PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS

DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID


TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Plastering Activity

JSA NO :

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

REV : 00
APPROVED BY: Ching Soon Seng (PM)

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)

PAGE : 01
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

CURRENT RISK CONTROL


Hazard/Effect

1 Basic Hand Tools

Not approve for use

Conform inspect and approve


type only

RISK RANKING
PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

COSEQUENCE (B)

NO

RISK ASSESSMENT
PROBABILITY (A)

HAZARD INDENTICATION

SCORE

LOCATION :

Disallow and remove

Work supervisor to make a final


check on all intended tools to be
used and comply with safety
requirement and standrad

Competent person only allow


to operate

Use or operate tools by trained /


competent person only

Handle with care and wear


correct type of PPE

Conduct TBT with the groups


prior to start

Always keep in proper storage


eg box , container or hand pack

Work area to display signances to


warn or inform

Damage parts attach with modification parts

Incompetent user
Drop and damage tools
Wrong use for it purpose
Malfunction while in use

Tools after use to place back to


where it kept .avoid expose to
wheather conditon
conduct visual check before
issue to use
Do not force to use if found
malfunction

RESPONSIBILITY

PE
Safety supervisor
site supervisor

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Plastering Activity

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)

APPROVED BY: Ching Soon Seng (PM)

JSA NO :
REV : 00

PAGE : 02
LOCATION :

(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

Used approved type safety shoe.


Housekeeping & material arrangement.

Standing supervision.
Put barricade & signage

crushed by equipment

Experianced/licensed operator.
Not allowed workers underneath during

Provide signalman to controll


lifting & provide tag line.

Provide signalman.
Standing supervision.

PROPOSED RISK CONTROL

LEVEL

CURRENT RISK CONTROL


Hazard/Effect

SCORE

Trip & falls

Job sequence /steps

2 Loading / Unloading
cement bag.

RISK RANKING

COSEQUENCE (B)

NO

RISK ASSESSMENT
PROBABILITY (A)

HAZARD INDENTICATION

RESPONSIBILITY

PE
Site Engineer
Site supervisor

lifting.
Lorry crane / Crane topple

Experianced / licensed operator.


Attach steel plate at crane outrigger

Ground condition inspection.


Fail of lifting gear

Used the right lifting gear & ensure that


lifting gear capable to take the load.

Do lifting gear inspection & colour code


Provide lifting gear testing certificate.

Site safety supervisor

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Plastering Activity

REV : 00

RISK ASSESSMENT

PROPOSED RISK CONTROL

LEVEL

RISK RANKING

SCORE

CURRENT RISK CONTROL


Hazard/Effect

COSEQUENCE (B)

Job sequence /steps

PAGE : 03

PROBABILITY (A)

HAZARD INDENTICATION

NO

APPROVED BY: Ching Soon Seng (PM)

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)


(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

LOCATION :

JSA NO :

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

3 Mortar mix

RESPONSIBILITY

PE
Splashing mortar into eye

Conduct daily toolbox talk


conduct by site supervisor

Wear safety glasses when


working with wet concrete.
Safety Supervisor

Concrete burns
4 Transfer mortar.
using wheel barrows

Back Pain

Trip & falls

Using gloves when working with


working with wet concrete

wash off any excess concrete


from your skin as soon as
possible.

Not carry overlimit load.

Rotate workers when handle the


manual handling ( Buddy system )

Used approved type safety shoe.


Housekeeping & material arrangement.

Provide safe access or ramps for wheel


Barrows

Site supervisor

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Plastering Activity

REV : 00

RISK ASSESSMENT

Wear safety glasses when


working with wet concrete.

Using gloves when working with


working with wet concrete

wash off any excess concrete


from your skin as soon as
possible.

Not carry overlimit load.

Rotate workers when handle the


manual handling ( Buddy system )

Used approved type safety shoe.


Housekeeping & material arrangement.

Provide safe access


clear all obstruction

To provide water water dispenser at site

Provide rest shelter to workers.

PROPOSED RISK CONTROL

LEVEL

SCORE

Conduct daily toolbox talk


conduct by site supervisor

CURRENT RISK CONTROL


Hazard/Effect

5 Perform plastering
work.

RISK RANKING

COSEQUENCE (B)

Job sequence /steps

PAGE : 04

PROBABILITY (A)

HAZARD INDENTICATION

NO

APPROVED BY: Ching Soon Seng (PM)

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)


(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

LOCATION :

JSA NO :

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

RESPONSIBILITY

PE
Splashing mortar into eye

Safety Supervisor
Concrete burns

Back / Arm Pain

Trip & falls

Heat Stress

Site supervisor

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Plastering Activity

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)

APPROVED BY: Ching Soon Seng (PM)

JSA NO :
REV : 00

PAGE : 05
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

Training workers for working at height.


Wear full body harness with large hook.

Provide safe working platform.


Provide lifelines / hook point.

housekeeping and material arrangement


Scaffolding must have toe board.

Provide boxes for loose item.


Barricade work area.

Solid & firm foundation to erect scaffolding


Used approved type of scaffolding

Inspection carry out by competant


person

CURRENT RISK CONTROL


Hazard/Effect

6 Perform plastering activity


at height using scaffolding

PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

RISK RANKING

COSEQUENCE (B)

NO

RISK ASSESSMENT
PROBABILITY (A)

HAZARD INDENTICATION

SCORE

LOCATION :

RESPONSIBILITY

PE
Trip & falls

Used approved type safety shoe.


Housekeeping & material arrangement.

Provide safe access


clear all obstruction

Site Engineer
Site Supervisor

Falling from height

Material falling from height

Scaffolding collapse

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Plastering Activity

REV : 00
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

CURRENT RISK CONTROL


Hazard/Effect

7 General housekeeping
issues

RISK RANKING
PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

RISK ASSESSMENT
COSEQUENCE (B)

NO

PAGE : 06

PROBABILITY (A)

HAZARD INDENTICATION

APPROVED BY: Ching Soon Seng (PM)

SCORE

LOCATION :

JSA NO :

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

RESPONSIBILITY

PE
slip ,trip & fall

Keep Floor clean and debris free

conduct daily tool box talk


Site Suoervisor
Safety Supervisor

Cuts/ punctures

Back injury

Do not put hand in trash cans pick up plastics bags from the
edges

use hand gloves for the


protection

use proper body posture

use safety lifiting techniques

Risk Rating

IMPACT SEVERITY
IMPACT CATEGORY

RISK AREA
Financial

2
Minor

3
Moderate

Less than Rm 50 k RM 50 K to RM 250 K RM 250 K- RM 1.0 K


First aid required

Medical treatment
required

Safety

None

Programme

Less than one week

1-4 Weeks

1-3 months

Negligible damage

Minor damage
some repairs
required

Moderate to high
damage requires
specialist to repair

Third party impact

LIKEHOOD

1
Minimal

4
Major

5
Severe

RM 1.0m to RM 10m

Greater than Rm 10 m

serious injury

a fatality case

3-6 months

greater than 6 months

Significant/permanent
widespread subtantial
damage
/permanent damage

Almost certain -happen frequenly (more than 10


times within the project

very likely -could happen frequenly (more than 3


times within the project

Likely-could happen occasionly (less than 3 times


within the project

Unlikely- could happen rarely (1 times within the


project

Very unlikely- probablilty will not happen (has never


occurred)