Anda di halaman 1dari 5

Balance work completion plan for TG unit-1 (26.03.

2016)
S. NO.

Description of Activities

AA

Emergency DM pumps

1
2
3
4
5
6
7
8
9
10
11
12
13
BB
1
2
3
4
5
6
7
8
9
10
CC
1
2
3
4
5
6
7
DD
1

Grouting EDM pump-B


Alignmnet and coupling of EDM Pump-B
Trial of EDM Pump-B
Installation of EDM Pump-A motor
Frame positioning and centering
Cabling of motor
Motor trial
Grouting EDM pump-A
Cabling of motor
Motor trial
Alignmnet and coupling of EDM Pump-A
Replacement of bearings of EDM Pump-A
Trial of EDM Pump-A
SG DMCW Pump house hoist
Erection of SG DMCW hoist/crane in all respect
Installation DSL and interconnection cabling
JBs installation for power cabling of SG DMCW
Installation of pendant
Power cabling work of SG DMCW hoist
Trial of SG DMCW pumps hoist
Load test of SGDMCW hoist
Mechanical seal replacement of SG DMCW -A and its trial
Trial of RAPH pump after gland hose replacement
Hinge assembly of strainer for easily opening/closing of cover
Heaters , flash tanks ,GSC and drain cooler
LP heater- 3 instrument mounting related work
All heaters safety valve flange bolts tightning after putting gaskets
Attending flange leakages of all heaters stand pipe
Charging of all heatres from both sides (steam and water)
Level gauges installation of flash tanks
Level gauges installation of GSC
Installation of balance intruments points of drain cooler
Butterfly valves hoist
Erection of BFVs hoist/crane in all respect

Responsible
Agency

UB electrical
UB electrical
UB electrical
UB electrical

UB electrical

Start Date

Completion
date

Remarks

S. NO.
2
3
4
5
6
7
8
EE
1
2
3
4
5
6
7
FF
1
2
3
4
5
6
7
8
GG
1
2
3
4
5
6
7
8
9
10
11

Description of Activities
Installation DSL and interconnection cabling
JBs installation for power cabling of BFVs
Installation of pendant
Power cabling work of BFVs hoist
Trial of BFVs pumps hoist
Load test of BFVs hoist
Butterfly valve actuators inlet cable termination and commissioning
TG DMCW Pump house hoist
Erection of TG DMCW hoist/crane in all respect
Installation DSL and interconnection cabling
JBs installation for power cabling of TG DMCW
Installation of pendant
Power cabling work of TG DMCW hoist
Trial of TG DMCW pumps hoist
Load test of DMCW hoist
ACW Pump house hoist
Erection of ACW hoist/crane in all respect
Installation DSL and interconnection cabling
JBs installation for power cabling of ACW
Installation of pendant
Power cabling work of ACW hoist
Trial of ACW pumps hoist
Load test of ACW hoist
Trial of ACW Pump-A
BFPs
Coupling guard of booster pumps- A, B &C
Coupling guard of feed pumps- A, B &C
Coupling guard of hydraulic pumps -A,B&C
Termination of casing drain line upto nearest drain pit
Insulation of feed pumps -A,B&C
Insulation of turbine lube oil coolers
Supports of BFP-A lube oil line
Lube oil piping slope of BFP-B&C
Attending leakages of union joints of all Feed and booster pumps
Re-checking of coupling bolts for tightneing
Replacement of jammed/inoperative valves of cooling water line

Responsible
Agency

Start Date

Completion
date

Remarks

UB electrical

outlet valve actuator issue

S. NO.
12
HH
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
II
1
2
3

Description of Activities
Oil drum shifting and area cleaning
Painting of equipments
Painting of exciter , generator and DFT checking
Painting of LP turbine outer covers, girders left & right
Painting of all pedestals cover 1,2,3&4
Equipments nomenclature as per requirement
Lube oil piping , seal oil and jacking oil pipes painting
Surface cleaning of all servomotors and removal of oil
Painting of all servo motors
Letter writing and arrow marking of all servo motors pipes
Letter writing and arrow marking of various system piping
Removal of all temporary supports with condenser
Removal spillage oil from condsener water boxes and surface preparation
Painting of condenser and water boxes
Cleaning of RE joints outer surfaces for painting
Spray painting of RE joints inlet and outlet pipe lines
Letter writing and arrow marking of RE joints inlet & outlet piping
Surface laening of all 3 nos BFPs motors for painting
Painting and letter writing of BFPs motors
Surface cleaning of MOT for painting
Painting and letter writing of MOT
MOT area claening and returing of excess oil drums
Surface cleaning of CEPS and strainer for painting
Painting work of CEPs and strainers
Surface cleaning of vacuum pumps and motors
Painting work of vacuum pumps and motors
Surface cleaning and Painting of BFVs and actuators
Surface cleanimg and painting of gas unit, co2 vaporisers and racks
Arrow marking and nomenclature of gas piping
Surface cleaning and painting of GSCs
Surface cleaning and painting of vapour exhauster fans of seal oil
Painting of seal oil and skid piping
Arrow marking and nomenclature of seal oil piping
Turbine and Auxs.
Strenthening of oil piping support in MOT
Replacement of emergency shut-off valve multiple gaskets
Stirrer asslembly of LP and HP dosing skids

Responsible
Agency

Start Date

Completion
date

Remarks

S. NO.
4
5
6
7
8

Description of Activities

Start Date

Completion
date

Remarks

Installation casing expansion of turbine


Area cleaning of 15.0M etc
Installation of missing valves handle
Installation of generator drier
Commissioning of H2 drier

10
11
12
13
14
15
16
17
18
19
20
21
22

Submission of all pending protocols of turbine , generator , exciter, condenser,


pumps etc
Submission of integral pipe line history sheets
Radiography and line diagram of integral piping system
Installation of deaerator motorised valve
Butterfly valves actuator cabling and commissioning
Condenser pit dewatering as customer handed over the pump
COLTS system commissioning
COLTS SYSTEM GAUGES mounting
COLTS panel grouting
Oil level indicator installation
Pipe line completion of lube oil transfer pumps EL 0.0 M
Control oil piping support strenthing at IVCVs
Seal steam system control valve approach platform
Generator H2 cooler header approach platform

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

Generator and exciter coolers drain and vents termination upto EL 0.0 M upto drain
pit
Reconsiliation of material
Vacuum pumps gauges mounting
Top-up of servo 320 in all dosing pumps
Intallation of orifces in control oil piping NRVs
Installation of isolation valves of Gov filter drain
Removal of sheeting from deaerator vent valves
Installtion of mechanical seals in all pumps
Finalization of JOP filter drain line
Centrifuge suction breather box commissioning
Exciter balance grouting work
Seal oil exhauster fan coupling
Completion of MOT top hand rail
H2 cooler header 8 NB valves installation
MOT tank mounted exhauster fan inlet line U-loop drain connection
Light fittings inside exciter cover

Responsible
Agency

UB electrical
after piping completion

S. NO.
39
40
41

Description of Activities
Filling of N2 in accumulator
Servicing of vacuum tank float valve
Seal oil skid cleaning

Responsible
Agency

Start Date

Completion
date

Remarks