2016)
S. NO.
Description of Activities
AA
Emergency DM pumps
1
2
3
4
5
6
7
8
9
10
11
12
13
BB
1
2
3
4
5
6
7
8
9
10
CC
1
2
3
4
5
6
7
DD
1
Responsible
Agency
UB electrical
UB electrical
UB electrical
UB electrical
UB electrical
Start Date
Completion
date
Remarks
S. NO.
2
3
4
5
6
7
8
EE
1
2
3
4
5
6
7
FF
1
2
3
4
5
6
7
8
GG
1
2
3
4
5
6
7
8
9
10
11
Description of Activities
Installation DSL and interconnection cabling
JBs installation for power cabling of BFVs
Installation of pendant
Power cabling work of BFVs hoist
Trial of BFVs pumps hoist
Load test of BFVs hoist
Butterfly valve actuators inlet cable termination and commissioning
TG DMCW Pump house hoist
Erection of TG DMCW hoist/crane in all respect
Installation DSL and interconnection cabling
JBs installation for power cabling of TG DMCW
Installation of pendant
Power cabling work of TG DMCW hoist
Trial of TG DMCW pumps hoist
Load test of DMCW hoist
ACW Pump house hoist
Erection of ACW hoist/crane in all respect
Installation DSL and interconnection cabling
JBs installation for power cabling of ACW
Installation of pendant
Power cabling work of ACW hoist
Trial of ACW pumps hoist
Load test of ACW hoist
Trial of ACW Pump-A
BFPs
Coupling guard of booster pumps- A, B &C
Coupling guard of feed pumps- A, B &C
Coupling guard of hydraulic pumps -A,B&C
Termination of casing drain line upto nearest drain pit
Insulation of feed pumps -A,B&C
Insulation of turbine lube oil coolers
Supports of BFP-A lube oil line
Lube oil piping slope of BFP-B&C
Attending leakages of union joints of all Feed and booster pumps
Re-checking of coupling bolts for tightneing
Replacement of jammed/inoperative valves of cooling water line
Responsible
Agency
Start Date
Completion
date
Remarks
UB electrical
S. NO.
12
HH
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
II
1
2
3
Description of Activities
Oil drum shifting and area cleaning
Painting of equipments
Painting of exciter , generator and DFT checking
Painting of LP turbine outer covers, girders left & right
Painting of all pedestals cover 1,2,3&4
Equipments nomenclature as per requirement
Lube oil piping , seal oil and jacking oil pipes painting
Surface cleaning of all servomotors and removal of oil
Painting of all servo motors
Letter writing and arrow marking of all servo motors pipes
Letter writing and arrow marking of various system piping
Removal of all temporary supports with condenser
Removal spillage oil from condsener water boxes and surface preparation
Painting of condenser and water boxes
Cleaning of RE joints outer surfaces for painting
Spray painting of RE joints inlet and outlet pipe lines
Letter writing and arrow marking of RE joints inlet & outlet piping
Surface laening of all 3 nos BFPs motors for painting
Painting and letter writing of BFPs motors
Surface cleaning of MOT for painting
Painting and letter writing of MOT
MOT area claening and returing of excess oil drums
Surface cleaning of CEPS and strainer for painting
Painting work of CEPs and strainers
Surface cleaning of vacuum pumps and motors
Painting work of vacuum pumps and motors
Surface cleaning and Painting of BFVs and actuators
Surface cleanimg and painting of gas unit, co2 vaporisers and racks
Arrow marking and nomenclature of gas piping
Surface cleaning and painting of GSCs
Surface cleaning and painting of vapour exhauster fans of seal oil
Painting of seal oil and skid piping
Arrow marking and nomenclature of seal oil piping
Turbine and Auxs.
Strenthening of oil piping support in MOT
Replacement of emergency shut-off valve multiple gaskets
Stirrer asslembly of LP and HP dosing skids
Responsible
Agency
Start Date
Completion
date
Remarks
S. NO.
4
5
6
7
8
Description of Activities
Start Date
Completion
date
Remarks
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Generator and exciter coolers drain and vents termination upto EL 0.0 M upto drain
pit
Reconsiliation of material
Vacuum pumps gauges mounting
Top-up of servo 320 in all dosing pumps
Intallation of orifces in control oil piping NRVs
Installation of isolation valves of Gov filter drain
Removal of sheeting from deaerator vent valves
Installtion of mechanical seals in all pumps
Finalization of JOP filter drain line
Centrifuge suction breather box commissioning
Exciter balance grouting work
Seal oil exhauster fan coupling
Completion of MOT top hand rail
H2 cooler header 8 NB valves installation
MOT tank mounted exhauster fan inlet line U-loop drain connection
Light fittings inside exciter cover
Responsible
Agency
UB electrical
after piping completion
S. NO.
39
40
41
Description of Activities
Filling of N2 in accumulator
Servicing of vacuum tank float valve
Seal oil skid cleaning
Responsible
Agency
Start Date
Completion
date
Remarks