37SOP-SEC-003

Rev. 0
Main Steam System

Main Steam System

37SOP-SEC-003
Rev. 0
Main Steam System

1.0

Scope of Applicability
This Procedure is applicable to:
Warm-up the main steam line
Put main steam system into service
Main steam system out of service.

2.0

3.0

Basis of Compilation
2.1

Nuclear system flow diagrams of 300MW Nuclear power plant, PCI-37SYC001-QNPP-45-JD.

2.2

Main Steam system drawing, PC1-175MS-501, 5030-45-5D, Rev. JD.

2.3

Turbine bypass steam system, PC1-37J11-002-CNPP-45-5D, Rev 2.

Initial Conditions
3.1

Related power supply, instrumentation and control power are normal for
instruments and equipment mentioned in Appendix A and B.

3.2

Compressed air system is operating normally.

3.3

Turbine turning gear is operating normally.

3.4

One circulating water pumps are in operation.

3.5

Reactor is at Hot zero Power (Mode 2).

3.6

Wide-range water level indications of both steam generators (SGs) are at 9.310.9m.

3.7

Main steam isolation valves (MSIVs) and their bypass valves are closed.

3.8

The drain valves upstream of MSIVs are opened to atmosphere. The motoroperated isolation valves upstream of SG atmospheric relief valves are open.
Atmospheric relief valves are set at auto mode. Their set point is the
corresponding to the value of SG secondary side pressure at SRC temperature
of 280C (82%).

3.9

System pressure before main steam isolation valve reaches to 5.5~6.45 MPa.

3.10

SSF system is in operation. In case if SSF pump is not available, MFW pump is
supplying water to SGs.

3.11

SG PORVs are at auto with the set point at 82% (6.32 MPa).

Page 1 of 12

37SOP-SEC-003
Rev. 0
Main Steam System

4.0

5.0

Precautions
4.1

Energize MSIVs, before the opening of its bypass valve SMS-V02A/B, and put
its control switches at "Closed" position.

4.2

Before main steam line warmed up, turning gear should be in continuous
operation.

4.3

When pipe after main steam isolation valve is warmed up and vacuum in
condenser is not established, drain after MSIV should be discharged to
atmosphere by using valve J010-V15 and J010-V16. After formation of
vacuum drain should be diverted to HPFT and put the valve J010-V05 in auto
mode.

4.4

Warming up of main steam lines should be performed slowly, heat up rate


should not exceed 3C/hr. The opening time of two bypass isolation valves
should be maintained same as for as possible, so that both the main steam
system pipes should be warmed up homogeneously.

4.5

Before the opening of the bypass valve of MSIV (SMS-V02A/B), open drain
valve SMS-V10 A/B to avoid water hammering.

4.6

Only when differential pressure before and after main steam isolation valve is
less than 0.2 MPa, the main steam isolation valve SMS-V01A/B can be
opened.

4.7

There should be no water hammering during main steamline warm-up.

Operation Steps
5.1

Putting system into service


5.1.1 System status preparation
a.

Confirm that all instrumentations of system as given in appendix


A "Main Steam System Instrumentation List", are put into
service, and operating normally.

b.

Confirm that equipment as given in appendix B "Main Steam


System Equipment Energized List" has been energized.

c.

Confirm that equipment status is in accordance with appendix C


"Check list for Main Steam System Valves Controlled in the
MCR".

d.

Confirm that status of secondary system is in accordance with


operation card Main Steam System Check List.

e.

Confirm that the solenoid valve of main steam isolation valve


has been energized.

Page 2 of 12

37SOP-SEC-003
Rev. 0
Main Steam System

f.

Confirm that the secondary side pressure of steam generator


reaches 5.5~6.45MPa.

g.

Confirm that the drain valve before SMS-V10A/B is opened to


atmosphere and drain after MSIV have the following status:
Drain valves J010-V15 and J010-V16 are opened (drain
discharge to atmosphere) if vacuum in condenser is not
established.
Drain valve J010-V05 is on Auto and its upstream and
downstream valves J010-V01 and J010-V02 are opened and
drain is discharged to HPFT, if the vacuum in condenser is
established.

h.

MSR II stage reheater steam system piping has been drained.

i.

Confirm that operation of turning gear is normal.

j.

Start one gland steam condenser exhauster fan.

k.

Confirm that both MSIVs are at "Closed" position and green


light in MCR on respective panel is ON.

5.1.2 Main steam line warm-up after MSIVs (Nuclear power ~2%).
a.

Open the bypass valves of MSIVs SMS-V002A/B intermittently


to heat up the main steam line at a rate of 3C/min. After steady
pressure is established in the main steam pipes down stream of
bypass valve, fully open the bypass valves SMS-V002A/B of
MSIVs. Pay close attention to any abnormal change in
condenser inlet temperature, turbine High Pressure Cylinder
metal temperature. main steam system should not produce
sound due to water hammer, Monitor SG level.

b.

Close drain valve upstream of MSIVs (SMS-V10A/B).

c.

After main steam system piping has been warmed up and the
differential pressure before and after isolation valve is less than
0.2 MPa, open MSIVs SMS-V001A and SMS-V001B.

d.

Close bypass valves SMS-V002A/B after main steam isolation


valve has been opened fully.

e.

After heat-up of pipe, regulate from the local, the opening of


following drain valves from main steam pipe to sump:
Drain from main steam header pipe to sump

J010-V15, V16

Drain from bypass header pipe to sump

J011-V41, V42

Page 3 of 12

37SOP-SEC-003
Rev. 0
Main Steam System

5.1.3 Warm-up ejectors and gland seal steam supply pipes when nuclear
power reaches 2%.
a.

Ask local operator to slowly open main steam line isolation


valve J019-V03 for warm up of pipes.

b.

Ask local operator to completely drain lines downstream of


valve J019-V03 by opening drain valve J019-V16E to sump.
Close valve J019-V03 when the lines are completely drained.

c.

Drain main steam header and Turbine Bypass Steam system to


sump by opening valves J010-V15, 16 and J011-V41, 42
respectively.

5.1.4 Main steam drain switch-over operation

5.2

a.

Confirm that normal vacuum has been built up in the condenser.

b.

Confirm that drain valves J010-V05 (Drain control valve from main
steam header pipe to HPFT) and J011-V20 (drain control valve from
bypass header pipe to HPFT) are at "Automatic" position:

c.

Ask local operator to close the valves J010-V15, V16 (Drain


valve from main steam header pipe to sump) and J011-V41,
V42 (Drain valve bypass header pipe to sump) fully:

d.

Ask local operator to open isolation valves J010-V01, J010V02, J011-V19, and J011-V21 fully.

e.

Ask local operator to open isolation valves J010-V03, J010V04, J011-V22 and J011-V23 fully (isolation valves before and
after steam trap).

Taking System out of service


5.2.1 Confirm that turbine has been tripped and it is on turning gear operation
status.
5.2.2 Before the vacuum is broken, ask local operator to transfer main steam
system drain from HPDFT to sump.

5.2.4

a.

Close valves J010-V01, J010-V02, J011-VI9, V011-V21, J010V03, J010-V04, J011-V22 and J011-V23.

b.

Slightly open drain valves from main steam header pipe and
bypass header pipe to sump by opening valves J010-V15, V16,
J011-V41, V42

c.

Confirm that condenser vacuum drops to zero. Stop steam


supply to the shaft sealing system.

When main steam system pressure decreases to 5.5MPa:

Page 4 of 12

37SOP-SEC-003
Rev. 0
Main Steam System

a.

Close main steam isolation valves SMS-V001A, B.

b.

Open drain valve SMS-V10A/B (to atmosphere drain valve)


before main steam isolation valve. SG PORVs are at auto and
SG level is normal.

Page 5 of 12

37SOP-SEC-003
Rev. 0
Main Steam System

6.0

Appendix
Appendix A
Main Steam System Instrumentation List

Instrumentation Code

Instrumentation Name

PI4109A

Pressure before main stop valve A

PI4109B

Pressure before main stop valve B

PI4118

bypass header pipe inlet pressure

TE4105

bypass dump header pipe steam inlet temperature

PR4101A

main steam pressure A

PR4101B

main steam pressure B

TR4102A

main steam temperature A

TR4102B

main steam temperature B

Remarks

Time:- _______________________ Date: _________________


Performed by: ______________________________ SS _________________________:

Page 6 of 12

37SOP-SEC-003
Rev. 0
Main Steam System

Appendix B
Main Steam System Equipment Energized List
Eq. Code

Equipment Name

Remarks

SMS-V001A

No.1 main steam isolation valve

SMS-V001B

No.2 main steam isolation valve

SMS-V002A

No.1 main steam isolation bypass valve

SMS-V002B

No.2 main steam isolation bypass valve

SMS-V004A,C

No.1 motor operated isolation valve of atmosphere relief valve

SMS-V004B,D

No.2 motor operated isolation valve of atmosphere relief valve

SMS-V005A,C

No.1 atmosphere relief valve

SMS-V005B,D

No.2 atmosphere relief valve

SMS-V10A

Motor operated drain valve before No. 1 MSIV.

SMS-V10B

Motor operated drain valve before No. 2 MSIV.

J010-V05

Pneumatic drain control valve

J011-V23

Pneumatic drain control valve

J011-V24

Pneumatic drain control valve

J010-V05

Main steam header pipe drain control vale

J013-V01

No.1 MSR main globe valve

J013-V02

No.2 MSR main globe valve

J013-V07

No.1 MSR small globe valve

J013-V08

No.2 MSR small globe valve

J013-V13

No.1 MSR preheat valve

J013-V14

No.2 MSR preheat valve

Not included
in PC

Gland seal condenser blower No. 1


Gland seal condenser blower No. 2
J011-V01

No. 1 bypass dump valve

J011-V 02

No.2 bypass dump valve

J011-V 03

No.3 bypass dump valve

J011-V 04

No.4 bypass dump valve

J011-V20

main steam bypass dump header pipe drain control valve

J019-V04

motor operated valve from main steam system to auxiliary

Page 7 of 12

37SOP-SEC-003
Rev. 0
Main Steam System

Eq. Code

Equipment Name

Remarks

steam system
J010-V501A

Pneumatic valve of main stop valve 1.

J010-V501B

Pneumatic valve of main stop valve 2.

Time:- _______________________ Date: _________________


Performed by: ______________________________ SS _________________________:

Page 8 of 12

37SOP-SEC-003
Rev. 0
Main Steam System

Appendix C
Check List for Main Steam System Valves Controlled from MCR
Eq. code

Equipment Name

SMS-V001A
SMS-V001B
SMS-V002A
SMS-V002B
SMS-V004A
SMS-V004B
SMS-V005A
SMS-V005B
SMS-V10A
SMS-V10B
J010-V05

No.1 main steam isolation valve


No.2 main steam isolation valve
No.1 main steam isolation bypass valve
No.2 main steam isolation bypass valve
No.1 motor operated isolation valve of relief valve
No.2 motor operated isolation valve of relief valve
No.1 atmosphere relief valve
No.2 atmosphere relief valve
Drain control valve before No.1 MSIV
Drain control valve before No.2 MSIV
Main steam header pipe drain control valve

Closed
Closed
Closed
Closed

J013-V01
J013-V02
J013-V07
J013-V08
J013-V13
J013-VI4
J011-V01
J011-V02
J011-V03
J011-V04
J011-V20

No.1 MSR large leak off valve


No.2 MSR large leak off valve
No.1 MSR small leak off valve
No.2 MSR small leak off valve
No.1 MSR preheat valve
No.2 MSR preheat valve
No.1 bypass dump valve
No.2 bypass dump valve
No.3 bypass dump valve
No.4 bypass dump valve
Main steam bypass dump header pipe drain control
valve
motor operated valve from main steam system to
auxiliary steam system
No. 1 automatic main stop valve
No.2 automatic main stop valve

Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed

J019-V04

Position

Remarks

Open
Open
Automatic
Automatic
Open
Open
Automatic

Automatic
Closed
Closed
Closed

Time:- _______________________ Date: _________________


Performed by: ______________________________ SS _________________________:

Page 9 of 12

37SOP-SEC-003
Rev. 0
Main Steam System

7.0

Operation Card
Main Steam System Check List

Eq. Code

Equipment Name

Position

SMS-V003A

Globe valve after 1# MSIV bypass valve

Open

SMS-V003B

Globe valve after 2# MSIV bypass valve

Open

SMS-V069A

1# main steam line N2 filling globe valve

Close

SMS-V069B

2# main steam line N2 filling globe valve

Close

SMS-V011A

Drain to atmosphere relief globe valve


before 1# MSIV

Regulating

SMS-V011B

Drain to atmosphere relief globe valve


before 2# MSIV

Regulating

SMS-V10A

Drain to atmosphere relief motor-operated


valve before 1# MSIV

Close

SMS-V10B

Drain to atmosphere relief motor operated


valve before 2# MSIV

Close

J010-V01

Globe valve before steam header pipe


drain control valve

Close

J010-V02

Globe valve after steam header pipe drain


control valve

Close

J010-V17

Drain valve before 1# main stop valve

Close

J010-V20

Drain valve before 2# main stop valve

Close

J010-V23

1# main stop valve steam atmosphere


relief globe valve

Close

J010-V24

2# main stop valve steam atmosphere


relief globe valve

Close

J013-V25

Globe valve before 1# MSR second stage


reheater steam pipe drain control valve

Close

J013-V26

Globe valve before 2# MSR second stage


reheater steam pipe drain control valve

Close

J013-V27

Globe valve before 1# MSR second stage


reheater steam pipe steam trap.

Open

J013-V28

Globe valve before 2# MSR second stage


reheater steam pipe steam trap.

Open

J019-V03

Main valve from main steam system to

Remarks

Close

Page 10 of 12

37SOP-SEC-003
Rev. 0
Main Steam System

Eq. Code

Equipment Name

Position

Remarks

auxiliary steam system


J010-V03

Globe valve before main steam header pipe Close


steam trap.

J013-V35

Globe valve MSR#1 drain pot drain valve


to sump

J013-V21

Globe valve MSR #1 drain pot drain valve


to HPDF

J013-V36

Globe valve MSR #2 drain pot drain valve


to sump

J013-V22

Globe valve MSR #2 drain pot drain valve


to PDF

Close

J010-V04

Globe valve after main steam header pipe


steam trap.

Close

J019-V16A

Drain main valve before auxiliary steam


motor-operated valve

Open

J019-V16E

Water discharge valve before auxiliary


steam motor-operated valve to gully.

Open

J019-V16B/C

Drain valve before auxiliary steam motoroperated valve

Open
Close
Open

Close

Time:- _______________________ Date: _________________


Performed by: __________________ M(O)____________________ SS ________________

Page 11 of 12