COORDINATION MEETING
MINUTES OF MEETING
Location of Meeting:
KHI - Cilegon
Date of Meeting:
25 January 2016
of
Date of Report:
M. Yusuf
25 January 2016
Distribution:
Attended by: (Refer to List of Meeting Attendance List)
PT. KHI Pipe Industries :
-
For KHI:
Signature: ______________________
Date: 25 January 2016
HCML :
-
For COOEC:
Signature: ______________________
Date: 25 January 2016
For HCML:
Signature: ______________________
Date: 25 January 2016
Ite
Discussion
Action by
Due Date
Page No.
Minute of Meeting
2 of 4
Continuation Sheet
& Status
GENERAL
1.
INFO
2.
INFO
3.
KHI
OPEN
INFO
KHI
26
Januar
y 2016
1.
2.
Minute of Meeting
Page No.
3 of 4
Continuation Sheet
ALL
PARTIES
28
Januar
y 2016
KHI
28
Januar
y 2016
KHI
28
Januar
y 2016
KHI
26
Januar
y 2016
INFO
PQT Report for Asphalt Enamel (AE) Coated Pipe have status
as follows:
4.
6.
KHI will revise Daily Progress for AEC and CWC Production to
become more informative including repair rate and rejection
rate based on meter square.
Note: KHI manufacturing repair or rejection rate KPI to be
provided.
7.
Minute of Meeting
8.
Page No.
4 of 4
Continuation Sheet
KHI
28
Januar
y 2016
ALL
PARTIES
KHI shall move all the above material to proper storage area.
9.
Attachment :
1. Attendance List
2. Production schedule Rev. 4