SITE CLEARING
ITEM 1-4-1/SR 8
Clear the whole area of the construction site of all grass, lalang, belukar,
shrubs and all debris and construction materials, structural or else
where as directed by Engineer.
5/24
SUB-TOTAL
DESCRIPTION
6/24
Supply and lay well burnt clay brickwork in cement mortar 1:3 in walls and
shafts of inspection chambers and manholes, piers to suspended pipe lines,
columns, walls to any depth or height not exceeding 3m measurement not
including openings. Include for flush pointing of joints.
(reduced to 225mm thickness for measurement.)
TURFING
ITEM 2-21-1/SR 31
Supply blended soil as specified in Section "C" and spread to a thickness
not less than 75mm. Including for fertilizing with 'rock phospate'
or 'NPK 15.15.15' as specified.
ITEM 2-21-2/SR 31
Provide and lay turves of carpet grass to side of slopes of drain or otherwise as
required and include for pegging in 'Spot-Turfing' where
specified and 610mm centre to centre untill turves thrive. Individual turves
should not be smaller than 225mm by 150mm. The Contractor shall inform
Engineer of his source of supply of all turvesused on the works.
FILLING
ITEM 2-3-1/SR 12
Supply approved earth filling material and backfill side slopes or
elsewhere as specified.
DAYWORK RATES - LABOUR
ITEM 14-1-1/SR 71
Supply General labour
7/24
SUB-TOTAL
OVERALL SUB TOTAL
Less 20%
TOTAL
8/24
QTY
UNIT
RATES
(RM)
AMOUNT
(RM)
16800.00
M2
4.50
75,600.00
92.00
M3
8.60
791.20
12.00
M3
18.00
216.00
12.00
M3
236.00
2,832.00
12.00
M2
48.00
576.00
9/24
14.00
25.20
352.80
59.00
240.00
14,160.00
53.00
15.60
826.80
95,354.80
QTY
UNIT
RATES
(RM)
AMOUNT
10/24
(RM)
75.00
M2
69.00
5,175.00
341.00
M2
12.00
4,092.00
341.00
M2
4.50
1,534.50
142.00
M3
20.70
96.00
Day
55.00
2,939.40
5,280.00
11/24
19,020.90
114,375.70
22,875.14
91,500.56
12/24
ITEM
A.
1
2
3
4
5
B.
1
2
3
4
5
C
1
2
D
1
E
1
F.
1
G.
1
H.
1
2
I.
1a.
1b.
1c.
1d.
2
3
4
J.
1
2
K.
1
2
3
4
L.
1
Supply & Install Pre-Fab MS Grating c/w Ironmongeries work for Manhole at Rubblewall
Supply and Install M.S Grating for Manhole at Jalan Mahameru as replacement
Drainage Stiffeners ( Kerb ( Left & Right of Top Capping for Drains
To supply top capping and kerb wall as stiffener to Drains Behind Rubble wall
Ditto but at cascading drain Rubble walls ( New Sump System)
Construct of Rubble Wall for Slope repair, Sump and Drainage System.
Construct Rubblewall at slope repair location along Jalan Mahameru Mainline
Ditto as above
Ditto as above
Ditto as above
Construct Rubblewall Bothsides at Cascading 1/2 Round Glazed Drainage System adjoining to new Sump
Construct New Sump consists of Rubble Pitching Materials
Construct Rubble wall under 1/2 dia 300mm drainage at end of drain to sump
Supply & Install 1/2 Round Glazed Drain at Rubblewall & New Sump area
Supply & Install 1/2 Dia glazed drains behind rubblewalls along Jalan Mahameru
Supply & Install 1/2 Dia glazed drains at New Sump
Supply & Install Weepholes at Rubble Walls
Supply & Install 3"dia PVC Pipe including preparation work as filter for rubble Pitching walls along Mahameru
Ditto But At Cascading drians
Supply & Lay Crushed Stones as Packing behind Retaining walls to form Weep holes and etc.
Ditto as above but at Sump Cascading drain Rubble walls
Capping for Drainage at Rubble Pitching walls
Capping for Jalan Mahameru Drainage Behind Rubble Pitching walls
SUB-TOTAL
DIMENSION In Meters
LENGTH WIDTH
HEIGHT
L
W
H
Units
Qty
Nos.
(Final)
Rates
Amount
125.00
125.00
1.20
8.00
8.00
1.00
0.35
###
1.00
0.38
2.20
0.30
0.15
0.80
0.08
M3
M3
M3
M3
M3
275.00
13.13
0.22
6.40
0.23
1.00
1.00
1.00
2.00
1.00
8.60
18.00
18.00
18.00
18.00
2,365.00
236.25
3.89
230.40
4.05
125.00
125.00
8.00
1.20
8.00
1.00
0.10
0.80
###
0.10
0.10
M3
M3
M3
M3
M3
12.50
0.242
0.64
0.144
0.242
1.00
1.00
2.00
1.00
2.00
236.00
236.00
236.00
236.00
236.00
500.88
7,139.00
302.08
33.98
913.79
1.00
1.00
0.15
0.15
M3
M3
18.75
1.69
1.00
1.00
32.20
20.30
603.75
34.26
0.60
M2
1.44
1.00
72.00
103.68
1.00
15.00
162.00
1.00
6.00
64.80
125.00
8.00
2.40
7.20
1.50
M2
7.20
1.50
M2
10.80
10.8
M2
113.00
8.00
0.30
0.30
6.50
14.00
80.00
12.00
8.00
1.20
0.90
0.65
0.65
0.65
0.65
0.30
0.30
0.30
1.25
1.80
1.95
1.15
0.80
0.70
0.70
113.00
8.00
M2
M2
33.90
2.40
2.00
2.00
15.00
15.00
1,017.00
72.00
M3
M3
M3
M3
M3
M3
M3
5.28
16.38
101.40
8.97
1.92
0.25
0.19
1.00
1.00
1.00
1.00
2.00
2.00
1.00
161.00
161.00
161.00
161.00
161.00
161.00
161.00
850.28
2,637.18
16,325.40
1,444.17
618.24
81.14
30.43
1.00
1.00
26.40
26.40
2,983.20
211.20
51.00
12.00
51.00
12.00
50.00
50.00
46.00
46.00
765.00
180.00
15.84
3.73
2.00
69.00
15,594.00
M.Run
M.Run
0.30
0.30
0.30
0.30
0.075
0.08
0.15
0.15
113.00
0.30
M.Run
M.Run
0.15
M3
0.15
M3
0.15
M.run
15.30
3.60
0.01
0.08
55,526.62
Remarks
SOR
SOR
SOR
SOR
SOR
Page
Page
Page
Page
Page
12
12
12
11
11
(Item
(item
(Item
(item
(item
2-2-6)
2-2-9)
2-2-9)
2-2-9)
2-2-9)
SOR
SOR
SOR
SOR
SOR
PAGE
PAGE
PAGE
PAGE
PAGE
14
14
14
14
14
(Item
(Item
(Item
(Item
(Item
2-5-5)
2-5-1) JKA1260/2A
2-5-5)
2-5-5)
2-5-1) JKA 1260/2A
SOR
SOR
SOR
SOR
SOR
SOR
SOR
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
26
26
26
26
26
26
26
(
(
(
(
(
(
(
Item
Item
Item
Item
Item
Item
Item
2-16-1)
2-16-1)
2-16-1)
2-16-1)
2-16-1)
2-16-1)
2-16-1)
Plus 20%
11,105.32
66,631.94