LINE CONSTRUCTION
Check format
9) All Nuts / Bolts, flat / Spring washers are provided as per approved drawings
10) All horizental Bolt heads are facing inside and vertical Bolt head facing up
11) Subsequent section are erected only after complete erection and
18) Slipping / Running over Nut / Bolts are replaced by new ones.
19) Threaded portion of bolts projected outside of nut is not less than 3 MM
20) Punching of threads projected outside is done at three positions on dia.
21) All left over holes are filled with correct size of Bolt / Nut
22) Vertically of Tower is checked with help of theodolite for both longitudinal &
transverse direction. This is with in specified limits.
23) Details of Missing member, nut , bolts etc.
CONSTRUCTION
ck format
Loc . No _________________
Tower Type________________
RESULT
14 days as per
Yes/No
Yes/No
site without
Yes/No
Yes/No
Yes/No
Yes/No
diagonals
Yes/No
wing and
Yes/No
Yes/No
Yes/No
Yes/No
OBSERVATION
Yes/No
ng erection observed.
Yes/No
of threads noticed.
Yes/No
s, member nos.
aneously.
Yes/No
Yes/No
Yes/No
d by new ones.
Yes/No
Yes/No
Yes/No
Bolt / Nut
Yes/No
Yes/No
Yes/No