DATE: _____18/12/2013____
Hazard
Risk
Assessment
(No Controls)
P
INSTALLATION
1-
1) Working at height
Scaffolding (mobile/fixed ):
Hazards
Working on incomplete scaffolding.
Working on unbalance scaffolding.
20
Consequences
Falls from scaffold platforms
Materials falling from scaffold platforms
Scaffold collapses.
Plant, vehicles etc. colliding with scaffold.
Scaffold tipping over
2-
Manual Handling :
Hazards
Risk
Assessment
(With Controls)
Controls
15
Work in charge need to conduct Start Card Briefing prior to start work.
Select the physically competent workers for shifting , lifting
installing of hangers & supports
Proper lifting techniques must be practiced.
Page 1 of 9
ASO_080022 - Rev0 - Date May 18, 2013
ASOLOUVREJV
HAZARD RISK ASSESSMENT
PROJECT NAME: LOUVRE ABU DHABI
DATE: _____18/12/2013____
-Back Pains
- Poor Site Illumination
-Slips, Trips, or Falling
3-
15
15
All tools provided must be assessed to ensure that they are fit for
purpose, they fit for the environment in which they are to be used and they are in
good condition.
* Visual checks must be completed by operatives on tools prior to their use.
*Tools are required to be suitable for the purpose for which they will be used.
* Eye protection is to be provided and used whenever work is done using cold
chisels, drills, grinders or other tools where there is risk of flying particles or other
or pieces of the tool breaking off.
* Open-bladed knives, screwdrivers, and other sharp tools are to be carried and
used so as not to cause injury to the user or others.
Page 2 of 9
ASO_080022 - Rev0 - Date May 18, 2013
ASOLOUVREJV
HAZARD RISK ASSESSMENT
PROJECT NAME: LOUVRE ABU DHABI
5.
DATE: _____18/12/2013____
* Non-ferrous (spark free) tools are to be used in flammable atmospheres.
* Insulated tools must be used where there is a possibility of live electrical work
* All tolls should be kept clear of unnecessary grease, moisture or dirt.
* Any moveable / adjustable parts should be lightly oiled to protect against
corrosion and to prevent wear and misalignment.
Only 110 volt electrical hand power tools will be used
* Sharpening activities must only be carried out by professionals as it is a relatively
skilled job.
* Tools should not be left lying around, they constitute a severe tripping hazard and
they are liable to get damaged.
* Supervisor to monitor hand tools which can deteriorate with time to ensure they
are sharpened or replaced as necessary, and to ensure that the tools are being
used correctly.
* Specific checks should be made as followed:
o Hammer and file handles for deterioration
Open-ended spanners for splayed jaws
Additional Control Measure:
Comply with AD EHS RI - CoP - 35.0 - Portable Power Tools
technique
The work in charge to select the physical persons for lifting materials .
Consequences
15
Enforce proper securing of the loads with required securing chains and
belts ( chain block should be certified and color coded and belt should be
in good condition and tagged)
Page 3 of 9
ASO_080022 - Rev0 - Date May 18, 2013
ASOLOUVREJV
HAZARD RISK ASSESSMENT
PROJECT NAME: LOUVRE ABU DHABI
DATE: _____18/12/2013____
6-
15
Page 4 of 9
ASO_080022 - Rev0 - Date May 18, 2013
ASOLOUVREJV
HAZARD RISK ASSESSMENT
PROJECT NAME: LOUVRE ABU DHABI
Consequences
Risk of getting injuries to working personnel/ damage
of materials by miss-handling of materials or shifting
of heavy items with make-shift arrangement.
Personal Injury
Back Pains
Poor Site Illumination
Slips, Trips, or Falling
7-
Using equipment
Hazards
Failure to do Pre-use inspection of all equipment.
DATE: _____18/12/2013____
15
Consequences
Hazards
Failure to Use certificated trained competent labour
and operators only.
15
15
Consequences
Page 5 of 9
ASO_080022 - Rev0 - Date May 18, 2013
ASOLOUVREJV
HAZARD RISK ASSESSMENT
PROJECT NAME: LOUVRE ABU DHABI
DATE: _____18/12/2013____
Hazards
Failure to ensure Slinging of material:
a. Correct slings.
b. Balance of load
consequences
10
Clearly identifying the items by labeling and posting warning signs .Dangerous
material should be kept out of reach of unauthorized persons
For every chemical there should be separate place of store mixing some chemicals
may cause explosion or fire or erosion
Use of appropriate mask is ensured
Measures taken to suppress any generation of dust on the road and work places by
wetting the area good house keeping
Hazards
Painting without follow MSDS
Consequences
Irritation
Harmful
Inhalation
Ingestion
Dust of material
Inhaling toxic gases
15
15
Physical injury
Lungs cancer
11
1.
2.
3.
Page 6 of 9
ASO_080022 - Rev0 - Date May 18, 2013
ASOLOUVREJV
HAZARD RISK ASSESSMENT
PROJECT NAME: LOUVRE ABU DHABI
DATE: _____18/12/2013____
Use equipment in shifting materials from higher level to the ground.
12
1.
Hazards
2.
3.
12
4.
5.
6.
7.
8.
9.
Installation of Pipes :
Hazards
15
Page 7 of 9
ASO_080022 - Rev0 - Date May 18, 2013
ASOLOUVREJV
HAZARD RISK ASSESSMENT
PROJECT NAME: LOUVRE ABU DHABI
14-
DATE: _____18/12/2013____
15
Page 8 of 9
ASO_080022 - Rev0 - Date May 18, 2013
ASOLOUVREJV
HAZARD RISK ASSESSMENT
PROJECT NAME: LOUVRE ABU DHABI
5
4
3
2
PROBABILITY
1 every Day operation
1 every Week operating
1 every Month operating
1 every operating Years
1
0
DATE: _____18/12/2013____
RISK LEVEL
If Risk Level 15 (High) Significant safety control required, control
measures are required to reduce the risk
If Risk Level is 8 12 (Moderate) High loss of potential, control
measures are required to reduce the risk
If Risk Level 6 (Low) Regarded as acceptable with current
control measures
Date: _______________
Date: _______________
Page 9 of 9
ASO_080022 - Rev0 - Date May 18, 2013