PEKERJAAN PEN
ID
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
TASK NAME
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
- Form work
Stack Foundation
- Pengukuran Ulang
- Bouwplank
- soil excavation
- soil disposed
- Compacted Sand layer
- Lean Concrete
- Concrete k-250
- Form work
Water Pool Foundation
- Pengukuran Ulang
- Bouwplank
- soil excavation
- soil disposed
- Compacted Sand layer
- Lean Concrete
- Concrete k-250
- Form work
Foundation Repairs
- Pengukuran Ulang
- Bouwplank
- soil excavation
- soil disposed
- Compacted Sand layer
- Lean Concrete
- Concrete k-250
- Form work
Mechanical & Electrical Work
Install & Erection Wet Scrubber package
Install & Erection Steel Structure support E
Install Ducting Scrubber to IDF
Pipie line Work
Install & Erection Stack
Install & Erection Water Pump
Painting
Test & Commissioning
Individual Test
Scrubber
ID fan
92
93
Water pump
Integrated Operating System
pment Layout
etric (Piping & Duct)
port (Structure)
k / Chimney
chasing Order
Wet Scrubber incl. Pump, Blower IDF, Control Panel
Ducting Scrubber to IDF
Pipe 20 inch sch 40, Valve, Elbow, Tiein & Accessories
Stack / Chimney
Steel Structure / Support Equipment
ufacturing / Fabrication
Pakage Irregated Cyclone Wet Scrubber
Stack / Chimney
sportation
Transport Package 1 (Scrubber, Stack)
Transport Package 2 (Ducting, Pipe)
& CONSTRUCTION
paration Work
Mobilization & Demobilization
Land clearing
Levelling and Grading
Soil investigation
Scrubber Foundation
- Pengukuran Ulang
- Bouwplank
- soil excavation
- soil disposed
- Compacted Sand layer
- Lean Concrete
- Concrete k-250
DURATION
75 days
75 days
1 day
1 day
20 days
1 day
1 day
3 days
2 days
4 days
5 days
2 days
7 days
41 days
6 days
2 days
2 days
2 days
2 days
2 days
32 days
30 days
30 days
7 days
7 days
5 days
53 days
14 days
2 days
2 days
2 days
3 days
10 days
10 days
17 days
11 days
1 day
1 day
1 day
1 day
1 day
1 day
4 days
START
10/3/2012
10/3/2012
10/3/2012
10/14/2012
10/4/2012
10/4/2012
10/4/2012
10/5/2012
10/8/2012
10/10/2012
10/10/2012
10/15/2012
10/17/2012
10/15/2012
10/15/2012
10/15/2012
10/15/2012
10/17/2012
10/17/2012
10/19/2012
10/17/2012
10/17/2012
10/19/2012
11/18/2012
11/18/2012
11/18/2012
10/25/2012
10/25/2012
10/25/2012
10/27/2012
10/29/2012
10/29/2012
10/29/2012
10/29/2012
11/8/2012
11/8/2012
11/8/2012
11/9/2012
11/10/2012
11/10/2012
11/11/2012
11/12/2012
11/13/2012
* Rebar Works
* Concrete k-250
- Form work
Stack Foundation
- Pengukuran Ulang
- Bouwplank
- soil excavation
- soil disposed
- Compacted Sand layer
- Lean Concrete
- Concrete k-250
* Rebar Works
* Concrete k-250
- Form work
Water Pool Foundation
- Pengukuran Ulang
- Bouwplank
- soil excavation
- soil disposed
- Compacted Sand layer
- Lean Concrete
- Concrete k-250
* Rebar Works
* Concrete k-250
- Form work
Foundation Repairs
- Pengukuran Ulang
- Bouwplank
- soil excavation
- soil disposed
- Compacted Sand layer
- Lean Concrete
- Concrete k-250
* Rebar Works
* Concrete k-250
- Form work
hanical & Electrical Work
Install & Erection Wet Scrubber package
Install & Erection Steel Structure support Equipment
Install Ducting Scrubber to IDF
Pipie line Work
Install & Erection Stack
Install & Erection Water Pump
& Commissioning
Individual Test
Scrubber
2 days
2 days
2 days
12 days
1 day
1 day
1 day
1 day
1 day
1 day
4 days
2 days
2 days
2 days
13 days
1 day
1 day
1 day
1 day
1 day
1 day
4 days
2 days
2 days
2 days
14 days
1 day
1 day
1 day
1 day
1 day
1 day
4 days
2 days
2 days
2 days
20 days
5 days
3 days
2 days
7 days
7 days
2 days
3 days
5 days
5 days
3 days
1 day
11/13/2012
11/15/2012
11/17/2012
11/9/2012
11/9/2012
11/10/2012
11/11/2012
11/11/2012
11/12/2012
11/13/2012
11/15/2012
11/15/2012
11/17/2012
11/19/2012
11/10/2012
11/10/2012
11/11/2012
11/12/2012
11/12/2012
11/13/2012
11/14/2012
11/17/2012
11/17/2012
11/19/2012
11/21/2012
11/11/2012
11/11/2012
11/12/2012
11/13/2012
11/13/2012
11/14/2012
11/15/2012
11/19/2012
11/19/2012
11/21/2012
11/23/2012
11/25/2012
11/25/2012
11/30/2012
12/3/2012
12/5/2012
11/26/2012
11/28/2012
12/12/2012
11/30/2012
11/30/2012
11/30/2012
12/3/2012
Water pump
Integrated Operating System
1 day
2 days
12/4/2012
12/15/2012
NTETIS
ASAP
FINISH
12/16/2012
12/16/2012
10/3/2012
10/14/2012
10/23/2012
10/4/2012
10/4/2012
10/7/2012
10/9/2012
10/13/2012
10/14/2012
10/16/2012
10/23/2012
11/24/2012
10/20/2012
10/16/2012
10/16/2012
10/18/2012
10/18/2012
10/20/2012
11/17/2012
11/15/2012
11/17/2012
11/24/2012
11/24/2012
11/22/2012
12/16/2012
11/7/2012
10/26/2012
10/28/2012
10/30/2012
10/31/2012
11/7/2012
11/7/2012
11/24/2012
11/18/2012
11/8/2012
11/9/2012
11/10/2012
11/10/2012
11/11/2012
11/12/2012
11/16/2012
11/14/2012
11/16/2012
11/18/2012
11/20/2012
11/9/2012
11/10/2012
11/11/2012
11/11/2012
11/12/2012
11/13/2012
11/18/2012
11/16/2012
11/18/2012
11/20/2012
11/22/2012
11/10/2012
11/11/2012
11/12/2012
11/12/2012
11/13/2012
11/14/2012
11/20/2012
11/18/2012
11/20/2012
11/22/2012
11/24/2012
11/11/2012
11/12/2012
11/13/2012
11/13/2012
11/14/2012
11/15/2012
11/22/2012
11/20/2012
11/22/2012
11/24/2012
12/14/2012
11/29/2012
12/2/2012
12/4/2012
12/11/2012
12/2/2012
11/29/2012
12/14/2012
12/4/2012
12/4/2012
12/2/2012
12/3/2012
12/4/2012
12/16/2012
SCHEDULE PABRIK
PEKERJAAN PEMBU
ID
1
2
3
4
5
6
7
8
9
10
11
12
13
TASK NAME
PEMBUATAN BEJANA BARU & BONGKAR EXISTING
ENGINEERING
Equipment Layout
Support (Structure)
Detail Equipment
Foundation
PROCUREMENT
Bejana masak + Agitator (motor)
Pipe & Support (Steel Structure)
Cabel Power & Cable Control
Pump Spray
Glass Woll pipe
ERECTION & CONSTRUCTION
ak + Agitator (motor)
ort (Steel Structure)
r & Cable Control
STRUCTION
DURATION
START
NTETIS
NA BARU
FINISH
PEMBUATAN
1
ENGINEERI1
Equipment1
Support (St1
Detail Equ 1
Foundation1
PROCUREM1
Bejana mas1
Pipe & Supp
1
Cabel Powe1
Pump Spra1
Glass Woll 1
ERECTION 1
day?
day?
day?
day?
day?
day?
day?
day?
day?
day?
day?
day?
day?
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###