Anda di halaman 1dari 20

Company Profile

PT TRUBA ALAM MANUNGGAL ENGINEERING Tbk.

State-of-the-art quality and reliability in

Engineering, Procurement and


Construction

Vision

To respond to the challenges of engineering


and power generation

Mission

Produce and provide products and services that are of


high quality standards, timely, and cost efficient both
in terms of production and services
l

Utilize technical abilities and technologies that are


appropriate and are dedicated towards providing
innovative solutions
l

Understand needs, provide solutions to problems as


well as exceed client expectations
l

Contents
Page 1. The World of Truba Manunggal
Page 2. Message from The President Director
Page 4. Corporate Structure
Page 5. Some of Truba Manunggals Subsidiaries
Page 6. Integrated EPC Services
Page 9. Power Generation
Page 11. Coal
Page 15. The People of Truba Manunggal
Page 14. Environment, Health and Safety
Page 17. Management Team

The World of

TRUBA MANUNGGAL
Integrated Engineering, Procurement and Construction (EPC)
The Company provides EPC services through its subsidiaries,
PT Manunggal Infrasolusi. PT Manunggal Infrasolusi deals with
EPC work related projects to power infrastructure as well as
other industrial EPC such as the oil and gas sector. PT Manunggal
Infrasolusi operates two other companies under its management
in the form of PT Truba Jaya Engineering and PT Manunggal
Engineering. Over the years, through its subsidiaries, The Company
has constructed about 90% of PLNs coal-fired and gas-fired
power plants, or roughly 15,000 MegaWatt capacity, including the
construction of some of the largest power plants in Indonesia for
the state-owned company PLN, such as:
- 2 x 660 MW CFPP (coal-fired power plant) Paiton, East Java
- 3 x 600 MW CFPP Suralaya, West Java
- 2 x 660 MW CCFP Tanjung Jati B, Central Java
- 740 MW GTCC (gas-turbine combined cycle) Cilegon, West Java
- 1500 MW GTCC Gresik, East Java
Truba Manunggal is also engaged in industrial projects in and outside of Indonesia, including: Installation of gas turbine for
Arabian Bemco, Tank works for Qatar Petroleum, Gantry Cranes for Laem Chabang and Structural works for Siemens. Trubas
industrial projects in Indonesia includes: NSO phase A field for Exxon Mobil, Nickel smelter plant for INCO, Aromatic plant for
Pertamina and Urea fertilizer storage for PT Pupuk Kaltim.

Power Generation
Domestic demand for electricity in Indonesia is still considered
largely unmet; particularly in areas outside Java. In addition, the
presence of adequate infrastructures and utilities such as electricity,
is one of the factors that induces favorable environment for
investments. In response to this need, the Government opened
up the power generating sector to private sector participation in a
bid to overcome the power supply shortage. Truba Manunggal has
responded positively to the Governments call, and is well on its
way in constructing several power plants which it will subsequently
operate and maintain.

Coal
Indonesia holds significant amounts of coal reserves that could
meet the demand for energy fuel in Indonesia for many years to
come. This offers the opportunity for coal to serve as a much more
affordable source of energy. Truba Manunggal recognizes this
opportunity and set its sight on securing concessionaires with
proven coal reserves as well as obtaining the rights for exploratory
works.

TRUBA ALAM MANUNGGAL ENGINEERING

Message from The President Director

TRUBA ALAM MANUNGGAL ENGINEERING

Truba Manunggals strength lies within our high quality


and experienced workforce, as well as our vertically
integrated line of business.
We believe that, despite todays challenging conditions
on the global economic front, Truba Manunggal has
excellent long-term growth prospects on the strength of
our strategic integration of the EPC, IPP and Coal Mining
businesses.
As an integrated EPC, IPP and Coal Mining operations,
our three core businesses complement and support one
another.

We have decades of expertise in the engineering,


procurement and construction of power plants, which
will soon provide a steady and sustainable stream
of revenues from our long-term Independent Power
Producer contracts.
Competitive Strength
Needless to say, our competitive strength lies in
such unique integration, enabling us to make highly
competitive bidding for prime power generating
projects, while ensuring our partners and shareholders
the prospects of a sustainable long-term growth.

Sidarta Sidik
President Director

TRUBA ALAM MANUNGGAL ENGINEERING

Corporate Structure
PT Truba Alam Manunggal Engineering Tbk.

PT Maxima Infrastruktur
(Coal Mining & Trading)

Manunggal Beijing
International Trade Co. Ltd.

TAME T.C. Pte. Ltd.

TAME Turnkey
(Labuan) Pte. Ltd.

Grenzone Pte. Ltd.

TAME Investments
Pte. Ltd.

PT Manunggal Infrasolusi
(Power Plant/Industrial)

PT Truba Jaya Engineering


(Construction)

PT Manunggal Engineering
(Engineering & Procurement)

PT Suar Alam Engineering


(Engineering & Procurement)

PT Manunggal Multi Energi


(Coal Mining)
PT Truba Segihan Utama
(Stock Piling)

PT Equator Manunggal
Power
PT Bangka Manunggal
Power
PT Ranyza Energi

PT Central Daya Energi

PT Menamas Mitra Energi

TRUBA ALAM MANUNGGAL ENGINEERING

PT Manunggal Power
(Power Plant)

Some of Truba Manunggals Subsidiaries

Engineering Procurement
Construction (EPC)
PT MANUNGGAL INFRASOLUSI

Independent Power Producer (IPP)


PT MANUNGGAL POWER

PT Manunggal Engineering

PT Truba Jaya Engineering

PT Suar Alam Engineering

PT Menamas Mitra Energi (MME)

PT Central Daya Energi (CDE)

PT Ranyza Energi

PT Banyuasing Power Energi

PT Bangka Manunggal Power

PT Equator Manunggal Power

Coal Mining and Trading


PT MAXIMA INFRASTRUKTUR

PT Manunggal Multi Energi

PT Truba Segihan Utama

Maxima Coal Pte Ltd

TRUBA ALAM MANUNGGAL ENGINEERING

Integrated
EPC Services

TRUBA ALAM MANUNGGAL ENGINEERING

Truba Manunggal views its EPC services as an integral


part of a one-stop solution for the development and
commissioning of electricity power plants, transmission
and other industrial works.
To achieve this, the Company has established whollyowned subsidiaries, namely PT Manunggal Infrasolusi.
EPC (Manunggal Infrasolusi) which is engaged in power
plant and industrial EPC.
The three subsidiaries of Manunggal Infrasolusi are
PT Truba Jaya Engineering (TJE), which is engaged
primarily in construction activities, and PT Manunggal
Engineering and PT Suar Alam Engineering, both of
which are engaged in engineering and procurement
activities.
TJE has implemented a number of installations that
include power plants, machinery for industrial as well
as the oil and gas sector. Whereas ME and SUE provide
technical assistance for power plant construction
projects, through feasibility study, detail engineering, as
well as procurement of machinery and equipment. All
three companies crucially support the Company in its
venture to operate in an integrated manner.
With over 30 years experience in EPC, we are one of
Indonesias leading EPC contractors for a wide variety of
power and industrial plants. We estimate that, through
TJE, we have built more than 90% of the coal-fired
and gas-fired power plants in Indonesia, with unit
capacities ranging from 25 MW to 660 MW and a total
installed capacity of more than 15,000 MW. We have
also successfully completed a large number of industrial
plant EPC projects, including cement plants, fertilizer
plants, chemical and petro-chemical plants, oil and
gas processing facilities and pulp and paper plants. In
addition to our existing EPC capabilities, we are also
currently expanding into the construction of renewable
energy power plants.
The Companys procurement services includes access
to raw materials and construction equipment, building
materials, and imported goods needed for construction,
mechanical or electrical works.

The Company is an integrated Engineering, Procurement, and


Construction (EPC) services include the construction of power plants
and industrial plants.

Overseas Project Truba Arabia


Truba Arabia is a Joint Venture between PT Truba
Jaya Engineering (TJE), a wholly owned subsidiary of
Truba Manunggal, and Arabian Bemco Contracting
Co. (BEMCO) a leading EPC contractor in Saudi Arabia.
Truba Arabia started operation in 2002 to serve Electrical
and Mechanical installation of the power generation
industry, oil & gas and industrial plants projects in
Saudi Arabia and the Middle East region. Truba Arabia
has a dedicated team of professional and highly skilled
workforce of over 1,000 personnel. The company has
already been contracted to install more than 40 gas &
steam turbines in Saudi Arabia
with a combined generating capacity of 4,000 MW.
Truba Arabias Quality and Safety is built upon TJEs
system that is internationally certified - ISO 9000:2000,
OHSAS and ASME. TJE provides support to Truba Arabia
by mobilizing experienced key project supervision
personnel and provides technical assistance in all
aspects of the management of projects.
Certification
Truba Manunggal, through TJE, is accredited by the
American Society of Mechanical Engineering (ASME) for
the design and assembly of power boilers. TJE has also
obtained the International certifications in the form of
ISO 9001 (Quality Management System) from Llyods, ISO
14001 (Environmental Management System) and AHSAS
18001 (Occupational Management) from Sucofindo
International. These certifications testify the Companys
strength in human resources; the skills and experiences
of the Companys personnel and ability to meet vigorous
standards of quality control.

Completed EPC Projects


Project Name
Location
Client

Power Plants
PLTU Unit 1 & 2 (2x65MW)
Banjarmasin
Co-Generation 300MW
Duri Utara
GTPP 2x50MW
Pemaron
Turbin Gas 6x143MW
Muara Tawar
Cilegon CC 740MW
Cilegon
PLTU 2x300MW
Cilacap
PLTU Unit 3 & 4 (2x100MW)
Tarahan
PLTU Tanjung Jati B (2x660MW)
Jepara

PLTU Unit 3 & 4 (2x100MW)
Tarahan

Mitsui
Stone & Webster
Wasamitra
Samsung
Mitsubishi
Cengda
JEL
JEL
(Jurong Engineering Ltd.)
JEL

Commencement Date
1998
1999
2003
2003
2004
2004
2005
1997
2005

TRUBA ALAM MANUNGGAL ENGINEERING

Completed EPC Projects


Project Name
Location
Client

Commencement Date

Paper Factories
Musi Pulp Mill
Tanjung Enim
Klockner
Mechanical and Construction Work PM 2
Pekanbaru
Pectech
Tank Foundation work, piping, Aerial pool
Pekanbaru
Pectech
Area Maintenance IKPP/RAPP
Pekanbaru
IKPP/ RAPP
Power installation in Kiln Evaporator
Pekanbaru
Pectech
Oil and Gas
Area-10 Pipe Line
Duri
Caltex
Oil Tank Rehabilitation Mesaid
Qatar
Qatar-Petro
Oil Production Area OSEIL
Seram
Daewoo
Area-10 Hook-Up & POP
Duri
Caltex
Suban Gas
Suban
Hyundai
Booster Compression
Lhouksukon
Tri Patra
Depot Terminal BBM
Cikampek
Pertamina
DSF-11
Duri
Caltex
Oil Area maintenance
Minas
Caltex
FPM
Duri
Tri Patra
FPM
Minas
Tri Patra
LNG Tangguh
Tanah Merah
Japan Gas

Corporation (JGC) Track

Kellogg Brown & Root (KBR)
FPMMaintenance and Construction work
Duri
TripatraFlour
Civil Work and Ground Work
Kulin
TripatraFlour
Fertilizers Factories
UBS-3 and conveyor system
Bontang
Chengda
UBS-5 and conveyor system
Bontang
Kalimantan Industrial

Estate (KIE)
Chemical Factories
Styrene Monomer (SM-2 exp)
Merak
RFCC Taoyuan
Taiwan

Cement Plant
Kerteh Olefin Plant
Cement Factories

1999
2001
2001
2002
2002
2002
2002
2003
2003
2005
2005
2006
Dec 07
Dec 07
2000
2005

Mitsubishi
Lucky Gold (LG)
Engineering

1998
2000

JEL

2000

Semen Cibinong

2003

Mitsubishi
Beca
PT Bukit Asam (Persero)
(PTBA)
Inco

1998
1998
2001

Riau
Dumai
Bula
Cikampek

Siemens
Elnusa
Daewoo
Pertamina

1998
2000
2001
2002

Perawang

IKPP

2002

Semarang
Thailand
Jakarta
Makasar
Panjang

IHI
JEL
Barata
Noell Indonesia
Pelindo II

1998
1998
1999
2000
2001

Cilegon
Soroako

Mitsubishi
Inco

2004
2004

Chengda Engineering Corp.


Shanghai Electric Corporation
PT Maxima Infrastruktur
Mitsubishi Corporation

Mar 07
Nov 07

China National Electric


Equipment Corporation (CNEEC)
China National Technical
Import & Export Corporation
Beijing Electric Power
Constructio Company (BEPCC)
Manunggal Engineering

Nov 07

Sumitomo Corp. Erection Div.


PT Jurong Engineering Lestari
Sumitomo Corp. Erection Div.
PT Jurong Engineering Lestari
MES-TSW Jont Operation

Jan 10
Feb 10
Feb 09
Oct 09
Jun 09

(Mitsui Eng. & Shipbuilding Co. Ltd.)


Taehei Dengyo Kaisha Ltd.

Nov 09

JGC/KBRI
PT Tanjung Enim Lestari
PT RAPP/PT IKPP
Chevron Pacific Indonesia
Chevron Pacific Indonesia
Kobe Steel Ltd.

Jul 06
Apr 08
Oct 08
Feb 08
Mar 08
Nov 07

Malaysia

Steel
Cibinong
Cibinong
Steel Processing and Mining
Indominco Coal
Bontang
Inco-Dryer Unit 2 (Gas Cleaning)
Soroako
Up-grade Coal Port
Kertapatih

Construction work and
Soroako
Gas Cleaner Installation
Pipe and Tank Construction
Minas Tank GS-6
Tank Renovation TK-220
Oil Tank OSEIL
Depot Tank BBM
Civil and Architectural Work
Bridge Expansion Lukut-Ukui
Heavy Equipment Work
Container Crane Tg.Mas
Container Crane ESCO
Container Crane P.Panamac
Container Crane Makasar
RTG Crane 35 ton
Transmission and Substation Work
Transmission and Power Tower
Spilicing Fiber Optic Line 4

1998
Sep 07
Sep 07
Apr 07
Aug 07

Dec 07

EPC projects under construction


Power
PLTU 2 (2x300 MW) Coal Fired Steam Power Plant
Banten, West Java
PLTU Pelabuhan Ratu 3x300 MW
West Java

Muara Karang Gas Power Plant Project
West Java
(Repowering) 720 MW
PLTU Indramayu 3x330 MW
West Java

PLTU 1 Banten Suralaya Unit 8, 1x600 - 700 MW
West Java

CFSPP Paiton 1x660 MW, Central Java
East Java

CP - Bharai Power Plant (2x30 MW) CFSPP
Sumatra
PLTU Tanjung Jati - B (3&4), CFPP 2x660 MW
Central Java
Balance of Plant
Mechanical Erection
Installation of CW Pipe
Mechanical Erecrion of Boiler & Auxillary Equipment
Steel Structure Erection & Field Painting of
Turbine & Control Building

PLTU Paiton Unit 3 Expansion Project, Paiton
East Java
Oil and Gas and other Industries
LNG Tangguh - Mechanical work
TEL MUSI - Maintenance work
RAPP - Maintenance work
Oil and Gas EPC - Duri
Oil and Gas EPC - Duri
GIIC Pellet Plant Mechanical &
Erection Work Plus Steel Structure Supply and Works

TRUBA ALAM MANUNGGAL ENGINEERING

Papua
Sumatra
Sumatra
Sumatra
Sumatra
Bahrain

Sep 07

Jan 08
May 08
Jul 08

Power Generation

2
TRUBA ALAM MANUNGGAL ENGINEERING

Electricity power in Indonesia is currently in short supply.


The problem is more acute in areas outside Java where
infrastructure development has lagged behind those in
Java.
The enactment of regional autonomy laws has meant
that Indonesian provinces have to generate their own
revenues by stimulating local industries and businesses.
But with the prevailing power shortage, neither business
nor investments can be expected to take roots, much
less grow.
The Government is fully aware of the power crisis
situation. Hence, the Government of Indonesia has
embarked on an accelerated program to construct new
power plant that will produce about 10,000 MW of
electricity from coal-fired power plants. The program is
termed the 10,000 MW Fastrack program that is slated
to be completed within 3 years, beginning construction
in 2007. The move by the government to utilize coal
as fuel for power generation is due to the abundant
coal reserves that Indonesia has, which would provide
a cheap solution for power generation to an emerging
country like Indonesia. This program is open for private
sector participation.
Responding to this opportunity, the Company positions
itself to undertake not only the EPC for power plants,
but to build, own and operate these power plants as the
so-called Independent Power Producer (IPP).
As an IPP, the Company will supply electricity to PT PLN
(Persero) as well as to private industries, regulated by
terms and conditions agreed upon by the Company and
the purchaser through a Power Purchase Agreement
(PPA).
Truba Manunggal IPP projects will focus outside of Java
Island. Allowing the Company to step in to provide
the unmet needs coming from more than 20 millions
consumers.

10

TRUBA ALAM MANUNGGAL ENGINEERING

More than three decades of hands-on expertise in the engineering,


procurement and construction of major power plants in Indonesia have
made Truba Manunggal a front-runner in the unfolding market for the
so-called Independent Power Producer.

The Companys key competitive advantages are:


1. Long and extensive experience and role as EPC
contractor for power, will allow effective control over
quality standards and construction management.
2. Construction of the IPP are mainly undertaken by the
Company itself, minimizing execution and
construction risk.
3. Access to semi-captive coal supply.
4. IPP sites located in areas that will ensure access to
water catchments as well as ease of logistics.
At present, the Company is operating 3 power plants
with total capacity of 170 MW, which consist of:
1. 130 MW CDE Diesel in Lampung
2. 20 MW Tanjung Batu, East Kalimantan
3. 20 MW Karang Joang, East Kalimantan
Truba Manunggal currently has 4 Power Purchase
Agreement (PPA) with PLN and 1PPA with a private
company, with total generating capacity of 414 MW:
1. 2x12MW Bangka, Bangka Island
2. 2x30MW Pontianak, West Kalimantan
3. 2x30MW CP Bahari, Lampung
4. 2x135MW Kuala Tanjung, North Sumatera

Coal

3
TRUBA ALAM MANUNGGAL ENGINEERING

11

The Company is also in the business of operating coal


mines and the trading of coal. These activities are carried
out in line with efforts to provide fuels needed to power
coal-fired power plants that are currently being build in
Indonesia as well as potential foreign market.
Positive business prospects
To address the power crisis that Indonesia is in, the
Government of Indonesia put into plan of building
10,000 MW of coal-fired power plants. The decision
to use coal as fuel for power is mainly due to the fact
that coal is presently the cheapest form of fossil fuel. In
addition to that Indonesia is blessed with the abundant
coal reserves, which would be of strategic importance
for the Government of Indonesia.
The fact that Indonesia is also considered as an
emerging market, the demand of power would kept on
increasing, because it not only need to meet the pent up
demand, but to add more affordable power capacity to
fuel the economic growth of the country.
This situation provides positive and ample growth
opportunities for the coal industry for the next decades
to come. In terms of the composition of energy sources
currently utilized by power plants in Indonesia (which
includes coal, gas, geothermal, water, and oil) coal
comprise as the largest type used and its composition is
expected to increase from 43% in 2006 to become 54%
by 2015.

With potentially strong businesses in both EPC and IPP, it makes


strategic sense for Truba Manunggal to secure its own supply of coal.
Securing this, will shape us into a fully integrated, coal-fired power plant
developer, operator and maintenance company.

The Company projects that the domestic consumption


of coal is expected to increase to as much as 30 to 40
million tons per year with the 10,000 MW coal-fired
power plants coming on-stream. The Company intends
to best utilize market opportunities in line with its
businesses in the ownership of power plants, and
integrated supplier of energy required by power plants.
Securing Coal Sources and Supply
At present, Truba Manunggal owns 2 exploitation
licences which includes Manunggal Multi Energi (MME)
at Muara Enim regency, South Sumatra, and Panimax Inti
Mining (PIM) at Tanah Bumbu, Kalimantan.
The Company plans to start producing from its coal
reserves, which at present estimate has about 140
million tons.

12

TRUBA ALAM MANUNGGAL ENGINEERING

The People of

TRUBA MANUNGGAL
Human resources are considered to be a vital element of the Company
for they are partners needed to achieve success for every business and
activity.
As a result, human resources counseling and
development within the Company are both carefully
planned and continuously implemented to ensure
that each employee contributes their best to
the Companys performance. In addition to this,
managements policy on human resources seek to,
among others, fulfill and move in accordance with
Government prescribed labor regulations and norms
such as its participation in the Labor Social Guarantee
(Jaminan Sosial Tenaga Kerja) or JAMSOSTEK scheme.
In terms of improving work quality and productivity,
the Company provides opportunities for its employees
access to education and training as a means of
refreshment from work as well as to enhance ones skill
sets. In implementing this, a program is developed
involving employees to identify skill sets that would
be needed to enhance the effectiveness of Trubas
people in achieving Companys goal, which in
return developed Trubas people into a high quality
workforce. This program could include the typical
internal or external update seminars, workshop and
courses, but also scholarship for advanced studies.

In addition to this, the Company seeks to promote


positive core values to all of its employees such
as integrity, transparency, cooperation, creativity,
determination, and providing the utmost in terms of
service.
Regular training and employee recruitment are
carefully planned and implemented in line with the
current and future professional needs of the intended
trainee. The Companys recruitment program is based
on a Business Plan that was mutually agreed upon
by all operational managers and which takes into
account, among others, the candidates qualifications.
At the same time, the Company strives to instill a safe
and healthy working environment, implement external
benchmarking to enhance employee creativity,
ability and productivity, as well as improve work
efficiency and HR placements so as to ensure that
the right people are in the right place. Subsequently,
the Company intends to place its employees with
its strategic partners in a number of joint venture
projects, with particular emphasis on Engineering, in
order to enhance the Companys competitiveness.

Corporate Values
PT Truba Alam Manunggal Engineering Tbk. builds strong relationship with its stakeholders based on 10 (ten) core
values, divided into 2 (two) categories, namely external and internal values.

Internal Values

1. Competence, continuously advance the quality


of skills, proficiencies, and mental attitude for
effectiveness of work.
2. Efficiency, the determination to always do the right
thing, always seeks the chances of improvement and
efficiency, always creative and innovative in order
to create added value for customers with a proper
and competitive price.
3. Integrity, firmness in holding the principle of truth
and corporate value in business activity which is
presented in consistency of words and behavior.
4. Teamwork, sharing capabilities and skill sets, based
on mutual respect, to achieve goals effectively.
5. Responsibility, a fully integrated approach to Health,
Safety and Environmental (HSE) management in
offices, on site and at clients locations, in every
place we provide our expertise ensuring HSE is top
priority in all of our activities.

External Values

1. Dedication, passion in giving our best to provide


effective solutions.
2. Competitive pricing, delivering products and
services which have high quality standard with cost
effective and always accomplished on the right time
as our promise.
3. Respect for Clients need, performing transparency,
accountability, and responsibility which related to
the result.
4. Professionalism, Always striving to give high quality
standard of products and services,
5. Balance, live in harmony with related elements, such
as: environment, people and community as well as
improving the living standards of local communities
and protecting the global environment and strive to
gain the trust of our clients and society.

TRUBA ALAM MANUNGGAL ENGINEERING

13

14

TRUBA ALAM MANUNGGAL ENGINEERING

Environment, Health
and Safety

The Company seeks to prioritize occupational health and safety and


environmental conservation in every aspect of its activities. In addition
to this, the Company also aspires to be a socially responsible organization by seeking to improve the welfare of the community where we
operate as well as implement environmental-friendly practices that
would contribute to the global community.

TRUBA ALAM MANUNGGAL ENGINEERING

15

Occupational Health and Safety


In its quest to ensure occupational health and safety,
the Company implements an onsite inspection of the
workplace of the work methods and impending issues as
well as job safety analysis. This process eventually results
in a Standard Operating Procedure (SOP) that is referred
to as the Work Safety Instruction (WSI). The instruction
incorporates work systems that must be implemented
by every employee to avoid work-related accidents.
In this respect, the Companys subsidiary, Truba Jaya
Engineering (TJE), has successfully been certified by the
National Council on Occupational Safety and Health
Administration (OSHA) of the US. The certification
internationally recognizes that the Companys business
activities are deemed to be both occupationally healthy
and safe. In addition to the OSHA certification, TJE also
secured the OHSAS 18001 (for Occupational Health and
Safety Management System-Requirements).
Environmental Conservation
In addition to the OSHA and OHSAS, TJE was also
internationally recognized for its effort in environmental
conservation through the ISO 14001. The Company
seriously seeks and implements efforts to conserve the
environment and protect the ecosystem that reside with
it, so as to ensure that the Environment is sustainably
and continuously perform its natural functions as well
benefits to the inhabitants. To reduce its environmental
footprint, Truba Manunggal put into service a very
efficient waste recycling facility that is operated to
ensure that it is stringently in accordance with the waste
recycling system.
Social Responsibility
As a responsible corporate citizen, the Company is
committed to take active role in the effort to improve
the general welfare of communities where the Company
is operating, as well as striving to be an environmentally
friendly in its activity, which in the long run would
benefit every one of us.
Presently the Company is revisiting its CSR program, to
enhance and focus the program to be as effective as
possible as well as in line with the Companys vision and
values.

16

TRUBA ALAM MANUNGGAL ENGINEERING

As power plants are known to have significant impact on environmental and


community well-being, Truba Manunggal takes its Corporate Social Responsibilities
(CSR) seriously. The Company has developed a comprehensive policy guideline and
manual for the undertaking of CSR activities in the communities surrounding its
operations.

In the past, Indonesia has, as we all know, experienced


number of natural disasters that have taken its toll on
numerous lives. In response to these natural disasters,
Truba Manunggal had proactively formed special teams
to directly provide vital assistance and support. The
assistance extended by the Company are in the form of
cash, medicines, clothes, blankets, food and water, as
well as providing medical team to assist in the disaster
affected areas.
Other forms of social-related assistance provided by
the Company include a blood donation program that is
routinely implemented once every three months. Blood
donation does not merely seek to extend vital medical
support to its recipients but it also has positive health
benefits for the donor as well.
In terms of education and religion, the Company extends
a scholarship program to children from less fortunate
families to ensure that their education continues and
strive to achieve success. The Company also builds
religious facilities, particularly within the vicinity of its
projects. The construction of the religious facilities are to
provide the local community as well as our employees to
ease access to conduct their prayers.
Going forward Truba Manunggal will focus its CSR
activities on education. The Company strongly believes
in contributing to the enlightenment of the Nation.
Hence, presently the Company is developing programs
to achieve this goal.

Management Team
Richard Harjani
President Commissioner

President Commisioner, received his Masters degree in 1994. Prior to his current position, he served as
Chief Executive Officer at PT Sulawesi Agro Utama, from February to December 2007. From 1994 to 2006,
Mr. Harjani also served as Chief Operating Officer at PT Rimo Catur Lestari.

Siswanto
Independent Commissioner

An independent Commisioner with a military background, he last held the rank of Brigadier General of
the Army. During his military career, Siswanto served in a number of important positions, including in
the UN Mission at Cambodia, lecturer at the Army Command Staff School in Bandung, and a staff at the
Planning Bureau, Army Head Quarters. Currently, he also serves as Comisioner or Director at several other
major corporations.

Board of Commissioner

Sidarta Sidik
President Director

President Director, hold a Master of Science from Stanford University, California, USA and a Bachelor of
Science from University of Washington, USA. Prior to 2001, Mr. Sidik had worked for several companies in
Indonesia such as PT NTT Indonesia, Artha Graha Group as well as in overseas NTT Group-Japan and AT
Kearney, Inc-USA. He currently also serves as President Commisioners in PT Truba Jaya Engineering

Shi Hong Chao


Director

Director, received a Bachelors Degree and a Masters Degree in Thermal Power Engineering from
Shanghai Jiaotong University and an MBA from China-Europe International Business School. Apart from
serving as a Director, Mr. Shi also serves as President Director of ME since November 2006. During the
period of June 1996 up to October 2006, he worked for CHEC and his latest position was Operation
Director in charge of business operations

Board of Directors

Andre Purnawan
Director

Director, recieved his Master of Business in Administration (MBA), majoring in Finance and Marketing
in 1988, from Indiana University, Indiana USA. Since 2006, aside from being appointed as a Director at
PT Truba Alam Manunggal Engineering, he was also appointed as Commisioners both at PT Manunggal
Engineering and PT Truba Jaya Engineering. During his career days from 1995 to 2006, he also served as
Director for the Sinar Mas Group.

FX. Agus Edyono, S.Ip


Unaffiliated Director

Unaffiliated Director, has a military background and his last active post was Colonel. During his military
career he served in East Timor, the Middle East, Morocco, Cambodia and Australia. Before his military
career, Mr. Edyono was part of the operational staff of PT Brajamusti Citra Nusantara and operational staff
of PT Usaha Kita Makmur Bersama. Mr Edyono holds a Bachelors Degree in State Administration, from
Universitas Terbuka, Bandung, 1996

Julius Edi Wibowo


Director

Indonesian citizen Received his Master of Science in Electrical Engineering majoring in wireless
communication in 1995 from Delft University of Technology Delft, The Netherland. Upon his graduation,
Mr. Wibowo also served as researcher at Rheinisch-Westflische Technische Hochschule (RWTH) Aachen,
Germany. Currently serves as Director of Truba Manunggal. Previously worked for several companies
including Booz-Allen & Hamilton Inc. and Deputy Director of Business Strategic & Planning in Truba
Manunggal.

Corporate Data
Name of Company
PT TRUBA ALAM MANUNGGAL ENGINEERING Tbk.
Line of Bussines
Integrated Electricity Power, Engineering, Procurement
and Construction Provider.
Head Office
Wisma BRI II, 30th-31st Floor
Jl. Jend. Sudirman Kav. 44-46
Jakarta 10210, Indonesia
Phone : (62-21) 5793 2255
Fax : (62-21) 5793 2334
Website: www.truba-manunggal.com
Corporate Secretary
Gamala V. Katoppo
E-mail : gamala.katoppo@truba-manunggal.com

Anda mungkin juga menyukai