Doc No:TIJ-CP-02
Rev:
02
Date: 23rd May,
2012
Page: 1 of 5
METHOD STATEMENT
FOR PREPRATION OF
CEMENT PLASTER
23rd May
03
approval
2012
01
9th May
2012
00
7th May
2012
Rev
No
DATE
Ab.Maje
ed
Ab.Maje
ed
Ab.Maje
ed
Prepared
By
TITTLE
METHOD OF STATEMENT FOR
CEMENT PLASTER
Checked
By
Approv
als
Doc No:TIJ-CP-02
Rev:
02
Date: 23rd May,
2012
Page: 1 of 5
Table of Contents
1. OBJECTIVE.......................................................................................................... 3
2. SCOPE................................................................................................................. 3
3. REFERECNES...................................................................................................... 3
4. ABBREVATIONS.................................................................................................. 3
5. RESPONSIBILITIES............................................................................................ 3
6. EQUIPMENT........................................................................................................ 4
7. PROCEDURE....................................................................................................... 4
8. MATERIAL........................................................................................................... 5
9. SAFETY EQUIPMENT........................................................................................ 5
10. SAFETY CHECKS............................................................................................ 5
11. MANPOWER.................................................................................................... 5
TITTLE
METHOD STATEMENT FOR
CEMENT PLASTER
Doc No:TIJ-CP-02
Rev:
02
Date: 23rd May,
2012
Page: 1 of 5
1. OBJECTIVE
1.1-
2. SCOPE
2.1
This method of statement covers inspection and quality
monitoring of construction activities for houses based on approved
engineering principles.
3. REFERECNES
3.1
3.2
3.3
4. ABBREVATIONS
4.1
4.2
4.3
4.4
PM
QA & QC
HSE
RFI
Project Manager
Quality Assurance & Quality Control
Health Safety & Environment.
Request for Inspection
5. RESPONSIBILITIES
5.1
Project Manager is responsible for ensuring, that the
construction activities
for the building are conducted according to this method of
statement, latest
approved construction drawings & project specification
will be followed in
true later in sprit.
5.2
Construction Manager is responsible for the implementation
METHOD STATEMENT FOR
CONSTRUCTION OF REMAINING WORKS ALMA-1
TOWNHOUSES
(58UNITS)
of method of
Statement
TITTLE
METHOD STATEMENT FOR
CEMENT PLASTER
Doc No:TIJ-CP-02
Rev:
02
Date: 23rd May,
2012
Page: 1 of 5
6. EQUIPMENT
6.1
6.2
6.3
6.4
6.5
6.6
6.7
Hand shovel
Hand Level
Wooden & steel trowel
Wire Brush
Mortar Pain
Plumb Bob
Straight edge
7. PROCEDURE
7.1
7.2
TITTLE
METHOD STATEMENT FOR
CEMENT PLASTER
Doc No:TIJ-CP-02
Rev:
02
Date: 23rd May,
2012
Page: 1 of 5
8. Material
8.1
8.2
8.3
9. Safety Equipment
9.1
9.2
9.3
9.4
9.5
9.6
10.
Safety helmet
Safety shoes
Gloves
Safety Glasses
Dust Mask
Ear Plugs
Safety Checks
10.1
Safety Engineer will make ensure that working area is safe
and accordance
with project site regulations
11.
11.1
11.2
11.3
11.4
11.5
11.6
MANPOWER
Site Engineer
QC Engineer
Supervisor
Foreman
Mason