CAPTULO I: INTRODUCCIN ....................................................................................................... 10
1.1) DESCRIPCIN DEL PROYECTO .......................................................................................... 10
1.2) ALCANCE DEL PROYECTO ................................................................................................. 10
1.3) UBICACIN DEL PROYECTO .............................................................................................. 11
1.4) ACTIVIDADES ECONMICAS ............................................................................................ 11
1.5) CLIMA ............................................................................................................................... 11
1.6) RELIEVE............................................................................................................................. 12
1.7) OBRAS HIDRULICAS DEL PROYECTO TINAJONES ........................................................... 12
CAPTULO II: DEMANDA DE AGUA .............................................................................................. 19
OBJETIVOS DEL CAPTULO II .................................................................................................... 19
2.1) INTRODUCCIN ................................................................................................................ 19
2.2) USO AGUA POTABLE ........................................................................................................ 20
2.2.1) REA DE INFLUENCIA DEL PROYECTO ....................................................................... 20
2.2.2) POBLACIN ............................................................................................................... 22
2.2.3) ESTIMACIN AL 2025 ................................................................................................ 23
2.2.4) DEMANDA DE AGUA POTABLE.................................................................................. 26
2.3) DEMANDA AGRCOLA: ..................................................................................................... 27
2.3.1) TEMPERATURA .......................................................................................................... 27
2.3.2) HORAS LUZ ................................................................................................................ 28
2.3.3) EVAPORACIN POTENCIAL ....................................................................................... 28
2.3.4) COEFICIENTES CONSUNTIVOS ................................................................................... 28
2.3.5) DEMANDA AGRICOLA ............................................................................................... 29
2.4) CONCLUSIONES Y RECOMENDACIONES DEL CAPTULO II ............................................... 29
CAPTULO III: OFERTA HIDRICA ................................................................................................... 31
OBJETIVOS DEL CAPTULO III ................................................................................................... 31
3.1) INTRODUCCIN ................................................................................................................ 31
3.2) HIDROLOGIA DE LA CUENCA ............................................................................................ 31
3.2.1) REA DE LA CUENCA ................................................................................................. 31
3.2.2) PRECIPITACIN.......................................................................................................... 32
3.2.2) EVAPORACIN........................................................................................................... 33
3.3) REGISTROS HISTORICOS ................................................................................................... 34
3.3.1) HISTOGRAMAS .......................................................................................................... 34
3.3.2) CURVAS DE DURACIN ............................................................................................. 46
2
NDICE DE FIGURAS
Figura 1 Foto satelital del reservorio Tinajones .......................................................................... 10
Figura 2 Intercuenca 137771 (morado) y la cuenca Chancay-Lambayeque (verde) ................... 11
Figura 3 Cultivos ubicados en la zona de chiclayo ...................................................................... 12
Figura 4 Bocatoma tnel Conchano ............................................................................................ 13
Figura 5 Tnel Conchano ............................................................................................................. 13
Figura 6 Estructuras de salida Tnel Chotano ............................................................................. 13
Figura 7 Tnel Chotano ............................................................................................................... 14
Figura 8 Bocatoma Raca Rumi..................................................................................................... 14
Figura 9 Cascada del canal alimentador...................................................................................... 15
Figura 10 Reservorio Tinajones ................................................................................................... 16
Figura 11 Canal de descarga proveniente del embalse............................................................... 16
Figura 12 Repartidor "La Puntilla"............................................................................................... 17
Figura 13 Canal Taymi ................................................................................................................. 18
Figura 14 Grfico que resume el flujo del Sistema Tinajones ..................................................... 18
Figura 15 Planta de tratamiento N1 de agua potable de Chiclayo ............................................ 19
Figura 16 rea de influencia del proyecto .................................................................................. 21
Figura 17 rea de influencia del proyecto Tinajones (ARCGIS)................................................... 22
Figura 18 Grfico de la poblacin estimada ................................................................................ 24
Figura 19 Ubicacin de las estaciones Sipan y Reque ................................................................. 27
Figura 20 rea del proyecto ........................................................................................................ 31
Figura 21 Reservorio Tinajones ................................................................................................... 32
Figura 22 Disminucin del caudal en funcin de la probabilidad del ro Chancay ..................... 36
Figura 23 Curva de variacin estacional del ro Chancay ............................................................ 37
Figura 24 Histograma mensual del ro Chancay .......................................................................... 38
Figura 25 Anlisis de tendencia del ro chancay ......................................................................... 38
Figura 26 Histograma anual del ro chancay ............................................................................... 39
Figura 27 Disminucin del caudal en funcin de la probabilidad del canal alimentador ........... 40
Figura 28 Curva de variacin estacional del canal alimentador.................................................. 40
Figura 29 Histograma mensual del canal Alimentador ............................................................... 41
Figura 30 Anlisis de tendencia del canal Alimentador .............................................................. 42
Figura 31 Disminucin del caudal en funcin del caudal de descarga ........................................ 43
Figura 32 Curva de variacin estacional del canal de descarga .................................................. 44
Figura 33 Histograma mensual del canal de Descarga................................................................ 45
Figura 34 Anlisis de tendencia del canal de Descarga ............................................................... 45
Figura 35 Histograma Anual del canal de Descarga .................................................................... 46
Figura 36 Curva de duracin mensual total del ro Chancay ...................................................... 48
Figura 37 Curva de duracin mensual (Enero-Abril) del ro Chancay ......................................... 48
Figura 38 Curva de duracin mensual (Mayo-Agosto) del ro Chancay ...................................... 48
Figura 39 Curva de duracin mensual (Septiembre-Diciembre) del ro Chancay ....................... 49
Figura 40 Curva de duracin mensual total del canal alimentador ............................................ 51
Figura 41 Curva de duracin (Enero-Abril) del canal alimentador.............................................. 51
Figura 42 Curva de duracin (Mayo-Agosto) del canal alimentador .......................................... 51
Figura 43 Curva de duracin mensual (Septiembre-Diciembre) del canal alimentador ............. 52
Figura 44 Curva de duracin mensual total del canal de descarga............................................. 54
4
NDICE DE TABLAS
Tabla 1 rea de sembrado de los cultivos................................................................................... 20
Tabla 2 Poblacin por distritos.................................................................................................... 23
Tabla 3 Poblacin por distritos.................................................................................................... 23
Tabla 4 Poblacin estimada por el mtodo grfico .................................................................... 24
Tabla 5 Poblacin estimada por el mtodo grfico .................................................................... 24
Tabla 6 Estimacin de la poblacin por el mtodo aritmtico ................................................... 25
Tabla 7 Proyeccin de la poblacin con el mtodo geomtrico en logaritmos .......................... 26
Tabla 8 Proyeccin de la poblacin por el mtodo de crecimiento geomtrico ........................ 26
Tabla 9 Promedio de la estimacin de la poblacin en el 2025 .................................................. 26
Tabla 10 Demanda poblacional al ao 2025 ............................................................................... 27
Tabla 11 Temperatura promedio de la cuenca ........................................................................... 27
Tabla 12 Horas luz de la cuenca por meses ................................................................................ 28
Tabla 13 Evapotranspiracin potencial de la cuenca por meses ................................................ 28
Tabla 14 Usos consuntivos de los cultivos seleccionados ........................................................... 29
Tabla 15 Demanda agrcola por ha sembrada ............................................................................ 29
Tabla 16 rea del proyecto ......................................................................................................... 32
Tabla 17 Precipitacin total de la estacin Llama ....................................................................... 32
Tabla 18 Precipitacin total de la estacin Sipn........................................................................ 33
Tabla 19 Precipitacin total de la estacin Santa Cruz ............................................................... 33
Tabla 20 Precipitacin total de la cuenca ................................................................................... 33
Tabla 21 Evaporacin de la cuenca ............................................................................................. 34
Tabla 22 Caudales mensuales del ro Chancay............................................................................ 34
Tabla 23 Caudales mensuales del canal alimentador ................................................................. 34
Tabla 24 Caudales mensuales del canal de descarga .................................................................. 35
Tabla 25 Conversin a logaritmos de los caudales mensuales de la Cuenca Chancay ............... 35
Tabla 26 Orden decreciente de los caudales convertidos a logaritmos ..................................... 35
Tabla 27 Estimacin de los caudales en funcin de los porcentajes deseados .......................... 36
Tabla 28 Conversin de los logaritmos para graficar la curva de variacin estacional .............. 36
Tabla 29 Caudal medio anual ...................................................................................................... 37
Tabla 30 Conversin a logaritmos del caudal del canal alimentador ......................................... 39
Tabla 31 Orden decreciente de los caudales convertidos en logaritmos ................................... 39
Tabla 32 Estimacin de los caudales en funcin de los porcentajes deseados .......................... 40
Tabla 33 Conversin de logaritmos para graficar la curva de variacin estacional .................... 40
Tabla 34 Caudal medio anual ...................................................................................................... 41
Tabla 35 Conversin a logaritmos del canal de descarga ........................................................... 43
Tabla 36 Ordenar en forma descendiente a los caudales convertidos en logaritmos ................ 43
Tabla 37 Estimacin de los caudales en funcin de los porcentajes deseados .......................... 44
Tabla 38Conversin de logaritmos para graficar la curva de variacin estacional ..................... 44
Tabla 39 Caudal medio anual ...................................................................................................... 44
Tabla 40 Caudales representativos del Ro Chancay (mensual).................................................. 47
Tabla 41 Caudales representativos del canal alimentador (mensual) ........................................ 50
Tabla 42 Caudales representativos del canal de descarga (mensual)......................................... 53
Tabla 43 Caudales representativos del ro chancay (anual) ........................................................ 55
Tabla 44 Caudales representativos del canal alimentador (anual) ............................................. 57
7
CAPTULO I: INTRODUCCIN
1.1) DESCRIPCIN DEL PROYECTO
Las ejecuciones de las obras principales del sistema Tinajones que corresponden a la Primera
Etapa se ejecutaron entre los aos de 1950 1990 con apoyo de una empresa alemana
(Salzgitter Industriebau GmbH). Este proyecto es uno de los ms importantes del pas, ya que
fue construido por necesidad y utilidad pblica.
La Inversin de todas estas obras super los 180 millones de dlares. Este proyecto comenz a
operar desde 1969. Utiliza las aguas provenientes del Ro Chancay y de los trasvases
provenientes de los Ros Conchano y Chotano.
Cuenta con una extensin superficial sembrada de aprox. 68,000 Ha (aos secos) hasta 85,000
ha (aos hmedos) beneficiando a ms de 26,000 agricultores. Por ltimo, permite el suministro
de agua para la Ciudad de Chiclayo y otros centros poblados en el departamento de Lambayeque
que cuenta con aproximadamente 650,000 habitantes.
De esta forma, gracias a este proyecto, se produjo un aumento la produccin y productividad en
el sector agrcola en la regin y la generacin de energa hidroelctrica.
10
1.5) CLIMA
La zona del proyecto abarca una gran parte de la Costa y un sector pequeo de la Sierra. Por lo
tanto, posee un clima rido con muy poca presencia de precipitaciones. La Costa pertenece a la
zona climtica subtropical que condiciona el carcter semidesrtico y desrtico de la angosta
franja costera (desierto subtropical).
Por otra parte, la regin de Lambayeque es altamente vulnerable a fenmenos naturales como
el Nio y las sequias (La Nia). Se producen lluvias intensas, inundaciones y deslizamientos.
Segn los estudios hechos en la zona, se proyecta que para el ao 2040 habr intensificacin de
aridez, inundaciones en la costa de la regin y disminucin de precipitaciones en la vertiente
atlntica.
11
1.6) RELIEVE
Es una zona plana y costera. Posee una planicie con muy poca pendiente de 0.1% a 2%.
Asimismo muestra grandes contrastes, como reas de riego o valle verde y otras desrticas o
dunas, el bosque seco tambin es tpica en esta zona.
Figura 3 Cultivos ubicados en la zona de chiclayo
Tnel Chotano: Deriva las aguas de los ros Chotano y Conchano hacia el ro Chancay. El tnel
est ubicado en la provincia de Chota. Tiene una longitud de 4766 m con un dimetro 3.65 m.
Soporta un caudal mximo de 31 m3/s y un volumen anual de 230 MMC.
Figura 6 Estructuras de salida Tnel Chotano
13
Bocatoma Raca Rumi: Est ubicada en el ro Chancay dentro del distrito de Chongoyape. Fue
construida entre 1965 a 1968. La obra entr en servicio desde el ao 1969. Capta las aguas del
ro Chancay y las deriva al canal alimentador del reservorio Tinajones. Est diseada para
soportar avenidas de hasta 75 m3/s.
Figura 8 Bocatoma Raca Rumi
14
Cascada del canal alimentador: Estructura especial de concreto armada. Su funcin es de salvar
el desnivel de 42.70 m en el curso del canal alimentador al reservorio. Se presenta como una
cada en escalera de 12 pasos que amortigua ese desnivel. Tiene una longitud de 245.7 m.
Figura 9 Cascada del canal alimentador
Reservorio Tinajones: Est ubicada en el valle lateral del ro Chancay que correspondiente a los
terrenos de la ex hacienda Tinajones, de donde proviene su denominacin. La presa fue
construida entre los aos 1963 1968. La supervisin estuvo a cargo de los contratistas
alemanes Salzgitter Industriebau GmbH. El Reservorio de Tinajones tiene ms de 45 aos en
servicio durante los cuales registr volmenes mnimos y normales de agua. La funcin que tiene
es la de almacenar los excedentes de agua del sistema Chotano - Chancay. Debido a ello,
resultaron beneficiados ms de 25,000 usuarios en el valle.
Cuenta con una capacidad de almacenamiento de 320 MMC, en un rea de 20 km2, cerrado por
una presa principal de 2440 metros de longitud y 40 metros de altura, y por 3 diques secundarios
de 850 metros, 400 metros y 315 metros de longitud con una altura de 20 metros cada uno.
Todos estos diques fueron construidos con relleno zonificado de tierra y estructura de ncleo
impermeable, con espaldones de grava (rip rap) y filtro. La presa principal tiene instalado
instrumentos para la medicin de la presin de poros y de las fluctuaciones de la napa fretica.
El reservorio tiene sus instalaciones de servicios con su equipamiento respectivo: cuenta con un
tnel de descarga, equipamiento en boca de entrada al tnel, equipamiento en el extremo aguas
abajo del tnel de descarga y casetas de control. Adems, cuenta con un aliviadero de crecidas
que es una estructura de concreto armado que tiene su equipamiento de ataguas metlicas.
La sedimentacin que se produce al ao es equivalente a 27 MMC. (8%)
15
Tnel de descarga: es de 380 metros de longitud con una seccin circular de 3.6 m de dimetro.
Est revestido de concreto con blindaje de acero. Tiene una capacidad (Q) de 80 m3/s.
16
Ro Taymi:
Se inicia en el Repartidor La Puntilla y se extiende como un ramal del ro Chancay (El otro ramal
es el ro Reque). Tiene una longitud de 1.8 km hasta llegar al repartidor de Desaguadero. Soporta
una capacidad de 110 m3/s.
Repartidor Desaguadero:
Es una estructura de concreto armado con sus resoectivas barandas metlicas. Se divide en 3
ramales. El nuevo canal Taymi (Qmax = 65 m3/s), el ro Lambayeque (Qmax = 42 m3/s) y el canal
Ptapo (Qmax = 3 m3/s).
Canal Taymi:
Inicia en el Repartidor Desaguadero y finaliza en el Repartidor Cachinche. Es un canal trapezoidal
que tiene una longitud de 48.8 km de longitud. Abastece desde hace 29 aos los sectores de
Ferreafe, Mochum, Tcume, Mrrope. Tiene una capacidad de conduccin de 25 a 65 m3/s.
Los taludes estn hechos de mampostera de piedra con espesor de 30 cm y con piso de concreto
de 15 cm de espesor. En diferentes puntos, se construyeron 14 tomas, 10 puentes vewhiculares,
6 puentes peatonales, entregas de quebradas, 16 alcantarillas, 3 sifones, 2 cadas una estructura
de regulacin y la Rpida Batangrande para salvar un desnivel de 17.6 m para un caudal de 35
m3/s.
17
Repartidor Cachinche: Es la estructura final del canal Taymi, divide las aguas en dos ramales:
Mochum(Qmax=17 m3/seg) y Tcume(Qmax=10 m3/seg). La regulacin se hace mediante 4
compuertas radiales. Anchos de entrada 3.03 m. x 2.00 m (ramal Mochum) y 2.44 x 2.00
m(ramal Tcume).
Sistema de Drenaje: Abarca la instalacin de la red de drenaje a nivel de canales principales,
secundarios y terciarios, en los siguientes sectores: Ferreafe(266.40 km -20,000 hs
beneficiadas), Mochum(28.80 km - 3,000 hs beneficiadas), Chacupe Santa Rosa(37.00 km 3,500 hs beneficiadas), Muy Finca(30.40 km - 7,900 hs), Fala-Capote-Lambayeque(57.6 km 8,800 hs beneficiadas) y Chiclayo Pimentel(45.70 km - 7,800 hs), lo cual hace un total de
465.90 kilmetros y 51,000 hectreas beneficiadas en el valle.
Figura 14 Grfico que resume el flujo del Sistema Tinajones
18
2.1) INTRODUCCIN
La masa de agua que se almacena en el Reservorio Tinajones sirve para regular la oferta hdrica
en el Valle Chancay Lambayeque para los diferentes usos consuntivos y no consuntivos. Dentro
de estos usos se encuentran el agrario, el poblacional, el industrial y el energtico, siendo
prioritario el uso poblacional para las ciudades de Chiclayo, Lambayeque y Ferreafe.
Poblacional:
En cuanto a la infraestructura del sistema de abastecimiento de agua para uso domstico, sta
se inicia a partir de la Toma Santeo en el Canal Lambayeque, luego se distribuyen las aguas por
el Canal Las Mercedes con un caudal de 1, 200 l/s hasta la planta de tratamiento de agua,
compuesta por 2 unidades donde se realiza los procesos de precolacin, coagulacin,
floculacin, sedimentacin, filtracin y desinfeccin con una produccin por planta de 750 y
400 l/s y un total de 1 150 l/s.
Figura 15 Planta de tratamiento N1 de agua potable de Chiclayo
Agrario:
Los cultivos de mayor superficie de siembra en la cuenca Chancay-Lambayeque, lo constituye la parte
baja. Los cultivos predominantes son el arroz y la caa de azcar, y cubren cerca del 75% del rea
sembrada. El maz, frijol Caupi, algodn, garbanzo, tomate, yuca, camote y hortalizas son
cultivos que se producen a menor escala.
El algodn ha estado disminuyendo su rea de sembrado como resultado del bajo precio en el
mercado. Actualmente el rea sembrada de pastos y de menestras presenta un descenso que
es perjudicial para la actividad pecuaria.
19
Cultivo
Arroz
Caa de azcar
Maz amarillo duro
Algodn
Otros
Porcentaje
43.96 %
35.76 %
5.74 %
4.78 %
9.76 %
Industriales:
Durante los ltimos aos, la produccin de azcar ha presentado indicativos de expansin con
un crecimiento de 20% anual. Esto se puede ver porque las ex-cooperativas azucareras se han
dedicado mayormente al cultivo industrial de la caa de azcar. Adems, las inversiones
privadas como las Industrias San Juan, Azucarera del Norte y la gestin privada de Pomalca han
obtenido buenos resultados.
20
-ETEN =
7.93 km2
84.78
- REQUE =
17.93 km2
47.03
- SAA =
20.90 km2
313.9
- TUMAN =
90.04 km2
130.34
- PUCALA =
56.64 km2
175.81
- CHONGOYAPE =
125.08 km2
712
- PATAPO =
36.96 km2
182.81
30.55 km2
200.57
- PITIPO =
30.02 km2
558,2
- TUCUME =
56.59 km2
67.0
- MORROPE =
51.8 km2
4313.89
- LAMBAYEQUE =
222.29 km2
332.73
- PIMENTEL =
55.57 km2
66.53
- SANTA ROSA =
1.07 km2
14.09
- MONSEFU =
40.16 km2
44.94
21
2.2.2) POBLACIN
La poblacin a la cual abastece el proyecto Tinajones se muestra en el siguiente cuadro, el cual est
ordenado por distritos. Los distritos sombreados de amarillo son aquellos que presentan partes
pertenecientes al rea de influencia, mientras que los que estn sombreados de verde son los que se
encuentran en su totalidad en el rea de influencia.
Para estimar la poblacin de una forma ms exacta, solo se tom un porcentaje de la poblacin total de
los distritos que no se encontraban en su totalidad en el rea de influencia, siendo este porcentaje
equivalente a la relacin entre el rea ubicada en la zona de influencia y el rea total del distrito. Para las
poblaciones que si se encuentran en su totalidad en la zona de influencia si se consider sus poblaciones
totales.
Los datos fueron tomados del INEI, los cuales van desde el 2000 hasta el 2015.
22
CHONGOYAPE
ETEN
MONSEFU
PIMENTEL
SANTA ROSA
SAA
PATAPO
PUCALA
TUMAN
3294
1100
27885
21861
793
855
4302
3566
19833
687
3298
1097
28041
22740
806
857
4336
3545
19983
687
3298
1093
28161
23625
819
856
4364
3520
20109
686
3295
1087
28256
24519
831
855
4388
3492
20216
685
3290
1081
28332
25430
843
854
4410
3462
20311
3283
1074
28398
26365
855
852
4430
3431
3275
1067
28451
27321
867
850
4448
3265
1059
28486
28294
878
848
3254
1051
28508
29286
889
3241
1043
28521
30303
3228
1034
28532
3214
1025
3200
PITIPO
LAMBAYEQUE
MORROPE
TUCUME
REQUE
960
38285
441
17609
4468
982
39226
449
17789
4560
1004
40135
457
17947
4648
1024
41026
465
18091
4733
682
1045
41913
473
18223
4816
20399
679
1065
42797
481
18350
4900
3398
20478
677
1086
43680
488
18469
4982
4463
3364
20544
674
1106
44557
496
18578
5063
845
4477
3328
20601
670
1126
45427
503
18678
5142
900
841
4489
3292
20652
667
1146
46293
510
18773
5222
31348
911
838
4500
3255
20699
663
1166
47168
517
18865
5301
28535
32422
921
834
4510
3219
20742
660
1186
48053
525
18953
5381
1017
28524
33524
932
831
4519
3181
20782
656
1207
48938
532
19038
5460
3185
1008
28511
34653
943
827
4527
3144
20811
652
1227
49823
539
19117
5540
3168
998
28489
35808
953
823
4534
3106
20838
648
1247
50711
546
19192
5618
3152
989
28460
36990
963
818
4539
3067
20858
644
1268
51598
553
19262
5697
3135
979
28430
38171
974
814
814
3029
20879
640
1288
52486
560
19332
5775
3118
970
28401
39353
984
809
809
2990
20900
636
1309
53374
567
19402
5854
3101
960
28371
40535
994
805
805
2951
20920
632
1329
54262
574
19472
5932
3084
951
28342
41717
1005
801
801
2913
20941
628
1349
55150
581
19542
6011
3067
942
28312
42899
1015
796
796
2874
20962
624
1370
56038
588
19612
6089
3050
932
28283
44081
1025
792
792
2836
20983
620
1390
56926
595
19682
6168
3034
923
28253
45263
1036
787
787
2797
21003
616
1411
57814
602
19752
6246
3017
913
28224
46445
1046
783
783
2758
21024
611
1431
58701
609
19823
6325
3000
904
28194
47627
1056
779
779
2720
21045
607
1452
59589
616
19893
6403
2983
894
28165
48809
1067
774
774
2681
21066
603
1472
60477
623
19963
6482
CHICLAYO
LA VICTORIA
PICSI
POMALCA
FERREAFE
PUEBLO NUEVO
MOCHUMI
SAN JOSE
Total
256332
149008
73376
8998
23112
32886
12498
18618
9987
259622
152263
74723
9088
23350
33174
12604
18731
10357
262639
155393
76001
9157
23561
33421
12696
18822
10728
265455
158435
77227
9222
23751
33640
12778
18896
11102
268111
161430
78423
9286
23928
33847
12852
18956
11480
270694
164417
79606
9345
24097
34041
12922
19011
11867
273176
167380
80770
9401
24256
34221
12987
19057
12261
275514
170288
81901
9452
24401
34383
13046
19088
12660
277741
173163
83009
9499
24536
34529
13099
19112
13066
279891
176026
84104
9544
24663
34667
13148
19134
13480
282004
178899
85197
9588
24787
34798
13197
19153
13904
284084
181782
86287
9631
24907
34928
13243
19162
14339
286105
184660
87369
9672
25020
35046
13288
19169
14783
288063
187530
88440
9710
25128
35157
13331
19172
15237
289956
190388
89499
9747
25229
35261
13370
19167
15700
291777
193232
90546
9782
25323
35360
13404
19158
16172
293598
196076
91593
9817
25417
35459
13438
19149
16644
295419
198920
92640
9852
25511
35558
13472
19140
17116
297240
201764
93687
9887
25605
35657
13506
19131
17588
299061
204608
94734
9922
25699
35756
13540
19122
18060
300882
207452
95781
9957
25793
35855
13574
19113
18532
302703
210296
96828
9992
25887
35954
13608
19104
19004
304524
213140
97875
10027
25981
36053
13642
19095
19476
306345
215984
98922
10062
26075
36152
13676
19086
19948
308166
218828
99969
10097
26169
36251
13710
19077
20420
309987
221672
101016
10132
26263
36350
13744
19068
20892
730755.627
742308.258
753140.467
763470.038
773477.656
783359.691
793045.473
802405.377
811539.217
820549.249
829552.517
838543.204
847452.717
856272.34
864995.318
873611.569
878497.044
887103.643
895710.243
904316.843
912923.443
921530.042
930136.642
938743.242
947349.841
955956.441
23
CHONGOYAPE
ETEN
MONSEFU
PIMENTEL
SANTA ROSA
SAA
PATAPO
PUCALA
TUMAN
PITIPO
LAMBAYEQUE
3168
998
28489
35808
953
823
4534
3106
20838
648
1247
50711
3152
989
28460
36990
963
818
4539
3067
20858
644
1268
51598
3135
979
28430
38171
974
814
814
3029
20879
640
1288
52486
3118
970
28401
39353
984
809
809
2990
20900
636
1309
53374
3101
960
28371
40535
994
805
805
2951
20920
632
1329
54262
3084
951
28342
41717
1005
801
801
2913
20941
628
1349
55150
3067
942
28312
42899
1015
796
796
2874
20962
624
1370
56038
3050
932
28283
44081
1025
792
792
2836
20983
620
1390
56926
3034
923
28253
45263
1036
787
787
2797
21003
616
1411
57814
3017
913
28224
46445
1046
783
783
2758
21024
611
1431
58701
3000
904
28194
47627
1056
779
779
2720
21045
607
1452
59589
2983
894
28165
48809
1067
774
774
2681
21066
603
1472
60477
MORROPE
TUCUME
REQUE
CHICLAYO
LA VICTORIA
PICSI
POMALCA
FERREAFE
PUEBLO NUEVO
MOCHUMI
SAN JOSE
Total
546
19192
5618
289956
190388
89499
9747
25229
35261
13370
19167
15700
553
19262
5697
291777
193232
90546
9782
25323
35360
13404
19158
16172
560
19332
5775
293598
196076
91593
9817
25417
35459
13438
19149
16644
567
19402
5854
295419
198920
92640
9852
25511
35558
13472
19140
17116
574
19472
5932
297240
201764
93687
9887
25605
35657
13506
19131
17588
581
19542
6011
299061
204608
94734
9922
25699
35756
13540
19122
18060
588
19612
6089
300882
207452
95781
9957
25793
35855
13574
19113
18532
595
19682
6168
302703
210296
96828
9992
25887
35954
13608
19104
19004
602
19752
6246
304524
213140
97875
10027
25981
36053
13642
19095
19476
609
19823
6325
306345
215984
98922
10062
26075
36152
13676
19086
19948
616
19893
6403
308166
218828
99969
10097
26169
36251
13710
19077
20420
623
19963
6482
309987
221672
101016
10132
26263
36350
13744
19068
20892
864995.318
873611.569
878497.044
887103.643
895710.243
904316.843
912923.443
921530.042
930136.642
938743.242
947349.841
955956.441
Crecimiento aritmtico
Se calcula con la siguiente frmula:
= +
=
2 1
Siendo:
Pt: poblacin futura despus de t aos
Po: poblacin presente
T: periodo de proyeccin
24
Para calcular la proyeccin se utiliz el total de la poblacin de todos los distritos ubicados en el rea de
influencia.
Tabla 6 Estimacin de la poblacin por el mtodo aritmtico
Ka
Nmero
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
9523.729429
Ao
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Poblacion total
730755.6274
742308.2583
753140.4665
763470.0378
773477.6564
783359.6908
793045.4734
802405.3767
811539.2175
820549.2492
829552.517
838543.2042
847452.7175
856272.3397
864995.3181
873611.5688
892659.0277
902182.7571
911706.4865
921230.2159
930753.9454
940277.6748
949801.4042
959325.1337
968848.8631
978372.5925
Crecimiento geomtrico
Para este mtodo se trabaja en base a una funcin logartmica, despus se eleva esa funcin a la
exponencial para obtener la poblacin proyectada.
Las frmulas utilizadas son:
= +
=
2 1
25
0.011903783
Ao
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Ln Poblacin total
13.502
13.518
13.532
13.546
13.559
13.571
13.584
13.595
13.607
13.618
13.629
13.639
13.650
13.660
13.670
13.680
13.704
13.716
13.728
13.740
13.752
13.764
13.776
13.788
13.799
13.811
Poblacion
894659.69
905373.17
916214.93
927186.53
938289.51
949525.44
960895.93
972402.58
984047.02
995830.89
976719.9761
26
Para la dotacin urbana se utiliz 150 lt/hab/da, el cual se obtuvo del siguiente cuadro proveniente de
un informe de Epsel S.A.
Tabla 10 Demanda poblacional al ao 2025
Poblacion en 2025
976719.98
Dotacion Urb
(l/hab/dia)
200
Demanda poblacional
(l/dia)
195343995.23
Demanda poblacional
(m3/dia)
195344
Demanda poblacional
(m3/S)
2.3
Sipan
2013
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembre
Octubre
Noviembre
Diciembre
27.66
27.04
24.97
23.35
21.10
20.13
20.43
21.53
22.30
22.19
24.98
Promedio
Reque
2014
26.88
27.57
27.85
26.23
25.59
24.35
22.19
21.80
22.57
23.23
23.68
25.12
2013
22.26
23.17
22.68
19.82
19.84
18.39
17.22
17.23
17.54
17.71
18.52
21.07
2014
24.19
23.81
23.99
22.23
23.73
22.46
19.59
18.64
18.68
19.25
19.59
20.61
24.44
25.55
25.39
23.31
23.13
21.57
19.78
19.52
20.08
20.62
20.99
22.94
27
ENERO
8.5
8.72
8.86
FEBREO
8.49
8.62
8.71
MARZO
8.21
8.23
8.25
Abril
8.5
8.40
8.34
Mayo
8.22
8.03
7.91
Junio
8.5
8.26
8.1
Julio
8.5
8.28
8.13
Agosto
7.66
7.55
7.47
Septiembre
8.49
8.47
8.45
Octubre
8.21
8.31
8.37
Noviembre Diciembre
8.5
8.22
8.69
8.45
8.81
8.6
Temperatura
media (C)
24.44
25.55
25.39
23.31
23.13
21.57
19.78
19.52
20.08
20.62
20.99
22.94
Horas de luz
(%)
8.72
8.62
8.23
8.40
8.03
8.26
8.28
7.55
8.47
8.31
8.69
8.45
ETo(mm/mes)
168.74
171.30
162.98
158.35
150.69
149.05
142.58
129.08
146.98
146.26
154.43
157.76
28
0.85
MES
ETo
(mm/mes)
ENERO
FEBREO
MARZO
Abril
Mayo
Junio
Julio
Agosto
Septiembre
Octubre
Noviembre
Diciembre
168.74
171.30
162.98
158.35
150.69
149.05
142.58
129.08
146.98
146.26
154.43
157.76
ARROZ
kc
1.10
1.10
1.10
1.10
1.10
1.10
USO
CONSUNTIVO
ETR (mm)
185.61
188.43
179.28
174.19
165.76
163.96
0.00
0.00
0.00
0.00
0.00
0.00
Total
1057.23
CAA DE AZCAR
USO
kc
CONSUNTIVO
ETR (mm)
0.80
134.99
0.80
137.04
0.80
130.39
0.80
126.68
0.80
120.55
0.80
119.24
0.80
114.07
0.80
103.27
0.80
117.59
0.80
117.01
0.80
123.54
0.80
126.20
1470.57
FRIJOL
kc
0.65
0.65
0.65
0.65
USO
CONSUNTIVO
ETR (mm)
109.68
111.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.38
102.54
MAIZ
kc
0.80
0.80
0.80
0.80
423.95
USO
CONSUNTIVO
ETR (mm)
0.00
0.00
0.00
126.68
120.55
119.24
114.07
0.00
0.00
0.00
0.00
0.00
480.54
ALGODN
USO
TOTAL ETR
kc
CONSUNTIVO
(mm)
ETR (mm)
0.00
430.28
0.00
436.83
0.00
309.67
0.00
427.55
0.60
90.42
497.28
0.60
89.43
491.88
0.60
85.55
313.68
0.60
77.45
180.72
0.60
88.19
205.77
0.60
87.76
204.77
0.00
223.92
0.00
228.75
518.79
Total
Hectareas
MES
Enero
Febrero
Marzo
Abril
Mayo
Junio
Julio
Agosto
Septiembre
Octubre
Noviembre
Diciembre
Arroz
4.78%
1912
0.000
0.000
0.000
0.000
0.812
0.822
0.790
0.712
0.809
0.788
0.000
0.000
Total
22.1590569
14.1274195
11.0608906
19.4711641
24.2100467
24.2990174
9.95223365
7.83821985
8.90318148
8.71978792
9.89873806
9.90834599
24.2990174
3951.09
Por otra parte, el clima condiciona el carcter desrtico y rido de la zona con escasas
precipitaciones. La temperatura flucta entre 15 a 28 C. Esto condiciona pocas de
reduccin de agua.
Se tuvo en consideracin los 3 mtodos para el clculo de poblacin futura para el ao
2025, ya que estos no presentaban mucha dispersin.
Se determin los principales cultivos de la zona. Para el clculo de la demanda agrcola,
se tuvo en cuenta que no todos los cultivos estn presentes en todo el ao.
Recomendaciones:
30
Hallar los caudales de diseo en base a periodos de retorno determinados por los
mtodos de Gumbel y Log Pearson.
Graficar histogramas para identificar los meses de avenidas y estiaje del reservorio.
Graficar la curva duracin y hallar los caudales de diseo en funcin de la probabilidad.
3.1) INTRODUCCIN
La oferta hdrica es aquella porcin de agua que, despus de haberse precipitado sobre la cuenca
y satisfecho las cuotas de evapotranspiracin e infiltracin del sistema suelo, escurre por los
cauces mayores de los ros y dems corrientes superficiales, alimenta lagos, lagunas y
reservorios, confluye con otras corrientes y llega directa o indirectamente al mar. Usualmente
esta porcin de agua que escurre por los ros es denominada escorrenta superficial y su
cuantificacin conforma el elemento principal de medicin en las redes de seguimiento
hidrolgico existentes en los distintos pases.
La oferta hdrica de una cuenca, corresponde tambin al volumen disponible de agua para
satisfacer la demanda generada por las actividades sociales y econmicas del hombre. Al
cuantificar la escorrenta superficial a partir del balance hdrico de la cuenca, se est estimando
la oferta de agua superficial de la misma. El conocimiento del caudal del ro, su confiabilidad y
extensin de la serie del registro histrico son variables que pueden influir en la estimacin de
la oferta hdrica superficial. Cuando existe informacin histrica confiable de los caudales con
series extensas, el caudal medio anual del ro es la oferta hdrica de esa cuenca.
Las reas tributarias de las cuencas y el rea total del proyecto se muestran en el siguiente
cuadro:
Tabla 16 rea del proyecto
Cuenca Chancay
Intercuenca 137774
Total
1290.8
1444
2734.8
km2
km2
km2
3.2.2) PRECIPITACIN
Los datos de precipitacin de la cuenca se obtuvieron de la Asociacin Nacional del Agua (ANA).
En este caso, se tomaron en cuenta solo las estaciones pluviomtricas ms cercanas al reservorio
Tinajones, siendo las estaciones Llama, Santa Cruz y Sipn.
Figura 21 Reservorio Tinajones
32
Llama
1481.4
1115
1156.1
1095.7
836.7
608.8
516.8
777
827.7
608
1317.3
Sipan
589.8
56.5
45.2
69.9
91.6
36.1
26.1
27
46.6
31
87.8
Santa Cruz
1759.8
2688.3
1260.3
885.3
577
601.8
482.9
515.7
607.8
680.6
600.5
Promedio (mm)
1277.00
1286.60
820.53
683.63
501.77
415.57
341.93
439.90
494.03
439.87
668.53
3.2.2) EVAPORACIN
Los datos histricos de evaporacin se obtuvieron de la estacin de Tinajones pertenecientes al
estudio de la cuenca Chancay Lambayeque, el cual fue realizado por la Direccin Ejecutiva del
Proyecto Olmos Tinajones (DEPOLTI) y por el Instituto Nacional de Desarrollo (INADE)
perteneciente al ao del 2001.
33
34
Debido a que an no se cuenta con los datos de los caudales que van desde septiembre hasta
diciembre del ao 2015, se opt por obtener dichos datos con la ayuda de la funcin objetivo
provisionada por el Excel.
No.
1
2
3
4
5
6
7
8
9
Ao
2007
2008
2009
2010
2011
2012
2013
2014
2015
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Dic.
3.79
3.36
4.35
4.58
3.98
2.75
2.35
1.87
1.54
2.73
3.82
3.21
4.00
4.75
4.71
4.72
4.04
3.22
2.50
2.29
2.71
3.75
3.89
2.98
4.21
4.70
4.95
4.24
3.90
3.35
2.69
2.10
1.85
2.35
3.10
3.62
3.16
4.14
4.27
4.52
3.95
2.94
2.41
1.80
2.06
2.01
1.92
2.28
3.36
4.08
3.58
4.70
3.53
2.52
2.32
1.68
1.83
2.38
2.27
3.60
4.68
4.99
4.68
4.60
4.06
3.02
2.43
1.68
1.43
2.48
3.44
3.09
3.84
3.99
4.90
4.34
4.23
3.71
2.68
2.25
1.66
2.77
2.29
3.09
3.08
3.62
4.61
3.66
4.19
2.93
2.35
1.96
2.28
2.70
3.00
3.44
4.19
3.89
4.80
4.53
3.89
3.31
2.46
1.88
2.00
2.78
3.19
3.24
No. Prob
1
11.1
2
22.2
3
33.3
4
44.4
5
55.6
6
66.7
7
77.8
8
88.9
9
100.0
Media
Desv Stand.
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Dic.
4.68
4.99
4.95
4.72
4.23
3.71
2.69
2.29
2.71
3.75
3.89
3.62
4.21
4.75
4.90
4.70
4.19
3.35
2.68
2.25
2.28
2.78
3.82
3.60
4.19
4.70
4.80
4.60
4.06
3.31
2.50
2.10
2.06
2.77
3.44
3.44
4.00
4.14
4.71
4.58
4.04
3.22
2.46
1.96
2.00
2.73
3.19
3.24
3.84
4.08
4.68
4.53
3.98
3.02
2.43
1.88
1.85
2.70
3.10
3.21
3.79
3.99
4.61
4.52
3.95
2.94
2.41
1.87
1.83
2.48
3.00
3.09
3.36
3.89
4.35
4.34
3.90
2.93
2.35
1.80
1.66
2.38
2.29
3.09
3.16
3.62
4.27
4.24
3.89
2.75
2.35
1.68
1.54
2.35
2.27
2.98
3.08
3.36
3.58
3.66
3.53
2.52
2.32
1.68
1.43
2.01
1.92
2.28
3.81
4.17
4.54
4.43
3.97
3.08
2.47
1.95
1.93
2.66
2.99
3.17
0.53
0.54
0.42
0.33
0.20
0.36
0.14
0.23
0.39
0.48
0.70
0.40
35
Prob
95.0
90.0
75.0
50.0
25.0
10.0
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Dic.
2.94
3.28
3.84
3.89
3.64
2.50
2.24
1.58
1.28
1.87
1.84
2.51
3.13
3.47
4.00
4.01
3.71
2.63
2.29
1.66
1.42
2.05
2.10
2.66
3.45
3.80
4.25
4.21
3.84
2.84
2.37
1.79
1.66
2.34
2.52
2.90
3.81
4.17
4.54
4.43
3.97
3.08
2.47
1.95
1.93
2.66
2.99
3.17
4.17
4.54
4.83
4.65
4.11
3.32
2.56
2.10
2.19
2.98
3.46
3.45
4.49
4.87
5.08
4.85
4.24
3.54
2.64
2.24
2.43
3.27
3.89
3.69
Prob
95.0
90.0
75.0
50.0
25.0
10.0
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Dic.
18.88
26.45
46.56
49.08
38.11
12.17
9.39
4.84
3.60
6.51
6.31
12.32
22.89
32.23
54.33
55.28
41.03
13.85
9.87
5.25
4.15
7.75
8.13
14.26
31.61
44.83
70.30
67.44
46.42
17.19
10.73
6.02
5.27
10.36
12.43
18.21
45.23
64.70
93.61
84.11
53.23
21.84
11.77
7.01
6.88
14.31
19.92
23.89
64.72
93.36
124.65
104.90
61.05
27.75
12.91
8.16
8.97
19.77
31.93
31.35
89.36
129.88
161.30
127.97
69.07
34.44
14.03
9.35
11.40
26.44
48.81
40.03
Una vez convertidos los logaritmos, se puede graficar la curva de variacin estacional.
36
La curva de variacin estacional muestra la variacin de los caudales en funcin del tiempo y su
probabilidad de ocurrencia. El conjunto de curvas de variacin determinan el rgimen de
distribucin de caudales en el tiempo y en funcin de la probabilidad con que los eventos son
igualados o excedidos.
El anlisis de Tendencia y los histogramas se obtuvieron de la siguiente manera:
Tabla 29 Caudal medio anual
Ao
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
2007
44.06
28.77
77.27
97.48
53.45
15.57
10.50
6.51
4.68
15.30
45.56
24.81
35.33
2008
54.85
115.19
111.11
112.42
56.62
25.00
12.18
9.89
15.03
42.35
49.06
19.74
51.95
2009
67.26
110.15
141.24
69.16
49.47
28.60
14.72
8.18
6.33
10.49
22.14
37.36
47.09
2010
23.50
62.67
71.77
91.69
51.97
18.95
11.09
6.07
7.85
7.48
6.83
9.82
30.81
2011
28.93
59.30
35.96
109.73
34.29
12.47
10.20
5.36
6.24
10.84
9.71
36.60
29.97
2012
107.98
147.37
108.31
99.37
58.11
20.48
11.33
5.37
4.18
11.97
31.34
22.07
52.32
2013
46.50
54.13
133.83
76.61
68.77
40.80
14.61
9.48
5.24
15.92
9.85
22.08
41.49
2014
21.73
37.52
100.30
39.04
66.00
18.75
10.44
7.12
9.74
14.86
20.09
31.12
31.39
2015
65.70
48.90
121.31
92.93
48.80
27.45
11.75
6.56
7.40
16.14
24.31
25.46
41.39
Min.
Pro.
Max.
Ene
Feb
Mar
Abr
Jun
Jul
21.73
28.77
35.96
39.04
34.29
12.47
10.20
5.36
51.17
73.78 100.12
87.60
54.16
23.12
11.87
68.77
40.80
14.72
May
Ago
Sep
Oct
Nov
Dic. Anual
Dec
Annual
4.18
7.48
6.83
9.82
29.97
7.17
7.41
16.15
24.32
25.45
40.19
9.89
15.03
42.35
49.06
37.36
52.32
37
Con el histograma mensual se puede determinar que el periodo de estiaje se da entre los meses
de junio y diciembre, mientras que el periodo de avenidas se da entre enero y mayo.
Figura 25 Anlisis de tendencia del ro chancay
El anlisis de tendencia indica que los caudales tienden a descender con el tiempo. Adems, la
lnea de tendencia no posee una gran pendiente, lo que indica que no existe mucha variacin
con los caudales, por lo que el anlisis es correcto.
38
No.
1
2
3
4
5
6
7
8
9
Ao
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Dic.
2007
2.85
2.72
3.43
3.75
3.48
2.41
2.24
1.69
1.41
2.54
3.62
2.74
2008
3.05
3.75
4.01
4.03
3.73
2.55
1.41
2.18
2.62
2.93
2.66
1.53
2009
3.36
3.88
3.06
3.30
3.01
2.21
1.96
1.68
1.57
2.18
2.80
3.18
2010
2.94
3.39
3.22
3.67
3.38
2.68
2.31
1.56
1.63
1.87
1.76
2.02
2011
3.18
3.49
3.23
3.89
3.30
2.35
2.22
1.55
1.51
1.71
1.78
3.36
2012
4.16
3.76
3.58
3.18
3.58
2.56
2.21
0.07
1.10
2.30
3.32
3.04
2013
3.31
3.22
4.03
3.46
3.75
3.36
2.48
2.14
1.32
2.56
2.18
2.63
2014
2.79
3.23
3.99
3.53
3.85
2.86
2.24
1.78
2.17
2.63
2.84
3.17
2015
3.59
3.03
3.87
3.91
3.67
3.17
2.34
1.72
1.79
2.41
2.82
2.85
No. Prob
1
11.1
2
22.2
3
33.3
4
44.4
5
55.6
6
66.7
7
77.8
8
88.9
9
100.0
Media
Desv Stand.
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Dic.
4.16
3.88
4.03
4.03
3.85
3.36
2.48
2.18
2.62
2.93
3.62
3.36
3.59
3.76
4.01
3.91
3.75
3.17
2.34
2.14
2.17
2.63
3.32
3.18
3.36
3.75
3.99
3.89
3.73
2.86
2.31
1.78
1.79
2.56
2.84
3.17
3.31
3.49
3.87
3.75
3.67
2.68
2.24
1.72
1.63
2.54
2.82
3.04
3.18
3.39
3.58
3.67
3.58
2.56
2.24
1.69
1.57
2.41
2.80
2.85
3.05
3.23
3.43
3.53
3.48
2.55
2.22
1.68
1.51
2.30
2.66
2.74
2.94
3.22
3.23
3.46
3.38
2.41
2.21
1.56
1.41
2.18
2.18
2.63
2.85
3.03
3.22
3.30
3.30
2.35
1.96
1.55
1.32
1.87
1.78
2.02
2.79
2.72
3.06
3.18
3.01
2.21
1.41
0.07
1.10
1.71
1.76
1.53
3.25
3.39
3.60
3.64
3.53
2.68
2.16
1.60
1.68
2.35
2.64
2.72
0.43
0.38
0.38
0.29
0.26
0.38
0.31
0.61
0.46
0.38
0.64
0.60
39
Prob
95.0
90.0
75.0
50.0
25.0
10.0
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Dic.
2.54
2.76
2.97
3.16
3.09
2.05
1.64
0.59
0.92
1.72
1.59
1.74
2.70
2.90
3.11
3.26
3.19
2.19
1.76
0.81
1.09
1.86
1.83
1.96
2.96
3.13
3.34
3.44
3.35
2.43
1.95
1.18
1.37
2.09
2.21
2.32
3.25
3.39
3.60
3.64
3.53
2.68
2.16
1.60
1.68
2.35
2.64
2.72
3.54
3.64
3.86
3.83
3.71
2.94
2.37
2.01
1.99
2.61
3.07
3.13
3.80
3.87
4.09
4.01
3.87
3.18
2.56
2.38
2.27
2.84
3.46
3.49
Prob
95.0
90.0
75.0
50.0
25.0
10.0
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Dic.
12.72
15.82
19.52
23.52
22.08
7.79
5.18
1.80
2.51
5.57
4.93
5.71
14.87
18.16
22.44
26.14
24.30
8.95
5.80
2.25
2.97
6.41
6.21
7.09
19.29
22.86
28.33
31.19
28.52
11.31
7.01
3.26
3.93
8.08
9.15
10.19
25.76
29.53
36.70
37.94
34.08
14.65
8.65
4.93
5.36
10.46
14.06
15.24
34.40
38.15
47.55
46.16
40.71
18.98
10.68
7.47
7.31
13.54
21.60
22.80
44.62
48.04
60.03
55.06
47.79
23.96
12.91
10.84
9.68
17.08
31.81
32.75
40
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
2007
17.30
15.15
30.99
42.50
32.56
11.10
9.36
5.41
4.11
12.69
37.42
15.43
19.50
2008
21.15
42.68
55.15
56.11
41.77
12.83
4.10
8.85
13.67
18.76
14.26
4.62
24.50
2009
28.88
48.39
21.41
27.04
20.30
9.11
7.13
5.34
4.83
8.82
16.51
24.06
18.49
2010
18.97
29.71
24.95
39.45
29.42
14.61
10.09
4.75
5.09
6.48
5.83
7.55
16.41
2011
23.99
32.63
25.23
49.12
27.22
10.45
9.17
4.73
4.50
5.54
5.94
28.83
18.95
2012
63.99
43.01
35.98
24.03
35.83
12.99
9.12
1.08
3.00
9.96
27.74
20.90
23.97
2013
27.40
24.93
56.20
31.71
42.47
28.88
12.00
8.48
3.75
12.93
8.85
13.83
22.62
2014
16.27
25.33
54.26
34.24
46.88
17.48
9.44
5.95
8.72
13.86
17.09
23.69
22.77
2015
36.38
20.76
47.80
49.97
39.29
23.89
10.38
5.56
5.97
11.13
16.75
17.33
23.77
Ene
Feb
Mar
Abr
Min.
16.27
15.15
21.41
24.03
20.30
9.11
Pro.
28.26
31.40
39.11
39.35
35.08
Max.
63.99
48.39
56.20
56.11
46.88
May
Jun
Jul
Ago
4.10
1.08
15.70
8.98
28.88
12.00
Sep
Oct
Nov
Dic. Anual
Dec
Annual
3.00
5.54
5.83
4.62
16.41
5.57
5.96
11.13
16.71
17.36
21.22
8.85
13.67
18.76
37.42
28.83
24.50
41
El anlisis de tendencia indica que los caudales tienden a ascender con el tiempo. Adems, la
lnea de tendencia no posee una gran pendiente, lo que indica que no existe mucha variacin
con los caudales, por lo que el anlisis es correcto.
42
No.
1
2
3
4
5
6
7
8
9
Ao
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Dic.
2007
3.49
3.87
2.45
1.58
2.38
2.74
2.64
2.57
1.91
2.62
2.58
3.17
2008
3.22
3.35
1.76
3.68
3.71
2.49
1.54
2.57
2.25
2.48
3.04
3.46
2009
3.56
2.37
2.70
2.85
2.90
2.11
2.09
2.25
1.98
2.61
2.52
2.57
2010
3.97
3.59
3.19
2.64
1.91
2.71
2.65
2.37
1.89
2.74
2.98
2.68
2011
3.48
3.43
3.15
2.19
3.56
2.69
2.56
2.21
1.05
0.95
1.29
2.16
2012
0.68
2.82
3.45
2.88
3.48
2.77
2.92
2.56
1.81
2.57
2.94
3.33
2013
3.74
3.59
0.49
2.53
3.27
3.30
2.81
2.73
2.18
2.65
2.90
3.07
2014
3.96
2.68
3.08
3.82
2.67
2.79
2.69
2.59
2.21
2.49
2.57
2.84
2015
3.42
3.67
2.66
3.07
2.91
2.92
2.97
3.00
1.97
2.49
2.71
2.99
No. Prob
1
11.1
2
22.2
3
33.3
4
44.4
5
55.6
6
66.7
7
77.8
8
88.9
9
100.0
Media
Desv Stand.
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Dic.
3.97
3.87
3.45
3.82
3.71
3.30
2.97
3.00
2.25
2.74
3.04
3.46
3.96
3.67
3.19
3.68
3.56
2.92
2.92
2.73
2.21
2.65
2.98
3.33
3.74
3.59
3.15
3.07
3.48
2.79
2.81
2.59
2.18
2.62
2.94
3.17
3.56
3.59
3.08
2.88
3.27
2.77
2.69
2.57
1.98
2.61
2.90
3.07
3.49
3.43
2.70
2.85
2.91
2.74
2.65
2.57
1.97
2.57
2.71
2.99
3.48
3.35
2.66
2.64
2.90
2.71
2.64
2.56
1.91
2.49
2.58
2.84
3.42
2.82
2.45
2.53
2.67
2.69
2.56
2.37
1.89
2.49
2.57
2.68
3.22
2.68
1.76
2.19
2.38
2.49
2.09
2.25
1.81
2.48
2.52
2.57
0.68
2.37
0.49
1.58
1.91
2.11
1.54
2.21
1.05
0.95
1.29
2.16
3.28
3.26
2.55
2.80
2.98
2.72
2.54
2.54
1.92
2.40
2.61
2.92
1.01
0.51
0.92
0.70
0.59
0.32
0.45
0.24
0.36
0.55
0.53
0.40
43
Prob
95.0
90.0
75.0
50.0
25.0
10.0
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
Dic.
1.63
2.42
1.04
1.66
2.00
2.20
1.79
2.14
1.33
1.50
1.74
2.25
1.99
2.60
1.37
1.91
2.22
2.32
1.96
2.23
1.46
1.70
1.93
2.40
2.60
2.92
1.93
2.33
2.58
2.51
2.23
2.37
1.68
2.03
2.26
2.65
3.28
3.26
2.55
2.80
2.98
2.72
2.54
2.54
1.92
2.40
2.61
2.92
3.96
3.61
3.17
3.27
3.38
2.94
2.85
2.70
2.16
2.77
2.97
3.19
4.57
3.92
3.73
3.69
3.74
3.13
3.12
2.85
2.38
3.10
3.30
3.44
Dic.
Prob
95.0
90.0
75.0
50.0
25.0
10.0
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
5.09
11.22
2.82
5.25
7.34
13.52
3.93
6.76
7.39
9.04
6.02
8.48
3.77
4.46
5.69
9.51
9.17
10.14
7.09
9.26
4.29
5.45
6.90
11.02
13.51
18.48
6.88
26.62
26.13
12.79
10.31
13.15
12.30
9.34
10.74
5.34
7.61
9.54
14.09
16.48
19.62
15.24
12.69
12.66
6.81
11.02
13.67
18.51
52.46
36.96
96.58
50.50
23.77
26.34
29.28
18.89
17.24
14.92
8.67
15.96
19.58
24.32
41.55
40.17
41.97
22.90
22.70
17.30
10.78
22.29
27.06
31.09
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Set.
Oct.
Nov.
2007
Ao
32.79
48.11
11.58
4.83
10.79
15.53
13.99
13.06
6.77
13.74
13.13
23.73
17.34
2008
25.15
28.49
5.81
39.78
40.71
12.03
4.68
13.11
9.53
11.92
20.88
31.92
20.33
2009
35.30
10.73
14.86
17.22
18.26
8.29
8.05
9.47
7.26
13.59
12.47
13.12
14.05
2010
52.81
36.23
24.30
13.95
6.73
14.98
14.18
10.67
6.61
15.46
19.71
14.55
19.18
2011
32.51
30.91
23.36
8.93
35.05
14.73
12.88
9.12
2.87
2.59
3.64
8.67
15.44
2012
1.98
16.74
31.63
17.81
32.43
15.88
18.56
12.87
6.13
13.01
18.99
27.83
17.82
2013
42.20
36.14
1.64
12.53
26.44
27.18
16.60
15.40
8.81
14.16
18.16
21.48
20.06
2014
52.47
14.58
21.73
45.48
14.50
16.21
14.71
13.29
9.13
12.08
13.12
17.19
20.37
2015
30.71
39.13
14.30
21.44
18.32
18.57
19.54
20.06
7.15
12.10
14.97
19.80
19.67
Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Sep
Oct
Nov
Dic. Anual
Dec
Annual
Min.
1.98
10.73
1.64
4.83
6.73
8.29
4.68
9.12
2.87
2.59
3.64
8.67
14.05
Pro.
33.99
29.01
16.58
20.22
22.58
15.93
13.69
13.01
7.14
12.07
15.01
19.81
18.25
Max.
52.81
48.11
31.63
45.48
40.71
27.18
19.54
20.06
9.53
15.46
20.88
31.92
20.37
44
El anlisis de tendencia indica que los caudales tienden a ascender con el tiempo. Adems, la
lnea de tendencia no posee una gran pendiente, lo que indica que no existe mucha variacin
con los caudales, por lo que el anlisis es correcto.
45
46
47
48
49
50
51
52
53
54
2008
Flow
[m/s]
203.746
85.833
60.675
43.255
32.82
21.726
14.988
11.974
8.61
4.862
4.105
1.225
2009
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
Flow
[m/s]
347.16
116.50
76.27
59.26
48.32
33.08
26.28
21.20
12.77
9.83
8.87
6.57
Flow
[m/s]
327.52
125.16
95.51
73.48
46.74
27.29
17.80
13.03
7.45
4.42
3.72
1.80
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
2012
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
2010
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
Flow
[m/s]
358.54
109.34
80.43
59.47
41.39
27.00
18.42
12.04
8.48
6.31
5.83
4.71
Flow
[m/s]
244.63
103.04
69.71
52.62
37.94
26.13
18.55
11.87
9.20
6.27
4.90
2.16
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
2013
2011
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
Flow
[m/s]
230.45
77.11
53.92
32.62
21.33
15.71
10.83
7.62
5.98
5.10
4.57
2.89
Flow
[m/s]
153.17
83.92
52.15
32.73
23.87
18.43
14.88
12.25
10.06
7.70
6.27
2.29
Prob
[%]
0.430
10
20
30
40
50
60
70
80
90
95
100
2014
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
Flow
[m/s]
214.39
87.61
42.30
25.21
19.38
15.49
11.62
10.09
7.34
5.21
4.13
1.00
2015
Flow
[m/s]
267.20
116.87
85.18
58.36
50.10
41.47
34.47
21.61
12.69
7.81
6.80
4.01
55
56
2008
Flow
[m/s]
69.453
45.123
34.187
22.698
16.858
13.872
11.174
9.4
7.227
4.257
3.219
0.725
2009
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
Flow
[m/s]
74.43
64.75
46.06
36.91
25.35
15.14
9.97
7.60
5.27
3.67
1.70
0.06
Flow
[m/s]
74.52
58.46
41.61
33.14
24.88
20.98
14.71
11.59
4.90
2.15
1.24
0.53
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
2012
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
2010
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
Flow
[m/s]
74.49
43.30
31.11
22.60
15.33
10.70
8.71
6.88
5.32
4.47
3.96
1.35
Flow
[m/s]
72.92
53.04
39.79
29.24
22.60
17.80
12.80
10.01
8.02
5.51
4.35
0.32
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
2013
2011
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
Flow
[m/s]
75.03
37.66
26.44
17.71
14.30
10.78
7.93
5.83
4.78
3.88
3.21
1.05
Flow
[m/s]
68.43
53.12
42.71
28.44
20.78
15.02
12.30
10.39
8.11
6.49
4.96
0.98
Prob
[%]
0.430
10
20
30
40
50
60
70
80
90
95
100
2014
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
Flow
[m/s]
74.09
48.15
30.96
22.23
17.75
12.31
9.59
7.30
4.88
2.98
1.99
0.21
2015
Flow
[m/s]
69.31
56.12
46.94
39.45
35.53
28.63
20.27
13.77
10.93
6.46
4.80
3.01
57
58
2008
Flow
[m/s]
60.9
44.6
33.05
23.075
18.45
15.375
15
14.4
9.908
6.5
6.5
1.667
2009
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
Flow
[m/s]
63.11
50.00
43.70
35.50
29.38
19.30
16.40
11.75
8.30
4.77
3.60
0.25
Flow
[m/s]
60.00
34.28
30.00
22.70
21.25
20.00
17.62
13.92
9.40
6.90
5.38
2.15
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
2012
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
2010
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
Flow
[m/s]
69.00
27.60
20.00
18.33
15.25
12.90
11.50
9.70
8.00
6.50
4.80
1.68
Flow
[m/s]
60.44
49.13
31.73
23.20
20.70
20.00
17.10
13.40
8.70
5.50
3.45
0.13
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
2013
2011
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
Flow
[m/s]
63.40
48.10
30.00
20.50
17.30
14.80
14.10
13.53
10.00
8.45
7.20
1.53
Flow
[m/s]
64.90
50.43
41.03
22.23
17.03
15.03
14.53
13.03
11.81
9.23
8.63
0.89
Prob
[%]
0.480
10
20
30
40
50
60
70
80
90
95
100
2014
Prob
[%]
0.400
10
20
30
40
50
60
70
80
90
95
100
Flow
[m/s]
61.80
42.50
37.80
25.80
15.20
13.93
13.15
9.10
8.60
3.10
2.10
0.22
2015
Flow
[m/s]
57.53
45.23
38.53
30.73
22.33
20.43
20.03
19.63
18.05
12.43
9.54
0.39
59
60
Adems, para posteriormente calcular la potencia y energa, se realiz la curva duracin anual
del canal de descarga. Esta curva contiene los caudales de todos los das entre los aos 2007 y
2015. Para calcular la potencia y energa se utilizaron los caudales sombreados de amarillo.
Figura 60 Curva de duracin anual del canal de descarga
Flow
[%]
0.03
[m/s]
69
10.00
44
20.00
30
24.20
25
27.55
22
39.92
18
48.00
15
70.00
80.00
90.00
95.00
100.00
61
Qmax m3/s
572.9
568.156
536.4
526.446
513.88
508.2
480.22
457.58
446.42
437.2
436.972
436.083
423.623
423.26
413.755
413.372
400.781
396.1
395.9
389.3
385.7
382.038
381.6
369.148
367.306
366
364.1
359.268
358.76
357.881
62
Qmax m3/s
572.9
568.156
536.4
526.446
513.88
508.2
480.22
457.58
446.42
437.2
436.972
436.083
423.623
423.26
413.755
413.372
400.781
396.1
395.9
389.3
385.7
382.038
381.6
369.148
367.306
366
364.1
359.268
358.76
357.881
T (Kolmorov)
0.032
0.065
0.097
0.129
0.161
0.194
0.226
0.258
0.290
0.323
0.355
0.387
0.419
0.452
0.484
0.516
0.548
0.581
0.613
0.645
0.677
0.710
0.742
0.774
0.806
0.839
0.871
0.903
0.935
0.968
Distrib. Gumbel
0.031
0.035
0.064
0.077
0.098
0.109
0.183
0.272
0.327
0.379
0.380
0.386
0.464
0.467
0.532
0.535
0.626
0.660
0.662
0.710
0.735
0.760
0.763
0.842
0.853
0.860
0.870
0.894
0.897
0.901
D max
Media
Desv (S)
428.94
64.42
Alfa
Beta
50.23
399.95
Diferencia
0.001
0.030
0.033
0.052
0.063
0.084
0.043
0.014
0.037
0.056
0.025
0.002
0.045
0.015
0.048
0.019
0.078
0.080
0.049
0.064
0.058
0.051
0.021
0.068
0.046
0.021
0.001
0.009
0.039
0.067
0.084
m3/s
0.24
Obteniendo que la diferencia mxima es menor al valor crtico de la tabla con un valor de
significancia de 0.05, se concluye que la muestra de caudales se ajusta a la distribucin Gumbel.
A continuacin, se muestra la grfica para diferentes periodos de retorno.
Tabla 49 Caudales para los diferentes TR
TR
5
10
20
50
100
1000
10000
Caudal (m3/s)
475.29
512.98
549.14
595.93
631.00
746.88
862.56
63
Qmax m3/s
572.9
568.156
536.4
526.446
513.88
508.2
480.22
457.58
446.42
437.2
436.972
436.083
423.623
423.26
413.755
413.372
400.781
396.1
395.9
389.3
385.7
382.038
381.6
369.148
367.306
366
364.1
359.268
358.76
357.881
Ln Q max
6.351
6.342
6.285
6.266
6.242
6.231
6.174
6.126
6.101
6.080
6.080
6.078
6.049
6.048
6.025
6.024
5.993
5.982
5.981
5.964
5.955
5.946
5.944
5.911
5.906
5.903
5.897
5.884
5.883
5.880
Media
Desv (S)
6.051
0.143
Sesgo
0.724
Sesgo corregido
0.869
p
0.2
0.1
0.05
0.02
0.01
0.001
0.0001
w
1.794
2.146
2.448
2.797
3.035
3.717
4.292
z
0.841
1.282
1.645
2.054
2.327
3.091
3.719
k
0.769
1.334
1.850
2.486
2.944
4.381
5.743
Ln Q
6.161
6.242
6.316
6.407
6.473
6.679
6.874
Q (m3/s)
474.06
514.04
553.45
606.25
647.37
795.34
966.80
64
P
0.8
0.9
0.95
0.98
0.99
0.999
0.9999
b
1
1
1
1
1
1
1
Y
7.0801101
8.3826671
9.5670288
11.020999
12.063053
15.301273
18.327779
Z
6.161785093
6.242844283
6.316548085
6.407029865
6.471877733
6.673394835
6.86173674
Q (m3/s)
474.27
514.32
553.66
606.09
646.70
791.08
955.02
65
3.3.4) SEDIMENTACIN
Los embalses son utilizados para almacenar agua en pocas de abundancia y utilizarla en tiempo
de escasez; en general existen dos tipos de embalses: los denominados frontales (on-stream
reservoirs) y los laterales (off-stream reservoirs).
En general, los embalses laterales con respecto a los frontales poseen un volumen de regulacin
menor, y existen unos factores que determinan su uso, estos tales como las caractersticas del
rio, la cantidad y caractersticas de los sedimentos fluviales, entre otras.
El embalse de Tinajones pertenece a este tipo de embalses, laterales, y se encuentra operando
ya desde hace ms de 40 aos.
Es conocido que el mayor problema que puede presentarse en los embalses es el fenmeno de
azolvamiento, que crea el efecto de prdida de volumen til por acumulacin de sedimentos en
l.
Ahora, desde el punto de vista sedimentolgico, los embalses laterales se consideran ms
efectivos contra la sedimentacin si es que cumplen estas dos condiciones; en ellos solo ingresan
caudales excedentes del sistema de aprovechamiento y que posea un sistema de desarenacin.
En el ao 2004 se realiz una evaluacin preliminar, en el cual se estim que un 9% del volumen
del reservorio es ocupado por diversos tipos de materiales slidos.
Adems segn los estudios del ANA, se recopilo la siguiente informacin
Tabla 54 Erosin de la cuenca Chancay
Gracias a esta informacin estudiada, se corrobora la informacin de que los embalses laterales,
poseen un nivel de sedimentacin menor.
Para esto se presenta un cuadro que fue extrado del informe de Disponibilidad del recurso
hdrico en las principales represas y reservorios de la costa norte y sur elaborado por DGCA en
febrero del 2012.
66
Los datos de precipitacin para las diferentes estaciones tomadas del ANA presentan
gran variabilidad, ya que la cuenca de Chancay- Lambayeque est dividido en 3 zonas.
Zona alta, media y baja. Aproximadamente, la Oferta de agua del proyecto Tinajones
est ubicada en la zona media de la cuenca y la Demanda de Agua est ubicada en la
zona baja. Se tomaron 2 estaciones de la zona media los cuales presentan mayores
precipitaciones totales que sobrepasan los 1000 mm al ao.
Los datos de caudales diarios obtenidos del proyecto Tinajones presentan valores
inconsistentes por presentar das en los que no hay datos sobre los caudales, por lo
que fue necesario no tomarlos en cuenta.
Los estudios de evaporacin elaborados hasta el 2001 son tiles pero no muy
representativos, ya que en estos ltimos aos los efectos del cambio climtico
pudieron ocasionar un incremento de la Temperatura.
67
Los embalses laterales presentan mayores ventajas para conservar su vida til que un
embalse frontal, ya que parte de la sedimentacin es separada del cauce principal
afectando solamente al embalse una fraccin del impacto total.
El proyecto Tinajones posee un embalse lateral. Sin embargo, el desarenador solo
tiene la finalidad de proteger al embalse pero la sedimentacin en el ro Chancay es
ms crtica, ya que el agua del embalse regresa al ro para ser usado para la demanda.
Con la curva de duracin mensual, se puede obtener los meses en que hay un mayor o
menor caudal. Para el rio Chancay, el mes en que hay un mayor caudal es en Marzo y
un menor es en Septiembre. Para el canal alimentador, ocurre un mayor caudal entre
los meses de Marzo, Abril y Mayo y un menor caudal en el mes de Septiembre. Para el
canal de descarga, el mayor caudal se da en Enero y el menor en Septiembre.
Para el rio Chancay, los mayores caudales promedios se presentan entre enero y
mayo, mientras que los menores van desde junio a diciembre, lo mismo ocurre en el
canal alimentador. El canal de descarga presenta los caudales medios ms variados,
posiblemente por su regulacin.
Para el canal alimentador, el ao en que hay un mayor caudal medio es en 2008,
mientras que en el que hay un menor es en 2010. Para el canal de descarga el mayor
caudal medio se da en el 2014 y el menor en el 2009. Para el rio Chancay el mayor
caudal medio se da en 2012 y el menor en 2012.
Recomendaciones
Se debe mejorar el monitoreo para la medicin de caudales del proyecto Tinajones para
reducir la cantidad de datos faltantes.
Para el clculo del caudal de diseo para mximas avenidas, es necesario usar diversos
mtodos de probabilidad porque la variacin entre caudales es significativo cuando se
quiere disear para ms de 100 aos.
Se requiere tener recientes estudios de evaporacin en la zona de estudio.
68
4.1) INTRODUCCIN
El presente proyecto consiste en mejorar la Central Hidroelctrica del Proyecto Tinajones. Para
lo cual se disear los elementos de ingeniera necesarios para el correcto funcionamiento de la
central, entre los cuales se incluye el diseo de la tubera forzada para los distintos tipos de
caudales necesarios, adems del clculo de energa y de la capacidad o potencia instalada.
Las centrales hidroelctricas son instalaciones que permiten aprovechar la energa potencial
gravitatoria (masa a una cierta altura) contenida en el agua de los ros, al convertirla en energa
elctrica mediante turbinas hidrulicas acopladas a generadores elctricos.
Las centrales hidroelctricas producen energa elctrica a partir de la energa potencial o
gravitatoria (masa a una cierta altura) contenida en el agua de los ros, mediante un equipo de
turbina-generador.
Figura 64 Central hidroelctrica
Presa hidrulica: es una barrera fabricada con piedra, hormign o materiales sueltos,
que se construye habitualmente apoyado en una montaa o desfiladero, sobre un ro o
arroyo. Se encarga de retener el agua en el cauce fluvial con diferentes finalidades: para
su posterior aprovechamiento en abastecimiento o regado; para elevar su nivel con el
objetivo de derivarla a canalizaciones de riego; para proteger una zona de sus efectos
dainos; o para la produccin de energa elctrica.
Figura 65 Presa hidrulica
Embalse: es el volumen de agua que queda retenido, de forma artificial, por la presa.
Se suele colocar en un lugar adecuado geolgica y topogrficamente y se puede
emplear para generar electricidad, abastecer de agua las poblaciones o regado.
Figura 66 Embalse
Tomas de agua: son construcciones que permiten recoger el agua para llevarlo hasta
las turbinas por medios de canales o tuberas. Se sitan en la pared anterior de la
presa, la que da al embalse. En el interior de la tubera, el agua transforma la energa
potencial en cintica, es decir, adquiere velocidad. Adems de unas compuertas para
regular la cantidad de agua que llega a las turbinas, poseen unas rejillas metlicas que
impiden que elementos extraos como troncos, ramas, etc. puedan llegar a
los labes y producir desperfectos. Desde aqu, el agua pasa a la tubera forzada que
atraviesa a presin el cuerpo de la presa.
70
Aliviaderos: permiten el paso del agua desde el embalse hasta el cauce del ro, aguas
abajo, para evitar el peligro por desbordamiento que podran ocasionar las crecidas. En
esos casos es necesario poder evacuar el agua sobrante sin necesidad de que pase por
la central.
Figura 68 Aliviaderos
Tubera forzada
Casa de mquinas
216.08 msnm
214.00 msnm
: 213.30 msnm
185.00 msnm
372 m
4.20 m
1.25 %
:
:
:
:
176.00 msnm
100.00 m
15 m
175.90 msnm
Para calcular la potencia, energa y los dimetros de la tubera forzada se utilizarn los siguientes
caudales, los cuales son caudales de descarga diarios que van desde el ao 2007 hasta el 2015.
Tabla 56 Caudales de diseo para calcular la potencia, energa y tubera forzada
Prob
[%]
20
24.2
27.55
39.92
48
Flow
[m/s]
30
25
22
18
15
72
73
Tubera forzada:
Con el fin de impulsar al fluido y mejorar la capacidad de generacin de la presa, el agua se hace
correr a travs de una gran tubera llamada Tubera Forzada o de Presin especialmente
diseada para reducir las prdidas de energa que se pudieran producir, llevando el agua hasta
la turbina en la casa de mquinas. Esta tubera tiene que soportar la presin que produce la
columna de agua, adems de la sobre-presin que provoca el golpe de ariete en caso de parada
brusca de la minicentral. Dependiendo de la orografa del terreno y de los factores
medioambientales, la colocacin de la tubera forzada ser subterrnea o exterior. Para la
construccin de estas tuberas se utiliza acero para saltos de agua de hasta 2000m y hormign
para saltos de agua de 500m.
74
Casa de Mquinas:
Es la construccin en donde se ubican las mquinas (turbinas, alternadores, etc.) y los elementos
de regulacin y comando.
Las casas de mquinas pueden tener distintas formas y distribucin dependiendo del tipo de
central hidroelctrica.
Figura 75 Sala de mquinas para central de caudal elevado y baja cada
75
La central de baja cada y alto caudal presenta generadores denominados "a bulbo", que estn
totalmente sumergidos en funcionamiento.
Figura 77 Sala de mquinas para central de caudal mediano y salto mediano
En la central de caudal mediano y salto mediano, la sala de mquinas al pie de la presa. El agua
ingresa por la toma ubicada en el mismo dique, y es llevada hasta las turbinas por medio de
conductos metlicos embutidos en el dique.
Figura 78 Sala de mquinas para central de alta presin y bajo caudal
En la central de alta presin y bajo caudal, la sala de mquinas se construye alejada de la presa.
El agua llega por medio de una tubera a presin desde la toma, por lo regular alejada de la
central, y en el trayecto suele haber una chimenea de equilibrio. La alta presin del agua que se
76
presenta en estos casos obliga a colocar vlvulas para la regulacin y cierre, capaces de soportar
el golpe de ariete.
Golpe de ariete:
Se denomina golpe de ariete al choque violento que se produce sobre las paredes de un
conducto forzado, cuando el movimiento lquido es modificado bruscamente. En otras palabras,
el golpe de ariete se puede presentar en una tubera que conduzca un lquido hasta el tope,
cuando se tiene un frenado o una aceleracin en el flujo; por ejemplo, el cambio de abertura en
una vlvula en la lnea. Al cerrarse rpidamente una vlvula en la tubera durante el
escurrimiento, el flujo a travs de la vlvula se reduce, lo cual incrementa la carga del lado aguas
arriba de la vlvula, inicindose un pulso de alta presin que se propaga en la direccin contraria
a la del escurrimiento. Esta onda provoca sobrepresiones y depresiones las cuales deforman las
tuberas y eventualmente la destruyen. Desde el punto de vista energtico puede considerarse
la transformacin de la energa cintica del fluido en energa potencial elstica (cambios de
presin) y viceversa. Si la tubera carece de roce y es indeformable y por lo tanto no hay prdidas
de energa, el fenmeno se reproduce indefinidamente. Si hay roce y la tubera es elstica parte
de la energa se va perdiendo y las sobrepresiones son cada vez menores hasta que el fenmeno
se extingue.
En el caso de cierre de una vlvula, la fuerza viva con que el agua estaba animada se convertira
en trabajo, determinando en las paredes de la tubera presiones superiores a la carga inicial. Si
se pudiera cerrar la vlvula en un tiempo t = 0, se produce el cierre instantneo y considerando
que el agua fuese incompresible y la tubera no fuese elstica, la sobrepresin tendra valor
infinito. En la prctica, el cierre lleva algn tiempo, por pequeo que sea y la energa que va a
absorberse se transforma en esfuerzos de compresin del agua y deformacin de las paredes
de la tubera.
En la Ingeniera es muy importante determinar la magnitud de esta sobrepresin con el objeto
de poder disear las tuberas con suficiente resistencia para soportarla. En las vlvulas operadas
a discrecin la sobrepresin no es muy grande porque se procura que Tv sea grande (cierre
lento). Pero en las salidas de operacin de equipos (parada de bombas, dao de vlvulas, etc.)
la sobrepresin puede ser muy grande, por lo que se procura disminuirla con vlvulas de alivio,
cmaras neumticas, chimeneas de equilibrio, etc.
Figura 79 Tuberas daadas por golpe de ariete
77
m3/s
m
%
m
dias
m/s2
w=
a=
a=
K=
nt=
ng=
ntr=
T=
k=
1000.00
7850.00
14000000.00
0.95
20.00
0.859
0.990
0.995
20.00
0.00025
kg/m3
kg/m3
kg/m2
S/U
%
S/U
S/U
S/U
C
m
12.00
20.00
5.00
0.05
0.0115
%
aos
USD/kg
USD/kWh
S/U
Diametro economico:
D=
Espesor:
Velocidad:
e=
V=
7.21 mm
3.27 m/s
Perdida de Carga:
Eficiencia hidraulica:
hf=
0.21 m
0.994 S/U
Altura Neta: Hn
Porcentaje de p.d.c
hs
Potencia: Pot=
37.19 m
0.56 %
9.26 MW
3.420349 m
78
D (m)
2.394
2.736
3.078
3.420
3.762
4.104
4.446
4.788
5.131
Costo anual de
tuberia
Costo anual de
energia no producida
C1 (USD)
27542.19
35973.47
45528.93
56208.55
68012.35
80940.31
94992.45
110168.76
126469.24
C2 (USD)
133774.14
68613.95
38075.87
22483.42
13960.43
9035.58
6055.44
4180.44
2960.78
Ct (USD)
161316.33
104587.43
83604.80
78691.97
81972.78
89975.89
101047.89
114349.20
129430.02
Para hallar el dimetro econmico de los dems caudales, solo se debe reemplazar el caudal
nominal con el caudal de diseo deseado. Los dems datos de aprovechamiento, tcnicos y
econmicos permanecen constantes.
Qdiseo: 25 m3/s
Tabla 61 Datos de aprovechamiento para Q=25 m3/s
Datos del Aprovechamiento:
Caudal nominal Q= 25.00
Salto Bruto H= 37.40
Sobrepresion Hs= 50.00
Longitud de Tuberia L= 115.00
Tiempo de Mantenimiento m= 7.00
Aceleracion de la gravedad g= 9.81
m3/s
m
%
m
dias
m/s2
79
w=
a=
a=
K=
nt=
ng=
ntr=
T=
k=
1000.00
7850.00
14000000.00
0.95
20.00
0.859
0.990
0.995
20.00
0.00025
kg/m3
kg/m3
kg/m2
S/U
%
S/U
S/U
S/U
C
m
12.00
20.00
5.00
0.05
0.0117
%
aos
USD/kg
USD/kWh
S/U
Diametro economico:
D=
Espesor:
Velocidad:
e=
V=
3.169937 m
6.69 mm
3.17 m/s
Perdida de Carga:
Eficiencia hidraulica:
hf=
0.22 m
0.994 S/U
Altura Neta: Hn
Porcentaje de p.d.c
hs
Potencia: Pot=
37.18 m
0.58 %
7.72 MW
D (m)
2.219
2.536
2.853
3.170
3.487
3.804
4.121
4.438
4.755
Costo anual de
tuberia
Costo anual de
energia no producida
C1 (USD)
23656.96
30898.88
39106.40
48279.50
58418.20
69522.48
81592.36
94627.82
108628.88
C2 (USD)
114903.32
58934.94
32704.70
19311.80
11991.11
7760.98
5201.23
3590.73
2543.12
Ct (USD)
138560.28
89833.82
71811.10
67591.30
70409.31
77283.46
86793.59
98218.55
111172.00
80
Qdiseo: 22 m3/s
Tabla 65 Datos de aprovechamiento para Q=22 m3/s
Datos del Aprovechamiento:
Caudal nominal Q= 22.00
Salto Bruto H= 37.40
Sobrepresion Hs= 50.00
Longitud de Tuberia L= 115.00
Tiempo de Mantenimiento m= 7.00
Aceleracion de la gravedad g= 9.81
m3/s
m
%
m
dias
m/s2
w=
a=
a=
K=
nt=
ng=
ntr=
T=
k=
1000.00
7850.00
14000000.00
0.95
20.00
0.859
0.990
0.995
20.00
0.00025
kg/m3
kg/m3
kg/m2
S/U
%
S/U
S/U
S/U
C
m
12.00
20.00
5.00
0.05
0.0118
%
aos
USD/kg
USD/kWh
S/U
Diametro economico:
D=
Espesor:
Velocidad:
e=
V=
3.005407 m
6.34 mm
3.10 m/s
Perdida de Carga:
Eficiencia hidraulica:
hf=
0.22 m
0.994 S/U
Altura Neta: Hn
Porcentaje de p.d.c
hs
Potencia: Pot=
37.18 m
0.59 %
6.79 MW
D (m)
2.104
2.404
2.705
3.005
3.306
3.606
3.907
4.208
4.508
Costo anual de
tuberia
Costo anual de
energia no producida
C1 (USD)
21264.95
27774.62
35152.26
43397.85
52511.40
62492.90
73342.36
85059.78
97645.16
C2 (USD)
103285.17
52975.89
29397.85
17359.14
10778.66
6976.25
4675.32
3227.66
2285.98
Ct (USD)
124550.12
80750.51
64550.11
60756.99
63290.06
69469.15
78017.68
88287.44
99931.13
81
Qdiseo: 18 m3/s
Tabla 69 Datos de aprovechamiento para Q=18 m3/s
Datos del Aprovechamiento:
Caudal nominal Q= 18.00
Salto Bruto H= 37.40
Sobrepresion Hs= 50.00
Longitud de Tuberia L= 115.00
Tiempo de Mantenimiento m= 7.00
Aceleracion de la gravedad g= 9.81
m3/s
m
%
m
dias
m/s2
w=
a=
a=
K=
nt=
ng=
ntr=
T=
k=
1000.00
7850.00
14000000.00
0.95
20.00
0.859
0.990
0.995
20.00
0.00025
kg/m3
kg/m3
kg/m2
S/U
%
S/U
S/U
S/U
C
m
82
12.00
20.00
5.00
0.05
0.0120
%
aos
USD/kg
USD/kWh
S/U
Diametro economico:
D=
Espesor:
Velocidad:
e=
V=
5.83 mm
3.00 m/s
Perdida de Carga:
Eficiencia hidraulica:
hf=
0.23 m
0.994 S/U
Altura Neta: Hn
Porcentaje de p.d.c
hs
Potencia: Pot=
37.17 m
0.61 %
5.55 MW
2.764231 m
D (m)
1.935
2.211
2.488
2.764
3.041
3.317
3.593
3.870
4.146
Costo anual de
tuberia
Costo anual de
energia no producida
C1 (USD)
17988.97
23495.80
29736.87
36712.18
44421.74
52865.54
62043.58
71955.87
82602.41
C2 (USD)
87373.55
44814.67
24868.96
14684.87
9118.15
5901.52
3955.06
2730.42
1933.81
Ct (USD)
105362.52
68310.47
54605.83
51397.05
53539.89
58767.06
65998.65
74686.30
84536.22
83
Qdiseo: 15 m3/s
Tabla 73 Datos de aprovechamiento para Q=15 m3/s
Datos del Aprovechamiento:
Caudal nominal Q= 15.00
Salto Bruto H= 37.40
Sobrepresion Hs= 50.00
Longitud de Tuberia L= 115.00
Tiempo de Mantenimiento m= 7.00
Aceleracion de la gravedad g= 9.81
m3/s
m
%
m
dias
m/s2
w=
a=
a=
K=
nt=
ng=
ntr=
T=
k=
1000.00
7850.00
14000000.00
0.95
20.00
0.859
0.990
0.995
20.00
0.00025
kg/m3
kg/m3
kg/m2
S/U
%
S/U
S/U
S/U
C
m
12.00
20.00
5.00
0.05
0.0122
%
aos
USD/kg
USD/kWh
S/U
Diametro economico:
D=
Espesor:
Velocidad:
e=
V=
5.40 mm
2.91 m/s
Perdida de Carga:
Eficiencia hidraulica:
hf=
0.24 m
0.994 S/U
Altura Neta: Hn
Porcentaje de p.d.c
hs
Potencia: Pot=
37.16 m
0.63 %
4.63 MW
2.561975 m
D (m)
1.793
2.050
2.306
2.562
2.818
3.074
3.331
3.587
3.843
Costo anual de
tuberia
Costo anual de
energia no producida
C1 (USD)
15452.81
20183.27
25544.45
31536.36
38158.99
45412.35
53296.44
61811.26
70956.80
C2 (USD)
75055.29
38496.53
21362.84
12614.54
7832.64
5069.50
3397.46
2345.48
1661.17
Ct (USD)
90508.10
58679.80
46907.29
44150.90
45991.63
50481.85
56693.90
64156.73
72617.97
84
El cuadro resumen con los dimetros econmicos de todos los caudales se muestra a
continuacin:
Tabla 77 Resumen de los dimetros econmicos, su espesor y velocidad para todos los caudales de diseo
Q nominal (m3/s)
Coeficiente de Darcy
30
0.0115
25
0.0117
22
0.0118
18
0.0120
15
0.0122
3.42
7.21
3.27
3.17
6.69
3.17
3.01
6.34
3.10
2.76
5.83
3.00
2.56
5.40
2.91
0.210
0.994
0.217
0.994
0.221
0.994
0.229
0.994
0.236
0.994
37.190
0.562
9.261
37.183
0.580
7.716
37.179
0.592
6.789
37.171
0.612
5.554
37.164
0.631
4.627
Golpe de ariete:
Una vez obtenidos los dimetros econmicos, sus espesores y velocidades, se debe calcular el
golpe de ariete para as encontrar la verdadera sobrepresin que requiere cada dimetro.
Primero se debe calcular el tiempo crtico (Tc), la celeridad de la onda (c) y finalmente el valor
mximo de la sobrepresin (h max) para cada caudal de diseo.
Tabla 78 Datos para calcular la sobrepresin
Mdulo de elasticidad del agua (E0)
Mdulo de elasticidad del material (E )
Mdulo de compresibilidad del lquido (e )
Masa especfica del lquido (p)
L
Salto Bruto
2.00E+03
2.10E+05
2.20E+03
0.00100
115.00
37.40
Mpa
Mpa
m
m
85
30
342.03
0.72
3.27
607.19
0.38
202.09
25
316.99
0.67
3.17
607.19
0.38
196.07
22
300.54
0.63
3.10
607.19
0.38
191.95
18
276.42
0.58
3.00
607.19
0.38
185.65
15
256.20
0.54
2.91
607.19
0.38
180.10
30
6.00
OK
12.76
34%
25
6.00
OK
12.38
33%
22
6.00
OK
12.12
32%
18
6.00
OK
11.72
31%
15
6.00
OK
11.37
30%
Una vez calculadas las sobrepresiones, stas se reemplazan en las frmulas para calcular el
dimetro econmico. Al inicio se utiliz una sobrepresin de 50% para cada caudal de diseo,
para corregir los dimetros, se reemplaz ese 50% por el porcentaje de sobrepresin de cada
caudal de diseo mostrado en el cuadro anterior. Por ejemplo, para el caudal de diseo de 30
m3/s se utiliz una sobrepresin (Hs) de 34%.
Los dimetros econmicos corregidos, se muestran a continuacin.
Tabla 81 Dimetros econmicos luego de utilizar el golpe de ariete
Q nominal (m3/s)
Coeficiente de Darcy
30
0.0115
25
0.0117
22
0.0118
18
0.0120
15
0.0121
3.47
6.55
3.16
3.22
6.03
3.06
3.06
5.68
2.99
2.82
5.19
2.89
2.61
4.78
2.80
0.194
0.995
0.199
0.995
0.202
0.995
0.208
0.994
0.213
0.994
37.206
0.518
9.265
37.201
0.531
7.720
37.198
0.540
6.793
37.192
0.555
5.557
37.187
0.569
4.630
86
() =
9.81
1000
Potencia efectiva: Es la capacidad real de energa que las centrales hidroelctricas pueden
entregar para su consumo. Su valor se determina usando el factor de planta (depende de la
capacidad de turbinas, ubicacin de la central).
Potencia firme: Es una parte que corresponde a la potencia efectiva. Indica la mxima cantidad
de energa que puede ser entregada de forma inmediata (en tiempo real) y con un alto nivel de
seguridad al sistema. Esto sirve para garantizar que los caudales cubran la demanda en periodos
crticos en las horas punta.
El margen de reserva al cubrir la demanda puede ser til para hacer frente a eventualidades
como la falla de la central, periodos de sequa u otros.
Energa:
La energa es obtenida del producto de la Potencia y el Tiempo.
Para calcular la energa anual, primero se deben obtener los caudales de diseo. En este caso,
se consideraron los caudales medios diarios de la curva de duracin: 30, 25, 22, 18 y 15 m3/s.
De sta forma, se hicieron 5 clculos de energas anuales correspondientes a cada caudal de
diseo. Teniendo el caudal de diseo, se procedi a obtener la capacidad instalada de las
turbinas.
Para calcular la potencia media diaria, se calcul la altura neta para cada da y se consider una
prdida de altura constante. Por otra parte, para los caudales se consider el menor entre el
caudal diario y el caudal de diseo, ya que ste ltimo representa el mximo caudal que puede
pasar por las turbinas. De este modo, el caudal excedente que sobrepasa este valor, contina el
flujo por el canal de descarga.
Tambin, es necesario tomar en cuenta que si se tiene valores por debajo del caudal mnimo
tcnico de la turbina no se va a producir la potencia para aquel da.
Al obtener la potencia media diaria para todos los das, el clculo de la energa se obtiene
multiplicando dicha potencia por el nmero de horas durante las que se obtiene esa potencia
(24 hr). Para este caso, para calcular la energa anual, ser necesario sumar todas las energas
generadas. Despus dividirlo entre el nmero de aos considerados.
Caudal mnimo tcnico: Es el caudal mnimo que puede ser turbinado. Se considera, puesto a
que si se usa un caudal por debajo de ste, las turbinas van a trabajar en malas condiciones. Se
calcula como la proporcin (K) del caudal de diseo, la cual depende del tipo de turbina a usar.
En este caso, para turbina Kaplan el K=0.22.
Factor de planta (Oferta): Es el cociente entre la energa real generada por la central elctrica y
la energa que pudiera haber generado si hubiera trabajado las turbinas a full carga durante el
mismo periodo de tiempo. Es un indicativo del grado de utilizacin de la capacidad efectiva de
una central hidroelctrica en el tiempo. En la prctica, el factor de planta nunca es 100 % dado
87
Q diseo: 30 m3/s
Tabla 82 Potencia y energa del Qdiseo: 30m3/s
Datos de Entrada
Persistencia:
20 %
Caudal de diseo:
30.00 m/s
Caudal de diseo/unidad:
15.00 m/s
Caudal ecolgico:
m/s
6.00 m/s
Tipo de turbina:
Kaplan
Altura mx.:
213.30 msnm
Nmero de unidades:
Nivel de descarga:
175.90 msnm
0.890
Altura bruta:
37.40 m
0.990
Prdidas hidrulicas:
Altura neta:
1.496 m
35.90 m
0.995
1.000
0.877
28.3
9.4333333
4.63 MW
9.26 MW
Resultados de la Simulacin
Produccin de energa promedio:
31.3 GWh/ao
Factor de planta:
0.39
Q diseo: 25 m3/s
Tabla 83 Potencia y energa del Qdiseo: 25m3/s
Datos de Entrada
Persistencia:
24 %
Caudal de diseo:
25.00 m/s
Caudal de diseo/unidad:
12.50 m/s
Caudal ecolgico:
Caudal tcnico mnimo:
m/s
5.00 m/s
Tipo de turbina:
Kaplan
Altura mx.:
213.30 msnm
Nmero de unidades:
Nivel de descarga:
175.90 msnm
0.890
Altura bruta:
37.40 m
0.990
Prdidas hidrulicas:
Altura neta:
1.496 m
35.90 m
0.995
1.000
0.877
28.3
9.4333333
3.86 MW
7.72 MW
Resultados de la Simulacin
Produccin de energa promedio:
29.3 GWh/ao
Factor de planta:
0.43
88
Q diseo: 22 m3/s
Tabla 84 Potencia y energa del Qdiseo: 22m3/s
Datos de Entrada
Persistencia:
28 %
Caudal de diseo:
22.00 m/s
Caudal de diseo/unidad:
11.00 m/s
Caudal ecolgico:
m/s
4.40 m/s
Tipo de turbina:
Kaplan
Altura mx.:
213.30 msnm
Nmero de unidades:
Nivel de descarga:
175.90 msnm
0.890
Altura bruta:
37.40 m
0.990
Prdidas hidrulicas:
Altura neta:
1.496 m
35.90 m
0.995
1.000
0.877
28.3
9.4333333
3.40 MW
6.79 MW
Resultados de la Simulacin
Produccin de energa promedio:
27.9 GWh/ao
Factor de planta:
0.47
Q diseo: 18 m3/s
Tabla 85 Potencia y energa del Qdiseo: 18m3/s
Datos de Entrada
Persistencia:
40 %
Caudal de diseo:
Caudal de diseo/unidad:
18.00 m/s
9.00 m/s
Caudal ecolgico:
Caudal tcnico mnimo:
m/s
3.60 m/s
Tipo de turbina:
Kaplan
Altura mx.:
213.30 msnm
Nmero de unidades:
Nivel de descarga:
175.90 msnm
0.890
Altura bruta:
37.40 m
0.990
Prdidas hidrulicas:
Altura neta:
1.496 m
35.90 m
0.995
1.000
0.877
28.3
9.4333333
2.78 MW
5.56 MW
Resultados de la Simulacin
Produccin de energa promedio:
25.2 GWh/ao
Factor de planta:
0.52
89
Q diseo: 15 m3/s
Tabla 86 Potencia y energa del Qdiseo: 15m3/s
Datos de Entrada
Persistencia:
48 %
Caudal de diseo:
15.00 m/s
Caudal de diseo/unidad:
7.50 m/s
Caudal ecolgico:
m/s
3.00 m/s
Tipo de turbina:
Kaplan
Altura mx.:
213.30 msnm
Nmero de unidades:
Nivel de descarga:
175.90 msnm
0.890
Altura bruta:
37.40 m
0.990
Prdidas hidrulicas:
Altura neta:
1.496 m
35.90 m
0.995
1.000
0.877
28.3
9.4333333
2.32 MW
4.63 MW
Resultados de la Simulacin
Produccin de energa promedio:
22.5 GWh/ao
Factor de planta:
0.56
Parmetros
Caudal de diseo
Capacidad instalada
Produccin de energa
Factor de Planta
Unidades
m/s
MW
GWh/ao
-
20
30.00
9.264
31.321
0.39
24
25.00
7.720
29.304
0.43
Persistencia
28
22.00
6.793
27.889
0.47
40
18.00
5.558
25.235
0.52
48
15.00
4.632
22.547
0.56
90
Q diseo: 30 m3/s
Tabla 88 Energa firme del caudal de 30 m3/s
Prob
[%]
Flow
[m/s]
10
170.68
20
143.66
30
129.52
40
103.27
50
87.06
60
69.64
70
51.35
75
43.58
80
26.62
90
0.00
95
0.00
100
0.00
Para el caso del caudal de diseo de 30 m3/s, se puede afirmar que a una persistencia de 75%
la energa firme es 43.58 MWh. Las energas secundarias son aquellas que sobrepasan ese
valor.
91
Q diseo: 25 m3/s
Tabla 89 Energa firme del caudal de 25 m3/s
Prob
[%]
Flow
[m/s]
10
152.51
20
134.26
30
117.62
40
99.99
50
85.68
60
68.89
70
51.35
75
43.58
80
29.27
90
0.00
95
0.00
100
0.00
Q diseo: 22 m3/s
Tabla 90 Energa firme del caudal de 22 m3/s
Prob
[%]
Flow
[m/s]
10
147.96
20
128.57
30
107.97
40
95.65
50
83.91
60
67.66
70
51.35
75
43.58
80
30.31
90
0.00
95
0.00
100
0.00
92
Q diseo: 18 m3/s
Tabla 91 Energa firme del caudal de 18 m3/s
Prob
[%]
Flow
[m/s]
10
130.21
20
112.49
30
96.49
40
87.33
50
79.60
60
65.96
70
50.05
75
43.58
80
30.40
90
0.00
95
0.00
100
0.00
93
Q diseo: 15 m3/s
Tabla 92 Energa firme del caudal de 15 m3/s
Prob
[%]
Flow
[m/s]
10
109.10
20
98.76
30
87.81
40
80.04
50
70.61
60
62.12
70
48.79
75
42.94
80
30.40
90
0.00
95
0.00
100
0.00
94
En el ltimo grafico se puede observar que el caudal de diseo que posee la mayor energa firme
es el del caudal de 30 m3/s. Lo que nos indica que con ese caudal la energa mnima que se
puede producir es mayor que la que se puede obtener con otros caudales.
Para disear las obras es mejor tomar como base el caudal de diseo mayor, ya que ste
nos permite obtener una mayor potencia y energa.
Hay que tener en cuenta que los costos seran ms altos con el mayor caudal de diseo,
ya que el dimetro econmico y el espesor de la tubera aumentan con el caudal. Sin
embargo, una ventaja que presentan las tuberas con los caudales altos es que tienen
una menor prdida de carga y una mayor eficiencia hidrulica.
El uso de la turbina Kaplan es el ms beneficioso por poseer un diseo tipo hlice, ya
que el rendimiento es ms eficiente al poseer una reaccin de flujo axial.
La seleccin del tipo de caudal depender de la cantidad de demanda que se planea
cubrir.
En sta central hidroelctrica se considerara de tamao mediano debido a que la
generacin de energa no es muy grande (aproximadamente entre 20 y 30 MW). La
utilidad de sta obra, sera la de alimentar a las ciudades aledaas que se encuentren
alrededor de la zona.
El diseo de la central hidroelctrica de Tinajones se hizo con el objetivo de aprovechar
el recurso del agua y no modificar los caudales correspondientes a la demanda de agua.
El criterio para no modificar la demanda de agua se bas en el conocimiento que se
tiene acerca de los eventos de sequas y crecidas que suceden en la zona de estudio.
Esto se refiere a que no se debe extraer agua adicional de otros puntos de la zona que
hagan variar el agua almacenada del embalse en temporadas de sequa y por otro lado,
con el objetivo de no aumentar los caudales en temporadas de intensa lluvias
(fenmeno del nio) que puedan generar inundaciones aguas abajo.
De sta forma, el nico punto de mayor factibilidad para la extraccin del agua sera
correspondiente al tnel de descarga. Adems, de garantizar a que no se modifique la
demanda de agua, era necesario evitar los costes adicionales de las obras de conduccin
correspondientes al transporte de agua. De sta forma, se seleccion la opcin ms
factible que posea un tramo de longitud mnima para el transporte el agua y que genere
una altitud bruta considerable para la generacin de energa.
95
Recomendaciones:
Para la curva duracin de los caudales de descarga se consideraron los das donde no
haba datos como 0. Lo correcto sera simplemente prescindir de esos valores, es decir
no considerarlos en el desarrollo de la curva duracin porque stos generan margen de
error.
Se recomienda tener un control fuerte en lo que respecta a contencin de sedimentos
en el flujo de agua, para extender a lo ms que se pueda el tiempo de vida de las
turbinas.
Se recomienda estar atento a la fecha de mantenimiento de las turbinas, para su buen
funcionamiento posterior.
96
Realizar el presupuesto y hallar el costo total del proyecto dependiendo de los caudales
de diseo.
Realizar el anlisis econmico y comprobar si el proyecto es viable econmicamente o
no.
Comparar los anlisis econmicos de cada caudal de diseo y elegir El diseo que nos
d una mejor rentabilidad y ganancia.
5.1) INTRODUCCIN
La evaluacin econmica se realiza para determinar si el proyecto es rentable o no. Para una
correcta evaluacin econmica se deben conocer primero ciertos conceptos.
Valor Actual Neto (VAN):
Es un indicador que forma parte del anlisis beneficio costo, es decir, cuando se aplica en
aquellos casos en que los beneficios de una inversin compense a los costos.
Adems, muestra la riqueza adicional que genera un proyecto luego de cubrir todos sus costos
en un horizonte determinado de tiempo, es decir, cuando se analiza una inversin, lo mnimo
que se debe obtener es: cubrir sus costos.
El VAN es un mtodo que se utiliza para la valoracin de distintas opciones de inversin. Este
mtodo consiste en actualizar los cobros y pagos de un proyecto o inversin y calcular su
diferencia. El VAN va a expresar una medida de rentabilidad del proyecto en trminos absolutos
netos, es decir, en n de unidades monetarias. A continuacin se muestra la frmula:
Figura 91 Frmula para calcular el VAN
En donde:
El VAN sirve para generar dos tipos de decisiones: en primer lugar, ver si las inversiones son
efectuables y en segundo lugar, ver qu inversin es mejor que otra en trminos absolutos. Los
criterios de decisin van a ser los siguientes:
97
VAN > 0: el valor actualizado de los cobros y pagos futuros de la inversin, a la tasa de
descuento elegida generar beneficios.
VAN < 0: el proyecto de inversin generar prdidas, por lo que deber ser rechazado.
As, desde el punto de vista matemtico el VAN acumula los beneficios y costos en el periodo
cero. Por ejemplo se tiene una inversin de S/. 50 000 que genera beneficios netos (ingresos
menos costos operativos, financieros) de S/. 20 000 el primer ao, de S/. 30 000 el segundo y
tercero, considerando una tasa mnima de rendimiento de 12% determine el VAN.
Se halla el VAN:
VAN (12%) = 20 000/(1,12) + 30 000/(1,12)2 +30 000/(1,12)3 - 50 000
VAN (12%) = 13 126
La interpretacin es la siguiente: El proyecto cubre todos sus costos, as como la tasa mnima del
12% requerida, adems de ello genera una riqueza adicional de S/. 13 126, es decir, el valor
generado.
La TIR nos da una medida relativa de la rentabilidad, es decir, va a venir expresada en tanto por
ciento. Pero el principal problema radica en su clculo ya que el nmero de periodos dar el
98
orden de la ecuacin a resolver. Para resolver este problema se puede acudir a diversas
aproximaciones que sern ms o menos fiables, o utilizar una calculadora financiero o utilizar
un programa informtico
Tambin se puede definir basndonos en su clculo, la TIR es la tasa de descuento que iguala,
en el momento inicial, la corriente futura de cobros con la de pagos, generando un VAN igual a
cero:
Figura 93 Frmula para calcular el TIR
El criterio de seleccin ser el siguiente donde k es la tasa de descuento de flujos elegida para
el clculo del VAN:
Si TIR > k, el proyecto de inversin ser aceptado. En este caso, la tasa de rendimiento
interno que obtenemos es superior a la tasa mnima de rentabilidad exigida a la
inversin.
Si TIR = k, estaramos en una situacin similar a la que se produca cuando el VAN era
igual a cero. En esta situacin, la inversin podr llevarse a cabo si mejora la posicin
competitiva de la empresa y no hay alternativas ms favorables.
Ratio Beneficio/Costo:
Es el cociente de dividir el valor actualizado de los beneficios del proyecto (ingresos) entre el
valor actualizado de los costos (egresos) a una tasa de actualizacin igual a la tasa de
rendimiento mnima aceptable (TREMA), a menudo tambin conocida como tasa de
actualizacin o tasa de evaluacin.
Los beneficios actualizados son todos los ingresos actualizados del proyecto, aqu tienen que ser
considerados desde ventas hasta recuperaciones y todo tipo de entradas de dinero; y los
costos actualizados son todos los egresos actualizados o salidas del proyecto desde costos de
operacin, inversiones, pago de impuestos, depreciaciones, pagos de crditos, intereses, etc. de
cada uno de los aos del proyecto. Su clculo es simple, se divide la suma de los beneficios
actualizados de todos los aos entre la suma de los costos actualizados de todos los aos del
proyecto.
99
5.2) PRESUPUESTO
5.2.1) OBRAS CIVILES
El presupuesto para las obras civiles se muestra a continuacin. ste incluye el metrado y los
precios unitarios para el tnel, tubera de presin y el canal de descarga. Este presupuesto es el
mismo para cada caudal de diseo, no existen variaciones entre stos.
Tabla 93 Presupuesto de las obras civiles
und
Metrado GENERAL
P.U. ($)
Parcial ($)
Gbl
1.00
50,000.00
50,000.00
50,000.00
Campamento
Gbl
1.00
30,000.00
30,000.00
30,000.00
Trazo y replanteo
Gbl
1.00
20,000.00
20,000.00
20,000.00
Ingeniera de Detalle
Gbl
1.00
70,000.00
70,000.00
70,000.00
ITEM
1.0
2.0
DESCRIPCION
OBRAS GENERALES
170,000.00
374,061.00
Movimiento de Tierra
100,675.30
m3
963.40
100.00
96,340.00
m3
1,445.10
3.00
4,335.30
m3
347.10
160.00
55,536.00
Kg
31,239.00
2.30
71,849.70
Gbl
1.00
16,000.00
16,000.00
Shotcrete
m2
1.00
60,000.00
60,000.00
Otros
Gbl
1.00
70,000.00
70,000.00
Concreto armado
127,385.70
2
146,000.00
Pernos de anclaje
3.0
Sub-Total ($)
TUBERIA DE PRESIN
62,156.60
Movimiento de Tierra
1,859.00
Excavacin en suelo
m3
202.00
5.00
m2
40.00
1.50
60.00
m3
263.00
3.00
789.00
m2
112.00
6.00
672.00
m3
224.00
150.00
33,600.00
kg
20,608.00
1.20
24,729.60
m2
108.00
12.00
1,296.00
143.00
1,750.00
250,250.00
250,250.00
1.00
790,000.00
790,000.00
790,000.00
1,010.00
672.00
59,625.60
4.0
CANAL DE DESCARGA
5.0
CASA DE MAQUINAS
Gbl
$
$
1,646,467.60
GG Y U (25%)
2,058,084.50
COSTO DIRECTO
100
411,616.90
30.0 m3/s
Potencia:
9.26 MW
Nro. Unidades:
Item
1.00
DESCRIPCION
Precio Unit.
(Instalado)
(US$)
Parcial
(Instalado)
(US$)
Unid.
Cant.
15,000
30,000
Ton
84
3,800
320,000
Total
(Instalado)
(US$)
EQUIPO HIDROMECANICO
Ataguia canal de descarga con equipo de izaje 2.0x2.0 m
Conducto forzado de acero
y pintura, al exterior
Subtotal Hidromecnico Generacin:
2.00
3.00
4.00
350,000
6,534,404.89
Gbl
Gbl
1
1
250,000
60,000
250,000
60,000
250,000
60,000
7,194,405
25.0 m3/s
Potencia:
7.72 MW
Nro. Unidades:
Item
1.00
DESCRIPCION
Unid.
Cant.
Precio Unit.
(Instalado)
(US$)
Parcial
(Instalado)
(US$)
Total
(Instalado)
(US$)
EQUIPO HIDROMECANICO
Ataguia canal de descarga con equipo de izaje 2.0x2.0 m
Conducto forzado de acero
y pintura, al exterior
15,000
30,000
Ton
84
3,800
320,000
3.00
4.00
350,000
5,687,249.24
Gbl
Gbl
1
1
250,000
60,000
250,000
60,000
250,000
60,000
6,347,249
101
22.0 m3/s
Potencia:
6.79 MW
Nro. Unidades:
Item
1.00
DESCRIPCION
Unid.
Cant.
Precio Unit.
(Instalado)
(US$)
Parcial
(Instalado)
(US$)
Total
(Instalado)
(US$)
EQUIPO HIDROMECANICO
Ataguia canal de descarga con equipo de izaje 2.0x2.0 m
Conducto forzado de acero
y pintura, al exterior
15,000
30,000
Ton
84
3,800
320,000
3.00
4.00
350,000
5,156,376.25
Gbl
Gbl
1
1
250,000
60,000
250,000
60,000
250,000
60,000
5,816,376
18.0 m3/s
Potencia:
5.56 MW
Nro. Unidades:
Item
1.00
DESCRIPCION
Precio Unit.
(Instalado)
(US$)
Parcial
(Instalado)
(US$)
Unid.
Cant.
15,000
30,000
Ton
84
3,800
320,000
Total
(Instalado)
(US$)
EQUIPO HIDROMECANICO
Ataguia canal de descarga con equipo de izaje 2.0x2.0 m
Conducto forzado de acero
y pintura, al exterior
Subtotal Hidromecnico Generacin:
2.00
3.00
4.00
350,000
4,426,753.20
Gbl
Gbl
1
1
250,000
60,000
250,000
60,000
250,000
60,000
5,086,753
15.0 m3/s
Potencia:
4.63 MW
Nro. Unidades:
Item
1.00
DESCRIPCION
Unid.
Cant.
Precio Unit.
(Instalado)
(US$)
Parcial
(Instalado)
(US$)
Total
(Instalado)
(US$)
EQUIPO HIDROMECANICO
Ataguia canal de descarga con equipo de izaje 2.0x2.0 m
Conducto forzado de acero
y pintura, al exterior
15,000
30,000
Ton
84
3,800
320,000
3.00
4.00
350,000
3,849,459.39
Gbl
Gbl
1
1
250,000
60,000
250,000
60,000
250,000
60,000
4,509,459
102
m/s
MW
30
9.26
25
7.72
22
6.79
18
5.56
15
4.63
$
$
S/. 2,058,084.50
S/. 7,194,404.89
S/. 2,058,084.50
S/. 6,347,249.24
S/. 2,058,084.50
S/. 5,816,376.25
S/. 2,058,084.50
S/. 5,086,753.20
S/. 2,058,084.50
S/. 4,509,459.39
Costo Total
US$
S/. 9,252,489.39
S/. 8,405,333.74
S/. 7,874,460.75
S/. 7,144,837.70
S/. 6,567,543.89
Sub-Total (USS.)
DESCRIPCION
ITEM
1.0
2.0
15
4.63
18
5.56
22
6.79
25
7.72
30
9.26
2,058,084.50
170,000.00
374,061.00
62,156.60
250,250.00
790,000.00
411,616.90
4,509,459.39
350,000
3,849,459
250,000
60,000
2,058,084.50
170,000.00
374,061.00
62,156.60
250,250.00
790,000.00
411,616.90
5,086,753.20
350,000
4,426,753.20
250,000
60,000
2,058,084.50
170,000.00
374,061.00
62,156.60
250,250.00
790,000.00
411,616.90
5,816,376.25
350,000
5,156,376.25
250,000
60,000
2,058,084.50
170,000.00
374,061.00
62,156.60
250,250.00
790,000.00
411,616.90
6,347,249.24
350,000
5,687,249.24
250,000
60,000
2,058,084.50
170,000.00
374,061.00
62,156.60
250,250.00
790,000.00
411,616.90
7,194,404.89
350,000
6,534,404.89
250,000
60,000
6,567,543.89
7,144,837.70
7,874,460.75
8,405,333.74
9,252,489.39
CAUDAL (m3/s)
9,264 kW
Costos
Inversin total
9,252,489 US$
0.12000
0.00414 i/((1+i)^n-1)
0.00000
TOTAL
Costo anual
30
= (1) x (2) =
0.12414
1,148,638 US$
Beneficios
Energa promedio anual
31,321,089 kWh
Valor de energa
55 Mill/kWh
Beneficio anual
1,722,660 US$
Capacidad firme
4,632 kW
Valor de capacidad
Beneficio anual
0 $/kW ao
(7) x (8)
0 US$
1,722,660 US$
Factor Beneficio-Costo
B/C
= (10) / (3) =
1.500
Indicadores econmicos
VAN
574,022 US$
TIR
18.50%
999 US$
0.037 US$
103
Persistencia: 24%
Tabla 101 Anlisis econmico para Q: 25 m3/s
Anlisis econmico preliminar
Datos del proyecto
Potencia
7,720 kW
Costos
Inversin total
8,405,334 US$
0.12000
30
0.00000
TOTAL
Costo anual
0.00414 i/((1+i)^n-1)
0.12414
= (1) x (2) =
1,043,469 US$
Beneficios
Energa promedio anual
29,304,407 kWh
Valor de energa
55 Mill/kWh
Beneficio anual
1,611,742 US$
Capacidad firme
3,860 kW
Valor de capacidad
Beneficio anual
0 $/kW ao
(7) x (8)
0 US$
1,611,742 US$
Factor Beneficio-Costo
B/C
= (10) / (3) =
1.545
Indicadores econmicos
VAN
568,274 US$
TIR
19.07%
1,089 US$
0.036 US$
Persistencia: 28%
Tabla 102 Anlisis econmico para Q: 22 m3/s
Anlisis econmico preliminar
Datos del proyecto
Potencia
6,793 kW
Costos
Obras Civiles
US$
Equipamiento electromecnico
US$
Inversin total
7,874,461 US$
0.12000
30
0.00414 i/((1+i)^n-1)
0.00000
TOTAL
0.12414
= (1) x (2) =
977,564 US$
Beneficios
Energa promedio anual
27,888,554 kWh
Valor de energa
55 Mill/kWh
Beneficio anual
1,533,870 US$
Capacidad firme
3,397 kW
Valor de capacidad
Beneficio anual
0 $/kW ao
(7) x (8)
0 US$
1,533,870 US$
Factor Beneficio-Costo
B/C
= (10) / (3) =
1.569
Indicadores econmicos
VAN
556,306 US$
TIR
19.38%
1,159 US$
0.035 US$
104
Persistencia: 40%
Tabla 103 Anlisis econmico para Q: 18 m3/s
Anlisis econmico preliminar
Datos del proyecto
Potencia
5,558 kW
Costos
Obras Civiles
US$
Equipamiento electromecnico
US$
Inversin total
7,144,838 US$
0.12000
30
0.00414 i/((1+i)^n-1)
0.00000
TOTAL
0.12414
= (1) x (2) =
886,986 US$
Beneficios
Energa promedio anual
25,234,711 kWh
Valor de energa
55 Mill/kWh
Beneficio anual
1,387,909 US$
Capacidad firme
2,779 kW
Valor de capacidad
Beneficio anual
0 $/kW ao
(7) x (8)
0 US$
1,387,909 US$
Factor Beneficio-Costo
B/C
= (10) / (3) =
1.565
Indicadores econmicos
VAN
500,923 US$
TIR
19.33%
1,285 US$
0.035 US$
Persistencia: 48%
Tabla 104 Anlisis econmico para Q: 15 m3/s
Anlisis econmico preliminar
Datos del proyecto
Potencia
4,632 kW
Costos
Obras Civiles
US$
Equipamiento electromecnico
US$
Inversin total
6,567,544 US$
0.12000
30
0.00414 i/((1+i)^n-1)
0.00000
TOTAL
0.12414
= (1) x (2) =
815,319 US$
Beneficios
Energa promedio anual
22,547,337 kWh
Valor de energa
55 Mill/kWh
Beneficio anual
1,240,104 US$
Capacidad firme
2,316 kW
Valor de capacidad
Beneficio anual
0 $/kW ao
(7) x (8)
0 US$
1,240,104 US$
Factor Beneficio-Costo
B/C
= (10) / (3) =
1.521
Indicadores econmicos
VAN
424,785 US$
TIR
18.77%
1,418 US$
0.036 US$
105
El cuadro resumen donde se muestran los indicadores econmicos de todas las persistencias se
muestra a continuacin.
Tabla 105 Cuadro resumen de todos los anlisis econmicos
Persistencia
Caudal
(m/s)
Potencia
(MW)
Energia
(GWh)
B/C
TIR %
VAN US$
Costo por kW
Instalado
US $
Costo por
kWh
US$
20%
24%
28%
40%
48%
30.00
25.00
22.00
18.00
15.00
9.26
7.72
6.79
5.56
4.63
31.32
29.30
27.89
25.23
22.55
1.50
1.54
1.57
1.56
1.52
18.50%
19.07%
19.38%
19.33%
18.77%
574,022
568,274
556,306
500,923
424,785
999
1,089
1,159
1,285
1,418
0.037
0.036
0.035
0.035
0.036
Todos los VAN tienen un valor mayor que 0, por lo tanto, el proyecto es rentable.
Se concluye que la obra es factible tanto tcnica como econmicamente, ya que existe
una demanda que debe ser atendida, y porque es posible recuperar las inversiones del
proyecto.
Para disear la central, se tomar el diseo que tenga el VAN mayor, el cual es el de una
persistencia de 20%. Ese VAN nos da la mayor ganancia neta.
La principal desventaja de utilizar el diseo con persistencia de 20%, es que posee los
menores TIR y relacin B/C, sin embargo, el indicador ms confiable es el VAN, por lo
tanto ese diseo sigue siendo el mejor y ms rentable.
No se consideraron los costos correspondientes a la operacin y mantenimiento para la
central hidroelctrica. Esto se debe a que solo se est realizando un Estudio de
Prefactibilidad. Adems, pese a que es de vital importancia considerar estos costos, la
central hidroelctrica de Tinajones no representa una obra de gran envergadura que
involucre una generacin de energa muy elevada. De esta forma, la incertidumbre de
la variacin de los costos en los posibles das de falta de operacin es menor.
Acerca del anlisis social y ambiental, los costos no se consideraron necesarios, puesto
a que la central hidroelctrica se desarrolla dentro de las instalaciones correspondientes
a una obra, ya construida (presa de Tinajones).
Sin duda, los trabajos relacionados al tnel de conduccin del agua hasta la casa de
mquinas incrementan significativamente los costos del proyecto.
De esta forma, se concluye que la elaboracin de sta nueva central hidroelctrica se
hizo con la finalidad de aumentar los beneficios energticos, optimizar y aprovechar de
una manera efectiva la utilizacin del recurso natural de la zona.
106
Recomendaciones:
Siempre debe tenerse en cuenta que el indicador ms importante es el VAN, pero eso
no quiere decir que el TIR y el B/C no deban tomarse en cuenta al momento de verificar
la viabilidad econmica del proyecto. El TIR siempre debe ser mayor que 0 y la B/C debe
ser mayor que 1.
Se debe tener mucho cuidado al realizar el metrado, ya que, en este caso en particular,
la potencia era lo que defini las principales diferencias entre los costos.
Para el anlisis econmico, sera necesario considerar los costos correspondientes a las
lneas de transmisin.
Tambin, sera importante determinar las zonas que se veran beneficiadas por la
demanda de energa.
Si se aprueba el estudio de prefactibilidad, se debe realizar un anlisis ms exhaustivo
del clculo de los costos. Esto se debe porque se usaron valores referenciales para
algunos clculos para el presupuesto del proyecto.
107
BIBLIOGRAFA
109