Annular Capacity.........................................................................
Boyles Law:...............................................................................
Casing pressure............................................................................
10
SIDPP - ICP
11
(Annular Pressure Loss psi -:- TVD ft. -:- 0.052) + Original Drilling Fluid Density ppg
12
13
14
MAMW x .052
15
16
17
18
19
20
21
22
23
24
25
26
27
(Slug Weight Annulus Weight) [Volume of Slug Annulus Weight] = Pit gain
28
29
30
31
32
MAASP: psi Round down to whole number............................................. (Max allow MW ppg Present MW ppg) x 0.052 x shoe TVD ft
33
Overbalance: psi..........................................................................
34
35
36
37
BHP reduction for pulling pipe out of the hole: psi (Dry)....................
(MW x .052 X DPMD bbls/ft) (Casing Cap - DPMD) x stand length x stands
WET = (MW X .052 X CLOSED END DISP) (CSGCAP CLOSED END DISP)
38
39
40
41
[(Mud Grad psi/ft Influx Grad psi/ft) x Influx height ft] + SIDPP psi
42
SIDPP (psi)....................................................................................
43
44
45
46
Trip margin.....................................................................................
Overbalance 0.052TVD ft
47
(Pressure Rise psi x Original kick volume bbls) Formation Pressure psi
48
49
50
51
51
MAMW
CSGTVD
DPC
DCC
DPOH
DCOH
DPCSG
SHOE
PSCR
MD
Measured Depth
TVD
KOP
EOB
End of Build
CLFL
MRL
SubSea