Part: 1
Type: 1
Project
(144) Madinah
Designer M.SEYAM
page
1 of 4
Building
Fence
Checked M.AMAM
date
21-Mar-16
Subject
Footing:
G. Beam:
Column:
REV
Cat. = C
V
Kd
= 96.4
= 0.85
I
Kzt
Kz
Cf
= 1
= 1
= 0.85
= 1
= 1.4
= 0.8
= 0.5
qz
= 0.00256 x Kz x Kzt x I x Kd x V
= 20.23
Ib/ft2
Ib/ft2
= 1.3
KN/m2
where
qz
: Velocity pressure
: Pressure
: fence height
V
Kd
: wind speed
: wind directionality factor
I
Kzt
Kz
: importance factor
: topographical factor
: Guest factor
SEYAM EXCEL
Project
(144) Madinah
Designer M.SEYAM
page
2 of 4
Fence
Subject
21-Mar-16
load = 5 KN/m
159
soil (2)
F1
date
686
F.S.L
300
soil (1)
F5
500
soil (1)
1193
F4
355
road level
F2
1879
F3
REV
2659
F6
Checked M.AMAM
2500
Footing:
G. Beam:
Column:
Elevation: 3
Part: 1
Type: 1
Building
2200
Calculate Loads
materials properties
Fc': 30 Mpa
- Horizontal Load:
Soil
S.B.C: 15 KN/m3
: 30
Ko: 0.5
Ka: 0.333
Kp: 3
- Virtical Load:
F footing = 2.2 x 2 x 0.5 x 25 = 55 KN
F column = 0.34 x 0.34 x 4.738 x 25 = 13.7 KN
F beam =
F soil (1) =
F soil (2) =
Fsurcharge=
SEYAM EXCEL
Project
(144) Madinah
Designer M.SEYAM
page
3 of 4
Building
Fence
Checked M.AMAM
date
21-Mar-16
Subject
Elevation: 3
Part: 1
Type: 1
Footing:
G. Beam:
Column:
REV
Stability check
- Sliding:
F horizontal = ( 1.74 x 4.2) + ( 2.71 x 4.2) + ( 3.46 x 4.2) + 1.07 + 3 = 37.3 KN/m
F vertical = ( 55 + 13.7 + 34.74 + 76.67 + 19.56 + 9.5) x tan(30) + 10.89 = 131.66 KN/m
Fv
f.o.s =
Fh
131.655
37.292
SAFE
- Over-turning:
Mo = ( 1.74 x 4.2 x 1.859) + ( 2.71 x 4.2 x 1.685) + ( 1.07 x 1.44) + ( 3 x 1.127) + ( 3.46 x 4.2 x 3.709)
= 91.58 KN/m
Mv = [( 55 + 13.7 + 34.74 + 76.67 ) x 2.2/2] + (19.56 x 1.725) + (9.5 x 1.725) + [10.89 x (1.193/3 + 0.5)]
= 258.03
Mv
f.o.s =
Mo
258.026
91.572
SAFE
- Soil stresses:
P = 55 + 13.7 + 34.74 + 76.67 + 19.56 + 9.5 = 209.17 KN
M = 91.572 - (10.89 x 0.898) - (19.56 x 0.625) + (9.5 x 0.625) = 63.634 KN.m
M
e =
63.634
209.17
= 0.305 m
2.2
6
= 0.367 m
e <
L
6
P
LxB
P
LxB
(1 +
(1 -
6e
L
6e
L
209.17
) =
2.2 x 2
209.17
) =
2.2 x 2
(1 +
(1 -
6 x 0.305
2.2
6 x 0.305
2.2
SAFE
) =
SAFE
Reinforcement:
M(1-1) = (58.22215 x 0.93^2 x 0.5) + (28.86785 x 0.93^2 x 0.5 x 2/3) = 33.51 KN.m
Mu(1-1)= 1.5 x 33.51 = 50.27 KN.m
M(2-2) = (
87.09 + 8
2
As = 412.5 mm2
As = 201.2 mm2
Project
(144) Madinah
Designer M.SEYAM
page
4 of 4
Building
Fence
Checked M.AMAM
date
21-Mar-16
Subject
REV
Elevation: 3
Part: 1
Type: 1
Footing:
G. Beam:
Column:
M(3-3)
( 9.38 + 9 ) x 3.96^2
10
= 28.83 KN.m
1.4
x 1200 x 300 = 1200 mm2
420
use 4 T 20 mm
- Horizontal Load:
F1 + F2 + F6 (wind) =
M(2-2)
7.91 x 3.96^2
10
= 12.41 KN.m
SEYAM EXCEL