PROCESS FUNCTION
Page 1
POTENTIAL
FAILURE MODE
S
E
V
POTENTIAL
E
EFFECT OF
R
FAILURE
I
T
Y
C
L
A
S
S
POTENTIAL CAUSE
OF FAILURE
O
C
C
U
R
PFMEA TEMPLATE
CURRENT PROCESS
CONTROL
D
E
T
E
C
T
RISK
PRIORITY
NUMBER
PF-002
PROCESS FUNCTION
Page 2
POTENTIAL
FAILURE MODE
S
E
V
POTENTIAL
E
EFFECT OF
R
FAILURE
I
T
Y
C
L
A
S
S
POTENTIAL CAUSE
OF FAILURE
O
C
C
U
R
PFMEA TEMPLATE
CURRENT PROCESS
CONTROL
D
E
T
E
C
T
RISK
PRIORITY
NUMBER
PF-002
PROCESS FUNCTION
Page 3
POTENTIAL
FAILURE MODE
S
E
V
POTENTIAL
E
EFFECT OF
R
FAILURE
I
T
Y
C
L
A
S
S
POTENTIAL CAUSE
OF FAILURE
O
C
C
U
R
PFMEA TEMPLATE
CURRENT PROCESS
CONTROL
D
E
T
E
C
T
RISK
PRIORITY
NUMBER
PF-002
PROCESS FUNCTION
Page 4
POTENTIAL
FAILURE MODE
S
E
V
POTENTIAL
E
EFFECT OF
R
FAILURE
I
T
Y
C
L
A
S
S
POTENTIAL CAUSE
OF FAILURE
O
C
C
U
R
PFMEA TEMPLATE
CURRENT PROCESS
CONTROL
D
E
T
E
C
T
RISK
PRIORITY
NUMBER
PF-002
upplierppap@alto-shaam.com
ly marked on Packaging.
FMEA #
REVISION #
DATE
ACTION RESULTS
RECOMMENDED
ACTION
Page 5
RESPONSIBILITY
& TARGET
COMPLETION
DATE
ACTION(S)
TAKEN
S
E
V
E
R
I
T
Y
O
C
C
U
R
D
E
T
E
C
T
PFMEA TEMPLATE
RISK
PRIORITY
NUMBER
PF-002
upplierppap@alto-shaam.com
ly marked on Packaging.
FMEA #
REVISION #
DATE
ACTION RESULTS
RECOMMENDED
ACTION
Page 6
RESPONSIBILITY
& TARGET
COMPLETION
DATE
ACTION(S)
TAKEN
S
E
V
E
R
I
T
Y
O
C
C
U
R
D
E
T
E
C
T
PFMEA TEMPLATE
RISK
PRIORITY
NUMBER
PF-002
upplierppap@alto-shaam.com
ly marked on Packaging.
FMEA #
REVISION #
DATE
ACTION RESULTS
RECOMMENDED
ACTION
Page 7
RESPONSIBILITY
& TARGET
COMPLETION
DATE
ACTION(S)
TAKEN
S
E
V
E
R
I
T
Y
O
C
C
U
R
D
E
T
E
C
T
PFMEA TEMPLATE
RISK
PRIORITY
NUMBER
PF-002
upplierppap@alto-shaam.com
ly marked on Packaging.
FMEA #
REVISION #
DATE
ACTION RESULTS
RECOMMENDED
ACTION
Page 8
RESPONSIBILITY
& TARGET
COMPLETION
DATE
ACTION(S)
TAKEN
S
E
V
E
R
I
T
Y
O
C
C
U
R
D
E
T
E
C
T
PFMEA TEMPLATE
RISK
PRIORITY
NUMBER
PF-002
5011234
John Doe, Mary Smith, Donald Brown, Sam Jones
APPROVED BY
Sam Jones
PROCESS
FUNCTION
010
PROCESS FUNCTION
Receive Incoming
material
POTENTIAL
FAILURE MODE
POTENTIAL
EFFECT OF
FAILURE
S
E
V
E
R
I
T
Y
C
L
A
S
S
POTENTIAL CAUSE
OF FAILURE
O
C
C
U
R
CURRENT PROCESS
CONTROL
020
030
Page 9
machining
blanking
oversized diameter
wrong program
entered
D
E
T
E
C
T
RISK
PRIORITY
NUMBER
84
48
operator training
out of calibration
calibration procedure
tool wear
PF-002
5011234
John Doe, Mary Smith, Donald Brown, Sam Jones
APPROVED BY
Sam Jones
PROCESS
FUNCTION
Page 10
PROCESS FUNCTION
POTENTIAL
FAILURE MODE
POTENTIAL
EFFECT OF
FAILURE
S
E
V
E
R
I
T
Y
C
L
A
S
S
POTENTIAL CAUSE
OF FAILURE
O
C
C
U
R
CURRENT PROCESS
CONTROL
D
E
T
E
C
T
RISK
PRIORITY
NUMBER
PF-002
5011234
John Doe, Mary Smith, Donald Brown, Sam Jones
APPROVED BY
Sam Jones
PROCESS
FUNCTION
Page 11
PROCESS FUNCTION
POTENTIAL
FAILURE MODE
POTENTIAL
EFFECT OF
FAILURE
S
E
V
E
R
I
T
Y
C
L
A
S
S
POTENTIAL CAUSE
OF FAILURE
O
C
C
U
R
CURRENT PROCESS
CONTROL
D
E
T
E
C
T
RISK
PRIORITY
NUMBER
PF-002
5011234
John Doe, Mary Smith, Donald Brown, Sam Jones
APPROVED BY
Sam Jones
PROCESS
FUNCTION
Page 12
PROCESS FUNCTION
POTENTIAL
FAILURE MODE
POTENTIAL
EFFECT OF
FAILURE
S
E
V
E
R
I
T
Y
C
L
A
S
S
POTENTIAL CAUSE
OF FAILURE
O
C
C
U
R
CURRENT PROCESS
CONTROL
D
E
T
E
C
T
RISK
PRIORITY
NUMBER
PF-002
001
A
1/5/2013
ACTION RESULTS
RECOMMENDED
ACTION
RESPONSIBILITY &
TARGET
COMPLETION DATE
ACTION(S)
TAKEN
S
E
V
E
R
I
T
Y
D
E
T
E
C
T
O
C
C
U
R
RISK PRIORITY
NUMBER
none
Page 13
PF-002
001
A
1/5/2013
ACTION RESULTS
RECOMMENDED
ACTION
Page 14
RESPONSIBILITY &
TARGET
COMPLETION DATE
ACTION(S)
TAKEN
S
E
V
E
R
I
T
Y
O
C
C
U
R
D
E
T
E
C
T
RISK PRIORITY
NUMBER
PF-002
001
A
1/5/2013
ACTION RESULTS
RECOMMENDED
ACTION
Page 15
RESPONSIBILITY &
TARGET
COMPLETION DATE
ACTION(S)
TAKEN
S
E
V
E
R
I
T
Y
O
C
C
U
R
D
E
T
E
C
T
RISK PRIORITY
NUMBER
PF-002
001
A
1/5/2013
ACTION RESULTS
RECOMMENDED
ACTION
Page 16
RESPONSIBILITY &
TARGET
COMPLETION DATE
ACTION(S)
TAKEN
S
E
V
E
R
I
T
Y
O
C
C
U
R
D
E
T
E
C
T
RISK PRIORITY
NUMBER
PF-002
THE P-FMEA IS UTILIZED BY THE RESPONSIBLE TEAM TO ASSURE TO THE EXTENT POSSIBLE, POTENTIAL FAILURE MO
Part Number
Enter the name and part number for the system or component
Team Members
Approved By
FMEA Number
Enter the FMEA Document Number, which may be used for Tracking
Revision
Enter the Revision of the FMEA Document (not the Part Revision)
Date
Process Function
Potential Failure
Mode
Potential Failure
Effect
Is defined as to the manner in which the process could potentially fail to meet the process intent. "How might the pro
Are defined as the effects of the failure. Examples might include: Does not fit, No power, Noisy, etc.
Severity
An assessment of the seriousness of the Effect. Should be assigned on a "1" to "10" scale, with "1" being No effect an
Class
Used to identify any "critical" characteristics for systems or components that may require additional process controls.
Is defined as to how the failure could occur, described in terms of something that can be corrected or controlled. Exam
(not
Error)
How Operator
frequently
the failure is projected to occur, on a scale of "1" - "10". The ranking number has a meaning. "10" me
Potential Cause of
Failure
Occurrence
meaning failure is unlikely. "5" meaning failure occurs occasionally, maybe 10 - 20% of the time.
Current Process
Controls
Detection
Risk Priority
Number
Recommended
Action
Responsibility and
Are descriptions of the controls that either prevent to extent possible or detect the failure should it occur. Examples m
An assessment of the probability that the Control Method will detect the potential failure. A "1" to "10" scale is used a
will prevent shipment of the defect. "1" meaning current control is almost certain to detect the failure. "10" meaning
expectation that control will detect the failure.
Is the Result of Multiplying each Value for "Severity", "Occurrence" and "Detection" (S x O x D). The RPN will be betwe
and those with the Highest Severity.
Corrective Action should be directed to those with highest RPN. Examples might include, design go/no-go gauge, auto
Enter the individual (or group) responsible for the recommended action and target completion date.
Target Date
Page 17
PFMEA Instructions
PF-003
Actions Taken
Resulting RPN
After the corrective action has been implemented, re-calculate results of S x O x D. If no action taken leave the RPN b
Page 18
PFMEA Instructions
PF-003
LURE MODES AND THEIR CAUSES HAVE BEEN CONSIDERED AND ADDRESSED.
orming, etc in the order of the manufacturing process. This should carryover from the
ht the process or part fail", i.e. Bent, Cracked, Dirty, improper set-up, etc.
controls.
led. Examples might include: Part Missing, Improper Weld, Operator Failed to Machine Part
. "10" meaning, Failure is almost inevitable, likely to occur more than 1 in 3 times. "1"
amples might include Error Proofing Fixtures, Operator measurements, Visual Checks, etc.
is used and assumes a Failure has occurred. What form of detection is currently in use that
meaning there is no known control to detect the failure. "5" meaning there is a Moderate
be between "1" and "10,000" and attention should be given to those with the highest value
Page 19
PFMEA Instructions
PF-003
he RPN blank.
Page 20
PFMEA Instructions
PF-003