1

Annular Pressure Loss.................................................................

(ECD MW) x TVD x 0.052 or BHCP HSP

Annular Capacity.........................................................................

(Hole ID2 pipe OD2 ) 1029.5

Annular Velocity: ft/min..................................................................

Pump Output bbls/min DCOH bbls/ft

Bottom Hold Circ. Pressure..........................................................

Hydrostatic Pressure psi + APL psi

Boyles Law:...............................................................................

V2 = V1 X P1 i.e. 1000 X 10 = 3.33g/gas


P2
3000

BOP rating for a normal FP.............................................................

(.465 X TVD X 100) %

Casing pressure............................................................................

SIDPP + (CSG TVD x MW x .052)

Drilling Fluid Density: ppg..............................................................

Pressure Gradient psi / ft 0.052

Drill Pipe Displacement..................................................................

(pipe OD2 pipe ID2 )1029.5

10

Dynamic Pressure loss....................................................................

SIDPP - ICP

11

Equivalent Circulating Density: ppg...................................................

(Annular Pressure Loss psi -:- TVD ft. -:- 0.052) + Original Drilling Fluid Density ppg

12

Equivalent Drilling Fluid Density: ppg..............................................

Pressure psi (TVD ft x 0.052)

13

Final Circulating Pressure: psi..........................................................

(PSCR psi x Kill MW ppg) OMW

14

Formation fracture gradient.............................................................

MAMW x .052

15

Formation Pressure: psi.................................................................

OMW X .052 X TVD + SIDPP

16

Gradient of Influx: psi/ft.....................................................................

(MW x .052) - ((SICP SIDPP) IH)

Height of influx: ft...........................................................................

Option 1 Kick Size bbls DCOH bbls/ft (around DC)


Option 2 DCL x DCOHC =DCOHV bbls, excess bbls DPOHC + DCL = IH

Hydrostatic Pressure: psi...............................................................

Drilling Fluid Density ppg x 0.052 x TVD ft

17
18
19

Initial Circulating Pressure: psi..........................................................

20

Kill Fluid Density: ppg round up to 1 decimal point..................................

21

Length of pipe to pull before well Starts to flow: ft (Dry)......................

22

Length of pipe to pull before well Starts to flow: ft (Wet)..................

(Overbalance psi x (Casing Cap Closed end Displ)


(MW X .052 X Closed End Displ)

23

Level Drop for pulling Collars out of Hole: ft (Wet)...........................

Length of collar ft x (Metal Displ bbls/ft + Collar Capacity bbls/f)


Casing Capacity bbls/ft

24

Level drop for pulling collars out of a Hole: ft (Dry)........................

(Length of Collar ft x Metal Displ bbls/ft) Casing Capacity bbls/ft

25

Level drop in Annulus (ft) (Dry).......................................................

26

Level Drop in Annulus (ft) (Wet).....................................................

(Length of DP/DC (ft) x Metal Displacement (bbl/ft + capacity (bbls/ft))


Annular Capacity (bbls/ft)

27

Pit gain with Slug in position (ft )......................................................

(Slug Weight Annulus Weight) [Volume of Slug Annulus Weight] = Pit gain

28

Level drop with slug in position..................................................

Pit gain DP Cap. Bbls/ft = Level drop

29

Max Allowable Drilling Fluid Density (ppg).......................................

(Surface Leak Off psi TVD ft 0.052) + Test mud ppg

SCR psi + SIDPP psi


(SIDPP psi -:- TVD ft. -:- 0.052) + Original Drilling Fluid Density ppg
(Overbalance psi x (Casing Cap DPMD bbls/ft))
(MW x .052 x DPMD bbls/ft)

(Length of DP/DC (ft) x Metal Displacement bbl/ft) Annular Capacity (bbls/ft)

30

Mud Gradient: psi/ft.......................................................................

Drilling Fluid Density ppg x 0.052

31

Mud Weight (ppg).........................................................................

HSP 0.052 TVD

32

MAASP: psi Round down to whole number............................................. (Max allow MW ppg Present MW ppg) x 0.052 x shoe TVD ft

33

Overbalance: psi..........................................................................

(HSP FP) x TVD = (MW X .052 X TVD) (PPG X TVD) X TVD

34

Percolation Rate: ft/hr....................................................................

Drill pipe pressure Increase psi/hr Drilling Fluid Gradient psi/ft

35

Pipe Metal Displacement..............................................................

(pipe OD2 pipe ID2 )1029.5

36

Pressure Drop per 100 strokes psi/100stks.....................................

(ICP psi FCP psi) x (100 Surface to Bit Strokes)

37

BHP reduction for pulling pipe out of the hole: psi (Dry)....................

(MW x .052 X DPMD bbls/ft) (Casing Cap - DPMD) x stand length x stands
WET = (MW X .052 X CLOSED END DISP) (CSGCAP CLOSED END DISP)

38

Pump pressure with new mud weight..............................................

Original psi X (New mw Old mw)

39

Pump Output: bbls/min...................................................................

Pump Output bbls/stks x Pump Speed spm

40

Pump pressure with new Pump strokes: psi.....................................

Present pressure psi x (newspm oldspm)2 =

41

Shut in Casing Pressure: psi...........................................................

[(Mud Grad psi/ft Influx Grad psi/ft) x Influx height ft] + SIDPP psi

42

SIDPP (psi)....................................................................................

Formation pressure Hydrostatic psi

43

Time to pump in minutes................................................................

Strokes -:- SPM

44

Total Active Fluid System (bbls)......................................................

Total well system volume (bbls) + Active Surface Volume (bbls)

45

Total Well system Volume (bbls).....................................................

Surface to bit volume (bbls) + Bit surface volume (bbls)

46

Trip margin.....................................................................................

Overbalance 0.052TVD ft

47

Volume to bleed bbls..................................................................

(Pressure Rise psi x Original kick volume bbls) Formation Pressure psi

48

Volume to fill per DP Stand stripped (wet). .....................................

(DPMD + DPCap) x Stand Length ft

49

Volume to Fill a DP Stand (Dry)......................................................

DPMD x Stand Length ft

50

Volume: bbls ...............................................................................

Depth ft x displacement bbls/ft

51

Volume to bleed to restore BHP to Formation psi........................

(psi increase X Pit gain) (Formation psi psi Increase)

51

Well flows due to swabbing: psi .....................................................

Formation pressure psi swab pressure psi

Kill Sheet Abbreviations


LOTMW

Leak Off Test Mud Weight

MAMW

Maximum Allowable Mud Weight ppg

CSGTVD

Casing True Vertical Depth ft

DPC

Drill Pipe Capacity bbls / ft

DCC

Drill Collar Capacity bbls / ft

DPOH

Drill Pipe Open Hole -Capacity bbls / ft

DCOH

Drill Collar Open Hole- Capacity bbls /ft

DPCSG

Drill Pipe Casing -Capacity bbls / ft

SHOE

Casing Shoe (bottom of the casing)

PSCR

Pump Slow Circulation Rate

MD

Measured Depth

TVD

True Vertical Depth

KOP

Kick Off Point

EOB

End of Build

CLFL

Choke Line Friction Loss

MRL

Marine Riser Length

SubSea