Rev. 0
Main Steam System
37SOP-SEC-003
Rev. 0
Main Steam System
1.0
Scope of Applicability
This Procedure is applicable to:
Warm-up the main steam line
Put main steam system into service
Main steam system out of service.
2.0
3.0
Basis of Compilation
2.1
2.2
2.3
Initial Conditions
3.1
Related power supply, instrumentation and control power are normal for
instruments and equipment mentioned in Appendix A and B.
3.2
3.3
3.4
3.5
3.6
Wide-range water level indications of both steam generators (SGs) are at 9.310.9m.
3.7
Main steam isolation valves (MSIVs) and their bypass valves are closed.
3.8
The drain valves upstream of MSIVs are opened to atmosphere. The motoroperated isolation valves upstream of SG atmospheric relief valves are open.
Atmospheric relief valves are set at auto mode. Their set point is the
corresponding to the value of SG secondary side pressure at SRC temperature
of 280C (82%).
3.9
System pressure before main steam isolation valve reaches to 5.5~6.45 MPa.
3.10
SSF system is in operation. In case if SSF pump is not available, MFW pump is
supplying water to SGs.
3.11
SG PORVs are at auto with the set point at 82% (6.32 MPa).
Page 1 of 12
37SOP-SEC-003
Rev. 0
Main Steam System
4.0
5.0
Precautions
4.1
Energize MSIVs, before the opening of its bypass valve SMS-V02A/B, and put
its control switches at "Closed" position.
4.2
Before main steam line warmed up, turning gear should be in continuous
operation.
4.3
When pipe after main steam isolation valve is warmed up and vacuum in
condenser is not established, drain after MSIV should be discharged to
atmosphere by using valve J010-V15 and J010-V16. After formation of
vacuum drain should be diverted to HPFT and put the valve J010-V05 in auto
mode.
4.4
4.5
Before the opening of the bypass valve of MSIV (SMS-V02A/B), open drain
valve SMS-V10 A/B to avoid water hammering.
4.6
Only when differential pressure before and after main steam isolation valve is
less than 0.2 MPa, the main steam isolation valve SMS-V01A/B can be
opened.
4.7
Operation Steps
5.1
b.
c.
d.
e.
Page 2 of 12
37SOP-SEC-003
Rev. 0
Main Steam System
f.
g.
h.
i.
j.
k.
5.1.2 Main steam line warm-up after MSIVs (Nuclear power ~2%).
a.
b.
c.
After main steam system piping has been warmed up and the
differential pressure before and after isolation valve is less than
0.2 MPa, open MSIVs SMS-V001A and SMS-V001B.
d.
e.
J010-V15, V16
J011-V41, V42
Page 3 of 12
37SOP-SEC-003
Rev. 0
Main Steam System
5.1.3 Warm-up ejectors and gland seal steam supply pipes when nuclear
power reaches 2%.
a.
b.
c.
5.2
a.
b.
Confirm that drain valves J010-V05 (Drain control valve from main
steam header pipe to HPFT) and J011-V20 (drain control valve from
bypass header pipe to HPFT) are at "Automatic" position:
c.
d.
Ask local operator to open isolation valves J010-V01, J010V02, J011-V19, and J011-V21 fully.
e.
Ask local operator to open isolation valves J010-V03, J010V04, J011-V22 and J011-V23 fully (isolation valves before and
after steam trap).
5.2.4
a.
Close valves J010-V01, J010-V02, J011-VI9, V011-V21, J010V03, J010-V04, J011-V22 and J011-V23.
b.
Slightly open drain valves from main steam header pipe and
bypass header pipe to sump by opening valves J010-V15, V16,
J011-V41, V42
c.
Page 4 of 12
37SOP-SEC-003
Rev. 0
Main Steam System
a.
b.
Page 5 of 12
37SOP-SEC-003
Rev. 0
Main Steam System
6.0
Appendix
Appendix A
Main Steam System Instrumentation List
Instrumentation Code
Instrumentation Name
PI4109A
PI4109B
PI4118
TE4105
PR4101A
PR4101B
TR4102A
TR4102B
Remarks
Page 6 of 12
37SOP-SEC-003
Rev. 0
Main Steam System
Appendix B
Main Steam System Equipment Energized List
Eq. Code
Equipment Name
Remarks
SMS-V001A
SMS-V001B
SMS-V002A
SMS-V002B
SMS-V004A,C
SMS-V004B,D
SMS-V005A,C
SMS-V005B,D
SMS-V10A
SMS-V10B
J010-V05
J011-V23
J011-V24
J010-V05
J013-V01
J013-V02
J013-V07
J013-V08
J013-V13
J013-V14
Not included
in PC
J011-V 02
J011-V 03
J011-V 04
J011-V20
J019-V04
Page 7 of 12
37SOP-SEC-003
Rev. 0
Main Steam System
Eq. Code
Equipment Name
Remarks
steam system
J010-V501A
J010-V501B
Page 8 of 12
37SOP-SEC-003
Rev. 0
Main Steam System
Appendix C
Check List for Main Steam System Valves Controlled from MCR
Eq. code
Equipment Name
SMS-V001A
SMS-V001B
SMS-V002A
SMS-V002B
SMS-V004A
SMS-V004B
SMS-V005A
SMS-V005B
SMS-V10A
SMS-V10B
J010-V05
Closed
Closed
Closed
Closed
J013-V01
J013-V02
J013-V07
J013-V08
J013-V13
J013-VI4
J011-V01
J011-V02
J011-V03
J011-V04
J011-V20
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
J019-V04
Position
Remarks
Open
Open
Automatic
Automatic
Open
Open
Automatic
Automatic
Closed
Closed
Closed
Page 9 of 12
37SOP-SEC-003
Rev. 0
Main Steam System
7.0
Operation Card
Main Steam System Check List
Eq. Code
Equipment Name
Position
SMS-V003A
Open
SMS-V003B
Open
SMS-V069A
Close
SMS-V069B
Close
SMS-V011A
Regulating
SMS-V011B
Regulating
SMS-V10A
Close
SMS-V10B
Close
J010-V01
Close
J010-V02
Close
J010-V17
Close
J010-V20
Close
J010-V23
Close
J010-V24
Close
J013-V25
Close
J013-V26
Close
J013-V27
Open
J013-V28
Open
J019-V03
Remarks
Close
Page 10 of 12
37SOP-SEC-003
Rev. 0
Main Steam System
Eq. Code
Equipment Name
Position
Remarks
J013-V35
J013-V21
J013-V36
J013-V22
Close
J010-V04
Close
J019-V16A
Open
J019-V16E
Open
J019-V16B/C
Open
Close
Open
Close
Page 11 of 12