Anda di halaman 1dari 75

AAU3902

Installation Guide
Issue

04

Date

2014-07-30

HUAWEI TECHNOLOGIES CO., LTD.

Copyright Huawei Technologies Co., Ltd. 2014. All rights reserved.


No part of this document may be reproduced or transmitted in any form or by any means without prior written
consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions


and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
and recommendations in this document are provided "AS IS" without warranties, guarantees or representations
of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address:

Huawei Industrial Base


Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website:

http://www.huawei.com

Email:

support@huawei.com

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

AAU3902
Installation Guide

About This Document

About This Document


Overview
This document describes procedures for installing an Active Antenna Unit 3902 (AAU3902,
referred to as AAU in this document) and its cables. It also provides checklists for hardware
installation.

Product Version
The following table lists the product versions related to this document.
Product Name

Solution Version

Product Version

DBS3900

SRAN7.0 and later versions

V100R007C00 and later


versions

RAN14.0 and later versions

V200R014C00 and later


versions

eRAN3.0 and later versions

V100R005C00 and later


versions

Intended Audience
This document is intended for:
l

Base station installation personnel

Organization
1 Changes in AAU3902 Installation Guide
This chapter describes the changes in AAU3902 Installation Guide.
2 Overview
This chapter describes the information to be known before the AAU installation, which includes
the installation scenarios and clearance requirements.
Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

ii

AAU3902
Installation Guide

About This Document

3 Installation Preparations
This chapter lists the tools and instruments that must be obtained before the installation. It also
specifies the skills that the onsite personnel must have.
4 Unpacking Check
Unpack and check the delivered equipment to ensure that all the materials are included and intact.
5 Moving an AAU
This section describes the method of moving an AAU and precautions that must be taken during
the moving.
6 Installation Process
The process of installing an AAU consists of installing an AAU and its cables, checking the
installed AAU, and performing a power-on check.
7 Installing an AAU
This chapter describes the process of installing an AAU.
8 Installing AAU Cables
This chapter describes the procedures for installing AAU cables.
9 Installation Checklist
This chapter describes how to check the hardware installation after an AAU is installed.
10 Powering On an AAU
This section describes the procedure for powering on an AAU.

Conventions
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol

Description
Indicates an imminently hazardous situation which, if not
avoided, will result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, could result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, may result in minor or moderate injury.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

iii

AAU3902
Installation Guide

About This Document

Symbol

Description
Indicates a potentially hazardous situation which, if not
avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to personal
injury.
Calls attention to important information, best practices and
tips.
NOTE is used to address information not related to personal
injury, equipment damage, and environment deterioration.

General Conventions
The general conventions that may be found in this document are defined as follows.
Convention

Description

Times New Roman

Normal paragraphs are in Times New Roman.

Boldface

Names of files, directories, folders, and users are in


boldface. For example, log in as user root.

Italic

Book titles are in italics.

Courier New

Examples of information displayed on the screen are in


Courier New.

Command Conventions
The command conventions that may be found in this document are defined as follows.

Issue 04 (2014-07-30)

Convention

Description

Boldface

The keywords of a command line are in boldface.

Italic

Command arguments are in italics.

[]

Items (keywords or arguments) in brackets [ ] are optional.

{ x | y | ... }

Optional items are grouped in braces and separated by


vertical bars. One item is selected.

[ x | y | ... ]

Optional items are grouped in brackets and separated by


vertical bars. One item is selected or no item is selected.

{ x | y | ... }*

Optional items are grouped in braces and separated by


vertical bars. A minimum of one item or a maximum of all
items can be selected.
Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.

iv

AAU3902
Installation Guide

About This Document

Convention

Description

[ x | y | ... ]*

Optional items are grouped in brackets and separated by


vertical bars. Several items or no item can be selected.

GUI Conventions
The GUI conventions that may be found in this document are defined as follows.
Convention

Description

Boldface

Buttons, menus, parameters, tabs, window, and dialog titles


are in boldface. For example, click OK.

>

Multi-level menus are in boldface and separated by the ">"


signs. For example, choose File > Create > Folder.

Keyboard Operations
The keyboard operations that may be found in this document are defined as follows.
Format

Description

Key

Press the key. For example, press Enter and press Tab.

Key 1+Key 2

Press the keys concurrently. For example, pressing Ctrl+Alt


+A means the three keys should be pressed concurrently.

Key 1, Key 2

Press the keys in turn. For example, pressing Alt, A means


the two keys should be pressed in turn.

Mouse Operations
The mouse operations that may be found in this document are defined as follows.

Issue 04 (2014-07-30)

Action

Description

Click

Select and release the primary mouse button without moving


the pointer.

Double-click

Press the primary mouse button twice continuously and


quickly without moving the pointer.

Drag

Press and hold the primary mouse button and move the
pointer to a certain position.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

AAU3902
Installation Guide

Contents

Contents
About This Document.....................................................................................................................ii
1 Changes in AAU3902 Installation Guide..................................................................................1
2 Overview.........................................................................................................................................3
2.1 Installation Scenarios......................................................................................................................................................4
2.2 Installation Clearance Requirements..............................................................................................................................7

3 Installation Preparations............................................................................................................12
3.1 Documents....................................................................................................................................................................13
3.2 Tools, Instruments, and Personal Protective Stuff.......................................................................................................13
3.3 Requirements for Onsite Personnel..............................................................................................................................14

4 Unpacking Check........................................................................................................................16
5 Moving an AAU...........................................................................................................................18
6 Installation Process.....................................................................................................................20
7 Installing an AAU........................................................................................................................21
7.1 Mounting Kits...............................................................................................................................................................22
7.2 Assembling Mounting Kits...........................................................................................................................................23
7.3 (Optional) Hoisting an AAU and Mounting Kits.........................................................................................................25
7.4 Installing an AAU on a Pole.........................................................................................................................................35

8 Installing AAU Cables................................................................................................................43


8.1 Cabling Requirements..................................................................................................................................................44
8.2 Cable Connections........................................................................................................................................................50
8.3 Cable Installation Process.............................................................................................................................................52
8.4 Installing an AAU PGND Cable..................................................................................................................................52
8.5 Opening the MU Cabling Cavity..................................................................................................................................54
8.6 Installing a CPRI Fiber Optic Cable.............................................................................................................................55
8.7 Installing an AAU Power Cable...................................................................................................................................56
8.8 Closing the MU Cabling Cavity...................................................................................................................................58
8.9 Installing a Feeder........................................................................................................................................................59
8.10 Installing an AISG Multi-Wire Cable and an AISG Extension Cable.......................................................................62

9 Installation Checklist..................................................................................................................66
Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

vi

AAU3902
Installation Guide

Contents

10 Powering On an AAU...............................................................................................................67

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

vii

AAU3902
Installation Guide

1 Changes in AAU3902 Installation Guide

Changes in AAU3902 Installation Guide


This chapter describes the changes in AAU3902 Installation Guide.

04 (2014-07-30)
This is the fourth commercial release.
Compared with Issue 03 (2014-03-14), no information is added to or deleted from this issue.
Compared with Issue 03 (2014-03-14), this issue includes the following change.
Topic

Change Description

The whole document

Changed the PU22 module in slot 2 to a filler


panel by moving the two RF ports on the
PU22 module to the bottom of the AU.

03 (2014-03-14)
This is the third commercial release.
Compared with Issue 02 (2013-12-23), no information is added to or deleted from this issue.
Compared with Issue 02 (2013-12-23), this issue includes the following change.
Topic

Change Description

8.9 Installing a Feeder

Added the figure showing the routing of the


feeder.

02 (2013-12-23)
This is the second commercial release.
Compared with Issue 01 (2013-09-26), no information is added to or deleted from this issue.
Compared with Issue 01 (2013-09-26), this issue includes the following change.
Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

AAU3902
Installation Guide

1 Changes in AAU3902 Installation Guide

Topic

Change Description

2.1 Installation Scenarios

Modified the specifications of the pole


secured on a wall.

01 (2013-09-26)
This is the first commercial release.
Compared with Draft A (2013-07-30), no information is added to or deleted from this issue.
Compared with Draft A (2013-07-30), this issue includes the following changes.
Topic

Change Description

2.1 Installation Scenarios

Added the installation scenario of the


auxiliary pole and modified the specifications
of the pole.

7.3 (Optional) Hoisting an AAU and


Mounting Kits

Optimized the procedure for binding an AAU


and added operations of the installation
personnel on the tower when the cramp ring
is close to the fixed pulley.

7.4 Installing an AAU on a Pole

Separated the procedure for installing an


AAU on a pole secured on a tower or the top
of a building and the procedure for installing
an AAU on a pole secured on a wall.

Draft A (2013-07-30)
This is a draft.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

AAU3902
Installation Guide

2 Overview

Overview

About This Chapter


This chapter describes the information to be known before the AAU installation, which includes
the installation scenarios and clearance requirements.
2.1 Installation Scenarios
An AAU can be installed on a pole secured on a tower, a wall, or the top of a building.
2.2 Installation Clearance Requirements
This section describes the recommended and minimum clearances for a single AAU and three
or more AAUs.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

AAU3902
Installation Guide

2 Overview

2.1 Installation Scenarios


An AAU can be installed on a pole secured on a tower, a wall, or the top of a building.

On a Main Pole Secured on a Tower or the Top of a Building


When an AAU is installed on a main pole, the pole bottom is secured on a stand. The following
figure shows an AAU installed on a main pole.
Figure 2-1 AAU installed on a main pole secured on a tower or the top of a building

The following figure shows the diameter of a main pole for installing an AAU.
Figure 2-2 Diameter of a main pole

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

AAU3902
Installation Guide

2 Overview
NOTE

l The diameter of a main pole for installing an AAU ranges from 70 mm (2.76 in.) to 114 mm (4.49 in.).
The thickness of a main pole must be greater than or equal to 4 mm (0.16 in.).
l When the diameter of a main pole ranges from 70 mm (2.76 in.) to 100 mm (3.94 in.), only one AAU
can be installed on the main pole.
l When the diameter of a main pole is greater than 100 mm (3.94 in.) and less than or equal to 114 mm
(4.49 in.), a maximum of two AAUs can be installed on the main pole.
l When an AAU is installed on a main pole secured on the top of a building, a minimum of 2200 mm
(86.61 in.) space must be reserved between the upper main bracket and the top of the building, and the
main pole base must have a weight-bearing capacity of at least 300 kg (661.5 lb).

On an Auxiliary Pole Secured on a Tower or the Top of a Building


When an AAU is installed on an auxiliary pole, the upper and lower ends of the auxiliary pole
are secured on a support. The following figure shows an AAU installed on an auxiliary pole.
Figure 2-3 AAU installed on an auxiliary pole

The following figure shows the diameter of an auxiliary pole for installing an AAU.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

AAU3902
Installation Guide

2 Overview

Figure 2-4 Diameter of an auxiliary pole

NOTE

l The diameter of an auxiliary pole for installing an AAU ranges from 50 mm (1.97 in.) to 114 mm (4.49
in.).
l When the diameter of an auxiliary pole ranges from 50 mm (1.97 in.) to 60 mm (2.36 in.), the thickness
of the auxiliary pole must be greater than or equal to 4 mm (0.16 in.), and only one AAU can be installed
on the auxiliary pole.
l When the diameter of an auxiliary pole is greater than 60 mm (2.36 in.) and less than or equal to 114
mm (4.49 in.), the thickness of the auxiliary pole must be greater than or equal to 3 mm (0.12 in.), and
a maximum of two AAUs can be installed on the auxiliary pole.
l When an AAU is installed on an auxiliary pole secured on the top of a building, a minimum of 2200
mm (86.61 in.) space must be reserved between the upper main bracket and the top of the building,
and the auxiliary pole base must have a weight-bearing capacity of 300 kg (661.5 lb).
l When an AAU is installed on an auxiliary pole secured on a tower, the length of the auxiliary pole
must be greater than or equal to 1350 mm (53.15 in.).

On a Pole Secured on a Wall


The following figure shows an AAU installed on a pole that is secured on a wall.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

AAU3902
Installation Guide

2 Overview

Figure 2-5 On a pole secured on a wall

NOTE

l The distance between the pole and the wall ranges from 200 mm (7.87 in.) to 250 mm (9.84 in.), and
the wall must have a weight-bearing capacity of 240 kg (529 lb). These specifications are determined
by site survey and may vary in different scenarios.
l Specifications of a pole secured on a wall are the same as those of an auxiliary pole secured on the top
of a building or a tower. For details, see Requirements of an auxiliary pole.

2.2 Installation Clearance Requirements


This section describes the recommended and minimum clearances for a single AAU and three
or more AAUs.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

AAU3902
Installation Guide

2 Overview
NOTE

l The recommended clearances ensure normal running and provide an appropriate space for operation
and maintenance (OM). If there is sufficient space, retain the recommended clearances.
l The minimum clearances ensure normal running and heat dissipation, but OM activities such as
checking indicator status cannot be properly conducted. If the installation space is insufficient, retain
the minimum clearances after the installation.

Clearances for a Single AAU


The following figure shows the recommended clearances for a single AAU.
NOTE

The clearances to be reserved on one side (left or right) of an AAU must be greater than or equal to 300
mm (11.81 in.), and the clearances to be reserved on the other side (right or left) must be greater than or
equal to 600 mm (23.62 in.).

Figure 2-6 Recommended clearances for a single AAU

The following figure shows the minimum clearances for a single AAU installed on a pole secured
on a tower or the top of a building.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

AAU3902
Installation Guide

2 Overview

Figure 2-7 Minimum clearances for a single AAU installed on a pole secured on a tower or the
top of a building

The following figure shows the minimum clearances for a single AAU installed on a pole secured
on a wall.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

AAU3902
Installation Guide

2 Overview

Figure 2-8 Minimum clearances for a single AAU installed on a pole secured on a wall

Clearances for Three or More AAUs


The following figure shows the recommended clearances for three or more AAUs installed on
poles secured on a wall.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

10

AAU3902
Installation Guide

2 Overview

Figure 2-9 Recommended clearances for three or more AAUs installed on poles secured on a
wall

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

11

AAU3902
Installation Guide

3 Installation Preparations

Installation Preparations

About This Chapter


This chapter lists the tools and instruments that must be obtained before the installation. It also
specifies the skills that the onsite personnel must have.
3.1 Documents
This section lists the documents that must be obtained before the installation.
3.2 Tools, Instruments, and Personal Protective Stuff
This section lists the tools and instruments that must be obtained before installation.
3.3 Requirements for Onsite Personnel
Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

12

AAU3902
Installation Guide

3 Installation Preparations

3.1 Documents
This section lists the documents that must be obtained before the installation.
l

Before the installation, familiarize yourself with related information in the following
documents:
AAU3902 Hardware Description
Safety Precautions

During the installation, refer to the following document:


Installation Reference

3.2 Tools, Instruments, and Personal Protective Stuff


This section lists the tools and instruments that must be obtained before installation.

Tools and Instruments


Wire stripper

ESD gloves

Compass

Torque screwdriver

Phillips screwdriver (M3 to


M6)

Adjustable wrench (size 32


mm or 1.26 in.)

(5 mm or 0.2 in.)

Flat-head screwdriver (M3


to M6)

(M3 to M6)

(M3 to M6)
Torque wrench

Hex key

Multimeter

Size: 16 mm (0.63 in.) or 32


mm (1.26 in.)

Combination wrench

(5 mm or 0.2 in.)

Size: 16 mm (0.63 in.) or 32


mm (1.26 in.)

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

13

AAU3902
Installation Guide

3 Installation Preparations

Heat gun

Measuring tape

Cable cutter

Lifting sling

Fixed pulley (weightbearing capacity > 500 kg or


1102.5 lb)

Utility knife

Diagonal pliers

Hydraulic pliers

Slip-proof glove

Safety helmet

Safety belt

Antiskid shoes

Union suit

Personal Protective Stuff

3.3 Requirements for Onsite Personnel


Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.
Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

14

AAU3902
Installation Guide

3 Installation Preparations

Before the installation, pay attention to the following:


l

The customer's technical engineers must be trained by Huawei and be familiar with the
proper installation and operation methods.

The number of onsite personnel depends on the engineering schedule and installation
environment. Generally, three to five onsite personnel are necessary.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

15

AAU3902
Installation Guide

4 Unpacking Check

Unpacking Check

Unpack and check the delivered equipment to ensure that all the materials are included and intact.

Context
NOTE

When transporting, moving, or installing the equipment, components, or parts, you must:
l

Prevent them from colliding with doors, walls, shelves, or other objects.

Wear clean gloves, and avoid touching the equipment, components, or parts with bare hands, sweatsoaked gloves, or dirty gloves.

NOTICE
l After a cabinet or an BBU is unpacked, it must be powered on within 7 days.
l After an AAU is unpacked, it must be powered on within 24 hours.

Procedure
Step 1 Check the total number of articles in each case according to the packing list.
If ...

Then ...

The total number tallies with the packing


list

Go to 2.

The total number does not tally with the


packing list

Find out the cause and report any missing


articles to the local Huawei office.

Step 2 Check the exterior of the packing case.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

16

AAU3902
Installation Guide

4 Unpacking Check

If...

Then...

The outer packing case is intact

Go to 3.

The outer packing case is severely damaged Find out the cause and report the situation to
or soaked
the local Huawei office.
Step 3 Check the type and quantity of the equipment in the cases according to the packing list.
If ...

Then ...

Types and quantity of the article tally with Sign the Packing List with the customer.
those on the packing list
There is any shipment shortage or wrong
shipment

Fill in and submit the Cargo Shortage and


Mishandling Report.

Articles are damaged.

Fill in and submit the Article Replacement


Report.

CAUTION
To protect the equipment and prevent damage to the equipment, you are advised to keep the
unpacked equipment and packing materials indoors, take photos of the stocking environment,
packing case or carton, packing materials, and any rusted or eroded equipment, and then file the
photos.
Step 4 Take the recording form out from the packing case for the antenna and fill out the form based
on the onsite situation.

NOTICE
l In the AAU cascading scenarios, you must fill out the recording form.
l Before filling out the recording form, ensure that the RET SN on the nameplate of the antenna
is the same as the RET SN in the recording form.
----End

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

17

AAU3902
Installation Guide

5 Moving an AAU

Moving an AAU

This section describes the method of moving an AAU and precautions that must be taken during
the moving.

Procedure
Step 1 Move an AAU to the installation position, as shown in the following figure.

NOTICE
l Hold the upper and lower handles of the AAU with both hands to prevent the AAU from
sliding.
l Moving methods in illustrations b and c are not recommended because the AAU may slide
off your hands.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

18

AAU3902
Installation Guide

5 Moving an AAU

Figure 5-1 Moving methods

----End

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

19

AAU3902
Installation Guide

6 Installation Process

Installation Process

The process of installing an AAU consists of installing an AAU and its cables, checking the
installed AAU, and performing a power-on check.
The following figure shows the installation process.
Figure 6-1 Installation process

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

20

AAU3902
Installation Guide

7 Installing an AAU

Installing an AAU

About This Chapter


This chapter describes the process of installing an AAU.
7.1 Mounting Kits
This section describes mounting kits for an AAU.
7.2 Assembling Mounting Kits
This section describes the procedure and precautions for assembling the mounting kits and
preinstalling the lower main bracket on the AAU.
7.3 (Optional) Hoisting an AAU and Mounting Kits
This section describes the procedure and precautions for hoisting an AAU and mounting kits.
7.4 Installing an AAU on a Pole
This section describes the procedure and precautions for installing an AAU on a pole.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

21

AAU3902
Installation Guide

7 Installing an AAU

7.1 Mounting Kits


This section describes mounting kits for an AAU.

Complete Set of Mounting Kits


The following figure shows a complete set of mounting kits.
Figure 7-1 Complete set of mounting kits

(A) Upper main bracket(1)

(B) Lower main bracket

(C) Angle adjusting component

(D) Auxiliary bracket

(E) M10x200 bolt

(F) M10x25 screws

NOTE

(1) The lifting eye on the upper main bracket can be used for hoisting an antenna or a module using a fixed
pulley.

Lower Main Bracket


The following figure shows the exterior of a lower main bracket.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

22

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-2 Lower main bracket

The distance between upper main bracket and lower main bracket is 1.22 m (4 ft). The angle of
the antenna is adjusted by using the angle adjusting component that is installed onto the lower
main bracket, and corresponds to the signs on the upper line: -3, -1.5, 0, +1.5, and +3.

7.2 Assembling Mounting Kits


This section describes the procedure and precautions for assembling the mounting kits and
preinstalling the lower main bracket on the AAU.

Procedure
Step 1 Optional: The angle adjusting component is installed in position +3 before delivery, and can
be adjusted according to the site requirements, as shown in the following figure.

NOTICE
Ensure that the DOWN side of the angle adjusting component and the arrows on the lower main
bracket face the same direction.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

23

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-3 Installing the angle adjusting component on the lower main bracket

(A) Angle adjusting component

(B) Lower main bracket

1.

Use an M10 torque wrench to loosen the four M10 screws on the angle adjusting component,
and remove the angle adjusting component.

2.

Adjust the position of the angle adjusting component in the lower main bracket as required.
Use an M10 torque wrench to tighten the four M10 screws on the angle adjusting component
to 40 Nm (354.03 lbfin.).

Step 2 Partially tighten a bolt on the auxiliary bracket, and preinstall the auxiliary bracket on the angle
adjusting component, as shown in the following figure.
Figure 7-4 Preinstalling the auxiliary bracket on the angle adjusting component

(A) Bolt

(B) Auxiliary bracket

Step 3 Preinstall the lower main bracket on the lower attachment plate of the AAU, as shown in the
following figure.
Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

24

AAU3902
Installation Guide

7 Installing an AAU

NOTICE
Ensure that the arrows on the lower main bracket are pointing to the top of the AAU.

Figure 7-5 Preinstalling the lower main bracket on the AAU

Step 4 Partially tighten a bolt on the other auxiliary bracket, and preinstall the auxiliary bracket on the
upper main bracket, as shown in the following figure.
Figure 7-6 Preinstalling the other auxiliary bracket on the upper main bracket

----End

7.3 (Optional) Hoisting an AAU and Mounting Kits


This section describes the procedure and precautions for hoisting an AAU and mounting kits.
Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

25

AAU3902
Installation Guide

7 Installing an AAU

Prerequisites

NOTICE
l Do not stand the AAU upright because the radio frequency (RF) ports at the bottom cannot
support the weight of the AAU.
l Place a foam pad or cardboard under an AAU to protect the AAU housing from damage
during the installation.
l When installing an AAU on a tower, a lifting sling and a fixed pulley must be used to securely
bind the AAU. The lifting sling can be removed only after the AAU is securely installed.
This prevents personal injury caused by any falling AAU.

Context
l

An AAU can be hoisted manually or using a winch.

If a fixed pulley is used, the load-bearing capacity of the fixed pulley must be greater than
500 kg (1102.5 lb).

If a winch is used, you are advised to choose a winch that meets the following requirements:
1.

The lifting capacity must be greater than 200 kg (441 lb).

2.

The winch can use many adapting pieces, such as, the round steel, U-steel, angle steel,
T-beam, and I-beam.

3.

Either the external or internal power supply is supported.

4.

There is a low risk that the lifted object may fall.

5.

The lifting sling provided by the customer can be used.

6.

The size is small, the weight is light, and the operation can be conveniently finished
by a single person.

Procedure
Step 1 An installation technician packs the fixed pulley and the assembled upper main and auxiliary
brackets into a tool package. Then the installation technician climbs the tower with the tool
package and a lifting sling.
NOTE

l The upper main and auxiliary brackets must be hoisted and installed onto the tower before the AAU
is hoisted onto the tower. If the installation technician does not bring the brackets up to the tower, the
brackets need to be hoisted using the fixed pulley.
l The upper main and auxiliary brackets can be hoisted onto the tower in the same way as the AAU. For
details, see Figure 7-16. Bind the upper main and auxiliary brackets, as shown in the following figure.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

26

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-7 Binding the upper main and auxiliary brackets

Step 2 The installation technician on the tower marks the installation position for the upper main bracket
based on requirements in 2.2 Installation Clearance Requirements.
Step 3 Secure the upper main and auxiliary brackets onto the pole.
1.

Manually adjust the two M10 nuts based on the diameter of the pole, and fit the brackets
on the pole. Then, partially tighten the untightened bolt on the auxiliary bracket into the
upper main bracket, as shown in the following figure.

NOTICE
Ensure that the arrows on the upper main bracket are pointing up.

Figure 7-8 Securing the upper main and auxiliary brackets onto the pole

2.

Issue 04 (2014-07-30)

The installation technician stands at a proper location and uses a compass to adjust the
azimuth according to the site requirements, as shown in the following figure.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

27

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-9 Adjusting the azimuth

(1) Compass

3.

Use an M10 torque wrench to tighten the two M10 bolts on the upper main brackets to 40
Nm (354.03 lbfin.) so that the main and auxiliary brackets are tightly secured onto the
pole, as shown in the following figure.

NOTICE
l Tighten the head of an M10 bolt until the locknut at the front of the bolt closely contacts
with the upper main bracket, and secure the two M10 nuts on the bolt.
l Tighten the two bolts alternatively and ensure that the spacing between the upper main
and auxiliary brackets is the same on both sides.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

28

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-10 Securing the upper main and auxiliary brackets onto the pole

(A) Locknut

(B) M10 nut

(C) Head of the M10 bolt

Step 4 The installation technician on the tower installs the fixed pulley on the lifting eye on the upper
main bracket, lead the lifting sling through the fixed pulley, and lower both ends of the lifting
sling down to the ground, as shown in the following figure.
Figure 7-11 Installing the fixed pulley and lifting sling

(1) Lifting eye

Issue 04 (2014-07-30)

(2) Fixed pulley

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

(3) Cramp ring

29

AAU3902
Installation Guide

7 Installing an AAU

Step 5 The installation technician under the tower uses the lifting sling and traction sling to bind the
AAU.
1.

Under the tower, wind the end with a cramp ring on the lifting sling round the lower handle
of the AAU for two circles and then the upper handle of the AAU for two circles, as shown
in the following figure.
Figure 7-12 Winding the lifting sling round the AAU

(1) Lower handle

2.

Issue 04 (2014-07-30)

(2) Upper handle

Reserve a length of 300 mm (11.81 in.) to 350 mm (13.78 in.) between the upper handle
and the cramp ring, and tie the lifting sling to the upper handle, as shown in the following
figure.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

30

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-13 Tying the lifting sling to the upper handle

(1) Tying position

3.

Open the cramp ring, clasp the lifting sling into the cramp ring, and close the cramp ring,
as shown in the following figure.
Figure 7-14 Clasping the lifting sling into the cramp ring

4.

Issue 04 (2014-07-30)

Use the traction sling to securely bind the lower handle of the AAU and make a secure
knot, as shown in the following figure.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

31

AAU3902
Installation Guide

7 Installing an AAU

NOTICE
The lower handle must be bound by the lifting sling on one side and traction sling on the
other side. This is to ensure the balance of the AAU during the lift.

Figure 7-15 Binding the lower handle with the traction sling

(1) Lifting sling

(2) Traction sling

Step 6 Hoist the AAU with its lower main and auxiliary brackets to the tower and protect the AAU
from colliding with the tower, as shown in the following figure.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

32

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-16 Hoisting the AAU (manually)

(1) Lifting sling

(2) Fixed pulley

(3) Traction sling

1.

Installation technicians A, B, and C pull the lifting sling downwards, and installation
technician E pulls the traction sling outwards to protect the AAU from colliding with the
tower.

2.

When the cramp ring is close to the fixed pulley, installation technician D moves the AAU
upright and hangs the upper handle of the AAU on the U-shaped slot of the upper main
bracket, as shown in the following figure.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

33

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-17 Hanging the upper handle of the AAU on the U-shaped slot of the upper main
bracket

3.

Issue 04 (2014-07-30)

Installation technician D unties the slings.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

34

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-18 Hoisting the AAU (using a winch)

(1) Lifting sling

(2) Fixed pulley

(3) Traction sling

(4) Winch

1.

Installation technician A operates the winch, and installation technician B pulls the traction
sling outwards to protect the AAU from colliding with the tower.

2.

When the cramp ring is close to the fixed pulley, installation technician C moves the AAU
upright and hangs the upper handle of the AAU on the U-shaped slot of the upper main
bracket, as shown in Figure 7-17.

3.

Installation technician D unties the slings.

----End

7.4 Installing an AAU on a Pole


This section describes the procedure and precautions for installing an AAU on a pole.

Prerequisites
Bind an AAU (with the lower main and auxiliary brackets) and the assembled upper main and
auxiliary brackets, and hoist them separately onto a tower. For details, see (Optional) Hoisting
an AAU and Mounting Kits.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

35

AAU3902
Installation Guide

7 Installing an AAU

Procedure
l

Installing an AAU on a pole secured on a tower or the top of a building


1.

Partially tighten the two screws on both sides of the upper main bracket into the AAU,
as shown in the following figure.
Figure 7-19 Partially securing the AAU to the upper main bracket

2.

Install the lower main bracket and the auxiliary bracket on the pole, partially tighten
the untightened bolt, and use an M10 torque wrench to tighten both bolts to 40 Nm
(354.03 lbfin.), as shown in the following figure.

NOTICE
Secure the two bolts alternatively and ensure that the spacing between the lower main
and auxiliary brackets is the same on both sides.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

36

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-20 Securing the AAU to the lower main bracket

(A) M10200 bolt

3.

(B) M10 nut

Use an M10 torque wrench to secure the two bolts on both sides of the upper main
bracket and the two bolts on both sides of the lower main bracket to 40 Nm (354.03
lbfin.), as shown in the following figure.
Figure 7-21 Tightening the bolts connecting the main brackets and the attachment
plates on the AAU

Installing an AAU on a pole secured on a wall


1.

Issue 04 (2014-07-30)

Mark the installation position of the upper main bracket, as shown in the following
figure.
Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.

37

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-22 Distance between the upper main bracket and the ground

2.

Secure the upper main and auxiliary brackets onto the pole.
a.

Manually adjust the two M10 nuts based on the diameter of the pole, and fit the
brackets on the pole. Then, partially tighten the untightened bolt on the auxiliary
bracket into the upper main bracket, as shown in the following figure.

NOTICE
Ensure that the arrows on the upper main bracket are pointing up.

Figure 7-23 Securing the upper main and auxiliary brackets onto the pole

b.

Issue 04 (2014-07-30)

The installation technician stands at a proper location and uses a compass to


adjust the azimuth according to the site requirements, as shown in the following
figure.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

38

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-24 Adjusting the azimuth

(1) Compass

c.

Use an M10 torque wrench to tighten the two M10 bolts on the upper main
brackets to 40 Nm (354.03 lbfin.) so that the main and auxiliary brackets are
tightly secured onto the pole, as shown in the following figure.

NOTICE
l Tighten the head of an M10 bolt until the locknut at the front of the bolt closely
contacts with the upper main bracket, and secure the two M10 nuts on the
bolt.
l Tighten the inner M10 nut on the bolt before tightening the outer M10 nut.
l Secure the two bolts alternatively and ensure that the spacing between the
upper main and auxiliary brackets is the same on both sides.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

39

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-25 Securing the upper main and auxiliary brackets onto the pole

(A) Locknut

3.

(B) M10 nut

(C) Head of the M10 bolt

Hang the upper handle of the AAU on the U-shaped slot of the upper main bracket,
and partially tighten the two bolts on the upper main bracket into the AAU, as shown
in the following figure.
Figure 7-26 Partially securing the AAU to the upper main bracket

4.

Issue 04 (2014-07-30)

Install the lower main bracket and the auxiliary bracket on the pole, partially tighten
the untightened bolt, and use an M10 torque wrench to tighten both bolts to 40 Nm
(354.03 lbfin.), as shown in the following figure.
Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.

40

AAU3902
Installation Guide

7 Installing an AAU

NOTICE
Tighten the two bolts alternatively and ensure that the spacing between the lower main
and auxiliary brackets is the same on both sides.

Figure 7-27 Securing the AAU to the lower main bracket

(A) M10x200 bolt

5.

Issue 04 (2014-07-30)

(B) M10 nut

Use an M10 torque wrench to secure the two bolts on both sides of the upper main
bracket and the two bolts on both sides of the lower main bracket to 40 Nm (354.03
lbfin.), as shown in the following figure.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

41

AAU3902
Installation Guide

7 Installing an AAU

Figure 7-28 Tightening the bolts connecting the main brackets and the attachment
plates on the AAU

----End

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

42

AAU3902
Installation Guide

8 Installing AAU Cables

Installing AAU Cables

About This Chapter


This chapter describes the procedures for installing AAU cables.
8.1 Cabling Requirements
Cables must be laid out according to the specified cabling requirements to prevent signal
interference.
8.2 Cable Connections
This section describes the cable connections for a single AAU and multiple AAUs.
8.3 Cable Installation Process
This section describes the cable installation process.
8.4 Installing an AAU PGND Cable
This section describes the procedure for installing an AAU PGND cable.
8.5 Opening the MU Cabling Cavity
This section describes the procedure and precautions for opening the MU cabling cavity.
8.6 Installing a CPRI Fiber Optic Cable
This section describes the procedure and precautions for installing a CPRI fiber optic cable.
8.7 Installing an AAU Power Cable
This section describes the procedure for installing an AAU power cable.
8.8 Closing the MU Cabling Cavity
This section describes the procedure and precautions for closing the MU cabling cavity.
8.9 Installing a Feeder
This section describes the procedure and precautions for installing a feeder for the AAU.
8.10 Installing an AISG Multi-Wire Cable and an AISG Extension Cable
This section describes the procedures for installing an AISG multi-wire cable and an AISG
extension cable.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

43

AAU3902
Installation Guide

8 Installing AAU Cables

8.1 Cabling Requirements


Cables must be laid out according to the specified cabling requirements to prevent signal
interference.
NOTE

If a cable listed below is not required, skip the cabling requirements of the cable.

General Cabling Requirements


Bending radius requirements
l

The bending radius of a 7/8'' feeder must be greater than 250 mm (9.84 in.), and the bending
radius of a 5/4'' feeder must be greater than 380 mm (14.96 in.).

The bending radius of a 1/4'' jumper must be greater than 35 mm (1.38 in.). The bending
radius of a super-flexible 1/2'' jumper must be greater than 50 mm (1.97 in.), and the bending
radius of an ordinary 1/2'' jumper must be greater than 127 mm (5 in.).

The bending radius of a power cable or PGND cable must be at least three times its diameter.

The bending radius of a fiber optic cable is at least 20 times of its diameter, and the bending
radius of a breakout cable is at least 30 mm (1.18 in.).

The bending radius of an E1/T1 cable must be at least three times its diameter.

The bending radius of a signal cable must be at least five times its diameter.

Cable binding requirements


l

Cables of the same type must be bound together.

Different types of cables must be separately laid out and bound, with a minimum distance
of 30 mm (1.18 in.) from each other.

The cables must be bound tightly and neatly. The sheaths of the cables must not be damaged.

The cable ties must face the same direction, and those at the same horizontal line must be
in a straight line.

The excess of the indoor cable ties is cut off. The excess of 5 mm (0.197 in.) of the outdoor
cable ties is reserved, and the cut surfaces are smooth without sharp edges.

After cables are installed, labels or nameplates must be attached to the cables at their ends,
curves, and interconnection positions.

Security requirements
l

When routing cables, avoid sharp objects, for example sharp edges on the wall. If necessary,
use tubes to protect the cables.

When routing cables, keep the cables away from heat sources and use heat insulation
materials to insulate the cables from the heat sources.

Reserve a proper distance (0.1 m or 3.937 in. is recommended) between equipment and
cables especially at the cable curves to protect the cables and equipment.

Indoor cabling requirements


l
Issue 04 (2014-07-30)

Route each cable into the room through the feeder window.
Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.

44

AAU3902
Installation Guide

8 Installing AAU Cables

Reserve drip loops for all cables outside the feeder window before routing them into the
room. Ensure that the radiuses of the drip loops are greater than or equal to the minimum
bending radiuses of the cables.

When routing a cable into the room, ensure that a person is assisting you in the room.

Apply waterproof treatment to the feeder window.

Outdoor Cabling Requirements


l

Protect outdoor cables against potential damage. For example, put the cables through tubes.

The cables to be protected include AC power cables, transmission cables, and cables laid
out underground.

When routing cables through tubes on the ground below the cabinet, put a 30 mm to 50
mm (1.18 in. to 1.97 in.) length of the tubes into the base of the cabinet but do not put the
tubes into the cabinet. Use waterproof tape or waterproof silicon gel to block both ends of
the tubes and use sheet metal tabs to secure the tubes to the cable holes in the base.

When routing cables through tubes along a metal cable trough below the cabinet, do not
put the tubes into the base of the cabinet but cover the cable trough and connect the tubes
to the cable holes in the base.

Use clips to secure cables outdoors. For the method of installing a clip, see the installation
guide delivered with the clip.

Arrange cables neatly along the routing direction and use clips to secure the cables.

Determine the positions where the clips are installed according to the actual situation. For
example, 7/8" feeders are secured with clips at an interval of 1.5 m to 2 m (4.92 ft to 6.56
ft), CPRI fiber optic cables and power cables are secured with clips at an interval of 1 m
to 1.5 m (3.28 ft to 4.92 ft). Ensure that the clips are evenly spaced and in the same direction.

When fastening cables with a clip, ensure that the cables are aligned neatly and are routed
through the holes in the clip. Do not stretch the cables too tightly.
NOTE

There are two types of clips: 3-hole clip and 6-hole clip, which are described as follows:
l

A 3-hole clip is shown by illustration a in the following figure. It is often used to fasten feeders.

A 6-hole clip is shown by illustration b in the following figure. It is often used to fasten power cables and
CPRI fiber optic cables.

Figure 8-1 Exterior of the clips

(1) Cable hole for feeders

Issue 04 (2014-07-30)

(2) Cable hole for fiber optic cables

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

(3) Cable hole for power cables

45

AAU3902
Installation Guide

8 Installing AAU Cables

The following figure shows the cables secured on a cable tray.


Figure 8-2 Cables secured on a cable tray

(1) 3-hole clip

(2) 6-hole clip

The following figure shows the cables secured on a tower.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

46

AAU3902
Installation Guide

8 Installing AAU Cables

Figure 8-3 Cables secured on a tower

(1) 3-hole clip

(2) 6-hole clip

Special Cabling Requirements


Cabling of power cables
l

Power cables must be installed in the position specified in engineering design documents.

If the length of power cables is insufficient, replace the cables rather than adding connectors
or soldering joints to lengthen the cables.

Cables can only be laid out under well-planned instructions. The cabling activities of fiber
optic cables are allowed only when qualified personnel and communication facilities are
available.

Do not circle and twist cables.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

47

AAU3902
Installation Guide

8 Installing AAU Cables

After routing a DC power cable onto the platform on a tower, route it along the shortest
path to the rails surrounding the platform, and route it along the inside of the rails.

After routing a DC power cable close to the equipment on a tower, use clips to secure the
power cable onto a pole or the rails surrounding the platform. Ensure that there is no
excessively long distance between the equipment and the position where the power cable
is secured.

Cabling of PGND cables


l

PGND cables for a base station must be connected to the same group of ground bars.

PGND cables must be buried in the ground or routed indoors.

The external conductor of the coaxial wire and the shield layer of the shielded cable must
have proper electrical contact with the metal surface of the equipment to which they are
connected.

PGND cables and signal cables must be installed separately. A certain distance must be
reserved between them to prevent interference from each other.

Switches or fuses must not be installed on the PGND cables.

Other devices must not be used for electrical connections of the PGND cables.

All the metal parts in the housing of the equipment must be reliably connected to the ground
terminal.

Cabling of E1 cables
l

E1 cables must not cross power cables, PGND cables, or RF cables when laid out. If
transmission cables are laid out with power cables, PGND cables, or RF cables in parallel,
the spacing between them must be greater than 30 mm (1.18 in.).

E1 cables are lined up straight and bound neatly with cable ties.

Sufficient slack is provided for E1 cables at turns.

E1 cables must not be pressed by the door of the cabinet when routed, as shown in the
following figure.
Figure 8-4 E1 cables routed in the cabinet

Cabling of fiber optic cables


l

Issue 04 (2014-07-30)

At least three people are required for laying out fiber optic cables. The cabling activities
of fiber optic cables are allowed only when qualified personnel and communication
facilities are available.
Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.

48

AAU3902
Installation Guide

8 Installing AAU Cables

The operating temperature of fiber optic cables ranges from -40C to +60C (-40F to
+140F). If the actual temperature is beyond this range, take protective measures or select
another route.

Do not circle and twist cables.

Do not bind a fiber optic cable at the position where it bends.

Do not stretch, step on, or place heavy objects on fiber optic cables. Keep the fiber optic
cables away from sharp objects.

When fiber optic cables are routed, the excess of the fiber optic cables must be coiled around
special devices, such as a fiber coiler.

An unarmored fiber optic cable must be bound using binding straps. If a fiber optic patch
cord needs to be secured in a cabinet or a piece of equipment, use binding straps to bind it
and then use cable ties to secure the binding straps to the cabinet or equipment. Ensure that
the fiber optic cables can flexibly move in the cable ties. Do not bend the fiber optic cables
sharply. The following figure shows how to bind the fiber optic cables correctly.
Figure 8-5 Binding fiber optic cables

When coiling fiber optic cables, apply even strength. Do not bend the fiber optic cables
with force.

Unused optical connectors must be covered with dustproof caps.

The fiber optic cables must not be pressed by the door of the cabinet when routed, as shown
in the following figures.
Figure 8-6 CPRI fiber optic cables routed in the cabinet (1)

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

49

AAU3902
Installation Guide

8 Installing AAU Cables

Figure 8-7 CPRI fiber optic cables routed in the cabinet (2)

Figure 8-8 FE/GE fiber optic cables routed in the cabinet

After routing a fiber optic cable onto the platform on a tower, route it along the shortest
path to the rails surrounding the platform, and route it along the inside of the rails.

After routing a fiber optic cable close to the equipment on a tower, use clips to secure the
fiber optic cable onto a pole or the rails surrounding the platform. Ensure that there is no
excessively long distance between the equipment and the position where the cable is
secured.

Coil the excess of the fiber optic cables near the equipment on the tower before securing
the cables on the tower.

8.2 Cable Connections


This section describes the cable connections for a single AAU and multiple AAUs.

Cable Connections for a Single AAU


The following figure shows the cable connections for a single AAU.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

50

AAU3902
Installation Guide

8 Installing AAU Cables

Figure 8-9 Cable connections for a single AAU

Cable Connections for Multiple AAUs


The following figure shows the cable connections for multiple AAUs.
Figure 8-10 Cable connections for multiple AAUs

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

51

AAU3902
Installation Guide

8 Installing AAU Cables

8.3 Cable Installation Process


This section describes the cable installation process.
The cable installation process is shown in the following figure.
Figure 8-11 Cable installation process

8.4 Installing an AAU PGND Cable


This section describes the procedure for installing an AAU PGND cable.

Context
The following table lists the specifications of a PGND cable.
Table 8-1 Specifications of a PGND cable

Issue 04 (2014-07-30)

Cable

Connector at
One End (for
the External
Ground Bar)

Connector at
the Other End
(for the AAU)

Crosssectional Area

Color

PGND cable

OT terminal
(M8)

OT terminal
(M6)

16 mm2 (0.025
in.2)

Green and
yellow

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

52

AAU3902
Installation Guide

8 Installing AAU Cables

Procedure
Step 1 Prepare a PGND cable.
1.

Cut the cable to the length suitable for the actual cable route.

2.

Add OT terminals to both ends of the cable according to the instructions in Assembling the
OT Terminal and the Power Cable.

Step 2 Install the PGND cable.


1.

Secure the M6 OT terminal at one end of the PGND cable to the ground terminal on the
AAU to 4.8Nm (42.48 lbfin.), then secure the M8 OT terminal at the other end to the
external ground copper bar to 8 Nm (70.81 lbfin.), as shown in the following figure.
Figure 8-12 Installing the PGND cable

NOTE

Crimp the OT terminal in correct directions, as shown in the following figure.

Figure 8-13 Correct direction of an OT terminal

2.

Secure the M8 OT terminal at the other end of the PGND cable to an external ground bar.

Step 3 Label the installed cable according to the instructions in Attaching a Sign Plate Label.
----End
Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

53

AAU3902
Installation Guide

8 Installing AAU Cables

8.5 Opening the MU Cabling Cavity


This section describes the procedure and precautions for opening the MU cabling cavity.

Procedure
Step 1 Put on an ESD wrist strap or a pair of ESD gloves.

NOTICE
Take proper ESD protection measures, for example, put on an ESD wrist strap or a pair of ESD
gloves, to prevent electrostatic damage to the boards, modules, or other electronic components.
Step 2 Open an MU cabling cavity, as shown in the following figure.
1.

Use an M4 Phillips screwdriver to loosen the screw on the handle of the cabling cavity.

2.

Raise the handle and push the handle inwards to open the MU cabling cavity.

NOTICE
After the screw on the handle is loosened, the handle springs open. Push the handle from
the original position with an angle less than or equal to 60.

Figure 8-14 Opening a cabling cavity

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

54

AAU3902
Installation Guide

8 Installing AAU Cables

Step 3 Use an M4 Phillips screwdriver to loosen the screws on the corresponding cable clips and open
the cable clips, as shown in the following figure.
Figure 8-15 Opening the cable clips

Step 4 Remove the waterproof blocks for the cables.


----End

8.6 Installing a CPRI Fiber Optic Cable


This section describes the procedure and precautions for installing a CPRI fiber optic cable.

Context
l

A CPRI fiber optic cable transmits CPRI signals between a BBU and an AAU.

For details about CPRI fiber optic cable connections, see section "CPRI Cable Connections"
in DBS3900 Hardware Description.

Procedure
Step 1 Lower the pullers of two optical modules, insert one optical module into the CPRI0 port on the
AAU and the other one into the CPRI port on the BBU, and raise the pullers, as shown in the
following figure.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

55

AAU3902
Installation Guide

8 Installing AAU Cables

Figure 8-16 Installing an optical module

Step 2 Take out a CPRI fiber optic cable and cut off the traction cable at its end.
Step 3 Remove the protection bag and white cap.
Step 4 Insert one end of the CPRI fiber optic cable into the CPRI0 port on the AAU, as shown in the
following figure.
Figure 8-17 Installing a CPRI fiber optic cable

Step 5 Insert the other end of the fiber optic cable into the optical module on the BBU side.
Step 6 Lay out the cables according to the instructions in Cabling Requirements, and use cable ties to
bind them.
Step 7 Label the installed cables according to the instructions in Attaching an L-Shaped Label.
----End

8.7 Installing an AAU Power Cable


This section describes the procedure for installing an AAU power cable.

Context
The following figure shows the power cable diagram on the AAU.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

56

AAU3902
Installation Guide

8 Installing AAU Cables

Figure 8-18 Power cable diagram on the AAU

(1) Power cable diagram on the AAU

Procedure
Step 1 Add an EPC5 connector to one end of the AAU power cable according to the instructions in
Assembling the EPC5 Connector and the Power Cable, and add a connector to the other end of
the power cable depending on the external power equipment.
Step 2 Connect the EPC5 connector at one end of the AAU power cable to the PWR port on the AAU,
as shown in the following figure.
Figure 8-19 Installing an AAU power cable

Step 3 Connect the connector at other end of the AAU power cable to the corresponding port on the
power equipment.
NOTE

l One DCDU-11B can supply power to a maximum of six AAUs. The AAU power cable can be connected
to any wiring terminal from LOAD0 to LOAD5 on the DCDU-11B.
l The EPU can supply power to a maximum of six AAUs. The AAU power cable can be connected to
any of RRU0 to RRU5 ports on the EPU.

Step 4 Lay out the cables according to the instructions in Cabling Requirements, and use cable ties to
bind them.
Step 5 Label the installed cables according to the instructions in Attaching a Cable-Tying Label.
----End
Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

57

AAU3902
Installation Guide

8 Installing AAU Cables

8.8 Closing the MU Cabling Cavity


This section describes the procedure and precautions for closing the MU cabling cavity.

Procedure
Step 1 Close the cable clips for the installed cables. Use an M4 torque screwdriver to tighten the three
screws on each clip in the sequence shown in the following figure to 2 Nm (17.7 lbfin.).

NOTICE
Ensure that the exposed shield layer of a power cable is properly tightened using a cable clip.

Figure 8-20 Closing and tightening cable clips

Step 2 Insert waterproof blocks into vacant cable troughs in the cabling cavity, as shown in the following
figure.

NOTICE
The cables and waterproof blocks should be securely placed in the correct slots.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

58

AAU3902
Installation Guide

8 Installing AAU Cables

Figure 8-21 Correct placement of waterproof blocks

Step 3 Close the cabling cavity and press the handle. Use an M4 Phillips screwdriver to tighten the
screw on the handle to 2 Nm (17.7 lbfin.), as shown in the following figure.
Figure 8-22 Closing a cabling cavity

Step 4 Take off the ESD wrist strap or ESD gloves, and pack up all tools.
----End

8.9 Installing a Feeder


This section describes the procedure and precautions for installing a feeder for the AAU.

Procedure
Step 1 Connect one end of the feeder with a DIN male connector to the RF port on the AAU and tighten
the connector to 25 Nm (221.27 lbfin.), as shown in the following figure.
Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

59

AAU3902
Installation Guide

8 Installing AAU Cables

Figure 8-23 Installing a feeder

Step 2 Connect the other end of the feeder to the external RF module.
Step 3 Waterproof the connector of the feeder, as shown in the following figure.
Figure 8-24 Waterproofing the connector of the feeder

(1) Waterproof tape

Issue 04 (2014-07-30)

(2) Insulation tape

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

60

AAU3902
Installation Guide

8 Installing AAU Cables


NOTE

l Before wrapping waterproof tape, stretch the tape evenly until the length of the tape becomes twice its
original length.
l Do not stretch the PVC insulation tape when wrapping the PVC insulation tape.
l Wrap each layer of tape around the connector tightly and neatly, and ensure that each layer of tape overlaps
more than 50% of the preceding layer. Ensure that neighboring layers are stuck to each other.
l Ensure that the adhesive surface of the tape overlaps the lower layer.
l When cutting off the cable ties, reserve a redundant length of 3 mm (0.12 in.) to 5 mm (0.2 in.).

1.

Wrap three layers of waterproof tape on the connector. Start wrapping the connector at a
position 50 mm (1.97 in.) away from the bottom of the connector to the top of the connector,
first from bottom up, then from top down, and finally from bottom up. Cut off the redundant
tape after three layers are wrapped. Wrap each layer of tape around the connector tightly.

2.

Wrap three layers of PVC insulation tape. Start the wrapping at a position 30 mm (1.18 in.)
away below the bottom of the waterproof tape to the top of the connector, first from bottom
up, then from top down, and finally from bottom up. Cut off the redundant tape after three
layers are wrapped. Wrap each layer of tape around the connector tightly.

3.

Start binding cable ties to the cable at a position 3 mm (0.12 in.) to 5 mm (0.2 in.) away
from one end of the PVC insulation tape.

Step 4 Check the dustproof caps on antenna connectors. In outdoor scenarios, dustproof caps must be
waterproofed, as shown in the following figure.

NOTICE
Do not remove dustproof caps from vacant antenna connectors.

Figure 8-25 Waterproofing a dustproof cap

(1) Dustproof cap

(2) Waterproof tape

(3) Insulation tape

NOTE

l Before wrapping waterproof tape, stretch the tape evenly until the length of the tape is twice its original
length. Stretch and press the tape tightly to avoid wrinkles or spaces. Ensure that the tape is tightly wrapped
and stuck and will not fall off.
l When wrapping tape, ensure that each layer of tape overlaps more than 50% of the preceding layer.
l Ensure that the adhesive surface of the tape overlaps the lower layer.

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

61

AAU3902
Installation Guide

8 Installing AAU Cables

1.

Verify that dustproof caps are not removed.

2.

Wrap each connector with three layers of waterproof tape, first from bottom up, then from
top down, and finally from bottom up. Do not cut the tape until all the three layers of the
tape are already wrapped. Wrap each layer of tape around the connector tightly.

3.

Wrap each connector with three layers of insulation tape, first from bottom up, then from
top down, and finally from bottom up. Do not cut the tape until all the three layers of the
tape are already wrapped. Wrap each layer of tape around the connector tightly.

4.

Start binding cable ties to the cable at a position 3 mm (0.12 in.) to 5 mm (0.2 in.) away
from one end of the PVC insulation tape.

Step 5 Lay out the cables according to the instructions in Cabling Requirements, and use cable ties to
bind them.
Step 6 Label the installed cable according to the instructions in Attaching a Sign Plate Label.
Step 7 Attach the color-coding to the installed cable according to the instructions in Attaching the Color
Ring.
----End

8.10 Installing an AISG Multi-Wire Cable and an AISG


Extension Cable
This section describes the procedures for installing an AISG multi-wire cable and an AISG
extension cable.

Context
When the distance between the RET port at the bottom of an RRU and the AISG IN port at the
bottom of an AAU is longer than 5 m (16.4 ft), an AISG multi-wire cable cannot connect the
RRU and the AAU because it is not long enough. In this case, an AISG extension cable is used
to extend the AISG multi-wire cable.

Procedure
Step 1 Install an AISG multi-wire cable and an AISG extension cable.
l

Issue 04 (2014-07-30)

The following figure shows how to install an AISG multi-wire cable when an AISG
extension cable is not used.
1.

Connect one end of the AISG multi-wire cable with a standard AISG female connector
to the AISG IN port at the bottom of the AAU, and use a 19 mm (0.75 in.) torque
wrench to tighten the connector to 2 Nm (17.7 lbf in.).

2.

Use an M3 flat-head screwdriver to loosen the screws on the dustproof cap on the RET
port at the bottom of an RRU and remove the dustproof cap.

3.

Connect the other end of the AISG multi-wire cable with a waterproof DB9 connector
to the RET port at the bottom of the RRU, and use an M3 flat-head screwdriver to
tighten the screws on the waterproof DB9 connector to 0.4 Nm (3.54 lbf in.).
Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.

62

AAU3902
Installation Guide

8 Installing AAU Cables

Figure 8-26 Installing an AISG multi-wire cable

Issue 04 (2014-07-30)

The following figure shows how to install an AISG multi-wire cable and an AISG extension
cable.
1.

Connect one end of the AISG extension cable with a standard AISG female connector
to the AISG IN port at the bottom of the AAU, and use a 19 mm (0.75 in.) torque
wrench to tighten the connector to 2 Nm (17.7 lbf in.).

2.

Connect the other end of the AISG extension cable with a standard AISG male
connector to the standard female connector on the AISG multi-wire cable.

3.

Use an M3 flat-head screwdriver to loosen the screws on the dustproof cap on the RET
port at the bottom of an RRU and remove the dustproof cap.

4.

Connect the other end of the AISG multi-wire cable with a waterproof DB9 connector
to the RET port at the bottom of the RRU, and use an M3 flat-head screwdriver to
tighten the screws on the waterproof DB9 connector to 0.4 Nm (3.54 lbf in.).

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

63

AAU3902
Installation Guide

8 Installing AAU Cables

Figure 8-27 Installing an AISG multi-wire cable and an AISG extension cable

(1) AISG extension cable

(2) AISG multi-wire cable

Step 2 Waterproof the connectors on the AISG multi-wire cable.


Figure 8-28 Waterproofing the connectors on the AISG multi-wire cable

(1) Waterproof tape

Issue 04 (2014-07-30)

(2) PVC insulation tape

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

64

AAU3902
Installation Guide

8 Installing AAU Cables


NOTE

l Before wrapping the waterproof tape, stretch the tape evenly until the length of the tape is twice its original
length.
l Do not stretch the PVC insulation tape when wrapping it.
l Wrap each layer of tape around the connector tightly and neatly, and ensure that each layer of tape overlaps
more than 50% of the lower layer.
l Ensure that the adhesive surface of the tape overlaps the lower layer.
l Leave an extra length of 3 mm (0.118 in.) to 5 mm (0.197 in.) when cutting the extra part off the cable ties.

1.

Verify that dustproof caps are not removed.

2.

Wrap three layers of waterproof tape on the connector, first from bottom up, then from top
down, and finally from bottom up. Cut off the redundant tape after three layers are wrapped.
Wrap each layer of tape around the connector tightly.

3.

Wrap three layers of PVC insulation tape on the connector, first from bottom up, then from
top down, and finally from bottom up. Cut off the redundant tape after three layers are
wrapped. Wrap each layer of tape around the connector tightly.

4.

Start binding cable ties to the cable at a position 3 mm (0.118 in.) to 5 mm (0.197 in.) away
from one end of the PVC insulation tape.

Step 3 Lay out the cables according to the instructions in Cabling Requirements, and use cable ties to
bind them.
Step 4 Label the installed cables according to the instructions in Attaching an L-Shaped Label.
----End

Issue 04 (2014-07-30)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

65

AAU3902
Installation Guide

9 Installation Checklist

Installation Checklist

This chapter describes how to check the hardware installation after an AAU is installed.
The following table describes the AAU hardware installation checklist.
Table 9-1 AAU installation checklist

Issue 04 (2014-07-30)

No.

Item

The position for each device conforms to the engineering drawing and meets
clearance requirements. Sufficient space is reserved for equipment maintenance.

The AAU is securely installed.

Vacant RF ports are covered with waterproof caps and the caps are tightened.

There are no connectors or joints on each power cable or PGND cable.

The terminals at both ends of each power cable or PGND cable are securely soldered
or crimped.

None of power cables and PGND cables can be short-circuited or reversely


connected. In addition, these cables are not damaged or broken.

Power cables and PGND cables are separately bound from other cables.

The protection ground of the AAU and the surge protection ground of the building
share one group of ground body.

The connectors of each signal cable are intact and securely linked, and these cables
are not damaged or broken.

10

Labels are correct, legible, and complete at both ends of each cable, feeder, and
jumper.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

66

AAU3902
Installation Guide

10 Powering On an AAU

10

Powering On an AAU

This section describes the procedure for powering on an AAU.

NOTICE
An AAU must be powered on within 24 hours after being unpacked. During maintenance, the
power-off time of an AAU cannot exceed 24 hours.
The following figure shows the procedure for powering on an AAU.
Figure 10-1 Powering on an AAU