Anda di halaman 1dari 8

TITTLE

METHOD STATEMENT FOR


CEMENT PLASTER

Doc No:TIJ-CP-02
Rev:
02
Date: 23rd May,
2012
Page: 1 of 5

CANYON VIEWS DEVELOPMENTS


DEFENCE HOUSING AUTHORITIES PHASE II (EXT)
ISLAMABAD, PAKISTAN

METHOD STATEMENT
FOR PREPRATION OF
CEMENT PLASTER

For the initial issue &

23rd May

METHOD STATEMENT FOR


CONSTRUCTION OF REMAINING WORKS ALMA-1
TOWNHOUSES
(58UNITS)

03

approval

2012

01

For the initial issue &


approval

9th May
2012

00

For the initial issue &


approval

7th May
2012

Rev
No

Details For Revision

DATE

Ab.Maje
ed
Ab.Maje
ed
Ab.Maje
ed
Prepared
By

TITTLE
METHOD OF STATEMENT FOR
CEMENT PLASTER

Checked
By

Approv
als

Doc No:TIJ-CP-02
Rev:
02
Date: 23rd May,
2012
Page: 1 of 5

METHOD STATEMENT FOR


CONSTRUCTION OF REMAINING WORKS ALMA-1
TOWNHOUSES
(58UNITS)

Table of Contents
1. OBJECTIVE.......................................................................................................... 3
2. SCOPE................................................................................................................. 3
3. REFERECNES...................................................................................................... 3
4. ABBREVATIONS.................................................................................................. 3
5. RESPONSIBILITIES............................................................................................ 3
6. EQUIPMENT........................................................................................................ 4
7. PROCEDURE....................................................................................................... 4
8. MATERIAL........................................................................................................... 5
9. SAFETY EQUIPMENT........................................................................................ 5
10. SAFETY CHECKS............................................................................................ 5
11. MANPOWER.................................................................................................... 5

TITTLE
METHOD STATEMENT FOR
CEMENT PLASTER

Doc No:TIJ-CP-02
Rev:
02
Date: 23rd May,
2012
Page: 1 of 5

METHOD STATEMENT FOR


CONSTRUCTION OF REMAINING WORKS ALMA-1
TOWNHOUSES
(58UNITS)

1. OBJECTIVE
1.1-

The main objective of this method of statement is to provide


guidance for the execution of construction of houses.

2. SCOPE
2.1
This method of statement covers inspection and quality
monitoring of construction activities for houses based on approved
engineering principles.

3. REFERECNES
3.1
3.2
3.3

Project Specifications Refer. Page # 80


Cement
Recommended Manufacturer
Sand
Recommended Source.

4. ABBREVATIONS
4.1
4.2
4.3
4.4

PM
QA & QC
HSE
RFI

Project Manager
Quality Assurance & Quality Control
Health Safety & Environment.
Request for Inspection

5. RESPONSIBILITIES
5.1
Project Manager is responsible for ensuring, that the
construction activities
for the building are conducted according to this method of
statement, latest
approved construction drawings & project specification
will be followed in
true later in sprit.
5.2
Construction Manager is responsible for the implementation
METHOD STATEMENT FOR
CONSTRUCTION OF REMAINING WORKS ALMA-1
TOWNHOUSES
(58UNITS)

of method of
Statement

TITTLE
METHOD STATEMENT FOR
CEMENT PLASTER

Doc No:TIJ-CP-02
Rev:
02
Date: 23rd May,
2012

METHOD STATEMENT FOR


CONSTRUCTION OF REMAINING WORKS ALMA-1
TOWNHOUSES
(58UNITS)

Page: 1 of 5

6. EQUIPMENT
6.1
6.2
6.3
6.4

6.5
6.6
6.7

Hand shovel
Hand Level
Wooden & steel trowel
Wire Brush
Mortar Pain
Plumb Bob
Straight edge

7. PROCEDURE
7.1
7.2

Layout & surface preparation.

Request for surface preparation for ceiling & walls.


7.3After Check out of all electric conduits, back boxes, drain pipes, sanitary
pipes,
doors, windows & ventilators and signed by contractor, MEP
Engineer.
7.4Walls shall be kept damp before applying plaster.
7.5The minimum thickness of the plaster shall be -3/4 i.e. with 1:5
7.6Cutting of concrete if required. It shall be Witness by Engineer
7.7Chipping of concrete surfaces. It shall be Witness by Engineer
7.8Fixing of wire mesh on block masonry and concrete joint or different materials
as
desired/required.
7.9Layout & marking for plaster thickness
7.10
Quality of mixing will be ensured before carryout.
7.11
Material shall be made in such way that it shouldnt last more than
30 minutes.
7.12
Curing of cement plaster for 10 days.
7.13
Activities shall be executed after approval of Engineer.
7.14
Engineer will be requested to visit and approve the quality of
plaster carried out.

METHOD STATEMENT FOR


CONSTRUCTION OF REMAINING WORKS ALMA-1
TOWNHOUSES
(58UNITS)

TITTLE
METHOD STATEMENT FOR
CEMENT PLASTER

Doc No:TIJ-CP-02
Rev:
02
Date: 23rd May,
2012
Page: 1 of 5

METHOD STATEMENT FOR


CONSTRUCTION OF REMAINING WORKS ALMA-1
TOWNHOUSES
(58UNITS)

8. Material
8.1
8.2
8.3

Ordinary Portland Cement approved by Engineer


Sand approved by Engineer
Water approved by Engineer

9. Safety Equipment
9.1
9.2
9.3
9.4
9.5
9.6

10.

Safety helmet
Safety shoes
Gloves
Safety Glasses
Dust Mask
Ear Plugs

Safety Checks

10.1
Safety Engineer will make ensure that working area is safe
and accordance
with project site regulations

11.
11.1
11.2

11.3
11.4
11.5
11.6

MANPOWER
Site Engineer
QC Engineer
Supervisor
Foreman
Mason
Labor

METHOD STATEMENT FOR


CONSTRUCTION OF REMAINING WORKS ALMA-1
TOWNHOUSES
(58UNITS)

Anda mungkin juga menyukai