- Objectives:
o To assess appropriate techniques for designing and implementing information
systems
o To assess appropriate controls for managing the risks inherent in information
systems development projects
- Learning outcomes:
o Identify the typical stages in an information systems project
o Identify the risks associated with typical phases of a project
o Understand approaches used by project managers to control projects
o Develop DFD, ERD and UML diagrams to design the information system
o Design and program small problems in Visual Basic
Management issues
1
Managing Systems Development
An Unsustainable Situation
- On one hand …
o People build information systems using no particular method
o People build fragile information systems
o People build inaccurate information systems
o Information system development is expensive
o Information system development requires considerable planning and effort
2
- On the other hand …
o Modern information systems are ever-increasing in sophistication
o Demands on information systems is always rising
o Information systems are what make a computing entity
o People consciously or unconsciously rely on software and information systems
for most of their social activities
- The tension created by the conflicting interests gave rise to a software crisis
peaking in the late 70s / early 80s
- The software crisis threatened to cripple the progress of computing as a whole
- Effects of the crisis still linger in the form of software development always playing
“catch-up” to hardware development
Success measures
A KPMG (2002) survey showed that the most important measures of success were:
o Meeting business case requirements (46%)
o On-time delivery (21%)
o Within budget delivery (9%)
o Equal weighting to all thee measures (24%)
3
o Define how an information system will be used within the business through
detailed specification of the features
o The communication problem!
- Control of changes in requirements
o Requirements creep: incremental changes to the specifications of an
information system project during implementation
- Integration risk
o Potential project overruns caused by additional work involved with integrating
the output form separate activities
- Unsystematic approaches:
o Focus was on finding the solution for the users’ problems
o Peter Drucker (management consultant): “efficiency is doing the job right, and
effectiveness is doing the right job”
o We need ways to investigate and understand our users’ business and the
problems they are having so that we can produce the right solution for the
right problem
4
Feasibility
study
Maintenance Analysis
Installation Design
Programming
- Applicability
o When the requirements are well-understood and changes will be fairly limited
during the design process
5
- Although it is still the root of many other models, it has many drawbacks:
o Each phase has to be completed before moving to the next one
→ Delay before system delivered
o All or nothing
- Sequential dependencies create delays forcing others to wait
o It assumes that the only role for users is in specifying requirements, and that
all requirements can be specified in advance
o Unfortunately, requirements grow and change throughout the process
and beyond, calling for considerable feedback and iterative consultation
- Disadvantages (Cont’d)
o Late tangible product maturity
o Late feedback
To both customer and developer
o Minimal risk management
For both customer and developer
o Late testing maturity
6
o Development risk management
o Sequential nature (still present in sub-systems)
Systems Development
- You are likely, in your future career, to find yourself involved in systems
development
o As an employee whose job is being re-organised, or
o As part of a team (as business analyst, …) involved in developing a new
system, or
o Adapting an existing system, or
o With responsibility for specifying requirements for a new system
7
Managing Systems Development
- Software crisis
o Costly mistakes in the development of large systems
o Problems with maintenance of existing systems
o Developments in hardware
o Users / clients calling for
o More more more
o Better software
o Cheaper software
o “We want it yesterday!”
8
Systems Development Life Cycle
Feasibility
study
Maintenance Analysis
Installation Design
Programming
- It aims are to evaluate whether the project is feasible and prepare a project plan
- Includes answers to following questions:
o What is to be carried out?
o Why is it being done?
o Who is going to do it?
o How is it to be accomplished?
o High level plan for the whole project
o When is it to be done?
Feasibility analysis
Feasibility type Purpose Issues considered
Economic Costs of benefits of Cost-benefit analysis
different solutions
Technical Outline the best technical Make or buy decision
solution Produce shortlist of software,
suppliers and systems integrators
Integration with existing systems
Operational Determine impact on Assess how well processes are
business processes supported by new system. Identify
outline requirements
Organizational Assess fit with Outline approach for introducing
organizational structure new system into organization
and culture
9
o Business objectives (e.g to increase our market with 25%)
o Project objectives:
Narrower
Specify exactly what the project is to deliver
E.g to implement an e-commerce trading system
o Scope
o What is included
o What is not included
o Constraints
o Hardware and software platform
o Time
o Resources
- Typical problems
o Insufficient time is devoted to it
o Team members are keen to proceed the work
o Insufficient gathering of requirements
o The activities, budget and timescal are underestimated
o Organizational, operational and technical risks may not be identified
Key activities:
o Focus groups
o Document review
o Surveys
o Observation
o Interviews
o Prototyping
o Producing the requirements specification
10
Systems design phase
- Systems design
o Defines the overall structure of the system and its inputs and outputs
- Systems design phase
o Defines how the completed system will operate
- Output – Design specification
- At the systems development stage the physical system is created by technical staff
through programming, database management and configuration
11
Activities:
1. Programming individual system modules and fixing errors or ‘bugs’ in the
system
2. Creating the database structures and data manipulation functions such as
database triggers and stored procedures
3. Creating the user interface for access through web browsers
4. Testing the database, programmes and interface
5. Writing system documentation for the users and future developers
Problems:
o The main difficulty with the development phase is the introduction of bugs or
errors into the system by developers. The problem is that developing a major
system requires tens or hundreds or millions of lines of code. Each line
represents an opportunity to include an error which can potentially ‘bring the
system down’. Even experienced programmers may produce around 10
defects per thousand lines of code
o Changes to specification is also a major issue
Systems implementation
- Systems implementation involves introducing the system into the business. This
starts with providing test versions of the system and then once test results are
satisfactory rolling out the changeover from the old system to the new system
- Migration or changeover from a previous information system to a new system is
particularly important for mission-critical e-business systems where errors in
management of changeover will result in a negative customer experience or
disruption to the supply chain
Activities:
o Changeover
o Migrating the system
o Data migration
o Data conversion (‘populating the database’)
o Testing
Options:
Option Main advantages Main disadvantages
1. Immediate cutover Rapid, lowest cost High risk. Major disruption
Straight form old to new if serious errors with
system on a single date system
2. Parallel running Lower risk than Slower and higher cost
Old and new system run side- immediate cutover than immediate cutover
by-side for a period
3. Phased implementation Good compromise Difficult to achieve
Different modules of the between methods 1 technically due to
system are introduced and 2 interdependencies
sequentially between modules
4. Pilot system Essential for Has to be used in
Trial implementation occurs multinational or combination with the other
12
before widespread deployment national rollouts methods
Problems:
o They are many cases of systems failing at the changeover phase (see for
example case study 7.2)
o Failure at this stage may be due to unexpected problems when the system
goes live which were not tested in the test environment. For example, the load
on a live system could be higher than that in the test environment. A further
problem is that there is a reluctance to delay the live date despite the system
not being fully tested
System maintenance
- Systems maintenance involves managing the system once it is live. Problems with
the system must be fixed. Since there is also time to reflect on the project overall,
some organizations will look to learn from their experiences on the project through a
project closedown review
Activities:
o A key activity is responding to errors as they are found. If serious, the
problems will have to be solved immediately through issuing a ‘patch’ release
to the system; otherwise they will be recorded for a later release. A system is
required for promptly reporting and reviewing errors
o A formal review may occur after the end of projects, this is the post-
implementation review. This assesses the success of the systems
development projects and lessons are recorded for further projects
Problems:
o Problems with the maintenance phase tend to be a consequence of
maintenance not being part of the overall project, so processes for reporting,
reviewing, fixing and notifying problems may not be in place
o A project closedown review is often omitted in organizations that do not have a
project quality management system in place since it all too easy to move on to
the next project and put problems with the project ‘under the carpet’
- Initiation
o Education to explain the purpose of the intranet and the importance of
updating is particularly important. Care must taken in calculating the return on
investment with information-based projects
- Analysis and design
o Specialist methods of mapping the information requirements are used as
described in chapter 9 on information architectures
- Development
o The design phase is relatively limited compared to most bespoke applications
since a content management system, existing CRM application or e-
commerce server will be used to setup structures for data storage.
Development of the web-based user interface needs specific skills which differ
13
somewhat from non web-based applications. These issues are also covered in
chapter 9
- Implementation
o A lot of work will be required to populate the system with information. Since
much of the information will already be available, methods of integrating with
other systems such as exporting the information from other systems and then
importing this information may be necessary
- Maintenance
o The maintenance phase is particularly important in these types of projects
since content needs to be kept up-to-date. Responsibilities and update
mechanisms for this are required. The usage of different information types in
web-based systems can be readily tracked and evaluated to check the
relevance of information. Controls need to be in place to maintain the quality
of information and these controls are referred to in chapter 10 which is
devoted to managing information quality
- Models are often built in the context of business and IT systems in order to better
understand existing or future systems. However, a model never fully corresponds to
reality. Modeling always means emphasizing and omitting:
o Emphasizing essential details
o Omitting irrelevant ones
- But what is essential and what is irrelevant? There is no universal answer to this
question. Rather, the answer depends on what the goals of the model are and who is
viewing or reading it
- The more information a model is supposed to give, the more complex and difficult it
becomes
o A map of Europe, for example, that simultaneously contains political,
geographical, demographic, and transportation-related information is hardly
legible. The solution to this problem is to convey the different types of
information on individual maps
- Different views are formed of the objects under consideration. These views are
interconnected in many ways. Generally, if one view is changed, all other views have
to be adjusted as well. If, for instance, in the Netherlands new land is reclaimed from
the North Sea, all views – meaning all maps – have to be updated
14
If we change the object, we have to change each view
- Methodology:
o An organized, documented set of procedures and guidelines for one or more
phases of the software life cycle, such as analysis or design
o Many methodologies include
o A diagramming notation for documenting the results of the procedure
o A step-by-step “cookbook” approach for carrying out the procedure
o An objective (ideally quantified) set of criteria for determining whether
the results of the procedures are of acceptable quality
- A model
o Is a representation
15
o Captures the important aspects of the thing being modelled from a certain
point of view and simplifies or omits all the rest
- A model of a software system is made in a modeling language
- A model has both semantics and notation
Source or
destination Information flow
- Information flows are single headed arrows. Unlabeled arrows are meaningless
16
Customer Sales
department
Product order
Product order
Customer Sales
department
Order confirmation
Customer Sales
department
Product order en
Order confirmation
- Model information, not paper
Dispatch Accounting
department
Products dispatched
Dispatch Accounting
department
Dispatch notes
- Paper reports can carry several different pieces of information, wowing the name of
the report doesn’t tell us what information is actually needed by the destination entity
- Modeling the flow on paper
Dispatch Accounting
department
Products dispatched
Dispatch
notes