Anda di halaman 1dari 15

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

UNIT

NPPL/KVK/MEIL/TPSC SPEC.

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

SCOPE

General

MECHANICAL

Design, engineering, manufacture, inspection and testing


at VENDORs and/or his SUB-VENDORs works, packing,
transportation to site, transit insurance from place of
Considered, but storage insurance Considered, but storage insurance is in Considered, but storage insurance is in
manufacture to site, unloading and storing at site, storage is in purchaser's scope
purchaser's scope
purchaser's scope
insurance, erection, testing, start-up, commissioning &
performance testing at site for fuel oil handling system

Unloading & forwarding system, complete with flexible


hoses (3 nos, 2 working simultaneously and one spare),
unloading & forwarding pumps, piping, fittings, strainers &
valves and all necessary accessories for completeness of
y
the system.

Considered

Considered

Considered

Two nos. 2 (1W+1S) of LDO Unloading pumps each of


capacity 25 cu.m/hr complete with motors, accessories and Considered
foundation bolts

Considered

Considered

Three nos. 3 (1W+1S+1(phase-2) of LDO forwarding


pumps each of capacity 23 cu.m/hr, complete with motors, Considered
and foundation bolts.

Considered

Considered

Design, supply, erection, testing and commissioning of


One no. (1) 250 cum fixed roof tank suitable for storing
LDO as per the LDO properties, complete with all
accessories such as associated nozzles, piping, fittings,
valves, vents, manholes, stairways, instruments, safety
sytems etc. as per the design code IS 803 / API 650

Considered

Considered

Considered

One no. MS drain oil tank of suitable capacity, complete


with piping, nozzles, drain oil pumps and accessories

Considered

Considered

Considered

One no. vertical type drain oil pump of suitable capacity to


Return line to LDO tank
Return line to LDO tank considered by
be installed on Drain Oil Tank.
considered by bidder.Single screw bidder.Single screw vertical pump
Drain oil tank capacity and pump capacity shall be
vertical pump considered
considered
mentioned in the technical bid by the bidder.

1 of 15

considered

Remarks

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

UNIT

NPPL/KVK/MEIL/TPSC SPEC.

Design and general arrangement of LDO pump and


discharge piping up to tank, complete with piping, fittings
and valves on pipe sleepers.

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

Pipe sleeper:
RCC pipe sleeper construction is
not in bidder scope, but during
detail engg, based on the bidder's
routing the load data has to be
given by bidder.

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

Remarks

Pipe sleeper:
RCC pipe sleeper construction is not in
bidder scope, but during detail engg,
based on the bidde's routing the load
data has to be given by bidder
Design of pipe sleepers are considered but scope
of cable tray not confirmed by bidder.

Cable Trays:
Cable Trays:
Bidder scope, price to be submitted
Bidder scope, price to be submitted
accordingly.
accordingly.
Will be furnished by XICON during
detail engineering. No civil details
will be shown by us on drawings
since civil design is not in Xicon
Development of drawings will be
p .Only
y dyke
y wall ,,Sleeper
p
Scope
during
detail
provided
id d d
i d
t il engineering
i
i
/Racks & Oily water collection
sump dimansions will be shown .
Civil Loads for tank foundation will
be provided by Xicon,

Development of optimized layout for complete Fuel Oil


system comprising of truck unloading, unloading Pump
p
g LDO Unloading
gp
p ,p
p g,
pumps,
piping,
house incorporating
Forwarding pumps, piping, Drain Oil Tank with pump with
inlet and outlet piping, etc.

Will be furnished during detail


engineering. No civil details will be
Layout Tank farm area, complete with general
shown by us on drawings since
arrangement drawings clearly indicating dimensions,
civil design is not in Xicon Scope
capacities and details of all associated civil works such as
.Only dyke wall ,Sleeper /Racks & Considered
paving, grading, tank foundations, dyke walls, barbed wire
Oily water collection sump
fences, water collection sumps, sleepers/racks for piping
dimansions will be shown . Civil
etc.
Loads for tank foundation will be
provided by Xicon

10

Crane and hoist in Pump house

11

Local NOC for CCOE approval


shall be provided by client.
All Local statutary approval
Getting approval from Chief Controller of Explosives (CCE)
required for whole plant defer from Confirmed
and Indian Boiler Regulations (IBR )
state to state. We do not have any
specific list since it is always in
client's scope.

Considered

12

Process and instrumentation diagrams, General


arrangement diagrams, clearly covering all systems, piping Considered
& cabling layouts.

Bidder has replied,"Not specifically clear in the


proposal"
proposal

XICON have considered 2 T


capacity

Thermosystems have considered 2 T


capacity

Considered

2 of 15

considered

Considered

5 T considered

Drain sunp location to be


finalised
by NPPL
fi
li d b

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

13

14

UNIT

NPPL/KVK/MEIL/TPSC SPEC.

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

Special equipments and tools required for erection as


required

Bidder has mentioned that "no


special tools and tackles are
required"

In schedule-13,bidder has
mentioned"Not applicable,as there are Bidder has replied"Schedule/list/information are
no special tools and tackles required for not available"
the system"

Regarding piping scope

Drain oil pipe line from boiler area


to drain oil tank is not considered
by bidder. Return line to LDO tank
considered by bidder.

Drain oil pipe line from boiler area to


drain oil tank is not considered by
bidder. Return line to LDO tank
considered by bidder.

to be confirmed

ELECTRICAL

MCC will be provided by Purchaser.


One (1) Fuel oil Area switchgear/ MCC shall be supplied by
Bidder confirm to delete MCC panel in
Bidder has provided the load list for
bidder as per system distribution requirement and
revised offer. Electrical load list will be
Purchaser to design switchgear
specified power feeders.
submitted along with revised offer.

Bidder replied"All electrical including supply and


site work are excluded"

Two (2) no 415 V, 3ph, 4W power supply feeders through


power cables with cable termination shall be provided by
purchaser to bidder supplied fuel oil switchgear/MCC.

MCC will be provided by Purchaser. Noted and confirm. Electrical load list
Bidder has provided the load list for will be submitted along with revised
Purchaser to design switchgear
offer.

Bidder replied"All electrical including supply and


site work are excluded"

Bidder shall consider the additional power feeders for


purchaser use, i.e. Four (4) no.s of 63A MCCB feeders &
Five (5) no.s of 32A MCCB feeders

MCC will be provided by Purchaser.


Noted and confirm. Electrical load list
Bidder has provided the load list for
will be submitted along with revised
Purchaser to design switchgear
offer.

Bidder replied "All electrical including supply and


site work are excluded"

Purchaser has considered the


power supply feeders in EBOP
scope

Purchaser has considered the power


supply feeders in EBOP scope

Bidder replied"All electrical including supply and


site work are excluded"

Local Push Button Station(LPBS) is


All Electrical drives with terminal boxes. Local push button considered by client.LPBS is
stations(LPBS), Local control panels etc. shall be by the
excluded from vendor scope and
Bidder.
the same shall be taken care during
commercial discussions.

Local Push Button Station(LPBS) is


considered by client. LPBS is excluded
from vendor scope and the same shall
be taken care during commercial offer.

Bidder replied"All electrical including supply and


site work are excluded"

Valve actuators with integral starters shall be by the bidder Considered

Considered

Agreed

LV Power and control cables and cabling between bidder


supplied equipment shall be in the scope of Bidder

Considered

Bidder replied"All electrical including supply and


site work are excluded"

Two (2) no 220V DC Power supply feeders shall be


provided by purchaser to bidder supplied Fuel Oil
Switchgear/MCC at a single point.
4
If any further DC power supply required for the bidder
supplied MCCs, bidder has to make looping from owner
provided source.

Considered

3 of 15

Remarks

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

UNIT

NPPL/KVK/MEIL/TPSC SPEC.

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

Cable trays, cable tray supports & fittings, conduit, cabling


accessories & fittings, etc between the bidder supplied
Considered
equipment shall be in the scope of bidder

Considered

Bidder replied"All
replied All electrical including supply and
site work are excluded"

Cable termination accessories including lugs, ferrules,


cleats, cable glands for bidder supplied cables shall be
provided by the bidder

Considered

Considered

Bidder replied"All electrical including supply and


site work are excluded"

10

As per system requirement, if any local MCCs / DBs are


envisaged by bidder, that shall be in the scope of bidder

Considered

Considered

Bidder replied"All electrical including supply and


site work are excluded"

11

Bidder has to mention the AC and DC power supply


requirement in the attached load list format along with his
offer

Load list furnished

Load list not furnished,bidder mentioned


that the load list will be submitted with
Bidder replied"All electrical including supply and
revised offer.To be taken during
site work are excluded"
commercial discussions.

12

Above ground earthing

Above ground earthing is in


purchaser's scope.

Above ground earthing is in purchaser's Bidder replied"All electrical including supply and
scope.
site work are excluded"

Field instrument / control systems shall include all


accessories such as package UPS Systems, Printers
etc.(if applicable) as required for proper functioning of the
control system / Instruments

Bidder considered the UPS, but


KVA is not mentioned.This shall be
discussed during commercial
discussions

Noted and revised our offer by


considered 3KVA UPS system (Nonredundant, stand alone) for which
instruments are in our scope only. If any
other loads to be considered the rating
of UPS will be increased.

No description of control & instrumentation in the


offer. Bidder to note that except for the deviations
clearly brought out, the offer will be considered as
in complete compliance to Specification (both
scopewise and technical requirement).

Field Instruments as per the approved P&ID.


Bidder to take prior approval of BOQ from purchaser.
Bidder to provide unit prices for each type and model

Considered

Considered

not confirmed by bidder

Control and instrument cable

Cables between XICON supplied


instruments to JB's considered

Cables between Thermosystem


Bidder replied"All electrical including supply and
supplied instruments to JB's considered site work are excluded"

Cable trays and accessories

Cable trays from XICON supplied


instruments to JB's considered

Cable trays from thermosystems


Bidder replied"All electrical including supply and
supplied instruments to JB's considered site work are excluded"

Local control panel / Junction boxes

Considered.

Considered

Agreed

Erection hardwares

Considered for XICON supplied


instruments

Considered for thermosystem supplied


instruments

Only for bidder scope items

Control & Instrumentation

MISCELLANEOUS

4 of 15

Remarks

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

UNIT

NPPL/KVK/MEIL/TPSC SPEC.

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

Start-up & Commissioning spares as required

List furnished. Unit price shall be


given and by bidder

List furnished,but
only
and
,
y gaskets
g
fasteners for tank nozzles are
considered. Unit price will be given by
bidder in the price offer and the same
shall be taken during commercial
discussions.

Mandatory spares

List furnished. Unit price shall be


given by bidder

List furnished. Unit price shall be given


by bidder.

Recommended spares

List furnished. Unit price shall be


given by bidder

Thermosystems have mentioned in


schedule-12"As mandatory spares are
List not furnished
covered with most of the spares,hence
p
q
are not required"
recommended spares

Special tools and tackles

In schedule-13, thermosystem have


In schedule-13, XICON mentioned
mentioned as "Not applicable,as there Bidder replied"Normal tools and tackles are
as "no special tools and tackles
are no special tools and tackles required sufficient".Pls obtain the list and unit price.
required for the system"
for the system"

Shop Painting with primer and Finish Painting

Confirmed as per specification

Confirmed as per specification

As per specification

Some loose finish paint to be supplied for touch-up after


installation at site.

Confirmed.

Confirmed.

As per specification

Seaworthy Packing (if required)

Bidder mentioned that , it will be


furnished during detail engg.Shall
g
be taken with bidder during
commercial discussions

Bidder mentioned sea worthy packing is


No details available in proposal
not applicable
pp
as there is no import
p

8
9
10
11
12
13

Transport to site
O&M Manuals
Calibration certificates
Erection manual
Commissioning procedure
Piping isometric drawings

Considered
Considered
Considered
Considered
Considered
Considered

Considered
Considered
Considered
Considered
Considered
Considered

14

Site test procedures

Bidder confirmed that along with


site test procedure,shop test
procedure will also be furnished
during detail engg.

Only site test procedure considered but


No details available in proposal
shop test is required for pumps.

15

Commissioning and site tests

Considered

Considered

No details available in proposal

16

Manpower and supervision of erection and commissioning Considered

Considered

No details available in proposal

17

Initial consumables for one year topping

Considered, but list not given

No details available in proposal

Considered,but list not given

5 of 15

Remarks

List provided in their offer number 1912 dated


22nd october-2015.Unit price shall be obtained
from bidder.

Thermosystems startup and


commissioning spares to be
matched with XICON & SRI
Engineers

List not furnished

Mandatory sparelist given by


thermosystems is in detail.
Schedule-11 of both the
bidders shall be same

No details available in proposal


No details available in proposal
No details available in proposal
No details available in proposal
No details available in proposal
No details available in proposal

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

UNIT

18

F
1
1.1

NPPL/KVK/MEIL/TPSC SPEC.

Warranty for Instruments

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

Warranty of all equipments and


instruments as per clause.This
shall be further discussed during
commercial terms

considered

No details available in proposal

DATA SHEETS
LDO Storage Tank

Nos.

1 for phase-1

1(vertical,cylindrical with fixed cone roof)

Net capacity

KL

Normal and max capacity will be


251 cum/302 cum,pls confirm

Normal and max capacity will be 251


cum/302 cum,pls confirm

Normal 250 /282 max

Dimensions

Dia x
Ht

8mx6m

8mx6m

6 m dia X 10 m height

IS 803 / API 650


IS 2062 -2011 GR E250 BR
IS 2062 Gr. B
IS 2062 Gr. A
IS 2062 Gr. B
A 106 Gr. B
A 234 Gr. WPB / A 105
A 105
IS 1239 M GI
CNAF
Neoprene Rubber
IS 1367
6
6
5

IS 803
IS 2062 Gr. B
IS 2062 Gr. B
IS 2062 Gr. A
IS 2062 Gr. B
A 106 Gr. B
A 234 Gr. WPB / A 105
A 105
IS 1239 M GI
CNAF
Neoprene Rubber
IS 1367
6
6
5

IS 803/API 650 (ASME VIII div-1)


IS 2062 Grade A
IS 2062 Grade A
IS 2062 Grade A
IS 2062 Grade A
Bidder to furnish
Bidder to furnish
Plate flange
Bidder to furnish
CAF
Bidder to furnish
Bidder to furnish
Bidder to furnish
Bidder to furnish
Bidder to furnish

1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16

Codes & Standards


Material of Construction
Shell, Roof & Bottom Plates
Structural Steels
Manholes
Nozzle Neck / Pipes
Nozzle Fittings
Nozzle Flanges
Top Handrailing
Gasket : For Nozzles
Gasket : For Manholes
Bolts & Nuts
Bottom Plate Thickness,
Shell Plate Thickness,
Roof Plate Thickness,

1.17

Venting capacity

Inbreathing and outbreathing as per


As per API 2000
API 2000

Not confirmed the code

1.18

Operating / design parameters

Atmospheric

Operating Temp - 60C, Sp. Gravity - 1

Atm/atm

1.19

Joint efficiency

Bidder not furnished

0.7

1.20

Painting

Bidder not furnished

After cleaning,2 coats of red oxide primer

1.21

Corrosion allowance

0.85
As per Technical specification
(RFQ-Rev-3-Fuel oil system_VolII mm
df)
2

Bidder not furnished

1.5 mm

1.22

MOC of nozzles

2
2.1

Drain Tank
Net capacity

2.2

Dimensions

2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2 12
2.12
2.13

Codes & Standards


Material of construction
Shell, Roof & Bottom Plates
Structural Steels
Manholes
Nozzle Neck / Pipes
Nozzle Fittings
Nozzle Flanges
Top Handrailing
Gasket : For Nozzles
Gasket : For Manholes

mm
mm
mm

mm

Nos.
KL
LxWx
H

Nozzle Pipe= API 5L Gr B ERW


Nozzle flange= A 105
1
5 cum

Bidder not furnished

SA 106 Gr.B

1
5 cum

1
5 cum

3m (L)x1.5 m(W)x1.5 m(H)

3 m x 1.5 m x 1.5 m

1.5 X 3.2

Good Engineering Practice


IS 2062 -2011 GR E250 BR
IS 2062 Gr. B
IS 2062 Gr. A
IS 2062 Gr. B
A 106 Gr. B
A 234 Gr. WPB / A 105
A 105
IS 1239 M GI
CNAF
Neoprene Rubber

IS 800 & good engineering practice


IS 2062 -2011 GR E250 BR
IS 2062 Gr. B
IS 2062 Gr. A
IS 2062 Gr. B
A 106 Gr. B
A 234 Gr. WPB / A 105
A 105
IS 1239 M GI
CNAF
Neoprene Rubber

ASME VIII
IS 2062
shell : 6mm , Roof : 5mm, bottom : 6mm
SA516 Gr.70
500 ID
SA106 Gr B
SORF
SA105
2 nos lefting legs
CIF 3mm
CIF,
CIF, 3mm

6 of 15

Remarks

Xicon to mention the code

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

2.14
2 15
2.15
2.16
2.17

DESCRIPTION

Bolts & Nuts


Thickness
Bottom Plate Thickness,
Shell Plate Thickness,
Venting capacity

UNIT

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

NPPL/KVK/MEIL/TPSC SPEC.

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

mm
mm

IS 1367
End plates : 8 mm
5
vent with goose neck as per API

IS 1367
End plates : 8 mm
5
As per API 2000

Gr. 4.9
6 mm
6 mm
5%

Operating Pressure= ATM/Design


pressure=Atm/Operating
temperatur=50 Deg C/Design
temperature=90 Deg C

Operating Temp - 60C, Sp. Gravity - 1

Atmospheric

Fuel Oil (LDO)


80 NB
8
3 numbers

Fuel Oil (LDO)


80 NB
8
3 nos(2W+1 spare)

LDO
80 NB
4
3 numbers

6 bar (g)

Bidder has mentioned atmospheric


pressure but bidder has to mention
design pressure of hoses.

Atmospheric

2.18

Operating / design parameters

deg C

3
3.1
3.2
3.3
3.4

Flexible Hoses
Service
Nominal Dia
Length between flange faces
Quantity required

Mm
M
Nos

3.5

Pressure at ambient
temperatures.

3.6

Class of hose and standard with


which hose complies

BS 1435 type S7 / IS 10773

BS 1435 type S7 / IS 10773

BS 1435-2 : 2005

3.7

Operating / Design temperature C

(40 / 90)

ambient / 60 deg C

30 deg/45 deg C

3.8

Hose material

Neoprene Rubber covers with


nitride lining

Neoprene Rubber

Rubber

4
4.1
4.2

LDO unloading pumps


Service / Application
Quantity

LDO
2 numbers

Text not clear in the proposal


2 numbers

4.3

Type

LDO / Unloading Area


2 numbers
Twin Screw external bearing
design

Positive displacement type-screw type

Three screw

4.4
4.5
4.6
47
4.7

Manufacturer
Location
Operating flow
Design flow

UT pumps/Tushaco
Unloading Pump Hose
25 cum/hr
25 cum/hr

As per enclosed vendor list


Unloading pump house
25 cum/hr
25 cum/hr

Tushaco/Delta PD
LDO yard
25 cum/hr
28 cum/hr

4.8

Operating head

Kg/cm2
(g)

3 kg/cm2

2.5 kg/cm2

10 kg/cm2

4.9

Design head

Kg/cm2
(g)

3 kg/cm2

2.5 kg/cm2

12.5 kg/cm2

4.10

Efficiency

65%

Bidder mentioned that, pump efficiency


Bidder replied that"they will provide later"
will be approx 45 - 50%

4.11
4.12

Max. pump speed


Max. motor speed
Pump BKW at design capacity
and total head
Recommended motor rating
Maximum allowable suction lift
(for minimum NPHS
requirement)

Rpm
Rpm

1450 rpm
1450 rpm

1450 rpm
1450 rpm

2950 rpm
2950 rpm

KW

5.16

13.5

KW

7.5 kw

7.5 kw

15 kw

4.13
4.14
4 15
4.15

bar(g)

Nos.

M3/hr
M3/hr

Flooded

Flooded suction
Providing these details are not possible
7 of 15

Remarks

Pls note 6 bar(g) is


considered by
XICON,whereas others
considered atmospheric.

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

UNIT

NPPL/KVK/MEIL/TPSC SPEC.

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

4.16

Maximum discharge pressure


which the pump is suitable and
can develop considering the
motor rating.

Kg/cm2
(g)

4 kg/cm

4.17

Permissible liquid temperature

45 deg C

4.18

Rotor type

4.19

Relief valve

4.20
4.21
4.22
4.23

Bearing location
Material of construction
Outer casing
Inner casing

4.24

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences
at this tender stage, However we will
provide the same during detail
engineering as per our pump vender
suggestions.

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

12.5 kg/cm2

45 deg C

during detail engg


built in spring loaded adjustable
pressure
during detail engg

Twin screw pump

Bidder replied that"they will provide later"

Inbuilt

inbuilt

Later

inbuilt

ASTM A216 Gr WCB


ASTM A216 Gr WCB

ASTM A216 Gr WCB


ASTM A216 Gr WCB

carbon steel,grade not given


carbon steel,grade not given

Screws

ASTM A 276 TP 431

ASTM A 276 TP 431

carbon steel,grade not given

4.25
4.26
4.27
4.28
4 28
4.29
4.30
4.31
4.32
4.33
4.34
4.35
4.36
4.37

Rotor
Shaft
Base Plate,
Relief valve body (Internals)
Mechanical seal
Gasket,
Coupling,
Shaft sleeves
Wear rings
All Fasteners,
Type of bearing used
Type of drive transmission
Type of coupling offered

AISI 431
AISI 431
MS
SS
30% chrome steel
CNAF
CI
13 % Cr,stainless steel
Cast iron
SS 304
Radial ball bearing
Motor driven
Flexible pin bush type

carbon steel,grade not given


SS,grade not given
CS
Internal
Provided
Provided
Provided
SS,grade not given
SS,grade not given
Bidder to confirm
SSEC to furnish the type of bearing
Direct coupled
lovejoy

4.38

Seal type

Single multi spring balanced

mechanical

4.39
4.40

Packing type
Type of lubrication

AISI 431
AISI 431
MS
SS
SiC vs C,30 % chrome steel
CNAF
CI
13 % Cr,stainless steel
during detail engg
SS 304
Radial ball
Direct coupled to gearbox/motor
Flexible pin bush type
Mechanical seal single acting SiC
VS carbon
DDE
DE:Grease,NDE: oil

Gland packing
DE: Grease, NDE: Oil

No packing
Grease

4.41

Suction / Discharge size

4.42
4.43

Flange standard for drilling


Rating

4.44

Recommended spares

4.45

Accessories provided (Yes/No)

4.46
4.47
4.48

Drain rim
Coupling guard
Foundation bolts
Relief valve with discharge end
connected to suction side
Relief valve setting pressure
adjustable

4.49
4.50

NB

100 NB/80 NB,based on the


will be furnished during detail
velocity criteria bidder confirmed to
engineering
recheck during detail engineering

4 inch /3 inch

ANSI B 16.5
150 #
List furnished,unit price of the same
to be given by bidder

ANSI B 16.5
ANSI B 16.5
during detail engg
CL 150
Recommended & Mandatory spares will
Spare list 1912 dated 22nd october-2015
be quoted separately

Yes
Yes
Yes

Yes
Yes
Yes

yes
yes
yes

Yes

Yes

Inbuilt

Yes

Yes

yes

8 of 15

Remarks

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

UNIT

NPPL/KVK/MEIL/TPSC SPEC.

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

4.51

Motor starter

Yes

Noted and considered relay based LCP


and Local push button station for
controlling the unloading pumps and
instruments signals up to storage tanks yes
in our revised offer.
Further distribution from LCP to DCS,
MCC is in purchaser's scope.

4.52
4.53
4.54

Type of suction strainers


Quantity of suction strainers
Drive type

Simplex -basket type


2 Nos
Electric motor

Simplex-basket type
One no for each pump
Motor driven

Y type
2
Motor drive

4.55

Applicable codes and standards

API 676

API 676

No details available

5
5.1
5.2

LDO forwarding pumps


Service / Application
Quantity
Type

5.4
5.5
5.6

Location
Operating flow
Design flow

LDO forwarding
3 numbers
Triple Screw pump with external
bearing design
Pumphouse
23 cum/hr
23 cum/hr

Oil
3 numbers

5.3
53

LDO Forwarding
3 numbers
Triple Screw pump with external
bearing design
Pump House
23 cum/hr
23 cum/hr

LDO yard
23 cum/hr
25

5.7

Operating head

15 kg /cm2

18 kg / cm2

25 kg /cm2

5.8

Design head

5.9
5.10
5.11

Efficiency
Max. pump speed
Max. motor speed
Pump BKW at design capacity
and total head
Recommended motor rating
Maximum allowable suction lift
(for minimum NPHS
requirement)
Maximum discharge pressure
which the pump is suitable and
can develop considering the
motor rating.

5.12
5.13
5.14

5.15

5.16

Permissible liquid temperature

5.17

Rotor type

5.18

Relief valve

5.19
5.20
5.21
5.22

Bearing location
Material of construction
Outer casing
Inner casing

Nos.

M3/hr
M3/hr
Kg/cm2
(g)

Screw

Kg/cm2
(g)

24

18 bar

later

%
Rpm
Rpm

80%
2920 rpm
1450 rpm

53%
2900 rpm
2900 rpm

Data not available,bidder to furnish


2950 rpm
2950 rpm

KW

28

21

25

KW

37

30

30

flooded

Kg/cm2
(g)

26 bar (g)

Deg C

40 deg C

flooded
will be furnished during detail
engineering

28.5 bar(g)

40 deg C

during detail engg


built in spring loaded with
adjustable pressure
during detail engg

Triple screw
Pls confirm,inbuilt spring loaded with
adjustable pressure
Later

inbuilt

CS fabricated,Gr B
CS fabricated Gr B

CS fabricated,Gr B
CS fabricated Gr B

carbon steel
carbon steel

9 of 15

Remarks

three screw
inbuilt

Pls note in the flow


scheme,boiler terminal
pressure requirement is 15 &
24 bar(g),operating and
design respectively.Bidder
has to meet this requirement.

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

UNIT

NPPL/KVK/MEIL/TPSC SPEC.

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

5.23
5 24
5.24
5.25
5.26
5.27
5.28
5.29
5.30
5.31
5.32
5.33
5.34
5.35

Screws
Rotor
Shaft
Base Plate,
Relief Valve Body,
Relief Valve (Internals),
Mechanical Seal,
Gasket,
Coupling,
Shaft sleeves
Wear rings
All Fasteners,
Type of bearing used

ASTM A 276 TP 431


AISI 431
AISI 431
MS
SS
SS
SiC Vs C
CNAF
CI
during detail engg
during detail engg
SS 304
Radial ball bearing

ASTM A 276 TP 431


AISI 431
AISI 431
MS
SS
SS
SiC Vs C
CNAF
CI
13 % Cr.stainless steel
Bidder reply is blank
SS 304
Radial ball bearing

carbon steel hardened


carbon steel hardened
SS
CS
Internal
provided
provided
provided
provided
SS
SS
provided
As per manufacturer recommendations

5.36

Type of drive transmission

Direct coupled to gear box/motor

Motor driven

Direct coupled

5.37

Type of coupling offered

Flexible Pin Bush type

Flexible pin bush

lovejoy

Single multi spring balanced

Mechanical

Gland packing
DE: Grease, NDE: Oil
Will be furnished during detail
engineering
during detail engg
during detail engg

No packing
Grease

5.38

Seal type

5.39
5.40

Packing type
Type of lubrication

Mech seal single acting SiC VS


carbon
during detail engg
by grease

5.41

Suction / Discharge size

100 NB/ 80 NB

5.42
5.43

Flange standard for drilling


Rating

ANSI B 16.5
150 #

5.44

Recommended spares

5.45

Accessories provided (Yes/No)

5.46
5.47
5.48

Drain rim
Coupling guard
Foundation bolts
Relief valve with discharge end
connected to suction side
Relief valve setting pressure
adjustable

5.49
5.50

As per Attached List in offer

Bidder replied that,this unit list will be


furnished by bidder in the revised
offer.shall be taken during commercial
discussions

4 inch /3 inch
ANSI B 16.5
CL 150

spare list 1912 dated 22nd october 2015

yes
Yes,provided
Yes,provided
Yes,provided

Yes,provided
Yes,provided
Yes,provided

yes
yes
yes

Yes,provided

Yes,provided

yes

Yes,provided

Yes,provided

yes

5.51

Motor Starter

Yes,provided

5.52
5.53
5.54

Type of suction strainers


Quantity of suction strainers
Drive type

Simplex -basket type


3 numbers
Electric motor

Noted and considered relay based LCP


in our revised offer.
Further distribution from LCP to DCS,
MCC is in purchaser's scope.
simplex basket type
3 numbers
Motor driven

5.55

Applicable codes and standards

API 676

API 676

latter

Simplex

Simplex

Y type

6
6.1

yes
Y type
3 numbers
Direct motor drive

Strainers
Type

10 of 15

Remarks

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

UNIT

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

NPPL/KVK/MEIL/TPSC SPEC.

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

62
6.2

Flow rate

Kg/hr

21500/19780 kg/hr

25 cum/hr for unloading and 23 cum/hr


for forwarding strainers

30

6.3

Design pressure

Kg/cm2
(g)

3.5 kg/cm2

1.5

10

6.4

Design temperature

70/70 deg C

60

40

6.5

Max. permissible pressure drop


under 50% clogged condition

during detail engg

2 mlc

1.2 kg

6.6
6.7
6.8
6.9
6.10

Screen basket data


Dia of perforations
Min thickness
Free straining area
End connections

bidder to give mesh details


6
0.8
01:06
Flanged end

40 Mesh

Bidder to provide

will be furnished during detail


engineering

latter

6.11

Size

100 NB

6.12
6.13
6 13
6.14
6.15
6.16

Type
Detail / standards
Cover type
IBR approval
Material of construction

SORF
16.5
150 #,ANSI
# ANSI B 16
5
flanged
Not required

6.17

Body

A 106 Gr.B sch 40

If size is less than 350 NB bidder to


consider A106 Gr.B sch 40 and not IS
3589 / Fabricated from IS 2062 Gr.B

6.18
6.19
6.20
6.21
6.22
6.23
6.24
6.25
6.26
6 27
6.27
6.28
6.29
6.30

Cover
Screen basket
Bolts / studs
Nuts
Gasket
Jacket coupling / flanges
Accessories (Yes/No)
Foundation bolts
Differential pressure gauge
Drain / vent cock
Support legs
Hydrostatic test pressure
Vacuum test required
Pressure drop test required
(clean / 50% clogged)

IS 2062
SS 304
A 193 Gr B 7
A 194 Gr 2H
CNAF
IS 2062

Fabricated from IS 2062


SS304
A 193 Gr B 7
A 194 Gr 2H
CNAF(Grafoil)
IS 2062

CS
SS

Yes
Yes
Yes
Yes
5.5 kg/cm2
No

Yes
Yes
Yes
Yes
Not given
not required

text not clear


text not clear
text not clear
text not clear
15 kg
latter

yes

yes

1.5 kg

SU/flowserve/maxflow/sehra

No information
Bidder confirmed 5 cum and discharge
piping upto nearest drain near pump
house

6.31
7
7.1

Sump pump
Pump make and model no.

7.2

Design capacity

7.3
7.4
7.5

Total head developed by


impeller
Losses in column pipe upto
discharge flange
Shut off head

Mm
Mm

Flange end
will be furnished during detail
engineering
Simplex
150 #,ANSI
16.5
# ANSI B 16
5
flanged
Not required

M3/hr

mlc

15

No information

mlc

during detail engg

No information

mlc

during detail engg

No information

11 of 15

Flanged
80 NB
Text not clear
Details not available in bid

CS

No data

Remarks

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

76
7.6

Hydrostatic test pressure

7.7

Number of stages
Minimum submergence
required
Pump speed
Pump efficiency at duty point
Power input to pump at duty
point
Maximum pump power
requirement
Power input to motor at duty
point
Motor efficiency at duty point
Motor rating
Motor speed
Motor make and model no.
Cooling water (if required)
Type of impeller
Maximum size of solids
permissible
Discharge nozzle size
Recommended sump
dimension
Opening dimension on cover
slab

7.8
7.9
7.10
7.11
7.12
7.13
7.14
7.15
7.16
7.17
7.18
7 18
7.21
7.22
7.23
7.24
7.25

UNIT

Kg/cm2
(g)

NPPL/KVK/MEIL/TPSC SPEC.

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

2 5 of design pressure
2.5

No information

during detail engg

No information

mlc

during detail engg

No information

rpm
%

2900 rpm
mfg std

No information
No information

KW

during detail engg

No information

KW

during detail engg

No information

KW

during detail engg

No information

%
KW
rpm

Not given
1.1
2900
CGL/BBL
No
Cast stainless steel

Not given
No information
No information
No information
No information
No information

Mm

40

No information

Mm

50

No information

Mxm

DDE

No information

Mm

DDE

No information

Weight of pump + support plate Kg

DDE

No information

7.27

Weight of motor
Pipe sizes (NB) and velocity
m/sec
LDO unloading lines from road
tanker to
suction header

Kg

DDE

No information

NB/m/s
ec

200 NB,0.7 m/s

NB/m/s
NB/
/
ec

200 NB,0.7 m/s

8.2

8.3

suction header

LDO unloading pump suction


lines

Remarks

Drain sump pump not considered in scope

7.26

8.1

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

NB/m/s
ec

125 NB,0.6 m/s


Pump suction side : Max. 0.85 m/s
Pump Discharge side : Max. 1.6 m/s

8.4

LDO unloading pump discharge NB/m/s


lines to storage tank
ec

125 NB,1.3 m/s

8.5

LDO forwarding pump suction


lines

125 NB,0.6 m/s

8.6

LDO pump discharge to boiler

8.7

Inlet to drain oil tank

88
8.8

Drain oil tank pump discharge


piping

NB/m/s
ec
NB/m/s
ec
NB/m/s
ec
NB/m/s
ec

Thermosystems & SSEC


have not furnished the
pipesizes and velocity
considered as given by
XICON

Pipe wise velocities will be provided


during detail engineering.

100 NB,1.3 m/s


50 NB,0.4 m/s
NB 1 m/s
50 NB,1

12 of 15

Not furnished

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

Scope matrix
INo .. x 250 KL LDO storage
tank
INo. x 5 KL drain Oil tank.
3 Nos. unloading points for
unloading LDOfrom road
tankers (as per P& ID)
LDO unloading system which
included pumps,
strainers, valves, pipes, fittings
etc.
LDO forwarding system upto
Boiler which included
pumps, strainers, valves, pipes,
fittings etc.
Drain oil system

7
8
9

UNIT

NPPL/KVK/MEIL/TPSC SPEC.

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

XICON/CLIENT

Thermosystems/CLIent

Xicon

thermosystems

Xicon

thermosystems

Xicon

thermosystems

Xicon

thermosystems

Xicon

thermosystems

Xicon

thermosystems

MCC for supplied equipments

Client

Client

Incoming cable to MCC


Power cables
Control cables from LPBS to
MCC
Flameproof local push button
station

Client
Client

Client
thermosystems

Client

Client

Client

Client

12

Instrumentation cable up to local


control panel

Client

Noted and considered relay based LCP


in our revised offer.
Further distribution from LCP to DCS,
MCC is in purchaser's scope.

13

Cable tray for control and


instrumentation cables

Client

considered upto junction box

14

Relay logic based LCP at pump


house

Client

Noted and considered relay based LCP


in our revised offer.
Further distribution from LCP to DCS,
MCC is in purchaser's scope.

Client

Client

Client

Client

Client

Client

Client
Client
Xicon

Client
Client
thermosystems

Client

Client

Client

Client

1
2
3

10
11

15
16
17
18
19
20
21
22

Interconnection between
DDCIMS and bidder's
instruments and panel
Below ground earthing of
equipments
Above ground earthing of
equipments
Illumjnation
Lightning protection
Foundation bolts for tanks
All civil works including insert
plates,grouting etc
S
Structural work like
piperack,trestles,bridges etc

13 of 15

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

This scope matrix is not given by bidder

Remarks

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

23
24
25

DESCRIPTION

UNIT

NPPL/KVK/MEIL/TPSC SPEC.

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

Client
Client
Client

Client
Client
Client

Client

Client

Client
Client

Client
Client

Client

Client

30
31
32
33
34

Oil water collection sump


Oil recovery pump
Waste water pump
Design and supply of OWS &
mechanical components
Effluent treatment
Service water piping
Instrument air piping inside and
outside dyke area and pump
house
Monorail hoist 2T capacity
Service air piping
Construction water
Construction power
CCOE approval

Xicon
Client
Client
Client
Xicon

thermosystems
Client
Client
Client
thermosystems

35

Local NOC for CCOE approval

Client

client

36
37

All other statutory approval


Mandatory spares
Recommended spares for 2
years operation

client
Xicon

thermosystems
thermosystems
Not applicable. As most of spares are
covered in Mandatory spares.

39

Commissioning spares

Xicon,pls obtain the list of spares

Fasteners and gaskets required for


commissioning is considered

40

Cathodic protection

Client

Client

41

Fire fighting system

Client

Client

Terminal Point

LDO inlet

1) At the outlet of Road Tanker

1) At the outlet of Road Tanker

LDO outlet

26
27
28
29

38

Xicon

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

LDO will be terminated near to boiler #1.


2) At Terminal Point Near Boiler as
Piping to Boiler #2 will be in the
per specification
purchasers scope.
Terminal point details not furnished

I
1

3.All drains to drain oil tank

3.Drain from fuel oil are to drain oil tank


including piping,accessories are in
bidders scope.

cum/hr

25

25

25

30

25

10

kw

7.5

7.5

15

cum/hr

23

23

23

240

180

2
25 kg/cm
g

Drain

PERFORMANCE
GUARANTEES
LDO unloading pump
Guaranteed head of LDO
unloading pump
Guaranteed auxiliary power
consumption of LDO unloading
pump
LDO forwarding pump
Guaranteed head of LDO
forwarding pump

14 of 15

Remarks

TECHNICAL BID EVALUATION REPORT - Fuel Oil System

PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu


Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications

Sr. NO.

DESCRIPTION

Guaranteed auxiliary power


consumption of LDO forwarding kw
pump
Drain oil pump
cum/hr
Guaranteed head of drain oil
m
pump
Guaranteed auxiliary power
consumption of drain oil pump

UNIT

Technical Ranking

Technical Conclusion

kw

XICON
offer no: 16/456/NB/RGK and
further Email correspondences

NPPL/KVK/MEIL/TPSC SPEC.

THERMOSYSTEMS
offer no: T2004 and further Email
correspondences

SRI & SRI Engineers


offer no: SRI/MEIL/1907Aand further Email
correspondences

37

30

30

10

Drain sump pump not considered in scope by


SSEC

2.2

2.2

Drain sump pump not considered in scope by


SSEC

1 st -XICON

2nd -THERMOSYSTEMS

3 rd - SRI & SRI ENGINEERS

XICON has given sufficient


technical datas from the initial
stage and supporting us by
providing relevant information for
our clarifications.

Thermosystem also supported but some


of the technical datas are irrelevant and
we brought them inline
inline, but still many
are open and bidder mentioned that
We suggest, not to consider SSEC offer
they will furnish during detail
considering the limited technical datas and limited
engineering.
support by them.If they are commercially
suitable,we need to get many technical items
LDO forwarding pump head shall be
confirmed from them.
same as XICON.
Drain oil pump head shall be same as
XICON

15 of 15

30

Remarks