This is a 51 hrs of guided learning course. Students need to invest further hours in the course, which
will include private study and home assignments. Lessons are held as indicated on the prospectus and
website.
Learners will be guided to review and evaluate standards and legislation to meet different LPG systems
installation scenarios. Knowledge and practical skills are assessed in the class room environment as
well as at LPG sites. During the course, legislation is reviewed thoroughly and candidates are expected
to follow and learn how to communicate LPG installation procedures with LPG system engineers.
Unit Content
Unit Content
Ventilation requirements for Natural Gas and LPG Systems; Gas Flame: Post-aerated flame,
Pre-aerated flame, Flame Lift and Lighting Back, Retention Flames, Flame Chilling;
Atmospheric Burners: injector, primary air port, mixing tube and burner; Pre-mix Burners:
Forced Draught Burner, Induced Draught Burner, Tunnel Burners; Gas Pressure and Flow:
Gas Flow in Pipes, Factors affecting Pressure Absorption; Gas Pressure readings: Maximum
Incidental Pressure (MIP), Maximum Operating Pressure (MOP), Operating Pressure (Working
Pressure), Maximum Pressure Absorption Across the Installation (Pressure Loss/ Drop),
Pressure Absorption Across the Natural Gas Meter, Appliance Operating Pressure (Burner
Pressure), Standing Pressure; Estimating Pipe Sizing: Domestic, Commercial, Considering
pressure drop; Measurement of Gas: Displacement meters; Positive displacement meters;
Rotary displacement meters; inferential meters, turbine meters, Orifice meter, Ultrasonic
Gas Meter; Gas Control Valves: Plug Cock or tap, Ball Valves, Butterfly Valves, Safety
Interlock, Disk Valve, Gate Valve, Diaphragm Valve, Needle Valve, cooker safety cut-off
valve, plug-in Quick release Valve, appliance Plug Tap, Solenoid Valve; Safety Shut-off Valve:
Electro-hydraulic, Electro-mechanical; Heat Operated Gas Control Valves: Thermal Cut-off,
Heat Motor, Pressure Stat, Thermistor Thermostat; Pressure Operated Controls Valves: nonreturn valve, Gas Relay Valve; low and high Pressure Cut-off Devices: Low Pressure Cut-off
Device, Under Pressure Shut-off Valve (UPSO), High Pressure or Overpressure Shut-off Valve
(OPSO); Pressure Regulators: Constant Pressure Regulator, Compensated Pressure
regulators; High-to-low Pressure Regulator; Flame Supervision devices: Bi-metalic Strip FSD,
Liquid Expansion FSD, Thermo-electric FSD, Flame Rectification FSD, Photo-electric FSD;
Thermostatic Control: Rod-type Bi-metallic Thermostat, Liquid Expansion Thermostat;
Ignition Devices: Piezo-electric Ignition, mains Ignition Transformer, Electronic Pulse Ignition;
Vitiation Sensing Devices: Oxygen Depletion System (ODS), Atmospheric Sensing Devices
(ASD); Pressure and Flow Proving Devices: Pressure Switch, Flow Switch, Transducer
Unit Content
Unit Content
MRA COP; outdoor installations: manifolds, regulators, pipe work, accessories, basic pipe sizing, pipe
installation, leak & pressure testing, system certification; indoors installations; Commissioning Gas
Installations; Gas Installer Responsibility; Gas industry Unsafe Situations; Responsibilities of the Gas
User (Responsible Person for the Premises); Responsibilities of the Gas Operative (not on site);
Responsibilities of the Gas Operative (on site)
Unit Content
Polyethylene Pipe Joining: Fusion welded joints, Electro-fusion welded joint, Compression
joint; Copper pipe jointing: Capillary joints, Compression joints, Press fitting joints; mild Steel
Pipe jointing; Semi-rigid and Flexible Pipe Connections: Flexible Stainless Steel, Flexible
Hoses, Appliance hoses, LPG supply hoses; Gas service Pipework: Protection of service
pipework Below Ground, Protection of service pipework above ground, service Pipework
Insulation, Equipotential Bonding at the meter, Emergency Control Valve; Connection to High
Rise Buildings; Gas Meter Installations: Meter Location, Meter Boxes, multi-occupancy
Buildings, removal of the Gas Meter, Meter By-pass; Commercial Gas Installations: reading
and producing line diagrams, Identification and marking of pipework, Purge point, Secondary
and check meters; internal installation pipework: Pipework laid in floors, Pipework laid in
walls; pipe work support and allowance for movement; LPG supply pressure reduction, LPG
Supply to block of flats; LPG Cylinder Installation Location of Cylinders, Care with Empty
Cylinders, Transportation of Cylinders; LPG Bulk Tank Installation: Storage Vessel Sitting,
Firewall Protection, Warning Notices, Storage Vessel Fittings; Gas Supplies from a Bulk Tank
Installation: Additional Storage Vessel Fittings; Pipe sizing LPG Installations
Tightness Testing and Purging: Pressure testing Apparatus: Pneumatic testing, Hydraulic
testing; Pressure Detecting Devices: Manometer, High Specific Gravity Test, Bourdon gauge;
Metering Devices: Volumetric Devices, Flow metering; Gas Sampling Equipment and
Detectors; Electronic Equipment and Calibration Certificates; Tightness Testing with Air
(Domestic) Procedure; Tightness testing and Purging with LPG (Domestic); Strength testing
for Commercial Pipework; Direct Purging Commercial Pipework; Indirect Purging Using
Nitrogen;
The following are the suggested pre-requisites and/or entry requirements needed:
Pre-Requisites:
Entry Requirements;
An MCAST Certificate of Achievement will be awarded to those candidates who satisfy the
80% attendance criteria AND ALSO choose to sit and pass the course assessment/s.
Students who opt not to sit for the assessment/s or fail (the assessment/s) will however
be awarded an MCAST Certificate of Attendance provided that they fulfill the minimum
attendance criteria as stated above.
If the student intends to obtain a Certificate of Achievement, she/he is required to sit for an
assessment/s. Assessment/s may take various forms such as a home assignment, class assignment,
practical test and time constrained test. However, the assessment/s is not compulsory and an
applicant may choose not to sit for it.