Date:

###

Note No.

By:

PMD

Sheet No.

STUP Consultants Pvt. Ltd.


Design of Penetration Depth of Pile of Intake Wall in Rock :

Unit wt of concrete
Unit wt of sand
Unit wt of steel
Unit wt of brick
Live load considered

=
=
=
=
=

2.5
1.8
7.85
2
500

t/m3
t/m3
t/m3
t/m3
kg/m

TOTAL VERTICAL LOAD CALCULATION :


1 Self weight of the Intake Well :
SL. No.

Item

Width

Depth

Length

Nos

Volume

Quantiy

1)

Roof

(m)

(m)

(m)

(m)

(m )

a)

Roof Beam RB1

0.3

1.2

16.25

17.55

43.9

b)

Roof Beam RB2

0.3

0.8

16.25

3.90

9.75

c)

Roof Beam RB3

0.3

0.8

16.25

3.90

9.75

d)

Roof Beam RB4

0.3

0.8

18.65

13.428

33.57

e)

Roof Beam RB5

0.3

0.8

18.65

8.952

22.38

f)
g)

Slab
Column

16.25
0.45

0.15
0.85

18.65
10.1

1
15

45.46
57.94875

113.6
144.871875

2)

Monorail Lev.

a)

Lintel Beam LB1

0.4

0.5

16.25

3.25

8.125

b)

Lintel Beam LB2

0.25

0.35

18.65

3.26

8.16

c)

Lintel Beam LB3

0.25

0.35

16.25

1.42

3.55

e)

Bracket in column
15 E.O .T Crane (Double
Girder) and Crane Beam

10

2.04

5.1

f)

20

2)

Intermediate Lev.

a)

Lintel Beam LB4

0.25

0.35

16.25

1.42

3.55

b)

Lintel Beam LB5

0.25

0.35

18.65

3.26

8.16

0.25

0.35

16.25

1.42

3.55

c)

Lintel Beam LB6

3)

Pump Floor Lev.

a)
b)
b)
c)
d)

Slab
Floor Beam FB1
Floor Beam FB2
Floor Beam FB2A
Floor Beam FB3
Floor Beam FB4

18.65
0.3
0.3
0.3
0.3
0.3

0.2
1.2
0.6
0.6
1
1

16.25
16.25
1.5
1.7
16.25
18.65

1
2
8
2
2
2

60.61
11.70
2.16
0.61
9.75
11.19

151.53
29.25
5.40
1.53
24.38
27.975

f)
g)
h)
i)
j)
k)

Floor Beam FB5


Floor Beam FB6
Pump
Bracket BK1
Bracket BK2
Bracket BK3

0.3
0.3

1
1.25

16.25
16.25

4.88
6.09

3.625
5
4.825

0.6
1
0.6

1.5
2.9
1.5

1
1
4
1
2
2

12.19
15.23
28
8
73
22

l)
m)

Pipe (1000 NB Pipe)


Water in pipe
Common header (1500 NB
pipe)
Water in common header

5
5

2
2

3
8

11.25
11.25

1
1

20

2
2

n)

o)
p)
q)
r)

Brick work
Brick work
Bracket +Pedestal+Bearing
Ring Beam

16.25
18.65

0.25
0.25

10.1
10.1

0.8

2.25

37.366

3.26
29
8.69

82.06

164.13

94.18

188.37
4
168.147

67.2588

Date:

###

Note No.

By:

PMD

Sheet No.

STUP Consultants Pvt. Ltd.

Total self weight

=
=

2 Truss Vertical Load acting on Intake well


3 Live load
a) At Roof Level
b) At floor level

200

16.25
16.25

18.65
18.65

(Refer Design note of Pipe Bridge)


151.53
151.53

Total live load

Total vertical load

1432

(S.W of intake well , live load,truss vertical load) =

303.06
1935

SW of Intake Well + live load

1735

Self weight of comtrol room + live load

1532

47.1

Horizontal Load
1)

Pipe Thrust

(1000 mm dia pipe and 30 m water head)

SW OF INTAKE+LL=2403 t
10

Pipe Thrust = 47.1 T

SW Of TRUSS= 200t

cl of Intake Well

Seismic Force =438 t


t

16.78 m

14.0 m

Top of Pile cap


Calculation of seismic horizontal coefficient
Outer diameter of well
Inner diameter of well

=
=

12.4
11.4

m
m

Z
I

=
=

0.16
1.5

(IS:1893)

Date:

###

Note No.

By:

PMD

Sheet No.

STUP Consultants Pvt. Ltd.


Stiiffness calculation for pile :
Dia of pile

Depth of fixity of pile from bottom of pile cap =

9.17

=
=

12EI / L3
25105

T/m

0.56

sec

Hence, sa/g

1.80

(IS:1893)

0.22

Total seismic wt

1783

Horizontal force due to seismic

384

Stiffness

Time period

C.G calculation of seismic mass :


5

8.39

1508 t
200 t
16.78 m

2231 t
t
Top of Pile cap

C.G of seismic mass acting on the structure

14.0

MOMENT CALCULATION :
Total ht of intake well upto top of pile cap

16.78

Total horizontal force at top of pile

431

Moment at top of pile

8512

t-m

0.8 m
Bottom of Pile Cap Level
2.22 m
Existing Ground Level
Level
6.92 m

9.17 m

Existing Rock Level

D.O.F Level

3.03 m
Termination Level

Date:

###

Note No.

By:

PMD

Sheet No.

STUP Consultants Pvt. Ltd.


Stability Check :
No of pile

12

Ht of top of rock level from bottom of pile cap level =

i)

nos.

6.92

Dia of pile

Self wt of each pile

18.01

Horizontal force per pile due to self wt

3.88

Moment per pile at top of rock level due to self wt

15

t-m

Horizontal force per pile


due to vertical load and LL

40

Moment at top of rock level

8694

t-m

Total self weight at pile cap base +LL

1935

Depth of fixity of pile

9.17

Response Reduction factor

Moment per pile

57

t-m

As per IRC: Amendments to IRC publications : Appendix -5


The socketed length in the rock may be calculated from the following equation :
Ls (socketed length)=

2H
D

4H2
D2

0.29 +

2.16 m

Hence, the penetration depth of intake well in rock

6M
D
1.87
(Hence, the assumption is ok)

2.16 m

Date:

###

Note No.

By:

PMD

Sheet No.

STUP Consultants Pvt. Ltd.

But, from depth of fixity criteria we have considered the socketed length of pile in rock as 5 m
Push -pull effect of pile due to horizontal seismic force :
Moment due to push -pull effect

3955.63

P/n

161.2

r/ r^2

0.021

t-m
t

3
5.3

6.2

Pmax

380.2

Hence,OK

Pmin

-57.8

Hence,OK

Max allowable vertical load capacity

450.0
t
(Refer vertical load cal)

Max allowable friction capacity

161.0
t
(Refer vertical load cal)

Date:

23-04-2016 Note No.

STUP Consultants Pvt. Ltd.


By:

PMD

Sheet No.

TOTAL SEISMIC WT CALCULATION :


1 Seismic weight of the Intake Well :
SL. No.

Item

Width

Depth

Length

Nos

Volume

Quantiy

1)

Roof

(m)

(m)

(m)

(m)

(m3)

a)

Roof Beam RB1

0.3

1.2

16.25

17.55

43.9

b)

Roof Beam RB2

0.3

0.8

16.25

3.90

9.75

c)

Roof Beam RB3

0.3

0.8

16.25

3.90

9.75

d)

Roof Beam RB4

0.3

0.8

18.65

13.428

33.57

e)

Roof Beam RB5

0.3

0.8

18.65

8.952

22.38

f)

Slab

16.25

0.15

18.65

45.46

113.6

g)

Column

0.4

0.8

10.1

15

48.48

121.2

2)

Monorail Lev.

a)

Lintel Beam LB1

0.4

0.5

16.25

3.25

8.125

b)

Lintel Beam LB2

0.25

0.35

18.65

3.26

8.16

c)

Lintel Beam LB3

0.25

0.35

16.25

1.42

3.55

e)

Bracket in column
15 E.O .T Crane (Double
Girder) and Crane Beam

10

2.04

5.1

f)

20

2)

Intermediate Lev.

a)

Lintel Beam LB4

0.25

0.35

16.25

1.42

3.55

b)

Lintel Beam LB5

0.25

0.35

18.65

3.26

8.16

0.25

0.35

16.25

1.42

3.55

c)

Lintel Beam LB6

3)

Pump Floor Lev.

a)
b)
b)
c)
d)

Slab
Floor Beam FB1
Floor Beam FB2
Floor Beam FB2A
Floor Beam FB3
Floor Beam FB4

18.65
0.3
0.3
0.3
0.3
0.3

0.2
1.2
0.6
0.6
1
1

16.25
16.25
1.5
1.7
16.25
18.65

1
2
8
2
2
2

60.61
11.70
2.16
0.61
9.75
11.19

151.53
29.25
5.40
1.53
24.38
27.975

Floor Beam FB5


Floor Beam FB6
Pump
Bracket BK1
Bracket BK2
Bracket BK3
Pipe (1000 NB Pipe)
Water in pipe
Common header (1500 NB
pipe)
Water in common header

0.3
0.3

1
1.25

16.25
16.25

4.88
6.09

3.625
5
4.825

0.6
1
0.6

1.5
2.9
1.5
5
5

1
1
4
1
2
2
2
2

12.19
15.23
28
8
73
22
3
8

11.25
11.25

1
1

10.1
10.1

2
2

1.8
15.0
0.8
12.2

1
1
1
12

f)
g)
h)
i)
j)
k)
l)
m)
n)

o)
p)
q)
5)
a)
b)
c)

Brick work
Brick work
Bracket +Pedestal+Bearing
Well
wall (Above Water Level)
Wall(Below Water Level)
Pile Cap
Pile

16.25
18.65

0.25
0.25

19
19
121
1

Total self weight in seismi (At Bottom of Pile Cap Level)

3.26
29
8.69

6
20

82.06

164.13

94.18

188.37
4

33.65
280.07
96.61
115.00

84.1
700.2
241.5
287.5
2231

Date:

###

Note No.

By:

PMD

Sheet No.

STUP Consultants Pvt. Ltd.

2.5 T/m3
1.8 T/m3
7.5 m

Unit wt of concrete
Unit wt of sand
Penetration depth of the intake well
1 Concrete Quantity of the Intake Well :
SL. No.

Item
Roof (At Lev. EL. 149.800
m

Width

Depth

Length

Nos

Volume

Quantiy

(m)

(m)

(m)

(m)

(m )

a)

Roof Beam RB1

0.3

1.2

11.75

12.69

31.7

b)

Roof Beam RB2

0.3

0.6

11.75

2.12

5.29

c)

Roof Beam RB3

0.3

0.8

11.75

2.82

7.05

d)

Roof Beam RB4

0.3

0.6

14.4

7.776

19.44

e)

Roof Beam RB5

0.3

0.6

14.4

5.184

12.96

Slab

14.25

0.15

16.45

35.16

87.9

0.4

0.8

2.5

10

0.4

0.8

2.5

10

20

1)

f)
g)
h)

Column (lev.149.8 to
147.3)
Column (lev.149.8 to
147.3)

2)

Monorail Lev. (At Lev. EL.


146.300 m

a)

Lintel Beam LB1

0.4

0.5

11.85

2.37

5.925

b)

Lintel Beam LB2

0.25

0.35

14.3

2.503

6.256

Lintel Beam LB3

0.25

0.35

11.85

1.037

2.592

c)
d)
e)
f)
e)
f)

Crane Supporting Beam


(MB 500)
Bracket in column
7.5 E.O .T Crane(Double
Girder) and Crane Beam
Column (lev.147.3 to
140.5)
Column (lev.147.3 to
140.5)

30

2.607
9

4.5

11.25
20

0.4

0.8

6.8

10.88

27.2

0.4

0.8

6.8

10

21.76

54.4

2)

Monorail Lev. (At Lev. EL.


143.500 m

a)

Lintel Beam LB4

0.25

0.35

11.85

1.04

2.59

b)

Lintel Beam LB5

0.25

0.35

14.3

2.5025

6.25625

Lintel Beam LB6

0.25

0.35

11.85

1.036875

2.59

Pump Floor Lev. (At Lev.


EL. 140.500 m)
Slab
Floor Beam FB1
Floor Beam FB2
Floor Beam FB3
Floor Beam FB4
Floor Beam FB5
Floor Beam FB6
Floor Beam FB7
Pump
Bracket BK1

16
0.3
0.3
0.3
0.3
0.3
0.3
0.3

0.2
1.2
0.6
1
1
1
1
0.75

14.25
14.2
0.72
14.2
14.3
2.6
11.85
11.85

1
2
8
2
2
2
1
1
4
1

45.6
10.22
1.0368
8.52
8.58
1.56
3.555
2.66625

114
25.56
2.59
21.30
21.45
3.90
8.89
6.67
40
6

c)
3)
a)
b)
c)
d)
e)
f)
g)
h)
i)

0.8

2.4

Date:

###

Note No.

By:

PMD

Sheet No.

0.8
6
5
5
6.6

2
1
2
2
1

4.8
18
0.00
0.00
0.00

STUP Consultants Pvt. Ltd.


j)
k)
l)
m)
n)
o)
p)
q)
r)
s)
5)
a)
b)
c)
d)
e)
f)
g)

Bracket BK2
Bracket BK3
Pipe
Water in pipe
Common header
Stair Arrangement for
Coomon header
Handrail <90 x 90 x 8
Brick work
Brick work
Bracket +Pedestal+Bearing
Well
wall (Above Water Level)
Wall(Below Water Level)
Sump Wall (above G.L)
Sump Wall (below G.L)
Top Slab
Bottom Slab
Sand
Inside stair arrangement in
well

3
3
0.00
0.00
0.00

1.00
0.51

47
14.25
16

0.25
0.25

22
22
22
22
98.5
98.5
98.5

9.3
9.3

2
2

5.5
20.5
3
7.5

1
1
1
1
0.6
1.5
1

8.4

12
45
0
0.00
0.00

66.26
74.4

132.5
148.8
4

122.33
455.97
66.73
166.82
59.11
147.78
827.57

305.8
1139.9
166.8
417.0
147.8
369.5
1489.6
1

Date:

23-04-2016

Note No.

By:

PMD

Sheet No.

Length
(m)

Nos
(m)

Volume
(m3)
60.6125

Quantiy
T
151.5313

14.20

10.22

25.56

STUP Consultants Pvt. Ltd.

Design of pump floor beam :


Pump Capacity

7t
7 t pump
200 thk slab
1200

500

500

Beam = 300 x 1200

7t
2.8 2.8

7t
1.5

Well

Beam = 300 x 600


1200

7t
2.8

7t
1.5

7.5 t/m
11.4 m

Pump Floor details :


3)

a)

Pump Floor Lev. (At Lev. EL. 140.500 m)


Width
Depth
(m)
(m)
Slab
0.20
Floor
Beam
FB1

b)
1)
2)
3)

0.30

From slab
From beam
LL
Total dead load

1.20
=
=
=
=
approx

0.5
0.9
5.7
7.1
7.5

t/m
t/m
t/m
t/m
t/m

Analysis of beam

Moment

(At Span) =

171.138 t/m

(From STAAD)

Reinforcement Calculation:
Grade of concrete
Grade of steel
Clear Cover

M30
fy500
30 mm

1157.5 mm

Mu/bd2
pt (% of reinforcement)

=
=

pc
Reinforcement provided

6.387
1.7 %
0.6 %
5903

1200-30-(25/2)

=
=
=

Hence, depth assuption is ok.

Date:

23-04-2016

Note No.

By:

PMD

Sheet No.

STUP Consultants Pvt. Ltd.

Thickness Check of the Wall of the Intake Well :


Vertical load at G.L
Moment

=
=
=

1935 t
8512 t-m
2837 t-m

Thickness of Intake Well


Grade of concrete

(using R=3)

0.5 m

Grade of steel

M30

fy500

Stress Check
~~~~
Analysis of Section under Bending + Thrust
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Input data
~~~~~~~~~~

Date : 2015.12.23
~~~~~~~~~~~~~~~~~

Concrete :Inst.Modulus,Ei = 1 t/m


Shrk.Strain,shr = 0

Deferred Modulus = 1 t/m


Allow.Tensile stress,ft = 0 t/m

Rebars : Total nr = 400


As/Ac = .02 %

Mod.of Elasticity,Er = 7 t/m

Node coordinates :
Ac = 222.847 m
~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Node#
X(m)
Y(m)
Node#
X(m)
Y(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
1
6.2
0
38
2.469
1.248
75
.24
4.491
112
.412
8.422
149
2.914
11.458
186
6.74
12.376
223
10.349
10.808
260
12.286
7.383
297
11.773
3.482
334
9.015
.676
371
5.308
.57
408
2.1
2.24
445
.542
5.505
482
1.264
9.05
519
3.973
11.447
556
7.579
11.731
593
10.63
9.787
630
11.897
6.399
667
10.869
2.931
704
7.961
.779
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Date:

23-04-2016

Note No.

By:

PMD

Sheet No.

STUP Consultants Pvt. Ltd.

Reinforcement Details :
~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Bar#
X(m)
Y(m)
Area(m)
Bar#
X(m)
Y(m)
Area(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
R 1
6.2
.059
.000113
R 42
.303
4.487
.000113
R 83
2.909
11.385
.000113
R 124
10.261
10.806
.000113
R 165
11.757
3.585
.000113
R 206
5.299
.512
.000113
R 247
.486
5.478
.000113
R 288
3.913
11.485
.000113
R 329
10.637
9.871
.000113
R 370
10.963
2.963
.000113
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Characteristics of Total Section :
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
At = 223.1178 m
Xc = 6.2 m
Yc = 6.1994 m
Ix = 1995.043 m4

Iy = 1994.195 m4

Ixy =-.01953 m4

Load case : well


~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(t)
Mx(tm)
My(tm)
f0(t/m)
Xn(m)
Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL
2403
3083
-.01
20.35
1009959
13.169
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete =

20.35 t/m at Node# 1

Max.Compressive stress = 141.813 t/m in Rebar# 1


Max.Compressive stress = 3059.351 t/m in Rebar# 1

<27500 t/m2

< 1000 t/m2


(As per Is-456)

Date:

23-04-2016

Note No.

By:

PMD

Sheet No.

Height of Column

10.1

Comun Width

0.45

Column depth

0.85

No. of columns

15

Grade of concrete

M30

Grade of steel

fy500

Brick wall length

5.325

Brick wall thickness

0.25

Height of brick wall that rests on column

Unit wt of brick

t/m3

Brick load on column

18.6375

Total vertical load on column

438

Horizontal seismic coefficient

0.07

Horizontal force due to seismic on column for vertical load

31.5

Horizontal force due to seismic on column for brick load

1.3

Ecentric moment due to crane

12

t-m

Moment due to seismic in each column

15.3

t-m

Vertical load in each column

47.8

(sls case)

Moment in each column

27.3

t-m

(sls case)

Vertical load in each column

72

(uls case)

Moment in each column

41

t-m

(uls case)

Clear Cover

40

mm

Dia of mail reinforcement

25

mm

d'

52.5

mm

850

mm

d'/D

0.06

STUP Consultants Pvt. Ltd.

Design of Column of the Pump floor :

nos

(consideing R=3)

Design of Column as per Sp-16 :

Date:

23-04-2016

Note No.

By:

PMD

Sheet No.

STUP Consultants Pvt. Ltd.


Chart for d'/D =

0.1

Pu / fck b D

0.06

Mu / fck b D2

0.04

0.01

0.3

1147.5

Using chart - 44 of Sp-16 :


p/fck
p

(% of steel required)

Ast required

Providing

(From ULS Check)

25 dia

Ast provided

(From SLS Check)

(% of steel)

provided

%
mm2

16 nos
=
=

7854

mm2

2.05

Date:

STUP Consultants Pvt. Ltd.

23-Apr-16

Designed By:

PMD

Note No:
Sheet No:

Calculation of Pile Reinforcement as per SP-16


In ULS Codition :
Maximum diameter of Main Reinforcement
Dia of Transverse Reinforcement

=
=

32 mm
12 mm

Clear Cover

Grade of Concrete

Grade of Reinforcement
Hence d'
=
75+12+32/2

=
=

Overall Depth D

1000 mm

Hence d'/D

0.103

75 mm
M30
Fe500
103 mm

75 mm

say = 0.1

d'

12 mm
32

Reinforcement: From chart 60 of SP 16


Pu/fckD2
Pu
Mux
Case 1:
Case 2:

570
0

Providing

T32

p provided=

85
85

dia bars
2.46 %

0.190
0.000

Mxu/fckD3

p/fck =

p=

0.028
0.028

0.01
0.025

0.30
0.75

24 nos.
Hence,Ok

mm

Date:

STUP Consultants Pvt. Ltd.

23-Apr-16

Designed By:

Note No:
Sheet No:

PMD

In SLS Codition :

Stress check for Pile of pier P1

pile
~~~~
Analysis of Section under Bending + Thrust
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Input data

Date : 2015.12.23

~~~~~~~~~~

~~~~~~~~~~~~~~~~~

Concrete :Inst.Modulus,Ei = 1 t/m

Deferred Modulus = 1 t/m

Shrk.Strain,shr = 0

Allow.Tensile stress,ft = 0 t/m

Rebars : Total nr = 24

Mod.of Elasticity,Er = 7 t/m

As/Ac = 2.46 %

Node coordinates :

Ac = .785 m

~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Node#

X(m)

Y(m)

Node#

X(m)

Y(m)

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
1

.5

20

.337

.027

39

.192

.106

58

.081

.228

77

.015

.379

96

.002

.544

115

.043

.703

134

.134

.841

153

.265

.941

172

.422

.994

191

.587

.992

210

.742

.937

229

.872

.835

248

.96

.695

267

.999

.535

286

.983

.371

305

.915

.22

324

.801

.101

343

.655

.024

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Reinforcement Details :
~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Bar#

X(m)

Y(m)

Area(m)

Bar#

X(m)

Y(m)

Area(m)

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
R 1

.5

.103

.000804

R 4

.219

.219

.000804

Date:

STUP Consultants Pvt. Ltd.

23-Apr-16

Designed By:

PMD

Note No:
Sheet No:

R 7

.103

.5

.000804

R 10

.219

.781

.000804

R 13

.5

.897

.000804

R 16

.781

.781

.000804

R 19

.897

.5

.000804

R 22

.781

.219

.000804

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Characteristics of Total Section :
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
At = .9012 m

Xc = .5 m

Yc = .5 m

Ix = .05821 m4

Iy = .05821 m4

Ixy = 0 m4

Load case : 1
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(t)

Mx(tm)

My(tm)

f0(t/m)

Xn(m)

Yn(m)

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL

-39

61

-.01

930.023

1668.451

.274

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete =

929.745 t/m at Node# 1

Max.Tensile stress = 14788.68 t/m in Rebar# 13


Max.Compressive stress = 4062.75 t/m in Rebar# 1
Load case : 2
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(t)

Mx(tm)

My(tm)

f0(t/m)

Xn(m)

Yn(m)

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL

440

61

-.01

1012.329

5920.288

.966

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~(As per Is-456)


Max. Compressive stress in Concrete =

1012.244 t/m at Node# 1

Max.Compressive stress = 6330.121 t/m in Rebar# 1

< 1000 t/m2


< 27500 t/m2