16 March 2016
Sector
Environment, Natural Resources, and
Agriculture Sector
Countries
Peoples Republic of China (PRC)
Mongolia (MON)
Areas of Operation
Number
394 ; 3%
Energy;
1,564 ;
13%
Social; 1,770
; 15%
Environment,
Natural
Resources,
and
Agriculture;
2,875 ; 24%
Transport;
5,453 ; 45%
Others; 70;
27%
Transport; 55;
21%
Energy; 28;
11%
Social; 48;
18%
Total:
12,056
Total: 261
Environment,
Natural
Resources,
and
Agriculture;
60; 23%
Number
TAs; 23 ; 1%
TAs; 29 ;
48%
Loans and
Grants; 31 ;
52%
Loans and
Grants;
2,852 ; 99%
Total: 2,875
TA = technical assistance
Total: 60
TAs
(Number)
TAs
(REG); 1;
4%
TAs (MON);
7; 24%
Loans and
Grants
(PRC); 27;
87%
Total: 31
TAs (PRC);
21; 72%
Total: 29
REG = regional
PPTA; 8; 28%
Total: 29
CDTA = capacity develoment technical assistance, PATA = policy and advisory technical assistance,
PPTA = project preparatory technical assistance, R- = regional.
Loan 2980
PRC
Loan 3054
PRC
Name
Loan 3114
PRC
Loan 3277
PRC
Loan 3336
PRC
General Description
0.50
QCBS
Q1-2 2016
0.55
QCBS
Q1-2 2016
0.80
QCBS
Q1-2 2016
0.19
0.76
CQS
QCBS
Q1-2 2016
Q1-2 2016
2.10
QCBS
Q1 2016
Name
General Description
Training in ecotourism
Water quality sampling
Financial audit
Waste management specialist (international)
14 individual national consltants (field
Integrated Livelihoods Improvement and
coordinator, implementation specialist,
Grant 9183 MON Sustainable Tourism at Khuvsgul Lake
procurement specialist, geographic information
National Park Project
system specialist, eco-tourism specialist, waste
management specialist, livestock and pasture
management specialist, agricultural processing
specialist, income generation specialist,
protected area specialist, rural finance
specialist, social and gender specialist, etc.)
A consulting firm for the TA
0.88 QCBS
Q1-2 2016
3 individual consultants (technical sustainable
0.18
ICS
Q1- 2016
Sustainable and Climate-Resilient Land
TA 8872 PRC
land management investment advisor,
Management in Western Region Project
monitoring and data management specialist,
and procurement specialist)
Sustainable Forest Management to Improve Resource persons
TBD
SSS
TBD
TA 8874 MON
Livelihood of Local Communities Project
CQS = consultants' qualifications selection, ICS = individual consultant selection, LCS = least cost selection, QCBS = quality- and cost-based selection,
SP = shopping, SSS = single source selection, TBD = to be determined.
Project Nam e
Am ount
($ m illion)
2016 Firm
Henan Hebi Qihe River Basin Environment Improvement and
Ecological Conservation Project
PRC Fujian Farmland Sustainable Utilization and Demonstration Project
PRC Shandong Groundw ater Protection Project
PRC Xinjiang Kelamayi Ecological Forest Infrastructure Project
Jiangxi Xinyu Kongmu River Watershed Flood Control and
PRC
Environmental Improvement Project
2016 Stand-by and 2017 Firm
Heilongjiang Jiamusi Irrigation and Drainage System Modernization
PRC
Project
Shanxi Urban-Rural Water Source Protection and Environmental
PRC
Demonstration Project
PRC
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
150.0
100.0
150.0
100.0
150.0
150.0
100.0
Project Nam e
Am ount
($ m illion)
2017 Firm
PRC Shanxi Inclusive Agricultural Value Chain Development Project
MON Agri-businesses Development Project
MON Tuul River Improvement Project
2017 Stand-by and 2018 Firm
Guizhou High Efficiency Water Utilization Demonstration in Rocky
PRC
Desertification Area Project
2018 Firm
Yangtze River Economic Belt Industrial Transformation and
PRC
Integrated Environmental Rehabilitation Project
2018 Stand-by
Integrated Environmental Rehabilitation in the Yangtze River
PRC
Project
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
100.0
50.0
20.0
150.0
200.0
300.0
Project Nam e
Am ount
($ m illion)
2016 Firm
Henan Hebi Qihe River Basin Environment Improvement and
Ecological Conservation Project
PRC Fujian Farmland Sustainable Utilization and Demonstration Project
PRC Shandong Groundw ater Protection Project
PRC Xinjiang Kelamayi Ecological Forest Infrastructure Project
Jiangxi Xinyu Kongmu River Watershed Flood Control and
PRC
Environmental Improvement Project
2016 Stand-by and 2017 Firm
Heilongjiang Jiamusi Irrigation and Drainage System Modernization
PRC
Project
Shanxi Urban-Rural Water Source Protection and Environmental
PRC
Demonstration Project
PRC
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
150.0
100.0
150.0
100.0
150.0
150.0
100.0
Project Nam e
Am ount
($ m illion)
2016 Firm
Strengthening Community Resilience to Dzud and Forest and
Steppe Fires Project
Managing Soil Pollution in Ger Areas Through Improved On-site
MON
Sanitation Project
MON Dzud Disaster Response Project
2016 Stand-by
MON Sustainable Vegetable Farming for Smallholders Project
MON
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
3.0
2.8
3.0
2.5
PPTA Nam e
Am ount
($ m illion)
2016 Firm
PRC Shanxi Inclusive Agricultural Value Chain Development Project
MON Sustainable Toursim Development Project
PRC Yangtze River Economic Belt Industrial Transformation and
PRC Integrated Environmental Rehabilitation in the Yangtze River
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
0.50
1.20
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
Type
TA Nam e
Am ount
($ m illion)
2016 Firm
Conservation and Storage of Forest Seed Genetic
Funds
Promoting South-South Cooperation in Flood Risk
PRC R-CDTA
Management
2016 Stand-by
The Research of PPP Model and Value for Money in
PRC
PATA
China
A Study on the Forest and Wetland Ecological Functional
PRC
PATA
Coupling and Development Degrees in the Region
The Research on Constructing Adaptive Agricultural
PRC
PATA Demonstration Zone in Huaihe River Economic Belt in
Anhui
MON
CDTA
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
0.50
0.55
0.40
0.10
0.40
Contact person:
Yoshiaki Kobayashi
Senior Water Resources Specialist, EAER
yoshikobayashi@adb.org