Enbridge Bakken Pipeline Project - Certificate OC-058

Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 1 of 49

HYDROSTATIC TEST
PLAN

Bakken Pipeline Expansion Project,


Mainline Pipeline NPS 16
Prepared by:
Surerus Pipeline Inc.
For:
Enbridge Bakken L.P.

20'12-1 '1-09
2

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 2 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN
1. Scope
This document was prepared for the hydrostatic pressure testing of the Enbridge Bakken
Mainline NPS 16 Pipeline Project planned for construction in the summer/fall of 2012
between Steelman, SK and Cromer, MB. The test shall be completed in two (2) underground
sections and two (2) above-ground sections totaling approximately 123,987m in length; the
test section end points are detailed within the document below. For the below-ground
sections the hydrostatic test consists of a minimum 4.25 hour strength and a minimum 4.25
hour leak test to verify the integrity of the pipeline following installation. At the pipeline end
points, the Steelman and Cromer terminal tie-ins, short sections of the pipeline will be tested
prior to installation due to access restrictions, these segments will be tested for a minimum
period of one (1) hour to permit visual inspection of the pipeline during a combined strength
and leak test.

2. Safety
2.1.

2.2.
2.3.
2.4.
2. 5.
2.6.
2.7.
2.8.
2.9.

All personnel shall review and follow the Emergency Response Plan (ERP) developed
specifically for this project. A copy of the ERP shall be available in each vehicle used
on the project and additional copies shall be posted within the test building and other
appropriate locations.
A pre-phase meeting will be held at the Surerus site office for all personnel involved in
the hydrostatic test prior to commencement of the test to ensure that all personnel
understand their respective duties.
Surerus will install warning signs and barricades to prevent access to the vicinity of the
test area. Warning signs shall indicate "DANGER - High Pressure Pipeline Test and
"Restricted Access".
All Surerus personnel not involved in the testing shall be removed from the area while
the pipeline section is under a pressure equal to or greater than 2,760kPa (-400psi).
Test heads and pressurizing pipe shall be secured to limit movement.
All testing equipment including compressors, recorders, deadweights, etc. shall be set
liP a safe distance from the test section and/or test heads.
Surerus employees shall inspect all hoses, lines, and connections for faults prior to
pressurizing the lines. The Surerus Hydrotest Pre-test Checklist will be completed to
ensure that all components meet the required ratings.
Surerus personnel shall ensure pressure hoses/unions are rated to twice the maximum
expected hydrotest pressures, and all safety lines are firm ly attached and secured with
whip checks.
An Enbridge representative will be on site for the duration of test activities.

3. Equipment
In addition to the details listed below, all testing materials, equipment, and instrumentation
shall comply with relevant Enbridge specifications including section 6.3 of CPSC-SPECHYDR0-005. A detailed list of all testing equipment including make, model and recent
calibration certificate shall be available for review prior to commencement of testing
activities. Surerlls shall supply the following equipment for com pletion of the hydrostatic test:
Pumps including transfer/fill pllmp, and squeeze pump.
Air compressors required for pipeline cleaning, pre-pack, and dewatering.
All pipeline pigs required for line fill and dewatering.
All necessary valves, hoses, and fittings reqllired to successfully complete the
test.
Calibrated temperature recorders, pressure recorders, ancl cleaclweights.
Calibrated flow meter for preparation of the yield plot where applicable.
DA\!E
REVISION
PAGE

2012- '1 '1-09


2
2 ofB

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

------SURI!JJ

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 3 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN
Adequate lighting and light towers at all work areas.

3.1 Test Heads


3.1.1 Surerus shall supply Enbridge approved test heads which comply with a ll
requirements of relevant specifications including section 6.2 of CPSC-SPECHYDR0-005 .
3.1.2 Test head assemblies shall comply with all requirements of CSA-2662 (latest
edition). All documentation certifying test head compliance shall be available for
review prior to commencement of testing.
3.1.3 Test heads will be welded to the section and the welds will be inspected by NDE
prior to filling the section. A minimum of 4m of heavywall pipe which remains
below 90% SMYS at the maximum anticipated test pressure shall be included in
the test section immediately adjacent to the test head.

3.2 Pumps
3.2.1
3.2.2

3.2.3
3.2.4

Surerus shall ensure that fill and squeeze pLimps are adequately sized for the
length and diameter of the section to be tested.
A transfer pump shall be installed at the edge of the water source (Alameda
Reservoir). The pump shall be placed within a lined containment berm capable
of containing 1.5 times the maximum volume of fuel contained within the pump.
The inlet end of the pump will have a screened intake which meets regulatory
requirements.
The fill pump will be an 8" inlet and 6" discharge pump capable of providing a fill
3
rate up to 7m /min. A second fill pump will be on location for back-up.
Surerus anticipates that the fill pump, storage tank, squeeze pump, and test
trailer will be set-up within available temporary workspace at the common test
point at the junction of section 1 and section 2 near 35+500.

T able 1 Pump Det a1'Is


Pump
Manufacturer/Model Suction
Discharge
Flow
Pioneer
10"
8"
4m"/min
Transfer #1
PP108S17"
4mJ/min
10"
8"
Transfer#2
Pioneer
PP108S1 7"
Fill #1
Pioneer PP86C21
6"
4.5 - 7m"/min
8"
6"
4.5 - 7m"/min
Fill #2 (Back-up}
Pioneer PP86C21'
1"
TBD
2"
500Umin
S_queeze _(Truck)
* Pump performance curves are mcluded as an attachment co th1s document.

3.3 Instrumentation:
3.3. 'I

3.3.2
3.3.3

Surerus shall supply pressure and temperature recorders and dead weights to
provide readings for the test data. The pressure shall be measured in kPa, and
the temperature measured in degrees Celsius.
All test charts and reports, including the depressurizing of tested lines, will be
included in the document turnover package.
Instrumentation for the test shall be as follows:
Single pen temperature recorders will be located at the 'fill point to record
and monitor the test medium temperature through the manifold during the fill.

DATE
REVISION
PAGE

2012-11 -09

2
3 of8

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 4 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN

3.3.4

Additional single pen temperature recorders will be located at each end of


the test section and a third temperature recorder installed near the middle of
the test section .
Two dual pen temperature/pressure recorders, a digital deadweight, and a
mechanical deadweight will be located at the fill point.
Two additional dual pen temperature/pressure recorders and deadweight
shall be located at the section end point.
All measurement equipment shall be certified for accuracy not more than 30 days
prior to commencement of the pressure test. The calibration certificates and
current calibration reports shall be maintained on site and included in the
turnover package following completion of the test.

3.4 Cold Weather Provisions


3.4.1
To counteract the effect of below freezing ambient conditions anticipated during
testing activities, Surerus shall perform the following :
Erect shelters around or hoard-in all exposed piping on the project.

Place heaters within the hoarding to maintain the pipe temperature above
freezing at all test head locations and above ground valve sites along the
project.

Promptly drain all f ill lines following water transfer to protect fill pipe and
pumps from freezing.
3.4.2 Based upon an expected minimum average ground temperature of 3C at the
time of testing , Surerus does not anticipate a requirement to heat hydrostatic test
water.

4. Line Fill
4.1 Test Sections
Section

1*

Start
Steelman
Terminal
(KPO+OOO)
Alameda
Reservoir East
n<P3s+soo)
Alameda
Reservoir East
(KP35+500)

End

Length

Volume

0+094

94m

11m

I<P0+100

35,400m

4,275m 3

I<P1 23+27l

88,350m

10,669m

Dewater
Location

0+094

Landspread in
Vicinity of KP
35+500
Landspread in
Vicinity of KP
35+500

Cromer Terminal
3
74m
9m
123+271
(I<P123+345)
" Note that hydrotest water for sections 1 and 4 will be provided by tankel' trucl(s.
These sections shall be JOO% visible at t he time of tesi:ing and subject to a oneg
how combined strength and leak test.

4''

KP123+27'1

DATE
REVISION
PAGE

2012-'1"1-09
2
4 or

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

-----SUR!Wj

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 5 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN

4.2 Fill section


Test heads will be welded onto the ends of each test section and will be
inspected by NDE. NDE documentation shall be retained to support acceptability
of the welds.
The foreman shall inspect all connections and hoses prior to filling the section.
Prior to filling the pipeline, the fill line shall be leak tested for a minimum of 5min
at 3,450kPa (- 500psi).
To ensure a consistent fill Surerus will monitor and control pressure at the
section end during fill. A pre-pack of compressed air will be established to offset
the head pressure due to the water column during the line fill; this backpressure
will be maintained throughout the fill at a pressure corresponding to the
anticipated water pressure according to the elevation profile. The backpressure
is anticipated to vary between 345 to 1,250Kpa (-50 to 180psi) throughout the
line fill process.
A single medium density pig will be pre-loaded into the test head and will be
driven through the pipeline by the rate of the fluid insertion.
Water shall be pumped from the Alameda Reservoir near the HOD exit location
and transferred via fill line to the section fill points at KP35+500. Enbridge shall
be responsible for obtaining all required water withdrawal permits.
Water shall be left in the pipeline at a pressure of approximately 25% of the
maximum test pressure during a stabilization period to ensure that a consistent
temperature is achieved.
During the line fill process fluid samples shall be obtained by Enbridge
Representatives and submitted for analysis as required.
The filling operation shall be continuous to prevent air ingress.
4.3 Pressurize and test the section.
Before pressurizing the section beyond a pressure of 2,760kPa, all work crews
will be notified and removed from the vicinity of the test section .
All pipe and fill connections shall be checked for leaks and these test areas shall
be maintained as "off-limits" to non-essential personnel.
Pressure will be increased to 2,760kPa and all visible piping inspected for leaks.
Upon completion of the leak checl<, the line and manifold will be bled off, an inline
check valve installed on the squeeze line and the squeeze pump connected to
the line.
Squeeze pressure will be initiated through a 1" or 2 line rated to 38,00QI(Pa
(-5,500psi) ; pressure shall be increased in stages as indicated in the Hydrostatic
Test Record Worksheets.

5. Test Stages
The pipeline shall be tested in the following stages:
e
Leak check
e
Strength test (including yield plot where required)
e
Leal< test

DATE
REVISION
PAGE

20'12- "11 -09


2
5 of 8

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 6 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN
5.1. Leak Check

The first stage involves a leal< check at approximately 2, 7601<Pa to allow visual inspection of
exposed piping and fittings included in the test section. Any pressure lost during this period
must be explained to the satisfaction of the Company's testing supervisor prior to
pressurizing to the target strength test pressure

5.2. Strength Test

Following satisfactory completion of the leak checl<, testing will continue by slowly raising the
pressure to the strength test pressure as indicated in the attached Hydrotest Calculation
Worksheets. The strength test will be held at a pressure greater than the minimum test
pressure.
5.2.1

5.2.2
5.2.3
5.2.4

5.2.5

Yield plotting, if required, shall be undertaken as the section is pressurized during the
strength test. Yield plotting shall commence at a pressure equivalent to 60% of the
maximum anticipated test pressure . Yield plotting shall only be required where the
expected maximum hoop stress in the test section during the strength test is greater
than 100% SMYS of the pipe. Enbridge shall be responsible for completing all yield
plots and associated documents.
Pumping shall continue until the selected strength test pressure is achieved or, where
a yield plot is required, the point where the yield plot deviates beyond the 0.2% offset
line.
The strength test will be held at a pressure greater than the minimum test pressure.
After pumping has ceased, and the selected strength test pressure has been
reached, the strength test will commence. The pressure at the highpoint shall match
or exceed this minimum at both the start and the end of the test, and at no time
during the test period shall the pressure at the high point drop below the required
minimum.
The minimum duration for the hold period on the strength test is four and a quarter
(4.25) hours.

5.3. Lealt Test

After successful completion of the strength test, a minimum four and a quarter (4.25) hour
leal< test will be conducted. Pressure will be dropped to a level corresponding to the leal< test
pressure indicated in the attached Hydrotest Calculation Sheets.
5.3.1
5.3.2
5.3.3

The minimum pressure at the high point shall be 110% of the intended maximum
operating pressure.
At the end of the leak test a hold period of two (2) hours is required where no drop in
pressure is experienced.
The test duration may be extended beyond the four (4) hour period to achieve these
requirements.

6. Test Documentation
Surerus will submit all required test doCLrmentation within the turnover package. Temperature
and pressure readings shall be recorded as follows:

DATE
REVISION
PAGE

2012-'1'1-09
2
6 of8

____,__

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN

SURERUS
- - - PipellneltJt:.

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 7 of 49

Every 5 minutes between 0-30 minutes


Every 10 minutes between 30-60 minutes
Every 15 minutes for the remainder of the test

Records shall include the start and stop times for any pumping, pressunzrng, or depressurizing of the test section. A copy of the test worksheet shall be made available for
review prior to commencement of the test. All documentation will be turned over to Enbridge
upon completion of testing to facilitate completion of required Leave To Open applications.

7. Leak Detection
During the leal< test, any drop in pressure which cannot be correlated to a change in
temperature shall be considered a leak. If a leak is suspected Surerus shall notify the
Enbridge Representative and further pressurizing of the pipeline shall be halted until the
source of the leak can be determined. Should any failure require repair, the line pressure
shall be reduced to static pressure, the section dewatered, and the repair completed.

8. Depressurizing
Upon the completion of a successful test, the pipeline w ill be depressurized slowly until the
energy has reached an acceptable level prior to dewatering. The line will be depressurized
into a pressure trucl< rated in excess of the maximum test pressure. Under no circumstances
will valves be moved to the full open position to initiate depressurizing. The maximum
depressurizing rate shall be equal to 200kPa/min.

9. Dewatering
9.1 All test water shall be disposed of in accordance with applicable regulations.
9.2 Upon successful testing of the sections the water will be discharged by means of a
controlled land release in the vicinity of KP 35+500 near the water source. Water
discharge volumes correspond to the section volumes. Enbridge shall secure all
necessary permits for the discharge of hydrostatic test water.
9.3 Lines will be securely fastened and supported to prevent "whipping" or sudden
releases of energy during the dewater or water transfer process.
9.4 A high density coated poly pig or bi-directional multi-disc pig propelled by
compressed air will be used for dewatering.
9.5 Surerus w ill utilize additional pigs for de-watering if insufficient volumes of f luid are
received at the release point of the section during initial de-water activities.
9.6 Additional runs will be performed as requ ired to ensure that the section is sufficiently
de-watered.
9.7 No conditioners, chemicals or additives will be used to alter t he natural quality of the
water at any point during the hydro test
9.8 Water shall be discharged into a diffuser and then directed through filter cloth to
prevent erosion at the dewater location.

1 0. Pig/Cleaning Runs
'10.1 Following completion of testing of each section, multiple dewatering runs shall be
completed to remove any free-standing water within the pipe section
satisfaction of the Enbridge Representative.

DATE
REVISION

PAGE

to

the

20'12-'11-09

2
7 of 8

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 8 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN
11 . Caliper Pigging
11 .1 Following completion of pipeline drying each section shall be inspected with an
electronic caliper pig supplied by an approved Enbridge sub-contractor.
1'1.2 Caliper pigging shall be completed in accordance with relevant Enbridge
specifications.
1'1.3 An inhibitor shall be added to the line following completion of the caliper runs as
directed by Enbridge representatives

12. fest Personnel


Surerus will utilize the fol lowing l<ey personnel to complete pressure testing activities:
Telford Advent

Superintendent

Surerus Pipeline Inc.

Chris Fleming

Project Engineer

Surerus Pipeline Inc.

Ken Hawthorne

Test Foreman

Surerus Pipeline Inc.

Zoran Ponjevic

Test Consultant

Prepense Specialty Testing

13. SubDContractors
e

Transfer and fill pumps along with all interconnecting piping between the pumps ,
tanks, and test heads shall be provided by Central Water and Equipment Services
based in Saskatoon, SK.
Electronic caliper pigging shall be completed by an approved Enbridge vendor to be
determined prior to caliper pigging activities.

14. Attachments
1.
2.
3.
4.

Hydrostatic Test Calculation Worksheets


Hydrostatic Test Pressure Profiles Section 1 and Section 2
Water Withdrawal Sketch
Pump Performance Curves

15. Reference Documents


1.
2.
3.
4.
5.

CPCS-SPEC-HYDR0-005 Rev. 1 Pipeline Hydrostatic Testing


CPCS-SPEC-PIPELINE-001 Rev. 1 - Pipeline Construction
CPCS-SPEC-PCCT-007 Rev. 1 -Post Construction Caliper Tool.
Bakken Pipeline Project Canada Alignment Sheets - D-WM057-05-500-001-A
GSA Z662-(Latest Edition) - Oil and Gas Pipeline Systems; Canadian Standards
Association
6. Pipeline Act and Regulation - Government of Saskatchewan (Latest Edition)
7. J..\ENV - Code of Practice for TemporanJ Diversion of Water for Hydrostatic Testing of
Pipelines
8. AENV - Code of Practice for the Release of Hydrostatic Tes( Water from the Hydrostatic
Testing of Petroleum Liquid and Gas Pipelines.
9. DFO - Freshwater Intake End-of-Pipe Fish Screen Guidelines.

DATE
REVISION
PAGE

2012-1!-09

2
8 of 8

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 9 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN

Attachment 1 = Hydrostatic Test Calculation Sheets

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 10 of 49

HYDROSTATIC TEST CALCULATION WORKS HEET


PROJECT NAME:
PROJECT#:

TEST DATE:
TEST#:
SECTION#:

jEnbrldga Bakken Mainline


11 202

FILL FLUID SOURCE: IAiameda Reservo1r


DEWATER LOCATION:I35+500
PIPELINE DATA
PIPE OD (D)=
406.4
(mm)
WALL THICKN ESS (I)=
7.14
(mm)
PIPE GRADE (S) =
(MPa)
414
(kPa)
MOP=
9,928
100% SMYS =
14,547 (kPa)
80% SMYS
11 ,638 (kPa)
15,711 (kPa)
108% SMYS
110% SMYS
16,002 (kPa)
SECTION LENGTH (m)
35,406 (m}
4,275,675 (litres)
SECTION VOLU ME (litres)
0.2% OFFSET (lilres)
(litres)
8,551

=
=
=

ELEVATION AND PRESSURE DIFFERENTIALS


EAST TEST POINT (ETP)
578.00
HIGH POINT (HP) =
589.00
LOW POINT (LP} =
544.00
WEST TEST POINT (WTP) =
587.00

YES

-16.00
0.281
60
1,440
2,110
1,688
2,279
2,321
116,161
940,536
1,881

--=- ,_.

WEST END I{ .P. LOCATION


EAST END K.P. LOCATION
TEST POINT IS WEST OR EAST

(in)
(in)
(ksi)
(psig)
(psig)
(psig)
(psig)
(psig)
(ft)
(gal)
(gal)

26,872
54

(bbls)
(bbls)

11 .0
34.0
45.0
2.0
43.0

(m)
(m)
(m)
(m)
(m)

108
333
441
20
421

12,759
12,651
13,092
12,671

(I<Pa)
(I<Pa)
(kPa)
(kPa)

'1,850
'1,835
1,899
1,838

(psig)
(psig)
(psig)
(psig)

MINIMUM 'STRENGTH TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

14,655
'14,547
14,988
14,567

(kPa)
(kPa)
(kPa)
(kPa)

2,125
2,1 '10
2, 174
2,113

(psig)
(psig)
(psig)
(psig)

87.7%
87.0%
90.0%
87.1%

100.7%
100.0%
103.0%
100.1%

(% SMYS)
(o/oSMYS) I
(% SMYS)
(o/oSMYS)

147.6%
146.5%
'151.0%
146.7%

CUSHION=!

200

(psig)
(psig)
(psig)
(psig)

102:1%
101 .4%
104.4%
101 .5%

(% SMYS)
(% SMYS)
(% SMYS)
(% SMYS)

('110% of MOP at High Point)


11,329 (I<Pa)
1,643
'11,221
(I<Pa)
1,627
'1'1,662 (I<Pa)
'1,691
'11 ,2<!-0 (I<Pa)
'1,630

(psig)
(psig)
(psig)
(psig)

77.9%
77.1%
80.2%
77.3%

CUSHION=!
(% SMYS)
(% SMYS)
(o/o SMYS)
(o/oSMYS)

CALCULATED BY (Signature 11 Full Name):


CHECKED BY CLIENT (Signature 8: Full Name):

(kPa)
(kPa)
(I<Pa)
(I<Pa)
(I<Pa)

(%SMYS)
(% SMYS)
I(% SMYS)
(% SMYS)

COMMENCEMENT 'STRENGTH TEST' PRESSURE (LI MIT IS 108% SMYS)


(The Lesser oi Min. Strength Test Pressure+ a Cushion, and 108% SMYS)
EAST TEST POINT (ETP) =
14,855 (I<Pa)
2,15.!!
HIGH POINT (HP)
14,747 (kPa)
2,139
LOW POINT (LP) =
15,188 (I<Pa)
2,203
14,767 (kPa)
WEST TEST POINT{WTP}_=
2,142

MINIMUM 'LEAl< TEST' PRESSURE


EAST TEST POINT (ETP)
HIGH POINT (HP) =
LOW POINT (LP)
WEST TEST POINT (WTP) =

0+094
35+500
EAST

(Yes, if Maximum Strength Test Pressure at Low Point> 100% SMYS)

YIELD PLOT NEEDED?


YIELD PLOT START PRESSURE
EAST TEST POINT (ETP) =
HIGH POINT (HP)
LOW POINT (LP) =
WEST TEST POINT (WTP) =

_.,_

HP - ETP=
ETP- LP =
HP - LP =
HP - WTP =
WTP-LP =

(m)
(m)
(m)
(m)

November 18,2012
1
1

Chris Flem1ng

DATE:

300
114.1%
113.0%
117.5%
'113.2%

(%MOP)
(%MOP)
I
(%MOP)
(% MOP)
j(kPa)

i(I<Pa)
(%MOP)
I<% MOP)
(%MOP)
(%MOP)

2012-11-09

DATE:

16/11/2012

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

SURERUS

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 11 of 49

HYDROSTATIC TEST CALCULATION WORKSHEET

~ne fnc.

PROJECT NAME:
PROJECT#:

I En bridge Bakken Mainline


11202

FILL FLUID SOURCE:IAiameda Reservoir


DEWATER LOCATION: 135+500
PIPELINE DATA
PIPE OD (D) =
406.4
(mm)
WALL THICKNESS (I) =
(mm)
7.14
PIPE GRADE (S) =
(MPa)
414
(kPa)
MOP=
9,928
100% SMYS =
14,547 (kPa)
80% SMYS =
11 ,638 (kPa)
108% SMYS=
15,71 1 (I<Pa)
110% SMYS =
16,002 (I<Pa)
SECTION LENGTH (m) =
87,771 (m)
SECTION VOLUME (lilres) =
10,599,342 (litres)
0.2% OFFSET (litres) =
2'1 ,1 99 (litres)
ELEVATION AND PRESSURE DIFFERENTIALS
EAST TEST POINT (ETP) =
483.00
HIGH POINT (HP) =
590.00
LOW POINT (LP) =
470.00
WEST TEST POINT (WTP) =
590.00

~ ~~ ~----:-

-=;
16.00
0.281
60
1,440
2,11 0
1,688
2,279
2,321
287,963
2,331,576
4,663

TEST DATE:
TEST#:
SECTION#:

'
WEST END K.P. LOCATION
EAST END K.P. LOCATION
TEST POINT IS WEST OR EAST

(in)
(in)
(ksi)
(psig)
(psig)
(psig)
(psig)
(psi g)
(ft)
(gal)
(gal)

66,616
133

(bbls)
(bbls)

107.0
13.0
120.0
0.0
120.0

(m)
(m)
(m)
(m)
(m)

1,049
127
1. 176
0
1,176

12,965
11 ,916
'13,092
1'1.916

(kPa)
(kPa)
(kPa)
(I<Pa)

1,880
1,728
1,899
1,728

(psig)
(psig)
(psig)
(psig)

MINIMUM 'STRENGTH TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POI NT (LP) =
WEST TEST POINT (WTP) =

'14,852
13,803
14,979
'13,803

(kPa)
(I<Pa)
(kPa)
(I<Pa)

2,1 54
2,002
2,'172
2,002

(psi g)
(psig)
(psig)
(psig)

89.1%
81.9%
90.0%
81.9%

102.1%
94.9%
103.0%
94.9%

(% SMYS)
(% SMYS)
(% SMYS)
(% SMYS)

(psig)
(psig)
(psig)
(psig)

103.8%
96.6%
104.7%
96.6%

(%SMYS)
(% SMYS)
(%SMYS)
(% SMYS)

(11 0% of MOP at High Point)


1,779
12,269 (kPa)
1,627
11,221 (I<Pa)
'1,798
12,397 (I<Pa)
1'1,22'1
(I<Pa)
'1,627

(psig)
(psig)
(pslg)
(psig)

84.3%
77. 1%
85.2%
77 .'1%

CUSHION = !
(% SMYS)
(%SMYS)
(% SMYS)
(% SMYS)

CALCULATED BY (Signature & Full Name):


CHECf<ED BY CLIENT (Signature 13. Full Name):

(kPa)
(kPa)
(I<Pa)
(kPa)
(kPa)

(%SMYS)
(% SMYS)
(% SMYS)
(%SMYS)

COMMENCEMENT 'STRENGTH TEST' PRESSURE (LIMIT IS 108% SMYS)


(The Lesser of Min. Strength Test Pressure., a Cushion, and '108% SMYS)
EAST TEST POINT (ETP) =
2, 190
15,102 (I<Pa)
14,053 (kPa)
2,038
HIGH POINT (HP) =
LOW POINT (LP) =
2,209
15,229 (kPa)
14,053 (kPa)
2,038
WEST TEST POINT {VVTP) =

MINIMUM 'LEAK TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (l-IP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

35+500
123+271
WEST

(Yes, if Maximum Strength Test Pressure at Low Point > 100% SMYS)

YIELD PLOT NEEDED?


YIELD PLOT START PRESSURE
EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

YES

~.,.-

HP- ETP =
ETP-LP =
HP LP =
HP - INTP =
VI!TP LP =

(m)
(m)
(m)
(m)

November 18, 2012


1

Chris Fleming

CUSHION =I

DATE:

149.6%
139.0%
150.9%
139.0%
250

300
'123.6%
113.0%
'124.9%
113.0%

(%MOP)
MOP)
I (%
(% MOP)
(% MOP)
l<kPa)

I(I<Pa)
(%MOP)
I<% MOP)
(%1'v10P)
(%MOP)

2012-11-09

DATE:

16/11/2012

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 12 of 49

SURERUS
---Pf
tffM

HYDROSTATIC TEST CALCULATION WORKSHEET

Inc.

PROJECT NAME:
PROJECT#:

I Enbrldge Bakken Mainline


11202

FILL FLUID SOURCE: ITanker Truck


DEWATER LOCATION: I0+094
PIPELINE DATA
PIPE OD (D) =
406.4
(mm)
WALL THICKNESS (t) =
7.92
(mm)
PIPE GRADE (S) =
(MPa)
414
MOP=
(I<Pa)
9,928
100% SMYS=
16,136 (kPa)
80% SMYS =
12,909 (kPa)
108% SMYS =
17,427 (kPa)
110% SMYS =
17,750 (kPa)
SECTION LENGTH (m) =
94
(m)
SECTION VOLUME (litres) =
11 ,261
(litres)
0.2% OFFSET (litres) =
(litres)
23
ELEVATION AND PRESSURE DIFFERENTIALS
EAST TEST POINT (ETP) =
587.00
HIGH POINT (HP) =
587.00
LOW POINT (LP) =
587.00
WEST TEST POINT (VVTP) =
587.00

16.00
0.312
60
1,440
2,340
1,872
2,528
2,574
308
2,477
5

TEST DATE:
TEST#:
SECTION#:

71
0

(bbls)
(bbls)

0.0
0.0
0.0
0.0
0.0

(m)
(m)
(m)
(m)
(m)

0
0
0
0
0

14,523
14,523
14,523
14,523

(kPa)
(kPa)
(kPa)
(kPa)

2,106
2,106
2, '106
2,106

(psig)
(psig)
(psig)
(psig)

MINIMUM 'STRENGTH TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (VVTP) =

15,321
15,321
15,321
15,32'1

(I<Pa)
(I(Pa)
(I<Pa)
(I<Pa)

2,222
2,222
2,222
2,222

(psi g)
(psig)
(psig)
(psig)

90.0%
90.0%
90.0%
90.0%

94.9%
94.9%
94.9%
94.9%

(%SMYS)
(% SMYS) I
(% SMYS)
(% SMYS)

154.3%
154.3%
154.3%
154.3%

CUSHION " !

300

(psig)
(psig)
(psig)
(psig)

96.8%
96.8%
96.8%
96.8%

(%SMYS)
(% SMYS)
(% SMYS)
(%SMYS)

(110% of MOP at High Poini)


11,221 (I<Pa)
1,627
'1 1,221
(I(Pa)
1,627
1'1,221 (I(Pa)
'1,627
{I(Pa)
'1,627
j-1 ,22'1

(psi g)
(psig)
(psig)
(psig)

69.5%
69.5%
69.5%
69.5%

CUSHION= !
(% SMYS)
(% SMYS) I
(% SMYS)
(%SMYS)

CALCULATED BY (Signature & Full Name):


CI-IECI(ED BY CLIENT (Signaiure 1!: Full Name):

(kPa)
(I<Pa)
(I(Pa)
(kPa)
(I<Pa)

(% SMYS)
(% SMYS)
I (% SMYS)
(% SMYS)

COMMENCEMENT 'STRENGTH TEST' PRESSURE (LIMIT IS 108% SMYS)


(The Lesser of Min. Strength Test Pressure,, a Cushion, and 108% SMYS)
EAST TEST POINT (ETP) =
15,621 (kPa)
2,266
HIGH POINT (HP) =
15,621
(I<Pa)
2,266
LOW POINT (LP) =
15,621 (kPa)
2,266
WEST TEST POINT (WTP) =
15,621
(I<Pa)
2,266

MINIMUM 'LEAK TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
liVEST TEST POINT (WTP) =

0+094
0+000
WEST

(Yes, if Maximum Strength Test Pressure at Low Point> 100% SMYS)

YIELD PLOT NEEDED?


YIELD PLOT START PRESSURE
EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (VIJTP) =

NO

WEST END K.P. LOCATION


EAST END K.P. LOCATION
TEST POINT IS WEST OR EAST

(in)
(in)
(ksi)
(psig)
(psi g)
(psig)
(psig)
(psig)
(fl)
(gal)
(gal)
HP - ETP =
ETP- LP =
HP- LP =
HP -WTP =
WTP LP =

(m)
(m)
(m)
(m)

November 18, 201 2


1
3

Chris Fleming

DATE:

300
'1 13.0%
113.0%
1'13.0%
'113.0%

(%MOP)

I (%MOP)

(%MOP)
(%MOP)

I(I<Pa)

I(I(Pa)
(%MOP)
MOP)
(%MOP)
(%MOP)

I<%

2012-1 1-09

DATE:

16/ 11/ 201 2

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 13 of 49

HYDROSTATI C TEST CALCULATION WORKSHEET


PROJECT NAME:
PROJECT#:

FILL FLUID SOURCE: I Tanker Truck


DEWATER LOCATION: j 123+271
PIPELINE DATA
(mm)
PIPEOD (D) =
406.4
(mm)
WALL THICKNESS (t) =
7.92
PIPE GRADE (S) =
414
(MPa)
(kPa)
MOP=
9,928
100% SMYS =
16,136 (I<Pa)
80% SMYS =
12,909 (kPa)
108% SMYS =
17,427 (kPa)
"I"IO%SMYS=
17,750 (kPa)
SECTION LENGTH (m) =
74
(m)
SECTION VOLUME (litres) =
(litres)
8,865
0.2% OFFSET (litres) =
18
(litres)
ELEVATION AND PRESSURE DIFFERENTIALS
EAST TEST POINT (ETP) =
587.00
HIGH POINT (HP) =
587.00
LOW POINT (LP) =
587.00
WEST TEST POINT (WTP) =
587.00

-=
~

-..

16.00
0.312
60
1.440
2,340
1,872
2,528
2,574
243
1,950
4

(m)
(m)
(m)
(m)

WEST END K.P. LOCATION


EAST END K.P. LOCATION
TEST POINT IS WEST OR EAST

(in)
(in)
(ksi)
(psig)
(psig)
(psig)
(psig)
(psig)

56
0

(bbls)
(bbls)

HP - ETP=
ETP LP =
HP LP =
HP - WTP=
WTP - LP =

0.0
0.0
0.0
0.0
0.0

(m)
(m)
(m)
(m)
(m)

0
0
0
0
0

2,106
2, 106
2,106
2.106

(psig)
(psig)
(psig)
(psig)

MINIMUM 'STRENGTH TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

15,321
15,321
15,321
15,321

(kPa)
(kPa)
(I<Pa)
(kPa)

2,222
2,222
2,222
2,222

(psig)
(psig)
(psig)
(psig)

90.0%
90.0%
90.0%
90.0%

(%SMYS)
(%SMYS)
I (%SMYS)
(% SMYS)

94.9%
94.9%
94.9%
94.9%

(% SMYS)
(% SMYS)
(%SMYS)
(% SMYS)

COMMENCEMENT 'STRENGTH TEST' PRESSURE (LIMIT IS 108% SMYS)


(The Lesser of Min. Strength Test Pressure: a Cushion, and 108% SMYS)
EAST TEST POINT (ETP) =
15,621 (I<Pa)
2,266
HIGH POINT (HP) =
15,621 (I;Pa)
2,266
LOW POINT (LP) =
15,621 (I<Pa)
2,266
WEST TEST POI NT (WTP) =
15,621 (kPa)
2,266

(psig)
(psig)
(psig)
(psig)

96.8%
96.8%
96.8%
96.8%

(% SMYS)
(% SMYS)
(% SMYS)
(% SMYS)

(110% of MOP at High Point)


"1"1 ,22'1 (I;Pa)
1,627
'1,627
11.221 (I;Pa)
(I;Pa)
1"1,221
1,627
11 ,221 (I;Pa)
1.627

(psig)
(psig)
(psig)
(psig)

69.5%
69.5%
69.5%
69.5%

CUSHION= !
(% SMYS)
(% SMYS)
(% SMYS)
(% SMYS)

CHECI<ED BY CLI ENT (Signature lJ. Full Name):

(I<Pa)
(I<Pa)
(I<Pa)
(I<Pa)
(I<Pa)

(Yes, if Maximum Strength Test Pressure at Low Point > 100% SMYS)
(kPa)
(I<Pa)
(kPa)
(kPa)

CALCULATED BY (Signature lJ, Full Nama):

123+271
123+345
WEST

(ft)

(gal)
(gal)

14,523
14,523
14,523
14,523

MINIMUM 'LEAl{ TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POI NT (WTP) =

1
4

YIELD PLOT NEEDED?


YIELD PLOT START PRESSURE
EAST TEST POINT (ETP) =
HIGH POINT (H P) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

NO

November 18, 2012

TEST DATE:
TEST #:
SECTION#:

1Enbrldge Bakl(en Mainline


11202

Chris Fleming

CUSHION= !

DATE:

154.3%
154.3%
154.3%
154.3%
300

300
113.0%
11 3.0%
113.0%
'11 3.0%

(% MOP)

I (%MOP)
(%MOP)
(%MOP)
I (I<Pa)

j(I<Pa)
(% MOP)
I<% MOP)
(%MOP)
(%1\JlOP)

2012-11 09

DATE:

16/11/2012

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

~URERUS
.lillliilliliiPiptl//ne Inc.

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 14 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN

Attachment 2- Hydrostatic Test Pressure Profiles

,+500 TO 0+000

Bakken Mainlir

SURERUS
-

s 16

HYDROSTATIC TEST PLAN


ELEVATION PROFILES

Pfpeloe.b:.:

600

1L!,300 I<Pa j
i'
I

'

14.,250 kPa;

14,244 kPa
High t>oint, 3+400, 589

-v~ ~A

J\1...,./~
v

530

!
I
I

''

'1\-

14,200 kPa

I
I

14,150 kPa j

I'

II

I 14,100 l<Pa!

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

TEST SECTION

1L!.,050 kPa!
I

14,000 I<Pa!
i

'

560

II

13,950 kPa;
I

I
I

13,900 I<Pa1
i

13,850 l<Pa;
j'

1540

~
0
,_,

I
I

-:-

~
0

ci

-;~

~
-:-

1./'l

0
0
0

.--!

ci

0
.....
-:-

1./'l

13,750 I<Pa
0

ci

ci

ci

.-i

~
+

.-i

1./'l
N

ci
0

~:

-:m

1./'l

1205- Enbridge Bakken - Hydrotest Elevation Points- 2012-10-13

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 15 of 49

13,800 kPa:
Low Point, 34+400, 544

13,803 kPa

,.,5-:-500 TO 123+850

Bakken Mainlt . - 1\lPS 16


HYDROSTATIC TEST PLAN

SURERUS
me..

ELEVATION PROFILES

P1De/IM

15,200 kPai

620

600
! High Wo int, 38-:-500, 590

14,979 kPa

isoo j \

15,000 kPa !

: 14,800 kPa

I~

!
560

14,600 kPa:

sL!.O

14-,400 kPa !'

js2o

14,200 kPai

isoo

13,803 kPa

low Po;ot, 123300, 470

14,000 kPa :

13,800 kPa l

i
''

L~. 60

c:i

!.{]

U)

!.{]

.;;

2;

j:,

("()

~-

':::i"

c:i
0

Lfl

Lfl

!.{]

c5

Lfl

.;;
1./')

0
Lfl
.;.

1./')

'-!:)

!.{]

!.{]

Lfl

L{)

!.{]

!.{]

2;

+
1./')

2;

00

00

r-...

+
IJ'l

1.....

"'

+
1./')

"'

!.{]

1./')

1./')

Lfl

!.{]

,_,

+
0
0

.-l

+
1./')
0

.-l

+
0
.-l
,....,

+
1./')
,....,

13,600 kPa

'""'

1205 - En bridge Bakken - Hydrotest Elevat ion Points- 2012-10-13

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 16 of 49

1480

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

lEST SECTION ...

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 17 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN

Attachment 3 = Water Withdrawal Sketch

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

BAI<t<EN MAINLINE NPS 16 "


DETAILED DRAW ING OF TEM PORARY WATER INTAKE FOR HVDROTEST
A LL DIMENSIONS IN METERS
DATE PREPARED: 12/07/2012
PREPA RED BY: JZ

PlAN V~EW
SCALf 1:2000

i!t

WARNING SIGN

ALAMEDA

FENCE

RESERVOIR
BAI<I<EN PIPELINE 16"

INTA KE SCREEN

T ANK

WARNING SIGN

35

15

I
PIPE 168.33 MM

110

PROFilE VI!EW
SCALE 1:2000 HORIZONTAL

1: 500 VERTICAl

TAN I(

4
1

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 18 of 49

12

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 19 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN

Attachment 4 ~ Pump Performance Curves

_?/),?

25

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

140 .
~

420

20 tu
UJ
15 LLI

'

"

120 .

10 ~
CL
5 :z:

360 /,

(../)

100 .

.
.

80 .

(../)

=
u..J

1--

::::E

=
<C

LU

=
_J

<C
1--

1--

UJ

LL
I

240

u..J
I

300

60

<C

LU

:r:

: <i 180
5

1--

40~

120

1.1

'

20 .
::

60
0

1600

2400

4000

3200

4800

5600

FLDWRATE U. S.GALLDNS PER MINUTE

u u u a u u u a u a u a u s 1 a u a a s a 1 1 a u u o 1 u a u a u u u '

200

400

600

f) Plf~~~fm'!aEfJl~f:.

800

1000

1200

6400

8000

8800

n u 1 u s B 1 1 a u a u a u o

1400

FLDWRATE CUBIC METERS PER HOUR

7200
1600

1800

2000

MODEL: PP 108Sl 7

IMPELLER OIA . 17 .5"

SIZE : 10"

SOLIDS SIZE : 3 .5"

8"

--

OWG NO. A71 6SHQNI


REVISION: 000
DRAWN BY: ESW
DATE: 4/ 2/201 2

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 20 of 49

800

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

NOTES :
HEADAND EFFICIENCY SHOWN
REFLECTLOSSES DUE TO
NON-RETURN VALVE, OPENCLEARANCEWEAR-RINGS AND
VACUUM PUMP POWER.

225 700
200 600

!75
(./) !50 .
~

L.1J
1L.1J

::;;:::
I

125

1-

L.1J
L.1J
L.L
I

<(

:::r:

<(

L.1J

lOO -

1-

11-

_.l
<(

5 300

_.l
<(

400

L.1J

:::r:

500

75
200

50 25

!00

0-

!200

800

!600

2000

2400

2800

3200

3600

4000

4400

900

1000

FLOWRATE U. S.GALLDNS PER MINUTE


u

!00

200

300

400

'
600

500

700

BOO

FLDWRATE CUBI C M
ETERS PER HOUR

IPCJtL'tcfm'!o~{Jl:Jt:.

MODEL: PPB6C21
SIZE: 8"

11

IMPELLER DIA. 21'0"


SOLIDS SIZE: 1.s//

OWG NO . 078l7HQNl
REVISION : 000
DRAWN BY: ESW
DATE: 412120 12

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 21 of 49

400

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 22 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN

Attachment 1 - Hydrostatic Test Calculation Sheets

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 23 of 49

____ ,.,_Inc.
SURERUS

HYDROSTATIC TEST CALCULATION WORKSHEET

PROJECT NAME:
PROJECT#:

I En bridge Bakken Mainline


11202

TEST DATE :
TEST#:
SECTION#:

November 1, 2012
1
1

FILL FLUID SOURCE:IAiameda Reservoir


DEWATER LOCATION : I35+500
PIPELINE DATA
PIPEOD (D)=
406.4
WALL THICKNESS (t) =
7.14
PIPE GRADE (S) =
414
MOP=
9,928
100% SMYS =
80% SMYS =
108% SMYS =
110% SMYS =
SECTION LENGTH (m) =
SECTION VOLUME (litres) =
0.2% OFFSET (litres) =

(mm)
(mm)
(MPa)
(kPa)
14,547
(kPa)
11 ,638
(kPa)
(kPa)
15,711
16,002
(kPa)
35,400
(m)
4 ,274,951 (Iiires)
8,550
(litres)

ELEVATION AND PRESSURE DIFFERENTIALS


EAST TEST POINT (ETP) =
578.00
HIGH POINT (HP) =
589.00
LOW POINT (LP) =
544.00
WEST TEST POINT {WTP) =
587.00
YIELD PLOT NEEDED?
YIELD PLOT START PRESSURE
EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT {WTP)

NO

60
1,440
2,110
1,688
2,279
2,321
116,142
940,376
1,881

EAST END K.P. LOCATION


TEST POINT IS WEST OR EAST

(ft)
(gal)
(gal)

26.868
54

HP- ETP =
ETP- LP =

(m)
(m)
(m)
(m)

11 .0
34.0
45.0
2.0
43.0

HP - LP =
HP - WfP =
WfP - LP =

1,850
1,835
1,899
1,838

(psi g)
(psig)
(psi g)
(psi g)

13,911
13,803
14,244

(kPa)
(kPa)
(kPa)
(kPa)

2,018
2,002
2,066
2,005

(psig)
(psig)
(psig)
(psi g)

87.7%
87.0%
90.0%
87.1%

95.6%
94.9%
97.9%
95.0%

COMMENCEMENT 'STRENGTH TEST' PRESSURE (LIMIT IS 108% SMYS)


(The Lesser of Min. Strength Test Pressure + a Cushion, and 108% SMYS)
EAST TEST POINT (ETP) =
14,211
(kPa)
2,061
HIGH POINT (HP) =
14,103 (kPa)
2,045
LOW POINT (LP) =
14,544
(kPa)
2,109
WEST TEST POINT {WTP) =
14,123
(kPa)
2,048

(psig)
(psig)
(psig)
(psig)

MINIMUM 'LEAK TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

(psig)
(psig)
(psig)
(psi g)

(110% of M OP at High Point)


(kPa)
1,643
11 .329
11,221
(kPa)
1,627
11.662 (kPa)
1,691
11 ,240
(kPa)
1,630

CALCULATED BY (Signature & Full Name):


CHECKED BY CLIENT (Signature & Full Name):

0+100
35+500
WEST

(bbls)
(bbls)
(m)
(m)
(m)
(m)
(m)

108
333
441
20
421

(kPa)
(kPa)
(kPa)
(kPa)
(kPa)

(Yes, if Maximum Strength Test Pressure at Low Point> 100% SMYS)


(kPa)
(kPa)
(kPa)
(kPa)

13,823

WEST END K.P. LOCATION

(in)
(in)
(ksi)
(psi g)
(psig)
(psig)
(psig)
(psig)

12,759
12,651
13,092
12,6 71

MINIMUM 'STRENGTH TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT {WTP) =

16.00
0.281

Chris Fleming

97.7%
96.9%
100.0%
97.1%

77.9%
77.1%
80.2%
77.3%

(% SMYS)
(% SMYS)
I(% SMYS)
(% SMYS)

(% SM YS)
(%SMYS) I
(% SMYS)
(% SMYS)

140.1%
139.0%
143.5%
139.2%

CUSHION=

300

(%
(%
(%
(%

(%MOP)
I (% MOP)
(%MOP)
(%MOP)
(kPa)

SMYS)
SMYS)
SMYS)
SMYS)

CUSHION =I
(% SMYS)
(% SMYSJ I
(% SMYS)
(% SMYS)

DATE:

300
114.1%
113.0%
117.5%
113.2%

(kPa)
(%MOP)
I(% MO P)
(% MOP)
(%MOP)

2012-10- 13

DATE:

15/10/2012

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 24 of 49

SURERUS
---Pf
p<ne

HYDROSTATIC TEST CALCULATION WORKSHEET

Inc.

PROJECT NAME:
PROJECT#:

jEnbridge Bakken Mainline


11202

FILL FLUID SOURCE: IAlameda Reservoir


DEWATER LOCATION:IJ5+500
PIPELINE DATA
406.4
(mm)
PIPEOD (D)=
WALL THICKNESS (t) =
(mm)
7.14
PIPE GRADE (S) =
414
(MPa)
MOP=
9,928
(kPa)
14,547 (kPa)
100% SMYS =
80% SMYS=
11,638 (kPa)
15,711
(kPa)
108% SMYS =
110% SMYS =
16,002 (kPa)
SECTION LENGTH (m) =
88,350 (m)
SECTION VOLUME (litres) =
10,669,263 (litres)
0.2% OFFSET (litres) =
21,339 (litres)
ELEVATION AND PRESSURE DIFFERENTIALS
EAST TEST POINT (ETP) =
483.00
HIGH POINT (HP) =
590.00
470.00
LOW POINT (LP) =
WEST TEST POINT (WTP) =
590.00

16.00
0.281
60
1,440
2,110
1,688
2,279
2,321
289,862
2,346,956
4,694

(m)
(m)
(m)
(m)

TEST DATE:
TEST#:
SECTION#:

WEST END K.P. LOCATION


EAST END K.P. LOCATION
TEST POINT IS WEST OR EAST

(in)
(in)
(ksi)
(psig)
(psig)
(psig)
(psig)
(psig)

67,056
134

(bbls)
(bbls)

HP- ETP =
ETP- LP =
HP - LP =
HP - WTP =
WTP - LP =

107.0
13.0
120.0
0.0
120.0

(m)
(m)

1,049
127
1,176
0
1,176

(m)
(m)
(m)

(kPa)
(kPa)
(kPa)
(kPa)

1,880
1,728
1,899
1,728

(psig)
(psig)
(psig)
(psi g)

MINIMUM 'STRENGTH TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

14,852
13,803
14,979
13,803

(kPa)
(kPa)
(kPa)
(kPa)

2,154
2,002
2,172
2,002

(psig)
(psig)
(psig)
(psig)

89.1%
81_9%
90.0%
81.9%

102.1%
94.9%
103.0%
94.9%

(% SMYS)
(% SMYS)
I(% SMYS)
(% SMYS)

(% SMYS)
(% SMYSJ I
(% SMYS)
(% SMYS)

149.6%
139.0%
150.9%
139.0%

CUSHION= !

250

COMMENCEMENT 'STRENGTH TEST' PRESSURE (LIMIT IS 108% SMYS)


(The Lesser of Min. Strength Test Pressure+ a Cushion, and 108% SMYS)
EAST TEST POINT (ETP) =
15,102 (kPa)
2,190
HIGH POINT (HP) =
14,053 (kPa)
2,038
LOW POINT (LP) =
2,209
15,229 (kPa)
WEST TEST POINT (WTP) =
2,038
14,053 (kPa)

(psig)
(psig)
(psig)
(psig)

103.8%
96.6%
104.7%
96.6%

(% SMYS)
(% SMYS)
(% SMYS)
(% SMYS)

(1 10% of MOP at High Point)


1,779
12,269 (kPa)
(kPa)
1,627
11 ,221
12,397 (kPa)
1,798
1,627
11 ,221
(kPa)

(psig)
(psig)
(psig)
(psig)

84.3%
77.1%
85.2%
77.1%

CUSHION =I
(% SMYS)
(% SMYSJ I
(% SMYS)
(% SMYS)

CALCULATED BY (Signature & Full Name):


CHECKED BY CLIENT (Signature & Full Name):

(kPa)
(kPa)
(kPa)
(kPa)
(kPa)

(Yes, if Maximum Strength Test Pressure at Low Point> 100% SMYS)

12,965
11,916
13,092
11 ,916

MINIMUM 'LEAK TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

35+500
123+850
WEST

(ft)

(gal)
(gal)

YIELD PLOT NEEDED?


YIELO PLOT START PRESSURE
EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

YES

November 1, 2012
1
2

Chris Fleming

DATE:

300
123.6%
113.0%
124.9%
113.0%

(%MOP)
I (%MOP)
(% MOP)
(%MOP)
(kPa)

(kPa)
(%MOP)
I<% MOP)
(%MOP)
(%MOP)

2012-10-13

DATE:

15/10/2012

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 25 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN

Attachment 2 - Hydrostatic Test Pressure Profiles

TEST SECTION ... .1S+SOO TO 0+000

Bakken MainlinE:: r11PS 16


HYDROSTATIC TEST PLAN

SURERUS

ELEVATION PROFILES

~Inc.

600

; 14,300 kPa

!
14,244 kPa

14,250 kPa i

High Point, 3+400, 589

14,200 kPa
i

14,150 kPal
580

- - - - - - - - - - - - - - - - ---

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

~,....,.1

14,100 kPa '

14,050 kPa ,
I

i
14,000 kPai

- -- - ---

1560

_
1~

13,900 kPa l

'

1 13,950 kPal

..

! 13,850

kPa 1

Low Point , 34+400, 544

13,803 kPa

;s4o

13,800 kPa i

.l

I
'

~-----------;-------------.~-------------,,---------------r---------------.---------------.-

0
0

.....
+

0
.....

U'l

ci

0
.....
+
0
.....

ci

0
.....
+
U'l
.....

0
.....

ci

ci

.....

.....

0
.....

U'l
M

U'l
N

13,750 kPa

ci

1205 - Enbridge Bakken- Hydrotest Elevation Points- 2012-10-13

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 26 of 49

i
!

Bakken Mainlint . PS 16
HYDROSTATIC TEST PLAN

SURERUS

ELEVATION PROFI LES

P.(pefne Inc

--,
15,200 kPa!

!620

600

- - - - - -- - - - - - - - - - - - - - -

if ,

- - --

- -- ---- - - -- -

l4,979 kPa &i 15,000 kPa l

-- - - -----------

High Point, 38+500, 590

: 580

-- --

. -

-- ... -

14,800 kPa l

I
--

\1

14,600 kPa

---- - -------- - - ---- - - - - - -- - - - - - - - -- - - - -- -

14,400 kPa

560

' 540

- - -- - - - -

- - - -- - ---

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

TEST SECTION 2 __,+500 TO 123+850

I
I

i'

14,200 kPa !

i520

isoo
I

-A--

14,000 kPa!

13,803 kPa
Low Point, 123+300, 470
1

' - - - -' -

460
0

ci
0

Lf)

Lf)

N'\

ci

Lf)

Lf)

Lf)

Lf)

Lf)
Lf)

ci

Lf)

0
q-

ci

ci
0

q-

Lf)

- -,

-,---

13,600 kPa

ci

ci

ci

ci

ci

ci

ci

ci

ci

ci

ci

ci

Lf)

Lf)

Lf)

Lf)

Lf)

Lf)

Lf)

Lf)

Lf)

Lf)

Lf)

1.0

Lf)

Lf)

1.0

r-...

Lf)

r-...

co

Lf)

co

----~- - - -

+
en
0

------ -

+
en
Lf)

0
0

......

---- - ---

Lf)

......

......
......

Lf)

......
......

ci
0

Lf)

......

- -- - - -

1205 - Enbridge Bakken - Hydrot est Elev at ion Point s- 2012-10-13

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 27 of 49

13,800 kPa '

480

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

~URERUS
.--Pipeline Inc.

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 28 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN

Attachment 3 - Water Withdrawal Sketch

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

BAKKEN MAINLINE NPS 16"


DETAILED DRAWING OF TEMPORARY WATER INTAKE FOR HYDROTEST
All DIMENSIONS IN METERS
DATE PREPARED: 12/07/2012
PREPARED BY: JZ

PLAN VIEW
SCALE 1'2000

I~

'

BAKKEN PIPELINE 16"

"'"""''"'"'~"-,.------WARNING SIGN

ALAMEDA
RESERVOIR

EXISTING PIPELINES
- -- >

<;i <.. __
FENCE

INTAKE SCREEN

TANK

WARNING SIGN
PIPE 168.33 MM

II
35

15

110

PROFILE VIEW
SCALE 1:2000 HORIZONTAl
1: 500 VERTICAL

12

4
1

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 29 of 49

TANK

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 30 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN

Attachment 4 - Pump Performance Curves

),v

25

"'

420

20 tu
L.U
IS LL

120

360 vh

10 ~
CL
5 :z
(/)

100

300
~ tl

1--

BO

L.U
L.U

Cl

LL

(./)

0<:
L1.J

L1.J

:::E
I

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

140 .
.

240
S :t

<!;

L.U

60

:::r::

<i lBO

<C
L1.J

1--

__J

1--

rJ

Cl

<C

40 .
20

1./.L

.
:

60
'

1600

BOO
I

200

2400

400

3200

4000

4BOC

5600

FLDWRATE U.S. GALLDNS PER MINUTE


I

600

, ,PIPCJ/:ff/f,{Jo~fJ/:J~

BOO

1000

1200

1400

FLDWRATE CUBIC M
ETERS PER HOUR

7200

6400
I

1600

BODO
I

IBOO

BBOO
I

2000

MODEL: PP108Sl7

IMPELLER DIA . 17. 5"

SIZE: 10"

SOLIDS SIZE: 3.5"

8"

DWG NO. A716SHQNI


REVISION: 000
DRAW
N BY: ESW
DATE: 41212012

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 31 of 49

120

HEAD AND EFFICIENCY SHOWN


REFLECT LOSSES DUE TO
NON-RETURN VALVE, OPENCLEARANCE WEAR-RINGS AND
VACUUM PUM
P POWER.

225
700
200 .
500

175
(/)150
c::u
L.lJ
IL.lJ

:::;:::
I

I00 -

_j

<l:

b 300

<r:
f-

o400
<l:
w

_j

fCl

L.lJ
L.lJ
L.L
I

125

Cl
<r:
L.lJ

..._500

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

NOTES:

I-

75
200

50
25

400

BOO

1200

1500

2400

2000

3200

2000

FLOWRATE U.S.GALLONS PER MINUTE


I

100

200

300

400

500

500

700

3500

800

4000

4400

900

1000

FLOWRATE CUB IC METERS PER HOUR

~~ Plpc;//;L~/tlJo~fd!Jfo:.
-

MODEL : PP86C21
SIZE: 8"

6"

IMPELLER DIA . 21 '0"


SOLIDS SIZE: 1.S"

DWG NO. 07817HQNI


REVISION : 000
DRAWN BY: ESW
DATE: 41212012

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 32 of 49

100

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

------SURI!JJ

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 33 of 49

HYDROSTATIC TEST
PLAN

Bakken Pipeline Expansion Project,


HOD Sections NPS 16
Prepared by:
Sur e r us Pipeline Inc.
For:
Enbridge Bakken L.P.

20'12-08-"14
0

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

------

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 34 of 49

Bakken NPS 16 HDD Sections


HYDROSTATIC TEST PLAN

SUR~&t~
1. Scope

This document was prepared for the hydrostatic pressure testing of the three (3) watercourse
crossing sections on the Enbridge Bakken NPS 16 Pipeline Project planned for installation by
Horizontal Directional Drill (HOD) methods. The three watercourse crossings include the
Shepherd Creek, Moose Mountain Creek, and the Pipestone Creek. The hydrostatic test
consists of a combined one (1) hour strength and leak test to verify the integrity of the
pipeline following installation.

2. Safety
2.1.

All personnel shall review and follow the Emergency Response Plan (ERP) developed
specifically for this project. A copy of the ERP shall be available in each vehicle used
on the project and additional copies shall be posted within the test building and other
appropriate locations.
2.2. A pre-phase meeting will be held at the Surerus site office for all personnel involved in
the hydrostatic test prior to commencement of the test to ensure that all personnel
understand their respective duties.
2.3. Surerus will install warning signs and barricades to prevent access to the vicinity of the
test area. Warning signs shall indicate "DANGER - High Pressure Pipeline Test" and
"Restricted Access".
2.4. All Surerus personnel not involved in the testing shall be removed from the area while
the pipeline section is under a pressure equal to or greater than 2,760kPa (400psi).
2.5. Test heads and pressurizing pipe shall be secured to limit movement.
2.6. All testing equipment including compressors, recorders, deadweights, etc. shall be set
up a safe distance from the test section and/or test heads.
2.7. Surerus employees shal l inspect all hoses, lines, and connections for faults prior to
pressurizing the lines . The Surerus Hydrotest Pre-test Checl{list will be completed to
ensure that all components meet the required ratings.
2.8. Surerus personnel shall ensure pressure hoses/unions are rated to twice the maximum
expected hydrotest pressures, and all safety lines are firmly attached and secured with
whip checi\S.
2.9. An Enbridge representative will be on site for the duration of test activities.

3. Equipment
Surerus shall supply the following equipment for completion of the hydrostatic test:
Pumps including transfer/fill pump, and squeeze pump.
Air compressors required for pipeline cleaning, pre-pack, and dewatering.
1-\11 pipeline pigs required for line fill and dewatering.
All necessary valves, hoses, and fittings required to successfully complete the
test.
Calibrated temperature recorders, pressure recorders, and deadweights.
Calibrated flow meter for preparation of the yield plot where applicable.
Adequate lighting and light towers at all worl\ areas.

3. 1 Test Heads

3:1."1

Surerus shall supply Enbriclge approved i:est heads.

DA l E
REVISION
PAGE

2012-08-1 <!

0
2 of6

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 35 of 49

------SURiJWJ
3.1 .2

3.1 .3

Bakken NPS 16 HDD Sections


HYDROSTATIC TEST PLAN
Test head assemblies shall comply with all requirements of CSA-Z662 (latest
edition). All documentation certifying test head compliance shall be available
prior to commencement of testing .
Test heads will be welded to the section and the welds will be inspected by NDE
prior to filling the section.

3.2 Pumps
3.2.1
3.2.2

Surerus shall ensure that fill and squeeze pumps are adequately sized for the
length and diameter of the section to be tested.
Water for the hydrostatic test will be withdrawn from the approved water source
(Shepherd's Creek) into tanker trucks and transferred to the test sections
according to the details in section 4 below.

3.3 Instrumentatio n:
3.3.1

3.3.2
3.3.3

3.3.4

Surerus shall supply pressure and temperature recorders and dead weights to
provide readings for the test data. The pressure shall be measured in psi or kPa,
and the temperature measured in degrees Celsius.
All test charts and reports, including the depressurizing of tested lines, will be
included in the document turnover package.
Instrumentation for the test shall be as follows:
Two dual pen temperature/pressure recorders and a digital dead weight will
be located at the fill point.
All measurement equipment shall be certified for accuracy not more than 30 days
prior to commencement of the pressure test. The calibration certificates and
current calibration reports shall be maintained on site and included in the
turnover package following completion of the test.

4. Line Fill
4.1 Test Sections
Section

Length

Volume

Source

Dewater Location

Shepherd's Creel{

377m

44m

Shepherd's Creel(

Transfer to Moose Min.


Creek Section

Moose Mountain
Creek

725m

85m

Shepherd's Creek
HOD Section

Landspread in
SE1/4 27-4-2W2

Pipestone Creel(

211m

25m

Pipestone Creek

Landspread in
SW1/4 17-9-28WPM

DATE

REVISION
PAGE

20'12-08- 1t!
0

3 of6

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

------SURlBJI,!

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 36 of 49

Bakken NPS 16 HDD Sections


HYDROSTATIC TEST PLAN

4.2 Fill section

Test heads will be welded onto the ends of each test section and will be
inspected by NDE. NDE documentation shall be retained to support acceptability
of the welds.
The foreman shall inspect all connections and hoses prior to filling the section.
Prior to filling the pipeline, the fill line shall be leak tested for a minimum of 5min
at 3,450kPa (500psi).
To ensure a consistent fill Surerus will monitor and control pressure at the
section end during fill. Surerus does not anticipate that a pre-pack of the line is
required due to the minimal elevation difference throughout the test section.
A single medium density pig will be pre-loaded into the test head and will be
driven through the pipeline by the rate of the fluid insertion.
During the line fill process fluid samples shall be obtained by Enbridge
Representatives and submitted for analysis as required.
The filling operation shall be continuous to prevent air ingress.
4.3 Pressurize and test the section.

Before pressurizing the section beyond a pressure of 2, 760kPa (400 psi), all
worl< crews will be notified and removed from the vicinity of the test section.
All pipe and fill connections shall be checked for leaks and these test areas shall
be maintained as "off-limits" to non-essential personnel.
Pressure will be increased to 2,760kPa (400psi) and all visible piping inspected
for leaks.
Upon completion of the leak check, the line and manifold will be bled off, an in line
check valve installed on the squeeze line and the squeeze pump connected to
the line.
Squeeze pressure will be initiated through a 1" or 2" line rated to 5500psi;
pressure shall be increased in stages as indicated in the Hydrostatic Test Record
Worl<sheets.

5. Test Stages
The pipeline shall be tested in a combined '1-hour strength and leak test. The pipe section
will be available for visual inspection throughout the duration of the test.
5.1. Combined One-Hour Strength and Lealt Test
The test involves a leal< check at approximately 2,760kPa (400psi) to allow visual inspection
of e:<posed piping and fittings included in the test section. Following satisfactory completion
of the leak checl<, testing will continue by slowly raising the pressure to the strength test
pressure as indicated in the attached Hydrotest Calculation Worksheets . The strength test
will be held at a pressure greater than the minimum test pressure.
5.2.1 The combined strength and leal< test will be held at a pressure greater than ths
minimum test pressure. The test pressure shall be basecl upon the ma)<imum
anticipated pressure the HDD section will e:<perience during the mainline pressure
test.
5.2.2 After pumping has ceased, and the selected strength test pressure has been
reachecl, the combined strength and leak test will commence. The pressure at the
l1ighpoint shall matcl1 or exceecl this minimum at both the start and the encl ohhe

DA l E
REVISI ON
PAGE

2012-08-"14
0
4 of6

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

------SUR!IJ.
5.2.3

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 37 of 49

Bakken NPS 16 HOD Sections


HYDROSTATIC TEST PLAN

test, and at no time during the test period shall the pressure at the high point drop
below the required minimum .
The minimum duration for the hold period on the combined strength and leal< test is
one (1) hour.

6. Test Documentation
Surerus will submit all requ ired test documentation within the turnover package. Temperature
and pressure readings shall be recorded as follows:

Every 5 minutes between 0-30 minutes


Every 10 minutes between 30-60 minutes

Records shall include the start and stop times for any pumping, pressunzmg, or depressurizing of the test section. A copy of the test worl<sheet shall be made available for
review prior to commencement of the test. All documentation will be turned over to Enbridge
upon completion of testing.

7. Leak Detection
During the leak test, any drop in pressure which cannot be correlated to a change in
temperature shall be considered a leak. If a leak is suspected Surerus shall notify the
Enbridge Representative and further pressurizing of the pipeline shall be halted until the
source of the leak can be determined. Should any failure require repair, the line pressure
shall be reduced to zero, the section dewatered, and the repair completed.

8. Depressurizing
Upon the completion of a successful test, the HOD section will be depressurized slowly until
the energy has reached an acceptable level prior to dewatering. The line will be
depressLirized into a pressure truck rated in excess of the maximum test pressure. Under no
circumstances will valves be moved to the full open position to initiate depressurizing.

9. Dewatering
9. 'I All test water shall be disposed of in accordance with applicable regulations.
9.2 Upon successful testing of the sections, the water will be discharged by means of a
controlled land release. Water discharge volumes correspond to the section volumes
noted in section 4 of this document. Enbridge shall secure all necessary permits for
the discharge of hydrostatic test water.
9.3 Lines will be securely fastened and supported to prevent "whipping" or sudden
releases of energy during the dewater or water transfer process.
9.4 A high density coated poly pig or bi-directional multi-disc pig propelled by
compressed air will be used for dewatering.
9.5 SLirerus will utilize additional pigs for de-watering if insufficient volumes of fluid are
received at the release point of the section during initial de-water activities.
9.6 Additional runs will be performed as required to ensure that the section is sufficiently
cle-watered.
9.7 No conditioners, chemicals or additives will be used to alter the natural quality of the
vvater ai any point during the hydro test.

DATE
REVISION
PAGE

20'12-08-14
0
5 of 6

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

------SUR!JJ

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 38 of 49

Bakken NPS 16 HDD Sections


HYDROSTATIC TEST PLAN

9.8 Water shall be discharged into a diffuser and then directed through filter cloth to
prevent erosion at the dewater location.

12. Test Personnel


Surerus will utilize the following key personnel to complete pressure testing activities:
Telford Advent

Superintendent

Surerus Pipeline Inc.

Julio Zavaleta

Project Engineer

Surerus Pipeline Inc.

Ken Hawthorne

Test Foreman

Surerus Pipeline Inc.

13. Attachments
1. Hydrostatic Test Calculation Worl<sheets - HOD Sections.

14. Reference Documents


1.
2.
3.
4.
5.

CPCS-SPEC-HYDR0-005 Rev. 1 Pipeline Hydrostatic Testing


CPCS-SPEC-PIPELINE-001 Rev. 1 - Pipeline Construction
CPCS-SPEC-PCCT-007 Rev. 1 - Post Construction Caliper Tool.
Bakken Pipeline Project Canada Alignment Sheets - D-WM057-05-500-001-A
CSA Z662-(Latest Edition) - Oil and Gas Pipeline Systems; Canadian Standards
Association
6. Pipeline Act and Regulation - Government of Saskatchewan (Latest Edition)
7. AENV - Code of Practice for Temporary Diversion of Water for Hydrostatic Testing of
Pipelines
8. AENV - Code of Practice for the Release of Hydrostatic Test Water from the Hydrostatic
Testing of Petroleum Liquid and Gas Pipelines.
9. DFO - Freshwater Intake End-of-Pipe Fish Screen Guidelines.

DAlE
REVISION
PAGE

2012-08-'14

0
6 of 6

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 39 of 49

HYDROSTATIC TEST CALCULATION WORKSHEET


PROJECT NAME:
PROJECT#:

TEST DATE:
TEST#:
SECTION#:

IEnbrldge Bakken Pre-Test Shepherd's Creek


11202

FILL FLUID SOURCE: I Shepherd's Creek


DEWATER LOCATION: 130+800
PIPELINE DATA
I PIPE OD(D) =
(mm)
406.4
WALL THICKNESS (t) =
(mm)
10.31
PIPE GRADE (S) =
(MPa)
414
MOP =
(kPa)
9,928
100% SMYS =
21,006 (kPa)
80%SMYS =
16,804 (kPa)
~ W8% SMYS=
22,686 (I<Pa)
110% SMYS =
23,106 (kPa)
SECTION LENGTH (m) =
377
(m)
SECTION VOLUME (litres) =
44,067 (litres)
0.2% OFFSET (litres) =
88
(litres)

16.00
0.406
60
1,440
3,046
2,437
3,290
3,351
1,237
9,694
19

ELEVATION AND PRESSURE DIFFERENTIALS V


EAST TEST POINT (ETP) =
570.00 (m)
HIGH POINT (HP) =
570.00 (m)
LOW POINT (LP) =
580.00 (m)
WEST TEST POINT (WTP) =
580.00 (m)

August 16,2012
1
HOD -SC

WEST END K.P. LOCATION


EAST END K.P. LOCATION
TEST POINT IS WEST OR EAST

(in)
(in)
(ksl)
(pslg)
(psig)
(psig)
(pslg)
(pslg)

30+490
30+861--..
'WES:y-'
~

(ft)

(gal)
(gal)

277
1

(bbls)
(bbls)

HP - ETP =
ETP- LP =
HP- LP =
HP- WTP =
WTP - LP =

0.0
10.0
10.0
10.0
0.0

(m)
(m)
(m)
(m)

0
98
98
98
0

(ml

(I<Pa)
(I<Pa)
(I<Pa)
(I<Pa)
(kPa)

./h

p_NO~Y

YIELD PLOT NEEDED?


YIELD PLOT START PRESSURE
EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

(Yes. if Maximum Strength Test Pressure at Low Point> 100% SMYS)

'18,807
18,807
18,905
18.905

(I<Pa)
(I<Pa)
(I<Pa)
(I<Pa)

2,728
2,728
2,742
2,742

(psig)
(psig)
(psig)
(psig)

MINIMUM 'STRENGTH TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINTJVVT_Pl =

'15,240
'15,240
15,338
15,338

(I<Pa)
(I<Pa)
(kPa)
(I<Pa)

2.210
2,210
2,225
2,225

(psig)
(psig)
(psig)
(psig)

89.5%
89.5%
90.0%
90.0%

72.6%
72.6%
73.0%
73.0%

(% SMYS)
(%SMYS)
(%SMYS)
(%SMYS)

(% SMYS)
(% SMYS)
(% SMYS)
(%SMYS)

COMMENCEMEN 1 'STRENGTH TEST' PRESSURE (LIMIT IS 108% SMYS)


(The Lesser or Min. Strength Tes~ Pressure,. a Cushion, and '108% SMYS)
EAST TEST POINT (ETP) =
'15,540 (I<Pa)
2,254
HIGH POINT (HP) =
15,5-'10 (I<Pa)
2,254
LOW POINT (LP) =
15,638 (I<Pa)
2,268
WEST TEST POINT (WTP) =
15,638 (I<Pa)
2,268

(psig)
(psig)
(psig)
(psig)

74.0%
74.0%
74.4%
R4%

(% SMYS)
(% SMYS)
(% SMYS)
(% SMYS)

MINIMUM 'LEAK TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (l-IP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

(psig)
(psig)
(psig)
(psig)

53.4%
53.4%
53.9%
53.9%

CUSHION =I
(%SMYS)
(%SMYS)
(%SMYS)
(% SMYS)

(110% of MOP a1High Point)


'1'1,22'1 (I<Pa)
1,627
'1'1 .22'1 (I<Pa)
1,627
11.31 g (I<Pa)
'1,642
'1 1,3'19 (I<Pa)
'1,6~2

CALCUIJ\TED BY (Signature B, Full Name):


CHECf<ED 8Y CLIENT (Signature 1!, Full Name):

Chns Flem1ng

CUSHION I

DATE:

153.5%
153.5%
154.5%
154.5%
300

300
'113.0%
'1'13.0%
114.0%
1'1-4.0%

(%MOP)

I (%MOP)
(%MOP)
(%MOP)
l(i<Pa)

l(kPa)
(%MOP)
I <% MOP)
(%MOP)
(%MOP)

2012-08-15

DATE:

15/08/2012

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 40 of 49

HYDROSTATIC TEST CALCULATION WORKSHEET


PROJECT NAME:
PROJECT#:

IEnbridge Bakken Pre-Test Alameda Res


11202

FILL FLUID SOURCE: !Moose Mountain Creek


DEWATER LOCATION: 135+800
PIPELINE DATA
(mm)
PIPE OD(D) =
406.4
(mm)
WALL THICKNESS (t) =
10.31
414
(MPa)
PIPE GRADE (S) =
(kPa)
MOP=
9,928
100% SMYS =
21,006 (kPa)
80% SMYS=
16,804 (kPa)
108% SMYS =
22,686 (kPa)
23, 106 (kPa)
110% SMYS =
(m)
725
SECTION LENGTH (m) =
84,744 (litres)
SECTION VOLUME (litres) =
(litres)
169
0.2% OFFSET (litres) =
ELEVATION AND PRESSURE DIFFERENTIALS
EAST TEST POINT (ETP) =
580.00
HIGH POINT (HP) =
580.00
LOW POINT (LP) =
575.00
WEST TEST POINT (WTP) =
575.00
NO

TEST DATE:
TEST#:
SECTION#:

-,.

16.00
0.406
60
1,440
3,046
2,437
3,290
3,351
2,379
18,641
37

(m)
(m)
(m)
(m)

WEST END K.P. LOCATION


EAST END K.P. LOCATION
TEST POINT IS WEST OR EAST

(in)
(in)
(ksi)
(psig)
(ps ig)
(psig)
(psig)
(psig)

533
1

(bbls)
(bbls)

HP ETP =
ETP-LP =
HP- LP =
HP-WTP =
WTP- LP =

0.0
5.0
5.0
5. 0
0.0

(m)
(m)
(m)
(m)
(m)

0
49
49
49
0

(kPa)
(kPa)
(kPa)
(kPa)

2,735
2,735
2,742
2.742

(psig)
(psig)
(psig)
(psig)

MINIMUM 'STRENGTH TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

15,240
15,240
15,289
15,289

(kPa)
(I<Pa)
(I<Pa)
(kPa)

2,210
2,210
2,2"17
2,217

(psig)
(psig)
(psig)
(psig)

89.8%
89.8%
90.0%
90.0%

(% SMYS)
(%SMYS)
I(% SMYS)
(% SMYS)

72.6%
72.6%
72 .8%
72.8%

(% SMYS)
(% SMYS)
(% SMYS)
(% SMYS)

COMMENCEMENT 'STRENGTH TEST' PRESSURE (LIMIT IS 103% SMYS)


(The Lesser of Min. Strength Test Pressure :- a Cushion, and 108% SMYS)
2,254
'15,540 (I<Pa)
EAST TEST POINT (ETP) =
15,540 (I<Pa)
2,254
HIGH POINT (HP) =
2,261
15,589 (I<Pa)
LOW POINT (LP) =
2,261
15,589 (I<Pa)
WEST TEST POINT (WTP) =

(psig)
(psig)
(psig)
(psig)

74.0%
74.0%
74.2%
74.2%

(%
(%
(%
(%

(11 0% of MOP at High Point)


'1'1,22'1
(I<Pa}
1,627
1,627
11 ,221 (I<Pa)
'1,634
"11 ,270 (I<Pa)
'1'1,270 (I<Pa)
'1,63!

(psig}
(psig)
(psig}
(psig)

53 A%
53.4%
53.7%
53.7%

CUSHION= I
(% SMYS)
(% SMYS)
(% SMYS)
(% SllilYS)

CHECI~ED

BY CLIENT (Signaiure (!, Full Name):

(kPa)
(I<Pa)
(I<Pa)
(I<Pa)
(kPa)

(Yes, if Maximum Strength Test Pressure at Low Point > 100% SMYS)

'18,856
18,856
18,905
18,905

CALCULATED BY (Signature 8. Full 1\lame):

35+048
35+773
WEST

(ft)

(gal)
(gal)

YIELD PLOT NEEDED?


YIELD PLOT START PRESSURE
EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

MINIMUM 'LEAK TEST' PRESSURE


EAST TEST POINT (ETP} =
HIGH POINT (HP} =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

August 23, 2012


1
HDD- AR

Chris Fleming

CUSHION =I

153.5%
153.5%
154.0%
154.0%
300

(%MOP)

I (%MOP)
(%MOP)
(%MOP)
l(kPa)

SMYS)
SMYS)
SMYS)
SMYS)

01-\TE:

300
"113.0%
"113.0%
113.5%
1"13.5%

I(I<Pa}
(%MOP}
IC%MOP)
(%MOP)
(%MOP}

2012-08-15

DATE:

15/08/2012

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

SURERUS

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 41 of 49

HYDROSTATIC TEST CALCULATION WORKSHEET

~lno.

PROJECT NAME:
PROJECT#:

IEnbrldge Bakl:en Pre-Test Pipestone Crk


11 202

FILL FLUID SOURCE: {Pipestone Creek


DEWATER LOCATION:I123+500
PIPELINE DATA
PIPE OD (D) =
406.4
(mm)
WALL THICKNESS (t) =
(mm)
10.31
PIPE GRADE (S) =
(MPa)
41 4
MOP =
9,928
(kPa)
100% SMYS =
21,006 (I<Pa)
80% SMYS =
16,804 (kPa)
108% SMYS =
22,686 (kPa)
110% SMYS =
23,106 (kPa)
SECTION LENGTH (m) =
(m)
211
SECTION VOLUME (litres) =
24,663 (lilres)
49
(litres)
0.2% OFFSET (litres) =
ELEVATION AND PRESSURE DIFFERENTIALS
EAST TEST POINT (ETP) =
474.00
HIGH POINT (HP) =
474.00
LOW POINT (LP) =
470.00
WEST TEST POINT (WTP) =
470.00
NO

16.00
0.406
60
1,440
3,046
2,437
3,290
3,351
692
5,425
11

WEST END K.P. LOCATION


EAST END K.P. LOCATION
TEST POI NT IS WEST OR EAST

(in)
(in)
(ksi)
(pslg)
(psig)
(psig)
(psig)
(psig)
(ft)
(gal)
(gal)
HP - ETP=
ETP- LP =
HP- LP =
HP - WTP =
WTP - LP =

(m)
(m)
(m)
(m)

155
0

(bbls)
(bbls)

0.0
4.0
4.0
4.0
0.0

(m)
(m)
(m)
(m)
(m)

0
39
39
39
0

18,866
18,866
18,905
18,905

(I<Pa)
(I<Pa)
(I<Pa)
(I<Pa)

2,736
2,736
2,742
2,742

(psig)
(psig)
(psig)
(psig)

MINIMUM 'STRENGTH TEST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

15,240
15,240
15,279
15,279

(I<Pa)
(I<Pa)
(I<Pa)
(I<Pa)

2,210
2,210
2,216
2,216

(psig)
(psig)
(pslg)
(psig)

89 .8%
89.8%
90.0%
90.0%

72.6%
72.6%
72.7%
72.7%

(% SMYS)
(% SMYS) I
(% SMYS)
(% SMYS)

153.5%
153.5%
153.9%
153.9%

CUSHION = I

300

(psig)
(psig)
(psig)
{psig)

74.0%
RO%
74.2%
74.2%

(%
(%
(%
(%

(11 0% of MOP ai High Poini)


11 ,221 (I<Pa)
'1,627
11,221 (I<Pa)
1,627
11,260 (I<Pa)
1,633
'11,260 (I<Pa)
'1,633

(psig)
(psig)
{psig)
(psig)

53.4%
53.4%
53.6%
53.6%

CUSHION = I
(% SMYS)
(% SMYS)
(% SMYS)
(% SMYS)

CHECI~ ED

BY CLI ENT (Sigi1ature B. Full Name):

(kPa)
(kPa)
(I<Pa)
(I<Pa)
(kPa)

(% SMYS)
(% SMYS)
I (% SMYS)
(% SMYS)

COMMENCEMENT 'STRENGTH TEST' PRESSURE (LIMIT IS 108% SMYS)


(Tha Lesser of Min. Strength Test Pressure-:- a Cushion, and 108% SMYS)
EAST TEST POINT (ETP) =
'15,540 (kPa)
2,254
HIGH POINT (HP) =
15,540 (I<Pa)
2,254
LOW POINT (LP) =
15,579 (I<Pa)
2,259
WEST TEST POINT (WTP) =
15,579 (I<Pa)
2,259

CALCULATED BY (Signature 1!: Full Name):

123+289
123+500
WEST

(Yes, if Maximum Strength Test Pressure at Low Point> 100% SMYS)

YIELD PLOT NEEDED?


YIELD PLOT START PRESSURE
EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (WTP) =

MINIMUM 'LEAK 1EST' PRESSURE


EAST TEST POINT (ETP) =
HIGH POINT (HP) =
LOW POINT (LP) =
WEST TEST POINT (\/IJTP) =

September 1, 2012
1
HOD -PC

TEST DATE:
TEST#:
SECTION#:

Chris Flem1ng

(% MOP)
(% MOP)
(%MOP)
(% MOP)

l(i<Pa)

SMYS)
SMYS)
SMYS)
SMYS)

DATE:

300
113.0%
1'13.0%
113.4%
'1 13.4%

I(I<Pa)
(%MOP)
l (%MOP)
(%MOP)
(%MOP)

2012-08-15

DATE:

lS/08/2012

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 42 of 49

Test Head Pre~ Test


Hydrostatic Pressure Test Record

S
RERUS
-U
--l'lptl/lte
lilt.

DATE

15/08/2012
FROM 0+000
TO 0+016
LENGTH

SECTION# NPS 16 TH-001/006

16 m

VOLUME
2.0 m3
TEST LOCATION .:. .F.;. ;:roc;;.b;.:.;ishc.;.;e"-r.. ;. Y; ;.;ar..: .d_ _ __ __
TEST STAGES
1)
2)
3)

TIME

Combined Leak/StrenQth
kPa
psi
2,760
400
1,160
8,000
19,300
2,799 Target Test Pressure(+/- 10psi)

DEADWEIGHT
PRESSURE (kPa)

SURERUS REPRESENTATIVE
HYDROSTATIC TEST PRESSURE RE CORD

TEMPERATURE
t;;t-<UUND
(C)
( c )

1-\MCit:N I

VOLUME
(m3)

NOTES

CLI ENT REPRESENTATIVE

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 43 of 49

Test Head Pre-Test


Hydrostatic Pressure Test Record
FROM IO+OOO
TO I0+016
LENGTH !

SECTION# NPS 16 TH-004/005

16m

2.0 m3
VOLUME
TEST LOCATION . :. .F.:.: ro:.: ;b:.: :ishe:.:.: :.:. .r. :. .Y: .:ar.: .d_ _ __ __
TEST STAGES
1)
2)
3)

TIME

Combined Leak/StrenQth
psi
kPa
2,760
400
1,160
8,000
19,300
2,799 Target Test Pressure(+/- 10psi)

DEADWEIGHT
PRESSURE (kPal

SURERUS REPRESENT.IHIVE
HVDROSTA TIC TEST PRESSURE RECORD

TEMPERATURE
AMI:!It:N I
GKOUNU

(C)

("C)

VOLUME
(m3}

NOTES

CLI ENT REPRESENTATIVE

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 44 of 49

HYDROSTATIC TEST
PLAN

Bakken Pipeline Expansion Project,


Mainline Pipeline NPS 16
Steelman Section
Prepared by:
Surerus Pipeline Inc.
For:
Enbridge Bakken L.Pm

DATE
REVISION

2012-11-16
0

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 45 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN
Steelman Section
1. Scope
This document was prepared for the hydrostatic pressure testing of the En bridge Bakl<en
Mainline NPS 16 Pipeline Project planned for construction in the summer/fall of 2012
between Steelman, SK and Cromer, MB. This test plan encompasses approximately 94m of
pipe from the Steelman terminal eastbound; the test section end points are detailed within th e
document below. The Steelman section of the pipeline will be tested above ground prior to
installation due to access restrictions. The segment will be tested for a minimum period of
one (1) hour to permit visual inspection of the pipeline during a combined strength and leak
test utilizing a water/methanol mix to prevent freezing during testing.

2. Safety
2.1.

All personnel shall review and follow the Emergency Response Plan (ERP) developed
specifically for this project. A copy of the ERP shall be available in each vehicle used
on the project.
2.2. A pre-phase meeting will be held at the Surerus site office for all personnel involved in
the hydrostatic test prior to commencement of the test to ensure that all personnel
understand their respective duties.
2.3. Surerus will install warning signs and barricades to prevent access to the vicinity of the
test area. Warning signs shall indicate "DANGER - High Pressure Pipeline Test" and
"Restricted Access".
2.4. All Surerus personnel not involved in the testing shall be removed from the area wh ile
the pipeline section is under a pressure equal to or greater than 2,760kPa (-400psi) .
2.5. Test heads and pressurizing pipe shall be secured to limit movement.
2 .6. All testing equipment including compressors, recorders, deadweights, etc. shall be s et
up a safe distance from the test section and/or test heads.
2.7. Surerus employees shall inspect all hoses, lines, and connections for faults prior to
pressurizing the lines. The Surerus Hydrotest Pre-test Checklist will be completed to
ensure that all components meet the required ratings.
2.8. Surerus personnel shall ensure pressure hoses/unions are rated to twice the maximum
expected hydrotest pressures, and all safety lines are firmly attached and secured with
whip checks.
2.9. Test crews shall review the requirements for working with methanol and wear
appropriate PPE at all times w here the risk of exposure to the test fluid exists.
2.10. An En bridge representative will be on site for the duration of test activities.

3. Equipment
Surerus shall supply the following equipment for completion of the hydrostatic test:
Tanker trucks to transfer test fluid.
Truck-mounted squeeze pump to complete pressure testing.
Air compressor required for pipeline cleaning and dewatering.
All pipeline pigs required for line fill and dewatering.
All necessary valves, hoses, and fittings required to successfully complete the
test.
Calibrated temperature recorders, pressure recorders, and deadweights.
Calibrated flow meter for preparation of the yield plot wl1ere applicable.
Adequate lighting and light towers at all work areas.

DATE
REVISION
PAGE

2012-11-"16
0
2 of6

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 46 of 49

Bakken Mainline NPS 1 6


HYDROSTATIC TEST PLAN
Steelman Section
3.1 Tes t Heads
3.1 .1

3.1 .2

3.1. 3

Surerus shall supply Enbridge approved test heads which comply with all
requirements of relevant specifications including section 6.2 of CPSC-SPECHYDR0-005.
Test l1ead assemblies shall comply with all requirements of CSA-Z662 (latest
edition). All documentation certifying test head compliance shall be available for
review prior to commencement of testing.
Test heads will be welded to the section and the welds will be inspected by N DE
prior to filling the section.

3.2 Pumps
3.2.1 Test fluid shall be transferred to the pipeline segment via tanker truck. A truck
mounted squeeze pump shall be utilized to increase pressure up to the required
test pressure.

3.3 Instrumentation :
3.3. 1

3. 3.2
3.3.3

3. 3.4

Surerus shall supply pressure and temperature recorders and dead weights to
provide readings for the test data. The pressure shall be measured in kPa, and
the temperature measured in degrees Celsius.
All test charts and reports, including the depressurizing of tested lines, will be
included in the document turnover package.
Instrumentation for the test shall be as follows:
e
A dual pen temperature/pressure recorder and a digital deadweight will be
located at the fill point.
e
An additional dual pen temperature/pressure recorder shall be located at the
section end point.
All measurement equipment shall be certified for accuracy not more than 30 days
prior to commencement of the pressure test. The calibration certificates and
current calibration reports shall be maintained on site and included in the
turnover package following completion of the test.

4. Line Fill
4.1 Test Sections
Sec tion

Start

End

Length

Volume

Dew ater
locatio n

Steelman
Tanker Truck
3
11m
Terminal
0+094
94m
at Section End
(KPO+OOO)
...
Note that hycl rotest fl u1d for section 1 w 111 be provaded by tanker trucks .

1,,

4 .2 Fill section
Test heads will be welded onto the ends o-r each test section and will be
inspected by NDE . NDE documentation shall be retained to support acceptability
of the welds.
The foreman shall inspect all connections and hoses prior to filling the section.
DATE
REVISION
PAGE

2012-11-16
0
3 of 6

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 47 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN
Steelman Section
The filling operation shall be continuous to prevent air ingress.

4.3 Pressurize and test the section.


Before pressurizing the section beyond a pressure of 2,760kPa, all work crews
will be notified and removed from the vicinity of the test section .
All pipe and fill connections shall be checked for leal<s and these test areas shall
be maintained as "off-limits" to non-essential personnel.
Pressure will be increased to 2,760kPa and all visible piping inspected for leaks.
Upon completion of the leak check, the line and manifold will be bled off, an in line
check valve installed on the squeeze line and the squeeze pump connected to
the line.
Squeeze pressure will be initiated through a 1" or 2" line rated to 38,000kPa
(- 5,500psi); pressure shall be increased in stages as indicated in the Hydrostatic
Test Record Worksheets.

5. Test Stages
The pipeline shall be tested in the following stages:
Leak check
Combined Strength and Leak test (including yield plot where required.

5.1. Leak Check


The first stage involves a leak checl<at approximately 2,760kPa to allow visual inspection of
exposed piping and fittings included in the test section. Any pressure lost during this period
must be explained to the satisfaction of the Company's testing supervisor prior to
pressurizing to the target strength test pressure
5.2. Combined Strength and Leak Test
The minimum duration for the combined strength and leak test is one (1) hour. Following
satisfactory completion of the leak checl<s, testing will continue by slowly raising the pressure
to the test pressure.
5.2.1

5.2.2
5.2.3
5.2.4

Yield plotting, if required , shall be undertaken as the section is pressurized during the
strength test. Yield plotting shall commence at a pressure equivalent to 60% of the
maximum anticipated test pressure. Yield plotting shall only be required where the
expected maximum hoop stress in the test section during the strength test is greater
than 100% SMYS of the pipe. Enbridge shall be responsible for completing all yield
plots and associated documents.
Pumping shall continue until the selected strength test pressure is achieved or, where
a yield plot is required, the point where the yield plot deviates beyond the 0.2% offset
line.
The strength test will be held at a pressure greater than the minimum test pressure.
After pumping has ceased, and the selected strength test pressure has been
reached, the strength test will commence. The pressure at the highpoint shall match
or e}cceed this minimum at both the start and the end of the test, and at no time

DATE
REVISION
PAGE

2012-'1'1-'16
0
4 of6

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 48 of 49

Bakken Mainline NPS 1 6


HYDROSTATIC TEST PLAN
Steelman Section

5.2.5

during the test period shall the pressure at the high point drop below the required
minimum.
The minimum duration for the hold period on the strength test is one (1) hour.

6. Test Documentation
Surerus will submit all required test documentation within the turnover package. Temperature
and pressure readings shall be recorded as follows:

Every 5 minutes between 0-30 minutes


Every 15 minutes for the remainder of the test

Records shall include the start and stop times for any pumping , pressunzmg , or depressurizing of the test section. A copy of the test worksheet shall be made available for
review prior to commencement of the test. All documentation will be turned over to Enbridge
upon completion of testing to facilitate completion of required Leave To Open applications.

7. Leak Detection
During the leal< test, any drop in pressure which cannot be correlated to a change in
temperature shall be considered a leak. If a leak is suspected Surerus shall notify the
Enbridge Representative and further pressurizing of the pipeline shall be halted until the
source of the leal< can be determined . Should any failure require repair, the line pressure
shall be reduced to static pressure, the section dewatered, and the repair completed.

8. Depressurizing
The line will be depressurized into a pressure truck rated in excess of the maximum test
pressure. Under no circumstances will valves be moved to the full open position to initiate
depressurizing.

9. Dewatering
9.1 Upon completion of the test, the test fluid will be transferred into tanker trucl<s for
disposal.
9.2 All transfer lines will be securely fastened and supported to prevent "whipping" or
sudden releases of energy during the dewater process.
9.3 The pipeline will be dewatered with a high density coated poly pig or bi-directional
multi-disc pig propelled by compressed air.

12, Test Personnel


Surerus will utilize the following l<ey personnel to complete pressure testing activities:
Telford Advent

Superintendent

Surerus Pipeline Inc.

Julio Zavaleta

Project Engineer

Surerus Pipeline Inc.

Ken Hawtl1orne

Test Foreman

Surerus Pipeline Inc.

DATE
REVISION
PAGE

2012-1'1-'16
0
5 of6

Enbridge Bakken Pipeline Project - Certificate OC-058


Leave to Open Bakken Pump Station to EPI Cromer Terminal

Appendix A - A3 Sureus Hydrostatic Test Plan


Page 49 of 49

Bakken Mainline NPS 16


HYDROSTATIC TEST PLAN
Steelman Section
13. Reference Documents
1.
2.
3.
4.
5.
6.

CPCS-SPEC-HYDR0-005 Rev. 1 Pipeline Hydrostatic Testing


CPCS-SPEC-PIPELINE-001 Rev. 1 - Pipeline Construction
CPCS-SPEC-PCCT-007 Rev. 1 - Post Construction Caliper Tool.
Bakken Pipeline Project Canada Alignment Sheets - D-WM057-05-500-001-A
CSA Z662-(Latest Ed ition) - Oil and Gas Pipeline Systems; Canadian Standards
Association
Pipeline Act and Regulation - Government of Saskatchewan (Latest Edition)

DATE
REVISION
PAGE

2012-1'1-16
0