POUR CARD

Pour No. :
Date:
01

NAME OF THE WORK

02

LOCATION

03

REFERENCE DRAWING NO

04

MIX PROPORTION

05

QTY OF CONCRETE

06

TOO LEVEL OF CONCRETE

07

CHECK FOR SHUTTERING

08

REINFORCEMENT

09

CHECK FOR FOUNDATION BOLTS/


METALLIC INSERTS (IF ANY)

CLEARED FOR CONCRETING

10

FOR CONTRACTOR

FOR POWERGRID

CONCRETING
11

CEMENT BRAND & WEEK NO

12

QTY OF CEMENT
a)
THEORETICAL

b)

ACTUAL

13

WATER CEMENT RATIO

14

IDENTIFICATION OF CUBES

FOR CONTRACTOR

FOR POWERGRID

Location No.:
Date:

TOWER FOUNDATION

1. PIT MARKING
POWERGRID CORPORATION OF INDIA LTD.

Location No:-

Name of Line:- 765 KV S/C SATNA-HATTA PART OF SATNA-BINA TL,CKT-I,PKG-A2


Name of Contractor:- M/S KPTL

Type of Tower:-

i)

Approd Drg. Nos.

----------------------------------------

ii)

Reference level

---------------------------------------

iii)

Alignment of Loc.w.r.t. Precious and next loc.

O.K./Not O.K.

iv)

Loc. of center peg/position of various land marks


are matching as per profile

O.K./Not O.K.

v)

Any new features on grnd.w.r.t. Profile Necessitating


Realignment/Shifting of Loc. or due to any reasons

Yes/No

vi)

Span on both sides of Loc.

As per profile/Actual
(Mtrs)
(Mtrs)

a) Preceding span (Loc. No.)


b) Succeeding span
vii)

Angle of deviation and bisection in case of angle tower Loc.


a) Angle of deviation
b) Bisection found

As per profile/Actual
O.K./Not O.K.

viii)

Position of cross pegs in transverse direction

O.K./Not O.K.

ix)

Position of all four pits are on leveled grnd. and safe

Yes/No

x)

Dimension of pit marking as per drgs.

O.K. /Not O.K.

xi)

Whether Benching/Revetment required if yes, then

Yes/No

a) If counter maps/Revetment drgs prepared

Yes/No

b) Possibly vol.

----------cum.

Certificate:- Cleared for excavation.


FOR CONTRACTOR

FOR POWER GRID

Signature...

Signature..

Name.

Name

Designation

(Site Supr./E1/E2/E3)

Date.

Date.

2. FOUNDATION CLASSIFICATION
POWERGRID CORPORATION OF INDIA LTD.
Location No.:
Name of Line:- 765 KV S/C SATNA- CHARKHERI OF SATNA-GWALIOR T/L,CKT-1,PACKAGE-P219-TW-07
Name of Contractor: M/S KEC
i)

Type of Tower:-

Strata wise pit details

STRATA DEPTH

RECEIVING END

PIT C

STRATA DEPTH

PIT B

STRATA DEPTH

STRATA DEPTH
Trial pit details/
Bore log details

PIT D

SENDING END

PIT A

NOTE: CLASSIFICATION MAY ALSO BE GIVEN ON TRAIL PIT OR ONE PIT EXECAVATION BASIS.
a) Predominant soil
ii)
Sub soil water table details as on date.
PIT A

iii)
iv)
v)
vi)

PIT C

PIT D

Water table is nearby well as on date


-------mtrs.
Maxm. Subsoil water table in monsoon season after
through local enquiry.
-------mtrs.
Surface water table on ground in monsoon Season and its
duration.
-----------mtrs. For ---------days
Type of cultivation.
Paddy fields/cultivated land/barred land
a)
Whether encasement of stubs required due to surface
water?
Yes/No
b)

vii)

PIT B

If yes, ht. Of encasement above ground level.

Whether soil investigation carried out at this Loc. or


nearby loc.

--------mtrs
Loc. No.

viii)
ix)
a)

b)
c)
d)

If this loc. Strata details are comparable with above


soil investigation report or any other loc. of this line.
Details of soil investigation report:STRATA DEPTH

Loc. No.

Sub soil water table.


Ultimate Bearing capacity
Angle of response(0)

xi)

Foundation classification proposed by contractor.

xii)

Foundation classification recommended.


Remarks/Reasons:-

--------------mtrs.
-------------Kg/m2
-------------degrees

As per Soil
Invest.

Actual

FOR CONTRACTOR

FOR POWERGRID

Signature.

Signature

Name..

Name.

Designation.

(Site Supr./E1/E2/E3)

Date

Date..

Approval
Site visited on..and details verified.
The classification of foundation is approved as
FOR POWERGRID
Signature.
Name:
Designation:
Date..

4.

STUB SETTING
POWERGRID CORPORATION OF INDIA LTD.

Location No.:-

Name of Line:- 765 KV S/C SEONI-BINA TL


Name of Contractor:- TATA PROJECTS LTD.

Type of Tower:-

i)

Approved drgs. Nos.

..

ii)

Pit Dimensions

..

a) Depth of pits

iii)

From Ref.Level

Ground Level

Pit A
Pit B
Pit C
Pit D
b) Pit dimensions are as per approved foundation classification

Yes/No

c) Excavated soil is kept 2m away from pit edge.

Yes/No

d) Under cutting done in case of fissured rocks

Yes/No

Alignment of template.
a) Tangent Tower
a.a) In the direction of line
b) Angle Tower
b.a) Angle of deviation
b.b) Alignment of template on bisection

iv)

Yes/No
...degrees
Yes/No

Diagonals of template.
AC.m
BD.m
0 = Angle of Deviation.
PQ = Line of Bisection.
(Line AD and BC are
Perpendicular to PQ)

STUB SETTING ON BISECTION.


v)

Level of template checked by dumpy level/water level

Yes/No

vi)

Ht of template above ground level

OK/Not OK

vii)

Clearance between lowest part of stub and base of pit (Not less
than 15 cm or as specified in the drg.)
Leg A...cm
Leg B...cm
Leg C...cm
Leg D..cm

viii)

Template support positioning is causing any danger to collapse

of pit

OK/Not OK

ix)

All members of template are fixed as per drg. and fully tightened

Yes/No

x)

Checking of stubs
a) Stub dimensions are as per type of tower
b) All plates/cleats fixed with reqd. no. of Nuts/Bolts and are fully
tightened

Yes/No
Yes/No

Certificate: Stub Setting Approved.


FOR CONTRACTOR

FOR POWERGRID

Signature.

Signature

Name

Name..

Designation..

(E1/E2/E3)

Date

Date

5.

CONSTRUCTION MATERIALS

POWERGRID CORPORATION OF INDIA LTD.

Location No.:-

Name of Line:- 765 KV S/C SEONI-BINA TL


Name of Contractor:- TATA PROJECTS LTD.

Type of Tower:-

i) Quality/Qty. of sand as per apprd. Drgs. And


Quantity Required

ii)

Quantity Avail

Approved Source

Quality (OK/Not OK)

Quality/Qty. of Metal as per apprd. Drgs. And specification.


Size

Quantity Required

Quantity Avail

Approved Source

Quality (OK/Not OK)

20 mm
40 mm

iii) Dimensions of the measuring Box


(30 cm X 30 cm X 39 cm Height)

OK/Not OK

iv) Properties of nominal Mix.


Grade of
Concrete

Quantity of Coarse
Aggregate

Quantity of Fine
aggregate

Quantity of Cement

M - 10

6 Boxes

3 Boxes

1 Bag

M - 20

3 Boxes

1.5 Boxes

1 Bag

v) Quality & Qty. of water as per specns.

vi) Reinforcement Steel.

Quantity of water

1Box less 1
litere(34.1 lit)
1box less 1 lit(30)

Dia. (MT)

Qty. Reqd. (MT)

Qty. Avail

Apprd. Source

Quality (OK/Not OK)

6 mm
10 mm
12 mm
16 mm
20 mm
25 mm
. mm
. mm
vii)
viii)

Form Boxes.
a) Dimensions are per apprd. Drgs.
b) Oiling of inner wall of form boxes
T & P and man power as per Annexure IA & IB are at
available at site.

OK/Not OK
OK/Not OK
Yes/No

Certificate:- Material & T & P cleared for lean concreting.


ix)

x)

Lean Concreting:a) Pits are free from all Foreign Materials


b) Pits are free from standing water (Dewatering continued
in advance by pumps/Buckets)
c) Mix ratio 1:3:6 with 40 mm metal
d) Concrete mixing by mixer as per specn.
e) Mixture running time (mixing Time-2 min.)
f) De-watering done
g) Lean concreting done upto specified level and area in all
the four pits.
h) No. of cement bags consumed

Yes/No
Yes/No
Yes/No
Yes/No
OK/Not OK
Yes/No/Not Required
As per Design

Yes/No
Actual

In case of excess excavation filling is done by lean Concrete


& no loose soil is permitted for filling.
Vol. Of excess lean concrete.

.Cu.m.

CERTIFICATE:- Pits are cleared for installation of reinforcement and form boxes.
FOR CONTRACTOR

FOR POWERGRID

Signature..

Signature...

Name...

Name..

Designation.
Date...

(E1/E2/E3)
Date..

6.

INSTALLATION OF REINFORCEMENT STEEL & FORM BOXES

POWERGRID CORPORATION OF INDIA LTD.

Location No:-

Name of Line:- 765 KV S/C SEONI-BINA TL


Name of Contractor:- THE TATA POWER CONPANY LTD.
i)

Apprd. Drg. Nos.

Type of Tower:..
..

ii)

Reinforcement steel
a) Quality/Qty. as per specification
b) Bending/Placing as per apprd. Drg.
c) Required no. of chairs approved
d) Binding done as per specifications.
e) Any undue stress or bending of steel bars
f) Steel is clean and free from loose rust or any other foreign matls.
g) Position of bars W.r.t. stub as per drg.

iii)

Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
OK/Not OK

Form Boxes:a) Dimensions as per approved drg.


b) Placing W.r.t. stub as per approved drg.
c) Bolts and Nuts are watertight

OK/Not OK
Yes/No
Yes/No

iv)

Clear cover of 50 mm (or as per specification available)

Yes/No

v)

Earth strips fixed as per approved drg.

Yes/No

Certificate:- Cleared for foundation casting.


FOR CONTRACTOR

FOR POWERGRID

Signature..........

Signature...

Name.

Name....

Designation

(E1/E2/E3)

Date..

Date

7.

MIXING, PLACING AND COMPACTION OF CONCRETE

POWERGRID CORPORATION OF INDIA LTD.

Location No.:-

Name of Line:- 765 KV S/C SEONT BINA TL


Name of Contractor:- TATA PROJECTS LTD.

Type of Tower:-

i)

Apprd. Drg. Nos.

ii)

Mix Ratio

..

iii)

a) For Pyramid/base with 40 mm metal with ratio 1:1.5:3

Yes/No

b) For Chimney with 20 mm metal with ratio 1:1.5:3

Yes/No

c) Water to cement ratio as per specification

Yes/No

Mixing done by
a) Mixer (Running time-2 min.)
b) Hand mixing (with 10% extra cement or as specified in LOA)

Yes/No

c) Hand mixing done on GI sheet platform

Yes/No

iv)

Use of poking rod for compacting

Yes/No

v)

Use of Vibrator for compacting

Yes/No

vi)

Checking of templates levels & its diagonals at regular

OK/Not OK

vii)

Casting of legs done in continuity

Yes/No

viii)

No. cement bags consumed

ix)

Coping is done as per approved drg.

Yes/No

x)

Details of cubes collection.

Yes/No

Twr. Leg

Pyramid (Date)

As per drg.

Chimney (Date)

Actual

No. of Cubes

A
B
C
D
xi)
xii)
xiii)
xiv)

Curing is started after 24 hrs. of foundation casting and


Foundation kept continuously in wet condition by putting
Wet gunny bags or otherwise.
Form boxes are removed after 24 hrs. of casting
Sufficient qty. of water available at Loc. Before back filling
Back filling is done by soil as per Specn. And free from
Foreign materials.

Yes/No
Yes/No
Yes/No
Yes/No

xv)

Back filling is done in layers with proper compacting and


adequate water sprinkling.
xvi) Back filling is done up to 75 mm above ground level or as
specified in specn.
xvii) Earth embankment of ht. 50 mm or as per specn. made along the
side of back filled earth.
xviii) Sufficient qty. of water sprinkled over back filled earth and
chimney kept wet by wet gunny bags.
xix) Template is removed after complete back filling.
xx)
Curing of back filled earth & chimney carried out for period as
per specn.
(Minimum period of curing 14 days after concreting both in
morning & evening)
a) availability of water pump with storing arrangement for
curing purpose.
b) Date of start of curing
..
c) Date of completion of curing
..
xxi) Cubes sent for testing as per approved FQP
xxii) All the surplus materials removed from site

Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No

Yes/No
Yes/No

Certificate:- Foundation is cleared for tower erection subject to fulfillment of part (I) before tower erection
and part (II) in due course as per planning.
Part (I)
Part (II)

Setting period (28 days) is allowed as per specification


(i) Revetment benching proposal status
(ii) Revetment benching likely execution date.

FOR CONTRACTOR

FOR POWERGRID

Signature.

Signature...

Name..

Name

Designation.

(E1/E2/E3)

Date

Date..

CONCRETE CUBE TEST REPORT

POWERGRID CORPORATION OF INDIA LTD.


Name of work: 765 KV S/C SEONI- BINA TL
Agreement No.:-C-46008-L095AI-CA-II/2089
Sample No: Loc. No.:Identification Mark:
Portion of work or Qty. represented sample:
Date & Time of casting:
Proportion of Mix:
7 days

28 days

1. Due date of test:


2. Actual date of testing:
3. Delay in testing:
4. Actual average compressive strength
5. Is average comp. Strength equal to or
more than specified comp. Strength

Yes/No

Yes/No

(Signature of Executing Agency)

(Signature of Powergrid Official)

Date.

Date..

FORMAT FOR JOINT SAMPLING OF


COARSE & FINE AGGREGATE
The samples of coarse/fine aggregate as per the following details have been collected jointly by us.
(1)

Location of site

(2)

Source of supply

Size of Aggregate

: Source

40 MM

20 MM

Fine Aggregate

(3)

No & Quantity of Sample taken

(4)

Name & address of Lab where


samples are being sent for testing.
(vide letter No. & date)

The samples have been sealed and identification mark slip duly signed has been placed inside the bag & another
slip duly signed has been pasted on the bags.

(Signature of Erection Agency)

(Signature of Powergrid official)

Date..

Date.

FORMAT FOR JOINT SAMPLING OF


REINFORCEMENT STEEL
The samples of reinforcement steel as per the following details have been collected jointly by us.
(1)

Location of store/site

(2)

Source of Supply

(3)

Diameters of rods.

(4)

Length of rods.

(5)

Lot No.(s)

(6)

No. of Samples taken

(7)

Name & Address of lab where


samples are being sent for testing
(vide letter No. & date)

The samples have been wrapped together & placed inside the bag. One identification mark slip duly signed has
been placed inside the bag & another slip duly signed has been pasted on the bag.

(Signature of Erection Agency)

(Signature of Powergrid Official)

Date..

Date.

TATA POWER COMPANY LIMITED


CONSTRUCTION OF 765 KV SEONI-BINA TRANS. LINE
JOINT MEASUREMENT CERTIFICATE FOR TOWER ERECTION

SL. NO.

..

LOCATION NO.

..

TYPE OF TOWER

COMPLETION DATE

WEIGHT OF TOWER

FOR CONTRACTOR

FOR POWERGRID

Signature:

Signature:

Name:..

Name:..

Designation:.

Designation:.

Date:

Date:.