Anda di halaman 1dari 10

DESIGN CHECKLIST

MECHANICAL SERVICES
1.0 AIR CONDITIONING AND VENTILATION SERVICES
PROJECT REF
:
PROJECT NAME :
DRAWING REF :
DATE
S.NO
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30

DESCRIPTION
Drawing Reference number, Title, Revision, Date
Legends and line types as per SMACNA
Standard details and Notes relevant to the project
Green building notes+ Declaration form from Consultant
Green building checklist+ HAP file
Reference drawing numbers, title and revision nos
Unit reference & capacity
Clearance space around Unit for maintenance
Sound attenuators in suction and discharge side
Distance between fresh air and extract air
Condensing unit locations+ Max refrigerant pipe length (40m)
Valves & Accessories- Pumps & HVAC equipment & in main riser
Fresh air with 2 HRW / ERV & Equipment schedules
Fresh air, Makeup air & Extract air flow rates
Duct sizes (Equal friction method) & traverse locations
No Duct/ pipe crossings over Atrium, Electrical & nonceiling areas
Acoustic insulation for first 3 meters from FCU discharge
Flexible duct length (1.5m max)
VCD for all branches except at the final branch
Fire damper locations
Transfer/Return air duct sizes, location
Air outlet sizes, velocity & location
Thermostat, Co2 sensors, Co sensor qty and location
Louver sizes and air flow rates
Chilled water supply flow rates, pipe sizes
HVAC for plant room, LV, ETS, ESR, Electrical room
Flue gas extract for Gas boilers, Generators, Diesel pumps
Non return dampers (NRD) qty and location
Thermal load summary- EER, Equipment selections
Schematic and plan shall match

LEGEND:
DM
DRAFTSMAN
ENGR ENGINEER
N/A
NOT APPLICABLE
SIGNATURE:
DRAFTSMAN NAME
& SIGN :

DRAFTSMAN NAME
& SIGN :
ENGINEER NAME &
SIGN:

IGN CHECKLIST

ANICAL SERVICES

NG AND VENTILATION SERVICES

REMARKS

CHECKLIST
DM ENGR

DESIGN CHECKLIST
MECHANICAL SERVICES
2.0 DRAINAGE SERVICES
PROJECT REF
:
PROJECT NAME :
DRAWING REF :
DATE
S.NO
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25

DESCRIPTION
Drawing Reference number, Title, Revision, Date
Legends and line types as per SMACNA
Standard details and Notes relevant to the project
Continuity of all pipes from Roof to Ground/ Basement floor
Pipe sizes, slopes, Levels as per DM notes
No Pipe crossings across Atrium, Electrical & nonceiling areas
Soil pipe connections for WC, Urinals
Waste line connections for WHB, Bath tub, Shower, Sinks
Venting for Manholes, Grease trap, holding tank, sump pump
Drain points in Plant room, garbage, water meter room
Separate headers for GF, if less than seven storey
Separate headers for GF & 1st, if greater than seven storey
Rodding eyes/ Clean out requirements as per DM notes
Car park drains, channel drain locations
Balcony, Planter & Patio drains to Waste stack
Rain water discharge (Free / Storm water network)
Manhole sizes, depth and schedules as per DM std, Gate levels
Section between FIC and DM network
Holding tank reqts in DIP + Calculations (2 days storage)
Gulley trap connections for Waste pipe
Grease trap details as per DM standard
Pressure reducing chamber provision before MH from LTS
Sump pump- capacity, location (Dead end) and sizes, Venting
Condensate drain collection tank if Cooling load > 100 TR
Soak away & Septic tank details as per DM standard

LEGEND:
DM
DRAFTSMAN
ENGR ENGINEER
N/A
NOT APPLICABLE
SIGNATURE:
DRAFTSMAN NAME
& SIGN :
ENGINEER NAME &
SIGN:

REMARKS

CHECKLIST
DM ENGR

DESIGN CHECKLIST
MECHANICAL SERVICES
3.0 WATER SUPPLY SERVICES
PROJECT REF
:
PROJECT NAME :
DRAWING REF :
DATE
S.NO
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
3.23
3.24
3.25

DESCRIPTION
Drawing Reference number, Title, Revision, Date
Legends and line types as per SMACNA
Unit references, Capacities and sizes
Standard details and Notes relevant to the project
Pipe sizes, traverse routes and description
Continuity of all pipes from Roof to Ground/ Basement floor
Schedule of Pump sets, Water tank, Water heaters etc
Valves & accessories for Pump sets, heaters, risers
Access and sump pit locations for Water tanks
Overflow, warning pipes, suction & discharge pipes for tank
Balancing lines with Valves between Tank partitions
No Pipe crossings across Atrium, Electrical & nonceiling areas
Water hammer arrestors at the index circuit
Hot water, Chilled cooled water, Cold water pipes to fixtures
Sections for Meter room as per DEWA regulations
Solar panel+ Calculations for villas, labour camps, toilet blocks
Treated grey water, Boosted & Gravity connections to fixtures
Incoming water connections from DEWA as per Setting out plan
Weather proof canopy protection for Roof pump room
Water softners for hot water supply
PRV connections in the riser
DRV for hot water return pipes in the branch riser or each room
Intermediate tanks required if the bldg height >90 meters
Filtration water supply for Villas, apartments (Kitchens)
Schematic and plan shall match

LEGEND:
DM
DRAFTSMAN
ENGR ENGINEER
N/A
NOT APPLICABLE
SIGNATURE:
DRAFTSMAN NAME
& SIGN :
ENGINEER NAME &
SIGN:

REMARKS

CHECKLIST
DM ENGR

DESIGN CHECKLIST
MECHANICAL SERVICES
4.0 FIRE FIGHTING SERVICES
PROJECT REF
:
PROJECT NAME :
DRAWING REF :
DATE
S.NO
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14
4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24

DESCRIPTION

Drawing Reference number, Title, Revision, Date


Legends and line types as per SMACNA
Unit references, Capacities and configuration
Standard details and Notes relevant to the project
Pipe sizes, traverse routes and description
Continuity of all pipes from Roof to Ground/ Basement floor
Fire pump location- Always against gravity
Valves & accessories for Pump sets, risers
Access and sump pit locations for Water tanks
Overflow, warning pipes, suction & discharge pipes for tank
Balancing lines with Valves between Tank partitions
No Pipe crossings across Atrium, Electrical & nonceiling areas
Incoming water connections from DEWA as per Setting out plan
Sprinkler and FHR coverage as per NFPA 13 & 14, CDD regulations
PRV with bypass PRV for both Wet riser and Sprinkler header
Breeching inlet with PRV connections and location
Void sprinklers incase if ceiling void > 800mm
Intermediate tanks required if the bldg height >90 meters
Weather proof canopy protection for Roof pump room
Foam type extinguisher for Generator rooms
FM 200 / Clean agent system- Server, Telephone, LV rooms
Preaction sprinkler system- Lift machine room
Co2 and DCP fire extinguisher for Electrical rooms
Antifreeze solution/ Dry pipe with deluge valves for Cold rooms
Sprinklers not required for Bath < 5.1 Sq.m, Pantries <2.2 Sq.m
4.25
Electrical, Telephone, Server, Generator & Lift machine rooms
LEGEND:
DM
DRAFTSMAN
ENGR ENGINEER
N/A
NOT APPLICABLE
SIGNATURE:
DRAFTSMAN NAME
& SIGN :
ENGINEER NAME &
SIGN:

REMARKS

CHECKLIST
DM ENGR