964

23%

ZONE 23

82.494

12889021

22089036
Supply of pipes

Kms

98.964

98.964

156242

15462325

70%

98.964

15462325

98.964

Earth work, Laying and Jointing

Kms

98.964

16.534

51337

5080478

23%

16.534

848800

16.534

Total Amount :4

0
9.406

11830950

Supply of pipes

ZONE 22

3.3.23

75.722

Earth work, Laying and Jointing

ZONE 21

3.3.22

Remarks

Amount

19706570

ZONE 20

3.3.21

Qty

20194044

ZONE 19

3.3.20

Uptodate
Amount

16901358

ZONE 18

3.3.19

Qty

17995051

ZONE 17

3.3.18

Amount

Kms

ZONE 16

3.3.17

Present

Qty

Kms

ZONE 15

3.3.16

Previous
Percentage

Supply of pipes

ZONE 14

3.3.15

Amount

Earth work, Laying and Jointing


ZONE 13

3.3.14

Further Breakup
Percentage

414745950

385988179.16

305412255

15947494

848800
321359749

CIVIL WORKS

4.1

Construction of Sump

10955321

23%

Earthwork

0.95

2738830

25%

95%

2601889

95%

2601889

95 % Amount claimed

Foundation Concrete work

0.42408

2738830

25%

42%

1161483

42%

1161483

95 % Amount claimed

Structure concrete work

0.09861

5477661

50%

10%

540152

10%

540152

95 % Amount claimed

4.2

Pump House

11431639

24%

Earthwork

0.95

2857910

25%

95%

2715015

95%

2715015

95 % Amount claimed

Foundation Concrete work

0.95

1143164

10%

95%

1086006

95%

1086006

95 % Amount claimed

Structure concrete work

0.44

7430565

65%

44%

3105976

44%

3105976

95 % Amount claimed

4.3

Construction of Control rooms

23 Nos

25244869

53%

Earthwork

23

14

274401

6311217

25%

2346128

1303405

14.00

3649533

95 % Amount claimed

Foundation Concrete work

23

11

109760

2524487

10%

521360

625632

11.00

1146992

95 % Amount claimed

Structure concrete work

23

11

713442

16409165

65%

3388849

4066619

11.00

7455468

95 % Amount claimed

Total Amount :-

786999821

748023682

17466857

5995656

23462514

5 DRIP SYSTEM
5.1 Primary HCU-Q=425 Cum/hr
5.1.1

Zone 1

5.1.2

Zone 2

5.1.3

Zone 3

5.1.4

Zone 4

5.1.5

Zone 5

23

29722261

3%

1292272
Supply

Nos

1.00

904591

70%

98.61%

892083

1.38%

12503

100%

904586

904591

70%

98.56%

891546

1.44%

13045

100%

904591

904591

70%

98.54%

891375

1.46%

13216

100%

904591

904591

70%

98.54%

891375

1.46%

13216

100%

904591

1292272
Supply

Nos

1.00
1292272

Supply

Nos

1.00
1292272

Supply

Nos

1.00
1292272

41 OF 227

Sl. No.

Description of Work
Supply

5.1.6

Zone 6

5.1.7

Zone 7

5.1.8

Zone 8

Req.Qty

Exe.Qty

Nos

1.00

Nos

5.1.12

Zone 12

5.1.13

Zone 13

5.1.14

Zone 14

5.1.15

Zone 15

5.1.16

Zone 16

5.1.17

Zone 17

5.1.18

Zone 18

5.1.19

Zone 19

5.1.20

Zone 20

5.1.21

Zone 21

5.1.22

Zone 22

5.1.23

Zone 23

Uptodate
Amount

Qty

Remarks

Amount

904591

70%

98.54%

891375

1.46%

13216

100%

904591

904591

70%

98.54%

891375

1.46%

13216

100%

904591

Nos

1.00

904591

70%

98.54%

891375

1.46%

13216

100%

904591

Nos

1.00

904591

70%

98.54%

891375

1.46%

13216

100%

904591

Nos

1.00

904591

70%

98.54%

891375

1.46%

13216

100%

904591

Nos

1.00

904591

70%

98.54%

891375

1.46%

13216

100%

904591

Nos

0.87

904591

70%

85.32%

771795

1.46%

13207

86.78%

785002

Nos

0.87

904591

70%

85.32%

771795

1.60%

14473

86.92%

786268

904591

70%

85.32%

771795

1.60%

14473

86.92%

786268

904591

70%

4.38%

39590

73%

660170

77.36%

699760

904591

70%

4.38%

39590

73%

660351

77.38%

699941

904591

70%

4.38%

39590

73%

660351

77.38%

699941

904591

70%

4.38%

39590

73%

660351

77.38%

699941

904591

70%

4.38%

39590

73%

660351

77.38%

699941

904591

70%

4.33%

39162

73%

660351

77.33%

699513

904591

70%

4.33%

39162

73%

660351

77.33%

699513

904591

70%

4.32%

39091

73%

660351

77.32%

699442

904591

70%

4.32%

39091

73%

660351

77.32%

699442

904591

70%

4.32%

39091

72%

651305

76.32%

1292272
Supply

Nos

0.87
1292272

Supply

Nos

0.77
1292272

Supply

Nos

0.77
1292272

Supply

Nos

0.77
1292272

Supply

Nos

0.77
1292272

Supply

Nos

0.77
1292272

Supply

Nos

0.77
1292272

Supply

Nos

0.77
1292272

Supply

Nos

0.77
1292272

Supply

Nos

0.77
1292272

Supply

Nos

0.76

Total Amount :-

846444342.999999

20805582.7

11623566

6767714

690396
18391275

Secondary HCU
Zone 1

1076894
Supply

Nos

10

10

Zone 2

5.2.3

Zone 3

5.2.4

Zone 4

5.2.5

Zone 5

5.2.6

Zone 6

5.2.7

Zone 7

5.2.8

Zone 8

5.2.9

Zone 9

5.2.10

Zone 10

753825

70%

99.37%

749053

0.63%

4772

100%

753825

753825

70%

98.80%

744777

1.20%

9048

100%

753825

753825

70%

96.13%

724603

3.88%

29222

100%

753825

753825

70%

96.13%

724603

3.88%

29222

100%

753825

753825

70%

96.13%

724603

3.88%

29222

100%

753825

753825

70%

96.13%

724603

3.88%

29222

100%

753825

753825

70%

96.13%

724603

3.88%

29222

100%

753825

753825

70%

96.13%

724603

3.88%

29222

100%

753825

753825

70%

79.82%

601710

3.87%

29173

83.69%

630883

753825

70%

79.82%

601710

3.87%

29173

83.69%

630883

753825

70%

79.65%

600416

3.87%

29173

83.52%

629589

1076894
Supply

Nos

10

10
1076894

Supply

Nos

10

10
1076894

Supply

Nos

10

10
1076894

Supply

Nos

10

10
1076894

Supply

Nos

10

10
1076894

Supply

Nos

10

10
1076894

Supply

Nos

10

10
1076894

Supply

Nos

10

8.37
1076894

Supply
5.2.11

Qty

1292272
Supply

5.2.2

Amount

1292272
Supply

5.2

Present

Qty

1292272
Supply

5.2.1

Previous
Percentage

1292272
Supply

Zone 11

Amount

1292272
Supply

5.1.11

Further Breakup
Percentage

1.00

Zone 9

Zone 10

Sub-Breakup
Amount

1292272
Supply

5.1.10

Rate

1292272
Supply

5.1.9

Unit of
Measure

Nos

10

8.37

Zone 11

1076894
Supply

Nos

10

8.35

42 OF 227

Sl. No.
5.2.12

Description of Work

Nos

10

8.42

Zone 13
Nos

10

Zone 17

5.2.18

Zone 18

5.2.19

Zone 19

5.2.20

Zone 20

5.2.21

Zone 21

5.2.22

Zone 22

5.2.23

Zone 23

Qty

Present
Amount

Qty

Uptodate
Amount

Qty

Remarks

Amount

753825

70%

80.35%

605719

3.88%

29248

84.23%

634967

753825

70%

79.65%

600416

3.88%

29248

83.53%

629664

Nos

10

8.35

753825

70%

7.93%

59810

75.59%

569817

83.52%

629627

Nos

10

8.35

753825

70%

7.93%

59810

75.59%

569817

83.52%

629627

Nos

10

8.35

753825

70%

7.93%

59810

75.59%

569817

83.52%

629627

753825

70%

7.93%

59810

75.59%

569817

83.52%

629627

753825

70%

7.93%

59810

75.59%

569817

83.52%

629627

753825

70%

7.93%

59810

75.59%

569817

83.52%

629627

753825

70%

7.93%

59810

75.59%

569817

83.52%

629627

753825

70%

7.92%

59693

75.61%

569967

83.53%

629660

753825

70%

7.92%

59693

75.61%

569967

83.53%

629660

59693

75.61%

569967

83.53%

1076894
Supply

Nos

10

8.35
1076894

Supply

Nos

10

8.35
1076894

Supply

Nos

10

8.35
1076894

Supply

Nos

10

8.35
1076894

Supply

Nos

10

8.35
1076894

Supply

Nos

10

8.35
1076894

Supply

Nos

10

8.35

Total Amount :-

753825
24768551

7.92%

17337985.7

9449168

6033791

629660
15482959

Automatic Electrical Valves per 4-6 growers parcel

5.3.1

Zone 1
Supply

5.3.2

1292272
Nos

100

100

Zone 2
Supply

5.3.3

5.3.4

Nos

100

100

100

100

Zone 4

5.3.5

100

100

Zone 5

5.3.6

100

100

Zone 6

5.3.7

100

100

Zone 7

5.3.8

100

100

Zone 8

5.3.9

Nos

Supply

100

100

Nos

Supply

100

100

Nos

Supply

100

100

Nos

Supply

100

100

Nos

Supply

100

100

Nos

Supply

100

100

Nos

Supply

100

100

Nos

Supply

100

100

Nos

904591

904591

70%

95.75%

866182

4.25%

38409

100%

904591

904591

70%

95.75%

866182

4.25%

38409

100%

904591

904591

70%

95.66%

865306

4.34%

39285

100%

904591

904591

70%

95.66%

865306

4.34%

39285

100%

904591

904591

70%

95.66%

865306

4.34%

39285

100%

904591

904591

70%

95.66%

865306

4.34%

39285

100%

904591

904591

70%

95.66%

865306

4.34%

39285

100%

904591

904591

70%

92.01%

832358

7.99%

72233

100%

904591

904591

70%

92.01%

832358

7.99%

72233

100%

904591

904591

70%

91.98%

832033

8.02%

72558

100%

904591

904591

70%

91.98%

832033

8.02%

72558

100%

904591

904591

70%

11.05%

99980

88.95%

804611

100%

904591

904591

70%

11.05%

99980

88.95%

804611

100%

904591

100

100

904591

70%

11.05%

99980

88.95%

804611

100%

904591

904591

70%

11.05%

99980

8.02%

72548

19.07%

172528

1292272
Nos

Zone 18

100%

1292272

Zone 17
Supply

38409

1292272

Zone 16

5.3.17

4.25%

1292272

Zone 15

5.3.16

866182

1292272

Zone 14

5.3.15

95.75%

1292272

Zone 13

5.3.14

70%

1292272

Zone 12

5.3.13

904591

1292272

Zone 11

5.3.12

904591

1292272

Zone 10

5.3.11

100%

1292272

Zone 9

5.3.10

38409

1292272
Nos

Supply

4.25%

1292272
Nos

Supply

866182

1292272
Nos

Supply

95.75%

1292272
Nos

Supply

70%

1292272
Nos

Supply

904591
1292272

Zone 3
Supply

5.3.18

Previous
Percentage

1076894
Supply

5.3

Amount

1076894
Supply

5.2.17

Further Breakup
Percentage

1076894

Zone 15

Zone 16

Sub-Breakup
Amount

8.35

Zone 14

5.2.16

Rate

1076894

Supply
5.2.15

Exe.Qty

1076894

Supply
5.2.14

Req.Qty

Zone 12
Supply

5.2.13

Unit of
Measure

100

19.07
1292272

43 OF 227

Sl. No.

Description of Work
Supply

5.3.19

Unit of
Measure

Req.Qty

Exe.Qty

Nos

100

19.07

Rate

Sub-Breakup
Amount

Zone 19
Nos

100

19.07

Zone 20
Nos

100

19.07

Zone 21
Nos

100

19.07

Zone 22
Nos

100

19.07

Zone 23
Nos

100

19.07

Total Amount :5.4

44583392

Nos

490

Nos

478

Nos

478

473

Supply

Nos

473

468

Supply

Nos

503

498

Supply

Nos

507

502

Supply

Nos

603

598

Supply

Nos

618

613

Supply

Nos

578

573

Supply

Nos

561

284

Supply

Nos

578

301

Supply

Nos

506

229

Supply

Nos

509

232

Supply

Nos

452

175

Supply

Nos

510

203

Supply

Nos

531

224

Supply

Nos

510

203

Supply

Nos

533

226

Supply

Nos

470

163

Supply

Nos

521

214

8.02%

72548

19.07%

172528

904591

70%

11.05%

99980

8.02%

72548

19.07%

172528

904591

70%

11.05%

99980

8.02%

72548

19.07%

172528

904591

70%

11.05%

99980

8.02%

72548

19.07%

12119840

3561306

172528
15681146

1263810

70%

95.34%

1204865

3.71%

46895

99.05%

1251760

1232860

70%

95.22%

1173915

3.80%

46895

99.03%

1220810

1232860

70%

88.89%

1095814

10.14%

124995

99.03%

1220809

1219964

70%

88.77%

1082918

10.25%

124995

99.02%

1207913

1297340

70%

84.85%

1100726

14.23%

184564

99.08%

1285290

1307657

70%

84.97%

1111043

14.11%

184564

99.08%

1295607

1555260

70%

42.25%

657229

56.97%

885981

99.22%

1543210

1593948

70%

43.66%

695917

55.58%

885981

99.24%

1581898

1490780

70%

39.77%

592749

59.43%

885981

99.20%

1478730

1446934

70%

29.96%

433448

20.73%

300017

50.69%

733465

1490780

70%

32.01%

477295

20.12%

300017

52.14%

777312

1305077

70%

21.80%

284468

23.53%

307142

45.33%

591610

1312815

70%

22.25%

292206

23.40%

307142

45.65%

599348

1165800

70%

12.45%

145190

26.35%

307142

38.80%

452332

1315394

70%

22.41%

294784

17.41%

229042

39.82%

523826

1369558

70%

25.47%

348880

16.73%

229109

42.20%

577989

1315394

70%

17.44%

229449

22.38%

294377

39.82%

523826

1374716

70%

21.01%

288770

21.41%

294377

42.42%

583147

1212226

70%

10.42%

126280

24.28%

294377

34.70%

420657

1343766

70%

19.19%

257820

21.91%

294377

41.10%

552197

1302498

70%

9.70%

126295

24.02%

312910

33.72%

439205

1426300

70%

12.08%

172349

27.39%

390658

39.47%

563007

1632636

70%

23.19%

378685

21.02%

343108

44.21%

1860712

Zone 21
Supply

Nos

505

170
2037572

Zone 22
Supply

Nos

553

218
2332338

Zone 23
Supply

Nos
Total Amount :-

Emitting pipe & drip manifold

99980

1919665

Zone 20

5.4.23

11.05%

1731752

Zone 19

5.4.22

70%

1963880

Zone 18

5.4.21

904591

1879135

Zone 17

5.4.20

172528

1956511

Zone 16

5.4.19

19.07%

1879135

Zone 15

5.4.18

72548

1665429

Zone 14

5.4.17

8.02%

1875450

Zone 13

5.4.16

99980

1864396

Zone 12

5.4.15

11.05%

2129686

Zone 11

5.4.14

70%

2067048

Zone 10

5.4.13

904591

2129686

Zone 9

5.4.12

172528

2277069

Zone 8

5.4.11

19.07%

2221800

Zone 7

5.4.10

72548

1868081

Zone 6

5.4.9

8.02%

1853343

Zone 5

5.4.8

99980

1742805

Zone 4

5.4.7

11.05%

1761228

Supply

5.4.6

70%

5%

473

Zone 3

5.4.5

Remarks

Amount

1761228

Supply

5.4.4

Qty

904591

20805582.7

485

Zone 2

5.4.3

Uptodate
Amount

1805443

Zone 1
Supply

5.5

29722261

Manual valves, fertilizer tank and fitting per grower parcel

5.4.2

Qty

1292272

Supply

5.4.1

Present
Amount

1292272

Supply
5.3.23

Qty

1292272

Supply
5.3.22

Previous
Percentage

1292272

Supply
5.1.21

Amount

1292272

Supply
5.3.20

Further Breakup
Percentage

633

280
44583392

31208373.340562

12571095

7574649

721793
20145744

80%

44 OF 227

Sl. No.

Description of Work

5.5.1

Unit of
Measure

Req.Qty

Exe.Qty

Mts

3326834

3320827

5.5.2

Zone 2

5.5.3

Mts

3276778

3270722

Mts

3257121

34461

Mts

3324053

34470

Mts

3372997

34476

Mts

3302037

34467

Mts

3435457

34484

Mts

3441823

34484

Mts

3435328

34484

Mts

3341017

34472

Mts

3249691

34460

Mts

3359754

3353707

Mts

3363281

3357227

Mts

3144563

3138510

Mts

3267865

3261810

Mts

3390591

3384532

Mts

3318554

3312497

Mts

3375403

3369345

Mts

3359235

3353178

Mts

3388749

3382691

Mts

3409192

3403133

Mts

3434300

3428241

Mts

3586875

34501

Zone 3

Zone 4

Zone 5

Zone 6

Zone 7

Zone 8

Zone 9

Zone 10

Zone 11

Zone 12

Zone 13

Zone 14

Zone 15

Zone 16

Zone 17

Zone 18

Zone 19

Zone 20

Zone 21

Zone 22

Zone 23

Total Amount :-

Supply

0.785

Nos

Supply

1.000

Nos

Supply

1.000

Nos

Supply

1.000

Nos

1.04%

247850

1.04%

247850

24252913

70%

1.02%

247894

1.02%

247894

23742691

70%

1.04%

247830

1.04%

247830

24702020

70%

1.00%

247948

1.00%

247948

24747793

70%

1.00%

247953

1.00%

247953

24701093

70%

1.00%

247948

1.00%

247948

24022968

70%

1.03%

247865

1.03%

247865

23366308

70%

1.06%

247781

1.06%

247781

24157693

70%

99.82%

24114501

0.9982

24114501

24183049

70%

99.82%

24139856

99.82%

24139856

22610402

70%

99.81%

22566881

99.81%

22566881

23496984

70%

99.81%

23453441

99.81%

23453441

24379417

70%

99.82%

24335855

99.82%

24335855

23861451

70%

99.82%

23817901

99.82%

23817901

24270216

70%

99.82%

24226656

99.82%

24226656

24153962

70%

99.82%

24110405

99.82%

24110405

24366176

70%

99.82%

24322614

99.82%

24322614

24513169

70%

99.82%

24469604

99.82%

24469604

24693701

70%

99.82%

24650132

99.82%

24650132

25790765

70%

0.96%

248072

0.96%

248072

554815542.008

72132148

241949936

314082085

1%

603060

70%

78.47%

473231

603060

70%

100.00%

603060

70%

603060

21.53%

129829

100%

603060

603061

100.00%

603061

100.00%

603061

100.00%

603061

70%

100.00%

603061

100.00%

603061

1.000

603060

70%

100.00%

603061

100.00%

603061

603060

70%

100.00%

603061

100.00%

603061

861515
Nos

Zone 7

70%

861515

Zone 6
Supply

23900994

861515

Zone 5

5.6.6

247788

861515

Zone 4

5.6.5

1.06%

861515

Zone 3

5.6.4

247788

861515
Nos

Zone 2

5.6.3

1.06%

792593631
19814841

Zone 1

5.6.2

70%

36843950

Automation controller and communication to center

Supply

23419728

35276715

Supply

5.6.1

23517521

35018813

Supply
5.5.23

99.82%

34808822

Supply
5.5.22

23517521

34505661

Supply
5.5.21

99.82%

34671737

Supply
5.5.20

70%

34087788

Supply
5.5.19

23561066

34827738

Supply
5.5.18

23877791

33567119

Supply
5.5.17

99.82%

32300574

Supply
5.5.16

23877791.4243532

34547213

Supply
5.5.15

99.82%

34510991

Supply
5.5.14

70%

33380439

Supply
5.5.13

23920984

34318526

Supply
5.5.12

Remarks

Amount

35287276

Supply
5.5.11

Qty

35353990

Supply
5.5.10

Uptodate
Amount

35288600

Supply
5.5.9

Qty

33918130

Supply
5.5.8

Present
Amount

34647019

Supply
5.5.7

Qty

34144277

Supply
5.5.6

Previous
Percentage

33456755

Supply
5.5.5

Amount

33658665

Supply
5.5.4

Further Breakup
Percentage

34172835

Supply

5.6.7

Sub-Breakup
Amount

Zone 1
Supply

5.6

Rate

1.000
861515

45 OF 227

Sl. No.

Description of Work
Supply

5.6.8

Unit of
Measure

Req.Qty

Exe.Qty

Nos

1.000

Supply

Nos

Nos

1.000

Supply

Nos

1.000

Supply

Nos

1.000

Supply

Nos

1.000

Supply

Nos

0.993

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Supply

Nos

0.489

Total Amount :-

19814845
3962968

5.7 Radio net

Nos

0.161

5.7.3

Nos

0.161

5.7.4

Nos

0.161

5.7.5

Nos

0.161

Supply

Nos

0.161

Supply

Nos

0.161

Supply

Nos

0.161

Supply

Nos

0.161

Supply

Nos

0.161

Supply

Nos

0.161

Supply

Nos

0.161

Supply

Nos

1.000

Zone 13
Supply

603060

70%

100.00%

603061

100.00%

603061

603060

70%

100.00%

603061

100.00%

603061

603060

70%

100.00%

603061

100.00%

603061

603060

70%

99.31%

598899

0.69%

4131.03

99.99%

603030

603060

70%

48.91%

294939

51.09%

308121

100.00%

603060

603060

70%

48.91%

294939

51.09%

308121

100.00%

603060

603060

70%

48.91%

294939

51.09%

308121

100.00%

603060

603060

70%

48.91%

294939

51.09%

308121

100.00%

603060

603060

70%

48.91%

294939

51.09%

308121

100.00%

603060

603060

70%

48.91%

294939

51.09%

308121

100.00%

603060

603060

70%

48.91%

294939

51.09%

308121

100.00%

603060

603060

70%

48.91%

294939

51.09%

308121

100.00%

603060

603060

70%

48.91%

294939

51.09%

308121

100.00%

603060

603060

70%

48.91%

294939

51.09%

308121

100.00%

13870380

10655191

3215170.02946616

603060
13870361

4%

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

1206121

70%

16.05%

193595

16.05%

193595

16.05%

193595

1723030

Zone 12

5.7.13

603061

1723030

Zone 11

5.7.12

100.00%

1723030

Zone 10

5.7.11

603061

1723030

Zone 9

5.7.10

100.00%

1723030

Zone 8

5.7.9

70%

1723030

Zone 7

5.7.8

603060

1723030

Zone 6

5.7.7

603061

1723030

Zone 5

5.7.6

100.00%

1723030

Zone 4
Supply

603061

1723030

Zone 3
Supply

100.00%

1723030

Zone 2
Supply

70%

1723030

Zone 1

5.7.2

603060

861515

Zone 23

Supply

603061

861515

Zone 22

5.7.1

100.00%

861515

Zone 21

5.6.23

603061

861515

Zone 20

5.6.22

100.00%

861515

Zone 19

5.6.21

70%

861515

Zone 18

5.6.20

603060

861515

Zone 17

5.6.19

Remarks

Amount

861515

Zone 16

5.6.18

Qty

861515

Zone 15

5.6.17

Uptodate
Amount

861515

Zone 14

5.6.16

Qty

861515

Zone 13

5.6.15

Present
Amount

861515

Zone 12

5.6.14

Qty

861515

Zone 11

5.6.13

Previous
Percentage

861515

Zone 10

5.6.12

Amount

861515

Supply

5.6.11

Further Breakup
Percentage

1.000

Zone 9

5.6.10

Sub-Breakup
Amount

861515

Zone 8

5.6.9

Rate

1723030
Nos

0.161

0
1206121

70%

16.05%

193595

46 OF 227

Sl. No.

Description of Work

5.7.14

Unit of
Measure

Req.Qty

Exe.Qty

Nos

0.161

Zone 14

Zone 15
Nos

Nos

Nos

Nos

Nos

Nos

Nos

1206121

Nos

1206121

1206121
1723030

Supply

Nos

5.8

1206121

9907420

Zone 1
Supply

5.8.2

Nos

Supply

0.738

Nos

Supply

0.965

Nos

Supply

0.965

Nos

Supply

0.742

Nos

Supply

0.742

Nos

Supply

0.742

Nos

Supply

0.742

Nos

Supply

0.742

Nos

Supply

0.742

Nos

Supply

0.742

Nos

Supply

0.743

Nos

Supply

0.529

Nos

Supply

0.356

Nos

Supply

0.354

Nos

Supply

0.354

Nos

Supply

0.353

Nos

Supply

0.353

Nos

16.05%

193595

16.05%

193595

70%

16.05%

193595

16.05%

193595

70%

16.05%

193595

16.05%

193595

70%

16.05%

193595

16.05%

193595

70%

16.05%

193595

16.05%

193595

193595

16.05%

70%

16.05%

34374432

2323140

2129543

193595
4452683

1%

301530

70%

73.76%

222435

25.11%

75709

98.87%

298143

301530

70%

96.55%

291141

2.08%

6263

98.63%

297404

301530

70%

96.55%

291141

2.08%

6263

98.63%

297404

301530

70%

74.25%

223895

24.38%

73510

98.63%

297405

301530

70%

74.25%

223895

24.38%

73510

98.63%

297405

301530

70%

74.25%

223895

24.38%

73510

98.63%

297405

301530

70%

74.25%

223895

24.38%

73510

98.63%

297405

301530

70%

74.25%

223895

24.38%

73510

98.63%

297405

301530

70%

74.25%

223895

2.08%

6263

76.33%

230158

301530

70%

74.25%

223895

2.08%

6263

76.33%

230158

301530

70%

74.26%

223895

2.08%

6263

76.34%

230158

301530

70%

52.89%

159466

23.44%

70691

76.34%

230157

301530

70%

35.64%

107486

23.44%

70691

59.09%

178177

301530

70%

35.40%

106746

23.44%

70691

58.84%

177437

301530

70%

35.40%

106746

23.44%

70691

58.84%

177437

301530

70%

35.34%

106565

23.50%

70874

58.84%

177439

301530

70%

35.34%

106565

23.50%

70874

58.84%

177439

0.353

301530

70%

35.34%

106565

2.14%

6445

37.48%

113010

301530

70%

35.34%

106565

2.14%

6445

37.48%

113010

430757
Nos

Zone 20

70%

430757

Zone 19
Supply

193595

430757

Zone 18

5.8.19

16.05%

430757

Zone 17

5.8.18

193595

430757

Zone 16

5.8.17

16.05%

430757

Zone 15

5.8.16

70%

430757

Zone 14

5.8.15

193595

430757

Zone 13

5.8.14

16.05%

430757

Zone 12

5.8.13

193595

430757

Zone 11

5.8.12

16.05%

430757

Zone 10

5.8.11

70%

430757

Zone 9

5.8.10

193595

430757

Zone 8

5.8.9

16.05%

430757

Zone 7

5.8.8

193595

430757

Zone 6

5.8.7

16.05%

430757

Zone 5

5.8.6

70%

430757

Zone 4

5.8.5

193595

430757

Zone 3

5.8.4

16.05%

430757

Zone 2

5.8.3

5.8.20

53069323

Other control Accessories sourced locally in India

5.8.1

193595

0.161

Total Amount :-

16.05%

0.161

Zone 23

70%

1723030

Supply

Remarks

Amount

0.161

Zone 22

5.7.23

1206121

1723030

Supply

Qty

0.161

Zone 21

5.7.22

1206121

1723030

Supply

Uptodate
Amount

0.161

Zone 20

5.7.21

1206121

1723030

Supply

Qty

0.161

Zone 19

5.7.20

1206121

1723030

Supply

Present
Amount

0.161

Zone 18

5.7.19

1206121

1723030

Supply
5.7.18

Qty

0.161

Zone 17

Previous
Percentage

1206121

1723030

Supply

Amount
0

0.161

Zone 16

5.7.17

Further Breakup
Percentage

1723030

Supply
5.7.16

Sub-Breakup
Amount
1723030

Supply
5.7.15

Rate

0.353
430757

47 OF 227

Sl. No.

Description of Work
Supply

5.8.21

Unit of
Measure

Req.Qty

Exe.Qty

Nos

0.353

Rate

Zone 21
Supply

5.8.22

Nos

Supply

0.353

Amount

Previous
Percentage

Qty

Present
Amount

Qty

Uptodate
Amount

Qty

Remarks

Amount

301530

70%

35.34%

106565

2.14%

6445

37.48%

113010

301530

70%

35.34%

106565

2.14%

6445

37.48%

113010

301530

70%

35.34%

106570

2.14%

6445

37.48%

113015

301530

70%

35.34%

106565

2.14%

6445

37.48%

430757
Nos

0.353

Zone 23
Supply

Further Breakup
Percentage

430757

Zone 22

5.8.23

Sub-Breakup
Amount

430757
Nos

0.353
Total Amount :Total Cumilative Amount :-

9907420

6935194

113010

3928845

937755

4866600

2298119580

345613840

2643738712

Assistant Executive Engineer,


KBJNL, MAROL LIS, Sub-division
Ilkal

Executive Engineer,
KBJNL.ARBC Division,
Almatti

48 OF 227

Project Name :
Agreement No. and date :
Agreement cost :
Contractor :
S.NO
1

1.2(a)
1.2(b)
1.2(c)
1.2(d)
1.2(e)
1.2(f)

Ramthal (Marol) Stage


55/2013-14 dated 07.01.2
Rs. 381.0546
M/s. NETAFIM- MEIL

Description
2
Detailed engineering, preparation of designs
and drawings
Part A- Preliminaries.
Project Engineering and Design Services
1
1.1 Survey & Investigation
Detailed Engineering and preparation of
1.2 designs
Approval to Design and Drawings for Main and
Feeder Pipeline
Approval to Design and Drawings for Main and
Sub mains for Block
Approval to Design and Drawings for Drip net
work
Approval to Civil GAD
Approval to Mechanical GAD
Approval to Surge Protection for Pipeline

Unit
3

Page 49 of 227

Qty
4

0.60%
1

No

No

No

No
No

1
1

No

Part B- Construction
2 Electro-Mechanical works
Design, supply, installation of pumping
2.1 machinery and pump house electrical works

As per Agrm

2.50%

S.NO

Description

Unit

As per Agrm
Qty

2.1.1
a
b
c
d

Pumps
Approval to Design and Drawings
Supply
Erection
Commissioning

Set
Set
Set
Set

1
10
10
10

2.1.2
a
b
c
d

Motors
Approval to Design and Drawings
Supply
Erection
Commissioning

Set
Set
Set
Set

1
10
10
10

2.1.3
a
b
c
d

Panels (all types)


Approval to Design and Drawings
Supply
Erection
Commissioning

Set
Set
Set
Set

1
1
1
1

2.1.4
a
b
c
d

Valves (all types)


Approval to Design and Drawings
Supply
Erection
Commissioning

Set
Set
Set
Set

1
10
10
10

2.1.4
a
b
d

Surge Protection Devices


Approval to Design and Drawings
Surge Tanks
Commissioning

Nos
Nos
Nos

6
6
6

2.2.1
a

2.2 Construction of 33 KV Electrical sub station


Transformers
Supply
Page 50 of 227

8%
Set

1
1

S.NO

Description

Unit

As per Agrm

b
c

Erection
Commissioning

Set
Set

Qty
1
1

2.2.2
a
b
c

Other related Material


Supply
Erection
Commissioning

LS
Ls
LS

LS
LS
LS

Set
Set
Set

1
1
1

a
b
c

2.3 Laying of 33 KV line from KPTCL substation


to Work site
Supply
Erection
Commissioning
3 Pipeline and related Civil Works
Construction of main and Branch
pipelines(Bulk water supply) including Earth
work, structures, supply, laying , jointing,
3.1 testing and commissioning1 350mm/248kpa/9Bar--8608 Rmt
a).Supply
b).Earth work, Laying and Jointing
c).Testing
d).Commissioning
2 350mm/248kpa/12Bar--1453 Rmt
a).Supply
b).Earth work, Laying and Jointing
c).Testing
d).Commissioning
Page 51 of 227

67.19%

Rmt

8608
8608
8608
8608

Rmt

1453
1453
1453
1453

S.NO

Description

Unit

As per Agrm
Qty

3 400mm/248kpa/9Bar--13308 Rmt
a).Supply
b).Earth work, Laying and Jointing
c).Testing
d).Commissioning
4 450mm/248kpa/9Bar--1073 Rmt
a).Supply
b).Earth work, Laying and Jointing
c).Testing
d).Commissioning
5 500mm/248kpa/9Bar--119 Rmt
a).Supply
b).Earth work, Laying and Jointing
c).Testing
d).Commissioning
6 600mm/248kpa/9Bar--4154 Rmt
a).Supply
b).Earth work, Laying and Jointing
c).Testing
d).Commissioning
7 700mm/248kpa/9Bar--4193 Rmt
a).Supply
b).Earth work, Laying and Jointing
c).Testing
d).Commissioning
8 800mm/248kpa/9Bar--4068 Rmt
a).Supply
Page 52 of 227

Rmt

13308
13308
13308
13308

Rmt

1073
1073
1073
1073

Rmt

119
119
119
119

Rmt

4154
4154
4154
4154

Rmt

4193
4193
4193
4193

Rmt

4068

S.NO

Description

Unit

Qty
4068
4068
4068

b).Earth work, Laying and Jointing


c).Testing
d).Commissioning
9 900mm/248kpa/9Bar--976 Rmt
a).Supply
b).Earth work, Laying and Jointing
c).Testing
d).Commissioning
10 900mm/248kpa/12Bar--3343 Rmt
a).Supply
b).Earth work, Laying and Jointing
c).Testing
d).Commissioning
11 1000mm/248kpa/9Bar--3589 Rmt
a).Supply
b).Earth work, Laying and Jointing
c).Testing
d).Commissioning

12 1000mm/248kpa/12Bar--2373 Rmt
a).Supply
b).Earth work, Laying and Jointing
c).Testing
d).Commissioning
13 1100mm/248kpa/9Bar--1290 Rmt
a).Supply
b).Earth work, Laying and Jointing
Page 53 of 227

As per Agrm

Rmt

976
976
976
976

Rmt

3343
3343
3343
3343

Rmt

3589
3589
3589
3589

Rmt

2373
2373
2373
2373

Rmt

1290
1290

S.NO

Description

Unit

As per Agrm
Qty
1290
1290

c).Testing
d).Commissioning

Construction of Main Feeder Pipe line


3.2 including supply, Earth work, Structure,
laying , jointing, testing and commissioning
(for 23 Zones)
ZONE 1
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 2
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 3
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 4
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
Page 54 of 227

128.886

Kms

6.360
6.360
6.360
6.360
6.360
9.420
9.420
9.420
9.420
9.420
5.202
5.202
5.202
5.202
5.202
5.460
5.460
5.460
5.460
5.460

S.NO

Description

Unit

As per Agrm
Qty

ZONE 5
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 6
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 7
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 8
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 9
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 10
Page 55 of 227

5.784
5.784
5.784
5.784
5.784
4.902
4.902
4.902
4.902
4.902
5.604
5.604
5.604
5.604
5.604
5.322
5.322
5.322
5.322
5.322
4.350
4.350
4.350
4.350
4.350
7.428

S.NO

Description
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 11
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 12
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 13
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 14
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 15
Supply of Pipes
Earthwork,Laying and Jointing
Page 56 of 227

Unit

As per Agrm
Qty
7.428
7.428
7.428
7.428
5.376
5.376
5.376
5.376
5.376
5.346
5.346
5.346
5.346
5.346
5.496
5.496
5.496
5.496
5.496
4.398
4.398
4.398
4.398
4.398
5.700
5.700
5.700

S.NO

Description

Unit

As per Agrm
Qty
5.700
5.700

Testing
Commissioning
ZONE 16
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 17
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 18
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 19
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 20
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
Page 57 of 227

4.584
4.584
4.584
4.584
4.584
4.788
4.788
4.788
4.788
4.788
4.986
4.986
4.986
4.986
4.986
4.650
4.650
4.650
4.650
4.650
5.352
5.352
5.352
5.352
5.352

S.NO

Description

Unit

As per Agrm
Qty

ZONE 21

5.424
5.424
5.424
5.424
5.424

Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 22

5.124
5.124
5.124
5.124
5.124

Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 23

7.830
7.830
7.830
7.830
7.830

Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
Construction of Pipe network of Mains and
3.3 Sub mains for Blocks
ZONE 1
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 2
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Page 58 of 227

Kms

1950.030
91.872
91.872
91.872
91.872
91.872
80.574
80.574
80.574
80.574

S.NO

Description

Unit

As per Agrm
Qty
80.574

Commissioning
ZONE 3
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 4
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 5
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 6
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 7
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
Page 59 of 227

79.308
79.308
79.308
79.308
79.308
84.234
84.234
84.234
84.234
84.234
78.018
78.018
78.018
78.018
78.018
81.642
81.642
81.642
81.642
81.642
84.784
84.784
84.784
84.784
84.784

S.NO

Description
ZONE 8
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 9
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 10
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 11
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 12
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 13
Supply of Pipes
Page 60 of 227

Unit

As per Agrm
Qty
90.054
90.054
90.054
90.054
90.054
90.384
90.384
90.384
90.384
90.384
82.698
82.698
82.698
82.698
82.698
86.526
86.526
86.526
86.526
86.526
83.196
83.196
83.196
83.196
83.196
80.622
80.622

S.NO

Description
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 14
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 15
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 16
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 17
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 18
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Page 61 of 227

Unit

As per Agrm
Qty
80.622
80.622
80.622
75.722
75.722
75.722
75.722
75.722
90.474
90.474
90.474
90.474
90.474
88.290
88.290
88.290
88.290
88.290
89.166
89.166
89.166
89.166
89.166
85.734
85.734
85.734
85.734

S.NO

Description

Unit

As per Agrm
Qty
85.734

Commissioning
ZONE 19
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 20
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 21
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 22
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
ZONE 23
Supply of Pipes
Earthwork,Laying and Jointing
Testing
Commissioning
Page 62 of 227

78.432
78.432
78.432
78.432
78.432
77.754
77.754
77.754
77.754
77.754
89.088
89.088
89.088
89.088
89.088
82.494
82.494
82.494
82.494
82.494
98.964
98.964
98.964
98.964
98.964

S.NO

Description

Unit

As per Agrm
Qty

a
b
c
a
b
c

3.4 Construction of Structures on Pipe line


network
4 CIVIL WORKS
4.1 Construction of Sump
Earthwork
Foundation Concrete work
Structure concrete work
Earth Work
Foundation Concrete work
Structure Concrete Work

a
b
c

4.2 Pump House


Earth work
Foundation Concrete work
Structure Concrete Work

a
b
c
a
b
c

4.3 Construction of Control rooms


Earthwork
Foundation Concrete work
Structure concrete work
Earth work
Foundation Concrete work
Structure Concrete Work

Nos
No
No
No

26%

5.1.1

5 DRIP SYSTEM ***


5.1 Primary Head Control Unit
Zone 1

LS

LS

1.25%
No
No
No

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
23
100%
100%
100%
100%
100%
100%

1.00
Supply
Installation
Commissioning

5.1.2

Zone 2

1.00
Supply

Page 63 of 227

S.NO

Description

Unit

As per Agrm
Qty

Installation
Commissioning
5.1.3

Zone 3

1.00
Supply
Installation
Commissioning

5.1.4

Zone 4

1.00
Supply
Installation
Commissioning

5.1.5

Zone 5

1.00
Supply
Installation
Commissioning

5.1.6

Zone 6

1.00
Supply
Installation
Commissioning

5.1.7

Zone 7

1.00
Supply
Installation
Commissioning

5.1.8

Zone 8

1.00
Supply
Installation
Commissioning

5.1.9

Zone 9

1.00
Supply
Installation
Commissioning

5.1.10

Zone 10

1.00
Supply

Page 64 of 227

S.NO

Description

Unit

As per Agrm
Qty

Installation
Commissioning
5.1.11

Zone 11

1.00
Supply
Installation
Commissioning

5.1.12

Zone 12

1.00
Supply
Installation
Commissioning

5.1.13

Zone 13

1.00
Supply
Installation
Commissioning

5.1.14

Zone 14

1.00
Supply
Installation
Commissioning

5.1.15

Zone 15

1.00
Supply
Installation
Commissioning

5.1.16

Zone 16

1.00
Supply
Installation
Commissioning

5.1.17

Zone 17

1.00
Supply
Installation
Commissioning

5.1.18

Zone 18

1.00
Supply

Page 65 of 227

S.NO

Description

Unit

As per Agrm
Qty

Installation
Commissioning
5.1.19

Zone 19

1.00
Supply
Installation
Commissioning

5.1.20

Zone 20

1.00
Supply
Installation
Commissioning

5.1.21

Zone 21

1.00
Supply
Installation
Commissioning

5.1.22

Zone 22

1.00
Supply
Installation
Commissioning

5.1.23

Zone 23

1.00
Supply
Installation
Commissioning

Sub-total

5.2.1

5.2 Secondary Head Control Unit


Zone 1

10.00
Supply
Installation
Commissioning

5.2.2

Zone 2

10.00
Supply
Installation

Page 66 of 227

S.NO

Description

Unit

As per Agrm
Qty

Commissioning
5.2.3

Zone 3

10.00
Supply
Installation
Commissioning

5.2.4

Zone 4

10.00
Supply
Installation
Commissioning

5.2.5

Zone 5

10.00
Supply
Installation
Commissioning

5.2.6

Zone 6

10.00
Supply
Installation
Commissioning

5.2.7

Zone 7

10.00
Supply
Installation
Commissioning

5.2.8

Zone 8

10.00
Supply
Installation
Commissioning

5.2.9

Zone 9

10.00
Supply
Installation
Commissioning

5.2.10

Zone 10

10.00
Supply
Installation

Page 67 of 227

S.NO

Description

Unit

As per Agrm
Qty

Commissioning
5.2.11

Zone 11

10.00
Supply
Installation
Commissioning

5.2.12

Zone 12

10.00
Supply
Installation
Commissioning

5.2.13

Zone 13

10.00
Supply
Installation
Commissioning

5.2.14

Zone 14

10.00
Supply
Installation
Commissioning

5.2.15

Zone 15

10.00
Supply
Installation
Commissioning

5.2.16

Zone 16

10.00
Supply
Installation
Commissioning

5.2.17

Zone 17

10.00
Supply
Installation
Commissioning

5.2.18

Zone 18

10.00
Supply
Installation

Page 68 of 227

S.NO

Description

Unit

As per Agrm
Qty

Commissioning
2.2.19

Zone 19

10.00
Supply
Installation
Commissioning

5.2.20

Zone 20

10.00
Supply
Installation
Commissioning

5.2.21

Zone 21

10.00
Supply
Installation
Commissioning

5.2.22

Zone 22

10.00
Supply
Installation
Commissioning

5.2.23

Zone 23

10.00
Supply
Installation
Commissioning

Sub Total
5.3
5.3.1

5.3.2

Automatic Electrical Valves per 4-6 growers


parcel
Zone 1
Supply
Installation
Commissioning
Zone 2
Supply
Installation
Page 69 of 227

1.00

1.00

S.NO

Description

Unit

As per Agrm
Qty

Commissioning
5.3.3

Zone 3

1.00
Supply
Installation
Commissioning

5.3.4

Zone 4

1.00
Supply
Installation
Commissioning

5.3.5

Zone 5

1.00
Supply
Installation
Commissioning

5.3.6

Zone 6

1.00
Supply
Installation
Commissioning

5.3.7

Zone 7

1.00
Supply
Installation
Commissioning

5.3.8

Zone 8

1.00
Supply
Installation
Commissioning

5.3.9

Zone 9

1.00
Supply
Installation
Commissioning

5.3.10

Zone 10

1.00
Supply
Installation

Page 70 of 227

S.NO

Description

Unit

As per Agrm
Qty

Commissioning
5.3.11

Zone 11

1.00
Supply
Installation
Commissioning

5.3.12

Zone 12

1.00
Supply
Installation
Commissioning

5.3.13

Zone 13

1.00
Supply
Installation
Commissioning

5.3.14

Zone 14

1.00
Supply
Installation
Commissioning

5.3.15

Zone 15

1.00
Supply
Installation
Commissioning

5.3.16

Zone 16

1.00
Supply
Installation
Commissioning

5.3.17

Zone 17

1.00
Supply
Installation
Commissioning

5.3.18

Zone 18

1.00
Supply
Installation

Page 71 of 227

S.NO

Description

Unit

As per Agrm
Qty

Commissioning
5.3.19

Zone 19

1.00
Supply
Installation
Commissioning

5.3.20

Zone 20

1.00
Supply
Installation
Commissioning

5.3.21

Zone 21

1.00
Supply
Installation
Commissioning

5.3.22

Zone 22

1.00
Supply
Installation
Commissioning

5.3.23

Zone 23

1.00
Supply
Installation
Commissioning

Sub Total
Manual valves, fertilizer tank and fitting per
5.4 grower parcel
5.4.1

Zone 1

490.00
Supply
Installation
Commissioning

5.4.2

Zone 2

478.00
Supply
Installation

Page 72 of 227

S.NO

Description

Unit

As per Agrm
Qty

Commissioning
5.4.3

Zone 3

478.00
Supply
Installation
Commissioning

5.4.4

Zone 4

473.00
Supply
Installation
Commissioning

5.4.5

Zone 5

503.00
Supply
Installation
Commissioning

5.4.6

Zone 6

507.00
Supply
Installation
Commissioning

5.4.7

Zone 7

603.00
Supply
Installation
Commissioning

5.4.8

Zone 8

618.00
Supply
Installation
Commissioning

5.4.9

Zone 9

578.00
Supply
Installation
Commissioning

5.4.10

Zone 10

561.00
Supply
Installation

Page 73 of 227

S.NO

Description

Unit

As per Agrm
Qty

Commissioning
5.4.11

Zone 11

578.00
Supply
Installation
Commissioning

5.4.12

Zone 12

506.00
Supply
Installation
Commissioning

5.4.13

Zone 13

509.00
Supply
Installation
Commissioning

5.4.14

Zone 14

452.00
Supply
Installation
Commissioning

5.4.15

Zone 15

510.00
Supply
Installation
Commissioning

5.4.16

Zone 16

531.00
Supply
Installation
Commissioning

5.4.17

Zone 17

510.00
Supply
Installation
Commissioning

5.4.18

Zone 18

533.00
Supply
Installation

Page 74 of 227

S.NO

Description

Unit

As per Agrm
Qty

Commissioning
5.4.19

Zone 19

470.00
Supply
Installation
Commissioning

5.4.20

Zone 20

521.00
Supply
Installation
Commissioning

5.4.21

Zone 21

505.00
Supply
Installation
Commissioning

5.4.22

Zone 22

553.00
Supply
Installation
Commissioning

5.4.23

Zone 23

633.00
Supply
Installation
Commissioning

Sub Total

5.5.1

5.5 Emitting pipe & drip manifold


Zone 1

3326834
Supply
Installation
Commissioning

5.5.2

Zone 2

3276778
Supply
Installation
Commissioning

Page 75 of 227

S.NO
5.5.3

Description

Unit

As per Agrm
Qty
3257121

Zone 3
Supply
Installation
Commissioning

5.5.4

Zone 4

3324053
Supply
Installation
Commissioning

5.5.5

Zone 5

3372997
Supply
Installation
Commissioning

5.5.6

Zone 6

3302037
Supply
Installation
Commissioning

5.5.7

Zone 7

3435457
Supply
Installation
Commissioning

5.5.8

Zone 8

3441823
Supply
Installation
Commissioning

5.5.9

Zone 9

3435328
Supply
Installation
Commissioning

5.5.10

Zone 10

3341017
Supply
Installation
Commissioning

Page 76 of 227

S.NO
5.5.11

Description

Unit

As per Agrm
Qty
3249691

Zone 11
Supply
Installation
Commissioning

5.5.12

Zone 12

3359754
Supply
Installation
Commissioning

5.5.13

Zone 13

3363281
Supply
Installation
Commissioning

5.5.14

Zone 14

3144563
Supply
Installation
Commissioning

5.5.15

Zone 15

3267865
Supply
Installation
Commissioning

5.5.16

Zone 16

3390591
Supply
Installation
Commissioning

5.5.17

Zone 17

3318554
Supply
Installation
Commissioning

5.5.18

Zone 18

3375403
Supply
Installation
Commissioning

Page 77 of 227

S.NO
5.5.19

Description

Unit

As per Agrm
Qty
3359235

Zone 19
Supply
Installation
Commissioning

5.5.20

Zone 20

3388749
Supply
Installation
Commissioning

5.5.21

Zone 21

3409192
Supply
Installation
Commissioning

5.5.22

Zone 22

3434300
Supply
Installation
Commissioning

5.5.23

Zone 23

3586875
Supply
Installation
Commissioning

Sub Total

5.6.1

Automation controller and central


communication unit including SCADA
5.6 software and personal computers
Zone 1

1.00

Supply
Installation
Commissioning
5.6.2

Zone 2

1.00
Supply
Installation

Page 78 of 227

S.NO

Description

Unit

As per Agrm
Qty

Commissioning
5.6.3

Zone 3

1.00
Supply
Installation
Commissioning

5.6.4

Zone 4

1.00
Supply
Installation
Commissioning

5.6.5

Zone 5

1.00
Supply
Installation
Commissioning

5.6.6

Zone 6

1.00
Supply
Installation
Commissioning

5.6.7

Zone 7

1.00
Supply
Installation
Commissioning

5.6.8

Zone 8

1.00
Supply
Installation
Commissioning

5.6.9

Zone 9

1.00
Supply
Installation
Commissioning

5.6.10

Zone 10

1.00
Supply
Installation

Page 79 of 227

S.NO

Description

Unit

As per Agrm
Qty

Commissioning
5.6.11

Zone 11

1.00
Supply
Installation
Commissioning

5.6.12

Zone 12

1.00
Supply
Installation
Commissioning

5.6.13

Zone 13

1.00
Supply
Installation
Commissioning

5.6.14

Zone 14

1.00
Supply
Installation
Commissioning

5.6.15

Zone 15

1.00
Supply
Installation
Commissioning

5.6.16

Zone 16

1.00
Supply
Installation
Commissioning

5.6.17

Zone 17

1.00
Supply
Installation
Commissioning

5.6.18

Zone 18

1.00
Supply
Installation

Page 80 of 227

S.NO

Description

Unit

As per Agrm
Qty

Commissioning
Zone 19

5.6.19

1.00
Supply
Installation
Commissioning

Zone 20

5.6.20

1.00
Supply
Installation
Commissioning

Zone 21

5.6.21

1.00
Supply
Installation
Commissioning

Zone 22

5.6.22

1.00
Supply
Installation
Commissioning

Zone 23

5.6.23

1.00
Supply
Installation
Commissioning

Sub Total
5.7 Radio Net
5.7.1

Zone 1

1.00
Supply
Installation
Commissioning

5.7.2

Zone 2

1.00
Supply
Installation
Commissioning

Page 81 of 227

S.NO
5.7.3

Description

Unit

As per Agrm
Qty
1.00

Zone 3
Supply
Installation
Commissioning

5.7.4

Zone 4

1.00
Supply
Installation
Commissioning

5.7.5

Zone 5

1.00
Supply
Installation
Commissioning

5.7.6

Zone 6

1.00
Supply
Installation
Commissioning

5.7.7

Zone 7

1.00
Supply
Installation
Commissioning

5.7.8

Zone 8

1.00
Supply
Installation
Commissioning

5.7.9

Zone 9

1.00
Supply
Installation
Commissioning

5.7.10

Zone 10

1.00
Supply
Installation
Commissioning

Page 82 of 227

S.NO
5.7.11

Description

Unit

As per Agrm
Qty
1.00

Zone 11
Supply
Installation
Commissioning

5.7.12

Zone 12

1.00
Supply
Installation
Commissioning

5.7.13

Zone 13

1.00
Supply
Installation
Commissioning

5.7.14

Zone 14

1.00
Supply
Installation
Commissioning

5.7.15

Zone 15

1.00
Supply
Installation
Commissioning

5.7.16

Zone 16

1.00
Supply
Installation
Commissioning

5.7.17

Zone 17

1.00
Supply
Installation
Commissioning

5.7.18

Zone 18

1.00
Supply
Installation
Commissioning

Page 83 of 227

S.NO
5.7.19

Description

Unit

As per Agrm
Qty
1.00

Zone 19
Supply
Installation
Commissioning

5.7.20

Zone 20

1.00
Supply
Installation
Commissioning

5.7.21

Zone 21

1.00
Supply
Installation
Commissioning

5.7.22

Zone 22

1.00
Supply
Installation
Commissioning

5.7.23

Zone 23

1.00
Supply
Installation
Commissioning

Sub Total

5.8.1

5.8.2

Other control Accessories sourced locally in


5.8 India
Zone 1
Supply
Installation
Commissioning
Zone 2
Supply
Installation
Commissioning
Page 84 of 227

1.00

1.00

S.NO
5.8.3

Description

Unit

As per Agrm
Qty
1.00

Zone 3
Supply
Installation
Commissioning

5.8.4

Zone 4

1.00
Supply
Installation
Commissioning

5.8.5

Zone 5

1.00
Supply
Installation
Commissioning

5.8.6

Zone 6

1.00
Supply
Installation
Commissioning

5.8.7

Zone 7

1.00
Supply
Installation
Commissioning

5.8.8

Zone 8

1.00
Supply
Installation
Commissioning

5.8.9

Zone 9

1.00
Supply
Installation
Commissioning

5.8.10

Zone 10

1.00
Supply
Installation
Commissioning

Page 85 of 227

S.NO
5.8.11

Description

Unit

As per Agrm
Qty
1.00

Zone 11
Supply
Installation
Commissioning

5.8.12

Zone 12

1.00
Supply
Installation
Commissioning

5.8.13

Zone 13

1.00
Supply
Installation
Commissioning

5.8.14

Zone 14

1.00
Supply
Installation
Commissioning

5.8.15

Zone 15

1.00
Supply
Installation
Commissioning

5.8.16

Zone 16

1.00
Supply
Installation
Commissioning

5.8.17

Zone 17

1.00
Supply
Installation
Commissioning

5.8.18

Zone 18

1.00
Supply
Installation
Commissioning

Page 86 of 227

S.NO
5.8.19

Description

Unit

As per Agrm
Qty
1.00

Zone 19
Supply
Installation
Commissioning

5.8.20

Zone 20

1.00
Supply
Installation
Commissioning

5.8.21

Zone 21

1.00
Supply
Installation
Commissioning

5.8.22

Zone 22

1.00
Supply
Installation
Commissioning

5.8.23

Zone 23

1.00
Supply
Installation
Commissioning

Sub Total
Part -C Operation and Maintenance for 5
years
6 Agronomy Services
6.1 Formation of WUCS
6.2 Agronomy support to the farmers
6.3 Training for WUCS and KBJNL staff
7 Supply of Spares and Tools
8 O & M of the Entire system
Month wise Total =
Cumulative Total =
Page 87 of 227

1.54%
No
No

1
1
1

No

No
No

1
1

S.NO

Description

Unit

As per Agrm
Qty

Operation and Maintainance


1 st O & M charges
2 nd O & M charges
3 rd O & M charges
4 th O & M charges
5 th O & M charges

Page 88 of 227

0.6554
0.6554
0.6554
0.6554
0.6554

REVISED CONSTRUCTION PROGRA


rol) Stage II Package 1 West side ( 11700 ha ) Drip Irrigation project
ed 07.01.2014
0546
Cr
M- MEIL (JOINT VENTURE)

As per Agrmt.
Value
5

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
6
7
8
9

Sep'14
Qty
10

2.286
1.143

1.143

0.343

0.343

0.343

0.343

0.229

0.229

0.114
0.057

1
0

0.114
0

0
1

0.000
0.057

0.057

0.057

1.143

9.526

Page 89 of 227

As per Agrmt.
Value
4.192
0.042
2.892
1.048
0.210

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value

10
10
10

0.000
2.892
1.048
0.210

10
10
10

1.735
0.629
0.126

0.838
0.008
0.578
0.210
0.042

1
1
1
1

0.008
0.578
0.210
0.042

0.419
0.004
0.289
0.105
0.021

1
10
10
10

0.004
0.289
0.105
0.021

0.419
0.004
0.394
0.021

6
6
6

0.004
0.394
0.021

0.427

2.515
0.025
1.735
0.629
0.126

1
0
0
0

0.042
0
0
0

0.025

0.762
0.610
0.427

Page 90 of 227

Sep'14
Qty

As per Agrmt.
Value
0.152
0.030

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
1
0.152
1
0.030

0.152
0.107
0.038
0.008

LS
LS
LS

0.107
0.038
0.008

1
1
1

0.267
0.095
0.019

0.381
0.267
0.095
0.019
256.031

143.377

5.018
1.649
0.143
0.358

8608
7468
912
0

5.018
1.430
0.015
0

0
1141
7696
8608

0.000
0.218
0.128
0.358

8.029
2.638
0.229
0.574

1453
1284
0
0

8.029
2.331
0
0

0
169
1453
1453

0.000
0.307
0.229
0.574

Page 91 of 227

Sep'14
Qty

As per Agrmt.
Value

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value

10.036
3.298
0.287
0.717

13308
12741
924

10.036
3.157
0.020

0
567
12384
13308

0.000
0.140
0.267
0.717

1.004
0.330
0.029
0.072

1073
792
0
0

1.004
0.243
0
0

0
281
1073
1073

0.000
0.086
0.029
0.072

0.151
0.049
0.004
0.011

119
116
0
0

0.151
0.048
0
0

0
3
119
119

0.000
0.001
0.004
0.011

6.022
1.979
0.172
0.430

4154
3754
858
0

6.022
1.788
0.036
0

0
400
3296
4154

0.000
0.191
0.137
0.430

9.033
2.968
0.258
0.645

4193
3696
0
0

9.033
2.616
0
0

0
497
4193
4193

0.000
0.352
0.258
0.645

11.040

4068

11.040

0.000

Page 92 of 227

Sep'14
Qty

As per Agrmt.
Value
3.627
0.315
0.789

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
3824
3.410
244
0.218
912
0.071
3156
0.245
0
0
4068
0.789

3.011
0.989
0.086
0.215

976
972
0
0

3.011
0.985
0
0

0
4
976
976

0.000
0.004
0.086
0.215

14.051
4.616
0.401
1.004

3343
3106
0
0

14.051
4.289
0
0

0
237
3343
3343

0.000
0.327
0.401
1.004

15.055
4.947
0.430
1.075

3589
3119
0
0

15.055
4.299
0
0

0
470
3589
3589

0.000
0.648
0.430
1.075

10.036
3.298
0.287
0.717

2373
2220
0
0

10.036
3.085
0
0

0
153
2373
2373

0.000
0.213
0.287
0.717

7.879
2.589

1290
1152

7.879
2.312

0
138

0.000
0.277

Page 93 of 227

Sep'14
Qty

As per Agrmt.
Value
0.225
0.563

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0
0
1290
0.225
0
0
1290
0.563

Sep'14
Qty

66.568

3.285
2.299
0.756
0.066
0.164

6.175
1.212
0
0

4.865
3.406
1.119
0.097
0.243

2.233
0.144
0
0

0.185
5.148
6.360
6.360

0.067
0.612
0.066
0.164

0
0
0
0

0
0
0
0

9.420
9.420
9.420
9.420

3.406
1.119
0.097
0.243

8.265

2.687
1.881
0.618
0.054
0.134

0
0
0
0

0
0
0
0

5.202
5.202
5.202
5.202

1.881
0.618
0.054
0.134

5.202

2.820
1.974
0.649
0.056
0.141

0
0
0
0

0
0
0
0

5.460
5.460
5.460
5.460

1.974
0.649
0.056
0.141

5.460

Page 94 of 227

0.126

As per Agrmt.
Value

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value

2.987
2.091
0.687
0.060
0.149

0
0
0
0

0
0
0
0

5.784
5.784
5.784
5.784

2.091
0.687
0.060
0.149

2.532
1.772
0.582
0.051
0.127

0
0
0
0

0
0
0
0

4.902
4.902
4.902
4.902

1.772
0.582
0.051
0.127

2.894
2.026
0.666
0.058
0.145

0
0
0
0

0
0
0
0

5.604
5.604
5.604
5.604

2.026
0.666
0.058
0.145

2.749
1.924
0.632
0.055
0.137

0
0
0
0

0
0
0
0

5.322
5.322
5.322
5.322

1.924
0.632
0.055
0.137

2.247
1.573
0.517
0.045
0.112

0
0
0
0

0
0
0
0

4.350
4.350
4.350
4.350

1.573
0.517
0.045
0.112

3.836
Page 95 of 227

Sep'14
Qty

5.784

As per Agrmt.
Value
2.686
0.882
0.077
0.192

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0
0
7.428
2.686
0
0
7.428
0.882
0
0
7.428
0.077
0
0
7.428
0.192

2.777
1.944
0.639
0.056
0.139

0
0
0
0

0
0
0
0

5.376
5.376
5.376
5.376

1.944
0.639
0.056
0.139

2.761
1.933
0.635
0.055
0.138

0
0
0
0

0
0
0
0

5.346
5.346
5.346
5.346

1.933
0.635
0.055
0.138

2.839
1.987
0.653
0.057
0.142

0
0
0
0

0
0
0
0

5.496
5.496
5.496
5.496

1.987
0.653
0.057
0.142

2.272
1.590
0.522
0.045
0.114

0
0
0
0

0
0
0
0

4.398
4.398
4.398
4.398

1.590
0.522
0.045
0.114

2.944
2.061
0.677

0
0

0
0

5.700
5.700

2.061
0.677

Page 96 of 227

Sep'14
Qty

As per Agrmt.
Value
0.059
0.147

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0
0
5.700
0.059
0
0
5.700
0.147

2.368
1.657
0.545
0.047
0.118

0
0
0
0

0
0
0
0

4.584
4.584
4.584
4.584

1.657
0.545
0.047
0.118

2.473
1.731
0.569
0.049
0.124

0
0
0
0

0
0
0
0

4.788
4.788
4.788
4.788

1.731
0.569
0.049
0.124

2.575
1.803
0.592
0.052
0.129

0
0
0
0

0
0
0
0

4.986
4.986
4.986
4.986

1.803
0.592
0.052
0.129

2.402
1.681
0.552
0.048
0.120

0
0
0
0

0
0
0
0

4.650
4.650
4.650
4.650

1.681
0.552
0.048
0.120

2.764
1.935
0.636
0.055
0.138

0
0
0
0

0
0
0
0

5.352
5.352
5.352
5.352

1.935
0.636
0.055
0.138

Page 97 of 227

Sep'14
Qty

As per Agrmt.
Value

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value

2.801
1.961
0.644
0.056
0.140

0
0
0
0

0
0
0
0

5.424
5.424
5.424
5.424

1.961
0.644
0.056
0.140

2.646
1.853
0.609
0.053
0.132

0
0
0
0

0
0
0
0

5.124
5.124
5.124
5.124

1.853
0.609
0.053
0.132

4.044
2.831
0.930
0.081
0.202

0
0
0
0

0
0
0
0

7.830
7.830
7.830
7.830

2.831
0.930
0.081
0.202

2.051
1.435
0.472
0.041
0.103

91.872
6
0
0

1.435
0
0
0

0.000
85.579
91.872
91.872

0.000
0.439
0.041
0.103

1.798
1.259
0.414
0.036

0
0
0

0
0
0

80.574
80.574
80.574

1.259
0.414
0.036

Sep'14
Qty

43.525

Page 98 of 227

3.707

80.574

As per Agrmt.
Value
0.090

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0
0
80.574
0.090

Sep'14
Qty

1.770
1.239
0.407
0.035
0.089

0
0
0
0

0
0
0
0

79.308
79.308
79.308
79.308

1.239
0.407
0.035
0.089

79.308

1.880
1.316
0.432
0.038
0.094

0
0
0
0

0
0
0
0

84.234
84.234
84.234
84.234

1.316
0.432
0.038
0.094

84.234

1.741
1.219
0.401
0.035
0.087

0
0
0
0

0
0
0
0

78.018
78.018
78.018
78.018

1.219
0.401
0.035
0.087

78.018

1.822
1.276
0.419
0.036
0.091

0
0
0
0

0
0
0
0

81.642
81.642
81.642
81.642

1.276
0.419
0.036
0.091

1.892
1.325
0.435
0.038
0.095

0
0
0
0

0
0
0
0

84.784
84.784
84.784
84.784

1.325
0.435
0.038
0.095

Page 99 of 227

As per Agrmt.
Value
2.010
1.407
0.462
0.040
0.101

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0
0
0
0

0
0
0
0

90.054
90.054
90.054
90.054

1.407
0.462
0.040
0.101

2.017
1.412
0.464
0.040
0.101

0
0
0
0

0
0
0
0

90.384
90.384
90.384
90.384

1.412
0.464
0.040
0.101

1.846
1.292
0.425
0.037
0.092

0
0
0
0

0
0
0
0

82.698
82.698
82.698
82.698

1.292
0.425
0.037
0.092

1.931
1.352
0.444
0.039
0.097

0
0
0
0

0
0
0
0

86.526
86.526
86.526
86.526

1.352
0.444
0.039
0.097

1.857
1.300
0.427
0.037
0.093

0
0
0
0

0
0
0
0

83.196
83.196
83.196
83.196

1.300
0.427
0.037
0.093

1.800
1.260

80.622

1.260

Page 100 of 227

Sep'14
Qty

As per Agrmt.
Value
0.414
0.036
0.090

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0
0
80.622
0.414
0
0
80.622
0.036
0
0
80.622
0.090

1.690
1.183
0.389
0.034
0.085

0
0
0
0

0
0
0
0

75.722
75.722
75.722
75.722

1.183
0.389
0.034
0.085

2.019
1.414
0.464
0.040
0.101

0
0
0
0

0
0
0
0

90.474
90.474
90.474
90.474

1.414
0.464
0.040
0.101

1.971
1.379
0.453
0.039
0.099

0
0
0
0

0
0
0
0

88.290
88.290
88.290
88.290

1.379
0.453
0.039
0.099

1.990
1.393
0.458
0.040
0.100

0
0
0
0

0
0
0
0

89.166
89.166
89.166
89.166

1.393
0.458
0.040
0.100

1.914
1.340
0.440
0.038

0
0
0

0
0
0

85.734
85.734
85.734

1.340
0.440
0.038

Page 101 of 227

Sep'14
Qty

As per Agrmt.
Value
0.096

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0
0
85.734
0.096

1.751
1.225
0.403
0.035
0.088

0
0
0
0

0
0
0
0

78.432
78.432
78.432
78.432

1.225
0.403
0.035
0.088

1.735
1.215
0.399
0.035
0.087

0
0
0
0

0
0
0
0

77.754
77.754
77.754
77.754

1.215
0.399
0.035
0.087

1.988
1.392
0.457
0.040
0.099

0
0
0
0

0
0
0
0

89.088
89.088
89.088
89.088

1.392
0.457
0.040
0.099

1.841
1.289
0.423
0.037
0.092

0
0
0
0

0
0
0
0

82.494
82.494
82.494
82.494

1.289
0.423
0.037
0.092

2.209
1.546
0.508
0.044
0.110

0
0
0
0

0
0
0
0

98.964
98.964
98.964
98.964

1.546
0.508
0.044
0.110

Page 102 of 227

Sep'14
Qty

As per Agrmt.
Value
2.560

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0

LS

2.560

0.274
0.274
0.548
0.274
0.274
0.548

4.763
1.096
0.274
0.274
0.548
0.274
0.274
0.548

0
0
0

0
0
0

1
1
1
100%
100%
100%

1.143
0.286
0.114
0.743

0
0
0

0
0
0

100%
100%
100%

0.286
0.114
0.743

0
0
0

100%
100%
100%
100%
100%
100%

0.631
0.252
1.641
0.631
0.252
1.641

1.00

0.129
0.090
0.032
0.006
0.129
0.090

2.524
0.631
0.252
1.641
0.631
0.252
1.641
99.073
2.972
0.129
0.090
0.032
0.006
0.129
0.090

0
0
0

1.00
Page 103 of 227

Sep'14
Qty

As per Agrmt.
Value
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
Page 104 of 227

Sep'14
Qty

As per Agrmt.
Value
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
Page 105 of 227

Sep'14
Qty

As per Agrmt.
Value
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
2.972

0.108
0.075
0.027
0.005
0.108
0.075
0.027

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
2.972

10.00

10.00

Page 106 of 227

0.108
0.075
0.027
0.005
0.108
0.075
0.027

Sep'14
Qty

As per Agrmt.
Value
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
Page 107 of 227

Sep'14
Qty

As per Agrmt.
Value
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
Page 108 of 227

Sep'14
Qty

As per Agrmt.
Value
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
0.108
0.075
0.027
0.005
2.477

0.129
0.090
0.032
0.006
0.129
0.090
0.032

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
10.00
0.108
0.075
0.027
0.005
2.477

1.00

1.00

Page 109 of 227

0.129
0.090
0.032
0.006
0.129
0.090
0.032

Sep'14
Qty

As per Agrmt.
Value
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
Page 110 of 227

Sep'14
Qty

As per Agrmt.
Value
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
Page 111 of 227

Sep'14
Qty

As per Agrmt.
Value
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
0.129
0.090
0.032
0.006
2.972

0.181
0.126
0.045
0.009
0.176
0.123
0.044

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
1.00
0.129
0.090
0.032
0.006
2.972

490.00

478.00

Page 112 of 227

0.181
0.126
0.045
0.009
0.176
0.123
0.044

Sep'14
Qty

As per Agrmt.
Value
0.009
0.176
0.123
0.044
0.009
0.174
0.122
0.044
0.009
0.185
0.130
0.046
0.009
0.187
0.131
0.047
0.009
0.222
0.156
0.056
0.011
0.228
0.159
0.057
0.011
0.213
0.149
0.053
0.011
0.207
0.145
0.052

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.009
478.00
0.176
0.123
0.044
0.009
473.00
0.174
0.122
0.044
0.009
503.00
0.185
0.130
0.046
0.009
507.00
0.187
0.131
0.047
0.009
603.00
0.222
0.156
0.056
0.011
618.00
0.228
0.159
0.057
0.011
578.00
0.213
0.149
0.053
0.011
561.00
0.207
0.145
0.052
Page 113 of 227

Sep'14
Qty

As per Agrmt.
Value
0.010
0.213
0.149
0.053
0.011
0.186
0.131
0.047
0.009
0.188
0.131
0.047
0.009
0.167
0.117
0.042
0.008
0.188
0.132
0.047
0.009
0.196
0.137
0.049
0.010
0.188
0.132
0.047
0.009
0.196
0.137
0.049

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.010
578.00
0.213
0.149
0.053
0.011
506.00
0.186
0.131
0.047
0.009
509.00
0.188
0.131
0.047
0.009
452.00
0.167
0.117
0.042
0.008
510.00
0.188
0.132
0.047
0.009
531.00
0.196
0.137
0.049
0.010
510.00
0.188
0.132
0.047
0.009
533.00
0.196
0.137
0.049
Page 114 of 227

Sep'14
Qty

As per Agrmt.
Value
0.010
0.173
0.121
0.043
0.009
0.192
0.134
0.048
0.010
0.186
0.130
0.047
0.009
0.204
0.143
0.051
0.010
0.233
0.163
0.058
0.012
4.458

3.417
2.392
0.854
0.171
3.366
2.356
0.841
0.168

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.010
470.00
0.173
0.121
0.043
0.009
521.00
0.192
0.134
0.048
0.010
505.00
0.186
0.130
0.047
0.009
553.00
0.204
0.143
0.051
0.010
633.00
0.233
0.163
0.058
0.012
4.458

3326833.69066

3276777.64066

Page 115 of 227

3.417
2.392
0.854
0.171
3.366
2.356
0.841
0.168

Sep'14
Qty

As per Agrmt.
Value
3.346
2.342
0.836
0.167
3.414
2.390
0.854
0.171
3.465
2.425
0.866
0.173
3.392
2.374
0.848
0.170
3.529
2.470
0.882
0.176
3.535
2.475
0.884
0.177
3.529
2.470
0.882
0.176
3.432
2.402
0.858
0.172

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
3257121.0434
3.346
2.342
0.836
0.167
3324053.48822
3.414
2.390
0.854
0.171
3372996.97207
3.465
2.425
0.866
0.173
3302037.34082
3.392
2.374
0.848
0.170
3435456.93975
3.529
2.470
0.882
0.176
3441822.85768
3.535
2.475
0.884
0.177
3435328.04865
3.529
2.470
0.882
0.176
3341017.21607
3.432
2.402
0.858
0.172
Page 116 of 227

Sep'14
Qty

As per Agrmt.
Value
3.338
2.337
0.835
0.167
3.451
2.416
0.863
0.173
3.455
2.418
0.864
0.173
3.230
2.261
0.808
0.162
3.357
2.350
0.839
0.168
3.483
2.438
0.871
0.174
3.409
2.386
0.852
0.170
3.467
2.427
0.867
0.173

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
3249691.48921
3.338
2.337
0.835
0.167
3359754.23027
3.451
2.416
0.863
0.173
3363280.54578
3.455
2.418
0.864
0.173
3144563.20016
3.230
2.261
0.808
0.162
3267865.38018
3.357
2.350
0.839
0.168
3390590.6197
3.483
2.438
0.871
0.174
3318554.08991
3.409
2.386
0.852
0.170
3375403.37658
3.467
2.427
0.867
0.173
Page 117 of 227

Sep'14
Qty

As per Agrmt.
Value
3.451
2.415
0.863
0.173
3.481
2.437
0.870
0.174
3.502
2.451
0.875
0.175
3.528
2.469
0.882
0.176
3.684
2.579
0.921
0.184
79.259

0.086
0.060
0.022
0.004
0.086
0.060
0.022

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
3359235.33185
3.451
2.415
0.863
0.173
3388749.0687
3.481
2.437
0.870
0.174
3409192.30338
3.502
2.451
0.875
0.175
3434299.92014
3.528
2.469
0.882
0.176
3586875.20616
3.684
2.579
0.921
0.184
79.259

1.00

1.00

Page 118 of 227

0.086
0.060
0.022
0.004
0.086
0.060
0.022

Sep'14
Qty

As per Agrmt.
Value
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
Page 119 of 227

Sep'14
Qty

As per Agrmt.
Value
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
Page 120 of 227

Sep'14
Qty

As per Agrmt.
Value
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
0.086
0.060
0.022
0.004
1.981

0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.00
0.086
0.060
0.022
0.004
1.981

1.00

1.00

Page 121 of 227

0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009

Sep'14
Qty

As per Agrmt.
Value
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
Page 122 of 227

Sep'14
Qty

As per Agrmt.
Value
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
Page 123 of 227

Sep'14
Qty

As per Agrmt.
Value
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
0.172
0.121
0.043
0.009
3.963

0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
1.00
0.172
0.121
0.043
0.009
3.963

1.00

1.00

Page 124 of 227

0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002

Sep'14
Qty

As per Agrmt.
Value
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
Page 125 of 227

Sep'14
Qty

As per Agrmt.
Value
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
Page 126 of 227

Sep'14
Qty

As per Agrmt.
Value
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.043
0.030
0.011
0.002
0.991

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
1.00
0.043
0.030
0.011
0.002
0.991

5.868
2.054
2.054

0
0

0
0

1
1

2.054
2.054

1.760

1.760

0.229
3.277

0
0

1
1

0.229
3.277
245.042

0
0
136.011

381.054
Page 127 of 227

Sep'14
Qty

As per Agrmt.
Value

Executed Qty Up to
Balance Qty to be Executed
Aug'14
Qty
Value
Qty
Value

Page 128 of 227

Sep'14
Qty

PROGRAM FOR BALANCE WORKS


oject

Sep'14
Value
11

Oct'14
Qty
12

Value
13

Nov'14
Qty
Value
14
15

PROGRAMME
Dec'14
Qty
Value
16
17

0.075

0.268

0.05

0.179

0.0572
0.0285

0.029

Page 129 of 227

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 130 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 131 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 132 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 133 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

0.015

PROGRAMME
Dec'14
Qty
Value

0.500

2.988

1.881

1.974

Page 134 of 227

0.059

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

2.091

Page 135 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 136 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 137 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

0.019

1.259

Page 138 of 227

PROGRAMME
Dec'14
Qty
Value

5.424

1.961

5.124

1.853

7.830

2.831

4.500

0.023

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

1.239

1.316

1.219

Page 139 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 140 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 141 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 142 of 227

PROGRAMME
Dec'14
Qty
Value

89.088

1.392

82.494

1.289

98.964

1.546

Sep'14
Value

Oct'14
Qty

100.00%

Nov'14
Qty
Value

Value

PROGRAMME
Dec'14
Qty
Value

0.274
50%

0.137
0.183

100%
100%

0.286
0.114

15%
15%
15%

0.095
0.038
0.246

50.00%

0.137
0.183

30.00%

0.223

15.00%
15.00%
15.00%

1.00

Page 143 of 227

0.095
0.038
0.246

0.09

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 144 of 227

PROGRAMME
Dec'14
Qty
Value

1.00

0.09

1.00

0.09

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 145 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 146 of 227

PROGRAMME
Dec'14
Qty
Value

1.00

0.09

1.00

0.09

1.00

0.09

10.00

0.08

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 147 of 227

PROGRAMME
Dec'14
Qty
Value

10.00

0.08

10.00

0.08

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 148 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 149 of 227

PROGRAMME
Dec'14
Qty
Value

10.00

0.08

10.00

0.08

10.00

0.08

100.00

0.09

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 150 of 227

PROGRAMME
Dec'14
Qty
Value

100.00

0.09

100.00

0.09

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 151 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 152 of 227

PROGRAMME
Dec'14
Qty
Value

100.00

0.09

100.00

0.09

100.00

0.09

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 153 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 154 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 155 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 156 of 227

PROGRAMME
Dec'14
Qty
Value
3257121

2.342

3324053

2.390

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 157 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 158 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 159 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 160 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 161 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 162 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 163 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 164 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 165 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 166 of 227

PROGRAMME
Dec'14
Qty
Value

Sep'14
Value

14.211
150.223

Oct'14
Qty

Nov'14
Qty
Value

Value

0.274
150.497
Page 167 of 227

1.098
151.595

PROGRAMME
Dec'14
Qty
Value

18.620
170.215

Sep'14
Value

Oct'14
Qty

Value

Nov'14
Qty
Value

Page 168 of 227

PROGRAMME
Dec'14
Qty
Value

MME
Jan'15
Qty
18

Feb'15
Value
19

Qty
20

Value
21

Page 169 of 227

Mar'15
Qty
Value
22
23

MME
Jan'15

Feb'15

Qty

Value

10 Nos

2.892

10 Nos

1.735

1Nos

0.008

Qty

Value

1
5 Nos

0.004
0.145

5 Nos

0.145

6
25%

0.004
0.099

25%

0.099

Page 170 of 227

Mar'15
Qty
Value

1 set

0.578

25%

0.099

1 set

0.427

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

500
2000

0.096
0.033

Mar'15
Qty
Value

LS
LS

0.054
0.013

LS
LS

0.134
0.032

641
2000

169

Page 171 of 227

0.123
0.033

0.307

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

567
3000

1000

Page 172 of 227

0.141
0.065

0.062

Mar'15
Qty
Value

3000

0.065

281

0.086

0.001

1000

0.041

1000

0.062

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

153

Page 173 of 227

Mar'15
Qty
Value
244
0.218
1000
0.078

0.004

237
1000

0.327
0.120

1200

0.144

1000

0.121

138

0.277

0.213

MME
Jan'15
Qty

1.932

Feb'15
Value

0.230

Qty

Value

0.185
1.000

0.067
0.119

1.155
2.000

0.418
0.238

2.000

2.000

Page 174 of 227

Mar'15
Qty
Value
500
0.087

1.000
3.652

0.119
0.038

3.500
2.000

0.416
0.021

0.238

2.000
2.000

0.238
0.021

0.238

2.000
2.000

0.238
0.021

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

4.902
0.500

1.772
0.059

5.604
0.500

2.026
0.059

5.322
0.500

1.924
0.059

4.350
0.500

1.573
0.059

Page 175 of 227

Mar'15
Qty
Value

1.600
1.600

0.190
0.017

1.400
1.900

0.166
0.020

1.500
2.000

0.178
0.021

1.600
2.100

0.190
0.022

1.200
1.700

0.143
0.018

MME
Jan'15

Feb'15

Qty
7.428
0.400

Value
2.686
0.048

5.376
0.500

Qty

Value

Mar'15
Qty
Value

0.600

0.071

2.000
3.000

0.238
0.031

1.944
0.059

0.500

0.059

1.500
2.500

0.178
0.026

5.346
0.500

1.933
0.059

0.500

0.059

1.500
2.500

0.178
0.026

5.496
0.600

1.987
0.071

0.800

0.095

1.000
2.400

0.119
0.025

4.398

1.590
0.500

0.059

1.000
1.500

0.119
0.015

2.000

0.238

2.000

0.238

5.700

2.061
Page 176 of 227

MME
Jan'15
Qty

4.584

4.788

4.986

4.650

5.352

Feb'15
Value

Qty

Value

Mar'15
Qty
Value
2.000
0.021

1.657
0.500

0.059

1.000
1.500

0.119
0.015

0.500

0.059

0.500
1.000

0.059
0.010

0.500

0.059

1.000
1.500

0.119
0.015

1.000

0.119

1.000
2.000

0.119
0.021

1.000

0.119

1.000
2.000

0.119
0.021

1.731

1.803

1.681

1.935

Page 177 of 227

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

Mar'15
Qty
Value

1.700

0.202

1.000
1.700

0.119
0.018

1.500
1.000

0.178
0.010

1.500

0.178

1.500
1.500

0.178
0.015

1.500
1.500

0.178
0.015

2.000

0.238

2.000
2.000

0.238
0.021

15.500

0.080

21.500
23.285

0.110
0.010

20.900

0.107

20.500
20.900

0.105
0.009

12.125

0.062

Page 178 of 227

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

Mar'15
Qty
Value

2.000

0.010

2.000
2.000

0.010
0.001

2.000

0.010

2.000
2.000

0.010
0.001

15.600
15.600

0.080
0.007

20.8
27.400

0.107
0.012

19.500
28.100

0.100
0.013

81.642
6.600

1.276
0.034

84.784
8.600

1.325
0.044

Page 179 of 227

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

90.054
5.300

1.407
0.027

90.384
6.000

1.412
0.031

82.692
10.000

1.292
0.051

86.526
14.000

1.352
0.072

83.196
13.000

1.300
0.067

80.622

1.260

Page 180 of 227

Mar'15
Qty
Value

24.200
29.500

0.124
0.013

15.000
21.000

0.077
0.009

19.000
29.000

0.098
0.013

26.000
40.600

0.133
0.018

22.200
35.200

0.114
0.016

MME
Jan'15
Qty

75.722

90.474

88.290

89.166

85.734

Feb'15
Value

Mar'15
Qty
Value
18.800
0.097
36.800
0.016

Qty
18.000

Value
0.092

8.000

0.041

14.600
22.600

0.075
0.010

2.000

0.010

2.000
2.000

0.010
0.001

9.000

0.046

26.200
35.200

0.135
0.016

8.500

0.044

23.900
32.400

0.123
0.014

6.500

0.033

16.500
23.000

0.085
0.010

1.183

1.414

1.379

1.393

1.340

Page 181 of 227

MME
Jan'15
Qty

78.432

77.754

22.000

Feb'15
Value

Qty

Value

Mar'15
Qty
Value

1.225
5.000

0.026

15.500
20.500

0.080
0.009

6.000

0.031

21.000
27.000

0.108
0.012

24.600
38.500

0.126
0.017

21.117
24.600

0.108
0.011

14.500
26.000

0.074
0.012

21.000
21.000

0.108
0.009

2.000

0.010

2.000
2.000

0.010
0.001

1.215

0.113

Page 182 of 227

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

LS

0.640

40.00%

0.297

Mar'15
Qty
Value
LS

0.640

0.182

30.00%

15.00%
15.00%
15.00%

0.223

0.095
0.038
0.246

15.00%
15.00%
15.00%

0.095
0.038
0.246

15.00%
15.00%
15.00%

1.00

1.00

0.090

Page 183 of 227

0.095
0.038
0.246

0.032

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

1.00

0.032

1.00

0.032

1.00

0.090

1.00

1.00

1.00

Mar'15
Qty
Value
1.00
0.032

1.00

0.032

1.00

0.032

1.00

0.032

1.00

0.032

0.090

0.090

0.090

1.00

0.090

1.00

0.090

Page 184 of 227

MME
Jan'15
Qty

1.00

Feb'15
Value

Qty

Value

1.00

0.090

1.00

0.090

1.00

0.090

1.00

0.090

1.00

0.032

0.090

1.00

0.090

1.00

0.090

1.00

0.090
Page 185 of 227

Mar'15
Qty
Value

MME
Jan'15
Qty

Feb'15
Value

1.00

0.090

1.00

0.090

Qty

1.00

10.00

Value

Mar'15
Qty
Value

0.032

10.00

0.027

10.00

0.027

0.075

Page 186 of 227

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

10.00

0.027

10.00

0.027

10.00

0.075

10.00

10.00

10.00

Mar'15
Qty
Value

10.00

0.027

10.00

0.027

10.00

0.027

10.00

0.027

0.075

0.075

0.075

10.00

0.075

10.00

0.075

Page 187 of 227

MME
Jan'15
Qty

10.00

Feb'15
Value

Qty

Value

10.00

0.075

10.00

0.075

10.00

0.075

10.00

0.075

10.00

0.027

0.075

10.00

0.075

10.00

0.075

10.00

0.075
Page 188 of 227

Mar'15
Qty
Value

MME
Jan'15
Qty

Feb'15
Value

10.00

0.075

10.00

0.075

Qty

Value

10.00

0.027

100.00

Mar'15
Qty
Value

100.00

0.032

100.00

0.032

0.090

Page 189 of 227

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

100.00

0.032

100.00

0.032

100.00

0.090

100.00

100.00

100.00

Mar'15
Qty
Value

100.00

0.032

100.00

0.032

100.00

0.032

100.00

0.032

0.090

0.090

0.090

100.00

0.090

100.00

0.090

Page 190 of 227

MME
Jan'15
Qty

100.00

Feb'15
Value

Qty

Value

100.00

0.090

100.00

0.090

100.00

0.090

100.00

0.090

100.00

0.032

0.090

100.00

0.090

100.00

0.090

100.00

0.090
Page 191 of 227

Mar'15
Qty
Value

MME
Jan'15
Qty

Feb'15
Value

100.00

0.090

100.00

0.090

490.00

Qty

Value

100.00

0.032

0.126
147.0

180.00

Mar'15
Qty
Value

0.046

180.00
120.0

0.014

0.046
0.011

Page 192 of 227

196.0

118.00
120.0

0.018

0.030
0.011

MME
Jan'15
Qty

478.00

473.00

Feb'15
Value

Qty

Value

Mar'15
Qty
Value

0.123
144.0

0.013

191.0

0.018

142.0

0.013

190.0

0.018

0.122

201.00

0.052

201.00
130.0

0.052
0.012

101.00
130.0

0.026
0.012

200.00

0.052

210.00
125.0

0.054
0.012

97.00
125.0

0.025
0.012

200.00

0.052

200.00
150.0

0.052
0.014

203.00
150.0

0.052
0.014

250.00

0.064

250.00
150.0

0.064
0.014

118.00
150.0

0.030
0.014

230.00

0.059

230.00
145.0

0.059
0.013

118.00
145.0

0.030
0.013

225.00

0.058

225.00
140.0

0.058
0.013

111.00
140.0

0.029
0.013

Page 193 of 227

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

Mar'15
Qty
Value

230.00

0.059

230.00
145.0

0.059
0.013

118.00
145.0

0.030
0.013

200.00

0.052

200.00
125.0

0.052
0.012

106.00
125.0

0.027
0.012

200.00

0.052

200.00
125.0

0.052
0.012

109.00
125.0

0.028
0.012

180.00

0.046

180.00
113.0

0.046
0.010

92.00
113.0

0.024
0.010

510.00

0.132
0.014

204.0

0.019

153.0

210.00

0.054

210.00
135.0

0.054
0.012

111.00
135.0

0.029
0.012

204.00

0.053

204.00
130.0

0.053
0.012

102.00
130.0

0.026
0.012

210.00

0.054

210.00
130.0

0.054
0.012

113.00
135.0

0.029
0.012

Page 194 of 227

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

Mar'15
Qty
Value

188.00

0.048

188.00
120.0

0.048
0.011

94.00
120.0

0.024
0.011

210.00

0.054

210.00
130.0

0.054
0.012

101.00
130.0

0.026
0.012

202.00

0.052

202.00
125.0

0.052
0.012

101.00
125.0

0.026
0.012

225.00

0.058

225.00
140.0

0.058
0.013

103.00
140.0

0.027
0.013

633.00

0.163
189.0

3326834

2.392

3276778

2.356

0.017

Page 195 of 227

253.0

0.023

MME
Jan'15
Qty

Feb'15
Value

3372997

2.425

3302037

2.374

3435457

2.470

3441823

2.475

Qty

Value

3435328

2.470

3341017

2.402

Page 196 of 227

Mar'15
Qty
Value

MME
Jan'15
Qty

3267865

Feb'15
Value

Qty

Value

3249691

2.337

3359754

2.416

3363281

2.418

3144563

2.261

Mar'15
Qty
Value

2.350

Page 197 of 227

3390591

2.438

3318554

2.386

3375403

2.427

MME
Jan'15
Qty

3586875

Feb'15
Value

Qty

Value

2.579

0.060

0.060

Page 198 of 227

Mar'15
Qty
Value
3359235

2.415

3388749

2.437

3409192

2.451

3434300

2.469

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

0.060

0.060

Page 199 of 227

Mar'15
Qty
Value

0.060

0.060

0.060

0.060

0.060

0.060

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

Page 200 of 227

Mar'15
Qty
Value

0.060

0.060

0.060

0.060

0.060

0.060

0.060

0.060

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

0.060

0.121

0.121

Page 201 of 227

Mar'15
Qty
Value

0.060

0.060

0.060

0.060

MME
Jan'15
Qty

Feb'15
Value

Qty

Value
1

0.121

0.121

Page 202 of 227

Mar'15
Qty
Value

0.121

0.121

0.121

0.121

0.121

0.121

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

Page 203 of 227

Mar'15
Qty
Value
1

0.121

0.121

0.121

0.121

0.121

0.121

0.121

0.121

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

0.121

0.030

0.030

Page 204 of 227

Mar'15
Qty
Value
1

0.121

0.121

0.121

0.121

MME
Jan'15
Qty

Feb'15
Value

Qty

Value
1

0.030

0.030

Page 205 of 227

Mar'15
Qty
Value

0.030

0.030

0.030

0.030

0.030

0.030

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

Page 206 of 227

Mar'15
Qty
Value
1

0.030

0.030

0.030

0.030

0.030

0.030

0.030

0.030

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

59.441
229.656

Mar'15
Qty
Value
1

0.030

0.030

0.030

0.030

0.030

44.316
273.972
Page 207 of 227

33.226
307.198

MME
Jan'15
Qty

Feb'15
Value

Qty

Value

Page 208 of 227

Mar'15
Qty
Value

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Dated: 07-01-2014

Sl. No.

Agt Value : Rs.

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Amount

3,810,546,305.00

Further Breakup
Percentage

Amount

Ra Bill - 13 & Part

Previous
Percentage

Qty

Up to Aug - 2015

Present
Amount

Qty

Uptodate
Amount

Qty

Remarks

Amount

Detailed engineering, preparation of designs and drawings


Part A- Preliminaries.
1

Project Engineering and Design Services


Survey, investigations, setting out works, detailed topographical

1.1

survey for command area of 11,700 Ha

1.2

Detailed engineering, preparation of designs and drawings

1.2 (b)

11,431,639

50%

11,431,639

50%

Approval to Design and Drawings for Main and Feeder Pipeline

1.2 (a)

Approval to Design and Drawings for Main and Submains for Block

100%

11,431,639

100%

11,431,639

3,429,492

30%

100%

3,429,492

100%

3,429,492

3,429,492

30%

100%

3,429,492

100%

3,429,492

1.2 (c)

Approval to Design and Drawings for Drip net work

2,286,328

20%

100%

2,286,328

100%

2,286,328

1.2 (d)

Approval to Civil GAD

1,143,164

10%

100%

1,143,164

100%

1.2 (e)

Approval to Mechanical GAD

571,582

5%

100%

571,582

100%

1.2 (f)

Approval to Surge Protection for Pipeline

571,582

5%

100%

571,582

100%

Total Amount :-

22,863,278

1,143,164
571,582
571,582

22,863,278

22,863,278

Part B- Construction
2

Electro-Mechanical works
2.1

2.1.1

Design, supply, installation of pumping machinery and pump house


electrical works

83,832,019

88%

Pumps

41,916,010

50%

a Approval to Design and Drawings

2.1.2

419,160

1%

100%

419,160

b Supply

28,922,047

69%

100%

28,922,047

c Erection

10,479,002

25%

Motors

25,149,606

251,496

1%

100%

251,496

b Supply

17,353,228

69%

100%

17,353,228

c Erection

6,287,401

25%

Panels (all types)

8,383,202

10%

4,191,601

5%

a Approval to Design and Drawings


b Supply
2.1.4

Valves (all types)


a Approval to Design and Drawings

2.1.4

10,479,002

100%

6,287,401

100%

5,784,409

83,832

1%

5,784,409

69%

100%

1,047,900

83,832

41,916

1%

100%

41,916

b Supply

2,892,205

69%

100%

2,892,205

c Erection

1,047,900

25%

100%

Surge Protection Devices

4,191,601

100%

419,160

100%

28,922,047

100%

10,479,002

30%

a Approval to Design and Drawings

2.1.3

100%

100%

251,496

100%

17,353,228

100%

6,287,401

100%

83,832

100%

5,784,409

100%

41,916

100%

2,892,205

100%

1,047,900

5%

a Approval Of design and Drawings

41,916

1%

100%

41,916

100%

41,916

b Supply

2,892,205

69%

100%

2,892,205

100%

2,892,205

C Erection

1,047,900

25%

33%

345,807

33%

345,807

4,267,812

70%

100%

4,267,812

100%

4,267,812

1,524,219

25%

100%

1,524,219

100%

1,524,219

1,066,953

70%

100%

1,066,953

100%

1,066,953

381,055

25%

100%

381,055

100%

381,055

2,667,382

70%

100%

2,667,382

100%

2,667,382

952,637

25%

476,318

50%

2.2 Construction of 33KV Electrical Sub Station


2.2.1 Transformers

7,621,093

8%

6,096,874

80%

1,524,219

20%

a Supply
c Erection
2.2.2 Other Related Materials
a Supply
c Erection
2.3 Laying of 33 KV line From KPTCL Sub station to work site
a Supply
b Earection
Total Amount :-

50%

37,724,409

49,963,884

476,318

37,262,380

87,226,264

3 Pipeline and related Civil Works


Construction of main and Branch pipelines including Earth work,
3.1

structures, supply, laying , jointing, testing and commissioning-(Bulk


Water Pipe line) Total Length Req=48547 Rmt

10

11

12

13

48,547.00

350mm/248kpa/9Bar--8608 Rmt

1,433,771,395

56%

71,688,570

5%

a).Supply

Mts

8,608.00

8,608.00

5,829.69

50,181,999

70%

8,608.000

50,181,972

b).Earth work, Laying and Jointing

Mts

8,608.00

8,608.41

1,915.47

16,488,371

23%

7,461.414

14,292,115

c).Testing

Mts

8,608.00

899.54

166.56

1,433,771

2%

899.536

149,827

d) Commissioning

Mts

8,608.00

3,584,428

5%

416.41

350mm/248kpa/12Bar--1453 Rmt

114,701,712
Mts

1,453.00

1,453.00

55,258.91

80,291,198

70%

1,453.000

80,291,196

b).Earth work, Laying and Jointing

Mts

1,453.00

1,452.89

18,156.50

26,381,394

23%

1,284.016

23,313,238

c).Testing

Mts

1,453.00

1,578.83

2,294,034

2%

d) Commissioning

Mts

1,453.00

3,947.07

5,735,086

5%

400mm/248kpa/9Bar--13308 Rmt

143,377,140
Mts

13,308.00

13,308.00

7,541.63

100,363,998

70%

13,308.000

100,364,012

Mts

13,308.00

13,096.08

2,477.96

32,976,742

23%

12,741.079

31,571,885

c).Testing

Mts

13,308.00

923.58

215.48

2,867,543

2%

923.575

199,012

d) Commissioning

Mts

13,308.00

538.69

7,168,857

5%

Mts

1,073.00

1,073.00

9,353.59

10,036,400

70%

1,073.000

10,036,402

b).Earth work, Laying and Jointing

Mts

1,073.00

1,072.98

3,073.32

3,297,674

23%

899.981

2,765,931

c).Testing

Mts

1,073.00

267.25

286,754

2%

d) Commissioning

Mts

1,073.00

668.11

716,886

5%

500mm/248kpa/9Bar--119 Rmt

2,150,657
Mts

119.00

119.00

12,650.92

1,505,460

b).Earth work, Laying and Jointing

Mts

119.00

115.04

4,156.73

c).Testing

Mts

119.00

d) Commissioning

Mts

119.00

3,066,088
-

355.00

173.00

1,453.000

80,291,196

1,452.886

26,379,326

879,677
-

13,308.000

100,364,012

13,096.079

32,451,562

923.575

199,012

531,685
-

1,073.000

10,036,402

1,072.981

3,297,616

70%

119.000

1,505,459

119.000

1,505,459

494,651

23%

115.037

478,179

115.037

478,179

43,013

2%

107,533

5%

Mts

4,154.00

4,154.00

14,496.48

60,218,399

70%

4,154.000

60,218,419

b).Earth work, Laying and Jointing

Mts

4,154.00

4,153.97

4,763.13

19,786,045

23%

3,813.970

18,166,434

c).Testing

Mts

4,154.00

857.80

414.19

1,720,526

2%

857.801

355,293

d) Commissioning

Mts

4,154.00

1,035.46

4,301,314

5%

700mm/248kpa/9Bar--4193 Rmt

129,039,426

340.00

1,619,464
-

Mts

4,193.00

4,193.00

21,542.48

90,327,598

70%

4,193.000

90,327,619

b).Earth work, Laying and Jointing

Mts

4,193.00

4,147.13

7,078.24

29,679,068

23%

3,696.130

26,162,092

c).Testing

Mts

4,193.00

615.50

2,580,789

2%

d) Commissioning

Mts

4,193.00

1,538.75

6,451,971

5%

a).Supply

Mts

4,068.00

4,068.00

27,138.74

110,400,397

70%

4,068.000

110,400,394

b).Earth work, Laying and Jointing

Mts

4,068.00

4,007.00

8,917.01

36,274,416

23%

3,823.920

34,097,933

c).Testing

Mts

4,068.00

912.00

3,154,297

2%

912.000

8,132,313

d) Commissioning

Mts

4,068.00

7,885,743

5%

157,714,853

775.39

43,013,142

4,154.000

60,218,419

4,153.970

19,785,898

857.801

355,293

451.00

3,192,287
-

4,193.000

90,327,619

4,147.130

29,354,379

11%

1,938.48

900mm/248kpa/9Bar--976 Rmt

9%

a).Supply

800mm/248kpa/9Bar--4068 Rmt

6%

a).Supply

183.08

1,632,527

4,068.000

110,400,394

4,007.000

35,730,460

912.000

8,132,313

3%

a).Supply

Mts

976.00

976.00

30,849.59

30,109,199

b).Earth work, Laying and Jointing

Mts

976.00

972.00

10,136.29

c).Testing

Mts

976.00

d) Commissioning

Mts

976.00

70%

976.000

30,109,200

976.000

30,109,200

9,893,023

23%

971.998

9,852,458

971.998

9,852,458

881.42

860,263

2%

2,203.54

2,150,657

5%

900mm/248kpa/12Bar--3343 Rmt

200,727,995

Mts

3,343.00

3,343.00

42,030.99

140,509,597

70%

3,343.000

140,509,600

b).Earth work, Laying and Jointing

Mts

3,343.00

3,277.92

13,810.18

46,167,439

23%

3,083.918

42,589,456

c).Testing

Mts

3,343.00

1,200.89

4,014,560

2%

d) Commissioning

Mts

3,343.00

3,002.21

10,036,400

5%

1000mm/248kpa/9Bar--3589 Rmt

215,065,709

14%

a).Supply

149,827

903.64
86,026,284

16,489,160

899.536

361.45

600mm/248kpa/9Bar--4154 Rmt

50,181,972

8,608.414

0%

a).Supply

8,608.000

1%

a).Supply

10%

b).Earth work, Laying and Jointing

14,337,714

168.87

a).Supply

450mm/248kpa/9Bar--1073 Rmt

2,197,045

8%

a).Supply

1,147.00

194.00

2,679,175
-

3,343.000

140,509,600

3,277.918

45,268,631

15%

a).Supply

Mts

3,589.00

3,589.00

41,946.50

150,545,996

70%

3,589.000

150,545,989

b).Earth work, Laying and Jointing

Mts

3,589.00

3,532.16

13,782.42

49,465,113

23%

3,105.921

42,807,102

c).Testing

Mts

3,589.00

1,198.47

4,301,314

2%

d) Commissioning

Mts

3,589.00

2,996.18

10,753,285

5%

a).Supply

Mts

2,373.00

2,373.00

42,294.14

100,363,998

70%

2,373.000

100,363,998

2,373.000

100,363,998

b).Earth work, Laying and Jointing

Mts

2,373.00

2,369.94

13,896.65

32,976,742

23%

2,369.942

32,934,246

2,369.942

32,934,246

c).Testing

Mts

2,373.00

1,208.40

2,867,543

2%

d) Commissioning

Mts

2,373.00

3,021.01

7,168,857

5%

1000mm/248kpa/12Bar--2373 Rmt

143,377,140

1100mm/248kpa/9Bar--1290 Rmt

112,551,055

426.24

5,874,620
-

3,589.000

150,545,989

3,532.161

48,681,722

10%

8%

a).Supply

Mts

1,290.00

1,290.00

61,074.22

78,785,738

70%

1,290.000

78,785,744

1,290.000

78,785,744

b).Earth work, Laying and Jointing

Mts

1,290.00

1,163.97

20,067.24

25,886,743

23%

1,163.967

25,886,077

1,163.967

25,886,077

c).Testing

Mts

1,290.00

1,744.98

2,251,021

2%

d) Commissioning

Mts

1,290.00

4,362.44

5,627,553

5%

Total Amount :-

1,433,771,395

1,433,771,395

1,317,393,595

21,672,568

1,339,066,163

Construction of Main Feeder Pipe line including supply, Earth work,


Structure, laying , jointing, testing and commissioning--(total Length
3.2
3.2.1

3.2.2

3.2.3

3.2.4

= 128.886 Km)

128.886

665,679,576

ZONE 1

0.26

32,848,580
Supply of pipes

Kms

6.360

6.360

3,615,410

22,994,006

70%

6.360

22,994,006

Earth work, Laying and Jointing

Kms

6.360

6.175

1,187,920

7,555,173

23%

6.050

7,186,918

Testing

Kms

6.360

103,297

656,972

2%

34,057,160

70%

9.420

34,057,160

11,190,210

23%

9.327

11,079,733

973,062

2%

18,807,362

70%

5.202

18,807,362

6,179,562

23%

5.179

6,152,239

537,353

2%

1.433

148,025

19,740,137

70%

5.460

19,740,137

ZONE 2

6.360

0.125

148,490

6.175

6.175

637,862

6.175

22,994,006
7,335,408 MB no 581 Pgno 58 To 59
637,862 MB no 585 Pgno 51 To 52

48,653,086
Supply of pipes

Kms

9.420

9.420

3,615,410

Earth work, Laying and Jointing

Kms

9.420

9.327

1,187,920

Testing

Kms

9.420

103,297

ZONE 3

9.327

9.420

34,057,160

9.327

11,079,733

963,455

9.327

963,455 MB no 585 Pgno 51 To 51

26,867,659
Supply of pipes

Kms

5.202

5.202

3,615,410

Earth work, Laying and Jointing

Kms

5.202

5.179

1,187,920

Testing

Kms

5.202

5.179

103,297

ZONE 4

3.746

5.202

18,807,362

5.179

6,152,239

386,952

5.179

534,977 MB No 585,Pg No 52 To 53

28,200,196
Supply of pipes

Kms

5.460

5.460

3,615,410

5.460

19,740,137

209 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Sl. No.

3.2.5

3.2.6

3.2.7

3.2.8

3.2.9

3.2.10

3.2.11

3.2.12

3.2.13

3.2.14

3.2.15

3.2.16

3.2.17

3.2.18

3.2.19

3.2.20

3.2.21

3.2.22

3.2.23

Dated: 07-01-2014

Agt Value : Rs.

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Earth work, Laying and Jointing

Kms

5.460

5.409

Amount

3,810,546,305.00

Further Breakup
Percentage

1,187,920

Amount

Percentage

6,486,045

23%

Qty

Up to Aug - 2015

Present
Amount

Qty

5.409

6,425,461

Testing

Kms

5.460

5.409

103,297

564,004

2%

Supply of pipes

Kms

5.784

5.784

3,615,410

20,911,530

70%

5.784

20,911,530

Earth work, Laying and Jointing

Kms

5.784

5.730

1,187,920

6,870,931

23%

5.090

5,691,626

ZONE 5

Ra Bill - 13 & Part

Previous

Uptodate
Amount

Qty
-

Remarks

Amount
5.409
5.409

6,425,461

5.409

558,736

0.640

760,269

558,736 MB No 585,Pg No 53 To 53

4.902

17,722,738

0.143

169,873

4.882

5,799,428

4.882

504,298

29,873,614

Testing

Kms

5.784

597,472

2%

Supply of pipes

Kms

4.902

4.902

3,615,410

17,722,739

70%

4.902

17,722,738

Earth work, Laying and Jointing

Kms

4.902

4.882

1,187,920

103,297

5,823,186

23%

4.739

5,629,555

ZONE 6

5.784

20,911,530

5.730

6,451,895

25,318,198
-

Testing

Kms

4.902

4.882

103,297

506,364

2%

4.882

504,298

Supply of pipes

Kms

5.604

5.604

3,615,410

20,260,757

70%

5.604

20,260,756

5.604

20,260,756

Earth work, Laying and Jointing

Kms

5.604

3.095

1,187,920

6,657,106

23%

3.095

3,676,614

3.095

3,676,614

ZONE 7

28,943,938

Testing

Kms

5.604

578,879

2%

Supply of pipes

Kms

5.322

5.322

3,615,410

19,241,211

70%

5.322

19,241,211

5.322

19,241,211

Earth work, Laying and Jointing

Kms

5.322

5.286

1,187,920

103,297

6,322,112

23%

5.286

5,879,057

5.286

5,879,057

ZONE 8

27,487,444

Testing

Kms

5.322

549,749

2%

Supply of pipes

Kms

4.350

4.350

3,615,410

15,727,032

70%

4.350

15,727,032

Earth work, Laying and Jointing

Kms

4.350

4.334

1,187,920

103,297

5,167,453

23%

4.242

5,039,158

ZONE 9

22,467,189

Testing

Kms

4.350

449,344

2%

Supply of pipes

Kms

7.428

7.428

3,615,410

26,855,263

70%

7.428

26,855,264

Earth work, Laying and Jointing

Kms

7.428

7.354

1,187,920

103,297

8,823,872

23%

6.235

5,857,547

ZONE 10

0.092

109,289

1.119

1,329,283

1.611

1,913,740

4.350

15,727,032

4.334

5,148,447

38,364,662

Testing

Kms

7.428

767,293

2%

Supply of pipes

Kms

5.376

5.376

3,615,410

19,436,443

70%

5.376

19,436,443

Earth work, Laying and Jointing

Kms

5.376

5.375

1,187,920

103,297

6,386,260

23%

3.764

4,052,018

ZONE 11

7.428

26,855,264

7.354

7,186,830

27,766,347

103,297

19,436,443

5.375

5,965,758

Testing

Kms

5.376

555,327

2%

Supply of pipes

Kms

5.346

5.346

3,615,410

19,327,981

70%

5.346

19,327,981

5.346

19,327,981

Earth work, Laying and Jointing

Kms

5.346

5.313

1,187,920

6,350,622

23%

5.313

6,311,421

5.313

6,311,421

0.699

72,205

5.496

19,870,292

5.480

6,126,006

ZONE 12

5.376

27,611,401

Testing

Kms

5.346

0.699

103,297

552,228

2%

0.699

72,205

Supply of pipes

Kms

5.496

5.496

3,615,410

19,870,292

70%

5.496

19,870,292

Earth work, Laying and Jointing

Kms

5.496

5.480

1,187,920

6,528,810

23%

5.346

5,966,825

15,900,572

4.398

4.369

ZONE 13

28,386,132

Testing

Kms

5.496

Supply of pipes

Kms

4.398

4.398

3,615,410

103,297

Earth work, Laying and Jointing

ZONE 14

567,723

2%

15,900,572

70%

4.398

5,224,474

23%

0.134

159,181
-

22,715,103

Kms

4.398

4.369

1,187,920

Testing

Kms

4.398

Supply of pipes

Kms

5.700

5.700

3,615,410

Earth work, Laying and Jointing

103,297

ZONE 15

4.369

5,190,024

454,302

2%

20,607,836

70%

5.700

20,607,836

6,771,146

23%

15,900,572
5,190,024
-

29,439,765

Kms

5.700

5.687

1,187,920

Testing

Kms

5.700

Supply of pipes

Kms

4.584

4.584

3,615,410

Earth work, Laying and Jointing

103,297

ZONE 16

5.279

5,548,166

588,795

2%

16,573,038

70%

4.584

16,573,038

5,445,427

23%

0.408

484,671
-

5.700
5.687
-

20,607,836
6,032,837
-

23,675,769

Kms

4.584

4.568

1,187,920

Testing

Kms

4.584

Supply of pipes

Kms

4.788

4.788

3,615,410

Earth work, Laying and Jointing

103,297

ZONE 17

0.208

247,087

4.584

4.360

5,179,333

473,515

2%

17,310,582

70%

4.788

17,310,582

4.788

5,687,763

23%

4.788

4.568
-

16,573,038
5,426,420
-

24,729,403

Kms

4.788

4.788

1,187,920

Testing

Kms

4.788

Supply of pipes

Kms

4.986

4.986

3,615,410

Earth work, Laying and Jointing

103,297

ZONE 18

4.788

5,519,626

494,588

2%

18,026,433

70%

4.986

18,026,433

5,922,971

23%

17,310,582
5,519,626
-

25,752,047

Kms

4.986

4.956

1,187,920

Testing

Kms

4.986

Supply of pipes

Kms

4.650

4.650

3,615,410

Earth work, Laying and Jointing

103,297

ZONE 19

2.826

3,357,063

515,041

2%

16,811,656

70%

4.650

16,811,655

5,523,830

23%

2.130

2,530,270
-

4.986
4.956
-

18,026,433
5,887,333
-

24,016,651

Kms

4.650

4.627

1,187,920

Testing

Kms

4.650

Supply of pipes

Kms

5.352

5.352

3,615,410

Earth work, Laying and Jointing

103,297

ZONE 20

0.314

373,007

4.650

4.313

5,101,581

480,333

2%

19,349,673

70%

5.352

19,349,673

5.352

6,357,750

23%

5.189

4.627
-

16,811,655
5,474,588
-

27,642,390

Kms

5.352

5.189

1,187,920

Testing

Kms

5.352

Supply of pipes

Kms

5.424

5.424

3,615,410

Earth work, Laying and Jointing

5.392

1,187,920

5.124

3,615,410

103,297

ZONE 21

5.189

6,001,496

552,848

2%

19,609,983

70%

5.424

19,609,983

6,443,280

23%

19,349,673
6,001,496
-

28,014,261

Kms

5.424

Testing

Kms

5.424

Supply of pipes

Kms

5.124

Earth work, Laying and Jointing

103,297

ZONE 22

5.234

5,980,254

560,285

2%

18,525,359

70%

5.124

18,525,360

6,086,904

23%

0.158

187,691
-

5.424
5.392
-

19,609,983
6,167,945
-

26,464,799

Kms

5.124

5.116

1,187,920

Testing

Kms

5.124

Supply of pipes

Kms

7.830

7.830

3,615,410

Earth work, Laying and Jointing

Kms

7.830

6.735

1,187,920

Testing

Kms

7.830

103,297

ZONE 23

1.543

1,766,234

529,296

2%

28,308,659

70%

7.830

28,308,658

9,301,416

23%

2.860

808,819

2%

3.573

4,244,439
-

5.124
5.116
-

18,525,360
6,010,673
-

40,440,941

103,297

Total Amount :-

665,679,576

3,397,452

3.875

4,603,191

592,185,333

44.069

20,311,785

23.680

105,709

665,679,576

7.830
6.735
-

28,308,658
8,000,644
612,497,119

Construction of Pipe network of Mains and Submains for Blocks----3.3


3.3.1

3.3.2

3.3.3

3.3.4

3.3.5

3.3.6

3.3.7

3.3.8

3.3.9

3.3.10

3.3.11

(Total Length 1950.030 Km)

1,950.030

435,252,031

ZONE 1

17%

20,506,082
Supply of pipes

Kms

91.872

91.872

156,242

14,354,257

70%

91.872

14,354,257

Earth work, Laying and Jointing

Kms

91.872

79.733

51,337

4,716,399

23%

79.733

4,093,224

Testing

Kms

91.872

23.680

4,464

410,122

2%

Commissioning

Kms

91.872

1,025,304

5%

11,160

ZONE 2

91.872

14,354,257

79.733

4,093,224

23.680
-

105,709 MB No 585 Pgno 42 To 50


-

17,984,337
Supply of pipes

Kms

80.574

80.574

156,242

12,589,036

70%

80.574

12,589,036

Earth work, Laying and Jointing

Kms

80.574

80.574

51,337

Testing

Kms

80.574

35.093

Commissioning

Kms

80.574

4,136,398

23%

80.574

3,623,031

4,464

359,687

2%

20.163

90,009

11,160

899,217

5%

ZONE 3

14.930

80.574

12,589,036

80.574

3,623,031

66,648
-

35.093
-

156,657 MB No 585,Pg No 29 To 34
-

17,701,763
Supply of pipes

Kms

79.308

79.308

156,242

12,391,234

70%

79.308

12,391,234

Earth work, Laying and Jointing

Kms

79.308

79.308

51,337

Testing

Kms

79.308

48.288

Commissioning

Kms

79.308

79.308

12,391,234

4,071,405

23%

73.668

3,781,867

5.640

289,539

79.308

4,071,406 MB No 581 Pgno 52 To 54

4,464

354,035

2%

33.151

147,988

15.137

67,572

48.288

215,560 MB No 581 Pgno 24 To 29

11,160

885,088

5%

ZONE 4

18,801,259
Supply of pipes

Kms

84.234

84.234

156,242

13,160,881

70%

84.234

13,160,881

Earth work, Laying and Jointing

Kms

84.234

84.234

51,337

4,324,290

23%

74.616

3,830,534

Testing

Kms

84.234

25.199

4,464

Commissioning

Kms

84.234

Supply of pipes

Kms

78.018

78.018

156,242

Earth work, Laying and Jointing

Kms

78.018

78.018

51,337

Testing

Kms

78.018

27.637

Commissioning

Kms

78.018

376,025

11,160

ZONE 5

2%

940,063

5%

12,189,682

70%

78.018

12,189,682

4,005,181

84.234

9.618

493,756

84.234

25.199

112,490

25.199

13,160,881
4,324,290 MB No 581 Pgno 58 To 59 & 62 To 64
112,490 MB No 581 Pgno 34 To 42
-

17,413,831

4,464
11,160

ZONE 6

23%

73.918

3,794,701

348,277

2%

27.637

123,373

870,692

5%

4.100

210,480
-

78.018

12,189,682

78.018

4,005,181

27.637

123,373

18,222,718
Supply of pipes

Kms

81.642

81.642

156,242

12,755,903

70%

81.642

12,755,902

Earth work, Laying and Jointing

Kms

81.642

81.642

51,337

4,191,225

23%

78.018

4,005,181

Testing

Kms

81.642

4,464

364,454

2%

Commissioning

Kms

81.642

11,160

911,136

5%

ZONE 7

3.624

186,044

81.642

12,755,902

81.642

4,191,225

18,924,021
Supply of pipes

Kms

84.784

84.784

156,242

13,246,815

70%

84.784

13,246,815

Earth work, Laying and Jointing

Kms

84.784

80.101

51,337

Testing

Kms

84.784

33.382

Commissioning

Kms

84.784

4,352,525

23%

64.055

3,288,368

4,464

378,480

2%

33.382

149,019

11,160

946,201

5%

ZONE 8

16.046

823,748
-

84.784

13,246,815

80.101

4,112,116

33.382

149,019

20,100,299
Supply of pipes

Kms

90.054

90.054

156,242

14,070,209

70%

90.054

14,070,209

Earth work, Laying and Jointing

Kms

90.054

86.155

51,337

4,623,069

23%

71.633

3,677,397

Testing

Kms

90.054

Commissioning

Kms

90.054

Supply of pipes

Kms

90.384

90.384

156,242

4,464

Earth work, Laying and Jointing

Kms

90.384

87.271

51,337

Testing

Kms

90.384

40.892

Commissioning

Kms

90.384

402,006

11,160

ZONE 9

2%

14.522

1,005,015

5%

14,121,769

70%

90.384

14,121,769

745,511
-

90.054

14,070,209

86.155

4,422,908

20,173,956
-

90.384

14,121,769

4,640,010

23%

76.186

3,911,132

11.085

569,067

87.271

4,480,199

4,464

403,479

2%

30.428

135,832

10.464

46,712

40.892

182,544

11,160

1,008,698

5%

ZONE 10

18,458,420
Supply of pipes

Kms

82.698

82.698

156,242

12,920,894

70%

82.698

12,920,894

Earth work, Laying and Jointing

Kms

82.698

68.072

51,337

55.359

2,841,944

Testing

Kms

82.698

51.965

Commissioning

Kms

82.698

4,245,437

23%

4,464

369,168

2%

11,160

922,921

5%

ZONE 11

82.698

12,920,894

12.713

652,643

68.072

3,494,587

51.965

231,975

51.965

231,975

19,312,840
Supply of pipes

Kms

86.526

86.526

156,242

13,518,988

70%

86.526

13,518,988

Earth work, Laying and Jointing

Kms

86.526

76.874

51,337

4,441,953

23%

70.785

3,633,863

6.089

312,589

86.526

13,518,988

76.874

3,946,452

210 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Sl. No.

3.3.12

3.3.13

3.3.14

3.3.15

3.3.16

3.3.17

3.3.18

3.3.19

3.3.20

3.3.21

3.3.22

3.3.23

Dated: 07-01-2014

Agt Value : Rs.

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Testing

Kms

86.526

Commissioning

Sub-Breakup

Rate

Amount

66.083

4,464
11,160

Qty

Amount

2%

Qty
-

86.526

965,642

5%

Kms

83.196

83.196

156,242

12,998,703

70%

83.196

12,998,702

Kms

83.196

83.193

51,337

4,271,002

23%

75.463

3,874,016

2%

Uptodate
Amount

Qty

66.083

294,998

7.730

396,832

Remarks

Amount
66.083

294,998
-

18,569,575

Testing

Kms

83.196

53.990

4,464

Commissioning

Kms

83.196

Supply of pipes

Kms

80.622

80.622

156,242

Earth work, Laying and Jointing

Kms

80.622

77.699

51,337

Testing

Kms

80.622

Commissioning

Kms

80.622

371,392

11,160

ZONE 13

53.990

241,014

928,479

5%

12,596,536

70%

80.622

12,596,536

4,138,862

23%

41.676

2,139,505

83.196

12,998,702

83.193

4,270,848

53.990

241,014
-

17,995,051

4,464
11,160

ZONE 14

359,901

2%

899,753

5%

36.023

1,849,299

80.622

12,596,536

77.699

3,988,804

16,901,358
Supply of pipes

Kms

75.722

75.722

156,242

11,830,951

70%

75.722

11,830,950

Earth work, Laying and Jointing

Kms

75.722

75.722

51,337

Testing

Kms

75.722

13.338

Commissioning

Kms

75.722

3,887,312

23%

61.696

3,167,265

4,464

338,027

2%

13.338

30,173

11,160

845,068

5%

14,135,831

70%

90.474

14,135,831

ZONE 15

14.026

720,048
-

75.722

11,830,950

75.722

3,887,313

13.338

30,173

20,194,044
Supply of pipes

Kms

90.474

90.474

156,242

Earth work, Laying and Jointing

Kms

90.474

88.553

51,337

Testing

Kms

90.474

49.030

Commissioning

Kms

90.474

4,644,630

23%

66.795

3,429,030

4,464

403,881

2%

49.030

218,873

11,160

1,009,702

5%

ZONE 16

21.758

1,116,982
-

90.474

14,135,831

88.553

4,546,012

49.030

218,873

19,706,570
Supply of pipes

Kms

88.290

88.290

156,242

13,794,599

70%

88.290

13,794,599

Earth work, Laying and Jointing

Kms

88.290

87.599

51,337

4,532,511

23%

74.035

3,800,707

Testing

Kms

88.290

Commissioning

Kms

88.290

Supply of pipes

Kms

89.166

89.166

156,242

4,464

Earth work, Laying and Jointing

Kms

89.166

89.166

51,337

Testing

Kms

89.166

Commissioning

Kms

89.166

394,131

11,160

ZONE 17

13.564

2%

696,330
-

985,329

5%

13,931,467

70%

89.166

13,931,467

4,577,482

23%

73.065

3,750,911

88.290

13,794,599

87.599

4,497,037

19,902,095

4,464
11,160

ZONE 18

398,042

2%

995,105

5%

16.101

826,571

89.166

13,931,467

89.166

4,577,482

19,136,063
Supply of pipes

Kms

85.734

85.734

156,242

13,395,244

70%

85.734

13,395,245

Earth work, Laying and Jointing

Kms

85.734

85.031

51,337

76.168

3,910,208

Testing

Kms

85.734

Commissioning

Kms

85.734

4,401,294

23%

4,464

382,721

2%

11,160

956,803

5%

ZONE 19

8.863

454,997

85.734

13,395,245

85.031

4,365,205

17,506,237
Supply of pipes

Kms

78.432

78.432

156,242

12,254,366

70%

78.432

12,254,366

78.432

12,254,366

Earth work, Laying and Jointing

Kms

78.432

70.675

51,337

4,026,435

23%

70.675

3,628,216

70.675

3,628,216

Testing

Kms

78.432

Commissioning

Kms

78.432

Supply of pipes

Kms

77.754

77.754

156,242

4,464

Earth work, Laying and Jointing

Kms

77.754

76.926

51,337

Testing

Kms

77.754

Commissioning

Kms

77.754

350,125

11,160

ZONE 20

2%

875,312

5%

12,148,434

70%

77.754

12,148,434

3,991,628

23%

64.688

3,320,864

17,354,906

4,464
11,160

ZONE 21

347,098

2%

867,745

5%

12.238

628,258

77.754

12,148,434

76.926

3,949,122

19,884,685
Supply of pipes

Kms

89.088

89.088

156,242

13,919,280

70%

89.088

13,919,280

Earth work, Laying and Jointing

Kms

89.088

79.293

51,337

79.293

4,070,635

Testing

Kms

89.088

0.998

Commissioning

Kms

89.088

4,573,478

23%

4,464

397,694

2%

11,160

994,234

5%

ZONE 22

0.998

89.088

13,919,280

79.293

4,070,635

0.998

4,455

4,455
-

18,412,886
Supply of pipes

Kms

82.494

82.494

156,242

12,889,020

70%

82.494

12,889,021

Earth work, Laying and Jointing

Kms

82.494

82.491

51,337

73.532

3,774,885

Testing

Kms

82.494

11.573

Commissioning

Kms

82.494

4,234,964

23%

4,464

368,258

2%

11,160

920,644

5%

ZONE 23

82.494

12,889,021

8.959

459,925

82.491

4,234,810

11.573

51,663

11.573

51,663

22,089,036
Supply of pipes

Kms

98.964

98.964

156,242

15,462,325

70%

98.964

15,462,325

Earth work, Laying and Jointing

Kms

98.964

67.769

51,337

5,080,478

23%

34.813

1,787,182

Testing

Kms

98.964

441,781

2%

Commissioning

Kms

98.964

1,104,452

5%

4,464
11,160
435,252,032
25,603,061

435,252,032
1.25%

25,603,061

25,603,061

1.25%
-

98.964

15,462,325

67.769

3,479,032

1,691,850

475.684

14,106,688

100.00%

25,603,061

100.00%

25,603,061

100.00%

25,603,061

100.00%

25,603,061

386,947,371

25,603,061

32.956

401,054,061

CIVIL WORKS
Construction of Sump

a
b
c

Earthwork

100%

95%

2,738,830

Foundation Concrete work

100%

42%

2,738,830

Structure concrete work

100%

10%

5,477,661

Pump House

Earthwork

Foundation Concrete work

c
4.3

Percentage
386,257

Kms

Total Amount :-

4.2

Amount

Up to Aug - 2015

Present

Supply of pipes

3.4 Construction of Structures on pipe line network

Percentage

Ra Bill - 13 & Part

Previous

Earth work, Laying and Jointing

ZONE 12

Total Amount :-

4.1

3,810,546,305.00

Further Breakup

Structure concrete work


Construction of Control rooms

100%

95%

2,857,910

100%

95%

1,143,164

100%

44%

7,430,565

23 Nos

10,955,321

23%

11,431,639

24%

25,244,869

Earthwork

23.00

21.00

274,401

Foundation Concrete work

23.00

21.00

109,760

Structure concrete work

23.00

18.00

713,442

Total Amount :-

2,738,830

25%

95.00%

2,601,889

95.00%

2,601,889

2,738,830

25%

42.41%

1,161,483

42.41%

1,161,483

5,477,661

50%

9.86%

540,152

9.86%

540,152

2,857,910

25%

95.00%

2,715,015

95.00%

2,715,015

1,143,164

10%

95.00%

1,086,006

95.00%

1,086,006

7,430,565

65%

44.00%

3,105,976

44.00%

3,105,976

6,311,217

25%

18.00

4,692,257

3.00

2,524,487

10%

18.00

1,876,896

3.00

16,409,165

65%

17.00

11,522,088

1.00

53%

858,712,025

876,934,743

29,301,761

782,043

21.00

312,816

21.00

2,189,712

677,770

18.00

12,199,858

5,474,300

1,772,629

31,074,390

5 DRIP SYSTEM
5.1 Primary HCU-Q=425 Cum/hr
5.1.1

5.1.2

5.1.3

5.1.4

5.1.5

5.1.6

5.1.7

5.1.8

5.1.9

5.1.10

5.1.11

5.1.12

5.1.13

5.1.14

5.1.15

5.1.16

5.1.17

5.1.18

23.00

29,722,261

Zone 1

3.00%

1,292,272
Supply

Nos

1.00

1.00

904,591

Instalation

Nos

1.00

1.00

323,068

Zone 2

904,591

70%

100.00%

904,586

0.00%

100.00%

904,586

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

1,292,272
Supply

Nos

1.00

1.00

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

Instalation

Nos

1.00

1.00

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

Zone 3

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 4

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 5

1,292,272

Zone 6

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 7

100.00%

323,068

1,292,272
Supply

Nos

1.00

1.00

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

Instalation

Nos

1.00

1.00

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

100.00%

904,583

100.00%

323,068

Zone 8

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 9

100.00%

323,068

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 10

1,292,272

Zone 11

100.00%

323,068

1,292,272
Supply

Nos

1.00

1.00

904,591

70%

Instalation

Nos

1.00

1.00

323,068

25%

904,591

70%

100.00%

904,583

0.00%

100.00%

904,583

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

904,591

70%

100.00%

904,583

0.00%

100.00%

904,583

323,068

25%

904,591

70%

88.27%

798,451

11.73%

106,108

100.00%

904,559

100.00%

92.04%

832,521

Zone 12

100.00%

904,583

0.00%
100.00%

323,068

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 13

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

323,068

25%

Supply

Nos

1.00

1.00

904,591

70%

Instalation

Nos

1.00

1.00

323,068

25%

904,591

70%

323,068

25%

904,591

70%

323,068

25%

904,591

70%

Zone 14

0.00%

0.00%

1,292,272

Zone 15

323,068

100.00%

323,068

7.96%

71,995

100.00%

904,516

100.00%

323,068

100.00%

323,068

6.15%

55,632

100.00%

904,545

100.00%

323,068

100.00%

323,068

7.47%

67,573

100.00%

904,565

100.00%

323,068

100.00%

323,068

7.47%

67,573

100.00%

904,565

1,292,272

Zone 16

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 17

93.85%

848,913

92.53%

836,992

1,292,272

Zone 18

1,292,272
Supply

Nos

1.00

1.00

92.53%

836,992

211 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Sl. No.

5.1.19

Zone 19

5.1.20

Zone 20

5.1.21

Dated: 07-01-2014

Agt Value : Rs.

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Instalation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Amount

1.00

Instalation

Nos

1.00

1.00

323,068

25%

Supply

Nos

1.00

1.00

904,591

70%

Instalation

Nos

1.00

323,068

25%

904,591

70%

323,068

25%

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Nos

230.00

Supply

Nos

10.00

10.00

75,383

Instalation

Nos

10.00

10.00

26,922

Secondary Head Control Unit

29,722,261

Supply

Nos

10.00

10.00

Instalation

Nos

10.00

10.00

Supply

Nos

10.00

10.00

Instalation

Nos

10.00

10.00

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

5.3.2

5.3.3

5.3.4

5.3.5

5.3.6

5.3.7

5.3.8

5.3.9

5.3.10

5.3.11

5.3.12

5.3.13

5.3.14

5.3.15

904,555

9.94%

88.23%

798,110

11.77%

106,481

100.00%

904,591

100.00%

323,068

100.00%

323,068

88.23%

798,110

11.77%

106,470

100.00%

904,580

0.00%

0.00%

88.29%

798,633

11.71%
100.00%

29,722,261

22,544,079

0.00%

0.00%

105,958

100.00%

323,068

100.00%

5,691,791

753,825

70%

100.00%

753,825

0.00%

269,223

25%

60.00%

161,534

40.00%

753,825

70%

100.00%

753,825

0.00%

269,223

25%

50.00%

134,612

50.00%

753,825

70%

100.00%

753,825

0.00%

269,223

25%

40.00%

107,689

60.00%

753,825

70%

100.00%

753,825

0.00%

269,223

25%

10.00%

26,922

90.00%

753,825

70%

100.00%

753,825

0.00%

269,223

25%

100.00%

10.00

753,825

70%

100.00%

753,825

0.00%

10.00

269,223

25%

90.00%

242,301

10.00%

904,591
323,068
28,235,869

107,689

100.00%

753,825

100.00%

269,223 MB No 540 Pg no 50

100.00%

134,611

753,825

100.00%

269,223 MB No 540 Pg no 50

100.00%

161,534

753,825

100.00%

269,223 MB No 540 Pg no 50

100.00%

242,301

753,825

100.00%

269,223 MB No 540 Pg no 50

100.00%

269,223

753,825

100.00%

753,825

70%

100.00%

753,825

0.00%

269,223

25%

753,825

70%

269,223

25%

753,825

70%

269,223

25%

26,922

269,223

100.00%

753,825

100.00%

269,223

100.00%

753,825

100.00%

269,223

100.00%

753,825

100.00%

269,223

100.00%

753,850

100.00%

269,223

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

100.00%

269,223

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

100.00%

753,825

100.00%

753,850

0.00%
100.00%

269,223

1,076,894
0.00%
100.00%

269,223

1,076,894
Supply

Nos

10.00

10.00

753,825

70%

Installation

Nos

10.00

10.00

269,223

25%

100.00%

753,850

100.00%

753,850

100.00%

0.00%

269,223

753,825

70%

269,223

25%

753,825

70%

100.00%

753,826

0.00%

269,223

25%

100.00%

269,223

753,825

70%

100.00%

753,852

269,223

25%

80.00%

100.00%

269,223

0.08%

603

100.00%

753,819

100.00%

269,223

100.00%

269,223

100.00%

753,826

0.00%

100.00%

269,223

0.00%

100.00%

753,852

215,379

0.00%

80.00%

215,379

100.00%

753,857

100.00%

269,223

100.00%

753,825

100.00%

269,223

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

99.92%

753,216

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

Supply

Nos

10.00

10.00

Installation

Nos

10.00

8.00

1,076,894

1,076,894
Supply

Nos

10.00

10.00

753,825

70%

88.86%

669,881

11.14%

Installation

Nos

10.00

10.00

269,223

25%

100.00%

269,223

0.00%

83,976

753,825

70%

98.53%

742,776

1.47%

269,223

25%

100.00%

269,223

0.00%

753,825

70%

89.85%

677,356

10.14%

76,469

100.00%

753,825

269,223

25%

70.00%

188,456

30.00%

80,767

100.00%

269,223

753,825

70%

89.85%

677,356

10.14%

76,469

100.00%

753,825

269,223

25%

100.00%

269,223

100.00%

269,223

753,825

70%

85.14%

641,851

14.86%

111,974

100.00%

753,825

269,223

25%

100.00%

269,223

100.00%

269,223

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

11,049
-

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00
1,076,894

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

1,076,894

1,076,894
Supply

Nos

10.00

10.00

753,825

70%

85.14%

641,851

14.86%

111,974

100.00%

753,825

Installation

Nos

10.00

10.00

269,223

25%

20.00%

53,845

80.00%

215,379

100.00%

269,224

753,825

70%

83.69%

630,920

16.30%

122,905

100.00%

753,825

269,223

25%

100.00%

269,223

100.00%

269,223

753,825

70%

16.30%

122,871

100.00%

753,825

269,223

25%

100.00%

269,223

100.00%

269,223

753,825

70%

16.30%

122,871

100.00%

753,825

269,223

25%

100.00%

269,223

100.00%

269,223

16.30%

122,871

100.00%

100.00%

269,223

100.00%

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00
1,076,894

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

83.70%

630,954

83.70%

630,954

1,076,894

1,076,894
Supply

Nos

10.00

10.00

753,825

Installation

Nos

10.00

10.00

269,223

Total Amount :-

5.3

100.00%

814,596

10.00

Zone 23

5.3.1

323,068

89,959

90.05%

10.00

Zone 22

5.2.23

904,584

100.00%

Nos

Zone 21

5.2.22

100.00%

Nos

Zone 20

5.2.21

68,020
323,068

Supply

Zone 19

5.2.20

7.52%
100.00%

Installation

Zone 18

5.2.19

836,564

1,076,894

Zone 17

5.2.18

92.48%

1,076,894

Zone 16

5.2.17

323,068

1,076,894

Zone 15

5.2.16

Remarks

Amount
100.00%

1,076,894

Zone 14

5.2.15

Qty
323,068

1,076,894

Zone 13

5.2.14

Amount
100.00%

1,076,894

Zone 12

5.2.13

Qty

1,292,272

Zone 11

5.2.12

Amount

1,292,272

Zone 10

5.2.11

Qty

Uptodate

1,292,272

Zone 9

5.2.10

70%

1.00

Zone 8

5.2.9

25%

904,591

1.00

Zone 7

5.2.8

323,068

1.00

Zone 6

5.2.7

70%

Nos

Zone 5

5.2.6

904,591

Nos

Zone 4

5.2.5

25%

Supply

Zone 3

5.2.4

70%

323,068

Instalation

Zone 2

5.2.3

904,591

1.00

Zone 1

5.2.2

25%

Nos

Total Amount :-

5.2.1

Percentage
323,068

Supply

Zone 23

5.2

Amount

Up to Aug - 2015

Present

1,292,272

Zone 22

5.1.23

Percentage

Ra Bill - 13 & Part

Previous

1,292,272

Zone 21

5.1.22

3,810,546,305.00

Further Breakup

Automatic Electrical Valves per 4-6 growers parcel

24,768,551

Nos

83.70%

630,954

25%

24,445,483

18,312,457

5,163,915

753,825
269,223
23,476,372

2,300.00

Zone 1

1,292,272
Supply

Nos

100.00

100.00

9,046

Installation

Nos

100.00

100.00

3,231

Zone 2

904,591

70.00%

100.00%

904,591

323,068

25.00%

5.00%

16,153

95.00%

306,915

50.00%

161,534

100.00%

904,591

100.00%

323,068 MB No 540 Pg no 51

100.00%

904,591

100.00%

323,068 MB No 540 Pg no 51

100.00%

904,591

100.00%

323,068 MB No 540 Pg no 51

100.00%

904,591

100.00%

323,068 MB No 540 Pg no 51

100.00%

904,591

100.00%

323,068

100.00%

904,591

100.00%

323,068

100.00%

904,591

100.00%

323,068

100.00%

904,591

100.00%

323,068

100.00%

904,591

100.00%

323,068

100.00%

904,591

100.00%

323,068

100.00%

904,591

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

904,591

70.00%

100.00%

904,591

Installation

Nos

100.00

100.00

323,068

25.00%

50.00%

161,534

904,591

70.00%

100.00%

904,591

323,068

25.00%

904,591

70.00%

323,068

25.00%

904,591

70.00%

323,068

25.00%

Zone 3

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 4

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 5

100.00%

904,591

100.00%

904,591

100.00%

323,068

1,292,272

Zone 6

100.00%

323,068

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

904,591

70.00%

Installation

Nos

100.00

100.00

323,068

25.00%

904,591

70.00%

323,068

25.00%

904,591

70.00%

323,068

25.00%

904,591

70.00%

323,068

25.00%

Zone 7

100.00%

904,591

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 8

100.00%

904,591

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 9

100.00%

904,591

100.00%

904,591

100.00%

323,068

1,292,272

Zone 10

100.00%

323,068

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

904,591

70.00%

Installation

Nos

100.00

100.00

323,068

25.00%

904,591

70.00%

323,068

25.00%

904,591

70.00%

100.00%

904,591

100.00%

904,591

323,068

25.00%

100.00%

323,068

100.00%

323,068

904,591

70.00%

100.00%

904,591

100.00%

904,591

323,068

25.00%

100.00%

323,068

904,591

70.00%

100.00%

904,591

100.00%

904,591

323,068

25.00%

97.00%

313,376

100.00%

323,068

904,591

70.00%

100.00%

904,591

100.00%

904,591

Zone 11

100.00%

904,591

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 12

100.00%

904,591

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 13

1,292,272

Zone 14

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 15

3.00%

9,692

1,292,272
Supply

Nos

100.00

100.00

212 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Sl. No.

5.3.16

Zone 16

5.3.17

Zone 17

5.3.18

5.3.19

5.3.20

5.1.21

5.3.22

5.3.23

Dated: 07-01-2014

Agt Value : Rs.

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Installation

Nos

100.00

100.00

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Sub-Breakup

Rate

Amount

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

5.4.3

5.4.4

5.4.5

5.4.6

5.4.7

5.4.8

5.4.9

5.4.10

5.4.11

5.4.12

5.4.13

5.4.14

5.4.15

5.4.16

5.4.17

5.4.18

5.4.19

5.4.20

5.4.21

5.4.22

5.4.23

5.5.1

5.5.2

5.5.3

5.5.4

5.5.5

5.5.6

5.5.9

5.5.10

70.00%

323,068

25.00%

904,591

70.00%

323,068

25.00%

100.00%

904,585

100.00%

904,585

Qty

Remarks

Amount

100.00%

323,068

100.00%

904,591

100.00%

323,068

100.00%

904,585

100.00%

323,068

100.00%

904,585

100.00%

323,068

100.00%

904,585

100.00%

323,068

100.00%

904,585

100.00%

323,068

100.00%

904,585

100.00%

323,068

100.00%

904,585

100.00%

323,068

323,068

100.00%

70.00%

100.00%

904,585

323,068

25.00%

9.00%

29,076

323,068

100.00%

323,068

91.00%

293,992

904,591

70.00%

100.00%

904,585

323,068

25.00%

904,591

70.00%

323,068

25.00%

904,591

70.00%

323,068

25.00%

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

100.00%

904,585

100.00%

904,585

100.00%

323,068

1,292,272
100.00%

323,068

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

904,591

70.00%

Installation

Nos

100.00

100.00

323,068

25.00%

29,722,261
12,100.00

44,583,392

27,913,080

100.00%

904,585

0.00%

21,971,822

100.00%

1,263,845

100.00%
100.00%

6,264,290

904,585
323,068
28,236,112

5%

1,805,443
Supply

Nos

490.00

490.00

2,579

Installation

Nos

490.00

490.00

921

1,263,810

70.00%

451,361

25.00%

1,232,860

70.00%

100.00%

451,361

100.00%
100.00%

1,263,845
451,361 MB No 540 Pg no 53

1,761,228
Supply

Nos

478.00

478.00

Installation

Nos

478.00

478.00

Supply

Nos

478.00

478.00

Installation

440,307

25.00%

1,232,860

70.00%

100.00%

1,232,802

100.00%

1,232,802

100.00%

1,219,867

100.00%

440,307

100.00%
100.00%

1,232,802
440,307 MB No 540 Pg no 53

1,761,228

Nos

478.00

478.00

440,307

25.00%

Supply

Nos

473.00

473.00

1,219,964

70.00%

Installation

Nos

473.00

473.00

435,701

25.00%

Supply

Nos

503.00

503.00

1,297,340

70.00%

Installation

Nos

503.00

503.00

Supply

Nos

507.00

507.00

Installation

Nos

507.00

507.00

Supply

Nos

603.00

603.00

Installation

Nos

603.00

603.00

Supply

Nos

618.00

618.00

Installation

100.00%

440,307

100.00%

435,701

100.00%
100.00%

1,232,802
440,307 MB No 540 Pg no 53

1,742,805
-

100.00%
100.00%

1,219,867
435,701 MB No 540 Pg no 53

1,853,343

463,336

25.00%

1,307,657

70.00%

100.00%

1,297,346

100.00%

1,307,693

100.00%

1,555,392

100.00%

1,594,018

100.00%

1,490,751

100.00%

463,336

100.00%

1,297,346

100.00%

463,336

100.00%

1,307,693

1,868,081

Zone 7

467,020

25.00%

1,555,260

70.00%

100.00%

467,020

100.00%

467,020

100.00%

1,555,392

2,221,800

Zone 8

555,450

25.00%

1,593,948

70.00%

100.00%

555,450

100.00%

555,450

100.00%

1,594,018

2,277,069

Nos

618.00

618.00

569,267

25.00%

Supply

Nos

578.00

578.00

1,490,780

70.00%

Installation

Nos

578.00

578.00

532,422

25.00%

Supply

Nos

561.00

561.00

1,446,934

70.00%

Installation

Nos

561.00

561.00

Supply

Nos

578.00

578.00

Installation

Nos

578.00

578.00

Supply

Nos

506.00

506.00

Installation

Zone 9

100.00%

569,267

100.00%

532,422

100.00%

569,267

100.00%

1,490,751

2,129,686

Zone 10

100.00%

532,422

100.00%

1,446,939

2,067,048

Zone 11

516,762

25.00%

1,490,780

70.00%

100.00%

1,446,939

100.00%

1,490,805

100.00%

1,305,035

100.00%

1,312,844

100.00%

516,762

100.00%

516,762

100.00%

1,490,805

2,129,686

Zone 12

532,422

25.00%

1,305,077

70.00%

100.00%

532,422

100.00%

532,422

100.00%

1,305,035

1,864,396

Nos

506.00

506.00

466,099

25.00%

Supply

Nos

509.00

509.00

1,312,815

70.00%

Installation

Nos

509.00

509.00

468,863

25.00%

Supply

Nos

452.00

452.00

1,165,800

70.00%

Installation

Nos

452.00

452.00

Supply

Nos

510.00

509.98

Installation

Nos

510.00

510.00

Supply

Nos

531.00

531.00

Installation

Zone 13

100.00%

466,099

100.00%

468,863

100.00%

466,099

100.00%
100.00%

1,312,844
468,863

0.71%

8,294

100.00%

1,165,800

100.00%

416,357

100.00%

416,357

0.63%

8,236

100.00%

1,315,394

100.00%

469,784

100.00%

469,784

0.61%

8,283

100.00%

1,369,558

100.00%

1,875,450

Zone 14

1,665,429

Zone 15

416,357

25.00%

1,315,394

70.00%

99.29%

1,157,506

99.37%

1,307,158

99.39%

1,361,275

99.37%

1,307,110

1,879,135

Zone 16

469,784

25.00%

1,369,558

70.00%

1,956,511

Nos

531.00

531.00

489,128

25.00%

Supply

Nos

510.00

510.00

1,315,394

70.00%

Installation

Nos

510.00

510.00

469,784

25.00%

Supply

Nos

533.00

533.00

1,374,716

70.00%

Installation

Nos

533.00

533.00

Supply

Nos

470.00

470.00

Installation

Nos

470.00

470.00

Supply

Nos

521.00

521.02

Installation

Zone 17

489,128

100.00%

489,128

0.63%

8,284

100.00%

1,315,394

100.00%

469,784

100.00%

469,784

0.60%

8,239

100.00%

1,374,716

100.00%

490,970

100.00%

490,970

58.55%

709,712

100.00%

1,212,226

100.00%

432,938

100.00%

432,938

52.81%

709,705

100.00%

1,343,766

100.00%

1,879,135

Zone 18

1,963,880

Zone 19

490,970

25.00%

1,212,226

70.00%

99.40%

1,366,477

41.45%

502,514

47.19%

634,061

45.52%

592,851

1,731,752

Zone 20

432,938

25.00%

1,343,766

70.00%

1,919,665

Nos

521.00

521.00

479,916

25.00%

Supply

Nos

505.00

505.02

1,302,498

70.00%

Installation

Nos

505.00

505.00

465,178

25.00%

Supply

Nos

553.00

553.01

1,426,300

70.00%

Installation

Nos

553.00

553.00

Supply

Nos

633.00

633.00

Installation

Nos

633.00

633.00

Zone 21

479,916

100.00%

479,916

54.48%

709,647

100.00%

1,302,498

100.00%

465,178

100.00%

465,178

54.79%

781,484

100.00%

1,426,300

100.00%

509,393

100.00%

509,393

47.87%

781,437

100.00%

1,632,636

583,085

100.00%

1,860,712

Zone 22

2,037,572

Zone 23

509,393

25.00%

1,632,636

70.00%

583,085

25.00%

45.21%

644,816

52.13%

851,199

0.00%

27,475,106

100.00%

23,920,849

2,332,338

44,583,392

Emitting pipe & drip manifold

77,161,500

42,354,221

100.00%

14,879,169

583,085
42,354,275

80%

Zone 1

34,172,835
Supply

Mts

3,326,834

3,326,815

23,920,984

Installation

Mts

3,326,834

3,326,834

8,543,209

Zone 2

23,920,984

70.00%

8,543,209

25.00%

Supply

Mts

3,276,778

3,276,620

Installation

Mts

3,276,778

3,276,778

23,561,066

70.00%

8,414,666

25.00%

Supply

Mts

3,257,121

3,257,254

23,419,728

70.00%

Mts

3,257,121

3,257,121

8,364,189

25.00%

100.00%

100.00%

34,144,277
Mts

3,324,053

3,323,980

23,900,994

70.00%

Mts

3,324,053

3,324,053

8,536,069

25.00%

100.00%

34,647,019
Mts

3,372,997

3,373,010

24,252,913

70.00%

Mts

3,372,997

3,372,997

8,661,755

25.00%

100.00%

33,918,130
Mts

3,302,037

3,301,924

23,742,691

70.00%

Mts

3,302,037

3,302,037

8,479,532

25.00%

Supply

Mts

3,435,457

3,435,581

24,702,020

70.00%

Installation

Mts

3,435,457

3,435,457

8,822,150

25.00%

100.00%

35,288,600

Supply

Mts

3,441,823

3,441,889

24,747,793

70.00%

Mts

3,441,823

3,441,823

8,838,497

25.00%

100.00%

35,287,276
Mts

3,435,328

3,435,458

24,701,093

70.00%

Mts

3,435,328

3,435,328

8,821,819

25.00%

100.00%

34,318,526
Mts

3,341,017

3,341,077

24,022,968

70.00%

Mts

3,341,017

3,341,017

8,579,632

25.00%

Supply

Mts

3,249,691

3,249,705

23,366,308

70.00%

Installation

Mts

3,249,691

3,249,691

8,345,110

25.00%

100.00%

33,380,439

100.00%

8,536,069

100.00%

8,661,755

100.00%

8,479,532

100.00%

8,822,150

100.00%

8,838,497

100.00%

8,821,819

100.00%

8,579,632

100.00%

8,345,110

100.00%
100.00%

70.00%

100.00%

23,420,685
8,364,189 MB No 540 Pg no 58

100.00%
100.00%

23,900,464
8,536,069 MB No 540 Pg no 58
-

24,253,009

100.00%

24,253,009

100.00%

8,661,755

100.00%

23,741,879

100.00%

8,479,532

100.00%

24,702,914

100.00%

8,822,150

100.00%

24,748,268

100.00%

8,838,497

100.00%

24,702,030

100.00%

8,821,819

100.00%

24,023,397

100.00%

8,579,632

100.00%

23,366,406

100.00%

8,345,110

100.00%

24,157,985

23,741,879

24,702,914

24,748,268

24,702,030

24,023,397

23,366,406

24,157,985

8,414,666 MB No 540 Pg no 58

23,900,464

24,157,693

8,543,209 MB No 540 Pg no 58

23,559,931

100.00%

34,510,991
3,359,754

8,364,189

23,420,685

Supply
Installation

3,359,754

100.00%

100.00%

Supply
Installation

Mts

8,414,666

Installation

Supply

100.00%

100.00%

100.00%

35,353,990

Zone 10

Supply
Installation

23,920,849

23,559,931

Supply
Installation

Zone 9

100.00%

Supply
Installation

Zone 6

100.00%

Installation

Zone 5

8,543,209

33,456,755

Zone 4

100.00%

33,658,665

Zone 3

Zone 12

904,591

Amount

100.00%

904,591

Zone 6

Zone 11

904,591

100.00

Zone 5

5.5.11

100.00%

25.00%

100.00

Zone 4

5.5.12

70.00%

323,068

100.00

Zone 3

Zone 8

904,591

100.00

Manual valves, fertilizer tank and fitting per grower parcel

Zone 7

Qty

Nos

Zone 23

5.5.8

323,068

Nos

Zone 22

5.5.7

Amount

Supply

Total Amount :5.5

100.00%

Installation

Zone 21

Zone 2

Qty

25.00%

1,292,272

Zone 20

Zone 1

Percentage
323,068

Uptodate

1,292,272

Zone 19

5.4.2

Amount

Up to Aug - 2015

Present

1,292,272

Zone 18

5.4.1

Percentage

Ra Bill - 13 & Part

Previous

1,292,272

Total Amount :5.4

3,810,546,305.00

Further Breakup

213 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Sl. No.

5.5.13

Zone 13

5.5.14

Zone 14

5.5.15

5.5.16

Zone 17

Zone 18

Exe.Qty

Sub-Breakup

Rate

Installation

Mts

3,359,754

3,359,754

Supply

Mts

3,363,281

3,363,281

Installation

Mts

3,363,281

3,363,281

Amount

Zone 21

Zone 22

5.6.2

Zone 2

5.6.3

5.6.4

5.6.5

5.6.6

5.6.7

5.6.8

5.6.9

5.6.10

5.6.11

5.6.12

5.6.13

5.6.14

5.6.15

5.6.16

5.6.17

5.6.18

5.6.19

5.6.20

5.6.21

22,610,402

70.00%

8,075,144

25.00%

5.7.1

5.7.2

5.7.3

5.7.4

5.7.5

5.7.6

5.7.7

5.7.8

5.7.9

100.00%

100.00%

33,567,119

Qty

Amount

Qty

100.00%

8,627,748

100.00%

8,636,803

100.00%

8,075,144

Mts

3,267,865

3,268,019

23,496,984

70.00%

Mts

3,267,865

3,267,865

8,391,780

25.00%

100.00%

100.00%

8,391,780

34,827,738

8,627,748

100.00%

24,183,385

100.00%

8,636,803

100.00%

22,609,840

100.00%

8,075,144

100.00%

23,498,085

100.00%

8,391,780

100.00%

8,706,935

100.00%

24,379,738

100.00%

8,706,935

100.00%

8,521,947

100.00%

23,860,851

100.00%

8,521,947

100.00%

8,667,934

100.00%

24,270,342

100.00%

8,667,934

0.18%
100.00%

43,557

100.00%

24,153,962

8,626,415

100.00%

8,626,415

0.18%
100.00%

43,562

100.00%

24,366,176

8,702,206

100.00%

8,702,206

0.18%
100.00%

43,566

100.00%

24,513,169

8,754,703

100.00%

8,754,703

0.18%
100.00%

43,569

100.00%

24,693,701

8,819,179

100.00%

8,819,179

0.17%
100.00%

43,591

100.00%

25,790,766

9,210,987

100.00%

9,210,987

24,183,385

22,609,840

23,498,085

Supply

Mts

3,390,591

3,390,635

24,379,417

70.00%

Installation

Mts

3,390,591

3,390,591

8,706,935

25.00%

Supply

Mts

3,318,554

3,318,471

23,861,451

70.00%

Installation

Mts

3,318,554

3,318,554

8,521,947

25.00%

100.00%

34,087,788

24,379,738

100.00%

34,671,737

23,860,851

Supply

Mts

3,375,403

3,375,421

24,270,216

70.00%

Installation

Mts

3,375,403

3,375,403

8,667,934

25.00%

100.00%

34,505,661

24,270,342

Supply

Mts

3,359,235

3,359,235

24,153,962

70.00%

Installation

Mts

3,359,235

3,359,235

8,626,415

25.00%

99.82%

34,808,822

24,110,405

Supply

Mts

3,388,749

3,388,749

24,366,176

70.00%

Installation

Mts

3,388,749

3,388,749

8,702,206

25.00%

Supply

Mts

3,409,192

3,409,192

24,513,169

70.00%

Installation

Mts

3,409,192

3,409,192

8,754,703

25.00%

99.82%

35,018,813

24,322,614

99.82%

35,276,715

24,469,604

Supply

Mts

3,434,300

3,434,300

24,693,701

70.00%

Installation

Mts

3,434,300

3,434,300

8,819,179

25.00%

Supply

Mts

3,586,875

3,586,875

25,790,765

70.00%

Installation

Mts

3,586,875

3,586,875

9,210,987

25.00%

99.82%

36,843,950

24,650,132

792,593,631

752,963,950

99.83%

0.00%

25,747,174

Remarks

Amount
100.00%

Supply
Installation

19,814,841

Amount

Uptodate

3,144,563

554,599,988

198,366,253

752,966,241

1%

861,515
Supply

Nos

1.00

1.00

603,060

Installation

Nos

1.00

1.00

215,379

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

100.00%

603,060

100.00%

100.00%

603,060

100.00%

215,379 MB No 540 Pg no 54

100.00%

603,061

100.00%

215,379 MB No 540 Pg no 54

100.00%

603,061

100.00%

215,379 MB No 540 Pg no 54

100.00%

603,061

100.00%

215,379 MB No 540 Pg no 54

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,060

0.00%

100.00%

603,060

100.00%

215,379

100.00%

603,060

100.00%

215,379

100.00%

603,060

100.00%

215,379

100.00%

603,060

100.00%

215,379

100.00%

603,060

100.00%

215,379

100.00%

603,060

215,379

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

100.00%

603,061

100.00%

603,061

100.00%

215,379

861,515

100.00%

215,379

100.00%

215,379

861,515
Supply

Nos

1.00

1.00

603,060

70.00%

Installation

Nos

1.00

1.00

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

100.00%

603,061

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

100.00%

603,061
100.00%

215,379

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 7

100.00%

603,061

100.00%

603,061

100.00%

215,379

861,515

Zone 8

100.00%

215,379

100.00%

215,379

861,515
Supply

Nos

1.00

1.00

603,060

70.00%

Installation

Nos

1.00

1.00

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

Zone 9

100.00%

603,061

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 10

100.00%

603,061
100.00%

215,379

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 11

100.00%

603,061
100.00%

215,379

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 12

100.00%

603,061

100.00%

603,061

100.00%

215,379

861,515

Zone 13

100.00%

215,379

861,515
Supply

Nos

1.00

1.00

603,060

70.00%

Installation

Nos

1.00

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

Zone 14

100.00%

603,060
0.00%

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 15

100.00%

603,060

100.00%

603,060

100.00%

603,060

100.00%

215,379

861,515

Zone 16

100.00%

215,379

861,515

Zone 17

100.00%

215,379

100.00%

215,379

861,515
Supply

Nos

1.00

1.00

603,060

70.00%

Installation

Nos

1.00

1.00

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

Zone 18

100.00%

603,060

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 19

100.00%

603,060

100.00%

215,379

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

Zone 20

100.00%

603,060

100.00%

603,060

100.00%

215,379

100.00%

215,379

100.00%

603,060

0.00%

100.00%

603,060

100.00%

215,379

100.00%

603,060

0.00%

100.00%

861,515

Zone 21

0.00%

861,515
Supply

Nos

1.00

1.00

603,060

70.00%

Installation

Nos

1.00

1.00

215,379

25.00%

Supply

Nos

1.00

1.00

603,060

70.00%

Installation

Nos

1.00

215,379

25.00%

603,060

70.00%

215,379

25.00%

100.00%

603,060
100.00%

215,379

861,515
100.00%

603,060
0.00%

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Total Amount :5.7

Qty

Up to Aug - 2015

Present

3,144,485

Zone 6

Zone 23

25.00%

3,144,563

Zone 5

Zone 22

70.00%

8,636,803

3,144,563

Zone 4

5.6.23

24,183,049

Mts

Zone 3

5.6.22

25.00%

Mts

Automation controller and communication to center


Zone 1

Percentage
8,627,748

Supply

Total Amount :5.6

Amount

Installation

Zone 23

5.6.1

Percentage

Ra Bill - 13 & Part

Previous

32,300,574

Zone 20

5.5.22

3,810,546,305.00

Further Breakup

34,547,213

Zone 19

5.5.21

5.5.23

Req.Qty

Zone 16

5.5.18

5.5.20

Agt Value : Rs.

Unit of
Measure

Zone 15

5.5.17

5.5.19

Dated: 07-01-2014

Description of Work

19,814,845

Radio net

3,962,968

Zone 1

18,824,091

100.00%

603,060
100.00%

0.00%

13,870,361

100.00%

1,206,121

215,379

100.00%

4,307,575

603,060
215,379
18,177,966

4%

1,723,030
Supply

Nos

1.00

1.00

1,206,121

Installation

Nos

1.00

1.00

430,758

Zone 2

1,206,121

70.00%

430,758

25.00%

1,206,121

70.00%

100.00%

430,758

100.00%

1,206,121

100.00%

430,758

100.00%

1,206,121

1,723,030
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Zone 3

430,758

25.00%

1,206,121

70.00%

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

100.00%

430,758

100.00%

430,758

100.00%

1,206,121

1,723,030

Zone 4

430,758

25.00%

1,206,121

70.00%

100.00%

430,758

100.00%

430,758

100.00%

1,206,121

1,723,030

Nos

1.00

1.00

430,758

25.00%

Supply

Nos

1.00

1.00

1,206,121

70.00%

Installation

Nos

1.00

1.00

430,758

25.00%

Supply

Nos

1.00

1.00

1,206,121

70.00%

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Zone 5

100.00%

430,758

100.00%

430,758

100.00%

430,758

100.00%

1,206,121

1,723,030

Zone 6

100.00%

430,758

100.00%

1,206,121

1,723,030

Zone 7

430,758

25.00%

1,206,121

70.00%

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

100.00%

430,758

100.00%

430,758

100.00%

1,206,121

1,723,030

Zone 8

430,758

25.00%

1,206,121

70.00%

430,758

25.00%

1,206,121

70.00%

100.00%

430,758

100.00%

430,758

100.00%

1,206,121

1,723,030

Zone 9

100.00%

430,758

100.00%

430,758

100.00%

1,206,121

1,723,030
-

214 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Sl. No.

Dated: 07-01-2014

Agt Value : Rs.

Unit of
Measure

Description of Work

5.7.10

Zone 10

5.7.11

Zone 11

5.7.12

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Amount

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Supply

Nos

1.00

1.00

1,206,121

70.00%

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

430,757

25.00%

1.00

1.00

1,206,121

70.00%

1.00

1.00

100.00%

1,206,121

100.00%

1,206,121

100.00%

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

430,758

100.00%

1,206,121

100.00%

430,758

100.00%

430,758

100.00%

1,206,121

100.00%

0.00%

430,758

100.00%

430,758

100.00%

1,206,121

0.00%

100.00%

1,206,121

100.00%

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

100.00%

430,757

1,206,121

100.00%

430,757

100.00%

1,206,121

100.00%

430,757

100.00%

430,757

100.00%

1,206,121

100.00%

430,757

100.00%

430,757

100.00%

430,757

100.00%

1,206,121

100.00%

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

430,757

100.00%

1,206,121

100.00%

430,757

100.00%

430,757

100.00%

1,206,121

100.00%

430,757

430,757

25.00%

Supply

Nos

1.00

1.00

1,206,121

70.00%

Installation

Nos

1.00

430,757

25.00%

1,206,121

70.00%

430,757

25.00%

100.00%

430,757

100.00%

1,206,121

0.00%

0.00%

100.00%

1,206,121

100.00%

430,757

100.00%

1,206,121

0.00%

100.00%

1,723,030

100.00%

430,757

1,723,030
100.00%

1,206,121
0.00%

1,723,030
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00
53,069,323
9,907,420

100.00%

1,206,121

0.00%

27,740,783

99.71%

300,677

100.00%

37,648,204

430,757

100.00%

8,615,149

1,206,121
430,757
36,355,932

1%

430,757
Supply

Nos

1.00

1.00

301,530

Installation

Nos

1.00

1.00

107,689

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

0.29%

853

100.00%

301,530 MB No 540 Pg no 46

100.00%

107,689

100.00%

107,689 MB No 540 Pg no 57

0.53%

1,593

99.99%

301,530 MB No 540 Pg no 46

100.00%

107,689

100.00%

107,689 MB No 540 Pg no 57

0.53%

1,593

99.99%

301,530 MB No 540 Pg no 46

100.00%

107,689

100.00%

107,689 MB No 540 Pg no 57

0.53%

1,591

100.00%

301,530 MB No 540 Pg no 46

100.00%

107,689

100.00%

107,689 MB No 540 Pg no 57

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,937

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,937

99.47%

299,939

430,757

430,757
Supply

Nos

1.00

1.00

301,530

70.00%

Installation

Nos

1.00

1.00

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

99.47%

299,939

0.53%

1,591

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,591

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,591

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,591

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,591

100.00%

301,530

100.00%

107,689

100.00%

107,689

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,939

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,939

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,939

99.47%

299,939

430,757

430,757
Supply

Nos

1.00

1.00

301,530

70.00%

Installation

Nos

1.00

1.00

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

99.47%

299,939

0.53%

1,591

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,594

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,594

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,583

100.00%

301,530

100.00%

107,689

100.00%

107,689

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,936

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,936

99.47%

299,947

430,757

430,757
Supply

Nos

1.00

1.00

301,530

70.00%

Installation

Nos

1.00

1.00

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

99.23%

299,207

0.77%

2,323

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,323

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,321

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,321

100.00%

301,530

100.00%

107,689

100.00%

107,689

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.23%

299,207

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.23%

299,209

99.23%

299,209

430,757

430,757
Supply

Nos

1.00

1.00

301,530

70.00%

Installation

Nos

1.00

1.00

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

99.23%

299,217

0.77%

2,313

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,313

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,313

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,313

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,308

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,313

100.00%

100.00%

107,689

100.00%

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.23%

299,217

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 21

99.23%

299,217

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 22

5.8.23

70.00%

1.00

Zone 20

5.8.22

25.00%

Nos

Zone 19

5.8.21

430,757

1,206,121

Nos

Zone 18

5.8.20

70.00%

Nos

Zone 17

5.8.19

25.00%

Supply

Zone 16

5.8.18

430,757

1,206,121

Installation

Zone 15

5.8.17

430,758

430,758

1,723,030

Zone 14

5.8.16

100.00%

Remarks

Amount
100.00%

1,723,030

Zone 13

5.8.15

Qty
430,758

1,723,030

Zone 12

5.8.14

70.00%

25.00%

Zone 11

5.8.13

25.00%

70.00%

Zone 10

5.8.12

430,757

1,206,121

25.00%

Zone 9

5.8.11

70.00%

430,757

Zone 8

5.8.10

25.00%

430,757

Zone 7

5.8.9

430,757

1,206,121

1,206,121

Zone 6

5.8.8

Amount
100.00%

1,723,030

Zone 5

5.8.7

70.00%

1.00

Zone 4

5.8.6

1,206,121

1.00

Zone 3

5.8.5

25.00%

1.00

Zone 2

5.8.4

70.00%

1.00

Zone 1

5.8.3

25.00%

430,757

1.00

Total Amount :-

5.8.2

430,758

1,206,121

1.00

Other control Accessories sourced locally in India

5.8.1

70.00%

Nos

Zone 23

5.8

25.00%

Nos

Zone 22

5.7.23

430,758

1,206,121

Nos

Zone 21

5.7.22

70.00%

Supply

Zone 20

5.7.21

1,206,121

Installation

Zone 19

5.7.20

25.00%

Qty

1,723,030

Zone 18

5.7.19

70.00%

430,758

Amount

1,723,030

Zone 17

5.7.18

1,206,121

Qty

1,723,030

Zone 16

5.7.17

25.00%

1,723,030

Zone 15

5.7.16

Percentage
430,758

Uptodate

1,723,030

Zone 14

5.7.15

Amount

Up to Aug - 2015

Present

1,723,030

Zone 13

5.7.14

Percentage

Ra Bill - 13 & Part

Previous

1,723,030

Zone 12

5.7.13

3,810,546,305.00

Further Breakup

99.23%

299,217

99.23%

299,222

430,757

Zone 23

430,757
Supply

Nos

1.00

1.00

301,530

70.00%

Installation

Nos

1.00

1.00

107,689

25.00%

Total Amount :-

9,907,420

99.23%

299,217

9,412,049

6,892,086

2,519,964

301,530
107,689
9,412,050

Part C Operation and Maintanance for 5 Years


6 Agromony Survices

58,682,413

6.1

Formation of WUCS

LS

100.00%

100.00%

6.3

Training for WUCS and KBJNL staff

LS

100.00%

0.00%
Total Amount :-

58,682,413

Total Cumilative Amount :-

20,538,845

35%

17,604,724

30%

50.00%
30.00%

38,143,568

3,092,051,377

Section Engineer

Assistant Executive Engineer,


KBJNL, MAROL LIS, Sub-division
Ilkal

10,269,422

50.00%

5,281,417

30.00%

10,269,422
5,281,417

15,550,839

15,550,839

382,088,056

3,474,139,433

Executive Engineer,
KBJNL.ARBC Division,
Almatti

215 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Dated: 07-01-2014

Sl. No.

Agt Value : Rs.

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Amount

3,810,546,305.00

Further Breakup
Percentage

Amount

Ra Bill - 13 & Part

Previous
Percentage

Qty

Up to Aug - 2015

Present
Amount

Qty

Uptodate
Amount

Qty

Remarks

Amount

Detailed engineering, preparation of designs and drawings


Part A- Preliminaries.
1

Project Engineering and Design Services


Survey, investigations, setting out works, detailed topographical

1.1

survey for command area of 11,700 Ha

1.2

Detailed engineering, preparation of designs and drawings

1.2 (b)

11,431,639

50%

11,431,639

50%

Approval to Design and Drawings for Main and Feeder Pipeline

1.2 (a)

Approval to Design and Drawings for Main and Submains for Block

100%

11,431,639

100%

11,431,639

3,429,492

30%

100%

3,429,492

100%

3,429,492

3,429,492

30%

100%

3,429,492

100%

3,429,492

Approval to Design and Drawings for Drip net work

2,286,328

20%

100%

2,286,328

100%

2,286,328

1.2 (d)

Approval to Civil GAD

1,143,164

10%

100%

1,143,164

100%

1,143,164

1.2 (e)

Approval to Mechanical GAD

571,582

5%

100%

571,582

100%

1.2 (f)

Approval to Surge Protection for Pipeline

571,582

5%

100%

571,582

100%

1.2 (c)

Total Amount :-

22,863,278

571,582
571,582

22,863,278

22,863,278

Part B- Construction
2

Electro-Mechanical works
2.1

2.1.1

Design, supply, installation of pumping machinery and pump house


electrical works

83,832,019

88%

Pumps

41,916,010

50%

25,149,606

30%

8,383,202

10%

4,191,601

5%

a Approval to Design and Drawings


b Supply
c Erection
2.1.2

Motors
a Approval to Design and Drawings
b Supply
c Erection

2.1.3

Panels (all types)


a Approval to Design and Drawings

100%

419,160

100%

28,922,047

25%

251,496

1%

100%

251,496

17,353,228

69%

100%

17,353,228

6,287,401

25%

100%

10,479,002

100%

6,287,401

100%

5,784,409

83,832

1%

100%

83,832

69%

41,916

1%

100%

41,916

b Supply

2,892,205

69%

100%

2,892,205

c Erection

1,047,900

25%

100%

Valves (all types)


a Approval to Design and Drawings

2.1.4

1%
69%

10,479,002

5,784,409

b Supply
2.1.4

419,160
28,922,047

Surge Protection Devices

4,191,601

100%

419,160

100%

28,922,047

100%

10,479,002

100%

251,496

100%

17,353,228

100%

6,287,401

100%

83,832

100%

5,784,409

100%

41,916

100%

2,892,205

1,047,900

100%

1,047,900

5%

a Approval Of design and Drawings

41,916

1%

100%

41,916

100%

41,916

b Supply

2,892,205

69%

100%

2,892,205

100%

2,892,205

C Erection

1,047,900

25%

33%

345,807

33%

345,807

4,267,812

70%

100%

4,267,812

100%

4,267,812

1,524,219

25%

100%

1,524,219

100%

1,524,219

1,066,953

70%

100%

1,066,953

100%

1,066,953

381,055

25%

100%

381,055

100%

381,055

2,667,382

70%

100%

2,667,382

100%

2,667,382

952,637

25%

476,318

50%

2.2 Construction of 33KV Electrical Sub Station


2.2.1 Transformers

7,621,093

8%

6,096,874

80%

1,524,219

20%

a Supply
c Erection
2.2.2 Other Related Materials
a Supply
c Erection
2.3 Laying of 33 KV line From KPTCL Sub station to work site
a Supply
b Earection
Total Amount :-

50%

37,724,409

49,963,884

476,318

37,262,380

87,226,264

3 Pipeline and related Civil Works


Construction of main and Branch pipelines including Earth work,
3.1

structures, supply, laying , jointing, testing and commissioning-(Bulk


Water Pipe line) Total Length Req=48547 Rmt

10

11

12

13

48,547.00

350mm/248kpa/9Bar--8608 Rmt

1,433,771,395

56%

71,688,570

5%

a).Supply

Mts

8,608.00

8,608.00

5,829.69

50,181,999

70%

8,608.000

50,181,972

b).Earth work, Laying and Jointing

Mts

8,608.00

8,608.41

1,915.47

16,488,371

23%

7,461.414

14,292,115

c).Testing

Mts

8,608.00

899.54

166.56

1,433,771

2%

899.536

149,827

899.536

149,827

d) Commissioning

Mts

8,608.00

416.41

3,584,428

5%

a).Supply

Mts

1,453.00

1,453.00

55,258.91

80,291,198

70%

1,453.000

80,291,196

1,453.000

80,291,196

b).Earth work, Laying and Jointing

Mts

1,453.00

1,452.89

18,156.50

26,381,394

23%

1,284.016

23,313,238

1,452.886

26,379,326

c).Testing

Mts

1,453.00

2,294,034

2%

d) Commissioning

Mts

1,453.00

5,735,086

5%

350mm/248kpa/12Bar--1453 Rmt

114,701,712

3,947.07
143,377,140

Mts

13,308.00

13,308.00

7,541.63

100,363,998

70%

13,308.000

100,364,012

Mts

13,308.00

13,096.08

2,477.96

32,976,742

23%

12,741.079

31,571,885

c).Testing

Mts

13,308.00

923.58

215.48

2,867,543

2%

923.575

199,012

d) Commissioning

Mts

13,308.00

538.69

7,168,857

5%

Mts

1,073.00

1,073.00

9,353.59

10,036,400

70%

1,073.000

10,036,402

b).Earth work, Laying and Jointing

Mts

1,073.00

1,072.98

3,073.32

3,297,674

23%

899.981

2,765,931

c).Testing

Mts

1,073.00

267.25

286,754

2%

d) Commissioning

Mts

1,073.00

668.11

716,886

5%

500mm/248kpa/9Bar--119 Rmt

2,150,657

50,181,972

8,608.414

16,489,160

3,066,088
-

355.00

879,677
-

13,308.000

100,364,012

13,096.079

32,451,562

923.575

199,012

1,073.000

10,036,402

1,072.981

3,297,616

1%

a).Supply

168.87

b).Earth work, Laying and Jointing

14,337,714

8,608.000

10%

a).Supply

450mm/248kpa/9Bar--1073 Rmt

2,197,045

8%

1,578.83

400mm/248kpa/9Bar--13308 Rmt

1,147.00

173.00

531,685
-

0%

a).Supply

Mts

119.00

119.00

12,650.92

1,505,460

70%

119.000

1,505,459

119.000

1,505,459

b).Earth work, Laying and Jointing

Mts

119.00

115.04

4,156.73

494,651

23%

115.037

478,179

115.037

478,179

c).Testing

Mts

119.00

361.45

43,013

2%

d) Commissioning

Mts

119.00

903.64

107,533

5%

a).Supply

Mts

4,154.00

4,154.00

14,496.48

60,218,399

70%

4,154.000

60,218,419

b).Earth work, Laying and Jointing

Mts

4,154.00

4,153.97

4,763.13

19,786,045

23%

3,813.970

18,166,434

c).Testing

Mts

4,154.00

857.80

414.19

1,720,526

2%

857.801

355,293

d) Commissioning

Mts

4,154.00

1,035.46

4,301,314

5%

600mm/248kpa/9Bar--4154 Rmt

86,026,284

700mm/248kpa/9Bar--4193 Rmt

129,039,426

Mts

4,193.00

4,193.00

21,542.48

90,327,598

70%

4,193.000

90,327,619

Mts

4,193.00

4,147.13

7,078.24

29,679,068

23%

3,696.130

26,162,092

c).Testing

Mts

4,193.00

615.50

2,580,789

2%

d) Commissioning

Mts

4,193.00

1,538.75

6,451,971

5%

157,714,853

340.00

1,619,464

4,154.000

60,218,419

4,153.970

19,785,898

857.801

355,293

4,193.000

90,327,619

4,147.130

29,354,379

9%

b).Earth work, Laying and Jointing

800mm/248kpa/9Bar--4068 Rmt

6%

a).Supply

451.00

3,192,287
-

11%

a).Supply

Mts

4,068.00

4,068.00

27,138.74

110,400,397

70%

4,068.000

110,400,394

b).Earth work, Laying and Jointing

Mts

4,068.00

4,007.00

8,917.01

36,274,416

23%

3,823.920

34,097,933

c).Testing

Mts

4,068.00

912.00

775.39

3,154,297

2%

912.000

8,132,313

912.000

8,132,313

d) Commissioning

Mts

4,068.00

1,938.48

7,885,743

5%

a).Supply

Mts

976.00

976.00

30,849.59

30,109,199

70%

976.000

30,109,200

976.000

30,109,200

b).Earth work, Laying and Jointing

Mts

976.00

972.00

10,136.29

9,893,023

23%

971.998

9,852,458

971.998

9,852,458

c).Testing

Mts

976.00

d) Commissioning

Mts

976.00

900mm/248kpa/9Bar--976 Rmt

43,013,142

881.42

200,727,995

860,263

2%

2,150,657

5%

Mts

3,343.00

3,343.00

42,030.99

140,509,597

b).Earth work, Laying and Jointing

Mts

3,343.00

3,277.92

13,810.18

c).Testing

Mts

3,343.00

d) Commissioning

Mts

3,343.00

70%

3,343.000

140,509,600

46,167,439

23%

3,083.918

42,589,456

1,200.89

4,014,560

2%

3,002.21

10,036,400

5%

1000mm/248kpa/9Bar--3589 Rmt

215,065,709
Mts

3,589.00

3,589.00

41,946.50

150,545,996

70%

3,589.000

150,545,989

Mts

3,589.00

3,532.16

13,782.42

49,465,113

23%

3,105.921

42,807,102

c).Testing

Mts

3,589.00

1,198.47

4,301,314

2%

d) Commissioning

Mts

3,589.00

2,996.18

10,753,285

5%

143,377,140

110,400,394

4,007.000

35,730,460

194.00

2,679,175
-

3,343.000

140,509,600

3,277.918

45,268,631

15%

b).Earth work, Laying and Jointing

1000mm/248kpa/12Bar--2373 Rmt

a).Supply

4,068.000

14%

a).Supply

1,632,527

3%

2,203.54

900mm/248kpa/12Bar--3343 Rmt

183.08

426.24

5,874,620
-

3,589.000

150,545,989

3,532.161

48,681,722

10%

a).Supply

Mts

2,373.00

2,373.00

42,294.14

100,363,998

70%

2,373.000

100,363,998

2,373.000

100,363,998

b).Earth work, Laying and Jointing

Mts

2,373.00

2,369.94

13,896.65

32,976,742

23%

2,369.942

32,934,246

2,369.942

32,934,246

c).Testing

Mts

2,373.00

1,208.40

2,867,543

2%

d) Commissioning

Mts

2,373.00

3,021.01

7,168,857

5%

a).Supply

Mts

1,290.00

1,290.00

78,785,738

70%

1,290.000

b).Earth work, Laying and Jointing

Mts

1,290.00

1,163.97

25,886,743

23%

1,163.967

c).Testing

Mts

1,290.00

2,251,021

2%

d) Commissioning

Mts

1,290.00

5,627,553

5%

1100mm/248kpa/9Bar--1290 Rmt

112,551,055

8%

61,074.22
20,067.24
1,744.98
4,362.44
Total Amount :-

1,433,771,395

78,785,744
25,886,077
-

1,433,771,395

1,290.000

1,163.967

1,317,393,595

21,672,568

78,785,744
25,886,077
-

1,339,066,163

Construction of Main Feeder Pipe line including supply, Earth work,


Structure, laying , jointing, testing and commissioning--(total Length
3.2
3.2.1

3.2.2

3.2.3

3.2.4

= 128.886 Km)

128.886

665,679,576

ZONE 1

0.26

32,848,580
Supply of pipes

Kms

6.360

6.360

3,615,410

22,994,006

70%

6.360

22,994,006

Earth work, Laying and Jointing

Kms

6.360

6.175

1,187,920

7,555,173

23%

6.050

7,186,918

Testing

Kms

6.360

103,297

656,972

2%

ZONE 2

6.360

0.125

148,490

6.175

6.175

637,862

6.175

22,994,006
7,335,408 MB no 581 Pgno 58 To 59
637,862 MB no 585 Pgno 51 To 52

48,653,086
Supply of pipes

Kms

9.420

9.420

3,615,410

34,057,160

70%

9.420

34,057,160

9.420

34,057,160

Earth work, Laying and Jointing

Kms

9.420

9.327

1,187,920

11,190,210

23%

9.327

11,079,733

9.327

11,079,733

Testing

Kms

9.420

973,062

2%

Supply of pipes

Kms

5.202

5.202

3,615,410

18,807,362

70%

5.202

18,807,362

5.202

18,807,362

Earth work, Laying and Jointing

Kms

5.202

5.179

1,187,920

103,297

6,179,562

23%

5.179

6,152,239

5.179

6,152,239

ZONE 3

9.327

963,455

9.327

963,455 MB no 585 Pgno 51 To 51

26,867,659

Testing

Kms

5.202

5.179

103,297

537,353

2%

1.433

148,025

Supply of pipes

Kms

5.460

5.460

3,615,410

19,740,137

70%

5.460

19,740,137

5.460

19,740,137

Earth work, Laying and Jointing

Kms

5.460

5.409

1,187,920

6,486,045

23%

5.409

6,425,461

5.409

6,425,461

ZONE 4

3.746

386,952

5.179

534,977 MB No 585,Pg No 52 To 53

28,200,196

216 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Sl. No.

Dated: 07-01-2014

Agt Value : Rs.

Unit of
Measure

Description of Work
Testing

3.2.5

3.2.6

3.2.7

3.2.8

3.2.9

3.2.10

3.2.11

3.2.12

3.2.13

3.2.14

3.2.15

3.2.16

3.2.17

3.2.18

3.2.19

3.2.20

3.2.21

3.2.22

3.2.23

Kms

Req.Qty
5.460

Exe.Qty

Sub-Breakup

Rate
5.409

Amount
103,297

ZONE 5

3,810,546,305.00

Further Breakup
Percentage

Amount

Ra Bill - 13 & Part

Previous
Percentage

564,004

2%

Qty

Up to Aug - 2015

Present
Amount

Qty

Uptodate
Amount

Qty

5.409

558,736

0.640

760,269

Remarks

Amount
5.409

558,736 MB No 585,Pg No 53 To 53

29,873,614
Supply of pipes

Kms

5.784

5.784

3,615,410

20,911,530

70%

5.784

20,911,530

Earth work, Laying and Jointing

Kms

5.784

5.730

1,187,920

6,870,931

23%

5.090

5,691,626

Testing

Kms

5.784

103,297

597,472

2%

Supply of pipes

Kms

4.902

4.902

3,615,410

17,722,739

70%

4.902

Earth work, Laying and Jointing

1,187,920

5,823,186

23%

ZONE 6

5.784
5.730
-

20,911,530
6,451,895
-

25,318,198

Kms

4.902

4.882

Testing

Kms

4.902

4.882

103,297

Supply of pipes

Kms

5.604

5.604

3,615,410

Earth work, Laying and Jointing

Kms

5.604

3.095

1,187,920

Testing

Kms

5.604

ZONE 7

17,722,738

4.902

17,722,738

4.739

5,629,555

506,364

2%

20,260,757

70%

5.604

20,260,756

0.143

169,873

4.882

4.882

504,298

4.882

504,298

5.604

20,260,756

5,799,428

6,657,106

23%

3.095

3,676,614

578,879

2%

3.095

3,676,614

19,241,211

70%

5.322

19,241,211

5.322

19,241,211

6,322,112

23%

5.286

5,879,057

5.286

5,879,057

549,749

2%

15,727,032

70%

4.350

15,727,032

5,167,453

23%

4.242

5,039,158

449,344

2%

26,855,263

70%

7.428

26,855,264

8,823,872

23%

6.235

5,857,547

767,293

2%

19,436,443

70%

5.376

19,436,443

6,386,260

23%

3.764

4,052,018

555,327

2%

19,327,981

70%

5.346

19,327,981

5.346

19,327,981

6,350,622

23%

5.313

6,311,421

5.313

6,311,421

552,228

2%

0.699

72,205

0.699

72,205

19,870,292

70%

5.496

19,870,292

5.496

19,870,292

6,528,810

23%

5.346

5,966,825

5.480

6,126,006

567,723

2%

15,900,572

70%

4.398

15,900,572

4.398

15,900,572

5,224,474

23%

4.369

5,190,024

4.369

5,190,024

454,302

2%

20,607,836

70%

5.700

20,607,836

6,771,146

23%

5.279

5,548,166

588,795

2%

16,573,038

70%

4.584

16,573,038

5,445,427

23%

4.360

5,179,333

473,515

2%

17,310,582

70%

4.788

17,310,582

4.788

17,310,582

5,687,763

23%

4.788

5,519,626

4.788

5,519,626

494,588

2%

18,026,433

70%

4.986

18,026,433

5,922,971

23%

2.826

3,357,063

515,041

2%

16,811,656

70%

4.650

16,811,655

5,523,830

23%

4.313

5,101,581

480,333

2%

19,349,673

70%

5.352

19,349,673

5.352

19,349,673

6,357,750

23%

5.189

6,001,496

5.189

6,001,496

552,848

2%

19,609,983

70%

5.424

19,609,983

6,443,280

23%

5.234

5,980,254

560,285

2%

18,525,359

70%

5.124

18,525,360

6,086,904

23%

1.543

1,766,234

529,296

2%

28,308,659

70%

7.830

9,301,416

23%

2.860

808,819

2%

28,943,938

103,297

ZONE 8

27,487,444
Supply of pipes

Kms

5.322

5.322

3,615,410

Earth work, Laying and Jointing

Kms

5.322

5.286

1,187,920

Testing

Kms

5.322

103,297

ZONE 9

22,467,189
Supply of pipes

Kms

4.350

4.350

3,615,410

Earth work, Laying and Jointing

Kms

4.350

4.334

1,187,920

Testing

Kms

4.350

103,297

ZONE 10

0.092

109,289
-

4.350

15,727,032

4.334

5,148,447

38,364,662
Supply of pipes

Kms

7.428

7.428

3,615,410

Earth work, Laying and Jointing

Kms

7.428

7.354

1,187,920

Testing

Kms

7.428

103,297

ZONE 11

1.119

1,329,283
-

7.428

26,855,264

7.354

7,186,830

27,766,347
Supply of pipes

Kms

5.376

5.376

3,615,410

Earth work, Laying and Jointing

Kms

5.376

5.375

1,187,920

Testing

Kms

5.376

103,297

ZONE 12

1.611

1,913,740
-

5.376

19,436,443

5.375

5,965,758

27,611,401
Supply of pipes

Kms

5.346

5.346

3,615,410

Earth work, Laying and Jointing

Kms

5.346

5.313

1,187,920

Testing

Kms

5.346

0.699

103,297

ZONE 13

28,386,132
Supply of pipes

Kms

5.496

5.496

3,615,410

Earth work, Laying and Jointing

Kms

5.496

5.480

1,187,920

Testing

Kms

5.496

103,297

ZONE 14

0.134

159,181
-

22,715,103
Supply of pipes

Kms

4.398

4.398

3,615,410

Earth work, Laying and Jointing

Kms

4.398

4.369

1,187,920

Testing

Kms

4.398

103,297

ZONE 15

29,439,765
Supply of pipes

Kms

5.700

5.700

3,615,410

Earth work, Laying and Jointing

Kms

5.700

5.687

1,187,920

Testing

Kms

5.700

103,297

ZONE 16

0.408

484,671
-

5.700

20,607,836

5.687

6,032,837

23,675,769
Supply of pipes

Kms

4.584

4.584

3,615,410

Earth work, Laying and Jointing

Kms

4.584

4.568

1,187,920

Testing

Kms

4.584

103,297

ZONE 17

0.208

247,087
-

4.584

16,573,038

4.568

5,426,420

24,729,403
Supply of pipes

Kms

4.788

4.788

3,615,410

Earth work, Laying and Jointing

Kms

4.788

4.788

1,187,920

Testing

Kms

4.788

103,297

ZONE 18

25,752,047
Supply of pipes

Kms

4.986

4.986

3,615,410

Earth work, Laying and Jointing

Kms

4.986

4.956

1,187,920

Testing

Kms

4.986

103,297

ZONE 19

2.130

2,530,270
-

4.986

18,026,433

4.956

5,887,333

24,016,651
Supply of pipes

Kms

4.650

4.650

3,615,410

Earth work, Laying and Jointing

Kms

4.650

4.627

1,187,920

Testing

Kms

4.650

103,297

ZONE 20

0.314

373,007
-

4.650

16,811,655

4.627

5,474,588

27,642,390
Supply of pipes

Kms

5.352

5.352

3,615,410

Earth work, Laying and Jointing

Kms

5.352

5.189

1,187,920

Testing

Kms

5.352

103,297

ZONE 21

28,014,261
Supply of pipes

Kms

5.424

5.424

3,615,410

Earth work, Laying and Jointing

Kms

5.424

5.392

1,187,920

Testing

Kms

5.424

103,297

ZONE 22

0.158

187,691
-

5.424

19,609,983

5.392

6,167,945

26,464,799
Supply of pipes

Kms

5.124

5.124

3,615,410

Earth work, Laying and Jointing

Kms

5.124

5.116

1,187,920

Testing

Kms

5.124

103,297

ZONE 23

3.573

4,244,439
-

5.124

18,525,360

5.116

6,010,673

40,440,941
Supply of pipes

Kms

7.830

7.830

3,615,410

Earth work, Laying and Jointing

Kms

7.830

6.735

1,187,920

Testing

Kms

7.830

103,297

Total Amount :-

665,679,576

28,308,658

3,397,452

3.875

4,603,191

592,185,333

44.069

20,311,785

23.680

105,709

665,679,576

7.830
6.735
-

28,308,658
8,000,644
612,497,119

Construction of Pipe network of Mains and Submains for Blocks----3.3


3.3.1

3.3.2

3.3.3

3.3.4

3.3.5

3.3.6

3.3.7

3.3.8

3.3.9

3.3.10

3.3.11

(Total Length 1950.030 Km)

1,950.030

435,252,031

ZONE 1

17%

20,506,082
Supply of pipes

Kms

91.872

91.872

156,242

14,354,257

70%

91.872

14,354,257

Earth work, Laying and Jointing

Kms

91.872

79.733

51,337

4,716,399

23%

79.733

4,093,224

Testing

Kms

91.872

23.680

4,464

410,122

2%

Commissioning

Kms

91.872

11,160

1,025,304

5%

ZONE 2

91.872

14,354,257

79.733

4,093,224

23.680
-

105,709 MB No 585 Pgno 42 To 50


-

17,984,337
Supply of pipes

Kms

80.574

80.574

156,242

12,589,036

70%

80.574

12,589,036

80.574

12,589,036

Earth work, Laying and Jointing

Kms

80.574

80.574

51,337

4,136,398

23%

80.574

3,623,031

80.574

3,623,031

2%

Testing

Kms

80.574

35.093

4,464

20.163

90,009

Commissioning

Kms

80.574

899,217

5%

Supply of pipes

Kms

79.308

79.308

156,242

12,391,234

359,687

70%

79.308

12,391,234

Earth work, Laying and Jointing

Kms

79.308

79.308

51,337

4,071,405

23%

73.668

3,781,867

5.640

289,539

79.308

2%

15.137

67,572

48.288

11,160

ZONE 3

14.930

66,648
-

35.093
-

156,657 MB No 585,Pg No 29 To 34
-

17,701,763

Testing

Kms

79.308

48.288

4,464

33.151

147,988

Commissioning

Kms

79.308

885,088

5%

Supply of pipes

Kms

84.234

84.234

156,242

13,160,881

354,035

70%

84.234

13,160,881

Earth work, Laying and Jointing

Kms

84.234

84.234

51,337

74.616

3,830,534

Testing

Kms

84.234

25.199

Commissioning

Kms

84.234

11,160

ZONE 4

79.308

12,391,234
4,071,406 MB No 581 Pgno 52 To 54
215,560 MB No 581 Pgno 24 To 29
-

18,801,259

4,324,290

23%

4,464

376,025

2%

11,160

940,063

5%

ZONE 5

84.234

9.618

493,756

84.234

25.199

112,490

25.199

13,160,881
4,324,290 MB No 581 Pgno 58 To 59 & 62 To 64
112,490 MB No 581 Pgno 34 To 42
-

17,413,831
Supply of pipes

Kms

78.018

78.018

156,242

12,189,682

70%

78.018

12,189,682

Earth work, Laying and Jointing

Kms

78.018

78.018

51,337

Testing

Kms

78.018

58.492

Commissioning

Kms

78.018

78.018

12,189,682

4,005,181

23%

73.918

3,794,701

4.100

210,480

78.018

4,005,181

4,464

348,277

2%

27.637

123,373

30.855

137,738

58.492

261,111

11,160

870,692

5%

ZONE 6

18,222,718
Supply of pipes

Kms

81.642

81.642

156,242

12,755,903

70%

81.642

12,755,902

Earth work, Laying and Jointing

Kms

81.642

81.642

51,337

4,191,225

23%

78.018

4,005,181

Testing

Kms

81.642

27.124

4,464

Commissioning

Kms

81.642

Supply of pipes

Kms

84.784

84.784

156,242

Earth work, Laying and Jointing

Kms

84.784

80.101

51,337

Testing

Kms

84.784

41.438

Commissioning

Kms

84.784

364,454

11,160

ZONE 7

2%

911,136

5%

13,246,815

70%

84.784

13,246,815

4,352,525

81.642

12,755,902

3.624

186,044

81.642

4,191,225

27.124

121,083

27.124

121,083
-

18,924,021

4,464
11,160

ZONE 8

84.784

13,246,815

23%

64.055

3,288,368

16.046

823,748

80.101

4,112,116

378,480

2%

33.382

149,019

8.056

35,962

41.438

184,981

946,201

5%

14,070,209

70%

90.054

14,070,209

71.633

3,677,397

20,100,299
Supply of pipes

Kms

90.054

90.054

156,242

Earth work, Laying and Jointing

Kms

90.054

86.155

51,337

Testing

Kms

90.054

62.513

Commissioning

Kms

90.054

4,623,069

23%

4,464

402,006

2%

11,160

1,005,015

5%

14,121,769

70%

90.384

14,121,769

ZONE 9

90.054

14,070,209

14.522

745,511

86.155

4,422,908

62.513

279,061

62.513

279,061

20,173,956
Supply of pipes

Kms

90.384

90.384

156,242

Earth work, Laying and Jointing

Kms

90.384

87.271

51,337

Testing

Kms

90.384

40.892

Commissioning

Kms

90.384

90.384

14,121,769

4,640,010

23%

76.186

3,911,132

11.085

569,067

87.271

4,480,199

4,464

403,479

2%

30.428

135,832

10.464

46,712

40.892

182,544

11,160

1,008,698

5%

ZONE 10

18,458,420
Supply of pipes

Kms

82.698

82.698

156,242

12,920,894

70%

82.698

12,920,894

Earth work, Laying and Jointing

Kms

82.698

68.072

51,337

4,245,437

23%

55.359

2,841,944

Testing

Kms

82.698

51.965

4,464

Commissioning

Kms

82.698

922,921

5%

Supply of pipes

Kms

86.526

86.526

156,242

13,518,988

369,168

70%

86.526

13,518,988

Earth work, Laying and Jointing

Kms

86.526

76.874

51,337

4,441,953

23%

70.785

3,633,863

Testing

Kms

86.526

66.083

4,464

386,257

2%

11,160

ZONE 11

2%

82.698

12,920,894

12.713

652,643

68.072

3,494,587

51.965

231,975

51.965

231,975
-

19,312,840

86.526

13,518,988

6.089

312,589

76.874

3,946,452

66.083

294,998

66.083

294,998

217 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Sl. No.

Dated: 07-01-2014

Agt Value : Rs.

Unit of
Measure

Description of Work
Commissioning

3.3.12

3.3.13

3.3.14

3.3.15

3.3.16

3.3.17

3.3.18

3.3.19

3.3.20

3.3.21

3.3.22

3.3.23

Kms

Req.Qty

Exe.Qty

Sub-Breakup

Rate

86.526

Amount
11,160

ZONE 12

Ra Bill - 13 & Part

Previous
Percentage

965,642

5%

Qty

Up to Aug - 2015

Present
Amount

Qty

Uptodate
Amount

Qty

Remarks

Amount

Supply of pipes

Kms

83.196

83.196

156,242

12,998,703

70%

83.196

12,998,702

Earth work, Laying and Jointing

Kms

83.196

83.193

51,337

4,271,002

23%

75.463

3,874,016

Testing

Kms

83.196

53.990

4,464

371,392

2%

53.990

241,014

Commissioning

Kms

83.196

928,479

5%

11,160

ZONE 13

7.730

396,832
-

83.196

12,998,702

83.193

4,270,848

53.990

241,014

17,995,051
Supply of pipes

Kms

80.622

80.622

156,242

12,596,536

70%

80.622

12,596,536

Earth work, Laying and Jointing

Kms

80.622

77.699

51,337

41.676

2,139,505

Testing

Kms

80.622

Commissioning

Kms

80.622

4,138,862

23%

4,464

359,901

2%

11,160

899,753

5%

ZONE 14

36.023

1,849,299

80.622

12,596,536

77.699

3,988,804

16,901,358
Supply of pipes

Kms

75.722

75.722

156,242

11,830,951

70%

75.722

11,830,950

Earth work, Laying and Jointing

51,337

Kms

75.722

75.722

Testing

Kms

75.722

13.338

Commissioning

Kms

75.722

3,887,312

23%

61.696

3,167,265

4,464

338,027

2%

13.338

30,173

11,160

845,068

5%

Supply of pipes

Kms

90.474

90.474

156,242

14,135,831

70%

90.474

14,135,831

Earth work, Laying and Jointing

Kms

90.474

88.553

51,337

Testing

Kms

90.474

49.030

Commissioning

Kms

90.474

4,644,630

ZONE 15

14.026

720,048
-

75.722

11,830,950

75.722

3,887,313

13.338

30,173
-

20,194,044

4,464
11,160

ZONE 16

23%

66.795

3,429,030

403,881

2%

49.030

218,873

1,009,702

5%

21.758

1,116,982
-

90.474

14,135,831

88.553

4,546,012

49.030

218,873

19,706,570
Supply of pipes

Kms

88.290

88.290

156,242

13,794,599

70%

88.290

13,794,599

Earth work, Laying and Jointing

Kms

88.290

87.599

51,337

74.035

3,800,707

Testing

Kms

88.290

Commissioning

Kms

88.290

696,330

13,794,599

87.599

4,497,037

4,532,511

23%

4,464

394,131

2%

985,329

5%

ZONE 17

13.564

88.290

11,160

19,902,095
Supply of pipes

Kms

89.166

89.166

156,242

13,931,467

70%

89.166

13,931,467

Earth work, Laying and Jointing

Kms

89.166

89.166

51,337

73.065

3,750,911

Testing

Kms

89.166

Commissioning

Kms

89.166

4,577,482

23%

4,464

398,042

2%

11,160

995,105

5%

ZONE 18

16.101

826,571

89.166

13,931,467

89.166

4,577,482

19,136,063
Supply of pipes

Kms

85.734

85.734

156,242

13,395,244

70%

85.734

13,395,245

Earth work, Laying and Jointing

Kms

85.734

85.031

51,337

4,401,294

23%

76.168

3,910,208

Testing

Kms

85.734

Commissioning

Kms

85.734

Supply of pipes

Kms

78.432

78.432

156,242

4,464

Earth work, Laying and Jointing

Kms

78.432

70.675

51,337

Testing

Kms

78.432

Commissioning

Kms

78.432

382,721

11,160

ZONE 19

2%

8.863

454,997
-

85.734

13,395,245

85.031

4,365,205

956,803

5%

12,254,366

70%

78.432

12,254,366

78.432

12,254,366

4,026,435

23%

70.675

3,628,216

70.675

3,628,216

17,506,237

4,464
11,160

ZONE 20

350,125

2%

875,312

5%

17,354,906
Supply of pipes

Kms

77.754

77.754

156,242

12,148,434

70%

77.754

12,148,434

Earth work, Laying and Jointing

Kms

77.754

76.926

51,337

64.688

3,320,864

Testing

Kms

77.754

Commissioning

Kms

77.754

3,991,628

23%

4,464

347,098

2%

11,160

867,745

5%

ZONE 21

12.238

628,258

77.754

12,148,434

76.926

3,949,122

19,884,685
Supply of pipes

Kms

89.088

89.088

156,242

13,919,280

70%

89.088

13,919,280

89.088

13,919,280

Earth work, Laying and Jointing

Kms

89.088

79.293

51,337

4,573,478

23%

79.293

4,070,635

79.293

4,070,635

Testing

Kms

89.088

0.998

4,464

Commissioning

Kms

89.088

Supply of pipes

Kms

82.494

82.494

156,242

Earth work, Laying and Jointing

Kms

82.494

82.491

51,337

Testing

Kms

82.494

11.573

Commissioning

Kms

82.494

397,694

11,160

ZONE 22

2%

994,234

5%

12,889,020

70%

82.494

12,889,021

4,234,964

23%

73.532

3,774,885

0.998

4,455

0.998

4,455
-

18,412,886

4,464
11,160

ZONE 23

368,258

2%

920,644

5%

15,462,325

70%

98.964

5,080,478

23%

34.813

441,781

2%

1,104,452

5%

82.494

12,889,021

8.959

459,925

82.491

4,234,810

11.573

51,663

11.573

51,663

22,089,036
Supply of pipes

Kms

98.964

98.964

156,242

Earth work, Laying and Jointing

Kms

98.964

67.769

51,337

Testing

Kms

98.964

Commissioning

Kms

98.964

4,464
11,160
435,252,032

3.4 Construction of Structures on pipe line network

25,603,061
Total Amount :-

Amount

18,569,575

Total Amount :-

4.1

3,810,546,305.00

Further Breakup
Percentage

435,252,032
1.25%

25,603,061

25,603,061

15,462,325
1,787,182

1.25%
-

98.964
67.769

15,462,325

32.956

1,691,850

604.232

14,680,533

100.00%

25,603,061

100.00%

25,603,061

100.00%

25,603,061

100.00%

25,603,061

386,947,371

25,603,061

3,479,032
401,627,906

CIVIL WORKS
Construction of Sump

10,955,321

23%

Earthwork

100%

95%

2,738,830

2,738,830

25%

95.00%

2,601,889

95.00%

2,601,889

Foundation Concrete work

100%

42%

2,738,830

2,738,830

25%

42.41%

1,161,483

42.41%

1,161,483

Structure concrete work

100%

10%

5,477,661

5,477,661

50%

9.86%

540,152

9.86%

540,152

2,857,910

25%

95.00%

2,715,015

95.00%

2,715,015

1,143,164

10%

95.00%

1,086,006

95.00%

1,086,006

7,430,565

65%

44.00%

3,105,976

44.00%

3,105,976

6,311,217

25%

18.00

4,692,257

3.00

782,043

21.00

4.2

Pump House

Earthwork

Foundation Concrete work

c
4.3

11,431,639

Structure concrete work


Construction of Control rooms

100%

95%

2,857,910

100%

95%

1,143,164

100%

44%

7,430,565

23 Nos

25,244,869

24%

53%

Earthwork

23.00

21.00

274,401

Foundation Concrete work

23.00

21.00

109,760

2,524,487

10%

18.00

1,876,896

3.00

312,816

21.00

2,189,712

Structure concrete work

23.00

18.00

713,442

16,409,165

65%

17.00

11,522,088

1.00

677,770

18.00

12,199,858

Total Amount :-

858,712,025

876,934,743

29,301,761

5,474,300

1,772,629

31,074,390

5 DRIP SYSTEM
5.1 Primary HCU-Q=425 Cum/hr
5.1.1

5.1.2

5.1.3

5.1.4

5.1.5

5.1.6

5.1.7

5.1.8

5.1.9

5.1.10

5.1.11

5.1.12

5.1.13

5.1.14

5.1.15

5.1.16

5.1.17

5.1.18

23.00

29,722,261

Zone 1

3.00%

1,292,272
Supply

Nos

1.00

1.00

904,591

Instalation

Nos

1.00

1.00

323,068

Zone 2

904,591

70%

100.00%

904,586

0.00%

100.00%

904,586

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 3

1,292,272

Zone 4

1,292,272
Supply

Nos

1.00

1.00

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

Instalation

Nos

1.00

1.00

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

100.00%

904,591

100.00%

904,591

100.00%

323,068

Zone 5

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 6

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 7

100.00%

323,068

1,292,272

Zone 8

1,292,272
Supply

Nos

1.00

1.00

904,591

70%

Instalation

Nos

1.00

1.00

323,068

25%

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

904,591

70%

100.00%

904,591

0.00%

100.00%

904,591

323,068

25%

100.00%

323,068

904,591

70%

100.00%

904,583

323,068

25%

904,591

Zone 9

0.00%
100.00%

323,068

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 10

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 11

100.00%

323,068

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 12

100.00%

904,583

0.00%

100.00%

323,068

70%

100.00%

904,583

0.00%

100.00%

904,583

323,068

25%

100.00%

323,068

0.00%

100.00%

323,068

100.00%

904,583

0.00%

100.00%

904,583

100.00%

323,068

1,292,272

Zone 13

1,292,272
Supply

Nos

1.00

1.00

904,591

70%

Instalation

Nos

1.00

323,068

25%

904,591

70%

323,068

25%

904,591

70%

323,068

25%

Zone 14

0.00%

0.00%

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 15

88.27%

798,451

92.04%

832,521

11.73%

106,108

100.00%

904,559

100.00%

323,068

100.00%

323,068

7.96%

71,995

100.00%

904,516

100.00%

323,068

100.00%

323,068

1,292,272

Zone 16

1,292,272
Supply

Nos

1.00

1.00

904,591

70%

Instalation

Nos

1.00

1.00

323,068

25%

904,591

70%

323,068

25%

Zone 17

93.85%

848,913

6.15%

55,632

100.00%

904,545

100.00%

323,068

100.00%

323,068

7.47%

67,573

100.00%

904,565

100.00%

323,068

100.00%

323,068

7.47%

67,573

100.00%

904,565

100.00%

323,068

100.00%

323,068

1,292,272
Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Zone 18

92.53%

836,992

1,292,272
Supply

Nos

1.00

1.00

904,591

70%

Instalation

Nos

1.00

1.00

323,068

25%

92.53%

836,992

218 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Sl. No.
5.1.19

Dated: 07-01-2014

Agt Value : Rs.

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Amount

Zone 19

5.1.20

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Instalation

Nos

1.00

Supply

Nos

Instalation

Secondary Head Control Unit


Zone 1

5.2.2

Zone 2

5.2.3

1.00

1.00

Nos

1.00

1.00

Nos

230.00

29,722,261

Supply

Nos

10.00

10.00

75,383

Instalation

Nos

10.00

10.00

26,922

Supply

Nos

10.00

10.00

Instalation

Nos

10.00

10.00

5.3.2

5.3.3

5.3.4

5.3.5

5.3.6

5.3.7

5.3.8

5.3.9

5.3.10

5.3.11

5.3.12

5.3.13

5.3.14

5.3.15

25%

323,068

100.00%

323,068

11.77%

106,470

100.00%

904,580

0.00%

0.00%

88.29%

798,633

11.71%
100.00%

29,722,261

22,544,079

105,958

100.00%

323,068

100.00%

5,691,791

904,591
323,068
28,235,869

753,825

70%

100.00%

753,825

0.00%

269,223

25%

60.00%

161,534

40.00%

753,825

70%

100.00%

753,825

0.00%

269,223

25%

50.00%

134,612

50.00%

107,689

100.00%

753,825

100.00%

269,223 MB No 540 Pg no 50

100.00%

134,611

753,825

100.00%

753,825

70%

100.00%

753,825

0.00%

269,223

25%

10.00%

26,922

90.00%

753,825

70%

100.00%

753,825

0.00%

269,223

25%

753,825

70%

100.00%

753,825

0.00%

269,223

25%

90.00%

242,301

10.00%

753,825

70%

100.00%

753,825

0.00%

269,223

25%

161,534

269,223 MB No 540 Pg no 50

100.00%

753,825

100.00%

269,223 MB No 540 Pg no 50

100.00%

753,825

100.00%

269,223 MB No 540 Pg no 50

100.00%

753,825

100.00%

269,223

100.00%

753,825

100.00%

269,223

100.00%

753,825

100.00%

269,223

100.00%

753,825

100.00%

269,223

100.00%

753,850

100.00%

269,223

100.00%

753,850

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

242,301

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

100.00%

269,223

1,076,894
26,922

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

100.00%

269,223

1,076,894
Supply

Nos

10.00

10.00

753,825

70%

Installation

Nos

10.00

10.00

269,223

25%

753,825

70%

269,223

25%

753,825

70%

269,223

25%

753,825

70%

269,223

25%

100.00%

753,825

0.00%
100.00%

269,223

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

100.00%

753,850

0.00%
100.00%

269,223

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

100.00%

753,850

99.92%

753,216

0.00%

100.00%

269,223

100.00%

269,223

0.08%

603

100.00%

753,819

100.00%

269,223

100.00%

269,223

1,076,894

1,076,894
Supply

Nos

10.00

10.00

753,825

70%

100.00%

753,826

0.00%

100.00%

753,826

Installation

Nos

10.00

10.00

269,223

25%

100.00%

269,223

0.00%

100.00%

269,223

753,825

70%

100.00%

753,852

0.00%

100.00%

753,852

269,223

25%

80.00%

215,379

0.00%

80.00%

215,379

753,825

70%

88.86%

669,881

11.14%

100.00%

753,857

269,223

25%

100.00%

269,223

0.00%

100.00%

269,223

753,825

70%

98.53%

742,776

1.47%

100.00%

753,825

269,223

25%

100.00%

269,223

0.00%

100.00%

269,223

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

8.00
1,076,894

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

83,976
-

1,076,894
11,049
-

1,076,894
Supply

Nos

10.00

10.00

753,825

70%

89.85%

677,356

10.14%

76,469

100.00%

753,825

Installation

Nos

10.00

10.00

269,223

25%

70.00%

188,456

30.00%

80,767

100.00%

269,223

753,825

70%

89.85%

677,356

10.14%

76,469

100.00%

753,825

269,223

25%

100.00%

269,223

100.00%

269,223

753,825

70%

14.86%

111,974

100.00%

753,825

269,223

25%

753,825

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00
1,076,894

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

85.14%

641,851

100.00%

269,223

100.00%

269,223

70%

85.14%

641,851

14.86%

111,974

100.00%

753,825

269,223

25%

20.00%

53,845

80.00%

215,379

100.00%

269,224

83.69%

630,920

1,076,894

1,076,894
Supply

Nos

10.00

10.00

753,825

70%

Installation

Nos

10.00

10.00

269,223

25%

753,825

70%

269,223

25%

753,825

70%

269,223

25%

16.30%

122,905

100.00%

753,825

100.00%

269,223

100.00%

269,223

16.30%

122,871

100.00%

753,825

100.00%

269,223

100.00%

269,223

16.30%

122,871

100.00%

753,825

100.00%

269,223

100.00%

269,223

16.30%

122,871

100.00%

269,223

100.00%

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

83.70%

630,954

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

83.70%

630,954

1,076,894
Supply

Nos

10.00

10.00

Installation

Nos

10.00

10.00

753,825
269,223

Total Amount :-

5.3.1

323,068

100.00%

0.00%

Zone 23

5.3

70%

798,110

904,591

60.00%

Zone 22

5.2.23

904,591

88.23%

100.00%

107,689

Zone 21

5.2.22

25%

106,481

753,825

Zone 20

5.2.21

323,068

0.00%

11.77%

40.00%

Zone 19

5.2.20

70%

798,110

100.00%

Zone 18

5.2.19

25%

904,591

88.23%

25%

Zone 17

5.2.18

323,068

904,555

0.00%

70%

Zone 16

5.2.17

70%

323,068

100.00%

269,223

Zone 15

5.2.16

904,591

100.00%

89,959

753,825

Zone 14

5.2.15

25%

323,068

9.94%

10.00

Zone 13

5.2.14

323,068

100.00%

10.00

Zone 12

5.2.13

814,596

10.00

Zone 11

5.2.12

90.05%

904,584

10.00

Zone 10

5.2.11

70%

100.00%

Nos

Zone 9

5.2.10

25%

904,591

68,020

Nos

Zone 8

5.2.9

323,068

Remarks

7.52%

Supply

Zone 7

5.2.8

836,564

Instalation

Zone 6

5.2.7

92.48%

Amount

1,076,894

Zone 5

5.2.6

70%

Qty

1,076,894

Zone 4

5.2.5

904,591

Uptodate
Amount

1,076,894

Zone 3

5.2.4

Qty

1,292,272

Total Amount :5.2

Amount

1,292,272

Zone 23

5.2.1

Up to Aug - 2015

Present

Qty

1,292,272

Zone 22

5.1.23

Ra Bill - 13 & Part

Previous
Percentage

1,292,272

Zone 21

5.1.22

Amount

1,292,272
Supply

Zone 20

5.1.21

3,810,546,305.00

Further Breakup
Percentage

Automatic Electrical Valves per 4-6 growers parcel

24,768,551

Nos

83.70%

630,954

25%

100.00%

24,445,483

18,312,457

5,163,915

753,825
269,223
23,476,372

2,300.00

Zone 1

1,292,272
Supply

Nos

100.00

100.00

9,046

Installation

Nos

100.00

100.00

3,231

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 2

904,591

70.00%

323,068

25.00%

5.00%

16,153

904,591

70.00%

100.00%

100.00%

904,591

904,591

323,068

25.00%

50.00%

161,534

100.00%

904,591

95.00%

306,915

100.00%

904,591

100.00%

323,068 MB No 540 Pg no 51

100.00%

904,591

100.00%

323,068 MB No 540 Pg no 51

100.00%

904,591

100.00%

323,068 MB No 540 Pg no 51

100.00%

904,591

100.00%

323,068 MB No 540 Pg no 51

100.00%

904,591

100.00%

323,068

100.00%

904,591

100.00%

323,068

100.00%

904,591

100.00%

323,068

100.00%

904,591

100.00%

323,068

100.00%

904,591

100.00%

323,068

100.00%

904,591

100.00%

323,068

100.00%

904,591

100.00%

323,068

1,292,272

Zone 3

50.00%

161,534

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

904,591

70.00%

Installation

Nos

100.00

100.00

323,068

25.00%

904,591

70.00%

323,068

25.00%

904,591

70.00%

323,068

25.00%

904,591

70.00%

323,068

25.00%

904,591

70.00%

323,068

25.00%

Zone 4

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 5

100.00%

904,591

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 6

100.00%

904,591

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 7

100.00%

904,591

100.00%

904,591

100.00%

323,068

1,292,272

Zone 8

100.00%

323,068

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

904,591

70.00%

Installation

Nos

100.00

100.00

323,068

25.00%

904,591

70.00%

323,068

25.00%

904,591

70.00%

323,068

25.00%

904,591

70.00%

323,068

25.00%

Zone 9

100.00%

904,591

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 10

100.00%

904,591

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 11

100.00%

904,591

100.00%

904,591

100.00%

323,068

1,292,272

Zone 12

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

904,591

70.00%

100.00%

904,591

100.00%

904,591

Installation

Nos

100.00

100.00

323,068

25.00%

100.00%

323,068

100.00%

323,068

904,591

70.00%

100.00%

904,591

100.00%

904,591

323,068

25.00%

100.00%

323,068

904,591

70.00%

100.00%

904,591

Zone 13

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 14

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

323,068

Supply

Nos

100.00

100.00

904,591

Installation

Nos

100.00

100.00

323,068

Zone 15

100.00%

904,591

25.00%

97.00%

313,376

100.00%

323,068

70.00%

100.00%

904,591

100.00%

904,591

25.00%

100.00%

323,068

100.00%

323,068

3.00%

9,692

1,292,272

219 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Sl. No.
5.3.16

5.3.17

5.3.18

5.3.19

5.3.20

5.1.21

5.3.22

5.3.23

Dated: 07-01-2014

Agt Value : Rs.

Unit of
Measure

Description of Work

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Amount

Zone 16

5.4.1

5.4.2

5.4.3

5.4.4

5.4.5

5.4.6

5.4.7

5.4.8

5.4.9

5.4.10

5.4.11

5.4.12

5.4.13

5.4.14

5.4.15

5.4.16

5.4.17

5.4.18

5.4.19

5.4.20

5.4.21

5.4.22

5.4.23

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Zone 17

5.5.1

5.5.2

5.5.3

Zone 18
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

5.5.6

5.5.7

5.5.10

5.5.11

5.5.12

5.5.13

25.00%

904,591

70.00%

100.00%

904,585

323,068

25.00%

904,591

70.00%

323,068

25.00%

904,591

Qty

100.00%

323,068

100.00%

100.00%

904,585

70.00%

100.00%

904,585

323,068

25.00%

9.00%

29,076

904,591

70.00%

100.00%

904,585

323,068

25.00%

100.00

100.00

904,591

70.00%

100.00

100.00

323,068

25.00%

Remarks

Amount

100.00%

904,591

100.00%

323,068

100.00%

323,068

904,585

100.00%

323,068

100.00%

100.00%

323,068

904,585

100.00%

323,068

100.00%

91.00%

293,992

904,585

100.00%

323,068

100.00%

100.00%

323,068

904,585

100.00%

904,591

70.00%

323,068

25.00%

904,591

70.00%

323,068

25.00%

100.00%

100.00%

323,068

904,585

323,068

100.00%

904,585

100.00%

323,068

100.00%

904,585

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00

100.00%

904,585

100.00%

323,068

1,292,272
Supply

Nos

100.00

100.00

Installation

Nos

100.00

100.00
29,722,261

12,100.00

44,583,392

27,913,080

100.00%

904,585

100.00%

0.00%

21,971,822

100.00%

1,263,845

323,068

100.00%
100.00%

6,264,290

904,585
323,068
28,236,112

5%

1,805,443
Supply

Nos

490.00

490.00

2,579

Installation

Nos

490.00

490.00

921

1,263,810

70.00%

451,361

25.00%

100.00%

451,361

100.00%

440,307

100.00%
100.00%

1,263,845
451,361 MB No 540 Pg no 53

1,761,228
Supply

Nos

478.00

478.00

1,232,860

70.00%

Installation

Nos

478.00

478.00

440,307

25.00%

Supply

Nos

478.00

478.00

1,232,860

70.00%

Installation

Nos

478.00

478.00

Supply

Nos

473.00

473.00

Installation

Nos

473.00

473.00

Supply

Nos

503.00

503.00

Installation

Zone 3

100.00%

1,232,802

100.00%
100.00%

1,232,802
440,307 MB No 540 Pg no 53

1,761,228

Zone 4

440,307

25.00%

1,219,964

70.00%

100.00%

1,232,802

100.00%

1,219,867

100.00%

1,297,346

100.00%

1,307,693

100.00%

440,307

100.00%
100.00%

1,232,802
440,307 MB No 540 Pg no 53

1,742,805

Zone 5

435,701

25.00%

1,297,340

70.00%

100.00%

435,701

100.00%
100.00%

1,219,867
435,701 MB No 540 Pg no 53

1,853,343

Nos

503.00

503.00

463,336

25.00%

Supply

Nos

507.00

507.00

1,307,657

70.00%

Installation

Nos

507.00

507.00

467,020

25.00%

Supply

Nos

603.00

603.00

1,555,260

70.00%

Installation

Nos

603.00

603.00

Supply

Nos

618.00

618.00

Installation

Nos

618.00

618.00

Supply

Nos

578.00

578.00

Installation

Zone 6

100.00%

463,336

100.00%

467,020

100.00%

1,297,346

100.00%

463,336

100.00%

1,307,693

1,868,081

Zone 7

100.00%

467,020

100.00%

1,555,392

2,221,800

Zone 8

555,450

25.00%

1,593,948

70.00%

100.00%

1,555,392

100.00%

1,594,018

100.00%

1,490,751

100.00%

1,446,939

100.00%

555,450

100.00%

555,450

100.00%

1,594,018

2,277,069

Zone 9

569,267

25.00%

1,490,780

70.00%

100.00%

569,267

100.00%

569,267

100.00%

1,490,751

2,129,686

Nos

578.00

578.00

532,422

25.00%

Supply

Nos

561.00

561.00

1,446,934

70.00%

Installation

Nos

561.00

561.00

516,762

25.00%

Supply

Nos

578.00

578.00

1,490,780

70.00%

Installation

Nos

578.00

578.00

Supply

Nos

506.00

506.00

Installation

Nos

506.00

506.00

Supply

Nos

509.00

509.00

Installation

Nos

509.00

509.00

Supply

Nos

452.00

452.00

Installation

Zone 10

100.00%

532,422

100.00%

516,762

100.00%

532,422

100.00%

1,446,939

2,067,048

Zone 11

100.00%

516,762

100.00%

1,490,805

2,129,686

Zone 12

532,422

25.00%

1,305,077

70.00%

100.00%

1,490,805

100.00%

1,305,035

100.00%

1,312,844

99.29%

1,157,506

99.37%

1,307,158

100.00%

532,422

100.00%

532,422

100.00%

1,305,035

1,864,396

Zone 13

466,099

25.00%

1,312,815

70.00%

100.00%

466,099

100.00%

466,099

100.00%

1,312,844

1,875,450

Zone 14

468,863

25.00%

1,165,800

70.00%

100.00%

468,863

100.00%

468,863

0.71%

8,294

100.00%

1,165,800

100.00%

1,665,429

Nos

452.00

452.00

416,357

25.00%

Supply

Nos

510.00

509.98

1,315,394

70.00%

Installation

Nos

510.00

510.00

469,784

25.00%

Supply

Nos

531.00

531.00

1,369,558

70.00%

Installation

Nos

531.00

531.00

Supply

Nos

510.00

510.00

Installation

Nos

510.00

510.00

Supply

Nos

533.00

533.00

Installation

Zone 15

416,357

100.00%

416,357

0.63%

8,236

100.00%

1,315,394

100.00%

469,784

100.00%

469,784

0.61%

8,283

100.00%

1,369,558

100.00%

489,128

100.00%

489,128

0.63%

8,284

100.00%

1,315,394

100.00%

469,784

100.00%

469,784

0.60%

8,239

100.00%

1,374,716

100.00%

1,879,135

Zone 16

1,956,511

Zone 17

489,128

25.00%

1,315,394

70.00%

99.39%

1,361,275

99.37%

1,307,110

99.40%

1,366,477

41.45%

502,514

1,879,135

Zone 18

469,784

25.00%

1,374,716

70.00%

1,963,880

Nos

533.00

533.00

490,970

25.00%

Supply

Nos

470.00

470.00

1,212,226

70.00%

Installation

Nos

470.00

470.00

432,938

25.00%

Supply

Nos

521.00

521.02

1,343,766

70.00%

Installation

Nos

521.00

521.00

Supply

Nos

505.00

505.02

Installation

Nos

505.00

505.00

Supply

Nos

553.00

553.01

Installation

Nos

553.00

553.00

Supply

Nos

633.00

633.00

Installation

Nos

633.00

633.00

583,085

25.00%

Zone 19

490,970

100.00%

490,970

58.55%

709,712

100.00%

1,212,226

100.00%

432,938

100.00%

432,938

52.81%

709,705

100.00%

1,343,766

100.00%

479,916

100.00%

479,916

54.48%

709,647

100.00%

1,302,498

100.00%

465,178

100.00%

465,178

54.79%

781,484

100.00%

1,426,300

100.00%

509,393

100.00%

509,393

47.87%

781,437

100.00%

1,632,636

100.00%

583,085

100.00%

1,731,752

Zone 20

1,919,665

Zone 21

479,916

25.00%

1,302,498

70.00%

47.19%

634,061

45.52%

592,851

45.21%

644,816

52.13%

851,199

1,860,712

Zone 22

465,178

25.00%

1,426,300

70.00%

509,393

25.00%

1,632,636

70.00%

2,037,572

Zone 23

2,332,338

44,583,392

Emitting pipe & drip manifold

77,161,500

42,354,221

0.00%

27,475,106

100.00%

23,920,849

100.00%

23,559,931

14,879,169

583,085
42,354,275

80%

Zone 1

34,172,835
Supply

Mts

3,326,834

3,326,815

23,920,984

Installation

Mts

3,326,834

3,326,834

8,543,209

Supply

Mts

3,276,778

3,276,620

Installation

Mts

3,276,778

3,276,778

8,414,666

25.00%

Zone 2

23,920,984

70.00%

8,543,209

25.00%

23,561,066

70.00%

33,456,755
Mts

3,257,121

3,257,254

23,419,728

70.00%

Mts

3,257,121

3,257,121

8,364,189

25.00%

Supply

Mts

3,324,053

3,323,980

23,900,994

70.00%

Installation

Mts

3,324,053

3,324,053

8,536,069

25.00%

100.00%

34,144,277

Supply

Mts

3,372,997

3,373,010

24,252,913

70.00%

Mts

3,372,997

3,372,997

8,661,755

25.00%

100.00%

33,918,130
Mts

3,302,037

3,301,924

23,742,691

70.00%

Mts

3,302,037

3,302,037

8,479,532

25.00%

100.00%

35,288,600

100.00%

8,364,189

100.00%

8,536,069

100.00%

8,661,755

100.00%

8,479,532

100.00%

8,822,150

100.00%

8,838,497

100.00%

8,821,819

100.00%

8,579,632

100.00%

8,345,110

100.00%

8,627,748

100.00%

Mts

3,435,457

3,435,581

24,702,020

70.00%

Mts

3,435,457

3,435,457

8,822,150

25.00%

Supply

Mts

3,441,823

3,441,889

24,747,793

70.00%

Installation

Mts

3,441,823

3,441,823

8,838,497

25.00%

100.00%

35,353,990

100.00%
100.00%

100.00%
100.00%

Supply

Mts

3,435,328

3,435,458

24,701,093

70.00%

Mts

3,435,328

3,435,328

8,821,819

25.00%

100.00%

34,318,526

Mts

3,341,017

3,341,077

24,022,968

70.00%

Mts

3,341,017

3,341,017

8,579,632

25.00%

100.00%

33,380,439
Mts

3,249,691

3,249,705

23,366,308

70.00%

Mts

3,249,691

3,249,691

8,345,110

25.00%

Supply

Mts

3,359,754

3,359,754

24,157,693

70.00%

Installation

Mts

3,359,754

3,359,754

8,627,748

25.00%

100.00%

34,510,991

8,536,069 MB No 540 Pg no 58

8,661,755

100.00%

23,741,879

100.00%

8,479,532

100.00%

24,702,914

100.00%

8,822,150

100.00%

24,748,268

100.00%

8,838,497

100.00%

24,702,030

100.00%

8,821,819

100.00%

24,023,397

100.00%

8,579,632

100.00%

23,366,406

100.00%

8,345,110

100.00%

24,157,985

100.00%

8,627,748

23,741,879

24,702,914

24,748,268

24,702,030

24,023,397

23,366,406

24,157,985

23,900,464

24,253,009

100.00%

8,364,189 MB No 540 Pg no 58

100.00%

Supply
Installation

23,420,685

100.00%

Supply
Installation

8,414,666 MB No 540 Pg no 58

24,253,009

Installation

8,543,209 MB No 540 Pg no 58

23,559,931

23,900,464

100.00%

35,287,276

23,920,849

23,420,685

Supply
Installation

34,547,213

8,414,666

Supply
Installation

Zone 12

100.00%

100.00%

Installation

Zone 11

100.00%

100.00%

34,647,019

Zone 10

100.00%

Supply

Zone 7

8,543,209

Installation

Zone 6

100.00%

33,658,665

Zone 3

Zone 13

323,068

Nos

Zone 2

Zone 9

904,591

Nos

Zone 1

Zone 8

100.00%

Supply

Manual valves, fertilizer tank and fitting per grower parcel

5.5.9

70.00%

Installation

Zone 23

5.5.8

904,591

Uptodate
Amount

1,292,272

Zone 22

Zone 5

Qty

1,292,272

Zone 21

Zone 4

Amount

1,292,272

Zone 20

5.5.5

Up to Aug - 2015

Present

Qty

1,292,272

Zone 19

5.5.4

Ra Bill - 13 & Part

Previous
Percentage

1,292,272

Total Amount :5.5

Amount

1,292,272
Supply

Total Amount :5.4

3,810,546,305.00

Further Breakup
Percentage

220 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Sl. No.

5.5.14

5.5.15

5.5.16

5.5.17

Req.Qty

Exe.Qty

Sub-Breakup

Rate

Amount

Zone 22

5.5.23

Zone 23

3,363,281

24,183,049

70.00%

3,363,281

3,363,281

8,636,803

25.00%

32,300,574
Mts

3,144,563

3,144,485

22,610,402

70.00%

Mts

3,144,563

3,144,563

8,075,144

25.00%

Zone 1

5.6.2

Zone 2

5.6.3

5.6.4

5.6.5

5.6.6

5.6.7

5.6.8

5.6.9

5.6.10

5.6.11

5.6.12

5.6.13

5.6.14

5.6.15

5.6.16

5.6.17

5.6.18

5.6.19

5.6.20

5.6.21

5.6.22

5.6.23

3,267,865

3,268,019

23,496,984

70.00%

Mts

3,267,865

3,267,865

8,391,780

25.00%

5.7.1

5.7.2

5.7.3

5.7.4

5.7.5

5.7.6

5.7.7

5.7.8

5.7.9

5.7.10

100.00%

34,827,738

Uptodate
Amount

24,183,385

Qty
-

Mts

3,390,591

3,390,635

24,379,417

70.00%

Mts

3,390,591

3,390,591

8,706,935

25.00%

100.00%

34,087,788

100.00%

24,183,385

100.00%

8,636,803

100.00%

22,609,840

100.00%

8,075,144

100.00%

23,498,085

100.00%

8,391,780

100.00%

24,379,738

100.00%

8,706,935

100.00%

23,860,851

100.00%

8,521,947

100.00%

24,270,342

100.00%

8,667,934

43,557

100.00%

24,153,962

8,626,415

100.00%

8,626,415

43,562

100.00%

24,366,176

8,702,206

100.00%

8,702,206

43,566

100.00%

24,513,169

8,754,703

100.00%

8,754,703

43,569

100.00%

24,693,701

8,819,179

100.00%

8,819,179

43,591

100.00%

25,790,766

9,210,987

100.00%

9,210,987

100.00%

8,636,803

100.00%

8,075,144

100.00%

8,391,780

100.00%

8,706,935

100.00%

8,521,947

100.00%

8,667,934

0.18%
100.00%

0.18%
100.00%

0.18%
100.00%

0.18%
100.00%

0.17%
100.00%

22,609,840

23,498,085

24,379,738

Supply

Mts

3,318,554

3,318,471

23,861,451

70.00%

Installation

Mts

3,318,554

3,318,554

8,521,947

25.00%

Supply

Mts

3,375,403

3,375,421

24,270,216

70.00%

Installation

Mts

3,375,403

3,375,403

8,667,934

25.00%

100.00%

34,671,737

23,860,851

100.00%

34,505,661

24,270,342

Supply

Mts

3,359,235

3,359,235

24,153,962

70.00%

Installation

Mts

3,359,235

3,359,235

8,626,415

25.00%

99.82%

34,808,822

24,110,405

Supply

Mts

3,388,749

3,388,749

24,366,176

70.00%

Installation

Mts

3,388,749

3,388,749

8,702,206

25.00%

99.82%

35,018,813

24,322,614

Supply

Mts

3,409,192

3,409,192

24,513,169

70.00%

Installation

Mts

3,409,192

3,409,192

8,754,703

25.00%

Supply

Mts

3,434,300

3,434,300

24,693,701

70.00%

Installation

Mts

3,434,300

3,434,300

8,819,179

25.00%

99.82%

35,276,715

24,469,604

99.82%

36,843,950

24,650,132

Supply

Mts

3,586,875

3,586,875

25,790,765

70.00%

Installation

Mts

3,586,875

3,586,875

9,210,987

25.00%

792,593,631

752,963,950

99.83%

0.00%

25,747,174

Remarks

Amount

Supply
Installation

19,814,841

Qty

Mts

554,599,988

198,366,253

752,966,241

1%

861,515
Supply

Nos

1.00

1.00

603,060

Installation

Nos

1.00

1.00

215,379

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

100.00%

603,060

100.00%

215,379

100.00%

603,060

100.00%

215,379 MB No 540 Pg no 54

100.00%

603,061

100.00%

215,379 MB No 540 Pg no 54

100.00%

603,061

100.00%

215,379 MB No 540 Pg no 54

100.00%

603,061

100.00%

215,379 MB No 540 Pg no 54

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,061

100.00%

215,379

100.00%

603,060

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 3

100.00%

603,061
100.00%

215,379

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 4

100.00%

603,061

100.00%

603,061

100.00%

215,379

861,515

Zone 5

100.00%

215,379

100.00%

215,379

861,515
Supply

Nos

1.00

1.00

603,060

70.00%

Installation

Nos

1.00

1.00

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

Zone 6

100.00%

603,061

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 7

100.00%

603,061
100.00%

215,379

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 8

100.00%

603,061

100.00%

603,061

100.00%

215,379

861,515

Zone 9

100.00%

215,379

100.00%

215,379

861,515
Supply

Nos

1.00

1.00

603,060

70.00%

Installation

Nos

1.00

1.00

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

Zone 10

100.00%

603,061

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 11

100.00%

603,061
100.00%

215,379

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 12

100.00%

603,061

100.00%

603,061

100.00%

215,379

861,515

Zone 13

100.00%

215,379

861,515
Supply

Nos

1.00

1.00

603,060

70.00%

Installation

Nos

1.00

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

Zone 14

100.00%

603,060

0.00%

0.00%

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 15

100.00%

603,060

100.00%

603,060

100.00%

100.00%

603,060

100.00%

215,379

100.00%

603,060

100.00%

215,379

100.00%

603,060

100.00%

215,379

100.00%

603,060

100.00%

215,379

100.00%

603,060

100.00%

215,379

100.00%

603,060

100.00%

215,379

100.00%

603,060

100.00%

603,060

100.00%

215,379

100.00%

603,060

215,379

861,515

Zone 16

100.00%

215,379

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 17

100.00%

603,060

100.00%

603,060

100.00%

215,379

861,515

Zone 18

100.00%

215,379

100.00%

215,379

861,515
Supply

Nos

1.00

1.00

603,060

70.00%

Installation

Nos

1.00

1.00

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

215,379

25.00%

603,060

70.00%

Zone 19

100.00%

603,060

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Zone 20

100.00%

603,060

100.00%

215,379

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

215,379

25.00%

Supply

Nos

1.00

1.00

603,060

70.00%

Installation

Nos

1.00

215,379

25.00%

603,060

70.00%

215,379

25.00%

Zone 21

100.00%

603,060

100.00%

603,060

100.00%

603,060

0.00%

0.00%

861,515

Zone 22

100.00%

215,379

861,515

Zone 23

0.00%

0.00%

861,515
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Total Amount :5.7

100.00%

33,567,119
Supply
Installation

Automation controller and communication to center

Up to Aug - 2015

Present
Amount

Supply
Installation

Total Amount :5.6


5.6.1

100.00%

3,363,281

Zone 21

5.5.22

Qty

Mts

Zone 20

Ra Bill - 13 & Part

Previous
Percentage

Mts

Zone 17

Zone 19

Amount

Supply

Zone 16

Zone 18

3,810,546,305.00

Further Breakup
Percentage

Installation

Zone 15

5.5.19

5.5.21

Agt Value : Rs.

Unit of
Measure

Zone 14

5.5.18

5.5.20

Dated: 07-01-2014

Description of Work

19,814,845

Radio net

3,962,968

Zone 1

18,824,091

100.00%

603,060

100.00%

0.00%

13,870,361

100.00%

1,206,121

215,379

100.00%
100.00%

4,307,575

603,060
215,379
18,177,966

4%

1,723,030
Supply

Nos

1.00

1.00

1,206,121

Installation

Nos

1.00

1.00

430,758

Zone 2

1,206,121

70.00%

430,758

25.00%

100.00%

430,758

100.00%

430,758

100.00%
100.00%

1,206,121
430,758 MB No 540 Pg no 55

1,723,030
Supply

Nos

1.00

1.00

1,206,121

70.00%

Installation

Nos

1.00

1.00

430,758

25.00%

Supply

Nos

1.00

1.00

1,206,121

70.00%

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Zone 3

100.00%

1,206,121

100.00%
100.00%

1,206,121
430,758 MB No 540 Pg no 55

1,723,030

Zone 4

430,758

25.00%

1,206,121

70.00%

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

100.00%

430,758

100.00%
100.00%

1,206,121
430,758 MB No 540 Pg no 55

1,723,030

Zone 5

430,758

25.00%

1,206,121

70.00%

100.00%

430,758

100.00%
100.00%

1,206,121
430,758 MB No 540 Pg no 55

1,723,030

Nos

1.00

1.00

430,758

25.00%

Supply

Nos

1.00

1.00

1,206,121

70.00%

Installation

Nos

1.00

1.00

430,758

25.00%

Supply

Nos

1.00

1.00

1,206,121

70.00%

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Zone 6

100.00%

430,758

100.00%

430,758

100.00%

1,206,121

100.00%

430,758

100.00%

1,206,121

1,723,030

Zone 7

100.00%

430,758

100.00%

1,206,121

1,723,030

Zone 8

430,758

25.00%

1,206,121

70.00%

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

100.00%

430,758

100.00%

430,758

100.00%

1,206,121

1,723,030

Zone 9

430,758

25.00%

1,206,121

70.00%

430,758

25.00%

1,206,121

70.00%

100.00%

430,758

100.00%

430,758

100.00%

1,206,121

1,723,030

Zone 10

100.00%

430,758

100.00%

430,758

100.00%

1,206,121

1,723,030
-

221 OF 227

Name of Work : Design, Supply, Installation, Testing and Commissioning Operation, Maintenance, Training and Transfer of RAMTHAL (MAROL) II nd Stage Package 1-(West side-11700 Ha) Automated Drip Irrigation System on Build Operate Maintain and Transfer basis consisting of the following : Pumping Machineries, Transformer Sub-Station, Rising Main Including Construction Of Civil Works Of Intake, Sump Well And Pump House, Electrical Works, EOT Crane, Supply Of
Spare Parts, Tools, Drip Irrigation System Including Drip lines, Auto Filters, Secondary Filters, Fertilizer Equipments, Irrigation Controllers, Solenoid Valves, Pressure Relief Valve, Butterfly Valves, Air Release Valves, Fittings and accessories etc. Including Operation and Maintenance of the System for Five Years after the Date of completion on turnkey basisName of the Agency : NETAFIM-MEIL (JV)
Agt.No.55 / 2013-14

Sl. No.

Dated: 07-01-2014

Agt Value : Rs.

Unit of
Measure

Description of Work
Installation

5.7.11

Zone 11

5.7.12

Zone 12

5.7.13

Nos

Req.Qty

Exe.Qty
1.00

Sub-Breakup

Rate

Amount

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

1.00

1,206,121

70.00%

1.00

1.00

430,758

25.00%

Supply

Nos

1.00

1.00

1,206,121

70.00%

Installation

Nos

1.00

Supply

Nos

1.00

1.00

Zone 22

5.7.23

Zone 23

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

430,757

25.00%

1.00

1,206,121

70.00%

1.00

430,757

25.00%

Supply

Nos

1.00

1.00

1,206,121

70.00%

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

430,757

25.00%

1.00

1.00

1,206,121

70.00%

1.00

1.00

430,757

25.00%

Supply

Nos

1.00

1.00

1,206,121

70.00%

Installation

Nos

1.00

100.00%

430,758

1,206,121

100.00%

1,206,121

100.00%

100.00%

1,206,121

430,758

100.00%

1,206,121

100.00%

100.00%

1,206,121

430,758

100.00%

1,206,121

100.00%

1,206,121

100.00%

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

0.00%

0.00%

100.00%

430,757

1,206,121

100.00%

430,757

100.00%

1,206,121

100.00%

430,757

100.00%

430,757

100.00%

1,206,121

100.00%

430,757

100.00%

430,757

100.00%

430,757

100.00%

1,206,121

100.00%

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

100.00%

1,206,121

430,757

100.00%

1,206,121

100.00%

430,757

100.00%

430,757

100.00%

1,206,121

100.00%

430,757

100.00%

430,757

100.00%

1,206,121

100.00%

1,206,121

100.00%

430,757

430,757

25.00%

100.00%

1,206,121

1,206,121

70.00%

430,757

25.00%

0.00%

100.00%

0.00%

430,757

100.00%

1,206,121

0.00%

0.00%

1,723,030
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00
53,069,323
9,907,420

100.00%

1,206,121

0.00%

27,740,783

99.71%

300,677

100.00%

37,648,204

430,757

100.00%
100.00%

8,615,149

1,206,121
430,757
36,355,932

1%

430,757
Supply

Nos

1.00

1.00

301,530

Installation

Nos

1.00

1.00

107,689

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

0.29%

853

100.00%

301,530 MB No 540 Pg no 46

100.00%

107,689

100.00%

107,689 MB No 540 Pg no 57

0.53%

1,593

99.99%

301,530 MB No 540 Pg no 46

100.00%

107,689

100.00%

107,689 MB No 540 Pg no 57

0.53%

1,593

99.99%

301,530 MB No 540 Pg no 46

100.00%

107,689

100.00%

107,689 MB No 540 Pg no 57

0.53%

1,591

100.00%

301,530 MB No 540 Pg no 46

100.00%

107,689

100.00%

107,689 MB No 540 Pg no 57

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,937

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,937

99.47%

299,939

430,757

430,757
Supply

Nos

1.00

1.00

301,530

70.00%

Installation

Nos

1.00

1.00

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

99.47%

299,939

0.53%

1,591

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,591

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,591

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,591

100.00%

301,530

100.00%

107,689

100.00%

107,689

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,939

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,939

99.47%

299,939

430,757

430,757
Supply

Nos

1.00

1.00

301,530

70.00%

Installation

Nos

1.00

1.00

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

99.47%

299,939

0.53%

1,591

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,591

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,594

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,594

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.53%

1,583

100.00%

301,530

100.00%

107,689

100.00%

107,689

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,939

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,936

99.47%

299,936

430,757

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.47%

299,947

430,757
Supply

Nos

1.00

1.00

301,530

70.00%

Installation

Nos

1.00

1.00

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

99.23%

299,207

0.77%

2,323

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,323

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,321

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,321

100.00%

301,530

100.00%

107,689

100.00%

107,689

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.23%

299,207

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.23%

299,209

99.23%

299,209

430,757

430,757
Supply

Nos

1.00

1.00

301,530

70.00%

Installation

Nos

1.00

1.00

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

301,530

70.00%

107,689

25.00%

99.23%

299,217

0.77%

2,313

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,313

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,313

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,313

100.00%

301,530

100.00%

107,689

100.00%

107,689

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.23%

299,217

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00

99.23%

299,217

99.23%

299,217

430,757

Zone 22

5.8.23

100.00%

1,723,030

Zone 21

5.8.22

430,758

430,758

1,723,030

Zone 20

5.8.21

70.00%

1.00

Zone 19

5.8.20

25.00%

Nos

Zone 18

5.8.19

430,757

1,206,121

Nos

Zone 17

5.8.18

70.00%

Nos

Zone 16

5.8.17

25.00%

Supply

Zone 15

5.8.16

430,757

1,206,121

Installation

Zone 14

5.8.15

100.00%

Remarks

100.00%

1,723,030

Zone 13

5.8.14

430,758

1,723,030

Zone 12

5.8.13

100.00%

Amount

1,723,030

Zone 11

5.8.12

Qty

1,723,030

Zone 10

5.8.11

70.00%

1.00

Zone 9

5.8.10

25.00%

1.00

Zone 8

5.8.9

430,757

1,206,121

1.00

Zone 7

5.8.8

70.00%

1.00

Zone 6

5.8.7

25.00%

Nos

Zone 5

5.8.6

430,757

1,206,121

Nos

Zone 4

5.8.5

70.00%

Nos

Zone 3

5.8.4

25.00%

Supply

Zone 2

5.8.3

430,757

1,206,121

Installation

Zone 1

5.8.2

Uptodate
Amount

1,723,030

Other control Accessories sourced locally in India

5.8.1

Qty

1,723,030

Total Amount :5.8

Up to Aug - 2015

Present
Amount

1,723,030

Zone 21

5.7.22

Qty

1,723,030

Zone 20

5.7.21

25.00%

1.00

Zone 19

5.7.20

70.00%

430,758

Nos

Zone 18

5.7.19

1,206,121

Nos

Zone 17

5.7.18

25.00%

Supply

Zone 16

5.7.17

430,758

Installation

Zone 15

5.7.16

Ra Bill - 13 & Part

Previous
Percentage

1,723,030

Zone 14

5.7.15

Amount

1,723,030

Zone 13

5.7.14

3,810,546,305.00

Further Breakup
Percentage

430,757
Supply

Nos

1.00

1.00

301,530

70.00%

Installation

Nos

1.00

1.00

107,689

25.00%

301,530

70.00%

107,689

25.00%

Zone 23

99.23%

299,222

0.77%

2,308

100.00%

301,530

100.00%

107,689

100.00%

107,689

0.77%

2,313

100.00%

107,689

100.00%

430,757
Supply

Nos

1.00

1.00

Installation

Nos

1.00

1.00
Total Amount :-

9,907,420

99.23%

299,217

100.00%

9,412,049

6,892,086

2,519,964

301,530
107,689
9,412,050

Part C Operation and Maintanance for 5 Years


6 Agromony Survices

58,682,413

6.1

Formation of WUCS

LS

100.00%

100.00%

6.3

Training for WUCS and KBJNL staff

LS

100.00%

0.00%
Total Amount :-

58,682,413

Total Cumilative Amount :-

20,538,845

35%

17,604,724

30%

50.00%
30.00%

38,143,568

3,092,051,377

Section Engineer

Assistant Executive Engineer,


KBJNL, MAROL LIS, Sub-division
Ilkal

10,269,422

50.00%

5,281,417

30.00%

10,269,422
5,281,417

15,550,839

15,550,839

382,661,901

3,474,713,278

Executive Engineer,
KBJNL.ARBC Division,
Almatti

222 OF 227

RA BILL - 13 (Up to Aug 2015 )


Project Name :

Ramthal (Marol) Stage II Package 1 West side ( 11700 ha) Drip Irrigation Project

Agreement No. and date :

55/2013-14 dated 07.01.2014

Agreement cost:

Rs 381.0546

Contractor:

M/s. NETAFIM-MEIL (JOINT VENTURE)


Total

S.No

Description

No of days delay in making good in the


shortfall

Quantity

Unit
Qty

Value

Quantity to be
completed during the
last month as per
agreed progamme

Actul qty executed


by review date

short fall if any

2.286

2.286

0.000

1.143

1.143

1.143

0.00

1.143

1.143

1.143

0.00

9.053

8.723

-0.330

-0.28

Short fall in
cumilative programe

Shortfall in excess no of days required


of25% of the
to make good in
cunilative programe
short fall

10

11

Remarks

Date of Notice to
contractor to make
the shortfall in the
sccedding month

Date by which
the short fall is
made

Contractor

Department

Cost of the
balance work
(short fall)

Penalty at 1% of
the short fall per
day

12

13

14

15

16

17

18

Detailed Engineering ,Preparation of designs and drawings


Part A - Perliminaries.
1

Project Engineering and Design Services

0.60%

1.1 Survey & Investigation

2.286
1

1.2 Detail Engineering and Preparation of designs


Part B - Construction
2
2.1

Electro-Mechanical works
Design, supply, installation of pumping machinery and pump house
electrical works

2.2 Construction of 33 KV Electrical sub station

0.025

9.526

7.967

7.684

0.08

0.762

0.724

0.724

0.00

0.381

0.362

0.314

-0.05

256.030

240.343

237.879

-2.46

143.377

136.208

133.907

-2.30

128.886

66.568

61.250

61.250

0.00

1950.03

43.525

41.349

40.163

-1.19

2.3 Laying of 33 KV line from KPTCL substation to Work site


3

Pipeline and related Civil Works

67.19%

Construction of main and Branch pipelines(Bulk water supply)


3.1 including Earth work, structures, supply, laying , jointing, testing and
commissioningConstruction of Main Feeder Pipe line including supply, Earth work,
3.2
Structure, laying , jointing, testing and commissioning (for 23 Zones)
3.3 Construction of Pipe network of Mains and Sub mains for Blocks

Kms

3.4 Construction of Structures on Pipe line network

LS

4 CIVIL WORKS

LS

4.2 Pump House


4.3 Construction of Control rooms

Nos

5 DRIP SYSTEM
5.1

2.56

1.536

2.560

1.02

4.763

4.274

3.107

-1.17

100%

1.096

1.096

0.430

-0.67

100%

1.143

1.143

0.691

-0.45

23

2.524

2.035

1.986

-0.05

99.073

94.126

94.116

-0.01

1.25%

4.1 Construction of Sump

26%

2.972

2.830

2.824

-0.01

5.2 Secondary Head Control Unit

2.477

2.353

2.348

-0.01

5.3

Automatic Electrical Valves per 4-6 growers parcel

2.972

2.824

2.824

0.00

5.4 Manual valves, fertilizer tank and fitting per grower parcel

4.458

4.235

4.235

0.00

5.5 Emitting pipe & drip manifold

79.259

75.296

75.297

0.00

1.981

1.882

1.818

-0.06

5.7 Radio Net

3.963

3.765

3.636

-0.13

5.8 Other control Accessories sourced locally in India

0.991

0.941

0.941

0.00

0.000

1.555

1.555

1.027

1.03

5.6

Primary Head Control Unit

Automation controller and central communication unit including


SCADA software and personal computers

Part -C Operation and Maintenance for 5 years


1.54%

5.868

6.1 Formation of WUCS

6 Agronomy Services

No

2.054

6.2 Agronomy support to the farmers

No

2.054

6.3 Training for WUCS and KBJNL staff

No

1.760

7 Supply of Spares and Tools

No

0.229

8 O & M of the Entire system

No

3.277

Cumulative Total =

381.054

Section Engineer

0.00
0.528

0.53
0.00

352.489

347.414

-5.075

Assistant Executive Engineer,


KBJNL, MAROL LIS, Sub-division
Ilkal

Executive Engineer,
KBJNL.ARBC Division,
Almatti

223 OF 227

Measurment for control room(Zone-3)


Nos

Length

Excavation for foundation


For columns
4
4

1.8
1.2

4
4

1.8
1.2

PCC 40M10
For columns

Steel
For Raft
For footing F1 (4 nos)
10mm @180mmc/c
Length=
Nos=

1.5+0.2+0.2=
(1500/180)+1x2)=

Total length=
For 4 nos
For footing F2 (4 nos)
10mm @180mmc/c
Length=
Nos=

0.9+0.2+0.2=
(900/180)+1x2)=

Total length=
For 4 nos
For Columns C1
Main Bar
25 mm 4 nos
Length=
Nos=

4+0.2+0.2=
4*4

Length=
Nos=

4+0.2+0.2=
4*4

16 mm 4 nos

Distribution Bar
8 mm @ 190 mm c/c
Length=

8 mm @ 190 mm c/c

For RECTANGLE Shape


0.35+0.2+0.35+0.2+0.05+0.05
Nos=

4.4/.19+1
For DAIMOND Shape

Length=

0.20+0.20+0.20+0.20+0.05+0.05
Nos=

4.4/.19+1

Length=
Nos=

4+0.2+0.2=
4*4

For Columns C2
12 mm 4 nos

Distribution Bar
8 mm @ 190 mm c/c
Length=

8 mm @ 190 mm c/c
Length=

For RECTANGLE Shape


0.35+0.2+0.35+0.2+0.05+0.05
Nos=

4.4/.19+1
For DAIMOND Shape

0.20+0.20+0.20+0.20+0.05+0.05
Nos=

4.4/.19+1

CC 20 M 20
For Zone 3
For Footing F1
4

1.6

0.45

0.23

For Footing F2

For Column C1
For Column C2

Plinth Beam

ol room(Zone-3)
Width

Hight

1.80
1.20

Qty

1.5
1.5

19.44 CUM
8.64 CUM
28.08 CUM

0.1
0.1

1.30 CUM
0.58 CUM
1.87 CUM

Total

1.80
1.20
Total

5+0.2+0.2=
500/180)+1x2)=

9+0.2+0.2=
00/180)+1x2)=

1.90
18.00
34.20 Rmt
136.80 Rmt

1.30
12.00
15.60 Rmt
62.40 Rmt

+0.2+0.2=

4.40
70.40 Rmt

+0.2+0.2=

4.40
70.40 Rmt

or RECTANGLE Shape
24

or DAIMOND Shape

Unit

1.2
28.80 Rmt

for 1 Raft

for 1 Raft

0.9
21.60 Rmt

24

+0.2+0.2=

4.40
70.40 Rmt

or RECTANGLE Shape
24

1.2
28.80 Rmt

24

0.9
21.60 Rmt

or DAIMOND Shape

1.60

0.3

3.07 CUM

1.00

0.3

1.20 CUM

0.30

0.7

0.38 CUM

0.23

0.7

0.15 CUM
4.80 CUM

Total=