PROJEK: -Kerja-kerja Pembersihan dan Pembaikan Sistem P

Lumpur
NO.

ITEM

A.
1

B.
1

C.
1

D.
1

E.
1

1/24

F.
1

G.
1

H.
1

SUB-TOTAL

PROJEK: -Kerja-kerja Pembersihan dan Pembaikan Sistem P


Lumpur

NO.

ITEM

I.
1

2/24

J.
1

K.
1

L.
1

3/24

SUB-TOTAL

OVERALL SUB TOTA


Less 20%
TOTAL

4/24

K: -Kerja-kerja Pembersihan dan Pembaikan Sistem Perparitan di


ur
DESCRIPTION

SITE CLEARING
ITEM 1-4-1/SR 8
Clear the whole area of the construction site of all grass, lalang, belukar,
shrubs and all debris and construction materials, structural or else
where as directed by Engineer.

EXCAVATION FOR DRAIN LAYING, PIPE, BOX CULVERT, SUMPS,


MANHOLES, PIERS
ITEM 2-2-6/SR 12
Excavate to drain for drain laying to depth not exceeding 1.5m in
pre-approved length to minimise inconvenience to pedestrian and
vehicular traffic, get out and remove to a tip to be provided by the
contractor away from work site, including where directed cutting site
slopes to angles as specified. On completion of drain laying return
selected spoil and ram sides of drains. Include all necessary timbering.
HAND EXCAVATION
ITEM 2-2-9/SR 12
Supply all necessary labour and tools for hand excavation, get out and remove
to a tip provided by the Contractor. On completion, return selected spoil and ram
CONCRETE TO DRAIN
ITEM 2-5-1/SR 14
Provide and lay concrete (1:3:6 - 38mm aggregate) in base and
haunching to block drain, "Pudu Cut" drain and H.R.G.W channels all as
per details in Drawing No. JKAL 1260/1A, JKAL 1260/2A and JKAL
1260/40. Include for all mixing and placing as required.
HARDCORE TO DRAIN AND BOX CULVERTS
ITEM 2-6-1/SR 15
Provide and lay approved hardcore in base of U-shaped drain and box
culverts as per detail Drawing No. JKAL 1260/39. Include for consolidating
the hardcore.

5/24

PRECAST CONCRETE BLOCK DRAIN


ITEM 2-7-1/SR 15
Purchase 610mm x 610mm precast concrete block drain from approved
manufacturer transport to site and lay to exact line, level and gradient as required
in prepared trench (measured separately). Include for jointing in cement
mortar (1:3) for cutting and waste.

PRECAST CONCRETE "U-SHAPED" DRAIN


ITEM 2-10-2/SR 16

Purchase 900x900 mm precast concrete U-shape drains with dry weather


flow channel from approved manufacturer, transport to site and lay to
exact line, level and gradient as required in prepared trench.
Include for jointing and pointing in cement mortar (1:3). Drawing
No. SP/003/11.90 (JKAL 1260/39) refers.
GLAZED WARE HALF-ROUND CHANNEL
ITEM 2-8-2/SR 16
Purchase best commercial quality straight 225mm G.W.H.R channel in
600mm or 900mm lengths from approved manufacturer, transport to site
and lay as directed on prepared concrete bed (measured separately). Include
for jointing in cement mortar 1:3 and for all cutting and waste.

SUB-TOTAL

K: -Kerja-kerja Pembersihan dan Pembaikan Sistem Perparitan di


ur

DESCRIPTION

BRICKLAYER AND MASON


ITEM 2-15-1/SR 25

6/24

Supply and lay well burnt clay brickwork in cement mortar 1:3 in walls and
shafts of inspection chambers and manholes, piers to suspended pipe lines,
columns, walls to any depth or height not exceeding 3m measurement not
including openings. Include for flush pointing of joints.
(reduced to 225mm thickness for measurement.)
TURFING
ITEM 2-21-1/SR 31
Supply blended soil as specified in Section "C" and spread to a thickness
not less than 75mm. Including for fertilizing with 'rock phospate'
or 'NPK 15.15.15' as specified.

ITEM 2-21-2/SR 31
Provide and lay turves of carpet grass to side of slopes of drain or otherwise as
required and include for pegging in 'Spot-Turfing' where
specified and 610mm centre to centre untill turves thrive. Individual turves
should not be smaller than 225mm by 150mm. The Contractor shall inform
Engineer of his source of supply of all turvesused on the works.

FILLING
ITEM 2-3-1/SR 12
Supply approved earth filling material and backfill side slopes or
elsewhere as specified.
DAYWORK RATES - LABOUR
ITEM 14-1-1/SR 71
Supply General labour

7/24

SUB-TOTAL
OVERALL SUB TOTAL
Less 20%
TOTAL

8/24

n di Cerun D, Bukit Setiawangsa, Kuala

QTY

UNIT

RATES
(RM)

AMOUNT
(RM)

16800.00

M2

4.50

75,600.00

92.00

M3

8.60

791.20

12.00

M3

18.00

216.00

12.00

M3

236.00

2,832.00

12.00

M2

48.00

576.00

9/24

14.00

25.20

352.80

59.00

240.00

14,160.00

53.00

15.60

826.80

95,354.80

n di Cerun D, Bukit Setiawangsa, Kuala

QTY

UNIT

RATES
(RM)

AMOUNT

10/24

(RM)

75.00

M2

69.00

5,175.00

341.00

M2

12.00

4,092.00

341.00

M2

4.50

1,534.50

142.00

M3

20.70

96.00

Day

55.00

2,939.40

5,280.00

11/24

19,020.90
114,375.70
22,875.14
91,500.56

12/24

Projek: TEMBOK BATU GUNUNG( RUBBLE PITCHING WALL) DI JALAN MAHAMERU.


NO.

ITEM

A.
1
2
3
4
5
B.
1
2
3
4
5
C
1
2
D
1
E
1
F.
1

G.
1
H.
1
2
I.
1a.
1b.
1c.
1d.
2
3
4
J.
1
2
K.
1
2
3
4
L.
1

TEMBOK BATU GUNUNG( RUBBLE PITCHING WALL) DI JALAN MAHAMERU.


DESCRIPTION

Excavation work for preparation of foundation


Excavation for Rubble Picthing along Jalan Mahameru
Excavation for half glazed drain behind of rubble wall
Excavation for New Rubble Wall at New Sump for Cascading drainage installation
Excavation for New Sump to be constructed at Cascading drain installation
Excavation for New Cascading drian at Sump
Foundation (Overall) For Rubble Walls, Sump & Drainages.
Foundation for Rubble Pitching Along Jalan Mahameru Mainline
Foundation for 1/2 dia 12" Glazed Drainage Behind Rubble Wall Along Jalan Mahameru Mainline
Foundation for Rubble Wall at Cascading Drain
Foundation for New Sump at Cascading drain
Foundation for New Cascading Drains at New Sump
Filling for Sub-Base for Drainage
Filling of sand as sub grade for 1/2 Glazed drain behind Rubble Wall along Mahameru Mainline
Ditto For Cascading drain at New Sump
Panel Brickwalls Construction
Construct Brickwall at new sump As Water Retention Wall
Rendering for Brickwall ( Brickwalls panel, Sump brickwalls & Drianage brickwalls).
Rendering for Completed Brick Water Retaining Wall at New Sump ( 2.4 m x 0.6 m)
Painting Of Brickwalls Panels, Bricks Colums ,MS Pre-Fab Fencing & Service MS Door.
Painting of Emulsion Paint for Brickwall Panel 2 coats (As Water retaining Wall at Sump)

Supply & Install Pre-Fab MS Grating c/w Ironmongeries work for Manhole at Rubblewall
Supply and Install M.S Grating for Manhole at Jalan Mahameru as replacement
Drainage Stiffeners ( Kerb ( Left & Right of Top Capping for Drains
To supply top capping and kerb wall as stiffener to Drains Behind Rubble wall
Ditto but at cascading drain Rubble walls ( New Sump System)
Construct of Rubble Wall for Slope repair, Sump and Drainage System.
Construct Rubblewall at slope repair location along Jalan Mahameru Mainline
Ditto as above
Ditto as above
Ditto as above
Construct Rubblewall Bothsides at Cascading 1/2 Round Glazed Drainage System adjoining to new Sump
Construct New Sump consists of Rubble Pitching Materials
Construct Rubble wall under 1/2 dia 300mm drainage at end of drain to sump
Supply & Install 1/2 Round Glazed Drain at Rubblewall & New Sump area
Supply & Install 1/2 Dia glazed drains behind rubblewalls along Jalan Mahameru
Supply & Install 1/2 Dia glazed drains at New Sump
Supply & Install Weepholes at Rubble Walls
Supply & Install 3"dia PVC Pipe including preparation work as filter for rubble Pitching walls along Mahameru
Ditto But At Cascading drians
Supply & Lay Crushed Stones as Packing behind Retaining walls to form Weep holes and etc.
Ditto as above but at Sump Cascading drain Rubble walls
Capping for Drainage at Rubble Pitching walls
Capping for Jalan Mahameru Drainage Behind Rubble Pitching walls

SUB-TOTAL

DIMENSION In Meters
LENGTH WIDTH
HEIGHT
L
W
H

Units

Qty

Nos.
(Final)

Rates

Amount

125.00
125.00
1.20
8.00
8.00

1.00
0.35
###
1.00
0.38

2.20
0.30
0.15
0.80
0.08

M3
M3
M3
M3
M3

275.00
13.13
0.22
6.40
0.23

1.00
1.00
1.00
2.00
1.00

8.60
18.00
18.00
18.00
18.00

2,365.00
236.25
3.89
230.40
4.05

125.00
125.00
8.00
1.20
8.00

1.00

0.10

0.80
###

0.10
0.10

M3
M3
M3
M3
M3

12.50
0.242
0.64
0.144
0.242

1.00
1.00
2.00
1.00
2.00

236.00
236.00
236.00
236.00
236.00

500.88
7,139.00
302.08
33.98
913.79

1.00
1.00

0.15
0.15

M3
M3

18.75
1.69

1.00
1.00

32.20
20.30

603.75
34.26

0.60

M2

1.44

1.00

72.00

103.68

1.00

15.00

162.00

1.00

6.00

64.80

125.00
8.00

2.40

7.20

1.50

M2

7.20

1.50

M2

10.80

10.8

M2

113.00
8.00

0.30
0.30

6.50
14.00
80.00
12.00
8.00
1.20
0.90

0.65
0.65
0.65
0.65
0.30
0.30
0.30

1.25
1.80
1.95
1.15
0.80
0.70
0.70

113.00
8.00

M2
M2

33.90
2.40

2.00
2.00

15.00
15.00

1,017.00
72.00

M3
M3
M3
M3
M3
M3
M3

5.28
16.38
101.40
8.97
1.92
0.25
0.19

1.00
1.00
1.00
1.00
2.00
2.00
1.00

161.00
161.00
161.00
161.00
161.00
161.00
161.00

850.28
2,637.18
16,325.40
1,444.17
618.24
81.14
30.43

1.00
1.00

26.40
26.40

2,983.20
211.20

51.00
12.00
51.00
12.00

50.00
50.00
46.00
46.00

765.00
180.00
15.84
3.73

2.00

69.00

15,594.00

M.Run
M.Run

0.30
0.30
0.30
0.30

0.075
0.08
0.15
0.15

113.00

0.30

M.Run
M.Run
0.15
M3
0.15
M3

0.15

M.run

15.30
3.60
0.01
0.08

55,526.62

Remarks

SOR
SOR
SOR
SOR
SOR

Page
Page
Page
Page
Page

12
12
12
11
11

(Item
(item
(Item
(item
(item

2-2-6)
2-2-9)
2-2-9)
2-2-9)
2-2-9)

SOR
SOR
SOR
SOR
SOR

PAGE
PAGE
PAGE
PAGE
PAGE

14
14
14
14
14

(Item
(Item
(Item
(Item
(Item

2-5-5)
2-5-1) JKA1260/2A
2-5-5)
2-5-5)
2-5-1) JKA 1260/2A

SOR Page 12(Item 2-3-2)


SOR Page 42 (Item 4-2-6)

SOR Page 39(Item 3-6-1)

SOR page 26(Item 2-15-4)

SOR PAGE 65 ( Item 10-1-5)

SOR PAGE 26 ( Item 2-15-4)


SOR PAGE 26 ( Item 2-15-4)

SOR
SOR
SOR
SOR
SOR
SOR
SOR

PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE

26
26
26
26
26
26
26

(
(
(
(
(
(
(

Item
Item
Item
Item
Item
Item
Item

2-16-1)
2-16-1)
2-16-1)
2-16-1)
2-16-1)
2-16-1)
2-16-1)

SOR PAGE 22 ( Item 2-13-1)


SOR PAGE 22 ( Item 2-13-1)

SOR PAGE 32 (Item 2-22--9)


Ditto
SOR page 26 (Item 2-16-5)
Ditto as above

SOR PAGE 19 (Item 2-10-35

Plus 20%
11,105.32
66,631.94